PERKIRAAN HARGA SATUAN DASAR KOTA BESAR DI INDONESIA


JURNAL DATABASE HARGA SATUAN (BIDANG IV CIPTA KARYA)
20/03/2023 13:32:31

Provinsi : Ibukota : UMP:


10 Lampung Bandar Lampung Rp 3,251,702

DATABASE BIDANG CIPTA KARYA (STD IV)

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
DAFTAR HARGA DASAR UPAH KERJA
1 Pekerja L.4.001 oh 105,300
2 Pekerja penganyam L.4.002 oh 105,300
3 Pekerja pengisi batu L.4.003 oh 105,300
4 Teknisi sampling kualitas air L.4.004 oh 132,900
5 Buruh Kasar L.4.005 oh 98,700
6 Tukang Atap L.4.006 oh 159,300
7 Tukang batu L.4.007 oh 157,900
8 Tukang Besi L.4.008 oh 159,300
9 Tukang Besi Konstruksi L.4.009 oh 157,900
10 Tukang cat L.4.010 oh 144,800
11 Tukang ereksi L.4.011 oh 144,800
12 Tukang Pancang L.4.012 oh 144,800
13 Tukang Kayu/Bekisting L.4.013 oh 144,800
14 Tukang gambar L.4.014 oh 184,300
15 Tukang Interior L.4.015 oh 184,300
16 Tukang Kayu L.4.016 oh 157,900
17 Tukang Las L.4.017 oh 144,800
18 Tukang Las Konstruksi L.4.018 oh 144,800
19 Tukang Listrik L.4.019 oh 171,100
20 Tukang Pipa L.4.020 oh 144,800
21 Tukang Plafon L.4.021 oh 144,800
22 Tukang Prodo L.4.022 oh 171,100
23 Tukang Ukir L.4.023 oh 144,800
24 Tukang vibrator L.4.024 oh 144,800
25 Tukang Bor L.4.025 oh 144,800
26 Tukang cat dan tulis *) L.4.026 oh 144,800
27 Tukang Jahit L.4.027 oh 144,800
28 Tukang Las biasa L.4.028 oh 144,800
29 Tukang Las Listrik L.4.029 oh 144,800
30 Tukang penganyam L.4.030 oh 144,800
31 Tukang Gali L.4.031 oh 134,300
32 Tukang gali sumur L.4.032 oh 135,600
33 Direktur Kontraktor (Pemberi Tugas) L.4.033 oh 315,800
34 Supervisor (Staf Kontraktor) L.4.034 oh 263,200
35 Mandor L.4.035 oh 236,900
36 Kepala Tukang L.4.036 oh 197,400
37 Operator alat berat L.4.037 oh 144,800
38 Operator Alat Pipa L.4.038 oh 144,800
39 Operator crane L.4.039 oh 144,800
40 Supir truck L.4.040 oh 144,800
41 Supir kendaraan < 2 ton (termasuk sedan) L.4.041 oh 144,800
42 Kenek L.4.042 oh 131,600
43 Pembantu operator crane L.4.043 oh 131,600
44 Operator Alat Pipa Ahli L.4.044 oh 131,600
45 Pembantu Operator Alat Pipa L.4.045 oh 131,600

www.mitra-arsitek.com Price CK 1/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
46 Operator Alat Elektronik L.4.046 oh 138,200
47 Operator Pompa L.4.047 oh 138,200
48 Operator printer L.4.048 oh 138,200
49 Operator Tripod/Crane *) L.4.049 oh 138,200
50 Operator, driver speedboat L.4.050 oh 138,200
51 Ahli madya (sipil/hidrologi) L.4.051 oh 236,900
52 Ahli madya geologist L.4.052 oh 236,900
53 Engineer (sipil/geologi)/ahli madya L.4.053 oh 236,900
54 Ahli Alat Berat L.4.054 oh 236,900
55 Ahli K3 L.4.055 oh 236,900
56 Dokter L.4.056 oh 236,900
57 Perawat L.4.057 oh 236,900
58 Juru Ukur L.4.058 oh 236,900
59 Asisten Ahli Ukur L.4.059 oh 197,400
60 Penjaga malam/Satpam L.4.060 oh 131,600
61 Tukang gambar Drafter L.4.061 oh 197,400
62 Desain Engineer L.4.062 oh 263,200
63 Operator komputer/printer/ploter L.4.063 oh 131,600

DAFTAR HARGA DASAR PERALATAN


64 Alat Bantu/Perlengkapan Umum T.4.001 Ls 283,100
65 Alat Rangka Atap Baja Canai Dingin T.4.002 Ls 454,500
66 Assesoris (perkuatan, las dll) T.4.003 Ls 175,400
67 Bahan Kerja Paving Blok T.4.004 Ls 210,000
68 Bahan Pasang Dinding Bata Ringan T.4.005 Ls 235,200
69 Bahan potong pipa T1/manual (gergaji) /saw T.4.006 hari 235,200
70 Bahan potong pipa T2/mekanik / cilinder T.4.007 hari 728,000
71 Mobile crane =< 3 ton T.4.008 hari 1,018,500
72 Penjaga jarak bekisting / spacer T.4.009 bh 4,900
73 Peralatan Pasang Dinding Bata Ringan T.4.010 Ls 264,600
74 Perancah kayu T.4.011 m3 1,431,000
75 Perlengkapan T.4.012 Ls 262,500
76 Perlengkapan Badkip T.4.013 Ls 159,000
77 Perlengkapan Bak T.4.014 Ls 162,000
78 Perlengkapan Kloset T.4.015 Ls 151,500
79 Perlengkapan Pipa T.4.016 Ls 151,500
80 Perlengkapan Urinoir T.4.017 Ls 147,000
81 Perlengkapan Wastafel T.4.018 Ls 154,500
82 Scafolding T.4.019 sewa-unit 25,300
83 Sewa alat las T.4.020 Jam 168,000
84 Sewa alat perakitan baja T.4.021 Jam 72,800
85 Sewa alat Perakitan Baja IWF T.4.022 Jam 68,300
86 Sewa alat ukur T.4.023 hr 69,600
87 Sewa crane T.4.024 unit hari 1,293,600
88 Sewa excavator type 225 kap 0,5 -1,0 m3 T.4.025 hari 1,808,100
89 Sewa Genset 1500 watt T.4.026 hari 343,400
90 Sewa pipe support T.4.027 Buah hari 316,800
91 Sewa Pompa Submersible 3m3/h T.4.028 hari 287,000
92 Sewa Tripot/Tackel & handle crane 2 T T.4.029 hari 467,800
93 Sewa Perlengkapan Gerinda T.4.030 jam 44,600
94 Sewa mesin gerinda potong T.4.031 hari 132,500
95 Rol Cat T.4.032 hari 24,800

DAFTAR HARGA DASAR MATERIAL


96 Air M.4.001 Ltr 700
97 Air test (air bersih) M.4.002 m3 52,000
98 Alang-alang M.4.003 Ikat 600
99 Alkasit M.4.004 kg 44,600

www.mitra-arsitek.com Price CK 2/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
100 Bata ringan tebal 7,5 cm M.4.005 m3 3,073,100
101 Bata berongga M.4.006 bh 1,800
102 Bata merah M.4.007 Bh 1,000
103 Bata pelapis Dinding 3cm x 7cm x 24cm M.4.008 Bh 800
104 Bata rooster M.4.009 bh 800
105 Batako M.4.010 bh 4,500
106 Batu alam / tempel M.4.011 m2 287,900
107 Batu apung M.4.012 kg 32,400
108 Batu belah M.4.013 m3 277,800
109 Batu granit M.4.014 Kg 16,800
110 Batu paras M.4.015 m2 88,000
111 Serbuk Batu M.4.016 kg 4,900
112 Batu pecah 2/3 M.4.017 m3 374,200
113 Batu teraso M.4.018 Kg 2,400
114 Ijuk M.4.019 m3 205,800
115 Kapur M.4.020 m3 378,300
116 Kapur padam M.4.021 m3 90,600
117 Kapur Pasang M.4.022 m3 534,100
118 Kapur sirih M.4.023 Kg 13,800
119 Kerikil M.4.024 m3 256,200
120 Kerikil (kg) M.4.025 kg 200
121 Koral beton M.4.026 m3 242,500
122 Mortar siap pakai M.4.027 Kg 11,500
123 Pasir beton M.4.028 m3 291,900
124 Pasir Beton (kg) M.4.029 kg 300
125 Pasir pasang M.4.030 m3 224,700
126 Pasir Silika M.4.031 Kg 2,400
127 Pasir urug M.4.032 M3 265,500
128 Semen M.4.033 Kg 2,000
129 Semen grout M.4.034 Kg 1,600
130 Semen nat M.4.035 Kg 9,200
131 Semen Warna M.4.036 Kg 2,600
132 Sirtu M.4.037 m3 255,800
133 Tanah Liat M.4.038 m3 139,300
134 Tanah urug M.4.039 m3 194,300
135 Tepung gypsum M.4.040 kg 4,100
136 Bambu Ø 6 - 8 / 600 cm M.4.041 btg 29,100
137 Dolken kayu Ø 8-10/400 cm M.4.042 btg 25,000
138 List kayu 2/4 M.4.043 m3 5,500,000
139 List kayu profil M.4.044 m 3,100
140 Plepet kayu M.4.045 m1 2,200
141 Kayu cetakan M.4.046 m2 151,500
142 Reng 2 x 3 cm Kayu Kelas II M.4.047 m3 3,104,000
143 Reng bengkirai 2/3 M.4.048 m1 4,800
144 Reng bengkirai 3/4 M.4.049 m1 9,200
145 Reng jati (lokal) 2/3 M.4.050 m1 6,300
146 Reng jati (lokal) 3/4 M.4.051 m1 13,100
147 Reng jati 3/4 (klas 1) M.4.052 m1 16,300
148 Reng kamper 2/3 M.4.053 m1 4,200
149 Reng kamper 3/4 M.4.054 m1 9,200
150 Reng kruing 2/3 M.4.055 m1 3,800
151 Reng kruing 3/4 M.4.056 m1 7,600
152 Kaso 5/7 Kelas II M.4.057 m3 3,675,000
153 Kaso 5/7 ( albasiah/meranti ) M.4.058 m3 3,465,000
154 Kaso-kaso (5 x 7) cm bengkirai M.4.059 m3 6,437,500
155 Kaso-kaso (5 x 7) cm jati lokal M.4.060 m3 11,100,000
156 Kaso-kaso (5 x 7) cm kamper M.4.061 m3 6,972,000
157 Kaso-kaso (5 x 7) cm kruing M.4.062 m3 4,410,000

www.mitra-arsitek.com Price CK 3/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
158 Kayu Kaso 5 / 7 (borneo) M.4.063 btg 70,200
159 Kayu Kaso 5 / 7 (borneo/meranti) M.4.064 m3 3,395,000
160 Kayu kruing 5/7 M.4.065 m3 4,590,000
161 Usuk kayu bengkirai 5/7 M.4.066 m1 22,800
162 Usuk kayu jati (lokal) 5/7 M.4.067 m1 37,000
163 Usuk kayu jati 5/7 (klas 1) M.4.068 m1 42,300
164 Usuk kayu kamper 5/7 M.4.069 m1 24,600
165 Usuk kayu kruing 5/7 M.4.070 m1 15,500
166 Usuk Kayu meranti 5/7 Kelas III M.4.071 m3 2,625,000
167 Balok kayu 8/15 Kelas I M.4.072 m3 7,875,000
168 Balok kayu bengkirai M.4.073 m3 6,375,000
169 Balok Kayu Borneo M.4.074 m3 3,640,000
170 Balok kayu jati (klas plitur) M.4.075 m3 10,878,000
171 Balok kayu jati (lokal) M.4.076 m3 9,919,000
172 Balok kayu kamper M.4.077 m3 6,723,000
173 Balok kayu kelas II M.4.078 m3 3,780,000
174 Balok kayu kruing M.4.079 m3 4,725,000
175 Balok kayu papan (klas plitur) M.4.080 m3 6,305,000
176 Balok kayu, 6 x 12 M.4.081 m3 4,590,000
177 Kayu balok 5/7 Kelas II M.4.082 m3 2,507,000
178 Kayu balok 5/7 kelas III M.4.083 m3 2,142,000
179 Kayu balok borneo M.4.084 M3 3,465,000
180 Kayu bengkirai balok M.4.085 m3 6,750,000
181 Kayu glugu balok M.4.086 m3 1,712,000
182 Kayu jati (klas plitur) balok M.4.087 m3 10,260,000
183 Kayu jati (lokal) balok M.4.088 m3 8,025,000
184 Kayu kamper balok M.4.089 m3 6,411,800
185 Kayu kelas II balok M.4.090 M3 3,180,000
186 Kayu kruing balok M.4.091 m3 5,040,000
187 Kayu bengkirai papan M.4.092 m3 6,437,500
188 Kayu jati (lokal) papan M.4.093 m3 9,595,000
189 Kayu jati papan M.4.094 m3 9,880,000
190 Kayu jati papan (klas 1) M.4.095 m3 10,878,000
191 Kayu kamper papan M.4.096 m3 6,660,800
192 Kayu kelas III (papan) M.4.097 m3 2,525,000
193 Kayu kruing papan M.4.098 m3 4,455,000
194 Kayu Papan 3 / 20 borneo/meranti M.4.099 m3 3,640,000
195 Kayu papan 3/20 M.4.100 m3 3,850,000
196 Kayu Papan kelas I M.4.101 M3 6,598,500
197 Kayu Papan kelas II M.4.102 m3 3,885,000
198 Kayu papan kelas III M.4.103 m3 2,650,000
199 Papan cetakan M.4.104 m3 1,760,000
200 Papan kayu 3/20 Kelas II M.4.105 m3 3,217,500
201 Papan kayu 3/20 Kelas III M.4.106 m3 1,854,000
202 Papan kayu bengkirai M.4.107 m3 6,750,000
203 Papan Kayu Borneo tebal 3cm M.4.108 m3 3,395,000
204 Papan kayu jati (klas plitur) M.4.109 m3 9,785,000
205 Papan kayu jati (lokal) M.4.110 m3 10,450,000
206 Papan kayu kamper M.4.111 m3 6,474,000
207 Papan kayu kelas II M.4.112 m3 3,640,000
208 Papan kayu kruing M.4.113 m3 4,545,000
209 Ram kayu bengkirai M.4.114 m3 5,145,000
210 Ram kayu jati (lokal) M.4.115 m3 8,400,000
211 Ram kayu kamper M.4.116 m3 5,486,300
212 Ram kayu kruing M.4.117 m3 3,605,000
213 Alluminium B M.4.118 Kg 24,800
214 Alluminium C M.4.119 Kg 25,600
215 Aluminium Composite Panel M.4.120 Lbr 309,100

www.mitra-arsitek.com Price CK 4/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
216 Aluminium foil M.4.121 M2 31,700
217 Aluminium strip M.4.122 m 26,200
218 Alumunium gel tbl 0,55 M.4.123 Lbr 142,100
219 Baja Ringan- Reng Truss M.4.124 M' 12,300
220 Baja Ringan-C Truss M.4.125 m1 21,700
221 Baja Siku M.4.126 Kg 15,800
222 Baja WF M.4.127 Kg 18,200
223 Baja strip (0,2 x 2) cm M.4.128 Kg 13,900
224 Baut (Srew driver) M.4.129 bh 500
225 Baut Ramset / Dina Bolt M.4.130 bh 4,900
226 Besi angkur Ø=8 mm M.4.131 Kg 13,600
227 Besi beton M.4.132 Kg 13,500
228 Besi hollow 50.50.3 M.4.133 Kg 21,300
229 Besi IWF M.4.134 Kg 9,800
230 Besi lis kaca (1 x 1) cm M.4.135 m 48,600
231 Besi plat baja M.4.136 Kg 11,100
232 Besi Profil M.4.137 Kg 15,600
233 Besi rangka M.4.138 kg 1,700
234 Besi siku L 30.30.3 M.4.139 Kg 13,700
235 Besi square tube M.4.140 m 28,700
236 Hollow 4/4 M.4.141 M1 13,200
237 Kait angin M.4.142 Bh 5,800
238 Kawat beton M.4.143 Kg 31,400
239 Kawat burung M.4.144 m2 15,900
240 Kawat dia 4 mm M.4.145 kg 38,000
241 Kawat duri M.4.146 M’ 19,400
242 Kawat harmonika M.4.147 m2 42,900
243 Kawat jaring M.4.148 Lbr 114,400
244 Kawat kassa M.4.149 m2 12,500
245 Kawat las listrik M.4.150 Kg 45,900
246 Kawat las gas M.4.151 Kg 46,800
247 Kawat nyamuk M.4.152 m2 13,400
248 Kawat penggantung M.4.153 m1 600
249 Pagar kawat jaring M.4.154 lbr 36,100
250 Paku 5 - 10 cm M.4.155 kg 25,400
251 Paku anti karat M.4.156 kg 22,800
252 Paku Biasa ½" - 1" M.4.157 Kg 24,300
253 Paku Biasa 2" - 5" M.4.158 Kg 26,800
254 Paku eternit M.4.159 kg 20,100
255 Paku gypsum M.4.160 kg 19,300
256 Paku Hak Panjang 15cm M.4.161 Kg 10,800
257 Paku Pancing 60 x 230 M.4.162 Kg 12,600
258 Paku plepet M.4.163 kg 16,700
259 Paku reng M.4.164 kg 17,700
260 Paku sekrup M.4.165 bh 900
261 Paku sekrup 3,5" M.4.166 Kg 13,400
262 Paku skrup 1 cm – 2,5 cm M.4.167 bh 600
263 Paku skrup 10 cm M.4.168 kg 14,200
264 Paku skrup 5 cm M.4.169 kg 17,000
265 Paku sumbat M.4.170 bh 500
266 Paku tripleks M.4.171 kg 20,200
267 Paku usuk M.4.172 kg 16,800
268 Paku/skrup atap anti karat M.4.173 bh 1,200
269 Pintu alluminium M.4.174 m 468,000
270 Pintu alumunium M.4.175 m2 235,100
271 Pintu gulung besi M.4.176 m2 555,500
272 Profil Alluminium "T" M.4.177 m 13,300
273 Profil kusen alluminium M.4.178 m1 129,600

www.mitra-arsitek.com Price CK 5/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
274 Rel pintu dorong M.4.179 Set 216,000
275 Rolling door alluminium M.4.180 m2 566,800
276 Screening M.4.181 Kg 2,700
277 Screw M.4.182 bh 600
278 Sekrup fixer M.4.183 bh 300
279 Sunscreen alumunium M.4.184 m2 272,500
280 Bak cuci piring M.4.185 Unit 421,400
281 Bak fiberglass M.4.186 Unit 342,400
282 Bak mandi teraso M.4.187 bh 187,900
283 Bathcuip M.4.188 Unit 2,667,500
284 Floor drain M.4.189 Unit 63,000
285 Klem Pipa M.4.190 bh 1,700
286 Kloset duduk / monoblock M.4.191 Unit 2,475,000
287 Kloset jongkok porselen M.4.192 bh 166,500
288 Kloset jongkok teraso M.4.193 Unit 272,500
289 Kran air M.4.194 M 25,800
290 L.Bow M.4.195 bh 10,600
291 Pipa Beton M.4.196 Bh 57,800
292 Pipa Conduit M.4.197 M' 5,500
293 Pipa tanah M.4.198 Bh 48,900
294 Socket Pipa M.4.199 bh 15,700
295 Urinoir M.4.200 Unit 1,358,000
296 Wastafel M.4.201 Unit 1,479,000
297 Waterdrain M.4.202 Bh 76,000
298 Pipa PVC 1/2" M.4.203 M 4,300
299 Pipa PVC 3/4" M.4.204 M 5,400
300 Pipa PVC 1” M.4.205 M 5,900
301 Pipa PVC 11/2” M.4.206 M 6,400
302 Pipa PVC 2” M.4.207 M 7,200
303 Pipa PVC 21/2” M.4.208 M 7,800
304 Pipa PVC 3" M.4.209 m1 7,900
305 Pipa PVC 3” M.4.210 M 9,600
306 Pipa PVC 4" M.4.211 M 9,200
307 Pipa galvanis ½” M.4.212 M 22,700
308 Pipa galvanis 3/4” M.4.213 M 25,300
309 Pipa galvanis 1” M.4.214 M 41,200
310 Pipa galvanis 11/2” M.4.215 M 79,100
311 Pipa galvanis 3” M.4.216 M 103,000
312 Pipa galvanis 4” M.4.217 M 131,400
313 Pipa Baja Ø 63 mm M.4.218 m 225,000
314 Pipa Baja Ø 100 mm M.4.219 m 393,800
315 Pipa Baja Ø 125 mm M.4.220 m 206,300
316 Pipa Baja Ø 150 mm M.4.221 m 131,500
317 Pipa Baja Ø 200 mm M.4.222 m 237,600
318 Pipa Baja Ø 250 mm M.4.223 m 280,400
319 Pipa Baja Ø 300 mm M.4.224 m 337,100
320 Pipa Baja Ø 400 mm M.4.225 m 407,400
321 Pipa Baja Ø 450 mm M.4.226 m 490,900
322 Pipa Baja Ø 500 mm M.4.227 m 588,000
323 Pipa Baja Ø 600 mm M.4.228 m 622,300
324 Pipa Baja Ø 800 mm M.4.229 m 898,800
325 Pipa Baja Ø 900 mm M.4.230 m 1,039,500
326 Pipa Baja Ø 1000 mm M.4.231 m 1,320,000
327 Pipa Baja Ø 1100 mm M.4.232 m 1,250,000
328 Pipa Baja Ø 1200 mm M.4.233 m 1,339,000
329 Pipa DCI Ø 100 mm M.4.234 m 135,700
330 Pipa DCI Ø 125 mm M.4.235 m 206,000
331 Pipa DCI Ø 150 mm M.4.236 m 343,000

www.mitra-arsitek.com Price CK 6/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
332 Pipa DCI Ø 200 mm M.4.237 M 566,500
333 Pipa DCI Ø 250 mm M.4.238 M 781,800
334 Pipa DCI Ø 300 mm M.4.239 m 1,092,000
335 Pipa DCI Ø 400 mm M.4.240 m 2,520,000
336 Pipa DCI Ø 450 mm M.4.241 m 2,940,000
337 Pipa DCI Ø 500 mm M.4.242 m 3,520,000
338 Pipa DCI Ø 600 mm M.4.243 m 3,528,000
339 Pipa DCI Ø 800 mm M.4.244 m 4,896,000
340 Pipa DCI Ø 900 mm M.4.245 m 5,457,000
341 Pipa DCI Ø 1000 mm M.4.246 m 6,300,000
342 Pipa DCI Ø 1100 mm M.4.247 m 6,955,000
343 Pipa DCI Ø 1200 mm M.4.248 m 8,030,000
344 Pipa GIP Ø 63 mm M.4.249 m 148,500
345 Pipa GIP Ø 100 mm M.4.250 m 245,300
346 Pipa GIP Ø 125 mm M.4.251 m 283,900
347 Pipa GIP Ø 150 mm M.4.252 m 347,300
348 Pipa GIP Ø 200 mm M.4.253 m 432,200
349 Pipa GIP Ø 250 mm M.4.254 m 584,400
350 Pipa GIP Ø 300 mm M.4.255 m 688,000
351 Pipa GIP Ø 400 mm M.4.256 m 864,400
352 Pipa GIP Ø 450 mm M.4.257 m 1,061,800
353 Pipa GIP Ø 500 mm M.4.258 m 1,124,600
354 Pipa GIP Ø 600 mm M.4.259 m 1,362,700
355 Pipa GIP Ø 800 mm M.4.260 m 1,834,600
356 Pipa GIP Ø 900 mm M.4.261 m 2,083,800
357 Pipa GIP Ø 1000 mm M.4.262 m 2,271,200
358 Pipa GIP Ø 1100 mm M.4.263 m 2,498,300
359 Pipa GIP Ø 1200 mm M.4.264 m 2,831,300
360 Pipa HDPE Ø 63 mm M.4.265 m 58,300
361 Pipa HDPE Ø 100 mm M.4.266 m 126,500
362 Pipa HDPE Ø 125 mm M.4.267 m 249,900
363 Pipa HDPE Ø 150 mm M.4.268 m 322,700
364 Pipa HDPE Ø 200 mm M.4.269 m 625,300
365 Pipa HDPE Ø 250 mm M.4.270 m 983,900
366 Pipa HDPE Ø 300 mm M.4.271 m 1,702,400
367 Pipa HDPE Ø 400 mm M.4.272 m 2,442,200
368 Pipa HDPE Ø 450 mm M.4.273 m 3,338,700
369 Pipa HDPE Ø 500 mm M.4.274 m 3,885,000
370 Pipa HDPE Ø 600 mm M.4.275 bh 6,600,000
371 Pipa HDPE Ø 800 mm M.4.276 m 9,396,000
372 Pipa HDPE Ø 900 mm M.4.277 m 10,584,000
373 Pipa HDPE Ø 1000 M.4.278 bh 11,760,000
374 Pipa HDPE Ø 1000 mm M.4.279 m 12,190,000
375 Pipa HDPE Ø 1100 M.4.280 bh 11,550,000
376 Pipa HDPE Ø 1100 mm M.4.281 m 11,385,000
377 Pipa HDPE Ø 1200 mm M.4.282 m 12,625,000
378 Pipa Ø 80 mm M.4.283 bh 56,300
379 Pipa Ø 100 mm M.4.284 bh 89,900
380 Pipa Ø 150 mm M.4.285 bh 92,200
381 Pipa Ø 200 mm M.4.286 bh 188,700
382 Pipa Ø 250 mm M.4.287 bh 213,400
383 Pipa Ø 300 mm M.4.288 bh 262,700
384 Pipa Ø 400 mm M.4.289 bh 367,800
385 Pipa Ø 450 mm M.4.290 bh 449,900
386 Pipa Ø 500 mm M.4.291 bh 509,800
387 Pipa Ø 600 mm M.4.292 bh 646,800
388 Pipa Ø 700 mm M.4.293 bh 692,600
389 Pipa Ø 800 mm M.4.294 bh 873,600

www.mitra-arsitek.com Price CK 7/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
390 Pipa PVC Ø 63 mm M.4.295 m 82,200
391 Pipa PVC Ø 90 mm M.4.296 m 99,000
392 Pipa PVC Ø 110 mm M.4.297 m 145,200
393 Pipa PVC Ø 150 mm M.4.298 m 176,600
394 Pipa PVC Ø 200 mm M.4.299 m 354,300
395 Pipa PVC Ø 250 mm M.4.300 m 457,900
396 Pipa PVC Ø 300 mm M.4.301 m 779,100
397 Pipa PVC Ø 400 mm M.4.302 m 1,433,200
398 Pipa PVC Ø 450 mm M.4.303 m 1,696,000
399 Pipa PVC Ø 500 mm M.4.304 m 2,461,000
400 Pipa PVC Ø 600 mm M.4.305 m 3,888,000
401 Pipa PVC Ø 800 mm M.4.306 m 5,243,000
402 Pipa PVC Ø 900 mm M.4.307 m 6,386,000
403 Pipa PVC Ø 1000 mm M.4.308 m 8,025,000
404 Pipa PVC Ø 1100 mm M.4.309 m 8,712,000
405 Pipa PVC Ø 1200 mm M.4.310 m 10,504,000
406 Tee Ø 150 mm M.4.311 bh 165,000
407 Tee Ø 200 mm M.4.312 bh 198,000
408 Tee Ø 250 mm M.4.313 bh 277,500
409 Tee Ø 300 mm M.4.314 bh 324,000
410 Tee Ø 400 mm M.4.315 bh 378,000
411 Tee Ø 450 mm M.4.316 bh 388,000
412 Tee Ø 500 mm M.4.317 bh 436,500
413 Tee Ø 600 mm M.4.318 bh 520,000
414 Tee Ø 700 mm M.4.319 bh 550,000
415 Tee Ø 800 mm M.4.320 bh 660,000
416 Tee Ø 900 mm M.4.321 bh 721,500
417 Tee Ø 1000 mm M.4.322 bh 721,000
418 Tee Ø 1100 mm M.4.323 bh 825,000
419 Tee Ø 1200 mm M.4.324 bh 832,000
420 Valve Ø 150 mm M.4.325 bh 5,936,000
421 Valve Ø 200 mm M.4.326 bh 7,035,000
422 Valve Ø 250 mm M.4.327 bh 10,070,000
423 Valve Ø 300 mm M.4.328 bh 13,038,000
424 Valve Ø 400 mm M.4.329 bh 16,157,000
425 Valve Ø 450 mm M.4.330 bh 17,363,000
426 Valve Ø 500 mm M.4.331 bh 20,907,000
427 Valve Ø 600 mm M.4.332 bh 25,850,000
428 Valve Ø 700 mm M.4.333 bh 27,352,000
429 Valve Ø 800 mm M.4.334 bh 29,100,000
430 Valve Ø 900 mm M.4.335 bh 34,133,000
431 Valve Ø 1000 mm M.4.336 bh 38,517,000
432 Valve Ø 1100 mm M.4.337 bh 40,875,000
433 Valve Ø 1200 mm M.4.338 bh 43,927,000
434 Akustik Uk. 60 cm x 120 cm M.4.339 Lbr 134,400
435 Akustik ukuran 30 x 30 cm M.4.340 Lbr 34,300
436 Akustik ukuran 30 x 60 cm M.4.341 Lbr 58,900
437 Asbes semen M.4.342 m2 85,600
438 Asbes 1,00 x 1,00 m M.4.343 lbr 26,900
439 Asbes Gelombang M.4.344 lbr 121,000
440 Asbes gelombang 92x250 M.4.345 Lbr 111,300
441 Asbes plat M.4.346 m2 37,100
442 Asbes semen tebal 4 mm M.4.347 m2 20,300
443 Asbes semen tebal 5 mm M.4.348 m2 22,300
444 Asbes semen tebal 6 mm M.4.349 m2 25,000
445 Bilik bambu M.4.350 m2 81,800
446 Formika M.4.351 Lbr 99,000
447 Gymfloor M.4.352 m2 137,000

www.mitra-arsitek.com Price CK 8/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
448 Gypsum board 9 mm M.4.353 lbr 85,300
449 Kalsiboard 3.5 mm M.4.354 lbr 70,400
450 Karpet M.4.355 m2 66,700
451 List profil cornees gypsum M.4.356 m1 28,400
452 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) M.4.357 M' 33,400
453 Multiplek M.4.358 lbr 88,400
454 Parquet kayu M.4.359 m2 15,000
455 Parquet kayu gymfloor M.4.360 m2 307,400
456 Phel film 12mm M.4.361 Lbr 145,000
457 Plafond PVC M.4.362 m2 116,700
458 Plastic aerator M.4.363 Bh 35,000
459 Polycarbonat M.4.364 m2 163,000
460 Plywood 120x240 tbl. 4 mm M.4.365 Lbr 77,100
461 Plywood 120x240 tbl. 6 mm M.4.366 Lbr 81,600
462 Plywood 120x240 tbl. 9 mm M.4.367 Lbr 120,000
463 Seng Gelombang 3" x 6" BJLS 28 M.4.368 Lbr 49,500
464 Seng Gelombang BJLS 32 M.4.369 lbr 126,500
465 Teakwood 4 mm 90 x 220 cm M.4.370 Lbr 62,100
466 Teakwood 4 mm, 120 x 240 M.4.371 Lbr 78,400
467 Tripleks M.4.372 Lbr 38,200
468 underlayer (pelapis bawah karpet) M.4.373 m2 29,100
469 Wallpaper M.4.374 m 39,200
470 Cat alkali resisting primer M.4.375 kg 34,300
471 Cat antara M.4.376 Kg 49,100
472 Cat Besi M.4.377 Kg 50,000
473 Cat dasar M.4.378 kg 27,500
474 Cat dasar Besi M.4.379 Kg 34,500
475 Cat dasar Kayu M.4.380 Kg 33,500
476 Cat dasar Tembok M.4.381 Kg 65,700
477 Cat duco M.4.382 kg 70,200
478 Cat emco M.4.383 kg 41,200
479 Cat ICI Weathershield M.4.384 kg 67,200
480 Cat kayu M.4.385 kg 54,900
481 Cat meni M.4.386 Kg 18,100
482 Cat Penutup Tembok M.4.387 Kg 38,500
483 Dempul M.4.388 Kg 42,000
484 Flincoat M.4.389 kg 39,300
485 Kuas M.4.390 Bh 18,700
486 Meni ( Read Lead ) A M.4.391 Kg 36,800
487 Meni ( Read Lead ) B M.4.392 Kg 35,000
488 Meni besi M.4.393 Ltr 32,100
489 Menie A M.4.394 Kg 35,100
490 Menie B M.4.395 Kg 38,600
491 Menie besi M.4.396 Kg 29,500
492 Minyak cat M.4.397 kg 37,800
493 Pengencer M.4.398 Kg 36,400
494 Plamir M.4.399 Kg 59,200
495 Politur M.4.400 L 36,100
496 Teak oil M.4.401 L 16,900
497 Tinner M.4.402 ltr 42,600
498 Vernis M.4.403 L 126,500
499 Vinyl M.4.404 Bh 20,600
500 Hospital plint M.4.405 bh 12,900
501 keramik artistik 10cm x 10cm atau 5cm x 20cm M.4.406 Bh 2,800
502 keramik artistik 10cm x 20cm M.4.407 m2 84,000
503 keramik Dinding 10cm x 20cm M.4.408 m2 90,100
504 keramik Dinding 20cm x 20cm M.4.409 m2 63,200
505 Keramik Dinding artistik M.4.410 m2 68,000

www.mitra-arsitek.com Price CK 9/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
506 Keramik mozaik ukuran 30cm x 30cm M.4.411 Bh 12,200
507 Keramik ukuran 20cm x 20cm M.4.412 Bh 5,000
508 keramik ukuran 30cm x 30cm M.4.413 Bh 5,900
509 keramik ukuran 33cm x 33cm M.4.414 Bh 7,700
510 List keramik dinding motif M.4.415 bh 11,700
511 Marmer M.4.416 m2 454,500
512 marmer ukuran 100cm x 100cm M.4.417 Bh 62,700
513 Mosaik M.4.418 m2 205,800
514 Plint internal cove artistik 5cm x 5cm x 20cm M.4.419 Bh 5,100
515 Plint keramik artistik M.4.420 bh 11,300
516 Plint keramik ukuran 10cm x 10cm M.4.421 Bh 5,600
517 Plint keramik ukuran 10cm x 20cm M.4.422 Bh 6,700
518 Plint keramik ukuran 5cm x 20cm M.4.423 Bh 5,100
519 Plint Ubin M.4.424 bh 3,600
520 Plint ubin granit M.4.425 bh 13,000
521 Plint ubin granit ukuran 10cm x 30cm M.4.426 Bh 14,600
522 Plint ubin granit ukuran 10cm x 40cm M.4.427 Bh 15,600
523 Plint ubin keramik 10 x 30 cm M.4.428 bh 4,600
524 Plint ubin keramik 10 x 40 cm M.4.429 bh 6,300
525 Plint ubin Pc abu-abu ukuran 10cm x 30cm M.4.430 Bh 5,300
526 Plint ubin Pc abu-abu ukuran 10cm x 40cm M.4.431 Bh 5,900
527 Plint ubin Pc abu-abu ukuran 15cm x 20cm M.4.432 Bh 6,500
528 Plint ubin PC warna M.4.433 bh 5,400
529 Plint ubin teralux kerang M.4.434 bh 5,900
530 Plint ubin teralux kerang ukuran 10cm x 30cm M.4.435 Bh 6,600
531 Plint ubin teralux kerang ukuran 10cm x 40cm M.4.436 Bh 7,700
532 Plint ubin teralux marmer M.4.437 bh 13,400
533 Plint ubin teralux marmer ukuran 10cm x 30cm M.4.438 Bh 13,600
534 Plint ubin teralux marmer ukuran 10cm x 40cm M.4.439 Bh 15,500
535 plint ubin teralux marmer ukuran 10cm x 60cm M.4.440 Bh 17,000
536 Plint ubin teraso M.4.441 bh 4,800
537 Plint ubin teraso ukuran 10cm x 30cm M.4.442 Bh 5,000
538 Plint ubin teraso ukuran 10cm x 40cm M.4.443 Bh 7,500
539 Plint ubin warna ukuran 10cm x 20cm M.4.444 Bh 4,700
540 Plint ubin warna ukuran 10cm x 30cm M.4.445 Bh 5,500
541 Plint ubin warna ukuran 10cm x 40cm M.4.446 Bh 7,100
542 plint vynil 15cm x 30cm M.4.447 Bh 28,000
543 Porselen M.4.448 m2 144,500
544 Porselen (11 x 11) cm M.4.449 Bh 6,600
545 Porselen Dinding 10x20 M.4.450 Bh 5,400
546 Porselen Dinding 20x20 M.4.451 Bh 7,500
547 Print outdoor flexi M.4.452 m2 55,100
548 Stepnosing granito M.4.453 bh 11,800
549 Ubin abu-abu M.4.454 m2 36,400
550 Ubin granit M.4.455 m2 319,200
551 ubin granit ukuran 30cm x30cm M.4.456 Bh 16,800
552 ubin granit ukuran 40cm x40cm M.4.457 Bh 20,000
553 Ubin keramik M.4.458 Bh 10,700
554 Ubin keramik artistik M.4.459 m2 56,000
555 ubin PC abu-abu ukuran 20cm x20 cm M.4.460 Bh 3,100
556 ubin PC abu-abu ukuran 30cm x30 cm M.4.461 Bh 4,900
557 ubin PC abu-abu ukuran 40cm x40cm M.4.462 Bh 6,800
558 Ubin porselen M.4.463 Bh 6,900
559 ubin teralux marmer ukuran 40cm x40cm M.4.464 Bh 12,000
560 ubin teralux ukuran 30cm x30cm M.4.465 Bh 15,400
561 Ubin teralux kerang M.4.466 m2 75,700
562 Ubin teralux marmer M.4.467 m2 291,900
563 ubin teralux marmer ukuran 30cm x30cm M.4.468 Bh 33,400

www.mitra-arsitek.com Price CK 10/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
564 ubin teralux marmer ukuran 40cm x40cm M.4.469 Bh 38,200
565 ubin teralux marmer ukuran 60cm x60cm M.4.470 Bh 44,600
566 Ubin teraso M.4.471 m2 142,100
567 ubin teraso ukuran 30cm x30cm M.4.472 Bh 13,500
568 ubin teraso ukuran 40cm x40cm M.4.473 Bh 17,300
569 Ubin warna M.4.474 m2 110,000
570 ubin warna ukuran 20cm x20cm M.4.475 Bh 11,300
571 ubin warna ukuran 30cm x30cm M.4.476 Bh 13,400
572 ubin warna ukuran 40cm x40 cm M.4.477 Bh 16,100
573 Atap Alluminium Gelombang tebal 0.55 M.4.478 m2 161,700
574 Atap metal gelombang t 0.35 mm M.4.479 m2 66,100
575 Bubung stel gel. M.4.480 Lbr 15,600
576 Bubungan gent.krmk KIA natural M.4.481 bh 28,400
577 Bubungan genteng beton warna M.4.482 bh 24,000
578 Bubungan genteng paris M.4.483 bh 21,900
579 Genteng aspal M.4.484 Bh 2,800
580 Genteng beton M.4.485 Bh 2,700
581 Genteng beton natural M.4.486 bh 3,100
582 Genteng beton Warna M.4.487 bh 3,000
583 Genteng bubung M.4.488 Bh 4,900
584 Genteng Bubung Kodok M.4.489 bh 1,700
585 Genteng Bubung Palentong M.4.490 bh 2,100
586 Genteng keramik KIA natural M.4.491 bh 6,900
587 Genteng kodok M.4.492 Bh 1,500
588 Genteng metal M.4.493 Bh 38,500
589 Genteng palentong M.4.494 Bh 2,700
590 Genteng Palentong Super M.4.495 bh 3,800
591 Genteng paris M.4.496 bh 900
592 Genteng Sirap M.4.497 lbr 4,400
593 nok genteng aspal M.4.498 Bh 26,300
594 nok genteng beton M.4.499 Bh 15,300
595 Nok Genteng Decra Bond M.4.500 lbr 68,900
596 nok genteng metal M.4.501 Bh 88,900
597 Nok metal M.4.502 bh 72,600
598 Nok Paten M.4.503 Lbr 42,800
599 Nok standar 40 cm 18, swg 22 M.4.504 m2 90,800
600 Nok standar 40x18 M.4.505 Bh 6,300
601 Nok Stel Gelombang M.4.506 lbr 80,700
602 Nok Stel rata M.4.507 lbr 60,500
603 Roof Light Fiberglass M.4.508 lbr 150,500
604 Rooflight 90x180 M.4.509 Lbr 120,000
605 Sirap kayu M.4.510 Bh 2,600
606 Talang / Jurai Canai Dingin M.4.511 M' 49,100
607 Fitting Lampu M.4.512 bh 25,800
608 Kabel NYM 3x2,5 mm2 M.4.513 m 21,200
609 Klem Pipa Listrik M.4.514 bh 800
610 Las Dop M.4.515 bh 1,000
611 Mongkok (Listrik) M.4.516 bh 1,500
612 Saklar (standar) M.4.517 bh 38,900
613 Tee Doos M.4.518 bh 1,500
614 Pipa listrik 5/8” M.4.519 btg 12,500
615 Kaca buram 12 mm M.4.520 m2 166,500
616 Kaca cermin 5 mm M.4.521 m2 167,100
617 Kaca cermin 8 mm M.4.522 m2 232,700
618 Kaca patri 5mm M.4.523 m2 83,300
619 Kaca polos M.4.524 m2 113,300
620 Kaca tebal 3mm M.4.525 m2 88,200
621 Kaca tebal 5 mm M.4.526 m2 121,200

www.mitra-arsitek.com Price CK 11/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
622 Kaca tebal 8 mm M.4.527 m2 190,900
623 Kaca wire glass M.4.528 m2 232,700
624 Profil kaca M.4.529 m 66,300
625 Bahan teraso cor M.4.530 m3 980,000
626 Beton 1:2:3 M.4.531 M3 1,332,000
627 Beton kedap air M.4.532 m3 298,000
628 Buis beton D. 80 cm M.4.533 bh 68,900
629 Conblock M.4.534 m2 6,300
630 Hollow Block 10 M.4.535 bh 7,300
631 Hollow Block 15 M.4.536 bh 6,800
632 Hollow Block 20 M.4.537 bh 10,700
633 Kasa gypsum M.4.538 roll 501,800
634 Kolom beton pracetak M.4.539 btg 209,700
635 Panel Beton Pracetak M.4.540 Lbr 165,000
636 Paving block 8 cm berwarna M.4.541 M2 119,900
637 Paving block 6 cm M.4.542 M2 132,300
638 Paving block 6cm berwarna M.4.543 M2 135,200
639 Paving block 8 cm natural M.4.544 M2 3,700
640 Roster 25/25 cm M.4.545 bh 14,700
641 Teraso cor di tempat, tebal 3cm M.4.546 M3 4,600
642 Terawang (roster) M.4.547 bh 8,500
643 Amplas M.4.548 Lbr 6,700
644 Bahan Bakar M.4.549 Ltr 9,900
645 Bahan Kimia M.4.550 Ltr 46,300
646 Batu Gerinda M.4.551 bh 74,300
647 Lem M.4.552 kg 15,500
648 Lem kayu M.4.553 Kg 12,900
649 Lem Putih M.4.554 Kg 15,300
650 Lem vinyl M.4.555 kg 21,600
651 Minyak bekisting M.4.556 Ltr 5,800
652 Minyak pelumas M.4.557 Ltr 36,100
653 Oli M.4.558 Ltr 38,500
654 Perekat M.4.559 Kg 45,900
655 Residu M.4.560 Ltr 8,700
656 Sabun M.4.561 Kg 12,400
657 Soda api M.4.562 Kg 47,300
658 Solar M.4.563 L 9,100
659 Gas Oxigen M.4.564 Tbg 1,511,800
660 Gas Aceteline M.4.565 Tbg 1,961,000
661 Kawat Solder (Timah) M.4.566 kg 910,000
662 Kawat Brazing (Kuningan) M.4.567 kg 1,064,000
663 Door closer M.4.568 set 272,500
664 Door holder M.4.569 Bh 101,900
665 Door stop M.4.570 Bh 106,900
666 Engsel angin M.4.571 Bh 7,900
667 Engsel jendela M.4.572 bh 10,100
668 Engsel kupu-kupu M.4.573 Bh 21,600
669 Engsel pintu M.4.574 Bh 18,600
670 Jendela besi M.4.575 m2 808,500
671 Jendela naco M.4.576 Bh 26,300
672 Jendela nako (rangka + kaca 5 mm) M.4.577 m2 59,400
673 Serat Semen M.4.578 lbr 90,100
674 Kunci lemari M.4.579 Set 12,600
675 Kunci silinder M.4.580 Bh 74,300
676 Kunci slot M.4.581 Bh 54,000
677 Kunci tanam antik M.4.582 Bh 270,000
678 Kunci tanam biasa M.4.583 Bh 143,000
679 Kunci tanam KM M.4.584 Bh 48,500

www.mitra-arsitek.com Price CK 12/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:47 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
680 Pintu lipat M.4.585 m2 510,000
681 Badkip M.4.586 bh 15,200
682 Floor hardener M.4.587 Kg 4,000
683 Grassblock M.4.588 m2 49,100
684 Gebalan Rumput M.4.589 m2 29,400
685 Internal cove M.4.590 bh 7,300
686 Jaring kawat baja dilas M.4.591 kg 11,700
687 Kalkarium M.4.592 Kg 5,300
688 Kerta karbon M.4.593 lbr 4,100
689 Kertas 100 x 100 cm M.4.594 lb 6,300
690 Lantai kerja tebal 10cm M.4.595 m3 787,500
691 Pengelasan M.4.596 cm 4,600
692 Prodo M.4.597 m2 3,000,000
693 Sealant M.4.598 Tube 239,800
694 Sealtape M.4.599 bh 3,700
695 Spring knip M.4.600 Bh 8,200
696 Strorox - 100 M.4.601 kg 43,000
697 Tali ijuk M.4.602 Kg 26,000
698 Underlayer irubber corrugated M.4.603 m2 97,300
699 Venetions blinds dan vertical blinds (tirai) M.4.604 m2 72,800
700 Waterstop lebar 150 mm M.4.605 m 78,000
701 Waterstop lebar 200 mm M.4.606 m 77,600
702 Waterstop lebar 230 mm - 320 mm M.4.607 m 93,100
703 Upah Kerja Mobiliasasi/Demobilisasi M.4.608 Ls 891,000
704 Alat Kerja Mobilisasi/Demobilisasi M.4.609 Ls 441,000
705 Bahan Kerja Mobilisasi/Demobilisasi M.4.610 Ls 280,000
706 Upah Kerja Pembuatan Septik Tank M.4.611 Ls 1,500,000
707 Alat Kerja Pembuatan Septik Tank M.4.612 Ls 499,500
708 Bahan Kerja Pembuatan Septik Tank M.4.613 Ls 6,500,000
709 Upah Kerja Pembuatan Sumur Resapan Limbah M.4.614 Ls 1,122,000
710 Alat Kerja Pembuatan Sumur Resapan Limbah M.4.615 Ls 350,000
711 Bahan Kerja Pembuatan Sumur Resapan Limbah M.4.616 Ls 4,590,000
712 Biaya Pengurusan Daya Listrik PLN M.4.617 Ls 5,390,000
713 Biaya Pengurusan Instalasai PDAM M.4.618 Ls 2,450,000
714 Shower Mandi M.4.619 Unit 136,400
715 Tangki Air M.4.620 Unit 1,337,500
716 Pompa Air M.4.621 Unit 612,000
717 Pintu Utama (Kusen+Panel) Type P1 M.4.622 set 2,058,000
718 Pintu Utama (Kusen+Panel) Type P2 M.4.623 set 1,792,000
719 Pintu Utama (Kusen+Panel) Type P3 M.4.624 set 1,100,000
720 Jendela Type J1 M.4.625 set 999,600
721 Jendela Type J2 M.4.626 set 588,000
722 Jendela Type J3 M.4.627 set 2,575,000
723 Lubang Angin M.4.628 Unit 27,800
724 MCB + Box M.4.629 Unit 381,500
725 Tembaga dia.1/2"-1.5m M.4.630 btg 663,000
726 Kabel NYM 3x2,5 mm2-SNI M.4.631 m1 13,200
727 Kabel NYM 2x1,5 mm2-SNI M.4.632 m1 11,100
728 Saklar Listrik M.4.633 unit 28,000
729 Lampu 5W M.4.634 unit 24,300
730 Lampu 15W M.4.635 unit 37,500
731 Lampu 20W M.4.636 unit 48,200
732 Receiptackle M.4.637 unit 33,000
733 Air Conditioner M.4.638 unit 3,456,000
734 Exhaust Fan M.4.639 unit 795,000
735 Cat Anti Bocor+Waterproofing M.4.640 kg 17,400
736 Pohon Perdu M.4.641 unit 495,000

www.mitra-arsitek.com Price CK 13/275


Aplikasi DataPro Premium v23.0 (Full).xlsx

DAFTAR ANALISA UTAMA


Analisa Harga Satuan Pekerjaan Sesuai Acuan PUPERA Tahun 2016 Bidang IV CIPTA KARYA
PERMEN PUPERA NO 28 Tahun 2016 Bidang Cipta Karya
20/03/2023 13:32:31
STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.2.2.1.1. P-001 1.00 m2 (K3) Pembuatan pagar sementara dari kayu tinggi 2 meter 312,870 0.64 . 82,386 - 230,484
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
5.00 Kg Semen 10,000 M.4.033 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral beton 2,183 M.4.026 . . .
0.07 m3 Kayu balok 5/7 Kelas II 180,504 M.4.082 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
0.40 Ltr Residu 3,480 M.4.560 . . .
A.2.2.1.2 P-002 1.00 m2 (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
388,755 0.64 . 92,906 - 295,849
0.20 OH Pekerja 21,060 L.4.001 . . .
0.40 OH Tukang Kayu 63,160 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
2.50 Kg Semen 5,000 M.4.033 . . .
1.20 Lbr Seng Gelombang 3" x 6" BJLS 28 59,400 M.4.368 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral beton 2,183 M.4.026 . . .
0.07 m3 Kayu balok 5/7 Kelas II 180,504 M.4.082 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
0.45 Ltr Meni besi 14,445 M.4.393 . . .
A.2.2.1.3. P-003 1.00 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter 596,366 0.54 . 77,116 - 519,250
0.20 OH Pekerja 21,060 L.4.001 . . .
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
1.00 btg Dolken kayu Ø 8-10/400 cm 25,000 M.4.042 . . .
2.00 Kg Semen 4,000 M.4.033 . . .
25.00 M’ Kawat duri 485,000 M.4.146 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral beton 2,183 M.4.026 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
A.2.2.1.4. P-004 1.00 m1 Pengukuran dan pemasangan Bouwplank 87,049 0.22 . 29,479 - 57,570
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 30,084 M.4.082 . . .
0.02 Kg Paku Biasa 2" - 5" 536 M.4.158 . . .

www.mitra-arsitek.com 14/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu papan 3/20 26,950 M.4.100 . . .
A.2.2.1.5. P-005 1.00 m2 (K3) Pembuatan kantor sementara lantai plesteran 1,507,354 5.35 . 755,365 - 751,989
2.00 OH Pekerja 210,600 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
1.00 OH Tukang batu 157,900 L.4.007 . . .
0.30 OH Kepala Tukang 59,220 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
0.18 m3 Kayu balok 5/7 Kelas II 451,260 M.4.082 . . .
0.08 Kg Paku Biasa 2" - 5" 2,144 M.4.158 . . .
1.10 Kg Baja strip (0,2 x 2) cm 15,290 M.4.128 . . .
35.00 Kg Semen 70,000 M.4.033 . . .
0.15 m3 Pasir pasang 33,705 M.4.030 . . .
0.10 m3 Pasir beton 29,190 M.4.028 . . .
0.15 m3 Koral beton 36,375 M.4.026 . . .
30.00 Bh Bata merah 30,000 M.4.007 . . .
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 12,375 M.4.368 . . .
0.20 Bh Jendela naco 5,260 M.4.576 . . .
0.08 m2 Kaca polos 9,064 M.4.524 . . .
0.15 Bh Kunci tanam biasa 21,450 M.4.583 . . .
0.06 Lbr Plywood 120x240 tbl. 4 mm 4,626 M.4.365 . . .
A.2.2.1.6. P-006 1.00 m2 (K3) Pembuatan rumah jaga (konstruksi kayu ) 1,439,645 2.70 . 383,605 - 1,056,040
1.00 OH Pekerja 105,300 L.4.001 . . .
1.50 OH Tukang Kayu 236,850 L.4.016 . . .
0.15 OH Kepala tukang 29,610 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.4.042 . . .
0.28 m3 Papan kayu 3/20 Kelas II 888,030 M.4.105 . . .
0.70 Kg Paku Biasa 2" - 5" 18,760 M.4.158 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 74,250 M.4.368 . . .
A.2.2.1.7. P-007 1.00 m2 (K3) Pembuatan gudang semen dan bahan 1,327,147 3.25 . 472,425 - 854,722
1.00 OH Pekerja 105,300 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
0.20 OH Kepala Tukang 39,480 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.70 btg Dolken kayu Ø 8-10/400 cm 42,500 M.4.042 . . .
0.21 m3 Papan kayu 3/20 Kelas II 675,675 M.4.105 . . .
0.30 Kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
10.50 Kg Semen 21,000 M.4.033 . . .
0.03 m3 Pasir beton 8,757 M.4.028 . . .
0.05 m3 Koral beton 12,125 M.4.026 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 74,250 M.4.368 . . .
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 12,375 M.4.368 . . .
A.2.2.1.8. P-008 1.00 m2 (K3) Pembuatan bedeng pekerja 1,345,387 3.25 . 472,425 - 872,962
1.00 OH Pekerja 105,300 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
0.20 OH Kepala Tukang 39,480 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
0.19 m3 Papan kayu 3/20 Kelas II 598,455 M.4.105 . . .

www.mitra-arsitek.com 15/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 Kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
18.00 Kg Semen 36,000 M.4.033 . . .
0.03 m3 Pasir beton 8,757 M.4.028 . . .
0.05 m3 Koral beton 12,125 M.4.026 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 74,250 M.4.368 . . .
1.35 Lbr Plywood 120x240 tbl. 4 mm 104,085 M.4.365 . . .
A.2.2.1.9. P-009 1.00 m2 (K3) Pembersihan lapangan dan perataan 22,375 0.15 . 22,375 - -
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
A.2.2.1.10. P-010 1.00 m2 (K3) Pembuatan steger/perancah dari bambu 513,636 3.25 . 472,425 - 41,211
1.00 OH Pekerja 105,300 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
0.20 OH Kepala Tukang 39,480 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.25 btg Bambu Ø 6 - 8 / 600 cm 36,375 M.4.041 . . .
0.19 Kg Tali ijuk 4,836 M.4.602 . . .
A.2.2.1.11. P-011 1.00 m2 Pembuatan kotak adukan ukuran 40cm x50cm x25cm 195,818 0.33 . 53,292 - 142,526
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.03 OH Kepala Tukang 5,922 L.4.036 . . .
0.04 m3 Kayu papan kelas III 95,400 M.4.103 . . .
0.02 m3 Kayu balok 5/7 kelas III 44,982 M.4.083 . . .
0.08 kg Paku Biasa 2" - 5" 2,144 M.4.158 . . .
A.2.2.1.12. P-012 1.00 m2 Pembuatan jalan sementara 184,080 1.01 . 106,485 - 77,595
1.00 OH Pekerja 105,300 L.4.001 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.15 m3 Batu belah 41,670 M.4.013 . . .
0.09 m3 Batu pecah 2/3 33,678 M.4.017 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
A.2.2.1.13. P-013 1.00 m2 Pembongkaran beton bertulang 298,182 2.00 . 298,182 - -
1.33 OH Pekerja 140,407 L.4.001 . . .
0.67 OH Mandor 157,775 L.4.035 . . .
A.2.2.1.14. P-014 1.00 m3 Pembongkaran dinding tembok bata 149,091 1.00 . 149,091 - -
0.67 OH Pekerja 70,204 L.4.001 . . .
0.33 OH Mandor 78,888 L.4.035 . . .
A.2.2.1.15. P-015 1.00 m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm 31,809 0.09 . 15,404 - 16,405
0.04 OH Pekerja 4,423 L.4.001 . . .
0.00 OH Tukang Besi 637 L.4.008 . . .
0.00 OH Kepala Tukang 395 L.4.036 . . .
0.04 OH Mandor 9,950 L.4.035 . . .
0.14 Lbr Kawat jaring 16,405 M.4.148 . . .
A.2.2.1.16. P-016 1.00 m2 Pemasangan panel beton pracetak 5x50x240 cm 485,883 0.53 . 66,095 - 419,788
0.38 OH Pekerja 39,488 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,501 L.4.035 . . .
0.99 Lbr Panel Beton Pracetak 162,690 M.4.540 . . .
0.53 btg Kolom beton pracetak 110,093 M.4.539 . . .
45.00 Kg Semen 90,000 M.4.033 . . .
0.07 m3 Pasir beton 21,601 M.4.028 . . .
0.15 m3 Koral beton 35,405 M.4.026 . . .

www.mitra-arsitek.com 16/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.2.3.1.1. P-017 1.00 m3 Penggalian tanah biasa sedalam 1 m 84,898 0.78 . 84,898 - -
0.75 OH Pekerja 78,975 L.4.001 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
A.2.3.1.2. P-018 1.00 m3 Penggalian tanah biasa sedalam 2 m 105,431 0.95 . 105,431 - -
0.90 OH Pekerja 94,770 L.4.001 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
A.2.3.1.3. P-019 1.00 m3 Menggali tanah biasa sedalam 3 m 126,437 1.12 . 126,437 - -
1.05 OH Pekerja 110,565 L.4.001 . . .
0.07 OH Mandor 15,872 L.4.035 . . .
A.2.3.1.4. P-020 1.00 m3 Menggali tanah keras sedalam 1 m 112,881 1.03 . 112,881 - -
1.00 OH Pekerja 105,300 L.4.001 . . .
0.03 OH Mandor 7,581 L.4.035 . . .
A.2.3.1.5. P-021 1.00 m3 Menggali tanah cadas sedalam 1 m 172,164 1.56 . 172,164 - -
1.50 OH Pekerja 157,950 L.4.001 . . .
0.06 OH Mandor 14,214 L.4.035 . . .
A.2.3.1.6. P-022 1.00 m3 Menggali tanah lumpur sedalam 1 m 137,021 1.25 . 137,021 - -
1.20 OH Pekerja 126,360 L.4.001 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
A.2.3.1.7. P-023 1.00 m2 Pengerjaan stripping tanah tebing setinggi 1 meter 6,450 0.06 . 6,450 - -
0.05 OH Pekerja 5,265 L.4.001 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.2.3.1.8. P-024 1.00 m3 (K3) Pembuangan tanah sejauh 30 meter 37,118 0.34 . 37,118 - -
0.33 OH Pekerja 34,749 L.4.001 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
A.2.3.1.9. P-025 1.00 m3 Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M 32,248 0.28 . 32,248 - -
0.25 OH Pekerja 26,325 L.4.001 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
A.2.3.1.10. P-026 1.00 m3 (K3) Pemadatan tanah tanah ( per 20 cm) 64,495 0.55 . 64,495 - -
0.50 OH Pekerja 52,650 L.4.001 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
A.2.3.1.11. P-027 1.00 m3 Pengurugan dengan pasir urug 352,559 0.31 . 33,959 - 318,600
0.30 OH Pekerja 31,590 L.4.001 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
1.20 M3 Pasir urug 318,600 M.4.032 . . .
A.2.3.1.12. P-028 1.00 m3 Pemasangan lapisan pudel campuran 1KP:3PP:7TL 447,255 1.32 . 174,248 - 273,007
0.80 OH Pekerja 84,240 L.4.001 . . .
0.40 OH Tukang Batu 63,160 L.4.007 . . .
0.04 OH Kepala Tukang 7,896 L.4.036 . . .
0.08 OH Mandor 18,952 L.4.035 . . .
0.14 m3 Kapur 51,071 M.4.020 . . .
0.40 m3 Pasir Pasang 89,880 M.4.030 . . .
0.95 m3 Tanah Liat 132,056 M.4.038 . . .
A.2.3.1.13. P-029 1.00 m3 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 1,254,149 0.17 . 19,349 - 1,234,800
0.15 OH Pekerja 15,795 L.4.001 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
6.00 m3 Ijuk 1,234,800 M.4.019 . . .
A.2.3.1.14. P-030 1.00 m3 Pengurugan sirtu padat 339,208 0.28 . 32,248 - 306,960
0.25 OH Pekerja 26,325 L.4.001 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
1.20 m3 Sirtu 306,960 M.4.037 . . .

