Anda di halaman 1dari 1

project title :

CADANGAN UNTUK MENDIRIKAN:-


FASA 1 :
i) 1 BLOK ASRAMA PEKERJA (69 UNIT)
5-TINGKAT HAK MILIK TUNGGAL (BLOK A)
ii) 1 BLOK ASRAMA PEKERJA (79 UNIT)
5-TINGKAT HAK MILIK TUNGGAL (BLOK B)
iii) 1 BLOK BANGUNAN KEMUDAHAN 2-TINGKAT
iv) 1 UNIT RUMAH PAM 1-TINGKAT
v) 1 UNIT PENCAWANG ELEKTRIK TNB
vi) 1 UNIT PUSAT PENGUMPULAN SAMPAH DAN
KITAR SEMULA 1-TINGKAT
FASA 2 :
i) 2 BLOK ASRAMA PEKERJA (118 UNIT)
5-TINGKAT HAK MILIK TUNGGAL (BLOK C & D)
ii) 1 BLOK ASRAMA PEKERJA (69 UNIT)
5-TINGKAT HAK MILIK TUNGGAL (BLOK E)

DI ATAS SEBAHAGIAN LOT 1377, 1690 DAN 1692,


MUKIM 12, JALAN NAFIRI, SUNGAI BAKAP,
SEBERANG PERAI SELATAN, PULAU PINANG.

UNTUK :-
TETUAN GUH CENTRALISED DORMITORY SDN. BHD.
PELAN KEBENARAN MERANCANG NO. MBSP/70/30-72/31 B.1 YANG TELAH
DILULUSKAN PADA TARIKH 16 OKTOBER 2020

architect :

DB-C
aLM a r c h i t e c t s
1-04-31, e-Gate, Lebuh Tunku Kudin 2, 117OO Gelugor, Penang, Malaysia
Tel O4-656687O Fax O4-6566871 Email : alm@alm-architects.com

m&e engineer :

5-4-11, HUNZA COMPLEX, JALAN GANGSA, GREENLANE, 11600 JELUTONG, PENANG.


| P : 04 - 668 9001 | F : 04 - 668 9003 | E : admin@ghtag.com |

drawing title :

ELECTRICAL INSTALLATION
FASA 1 & 2 - ASRAMA PEKERJA BLOK A TO E
- TYPICAL UNIT
- TABLE OF ELECTRICAL LEGENDS & POINTS
- SCHEMATIC SINGLE LINE

project no : drawing no :

J920 GTC/J920/EL12
approved by :
teh k b.

PELAN LANTAI checked by :


foong c s.
drawn by :
adelin
KELUASAN LANTAI : 100 M.P. (1,076 K.P.) date : dwg. scale :
21 Jun 2021 1:75 (A1)
SKALA : 1 : 100
printed on :
8-Jul-21 7:32 PM
rev. :
preliminary dwg. tender dwg.

construction dwg. contract dwg. A

Anda mungkin juga menyukai