www.mitra-arsitek.com 17/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.3.2.1.1. P-031 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 1,155,287 2.40 . 308,948 - 846,340
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
202.00 Kg Semen 404,000 M.4.033 . . .
0.49 m3 Pasir Pasang 108,980 M.4.030 . . .
A.3.2.1.2. P-032 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 4PP 1,085,152 2.40 . 308,948 - 776,204
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
163.00 Kg Semen 326,000 M.4.033 . . .
0.52 m3 Pasir Pasang 116,844 M.4.030 . . .
A.3.2.1.3. P-033 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 1,036,544 2.40 . 308,948 - 727,597
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
136.00 Kg Semen 272,000 M.4.033 . . .
0.54 m3 Pasir Pasang 122,237 M.4.030 . . .
A.3.2.1.4. P-034 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 6PP 1,002,364 2.40 . 308,948 - 693,417
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
117.00 Kg Semen 234,000 M.4.033 . . .
0.56 m3 Pasir Pasang 126,057 M.4.030 . . .
A.3.2.1.5. P-035 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 8PP 955,532 2.40 . 308,948 - 646,585
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
91.00 Kg Semen 182,000 M.4.033 . . .
0.58 m3 Pasir Pasang 131,225 M.4.030 . . .
A.3.2.1.6. P-036 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP 1,123,017 2.40 . 308,948 - 814,069
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
0.17 m3 Kapur 64,311 M.4.020 . . .
170.00 Kg Semen 340,000 M.4.033 . . .
0.34 m3 Pasir Pasang 76,398 M.4.030 . . .
A.3.2.1.7. P-037 1.00 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP 930,470 2.40 . 308,948 - 621,523

www.mitra-arsitek.com 18/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
61.00 Kg Semen 122,000 M.4.033 . . .
0.15 m3 Kapur 55,610 M.4.020 . . .
0.49 m3 Pasir Pasang 110,552 M.4.030 . . .
A.3.2.1.8. P-038 1.00 m3 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP 891,383 2.40 . 308,948 - 582,435
1.50 OH Pekerja 157,950 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
41.00 Kg Semen 82,000 M.4.033 . . .
0.13 m3 Kapur 49,557 M.4.020 . . .
0.52 m3 Pasir Pasang 117,518 M.4.030 . . .
A.3.2.1.9. P-039 1.00 m3 Pemasangan batu kosong (anstamping) 608,709 1.25 . 160,653 - 448,056
0.78 OH Pekerja 82,134 L.4.001 . . .
0.39 OH Tukang Batu 61,581 L.4.007 . . .
0.04 OH Kepala Tukang 7,699 L.4.036 . . .
0.04 OH Mandor 9,239 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
0.43 m3 Pasir urug 114,696 M.4.032 . . .
A.3.2.1.10. P-040 1.00 m3 (K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB
3,039,125
: 3 Kr dan 40%
4.51batu belah
. 549,287 - 2,489,838
3.40 OH Pekerja 358,020 L.4.001 . . .
0.85 OH Tukang Batu 134,215 L.4.007 . . .
0.09 OH Kepala Tukang 16,779 L.4.036 . . .
0.17 OH Mandor 40,273 L.4.035 . . .
0.48 m3 Batu belah 133,344 M.4.013 . . .
194.00 Kg Semen 388,000 M.4.033 . . .
0.31 m3 Pasir Beton 91,073 M.4.028 . . .
0.47 m3 Kerikil 119,902 M.4.024 . . .
126.00 Kg Besi beton 1,701,000 M.4.132 . . .
1.80 Kg Kawat beton 56,520 M.4.143 . . .
A.3.2.1.11. P-041 1.00 m3 Pemasangan pondasi sumuran, diameter 100 cm 1,147,008 3.40 . 423,023 - 723,984
2.40 OH Pekerja 252,720 L.4.001 . . .
0.80 OH Tukang Batu 126,320 L.4.007 . . .
0.08 OH Kepala Tukang 15,792 L.4.036 . . .
0.12 OH Mandor 28,191 L.4.035 . . .
0.45 m3 Batu belah 125,010 M.4.013 . . .
194.00 Kg Semen 388,000 M.4.033 . . .
0.31 m3 Pasir Beton 91,073 M.4.028 . . .
0.47 m3 Kerikil 119,902 M.4.024 . . .
A.4.1.1.1 P-042 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 1,347,357 2.04 . 242,357 - 1,105,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
247.00 kg Semen 494,000 M.4.033 . . .

www.mitra-arsitek.com 19/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
869.00 kg Pasir Beton (kg) 260,700 M.4.029 . . .
999.00 kg Kerikil (kg) 199,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.2 P-043 1.00 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 1,395,657 2.04 . 242,357 - 1,153,300
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
276.00 kg Semen 552,000 M.4.033 . . .
828.00 kg Pasir Beton (kg) 248,400 M.4.029 . . .
1,012.00 kg Kerikil (kg) 202,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.3 P-044 1.00 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 1,433,957 2.04 . 242,357 - 1,191,600
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
299.00 kg Semen 598,000 M.4.033 . . .
799.00 kg Pasir Beton (kg) 239,700 M.4.029 . . .
1,017.00 kg Kerikil (kg) 203,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.4 P-045 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
1,249,402 1.48 . 176,102 - 1,073,300
1.20 OH Pekerja 126,360 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.06 OH Mandor 14,214 L.4.035 . . .
230.00 kg Semen 460,000 M.4.033 . . .
893.00 kg Pasir Beton (kg) 267,900 M.4.029 . . .
1,027.00 kg Kerikil (kg) 205,400 M.4.025 . . .
200.00 Ltr Air 140,000 M.4.001 . . .
A.4.1.1.5. P-046 1.00 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c1,478,657
= 0,66 2.04 . 242,357 - 1,236,300
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
326.00 kg Semen 652,000 M.4.033 . . .
760.00 kg Pasir Beton (kg) 228,000 M.4.029 . . .
1,029.00 kg Kerikil (kg) 205,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.6 P-047 1.00 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, 1,522,357
w/c = 0,61 2.04 . 242,357 - 1,280,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
352.00 kg Semen 704,000 M.4.033 . . .
731.00 kg Pasir Beton (kg) 219,300 M.4.029 . . .
1,031.00 kg Kerikil (kg) 206,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.7. P-048 1.00 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm,1,553,657
w/c = 0,58 2.04 . 242,357 - 1,311,300
1.65 OH Pekerja 173,745 L.4.001 . . .

www.mitra-arsitek.com 20/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
371.00 kg Semen 742,000 M.4.033 . . .
698.00 kg Pasir Beton (kg) 209,400 M.4.029 . . .
1,047.00 kg Kerikil (kg) 209,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.8. P-049 1.00 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, 1,576,257
w/c = 0,56 2.04 . 242,357 - 1,333,900
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
384.00 kg Semen 768,000 M.4.033 . . .
692.00 kg Pasir Beton (kg) 207,600 M.4.029 . . .
1,039.00 kg Kerikil (kg) 207,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.9. P-050 1.00 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm,1,615,257
w/c = 0,53 2.04 . 242,357 - 1,372,900
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
406.00 kg Semen 812,000 M.4.033 . . .
684.00 kg Pasir Beton (kg) 205,200 M.4.029 . . .
1,026.00 kg Kerikil (kg) 205,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.10. P-051 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm,1,627,357
w/c = 0,52 2.04 . 242,357 - 1,385,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
413.00 kg Semen 826,000 M.4.033 . . .
681.00 kg Pasir Beton (kg) 204,300 M.4.029 . . .
1,021.00 kg Kerikil (kg) 204,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.11. P-052 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm,1,738,879
w/c = 0,49 2.59 . 308,179 - 1,430,700
2.10 OH Pekerja 221,130 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.11 OH Mandor 24,875 L.4.035 . . .
439.00 kg Semen 878,000 M.4.033 . . .
670.00 kg Pasir Beton (kg) 201,000 M.4.029 . . .
1,006.00 kg Kerikil (kg) 201,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.12. P-053 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm,1,754,779
w/c = 0,48 2.59 . 308,179 - 1,446,600
2.10 OH Pekerja 221,130 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.11 OH Mandor 24,875 L.4.035 . . .
448.00 kg Semen 896,000 M.4.033 . . .
667.00 kg Pasir Beton (kg) 200,100 M.4.029 . . .

www.mitra-arsitek.com 21/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1,000.00 kg Kerikil (kg) 200,000 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.12. P-053a 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), campuran bahan kimia
1,963,129 2.59 . 308,179 - 1,654,950
2.10 OH Pekerja 221,130 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.11 OH Mandor 24,875 L.4.035 . . .
448.00 kg Semen 896,000 M.4.033 . . .
667.00 kg Pasir Beton (kg) 200,100 M.4.029 . . .
1,000.00 kg Kerikil (kg) 200,000 M.4.025 . . .
4.50 Ltr Bahan Kimia 208,350 M.4.550 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.13 P-054 1.00 m3 Membuat beton kedap air dengan strorox - 100 1,504,851 2.59 . 308,179 - 1,196,672
2.10 OH Pekerja 221,130 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.11 OH Mandor 24,875 L.4.035 . . .
400.00 kg Semen 800,000 M.4.033 . . .
0.48 m3 Pasir Beton 140,112 M.4.028 . . .
0.80 m3 Kerikil 204,960 M.4.024 . . .
1.20 kg Strorox - 100 51,600 M.4.601 . . .
A.4.1.1.14 P-055 1.00 m1 Pemasangan PVC Waterstop lebar 150 mm 93,865 0.10 . 11,965 - 81,900
0.06 OH Pekerja 6,318 L.4.001 . . .
0.03 OH Tukang Pipa 4,344 L.4.020 . . .
0.00 OH Kepala Tukang 592 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.05 m Waterstop lebar 150 mm 81,900 M.4.605 . . .
A.4.1.1.15 P-056 1.00 m1 Pemasangan PVC Waterstop lebar 200 mm 96,367 0.12 . 14,887 - 81,480
0.07 OH Pekerja 7,371 L.4.001 . . .
0.04 OH Tukang Pipa 5,068 L.4.020 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.05 m Waterstop lebar 200 mm 81,480 M.4.606 . . .
A.4.1.1.16 P-057 1.00 m1 Membuat PVC Waterstop lebar 230 mm - 320 mm 114,232 0.13 . 16,477 - 97,755
0.08 OH Pekerja 8,424 L.4.001 . . .
0.04 OH Tukang Batu 6,316 L.4.007 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.05 m Waterstop lebar 230 mm - 320 mm 97,755 M.4.607 . . .
A.4.1.1.17 P-058 1.00 kg Pembesian dengan besi polos atau besi ulir 16,731 0.02 . 2,085 - 14,646
0.01 OH Pekerja 737 L.4.001 . . .
0.01 OH Tukang Besi 1,115 L.4.008 . . .
0.00 OH Kepala Tukang 138 L.4.036 . . .
0.00 OH Mandor 95 L.4.035 . . .
1.05 kg Besi beton 14,175 M.4.132 . . .
0.02 kg Kawat beton 471 M.4.143 . . .
A.4.1.1.18 P-059 1.00 kg Pemasangan kabel presstressed polos/strands 15,982 0.01 . 1,493 - 14,489
0.01 OH Pekerja 527 L.4.001 . . .
0.01 OH Tukang Besi 797 L.4.008 . . .
0.00 OH Kepala Tukang 99 L.4.036 . . .

www.mitra-arsitek.com 22/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 71 L.4.035 . . .
1.05 kg Besi beton 14,175 M.4.132 . . .
0.01 kg Kawat beton 314 M.4.143 . . .
A.4.1.1.19 P-060 1.00 kg Pemasangan jaring kawat baja (wiremesh) 13,270 0.01 . 1,179 - 12,091
0.00 OH Pekerja 263 L.4.001 . . .
0.00 OH Tukang Besi 398 L.4.008 . . .
0.00 OH Kepala Tukang 494 L.4.036 . . .
0.00 OH Mandor 24 L.4.035 . . .
1.02 kg Jaring kawat baja dilas 11,934 M.4.591 . . .
0.01 kg Kawat beton 157 M.4.143 . . .
A.4.1.1.20 P-061 1.00 m2 (K3) Pemasangan bekisting untuk pondasi 189,462 0.83 . 107,102 - 82,360
0.52 OH Pekerja 54,756 L.4.001 . . .
0.26 OH Tukang Kayu 41,054 L.4.016 . . .
0.03 OH Kepala Tukang 5,132 L.4.036 . . .
0.03 OH Mandor 6,159 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.30 kg Paku 5 - 10 cm 7,620 M.4.155 . . .
0.10 Ltr Minyak bekisting 580 M.4.556 . . .
A.4.1.1.21 P-062 1.00 m2 (K3) Pemasangan bekisting untuk sloof 198,732 0.83 . 107,102 - 91,630
0.52 OH Pekerja 54,756 L.4.001 . . .
0.26 OH Tukang Kayu 41,054 L.4.016 . . .
0.03 OH Kepala Tukang 5,132 L.4.036 . . .
0.03 OH Mandor 6,159 L.4.035 . . .
0.05 m3 Papan kayu 3/20 Kelas III 83,430 M.4.106 . . .
0.30 kg Paku 5 - 10 cm 7,620 M.4.155 . . .
0.10 Ltr Minyak bekisting 580 M.4.556 . . .
A.4.1.1.22 P-063 1.00 m2 (K3) Pemasangan bekisting untuk kolom 370,677 1.06 . 135,937 - 234,740
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.23 P-064 1.00 m2 (K3) Pemasangan bekisting untuk balok 382,017 1.06 . 135,937 - 246,080
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 68,040 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.24 P-065 1.00 m2 (K3) Pemasangan bekisting untuk lantai 470,677 1.06 . 135,937 - 334,740
0.66 OH Pekerja 69,498 L.4.001 . . .

www.mitra-arsitek.com 23/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
6.00 btg Dolken kayu Ø 8-10/400 cm 150,000 M.4.042 . . .
A.4.1.1.25 P-066 1.00 m2 (K3) Pemasangan bekisting untuk dinding 415,637 1.06 . 135,937 19,600 260,100
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.03 m3 Papan kayu 3/20 Kelas III 55,620 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 75,600 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.4.042 . . .
4.00 bh Penjaga jarak bekisting / spacer 19,600 T.4.009 . . .
A.4.1.1.26 P-067 1.00 m2 (K3) Pemasangan bekisting untuk tangga 351,847 1.06 . 135,937 - 215,910
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.03 m3 Papan kayu 3/20 Kelas III 55,620 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.15 Ltr Minyak bekisting 870 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.27 P-068 1.00 m2 Pemasangan jembatan untuk pengecoran beton 121,812 0.21 . 26,572 - 95,240
0.15 OH Pekerja 15,795 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 66,660 M.4.097 . . .
0.60 kg Paku Biasa 2" - 5" 16,080 M.4.158 . . .
0.50 btg Dolken kayu Ø 8-10/400 cm 12,500 M.4.042 . . .
A.4.1.1.28 P-069 1.00 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting) 4,735,913 8.45 . 1,088,545 - 3,647,368
5.30 OH Pekerja 558,090 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.30 OH Tukang kayu 205,270 L.4.016 . . .
1.05 OH Tukang besi 167,265 L.4.008 . . .
0.26 OH Kepala tukang 51,719 L.4.036 . . .
0.27 OH Mandor 62,779 L.4.035 . . .
0.20 m3 Papan kayu 3/20 Kelas III 370,800 M.4.106 . . .
1.50 kg Paku Biasa 2" - 5" 40,200 M.4.158 . . .
0.40 Ltr Minyak bekisting 2,320 M.4.556 . . .

www.mitra-arsitek.com 24/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
157.50 kg Besi beton 2,126,250 M.4.132 . . .
2.25 kg Kawat beton 70,650 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
A.4.1.1.29 P-070 1.00 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) 5,762,522 9.49 . 1,238,514 - 4,524,008
5.65 OH Pekerja 594,945 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.56 OH Tukang kayu 246,324 L.4.016 . . .
1.40 OH Tukang besi 223,020 L.4.008 . . .
0.32 OH Kepala tukang 63,760 L.4.036 . . .
0.28 OH Mandor 67,043 L.4.035 . . .
0.27 m3 Papan kayu 3/20 Kelas III 500,580 M.4.106 . . .
2.00 kg Paku Biasa 2" - 5" 53,600 M.4.158 . . .
0.60 Ltr Minyak bekisting 3,480 M.4.556 . . .
210.00 kg Besi beton 2,835,000 M.4.132 . . .
3.00 kg Kawat beton 94,200 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
A.4.1.1.30 P-071 1.00 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) 9,232,378 11.83 . 1,544,030 - 7,688,348
7.05 OH Pekerja 742,365 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.65 OH Tukang kayu 260,535 L.4.016 . . .
2.10 OH Tukang besi 334,530 L.4.008 . . .
0.40 OH Kepala tukang 79,552 L.4.036 . . .
0.35 OH Mandor 83,626 L.4.035 . . .
0.40 m3 Papan kayu 3/20 Kelas III 741,600 M.4.106 . . .
4.00 kg Paku Biasa 2" - 5" 107,200 M.4.158 . . .
2.00 Ltr Minyak bekisting 11,600 M.4.556 . . .
315.00 kg Besi beton 4,252,500 M.4.132 . . .
4.50 kg Kawat beton 141,300 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
0.15 M3 Kayu kelas II balok 477,000 M.4.090 . . .
3.50 Lbr Plywood 120x240 tbl. 9 mm 420,000 M.4.367 . . .
20.00 btg Dolken kayu Ø 8-10/400 cm 500,000 M.4.042 . . .
A.4.1.1.31 P-072 1.00 m3 Membuat balok beton bertulang (200 kg besi + bekisting) 7,172,569 10.33 . 1,336,701 - 5,835,868
6.35 OH Pekerja 668,655 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.65 OH Tukang kayu 260,535 L.4.016 . . .
1.40 OH Tukang besi 223,020 L.4.008 . . .
0.33 OH Kepala tukang 65,734 L.4.036 . . .
0.32 OH Mandor 75,334 L.4.035 . . .
0.32 m3 Papan kayu 3/20 Kelas III 593,280 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 85,760 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,280 M.4.556 . . .
210.00 kg Besi beton 2,835,000 M.4.132 . . .
3.00 kg Kawat beton 94,200 M.4.143 . . .

www.mitra-arsitek.com 25/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
0.14 m3 Kayu kelas II balok 445,200 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 336,000 M.4.367 . . .
16.00 btg Dolken kayu Ø 8-10/400 cm 400,000 M.4.042 . . .
A.4.1.1.32 P-073 1.00 m3 Membuat kolom beton bertulang (150 kg besi + bekisting) 6,529,105 8.46 . 1,089,137 - 5,439,968
5.30 OH Pekerja 558,090 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.30 OH Tukang kayu 205,270 L.4.016 . . .
1.05 OH Tukang besi 167,265 L.4.008 . . .
0.27 OH Kepala tukang 52,311 L.4.036 . . .
0.27 OH Mandor 62,779 L.4.035 . . .
0.32 m3 Papan kayu 3/20 Kelas III 593,280 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 85,760 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,280 M.4.556 . . .
157.50 kg Besi beton 2,126,250 M.4.132 . . .
2.25 kg Kawat beton 70,650 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
0.12 m3 Kayu kelas II balok 381,600 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 336,000 M.4.367 . . .
32.00 btg Dolken kayu Ø 8-10/400 cm 800,000 M.4.042 . . .
A.4.1.1.33 P-074 1.00 m3 Membuat dinding beton bertulang (150 kg besi + bekisting) 5,805,112 3.68 . 586,264 - 5,218,848
0.53 OH Pekerja 55,809 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.30 OH Tukang kayu 205,270 L.4.016 . . .
1.05 OH Tukang besi 167,265 L.4.008 . . .
0.26 OH Kepala tukang 51,719 L.4.036 . . .
0.27 OH Mandor 62,779 L.4.035 . . .
0.24 m3 Papan kayu 3/20 Kelas III 444,960 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 85,760 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,280 M.4.556 . . .
157.50 kg Besi beton 2,126,250 M.4.132 . . .
2.25 kg Kawat beton 70,650 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
0.16 m3 Kayu kelas II balok 508,800 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 336,000 M.4.367 . . .
24.00 btg Dolken kayu Ø 8-10/400 cm 600,000 M.4.042 . . .
A.4.1.1.34 P-075 1.00 m3 Membuat dinding beton bertulang (200 kg besi + bekisting) 6,739,622 9.49 . 1,238,514 - 5,501,108
5.65 OH Pekerja 594,945 L.4.001 . . .
0.28 OH Tukang batu 43,423 L.4.007 . . .
1.56 OH Tukang kayu 246,324 L.4.016 . . .
1.40 OH Tukang besi 223,020 L.4.008 . . .
0.32 OH Kepala tukang 63,760 L.4.036 . . .
0.28 OH Mandor 67,043 L.4.035 . . .
0.25 m3 Papan kayu 3/20 Kelas III 463,500 M.4.106 . . .

www.mitra-arsitek.com 26/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.00 kg Paku Biasa 2" - 5" 80,400 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,960 M.4.556 . . .
210.00 kg Besi beton 2,835,000 M.4.132 . . .
3.00 kg Kawat beton 94,200 M.4.143 . . .
336.00 kg Semen 672,000 M.4.033 . . .
0.54 m3 Pasir Beton 157,626 M.4.028 . . .
0.81 m3 Kerikil 207,522 M.4.024 . . .
0.11 m3 Kayu kelas II balok 333,900 M.4.090 . . .
2.50 Lbr Plywood 120x240 tbl. 9 mm 300,000 M.4.367 . . .
14.00 btg Dolken kayu Ø 8-10/400 cm 350,000 M.4.042 . . .
A.4.1.1.35 P-076 1.00 m1 Membuat kolom praktis beton bertulang (11 x 11) cm 109,396 0.26 . 31,773 - 77,623
0.18 OH Pekerja 18,954 L.4.001 . . .
0.02 OH Tukang batu 3,158 L.4.007 . . .
0.02 OH Tukang kayu 3,158 L.4.016 . . .
0.02 OH Tukang besi 3,186 L.4.008 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
0.00 m3 Papan kayu 3/20 Kelas III 3,708 M.4.106 . . .
0.01 kg Paku Biasa 2" - 5" 268 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,960 M.4.556 . . .
3.00 kg Besi beton 40,500 M.4.132 . . .
0.45 kg Kawat beton 14,130 M.4.143 . . .
4.00 kg Semen 8,000 M.4.033 . . .
0.01 m3 Pasir Beton 1,751 M.4.028 . . .
0.01 m3 Kerikil 2,306 M.4.024 . . .
A.4.1.1.36 P-077 1.00 m1 Membuat ring balok beton bertulang (10 x 15) cm 133,178 0.42 . 52,480 - 80,698
0.30 OH Pekerja 31,274 L.4.001 . . .
0.03 OH Tukang batu 5,211 L.4.007 . . .
0.03 OH Tukang kayu 5,211 L.4.016 . . .
0.03 OH Tukang besi 5,257 L.4.008 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
0.00 m3 Papan kayu 3/20 Kelas III 5,562 M.4.106 . . .
0.02 kg Paku Biasa 2" - 5" 536 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,960 M.4.556 . . .
3.60 kg Besi beton 48,600 M.4.132 . . .
0.05 kg Kawat beton 1,570 M.4.143 . . .
5.50 kg Semen 11,000 M.4.033 . . .
0.01 m3 Pasir Beton 2,627 M.4.028 . . .
0.02 m3 Kerikil 3,843 M.4.024 . . .
A.4.1.2.1. P-078 1.00 m2 (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (1200.16
118,331 ± 20) mm . 19,427 - 98,904
0.13 OH Pekerja 13,900 L.4.001 . . .
0.02 OH Tukang batu 3,474 L.4.007 . . .
0.00 OH Kepala tukang 395 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
26.08 Kg Semen 52,160 M.4.033 . . .
60.80 Kg Pasir Beton (kg) 18,240 M.4.029 . . .
82.32 Kg Kerikil (kg) 16,464 M.4.025 . . .
17.20 L Air 12,040 M.4.001 . . .
A.4.1.2.2. P-079 1.00 m2 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120
147,913 0.20± 20) mm . 24,283 - 123,630

www.mitra-arsitek.com 27/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.17 OH Pekerja 17,375 L.4.001 . . .
0.03 OH Tukang batu 4,421 L.4.007 . . .
0.00 OH Kepala tukang 592 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
32.60 Kg Semen 65,200 M.4.033 . . .
76.00 Kg Pasir Beton (kg) 22,800 M.4.029 . . .
102.90 Kg Kerikil (kg) 20,580 M.4.025 . . .
21.50 L Air 15,050 M.4.001 . . .
A.4.1.2.3. P-080 1.00 m2 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120
163,377 ± 20) mm .
0.24 29,021 - 134,356
0.20 OH Pekerja 20,849 L.4.001 . . .
0.03 OH Tukang batu 5,211 L.4.007 . . .
0.00 OH Kepala tukang 592 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
32.12 Kg Semen 64,240 M.4.033 . . .
91.20 Kg Pasir Beton (kg) 27,360 M.4.029 . . .
123.48 Kg Kerikil (kg) 24,696 M.4.025 . . .
25.80 L Air 18,060 M.4.001 . . .
A.4.1.2.4. P-081 1.00 m2 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120
221,903 ± 20) mm .
0.31 36,458 - 185,445
0.25 OH Pekerja 26,114 L.4.001 . . .
0.04 OH Tukang batu 6,474 L.4.007 . . .
0.00 OH Kepala tukang 790 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
48.90 Kg Semen 97,800 M.4.033 . . .
114.00 Kg Pasir Beton (kg) 34,200 M.4.029 . . .
154.35 Kg Kerikil (kg) 30,870 M.4.025 . . .
32.25 L Air 22,575 M.4.001 . . .
A.4.1.2.5. P-082 1.00 m2 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) 327,803 0.09 . 14,554 - 313,249
0.01 OH Pekerja 737 L.4.001 . . .
0.08 OH Tukang batu 12,000 L.4.007 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.08 m3 Lantai kerja tebal 10cm 63,000 M.4.595 . . .
9.39 Kg Besi hollow 50.50.3 200,092 M.4.133 . . .
0.01 m3 Kaso 5/7 Kelas II 18,375 M.4.057 . . .
0.08 Lbr Phel film 12mm 11,600 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
3.88 Bh Baut Ramset / Dina Bolt 19,022 M.4.130 . . .
A.4.1.2.6. P-083 1.00 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) 36,614 0.05 . 7,448 - 29,166
0.00 OH Pekerja 421 L.4.001 . . .
0.04 OH Tukang batu 6,000 L.4.007 . . .
0.00 OH Kepala tukang 790 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 18,375 M.4.057 . . .
0.04 Lbr Phel film 12mm 6,235 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
0.69 Bh Baut Ramset / Dina Bolt 3,396 M.4.130 . . .
A.4.1.2.7. P-084 1.00 m2 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) 34,896 0.05 . 7,448 - 27,449
0.00 OH Pekerja 421 L.4.001 . . .
0.04 OH Tukang batu 6,000 L.4.007 . . .
0.00 OH Kepala tukang 790 L.4.036 . . .

www.mitra-arsitek.com 28/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 237 L.4.035 . . .
0.00 m3 Kaso 5/7 Kelas II 14,700 M.4.057 . . .
0.05 Lbr Phel film 12mm 6,960 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
0.05 Kg Paku Biasa 2" - 5" 1,233 M.4.158 . . .
0.69 Bh Baut Ramset / Dina Bolt 3,396 M.4.130 . . .
A.4.1.2.8. P-085 1.00 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 9,608 0.08 . 9,608 - -
0.05 OH Pekerja 5,581 L.4.001 . . .
0.02 OH Tukang kayu 2,842 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.9. P-086 1.00 bh Pemasangan dan membuka bekisting komponen balok beton pracetak15,293 0.12 . 15,293 - -
0.09 OH Pekerja 9,372 L.4.001 . . .
0.03 OH Tukang kayu 4,737 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.10. P-087 1.00 bh Pemasangan dan membuka bekisting komponen Kolom beton pracetak12,450 0.10 . 12,450 - -
0.07 OH Pekerja 7,476 L.4.001 . . .
0.02 OH Tukang kayu 3,790 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.11. P-088 1.00 bh Penuangan/menebar beton untuk komponen plat pracetak 87,807 0.54 . 87,807 - -
0.06 OH Pekerja 6,739 L.4.001 . . .
0.24 OH Tukang batu 38,528 L.4.007 . . .
0.13 OH Tukang vibrator 18,534 L.4.024 . . .
0.03 OH Kepala Tukang 6,712 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.12. P-089 1.00 bh Penuangan/menebar beton untuk komponen balok pracetak 90,057 0.56 . 90,057 - -
0.07 OH Pekerja 7,266 L.4.001 . . .
0.24 OH Tukang batu 38,212 L.4.007 . . .
0.14 OH Tukang vibrator 19,982 L.4.024 . . .
0.04 OH Kepala Tukang 7,304 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.13. P-090 1.00 bh Penuangan/menebar beton untuk komponen kolom pracetak 81,530 0.50 . 81,530 - -
0.06 OH Pekerja 6,423 L.4.001 . . .
0.21 OH Tukang batu 33,633 L.4.007 . . .
0.12 OH Tukang vibrator 17,666 L.4.024 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.14. P-091 1.00 bh Ereksi komponen untuk pelat pracetak 580,557 0.54 . 84,655 435,151 60,752
0.07 OH Operator crane 9,702 L.4.039 . . .
0.07 OH Pembantu operator crane 8,817 L.4.043 . . .
0.07 OH Pekerja 7,055 L.4.001 . . .
0.07 OH Tukang batu 10,579 L.4.007 . . .
0.13 OH Tukang ereksi 19,403 L.4.011 . . .
0.07 OH Kepala tukang 13,226 L.4.036 . . .
0.07 OH Mandor 15,872 L.4.035 . . .
6.68 L Solar 60,752 M.4.563 . . .
0.07 unit hari Sewa crane 86,671 T.4.024 . . .
1.10 Buah hari Sewa pipe support 348,480 T.4.027 . . .
A.4.1.2.15. P-092 1.00 bh Ereksi komponen untuk balok pracetak 560,064 0.49 . 77,074 427,390 55,601
0.06 OH Operator crane 8,833 L.4.039 . . .
0.06 OH Pembantu operator crane 8,028 L.4.043 . . .

www.mitra-arsitek.com 29/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.06 OH Pekerja 6,423 L.4.001 . . .
0.06 OH Tukang batu 9,632 L.4.007 . . .
0.12 OH Tukang ereksi 17,666 L.4.011 . . .
0.06 OH Kepala tukang 12,041 L.4.036 . . .
0.06 OH Mandor 14,451 L.4.035 . . .
6.11 L Solar 55,601 M.4.563 . . .
0.06 unit hari Sewa crane 78,910 T.4.024 . . .
1.10 Buah hari Sewa pipe support 348,480 T.4.027 . . .
A.4.1.2.16. P-093 1.00 bh Ereksi komponen untuk Kolom pracetak 984,520 0.66 . 104,871 804,329 75,321
0.08 OH Operator crane 12,018 L.4.039 . . .
0.08 OH Pembantu operator crane 10,923 L.4.043 . . .
0.08 OH Pekerja 8,740 L.4.001 . . .
0.08 OH Tukang batu 13,106 L.4.007 . . .
0.17 OH Tukang ereksi 24,037 L.4.011 . . .
0.08 OH Kepala tukang 16,384 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
8.28 L Solar 75,321 M.4.563 . . .
0.08 unit hari Sewa crane 107,369 T.4.024 . . .
2.20 Buah hari Sewa pipe support 696,960 T.4.027 . . .
A.4.1.2.17. P-094 1.00 bh Melangsir komponen plat pracetak ( ± 20 m) 55,094 0.10 . 13,253 24,578 17,263
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang batu 6,000 L.4.007 . . .
0.02 OH Operator crane 2,751 L.4.039 . . .
0.02 OH Pembantu operator crane 2,500 L.4.043 . . .
1.90 L Solar 17,263 M.4.563 . . .
0.02 UH Sewa crane 24,578 T.4.024 . . .
A.4.1.2.18. P-095 1.00 bh Melangsir komponen balok pracetak ( ± 20 m) 55,094 0.10 . 13,253 24,578 17,263
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang batu 6,000 L.4.007 . . .
0.02 OH Operator crane 2,751 L.4.039 . . .
0.02 OH Pembantu operator crane 2,500 L.4.043 . . .
1.90 L Solar 17,263 M.4.563 . . .
0.02 UH Sewa crane 24,578 T.4.024 . . .
A.4.1.2.19. P-096 1.00 bh Melangsir komponen kolom pracetak ( ± 20 m) 55,094 0.10 . 13,253 24,578 17,263
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang batu 6,000 L.4.007 . . .
0.02 OH Operator crane 2,751 L.4.039 . . .
0.02 OH Pembantu operator crane 2,500 L.4.043 . . .
1.90 L Solar 17,263 M.4.563 . . .
0.02 UH Sewa crane 24,578 T.4.024 . . .
A.4.1.2.20. P-097 1.00 m3 Grouting campuran 3,920,000 - . - - 3,920,000
1,200.00 Kg Semen grout 1,920,000 M.4.034 . . .
650.00 Kg Screening 1,755,000 M.4.181 . . .
350.00 L Air 245,000 M.4.001 . . .
A.4.1.2.21. P-098 1.00 m3 Grouting tidak campuran 3,240,000 - . - - 3,240,000
1,850.00 Kg Semen grout 2,960,000 M.4.034 . . .
400.00 L Air 280,000 M.4.001 . . .
A.4.1.2.22. P-099 1.00 titik Upah melakukan grouting pada join pracetak 81,322 0.48 . 81,322 - -
0.37 OH Tukang batu 57,949 L.4.007 . . .
0.07 OH Kepala tukang 14,608 L.4.036 . . .

www.mitra-arsitek.com 30/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 OH Mandor 8,765 L.4.035 . . .
A.4.1.2.23. P-100 1.00 titik Pemasangan Bekisting join pracetak 104,611 0.31 . 42,836 - 61,775
0.15 OH Pekerja 15,479 L.4.001 . . .
0.15 OH Tukang kayu 23,211 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 44,100 M.4.057 . . .
0.00 m3 Kayu papan kelas III 10,600 M.4.103 . . .
0.26 Kg Paku Biasa 2" - 5" 7,075 M.4.158 . . .
A.4.1.2.24. P-101 1.00 titik Upah Join dengan Sling 95,556 0.67 . 95,556 - -
0.22 OH Pekerja 23,166 L.4.001 . . .
0.22 OH Tukang kayu 34,738 L.4.016 . . .
0.22 OH Tukang besi 35,046 L.4.008 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
A.4.2.1.1. P-102 1.00 titik Pemasangan besi profil 34,841 0.13 . 16,901 - 17,940
0.06 OH Pekerja 6,318 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,688 L.4.018 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.15 Kg Besi Profil 17,940 M.4.137 . . .
A.4.2.1.2. P-103 1.00 kg Pemasangan rangka kuda-kuda baja IWF 28,171 0.13 . 16,901 - 11,270
0.06 OH Pekerja 6,318 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,688 L.4.018 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.15 Kg Besi IWF 11,270 M.4.134 . . .
A.4.2.1.3. P-104 1.00 kg Pengerjaan pekerjaan perakitan 951 0.00 . 277 546 127
0.00 OH Pekerja 105 L.4.001 . . .
0.00 OH Tukang Besi Konstruksi 158 L.4.009 . . .
0.00 OH Kepala tukang 2 L.4.036 . . .
0.00 OH Mandor 12 L.4.035 . . .
0.01 Ltr Solar 91 M.4.563 . . .
0.00 Ltr Minyak pelumas 36 M.4.557 . . .
0.01 Jam Sewa alat Perakitan Baja IWF 546 T.4.022 . . .
A.4.2.1.4. P-105 1.00 m2 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
867,526 2.26 . 295,651 - 571,875
1.05 OH Pekerja 110,565 L.4.001 . . .
1.05 OH Tukang Las 152,040 L.4.017 . . .
0.11 OH Kepala tukang 20,727 L.4.036 . . .
0.05 OH Mandor 12,319 L.4.035 . . .
15.00 Kg Besi siku L 30.30.3 205,500 M.4.139 . . .
32.80 Kg Besi plat baja 364,080 M.4.136 . . .
0.05 Kg Kawat las listrik 2,295 M.4.150 . . .
A.4.2.1.5. P-106 1.00 m1 Pengerjaan pengelasan dengan las listrik 593,326 0.64 . 82,386 285,600 225,340
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Besi Konstruksi 31,580 L.4.009 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
4.00 Kg Kawat las listrik 183,600 M.4.150 . . .
3.00 Ltr Solar 27,300 M.4.563 . . .
0.40 Ltr Minyak pelumas 14,440 M.4.557 . . .

www.mitra-arsitek.com 31/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.70 Jam Sewa alat las 285,600 T.4.020 . . .
A.4.2.1.6. P-107 1.00 m2 Pembuatan rangka jendela besi scuare tube (25 x 5) cm 631,358 1.40 . 182,977 - 448,381
0.65 OH Pekerja 68,445 L.4.001 . . .
0.65 OH Tukang Las 94,120 L.4.017 . . .
0.07 OH Kepala tukang 12,831 L.4.036 . . .
0.03 OH Mandor 7,581 L.4.035 . . .
4.76 m Besi square tube 136,612 M.4.140 . . .
4.52 m Besi lis kaca (1 x 1) cm 219,769 M.4.135 . . .
20.00 cm Pengelasan 92,000 M.4.596 . . .
A.4.2.1.7. P-108 1.00 m2 Pemasangan pintu rolling door besi 880,729 2.53 . 325,229 - 555,500
1.20 OH Pekerja 126,360 L.4.001 . . .
1.20 OH Tukang Las 173,760 L.4.017 . . .
0.12 OH Kepala tukang 23,688 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.00 m2 Pintu gulung besi 555,500 M.4.176 . . .
A.4.2.1.8. P-109 1.00 m2 Pemasangan pintu lipat (folding door) plastik/PVC 639,705 0.95 . 129,705 - 510,000
0.44 OH Pekerja 46,332 L.4.001 . . .
0.44 OH Tukang kayu 69,476 L.4.016 . . .
0.04 OH Kepala tukang 8,686 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
1.00 m2 Pintu lipat 510,000 M.4.585 . . .
A.4.2.1.9. P-110 1.00 m2 Pemasangan sunscreen alluminium 425,104 0.96 . 152,604 - 272,500
0.08 OH Pekerja 8,424 L.4.001 . . .
0.80 OH Tukang Besi 127,440 L.4.008 . . .
0.08 OH Kepala tukang 15,792 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.00 m2 Sunscreen alumunium 272,500 M.4.184 . . .
A.4.2.1.10. P-111 1.00 m2 Pemasangan rolling door alluminium 862,985 2.15 . 296,185 - 566,800
1.00 OH Pekerja 105,300 L.4.001 . . .
1.00 OH Tukang Besi 159,300 L.4.008 . . .
0.10 OH Kepala tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 m2 Rolling door alluminium 566,800 M.4.180 . . .
A.4.2.1.11. P-112 1.00 m1 Pemasangan kusen pintu alluminium 42,342 0.09 . 12,724 - 29,618
0.04 OH Pekerja 4,528 L.4.001 . . .
0.04 OH Tukang Besi 6,850 L.4.008 . . .
0.00 OH Kepala tukang 849 L.4.036 . . .
0.00 OH Mandor 497 L.4.035 . . .
1.10 m Profil Alluminium "T" 14,630 M.4.177 . . .
2.00 bh Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 14,388 M.4.598 . . .
A.4.2.1.12. P-113 1.00 m2 Pemasangan pintu alluminium strip lebar 8 cm 466,204 0.18 . 25,164 - 441,040
0.09 OH Pekerja 8,951 L.4.001 . . .
0.09 OH Tukang Besi 13,541 L.4.008 . . .
0.01 OH Kepala tukang 1,678 L.4.036 . . .
0.00 OH Mandor 995 L.4.035 . . .
4.40 m Profil Alluminium "T" 58,520 M.4.177 . . .
14.60 m Aluminium strip 382,520 M.4.122 . . .
A.4.2.1.13. P-114 1.00 m2 Pemasangan pintu kaca rangka alluminium 2,447,748 0.18 . 25,452 - 2,422,296
0.09 OH Pekerja 8,951 L.4.001 . . .

www.mitra-arsitek.com 32/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Besi 13,541 L.4.008 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
4.40 m Pintu alluminium 2,059,200 M.4.174 . . .
4.50 m Profil kaca 298,350 M.4.529 . . .
0.27 Tube Sealant 64,746 M.4.598 . . .
A.4.2.1.14. P-115 1.00 m2 Pemasangan venetions blinds dan Vertical blinds 185,333 0.75 . 112,533 - 72,800
0.35 OH Pekerja 36,855 L.4.001 . . .
0.35 OH Tukang Interior 64,505 L.4.015 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
1.00 m2 Venetions blinds dan vertical blinds (tirai) 72,800 M.4.604 . . .
A.4.2.1.15. P-116 1.00 m2 Pemasangan terali besi strip (2 x 3) mm 680,724 3.59 . 470,296 - 210,428
1.67 OH Pekerja 175,851 L.4.001 . . .
1.67 OH Tukang Las 241,816 L.4.017 . . .
0.17 OH Kepala tukang 32,966 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
6.18 kg Baja strip (0,2 x 2) cm 85,860 M.4.128 . . .
27.08 cm Pengelasan 124,568 M.4.596 . . .
A.4.2.1.16. P-117 1.00 m2 Pemasangan kawat nyamuk 119,177 0.22 . 29,479 - 89,698
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.10 m2 Kawat nyamuk 14,740 M.4.152 . . .
11.11 cm Pengelasan 51,106 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 23,852 M.4.128 . . .
A.4.2.1.17. P-118 1.00 m2 Pemasangan jendela nako & tralis 228,465 0.42 . 56,825 - 171,640
0.20 OH Pekerja 21,060 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.10 m2 Jendela nako (rangka + kaca 5 mm) 65,340 M.4.577 . . .
10.00 bh Paku sekrup 9,000 M.4.165 . . .
7.00 m Baja strip (0,2 x 2) cm 97,300 M.4.128 . . .
A.4.2.1.18. P-119 1.00 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 183,297 0.42 . 57,105 - 126,192
0.20 OH Pekerja 21,060 L.4.001 . . .
0.20 OH Tukang Atap 31,860 L.4.006 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 51,975 M.4.368 . . .
0.02 kg Paku Biasa 2" - 5" 402 M.4.158 . . .
0.02 m3 Kayu Papan kelas II 73,815 M.4.102 . . .
A.4.2.1.19 P-120 1.00 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 130,595
cm 0.49 . 71,402 - 59,193
0.15 OH Pekerja 15,795 L.4.001 . . .
0.30 OH Tukang Atap 47,790 L.4.006 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 51,975 M.4.368 . . .
0.01 kg Paku Biasa 2" - 5" 268 M.4.158 . . .

www.mitra-arsitek.com 33/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 kg Baja strip (0,2 x 2) cm 6,950 M.4.128 . . .
A.4.2.1.20. P-121 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding
295,765partisi0.54 . 74,165 175,400 46,200
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Besi 39,825 L.4.008 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
3.50 M1 Hollow 4/4 46,200 M.4.141 . . .
1.00 Ls Assesoris (perkuatan, las dll) 175,400 T.4.003 . . .
A.4.2.1.21. P-122 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
331,983 0.75 . 103,783 175,400 52,800
0.35 OH Pekerja 36,855 L.4.001 . . .
0.35 OH Tukang Besi 55,755 L.4.008 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
4.00 M1 Hollow 4/4 52,800 M.4.141 . . .
1.00 Ls Assesoris (perkuatan, las dll) 175,400 T.4.003 . . .
A.4.2.1.22. P-123 1.00 m2 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75
358,541 1.63 . 225,206 45,450 87,885
0.76 OH Pekerja 80,070 L.4.001 . . .
0.76 OH Tukang Besi 121,132 L.4.008 . . .
0.08 OH Kepala Tukang 15,002 L.4.036 . . .
0.04 OH Mandor 9,002 L.4.035 . . .
4.05 m1 Baja Ringan-C Truss 87,885 M.4.125 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 45,450 T.4.002 . . .
A.4.2.1.23. P-124 1.00 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75
350,727 1.58 . 217,392 45,450 87,885
0.73 OH Pekerja 77,290 L.4.001 . . .
0.73 OH Tukang Besi 116,926 L.4.008 . . .
0.07 OH Kepala Tukang 14,410 L.4.036 . . .
0.04 OH Mandor 8,765 L.4.035 . . .
4.05 m1 Baja Ringan-C Truss 87,885 M.4.125 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 45,450 T.4.002 . . .
A.4.2.1.24. P-125 1.00 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK 329,046
ATAP GENTENG
0.71 BIASA/METAL
. 106,564 45,450 177,032
0.20 OH Pekerja 21,060 L.4.001 . . .
0.45 OH Tukang Besi 71,685 L.4.008 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
3.72 M' Baja Ringan-C Truss 80,724 M.4.125 . . .
28.00 bh Baut (Srew driver) 14,000 M.4.129 . . .
2.00 bh Baut Ramset / Dina Bolt 9,800 M.4.130 . . .
5.40 M' Baja Ringan- Reng Truss 66,420 M.4.124 . . .
0.12 M' Talang / Jurai Canai Dingin 6,088 M.4.511 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 45,450 T.4.002 . . .
A.4.4.1.1. P-126 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 350,791
1 SP : 2 PP
0.85 . 105,815 - 244,976
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
43.50 Kg Semen 87,000 M.4.033 . . .
0.08 m3 Pasir Pasang 17,976 M.4.030 . . .
A.4.4.1.2. P-127 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 332,163
1 SP : 3 PP
0.85 . 105,815 - 226,348
0.60 OH Pekerja 63,180 L.4.001 . . .

www.mitra-arsitek.com 34/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
32.95 Kg Semen 65,900 M.4.033 . . .
0.09 m3 Pasir Pasang 20,448 M.4.030 . . .
A.4.4.1.3. P-128 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
319,812
1 SP : 4 PP0.85 . 105,815 - 213,997
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
26.55 Kg Semen 53,100 M.4.033 . . .
0.09 m3 Pasir Pasang 20,897 M.4.030 . . .
A.4.4.1.4. P-129 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
313,134
1 SP : 5 PP0.85 . 105,815 - 207,319
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
22.20 Kg Semen 44,400 M.4.033 . . .
0.10 m3 Pasir Pasang 22,919 M.4.030 . . .
A.4.4.1.5. P-130 1.00 m2 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran
310,228
1 SP : 6 PP
0.85 . 105,815 - 204,413
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
18.50 Kg Semen 37,000 M.4.033 . . .
0.12 m3 Pasir Pasang 27,413 M.4.030 . . .
A.4.4.1.6 P-131 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
297,163
1SP : 3KP0.85
: 10PP . 105,815 - 191,348
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
10.08 Kg Semen 20,160 M.4.033 . . .
0.03 m3 Kapur 10,403 M.4.020 . . .
0.09 m3 Pasir Pasang 20,785 M.4.030 . . .
A.4.4.1.7 P-132 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
169,346
1SP : 2PP0.43 . 52,908 - 116,439
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
18.95 Kg Semen 37,900 M.4.033 . . .
0.04 m3 Pasir Pasang 8,539 M.4.030 . . .
A.4.4.1.8 P-133 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
160,636
1SP : 3PP0.43 . 52,908 - 107,728
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .

www.mitra-arsitek.com 35/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
14.37 Kg Semen 28,740 M.4.033 . . .
0.04 m3 Pasir Pasang 8,988 M.4.030 . . .
A.4.4.1.9 P-134 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
155,570
1SP :4PP 0.43 . 52,908 - 102,662
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 m3 Bata merah 70,000 M.4.007 . . .
11.50 Kg Semen 23,000 M.4.033 . . .
0.04 m3 Pasir Pasang 9,662 M.4.030 . . .
A.4.4.1.10 P-135 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
152,379
1 SP : 5 PP0.43 . 52,908 - 99,472
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
9.68 Kg Semen 19,360 M.4.033 . . .
0.05 m3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.1.11 P-136 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
150,558
1 SP : 6 PP0.43 . 52,908 - 97,650
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
8.32 Kg Semen 16,640 M.4.033 . . .
0.05 m3 Pasir Pasang 11,010 M.4.030 . . .
A.4.4.1.12 P-137 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
147,143
1SP : 8 PP0.43 . 52,908 - 94,235
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
6.50 Kg Semen 13,000 M.4.033 . . .
0.05 m3 Pasir Pasang 11,235 M.4.030 . . .
A.4.4.1.13 P-138 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
148,817
1SP : 3KP 0.43
:10PP . 52,908 - 95,910
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
4.50 Kg Semen 9,000 M.4.033 . . .
0.02 m3 Kapur 5,675 M.4.020 . . .
0.05 m3 Pasir Pasang 11,235 M.4.030 . . .
A.4.4.1.14 P-139 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
133,808
1SM : 1KP0.43:1PP . 52,908 - 80,901
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .

www.mitra-arsitek.com 36/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
0.02 Kg Semen Warna 47 M.4.036 . . .
0.02 m3 Kapur 6,809 M.4.020 . . .
0.02 m3 Pasir Pasang 4,045 M.4.030 . . .
A.4.4.1.15 P-140 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
134,532
1SM : 1KP
0.43
:2PP . 52,908 - 81,624
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
0.01 Kg Semen Warna 36 M.4.036 . . .
0.01 m3 Kapur 5,296 M.4.020 . . .
0.03 m3 Pasir Pasang 6,292 M.4.030 . . .
A.4.4.1.16 P-141 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP : 3PP 429,545 0.53 . 67,765 - 361,780
0.35 OH Pekerja 36,855 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
30.32 Kg Semen 60,640 M.4.033 . . .
0.73 m3 Pasir Pasang 163,582 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.17 P-142 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP:4PP 427,312 0.53 . 67,765 - 359,546
0.35 OH Pekerja 36,855 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
12.50 m3 Hollow Block 20 133,750 M.4.537 . . .
24.26 Kg Semen 48,520 M.4.033 . . .
0.77 m3 Pasir Pasang 173,468 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.8 P-143 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :3PP 316,676 0.47 . 58,803 - 257,873
0.32 OH Pekerja 33,696 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
12.50 bh Hollow Block 15 85,000 M.4.536 . . .
22.74 Kg Semen 45,480 M.4.033 . . .
0.55 m3 Pasir Pasang 123,585 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.19 P-144 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :4PP 314,787 0.47 . 58,803 - 255,983
0.32 OH Pekerja 33,696 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
12.50 m3 Hollow Block 15 85,000 M.4.536 . . .
18.20 Kg Semen 36,400 M.4.033 . . .
0.58 m3 Pasir Pasang 130,775 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .

www.mitra-arsitek.com 37/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.20 P-145 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :3PP 260,076 0.43 . 52,908 - 207,169
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
12.50 bh Hollow Block 10 91,250 M.4.535 . . .
15.16 Kg Semen 30,320 M.4.033 . . .
0.36 m3 Pasir Pasang 81,791 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.21 P-146 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :4PP 259,409 0.43 . 52,908 - 206,502
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
12.50 bh Hollow Block 10 91,250 M.4.535 . . .
12.13 Kg Semen 24,260 M.4.033 . . .
0.39 m3 Pasir Pasang 87,184 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.22 P-147 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 106,772 0.43 . 52,908 - 53,865
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
30.00 bh Bata rooster 24,000 M.4.009 . . .
11.00 Kg Semen 22,000 M.4.033 . . .
0.04 m3 Pasir Pasang 7,865 M.4.030 . . .
A.4.4.1.23 P-148 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 136,772 0.43 . 52,908 - 83,865
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
30.00 bh Bata berongga 54,000 M.4.006 . . .
11.00 Kg Semen 22,000 M.4.033 . . .
0.04 m3 Pasir Pasang 7,865 M.4.030 . . .
A.4.4.1.24 P-149 1.00 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 SP 152,980
: 3 PP 0.48 . 61,790 - 91,190
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 m3 Bata rooster 56,000 M.4.009 . . .
14.00 Kg Semen 28,000 M.4.033 . . .
0.03 m3 Pasir Pasang 7,190 M.4.030 . . .
A.4.4.1.25 P-150 1.00 m2 Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
346,539
B. 0.50 . 60,659 23,520 262,361
0.35 OH Pekerja 36,855 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.08 m3 Bata ringan tebal 7,5 cm 230,483 M.4.005 . . .
2.77 Kg Mortar siap pakai 31,878 M.4.027 . . .
0.10 Ls Bahan Pasang Dinding Bata Ringan 23,520 T.4.005 . . .

www.mitra-arsitek.com 38/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.26 P-151 1.00 m2 Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai
445,029 0.50 . 60,659 26,460 357,910
0.35 OH Pekerja 36,855 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.10 m3 Bata ringan tebal 7,5 cm 307,310 M.4.005 . . .
4.40 Kg Mortar siap pakai 50,600 M.4.027 . . .
0.10 Ls Peralatan Pasang Dinding Bata Ringan 26,460 T.4.010 . . .
A.4.4.2.1. P-152 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 15 mm. 96,393 0.48 . 61,790 - 34,603
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
15.50 Kg Semen 31,008 M.4.033 . . .
0.02 m3 Pasir Pasang 3,595 M.4.030 . . .
A.4.4.2.2. P-153 1.00 m2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. 86,732 0.48 . 61,790 - 24,942
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
10.22 Kg Semen 20,448 M.4.033 . . .
0.02 m3 Pasir Pasang 4,494 M.4.030 . . .
A.4.4.2.3. P-154 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 82,510 0.48 . 61,790 - 20,720
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
7.78 Kg Semen 15,552 M.4.033 . . .
0.02 m3 Pasir Pasang 5,168 M.4.030 . . .
A.4.4.2.4. P-155 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 15 mm 79,662 0.48 . 61,790 - 17,873
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
6.24 Kg Semen 12,480 M.4.033 . . .
0.02 m3 Pasir Pasang 5,393 M.4.030 . . .
A.4.4.2.5. P-156 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 78,000 0.48 . 61,790 - 16,210
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
5.18 Kg Semen 10,368 M.4.033 . . .
0.03 m3 Pasir Pasang 5,842 M.4.030 . . .
A.4.4.2.6. P-157 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 15 mm. 76,688 0.48 . 61,790 - 14,899
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
4.42 Kg Semen 8,832 M.4.033 . . .
0.03 m3 Pasir Pasang 6,067 M.4.030 . . .

www.mitra-arsitek.com 39/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.2.7. P-158 1.00 m2 Pemasangan plesteran 1SP : 7PP tebal 15 mm 75,953 0.48 . 61,790 - 14,164
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
3.94 Kg Semen 7,872 M.4.033 . . .
0.03 m3 Pasir Pasang 6,292 M.4.030 . . .
A.4.4.2.8. P-159 1.00 m2 Pemasangan plesteran 1SP : 8PP tebal 15 mm 75,218 0.48 . 61,790 - 13,428
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
3.46 Kg Semen 6,912 M.4.033 . . .
0.03 m3 Pasir Pasang 6,516 M.4.030 . . .
A.4.4.2.9. P-160 1.00 m2 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm 79,532 0.51 . 63,489 - 16,043
0.36 OH Pekerja 37,908 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
5.76 Kg Semen 11,520 M.4.033 . . .
0.00 m3 Kapur Pasang 1,602 M.4.022 . . .
0.01 m3 Pasir Pasang 2,921 M.4.030 . . .
A.4.4.2.10. P-161 1.00 m2 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm 76,654 0.51 . 63,489 - 13,165
0.36 OH Pekerja 37,908 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
3.00 Kg Semen 6,000 M.4.033 . . .
0.01 m3 Kapur Pasang 2,671 M.4.022 . . .
0.02 m3 Pasir Pasang 4,494 M.4.030 . . .
A.4.4.2.11. P-162 1.00 m2 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm 70,336 0.51 . 63,489 - 6,847
0.36 OH Pekerja 37,908 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.01 m3 Semen 18 M.4.033 . . .
0.01 m3 Kapur Pasang 4,807 M.4.022 . . .
0.01 m3 Pasir Pasang 2,022 M.4.030 . . .
A.4.4.2.12. P-163 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm 70,612 0.51 . 63,489 - 7,123
0.36 OH Pekerja 37,908 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.01 m3 Semen 14 M.4.033 . . .
0.01 m3 Kapur Pasang 3,739 M.4.022 . . .
0.02 m3 Pasir Pasang 3,371 M.4.030 . . .
A.4.4.2.13. P-164 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 20 mm 116,191 0.64 . 82,860 - 33,331
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .

www.mitra-arsitek.com 40/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Mandor 5,212 L.4.035 . . .
13.63 Kg Semen 27,264 M.4.033 . . .
0.03 m3 Pasir Pasang 6,067 M.4.030 . . .
A.4.4.2.14. P-165 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 20 mm 93,687 0.49 . 65,986 - 27,702
0.26 OH Pekerja 27,378 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
10.37 Kg Semen 20,736 M.4.033 . . .
0.03 m3 Pasir Pasang 6,966 M.4.030 . . .
A.4.4.2.15. P-166 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 20 mm. 106,690 0.64 . 82,860 - 23,830
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
8.32 Kg Semen 16,640 M.4.033 . . .
0.03 m3 Pasir Pasang 7,190 M.4.030 . . .
A.4.4.2.16. P-167 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 20 mm 104,548 0.64 . 82,860 - 21,689
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
6.91 Kg Semen 13,824 M.4.033 . . .
0.04 m3 Pasir Pasang 7,865 M.4.030 . . .
A.4.4.2.17. P-168 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 20 mm 102,725 0.64 . 82,860 - 19,865
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
5.89 Kg Semen 11,776 M.4.033 . . .
0.04 m3 Pasir Pasang 8,089 M.4.030 . . .
A.4.4.2.18. P-169 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm 99,494 0.70 . 90,625 - 8,870
0.44 OH Pekerja 46,332 L.4.001 . . .
0.22 OH Tukang Batu 34,738 L.4.007 . . .
0.02 OH Kepala Tukang 4,343 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
0.01 m3 Semen 18 M.4.033 . . .
0.01 m3 Kapur Pasang 4,807 M.4.022 . . .
0.02 m3 Pasir Pasang 4,045 M.4.030 . . .
A.4.4.2.19. P-170 1.00 m2 Pemasangan berapen 1SP : 5PP tebal 15 mm 47,322 0.24 . 31,112 - 16,210
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Batu 11,843 L.4.007 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
5.18 Kg Semen 10,368 M.4.033 . . .
0.03 m3 Pasir Pasang 5,842 M.4.030 . . .
A.4.4.2.20. P-171 1.00 m1 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm 84,349 0.52 . 80,428 - 3,921
0.08 OH Pekerja 8,424 L.4.001 . . .
0.40 OH Tukang Batu 63,160 L.4.007 . . .
0.04 OH Kepala Tukang 7,896 L.4.036 . . .

www.mitra-arsitek.com 41/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 948 L.4.035 . . .
0.50 Kg Semen 1,000 M.4.033 . . .
0.01 m3 Pasir Pasang 2,921 M.4.030 . . .
A.4.4.2.21. P-172 1.00 m2 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm 364,901 0.72 . 92,901 - 272,000
0.45 OH Pekerja 47,385 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.02 OH Mandor 5,449 L.4.035 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
15.00 Kg Batu granit 252,000 M.4.014 . . .
A.4.4.2.22. P-173 1.00 m2 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm 148,901 0.72 . 92,901 - 56,000
0.45 OH Pekerja 47,385 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.02 OH Mandor 5,449 L.4.035 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
15.00 Kg Batu teraso 36,000 M.4.018 . . .
A.4.4.2.23. P-174 1.00 m2 Pemasangan plesteran ciprat 1SP : 2PP 62,896 0.43 . 52,908 - 9,988
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
4.32 Kg Semen 8,640 M.4.033 . . .
0.01 m3 Pasir Pasang 1,348 M.4.030 . . .
A.4.4.2.24 P-175 1.00 m2 Pemasangan finishing siar pasangan bata merah 37,328 0.24 . 31,112 - 6,216
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Batu 11,843 L.4.007 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
3.11 Kg Semen 6,216 M.4.033 . . .
A.4.4.2.25. P-176 1.00 m2 Pemasangan Finishing siar pasangan conblock ekspose 17,835 0.11 . 14,635 - 3,200
0.07 OH Pekerja 7,371 L.4.001 . . .
0.04 OH Tukang Batu 5,527 L.4.007 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.60 Kg Semen 3,200 M.4.033 . . .
A.4.4.2.26. P-177 1.00 m2 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. 77,166 0.48 . 61,790 - 15,376
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
6.34 Kg Semen 12,680 M.4.033 . . .
0.01 m3 Pasir Pasang 2,696 M.4.030 . . .
A.4.4.2.27. P-178 1.00 m2 Pemasangan acian. 47,693 0.32 . 41,193 - 6,500
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
3.25 Kg Semen 6,500 M.4.033 . . .
A.4.4.2.28. P-179 1.00 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) 93,790 0.48 . 61,790 - 32,000

www.mitra-arsitek.com 42/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
16.00 Kg Semen 32,000 M.4.033 . . .
A.4.4.2.29. P-180 1.00 m2 Pemasangan Acian dengan mortar siap pakai (MSP) 48,393 0.32 . 41,193 - 7,200
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
3.60 Kg Semen 7,200 M.4.033 . . .
A.4.4.3.1. P-181 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm 126,504 0.40 . 51,708 - 74,796
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin PC abu-abu ukuran 40cm x40cm 45,084 M.4.462 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.2. P-182 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm 139,983 0.40 . 51,708 - 88,275
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin PC abu-abu ukuran 30cm x30 cm 58,163 M.4.461 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.3. P-183 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm 168,889 0.43 . 55,828 - 113,062
0.27 OH Pekerja 28,431 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala tukang 2,764 L.4.036 . . .
0.01 OH Mandor 3,317 L.4.035 . . .
26.50 Bh ubin PC abu-abu ukuran 20cm x20 cm 82,150 M.4.460 . . .
10.40 kg Semen 20,800 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.4. P-184 1.00 m2 Pemasangan lantai ubin warna ukuran 40cm x40 cm 191,543 0.40 . 51,708 - 139,835
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin warna ukuran 40cm x40 cm 106,743 M.4.477 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.5. P-185 1.00 m2 Pemasangan lantai ubin warna ukuran 30cm x30cm 246,620 0.42 . 53,551 - 193,070
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin warna ukuran 30cm x30cm 159,058 M.4.476 . . .

www.mitra-arsitek.com 43/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.6. P-186 1.00 m2 Pemasangan lantai ubin warna ukuran 20cm x20cm 390,401 0.43 . 55,828 - 334,574
0.27 OH Pekerja 28,431 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala tukang 2,764 L.4.036 . . .
0.01 OH Mandor 3,317 L.4.035 . . .
26.50 Bh ubin warna ukuran 20cm x20cm 299,450 M.4.475 . . .
10.40 kg Semen 20,800 M.4.033 . . .
1.62 Kg Semen Warna 4,212 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.7. P-187 1.00 m2 Pemasangan lantai ubin teraso ukuran 40cm x40cm 199,499 0.40 . 51,708 - 147,791
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin teraso ukuran 40cm x40cm 114,699 M.4.473 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.8. P-188 1.00 m2 Pemasangan lantai ubin teraso ukuran 30cm x30cm 247,807 0.42 . 53,551 - 194,257
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin teraso ukuran 30cm x30cm 160,245 M.4.472 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.9. P-189 1.00 m2 Pemasangan lantai ubin granit ukuran 40cm x40cm 217,400 0.40 . 51,708 - 165,692
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin granit ukuran 40cm x40cm 132,600 M.4.457 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.10. P-190 1.00 m2 Pemasangan lantai ubin granit ukuran 30cm x30cm 286,978 0.42 . 53,551 - 233,428
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin granit ukuran 30cm x30cm 199,416 M.4.456 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.11. P-191 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 164,360 0.40 . 51,708 - 112,652
0.25 OH Pekerja 26,325 L.4.001 . . .

www.mitra-arsitek.com 44/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 79,560 M.4.464 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.12. P-192 1.00 m2 Pemasangan lantai ubin teralux ukuran 30cm x30cm 270,360 0.42 . 53,551 - 216,810
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin teralux ukuran 30cm x30cm 182,798 M.4.465 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.13. P-193 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm 220,903 0.38 . 49,432 - 171,472
0.24 OH Pekerja 25,272 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 2,843 L.4.035 . . .
3.10 Bh ubin teralux marmer ukuran 60cm x60cm 138,260 M.4.470 . . .
9.60 kg Semen 19,200 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.14. P-194 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 338,066 0.40 . 51,708 - 286,358
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 253,266 M.4.469 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.15. P-195 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm 484,020 0.42 . 53,551 - 430,470
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin teralux marmer ukuran 30cm x30cm 396,458 M.4.468 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
A.4.4.3.16. P-196 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm 65,298 0.19 . 26,649 - 38,649
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
5.30 Bh Plint ubin Pc abu-abu ukuran 15cm x 20cm 34,450 M.4.432 . . .
1.65 kg Semen 3,300 M.4.033 . . .

www.mitra-arsitek.com 45/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 M3 Pasir Pasang 899 M.4.030 . . .
A.4.4.3.17. P-197 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm 48,512 0.19 . 26,649 - 21,863
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin Pc abu-abu ukuran 10cm x 30cm 18,709 M.4.430 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.18. P-198 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm 45,438 0.19 . 26,649 - 18,789
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin Pc abu-abu ukuran 10cm x 40cm 15,635 M.4.431 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 M3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.19. P-199 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 20cm 42,318 0.19 . 26,649 - 15,669
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin warna ukuran 10cm x 20cm 12,455 M.4.444 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.20. P-200 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 30cm 49,278 0.19 . 26,649 - 22,629
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin warna ukuran 10cm x 30cm 19,415 M.4.445 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.21. P-201 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 40cm 48,678 0.19 . 26,649 - 22,029
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin warna ukuran 10cm x 40cm 18,815 M.4.446 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.22. P-202 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 30cm 47,513 0.19 . 26,649 - 20,864
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin teraso ukuran 10cm x 30cm 17,650 M.4.442 . . .

www.mitra-arsitek.com 46/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.23. P-203 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 40cm 49,738 0.19 . 26,649 - 23,089
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin teraso ukuran 10cm x 40cm 19,875 M.4.443 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.24. P-204 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 40cm 71,203 0.19 . 26,649 - 44,554
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin granit ukuran 10cm x 40cm 41,340 M.4.427 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.25. P-205 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 30cm 81,401 0.19 . 26,649 - 54,752
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin granit ukuran 10cm x 30cm 51,538 M.4.426 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.26. P-206 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm 50,114 0.19 . 26,649 - 23,465
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.63 Bh Plint ubin teralux kerang ukuran 10cm x 40cm 20,251 M.4.436 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.27. P-207 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm 53,161 0.19 . 26,649 - 26,512
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin teralux kerang ukuran 10cm x 30cm 23,298 M.4.435 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.28. P-208 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm 58,763 0.19 . 26,649 - 32,114
0.09 OH Pekerja 9,477 L.4.001 . . .

www.mitra-arsitek.com 47/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.70 Bh plint ubin teralux marmer ukuran 10cm x 60cm 28,900 M.4.440 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.29. P-209 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm 70,938 0.19 . 26,649 - 44,289
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin teralux marmer ukuran 10cm x 40cm 41,075 M.4.439 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.30. P-210 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm 77,871 0.19 . 26,649 - 51,222
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin teralux marmer ukuran 10cm x 30cm 48,008 M.4.438 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
A.4.4.3.31. P-211 1.00 m2 Pemasangan lantai teraso cor di tempat, tebal 3cm 74,573 0.58 . 74,147 - 426
0.36 OH Pekerja 37,908 L.4.001 . . .
0.18 OH Tukang Batu 28,422 L.4.007 . . .
0.02 OH Kepala tukang 3,553 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 M3 Teraso cor di tempat, tebal 3cm 166 M.4.546 . . .
0.10 Kg Semen warna 260 M.4.036 . . .
A.4.4.3.32. P-212 1.00 m2 Pemasangan lantai keramik artistik 10cm x 20cm 266,017 1.12 . 144,176 - 121,842
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 m2 keramik artistik 10cm x 20cm 88,200 M.4.407 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 M3 Pasir pasang 10,112 M.4.030 . . .
2.75 Kg Semen warna 7,150 M.4.036 . . .
A.4.4.3.33. P-213 1.00 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 475,787 1.12 . 144,176 - 331,612
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
106.00 Bh keramik artistik 10cm x 10cm atau 5cm x 20cm 296,800 M.4.406 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
3.20 Kg Semen Warna 8,320 M.4.036 . . .

www.mitra-arsitek.com 48/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.34. P-214 1.00 m2 Pemasangan lantai keramik ukuran 33cm x 33cm 251,879 1.12 . 144,176 - 107,704
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
10.00 Bh keramik ukuran 33cm x 33cm 77,000 M.4.414 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
1.62 Kg Semen Warna 4,212 M.4.036 . . .
A.4.4.3.35. P-215 1.00 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 248,220 1.12 . 144,176 - 104,045
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
11.87 Bh keramik ukuran 30cm x 30cm 70,033 M.4.413 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
A.4.4.3.36. P-216 1.00 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 311,799 1.12 . 144,176 - 167,624
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
26.50 Bh Keramik ukuran 20cm x 20cm 132,500 M.4.412 . . .
10.40 Kg Semen 20,800 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
1.62 Kg Semen Warna 4,212 M.4.036 . . .
A.4.4.3.37. P-217 1.00 m2 keramik ukuran 10cm x 33cm untuk variasi/border 610,654 1.68 . 216,480 - 394,174
1.05 OH Pekerja 110,565 L.4.001 . . .
0.53 OH Tukang Batu 82,898 L.4.007 . . .
0.05 OH Kepala tukang 10,462 L.4.036 . . .
0.05 OH Mandor 12,556 L.4.035 . . .
33.00 Bh Ubin keramik 353,100 M.4.458 . . .
9.80 Kg Semen 19,600 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
4.37 Kg Semen Warna 11,362 M.4.036 . . .
A.4.4.3.38. P-218 1.00 m2 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm 331,253 1.12 . 144,176 - 187,077
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
11.87 Bh Keramik mozaik ukuran 30cm x 30cm 144,814 M.4.411 . . .
14.15 Kg Semen 28,300 M.4.033 . . .
0.04 M3 Pasir Pasang 8,763 M.4.030 . . .
2.00 Kg Semen Warna 5,200 M.4.036 . . .
A.4.4.3.39. P-219 1.00 m1 Pemasangan plint keramik ukuran 10cm x 20cm 70,311 0.22 . 31,782 - 38,529
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .

www.mitra-arsitek.com 49/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
5.30 Bh Plint keramik ukuran 10cm x 20cm 35,510 M.4.422 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
0.03 Kg Semen Warna 65 M.4.036 . . .
A.4.4.3.40. P-220 1.00 m1 Pemasangan plint keramik ukuran 10cm x 10cm 94,226 0.22 . 31,782 - 62,444
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
10.60 Bh Plint keramik ukuran 10cm x 10cm 59,360 M.4.421 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
0.05 Kg Semen Warna 130 M.4.036 . . .
A.4.4.3.41. P-221 1.00 m1 Pemasangan plint keramik ukuran 5cm x 20cm 60,322 0.22 . 31,782 - 28,541
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
5.30 Bh Plint keramik ukuran 5cm x 20cm 27,030 M.4.423 . . .
0.57 Kg Semen 1,140 M.4.033 . . .
0.00 M3 Pasir Pasang 337 M.4.030 . . .
0.01 Kg Semen Warna 34 M.4.036 . . .
A.4.4.3.42. P-222 1.00 m1 Pemasangan plint internal cove artistik 5cm x 5cm x 20cm 251,451 1.61 . 221,207 - 30,244
0.75 OH Pekerja 78,975 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala tukang 14,805 L.4.036 . . .
0.04 OH Mandor 9,002 L.4.035 . . .
5.30 Bh Plint internal cove artistik 5cm x 5cm x 20cm 27,030 M.4.419 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 M3 Pasir Pasang 674 M.4.030 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
A.4.4.3.43. P-223 1.00 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 238,819 1.12 . 144,176 - 94,644
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.06 Bh marmer ukuran 100cm x 100cm 66,462 M.4.417 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 M3 Pasir Pasang 10,112 M.4.030 . . .
0.65 Kg Semen Warna 1,690 M.4.036 . . .
A.4.4.3.44. P-224 1.00 m2 Pemasangan lantai karpet 124,782 0.37 . 50,232 - 74,550
0.17 OH Pekerja 17,901 L.4.001 . . .
0.17 OH Tukang Kayu 26,843 L.4.016 . . .
0.02 OH Kepala tukang 3,356 L.4.036 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.05 m2 Karpet 70,035 M.4.355 . . .
0.35 Kg Lem kayu 4,515 M.4.553 . . .
A.4.4.3.45. P-225 1.00 m2 Pemasangan underlayer (pelapis bawah karpet) 70,444 0.26 . 35,374 - 35,070
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Kayu 18,948 L.4.016 . . .

www.mitra-arsitek.com 50/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.05 m2 underlayer (pelapis bawah karpet) 30,555 M.4.373 . . .
0.35 Kg Lem kayu 4,515 M.4.553 . . .
A.4.4.3.46. P-226 1.00 m2 Pemasangan lantai parquet kayu 167,666 1.12 . 144,176 - 23,490
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Kayu 55,265 L.4.016 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 m2 Parquet kayu 15,750 M.4.359 . . .
0.60 Kg Lem kayu 7,740 M.4.553 . . .
A.4.4.3.47. P-227 1.00 m2 Pemasangan lantai kayu gymfloor 474,686 1.12 . 144,176 - 330,510
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Kayu 55,265 L.4.016 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 m2 Parquet kayu gymfloor 322,770 M.4.360 . . .
0.60 Kg Lem kayu 7,740 M.4.553 . . .
A.4.4.3.48. P-228 1.00 m2 Pemasangan dinding porslen 11cm x 11cm 800,110 1.60 . 205,965 - 594,145
1.00 OH Pekerja 105,300 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
86.00 Bh Porselen (11 x 11) cm 567,600 M.4.449 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
A.4.4.3.49. P-229 1.00 m2 Pemasangan dinding porslen 10cm x 20cm 501,363 1.44 . 185,369 - 315,995
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
53.00 Bh Porselen Dinding 10x20 286,200 M.4.450 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.50. P-230 1.00 m2 Pemasangan dinding porslen 20cm x 20cm 408,057 1.44 . 185,369 - 222,689
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
26.00 Bh Porselen Dinding 20x20 195,000 M.4.451 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
1.94 Kg Semen Warna 5,044 M.4.036 . . .
A.4.4.3.51. P-231 1.00 m2 Pemasangan dinding keramik artistik 10cm x 20cm 289,963 1.44 . 185,369 - 104,595
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .

www.mitra-arsitek.com 51/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 m2 Keramik Dinding artistik 74,800 M.4.410 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.52. P-232 1.00 m2 Pemasangan dinding keramik artistik 5cm x 20cm 286,953 1.44 . 185,369 - 101,585
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.05 m2 Keramik Dinding artistik 71,400 M.4.410 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
2.90 Kg Semen Warna 7,540 M.4.036 . . .
A.4.4.3.53. P-233 1.00 m2 Pemasangan dinding keramik 10cm x 20cm 309,768 1.44 . 185,369 - 124,400
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.05 m2 keramik Dinding 10cm x 20cm 94,605 M.4.408 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.54. P-234 1.00 m2 Pemasangan dinding keramik 20cm x 20cm 282,577 1.44 . 185,369 - 97,209
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.10 m2 keramik Dinding 20cm x 20cm 69,520 M.4.409 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 M3 Pasir Pasang 4,045 M.4.030 . . .
1.94 Kg Semen Warna 5,044 M.4.036 . . .
A.4.4.3.55. P-235 1.00 m2 Pemasangan dinding marmer 100cm x 100cm 513,080 2.08 . 267,755 - 245,325
1.30 OH Pekerja 136,890 L.4.001 . . .
0.65 OH Tukang Batu 102,635 L.4.007 . . .
0.07 OH Kepala tukang 12,831 L.4.036 . . .
0.07 OH Mandor 15,399 L.4.035 . . .
1.06 Bh marmer ukuran 100cm x 100cm 66,462 M.4.417 . . .
12.44 Kg Semen 24,880 M.4.033 . . .
0.03 M3 Semen 50 M.4.033 . . .
0.65 Kg Pasir Pasang 146,055 M.4.030 . . .
3.03 Bh Semen Warna 7,878 M.4.036 . . .
A.4.4.3.56. P-236 1.00 m2 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm 294,013 1.60 . 205,965 - 88,048
1.00 OH Pekerja 105,300 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
63.00 Bh Bata pelapis Dinding 3cm x 7cm x 24cm 50,400 M.4.008 . . .
12.44 Kg Semen 24,880 M.4.033 . . .
0.03 M3 Pasir Pasang 5,618 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .

www.mitra-arsitek.com 52/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.57. P-237 1.00 m2 Pemasangan dinding batu paras 272,340 1.12 . 144,176 - 128,165
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.10 m2 Batu paras 96,800 M.4.015 . . .
11.75 Kg Semen 23,500 M.4.033 . . .
0.04 M3 Pasir Pasang 7,865 M.4.030 . . .
A.4.4.3.58. P-238 1.00 m2 Pemasangan dinding batu tempel hitam 492,230 1.12 . 144,176 - 348,055
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.10 m2 Batu alam / tempel 316,690 M.4.011 . . .
11.75 Kg Semen 23,500 M.4.033 . . .
0.04 M3 Pasir Pasang 7,865 M.4.030 . . .
A.4.4.3.59. P-239 1.00 m2 Pemasangan lantai vynil ukuran 30cm x 30cm 293,373 0.32 . 44,336 - 249,037
0.15 OH Pekerja 15,795 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
11.87 Bh Vinyl 244,522 M.4.404 . . .
0.35 Kg Lem kayu 4,515 M.4.553 . . .
A.4.4.3.60. P-240 1.00 m2 Pemasangan wallpaper lebar 50 cm 158,382 0.54 . 68,317 - 90,065
0.35 OH Pekerja 36,855 L.4.001 . . .
0.18 OH Tukang Batu 27,633 L.4.007 . . .
0.02 OH Kepala tukang 3,356 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
2.20 m Wallpaper 86,240 M.4.374 . . .
0.25 Kg Lem Putih 3,825 M.4.554 . . .
A.4.4.3.61. P-241 1.00 m2 Pemasangan floor harderner 55,374 0.26 . 35,374 - 20,000
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
5.00 Kg Floor hardener 20,000 M.4.587 . . .
A.4.4.3.62. P-242 1.00 m1 Pemasangan plint vynil 15cm x 30cm 73,895 0.17 . 23,583 - 50,312
0.08 OH Pekerja 8,424 L.4.001 . . .
0.08 OH Tukang Batu 12,632 L.4.007 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.76 Bh plint vynil 15cm x 30cm 49,280 M.4.447 . . .
0.08 Kg Lem kayu 1,032 M.4.553 . . .
A.4.4.3.63. P-243 1.00 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 55,215 0.26 . 35,374 - 19,841
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.00 M3 Kayu Papan kelas I 19,796 M.4.101 . . .
0.05 Kg Paku sekrup 45 M.4.165 . . .

www.mitra-arsitek.com 53/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.64. P-244 1.00 m2 Pemasangan paving block natural tebal 6 cm 240,545 0.53 . 71,327 21,000 148,218
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
1.01 M2 Paving block 6 cm 133,623 M.4.542 . . .
0.05 M3 Pasir beton 14,595 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,000 T.4.004 . . .
A.4.4.3.65. P-245 1.00 m2 Pemasangan paving block natural tebal 8 cm 116,497 0.53 . 71,327 21,000 24,170
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
1.01 M2 Paving block 8 cm natural 3,737 M.4.544 . . .
0.07 M3 Pasir beton 20,433 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,000 T.4.004 . . .
A.4.4.3.66. P-246 1.00 m2 Pemasangan paving block berwarna tebal 6 cm 243,474 0.53 . 71,327 21,000 151,147
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
1.01 M2 Paving block 6cm berwarna 136,552 M.4.543 . . .
0.05 M3 Pasir beton 14,595 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,000 T.4.004 . . .
A.4.4.3.67. P-247 1.00 m2 Pemasangan paving block berwarna tebal 8 cm 233,859 0.53 . 71,327 21,000 141,532
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
1.01 M2 Paving block 8 cm berwarna 121,099 M.4.541 . . .
0.07 M3 Pasir beton 20,433 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,000 T.4.004 . . .
A.4.4.3.68. P-248 1.00 m2 Pemasangan Aluminium Composite Panel 156,038 0.24 . 31,217 - 124,822
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Besi 11,948 L.4.008 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.37 Lbr Aluminium Composite Panel 112,822 M.4.120 . . .
20.00 bh Screw 12,000 M.4.182 . . .
A.4.5.1.1. P-249 1.00 m2 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm110,903 0.11 . 16,541 - 94,362
0.03 OH Pekerja 3,159 L.4.001 . . .
0.07 OH Tukang kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 m2 Asbes semen 94,160 M.4.342 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
A.4.5.1.2. P-250 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 30) cm 447,984 0.26 . 35,374 - 412,610
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang kayu 18,948 L.4.016 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .

www.mitra-arsitek.com 54/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 1,421 L.4.035 . . .
12.00 Lbr Akustik ukuran 30 x 30 cm 411,600 M.4.340 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .
A.4.5.1.3. P-251 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 60) cm 378,004 0.26 . 35,374 - 342,630
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang kayu 18,948 L.4.016 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
5.80 Lbr Akustik ukuran 30 x 60 cm 341,620 M.4.341 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .
A.4.5.1.4. P-252 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm 232,089 0.22 . 29,479 - 202,610
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.50 Lbr Akustik Uk. 60 cm x 120 cm 201,600 M.4.339 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .
A.4.5.1.5. P-253 1.00 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm,44,410
4 mm & 6 0.22 . 29,479 - 14,931
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.38 Lbr Tripleks 14,325 M.4.372 . . .
0.03 kg Paku tripleks 606 M.4.171 . . .
A.4.5.1.6. P-254 1.00 m2 Pemasangan langit-langit lambrisering kayu, tebal 9 mm 293,780 1.72 . 235,828 - 57,952
0.80 OH Pekerja 84,240 L.4.001 . . .
0.80 OH Tukang kayu 126,320 L.4.016 . . .
0.08 OH Kepala tukang 15,792 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.02 m3 Kayu Papan 3/20 57,750 M.4.100 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
A.4.5.1.7. P-255 1.00 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 51,745
9 mm 0.16 . 20,597 - 31,148
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Tukang kayu 7,895 L.4.016 . . .
0.01 OH Kepala tukang 987 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.36 Lbr Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 99 M.4.165 . . .
A.4.5.1.8. P-256 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut 407,718
rangka alluminium
1.08 . 147,393 - 260,325
0.50 OH Pekerja 52,650 L.4.001 . . .
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
3.60 m Profil Alluminium "T" 47,880 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,700 M.4.145 . . .
1.05 bh Baut Ramset / Dina Bolt 5,145 M.4.130 . . .
1.50 Lbr Akustik Uk. 60 cm x 120 cm 201,600 M.4.339 . . .
A.4.5.1.9. P-257 1.00 m1 Pemasangan list langit-langit kayu profil 18,381 0.11 . 14,858 - 3,523
0.05 OH Pekerja 5,265 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .

www.mitra-arsitek.com 55/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala tukang 987 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.05 m List kayu profil 3,255 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 268 M.4.158 . . .
A.4.5.1.10. P-258 1.00 m2 Pemasangan Plafond PVC 211,308 0.50 . 77,973 - 133,335
0.15 OH Pekerja 15,795 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
1.05 m2 Plafond PVC 122,535 M.4.362 . . .
18.00 bh Screw 10,800 M.4.182 . . .
A.4.5.1.10. P-259 1.00 m2 Pemasangan List Plafond PVC 59,267 0.16 . 20,597 - 38,670
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala tukang 987 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.05 M' List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) 35,070 M.4.357 . . .
6.00 bh Screw 3,600 M.4.182 . . .
A.4.5.2.1. P-260 1.00 m2 Pemasangan atap genteng palentong kecil 98,513 0.24 . 31,013 - 67,500
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,481 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
25.00 Bh Genteng palentong 67,500 M.4.494 . . .
A.4.5.2.2. P-261 1.00 m2 Pemasangan atap genteng kodok glazuur 68,612 0.24 . 31,112 - 37,500
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
25.00 Bh Genteng kodok 37,500 M.4.492 . . .
A.4.5.2.3. P-262 1.00 m2 Pemasangan atap genteng palentong besar/super 49,112 0.24 . 31,112 - 18,000
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
12.00 Bh Genteng kodok 18,000 M.4.492 . . .
A.4.5.2.4. P-263 1.00 m1 Pemasangan bubung genteng palentong 125,812 0.62 . 78,122 - 47,690
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
5.00 Bh Genteng bubung 24,500 M.4.488 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 M3 Pasir Pasang 7,190 M.4.030 . . .
A.4.5.2.5. P-264 1.00 m1 Pemasangan bubung genteng kodok glazuur 125,812 0.62 . 78,122 - 47,690
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
5.00 Bh Genteng bubung 24,500 M.4.488 . . .

www.mitra-arsitek.com 56/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 M3 Pasir Pasang 7,190 M.4.030 . . .
A.4.5.2.6. P-265 1.00 m1 Pemasangan bubung genteng palentong besar 120,912 0.62 . 78,122 - 42,790
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
4.00 Bh Genteng bubung 19,600 M.4.488 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 M3 Pasir Pasang 7,190 M.4.030 . . .
A.4.5.2.7. P-266 1.00 m2 Pemasangan roof light fibreglass 90x180 101,701 0.22 . 28,361 - 73,340
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 10,579 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.60 Lbr Rooflight 90x180 72,000 M.4.509 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.5.2.8. P-267 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm 87,221 0.23 . 30,059 - 57,162
0.14 OH Pekerja 14,742 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.50 Lbr Asbes gelombang 92x250 55,650 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.9. P-268 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm 98,351 0.23 . 30,059 - 68,292
0.14 OH Pekerja 14,742 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.60 Lbr Asbes gelombang 92x250 66,780 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.10. P-269 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm 97,127 0.22 . 28,835 - 68,292
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.60 Lbr Asbes gelombang 92x250 66,780 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.11. P-270 1.00 m2 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm 113,822 0.22 . 28,835 - 84,987
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.75 Lbr Asbes gelombang 92x250 83,475 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.12. P-271 1.00 m2 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm 69,302 0.22 . 28,835 - 40,467
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .

www.mitra-arsitek.com 57/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 Lbr Asbes gelombang 92x250 38,955 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.13. P-272 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm 77,093 0.22 . 28,835 - 48,258
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.42 Lbr Asbes gelombang 92x250 46,746 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.14. P-273 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm 79,319 0.22 . 28,835 - 50,484
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.44 Lbr Asbes gelombang 92x250 48,972 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.15. P-274 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm 87,110 0.22 . 28,835 - 58,275
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.51 Lbr Asbes gelombang 92x250 56,763 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.16. P-275 1.00 m2 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm 119,387 0.22 . 28,835 - 90,552
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.80 Lbr Asbes gelombang 92x250 89,040 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.17. P-276 1.00 m2 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm 71,528 0.22 . 28,835 - 42,693
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.37 Lbr Asbes gelombang 92x250 41,181 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.18. P-277 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm 72,641 0.22 . 28,835 - 43,806
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.38 Lbr Asbes gelombang 92x250 42,294 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.19. P-278 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm 81,545 0.22 . 28,835 - 52,710
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.46 Lbr Asbes gelombang 92x250 51,198 M.4.345 . . .

www.mitra-arsitek.com 58/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.20. P-279 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm 84,884 0.22 . 28,835 - 56,049
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.49 Lbr Asbes gelombang 92x250 54,537 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.21. P-280 1.00 m2 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm 93,788 0.22 . 28,835 - 64,953
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.57 Lbr Asbes gelombang 92x250 63,441 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.22. P-281 1.00 m1 Pemasangan bubung stel gelombang 0,92m 74,937 0.23 . 32,097 - 42,840
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.40 Lbr Bubung stel gel. 37,440 M.4.480 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.23. P-282 1.00 m1 Pemasangan bubung stel gelombang 1,05m 70,257 0.23 . 32,097 - 38,160
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.10 Lbr Bubung stel gel. 32,760 M.4.480 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.24. P-283 1.00 m1 Pemasangan bubung stel gelombang 1,08m 69,477 0.23 . 32,097 - 37,380
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.05 Lbr Bubung stel gel. 31,980 M.4.480 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.25. P-284 1.00 m1 Pemasangan Nok paten 0,92m 88,857 0.23 . 32,097 - 56,760
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 Lbr Nok Paten 51,360 M.4.503 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.26. P-285 1.00 m1 Pemasangan Nok paten 1,05m 88,857 0.23 . 32,097 - 56,760
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 Lbr Nok Paten 51,360 M.4.503 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .

www.mitra-arsitek.com 59/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.2.27. P-286 1.00 m1 Pemasangan Nok paten 1,08m 88,857 0.23 . 32,097 - 56,760
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 Lbr Nok Paten 51,360 M.4.503 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.28. P-287 1.00 m1 Pemasangan nok stel rata 0,92m 90,209 0.27 . 37,729 - 52,480
0.10 OH Pekerja 10,530 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 Lbr Nok Paten 47,080 M.4.503 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.29. P-288 1.00 m1 Pemasangan nok stel rata 1,05m 84,577 0.23 . 32,097 - 52,480
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 Lbr Nok Paten 47,080 M.4.503 . . .
6.00 Bh Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.30. P-289 1.00 m2 Pemasangan genteng beton 71,697 0.32 . 41,193 - 30,504
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
11.00 Bh Genteng beton 29,700 M.4.485 . . .
0.03 Kg Paku Biasa 2" - 5" 804 M.4.158 . . .
A.4.5.2.31. P-290 1.00 m2 Pemasangan genteng aspal 137,575 0.51 . 71,391 - 66,184
0.20 OH Pekerja 21,060 L.4.001 . . .
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.00 OH Kepala tukang 592 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
6.90 Bh Genteng aspal 19,320 M.4.484 . . .
0.35 Lbr Plywood 120x240 tbl. 6 mm 28,560 M.4.366 . . .
0.03 Kg Paku Biasa 2" - 5" 804 M.4.158 . . .
0.50 Bh Plastic aerator 17,500 M.4.363 . . .
A.4.5.2.32. P-291 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 93,971 0.31 . 39,061 - 54,910
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.30 Bh Genteng metal 50,050 M.4.493 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.33. P-292 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai 120,921 0.31 . 39,061 - 81,860
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
2.00 Bh Genteng metal 77,000 M.4.493 . . .

www.mitra-arsitek.com 60/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.34. P-293 1.00 m2 Pemasangan atap sirap kayu 147,145 0.45 . 63,785 - 83,360
0.17 OH Pekerja 17,480 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
30.00 Bh Sirap kayu 78,000 M.4.510 . . .
0.20 Kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
A.4.5.2.35. P-294 1.00 m1 Pemasangan nok genteng beton 168,666 0.64 . 82,386 - 86,280
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
3.50 Bh nok genteng beton 53,550 M.4.499 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
10.80 Kg Semen 21,600 M.4.033 . . .
0.03 M3 Pasir Pasang 7,190 M.4.030 . . .
1.00 Kg Semen warna 2,600 M.4.036 . . .
A.4.5.2.36. P-295 1.00 m1 Pemasangan Nok genteng aspal 125,061 0.41 . 58,994 - 66,068
0.13 OH Pekerja 13,163 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
2.00 Bh nok genteng aspal 52,600 M.4.498 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.00 M3 Kayu balok borneo 12,128 M.4.084 . . .
A.4.5.2.37. P-296 1.00 m1 Pemasangan nok genteng metal 155,181 0.43 . 56,051 - 99,130
0.25 OH Pekerja 26,325 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
1.10 Bh nok genteng metal 97,790 M.4.501 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.5.2.38. P-297 1.00 m1 Pemasangan Nok sirap 81,474 0.41 . 58,994 - 22,480
0.13 OH Pekerja 13,163 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 19,800 M.4.368 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.5.2.39. P-298 1.00 m2 Pemasangan atap seng gelombang 59,902 0.19 . 24,716 - 35,186
0.12 OH Pekerja 12,636 L.4.001 . . .
0.06 OH Tukang Kayu 9,474 L.4.016 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 34,650 M.4.368 . . .
0.02 Kg Paku Biasa 2" - 5" 536 M.4.158 . . .
A.4.5.2.40. P-299 1.00 m1 Pemasangan nok atap seng 45,573 0.23 . 29,651 - 15,922
0.15 OH Pekerja 15,795 L.4.001 . . .

www.mitra-arsitek.com 61/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.30 Lbr Seng Gelombang 3" x 6" BJLS 28 14,850 M.4.368 . . .
0.04 Kg Paku Biasa 2" - 5" 1,072 M.4.158 . . .
A.4.5.2.41. P-300 1.00 m2 Pemasangan atap alumunium 300,854 0.99 . 151,433 - 149,421
0.15 OH Pekerja 15,795 L.4.001 . . .
0.75 OH Tukang Kayu 118,425 L.4.016 . . .
0.08 OH Kepala tukang 15,792 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.05 Lbr Alumunium gel tbl 0,55 149,205 M.4.123 . . .
0.02 Kg Paku Hak Panjang 15cm 216 M.4.161 . . .
A.4.5.2.42. P-301 1.00 m1 Pemasangan Nok alumunium 208,007 1.25 . 200,015 - 7,992
0.10 OH Pekerja 10,530 L.4.001 . . .
1.00 OH Tukang Kayu 157,900 L.4.016 . . .
0.10 OH Kepala tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.20 Bh Nok standar 40x18 7,560 M.4.505 . . .
0.04 Kg Paku Hak Panjang 15cm 432 M.4.161 . . .
A.4.5.2.43. P-302 1.00 m2 Pemasangan alumunium foil/sisalation 59,857 0.21 . 26,572 - 33,285
0.15 OH Pekerja 15,795 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala tukang 987 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.05 M2 Aluminium foil 33,285 M.4.121 . . .
A.4.6.1.1. P-303 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu13,259,355
kelas I 30.45 . 4,550,455 - 8,708,900
7.00 OH Pekerja 737,100 L.4.001 . . .
21.00 OH Tukang kayu 3,315,900 L.4.016 . . .
2.10 OH Kepala tukang 414,540 L.4.036 . . .
0.35 OH Mandor 82,915 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,662,500 M.4.072 . . .
1.25 Kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 Kg Lem kayu 12,900 M.4.553 . . .
A.4.6.1.2. P-304 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu13,396,790
kelas II atau 26.10
III . 3,900,390 - 9,496,400
6.00 OH Pekerja 631,800 L.4.001 . . .
18.00 OH Tukang kayu 2,842,200 L.4.016 . . .
1.80 OH Kepala tukang 355,320 L.4.036 . . .
0.30 OH Mandor 71,070 L.4.035 . . .
1.20 m3 Balok kayu 8/15 Kelas I 9,450,000 M.4.072 . . .
1.25 Kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 Kg Lem kayu 12,900 M.4.553 . . .
A.4.6.1.3. P-305 1.00 m2 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II 382,981 1.52 . 227,641 - 155,340
0.35 OH Pekerja 36,855 L.4.001 . . .
1.05 OH Tukang kayu 165,795 L.4.016 . . .
0.11 OH Kepala tukang 20,727 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 154,000 M.4.100 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.4. P-306 1.00 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III 382,981 1.52 . 227,641 - 155,340
0.35 OH Pekerja 36,855 L.4.001 . . .

www.mitra-arsitek.com 62/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.05 OH Tukang kayu 165,795 L.4.016 . . .
0.11 OH Kepala tukang 20,727 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 154,000 M.4.100 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.5. P-307 1.00 m2 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II 810,515 4.35 . 650,065 - 160,450
1.00 OH Pekerja 105,300 L.4.001 . . .
3.00 OH Tukang kayu 473,700 L.4.016 . . .
0.30 OH Kepala tukang 59,220 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 154,000 M.4.100 . . .
0.50 Kg Lem kayu 6,450 M.4.553 . . .
A.4.6.1.6. P-308 1.00 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau
616,322
II 3.48 . 520,052 - 96,270
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang kayu 378,960 L.4.016 . . .
0.24 OH Kepala tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.02 m3 Kayu Papan 3/20 92,400 M.4.100 . . .
0.30 Kg Lem kayu 3,870 M.4.553 . . .
A.4.6.1.7. P-309 1.00 m2 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau
902,915
II 4.35 . 650,065 - 252,850
1.00 OH Pekerja 105,300 L.4.001 . . .
3.00 OH Tukang kayu 473,700 L.4.016 . . .
0.30 OH Kepala tukang 59,220 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
0.06 m3 Kayu Papan 3/20 246,400 M.4.100 . . .
0.50 Kg Lem kayu 6,450 M.4.553 . . .
A.4.6.1.8. P-310 1.00 m2 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup
635,650 3.05 . 455,046 - 180,604
0.70 OH Pekerja 73,710 L.4.001 . . .
2.10 OH Tukang kayu 331,590 L.4.016 . . .
0.21 OH Kepala tukang 41,454 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 96,250 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 804 M.4.158 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 Lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
A.4.6.1.9. P-311 1.00 m2 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau 702,966
II 3.48 . 520,052 - 182,914
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang kayu 378,960 L.4.016 . . .
0.24 OH Kepala tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 98,560 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 804 M.4.158 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 Lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
A.4.6.1.10. P-312 1.00 m2 Pemasangan jalusi kusen, kayu kelas I atau II 740,213 3.21 . 505,193 - 235,020
0.67 OH Pekerja 70,551 L.4.001 . . .
2.00 OH Tukang kayu 315,800 L.4.016 . . .
0.20 OH Kepala tukang 39,480 L.4.036 . . .
0.34 OH Mandor 79,362 L.4.035 . . .
0.06 m3 Kayu Papan 3/20 231,000 M.4.100 . . .

www.mitra-arsitek.com 63/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
A.4.6.1.11. P-313 1.00 m2 Pemasangan teakwood rangkap, rangka expose kayu kelas I 683,076 3.48 . 520,052 - 163,024
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang kayu 378,960 L.4.016 . . .
0.24 OH Kepala tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 96,250 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 804 M.4.158 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 Lbr Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
A.4.6.1.12. P-314 1.00 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas
771,648
II 3.70 . 552,674 - 218,974
0.85 OH Pekerja 89,505 L.4.001 . . .
2.55 OH Tukang kayu 402,645 L.4.016 . . .
0.26 OH Kepala tukang 50,337 L.4.036 . . .
0.04 OH Mandor 10,187 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 96,250 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 804 M.4.158 . . .
0.80 kg Lem kayu 10,320 M.4.553 . . .
1.00 Lbr Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
0.50 Lbr Formika 49,500 M.4.351 . . .
A.4.6.1.13. P-315 1.00 m3 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II11,621,340
dan III bentang
17.40
6 meter . 2,600,260 - 9,021,080
4.00 OH Pekerja 421,200 L.4.001 . . .
12.00 OH Tukang kayu 1,894,800 L.4.016 . . .
1.20 OH Kepala tukang 236,880 L.4.036 . . .
0.20 OH Mandor 47,380 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,662,500 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 150,080 M.4.158 . . .
A.4.6.1.14. P-316 1.00 m3 Pemasangan konstruksi kuda-kuda expose, kayu kelas I 14,164,016 29.15 . 4,355,436 - 9,808,580
6.70 OH Pekerja 705,510 L.4.001 . . .
20.10 OH Tukang kayu 3,173,790 L.4.016 . . .
2.01 OH Kepala tukang 396,774 L.4.036 . . .
0.34 OH Mandor 79,362 L.4.035 . . .
1.20 m3 Balok kayu 8/15 Kelas I 9,450,000 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 150,080 M.4.158 . . .
A.4.6.1.15. P-317 1.00 m3 Pemasangan konstruksi gordeng, kayu kelas II 13,306,836 29.15 . 4,355,436 - 8,951,400
6.70 OH Pekerja 705,510 L.4.001 . . .
20.10 OH Tukang kayu 3,173,790 L.4.016 . . .
2.01 OH Kepala tukang 396,774 L.4.036 . . .
0.34 OH Mandor 79,362 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,662,500 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku Biasa 2" - 5" 80,400 M.4.158 . . .
A.4.6.1.16. P-318 1.00 m2 Pemasangan rangka atap genteng keramik, kayu kelas II 183,021 0.22 . 29,479 - 153,542
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 35,098 M.4.082 . . .

www.mitra-arsitek.com 64/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 m3 Reng 2 x 3 cm Kayu Kelas II 111,744 M.4.047 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.17. P-319 1.00 m2 Pemasangan rangka atap genteng beton, kayu kelas II 248,205 0.22 . 29,479 - 218,726
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 35,098 M.4.082 . . .
0.06 m3 Reng 2 x 3 cm Kayu Kelas II 176,928 M.4.047 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.18. P-320 1.00 m2 Pemasangan rangka atap sirap, kayu kelas II 72,000 0.26 . 35,374 - 36,626
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang kayu 18,948 L.4.016 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 35,098 M.4.082 . . .
0.06 m3 Paku Biasa 2" - 5" 1,528 M.4.158 . . .
A.4.6.1.19. P-321 1.00 m2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau 130,822
III 0.56 . 86,855 - 43,968
0.15 OH Pekerja 15,795 L.4.001 . . .
0.30 OH Tukang kayu 47,370 L.4.016 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
0.02 m3 Kayu balok 5/7 Kelas II 38,608 M.4.082 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
A.4.6.1.20. P-322 1.00 m2 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III
124,285 0.54 . 76,721 - 47,564
0.20 OH Pekerja 21,060 L.4.001 . . .
0.30 OH Tukang kayu 47,370 L.4.016 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
0.02 m3 Kayu balok 5/7 Kelas II 40,864 M.4.082 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.21. P-323 1.00 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 91,503 0.33 . 47,243 - 44,260
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 41,580 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
A.4.6.1.22. P-324 1.00 m1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 90,933 0.33 . 47,243 - 43,690
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 42,350 M.4.100 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.23. P-325 1.00 m2 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau 322,148
III 0.65 . 97,628 - 224,520
0.15 OH Pekerja 15,795 L.4.001 . . .
0.45 OH Tukang kayu 71,055 L.4.016 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .

www.mitra-arsitek.com 65/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 m3 Balok kayu 8/15 Kelas I 220,500 M.4.072 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
A.4.6.1.24. P-326 1.00 m2 Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas304,816
II 0.65 . 97,628 - 207,188
0.15 OH Pekerja 15,795 L.4.001 . . .
0.45 OH Tukang kayu 71,055 L.4.016 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 128,520 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 Lbr Teakwood 4 mm, 120 x 240 67,424 M.4.371 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
A.4.6.1.25. P-327 1.00 m2 Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas 336,083
II 0.87 . 130,013 - 206,070
0.20 OH Pekerja 21,060 L.4.001 . . .
0.60 OH Tukang kayu 94,740 L.4.016 . . .
0.06 OH Kepala tukang 11,844 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 128,520 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 Lbr Plywood 120x240 tbl. 4 mm 66,306 M.4.365 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
A.4.6.1.26. P-328 1.00 m2 Pemasangan dinding lambrisering dari Kayu Papan kelas I 419,804 2.61 . 390,039 - 29,765
0.60 OH Pekerja 63,180 L.4.001 . . .
1.80 OH Tukang kayu 284,220 L.4.016 . . .
0.18 OH Kepala tukang 35,532 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 26,950 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku sekrup 135 M.4.165 . . .
A.4.6.1.27. P-329 1.00 m2 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm
48,471 0.11 . 16,291 - 32,180
0.03 OH Pekerja 2,633 L.4.001 . . .
0.08 OH Tukang kayu 11,843 L.4.016 . . .
0.01 OH Kepala tukang 1,579 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.40 m3 Plywood 120x240 tbl. 4 mm 30,840 M.4.365 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.28. P-330 1.00 m2 Pemasangan dinding bilik, rangka kayu kelas III atau IV 195,216 0.16 . 20,597 - 174,620
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Tukang kayu 7,895 L.4.016 . . .
0.01 OH Kepala tukang 987 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.50 m2 Bilik bambu 122,700 M.4.350 . . .
0.01 m3 Kayu balok 5/7 Kelas II 35,098 M.4.082 . . .
0.01 kg Paku Biasa 2" - 5" 322 M.4.158 . . .
0.00 m3 List kayu 2/4 16,500 M.4.043 . . .
A.4.6.2.1. P-331 1.00 bh Pemasangan kunci tanam antik 383,613 0.72 . 113,613 - 270,000
0.06 OH Pekerja 6,318 L.4.001 . . .
0.60 OH Tukang kayu 94,740 L.4.016 . . .
0.06 OH Kepala tukang 11,844 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Bh Kunci tanam antik 270,000 M.4.582 . . .

www.mitra-arsitek.com 66/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.6.2.2. P-332 1.00 bh Pemasangan kunci tanam biasa 234,058 0.57 . 91,058 - 143,000
0.01 OH Pekerja 1,053 L.4.001 . . .
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 Bh Kunci tanam biasa 143,000 M.4.583 . . .
A.4.6.2.3. P-333 1.00 bh Pemasangan kunci kamar mandi 138,557 0.56 . 90,057 - 48,500
0.01 OH Pekerja 527 L.4.001 . . .
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Bh Kunci tanam KM 48,500 M.4.584 . . .
A.4.6.2.4. P-334 1.00 bh Pemasangan kunci silinder 164,357 0.56 . 90,057 - 74,300
0.01 OH Pekerja 527 L.4.001 . . .
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Bh Kunci silinder 74,300 M.4.580 . . .
A.4.6.2.5. P-335 1.00 bh Pemasangan engsel pintu 47,015 0.18 . 28,415 - 18,600
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.00 Bh Engsel pintu 18,600 M.4.574 . . .
A.4.6.2.6. P-336 1.00 bh Pemasangan engsel jendela kupu-kupu 40,535 0.12 . 18,935 - 21,600
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.00 OH Mandor 118 L.4.035 . . .
1.00 Bh Engsel kupu-kupu 21,600 M.4.573 . . .
A.4.6.2.7. P-337 1.00 bh Pemasangan engsel angin 54,076 0.32 . 46,176 - 7,900
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 118 L.4.035 . . .
1.00 Bh Engsel angin 7,900 M.4.571 . . .
A.4.6.2.8. P-338 1.00 bh Pemasangan spring knip 38,321 0.19 . 30,121 - 8,200
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 Bh Spring knip 8,200 M.4.600 . . .
A.4.6.2.9. P-339 1.00 bh Pemasangan kait angin 35,921 0.19 . 30,121 - 5,800
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 Bh Kait angin 5,800 M.4.142 . . .
A.4.6.2.10. P-340 1.00 bh Pemasangan door closer 367,296 0.60 . 94,796 - 272,500
0.05 OH Pekerja 5,265 L.4.001 . . .

www.mitra-arsitek.com 67/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 set Door closer 272,500 M.4.568 . . .
A.4.6.2.11. P-341 1.00 bh Pemasangan kunci slot 91,871 0.24 . 37,871 - 54,000
0.02 OH Pekerja 2,106 L.4.001 . . .
0.20 OH Tukang kayu 31,580 L.4.016 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.00 Bh Kunci slot 54,000 M.4.581 . . .
A.4.6.2.12. P-342 1.00 bh Pemasangan Door holder 196,696 0.60 . 94,796 - 101,900
0.05 OH Pekerja 5,265 L.4.001 . . .
0.50 OH Tukang kayu 78,950 L.4.016 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Bh Door holder 101,900 M.4.569 . . .
A.4.6.2.13. P-343 1.00 bh Pemasangan door stop 126,902 0.13 . 20,002 - 106,900
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang kayu 15,790 L.4.016 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 Bh Door stop 106,900 M.4.570 . . .
A.4.6.2.14. P-344 1.00 bh Pemasangan Rrel pintu sorong 329,613 0.72 . 113,613 - 216,000
0.06 OH Pekerja 6,318 L.4.001 . . .
0.60 OH Tukang kayu 94,740 L.4.016 . . .
0.06 OH Kepala tukang 11,844 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Set Rel pintu dorong 216,000 M.4.179 . . .
A.4.6.2.15. P-345 1.00 bh Pemasangan kunci lemari 59,950 0.30 . 47,350 - 12,600
0.03 OH Pekerja 2,633 L.4.001 . . .
0.25 OH Tukang kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.00 Set Kunci lemari 12,600 M.4.579 . . .
A.4.6.2.16. P-346 1.00 m2 Pemasangan kaca tebal 3 mm 137,425 0.18 . 28,415 - 109,010
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.10 m2 Kaca tebal 3mm 97,020 M.4.525 . . .
0.05 Kg SEalant 11,990 M.4.598 . . .
A.4.6.2.17. P-347 1.00 m2 Pemasangan kaca tebal 5 mm 173,725 0.18 . 28,415 - 145,310
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.10 m2 Kaca tebal 5 mm 133,320 M.4.526 . . .
0.05 Kg SEalant 11,990 M.4.598 . . .
A.4.6.2.18. P-348 1.00 m2 Pemasangan kaca tebal 8 mm 258,978 0.20 . 32,202 - 226,776
0.02 OH Pekerja 1,790 L.4.001 . . .

www.mitra-arsitek.com 68/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.17 OH Tukang kayu 26,843 L.4.016 . . .
0.02 OH Kepala tukang 3,356 L.4.036 . . .
0.00 OH Mandor 213 L.4.035 . . .
1.10 m2 Kaca tebal 8 mm 209,990 M.4.527 . . .
0.07 Kg SEalant 16,786 M.4.598 . . .
A.4.6.2.19. P-349 1.00 m2 Pemasangan kaca buram tebal 12 mm 247,286 0.30 . 47,350 - 199,936
0.03 OH Pekerja 2,633 L.4.001 . . .
0.25 OH Tukang kayu 39,475 L.4.016 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.10 m2 Kaca buram 12 mm 183,150 M.4.520 . . .
0.07 Kg SEalant 16,786 M.4.598 . . .
A.4.6.2.20. P-350 1.00 m2 Pemasangan kaca cermin tebal 5 mm 213,931 0.19 . 30,121 - 183,810
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.10 m2 Kaca cermin 5 mm 183,810 M.4.521 . . .
A.4.6.2.21. P-351 1.00 m2 Pemasangan kaca cermin tebal 8 mm 290,091 0.21 . 34,121 - 255,970
0.02 OH Pekerja 1,790 L.4.001 . . .
0.17 OH Tukang kayu 26,843 L.4.016 . . .
0.02 OH Kepala tukang 3,356 L.4.036 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.10 m2 Kaca cermin 8 mm 255,970 M.4.522 . . .
A.4.6.2.22. P-352 1.00 m2 Pemasangan kaca wireglassed tebal 5 mm 286,091 0.19 . 30,121 - 255,970
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.10 m2 Kaca wire glass 255,970 M.4.528 . . .
A.4.6.2.23. P-353 1.00 m2 Pemasangan kaca patri tebal 5 mm 139,111 0.24 . 35,491 - 103,620
0.08 OH Pekerja 7,898 L.4.001 . . .
0.15 OH Tukang kayu 23,685 L.4.016 . . .
0.02 OH Kepala tukang 2,961 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 m2 Kaca patri 5mm 91,630 M.4.523 . . .
0.05 Kg Sealant 11,990 M.4.598 . . .
A.4.7.1.1. P-354 1.00 m2 Pengikisan/pengerokan permukaan cat lama 18,871 0.15 . 16,506 - 2,365
0.15 OH Pekerja 15,795 L.4.001 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.05 Kg Soda api 2,365 M.4.562 . . .
A.4.7.1.2. P-355 1.00 m2 Pencucian bidang permukaan tembok yang pernah dicat 17,126 0.15 . 16,506 - 620
0.15 OH Pekerja 15,795 L.4.001 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.05 Kg Sabun 620 M.4.561 . . .
A.4.7.1.3. P-356 1.00 m2 Pengerokan karat pada permukaan baja cara manual 18,310 0.16 . 17,690 - 620
0.15 OH Pekerja 15,795 L.4.001 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.05 Kg Sabun 620 M.4.561 . . .
A.4.7.1.4. P-357 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
45,657
cat penutup)
0.09 . 10,569 - 35,088

www.mitra-arsitek.com 69/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Pekerja 7,371 L.4.001 . . .
0.01 OH Tukang cat 1,303 L.4.010 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.20 Kg Cat meni 3,620 M.4.386 . . .
0.15 Kg Plamir 8,880 M.4.399 . . .
0.17 Kg Cat dasar Kayu 5,695 M.4.380 . . .
0.26 Kg Cat kayu 14,274 M.4.385 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.03 Kg Pengencer 1,092 M.4.398 . . .
0.20 Lbr Amplas 1,340 M.4.548 . . .
A.4.7.1.5. P-358 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis
64,104
cat Penutup)
0.18 . 24,075 - 40,029
0.07 OH Pekerja 7,371 L.4.001 . . .
0.11 OH Tukang cat 15,204 L.4.010 . . .
0.00 OH Kepala tukang 790 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.20 Kg Cat meni 3,620 M.4.386 . . .
0.15 Kg Plamir 8,880 M.4.399 . . .
0.17 Kg Cat dasar Kayu 5,695 M.4.380 . . .
0.35 Kg Cat kayu 19,215 M.4.385 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.03 Kg Pengencer 1,092 M.4.398 . . .
0.20 Lbr Amplas 1,340 M.4.548 . . .
A.4.7.1.6. P-359 1.00 m2 Pelaburan bidang kayu dengan teak oil 32,565 0.17 . 26,481 - 6,084
0.04 OH Pekerja 4,212 L.4.001 . . .
0.06 OH Tukang cat 9,122 L.4.010 . . .
0.06 OH Kepala tukang 12,436 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.36 L Teak oil 6,084 M.4.401 . . .
A.4.7.1.7. P-360 1.00 m2 Pelaburan bidang kayu dengan politur 49,013 0.12 . 16,769 - 32,244
0.04 OH Pekerja 4,212 L.4.001 . . .
0.06 OH Tukang cat 8,688 L.4.010 . . .
0.02 OH Kepala tukang 3,158 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.15 L Politur 5,415 M.4.400 . . .
0.37 L Politur 13,429 M.4.400 . . .
2.00 Lbr Amplas 13,400 M.4.548 . . .
A.4.7.1.8. P-361 1.00 m2 Pelaburan bidang kayu dengan cat residu dan ter 14,996 0.11 . 11,951 - 3,045
0.10 OH Pekerja 10,530 L.4.001 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.35 L Residu 3,045 M.4.560 . . .
A.4.7.1.9. P-362 1.00 m2 Pelaburan bidang kayu dengan vernis 65,630 0.34 . 43,885 - 21,745
0.16 OH Pekerja 16,848 L.4.001 . . .
0.16 OH Tukang cat 23,168 L.4.010 . . .
0.02 OH Kepala tukang 3,158 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.15 L Vernis 18,975 M.4.403 . . .
0.05 Kg Dempul 2,100 M.4.388 . . .
0.10 Lbr Amplas 670 M.4.548 . . .
A.4.7.1.10. P-363 1.00 m2 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat
35,683
penutup)0.09 . 13,183 - 22,500

www.mitra-arsitek.com 70/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Pekerja 2,106 L.4.001 . . .
0.06 OH Tukang cat 9,122 L.4.010 . . .
0.01 OH Kepala tukang 1,244 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.10 Kg Plamir 5,920 M.4.399 . . .
0.10 Kg Cat dasar Tembok 6,570 M.4.381 . . .
0.26 Kg Cat Penutup Tembok 10,010 M.4.387 . . .
A.4.7.1.11. P-364 1.00 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 25,384 0.08 . 10,570 - 14,814
0.03 OH Pekerja 2,948 L.4.001 . . .
0.04 OH Tukang cat 6,082 L.4.010 . . .
0.00 OH Kepala tukang 829 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.12 Kg Cat dasar Tembok 7,884 M.4.381 . . .
0.18 Kg Cat Penutup Tembok 6,930 M.4.387 . . .
A.4.7.1.12. P-365 1.00 m2 Pelaburan tembok dengan kalkarium 11,100 0.08 . 10,570 - 530
0.03 OH Pekerja 2,948 L.4.001 . . .
0.04 OH Tukang cat 6,082 L.4.010 . . .
0.00 OH Kepala tukang 829 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.10 Kg Kalkarium 530 M.4.592 . . .
A.4.7.1.13. P-366 1.00 m2 Pelaburan tembok dengan kapur sirih 19,442 0.15 . 16,552 - 2,890
0.15 OH Pekerja 15,795 L.4.001 . . .
0.00 OH Tukang cat 145 L.4.010 . . .
0.00 OH Kepala tukang 20 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
0.15 Kg Kapur sirih 2,070 M.4.023 . . .
0.10 Lbr Amplas 670 M.4.548 . . .
0.25 Ikat Alang-alang 150 M.4.003 . . .
A.4.7.1.14. P-367 1.00 m2 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) 11,257 0.05 . 5,627 - 5,630
0.04 OH Pekerja 4,212 L.4.001 . . .
0.01 OH Tukang cat 724 L.4.010 . . .
0.00 OH Kepala tukang 99 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
0.30 Kg Kapur sirih 4,140 M.4.023 . . .
0.20 Lbr Amplas 1,340 M.4.548 . . .
0.25 Ikat Alang-alang 150 M.4.003 . . .
A.4.7.1.15. P-368 1.00 m2 Pemasangan wallpaper 85,226 0.24 . 35,606 - 49,620
0.02 OH Pekerja 2,106 L.4.001 . . .
0.20 OH Tukang cat 28,960 L.4.010 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
1.20 m2 Wallpaper 47,040 M.4.374 . . .
0.20 Kg Lem kayu 2,580 M.4.553 . . .
A.4.7.1.16. P-369 1.00 m2 Pengecatan permukaan baja dengan menie besi 38,743 0.24 . 35,606 - 3,137
0.02 OH Pekerja 2,106 L.4.001 . . .
0.20 OH Tukang cat 28,960 L.4.010 . . .
0.02 OH Kepala tukang 3,948 L.4.036 . . .
0.00 OH Mandor 592 L.4.035 . . .
0.10 Kg Menie besi 2,950 M.4.396 . . .
0.01 Bh Kuas 187 M.4.390 . . .

www.mitra-arsitek.com 71/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.7.1.17. P-370 1.00 m2 Pengecatan permukaan baja dengan menie besi dengan perancah 71,486 0.51 . 65,123 2,862 3,501
0.25 OH Pekerja 26,325 L.4.001 . . .
0.23 OH Tukang cat 32,580 L.4.010 . . .
0.02 OH Kepala tukang 4,442 L.4.036 . . .
0.01 OH Mandor 1,777 L.4.035 . . .
0.10 Kg Menie besi 2,950 M.4.396 . . .
0.01 L Pengencer 364 M.4.398 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.00 m3 Perancah kayu 2,862 T.4.011 . . .
A.4.7.1.18. P-371 1.00 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis 79,689 0.53 . 67,768 - 11,921
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang cat 36,200 L.4.010 . . .
0.03 OH Kepala tukang 4,935 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
0.10 Kg Menie A 3,510 M.4.394 . . .
0.10 Kg Menie B 3,860 M.4.395 . . .
0.08 Kg Cat Besi 4,000 M.4.377 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.01 L Pengencer 364 M.4.398 . . .
A.4.7.1.19. P-372 1.00 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat
33,637
mutakhir 0.14 . 18,086 - 15,551
0.06 OH Pekerja 6,318 L.4.001 . . .
0.06 OH Tukang cat 8,688 L.4.010 . . .
0.01 OH Kepala tukang 2,369 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.30 Kg Cat Besi 15,000 M.4.377 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.01 L Pengencer 364 M.4.398 . . .
A.4.7.1.20. P-373 1.00 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 195,183 1.30 . 178,490 - 16,693
0.40 OH Pekerja 42,120 L.4.001 . . .
0.80 OH Tukang cat 115,840 L.4.010 . . .
0.08 OH Kepala tukang 15,792 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
0.11 Kg Cat dasar Besi 3,795 M.4.379 . . .
0.17 Kg Cat antara 8,347 M.4.376 . . .
0.08 Kg Cat Besi 4,000 M.4.377 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.01 L Pengencer 364 M.4.398 . . .
A.4.7.1.21. P-374 1.00 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat
177,400
mutakhir1.19 . 162,036 - 15,364
0.40 OH Pekerja 42,120 L.4.001 . . .
0.70 OH Tukang cat 101,360 L.4.010 . . .
0.07 OH Kepala tukang 13,818 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
0.30 Kg Cat Besi 15,000 M.4.377 . . .
0.01 L Pengencer 364 M.4.398 . . .
A.4.7.1.22. P-375 1.00 m2 Plituran dengan plitur melamic 17,245 0.12 . 16,204 - 1,041
0.04 OH Pekerja 4,212 L.4.001 . . .
0.07 OH Tukang cat 10,136 L.4.010 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
0.03 Kg Cat Dasar Kayu 1,005 M.4.380 . . .

www.mitra-arsitek.com 72/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 L Pengencer 36 M.4.398 . . .
A.5.1.1.1. P-376 1.00 bh (K3) Pemasangan closet duduk/moblock 3,051,808 4.57 . 561,058 15,750 2,475,000
3.30 OH Pekerja 347,490 L.4.001 . . .
1.10 OH Tukang batu 173,690 L.4.007 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.16 OH Mandor 37,904 L.4.035 . . .
1.00 Unit Kloset duduk / monoblock 2,475,000 M.4.191 . . .
0.06 % Perlengkapan 15,750 T.4.012 . . .
A.5.1.1 2. P-377 1.00 bh Pemasangan closet jongkok porslen 696,411 2.81 . 409,664 - 286,747
1.00 OH Pekerja 105,300 L.4.001 . . .
1.50 OH Tukang batu 236,850 L.4.007 . . .
0.15 OH Kepala tukang 29,610 L.4.036 . . .
0.16 OH Mandor 37,904 L.4.035 . . .
1.00 Unit Kloset jongkok teraso 272,500 M.4.193 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 M3 Pasir pasang 2,247 M.4.030 . . .
A.5.1.1 3. P-378 1.00 bh Pemasangan closet jongkok teraso 677,352 2.70 . 383,605 - 293,747
1.00 OH Pekerja 105,300 L.4.001 . . .
1.50 OH Tukang batu 236,850 L.4.007 . . .
0.15 OH Kepala tukang 29,610 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 Unit Kloset jongkok teraso 272,500 M.4.193 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 M3 Pasir pasang 2,247 M.4.030 . . .
7.00 Bh Bata merah 7,000 M.4.007 . . .
A.5.1.1 4. P-379 1.00 bh (K3) Pemasangan uriir 1,745,782 2.15 . 294,785 78,750 1,372,247
1.00 OH Pekerja 105,300 L.4.001 . . .
1.00 OH Tukang batu 157,900 L.4.007 . . .
0.10 OH Kepala tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 Unit Urinoir 1,358,000 M.4.200 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 M3 Pasir pasang 2,247 M.4.030 . . .
0.30 % Perlengkapan 78,750 T.4.012 . . .
A.5.1.1 5. P-380 1.00 bh (K3) Pemasangan wastafel 2,219,686 2.86 . 399,139 31,500 1,789,047
1.20 OH Pekerja 126,360 L.4.001 . . .
1.45 OH Tukang batu 228,955 L.4.007 . . .
0.15 OH Kepala tukang 29,610 L.4.036 . . .
0.06 OH Mandor 14,214 L.4.035 . . .
1.20 Unit Wastafel 1,774,800 M.4.201 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 M3 Pasir pasang 2,247 M.4.030 . . .
0.12 % Perlengkapan 31,500 T.4.012 . . .
A.5.1.1 6. P-381 1.00 bh (K3) Pemasangan bathcuip porselen 2,861,838 0.90 . 141,838 52,500 2,667,500
0.08 OH Pekerja 7,898 L.4.001 . . .
0.75 OH Tukang batu 118,425 L.4.007 . . .
0.08 OH Kepala tukang 14,805 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Unit Bathcuip 2,667,500 M.4.188 . . .
0.20 % Perlengkapan 52,500 T.4.012 . . .

www.mitra-arsitek.com 73/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.5.1.1 7. P-382 1.00 bh (K3) Pemasangan bak fibreglass vol 1 m3 1,623,430 8.45 . 1,249,530 31,500 342,400
3.00 OH Pekerja 315,900 L.4.001 . . .
4.50 OH Tukang batu 710,550 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.90 OH Mandor 213,210 L.4.035 . . .
1.00 Unit Bak fiberglass 342,400 M.4.186 . . .
0.12 % Perlengkapan 31,500 T.4.012 . . .
A.5.1.1 8. P-383 1.00 bh (K3) Pemasangan bak mandi batu bata vol 0,30 m3 4,020,837 9.33 . 1,171,827 - 2,849,010
6.00 OH Pekerja 631,800 L.4.001 . . .
3.00 OH Tukang batu 473,700 L.4.007 . . .
0.30 OH Kepala tukang 59,220 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
150.00 M3 Bata merah 150,000 M.4.007 . . .
120.00 Kg Semen 240,000 M.4.033 . . .
0.30 M3 Pasir pasang 67,410 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,376,000 M.4.449 . . .
6.00 Kg Semen warna 15,600 M.4.036 . . .
A.5.1.1 9. P-384 1.00 bh Pemasangan bak mandi teraso vol 0,30 m3 1,623,430 8.45 . 1,249,530 31,500 342,400
3.00 OH Pekerja 315,900 L.4.001 . . .
4.50 OH Tukang batu 710,550 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.90 OH Mandor 213,210 L.4.035 . . .
1.00 Unit Bak fiberglass 342,400 M.4.186 . . .
0.12 % Perlengkapan 31,500 T.4.012 . . .
A.5.1.1 10. P-385 1.00 bh Pemasangan bak air fibreglass vol 1 m3 488,982 0.81 . 115,082 31,500 342,400
0.30 OH Pekerja 31,590 L.4.001 . . .
0.45 OH Tukang batu 71,055 L.4.007 . . .
0.05 OH Kepala tukang 8,883 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
1.00 Unit Bak fiberglass 342,400 M.4.186 . . .
0.12 % Perlengkapan 31,500 T.4.012 . . .
A.5.1.1 11. P-386 1.00 bh Pemasangan bak beton volume 1 m3 9,410,284 8.07 . 1,093,234 26,250 8,290,800
3.50 OH Pekerja 368,550 L.4.001 . . .
4.50 OH Tukang batu 710,550 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.90 M3 Beton 1:2:3 1,198,800 M.4.531 . . .
180.00 Kg Besi beton 2,430,000 M.4.132 . . .
8.00 M2 Kayu cetakan 1,212,000 M.4.046 . . .
500.00 Bh Ubin porselen 3,450,000 M.4.463 . . .
0.10 % Perlengkapan 26,250 T.4.012 . . .
A.5.1.1 12. P-387 1.00 bh Pemasangan bak cuci piring stainlessteel 557,405 0.38 . 60,005 - 497,400
0.03 OH Pekerja 3,159 L.4.001 . . .
0.30 OH Tukang batu 47,370 L.4.007 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
1.00 Unit Bak cuci piring 421,400 M.4.185 . . .
1.00 Bh Waterdrain 76,000 M.4.202 . . .
A.5.1.1 13. P-388 1.00 bh Pemasangan bak cuci piring teraso 648,643 0.63 . 100,008 - 548,635
0.05 OH Pekerja 5,265 L.4.001 . . .

www.mitra-arsitek.com 74/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 OH Tukang batu 78,950 L.4.007 . . .
0.05 OH Kepala tukang 9,870 L.4.036 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
1.00 Unit Bak cuci piring 421,400 M.4.185 . . .
1.00 Bh Waterdrain 76,000 M.4.202 . . .
20.00 Kg Semen 40,000 M.4.033 . . .
0.05 M3 Pasir pasang 11,235 M.4.030 . . .
A.5.1.1 14. P-389 1.00 bh Pemasangan floor drain 83,002 0.13 . 20,002 - 63,000
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang batu 15,790 L.4.007 . . .
0.01 OH Kepala tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 Unit Floor drain 63,000 M.4.189 . . .
A.5.1.1 15. P-390 1.00 bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm 558,732 2.96 . 357,955 - 200,777
2.16 OH Pekerja 227,448 L.4.001 . . .
0.72 OH Tukang batu 113,688 L.4.007 . . .
0.07 OH Kepala tukang 14,213 L.4.036 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
40.00 bh Bata merah 40,000 M.4.007 . . .
44.00 Kg Semen 88,000 M.4.033 . . .
0.07 M3 Pasir pasang 15,729 M.4.030 . . .
0.06 M3 Pasir beton 17,514 M.4.028 . . .
0.07 M3 Kerikil 17,934 M.4.024 . . .
1.60 Kg Besi beton 21,600 M.4.132 . . .
A.5.1.1 16. P-391 1.00 bh Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 844,213 4.38 . 524,507 - 319,706
3.20 OH Pekerja 336,960 L.4.001 . . .
1.15 OH Tukang batu 181,585 L.4.007 . . .
0.01 OH Kepala tukang 2,171 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
77.00 Kg Semen 154,000 M.4.033 . . .
0.13 M3 Pasir pasang 29,211 M.4.030 . . .
0.09 M3 Pasir beton 26,271 M.4.028 . . .
0.02 M3 Kerikil 5,124 M.4.024 . . .
2.60 Kg Besi beton 35,100 M.4.132 . . .
A.5.1.1 17. P-392 1.00 bh Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm1,025,809 4.38 . 524,507 - 501,302
3.20 OH Pekerja 336,960 L.4.001 . . .
1.15 OH Tukang batu 181,585 L.4.007 . . .
0.01 OH Kepala tukang 2,171 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
123.00 bh Bata merah 123,000 M.4.007 . . .
114.00 Kg Semen 228,000 M.4.033 . . .
0.18 M3 Pasir pasang 41,345 M.4.030 . . .
0.12 M3 Pasir beton 35,028 M.4.028 . . .
0.03 M3 Kerikil 8,455 M.4.024 . . .
4.85 Kg Besi beton 65,475 M.4.132 . . .
A.5.1.1 18. P-393 1.00 m1 Pemasangan pipa galvanis diameter ½” 147,185 0.18 . 28,070 91,875 27,240
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .

www.mitra-arsitek.com 75/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 M Pipa galvanis ½” 27,240 M.4.212 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 19. P-394 1.00 bh Pemasangan kran diameter ½” atau 3/4” 99,186 0.46 . 73,294 - 25,893
0.01 OH Pekerja 1,053 L.4.001 . . .
0.40 OH Tukang batu 63,160 L.4.007 . . .
0.04 OH Kepala tukang 7,896 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 M Kran air 25,800 M.4.194 . . .
0.03 bh Sealtape 93 M.4.599 . . .
A.5.1.1 20. P-395 1.00 m1 Pemasangan pipa galvanis diameter 3/4” 150,305 0.18 . 28,070 91,875 30,360
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 M Pipa galvanis 3/4” 30,360 M.4.213 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 21. P-396 1.00 m1 Pemasangan pipa galvanis diameter 1” 169,385 0.18 . 28,070 91,875 49,440
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 M Pipa galvanis 1” 49,440 M.4.214 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 22. P-397 1.00 m1 Pemasangan pipa galvanis diameter 1 ½” 231,327 0.31 . 44,532 91,875 94,920
0.11 OH Pekerja 11,372 L.4.001 . . .
0.18 OH Tukang batu 28,422 L.4.007 . . .
0.02 OH Kepala tukang 3,553 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.20 M Pipa galvanis 11/2” 94,920 M.4.215 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 23. P-398 1.00 m1 Pemasangan pipa galvanis diameter 3” 271,417 0.39 . 55,942 91,875 123,600
0.14 OH Pekerja 14,216 L.4.001 . . .
0.23 OH Tukang batu 35,528 L.4.007 . . .
0.02 OH Kepala tukang 4,540 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 M Pipa galvanis 3” 123,600 M.4.216 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 24. P-399 1.00 m1 Pemasangan pipa galvanis diameter 4” 305,497 0.39 . 55,942 91,875 157,680
0.14 OH Pekerja 14,216 L.4.001 . . .
0.23 OH Tukang batu 35,528 L.4.007 . . .
0.02 OH Kepala tukang 4,540 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 M Pipa galvanis 4” 157,680 M.4.217 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 25. P-400 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 111,958 0.10 . 14,923 91,875 5,160
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang batu 9,474 L.4.007 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .

www.mitra-arsitek.com 76/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.20 M Pipa PVC 1/2" 5,160 M.4.203 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 26. P-401 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 113,278 0.10 . 14,923 91,875 6,480
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang batu 9,474 L.4.007 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.20 M Pipa PVC 3/4" 6,480 M.4.204 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 27. P-402 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1” 113,878 0.10 . 14,923 91,875 7,080
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang batu 9,474 L.4.007 . . .
0.01 OH Kepala tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.20 M Pipa PVC 1” 7,080 M.4.205 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 28. P-403 1.00 m1 Pemasangan pipa PVC tipe AW diameter 11/2” 121,940 0.16 . 22,385 91,875 7,680
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.20 M Pipa PVC 11/2” 7,680 M.4.206 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 29. P-404 1.00 m1 Pemasangan pipa PVC tipe AW diameter 2” 122,900 0.16 . 22,385 91,875 8,640
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang batu 14,211 L.4.007 . . .
0.01 OH Kepala tukang 1,777 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.20 M Pipa PVC 2” 8,640 M.4.207 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 30. P-405 1.00 m1 Pemasangan pipa PVC tipe AW diameter 21/2” 134,693 0.23 . 33,458 91,875 9,360
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang batu 21,317 L.4.007 . . .
0.01 OH Kepala tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 M Pipa PVC 21/2” 9,360 M.4.208 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 31. P-406 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” 136,853 0.23 . 33,458 91,875 11,520
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang batu 21,317 L.4.007 . . .
0.01 OH Kepala tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 M Pipa PVC 3” 11,520 M.4.210 . . .
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 32. P-407 1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” 136,373 0.23 . 33,458 91,875 11,040
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang batu 21,317 L.4.007 . . .
0.01 OH Kepala tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 M Pipa PVC 4" 11,040 M.4.211 . . .

www.mitra-arsitek.com 77/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 % Perlengkapan 91,875 T.4.012 . . .
A.5.1.1 33. P-408 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah 171,580 0.13 . 16,477 - 155,103
0.08 OH Pekerja 8,424 L.4.001 . . .
0.04 OH Tukang batu 6,316 L.4.007 . . .
0.00 OH Kepala tukang 790 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.60 m Pipa tanah 78,240 M.4.198 . . .
35.00 Kg Semen 70,000 M.4.033 . . .
0.01 M3 Pasir pasang 3,146 M.4.030 . . .
0.01 M3 Pasir urug 3,717 M.4.032 . . .
A.5.1.1 34. P-409 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm 97,800 0.10 . 12,358 - 85,442
0.06 OH Pekerja 6,318 L.4.001 . . .
0.03 OH Tukang batu 4,737 L.4.007 . . .
0.00 OH Kepala tukang 592 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.60 Bh Pipa tanah 78,240 M.4.198 . . .
0.68 Kg Semen 1,360 M.4.033 . . .
0.01 M3 Pasir pasang 2,921 M.4.030 . . .
0.01 M3 Pasir urug 2,921 M.4.032 . . .
A.5.1.1 35. P-410 1.00 m1 Pemasangan pipa beton diameter 15 - 20 cm 119,237 0.22 . 28,835 - 90,402
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang batu 11,053 L.4.007 . . .
0.01 OH Kepala tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.10 Bh Pipa Beton 63,580 M.4.196 . . .
0.03 M3 Bata merah 27 M.4.007 . . .
3.92 Kg Semen 7,840 M.4.033 . . .
0.06 M3 Pasir pasang 12,583 M.4.030 . . .
0.02 M3 Pasir urug 6,372 M.4.032 . . .
A.5.1.1.36. P-411 1.00 m1 Pemasangan pipa beton diameter 30 - 100 cm 195,023 0.61 . 78,267 - 116,756
0.38 OH Pekerja 40,014 L.4.001 . . .
0.19 OH Tukang batu 30,001 L.4.007 . . .
0.02 OH Kepala tukang 3,751 L.4.036 . . .
0.02 OH Mandor 4,501 L.4.035 . . .
1.10 Bh Pipa Beton 63,580 M.4.196 . . .
0.55 M3 Bata merah 550 M.4.007 . . .
10.30 Kg Semen 20,600 M.4.033 . . .
0.06 M3 Pasir pasang 13,707 M.4.030 . . .
0.07 M3 Pasir urug 18,320 M.4.032 . . .
A.8.4.1.1 P-412 1.00 m1 (K3) Pemasangan pipa PVC Ø 63 mm 101,368 0.13 . 16,361 2,807 82,200
0.08 OH Pekerja 8,529 L.4.001 . . .
0.04 OH Tukang pipa 5,937 L.4.020 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 m Pipa PVC Ø 63 mm 82,200 M.4.295 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 2,807 T.4.029 . . .
A.8.4.1.2 P-413 1.00 m1 (K3) Pemasangan pipa PVC Ø 90 mm 121,578 0.15 . 18,836 3,742 99,000
0.09 OH Pekerja 9,898 L.4.001 . . .
0.05 OH Tukang pipa 6,806 L.4.020 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.00 m Pipa PVC Ø 90 mm 99,000 M.4.296 . . .

www.mitra-arsitek.com 78/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 3,742 T.4.029 . . .
A.8.4.1.3 P-414 1.00 m1 (K3) Pemasangan pipa PVC Ø 110 mm 171,215 0.17 . 21,337 4,678 145,200
0.11 OH Pekerja 11,057 L.4.001 . . .
0.05 OH Tukang pipa 7,674 L.4.020 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
1.00 m Pipa PVC Ø 110 mm 145,200 M.4.297 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 4,678 T.4.029 . . .
A.8.4.1.4 P-415 1.00 m1 (K3) Pemasangan pipa PVC Ø 150 mm 206,025 0.19 . 23,811 5,614 176,600
0.12 OH Pekerja 12,425 L.4.001 . . .
0.06 OH Tukang pipa 8,543 L.4.020 . . .
0.01 OH Mandor 2,843 L.4.035 . . .
1.00 m Pipa PVC Ø 150 mm 176,600 M.4.298 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 5,614 T.4.029 . . .
A.8.4.1.5 P-416 1.00 m1 (K3) Pemasngan pipa PVC Ø 200 mm 403,686 0.30 . 38,159 11,227 354,300
0.19 OH Pekerja 19,902 L.4.001 . . .
0.10 OH Tukang pipa 13,756 L.4.020 . . .
0.02 OH Mandor 4,501 L.4.035 . . .
1.00 m Pipa PVC Ø 200 mm 354,300 M.4.299 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 11,227 T.4.029 . . .
A.8.4.1.6 P-417 1.00 m1 (K3) Pemasangan pipa PVC Ø 250 mm 525,456 0.41 . 51,651 15,905 457,900
0.26 OH Pekerja 26,957 L.4.001 . . .
0.13 OH Tukang pipa 18,534 L.4.020 . . .
0.03 OH Mandor 6,159 L.4.035 . . .
1.00 m Pipa PVC Ø 250 mm 457,900 M.4.300 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 15,905 T.4.029 . . .
A.8.4.1.7 P-418 1.00 m1 (K3) Pemasangan pipa PVC Ø 300 mm 856,926 0.47 . 59,114 18,712 779,100
0.29 OH Pekerja 30,958 L.4.001 . . .
0.15 OH Tukang pipa 21,286 L.4.020 . . .
0.03 OH Mandor 6,870 L.4.035 . . .
1.00 m Pipa PVC Ø 300 mm 779,100 M.4.301 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,712 T.4.029 . . .
A.8.4.1.8 P-419 1.00 m1 (K3) Pemasangan pipa PVC Ø 400 mm 1,580,085 0.87 . 109,461 37,424 1,433,200
0.54 OH Pekerja 57,283 L.4.001 . . .
0.27 OH Tukang pipa 39,386 L.4.020 . . .
0.05 OH Mandor 12,793 L.4.035 . . .
1.00 m Pipa PVC Ø 400 mm 1,433,200 M.4.302 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 37,424 T.4.029 . . .
A.8.4.1.9 P-420 1.00 m1 (K3) Pemasangan pipa PVC Ø 450 mm 1,877,606 1.07 . 134,826 46,780 1,696,000
0.67 OH Pekerja 70,446 L.4.001 . . .
0.34 OH Tukang pipa 48,508 L.4.020 . . .
0.07 OH Mandor 15,872 L.4.035 . . .
1.00 m Pipa PVC Ø 450 mm 1,696,000 M.4.303 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 46,780 T.4.029 . . .
A.8.4.1.10 P-421 1.00 m1 (K3) Pemasangan pipa PVC Ø 500 mm 2,681,092 1.30 . 163,021 57,072 2,461,000
0.81 OH Pekerja 85,188 L.4.001 . . .
0.41 OH Tukang pipa 58,644 L.4.020 . . .
0.08 OH Mandor 19,189 L.4.035 . . .
1.00 m Pipa PVC Ø 500 mm 2,461,000 M.4.304 . . .
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 57,072 T.4.029 . . .
A.8.4.1.11 P-422 1.00 m1 (K3) Pemasangan pipa PVC Ø 600 mm 4,148,705 1.53 . 192,874 67,831 3,888,000

www.mitra-arsitek.com 79/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.96 OH Pekerja 100,772 L.4.001 . . .
0.48 OH Tukang pipa 69,359 L.4.020 . . .
0.10 OH Mandor 22,742 L.4.035 . . .
1.00 m Pipa PVC Ø 600 mm 3,888,000 M.4.305 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 67,831 T.4.029 . . .
A.8.4.1.12 P-423 1.00 m1 (K3) Pemasangan pipa PVC Ø 800 mm 5,685,846 2.59 . 325,896 116,950 5,243,000
1.62 OH Pekerja 170,375 L.4.001 . . .
0.81 OH Tukang pipa 117,143 L.4.020 . . .
0.16 OH Mandor 38,378 L.4.035 . . .
1.00 m Pipa PVC Ø 800 mm 5,243,000 M.4.306 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 116,950 T.4.029 . . .
A.8.4.1.13 P-424 1.00 m1 (K3) Pemasangan pipa PVC Ø 900 mm 6,849,163 2.71 . 340,599 122,564 6,386,000
1.69 OH Pekerja 178,062 L.4.001 . . .
0.85 OH Tukang pipa 122,501 L.4.020 . . .
0.17 OH Mandor 40,036 L.4.035 . . .
1.00 m Pipa PVC Ø 900 mm 6,386,000 M.4.307 . . .
0.26 hari Sewa Tripot/Tackel & handle crane 2 T 122,564 T.4.029 . . .
A.8.4.1.14 P-425 1.00 m1 (K3) Pemasangan pipa PVC Ø 1000 mm 8,544,358 3.03 . 381,825 137,533 8,025,000
1.90 OH Pekerja 199,544 L.4.001 . . .
0.95 OH Tukang pipa 137,270 L.4.020 . . .
0.19 OH Mandor 45,011 L.4.035 . . .
1.00 m Pipa PVC Ø 1000 mm 8,025,000 M.4.308 . . .
0.29 hari Sewa Tripot/Tackel & handle crane 2 T 137,533 T.4.029 . . .
A.8.4.1.15 P-426 1.00 m1 (K3) Pemasangan pipa PVC Ø 1100 mm 9,287,784 3.36 . 422,814 152,971 8,712,000
2.10 OH Pekerja 221,025 L.4.001 . . .
1.05 OH Tukang pipa 152,040 L.4.020 . . .
0.21 OH Mandor 49,749 L.4.035 . . .
1.00 m Pipa PVC Ø 1100 mm 8,712,000 M.4.309 . . .
0.33 hari Sewa Tripot/Tackel & handle crane 2 T 152,971 T.4.029 . . .
A.8.4.1.16 P-427 1.00 m1 (K3) Pemasangan pipa PVC Ø 1200 mm 11,135,743 3.69 . 463,803 167,940 10,504,000
2.30 OH Pekerja 242,506 L.4.001 . . .
1.15 OH Tukang pipa 166,810 L.4.020 . . .
0.23 OH Mandor 54,487 L.4.035 . . .
1.00 m Pipa PVC Ø 1200 mm 10,504,000 M.4.310 . . .
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 167,940 T.4.029 . . .
A.8.4.1.17 P-428 1.00 m1 (K3) Pemasangan pipa HDPE Ø 63 mm 74,046 0.06 . 6,858 8,888 58,300
0.04 OH Pekerja 3,686 L.4.001 . . .
0.02 OH Tukang pipa 2,462 L.4.020 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 m Pipa HDPE Ø 63 mm 58,300 M.4.265 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,888 T.4.029 . . .
A.8.4.1.18 P-429 1.00 m1 (K3) Pemasangan pipa HDPE Ø 100 mm 143,444 0.06 . 8,056 8,888 126,500
0.04 OH Pekerja 4,212 L.4.001 . . .
0.02 OH Tukang pipa 2,896 L.4.020 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.00 m Pipa HDPE Ø 100 mm 126,500 M.4.266 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,888 T.4.029 . . .
A.8.4.1.19 P-430 1.00 m1 (K3) Pemasangan pipa HDPE Ø 125 mm 268,042 0.07 . 9,253 8,888 249,900
0.05 OH Pekerja 4,739 L.4.001 . . .
0.02 OH Tukang pipa 3,330 L.4.020 . . .

www.mitra-arsitek.com 80/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 m Pipa HDPE Ø 125 mm 249,900 M.4.267 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,888 T.4.029 . . .
A.8.4.1.20 P-431 1.00 m1 (K3) Pemasangan pipa HDPE Ø 150 mm 344,027 0.10 . 12,439 8,888 322,700
0.06 OH Pekerja 6,529 L.4.001 . . .
0.03 OH Tukang pipa 4,489 L.4.020 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.00 m Pipa HDPE Ø 150 mm 322,700 M.4.268 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,888 T.4.029 . . .
A.8.4.1.21 P-432 1.00 m1 (K3) Pemasangan pipa HDPE Ø 200 mm 654,683 0.16 . 20,494 8,888 625,300
0.10 OH Pekerja 10,741 L.4.001 . . .
0.05 OH Tukang pipa 7,385 L.4.020 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
1.00 m Pipa HDPE Ø 200 mm 625,300 M.4.269 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,888 T.4.029 . . .
A.8.4.1.22 P-433 1.00 m1 (K3) Pemasangan pipa HDPE Ø 250 mm 1,030,334 0.21 . 26,786 19,648 983,900
0.13 OH Pekerja 14,005 L.4.001 . . .
0.07 OH Tukang pipa 9,702 L.4.020 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
1.00 m Pipa HDPE Ø 250 mm 983,900 M.4.270 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,648 T.4.029 . . .
A.8.4.1.23 P-434 1.00 m1 (K3) Pemasangan pipa HDPE Ø 300 mm 1,767,043 0.27 . 34,236 30,407 1,702,400
0.17 OH Pekerja 17,901 L.4.001 . . .
0.09 OH Tukang pipa 12,308 L.4.020 . . .
0.02 OH Mandor 4,027 L.4.035 . . .
1.00 m Pipa HDPE Ø 300 mm 1,702,400 M.4.271 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 30,407 T.4.029 . . .
A.8.4.1.24 P-435 1.00 m1 (K3) Pemasangan pipa HDPE Ø 400 mm 2,571,709 0.46 . 58,403 71,106 2,442,200
0.29 OH Pekerja 30,537 L.4.001 . . .
0.15 OH Tukang pipa 20,996 L.4.020 . . .
0.03 OH Mandor 6,870 L.4.035 . . .
1.00 m Pipa HDPE Ø 400 mm 2,442,200 M.4.272 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 71,106 T.4.029 . . .
A.8.4.1.25 P-436 1.00 m1 (K3) Pemasangan pipa HDPE Ø 450 mm 3,504,655 0.58 . 72,395 93,560 3,338,700
0.36 OH Pekerja 37,803 L.4.001 . . .
0.18 OH Tukang pipa 26,064 L.4.020 . . .
0.04 OH Mandor 8,528 L.4.035 . . .
1.00 m Pipa HDPE Ø 450 mm 3,338,700 M.4.273 . . .
0.20 hari Sewa Tripot/Tackel & handle crane 2 T 93,560 T.4.029 . . .
A.8.4.1.26 P-437 1.00 m1 (K3) Pemasangan pipa HDPE Ø 500 mm 4,089,476 0.69 . 87,058 117,418 3,885,000
0.43 OH Pekerja 45,595 L.4.001 . . .
0.22 OH Tukang pipa 31,277 L.4.020 . . .
0.04 OH Mandor 10,187 L.4.035 . . .
1.00 m Pipa HDPE Ø 500 mm 3,885,000 M.4.274 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 117,418 T.4.029 . . .
A.8.4.1.27 P-438 1.00 m1 (K3) Pemasangan pipa HDPE Ø 600 mm 4,131,679 0.82 . 103,064 143,615 3,885,000
0.51 OH Pekerja 53,914 L.4.001 . . .
0.26 OH Tukang pipa 37,069 L.4.020 . . .
0.05 OH Mandor 12,082 L.4.035 . . .
1.00 m Pipa HDPE Ø 500 mm 3,885,000 M.4.274 . . .

www.mitra-arsitek.com 81/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.31 hari Sewa Tripot/Tackel & handle crane 2 T 143,615 T.4.029 . . .
A.8.4.1.28 P-439 1.00 m1 (K3) Pemasangan pipa HDPE Ø 800 mm 9,843,747 1.43 . 179,698 268,049 9,396,000
0.89 OH Pekerja 94,033 L.4.001 . . .
0.45 OH Tukang pipa 64,581 L.4.020 . . .
0.09 OH Mandor 21,084 L.4.035 . . .
1.00 m Pipa HDPE Ø 800 mm 9,396,000 M.4.276 . . .
0.57 hari Sewa Tripot/Tackel & handle crane 2 T 268,049 T.4.029 . . .
A.8.4.1.29 P-440 1.00 m1 (K3) Pemasangan pipa HDPE Ø 900 mm 11,269,549 2.17 . 272,482 413,067 10,584,000
1.35 OH Pekerja 142,471 L.4.001 . . .
0.68 OH Tukang pipa 98,030 L.4.020 . . .
0.14 OH Mandor 31,982 L.4.035 . . .
1.00 m Pipa HDPE Ø 900 mm 10,584,000 M.4.277 . . .
0.88 hari Sewa Tripot/Tackel & handle crane 2 T 413,067 T.4.029 . . .
A.8.4.1.30 P-441 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1000 mm 13,035,508 2.66 . 334,202 511,305 12,190,000
1.66 OH Pekerja 174,693 L.4.001 . . .
0.83 OH Tukang pipa 120,184 L.4.020 . . .
0.17 OH Mandor 39,325 L.4.035 . . .
1.00 m Pipa HDPE Ø 1000 mm 12,190,000 M.4.279 . . .
1.09 hari Sewa Tripot/Tackel & handle crane 2 T 511,305 T.4.029 . . .
A.8.4.1.31 P-442 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1100 mm 12,314,873 2.91 . 366,174 563,699 11,385,000
1.82 OH Pekerja 191,435 L.4.001 . . .
0.91 OH Tukang pipa 131,623 L.4.020 . . .
0.18 OH Mandor 43,116 L.4.035 . . .
1.00 m Pipa HDPE Ø 1100 mm 11,385,000 M.4.281 . . .
1.21 hari Sewa Tripot/Tackel & handle crane 2 T 563,699 T.4.029 . . .
A.8.4.1.32 P-443 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1200 mm 13,843,290 3.79 . 477,294 740,995 12,625,000
2.37 OH Pekerja 249,561 L.4.001 . . .
1.19 OH Tukang pipa 171,588 L.4.020 . . .
0.24 OH Mandor 56,145 L.4.035 . . .
1.00 m Pipa HDPE Ø 1200 mm 12,625,000 M.4.282 . . .
1.58 hari Sewa Tripot/Tackel & handle crane 2 T 740,995 T.4.029 . . .
A.8.4.1.33 P-444 1.00 m1 (K3) Pemasangan pipa GIP Ø 63 mm 235,565 0.55 . 69,289 17,776 148,500
0.35 OH Pekerja 36,329 L.4.001 . . .
0.17 OH Tukang pipa 24,906 L.4.020 . . .
0.03 OH Mandor 8,055 L.4.035 . . .
1.00 m Pipa GIP Ø 63 mm 148,500 M.4.249 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,776 T.4.029 . . .
A.8.4.1.34 P-445 1.00 m1 (K3) Pemasangan pipa GIP Ø 100 mm 343,632 0.64 . 80,556 17,776 245,300
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang pipa 28,960 L.4.020 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
1.00 m Pipa GIP Ø 100 mm 245,300 M.4.250 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,776 T.4.029 . . .
A.8.4.1.35 P-446 1.00 m1 (K3) Pemasangan pipa GIP Ø 125 mm 391,947 0.72 . 90,270 17,776 283,900
0.45 OH Pekerja 47,174 L.4.001 . . .
0.22 OH Tukang pipa 32,435 L.4.020 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.00 m Pipa GIP Ø 125 mm 283,900 M.4.251 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,776 T.4.029 . . .
A.8.4.1.36 P-447 1.00 m1 (K3) Pemasangan pipa GIP Ø 150 mm 468,946 0.81 . 101,998 19,648 347,300

www.mitra-arsitek.com 82/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.51 OH Pekerja 53,282 L.4.001 . . .
0.25 OH Tukang pipa 36,634 L.4.020 . . .
0.05 OH Mandor 12,082 L.4.035 . . .
1.00 m Pipa GIP Ø 150 mm 347,300 M.4.252 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,648 T.4.029 . . .
A.8.4.1.37 P-448 1.00 m1 (K3) Pemasangan pipa GIP Ø 200 mm 612,249 1.27 . 160,401 19,648 432,200
0.80 OH Pekerja 83,819 L.4.001 . . .
0.40 OH Tukang pipa 57,630 L.4.020 . . .
0.08 OH Mandor 18,952 L.4.035 . . .
1.00 m Pipa GIP Ø 200 mm 432,200 M.4.253 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,648 T.4.029 . . .
A.8.4.1.38 P-449 1.00 m1 (K3) Pemasangan pipa GIP Ø 250 mm 795,263 1.52 . 191,215 19,648 584,400
0.95 OH Pekerja 99,930 L.4.001 . . .
0.48 OH Tukang pipa 68,780 L.4.020 . . .
0.10 OH Mandor 22,506 L.4.035 . . .
1.00 m Pipa GIP Ø 250 mm 584,400 M.4.254 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,648 T.4.029 . . .
A.8.4.1.39 P-450 1.00 m1 (K3) Pemasangan pipa GIP Ø 300 mm 900,627 1.53 . 192,979 19,648 688,000
0.96 OH Pekerja 100,877 L.4.001 . . .
0.48 OH Tukang pipa 69,359 L.4.020 . . .
0.10 OH Mandor 22,742 L.4.035 . . .
1.00 m Pipa GIP Ø 300 mm 688,000 M.4.255 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,648 T.4.029 . . .
A.8.4.1.40 P-451 1.00 m1 (K3) Pemasangan pipa GIP Ø 400 mm 1,135,336 1.94 . 244,037 26,899 864,400
1.21 OH Pekerja 127,624 L.4.001 . . .
0.61 OH Tukang pipa 87,749 L.4.020 . . .
0.12 OH Mandor 28,665 L.4.035 . . .
1.00 m Pipa GIP Ø 400 mm 864,400 M.4.256 . . .
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 26,899 T.4.029 . . .
A.8.4.1.41 P-452 1.00 m1 (K3) Pemasangan pipa GIP Ø 450 mm 1,361,036 2.16 . 272,337 26,899 1,061,800
1.35 OH Pekerja 142,471 L.4.001 . . .
0.68 OH Tukang pipa 97,885 L.4.020 . . .
0.14 OH Mandor 31,982 L.4.035 . . .
1.00 m Pipa GIP Ø 450 mm 1,061,800 M.4.257 . . .
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 26,899 T.4.029 . . .
A.8.4.1.42 P-453 1.00 m1 (K3) Pemasangan pipa GIP Ø 500 mm 1,456,403 2.35 . 295,938 35,865 1,124,600
1.47 OH Pekerja 154,686 L.4.001 . . .
0.74 OH Tukang pipa 106,428 L.4.020 . . .
0.15 OH Mandor 34,824 L.4.035 . . .
1.00 m Pipa GIP Ø 500 mm 1,124,600 M.4.258 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 35,865 T.4.029 . . .
A.8.4.1.43 P-454 1.00 m1 (K3) Pemasangan pipa GIP Ø 600 mm 1,665,953 2.12 . 267,388 35,865 1,362,700
1.33 OH Pekerja 139,733 L.4.001 . . .
0.66 OH Tukang pipa 96,147 L.4.020 . . .
0.13 OH Mandor 31,508 L.4.035 . . .
1.00 m Pipa GIP Ø 600 mm 1,362,700 M.4.259 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 35,865 T.4.029 . . .
A.8.4.1.44 P-455 1.00 m1 (K3) Pemasangan pipa GIP Ø 800 mm 2,343,581 3.72 . 468,633 40,348 1,834,600
2.33 OH Pekerja 245,033 L.4.001 . . .
1.16 OH Tukang pipa 168,402 L.4.020 . . .

www.mitra-arsitek.com 83/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.23 OH Mandor 55,198 L.4.035 . . .
1.00 m Pipa GIP Ø 800 mm 1,834,600 M.4.260 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,348 T.4.029 . . .
A.8.4.1.45 P-456 1.00 m1 (K3) Pemasangan pipa GIP Ø 900 mm 2,652,395 4.20 . 528,247 40,348 2,083,800
2.62 OH Pekerja 276,202 L.4.001 . . .
1.31 OH Tukang pipa 189,978 L.4.020 . . .
0.26 OH Mandor 62,068 L.4.035 . . .
1.00 m Pipa GIP Ø 900 mm 2,083,800 M.4.261 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,348 T.4.029 . . .
A.8.4.1.46 P-457 1.00 m1 (K3) Pemasangan pipa GIP Ø 1000 mm 2,897,843 4.66 . 586,295 40,348 2,271,200
2.91 OH Pekerja 306,528 L.4.001 . . .
1.46 OH Tukang pipa 210,829 L.4.020 . . .
0.29 OH Mandor 68,938 L.4.035 . . .
1.00 m Pipa GIP Ø 1000 mm 2,271,200 M.4.262 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,348 T.4.029 . . .
A.8.4.1.47 P-458 1.00 m1 (K3) Pemasangan pipa GIP Ø 1100 mm 3,183,096 5.12 . 644,448 40,348 2,498,300
3.20 OH Pekerja 336,960 L.4.001 . . .
1.60 OH Tukang pipa 231,680 L.4.020 . . .
0.32 OH Mandor 75,808 L.4.035 . . .
1.00 m Pipa GIP Ø 1100 mm 2,498,300 M.4.263 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,348 T.4.029 . . .
A.8.4.1.48 P-459 1.00 m1 (K3) Pemasangan pipa GIP Ø 1200 mm 3,243,586 2.44 . 371,938 40,348 2,831,300
0.35 OH Pekerja 36,729 L.4.001 . . .
1.74 OH Tukang pipa 252,531 L.4.020 . . .
0.35 OH Mandor 82,678 L.4.035 . . .
1.00 m Pipa GIP Ø 1200 mm 2,831,300 M.4.264 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,348 T.4.029 . . .
A.8.4.1.49 P-460 1.00 m1 (K3) Pemasangan pipa DCI Ø 100 mm 390,754 0.64 . 77,290 177,764 135,700
0.49 OH Pekerja 51,492 L.4.001 . . .
0.10 OH Tukang pipa 14,190 L.4.020 . . .
0.05 OH Mandor 11,608 L.4.035 . . .
1.00 m Pipa DCI Ø 100 mm 135,700 M.4.234 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 177,764 T.4.029 . . .
A.8.4.1.50 P-461 1.00 m1 (K3) Pemasangan pipa DCI Ø 125 mm 470,176 0.71 . 86,412 177,764 206,000
0.55 OH Pekerja 57,599 L.4.001 . . .
0.11 OH Tukang pipa 15,783 L.4.020 . . .
0.06 OH Mandor 13,030 L.4.035 . . .
1.00 m Pipa DCI Ø 125 mm 206,000 M.4.235 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 177,764 T.4.029 . . .
A.8.4.1.51 P-462 1.00 m1 (K3) Pemasangan pipa DCI Ø 150 mm 617,574 0.80 . 96,810 177,764 343,000
0.61 OH Pekerja 64,549 L.4.001 . . .
0.12 OH Tukang pipa 17,810 L.4.020 . . .
0.06 OH Mandor 14,451 L.4.035 . . .
1.00 m Pipa DCI Ø 150 mm 343,000 M.4.236 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 177,764 T.4.029 . . .
A.8.4.1.52 P-463 1.00 m1 (K3) Pemasangan pipa DCI Ø 200 mm 879,193 1.11 . 134,929 177,764 566,500
0.86 OH Pekerja 90,032 L.4.001 . . .
0.17 OH Tukang pipa 24,761 L.4.020 . . .
0.09 OH Mandor 20,137 L.4.035 . . .
1.00 M Pipa DCI Ø 200 mm 566,500 M.4.237 . . .

www.mitra-arsitek.com 84/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 177,764 T.4.029 . . .
A.8.4.1.53 P-464 1.00 m1 (K3) Pemasangan pipa DCI Ø 250 mm 955,348 1.24 . 150,158 23,390 781,800
0.95 OH Pekerja 100,140 L.4.001 . . .
0.19 OH Tukang pipa 27,512 L.4.020 . . .
0.10 OH Mandor 22,506 L.4.035 . . .
1.00 M Pipa DCI Ø 250 mm 781,800 M.4.238 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 23,390 T.4.029 . . .
A.8.4.1.54 P-465 1.00 m1 (K3) Pemasangan pipa DCI Ø 300 mm 1,278,886 1.27 . 153,672 33,214 1,092,000
0.97 OH Pekerja 102,457 L.4.001 . . .
0.20 OH Tukang pipa 28,236 L.4.020 . . .
0.10 OH Mandor 22,979 L.4.035 . . .
1.00 m Pipa DCI Ø 300 mm 1,092,000 M.4.239 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 33,214 T.4.029 . . .
A.8.4.1.55 P-466 1.00 m1 (K3) Pemasangan pipa DCI Ø 400 mm 2,833,469 2.10 . 257,381 56,088 2,520,000
1.55 OH Pekerja 162,689 L.4.001 . . .
0.31 OH Tukang pipa 44,743 L.4.020 . . .
0.09 OH Operator alat berat 13,466 L.4.037 . . .
0.15 OH Mandor 36,483 L.4.035 . . .
1.00 m Pipa DCI Ø 400 mm 2,520,000 M.4.240 . . .
0.02 hari Sewa excavator type 225 kap 0,5 -1,0 m3 41,586 T.4.025 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 14,502 T.4.029 . . .
A.8.4.1.56 P-467 1.00 m1 (K3) Pemasangan pipa DCI Ø 450 mm 3,317,736 2.50 . 307,057 70,679 2,940,000
1.81 OH Pekerja 190,909 L.4.001 . . .
0.36 OH Tukang pipa 52,562 L.4.020 . . .
0.14 OH Operator alat berat 20,706 L.4.037 . . .
0.18 OH Mandor 42,879 L.4.035 . . .
1.00 m Pipa DCI Ø 450 mm 2,940,000 M.4.241 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 52,435 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,244 T.4.029 . . .
A.8.4.1.57 P-468 1.00 m1 (K3) Pemasangan pipa DCI Ø 500 mm 3,953,810 2.85 . 351,283 82,526 3,520,000
2.05 OH Pekerja 215,549 L.4.001 . . .
0.41 OH Tukang pipa 59,223 L.4.020 . . .
0.19 OH Operator alat berat 27,946 L.4.037 . . .
0.21 OH Mandor 48,565 L.4.035 . . .
1.00 m Pipa DCI Ø 500 mm 3,520,000 M.4.242 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 61,475 T.4.025 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 21,051 T.4.029 . . .
A.8.4.1.58 P-469 1.00 m1 (K3) Pemasangan pipa DCI Ø 600 mm 4,028,902 2.91 . 360,011 140,890 3,528,000
2.01 OH Pekerja 211,758 L.4.001 . . .
0.40 OH Tukang pipa 58,210 L.4.020 . . .
0.29 OH Operator alat berat 42,426 L.4.037 . . .
0.20 OH Mandor 47,617 L.4.035 . . .
1.00 m Pipa DCI Ø 600 mm 3,528,000 M.4.243 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 104,870 T.4.025 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 36,021 T.4.029 . . .
A.8.4.1.59 P-470 1.00 m1 (K3) Pemasangan pipa DCI Ø800 mm 5,834,104 5.51 . 680,968 257,135 4,896,000
3.86 OH Pekerja 406,353 L.4.001 . . .
0.77 OH Tukang pipa 111,786 L.4.020 . . .
0.49 OH Operator alat berat 71,386 L.4.037 . . .
0.39 OH Mandor 91,443 L.4.035 . . .

www.mitra-arsitek.com 85/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 m Pipa DCI Ø 800 mm 4,896,000 M.4.244 . . .
0.08 hari Sewa excavator type 225 kap 0,5 -1,0 m3 151,880 T.4.025 . . .
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 105,255 T.4.029 . . .
A.8.4.1.60 P-471 1.00 m1 (K3) Pemasangan pipa DCI Ø900 mm 6,615,876 7.09 . 874,708 284,168 5,457,000
5.00 OH Pekerja 525,974 L.4.001 . . .
1.00 OH Tukang pipa 144,655 L.4.020 . . .
0.59 OH Operator alat berat 85,866 L.4.037 . . .
0.50 OH Mandor 118,213 L.4.035 . . .
1.00 m Pipa DCI Ø 900 mm 5,457,000 M.4.245 . . .
0.09 hari Sewa excavator type 225 kap 0,5 -1,0 m3 168,153 T.4.025 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 116,014 T.4.029 . . .
A.8.4.1.61 P-472 1.00 m1 (K3) Pemasangan pipa DCI Ø1000 mm 7,717,177 8.60 . 1,075,265 341,912 6,300,000
5.93 OH Pekerja 624,534 L.4.001 . . .
1.19 OH Tukang pipa 171,733 L.4.020 . . .
0.79 OH Operator alat berat 114,826 L.4.037 . . .
0.69 OH Mandor 164,172 L.4.035 . . .
1.00 m Pipa DCI Ø 1000 mm 6,300,000 M.4.246 . . .
0.11 hari Sewa excavator type 225 kap 0,5 -1,0 m3 202,507 T.4.025 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 139,404 T.4.029 . . .
A.8.4.1.62 P-473 1.00 m1 (K3) Pemasangan pipa DCI Ø1100 mm 8,584,516 9.83 . 1,212,474 417,042 6,955,000
6.95 OH Pekerja 731,730 L.4.001 . . .
1.39 OH Tukang pipa 201,272 L.4.020 . . .
0.79 OH Operator alat berat 114,826 L.4.037 . . .
0.70 OH Mandor 164,646 L.4.035 . . .
1.00 m Pipa DCI Ø 1100 mm 6,955,000 M.4.247 . . .
0.15 hari Sewa excavator type 225 kap 0,5 -1,0 m3 274,831 T.4.025 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 142,211 T.4.029 . . .
A.8.4.1.63 P-474 1.00 m1 (K3) Pemasangan pipa DCI Ø1200 mm 9,925,683 11.37 . 1,401,817 493,866 8,030,000
8.06 OH Pekerja 848,297 L.4.001 . . .
1.61 OH Tukang pipa 233,273 L.4.020 . . .
0.89 OH Operator alat berat 129,306 L.4.037 . . .
0.81 OH Mandor 190,941 L.4.035 . . .
1.00 m Pipa DCI Ø 1200 mm 8,030,000 M.4.248 . . .
0.18 hari Sewa excavator type 225 kap 0,5 -1,0 m3 325,458 T.4.025 . . .
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 168,408 T.4.029 . . .
A.8.4.1.64 P-475 1.00 m1 (K3) Pemasangan pipa baja Ø 63 mm 305,741 0.65 . 78,870 1,871 225,000
0.50 OH Pekerja 52,545 L.4.001 . . .
0.10 OH Tukang pipa 14,480 L.4.020 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 m Pipa Baja Ø 63 mm 225,000 M.4.218 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.65 P-476 1.00 m1 (K3) Pemasangan pipa baja Ø 100 mm 487,177 0.75 . 91,506 1,871 393,800
0.58 OH Pekerja 60,969 L.4.001 . . .
0.12 OH Tukang pipa 16,797 L.4.020 . . .
0.06 OH Mandor 13,740 L.4.035 . . .
1.00 m Pipa Baja Ø 100 mm 393,800 M.4.219 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.66 P-477 1.00 m1 (K3) Pemasangan pipa baja Ø 125 mm 310,628 0.84 . 102,457 1,871 206,300
0.65 OH Pekerja 68,234 L.4.001 . . .
0.13 OH Tukang pipa 18,824 L.4.020 . . .

www.mitra-arsitek.com 86/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Mandor 15,399 L.4.035 . . .
1.00 m Pipa Baja Ø 125 mm 206,300 M.4.220 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.67 P-478 1.00 m1 (K3) Pemasangan pipa baja Ø 150 mm 245,305 0.92 . 111,934 1,871 131,500
0.71 OH Pekerja 74,552 L.4.001 . . .
0.14 OH Tukang pipa 20,562 L.4.020 . . .
0.07 OH Mandor 16,820 L.4.035 . . .
1.00 m Pipa Baja Ø 150 mm 131,500 M.4.221 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.68 P-479 1.00 m1 (K3) Pemasangan pipa baja Ø 200 mm 415,256 1.45 . 175,785 1,871 237,600
1.11 OH Pekerja 117,199 L.4.001 . . .
0.22 OH Tukang pipa 32,290 L.4.020 . . .
0.11 OH Mandor 26,296 L.4.035 . . .
1.00 m Pipa Baja Ø 200 mm 237,600 M.4.222 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.69 P-480 1.00 m1 (K3) Pemasangan pipa baja Ø 250 mm 491,673 1.72 . 209,402 1,871 280,400
1.33 OH Pekerja 139,523 L.4.001 . . .
0.27 OH Tukang pipa 38,372 L.4.020 . . .
0.13 OH Mandor 31,508 L.4.035 . . .
1.00 m Pipa Baja Ø 250 mm 280,400 M.4.223 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.70 P-481 1.00 m1 (K3) Pemasangan pipa baja Ø 300 mm 562,352 1.84 . 223,381 1,871 337,100
1.42 OH Pekerja 149,000 L.4.001 . . .
0.28 OH Tukang pipa 40,978 L.4.020 . . .
0.14 OH Mandor 33,403 L.4.035 . . .
1.00 m Pipa Baja Ø 300 mm 337,100 M.4.224 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,871 T.4.029 . . .
A.8.4.1.71 P-482 1.00 m1 (K3) Pemasangan pipa baja Ø 400 mm 848,238 3.08 . 373,776 67,063 407,400
2.37 OH Pekerja 249,140 L.4.001 . . .
0.47 OH Tukang pipa 68,490 L.4.020 . . .
0.24 OH Mandor 56,145 L.4.035 . . .
1.00 m Pipa Baja Ø 400 mm 407,400 M.4.225 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 48,819 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,244 T.4.029 . . .
A.8.4.1.72 P-483 1.00 m1 (K3) Pemasangan pipa baja Ø 450 mm 907,553 2.90 . 352,334 64,319 490,900
2.23 OH Pekerja 234,924 L.4.001 . . .
0.45 OH Tukang pipa 64,581 L.4.020 . . .
0.22 OH Mandor 52,829 L.4.035 . . .
1.00 m Pipa Baja Ø 450 mm 490,900 M.4.226 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 47,011 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,309 T.4.029 . . .
A.8.4.1.73 P-484 1.00 m1 (K3) Pemasangan pipa baja Ø 500 mm 1,045,515 3.16 . 384,029 73,486 588,000
2.43 OH Pekerja 256,090 L.4.001 . . .
0.49 OH Tukang pipa 70,373 L.4.020 . . .
0.24 OH Mandor 57,567 L.4.035 . . .
1.00 m Pipa Baja Ø 500 mm 588,000 M.4.227 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 52,435 T.4.025 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 21,051 T.4.029 . . .
A.8.4.1.74 P-485 1.00 m1 (K3) Pemasangan pipa baja Ø 600 mm 1,038,222 2.87 . 348,859 67,063 622,300
2.21 OH Pekerja 232,502 L.4.001 . . .

www.mitra-arsitek.com 87/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.44 OH Tukang pipa 64,002 L.4.020 . . .
0.22 OH Mandor 52,355 L.4.035 . . .
1.00 m Pipa Baja Ø 600 mm 622,300 M.4.228 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 48,819 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,244 T.4.029 . . .
A.8.4.1.75 P-486 1.00 m1 (K3) Pemasangan pipa baja Ø 800 mm 1,643,361 5.07 . 615,544 129,017 898,800
3.90 OH Pekerja 410,354 L.4.001 . . .
0.78 OH Tukang pipa 112,799 L.4.020 . . .
0.39 OH Mandor 92,391 L.4.035 . . .
1.00 m Pipa Baja Ø 800 mm 898,800 M.4.229 . . .
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 83,173 T.4.025 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 45,844 T.4.029 . . .
A.8.4.1.76 P-487 1.00 m1 (K3) Pemasangan pipa baja Ø 900 mm 1,766,919 4.92 . 579,601 147,818 1,039,500
4.40 OH Pekerja 463,636 L.4.001 . . .
0.08 OH Tukang pipa 11,729 L.4.020 . . .
0.44 OH Mandor 104,236 L.4.035 . . .
1.00 m Pipa Baja Ø 900 mm 1,039,500 M.4.230 . . .
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 94,021 T.4.025 . . .
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 53,797 T.4.029 . . .
A.8.4.1.77 P-488 1.00 m1 (K3) Pemasangan pipa baja Ø 1000 mm 2,260,134 6.36 . 773,047 167,087 1,320,000
4.90 OH Pekerja 515,444 L.4.001 . . .
0.98 OH Tukang pipa 141,759 L.4.020 . . .
0.49 OH Mandor 115,844 L.4.035 . . .
1.00 m Pipa Baja Ø 1000 mm 1,320,000 M.4.231 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 104,870 T.4.025 . . .
0.13 hari Sewa Tripot/Tackel & handle crane 2 T 62,217 T.4.029 . . .
A.8.4.1.78 P-489 1.00 m1 (K3) Pemasangan pipa baja Ø 1100 mm 2,286,778 7.00 . 850,890 185,888 1,250,000
5.39 OH Pekerja 567,251 L.4.001 . . .
1.08 OH Tukang pipa 155,950 L.4.020 . . .
0.54 OH Mandor 127,689 L.4.035 . . .
1.00 m Pipa Baja Ø 1100 mm 1,250,000 M.4.232 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 115,718 T.4.025 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 70,170 T.4.029 . . .
A.8.4.1.79 P-490 1.00 m1 (K3) Pemasangan pipa baja Ø 1200 mm 2,474,226 7.66 . 930,536 204,690 1,339,000
5.90 OH Pekerja 620,954 L.4.001 . . .
1.18 OH Tukang pipa 170,285 L.4.020 . . .
0.59 OH Mandor 139,297 L.4.035 . . .
1.00 m Pipa Baja Ø 1200 mm 1,339,000 M.4.233 . . .
0.07 hari Sewa excavator type 225 kap 0,5 -1,0 m3 126,567 T.4.025 . . .
0.17 hari Sewa Tripot/Tackel & handle crane 2 T 78,123 T.4.029 . . .
A.8.4.2.1 P-491 1.00 m1 (K3) Pemotongan pipa PVC Ø 63 mm 83,840 0.01 . 935 706 82,200
0.01 OH Pekerja 527 L.4.001 . . .
0.00 OH Tukang pipa 290 L.4.020 . . .
0.00 OH Mandor 118 L.4.035 . . .
1.00 bh Pipa PVC Ø 63 mm 82,200 M.4.295 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 706 T.4.006 . . .
A.8.4.2.2 P-492 1.00 m1 (K3) Pemotongan pipa PVC Ø 90 mm 102,430 0.02 . 2,725 706 99,000
0.01 OH Pekerja 1,474 L.4.001 . . .
0.01 OH Tukang pipa 1,014 L.4.020 . . .
0.00 OH Mandor 237 L.4.035 . . .

www.mitra-arsitek.com 88/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa PVC Ø 90 mm 99,000 M.4.296 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 706 T.4.006 . . .
A.8.4.2.3 P-493 1.00 bh (K3) Pemotongan pipa PVC Ø 110 mm 150,289 0.04 . 4,383 706 145,200
0.02 OH Pekerja 2,317 L.4.001 . . .
0.01 OH Tukang pipa 1,593 L.4.020 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.00 bh Pipa PVC Ø 110 mm 145,200 M.4.297 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 706 T.4.006 . . .
A.8.4.2.4 P-494 1.00 bh (K3) Pemotongan pipa PVC Ø 150 mm 183,453 0.05 . 6,147 706 176,600
0.03 OH Pekerja 3,264 L.4.001 . . .
0.02 OH Tukang pipa 2,172 L.4.020 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 bh Pipa PVC Ø 150 mm 176,600 M.4.298 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 706 T.4.006 . . .
A.8.4.2.5 P-495 1.00 bh (K3) Pemotongan pipa PVC Ø 200 mm 374,515 0.13 . 16,217 3,998 354,300
0.08 OH Pekerja 8,529 L.4.001 . . .
0.04 OH Tukang pipa 5,792 L.4.020 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 bh Pipa PVC Ø 200 mm 354,300 M.4.299 . . .
0.02 hari Bahan potong pipa T1/manual (gergaji) /saw 3,998 T.4.006 . . .
A.8.4.2.6 P-496 1.00 bh (K3) Pemotongan pipa PVC Ø 250 mm 490,781 0.21 . 25,825 7,056 457,900
0.13 OH Pekerja 13,478 L.4.001 . . .
0.06 OH Tukang pipa 9,267 L.4.020 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
1.00 bh Pipa PVC Ø 250 mm 457,900 M.4.300 . . .
0.03 hari Bahan potong pipa T1/manual (gergaji) /saw 7,056 T.4.006 . . .
A.8.4.2.7 P-497 1.00 bh (K3) Pemotongan pipa PVC Ø 300 mm 818,827 0.25 . 31,025 8,702 779,100
0.16 OH Pekerja 16,322 L.4.001 . . .
0.08 OH Tukang pipa 11,150 L.4.020 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
1.00 bh Pipa PVC Ø 300 mm 779,100 M.4.301 . . .
0.04 hari Bahan potong pipa T1/manual (gergaji) /saw 8,702 T.4.006 . . .
A.8.4.2.8 P-498 1.00 bh (K3) Pemotongan pipa PVC Ø 400 mm 1,520,136 0.53 . 66,709 20,227 1,433,200
0.33 OH Pekerja 34,854 L.4.001 . . .
0.17 OH Tukang pipa 24,037 L.4.020 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
1.00 bh Pipa PVC Ø 400 mm 1,433,200 M.4.302 . . .
0.09 hari Bahan potong pipa T1/manual (gergaji) /saw 20,227 T.4.006 . . .
A.8.4.2.9 P-499 1.00 bh (K3) Pemotongan pipa PVC Ø 450 mm 1,819,896 0.67 . 84,584 39,312 1,696,000
0.42 OH Pekerja 44,226 L.4.001 . . .
0.21 OH Tukang pipa 30,408 L.4.020 . . .
0.04 OH Mandor 9,950 L.4.035 . . .
1.00 bh Pipa PVC Ø 450 mm 1,696,000 M.4.303 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 39,312 T.4.007 . . .
A.8.4.2.10 P-500 1.00 bh (K3) Pemotongan pipa PVC Ø 500 mm 2,615,599 0.83 . 104,367 50,232 2,461,000
0.52 OH Pekerja 54,545 L.4.001 . . .
0.26 OH Tukang pipa 37,503 L.4.020 . . .
0.05 OH Mandor 12,319 L.4.035 . . .
1.00 bh Pipa PVC Ø 500 mm 2,461,000 M.4.304 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 50,232 T.4.007 . . .

www.mitra-arsitek.com 89/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.11 P-501 1.00 bh (K3) Pemotongan pipa PVC Ø 600 mm 4,075,931 1.00 . 125,323 62,608 3,888,000
0.62 OH Pekerja 65,602 L.4.001 . . .
0.31 OH Tukang pipa 45,033 L.4.020 . . .
0.06 OH Mandor 14,688 L.4.035 . . .
1.00 bh Pipa PVC Ø 600 mm 3,888,000 M.4.305 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 62,608 T.4.007 . . .
A.8.4.2.12 P-502 1.00 bh (K3) Pemotongan pipa PVC Ø 800 mm 5,578,890 1.74 . 219,410 116,480 5,243,000
1.09 OH Pekerja 114,672 L.4.001 . . .
0.55 OH Tukang pipa 78,916 L.4.020 . . .
0.11 OH Mandor 25,822 L.4.035 . . .
1.00 bh Pipa PVC Ø 800 mm 5,243,000 M.4.306 . . .
0.16 hari Bahan potong pipa T2/mekanik / cilinder 116,480 T.4.007 . . .
A.8.4.2.13 P-503 1.00 bh (K3) Pemotongan pipa PVC Ø 900 mm 6,738,139 1.83 . 229,835 122,304 6,386,000
1.14 OH Pekerja 120,147 L.4.001 . . .
0.57 OH Tukang pipa 82,681 L.4.020 . . .
0.11 OH Mandor 27,007 L.4.035 . . .
1.00 bh Pipa PVC Ø 900 mm 6,386,000 M.4.307 . . .
0.17 hari Bahan potong pipa T2/mekanik / cilinder 122,304 T.4.007 . . .
A.8.4.2.14 P-504 1.00 bh (K3) Pemotongan pipa PVC Ø 1000 mm 8,423,025 2.06 . 258,977 139,048 8,025,000
1.29 OH Pekerja 135,311 L.4.001 . . .
0.64 OH Tukang pipa 93,106 L.4.020 . . .
0.13 OH Mandor 30,560 L.4.035 . . .
1.00 bh Pipa PVC Ø 1000 mm 8,025,000 M.4.308 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 139,048 T.4.007 . . .
A.8.4.2.15 P-505 1.00 bh (K3) Pemotongan pipa PVC Ø 1100 mm 9,154,946 2.29 . 287,882 155,064 8,712,000
1.43 OH Pekerja 150,474 L.4.001 . . .
0.72 OH Tukang pipa 103,532 L.4.020 . . .
0.14 OH Mandor 33,877 L.4.035 . . .
1.00 bh Pipa PVC Ø 1100 mm 8,712,000 M.4.309 . . .
0.21 hari Bahan potong pipa T2/mekanik / cilinder 155,064 T.4.007 . . .
A.8.4.2.16 P-506 1.00 bh (K3) Pemotongan pipa PVC Ø 1200 mm 10,992,596 2.52 . 316,788 171,808 10,504,000
1.57 OH Pekerja 165,637 L.4.001 . . .
0.79 OH Tukang pipa 113,958 L.4.020 . . .
0.16 OH Mandor 37,193 L.4.035 . . .
1.00 bh Pipa PVC Ø 1200 mm 10,504,000 M.4.310 . . .
0.24 hari Bahan potong pipa T2/mekanik / cilinder 171,808 T.4.007 . . .
A.8.4.2.17 P-507 1.00 bh (K3) Pemotongan pipa HDPE Ø 63 mm 66,538 0.04 . 5,326 2,912 58,300
0.00 OH Pekerja 211 L.4.001 . . .
0.00 OH Tukang pipa 145 L.4.020 . . .
0.00 OH Mandor 47 L.4.035 . . .
0.03 OH Operator Alat Pipa 4,923 L.4.038 . . .
1.00 bh Pipa HDPE Ø 63 mm 58,300 M.4.265 . . .
0.00 hari Bahan potong pipa T2/mekanik / cilinder 2,912 T.4.007 . . .
A.8.4.2.18 P-508 1.00 bh (K3) Pemotongan pipa HDPE Ø 100 mm 141,724 0.08 . 11,584 3,640 126,500
0.01 OH Pekerja 632 L.4.001 . . .
0.00 OH Tukang pipa 434 L.4.020 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.07 OH Operator Alat Pipa 10,281 L.4.038 . . .
1.00 bh Pipa HDPE Ø 100 mm 126,500 M.4.266 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 3,640 T.4.007 . . .

www.mitra-arsitek.com 90/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.19 P-509 1.00 bh (K3) Pemotongan pipa HDPE Ø 125 mm 270,077 0.11 . 15,809 4,368 249,900
0.01 OH Pekerja 948 L.4.001 . . .
0.01 OH Tukang pipa 724 L.4.020 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.10 OH Operator Alat Pipa 13,901 L.4.038 . . .
1.00 bh Pipa HDPE Ø 125 mm 249,900 M.4.267 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 4,368 T.4.007 . . .
A.8.4.2.20 P-510 1.00 bh (K3) Pemotongan pipa HDPE Ø 150 mm 350,090 0.15 . 20,838 6,552 322,700
0.02 OH Pekerja 1,685 L.4.001 . . .
0.01 OH Tukang pipa 1,158 L.4.020 . . .
0.00 OH Mandor 474 L.4.035 . . .
0.12 OH Operator Alat Pipa 17,521 L.4.038 . . .
1.00 bh Pipa HDPE Ø 150 mm 322,700 M.4.268 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 6,552 T.4.007 . . .
A.8.4.2.21 P-511 1.00 bh (K3) Pemotongan pipa HDPE Ø 200 mm 671,203 0.24 . 33,527 12,376 625,300
0.04 OH Pekerja 4,633 L.4.001 . . .
0.02 OH Tukang pipa 3,186 L.4.020 . . .
0.00 OH Mandor 948 L.4.035 . . .
0.17 OH Operator Alat Pipa 24,761 L.4.038 . . .
1.00 bh Pipa HDPE Ø 200 mm 625,300 M.4.269 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 12,376 T.4.007 . . .
A.8.4.2.22 P-512 1.00 bh (K3) Pemotongan pipaHDPE Ø 250 mm 1,046,137 0.33 . 45,493 16,744 983,900
0.07 OH Pekerja 7,055 L.4.001 . . .
0.03 OH Tukang pipa 4,778 L.4.020 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.22 OH Operator Alat Pipa 32,001 L.4.038 . . .
1.00 bh Pipa HDPE Ø 250 mm 983,900 M.4.270 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 16,744 T.4.007 . . .
A.8.4.2.23 P-513 1.00 bh (K3) Pemotongan pipa HDPE Ø 300 mm 1,781,606 0.42 . 57,366 21,840 1,702,400
0.09 OH Pekerja 9,477 L.4.001 . . .
0.05 OH Tukang pipa 6,516 L.4.020 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
0.27 OH Operator Alat Pipa 39,241 L.4.038 . . .
1.00 bh Pipa HDPE Ø 300 mm 1,702,400 M.4.271 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 21,840 T.4.007 . . .
A.8.4.2.24 P-514 1.00 bh (K3) Pemotongan pipa HDPE Ø 400 mm 2,571,606 0.65 . 89,366 40,040 2,442,200
0.18 OH Pekerja 18,638 L.4.001 . . .
0.09 OH Tukang pipa 12,742 L.4.020 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.37 OH Operator Alat Pipa 53,721 L.4.038 . . .
1.00 bh Pipa HDPE Ø 400 mm 2,442,200 M.4.272 . . .
0.06 hari Bahan potong pipa T2/mekanik / cilinder 40,040 T.4.007 . . .
A.8.4.2.25 P-515 1.00 bh (K3) Pemotongan pipa HDPE Ø 450 mm 3,496,124 0.78 . 106,464 50,960 3,338,700
0.23 OH Pekerja 23,693 L.4.001 . . .
0.11 OH Tukang pipa 16,362 L.4.020 . . .
0.02 OH Mandor 5,449 L.4.035 . . .
0.42 OH Operator Alat Pipa 60,961 L.4.038 . . .
1.00 bh Pipa HDPE Ø 450 mm 3,338,700 M.4.273 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 50,960 T.4.007 . . .
A.8.4.2.26 P-516 1.00 bh (K3) Pemotongan pipa HDPE Ø 500 mm 4,071,009 0.92 . 124,129 61,880 3,885,000

www.mitra-arsitek.com 91/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 OH Pekerja 29,168 L.4.001 . . .
0.14 OH Tukang pipa 20,127 L.4.020 . . .
0.03 OH Mandor 6,633 L.4.035 . . .
0.47 OH Operator Alat Pipa 68,201 L.4.038 . . .
1.00 bh Pipa HDPE Ø 500 mm 3,885,000 M.4.274 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 61,880 T.4.007 . . .
A.8.4.2.27 P-517 1.00 bh (K3) Pemotongan pipa HDPE Ø 600 mm 6,823,273 1.10 . 149,745 73,528 6,600,000
0.33 OH Pekerja 35,065 L.4.001 . . .
0.17 OH Tukang pipa 24,182 L.4.020 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.57 OH Operator Alat Pipa 82,681 L.4.038 . . .
1.00 bh Pipa HDPE Ø 600 mm 6,600,000 M.4.275 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 73,528 T.4.007 . . .
A.8.4.2.28 P-518 1.00 bh (K3) Pemotongan pipa HDPE Ø 800 mm 9,759,037 1.73 . 232,725 130,312 9,396,000
0.60 OH Pekerja 63,285 L.4.001 . . .
0.30 OH Tukang pipa 43,585 L.4.020 . . .
0.06 OH Mandor 14,214 L.4.035 . . .
0.77 OH Operator Alat Pipa 111,641 L.4.038 . . .
1.00 bh Pipa HDPE Ø 800 mm 9,396,000 M.4.276 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 130,312 T.4.007 . . .
A.8.4.2.29 P-519 1.00 bh (K3) Pemotongan pipa HDPE Ø 900 mm 11,090,406 2.33 . 309,846 196,560 10,584,000
0.91 OH Pekerja 96,139 L.4.001 . . .
0.46 OH Tukang pipa 66,029 L.4.020 . . .
0.09 OH Mandor 21,558 L.4.035 . . .
0.87 OH Operator Alat Pipa 126,121 L.4.038 . . .
1.00 bh Pipa HDPE Ø 900 mm 10,584,000 M.4.277 . . .
0.27 hari Bahan potong pipa T2/mekanik / cilinder 196,560 T.4.007 . . .
A.8.4.2.30 P-520 1.00 bh (K3) Pemotongan pipa HDPE Ø 1000 mm 12,368,670 2.77 . 366,974 241,696 11,760,000
1.13 OH Pekerja 118,463 L.4.001 . . .
0.56 OH Tukang pipa 81,378 L.4.020 . . .
0.11 OH Mandor 26,533 L.4.035 . . .
0.97 OH Operator Alat Pipa 140,601 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1000 11,760,000 M.4.278 . . .
0.33 hari Bahan potong pipa T2/mekanik / cilinder 241,696 T.4.007 . . .
A.8.4.2.31 P-521 1.00 bh (K3) Pemotongan pipa HDPE Ø 1100 mm 12,220,169 3.05 . 404,449 265,720 11,550,000
1.24 OH Pekerja 130,361 L.4.001 . . .
0.62 OH Tukang pipa 89,631 L.4.020 . . .
0.12 OH Mandor 29,376 L.4.035 . . .
1.07 OH Operator Alat Pipa 155,081 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1100 11,550,000 M.4.280 . . .
0.37 hari Bahan potong pipa T2/mekanik / cilinder 265,720 T.4.007 . . .
A.8.4.2.32 P-522 1.00 bh (K3) Pemotongan pipa HDPE Ø 1200 mm 13,467,819 3.76 . 495,563 347,256 12,625,000
1.62 OH Pekerja 170,481 L.4.001 . . .
0.81 OH Tukang pipa 117,143 L.4.020 . . .
0.16 OH Mandor 38,378 L.4.035 . . .
1.17 OH Operator Alat Pipa 169,561 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1200 mm 12,625,000 M.4.282 . . .
0.48 hari Bahan potong pipa T2/mekanik / cilinder 347,256 T.4.007 . . .
A.8.4.2.33 P-523 1.00 bh (K3) Pemotongan pipa GIP Ø 63 mm 164,799 0.03 . 3,923 12,376 148,500
0.02 OH Pekerja 2,001 L.4.001 . . .

www.mitra-arsitek.com 92/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Tukang pipa 1,448 L.4.020 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.00 bh Pipa GIP Ø 63 mm 148,500 M.4.249 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 12,376 T.4.007 . . .
A.8.4.2.34 P-524 1.00 bh (K3) Pemotongan pipa GIP Ø 100 mm 269,404 0.09 . 11,728 12,376 245,300
0.06 OH Pekerja 6,107 L.4.001 . . .
0.03 OH Tukang pipa 4,199 L.4.020 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.00 bh Pipa GIP Ø 100 mm 245,300 M.4.250 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 12,376 T.4.007 . . .
A.8.4.2.35 P-525 1.00 bh (K3) Pemotongan pipa GIP Ø 125 mm 327,133 0.15 . 18,481 24,752 283,900
0.09 OH Pekerja 9,688 L.4.001 . . .
0.05 OH Tukang pipa 6,661 L.4.020 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.00 bh Pipa GIP Ø 125 mm 283,900 M.4.251 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 24,752 T.4.007 . . .
A.8.4.2.36 P-526 1.00 bh (K3) Pemotongan pipa GIP Ø 150 mm 398,483 0.21 . 26,431 24,752 347,300
0.13 OH Pekerja 13,794 L.4.001 . . .
0.07 OH Tukang pipa 9,557 L.4.020 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
1.00 bh Pipa GIP Ø 150 mm 347,300 M.4.252 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 24,752 T.4.007 . . .
A.8.4.2.37 P-527 1.00 bh (K3) Pemotongan pipa GIP Ø 200 mm 537,801 0.54 . 68,473 37,128 432,200
0.34 OH Pekerja 35,802 L.4.001 . . .
0.17 OH Tukang pipa 24,616 L.4.020 . . .
0.03 OH Mandor 8,055 L.4.035 . . .
1.00 bh Pipa GIP Ø 200 mm 432,200 M.4.253 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 37,128 T.4.007 . . .
A.8.4.2.38 P-528 1.00 bh (K3) Pemotongan pipa GIP Ø 250 mm 716,997 0.76 . 95,469 37,128 584,400
0.48 OH Pekerja 50,018 L.4.001 . . .
0.24 OH Tukang pipa 34,318 L.4.020 . . .
0.05 OH Mandor 11,134 L.4.035 . . .
1.00 bh Pipa GIP Ø 250 mm 584,400 M.4.254 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 37,128 T.4.007 . . .
A.8.4.2.39 P-529 1.00 bh (K3) Pemotongan pipa GIP Ø 300 mm 826,534 0.81 . 101,406 37,128 688,000
0.50 OH Pekerja 53,071 L.4.001 . . .
0.25 OH Tukang pipa 36,490 L.4.020 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 bh Pipa GIP Ø 300 mm 688,000 M.4.255 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 37,128 T.4.007 . . .
A.8.4.2.40 P-530 1.00 bh (K3) Pemotongan pipa GIP Ø 400 mm 1,062,577 1.18 . 148,673 49,504 864,400
0.74 OH Pekerja 77,711 L.4.001 . . .
0.37 OH Tukang pipa 53,431 L.4.020 . . .
0.07 OH Mandor 17,531 L.4.035 . . .
1.00 bh Pipa GIP Ø 400 mm 864,400 M.4.256 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 49,504 T.4.007 . . .
A.8.4.2.41 P-531 1.00 bh (K3) Pemotongan pipa GIP Ø 450 mm 1,282,130 1.36 . 170,826 49,504 1,061,800
0.85 OH Pekerja 89,294 L.4.001 . . .
0.42 OH Tukang pipa 61,395 L.4.020 . . .
0.09 OH Mandor 20,137 L.4.035 . . .

www.mitra-arsitek.com 93/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa GIP Ø 450 mm 1,061,800 M.4.257 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 49,504 T.4.007 . . .
A.8.4.2.42 P-532 1.00 bh (K3) Pemotongan pipa GIP Ø 500 mm 1,363,661 1.51 . 189,557 49,504 1,124,600
0.94 OH Pekerja 99,087 L.4.001 . . .
0.47 OH Tukang pipa 68,201 L.4.020 . . .
0.09 OH Mandor 22,269 L.4.035 . . .
1.00 bh Pipa GIP Ø 500 mm 1,124,600 M.4.258 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 49,504 T.4.007 . . .
A.8.4.2.43 P-533 1.00 bh (K3) Pemotongan pipa GIP Ø 600 mm 1,598,486 1.38 . 173,906 61,880 1,362,700
0.86 OH Pekerja 90,979 L.4.001 . . .
0.43 OH Tukang pipa 62,554 L.4.020 . . .
0.09 OH Mandor 20,373 L.4.035 . . .
1.00 bh Pipa GIP Ø 600 mm 1,362,700 M.4.259 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 61,880 T.4.007 . . .
A.8.4.2.44 P-534 1.00 bh (K3) Pemotongan pipa GIP Ø 800 mm 2,212,057 2.51 . 315,577 61,880 1,834,600
1.57 OH Pekerja 165,005 L.4.001 . . .
0.78 OH Tukang pipa 113,378 L.4.020 . . .
0.16 OH Mandor 37,193 L.4.035 . . .
1.00 bh Pipa GIP Ø 800 mm 1,834,600 M.4.260 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 61,880 T.4.007 . . .
A.8.4.2.45 P-535 1.00 bh (K3) Pemotongan pipa GIP Ø 900 mm 2,502,140 2.83 . 356,460 61,880 2,083,800
1.77 OH Pekerja 186,381 L.4.001 . . .
0.89 OH Tukang pipa 128,148 L.4.020 . . .
0.18 OH Mandor 41,931 L.4.035 . . .
1.00 bh Pipa GIP Ø 900 mm 2,083,800 M.4.261 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 61,880 T.4.007 . . .
A.8.4.2.46 P-536 1.00 bh (K3) Pemotongan pipa GIP Ø 1000 mm 2,742,905 3.16 . 397,449 74,256 2,271,200
1.97 OH Pekerja 207,862 L.4.001 . . .
0.99 OH Tukang pipa 142,918 L.4.020 . . .
0.20 OH Mandor 46,669 L.4.035 . . .
1.00 bh Pipa GIP Ø 1000 mm 2,271,200 M.4.262 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 74,256 T.4.007 . . .
A.8.4.2.47 P-537 1.00 bh (K3) Pemotongan pipa GIP Ø 1100 mm 3,011,231 3.49 . 438,675 74,256 2,498,300
2.18 OH Pekerja 229,343 L.4.001 . . .
1.09 OH Tukang pipa 157,687 L.4.020 . . .
0.22 OH Mandor 51,644 L.4.035 . . .
1.00 bh Pipa GIP Ø 1100 mm 2,498,300 M.4.263 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 74,256 T.4.007 . . .
A.8.4.2.48 P-538 1.00 bh (K3) Pemotongan pipa GIP Ø 1200 mm 3,385,220 3.81 . 479,664 74,256 2,831,300
2.38 OH Pekerja 250,825 L.4.001 . . .
1.19 OH Tukang pipa 172,457 L.4.020 . . .
0.24 OH Mandor 56,382 L.4.035 . . .
1.00 bh Pipa GIP Ø 1200 mm 2,831,300 M.4.264 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 74,256 T.4.007 . . .
A.8.4.2.49 P-539 1.00 bh (K3) Pemotongan pipa DCI Ø 100 mm 148,265 0.09 . 11,162 1,403 135,700
0.07 OH Pekerja 7,476 L.4.001 . . .
0.01 OH Tukang pipa 2,027 L.4.020 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.00 bh Pipa DCI Ø 100 mm 135,700 M.4.234 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,403 T.4.029 . . .

www.mitra-arsitek.com 94/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.50 P-540 1.00 bh (K3) Pemotongan pipa DCI Ø 125 mm 228,263 0.15 . 17,585 4,678 206,000
0.11 OH Pekerja 11,794 L.4.001 . . .
0.02 OH Tukang pipa 3,186 L.4.020 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
1.00 bh Pipa DCI Ø 125 mm 206,000 M.4.235 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 4,678 T.4.029 . . .
A.8.4.2.51 P-541 1.00 bh (K3) Pemotongan pipa DCI Ø 150 mm 376,587 0.21 . 25,167 8,420 343,000
0.16 OH Pekerja 16,743 L.4.001 . . .
0.03 OH Tukang pipa 4,634 L.4.020 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
1.00 bh Pipa DCI Ø 150 mm 343,000 M.4.236 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,420 T.4.029 . . .
A.8.4.2.52 P-542 1.00 bh (K3) Pemotongan pipa DCI Ø 200 mm 649,637 0.48 . 57,876 25,261 566,500
0.37 OH Pekerja 38,540 L.4.001 . . .
0.07 OH Tukang pipa 10,570 L.4.020 . . .
0.04 OH Mandor 8,765 L.4.035 . . .
1.00 bh Pipa DCI Ø 200 mm 566,500 M.4.237 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 25,261 T.4.029 . . .
A.8.4.2.53 P-543 1.00 bh (K3) Pemotongan pipa DCI Ø 250 mm 891,199 0.62 . 75,250 34,149 781,800
0.48 OH Pekerja 50,123 L.4.001 . . .
0.10 OH Tukang pipa 13,756 L.4.020 . . .
0.05 OH Mandor 11,371 L.4.035 . . .
1.00 bh Pipa DCI Ø 250 mm 781,800 M.4.238 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 34,149 T.4.029 . . .
A.8.4.2.54 P-544 1.00 bh (K3) Pemotongan pipa DCI Ø 300 mm 1,209,721 0.67 . 80,765 36,956 1,092,000
0.51 OH Pekerja 53,914 L.4.001 . . .
0.10 OH Tukang pipa 14,770 L.4.020 . . .
0.05 OH Mandor 12,082 L.4.035 . . .
1.00 bh Pipa DCI Ø 300 mm 1,092,000 M.4.239 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 36,956 T.4.029 . . .
A.8.4.2.55 P-545 1.00 bh (K3) Pemotongan pipa DCI Ø 400 mm 2,783,602 1.22 . 148,578 115,024 2,520,000
0.94 OH Pekerja 99,087 L.4.001 . . .
0.19 OH Tukang pipa 27,222 L.4.020 . . .
0.09 OH Mandor 22,269 L.4.035 . . .
1.00 bh Pipa DCI Ø 400 mm 2,520,000 M.4.240 . . .
0.16 hari Bahan potong pipa T2/mekanik / cilinder 115,024 T.4.007 . . .
A.8.4.2.56 P-546 1.00 bh (K3) Pemotongan pipa DCI Ø 450 mm 3,247,730 1.48 . 179,602 128,128 2,940,000
1.14 OH Pekerja 119,726 L.4.001 . . .
0.23 OH Tukang pipa 32,870 L.4.020 . . .
0.11 OH Mandor 27,007 L.4.035 . . .
1.00 bh Pipa DCI Ø 450 mm 2,940,000 M.4.241 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 128,128 T.4.007 . . .
A.8.4.2.57 P-547 1.00 bh (K3) Pemotongan pipa DCI Ø 500 mm 3,866,901 1.71 . 207,125 139,776 3,520,000
1.31 OH Pekerja 138,154 L.4.001 . . .
0.26 OH Tukang pipa 37,938 L.4.020 . . .
0.13 OH Mandor 31,034 L.4.035 . . .
1.00 bh Pipa DCI Ø 500 mm 3,520,000 M.4.242 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 139,776 T.4.007 . . .
A.8.4.2.58 P-548 1.00 bh (K3) Pemotongan pipa DCI Ø 600 mm 3,874,585 1.70 . 206,809 139,776 3,528,000
1.31 OH Pekerja 137,838 L.4.001 . . .

www.mitra-arsitek.com 95/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.26 OH Tukang pipa 37,938 L.4.020 . . .
0.13 OH Mandor 31,034 L.4.035 . . .
1.00 bh Pipa DCI Ø 600 mm 3,528,000 M.4.243 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 139,776 T.4.007 . . .
A.8.4.2.59 P-549 1.00 bh (K3) Pemotongan pipa DCI Ø 800 mm 5,532,139 3.38 . 410,459 225,680 4,896,000
2.60 OH Pekerja 273,569 L.4.001 . . .
0.52 OH Tukang pipa 75,296 L.4.020 . . .
0.26 OH Mandor 61,594 L.4.035 . . .
1.00 bh Pipa DCI Ø 800 mm 4,896,000 M.4.244 . . .
0.31 hari Bahan potong pipa T2/mekanik / cilinder 225,680 T.4.007 . . .
A.8.4.2.60 P-550 1.00 bh (K3) Pemotongan pipa DCI Ø 900 mm 6,266,660 4.38 . 532,292 277,368 5,457,000
3.37 OH Pekerja 354,861 L.4.001 . . .
0.67 OH Tukang pipa 97,595 L.4.020 . . .
0.34 OH Mandor 79,835 L.4.035 . . .
1.00 bh Pipa DCI Ø 900 mm 5,457,000 M.4.245 . . .
0.38 hari Bahan potong pipa T2/mekanik / cilinder 277,368 T.4.007 . . .
A.8.4.2.61 P-551 1.00 bh (K3) Pemotongan pipa DCI Ø 1000 mm 7,256,112 5.23 . 635,064 321,048 6,300,000
4.02 OH Pekerja 423,411 L.4.001 . . .
0.80 OH Tukang pipa 116,419 L.4.020 . . .
0.40 OH Mandor 95,234 L.4.035 . . .
1.00 bh Pipa DCI Ø 1000 mm 6,300,000 M.4.246 . . .
0.44 hari Bahan potong pipa T2/mekanik / cilinder 321,048 T.4.007 . . .
A.8.4.2.62 P-552 1.00 bh (K3) Pemotongan pipa DCI Ø 1100 mm 8,070,577 6.15 . 747,209 368,368 6,955,000
4.73 OH Pekerja 498,174 L.4.001 . . .
0.95 OH Tukang pipa 136,981 L.4.020 . . .
0.47 OH Mandor 112,054 L.4.035 . . .
1.00 bh Pipa DCI Ø 1100 mm 6,955,000 M.4.247 . . .
0.51 hari Bahan potong pipa T2/mekanik / cilinder 368,368 T.4.007 . . .
A.8.4.2.63 P-553 1.00 bh (K3) Pemotongan pipa DCI Ø 1200 mm 9,318,264 7.15 . 868,936 419,328 8,030,000
5.50 OH Pekerja 579,361 L.4.001 . . .
1.10 OH Tukang pipa 159,280 L.4.020 . . .
0.55 OH Mandor 130,295 L.4.035 . . .
1.00 bh Pipa DCI Ø 1200 mm 8,030,000 M.4.248 . . .
0.58 hari Bahan potong pipa T2/mekanik / cilinder 419,328 T.4.007 . . .
A.8.4.2.64 P-554 1.00 bh (K3) Pemotongan pipa baja Ø 63 mm 256,464 0.04 . 4,528 26,936 225,000
0.03 OH Pekerja 2,948 L.4.001 . . .
0.01 OH Tukang pipa 869 L.4.020 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 bh Pipa Baja Ø 63 mm 225,000 M.4.218 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 26,936 T.4.007 . . .
A.8.4.2.65 P-555 1.00 bh (K3) Pemotongan pipa baja Ø 100 mm 436,227 0.11 . 13,307 29,120 393,800
0.09 OH Pekerja 8,951 L.4.001 . . .
0.02 OH Tukang pipa 2,462 L.4.020 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 bh Pipa Baja Ø 100 mm 393,800 M.4.219 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 29,120 T.4.007 . . .
A.8.4.2.66 P-556 1.00 bh (K3) Pemotongan pipa baja Ø 125 mm 257,870 0.17 . 20,994 30,576 206,300
0.13 OH Pekerja 14,005 L.4.001 . . .
0.03 OH Tukang pipa 3,910 L.4.020 . . .
0.01 OH Mandor 3,080 L.4.035 . . .

www.mitra-arsitek.com 96/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa Baja Ø 125 mm 206,300 M.4.220 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 30,576 T.4.007 . . .
A.8.4.2.67 P-557 1.00 bh (K3) Pemotongan pipa baja Ø 150 mm 193,257 0.24 . 28,997 32,760 131,500
0.18 OH Pekerja 19,375 L.4.001 . . .
0.04 OH Tukang pipa 5,358 L.4.020 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
1.00 bh Pipa Baja Ø 150 mm 131,500 M.4.221 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 32,760 T.4.007 . . .
A.8.4.2.68 P-558 1.00 bh (K3) Pemotongan pipa baja Ø 200 mm 356,530 0.62 . 75,250 43,680 237,600
0.48 OH Pekerja 50,123 L.4.001 . . .
0.10 OH Tukang pipa 13,756 L.4.020 . . .
0.05 OH Mandor 11,371 L.4.035 . . .
1.00 bh Pipa Baja Ø 200 mm 237,600 M.4.222 . . .
0.06 hari Bahan potong pipa T2/mekanik / cilinder 43,680 T.4.007 . . .
A.8.4.2.69 P-559 1.00 bh (K3) Pemotongan pipa baja Ø 250 mm 434,612 0.86 . 104,708 49,504 280,400
0.66 OH Pekerja 69,814 L.4.001 . . .
0.13 OH Tukang pipa 19,258 L.4.020 . . .
0.07 OH Mandor 15,635 L.4.035 . . .
1.00 bh Pipa Baja Ø 250 mm 280,400 M.4.223 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 49,504 T.4.007 . . .
A.8.4.2.70 P-560 1.00 bh (K3) Pemotongan pipa baja Ø 300 mm 507,070 0.97 . 117,554 52,416 337,100
0.75 OH Pekerja 78,449 L.4.001 . . .
0.15 OH Tukang pipa 21,575 L.4.020 . . .
0.07 OH Mandor 17,531 L.4.035 . . .
1.00 bh Pipa Baja Ø 300 mm 337,100 M.4.224 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 52,416 T.4.007 . . .
A.8.4.2.71 P-561 1.00 bh (K3) Pemotongan pipa baja Ø 400 mm 711,288 1.87 . 227,448 76,440 407,400
1.44 OH Pekerja 151,632 L.4.001 . . .
0.29 OH Tukang pipa 41,702 L.4.020 . . .
0.14 OH Mandor 34,114 L.4.035 . . .
1.00 bh Pipa Baja Ø 400 mm 407,400 M.4.225 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 76,440 T.4.007 . . .
A.8.4.2.72 P-562 1.00 bh (K3) Pemotongan pipa baja Ø 450 mm 789,821 1.82 . 221,025 77,896 490,900
1.40 OH Pekerja 147,315 L.4.001 . . .
0.28 OH Tukang pipa 40,544 L.4.020 . . .
0.14 OH Mandor 33,166 L.4.035 . . .
1.00 bh Pipa Baja Ø 450 mm 490,900 M.4.226 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 77,896 T.4.007 . . .
A.8.4.2.73 P-563 1.00 bh (K3) Pemotongan pipa baja Ø 500 mm 912,087 2.03 . 246,191 77,896 588,000
1.56 OH Pekerja 164,057 L.4.001 . . .
0.31 OH Tukang pipa 45,178 L.4.020 . . .
0.16 OH Mandor 36,956 L.4.035 . . .
1.00 bh Pipa Baja Ø 500 mm 588,000 M.4.227 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 77,896 T.4.007 . . .
A.8.4.2.74 P-564 1.00 bh (K3) Pemotongan pipa baja Ø 600 mm 931,551 1.87 . 226,987 82,264 622,300
1.44 OH Pekerja 151,316 L.4.001 . . .
0.29 OH Tukang pipa 41,558 L.4.020 . . .
0.14 OH Mandor 34,114 L.4.035 . . .
1.00 bh Pipa Baja Ø 600 mm 622,300 M.4.228 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 82,264 T.4.007 . . .

www.mitra-arsitek.com 97/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.75 P-565 1.00 bh (K3) Pemotongan pipa baja Ø 800 mm 1,434,043 3.41 . 414,395 120,848 898,800
2.62 OH Pekerja 276,307 L.4.001 . . .
0.53 OH Tukang pipa 76,020 L.4.020 . . .
0.26 OH Mandor 62,068 L.4.035 . . .
1.00 bh Pipa Baja Ø 800 mm 898,800 M.4.229 . . .
0.17 hari Bahan potong pipa T2/mekanik / cilinder 120,848 T.4.007 . . .
A.8.4.2.76 P-566 1.00 bh (K3) Pemotongan pipa baja Ø 900 mm 1,641,941 3.86 . 469,217 133,224 1,039,500
2.97 OH Pekerja 312,846 L.4.001 . . .
0.59 OH Tukang pipa 86,011 L.4.020 . . .
0.30 OH Mandor 70,359 L.4.035 . . .
1.00 bh Pipa Baja Ø 900 mm 1,039,500 M.4.230 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 133,224 T.4.007 . . .
A.8.4.2.77 P-567 1.00 bh (K3) Pemotongan pipa baja Ø 1000 mm 1,990,617 4.32 . 524,289 146,328 1,320,000
3.32 OH Pekerja 349,491 L.4.001 . . .
0.66 OH Tukang pipa 96,147 L.4.020 . . .
0.33 OH Mandor 78,651 L.4.035 . . .
1.00 bh Pipa Baja Ø 1000 mm 1,320,000 M.4.231 . . .
0.20 hari Bahan potong pipa T2/mekanik / cilinder 146,328 T.4.007 . . .
A.8.4.2.78 P-568 1.00 bh (K3) Pemotongan pipa baja Ø 1100 mm 1,987,920 4.77 . 579,216 158,704 1,250,000
3.67 OH Pekerja 386,135 L.4.001 . . .
0.73 OH Tukang pipa 106,138 L.4.020 . . .
0.37 OH Mandor 86,942 L.4.035 . . .
1.00 bh Pipa Baja Ø 1100 mm 1,250,000 M.4.232 . . .
0.22 hari Bahan potong pipa T2/mekanik / cilinder 158,704 T.4.007 . . .
A.8.4.2.79 P-569 1.00 bh (K3) Pemotongan pipa baja Ø 1200 mm 2,056,096 5.22 . 634,288 171,808 1,250,000
4.02 OH Pekerja 422,780 L.4.001 . . .
0.80 OH Tukang pipa 116,274 L.4.020 . . .
0.40 OH Mandor 95,234 L.4.035 . . .
1.00 bh Pipa Baja Ø 1100 mm 1,250,000 M.4.232 . . .
0.24 hari Bahan potong pipa T2/mekanik / cilinder 171,808 T.4.007 . . .
A.8.4.3.1 P-570 1.00 bh (K3) Pemasangan Valve Ø 150 mm 6,270,662 2.29 . 287,882 46,780 5,936,000
1.43 OH Pekerja 150,474 L.4.001 . . .
0.72 OH Tukang pipa 103,532 L.4.020 . . .
0.14 OH Mandor 33,877 L.4.035 . . .
1.00 bh Valve Ø 150 mm 5,936,000 M.4.325 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 46,780 T.4.029 . . .
A.8.4.3.2 P-571 1.00 bh (K3) Pemasangan Valve Ø 200 mm 7,520,428 2.74 . 345,088 140,340 7,035,000
1.71 OH Pekerja 180,484 L.4.001 . . .
0.86 OH Tukang pipa 124,094 L.4.020 . . .
0.17 OH Mandor 40,510 L.4.035 . . .
1.00 bh Valve Ø 200 mm 7,035,000 M.4.326 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 140,340 T.4.029 . . .
A.8.4.3.3 P-572 1.00 bh (K3) Pemasangan Valve Ø 250 mm 10,602,208 2.74 . 345,088 187,120 10,070,000
1.71 OH Pekerja 180,484 L.4.001 . . .
0.86 OH Tukang pipa 124,094 L.4.020 . . .
0.17 OH Mandor 40,510 L.4.035 . . .
1.00 bh Valve Ø 250 mm 10,070,000 M.4.327 . . .
0.40 hari Sewa Tripot/Tackel & handle crane 2 T 187,120 T.4.029 . . .
A.8.4.3.4 P-573 1.00 bh (K3) Pemasangan Valve Ø 300 mm 13,674,680 3.20 . 402,780 233,900 13,038,000
2.00 OH Pekerja 210,600 L.4.001 . . .

www.mitra-arsitek.com 98/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 OH Tukang pipa 144,800 L.4.020 . . .
0.20 OH Mandor 47,380 L.4.035 . . .
1.00 bh Valve Ø 300 mm 13,038,000 M.4.328 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
A.8.4.3.5 P-574 1.00 bh (K3) Pemasangan Valve Ø 400 mm 17,315,462 5.49 . 690,662 467,800 16,157,000
3.43 OH Pekerja 361,074 L.4.001 . . .
1.72 OH Tukang pipa 248,332 L.4.020 . . .
0.34 OH Mandor 81,257 L.4.035 . . .
1.00 bh Valve Ø 400 mm 16,157,000 M.4.329 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
A.8.4.3.6 P-575 1.00 bh (K3) Pemasangan Valve Ø 450 mm 18,521,462 5.49 . 690,662 467,800 17,363,000
3.43 OH Pekerja 361,074 L.4.001 . . .
1.72 OH Tukang pipa 248,332 L.4.020 . . .
0.34 OH Mandor 81,257 L.4.035 . . .
1.00 bh Valve Ø 450 mm 17,363,000 M.4.330 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
A.8.4.3.7 P-576 1.00 bh (K3) Pemasangan Valve Ø 500 mm 22,180,360 6.40 . 805,560 467,800 20,907,000
4.00 OH Pekerja 421,200 L.4.001 . . .
2.00 OH Tukang pipa 289,600 L.4.020 . . .
0.40 OH Mandor 94,760 L.4.035 . . .
1.00 bh Valve Ø 500 mm 20,907,000 M.4.331 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
A.8.4.3.8 P-577 1.00 bh (K3) Pemasangan Valve Ø 600 mm 26,722,454 2.27 . 286,224 586,230 25,850,000
1.42 OH Pekerja 149,631 L.4.001 . . .
0.71 OH Tukang pipa 102,953 L.4.020 . . .
0.14 OH Mandor 33,640 L.4.035 . . .
1.00 bh Valve Ø 600 mm 25,850,000 M.4.332 . . .
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 280,680 T.4.029 . . .
0.30 hari Mobile crane =< 3 ton 305,550 T.4.008 . . .
A.8.4.3.9 P-578 1.00 bh (K3) Pemasangan Valve Ø 700 mm 28,383,032 2.29 . 287,882 743,150 27,352,000
1.43 OH Pekerja 150,474 L.4.001 . . .
0.72 OH Tukang pipa 103,532 L.4.020 . . .
0.14 OH Mandor 33,877 L.4.035 . . .
1.00 bh Valve Ø 700 mm 27,352,000 M.4.333 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
0.50 hari Mobile crane =< 3 ton 509,250 T.4.008 . . .
A.8.4.3.10 P-579 1.00 bh (K3) Pemasangan Valve Ø 800 mm 30,202,927 2.86 . 359,777 743,150 29,100,000
1.79 OH Pekerja 188,066 L.4.001 . . .
0.89 OH Tukang pipa 129,306 L.4.020 . . .
0.18 OH Mandor 42,405 L.4.035 . . .
1.00 bh Valve Ø 800 mm 29,100,000 M.4.334 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
0.50 hari Mobile crane =< 3 ton 509,250 T.4.008 . . .
A.8.4.3.11 P-580 1.00 bh (K3) Pemasangan Valve Ø 900 mm 35,592,813 2.74 . 345,088 1,114,725 34,133,000
1.71 OH Pekerja 180,484 L.4.001 . . .
0.86 OH Tukang pipa 124,094 L.4.020 . . .
0.17 OH Mandor 40,510 L.4.035 . . .
1.00 bh Valve Ø 900 mm 34,133,000 M.4.335 . . .
0.75 hari Sewa Tripot/Tackel & handle crane 2 T 350,850 T.4.029 . . .
0.75 hari Mobile crane =< 3 ton 763,875 T.4.008 . . .

www.mitra-arsitek.com 99/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.3.12 P-581 1.00 bh (K3) Pemasangan Valve Ø 1000 mm 40,521,122 4.11 . 517,822 1,486,300 38,517,000
2.57 OH Pekerja 270,726 L.4.001 . . .
1.29 OH Tukang pipa 186,213 L.4.020 . . .
0.26 OH Mandor 60,883 L.4.035 . . .
1.00 bh Valve Ø 1000 mm 38,517,000 M.4.336 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,018,500 T.4.008 . . .
A.8.4.3.13 P-582 1.00 bh (K3) Pemasangan Valve Ø 1100 mm 42,965,470 4.80 . 604,170 1,486,300 40,875,000
3.00 OH Pekerja 315,900 L.4.001 . . .
1.50 OH Tukang pipa 217,200 L.4.020 . . .
0.30 OH Mandor 71,070 L.4.035 . . .
1.00 bh Valve Ø 1100 mm 40,875,000 M.4.337 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,018,500 T.4.008 . . .
A.8.4.3.14 P-583 1.00 bh (K3) Pemasangan Valve Ø 1200 mm 46,017,470 4.80 . 604,170 1,486,300 43,927,000
3.00 OH Pekerja 315,900 L.4.001 . . .
1.50 OH Tukang pipa 217,200 L.4.020 . . .
0.30 OH Mandor 71,070 L.4.035 . . .
1.00 bh Valve Ø 1200 mm 43,927,000 M.4.338 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 467,800 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,018,500 T.4.008 . . .
A.8.4.3.15 P-584 1.00 bh (K3) Pemasangan Tee Ø 150 mm 199,541 0.17 . 21,442 13,098 165,000
0.11 OH Pekerja 11,162 L.4.001 . . .
0.05 OH Tukang pipa 7,674 L.4.020 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
1.00 bh Tee Ø 150 mm 165,000 M.4.311 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 13,098 T.4.029 . . .
A.8.4.3.16 P-585 1.00 bh (K3) Pemasangan Tee Ø 200 mm 255,161 0.35 . 43,595 13,566 198,000
0.22 OH Pekerja 22,745 L.4.001 . . .
0.11 OH Tukang pipa 15,638 L.4.020 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
1.00 bh Tee Ø 200 mm 198,000 M.4.312 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 13,566 T.4.029 . . .
A.8.4.3.17 P-586 1.00 bh (K3) Pemasangan 1 buah Tee Ø 250 mm 361,492 0.52 . 65,748 18,244 277,500
0.33 OH Pekerja 34,328 L.4.001 . . .
0.16 OH Tukang pipa 23,602 L.4.020 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
1.00 bh Tee Ø 250 mm 277,500 M.4.313 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,244 T.4.029 . . .
A.8.4.3.18 P-587 1.00 bh (K3) Pemasangan Tee Ø 300 mm 645,801 0.70 . 87,901 233,900 324,000
0.44 OH Pekerja 45,911 L.4.001 . . .
0.22 OH Tukang pipa 31,566 L.4.020 . . .
0.04 OH Mandor 10,424 L.4.035 . . .
1.00 bh Tee Ø 300 mm 324,000 M.4.314 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
A.8.4.3.19 P-588 1.00 bh (K3) Pemasangan Tee Ø 400 mm 744,107 1.05 . 132,207 233,900 378,000
0.66 OH Pekerja 69,077 L.4.001 . . .
0.33 OH Tukang pipa 47,494 L.4.020 . . .
0.07 OH Mandor 15,635 L.4.035 . . .
1.00 bh Tee Ø 400 mm 378,000 M.4.315 . . .

www.mitra-arsitek.com 100/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
A.8.4.3.20 P-589 1.00 bh (K3) Pemasangan Tee Ø 450 mm 776,260 1.23 . 154,360 233,900 388,000
0.77 OH Pekerja 80,660 L.4.001 . . .
0.38 OH Tukang pipa 55,458 L.4.020 . . .
0.08 OH Mandor 18,241 L.4.035 . . .
1.00 bh Tee Ø 450 mm 388,000 M.4.316 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 233,900 T.4.029 . . .
A.8.4.3.21 P-590 1.00 bh (K3) Pemasangan Tee Ø 500 mm 893,692 1.40 . 176,512 280,680 436,500
0.88 OH Pekerja 92,243 L.4.001 . . .
0.44 OH Tukang pipa 63,422 L.4.020 . . .
0.09 OH Mandor 20,847 L.4.035 . . .
1.00 bh Tee Ø 500 mm 436,500 M.4.317 . . .
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 280,680 T.4.029 . . .
A.8.4.3.22 P-591 1.00 bh (K3) Pemasangan Tee Ø 600 mm 928,880 1.75 . 220,818 188,061 520,000
1.10 OH Pekerja 115,409 L.4.001 . . .
0.55 OH Tukang pipa 79,350 L.4.020 . . .
0.11 OH Mandor 26,059 L.4.035 . . .
1.00 bh Tee Ø 600 mm 520,000 M.4.318 . . .
0.19 hari Sewa Tripot/Tackel & handle crane 2 T 90,285 T.4.029 . . .
0.10 hari Mobile crane =< 3 ton 97,776 T.4.008 . . .
A.8.4.3.23 P-592 1.00 bh (K3) Pemasangan Tee Ø 700 mm 1,035,470 2.11 . 265,124 220,346 550,000
1.32 OH Pekerja 138,575 L.4.001 . . .
0.66 OH Tukang pipa 95,278 L.4.020 . . .
0.13 OH Mandor 31,271 L.4.035 . . .
1.00 bh Tee Ø 700 mm 550,000 M.4.319 . . .
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 105,255 T.4.029 . . .
0.11 hari Mobile crane =< 3 ton 115,091 T.4.008 . . .
A.8.4.3.24 P-593 1.00 bh (K3) Pemasangan Tee Ø 800 mm 1,221,041 2.46 . 309,430 251,611 660,000
1.54 OH Pekerja 161,741 L.4.001 . . .
0.77 OH Tukang pipa 111,206 L.4.020 . . .
0.15 OH Mandor 36,483 L.4.035 . . .
1.00 bh Tee Ø 800 mm 660,000 M.4.320 . . .
0.26 hari Sewa Tripot/Tackel & handle crane 2 T 120,225 T.4.029 . . .
0.13 hari Mobile crane =< 3 ton 131,387 T.4.008 . . .
A.8.4.3.25 P-594 1.00 bh (K3) Pemasangan Tee Ø 900 mm 1,389,378 2.81 . 353,736 314,142 721,500
1.76 OH Pekerja 184,907 L.4.001 . . .
0.88 OH Tukang pipa 127,134 L.4.020 . . .
0.18 OH Mandor 41,694 L.4.035 . . .
1.00 bh Tee Ø 900 mm 721,500 M.4.321 . . .
0.32 hari Sewa Tripot/Tackel & handle crane 2 T 150,164 T.4.029 . . .
0.16 hari Mobile crane =< 3 ton 163,979 T.4.008 . . .
A.8.4.3.26 P-595 1.00 bh (K3) Pemasangan Tee Ø 1000 mm 1,476,642 3.16 . 398,041 357,600 721,000
1.98 OH Pekerja 208,073 L.4.001 . . .
0.99 OH Tukang pipa 143,062 L.4.020 . . .
0.20 OH Mandor 46,906 L.4.035 . . .
1.00 bh Tee Ø 1000 mm 721,000 M.4.322 . . .
0.37 hari Sewa Tripot/Tackel & handle crane 2 T 171,215 T.4.029 . . .
0.18 hari Mobile crane =< 3 ton 186,386 T.4.008 . . .
A.8.4.3.27 P-596 1.00 bh (K3) Pemasangan Tee Ø 1100 mm 1,644,489 3.51 . 442,347 377,141 825,000
2.20 OH Pekerja 231,239 L.4.001 . . .

www.mitra-arsitek.com 101/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 OH Tukang pipa 158,990 L.4.020 . . .
0.22 OH Mandor 52,118 L.4.035 . . .
1.00 bh Tee Ø 1100 mm 825,000 M.4.323 . . .
0.39 hari Sewa Tripot/Tackel & handle crane 2 T 180,571 T.4.029 . . .
0.19 hari Mobile crane =< 3 ton 196,571 T.4.008 . . .
A.8.4.3.28 P-597 1.00 bh (K3) Pemasangan Tee Ø 1200 mm 1,758,326 3.87 . 486,653 439,673 832,000
2.42 OH Pekerja 254,405 L.4.001 . . .
1.21 OH Tukang pipa 174,918 L.4.020 . . .
0.24 OH Mandor 57,330 L.4.035 . . .
1.00 bh Tee Ø 1200 mm 832,000 M.4.324 . . .
0.45 hari Sewa Tripot/Tackel & handle crane 2 T 210,510 T.4.029 . . .
0.23 hari Mobile crane =< 3 ton 229,163 T.4.008 . . .
A.8.4.4.1 P-598 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm 1,501,019 2.35 . 295,333 1,149,386 56,300
1.47 OH Pekerja 154,370 L.4.001 . . .
0.73 OH Tukang pipa 106,138 L.4.020 . . .
0.15 OH Mandor 34,824 L.4.035 . . .
1.00 bh Pipa Ø 80 mm 56,300 M.4.283 . . .
0.61 hari Bahan potong pipa T2/mekanik / cilinder 441,168 T.4.007 . . .
0.08 hari Sewa Genset 1500 watt 25,755 T.4.026 . . .
0.97 hari Sewa Pompa Submersible 3m3/h 277,816 T.4.028 . . .
0.87 hari Sewa Tripot/Tackel & handle crane 2 T 404,647 T.4.029 . . .
A.8.4.4.2 P-599 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm 1,684,835 2.63 . 331,583 1,263,352 89,900
1.65 OH Pekerja 173,324 L.4.001 . . .
0.82 OH Tukang pipa 119,170 L.4.020 . . .
0.17 OH Mandor 39,089 L.4.035 . . .
1.00 bh Pipa Ø 100 mm 89,900 M.4.284 . . .
0.65 hari Bahan potong pipa T2/mekanik / cilinder 473,200 T.4.007 . . .
0.16 hari Sewa Genset 1500 watt 54,601 T.4.026 . . .
1.08 hari Sewa Pompa Submersible 3m3/h 309,386 T.4.028 . . .
0.91 hari Sewa Tripot/Tackel & handle crane 2 T 426,166 T.4.029 . . .
A.8.4.4.3 P-600 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm 2,062,677 3.35 . 422,208 1,548,268 92,200
2.10 OH Pekerja 220,709 L.4.001 . . .
1.05 OH Tukang pipa 151,750 L.4.020 . . .
0.21 OH Mandor 49,749 L.4.035 . . .
1.00 bh Pipa Ø 150 mm 92,200 M.4.285 . . .
0.76 hari Bahan potong pipa T2/mekanik / cilinder 553,280 T.4.007 . . .
0.37 hari Sewa Genset 1500 watt 126,715 T.4.026 . . .
1.35 hari Sewa Pompa Submersible 3m3/h 388,311 T.4.028 . . .
1.03 hari Sewa Tripot/Tackel & handle crane 2 T 479,963 T.4.029 . . .
A.8.4.4.4 P-601 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm 2,534,718 4.07 . 512,834 1,833,184 188,700
2.55 OH Pekerja 268,094 L.4.001 . . .
1.27 OH Tukang pipa 184,330 L.4.020 . . .
0.26 OH Mandor 60,410 L.4.035 . . .
1.00 bh Pipa Ø 200 mm 188,700 M.4.286 . . .
0.87 hari Bahan potong pipa T2/mekanik / cilinder 633,360 T.4.007 . . .
0.58 hari Sewa Genset 1500 watt 198,829 T.4.026 . . .
1.63 hari Sewa Pompa Submersible 3m3/h 467,236 T.4.028 . . .
1.14 hari Sewa Tripot/Tackel & handle crane 2 T 533,760 T.4.029 . . .
A.8.4.4.5 P-602 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm 2,934,960 4.79 . 603,459 2,118,100 213,400
3.00 OH Pekerja 315,479 L.4.001 . . .

www.mitra-arsitek.com 102/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 OH Tukang pipa 216,910 L.4.020 . . .
0.30 OH Mandor 71,070 L.4.035 . . .
1.00 bh Pipa Ø 250 mm 213,400 M.4.287 . . .
0.98 hari Bahan potong pipa T2/mekanik / cilinder 713,440 T.4.007 . . .
0.79 hari Sewa Genset 1500 watt 270,943 T.4.026 . . .
1.90 hari Sewa Pompa Submersible 3m3/h 546,161 T.4.028 . . .
1.26 hari Sewa Tripot/Tackel & handle crane 2 T 587,557 T.4.029 . . .
A.8.4.4.6 P-603 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm 3,359,801 5.51 . 694,085 2,403,016 262,700
3.45 OH Pekerja 362,864 L.4.001 . . .
1.72 OH Tukang pipa 249,490 L.4.020 . . .
0.35 OH Mandor 81,731 L.4.035 . . .
1.00 bh Pipa Ø 300 mm 262,700 M.4.288 . . .
1.09 hari Bahan potong pipa T2/mekanik / cilinder 793,520 T.4.007 . . .
1.00 hari Sewa Genset 1500 watt 343,057 T.4.026 . . .
2.18 hari Sewa Pompa Submersible 3m3/h 625,086 T.4.028 . . .
1.37 hari Sewa Tripot/Tackel & handle crane 2 T 641,354 T.4.029 . . .
A.8.4.4.7 P-604 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm 4,215,984 6.95 . 875,336 2,972,848 367,800
4.35 OH Pekerja 457,634 L.4.001 . . .
2.17 OH Tukang pipa 314,650 L.4.020 . . .
0.44 OH Mandor 103,052 L.4.035 . . .
1.00 bh Pipa Ø 400 mm 367,800 M.4.289 . . .
1.31 hari Bahan potong pipa T2/mekanik / cilinder 953,680 T.4.007 . . .
1.42 hari Sewa Genset 1500 watt 487,285 T.4.026 . . .
2.73 hari Sewa Pompa Submersible 3m3/h 782,936 T.4.028 . . .
1.60 hari Sewa Tripot/Tackel & handle crane 2 T 748,948 T.4.029 . . .
A.8.4.4.8 P-605 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm 4,673,626 7.67 . 965,961 3,257,764 449,900
4.80 OH Pekerja 505,019 L.4.001 . . .
2.40 OH Tukang pipa 347,230 L.4.020 . . .
0.48 OH Mandor 113,712 L.4.035 . . .
1.00 bh Pipa Ø 450 mm 449,900 M.4.290 . . .
1.42 hari Bahan potong pipa T2/mekanik / cilinder 1,033,760 T.4.007 . . .
1.63 hari Sewa Genset 1500 watt 559,399 T.4.026 . . .
3.00 hari Sewa Pompa Submersible 3m3/h 861,861 T.4.028 . . .
1.72 hari Sewa Tripot/Tackel & handle crane 2 T 802,745 T.4.029 . . .
A.8.4.4.9 P-606 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm 5,109,067 8.39 . 1,056,587 3,542,680 509,800
5.25 OH Pekerja 552,404 L.4.001 . . .
2.62 OH Tukang pipa 379,810 L.4.020 . . .
0.53 OH Mandor 124,373 L.4.035 . . .
1.00 bh Pipa Ø 500 mm 509,800 M.4.291 . . .
1.53 hari Bahan potong pipa T2/mekanik / cilinder 1,113,840 T.4.007 . . .
1.84 hari Sewa Genset 1500 watt 631,513 T.4.026 . . .
3.28 hari Sewa Pompa Submersible 3m3/h 940,786 T.4.028 . . .
1.83 hari Sewa Tripot/Tackel & handle crane 2 T 856,542 T.4.029 . . .
A.8.4.4.10 P-607 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm 5,997,150 9.83 . 1,237,838 4,112,512 646,800
6.15 OH Pekerja 647,174 L.4.001 . . .
3.07 OH Tukang pipa 444,970 L.4.020 . . .
0.62 OH Mandor 145,694 L.4.035 . . .
1.00 bh Pipa Ø 600 mm 646,800 M.4.292 . . .
1.75 hari Bahan potong pipa T2/mekanik / cilinder 1,274,000 T.4.007 . . .
2.26 hari Sewa Genset 1500 watt 775,741 T.4.026 . . .

www.mitra-arsitek.com 103/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.83 hari Sewa Pompa Submersible 3m3/h 1,098,636 T.4.028 . . .
2.06 hari Sewa Tripot/Tackel & handle crane 2 T 964,136 T.4.029 . . .
A.8.4.4.11 P-608 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm 6,794,033 11.27 . 1,419,089 4,682,344 692,600
7.05 OH Pekerja 741,944 L.4.001 . . .
3.52 OH Tukang pipa 510,130 L.4.020 . . .
0.71 OH Mandor 167,015 L.4.035 . . .
1.00 bh Pipa Ø 700 mm 692,600 M.4.293 . . .
1.97 hari Bahan potong pipa T2/mekanik / cilinder 1,434,160 T.4.007 . . .
2.68 hari Sewa Genset 1500 watt 919,969 T.4.026 . . .
4.38 hari Sewa Pompa Submersible 3m3/h 1,256,486 T.4.028 . . .
2.29 hari Sewa Tripot/Tackel & handle crane 2 T 1,071,730 T.4.029 . . .
A.8.4.4.12 P-609 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm 7,726,116 12.71 . 1,600,340 5,252,176 873,600
7.95 OH Pekerja 836,714 L.4.001 . . .
3.97 OH Tukang pipa 575,290 L.4.020 . . .
0.80 OH Mandor 188,336 L.4.035 . . .
1.00 bh Pipa Ø 800 mm 873,600 M.4.294 . . .
2.19 hari Bahan potong pipa T2/mekanik / cilinder 1,594,320 T.4.007 . . .
3.10 hari Sewa Genset 1500 watt 1,064,197 T.4.026 . . .
4.93 hari Sewa Pompa Submersible 3m3/h 1,414,336 T.4.028 . . .
2.52 hari Sewa Tripot/Tackel & handle crane 2 T 1,179,324 T.4.029 . . .
A.8.4.5.1 P-610 1.00 bh (K3) Pengetesan pipa Ø 50 mm 1,807 0.01 . 1,032 - 775
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.00 m3 Air test (air bersih) 104 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.2 P-611 1.00 m1 (K3) Pengetesan pipa Ø 75 mm 1,911 0.01 . 1,032 - 879
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.00 m3 Air test (air bersih) 208 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.3 P-612 1.00 m1 (K3) Pengetesan pipa Ø 100 mm 2,119 0.01 . 1,032 - 1,087
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.01 m3 Air test (air bersih) 416 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.4 P-613 1.00 m1 (K3) Pengetesan pipa Ø 150 mm 2,639 0.01 . 1,032 - 1,607
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.02 m3 Air test (air bersih) 936 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.5 P-614 1.00 m1 (K3) Pengetesan 1 m pipa Ø 200 mm 3,315 0.01 . 1,032 - 2,283
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.03 m3 Air test (air bersih) 1,612 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .

www.mitra-arsitek.com 104/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.5.6 P-615 1.00 m1 (K3) Pengetesan pipa Ø 250 mm 4,251 0.01 . 1,032 - 3,219
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.05 m3 Air test (air bersih) 2,548 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.7 P-616 1.00 m1 (K3) Pengetesan 1 m pipa Ø 300 mm 5,395 0.01 . 1,032 - 4,363
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.07 m3 Air test (air bersih) 3,692 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.8 P-617 1.00 m1 (K3) Pengetesan pipa Ø 400 mm 8,255 0.01 . 1,032 - 7,223
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.13 m3 Air test (air bersih) 6,552 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.9 P-618 1.00 m1 (K3) Pengetesan 1 m pipa Ø 500 mm 9,919 0.01 . 1,032 - 8,887
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.16 m3 Air test (air bersih) 8,216 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.5.10 P-619 1.00 m1 (K3) Pengetesan pipa Ø 600 mm 16,419 0.01 . 1,032 - 15,387
0.01 OH Pekerja 842 L.4.001 . . .
0.00 OH Mandor 190 L.4.035 . . .
0.28 m3 Air test (air bersih) 14,716 M.4.002 . . .
0.06 Ltr Bahan Bakar 594 M.4.549 . . .
0.00 Ltr Oli 77 M.4.558 . . .
A.8.4.6.1 P-620 1.00 titik (K3) Pemasangan titik lampu 700,147 0.36 . 52,509 - 647,638
0.15 OH Pekerja 15,795 L.4.001 . . .
0.15 OH Tukang batu 23,685 L.4.007 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
0.28 btg Pipa listrik 5/8” 3,538 M.4.519 . . .
24.00 m Kabel NYM 3x2,5 mm2 508,800 M.4.513 . . .
3.00 bh Tee Doos 4,500 M.4.518 . . .
4.00 bh L.Bow 42,400 M.4.195 . . .
3.00 bh Las Dop 3,000 M.4.515 . . .
24.00 bh Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 bh Mongkok (Listrik) 1,500 M.4.516 . . .
1.00 bh Saklar (standar) 38,900 M.4.517 . . .
1.00 bh Fitting Lampu 25,800 M.4.512 . . .
A.8.4.6.2 P-621 1.00 titik Memasang Instalasi Penerangan 374,734 0.36 . 52,509 - 322,225
0.15 OH Pekerja 15,795 L.4.001 . . .
0.15 OH Tukang batu 23,685 L.4.007 . . .
0.03 OH Kepala tukang 5,922 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
11.00 M' Kabel NYM 3x2,5 mm2 233,200 M.4.513 . . .

www.mitra-arsitek.com 105/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
11.00 M' Pipa Conduit 60,500 M.4.197 . . .
1.00 bh Socket Pipa 15,700 M.4.199 . . .
2.00 bh Tee Doos 3,000 M.4.518 . . .
3.00 bh Klem Pipa 5,100 M.4.190 . . .
6.00 bh Sekrup fixer 1,800 M.4.183 . . .
2.00 bh Las Dop 2,000 M.4.515 . . .
0.25 bh Sealtape 925 M.4.599 . . .
. . . .
. . . .
DAFTAR ANALISA SNI . . . .
Analisa Harga Satuan Pekerjaan SNI . . . .
. . . .
. . . .
. . . .
STANDAR ID Koef. Unit Uraian - - . - - -
. . . .
SNI-2002 S-001 1.00 m1 Pek. Pengukuran & Pemasangan Bowplank 96,235 0.22 . 29,479 - 66,756
0.01 m3 Kayu Kaso 5 / 7 (borneo/meranti) 40,740 M.4.064 . . .
0.01 m3 Kayu Papan 3 / 20 borneo/meranti 25,480 M.4.099 . . .
0.02 kg Paku Biasa 2" - 5" 536 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI 2008 S-002 1.00 m2 Pekerjaan Pengukuran Gedung 18,991 0.13 . 18,295 696 -
0.08 oh Pekerja 8,424 L.4.001 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
0.02 oh Asisten Ahli Ukur 3,948 L.4.059 . . .
0.01 hr Sewa alat ukur 696 T.4.023 . . .
SNI-2002 S-003 1.00 m2 Membersihkan Lapangan dan Perataan 22,375 0.15 . 22,375 - -
0.10 oh Pekerja 10,530 L.4.001 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
AK-SNI 2008 S-004 1.00 m2 Pembuatan jalan sementara, tebal 25 cm 226,346 1.10 . 128,990 - 97,356
0.28 m3 Batu belah 76,395 M.4.013 . . .
0.03 m3 Kerikil 7,686 M.4.024 . . .
0.05 m3 Pasir Urug 13,275 M.4.032 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.10 oh Mandor 23,690 L.4.035 . . .
SNI-2002 S-005 1.00 m2 Pembuatan Jalan Sementara 186,064 1.05 . 117,145 - 68,919
0.15 m3 Batu belah 41,670 M.4.013 . . .
0.09 m3 Batu belah 25,002 M.4.013 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-006 1.00 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran 1,724,870 5.35 . 755,365 - 969,505
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
0.18 m3 Kayu balok borneo 623,700 M.4.084 . . .
0.85 kg Paku Biasa 2" - 5" 22,780 M.4.158 . . .
1.10 kg Baja strip (0,2 x 2) cm 15,290 M.4.128 . . .

www.mitra-arsitek.com 106/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
35.00 kg Semen 70,000 M.4.033 . . .
0.15 m3 Pasir pasang 33,705 M.4.030 . . .
0.10 m3 Pasir beton 29,190 M.4.028 . . .
0.15 m3 Koral Beton 36,375 M.4.026 . . .
30.00 bh Bata merah 30,000 M.4.007 . . .
0.25 lbr Seng Gelombang 3" x 6" BJLS 28 12,375 M.4.368 . . .
0.50 bh Jendela nako (rangka + kaca 5 mm) 29,700 M.4.577 . . .
0.08 m2 Kaca Polos 9,064 M.4.524 . . .
0.15 bh Kunci tanam biasa 21,450 M.4.583 . . .
0.06 lbr Plywood 120x240 tbl. 4 mm 4,626 M.4.365 . . .
2.00 oh Pekerja 210,600 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
1.00 oh Tukang batu 157,900 L.4.007 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-007 1.00 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m 447,211 0.64 . 82,386 - 364,825
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
2.50 Kg Semen 5,000 M.4.033 . . .
1.20 lbr Seng Gelombang 3" x 6" BJLS 28 59,400 M.4.368 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral Beton 2,183 M.4.026 . . .
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 249,480 M.4.058 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
0.45 Lt Meni Besi 14,445 M.4.393 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
SNI-2002 S-008 1.00 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m 591,106 0.54 . 71,856 - 519,250
1.00 btg Dolken kayu Ø 8-10/400 cm 25,000 M.4.042 . . .
2.00 Kg Semen 4,000 M.4.033 . . .
25.00 Kg Kawat Duri 485,000 M.4.146 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral Beton 2,183 M.4.026 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
SNI-2002 S-009 1.00 m1 Pagar Sementara dari Kayu tinggi 2 m 376,846 0.64 . 82,386 - 294,460
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
2.50 Kg Semen 5,000 M.4.033 . . .
0.01 m3 Pasir beton 1,460 M.4.028 . . .
0.01 m3 Koral Beton 2,183 M.4.026 . . .
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 249,480 M.4.058 . . .
0.06 Kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
0.40 Lt Residu 3,480 M.4.560 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .

www.mitra-arsitek.com 107/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 4,738 L.4.035 . . .
SNI-2002 S-010 1.00 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m 28,044 0.09 . 12,377 - 15,667
0.43 lbr Pagar kawat jaring 15,667 M.4.154 . . .
0.04 oh Pekerja 4,423 L.4.001 . . .
0.04 oh Tukang besi 6,691 L.4.008 . . .
0.00 oh Kepala Tukang 790 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
SNI-2002 S-011 1.00 m2 Pembuatan Gudang Semen dan Alat - alat 1,482,247 3.25 . 472,425 - 1,009,822
1.70 btg Dolken kayu Ø 8-10/400 cm 42,500 M.4.042 . . .
0.21 m3 Kayu balok borneo 727,650 M.4.084 . . .
0.30 Kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
10.50 Kg Semen 21,000 M.4.033 . . .
0.03 m3 Pasir beton 8,757 M.4.028 . . .
0.05 m3 Koral Beton 12,125 M.4.026 . . .
1.50 lbr Seng Gelombang BJLS 32 189,750 M.4.369 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-012 1.00 m2 Pembuatan Rumah Jaga / Konstruksi Kayu 1,623,455 2.70 . 383,605 - 1,239,850
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.4.042 . . .
0.28 m3 Kayu balok borneo 956,340 M.4.084 . . .
0.70 Kg Paku Biasa 2" - 5" 18,760 M.4.158 . . .
1.50 lbr Seng Gelombang BJLS 32 189,750 M.4.369 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
1.50 oh Tukang kayu 236,850 L.4.016 . . .
0.15 oh Kepala tukang 29,610 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-013 1.00 m2 Pembuatan Bedeng Buruh 1,506,922 3.25 . 472,425 - 1,034,497
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.4.042 . . .
0.19 m3 Kayu balok borneo 644,490 M.4.084 . . .
0.30 Kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
18.00 Kg Semen 36,000 M.4.033 . . .
0.03 m3 Pasir beton 8,757 M.4.028 . . .
0.05 m3 Koral Beton 12,125 M.4.026 . . .
1.50 lbr Seng Gelombang BJLS 32 189,750 M.4.369 . . .
1.35 lbr Plywood 120x240 tbl. 4 mm 104,085 M.4.365 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-014 1.00 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 193,266 0.03 . 5,092 - 188,174
0.04 m3 Papan kayu 3/20 Kelas II 115,830 M.4.105 . . .
0.08 Kg Paku Biasa 2" - 5" 2,144 M.4.158 . . .
1.00 btg Kayu Kaso 5 / 7 (borneo) 70,200 M.4.063 . . .
0.03 oh Tukang kayu 4,737 L.4.016 . . .
0.00 oh Mandor 355 L.4.035 . . .
SNI-2002 S-015 1.00 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 90,806 0.28 . 55,206 - 35,600
1.00 btg Bambu Ø 6 - 8 / 600 cm 29,100 M.4.041 . . .
0.25 Kg Tali ijuk 6,500 M.4.602 . . .

www.mitra-arsitek.com 108/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Pekerja 211 L.4.001 . . .
0.02 oh Tukang kayu 2,684 L.4.016 . . .
0.25 oh Kepala tukang 49,350 L.4.036 . . .
0.01 oh Mandor 2,961 L.4.035 . . .
SNI-2002 S-016 1.00 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 505,111 0.53 . 66,095 - 439,016
0.99 lbr Panel beton pracetak 162,690 M.4.540 . . .
0.53 btg Kolom beton pracetak 110,093 M.4.539 . . .
0.07 m3 Pasir beton 21,601 M.4.028 . . .
0.15 m3 Batu pecah 2/3 54,633 M.4.017 . . .
45.00 kg Semen 90,000 M.4.033 . . .
0.38 oh Pekerja 39,488 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,501 L.4.035 . . .
AK-SNI 2008 S-017 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng) 1,096,878 5.12 . 764,678 - 332,200
0.04 m3 Papan kayu 3/20 Kelas II 112,613 M.4.105 . . .
1.40 m1 Seng Gelombang 3" x 6" BJLS 28 69,300 M.4.368 . . .
0.60 kg Paku Biasa 2" - 5" 16,080 M.4.158 . . .
1.50 kg Cat kayu 82,350 M.4.385 . . .
16.80 kg Semen 33,600 M.4.033 . . .
0.03 m3 Pasir beton 7,881 M.4.028 . . .
0.04 m3 Kerikil 10,376 M.4.024 . . .
2.10 oh Pekerja 221,130 L.4.001 . . .
0.02 oh Tukang batu 2,763 L.4.007 . . .
1.00 oh Tukang kayu 157,900 L.4.016 . . .
1.00 oh Tukang cat 144,800 L.4.010 . . .
1.01 oh Mandor 238,085 L.4.035 . . .
AK-SNI 2008 S-018 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 752,453 3.12 . 434,453 - 318,000
0.04 m3 Papan kayu 3/20 Kelas II 112,613 M.4.105 . . .
1.00 m2 Print outdoor flexi 55,100 M.4.452 . . .
0.60 kg Paku Biasa 2" - 5" 16,080 M.4.158 . . .
1.50 kg Cat kayu 82,350 M.4.385 . . .
16.80 kg Semen 33,600 M.4.033 . . .
0.03 m3 Pasir beton 7,881 M.4.028 . . .
0.04 m3 Kerikil 10,376 M.4.024 . . .
0.02 oh Tukang batu 2,763 L.4.007 . . .
1.00 oh Tukang kayu 157,900 L.4.016 . . .
1.00 oh Tukang cat 144,800 L.4.010 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.10 oh Mandor 23,690 L.4.035 . . .
AK-SNI 2008 S-019 1.00 m3 Membongkar pasangan batu kali 673,720 4.40 . 673,720 - -
4.00 oh Tukang batu 631,600 L.4.007 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
AK-SNI 2008 S-020 1.00 m3 Membongkar pasangan batu merah dan membersihkan 326,330 2.10 . 326,330 - -
2.00 oh Tukang batu 315,800 L.4.007 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
AK-SNI 2008 S-021 1.00 m3 Membongkar beton bertulang dan membersihkan 897,670 8.30 . 897,670 - -
0.20 oh Tukang batu 31,580 L.4.007 . . .
8.00 oh Pekerja 842,400 L.4.001 . . .
0.10 oh Mandor 23,690 L.4.035 . . .

www.mitra-arsitek.com 109/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-022 1.00 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 23,429 0.21 . 23,429 - -
0.20 oh Pekerja 21,060 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-023 1.00 m2 Mengupas plesteran lama 16,124 0.14 . 16,124 - -
0.13 oh Pekerja 13,163 L.4.001 . . .
0.01 oh Mandor 2,961 L.4.035 . . .
AK-SNI 2008 S-024 1.00 m2 Membongkar genteng / sirap untuk dipergunakan lagi 23,429 0.21 . 23,429 - -
0.20 oh Pekerja 21,060 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-025 1.00 m2 Membongkar atap seng 18,495 0.15 . 18,495 - -
0.05 oh Tukang besi 7,965 L.4.008 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
AK-SNI 2008 S-026 1.00 m2 Membongkar usuk / reng dipakai lagi 34,087 0.28 . 34,087 - -
0.06 oh Tukang kayu 9,474 L.4.016 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-027 1.00 m2 Membongkar usuk / reng tidak dipakai lagi 23,429 0.21 . 23,429 - -
0.20 oh Pekerja 21,060 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-028 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk
1,534,420
digunakan
10.80
lagi . 1,534,420 - -
6.00 oh Tukang kayu 947,400 L.4.016 . . .
0.60 oh Kepala Tukang 118,440 L.4.036 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
AK-SNI 2008 S-029 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak152,680
digunakan 1.20
lagi . 152,680 - -
1.00 oh Pekerja 105,300 L.4.001 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
AK-SNI 2008 S-030 1.00 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar 2,600,260 17.40 . 2,600,260 - -
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala Tukang 236,880 L.4.036 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-031 1.00 m3 Menggali tanah biasa sedalam 1 meter 84,898 0.78 . 84,898 - -
0.75 oh Pekerja 78,975 L.4.001 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
SNI-2007 S-032 1.00 m3 Menggali tanah biasa sedalam 2 meter 105,431 0.95 . 105,431 - -
0.90 oh Pekerja 94,770 L.4.001 . . .
0.05 oh Mandor 10,661 L.4.035 . . .
SNI-2007 S-033 1.00 m3 Menggali tanah biasa sedalam 3 meter 126,437 1.12 . 126,437 - -
1.05 oh Pekerja 110,565 L.4.001 . . .
0.07 oh Mandor 15,872 L.4.035 . . .
SNI-2007 S-034 1.00 m3 Menggali tanah keras sedalam 1 meter 112,881 1.03 . 112,881 - -
1.00 oh Pekerja 105,300 L.4.001 . . .
0.03 oh Mandor 7,581 L.4.035 . . .
SNI-2007 S-035 1.00 m3 Menggali tanah cadas sedalam 1 meter 172,164 1.56 . 172,164 - -
1.50 oh Pekerja 157,950 L.4.001 . . .
0.06 oh Mandor 14,214 L.4.035 . . .
SNI-2007 S-036 1.00 m3 Menggali tanah lumpur sedalam 1 meter 137,021 1.25 . 137,021 - -
1.20 oh Pekerja 126,360 L.4.001 . . .

www.mitra-arsitek.com 110/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 oh Mandor 10,661 L.4.035 . . .
SNI-2007 S-037 1.00 m2 Mengerjakan stripping tebing setinggi 1 meter 6,450 0.06 . 6,450 - -
0.05 oh Pekerja 5,265 L.4.001 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-038 1.00 m3 Urug kembali bekas galian 24,719 0.21 . 24,719 - -
0.19 oh Pekerja 20,218 L.4.001 . . .
0.02 oh Mandor 4,501 L.4.035 . . .
SNI-2007 S-039 1.00 m3 Membuang tanah sejauh 30 meter 37,118 0.34 . 37,118 - -
0.33 oh Pekerja 34,749 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-040 1.00 m3 Membuang tanah sejauh 150 meter 66,180 0.57 . 66,180 - -
0.52 oh Pekerja 54,335 L.4.001 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-041 1.00 m3 Memadatkan tanah (per 20 cm) 64,495 0.55 . 64,495 - -
0.50 oh Pekerja 52,650 L.4.001 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
AK-SNI 2008 S-042 1.00 m2 Meratakan tanah ditumbuk halus 28,694 0.26 . 28,694 - -
0.25 oh Pekerja 26,325 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-043 1.00 m3 Mengurug pasir urug 352,559 0.31 . 33,959 - 318,600
1.20 m3 Pasir urug 318,600 M.4.032 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-044 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL 408,415 1.32 . 174,248 - 234,167
0.14 m3 Kapur padam 12,231 M.4.021 . . .
0.40 m3 Pasir pasang 89,880 M.4.030 . . .
0.95 m3 Tanah Liat 132,056 M.4.038 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
0.40 oh Tukang batu 63,160 L.4.007 . . .
0.04 oh Kepala tukang 7,896 L.4.036 . . .
0.08 oh Mandor 18,952 L.4.035 . . .
SNI-2007 S-045 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 5 TL 369,449 1.32 . 174,248 - 195,201
0.25 m3 Kapur padam 22,469 M.4.021 . . .
1.24 m3 Tanah Liat 172,732 M.4.038 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
0.40 oh Tukang batu 63,160 L.4.007 . . .
0.04 oh Kepala tukang 7,896 L.4.036 . . .
0.08 oh Mandor 18,952 L.4.035 . . .
SNI-2007 S-046 1.00 m3 Memasang lapisan ijuk tebal 10 cm 328,049 0.17 . 19,349 - 308,700
1.50 m3 Ijuk 308,700 M.4.019 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2002 S-047 1.00 m3 Pemasangan lapisan ijuk 266,309 0.17 . 19,349 - 246,960
1.20 m3 Ijuk 246,960 M.4.019 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-048 1.00 m3 Mengurug sirtu padat untuk peninggian lantai bangunan 339,208 0.28 . 32,248 - 306,960
1.20 m3 Sirtu 306,960 M.4.037 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.03 oh Mandor 5,923 L.4.035 . . .

www.mitra-arsitek.com 111/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-049 1.00 m3 Urug tanah mendatangkan 267,119 0.31 . 33,959 - 233,160
1.20 m3 Tanah urug 233,160 M.4.039 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-050 1.00 m3 Membuang tanah dengan menghampar 28,694 0.26 . 28,694 - -
0.25 oh Pekerja 26,325 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-051 1.00 m1 Pekerjaan Membuat sumur 368,208 1.81 . 230,408 - 137,800
2.00 bh Buis beton D. 80 cm 137,800 M.4.533 . . .
1.00 oh Tukang gali sumur 135,600 L.4.032 . . .
0.74 oh Pekerja 77,396 L.4.001 . . .
0.07 oh Mandor 17,412 L.4.035 . . .
AK-SNI 2008 S-052 1.00 m2 Pekerjaan Gebalan rumput 93,793 0.53 . 58,573 - 35,220
0.20 btg Bambu Ø 6 - 8 / 600 cm 5,820 M.4.041 . . .
1.00 m2 Gebalan rumput 29,400 M.4.589 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
SNI-2002 S-053 1.00 m3 Pasangan pondasi 1 Pc : 1 Ps 1,469,083 2.40 . 308,948 - 1,160,136
1.10 m3 Batu belah 305,580 M.4.013 . . .
392.00 kg Semen 784,000 M.4.033 . . .
0.31 m3 Pasir pasang 70,556 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala Tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2002 S-054 1.00 m3 Pasangan pondasi 1 Pc : 2 Ps 1,244,474 2.40 . 308,948 - 935,527
1.10 m3 Batu belah 305,580 M.4.013 . . .
267.00 kg Semen 534,000 M.4.033 . . .
0.43 m3 Pasir pasang 95,947 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala Tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-055 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP 1,155,287 2.40 . 308,948 - 846,340
1.20 m3 Batu belah 333,360 M.4.013 . . .
202.00 kg Semen 404,000 M.4.033 . . .
0.49 m3 Pasir pasang 108,980 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-056 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP 1,085,152 2.40 . 308,948 - 776,204
1.20 m3 Batu belah 333,360 M.4.013 . . .
163.00 kg Semen 326,000 M.4.033 . . .
0.52 m3 Pasir pasang 116,844 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-057 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP 1,036,544 2.40 . 308,948 - 727,597

www.mitra-arsitek.com 112/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.20 m3 Batu belah 333,360 M.4.013 . . .
136.00 kg Semen 272,000 M.4.033 . . .
0.54 m3 Pasir pasang 122,237 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-058 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP 1,002,364 2.40 . 308,948 - 693,417
1.20 m3 Batu belah 333,360 M.4.013 . . .
117.00 kg Semen 234,000 M.4.033 . . .
0.56 m3 Pasir pasang 126,057 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-059 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP 955,532 2.40 . 308,948 - 646,585
1.20 m3 Batu belah 333,360 M.4.013 . . .
91.00 kg Semen 182,000 M.4.033 . . .
0.58 m3 Pasir pasang 131,225 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2002 S-060 1.00 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 859,669 2.40 . 308,948 - 550,721
1.10 m3 Batu belah 305,580 M.4.013 . . .
0.23 m3 Kapur Pasang 122,309 M.4.022 . . .
0.23 m3 Semen Warna 595 M.4.036 . . .
0.54 m3 Pasir pasang 122,237 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala Tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-061 1.00 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP 809,945 2.40 . 308,948 - 500,997
1.20 m3 Batu belah 333,360 M.4.013 . . .
0.17 m3 Kapur Pasang 90,797 M.4.022 . . .
0.17 m3 Semen Warna 442 M.4.036 . . .
0.34 m3 Pasir pasang 76,398 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
AK-SNI 2008 S-062 1.00 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 1,041,292 2.40 . 308,948 - 732,344
1.20 m3 Batu belah 333,360 M.4.013 . . .
95.42 kg Semen 190,840 M.4.033 . . .
0.23 m3 Kapur Pasang 122,309 M.4.022 . . .
0.38 m3 Pasir pasang 85,835 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala Tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .

www.mitra-arsitek.com 113/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-063 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP 953,373 2.40 . 308,948 - 644,425
1.20 m3 Batu belah 333,360 M.4.013 . . .
61.00 kg Semen 122,000 M.4.033 . . .
0.15 m3 Kapur Pasang 78,513 M.4.022 . . .
0.49 m3 Pasir pasang 110,552 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-064 1.00 m3 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP 911,793 2.40 . 308,948 - 602,845
1.20 m3 Batu belah 333,360 M.4.013 . . .
41.00 kg Semen 82,000 M.4.033 . . .
0.13 m3 Kapur Pasang 69,967 M.4.022 . . .
0.52 m3 Pasir pasang 117,518 M.4.030 . . .
1.50 oh Pekerja 157,950 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.08 oh Kepala tukang 14,805 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-065 1.00 m3 Memasang batu kosong (aanstamping) 608,709 1.25 . 160,653 - 448,056
1.20 m3 Batu belah 333,360 M.4.013 . . .
0.43 m3 Pasir urug 114,696 M.4.032 . . .
0.78 oh Pekerja 82,134 L.4.001 . . .
0.39 oh Tukang batu 61,581 L.4.007 . . .
0.04 oh Kepala tukang 7,699 L.4.036 . . .
0.04 oh Mandor 9,239 L.4.035 . . .
SNI-2007 S-066 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan
3,032,714
40% batu belah
4.51 . 549,287 - 2,483,427
0.48 m3 Batu belah 133,344 M.4.013 . . .
194.00 kg Semen 388,000 M.4.033 . . .
0.31 m3 Pasir beton 91,073 M.4.028 . . .
0.47 m3 Koral Beton 113,490 M.4.026 . . .
126.00 kg Besi beton 1,701,000 M.4.132 . . .
1.80 kg Kawat beton 56,520 M.4.143 . . .
3.40 oh Pekerja 358,020 L.4.001 . . .
0.85 oh Tukang batu 134,215 L.4.007 . . .
0.09 oh Kepala tukang 16,779 L.4.036 . . .
0.17 oh Mandor 40,273 L.4.035 . . .
SNI-2007 S-067 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan
1,275,194
40% batu belah
4.51 tanpa besi
. 549,287 - 725,907
0.48 m3 Batu belah 133,344 M.4.013 . . .
194.00 kg Semen 388,000 M.4.033 . . .
0.31 m3 Pasir beton 91,073 M.4.028 . . .
0.47 m3 Koral Beton 113,490 M.4.026 . . .
3.40 oh Pekerja 358,020 L.4.001 . . .
0.85 oh Tukang batu 134,215 L.4.007 . . .
0.09 oh Kepala tukang 16,779 L.4.036 . . .
0.17 oh Mandor 40,273 L.4.035 . . .
SNI-2007 S-068 1.00 m3 Memasang pondasi sumuran, diameter 100 cm 1,140,596 3.40 . 423,023 - 717,573
0.45 m3 Batu belah 125,010 M.4.013 . . .
194.00 kg Semen 388,000 M.4.033 . . .
0.31 m3 Pasir beton 91,073 M.4.028 . . .
0.47 m3 Koral Beton 113,490 M.4.026 . . .

www.mitra-arsitek.com 114/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.40 oh Pekerja 252,720 L.4.001 . . .
0.80 oh Tukang batu 126,320 L.4.007 . . .
0.08 oh Kepala tukang 15,792 L.4.036 . . .
0.12 oh Mandor 28,191 L.4.035 . . .
SNI-2007 S-069 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 350,791
campuran spesi
0.851 PC : 2 PP
. 105,815 - 244,976
140.00 bh Bata merah 140,000 M.4.007 . . .
43.50 kg Semen 87,000 M.4.033 . . .
0.08 m3 Pasir pasang 17,976 M.4.030 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-070 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 332,163
campuran spesi
0.851 PC : 3 PP
. 105,815 - 226,348
140.00 bh Bata merah 140,000 M.4.007 . . .
32.95 kg Semen 65,900 M.4.033 . . .
0.09 m3 Pasir pasang 20,448 M.4.030 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-071 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 319,812
campuran spesi
0.851 PC : 4 PP
. 105,815 - 213,997
140.00 bh Bata merah 140,000 M.4.007 . . .
26.55 kg Semen 53,100 M.4.033 . . .
0.09 m3 Pasir pasang 20,897 M.4.030 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-072 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 313,134
campuran spesi
0.851 PC : 5 PP
. 105,815 - 207,319
140.00 bh Bata merah 140,000 M.4.007 . . .
22.20 kg Semen 44,400 M.4.033 . . .
0.10 m3 Pasir pasang 22,919 M.4.030 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-073 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 310,228
campuran spesi
0.851 PC : 6 PP
. 105,815 - 204,413
140.00 bh Bata merah 140,000 M.4.007 . . .
18.50 kg Semen 37,000 M.4.033 . . .
0.12 m3 Pasir pasang 27,413 M.4.030 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-074 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 289,251
campuran spesi
0.851 PC : 3 KP
. : 10 PP 105,815 - 183,436
140.00 bh Bata merah 140,000 M.4.007 . . .
10.08 kg Semen 20,160 M.4.033 . . .
0.09 m3 Pasir pasang 20,785 M.4.030 . . .
0.03 m3 Kapur padam 2,492 M.4.021 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .

www.mitra-arsitek.com 115/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-075 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
169,346
campuran 0.43
spesi 1 PC : 2. PP 52,908 - 116,439
70.00 bh Bata merah 70,000 M.4.007 . . .
18.95 kg Semen 37,900 M.4.033 . . .
0.04 m3 Pasir pasang 8,539 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-076 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
160,636
campuran 0.43
spesi 1 PC : 3. PP 52,908 - 107,728
70.00 bh Bata merah 70,000 M.4.007 . . .
14.37 kg Semen 28,740 M.4.033 . . .
0.04 m3 Pasir pasang 8,988 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-077 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
155,570
campuran 0.43
spesi 1 PC : 4. PP 52,908 - 102,662
70.00 bh Bata merah 70,000 M.4.007 . . .
11.50 kg Semen 23,000 M.4.033 . . .
0.04 m3 Pasir pasang 9,662 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-078 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
152,379
campuran 0.43
spesi 1 PC : 5. PP 52,908 - 99,472
70.00 bh Bata merah 70,000 M.4.007 . . .
9.68 kg Semen 19,360 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-079 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
150,558
campuran 0.43
spesi 1 PC : 6. PP 52,908 - 97,650
70.00 bh Bata merah 70,000 M.4.007 . . .
8.32 kg Semen 16,640 M.4.033 . . .
0.05 m3 Pasir pasang 11,010 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-080 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran
147,143 spesi
0.43
1 PC : 8 PP. 52,908 - 94,235
70.00 bh Bata merah 70,000 M.4.007 . . .
6.50 kg Semen 13,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,235 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .

www.mitra-arsitek.com 116/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-081 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
144,502
campuran 0.43
spesi 1 PC : 3. KP : 10 PP 52,908 - 91,594
70.00 bh Bata merah 70,000 M.4.007 . . .
4.50 kg Semen 9,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,235 M.4.030 . . .
0.02 m3 Kapur padam 1,359 M.4.021 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-082 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
128,630
campuran0.43
spesi 1 KP : .1 SM : 1 PP 52,908 - 75,722
70.00 bh Bata merah 70,000 M.4.007 . . .
0.02 m3 Semen Warna 47 M.4.036 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
0.02 m3 Kapur padam 1,631 M.4.021 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-083 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
130,504
campuran 0.43
spesi 1 KP : 1. SM : 2 PP 52,908 - 77,596
70.00 bh Bata merah 70,000 M.4.007 . . .
0.01 m3 Semen Warna 36 M.4.036 . . .
0.03 m3 Pasir pasang 6,292 M.4.030 . . .
0.01 m3 Kapur padam 1,268 M.4.021 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-084 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 423,569 0.48 . 61,790 - 361,780
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
30.32 kg Semen 60,640 M.4.033 . . .
0.73 m3 Pasir pasang 163,582 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-085 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 421,336 0.48 . 61,790 - 359,546
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
24.26 kg Semen 48,520 M.4.033 . . .
0.77 m3 Pasir pasang 173,468 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-086 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 321,362 0.51 . 63,489 - 257,873
12.50 bh Hollow Block 15 85,000 M.4.536 . . .
22.74 kg Semen 45,480 M.4.033 . . .
0.55 m3 Pasir pasang 123,585 M.4.030 . . .

www.mitra-arsitek.com 117/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-087 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 319,472 0.51 . 63,489 - 255,983
12.50 bh Hollow Block 15 85,000 M.4.536 . . .
18.20 kg Semen 36,400 M.4.033 . . .
0.58 m3 Pasir pasang 130,775 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-088 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 260,076 0.43 . 52,908 - 207,169
12.50 bh Hollow Block 10 91,250 M.4.535 . . .
15.16 kg Semen 30,320 M.4.033 . . .
0.36 m3 Pasir pasang 81,791 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-089 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 259,409 0.43 . 52,908 - 206,502
12.50 bh Hollow Block 10 91,250 M.4.535 . . .
12.13 kg Semen 24,260 M.4.033 . . .
0.39 m3 Pasir pasang 87,184 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-090 1.00 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran 323,298
spesi 1 PC : 30.43
PP . 52,908 - 270,390
16.00 bh Roster 25/25 cm 235,200 M.4.545 . . .
14.00 kg Semen 28,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-091 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
343,098spesi 10.43
PC : 3 PP . 52,908 - 290,190
30.00 bh Terawang (roster) 255,000 M.4.547 . . .
14.00 kg Semen 28,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-092 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
337,772spesi 10.43
PC : 4 PP . 52,908 - 284,865
30.00 bh Terawang (roster) 255,000 M.4.547 . . .

www.mitra-arsitek.com 118/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
11.00 kg Semen 22,000 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-093 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran
222,980 spesi
0.48
1 PC : 3 PP
. 61,790 - 161,190
70.00 bh Bata berongga 126,000 M.4.006 . . .
14.00 kg Semen 28,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2002 S-094 1.00 m2 Pasangan dinding batako 166,575 0.64 . 76,337 - 90,238
12.50 bh Batako 56,250 M.4.010 . . .
12.50 kg Semen 25,000 M.4.033 . . .
0.04 m3 Pasir pasang 8,988 M.4.030 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
SNI-2002 S-095 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 45,836 0.13 . 15,872 - 29,963
17.00 bh Bata merah 17,000 M.4.007 . . .
4.94 kg Semen 9,885 M.4.033 . . .
0.01 m3 Pasir pasang 3,078 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.03 oh Tukang batu 4,737 L.4.007 . . .
0.00 oh Kepala tukang 592 L.4.036 . . .
0.00 oh Mandor 1,066 L.4.035 . . .
SNI-2007 S-096 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c1,247,490
= 0,87 2.04 . 242,357 - 1,005,132
247.00 kg Semen 494,000 M.4.033 . . .
0.62 m3 Pasir beton 181,182 M.4.028 . . .
0.74 m3 Koral beton 179,450 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-097 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 2.04
1,299,265 . 242,357 - 1,056,908
276.00 kg Semen 552,000 M.4.033 . . .
0.59 m3 Pasir beton 172,630 M.4.028 . . .
0.75 m3 Koral beton 181,778 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-098 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
1,340,120 2.04 . 242,357 - 1,097,763
299.00 kg Semen 598,000 M.4.033 . . .

www.mitra-arsitek.com 119/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.57 m3 Pasir beton 166,587 M.4.028 . . .
0.75 m3 Koral beton 182,675 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-099 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
1,146,775 1.48 . 176,102 - 970,673
230.00 kg Semen 460,000 M.4.033 . . .
0.64 m3 Pasir beton 186,203 M.4.028 . . .
0.76 m3 Koral beton 184,470 M.4.026 . . .
200.00 Ltr Air 140,000 M.4.001 . . .
1.20 oh Pekerja 126,360 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.06 oh Mandor 14,214 L.4.035 . . .
SNI-2007 S-100 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
1,388,163 2.04 . 242,357 - 1,145,806
326.00 kg Semen 652,000 M.4.033 . . .
0.54 m3 Pasir beton 158,473 M.4.028 . . .
0.76 m3 Koral beton 184,834 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-101 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
1,434,456 2.04 . 242,357 - 1,192,098
352.00 kg Semen 704,000 M.4.033 . . .
0.52 m3 Pasir beton 152,401 M.4.028 . . .
0.76 m3 Koral beton 185,197 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-102 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
1,468,482 2.04 . 242,357 - 1,226,124
371.00 kg Semen 742,000 M.4.033 . . .
0.50 m3 Pasir beton 145,541 M.4.028 . . .
0.78 m3 Koral beton 188,083 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-103 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
1,491,772 2.04 . 242,357 - 1,249,414
384.00 kg Semen 768,000 M.4.033 . . .
0.49 m3 Pasir beton 144,286 M.4.028 . . .
0.77 m3 Koral beton 186,628 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .

www.mitra-arsitek.com 120/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-104 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
1,531,780 2.04 . 242,357 - 1,289,422
406.00 kg Semen 812,000 M.4.033 . . .
0.49 m3 Pasir beton 142,622 M.4.028 . . .
0.76 m3 Koral beton 184,300 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-105 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
1,544,240 2.04 . 242,357 - 1,301,883
413.00 kg Semen 826,000 M.4.033 . . .
0.49 m3 Pasir beton 141,980 M.4.028 . . .
0.76 m3 Koral beton 183,403 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 173,745 L.4.001 . . .
0.28 oh Tukang batu 43,423 L.4.007 . . .
0.03 oh Kepala tukang 5,527 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-106 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
1,657,093 2.59 . 308,179 - 1,348,914
439.00 kg Semen 878,000 M.4.033 . . .
0.48 m3 Pasir beton 139,703 M.4.028 . . .
0.75 m3 Koral beton 180,711 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
2.10 oh Pekerja 221,130 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.11 oh Mandor 24,875 L.4.035 . . .
SNI-2007 S-107 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
1,673,359 2.59 . 308,179 - 1,365,181
448.00 kg Semen 896,000 M.4.033 . . .
0.48 m3 Pasir beton 139,061 M.4.028 . . .
0.74 m3 Koral beton 179,620 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
2.10 oh Pekerja 221,130 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.11 oh Mandor 24,875 L.4.035 . . .
SNI-2007 S-108 1.00 m3 Membuat beton kedap air dengan strorox – 100 1,493,891 2.59 . 308,179 - 1,185,712
400.00 kg Semen 800,000 M.4.033 . . .
0.48 m3 Pasir beton 140,112 M.4.028 . . .
0.80 m3 Koral Beton 194,000 M.4.026 . . .
1.20 kg Strorox - 100 51,600 M.4.601 . . .
2.10 oh Pekerja 221,130 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.11 oh Mandor 24,875 L.4.035 . . .
SNI-2007 S-109 1.00 kg Pembesian dengan besi ulir 16,731 0.02 . 2,085 - 14,646
1.05 kg Besi beton 14,175 M.4.132 . . .
0.02 kg Kawat beton 471 M.4.143 . . .

www.mitra-arsitek.com 121/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Pekerja 737 L.4.001 . . .
0.01 oh Tukang besi 1,115 L.4.008 . . .
0.00 oh Kepala tukang 138 L.4.036 . . .
0.00 oh Mandor 95 L.4.035 . . .
SNI-2007 S-110 1.00 kg Pembesian dengan besi polos 16,731 0.02 . 2,085 - 14,646
1.05 kg Besi beton 14,175 M.4.132 . . .
0.02 kg Kawat beton 471 M.4.143 . . .
0.01 oh Pekerja 737 L.4.001 . . .
0.01 oh Tukang besi 1,115 L.4.008 . . .
0.00 oh Kepala tukang 138 L.4.036 . . .
0.00 oh Mandor 95 L.4.035 . . .
SNI-2007 S-111 1.00 kg Memasang kabel presstressed polos/strands 15,982 0.01 . 1,493 - 14,489
1.05 kg Besi beton 14,175 M.4.132 . . .
0.01 kg Kawat beton 314 M.4.143 . . .
0.01 oh Pekerja 527 L.4.001 . . .
0.01 oh Tukang besi 797 L.4.008 . . .
0.00 oh Kepala tukang 99 L.4.036 . . .
0.00 oh Mandor 71 L.4.035 . . .
SNI-2007 S-112 10.00 kg Memasang jaring kawat baja/wire mesh 13,270 0.01 . 1,179 - 12,091
1.02 kg Jaring kawat baja dilas 11,934 M.4.591 . . .
0.01 kg Kawat beton 157 M.4.143 . . .
0.00 oh Pekerja 263 L.4.001 . . .
0.00 oh Tukang besi 398 L.4.008 . . .
0.00 oh Kepala tukang 494 L.4.036 . . .
0.00 oh Mandor 24 L.4.035 . . .
AK-SNI 2008 S-113 1.00 m2 Cetakan beton / begisting memakai papan 209,834 0.76 . 112,249 - 97,585
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 44,625 M.4.071 . . .
0.02 m3 Papan cetakan 42,240 M.4.104 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.05 oh Kepala Tukang 9,870 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-114 1.00 m2 Cetakan beton / begisting memakai multiplek 198,269 0.76 . 112,249 - 86,020
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 44,625 M.4.071 . . .
0.35 lbr Multiplek 30,675 M.4.358 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.05 oh Kepala Tukang 9,870 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-115 1.00 m3 Membongkar cetakan 5,389,556 25.40 . 3,578,256 1,811,300 -
4.00 oh Pekerja 421,200 L.4.001 . . .
0.70 m3 Perancah kayu 1,001,700 T.4.011 . . .
3.50 oh Pekerja 368,550 L.4.001 . . .
10.50 oh Tukang kayu 1,657,950 L.4.016 . . .
1.05 oh Kepala Tukang 207,270 L.4.036 . . .
0.18 oh Mandor 41,458 L.4.035 . . .
32.00 sewa-unit Scafolding 809,600 T.4.019 . . .
2.20 oh Pekerja 231,660 L.4.001 . . .

www.mitra-arsitek.com 122/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.50 oh Tukang kayu 552,650 L.4.016 . . .
0.35 oh Kepala Tukang 69,090 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
SNI-2002 S-116 1.00 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 1,245,271 1.79 . 236,164 - 1,009,107
0.02 m3 Pasir urug 5,045 M.4.032 . . .
0.09 m3 Pasir beton 27,439 M.4.028 . . .
0.15 m3 Batu pecah 2/3 56,130 M.4.017 . . .
60.50 kg Semen 121,000 M.4.033 . . .
45.00 kg Besi beton 607,500 M.4.132 . . .
0.90 kg Kawat beton 28,260 M.4.143 . . .
0.03 m3 Kayu kruing 5/7 146,880 M.4.065 . . .
0.12 kg Paku reng 2,124 M.4.164 . . .
0.09 ltr Minyak bekisting 522 M.4.556 . . .
0.24 kg Plamir 14,208 M.4.399 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.67 oh Tukang batu 105,793 L.4.007 . . .
0.07 oh Kepala Tukang 13,226 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2002 S-117 1.00 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 982,149 1.39 . 182,536 - 799,613
0.02 m3 Pasir urug 4,248 M.4.032 . . .
0.08 m3 Pasir beton 23,352 M.4.028 . . .
0.13 m3 Batu pecah 2/3 46,775 M.4.017 . . .
49.00 kg Semen 98,000 M.4.033 . . .
34.50 kg Besi beton 465,750 M.4.132 . . .
0.70 kg Kawat beton 21,980 M.4.143 . . .
0.03 m3 Kayu kruing 5/7 123,930 M.4.065 . . .
0.12 kg Paku Biasa 2" - 5" 3,216 M.4.158 . . .
0.09 ltr Minyak bekisting 522 M.4.556 . . .
0.20 kg Plamir 11,840 M.4.399 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
0.50 oh Tukang batu 78,950 L.4.007 . . .
0.05 oh Kepala Tukang 9,870 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-118 1.00 m1 Memasang 1 m’ PVC Waterstop lebar 150 mm 94,258 0.10 . 12,358 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.06 oh Pekerja 6,318 L.4.001 . . .
0.03 oh Tukang batu 4,737 L.4.007 . . .
0.00 oh Kepala tukang 592 L.4.036 . . .
0.00 oh Mandor 711 L.4.035 . . .
SNI-2007 S-119 1.00 m1 Memasang PVC Waterstop lebar 200 mm 97,245 0.12 . 15,345 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.04 oh Tukang batu 5,527 L.4.007 . . .
0.00 oh Kepala tukang 790 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2007 S-120 1.00 m1 Membuat PVC Waterstop lebar 230 mm – 320 mm 98,377 0.13 . 16,477 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.08 oh Pekerja 8,424 L.4.001 . . .
0.04 oh Tukang batu 6,316 L.4.007 . . .
0.00 oh Kepala tukang 790 L.4.036 . . .

www.mitra-arsitek.com 123/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 948 L.4.035 . . .
AK-SNI 2008 S-121 1.00 m1 Cor beton kerb ( 15 x 30 ) cm 75,806 0.20 . 24,811 - 50,995
15.30 kg Semen 30,600 M.4.033 . . .
0.02 m3 Pasir pasang 5,460 M.4.030 . . .
0.04 m3 Kerikil 9,454 M.4.024 . . .
0.00 m3 Papan cetakan 4,752 M.4.104 . . .
0.03 kg Paku Biasa 2" - 5" 729 M.4.158 . . .
0.03 oh Tukang kayu 5,369 L.4.016 . . .
0.02 oh Tukang batu 2,495 L.4.007 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.14 oh Pekerja 14,468 L.4.001 . . .
0.01 oh Mandor 1,492 L.4.035 . . .
AK-SNI 2008 S-122 1.00 m1 Cor beton Devider ( 30 x 30 ) cm 137,217 0.33 . 40,708 - 96,509
30.60 kg Semen 61,200 M.4.033 . . .
0.05 m3 Pasir pasang 10,920 M.4.030 . . .
0.07 m3 Kerikil 18,908 M.4.024 . . .
0.00 m3 Papan cetakan 4,752 M.4.104 . . .
0.03 kg Paku Biasa 2" - 5" 729 M.4.158 . . .
0.03 oh Tukang kayu 5,369 L.4.016 . . .
0.03 oh Tukang batu 4,974 L.4.007 . . .
0.01 oh Kepala tukang 1,303 L.4.036 . . .
0.25 oh Pekerja 26,314 L.4.001 . . .
0.01 oh Mandor 2,748 L.4.035 . . .
SNI-2007 S-123 1.00 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm 96,393 0.48 . 61,790 - 34,603
15.50 kg Semen 31,008 M.4.033 . . .
0.02 m3 Pasir pasang 3,595 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-124 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm 86,732 0.48 . 61,790 - 24,942
10.22 kg Semen 20,448 M.4.033 . . .
0.02 m3 Pasir pasang 4,494 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-125 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 82,510 0.48 . 61,790 - 20,720
7.78 kg Semen 15,552 M.4.033 . . .
0.02 m3 Pasir pasang 5,168 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-126 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm 79,662 0.48 . 61,790 - 17,873
6.24 kg Semen 12,480 M.4.033 . . .
0.02 m3 Pasir pasang 5,393 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .

www.mitra-arsitek.com 124/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-127 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 78,000 0.48 . 61,790 - 16,210
5.18 kg Semen 10,368 M.4.033 . . .
0.03 m3 Pasir pasang 5,842 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-128 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm 76,688 0.48 . 61,790 - 14,899
4.42 kg Semen 8,832 M.4.033 . . .
0.03 m3 Pasir pasang 6,067 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-129 1.00 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm 75,953 0.48 . 61,790 - 14,164
3.94 kg Semen 7,872 M.4.033 . . .
0.03 m3 Pasir pasang 6,292 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-130 1.00 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 75,218 0.48 . 61,790 - 13,428
3.46 kg Semen 6,912 M.4.033 . . .
0.03 m3 Pasir pasang 6,516 M.4.030 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.15 oh Tukang batu 23,685 L.4.007 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-131 1.00 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 78,202 0.51 . 63,489 - 14,713
5.76 kg Semen 11,520 M.4.033 . . .
0.00 m3 Kapur padam 272 M.4.021 . . .
0.01 m3 Pasir pasang 2,921 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-132 1.00 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 74,436 0.51 . 63,489 - 10,947
3.00 kg Semen 6,000 M.4.033 . . .
0.01 m3 Kapur padam 453 M.4.021 . . .
0.02 m3 Pasir pasang 4,494 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-133 1.00 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 66,350 0.51 . 63,489 - 2,861
0.01 m3 Semen Warna 23 M.4.036 . . .
0.01 m3 Kapur padam 815 M.4.021 . . .
0.01 m3 Pasir pasang 2,022 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .

www.mitra-arsitek.com 125/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-134 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 67,512 0.51 . 63,489 - 4,023
0.01 m3 Semen Warna 18 M.4.036 . . .
0.01 m3 Kapur padam 634 M.4.021 . . .
0.02 m3 Pasir pasang 3,371 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2002 S-135 1.00 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 73,519 0.51 . 63,489 - 10,030
1.84 kg Semen 3,680 M.4.033 . . .
0.01 m3 Kapur Pasang 3,205 M.4.022 . . .
0.01 m3 Pasir pasang 3,146 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala Tukang 2,369 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-136 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm 116,191 0.64 . 82,860 - 33,331
13.63 kg Semen 27,264 M.4.033 . . .
0.03 m3 Pasir pasang 6,067 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-137 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm 93,687 0.49 . 65,986 - 27,702
10.37 kg Semen 20,736 M.4.033 . . .
0.03 m3 Pasir pasang 6,966 M.4.030 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-138 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm 106,690 0.64 . 82,860 - 23,830
8.32 kg Semen 16,640 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-139 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm 104,548 0.64 . 82,860 - 21,689
6.91 kg Semen 13,824 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-140 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm 102,725 0.64 . 82,860 - 19,865
5.89 kg Semen 11,776 M.4.033 . . .
0.04 m3 Pasir pasang 8,089 M.4.030 . . .

www.mitra-arsitek.com 126/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-141 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 95,508 0.70 . 90,625 - 4,883
0.01 m3 Semen Warna 23 M.4.036 . . .
0.01 m3 Kapur padam 815 M.4.021 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
0.44 oh Pekerja 46,332 L.4.001 . . .
0.22 oh Tukang batu 34,738 L.4.007 . . .
0.02 oh Kepala tukang 4,343 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-142 1.00 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm 47,322 0.24 . 31,112 - 16,210
5.18 kg Semen 10,368 M.4.033 . . .
0.03 m3 Pasir pasang 5,842 M.4.030 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.08 oh Tukang batu 11,843 L.4.007 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-143 1.00 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 21,427 0.14 . 19,977 - 1,449
0.50 kg Semen 1,000 M.4.033 . . .
0.00 m3 Pasir pasang 449 M.4.030 . . .
0.06 oh Pekerja 6,002 L.4.001 . . .
0.04 oh Tukang batu 6,000 L.4.007 . . .
0.04 oh Kepala Tukang 7,501 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
AK-SNI 2008 S-144 1.00 m1 Sponengan (untuk saluran dan sejenisnya) 16,785 0.13 . 15,872 - 913
0.36 kg Semen 720 M.4.033 . . .
0.00 m3 Pasir pasang 193 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.03 oh Tukang batu 4,737 L.4.007 . . .
0.00 oh Kepala Tukang 592 L.4.036 . . .
0.00 oh Mandor 1,066 L.4.035 . . .
SNI-2007 S-145 1.00 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm 364,901 0.72 . 92,901 - 272,000
10.00 kg Semen 20,000 M.4.033 . . .
15.00 kg Batu granit 252,000 M.4.014 . . .
0.45 oh Pekerja 47,385 L.4.001 . . .
0.23 oh Tukang batu 35,528 L.4.007 . . .
0.02 oh Kepala tukang 4,540 L.4.036 . . .
0.02 oh Mandor 5,449 L.4.035 . . .
SNI-2007 S-146 1.00 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm 148,901 0.72 . 92,901 - 56,000
10.00 kg Semen 20,000 M.4.033 . . .
15.00 kg Batu teraso 36,000 M.4.018 . . .
0.45 oh Pekerja 47,385 L.4.001 . . .
0.23 oh Tukang batu 35,528 L.4.007 . . .
0.02 oh Kepala tukang 4,540 L.4.036 . . .
0.02 oh Mandor 5,449 L.4.035 . . .
SNI-2007 S-147 1.00 m2 Memasang Plesteran Ciprat 1 PC : 2 PP 62,896 0.43 . 52,908 - 9,988
4.32 kg Semen 8,640 M.4.033 . . .
0.01 m3 Pasir pasang 1,348 M.4.030 . . .

www.mitra-arsitek.com 127/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
SNI-2007 S-148 1.00 m2 Memasang finishing siar pasangan dinding bata merah (=20 m’) 37,328 0.24 . 31,112 - 6,216
3.11 kg Semen 6,216 M.4.033 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.08 oh Tukang batu 11,843 L.4.007 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-149 1.00 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) 17,835 0.11 . 14,635 - 3,200
1.60 kg Semen 3,200 M.4.033 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.04 oh Tukang batu 5,527 L.4.007 . . .
0.00 oh Kepala tukang 790 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-150 1.00 m2 Plesteran siar adukan 1 Pc : 2 Ps 42,360 0.24 . 30,125 - 12,235
4.32 kg Semen 8,640 M.4.033 . . .
0.02 m3 Pasir pasang 3,595 M.4.030 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.07 oh Tukang batu 11,053 L.4.007 . . .
0.01 oh Kepala Tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-151 1.00 m2 Memasang acian 47,693 0.32 . 41,193 - 6,500
3.25 kg Semen 6,500 M.4.033 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-152 1.00 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 84,844 0.49 . 65,986 - 18,859
7.07 kg Semen 14,140 M.4.033 . . .
0.02 m3 Pasir pasang 4,719 M.4.030 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
AK-SNI 2008 S-153 1.00 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 96,390 0.64 . 82,386 - 14,004
5.10 kg Semen 10,200 M.4.033 . . .
0.00 m3 Kapur pasang 748 M.4.022 . . .
0.01 m3 Pasir pasang 3,056 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-154 1.00 m2 Plesteran batu kali 1pc:3ps 103,065 0.64 . 82,386 - 20,679
8.16 kg Semen 16,320 M.4.033 . . .
0.02 m3 Pasir pasang 4,359 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .

www.mitra-arsitek.com 128/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-155 1.00 m2 Plesteran batu kali 1pc:4ps 100,104 0.64 . 82,386 - 17,718
6.51 kg Semen 13,022 M.4.033 . . .
0.02 m3 Pasir pasang 4,696 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-156 1.00 m2 Plesteran K- 50, tebal 20 mm 103,128 0.58 . 74,147 - 28,981
11.12 kg Semen 22,240 M.4.033 . . .
0.03 m3 Pasir pasang 6,741 M.4.030 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.18 oh Tukang batu 28,422 L.4.007 . . .
0.02 oh Kepala Tukang 3,553 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-157 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm 120,033 0.40 . 51,708 - 68,325
1.06 m2 Ubin abu-abu 38,613 M.4.454 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-158 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm 122,549 0.42 . 53,551 - 68,998
1.07 m2 Ubin abu-abu 38,886 M.4.454 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-159 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm 125,323 0.43 . 55,828 - 69,496
1.06 m2 Ubin abu-abu 38,584 M.4.454 . . .
10.40 kg Semen 20,800 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.27 oh Pekerja 28,431 L.4.001 . . .
0.14 oh Tukang batu 21,317 L.4.007 . . .
0.01 oh Kepala tukang 2,764 L.4.036 . . .
0.01 oh Mandor 3,317 L.4.035 . . .
SNI-2007 S-160 1.00 m2 Memasang lantai ubin warna ukuran (40 x 40) cm 201,488 0.40 . 51,708 - 149,780
1.06 m2 Ubin warna 116,688 M.4.474 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.30 kg Semen warna 3,380 M.4.036 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-161 1.00 m2 Memasang lantai ubin warna ukuran (30 x 30) cm 205,075 0.42 . 53,551 - 151,525
1.07 m2 Ubin warna 117,513 M.4.474 . . .

www.mitra-arsitek.com 129/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-162 1.00 m2 Memasang lantai ubin warna ukuran (20 x 20) cm 207,551 0.43 . 55,828 - 151,724
1.06 m2 Ubin warna 116,600 M.4.474 . . .
10.40 kg Semen 20,800 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.62 kg Semen warna 4,212 M.4.036 . . .
0.27 oh Pekerja 28,431 L.4.001 . . .
0.14 oh Tukang batu 21,317 L.4.007 . . .
0.01 oh Kepala tukang 2,764 L.4.036 . . .
0.01 oh Mandor 3,317 L.4.035 . . .
SNI-2007 S-163 1.00 m2 Memasang lantai ubin teraso ukuran (40 x 40) cm 235,540 0.40 . 51,708 - 183,831
1.06 m2 Ubin teraso 150,740 M.4.471 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.30 kg Semen warna 3,380 M.4.036 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-164 1.00 m2 Memasang lantai ubin teraso ukuran (30 x 30) cm 239,368 0.42 . 53,551 - 185,817
1.07 m2 Ubin teraso 151,805 M.4.471 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-165 1.00 m2 Memasang lantai ubin granit ukuran (40 x 40) cm 423,407 0.40 . 51,708 - 371,699
1.06 m2 Ubin granit 338,607 M.4.455 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.30 kg Semen warna 3,380 M.4.036 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-166 1.00 m2 Memasang lantai ubin granit ukuran (30 x 30) cm 428,564 0.42 . 53,551 - 375,013
1.07 m2 Ubin granit 341,001 M.4.455 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .

www.mitra-arsitek.com 130/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-167 1.00 m2 Memasang lantai ubin teralux ukuran (40 x 40) cm 165,102 0.40 . 51,708 - 113,394
1.06 m2 Ubin teralux kerang 80,303 M.4.466 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.30 kg Semen warna 3,380 M.4.036 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-168 1.00 m2 Memasang lantai ubin teralux ukuran (30 x 30) cm 168,433 0.42 . 53,551 - 114,882
1.07 m2 Ubin teralux kerang 80,870 M.4.466 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-169 1.00 m2 Memasang lantai ubin teralux marmer ukuran (60 x 60) cm 408,404 0.38 . 49,432 - 358,972
1.12 m2 Ubin teralux marmer 325,760 M.4.467 . . .
9.60 kg Semen 19,200 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.12 oh Tukang batu 18,948 L.4.007 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
SNI-2007 S-170 1.00 m2 Memasang lantai ubin teralux marmer ukuran (40 x 40) cm 394,447 0.40 . 51,708 - 342,739
1.06 m2 Ubin teralux marmer 309,648 M.4.467 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.30 kg Semen warna 3,380 M.4.036 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.13 oh Tukang batu 19,738 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-171 1.00 m2 Memasang lantai ubin teralux marmer ukuran (30 x 30) cm 399,399 0.42 . 53,551 - 345,848
1.07 m2 Ubin teralux marmer 311,837 M.4.467 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.26 oh Pekerja 27,378 L.4.001 . . .
0.13 oh Tukang batu 20,527 L.4.007 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2007 S-172 1.00 m1 Memasang plint ubin PC abu-abu ukuran (15 x 20) cm 49,928 0.19 . 26,649 - 23,279
5.30 bh Plint Ubin 19,080 M.4.424 . . .
1.65 kg Semen 3,300 M.4.033 . . .

www.mitra-arsitek.com 131/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 m3 Pasir pasang 899 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-173 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 30) cm 42,511 0.19 . 26,649 - 15,862
3.53 bh Plint Ubin 12,708 M.4.424 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-174 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 40) cm 39,343 0.19 . 26,649 - 12,694
2.65 bh Plint Ubin 9,540 M.4.424 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-175 1.00 m1 Pasang plint ubin PC abu-abu ukuran 10 x 20 cm 60,123 0.19 . 26,649 - 33,474
5.30 bh Plint keramik ukuran 10cm x 10cm 29,680 M.4.421 . . .
1.56 kg Semen 3,120 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-176 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 20) cm 58,483 0.19 . 26,649 - 31,834
5.30 bh Plint ubin PC warna 28,620 M.4.433 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-177 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 30) cm 48,925 0.19 . 26,649 - 22,276
3.53 bh Plint ubin PC warna 19,062 M.4.433 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-178 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 40) cm 44,173 0.19 . 26,649 - 17,524
2.65 bh Plint ubin PC warna 14,310 M.4.433 . . .
1.14 kg Semen 2,280 M.4.033 . . .

www.mitra-arsitek.com 132/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-179 1.00 m1 Memasang plint ubin teraso ukuran (10 x 30) cm 46,807 0.19 . 26,649 - 20,158
3.53 bh Plint ubin teraso 16,944 M.4.441 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-180 1.00 m1 Memasang plint ubin teraso ukuran (10 x 40) cm 42,583 0.19 . 26,649 - 15,934
2.65 bh Plint ubin teraso 12,720 M.4.441 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-181 1.00 m1 Memasang plint ubin granit ukuran (10 x 40) cm 64,313 0.19 . 26,649 - 37,664
2.65 bh Plint ubin granit 34,450 M.4.425 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-182 1.00 m1 Memasang plint ubin granit ukuran (10 x 30) cm 75,753 0.19 . 26,649 - 49,104
3.53 bh Plint ubin granit 45,890 M.4.425 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-183 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 40) cm 45,498 0.19 . 26,649 - 18,849
2.65 bh Plint ubin teralux kerang 15,635 M.4.434 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .

www.mitra-arsitek.com 133/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-184 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 30) cm 50,690 0.19 . 26,649 - 24,041
3.53 bh Plint ubin teralux kerang 20,827 M.4.434 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-185 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 60) cm 52,643 0.19 . 26,649 - 25,994
1.70 bh Plint ubin teralux marmer 22,780 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-186 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 40) cm 65,373 0.19 . 26,649 - 38,724
2.65 bh Plint ubin teralux marmer 35,510 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-187 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 30) cm 77,165 0.19 . 26,649 - 50,516
3.53 bh Plint ubin teralux marmer 47,302 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-188 1.00 m2 Memasang lantai teraso cor ditempat, tebal 3 cm 109,427 0.58 . 74,147 - 35,280
0.04 m3 Bahan teraso cor 35,280 M.4.530 . . .
0.36 oh Pekerja 37,908 L.4.001 . . .
0.18 oh Tukang batu 28,422 L.4.007 . . .
0.02 oh Kepala tukang 3,553 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-189 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 20) cm 237,177 1.12 . 144,176 - 93,002
1.06 m2 Ubin keramik artistik 59,360 M.4.459 . . .
8.19 kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
2.75 kg Semen warna 7,150 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .

www.mitra-arsitek.com 134/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-190 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) 238,347
cm 1.12 . 144,176 - 94,172
1.06 m2 Ubin keramik artistik 59,360 M.4.459 . . .
8.19 kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
3.20 kg Semen warna 8,320 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-191 1.00 m2 Memasang lantai keramik ukuran (33 x 33) cm 186,531 1.12 . 144,176 - 42,356
1.09 m2 Ubin keramik 11,652 M.4.458 . . .
8.19 kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.62 kg Semen warna 4,212 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-192 1.00 m2 Memasang lantai keramik ukuran (30 x 30) cm 189,615 1.12 . 144,176 - 45,439
1.07 m2 Ubin keramik 11,428 M.4.458 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-193 1.00 m2 Memasang lantai keramik ukuran (20 x 20) cm 190,641 1.12 . 144,176 - 46,466
1.06 m2 Ubin keramik 11,342 M.4.458 . . .
10.40 kg Semen 20,800 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
1.62 kg Semen warna 4,212 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-194 1.00 m2 Memasang lantai keramik ukuran (10 x 33) cm, variasi/border 269,206 1.68 . 216,480 - 52,726
1.09 m2 Ubin keramik 11,652 M.4.458 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
4.37 kg Semen warna 11,362 M.4.036 . . .
1.05 oh Pekerja 110,565 L.4.001 . . .
0.53 oh Tukang batu 82,898 L.4.007 . . .
0.05 oh Kepala tukang 10,462 L.4.036 . . .
0.05 oh Mandor 12,556 L.4.035 . . .
SNI-2007 S-195 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC 406,295
: 3 PP 1.12 . 144,176 - 262,119
1.07 m2 Mosaik 219,856 M.4.418 . . .
14.15 kg Semen 28,300 M.4.033 . . .

www.mitra-arsitek.com 135/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 m3 Pasir pasang 8,763 M.4.030 . . .
2.00 kg Semen warna 5,200 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-196 1.00 m1 Memasang plint keramik artisitk ukuran (10 x 20) cm 89,558 0.19 . 26,649 - 62,909
5.30 bh Plint keramik artistik 59,890 M.4.420 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.03 kg Semen warna 65 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-197 1.00 m1 Memasang plint keramik artisitik ukuran (10 x 10) cm 149,513 0.19 . 26,649 - 122,864
10.60 bh Plint keramik artistik 119,780 M.4.420 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.05 kg Semen warna 130 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-198 1.00 m1 Memasang plint keramik ukuran (5 x 20) cm 88,050 0.19 . 26,649 - 61,401
5.30 bh Plint keramik artistik 59,890 M.4.420 . . .
0.57 kg Semen 1,140 M.4.033 . . .
0.00 m3 Pasir pasang 337 M.4.030 . . .
0.01 kg Semen warna 34 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-199 1.00 m1 Pasang plint keramik ukuran 10 x 40 cm 46,678 0.19 . 26,649 - 20,029
2.65 bh Plint ubin keramik 10 x 40 cm 16,695 M.4.429 . . .
1.20 kg Semen 2,400 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-200 1.00 m1 Pasang plint keramik ukuran 10 x 30 cm 47,166 0.19 . 26,649 - 20,517
3.53 bh Plint ubin keramik 10 x 30 cm 16,238 M.4.428 . . .
1.65 kg Semen 3,300 M.4.033 . . .
0.00 m3 Pasir pasang 719 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .

www.mitra-arsitek.com 136/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-201 1.00 m1 Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm 68,553 0.19 . 26,649 - 41,904
5.30 bh Internal cove 38,690 M.4.590 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 kg Semen warna 260 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-202 1.00 m2 Memasang lantai marmer ukuran (100 x 100) cm 654,127 1.12 . 144,176 - 509,952
1.06 m2 Marmer 481,770 M.4.416 . . .
8.19 kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.65 kg Semen warna 1,690 M.4.036 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-203 1.00 m2 Memasang lantai karpet 125,692 0.37 . 50,232 - 75,460
1.05 m2 Karpet 70,035 M.4.355 . . .
0.35 kg Lem 5,425 M.4.552 . . .
0.17 oh Pekerja 17,901 L.4.001 . . .
0.17 oh Tukang kayu 26,843 L.4.016 . . .
0.02 oh Kepala tukang 3,356 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
SNI-2007 S-204 1.00 m2 Memasang underlayer 142,964 0.26 . 35,374 - 107,590
1.05 m2 Underlayer irubber corrugated 102,165 M.4.603 . . .
0.35 kg Lem 5,425 M.4.552 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-205 1.00 m2 Memasang lantai parquet 169,226 1.12 . 144,176 - 25,050
1.05 m2 Parquet kayu 15,750 M.4.359 . . .
0.60 kg Lem 9,300 M.4.552 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang kayu 55,265 L.4.016 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-206 1.00 m2 Memasang lantai kayu (gym floor) 297,326 1.12 . 144,176 - 153,150
1.05 m2 Gymfloor 143,850 M.4.352 . . .
0.60 kg Lem 9,300 M.4.552 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang kayu 55,265 L.4.016 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-207 1.00 m2 Memasang dinding porselen ukuran (11 x 11) cm 383,657 1.60 . 205,965 - 177,692
1.05 m2 Porselen 151,147 M.4.448 . . .
9.30 kg Semen 18,600 M.4.033 . . .

www.mitra-arsitek.com 137/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
1.50 kg Semen warna 3,900 M.4.036 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.50 oh Tukang batu 78,950 L.4.007 . . .
0.05 oh Kepala tukang 9,870 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-208 1.00 m2 Memasang dinding porselin ukuran (10 x 20) cm 368,333 1.44 . 185,369 - 182,965
1.06 m2 Porselen 153,170 M.4.448 . . .
9.30 kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.75 kg Semen warna 7,150 M.4.036 . . .
0.90 oh Pekerja 94,770 L.4.001 . . .
0.45 oh Tukang batu 71,055 L.4.007 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.05 oh Mandor 10,661 L.4.035 . . .
SNI-2007 S-209 1.00 m2 Memasang dinding porselin ukuran (20 x 20) cm 366,227 1.44 . 185,369 - 180,859
1.06 m2 Porselen 153,170 M.4.448 . . .
9.30 kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
1.94 kg Semen warna 5,044 M.4.036 . . .
0.90 oh Pekerja 94,770 L.4.001 . . .
0.45 oh Tukang batu 71,055 L.4.007 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.05 oh Mandor 10,661 L.4.035 . . .
SNI-2007 S-210 1.00 m2 Memasang dinding keramik ukuran (10 x 20) cm 304,203 1.44 . 185,369 - 118,835
1.06 m2 keramik artistik 10cm x 20cm 89,040 M.4.407 . . .
9.30 kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.75 kg Semen warna 7,150 M.4.036 . . .
0.90 oh Pekerja 94,770 L.4.001 . . .
0.45 oh Tukang batu 71,055 L.4.007 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.05 oh Mandor 10,661 L.4.035 . . .
SNI-2007 S-211 1.00 m2 Memasang dinding marmer ukuran (100 x 100) cm 862,192 2.08 . 267,755 - 594,438
1.06 m2 Marmer 481,770 M.4.416 . . .
3.00 bh Paku Biasa 2" - 5" 80,480 M.4.158 . . .
12.44 kg Semen 24,880 M.4.033 . . .
0.03 m3 Pasir pasang 5,618 M.4.030 . . .
0.65 kg Semen warna 1,690 M.4.036 . . .
1.30 oh Pekerja 136,890 L.4.001 . . .
0.65 oh Tukang batu 102,635 L.4.007 . . .
0.07 oh Kepala tukang 12,831 L.4.036 . . .
0.07 oh Mandor 15,399 L.4.035 . . .
SNI-2007 S-212 1.00 m2 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm 306,613 1.60 . 205,965 - 100,648
63.00 bh Bata merah 63,000 M.4.007 . . .
12.44 kg Semen 24,880 M.4.033 . . .
0.03 m3 Pasir pasang 5,618 M.4.030 . . .
2.75 kg Semen warna 7,150 M.4.036 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.50 oh Tukang batu 78,950 L.4.007 . . .

www.mitra-arsitek.com 138/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 oh Kepala tukang 9,870 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-213 1.00 m2 Memasang dinding batu paras 272,340 1.12 . 144,176 - 128,165
1.10 m2 Batu paras 96,800 M.4.015 . . .
11.75 kg Semen 23,500 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-214 1.00 m2 Memasang dinding batu tempel hitam 492,230 1.12 . 144,176 - 348,055
1.10 m2 Batu alam / tempel 316,690 M.4.011 . . .
11.75 kg Semen 23,500 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
0.35 oh Tukang batu 55,265 L.4.007 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-215 1.00 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I 296,418 0.32 . 44,336 - 252,082
11.87 m2 Vinyl 244,522 M.4.404 . . .
0.35 kg Lem vinyl 7,560 M.4.555 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-216 1.00 m2 Memasang wall paper, lebar 50 cm 163,052 0.54 . 72,937 - 90,115
2.20 m1 Wallpaper 86,240 M.4.374 . . .
0.25 kg Lem 3,875 M.4.552 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
0.18 oh Tukang Interior 32,253 L.4.015 . . .
0.02 oh Kepala tukang 3,356 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
SNI-2007 S-217 1.00 m2 Memasang floor hardener 55,374 0.26 . 35,374 - 20,000
5.00 kg Floor hardener 20,000 M.4.587 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-218 1.00 m1 Memasang plint kayu kelas II ukuran (2 x 10) cm 47,144 0.26 . 35,374 - 11,770
0.00 m3 Papan kayu kelas II 10,920 M.4.112 . . .
0.05 kg Paku skrup 5 cm 850 M.4.169 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
AK-SNI 2008 S-219 1.00 m1 Pasang keramik stepnosing granito 7/30 67,275 0.16 . 23,621 - 43,654
3.60 bh Stepnosing granito 42,480 M.4.453 . . .
0.41 kg Semen 816 M.4.033 . . .
0.00 m3 Pasir Pasang 202 M.4.030 . . .
0.06 kg Semen Warna 156 M.4.036 . . .

www.mitra-arsitek.com 139/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
AK-SNI 2008 S-220 1.00 m1 Pasang list keramik dinding 5/20 83,295 0.16 . 23,621 - 59,674
5.00 bh List keramik dinding motif 58,500 M.4.415 . . .
0.41 kg Semen 816 M.4.033 . . .
0.00 m3 Pasir pasang 202 M.4.030 . . .
0.06 kg Semen Warna 156 M.4.036 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
AK-SNI 2008 S-221 1.00 m1 Memasang hospital plint panjang 20 cm 98,038 0.19 . 26,649 - 71,389
5.30 bh Hospital plint 68,370 M.4.405 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.03 kg Semen warna 65 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-222 1.00 m1 Memasang hospital plint panjang 30 cm 45,906 0.19 . 26,649 - 19,257
3.53 bh Plint ubin keramik 10 x 30 cm 16,238 M.4.428 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.03 kg Semen warna 65 M.4.036 . . .
0.09 oh Pekerja 9,477 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-223 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-224 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-225 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .

www.mitra-arsitek.com 140/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-226 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-227 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-228 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-229 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-230 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-231 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-232 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .

www.mitra-arsitek.com 141/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-233 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-234 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 122,558 0.80 . 102,983 - 19,575
1.00 m2 Conblock 6,300 M.4.534 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-235 1.00 m2 Pasang grassblock bulat tebal 10 cm 165,358 0.80 . 102,983 - 62,375
1.00 m2 Grassblock 49,100 M.4.588 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
AK-SNI 2008 S-236 1.00 m2 Pasang grassblock tebal 10 cm 165,358 0.80 . 102,983 - 62,375
1.00 m2 Grassblock 49,100 M.4.588 . . .
0.05 m3 Pasir urug 13,275 M.4.032 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.25 oh Tukang batu 39,475 L.4.007 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
SNI-2007 S-237 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati16,562,655
(klas plitur) 30.45 . 4,550,455 - 12,012,200
1.10 m3 Balok kayu jati (klas plitur) 11,965,800 M.4.075 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
7.00 oh Pekerja 737,100 L.4.001 . . .
21.00 oh Tukang kayu 3,315,900 L.4.016 . . .
2.10 oh Kepala tukang 414,540 L.4.036 . . .
0.35 oh Mandor 82,915 L.4.035 . . .
SNI-2007 S-238 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati15,507,755
lokal 30.45 . 4,550,455 - 10,957,300
1.10 m3 Balok kayu jati (lokal) 10,910,900 M.4.076 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
7.00 oh Pekerja 737,100 L.4.001 . . .
21.00 oh Tukang kayu 3,315,900 L.4.016 . . .
2.10 oh Kepala tukang 414,540 L.4.036 . . .
0.35 oh Mandor 82,915 L.4.035 . . .
SNI-2007 S-239 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
12,014,390 26.10 . 3,900,390 - 8,114,000
1.20 m3 Balok kayu kamper 8,067,600 M.4.077 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
6.00 oh Pekerja 631,800 L.4.001 . . .

www.mitra-arsitek.com 142/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
18.00 oh Tukang kayu 2,842,200 L.4.016 . . .
1.80 oh Kepala tukang 355,320 L.4.036 . . .
0.30 oh Mandor 71,070 L.4.035 . . .
SNI-2007 S-240 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai
11,596,790 26.10 . 3,900,390 - 7,696,400
1.20 m3 Balok kayu bengkirai 7,650,000 M.4.073 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
6.00 oh Pekerja 631,800 L.4.001 . . .
18.00 oh Tukang kayu 2,842,200 L.4.016 . . .
1.80 oh Kepala tukang 355,320 L.4.036 . . .
0.30 oh Mandor 71,070 L.4.035 . . .
SNI-2007 S-241 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing
9,616,790 26.10 . 3,900,390 - 5,716,400
1.20 m3 Balok kayu kruing 5,670,000 M.4.079 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
6.00 oh Pekerja 631,800 L.4.001 . . .
18.00 oh Tukang kayu 2,842,200 L.4.016 . . .
1.80 oh Kepala tukang 355,320 L.4.036 . . .
0.30 oh Mandor 71,070 L.4.035 . . .
SNI-2007 S-242 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur) 620,381 1.52 . 227,641 - 392,740
0.04 m3 Papan kayu jati (klas plitur) 391,400 M.4.109 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
1.05 oh Tukang kayu 165,795 L.4.016 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-243 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (lokal) 646,981 1.52 . 227,641 - 419,340
0.04 m3 Papan kayu jati (lokal) 418,000 M.4.110 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
1.05 oh Tukang kayu 165,795 L.4.016 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-244 1.00 m2 Membuat dan memasang pintu klamp, kayu kamper 487,941 1.52 . 227,641 - 260,300
0.04 m3 Papan kayu kamper 258,960 M.4.111 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
1.05 oh Tukang kayu 165,795 L.4.016 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-245 1.00 m2 Membuat dan memasang pintu klamp, kayu bengkirai 498,981 1.52 . 227,641 - 271,340
0.04 m3 Papan kayu bengkirai 270,000 M.4.107 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
1.05 oh Tukang kayu 165,795 L.4.016 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-246 1.00 m2 Membuat dan memasang pintu klamp, kayu kruing 410,781 1.52 . 227,641 - 183,140
0.04 m3 Papan kayu kruing 181,800 M.4.113 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .

www.mitra-arsitek.com 143/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 oh Pekerja 36,855 L.4.001 . . .
1.05 oh Tukang kayu 165,795 L.4.016 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-247 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur) 1,047,915 4.35 . 650,065 - 397,850
0.04 m3 Papan kayu jati (klas plitur) 391,400 M.4.109 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-248 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal) 1,074,515 4.35 . 650,065 - 424,450
0.04 m3 Papan kayu jati (lokal) 418,000 M.4.110 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-249 1.00 m2 Membuat dan memasang daun pintu panel, kayu kamper 915,475 4.35 . 650,065 - 265,410
0.04 m3 Papan kayu kamper 258,960 M.4.111 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-250 1.00 m2 Membuat dan memasang daun pintu panel, kayu bengkirai 926,515 4.35 . 650,065 - 276,450
0.04 m3 Papan kayu bengkirai 270,000 M.4.107 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-251 1.00 m2 Membuat dan memasang daun pintu panel, kayu kruing 838,315 4.35 . 650,065 - 188,250
0.04 m3 Papan kayu kruing 181,800 M.4.113 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-252 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur)
758,762 3.48 . 520,052 - 238,710
0.02 m3 Papan kayu jati (klas plitur) 234,840 M.4.109 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
2.40 oh Tukang kayu 378,960 L.4.016 . . .
0.24 oh Kepala tukang 47,376 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-253 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal) 774,722 3.48 . 520,052 - 254,670
0.02 m3 Papan kayu jati (lokal) 250,800 M.4.110 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .

www.mitra-arsitek.com 144/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.40 oh Tukang kayu 378,960 L.4.016 . . .
0.24 oh Kepala tukang 47,376 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-254 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper 679,298 3.48 . 520,052 - 159,246
0.02 m3 Papan kayu kamper 155,376 M.4.111 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
2.40 oh Tukang kayu 378,960 L.4.016 . . .
0.24 oh Kepala tukang 47,376 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-255 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai 685,922 3.48 . 520,052 - 165,870
0.02 m3 Papan kayu bengkirai 162,000 M.4.107 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
2.40 oh Tukang kayu 378,960 L.4.016 . . .
0.24 oh Kepala tukang 47,376 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-256 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing 633,002 3.48 . 520,052 - 112,950
0.02 m3 Papan kayu kruing 109,080 M.4.113 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
2.40 oh Tukang kayu 378,960 L.4.016 . . .
0.24 oh Kepala tukang 47,376 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-257 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
1,282,755 4.35 . 650,065 - 632,690
0.06 m3 Papan kayu jati (klas plitur) 626,240 M.4.109 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-258 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) 1,325,315 4.35 . 650,065 - 675,250
0.06 m3 Papan kayu jati (lokal) 668,800 M.4.110 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-259 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper 1,070,851 4.35 . 650,065 - 420,786
0.06 m3 Papan kayu kamper 414,336 M.4.111 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-260 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai 1,088,515 4.35 . 650,065 - 438,450
0.06 m3 Papan kayu bengkirai 432,000 M.4.107 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .

www.mitra-arsitek.com 145/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-261 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing 947,395 4.35 . 650,065 - 297,330
0.06 m3 Papan kayu kruing 290,880 M.4.113 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-262 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup800,575
kayu jati lokal
3.05(lebar sampai
. 90 cm) 455,046 - 345,529
0.03 m3 Papan kayu jati (lokal) 261,250 M.4.110 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
2.10 oh Tukang kayu 331,590 L.4.016 . . .
0.21 oh Kepala tukang 41,454 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-263 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup701,175
kayu kamper 3.05
(lebar sampai
. 90 cm) 455,046 - 246,129
0.03 m3 Papan kayu kamper 161,850 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
2.10 oh Tukang kayu 331,590 L.4.016 . . .
0.21 oh Kepala tukang 41,454 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-264 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup708,075
kayu bengkirai
3.05(lebar sampai
. 90 cm) 455,046 - 253,029
0.03 m3 Papan kayu bengkirai 168,750 M.4.107 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
2.10 oh Tukang kayu 331,590 L.4.016 . . .
0.21 oh Kepala tukang 41,454 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-265 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup652,950
kayu kruing3.05
(lebar sampai. 90 cm) 455,046 - 197,904
0.03 m3 Papan kayu kruing 113,625 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
0.70 oh Pekerja 73,710 L.4.001 . . .
2.10 oh Tukang kayu 331,590 L.4.016 . . .
0.21 oh Kepala tukang 41,454 L.4.036 . . .
0.04 oh Mandor 8,292 L.4.035 . . .
SNI-2007 S-266 1.00 m2 Memasang jalusi kusen, kayu jati (klas plitur) 1,095,938 3.21 . 505,193 - 590,745
0.06 m3 Papan kayu jati (klas plitur) 587,100 M.4.109 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 70,551 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .

www.mitra-arsitek.com 146/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-267 1.00 m2 Memasang jalusi kusen, kayu jati (lokal) 1,135,838 3.21 . 505,193 - 630,645
0.06 m3 Papan kayu jati (lokal) 627,000 M.4.110 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 70,551 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-268 1.00 m2 Memasang jalusi kusen, kayu kamper 897,278 3.21 . 505,193 - 392,085
0.06 m3 Papan kayu kamper 388,440 M.4.111 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 70,551 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-269 1.00 m2 Memasang jalusi kusen, kayu bengkirai 913,838 3.21 . 505,193 - 408,645
0.06 m3 Papan kayu bengkirai 405,000 M.4.107 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 70,551 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-270 1.00 m2 Memasang jalusi kusen, kayu kruing 781,538 3.21 . 505,193 - 276,345
0.06 m3 Papan kayu kruing 272,700 M.4.113 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 70,551 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2002 S-271 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 713,386 2.83 . 425,567 - 287,819
0.02 m3 Papan kayu jati (lokal) 204,820 M.4.110 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 78,400 M.4.371 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala Tukang 39,480 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2002 S-272 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 635,456 2.83 . 425,567 - 209,889
0.02 m3 Papan kayu kamper 126,890 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 78,400 M.4.371 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala Tukang 39,480 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2002 S-273 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 640,866 2.83 . 425,567 - 215,299
0.02 m3 Papan kayu bengkirai 132,300 M.4.107 . . .

www.mitra-arsitek.com 147/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 78,400 M.4.371 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala Tukang 39,480 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2002 S-274 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 597,648 2.83 . 425,567 - 172,081
0.02 m3 Papan kayu kruing 89,082 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 78,400 M.4.371 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
2.00 oh Tukang kayu 315,800 L.4.016 . . .
0.20 oh Kepala Tukang 39,480 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-275 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
837,173 3.70 . 552,674 - 284,499
0.03 m3 Papan kayu kamper 161,850 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,320 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
0.50 lbr Formika 49,500 M.4.351 . . .
0.85 oh Pekerja 89,505 L.4.001 . . .
2.55 oh Tukang kayu 402,645 L.4.016 . . .
0.26 oh Kepala tukang 50,337 L.4.036 . . .
0.04 oh Mandor 10,187 L.4.035 . . .
SNI-2007 S-276 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
844,073 3.70 . 552,674 - 291,399
0.03 m3 Papan kayu bengkirai 168,750 M.4.107 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,320 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
0.50 lbr Formika 49,500 M.4.351 . . .
0.85 oh Pekerja 89,505 L.4.001 . . .
2.55 oh Tukang kayu 402,645 L.4.016 . . .
0.26 oh Kepala tukang 50,337 L.4.036 . . .
0.04 oh Mandor 10,187 L.4.035 . . .
SNI-2007 S-277 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
788,948 3.70 . 552,674 - 236,274
0.03 m3 Papan kayu kruing 113,625 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,320 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
0.50 lbr Formika 49,500 M.4.351 . . .
0.85 oh Pekerja 89,505 L.4.001 . . .
2.55 oh Tukang kayu 402,645 L.4.016 . . .
0.26 oh Kepala tukang 50,337 L.4.036 . . .
0.04 oh Mandor 10,187 L.4.035 . . .
SNI-2007 S-278 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur)
14,244,840
bentang 617.40
meter . 2,600,260 - 11,644,580
1.10 m3 Kayu jati (klas plitur) balok 11,286,000 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .

www.mitra-arsitek.com 148/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-279 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang
11,786,340
6 meter
17.40 . 2,600,260 - 9,186,080
1.10 m3 Kayu jati (lokal) balok 8,827,500 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-280 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang
10,011,820
6 meter 17.40 . 2,600,260 - 7,411,560
1.10 m3 Kayu kamper balok 7,052,980 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-281 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang
10,383,840
6 meter17.40 . 2,600,260 - 7,783,580
1.10 m3 Kayu bengkirai balok 7,425,000 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-282 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang8,502,840
6 meter 17.40 . 2,600,260 - 5,902,580
1.10 m3 Kayu kruing balok 5,544,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-283 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 4,842,040
6 meter 17.40 . 2,600,260 - 2,241,780
1.10 m3 Kayu glugu balok 1,883,200 M.4.086 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
4.00 oh Pekerja 421,200 L.4.001 . . .
12.00 oh Tukang kayu 1,894,800 L.4.016 . . .
1.20 oh Kepala tukang 236,880 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2007 S-284 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur) 17,026,016 29.15 . 4,355,436 - 12,670,580
1.20 m3 Kayu jati (klas plitur) balok 12,312,000 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
6.70 oh Pekerja 705,510 L.4.001 . . .
20.10 oh Tukang kayu 3,173,790 L.4.016 . . .

www.mitra-arsitek.com 149/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.01 oh Kepala tukang 396,774 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-285 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal 14,344,016 29.15 . 4,355,436 - 9,988,580
1.20 m3 Kayu jati (lokal) balok 9,630,000 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
6.70 oh Pekerja 705,510 L.4.001 . . .
20.10 oh Tukang kayu 3,173,790 L.4.016 . . .
2.01 oh Kepala tukang 396,774 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-286 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kamper 12,408,176 29.15 . 4,355,436 - 8,052,740
1.20 m3 Kayu kamper balok 7,694,160 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
6.70 oh Pekerja 705,510 L.4.001 . . .
20.10 oh Tukang kayu 3,173,790 L.4.016 . . .
2.01 oh Kepala tukang 396,774 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-287 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kruing 10,762,016 29.15 . 4,355,436 - 6,406,580
1.20 m3 Kayu kruing balok 6,048,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
6.70 oh Pekerja 705,510 L.4.001 . . .
20.10 oh Tukang kayu 3,173,790 L.4.016 . . .
2.01 oh Kepala tukang 396,774 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-288 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai 12,814,016 29.15 . 4,355,436 - 8,458,580
1.20 m3 Kayu bengkirai balok 8,100,000 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 150,080 M.4.158 . . .
6.70 oh Pekerja 705,510 L.4.001 . . .
20.10 oh Tukang kayu 3,173,790 L.4.016 . . .
2.01 oh Kepala tukang 396,774 L.4.036 . . .
0.34 oh Mandor 79,362 L.4.035 . . .
SNI-2007 S-289 1.00 m3 Memasang konstruksi gordeng, kayu jati (klas plitur) 13,135,056 10.44 . 1,560,156 - 11,574,900
1.10 m3 Kayu jati (klas plitur) balok 11,286,000 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
SNI-2007 S-290 1.00 m3 Memasang konstruksi gordeng, kayu jati lokal 10,676,556 10.44 . 1,560,156 - 9,116,400
1.10 m3 Kayu jati (lokal) balok 8,827,500 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .

www.mitra-arsitek.com 150/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-291 1.00 m3 Memasang konstruksi gordeng, kayu kamper 8,902,036 10.44 . 1,560,156 - 7,341,880
1.10 m3 Kayu kamper balok 7,052,980 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
SNI-2007 S-292 1.00 m3 Memasang konstruksi gordeng, kayu bengkirai 9,274,056 10.44 . 1,560,156 - 7,713,900
1.10 m3 Kayu bengkirai balok 7,425,000 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
SNI-2007 S-293 1.00 m3 Memasang konstruksi gordeng, kayu kruing 7,393,056 10.44 . 1,560,156 - 5,832,900
1.10 m3 Kayu kruing balok 5,544,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
SNI-2007 S-294 1.00 m3 Memasang konstruksi gordeng, kayu glugu 3,732,256 10.44 . 1,560,156 - 2,172,100
1.10 m3 Kayu glugu balok 1,883,200 M.4.086 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 80,400 M.4.158 . . .
2.40 oh Pekerja 252,720 L.4.001 . . .
7.20 oh Tukang kayu 1,136,880 L.4.016 . . .
0.72 oh Kepala tukang 142,128 L.4.036 . . .
0.12 oh Mandor 28,428 L.4.035 . . .
AK-SNI 2008 S-295 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 146,669 0.22 . 29,479 - 117,190
2.20 m1 Usuk kayu jati (lokal) 5/7 81,400 M.4.067 . . .
5.00 m1 Reng jati (lokal) 2/3 31,500 M.4.050 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-296 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 119,389 0.22 . 29,479 - 89,910
2.20 m1 Usuk kayu kamper 5/7 54,120 M.4.069 . . .
5.00 m1 Reng jati (lokal) 2/3 31,500 M.4.050 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .

www.mitra-arsitek.com 151/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-297 1.00 m2 Memasang usuk kamper 5/7, reng kamper 2/3 108,889 0.22 . 29,479 - 79,410
2.20 m1 Usuk kayu kamper 5/7 54,120 M.4.069 . . .
5.00 m1 Reng kamper 2/3 21,000 M.4.053 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-298 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 115,429 0.22 . 29,479 - 85,950
2.20 m1 Usuk kayu bengkirai 5/7 50,160 M.4.066 . . .
5.00 m1 Reng jati (lokal) 2/3 31,500 M.4.050 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-299 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 107,929 0.22 . 29,479 - 78,450
2.20 m1 Usuk kayu bengkirai 5/7 50,160 M.4.066 . . .
5.00 m1 Reng bengkirai 2/3 24,000 M.4.048 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-300 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 99,369 0.22 . 29,479 - 69,890
2.20 m1 Usuk kayu kruing 5/7 34,100 M.4.070 . . .
5.00 m1 Reng jati (lokal) 2/3 31,500 M.4.050 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-301 1.00 m2 Memasang usuk kruing 5/7, reng kruing 2/3 86,869 0.22 . 29,479 - 57,390
2.20 m1 Usuk kayu kruing 5/7 34,100 M.4.070 . . .
5.00 m1 Reng kruing 2/3 19,000 M.4.055 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-302 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) 208,329 0.22 . 29,479 - 178,850
2.20 m1 Usuk kayu jati 5/7 (klas 1) 93,060 M.4.068 . . .
5.00 m1 Reng jati 3/4 (klas 1) 81,500 M.4.052 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .

www.mitra-arsitek.com 152/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-303 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4 153,389 0.22 . 29,479 - 123,910
2.20 m1 Usuk kayu kamper 5/7 54,120 M.4.069 . . .
5.00 m1 Reng jati (lokal) 3/4 65,500 M.4.051 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-304 1.00 m2 Memasang usuk kamper 5/7, reng kamper 3/4 133,889 0.22 . 29,479 - 104,410
2.20 m1 Usuk kayu kamper 5/7 54,120 M.4.069 . . .
5.00 m1 Reng kamper 3/4 46,000 M.4.054 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-305 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 149,429 0.22 . 29,479 - 119,950
2.20 m1 Usuk kayu bengkirai 5/7 50,160 M.4.066 . . .
5.00 m1 Reng jati (lokal) 3/4 65,500 M.4.051 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-306 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 129,929 0.22 . 29,479 - 100,450
2.20 m1 Usuk kayu bengkirai 5/7 50,160 M.4.066 . . .
5.00 m1 Reng bengkirai 3/4 46,000 M.4.049 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-307 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 133,369 0.22 . 29,479 - 103,890
2.20 m1 Usuk kayu kruing 5/7 34,100 M.4.070 . . .
5.00 m1 Reng jati (lokal) 3/4 65,500 M.4.051 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-308 1.00 m2 Memasang usuk kruing 5/7, reng kruing 3/4 105,869 0.22 . 29,479 - 76,390

www.mitra-arsitek.com 153/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.20 m1 Usuk kayu kruing 5/7 34,100 M.4.070 . . .
5.00 m1 Reng kruing 3/4 38,000 M.4.056 . . .
0.15 kg Paku usuk 2,520 M.4.172 . . .
0.10 kg Paku reng 1,770 M.4.164 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-309 1.00 m2 Memasang rangka atap sirap, kayu jati (lokal) 1,364,859 0.26 . 35,374 - 1,329,485
0.17 m3 Kayu jati (lokal) balok 1,324,125 M.4.088 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-310 1.00 m2 Memasang rangka atap sirap, kayu kamper 1,098,681 0.26 . 35,374 - 1,063,307
0.17 m3 Kayu kamper balok 1,057,947 M.4.089 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-311 1.00 m2 Memasang rangka atap sirap, kayu bengkirai 1,154,484 0.26 . 35,374 - 1,119,110
0.17 m3 Kayu bengkirai balok 1,113,750 M.4.085 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-312 1.00 m2 Memasang rangka atap sirap, kayu kruing 872,334 0.26 . 35,374 - 836,960
0.17 m3 Kayu kruing balok 831,600 M.4.091 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-313 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) 263,155 0.56 . 86,855 - 176,300
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 170,940 M.4.060 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-314 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kamper 199,583 0.56 . 86,855 - 112,729
0.02 m3 Kaso-kaso (5 x 7) cm kamper 107,369 M.4.061 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .

www.mitra-arsitek.com 154/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-315 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai 191,352 0.56 . 86,855 - 104,498
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 99,138 M.4.059 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-316 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kruing 160,129 0.56 . 86,855 - 73,274
0.02 m3 Kaso-kaso (5 x 7) cm kruing 67,914 M.4.062 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.08 oh Mandor 17,768 L.4.035 . . .
SNI-2007 S-317 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) 264,351 0.54 . 76,721 - 187,630
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 180,930 M.4.060 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-318 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kamper 197,065 0.54 . 76,721 - 120,344
0.02 m3 Kaso-kaso (5 x 7) cm kamper 113,644 M.4.061 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-319 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai 188,352 0.54 . 76,721 - 111,631
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 104,931 M.4.059 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-320 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kruing 155,304 0.54 . 76,721 - 78,583
0.02 m3 Kaso-kaso (5 x 7) cm kruing 71,883 M.4.062 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-321 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) 175,418 0.48 . 67,877 - 107,541
0.01 m3 Kayu jati (lokal) balok 104,325 M.4.088 . . .
0.12 kg Paku Biasa 2" - 5" 3,216 M.4.158 . . .
0.17 oh Pekerja 17,901 L.4.001 . . .
0.27 oh Tukang kayu 42,633 L.4.016 . . .
0.03 oh Kepala Tukang 5,330 L.4.036 . . .
0.01 oh Mandor 2,014 L.4.035 . . .
AK-SNI 2008 S-322 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kamper 154,447 0.48 . 67,877 - 86,569

www.mitra-arsitek.com 155/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu kamper balok 83,353 M.4.089 . . .
0.12 kg Paku Biasa 2" - 5" 3,216 M.4.158 . . .
0.17 oh Pekerja 17,901 L.4.001 . . .
0.27 oh Tukang kayu 42,633 L.4.016 . . .
0.03 oh Kepala Tukang 5,330 L.4.036 . . .
0.01 oh Mandor 2,014 L.4.035 . . .
AK-SNI 2008 S-323 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai 158,843 0.48 . 67,877 - 90,966
0.01 m3 Kayu bengkirai balok 87,750 M.4.085 . . .
0.12 kg Paku Biasa 2" - 5" 3,216 M.4.158 . . .
0.17 oh Pekerja 17,901 L.4.001 . . .
0.27 oh Tukang kayu 42,633 L.4.016 . . .
0.03 oh Kepala Tukang 5,330 L.4.036 . . .
0.01 oh Mandor 2,014 L.4.035 . . .
AK-SNI 2008 S-324 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kruing 136,613 0.48 . 67,877 - 68,736
0.01 m3 Kayu kruing balok 65,520 M.4.091 . . .
0.12 kg Paku Biasa 2" - 5" 3,216 M.4.158 . . .
0.17 oh Pekerja 17,901 L.4.001 . . .
0.27 oh Tukang kayu 42,633 L.4.016 . . .
0.03 oh Kepala Tukang 5,330 L.4.036 . . .
0.01 oh Mandor 2,014 L.4.035 . . .
SNI-2002 S-325 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) 160,962 0.43 . 61,982 - 98,980
0.01 m3 Kayu jati (lokal) balok 96,300 M.4.088 . . .
0.10 kg Paku biasa 2" - 5" 2,680 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-326 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 141,603 0.43 . 61,982 - 79,622
0.01 m3 Kayu kamper balok 76,942 M.4.089 . . .
0.10 kg Paku biasa 2" - 5" 2,680 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-327 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 145,662 0.43 . 61,982 - 83,680
0.01 m3 Kayu bengkirai balok 81,000 M.4.085 . . .
0.10 kg Paku biasa 2" - 5" 2,680 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-328 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 125,142 0.43 . 61,982 - 63,160
0.01 m3 Kayu kruing balok 60,480 M.4.091 . . .
0.10 kg Paku biasa 2" - 5" 2,680 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-329 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) 120,022 0.33 . 48,230 - 71,792
0.01 m3 Papan kayu jati (klas plitur) 70,452 M.4.109 . . .

www.mitra-arsitek.com 156/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-330 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) 124,810 0.33 . 48,230 - 76,580
0.01 m3 Papan kayu jati (lokal) 75,240 M.4.110 . . .
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-331 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kamper 96,182 0.33 . 48,230 - 47,953
0.01 m3 Papan kayu kamper 46,613 M.4.111 . . .
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-332 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai 98,170 0.33 . 48,230 - 49,940
0.01 m3 Papan kayu bengkirai 48,600 M.4.107 . . .
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-333 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kruing 82,294 0.33 . 48,230 - 34,064
0.01 m3 Papan kayu kruing 32,724 M.4.113 . . .
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-334 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) 156,218 0.33 . 47,243 - 108,975
0.01 m3 Papan kayu jati (klas plitur) 107,635 M.4.109 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-335 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 163,533 0.33 . 47,243 - 116,290
0.01 m3 Papan kayu jati (lokal) 114,950 M.4.110 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-336 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 119,797 0.33 . 47,243 - 72,554
0.01 m3 Papan kayu kamper 71,214 M.4.111 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .

www.mitra-arsitek.com 157/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-337 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai 122,833 0.33 . 47,243 - 75,590
0.01 m3 Papan kayu bengkirai 74,250 M.4.107 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-338 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 98,578 0.33 . 47,243 - 51,335
0.01 m3 Papan kayu kruing 49,995 M.4.113 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-339 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur) 205,472 0.43 . 61,982 - 143,491
0.01 m3 Papan kayu jati (klas plitur) 141,883 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-340 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) 215,115 0.43 . 61,982 - 153,133
0.01 m3 Papan kayu jati (lokal) 151,525 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-341 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 157,463 0.43 . 61,982 - 95,481
0.01 m3 Papan kayu kamper 93,873 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-342 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 161,465 0.43 . 61,982 - 99,483
0.01 m3 Papan kayu bengkirai 97,875 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-343 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 129,492 0.43 . 61,982 - 67,511
0.01 m3 Papan kayu kruing 65,903 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .

www.mitra-arsitek.com 158/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-344 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur) 115,238 0.22 . 29,479 - 85,759
0.01 m3 Papan kayu jati (klas plitur) 84,151 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-345 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal) 120,957 0.22 . 29,479 - 91,478
0.01 m3 Papan kayu jati (lokal) 89,870 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-346 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 86,763 0.22 . 29,479 - 57,284
0.01 m3 Papan kayu kamper 55,676 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-347 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 89,137 0.22 . 29,479 - 59,658
0.01 m3 Papan kayu bengkirai 58,050 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-348 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 70,174 0.22 . 29,479 - 40,695
0.01 m3 Papan kayu kruing 39,087 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-349 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur) 89,797 0.22 . 29,479 - 60,318
0.01 m3 Papan kayu jati (klas plitur) 58,710 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-350 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal 93,787 0.22 . 29,479 - 64,308
0.01 m3 Papan kayu jati (lokal) 62,700 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .

www.mitra-arsitek.com 159/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-351 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper 69,931 0.22 . 29,479 - 40,452
0.01 m3 Papan kayu kamper 38,844 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-352 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai 71,587 0.22 . 29,479 - 42,108
0.01 m3 Papan kayu bengkirai 40,500 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-353 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing 58,357 0.22 . 29,479 - 28,878
0.01 m3 Papan kayu kruing 27,270 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-354 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) 78,055 0.22 . 29,479 - 48,576
0.00 m3 Papan kayu jati (klas plitur) 46,968 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-355 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) 81,247 0.22 . 29,479 - 51,768
0.00 m3 Papan kayu jati (lokal) 50,160 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-356 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper 62,162 0.22 . 29,479 - 32,683
0.00 m3 Papan kayu kamper 31,075 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-357 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai 63,487 0.22 . 29,479 - 34,008
0.00 m3 Papan kayu bengkirai 32,400 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .

www.mitra-arsitek.com 160/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-358 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing 52,903 0.22 . 29,479 - 23,424
0.00 m3 Papan kayu kruing 21,816 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,608 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-359 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal) 642,449 2.61 . 390,039 - 252,410
0.03 m3 Ram kayu jati (lokal) 210,000 M.4.115 . . .
1.00 m2 Asbes plat 37,100 M.4.346 . . .
0.30 kg Paku reng 5,310 M.4.164 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala Tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
AK-SNI 2008 S-360 1.00 m2 Membuat listplank asbes plat ram kayu kamper 569,607 2.61 . 390,039 - 179,568
0.03 m3 Ram kayu kamper 137,158 M.4.116 . . .
1.00 m2 Asbes plat 37,100 M.4.346 . . .
0.30 kg Paku reng 5,310 M.4.164 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala Tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
AK-SNI 2008 S-361 1.00 m2 Membuat listplank asbes plat ram kayu bengkirai 624,254 3.21 . 453,219 - 171,035
0.03 m3 Ram kayu bengkirai 128,625 M.4.114 . . .
1.00 m2 Asbes plat 37,100 M.4.346 . . .
0.30 kg Paku reng 5,310 M.4.164 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala Tukang 35,532 L.4.036 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
AK-SNI 2008 S-362 1.00 m2 Membuat listplank asbes plat ram kayu kruing 522,574 2.61 . 390,039 - 132,535
0.03 m3 Ram kayu kruing 90,125 M.4.117 . . .
1.00 m2 Asbes plat 37,100 M.4.346 . . .
0.30 kg Paku reng 5,310 M.4.164 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala Tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-363 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal) 379,380 0.65 . 97,628 - 281,752
0.03 m3 Balok kayu jati (lokal) 277,732 M.4.076 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-364 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper 289,892 0.65 . 97,628 - 192,264
0.03 m3 Balok kayu kamper 188,244 M.4.077 . . .

www.mitra-arsitek.com 161/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-365 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai 280,148 0.65 . 97,628 - 182,520
0.03 m3 Balok kayu bengkirai 178,500 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-366 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing 233,948 0.65 . 97,628 - 136,320
0.03 m3 Balok kayu kruing 132,300 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-367 1.00 m2 Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal)
454,028 0.65 . 97,628 - 356,400
0.03 m3 Balok kayu jati (lokal) 277,732 M.4.076 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 67,424 M.4.371 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-368 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper 364,540 0.65 . 97,628 - 266,912
0.03 m3 Balok kayu kamper 188,244 M.4.077 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 67,424 M.4.371 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-369 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
354,796 0.65 . 97,628 - 257,168
0.03 m3 Balok kayu bengkirai 178,500 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 67,424 M.4.371 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-370 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing308,596 0.65 . 97,628 - 210,968
0.03 m3 Balok kayu kruing 132,300 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 67,424 M.4.371 . . .

www.mitra-arsitek.com 162/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.45 oh Tukang kayu 71,055 L.4.016 . . .
0.05 oh Kepala tukang 8,883 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2007 S-371 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper395,807 0.87 . 130,013 - 265,794
0.03 m3 Balok kayu kamper 188,244 M.4.077 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 66,306 M.4.365 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.60 oh Tukang kayu 94,740 L.4.016 . . .
0.06 oh Kepala tukang 11,844 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-372 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai 386,063 0.87 . 130,013 - 256,050
0.03 m3 Balok kayu bengkirai 178,500 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 66,306 M.4.365 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.60 oh Tukang kayu 94,740 L.4.016 . . .
0.06 oh Kepala tukang 11,844 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-373 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing 339,863 0.87 . 130,013 - 209,850
0.03 m3 Balok kayu kruing 132,300 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 66,306 M.4.365 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.60 oh Tukang kayu 94,740 L.4.016 . . .
0.06 oh Kepala tukang 11,844 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2007 S-374 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur) 463,344 2.61 . 390,039 - 73,305
0.01 m3 Papan kayu jati (klas plitur) 68,495 M.4.109 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-375 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal) 467,999 2.61 . 390,039 - 77,960
0.01 m3 Papan kayu jati (lokal) 73,150 M.4.110 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-376 1.00 m2 Memasang dinding lambriziring dari papan kayu kamper 440,167 2.61 . 390,039 - 50,128
0.01 m3 Papan kayu kamper 45,318 M.4.111 . . .

www.mitra-arsitek.com 163/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-377 1.00 m2 Memasang dinding lambriziring dari papan kayu bengkirai 442,099 2.61 . 390,039 - 52,060
0.01 m3 Papan kayu bengkirai 47,250 M.4.107 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-378 1.00 m2 Memasang dinding lambriziring dari papan kayu kruing 426,664 2.61 . 390,039 - 36,625
0.01 m3 Papan kayu kruing 31,815 M.4.113 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
0.60 oh Pekerja 63,180 L.4.001 . . .
1.80 oh Tukang kayu 284,220 L.4.016 . . .
0.18 oh Kepala tukang 35,532 L.4.036 . . .
0.03 oh Mandor 7,107 L.4.035 . . .
SNI-2007 S-379 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm 48,346 0.11 . 16,291 - 32,055
0.40 lbr Plywood 120x240 tbl. 4 mm 30,840 M.4.365 . . .
0.05 kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.03 oh Pekerja 2,633 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.00 oh Mandor 237 L.4.035 . . .
SNI-2007 S-380 1.00 m2 Memasang dinding bilik, rangka kayu kruing 221,858 0.16 . 20,597 - 201,262
1.50 m2 Bilik bambu 122,700 M.4.350 . . .
0.01 m3 Kaso-kaso (5 x 7) cm kruing 61,740 M.4.062 . . .
0.00 m3 List kayu 2/4 16,500 M.4.043 . . .
0.01 kg Paku Biasa 2" - 5" 322 M.4.158 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.05 oh Tukang kayu 7,895 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-381 1.00 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 59,827 0.12 . 17,491 - 42,336
0.00 m3 Papan kayu jati (lokal) 41,800 M.4.110 . . .
0.02 kg Paku biasa 2" - 5" 536 M.4.158 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.08 oh Tukang kayu 12,632 L.4.016 . . .
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.00 oh Mandor 332 L.4.035 . . .
AK-SNI 2008 S-382 1.00 m1 Mengerjakan papan ruiter kayu kamper 2/20 43,923 0.12 . 17,491 - 26,432
0.00 m3 Papan kayu kamper 25,896 M.4.111 . . .
0.02 kg Paku biasa 2" - 5" 536 M.4.158 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.08 oh Tukang kayu 12,632 L.4.016 . . .

www.mitra-arsitek.com 164/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.00 oh Mandor 332 L.4.035 . . .
AK-SNI 2008 S-383 1.00 m1 Mengerjakan papan ruiter kayu bengkirai 2/20 45,027 0.12 . 17,491 - 27,536
0.00 m3 Papan kayu bengkirai 27,000 M.4.107 . . .
0.02 kg Paku biasa 2" - 5" 536 M.4.158 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.08 oh Tukang kayu 12,632 L.4.016 . . .
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.00 oh Mandor 332 L.4.035 . . .
AK-SNI 2008 S-384 1.00 m1 Mengerjakan papan ruiter kayu kruing 2/20 36,207 0.12 . 17,491 - 18,716
0.00 m3 Papan kayu kruing 18,180 M.4.113 . . .
0.02 kg Paku biasa 2" - 5" 536 M.4.158 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.08 oh Tukang kayu 12,632 L.4.016 . . .
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.00 oh Mandor 332 L.4.035 . . .
SNI-2002 S-385 1.00 m2 Pasang plywood tebal 4 mm, untuk dinding 48,443 0.11 . 16,263 - 32,180
0.40 lbr Plywood 120x240 tbl. 4 mm 30,840 M.4.365 . . .
0.05 kg Paku biasa 2" - 5" 1,340 M.4.158 . . .
0.03 oh Pekerja 2,633 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala Tukang 1,481 L.4.036 . . .
0.00 oh Mandor 308 L.4.035 . . .
AK-SNI 2008 S-386 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) tanpa plepet
205,429 0.54 . 77,931 - 127,498
0.01 m3 Kayu jati (lokal) balok 96,300 M.4.088 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-387 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet186,071 0.54 . 77,931 - 108,140
0.01 m3 Kayu kamper balok 76,942 M.4.089 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-388 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet
190,129 0.54 . 77,931 - 112,198
0.01 m3 Kayu bengkirai balok 81,000 M.4.085 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-389 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet169,609 0.54 . 77,931 - 91,678
0.01 m3 Kayu kruing balok 60,480 M.4.091 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .

www.mitra-arsitek.com 165/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-390 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai211,517
plepet 0.54 . 77,931 - 133,586
0.01 m3 Kayu jati (lokal) balok 96,300 M.4.088 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
2.60 m1 Plepet kayu 5,720 M.4.045 . . .
0.01 kg Paku eternit 201 M.4.159 . . .
0.01 kg Paku plepet 167 M.4.163 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-391 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
192,159 0.54 . 77,931 - 114,228
0.01 m3 Kayu kamper balok 76,942 M.4.089 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
2.60 m1 Plepet kayu 5,720 M.4.045 . . .
0.01 kg Paku eternit 201 M.4.159 . . .
0.01 kg Paku plepet 167 M.4.163 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-392 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai 196,217
plepet 0.54 . 77,931 - 118,286
0.01 m3 Kayu bengkirai balok 81,000 M.4.085 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
2.60 m1 Plepet kayu 5,720 M.4.045 . . .
0.01 kg Paku eternit 201 M.4.159 . . .
0.01 kg Paku plepet 167 M.4.163 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-393 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
175,697 0.54 . 77,931 - 97,766
0.01 m3 Kayu kruing balok 60,480 M.4.091 . . .
0.06 kg Paku Biasa 2" - 5" 1,608 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 29,590 M.4.343 . . .
2.60 m1 Plepet kayu 5,720 M.4.045 . . .
0.01 kg Paku eternit 201 M.4.159 . . .
0.01 kg Paku plepet 167 M.4.163 . . .
0.18 oh Pekerja 18,954 L.4.001 . . .
0.32 oh Tukang kayu 50,528 L.4.016 . . .
0.03 oh Kepala Tukang 6,317 L.4.036 . . .
0.01 oh Mandor 2,132 L.4.035 . . .
AK-SNI 2008 S-394 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal)
258,924 0.66 . 93,842 - 165,083

www.mitra-arsitek.com 166/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu jati (lokal) balok 104,325 M.4.088 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-395 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
237,953 0.66 . 93,842 - 144,111
0.01 m3 Kayu kamper balok 83,353 M.4.089 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-396 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
242,349 0.66 . 93,842 - 148,508
0.01 m3 Kayu bengkirai balok 87,750 M.4.085 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-397 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
220,119 0.66 . 93,842 - 126,278
0.01 m3 Kayu kruing balok 65,520 M.4.091 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-398 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow 214,153 0.66 . 93,842 - 120,312
4.50 m1 Hollow 4/4 59,400 M.4.141 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .

www.mitra-arsitek.com 167/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.15 kg Paku sekrup 135 M.4.165 . . .
5.00 m1 Kawat penggantung 3,000 M.4.153 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-399 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal)
253,560 0.66 . 93,842 - 159,719
0.01 m3 Kayu jati (lokal) balok 104,325 M.4.088 . . .
0.36 lbr Kalsiboard 3.5 mm 25,344 M.4.354 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-400 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper232,589 0.66 . 93,842 - 138,747
0.01 m3 Kayu kamper balok 83,353 M.4.089 . . .
0.36 lbr Kalsiboard 3.5 mm 25,344 M.4.354 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-401 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai236,985 0.66 . 93,842 - 143,144
0.01 m3 Kayu bengkirai balok 87,750 M.4.085 . . .
0.36 lbr Kalsiboard 3.5 mm 25,344 M.4.354 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-402 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 214,755 0.66 . 93,842 - 120,914
0.01 m3 Kayu kruing balok 65,520 M.4.091 . . .
0.36 lbr Kalsiboard 3.5 mm 25,344 M.4.354 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .

www.mitra-arsitek.com 168/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 kg Alkasit 134 M.4.004 . . .
0.05 kg Paku gypsum 965 M.4.160 . . .
0.12 kg Paku usuk 2,016 M.4.172 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
AK-SNI 2008 S-403 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 208,789 0.66 . 93,842 - 114,948
4.50 m1 Hollow 4/4 59,400 M.4.141 . . .
0.36 lbr Kalsiboard 3.5 mm 25,344 M.4.354 . . .
0.05 roll Kasa gypsum 25,090 M.4.538 . . .
0.45 kg Tepung gypsum 1,845 M.4.040 . . .
0.00 kg Alkasit 134 M.4.004 . . .
0.15 kg Paku sekrup 135 M.4.165 . . .
5.00 m1 Kawat penggantung 3,000 M.4.153 . . .
0.24 oh Pekerja 25,272 L.4.001 . . .
0.37 oh Tukang kayu 58,423 L.4.016 . . .
0.04 oh Kepala Tukang 7,304 L.4.036 . . .
0.01 oh Mandor 2,843 L.4.035 . . .
SNI-2007 S-404 1.00 m2 Memasang langit-langit asbes semen, tebal 4 mm 39,073 0.11 . 16,541 - 22,532
1.10 m2 Asbes semen tebal 4 mm 22,330 M.4.347 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
0.03 oh Pekerja 3,159 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2007 S-405 1.00 m2 Memasang langit-langit asbes semen, tebal 5 mm 41,273 0.11 . 16,541 - 24,732
1.10 m2 Asbes semen tebal 5 mm 24,530 M.4.348 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
0.03 oh Pekerja 3,159 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2007 S-406 1.00 m2 Memasang langit-langit asbes semen, tebal 6 mm 44,243 0.11 . 16,541 - 27,702
1.10 m2 Asbes semen tebal 6 mm 27,500 M.4.349 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
0.03 oh Pekerja 3,159 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2007 S-407 1.00 m2 Memasang langit-langit akustik ukuran (30 x 30) cm 447,984 0.26 . 35,374 - 412,610
12.00 lbr Akustik ukuran 30 x 30 cm 411,600 M.4.340 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.12 oh Tukang kayu 18,948 L.4.016 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-408 1.00 m2 Memasang langit-langit akustik ukuran (30 x 60) cm 372,109 0.22 . 29,479 - 342,630
5.80 lbr Akustik ukuran 30 x 60 cm 341,620 M.4.341 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .

www.mitra-arsitek.com 169/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-409 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm 232,089 0.22 . 29,479 - 202,610
1.50 lbr Akustik Uk. 60 cm x 120 cm 201,600 M.4.339 . . .
0.05 kg Paku tripleks 1,010 M.4.171 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-410 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm 44,410 0.22 . 29,479 - 14,931
0.38 lbr Tripleks 14,325 M.4.372 . . .
0.03 kg Paku tripleks 606 M.4.171 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-411 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm 44,410 0.22 . 29,479 - 14,931
0.38 lbr Tripleks 14,325 M.4.372 . . .
0.03 kg Paku tripleks 606 M.4.171 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-412 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm 44,410 0.22 . 29,479 - 14,931
0.38 lbr Tripleks 14,325 M.4.372 . . .
0.03 kg Paku tripleks 606 M.4.171 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-413 1.00 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm 293,780 1.72 . 235,828 - 57,952
0.02 m3 Kayu Papan 3/20 57,750 M.4.100 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
0.80 oh Pekerja 84,240 L.4.001 . . .
0.80 oh Tukang kayu 126,320 L.4.016 . . .
0.08 oh Kepala tukang 15,792 L.4.036 . . .
0.04 oh Mandor 9,476 L.4.035 . . .
SNI-2007 S-414 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal51,745
9 mm 0.16 . 20,597 - 31,148
0.36 lbr Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 99 M.4.165 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.05 oh Tukang kayu 7,895 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-415 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
407,718 1.08 . 147,393 - 260,325
3.60 m’ Profil Alluminium "T" 47,880 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,700 M.4.145 . . .
1.05 bh Baut Ramset / Dina Bolt 5,145 M.4.130 . . .

www.mitra-arsitek.com 170/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 lbr Akustik Uk. 60 cm x 120 cm 201,600 M.4.339 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.05 oh Kepala tukang 9,870 L.4.036 . . .
0.03 oh Mandor 5,923 L.4.035 . . .
SNI-2007 S-416 1.00 m1 Memasang ist langit-langit kayu profil 18,381 0.11 . 14,858 - 3,523
1.05 m1 List kayu profil 3,255 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 268 M.4.158 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.05 oh Tukang kayu 7,895 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.00 oh Mandor 711 L.4.035 . . .
AK-SNI 2008 S-417 1.00 m1 Pasang list profil cornees gypsum lebar sampai 5 cm 54,304 0.16 . 20,038 - 34,266
1.10 m1 List profil cornees gypsum 31,240 M.4.356 . . .
0.70 kg Tepung gypsum 2,870 M.4.040 . . .
0.00 kg Alkasit 156 M.4.004 . . .
0.11 oh Pekerja 11,846 L.4.001 . . .
0.04 oh Tukang kayu 5,921 L.4.016 . . .
0.00 oh Kepala Tukang 730 L.4.036 . . .
0.01 oh Mandor 1,540 L.4.035 . . .
AK-SNI 2008 S-418 1.00 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm 55,061 0.16 . 20,038 - 35,024
1.10 m1 List profil cornees gypsum 31,240 M.4.356 . . .
0.88 kg Tepung gypsum 3,588 M.4.040 . . .
0.00 kg Alkasit 196 M.4.004 . . .
0.11 oh Pekerja 11,846 L.4.001 . . .
0.04 oh Tukang kayu 5,921 L.4.016 . . .
0.00 oh Kepala Tukang 730 L.4.036 . . .
0.01 oh Mandor 1,540 L.4.035 . . .
AK-SNI 2008 S-419 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 56,273 0.16 . 20,492 - 35,781
1.10 m1 List profil cornees gypsum 31,240 M.4.356 . . .
1.05 kg Tepung gypsum 4,305 M.4.040 . . .
0.01 kg Alkasit 236 M.4.004 . . .
0.11 oh Pekerja 11,846 L.4.001 . . .
0.04 oh Tukang kayu 6,316 L.4.016 . . .
0.00 oh Kepala Tukang 790 L.4.036 . . .
0.01 oh Mandor 1,540 L.4.035 . . .
AK-SNI 2008 S-420 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak
3,561,660
berlubang
22.00 . 3,356,500 - 205,160
1.00 lb Kertas 100 x 100 cm 6,300 M.4.594 . . .
15.00 lbr Kerta karbon 61,500 M.4.593 . . .
2.00 oh Tukang gambar 368,600 L.4.014 . . .
16.00 oh Tukang Ukir 2,316,800 L.4.023 . . .
1.00 oh Kepala Tukang 197,400 L.4.036 . . .
20.00 lbr Amplas 134,000 M.4.548 . . .
0.08 kg Dempul 3,360 M.4.388 . . .
3.00 oh Tukang kayu 473,700 L.4.016 . . .
AK-SNI 2008 S-421 1.00 m3 Memasang usuk peniung, kayu jati (klas plitur) 12,162,855 30.45 . 4,550,455 - 7,612,400
1.20 m3 Balok kayu papan (klas plitur) 7,566,000 M.4.080 . . .
1.25 kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 kg Lem kayu 12,900 M.4.553 . . .
7.00 oh Pekerja 737,100 L.4.001 . . .

www.mitra-arsitek.com 171/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
21.00 oh Tukang kayu 3,315,900 L.4.016 . . .
2.10 oh Kepala tukang 414,540 L.4.036 . . .
0.35 oh Mandor 82,915 L.4.035 . . .
SNI-2002 S-422 1.00 m2 Pasang Atap Genteng Palentong Kecil 98,612 0.24 . 31,112 - 67,500
25.00 bh Genteng palentong 67,500 M.4.494 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
AK-SNI 2008 S-423 1.00 m2 Pasang genteng paris 63,693 0.32 . 41,193 - 22,500
25.00 bh Genteng paris 22,500 M.4.496 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-424 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 69,093 0.32 . 41,193 - 27,900
9.00 bh Genteng beton natural 27,900 M.4.486 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-425 1.00 m1 Pasang Genteng Bubung Palentong 111,812 0.62 . 78,122 - 33,690
5.00 bh Genteng Bubung Palentong 10,500 M.4.490 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
SNI-2002 S-426 1.00 m1 Pasang Nok Genteng Beton 124,566 0.64 . 82,386 - 42,180
3.50 lbr Genteng Beton 9,450 M.4.485 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
10.80 Kg Semen 21,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
1.00 Kg Semen Warna 2,600 M.4.036 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-427 1.00 m1 Pasang bubungan genteng paris 206,468 0.64 . 82,386 - 124,082
5.00 bh Bubungan genteng paris 109,500 M.4.483 . . .
0.02 m3 Kapur pasang 8,118 M.4.022 . . .
0.02 m3 Pasir pasang 3,415 M.4.030 . . .
1.52 kg Semen 3,048 M.4.033 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
SNI-2002 S-428 1.00 m2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 92,071 0.23 . 30,059 - 62,012
0.50 lbr Asbes Gelombang 60,500 M.4.344 . . .

www.mitra-arsitek.com 172/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-429 1.00 m2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 104,171 0.23 . 30,059 - 74,112
0.60 lbr Asbes Gelombang 72,600 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-430 1.00 m2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 102,947 0.22 . 28,835 - 74,112
0.60 lbr Asbes Gelombang 72,600 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-431 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 121,097 0.22 . 28,835 - 92,262
0.75 lbr Asbes Gelombang 90,750 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-432 1.00 m2 Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 72,697 0.22 . 28,835 - 43,862
0.35 lbr Asbes Gelombang 42,350 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-433 1.00 m2 Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 81,167 0.22 . 28,835 - 52,332
0.42 lbr Asbes Gelombang 50,820 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-434 1.00 m2 Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 83,113 0.22 . 28,361 - 54,752
0.44 lbr Asbes Gelombang 53,240 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-435 1.00 m2 Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 91,583 0.22 . 28,361 - 63,222
0.51 lbr Asbes Gelombang 61,710 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .

www.mitra-arsitek.com 173/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-436 1.00 m2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 126,673 0.22 . 28,361 - 98,312
0.80 lbr Asbes Gelombang 96,800 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-437 1.00 m2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 74,643 0.22 . 28,361 - 46,282
0.37 lbr Asbes Gelombang 44,770 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-438 1.00 m2 Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 75,853 0.22 . 28,361 - 47,492
0.38 lbr Asbes Gelombang 45,980 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-439 1.00 m2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 85,533 0.22 . 28,361 - 57,172
0.46 lbr Asbes Gelombang 55,660 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-440 1.00 m2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 89,163 0.22 . 28,361 - 60,802
0.49 lbr Asbes Gelombang 59,290 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-441 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 98,843 0.22 . 28,361 - 70,482
0.57 lbr Asbes Gelombang 68,970 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-442 1.00 m1 Pasang Nok Stel Gelombang 0.92m 301,377 0.23 . 32,097 - 269,280
2.40 lbr Nok Stel Gelombang 193,680 M.4.506 . . .
6.00 Kg Paku Pancing 60 x 230 75,600 M.4.162 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .

www.mitra-arsitek.com 174/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-443 1.00 m1 Pasang Nok Stel Gelombang 1.05m 281,967 0.23 . 32,097 - 249,870
2.10 lbr Nok Stel Gelombang 169,470 M.4.506 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-444 1.00 m1 Pasang Nok Stel Gelombang 1.08m 277,932 0.23 . 32,097 - 245,835
2.05 lbr Nok Stel Gelombang 165,435 M.4.506 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-445 1.00 m1 Pasang Nok Paten 0.92m 163,857 0.23 . 32,097 - 131,760
1.20 lbr Nok Paten 51,360 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-446 1.00 m1 Pasang Nok Paten 1.05m 163,857 0.23 . 32,097 - 131,760
1.20 lbr Nok Paten 51,360 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-447 1.00 m1 Pasang Nok Paten 1.08m 163,857 0.23 . 32,097 - 131,760
1.20 lbr Nok paten 51,360 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .
0.01 oh Kepala Tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-448 1.00 m1 Pasang Nok Stel rata 0.92m 184,679 0.27 . 37,729 - 146,950
1.10 lbr Nok Stel rata 66,550 M.4.507 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-449 1.00 m1 Pasang Nok Stel rata 1.05m 179,047 0.23 . 32,097 - 146,950
1.10 lbr Nok Stel rata 66,550 M.4.507 . . .
6.00 Kg Paku sekrup 3,5" 80,400 M.4.166 . . .
0.08 oh Pekerja 8,845 L.4.001 . . .
0.13 oh Tukang kayu 19,738 L.4.016 . . .

www.mitra-arsitek.com 175/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala tukang 2,566 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2002 S-450 1.00 m2 Pasang Nok Atap Seng 31,455 0.10 . 15,633 - 15,822
0.30 lbr Seng Gelombang 3" x 6" BJLS 28 14,850 M.4.368 . . .
0.04 Kg Paku Biasa ½" - 1" 972 M.4.157 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.07 oh Tukang kayu 11,053 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-451 1.00 m2 Pasang Atap Alluminium 186,424 0.10 . 16,423 - 170,001
1.05 m2 Atap Alluminium Gelombang tebal 0.55 169,785 M.4.478 . . .
0.02 Kg Paku Hak Panjang 15cm 216 M.4.161 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-452 1.00 m2 Pasang Nok Alluminium 282,165 1.12 . 172,773 - 109,392
1.20 m2 Nok standar 40 cm 18, swg 22 108,960 M.4.504 . . .
0.04 Kg Paku Hak Panjang 15cm 432 M.4.161 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
1.00 oh Tukang kayu 157,900 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-453 1.00 m2 Pasang Alluminium Foil / Sisalation 59,857 0.21 . 26,572 - 33,285
1.05 m2 Aluminium foil 33,285 M.4.121 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.05 oh Tukang kayu 7,895 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-454 1.00 m2 Pasang Atap Genteng Aspal 135,925 0.51 . 71,391 - 64,534
6.90 lbr Genteng Aspal 19,320 M.4.484 . . .
0.35 lbr Plywood 120x240 tbl. 4 mm 26,985 M.4.365 . . .
0.03 Kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 Bh Plastic Aerator 17,500 M.4.363 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang kayu 47,370 L.4.016 . . .
0.00 oh Kepala tukang 592 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-455 1.00 m2 Pasang Atap Genteng Metal 83,691 0.31 . 39,061 - 44,630
1.02 lbr Genteng Metal 39,270 M.4.493 . . .
0.20 Kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.00 oh Mandor 237 L.4.035 . . .
SNI-2002 S-456 1.00 m2 Pasang Atap Genteng Kodok / Glazzur 68,612 0.24 . 31,112 - 37,500
25.00 bh Genteng Kodok 37,500 M.4.492 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.08 oh Tukang kayu 11,843 L.4.016 . . .
0.01 oh Kepala tukang 1,579 L.4.036 . . .

www.mitra-arsitek.com 176/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-457 1.00 m2 Pasang Atap Genteng Palentong Super / Besar 73,949 0.22 . 28,349 - 45,600
12.00 bh Genteng Palentong Super 45,600 M.4.495 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.06 oh Tukang kayu 9,474 L.4.016 . . .
0.01 oh Kepala tukang 1,184 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-458 1.00 m2 Pasang Atap Sirap 332,645 0.45 . 63,785 - 268,860
60.00 lbr Genteng Sirap 264,000 M.4.497 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
0.17 oh Pekerja 17,480 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-459 1.00 m1 Pasang Genteng Bubung Kodok Glazzur 109,812 0.62 . 78,122 - 31,690
5.00 bh Genteng Bubung Kodok 8,500 M.4.489 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
SNI-2002 S-460 1.00 m1 Pasang Genteng Bubung Palentong Besar 109,712 0.62 . 78,122 - 31,590
4.00 bh Genteng Bubung Palentong 8,400 M.4.490 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
SNI-2002 S-461 1.00 m1 Pasang Rooflight Fiberglass ( 180 x 90 ) cm 120,001 0.22 . 28,361 - 91,640
0.60 lbr Roof Light Fiberglass 90,300 M.4.508 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang kayu 10,579 L.4.016 . . .
0.01 oh Kepala tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-462 1.00 m1 Pasang Nok Genteng Aspal 125,549 0.41 . 58,994 - 66,555
2.00 lbr Nok Genteng Aspal 52,600 M.4.498 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.00 m3 Balok Kayu Borneo 12,740 M.4.074 . . .
0.13 oh Pekerja 13,163 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-463 1.00 m1 Pasang Nok Genteng Metal 133,056 0.43 . 56,051 - 77,005
1.10 lbr Nok Genteng Decra Bond 75,790 M.4.500 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .

www.mitra-arsitek.com 177/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
SNI-2002 S-464 1.00 m1 Pasang Nok Sirap 95,172 0.41 . 58,994 - 36,178
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 19,800 M.4.368 . . .
0.06 Kg Paku Biasa ½" - 1" 1,458 M.4.157 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
0.00 m3 Papan Kayu Borneo tebal 3cm 13,580 M.4.108 . . .
0.13 oh Pekerja 13,163 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala tukang 4,935 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-465 1.00 m2 Pasang Atap Seng Gelombang 59,852 0.19 . 24,716 - 35,136
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 34,650 M.4.368 . . .
0.02 Kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.12 oh Pekerja 12,636 L.4.001 . . .
0.06 oh Tukang kayu 9,474 L.4.016 . . .
0.01 oh Kepala tukang 1,184 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
AK-SNI 2008 S-466 1.00 m2 Pasang genteng paris untuk rumah tingkat 75,408 0.43 . 52,908 - 22,500
25.00 bh Genteng paris 22,500 M.4.496 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
AK-SNI 2008 S-467 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat80,808 0.43 . 52,908 - 27,900
9.00 bh Genteng beton natural 27,900 M.4.486 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
AK-SNI 2008 S-468 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 68,193 0.32 . 41,193 - 27,000
9.00 bh Genteng beton Warna 27,000 M.4.487 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-469 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat79,908 0.43 . 52,908 - 27,000
9.00 bh Genteng beton Warna 27,000 M.4.487 . . .
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
AK-SNI 2008 S-470 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 141,243 0.32 . 41,193 - 100,050
14.50 bh Genteng keramik KIA natural 100,050 M.4.491 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-471 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah 97,858
tingkat 0.43 . 52,908 - 44,950
14.50 bh Genteng beton natural 44,950 M.4.486 . . .

www.mitra-arsitek.com 178/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Pekerja 31,590 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.02 oh Mandor 3,554 L.4.035 . . .
AK-SNI 2008 S-472 1.00 m2 Pasang bubungan genteng beton Warna 192,968 0.64 . 82,386 - 110,582
4.00 bh Bubungan genteng beton warna 96,000 M.4.482 . . .
0.02 m3 Kapur pasang 8,118 M.4.022 . . .
0.02 m3 Pasir pasang 3,415 M.4.030 . . .
1.52 kg Semen 3,048 M.4.033 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-473 1.00 m2 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural210,568 0.64 . 82,386 - 128,182
4.00 bh Bubungan gent.krmk KIA natural 113,600 M.4.481 . . .
0.02 m3 Kapur pasang 8,118 M.4.022 . . .
0.02 m3 Pasir pasang 3,415 M.4.030 . . .
1.52 kg Semen 3,048 M.4.033 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.20 oh Tukang batu 31,580 L.4.007 . . .
0.02 oh Kepala Tukang 3,948 L.4.036 . . .
0.02 oh Mandor 4,738 L.4.035 . . .
AK-SNI 2008 S-474 1.00 m2 Pasang atap metal gelombang 111,283 0.31 . 39,061 - 72,222
1.02 m2 Atap metal gelombang t 0.35 mm 67,422 M.4.479 . . .
4.00 bh Paku/skrup atap anti karat 4,800 M.4.173 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.00 oh Mandor 237 L.4.035 . . .
AK-SNI 2008 S-475 1.00 m1 Pasang nok genteng metal U type prima roof 137,051 0.43 . 56,051 - 81,000
1.10 bh Nok metal 79,860 M.4.502 . . .
0.05 kg Paku anti karat 1,140 M.4.156 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala Tukang 2,961 L.4.036 . . .
0.01 oh Mandor 3,080 L.4.035 . . .
AK-SNI 2008 S-476 1.00 m2 Pasang atap polikarbonat 333,912 1.05 . 142,762 - 191,150
1.05 m2 Polycarbonat 171,150 M.4.364 . . .
7.00 kg Besi rangka 11,900 M.4.138 . . .
9.00 bh Paku sekrup 8,100 M.4.165 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.50 oh Tukang besi 79,650 L.4.008 . . .
0.05 oh Kepala Tukang 9,870 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-477 1.00 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 18,752 0.15 . 16,387 - 2,365
0.05 kg Soda api 2,365 M.4.562 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-478 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 17,007 0.15 . 16,387 - 620
0.05 kg Sabun 620 M.4.561 . . .

www.mitra-arsitek.com 179/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 oh Pekerja 15,795 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-479 1.00 m2 Mendempul dan Menggosok Kayu 15,826 0.09 . 11,386 - 4,440
0.08 kg Dempul 3,360 M.4.388 . . .
0.02 kg Minyak cat 756 M.4.397 . . .
0.01 kg Batu apung 324 M.4.012 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.04 oh Tukang Cat 5,792 L.4.010 . . .
0.00 oh Kepala tukang 790 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-480 1.00 m2 Pengecatan Bidang Kayu Lama 43,192 0.16 . 20,304 - 22,888
0.15 kg Plamir 8,880 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.17 kg Cat kayu 9,333 M.4.385 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.08 oh Tukang Cat 10,860 L.4.010 . . .
0.01 oh Kepala tukang 1,481 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-481 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 241,900
Lapis Cat 0.09
Penutup . 10,451 - 31,449
0.20 kg Cat meni 3,620 M.4.386 . . .
0.15 kg Plamir 8,880 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.26 kg Cat kayu 14,274 M.4.385 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.01 oh Tukang Cat 1,303 L.4.010 . . .
0.01 oh Kepala tukang 1,184 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-482 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 360,347
Lapis Cat 0.18
Penutup . 23,957 - 36,390
0.20 kg Cat meni 3,620 M.4.386 . . .
0.15 kg Plamir 8,880 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.35 kg Cat kayu 19,215 M.4.385 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.11 oh Tukang Cat 15,204 L.4.010 . . .
0.00 oh Kepala tukang 790 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-483 1.00 m2 Pelaburan Bidang Kayu dengan Teak Oil 32,447 0.17 . 26,363 - 6,084
0.36 ltr Teak oil 6,084 M.4.401 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.06 oh Tukang Cat 9,122 L.4.010 . . .
0.06 oh Kepala tukang 12,436 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-484 1.00 m2 Pelaburan Bidang Kayu dengan Pelitur 44,683 0.08 . 12,439 - 32,244
0.15 ltr Politur 5,415 M.4.400 . . .
0.37 ltr Politur 13,429 M.4.400 . . .
2.00 lbr Amplas 13,400 M.4.548 . . .
0.06 oh Tukang cat 8,688 L.4.010 . . .
0.02 oh Kepala Tukang 3,158 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-485 1.00 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 14,996 0.11 . 11,951 - 3,045

www.mitra-arsitek.com 180/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 ltr Residu 3,045 M.4.560 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-486 1.00 m2 Pelaburan Bidang Kayu dengan Vernis 65,699 0.34 . 43,767 - 21,932
0.15 Ltr Vernis 18,975 M.4.403 . . .
0.05 Kg Dempul 2,100 M.4.388 . . .
0.10 Lbr Amplas 670 M.4.548 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.16 oh Pekerja 16,848 L.4.001 . . .
0.16 oh Tukang Cat 23,168 L.4.010 . . .
0.02 oh Kepala tukang 3,158 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-487 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
31,744 ) 0.09 . 13,064 - 18,680
0.10 Kg Plamir 5,920 M.4.399 . . .
0.10 Kg Cat dasar 2,750 M.4.378 . . .
0.26 Kg Cat Penutup Tembok 10,010 M.4.387 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.06 oh Tukang Cat 9,122 L.4.010 . . .
0.01 oh Kepala tukang 1,244 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-488 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,681 0.08 . 10,451 - 10,230
0.12 kg Cat dasar 3,300 M.4.378 . . .
0.18 lbr Cat Penutup Tembok 6,930 M.4.387 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.04 oh Tukang Cat 6,082 L.4.010 . . .
0.00 oh Kepala tukang 829 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-489 1.00 m2 Melabur tembok dengan kalkarium 10,981 0.08 . 10,451 - 530
0.10 kg Kalkarium 530 M.4.592 . . .
0.03 oh Pekerja 2,948 L.4.001 . . .
0.04 oh Tukang Cat 6,082 L.4.010 . . .
0.00 oh Kepala tukang 829 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-490 1.00 m2 Melabur Tembok dengan Kapur Sirih 22,304 0.15 . 16,552 2,862 2,890
0.10 Lbr Amplas 670 M.4.548 . . .
0.25 ikat Alang-alang 150 M.4.003 . . .
0.00 m3 Perancah Kayu 2,862 T.4.011 . . .
0.15 Kg Kapur Sirih 2,070 M.4.023 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.00 oh Tukang Cat 145 L.4.010 . . .
0.00 oh Kepala tukang 20 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-491 1.00 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 12,629 0.05 . 5,627 2,862 4,140
0.00 m3 Perancah Kayu 2,862 T.4.011 . . .
0.30 Kg Kapur Sirih 4,140 M.4.023 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.01 oh Tukang Cat 724 L.4.010 . . .
0.00 oh Kepala tukang 99 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-492 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi 40,780 0.25 . 37,383 - 3,397

www.mitra-arsitek.com 181/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 Kg Meni besi 3,210 M.4.393 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.20 oh Tukang Cat 28,960 L.4.010 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-493 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 71,382 0.51 . 65,123 2,862 3,397
0.10 Kg Meni besi 3,210 M.4.393 . . .
0.01 Bh Kuas 187 M.4.390 . . .
0.00 m3 Perancah kayu 2,862 T.4.011 . . .
0.25 oh Pekerja 26,325 L.4.001 . . .
0.23 oh Tukang Cat 32,580 L.4.010 . . .
0.02 oh Kepala tukang 4,442 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-494 1.00 m2 Pemasangan Wall Paper 88,273 0.22 . 32,053 - 56,220
1.20 m3 Wallpaper 47,040 M.4.374 . . .
0.20 Kg Perekat 9,180 M.4.559 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.20 oh Tukang Cat 28,960 L.4.010 . . .
0.00 oh Kepala tukang 395 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-495 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
20,1414 Lapis
0.04
Cat Konvensional,
. tebal 2007,719
um 2,862 9,560
0.10 Kg Meni ( Read Lead ) A 3,680 M.4.391 . . .
0.10 Kg Meni ( Read Lead ) B 3,500 M.4.392 . . .
0.04 Kg Alluminium C 1,024 M.4.119 . . .
0.04 Kg Alluminium B 992 M.4.118 . . .
0.01 Ltr Pengencer 364 M.4.398 . . .
0.00 m3 Perancah Kayu 2,862 T.4.011 . . .
0.01 oh Pekerja 632 L.4.001 . . .
0.01 oh Tukang Cat 869 L.4.010 . . .
0.02 oh Kepala tukang 4,442 L.4.036 . . .
0.01 oh Mandor 1,777 L.4.035 . . .
SNI-2002 S-496 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
22,7401 Lapis
0.08
Cat Mutakhir,
. tebal 200 um
13,110 - 9,630
0.30 Kg Meni Besi 9,630 M.4.393 . . .
0.01 oh Pekerja 632 L.4.001 . . .
0.06 oh Tukang Cat 8,688 L.4.010 . . .
0.01 oh Kepala tukang 2,369 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-497 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
290,4623 Lapis
1.80
Cat Konvensional,
. tebal275,090
200 um - 15,372
0.11 Kg Cat Dasar 3,025 M.4.378 . . .
0.17 Kg Cat Antara 8,347 M.4.376 . . .
0.08 Kg Cat Besi 4,000 M.4.377 . . .
0.50 oh Pekerja 52,650 L.4.001 . . .
0.80 oh Tukang Cat 115,840 L.4.010 . . .
0.30 oh Kepala tukang 59,220 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2002 S-498 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot 238,590
( Airless Spray
1.50
) dgn Sistem
. 1 Lapis Cat
230,340
Mutakhir, tebal -200 um 8,250
0.30 Kg Cat Dasar 8,250 M.4.378 . . .
0.40 oh Pekerja 42,120 L.4.001 . . .
0.70 oh Tukang Cat 101,360 L.4.010 . . .

www.mitra-arsitek.com 182/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Kepala tukang 39,480 L.4.036 . . .
0.20 oh Mandor 47,380 L.4.035 . . .
SNI-2002 S-499 1.00 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 17,007 0.15 . 16,387 - 620
0.05 Kg Sabun 620 M.4.561 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-500 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir 871,530
( Sanblasting4.50
) dgn Tingkat
. Kebersihan
676,530
Sa 2½. - 195,000
40.00 Kg Pasir Silika 96,000 M.4.031 . . .
10.00 Ltr Bahan Bakar 99,000 M.4.549 . . .
1.60 oh Pekerja 168,480 L.4.001 . . .
1.60 oh Tukang Cat 231,680 L.4.010 . . .
0.80 oh Kepala tukang 157,920 L.4.036 . . .
0.50 oh Mandor 118,450 L.4.035 . . .
SNI-2002 S-501 1.00 m2 Menyabun Permukaan Tembok Lama 17,007 0.15 . 16,387 - 620
0.05 Kg Sabun 620 M.4.561 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
AK-SNI 2008 S-502 1.00 m2 Pengecatan tembok tidak terlindung dari panas dan hujan 40,686 0.09 . 13,064 - 27,622
0.10 kg Cat alkali resisting primer 3,430 M.4.375 . . .
0.36 kg Cat ICI Weathershield 24,192 M.4.384 . . .
0.06 oh Tukang cat 9,122 L.4.010 . . .
0.01 oh Kepala Tukang 1,244 L.4.036 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.00 oh Mandor 592 L.4.035 . . .
AK-SNI 2008 S-503 1.00 m2 Pengecatan bidang besi ( 3 x ) 43,370 0.18 . 23,957 - 19,413
0.17 kg Cat meni 3,023 M.4.386 . . .
0.20 kg Cat besi 10,000 M.4.377 . . .
0.15 ltr Tinner 6,390 M.4.402 . . .
0.07 oh Pekerja 7,371 L.4.001 . . .
0.11 oh Tukang cat 15,204 L.4.010 . . .
0.00 oh Kepala Tukang 790 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
AK-SNI 2008 S-504 1.00 m2 Pengetiran kayu ( 2 x ) 14,760 0.11 . 11,715 - 3,045
0.35 kg Residu 3,045 M.4.560 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
AK-SNI 2008 S-505 1.00 m2 Pekerjaan cat duco 3 x 105,724 0.54 . 72,791 - 32,933
0.43 kg Cat duco 29,835 M.4.382 . . .
0.06 ltr Tinner 2,428 M.4.402 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.10 lbr Amplas 670 M.4.548 . . .
0.30 oh Tukang cat 43,440 L.4.010 . . .
0.03 oh Kepala Tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-506 1.00 m2 Mengecat genteng 37,256 0.09 . 13,064 - 24,192
0.36 kg Cat ICI Weathershield 24,192 M.4.384 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.06 oh Tukang cat 9,122 L.4.010 . . .
0.01 oh Kepala Tukang 1,244 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .

www.mitra-arsitek.com 183/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-507 1.00 m2 Mengecat kerb 3 kali 92,456 0.54 . 72,791 - 19,665
0.43 kg Cat emco 17,510 M.4.383 . . .
0.06 ltr Minyak cat 2,155 M.4.397 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang cat 43,440 L.4.010 . . .
0.03 oh Kepala Tukang 5,922 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-SNI 2008 S-508 1.00 m2 Memasang Prodo Mas 24 karat 5,187,268 9.10 . 1,580,680 - 3,606,588
1.20 m2 Prodo 3,600,000 M.4.597 . . .
0.12 kg Cat kayu 6,588 M.4.385 . . .
0.10 oh Tukang cat 14,480 L.4.010 . . .
8.00 oh Tukang Prodo 1,368,800 L.4.022 . . .
1.00 oh Kepala tukang 197,400 L.4.036 . . .
AK-SNI 2008 S-509 1.00 m2 Mengerjakan Cat Sungging 889,800 5.82 . 860,516 - 29,285
0.12 kg Cat meni 2,172 M.4.386 . . .
0.04 oh Tukang cat 5,792 L.4.010 . . .
0.00 oh Kepala Tukang 790 L.4.036 . . .
0.07 oh Pekerja 7,024 L.4.001 . . .
0.00 oh Mandor 782 L.4.035 . . .
0.43 kg Cat kayu 23,333 M.4.385 . . .
0.10 ltr Minyak cat 3,780 M.4.397 . . .
5.00 oh Tukang cat 724,000 L.4.010 . . .
0.50 oh Kepala Tukang 98,700 L.4.036 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-510 1.00 bh Memasang Kloset Duduk / Monoblok 3,043,371 4.56 . 559,281 9,090 2,475,000
1.00 bh Kloset duduk / monoblock 2,475,000 M.4.191 . . .
0.06 Ls Perlengkapan Kloset 9,090 T.4.015 . . .
3.30 oh Pekerja 347,490 L.4.001 . . .
1.10 oh Tukang batu 173,690 L.4.007 . . .
0.00 oh Kepala Tukang 197 L.4.036 . . .
0.16 oh Mandor 37,904 L.4.035 . . .
SNI-2002 S-511 1.00 bh Memasang 1Kloset Jongkok Porselen 856,901 4.16 . 676,154 - 180,747
1.00 bh Kloset jongkok porselen 166,500 M.4.192 . . .
6.00 kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
1.50 oh Tukang batu 236,850 L.4.007 . . .
1.50 oh Kepala Tukang 296,100 L.4.036 . . .
0.16 oh Mandor 37,904 L.4.035 . . .
SNI-2002 S-512 1.00 bh Memasang Kloset Jongkok Teraso 721,176 2.91 . 427,429 - 293,747
1.00 bh Kloset jongkok teraso 272,500 M.4.193 . . .
7.00 bh Bata merah 7,000 M.4.007 . . .
6.00 kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
1.50 oh Tukang batu 236,850 L.4.007 . . .
0.30 oh Kepala Tukang 59,220 L.4.036 . . .
0.11 oh Mandor 26,059 L.4.035 . . .
SNI-2002 S-513 1.00 bh Memasang Urinoir 1,722,977 2.20 . 306,630 44,100 1,372,247

www.mitra-arsitek.com 184/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Urinoir 1,358,000 M.4.200 . . .
0.30 Ls Perlengkapan Urinoir 44,100 T.4.017 . . .
6.00 kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
1.00 oh Tukang batu 157,900 L.4.007 . . .
0.10 oh Kepala Tukang 19,740 L.4.036 . . .
0.10 oh Mandor 23,690 L.4.035 . . .
SNI-2002 S-514 1.00 bh Memasang Wastafel 1,920,402 2.90 . 408,615 18,540 1,493,247
1.00 bh Wastafel 1,479,000 M.4.201 . . .
0.12 Ls Perlengkapan Wastafel 18,540 T.4.018 . . .
6.00 kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
1.20 oh Pekerja 126,360 L.4.001 . . .
1.45 oh Tukang batu 228,955 L.4.007 . . .
0.15 oh Kepala Tukang 29,610 L.4.036 . . .
0.10 oh Mandor 23,690 L.4.035 . . .
SNI-2002 S-515 1.00 bh Memasang Bak Mandi Fiberglass, volume 0.30 m³ 1,120,085 5.15 . 748,525 29,160 342,400
1.00 bh Bak fiberglass 342,400 M.4.186 . . .
0.18 Ls Perlengkapan Bak 29,160 T.4.014 . . .
1.80 oh Pekerja 189,540 L.4.001 . . .
2.70 oh Tukang batu 426,330 L.4.007 . . .
0.54 oh Kepala Tukang 106,596 L.4.036 . . .
0.11 oh Mandor 26,059 L.4.035 . . .
SNI-2002 S-516 1.00 bh Memasang Badkip Porselen 371,418 2.08 . 324,418 31,800 15,200
1.00 bh Badkip 15,200 M.4.586 . . .
0.20 Ls Perlengkapan Badkip 31,800 T.4.013 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
0.08 oh Tukang batu 11,843 L.4.007 . . .
0.75 oh Kepala Tukang 148,050 L.4.036 . . .
0.25 oh Mandor 59,225 L.4.035 . . .
SNI-2002 S-517 1.00 bh Memasang Bak Fiberglass volume 1 m³ air 1,779,160 9.30 . 1,417,320 19,440 342,400
1.00 bh Bak fiberglass 342,400 M.4.186 . . .
0.12 Ls Perlengkapan Bak 19,440 T.4.014 . . .
3.00 oh Pekerja 315,900 L.4.001 . . .
4.50 oh Tukang batu 710,550 L.4.007 . . .
0.90 oh Kepala Tukang 177,660 L.4.036 . . .
0.90 oh Mandor 213,210 L.4.035 . . .
SNI-2002 S-518 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 97,681 0.10 . 12,239 - 85,442
1.60 bh Pipa tanah 78,240 M.4.198 . . .
0.68 kg Semen 1,360 M.4.033 . . .
0.01 m3 Pasir pasang 2,921 M.4.030 . . .
0.01 m3 Pasir urug 2,921 M.4.032 . . .
0.06 oh Pekerja 6,318 L.4.001 . . .
0.03 oh Tukang batu 4,737 L.4.007 . . .
0.00 oh Kepala Tukang 592 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-519 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 104,031 0.13 . 17,188 - 86,843
1.60 bh Pipa tanah 78,240 M.4.198 . . .
0.87 Kg Semen 1,740 M.4.033 . . .

www.mitra-arsitek.com 185/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Pasir pasang 3,146 M.4.030 . . .
0.01 m3 Pasir urug 3,717 M.4.032 . . .
0.08 oh Pekerja 8,424 L.4.001 . . .
0.04 oh Tukang batu 6,316 L.4.007 . . .
0.00 oh Kepala Tukang 790 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-520 1.00 m1 Memasang Pipa Beton Ø 5 cm - 20 cm 135,210 0.22 . 28,835 - 106,375
1.10 bh Pipa beton 63,580 M.4.196 . . .
16.00 bh Bata merah 16,000 M.4.007 . . .
3.92 kg Semen 7,840 M.4.033 . . .
0.06 m3 Pasir pasang 12,583 M.4.030 . . .
0.02 m3 Pasir urug 6,372 M.4.032 . . .
0.14 oh Pekerja 14,742 L.4.001 . . .
0.07 oh Tukang batu 11,053 L.4.007 . . .
0.01 oh Kepala Tukang 1,382 L.4.036 . . .
0.01 oh Mandor 1,658 L.4.035 . . .
SNI-2002 S-521 1.00 m1 Memasang Pipa Beton Ø 30 cm - 100 cm 524,473 0.61 . 78,267 - 446,206
1.10 bh Pipa beton 63,580 M.4.196 . . .
330.00 bh Bata merah 330,000 M.4.007 . . .
10.30 kg Semen 20,600 M.4.033 . . .
0.06 m3 Pasir pasang 13,707 M.4.030 . . .
0.07 m3 Pasir urug 18,320 M.4.032 . . .
0.38 oh Pekerja 40,014 L.4.001 . . .
0.19 oh Tukang batu 30,001 L.4.007 . . .
0.02 oh Kepala Tukang 3,751 L.4.036 . . .
0.02 oh Mandor 4,501 L.4.035 . . .
SNI-2002 S-522 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t =749,092
35 cm 4.23 . 501,315 - 247,777
87.00 bh Bata merah 87,000 M.4.007 . . .
44.00 kg Semen 88,000 M.4.033 . . .
0.07 m3 Pasir pasang 15,729 M.4.030 . . .
0.07 m3 Kerikil 17,934 M.4.024 . . .
1.60 kg Besi beton 21,600 M.4.132 . . .
0.06 m3 Pasir beton 17,514 M.4.028 . . .
3.20 oh Pekerja 336,960 L.4.001 . . .
1.02 oh Tukang batu 160,269 L.4.007 . . .
0.00 oh Kepala Tukang 296 L.4.036 . . .
0.02 oh Mandor 3,790 L.4.035 . . .
SNI-2002 S-523 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t =650,016
50 cm 2.01 . 250,310 - 399,706
150.00 bh Bata merah 150,000 M.4.007 . . .
77.00 kg Semen 154,000 M.4.033 . . .
0.13 m3 Pasir pasang 29,211 M.4.030 . . .
0.02 m3 Kerikil 5,124 M.4.024 . . .
2.60 kg Besi beton 35,100 M.4.132 . . .
0.09 m3 Pasir beton 26,271 M.4.028 . . .
1.42 oh Pekerja 149,526 L.4.001 . . .
0.47 oh Tukang batu 74,687 L.4.007 . . .
0.05 oh Kepala Tukang 9,278 L.4.036 . . .
0.07 oh Mandor 16,820 L.4.035 . . .
SNI-2002 S-524 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t =994,666
65 cm 3.16 . 394,364 - 600,302
222.00 bh Bata merah 222,000 M.4.007 . . .

www.mitra-arsitek.com 186/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
114.00 kg Semen 228,000 M.4.033 . . .
0.18 m3 Pasir pasang 41,345 M.4.030 . . .
0.03 m3 Kerikil 8,455 M.4.024 . . .
4.85 kg Besi beton 65,475 M.4.132 . . .
0.12 m3 Pasir beton 35,028 M.4.028 . . .
2.16 oh Pekerja 227,448 L.4.001 . . .
0.72 oh Tukang batu 113,688 L.4.007 . . .
0.07 oh Kepala Tukang 14,213 L.4.036 . . .
0.11 oh Mandor 25,585 L.4.035 . . .
0.10 oh Tukang Gali 13,430 L.4.031 . . .
SNI-2002 S-525 1.00 m1 Memasang Pipa Galvanis Ø ½" 108,335 0.18 . 28,070 53,025 27,240
1.20 m1 Pipa galvanis ½” 27,240 M.4.212 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.05 oh Pekerja 5,686 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.03 oh Mandor 6,396 L.4.035 . . .
SNI-2002 S-526 1.00 m1 Memasang Pipa Galvanis Ø ¾" 111,455 0.18 . 28,070 53,025 30,360
1.20 m1 Pipa galvanis 3/4” 30,360 M.4.213 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.05 oh Pekerja 5,686 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.03 oh Mandor 6,396 L.4.035 . . .
SNI-2002 S-527 1.00 m1 Memasang Pipa Galvanis Ø 1" 130,535 0.18 . 28,070 53,025 49,440
1.20 m1 Pipa galvanis 1” 49,440 M.4.214 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.05 oh Pekerja 5,686 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.03 oh Mandor 6,396 L.4.035 . . .
SNI-2002 S-528 1.00 m1 Memasang Pipa Galvanis Ø 1½" 192,572 0.31 . 44,627 53,025 94,920
1.20 m1 Pipa galvanis 11/2” 94,920 M.4.215 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.11 oh Pekerja 11,372 L.4.001 . . .
0.18 oh Tukang batu 28,422 L.4.007 . . .
0.02 oh Kepala Tukang 3,553 L.4.036 . . .
0.01 oh Mandor 1,279 L.4.035 . . .
SNI-2002 S-529 1.00 m1 Memasang Pipa Galvanis Ø 3" 221,252 0.31 . 44,627 53,025 123,600
1.20 m1 Pipa galvanis 3” 123,600 M.4.216 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.11 oh Pekerja 11,372 L.4.001 . . .
0.18 oh Tukang batu 28,422 L.4.007 . . .
0.02 oh Kepala Tukang 3,553 L.4.036 . . .
0.01 oh Mandor 1,279 L.4.035 . . .
SNI-2002 S-530 1.00 m1 Memasang Pipa Galvanis Ø 4" 266,500 0.39 . 55,795 53,025 157,680
1.20 m1 Pipa galvanis 4” 157,680 M.4.217 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.14 oh Pekerja 14,216 L.4.001 . . .
0.23 oh Tukang batu 35,528 L.4.007 . . .

www.mitra-arsitek.com 187/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Kepala Tukang 4,442 L.4.036 . . .
0.01 oh Mandor 1,611 L.4.035 . . .
SNI-2002 S-531 1.00 m1 Memasang Pipa PVC tipe AW Ø ½" 73,061 0.10 . 14,876 53,025 5,160
1.20 m1 Pipa PVC 1/2" 5,160 M.4.203 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.04 oh Pekerja 3,791 L.4.001 . . .
0.06 oh Tukang batu 9,474 L.4.007 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.00 oh Mandor 426 L.4.035 . . .
SNI-2002 S-532 1.00 m1 Memasang Pipa PVC tipe AW Ø ¾" 74,381 0.10 . 14,876 53,025 6,480
1.20 m1 Pipa PVC 3/4" 6,480 M.4.204 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.04 oh Pekerja 3,791 L.4.001 . . .
0.06 oh Tukang batu 9,474 L.4.007 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.00 oh Mandor 426 L.4.035 . . .
SNI-2002 S-533 1.00 m1 Memasang Pipa PVC tipe AW Ø 1" 74,981 0.10 . 14,876 53,025 7,080
1.20 m1 Pipa PVC 1” 7,080 M.4.205 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.04 oh Pekerja 3,791 L.4.001 . . .
0.06 oh Tukang batu 9,474 L.4.007 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.00 oh Mandor 426 L.4.035 . . .
SNI-2002 S-534 1.00 m1 Memasang Pipa PVC tipe AW Ø 1½" 75,581 0.10 . 14,876 53,025 7,680
1.20 m1 Pipa PVC 11/2” 7,680 M.4.206 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.04 oh Pekerja 3,791 L.4.001 . . .
0.06 oh Tukang batu 9,474 L.4.007 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.00 oh Mandor 426 L.4.035 . . .
SNI-2002 S-535 1.00 m1 Memasang Pipa PVC tipe AW Ø 2" 84,021 0.16 . 22,356 53,025 8,640
1.20 m1 Pipa PVC 2” 8,640 M.4.207 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.05 oh Pekerja 5,728 L.4.001 . . .
0.09 oh Tukang batu 14,211 L.4.007 . . .
0.01 oh Kepala Tukang 1,777 L.4.036 . . .
0.00 oh Mandor 640 L.4.035 . . .
SNI-2002 S-536 1.00 m1 Memasang Pipa PVC tipe AW Ø 2½" 77,261 0.10 . 14,876 53,025 9,360
1.20 m1 Pipa PVC 21/2” 9,360 M.4.208 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.04 oh Pekerja 3,791 L.4.001 . . .
0.06 oh Tukang batu 9,474 L.4.007 . . .
0.01 oh Kepala Tukang 1,184 L.4.036 . . .
0.00 oh Mandor 426 L.4.035 . . .
SNI-2002 S-537 1.00 m1 Memasang Pipa PVC tipe AW Ø 3" 95,987 0.23 . 33,482 53,025 9,480
1.20 m1 Pipa PVC 3" 9,480 M.4.209 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.08 oh Pekerja 8,529 L.4.001 . . .
0.14 oh Tukang batu 21,317 L.4.007 . . .
0.01 oh Kepala Tukang 2,665 L.4.036 . . .

www.mitra-arsitek.com 188/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 971 L.4.035 . . .
SNI-2002 S-538 1.00 m1 Memasang Pipa PVC tipe AW Ø 4" 102,346 0.23 . 38,281 53,025 11,040
1.20 m1 Pipa PVC 4" 11,040 M.4.211 . . .
0.35 Ls Perlengkapan Pipa 53,025 T.4.016 . . .
0.08 oh Pekerja 8,529 L.4.001 . . .
0.14 oh Kepala Tukang 26,649 L.4.036 . . .
0.01 oh Tukang batu 2,132 L.4.007 . . .
0.00 oh Mandor 971 L.4.035 . . .
SNI-2002 S-539 1.00 bh Memasang Bak Cuci Piring Stainles Steel 554,206 0.36 . 56,806 - 497,400
1.00 bh Bak cuci piring 421,400 M.4.185 . . .
1.00 set Waterdrain 76,000 M.4.202 . . .
0.03 oh Pekerja 3,159 L.4.001 . . .
0.30 oh Tukang batu 47,370 L.4.007 . . .
0.03 oh Kepala Tukang 5,922 L.4.036 . . .
0.00 oh Mandor 355 L.4.035 . . .
SNI-2002 S-540 1.00 bh Memasang Bak Cuci Piring Teraso 643,312 0.60 . 94,677 - 548,635
1.00 bh Bak cuci piring 421,400 M.4.185 . . .
1.00 set Waterdrain 76,000 M.4.202 . . .
20.00 kg Semen 40,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,235 M.4.030 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.50 oh Tukang batu 78,950 L.4.007 . . .
0.05 oh Kepala Tukang 9,870 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-541 1.00 bh Memasang Kran Ø ¾" atau ½" 45,894 0.13 . 20,002 - 25,893
1.00 bh Kran air 25,800 M.4.194 . . .
0.03 bh Sealtape 93 M.4.599 . . .
0.01 oh Pekerja 1,053 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-542 1.00 bh Memasang Floor Drain 83,002 0.13 . 20,002 - 63,000
1.00 bh Floor drain 63,000 M.4.189 . . .
0.01 oh Pekerja 1,053 L.4.001 . . .
0.10 oh Tukang batu 15,790 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-543 1.00 bh Memasang Bak Mandi Teraso, volume 0.30 m3 581,579 3.03 . 379,432 - 202,147
1.00 bh Bak mandi teraso 187,900 M.4.187 . . .
6.00 kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
2.10 oh Pekerja 221,130 L.4.001 . . .
0.75 oh Tukang batu 118,425 L.4.007 . . .
0.07 oh Kepala Tukang 13,818 L.4.036 . . .
0.11 oh Mandor 26,059 L.4.035 . . .
SNI-2002 S-544 1.00 bh Memasang bak mandi batu bata volume 0,30 m3 4,214,400 9.60 . 1,235,790 - 2,978,610
240.00 bh Bata merah 240,000 M.4.007 . . .
120.00 Kg Semen 240,000 M.4.033 . . .
0.30 m3 Pasir pasang 67,410 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,376,000 M.4.449 . . .

www.mitra-arsitek.com 189/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
6.00 Kg Semen nat 55,200 M.4.035 . . .
6.00 oh Pekerja 631,800 L.4.001 . . .
3.00 oh Tukang batu 473,700 L.4.007 . . .
0.30 oh Kepala Tukang 59,220 L.4.036 . . .
0.30 oh Mandor 71,070 L.4.035 . . .
SNI-2002 S-545 1.00 bh Membuat bak beton volume 1 m3 air 5,442,980 9.80 . 1,469,970 28,310 3,944,700
0.90 m3 Beton kedap air 268,200 M.4.532 . . .
180.00 kg Besi beton 2,430,000 M.4.132 . . .
8.00 m2 Kayu cetakan 1,212,000 M.4.046 . . .
5.00 m2 Ubin porselen 34,500 M.4.463 . . .
0.10 Ls Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
3.50 oh Pekerja 368,550 L.4.001 . . .
4.50 oh Tukang batu 710,550 L.4.007 . . .
0.90 oh Kepala Tukang 177,660 L.4.036 . . .
0.90 oh Mandor 213,210 L.4.035 . . .
SNI-2007 S-546 1.00 kg Memasang besi profil 34,841 0.13 . 16,901 - 17,940
1.15 kg Besi profil 17,940 M.4.137 . . .
0.06 oh Pekerja 6,318 L.4.001 . . .
0.06 oh Tukang las 8,688 L.4.017 . . .
0.01 oh Kepala tukang 1,184 L.4.036 . . .
0.00 oh Mandor 711 L.4.035 . . .
SNI-2007 S-547 100.00 kg Mengerjakan pekerjaan perakitan 98,792 0.21 . 27,842 58,240 12,710
1.00 lte Solar 9,100 M.4.563 . . .
0.10 ltr Minyak pelumas 3,610 M.4.557 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang besi 15,930 L.4.008 . . .
0.00 oh Kepala tukang 197 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
0.80 Jam Sewa alat perakitan baja 58,240 T.4.021 . . .
SNI-2007 S-548 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja882,751
siku 2.26 . 310,876 - 571,875
15.00 kg Besi siku L 30.30.3 205,500 M.4.139 . . .
32.80 kg Besi plat baja 364,080 M.4.136 . . .
0.05 kg Kawat las listrik 2,295 M.4.150 . . .
1.05 oh Pekerja 110,565 L.4.001 . . .
1.05 oh Tukang besi 167,265 L.4.008 . . .
0.11 oh Kepala tukang 20,727 L.4.036 . . .
0.05 oh Mandor 12,319 L.4.035 . . .
SNI-2007 S-549 10.00 cm Mengerjakan pengelasan dengan las listrik 59,361 0.06 . 8,267 28,560 22,534
0.40 kg Kawat las listrik 18,360 M.4.150 . . .
0.30 ltr Solar 2,730 M.4.563 . . .
0.04 ltr Minyak pelumas 1,444 M.4.557 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.02 oh Tukang besi 3,186 L.4.008 . . .
0.00 oh Kepala tukang 395 L.4.036 . . .
0.00 oh Mandor 474 L.4.035 . . .
0.17 Jam Sewa alat las 28,560 T.4.020 . . .
SNI-2007 S-550 1.00 m2 Membuat rangka jendela besi square tube (25 x 5) cm 640,783 1.40 . 192,402 - 448,381
4.76 m1 Besi square tube 136,612 M.4.140 . . .
4.52 m1 Besi lis kaca (1 x 1) cm 219,769 M.4.135 . . .
20.00 cm Pengelasan 92,000 M.4.596 . . .

www.mitra-arsitek.com 190/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.65 oh Pekerja 68,445 L.4.001 . . .
0.65 oh Tukang besi 103,545 L.4.008 . . .
0.07 oh Kepala tukang 12,831 L.4.036 . . .
0.03 oh Mandor 7,581 L.4.035 . . .
SNI-2007 S-551 1.00 m2 Memasang pintu rolling door besi 898,129 2.53 . 342,629 - 555,500
1.00 m2 Pintu gulung besi 555,500 M.4.176 . . .
1.20 oh Pekerja 126,360 L.4.001 . . .
1.20 oh Tukang besi 191,160 L.4.008 . . .
0.12 oh Kepala tukang 23,688 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2007 S-552 1.00 m2 Memasang pintu lipat (Folding door) 640,321 0.95 . 130,321 - 510,000
1.00 m2 Pintu lipat 510,000 M.4.585 . . .
0.44 oh Pekerja 46,332 L.4.001 . . .
0.44 oh Tukang besi 70,092 L.4.008 . . .
0.04 oh Kepala tukang 8,686 L.4.036 . . .
0.02 oh Mandor 5,212 L.4.035 . . .
SNI-2007 S-553 1.00 m2 Memasang sunscreen alluminium 425,104 0.96 . 152,604 - 272,500
1.00 m2 Sunscreen alumunium 272,500 M.4.184 . . .
0.08 oh Pekerja 8,424 L.4.001 . . .
0.80 oh Tukang besi 127,440 L.4.008 . . .
0.08 oh Kepala tukang 15,792 L.4.036 . . .
0.00 oh Mandor 948 L.4.035 . . .
SNI-2007 S-554 1.00 m2 Memasang rolling door alluminium 862,985 2.15 . 296,185 - 566,800
1.00 m2 Rolling door alluminium 566,800 M.4.180 . . .
1.00 oh Pekerja 105,300 L.4.001 . . .
1.00 oh Tukang besi 159,300 L.4.008 . . .
0.10 oh Kepala tukang 19,740 L.4.036 . . .
0.05 oh Mandor 11,845 L.4.035 . . .
SNI-2007 S-555 1.00 m1 Memasang kusen pintu alluminium 170,212 0.09 . 12,664 - 157,548
1.10 m1 Profil kusen alluminium 142,560 M.4.178 . . .
2.00 bh Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 14,388 M.4.598 . . .
0.04 oh Pekerja 4,528 L.4.001 . . .
0.04 oh Tukang besi konstruksi 6,790 L.4.009 . . .
0.00 oh Kepala tukang 849 L.4.036 . . .
0.00 oh Mandor 497 L.4.035 . . .
SNI-2007 S-556 1.00 m2 Memasang pintu alluminium strip lebar 8 cm 977,805 0.18 . 25,045 - 952,760
4.40 m1 Profil kusen alluminium 570,240 M.4.178 . . .
14.60 m1 Aluminium strip 382,520 M.4.122 . . .
0.09 oh Pekerja 8,951 L.4.001 . . .
0.09 oh Tukang besi konstruksi 13,422 L.4.009 . . .
0.01 oh Kepala tukang 1,678 L.4.036 . . .
0.00 oh Mandor 995 L.4.035 . . .
SNI-2007 S-557 1.00 m2 Memasang pintu kaca rangka alluminium 2,447,748 0.18 . 25,452 - 2,422,296
4.40 m1 Pintu alluminium 2,059,200 M.4.174 . . .
4.50 m1 Profil kaca 298,350 M.4.529 . . .
0.27 tube Sealant 64,746 M.4.598 . . .
0.09 oh Pekerja 8,951 L.4.001 . . .
0.09 oh Tukang besi 13,541 L.4.008 . . .
0.01 oh Kepala tukang 1,777 L.4.036 . . .

www.mitra-arsitek.com 191/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2007 S-558 1.00 m2 Memasang venetions blinds dan Vertical blinds 176,583 0.75 . 103,783 - 72,800
1.00 m2 Venetions blinds dan vertical blinds (tirai) 72,800 M.4.604 . . .
0.35 oh Pekerja 36,855 L.4.001 . . .
0.35 oh Tukang besi 55,755 L.4.008 . . .
0.04 oh Kepala tukang 6,909 L.4.036 . . .
0.02 oh Mandor 4,264 L.4.035 . . .
SNI-2007 S-559 1.00 m2 Memasang terali besi strip (2 x 3) mm 704,939 3.59 . 494,511 - 210,428
6.18 kg Baja strip (0,2 x 2) cm 85,860 M.4.128 . . .
27.08 cm Pengelasan 124,568 M.4.596 . . .
1.67 oh Pekerja 175,851 L.4.001 . . .
1.67 oh Tukang besi 266,031 L.4.008 . . .
0.17 oh Kepala tukang 32,966 L.4.036 . . .
0.08 oh Mandor 19,663 L.4.035 . . .
SNI-2007 S-560 1.00 m2 Memasang kawat nyamuk dengan plepet baja strip 119,317 0.22 . 29,619 - 89,698
1.10 m2 Kawat nyamuk 14,740 M.4.152 . . .
11.11 cm Pengelasan 51,106 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 23,852 M.4.128 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang besi 15,930 L.4.008 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-561 1.00 m2 Pasang kawat nyamuk dengan plepet kayu 55,628 0.21 . 28,412 - 27,215
1.10 m2 Kawat nyamuk 14,740 M.4.152 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,989 M.4.096 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2007 S-562 1.00 m2 Memasang jendela nako & tralis 225,745 0.42 . 57,105 - 168,640
1.10 m2 Jendela nako (rangka + kaca 5 mm) 65,340 M.4.577 . . .
10.00 bh Paku skrup 1 cm – 2,5 cm 6,000 M.4.167 . . .
7.00 m1 Baja strip (0,2 x 2) cm 97,300 M.4.128 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.20 oh Tukang besi 31,860 L.4.008 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.00 oh Mandor 237 L.4.035 . . .
SNI-2007 S-563 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
130,570 0.49 . 71,402 - 59,168
1.05 m Seng Gelombang 3" x 6" BJLS 28 51,975 M.4.368 . . .
0.01 kg Paku Biasa ½" - 1" 243 M.4.157 . . .
0.50 kg Baja strip (0,2 x 2) cm 6,950 M.4.128 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.30 oh Tukang besi 47,790 L.4.008 . . .
0.03 oh Kepala tukang 5,922 L.4.036 . . .
0.01 oh Mandor 1,895 L.4.035 . . .
SNI-2002 S-564 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati 213,974 0.58 . 84,186 - 129,788
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu jati papan 94,848 M.4.094 . . .

www.mitra-arsitek.com 192/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.25 kg Flincoat 9,825 M.4.389 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-565 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal) 211,238 0.58 . 84,186 - 127,052
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu jati (lokal) papan 92,112 M.4.093 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-566 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper 183,069 0.58 . 84,186 - 98,883
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu kamper papan 63,944 M.4.096 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-567 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing 161,894 0.58 . 84,186 - 77,708
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu kruing papan 42,768 M.4.098 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-568 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 180,926 0.58 . 84,186 - 96,740
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu bengkirai papan 61,800 M.4.092 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.15 oh Pekerja 15,795 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-569 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1) 316,190 0.47 . 72,603 - 243,587
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu jati papan (klas 1) 206,682 M.4.095 . . .
0.30 kg Flincoat 11,790 M.4.389 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .

www.mitra-arsitek.com 193/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2002 S-570 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal) 289,848 0.47 . 72,603 - 217,245
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu jati (lokal) papan 182,305 M.4.093 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-571 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper 234,098 0.47 . 72,603 - 161,495
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu kamper papan 126,555 M.4.096 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-572 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing 192,188 0.47 . 72,603 - 119,585
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu kruing papan 84,645 M.4.098 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-573 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 229,855 0.47 . 72,603 - 157,252
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 24,750 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu bengkirai papan 122,313 M.4.092 . . .
0.25 kg Flincoat 9,825 M.4.389 . . .
0.04 oh Pekerja 4,212 L.4.001 . . .
0.40 oh Tukang kayu 63,160 L.4.016 . . .
0.03 oh Kepala Tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
AK-SNI 2008 S-574 1.00 m1 Pasang talang torong 1,541,884 6.49 . 934,384 - 607,500
10.00 m1 Seng Gelombang 3" x 6" BJLS 28 495,000 M.4.368 . . .
225.00 bh Paku sumbat 112,500 M.4.170 . . .
2.25 oh Pekerja 236,925 L.4.001 . . .
3.75 oh Tukang besi 597,375 L.4.008 . . .
0.38 oh Kepala Tukang 74,025 L.4.036 . . .
0.11 oh Mandor 26,059 L.4.035 . . .
SNI-2002 S-575 1.00 m2 Pasang jendela besi 1,106,831 2.21 . 298,331 - 808,500
1.00 m2 Jendela besi 808,500 M.4.575 . . .
1.05 oh Pekerja 110,565 L.4.001 . . .
1.05 oh Tukang besi konstruksi 165,795 L.4.009 . . .
0.11 oh Kepala Tukang 20,727 L.4.036 . . .
0.01 oh Mandor 1,244 L.4.035 . . .
SNI-2002 S-576 1.00 m2 Pasang jendela besi tahan api 1,130,706 2.35 . 322,206 - 808,500

www.mitra-arsitek.com 194/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 m2 Jendela besi 808,500 M.4.575 . . .
1.02 oh Pekerja 107,617 L.4.001 . . .
1.20 oh Tukang besi konstruksi 189,480 L.4.009 . . .
0.12 oh Kepala Tukang 23,688 L.4.036 . . .
0.01 oh Mandor 1,421 L.4.035 . . .
SNI-2002 S-577 1.00 m2 Pasang pintu alumunium 533,419 2.21 . 298,319 - 235,100
1.00 m2 Pintu alumunium 235,100 M.4.175 . . .
1.05 oh Pekerja 110,565 L.4.001 . . .
1.05 oh Tukang besi konstruksi 165,795 L.4.009 . . .
0.11 oh Kepala Tukang 20,727 L.4.036 . . .
0.01 oh Mandor 1,232 L.4.035 . . .
SNI-2002 S-578 1.00 m2 Pasang kawat harmonika 88,078 0.21 . 28,412 - 59,665
1.10 m2 Kawat harmonika 47,190 M.4.147 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,989 M.4.096 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2002 S-579 1.00 m2 Pasang kawat kassa 54,638 0.21 . 28,412 - 26,225
1.10 m2 Kawat kassa 13,750 M.4.149 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,989 M.4.096 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2002 S-580 1.00 m2 Pasang kawat burung 58,378 0.21 . 28,412 - 29,965
1.10 m2 Kawat burung 17,490 M.4.144 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,989 M.4.096 . . .
0.10 oh Pekerja 10,530 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2002 S-581 1.00 bh Pasang kunci Tanam Antik 383,613 0.72 . 113,613 - 270,000
1.00 bh kunci Tanam Antik 270,000 M.4.582 . . .
0.06 oh Pekerja 6,318 L.4.001 . . .
0.60 oh Tukang kayu 94,740 L.4.016 . . .
0.06 oh Kepala tukang 11,844 L.4.036 . . .
0.00 oh Mandor 711 L.4.035 . . .
SNI-2002 S-582 1.00 bh Pasang kunci Tanam Biasa 226,162 0.53 . 83,162 - 143,000
1.00 bh Kunci tanam biasa 143,000 M.4.583 . . .
0.01 oh Pekerja 1,053 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.01 oh Mandor 1,185 L.4.035 . . .
SNI-2002 S-583 1.00 bh Pasang kunci Tanam Kamar Mandi 129,556 0.51 . 81,056 - 48,500
1.00 bh Kunci tanam KM 48,500 M.4.584 . . .
0.01 oh Pekerja 527 L.4.001 . . .

www.mitra-arsitek.com 195/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-584 1.00 bh Pasang kunci Silinder 154,823 0.51 . 80,523 - 74,300
1.00 bh Kunci silinder 74,300 M.4.580 . . .
0.01 oh Pekerja 527 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.01 oh Kepala tukang 987 L.4.036 . . .
0.00 oh Mandor 59 L.4.035 . . .
SNI-2002 S-585 1.00 bh Pasang Engsel Pintu 47,003 0.18 . 28,403 - 18,600
1.00 bh Engsel pintu 18,600 M.4.574 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-586 1.00 bh Pasang Engsel Jendela Kupu - kupu 29,035 0.12 . 18,935 - 10,100
1.00 bh Engsel jendela 10,100 M.4.572 . . .
0.01 oh Pekerja 1,053 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2002 S-587 1.00 bh Buah Pasang Engsel Angin 47,903 0.25 . 40,003 - 7,900
1.00 bh Engsel angin 7,900 M.4.571 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
SNI-2002 S-588 1.00 bh Pasang Spring Knip 36,603 0.18 . 28,403 - 8,200
1.00 bh Spring knip 8,200 M.4.600 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-589 1.00 bh Pasang Kait angin 34,203 0.18 . 28,403 - 5,800
1.00 bh Kait angin 5,800 M.4.142 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-590 1.00 bh Pasang Door Closer 367,177 0.60 . 94,677 - 272,500
1.00 bh Door closer 272,500 M.4.568 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.05 oh Kepala tukang 9,870 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-591 1.00 bh Pasang kunci selot 91,871 0.24 . 37,871 - 54,000
1.00 bh Kunci slot 54,000 M.4.581 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.20 oh Tukang kayu 31,580 L.4.016 . . .
0.02 oh Kepala tukang 3,948 L.4.036 . . .

www.mitra-arsitek.com 196/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 237 L.4.035 . . .
SNI-2002 S-592 1.00 bh Pasang pegangan pintu / door holder 196,577 0.60 . 94,677 - 101,900
1.00 bh Door holder 101,900 M.4.569 . . .
0.05 oh Pekerja 5,265 L.4.001 . . .
0.50 oh Tukang kayu 78,950 L.4.016 . . .
0.05 oh Kepala tukang 9,870 L.4.036 . . .
0.00 oh Mandor 592 L.4.035 . . .
SNI-2002 S-593 1.00 bh Pasang door stop 125,835 0.12 . 18,935 - 106,900
1.00 bh Door stop 106,900 M.4.570 . . .
0.01 oh Pekerja 1,053 L.4.001 . . .
0.10 oh Tukang kayu 15,790 L.4.016 . . .
0.01 oh Kepala tukang 1,974 L.4.036 . . .
0.00 oh Mandor 118 L.4.035 . . .
SNI-2002 S-594 1.00 bh Pasang rel pintu dorong 329,613 0.72 . 113,613 - 216,000
1.00 bh Rel pintu dorong 216,000 M.4.179 . . .
0.06 oh Pekerja 6,318 L.4.001 . . .
0.60 oh Tukang kayu 94,740 L.4.016 . . .
0.06 oh Kepala tukang 11,844 L.4.036 . . .
0.00 oh Mandor 711 L.4.035 . . .
SNI-2002 S-595 1.00 bh Pasang kunci lemari 59,939 0.30 . 47,339 - 12,600
1.00 bh Kunci lemari 12,600 M.4.579 . . .
0.03 oh Pekerja 2,633 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-596 1.00 m2 Pasang kaca, tebal 3 mm 153,033 0.18 . 28,403 - 124,630
1.10 m2 Kaca polos 124,630 M.4.524 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-597 1.00 m2 Pasang kaca, tebal 5 mm 153,033 0.18 . 28,403 - 124,630
1.10 m2 Kaca polos 124,630 M.4.524 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-598 1.00 m2 Pasang kaca, tebal 8 mm 155,868 0.20 . 31,238 - 124,630
1.10 m2 Kaca polos 124,630 M.4.524 . . .
0.02 oh Pekerja 1,737 L.4.001 . . .
0.17 oh Tukang kayu 26,054 L.4.016 . . .
0.02 oh Kepala tukang 3,257 L.4.036 . . .
0.00 oh Mandor 190 L.4.035 . . .
SNI-2002 S-599 1.00 m2 Pasang kaca buram, tebal 12 mm 230,489 0.30 . 47,339 - 183,150
1.10 m2 Kaca buram 12 mm 183,150 M.4.520 . . .
0.03 oh Pekerja 2,633 L.4.001 . . .
0.25 oh Tukang kayu 39,475 L.4.016 . . .
0.03 oh Kepala tukang 4,935 L.4.036 . . .
0.00 oh Mandor 296 L.4.035 . . .
SNI-2002 S-600 1.00 m2 Pasang kaca cermin, tebal 5 mm 212,213 0.18 . 28,403 - 183,810

www.mitra-arsitek.com 197/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 m2 Kaca cermin 5 mm 183,810 M.4.521 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-601 1.00 m2 Pasang kaca cermin, tebal 6 mm 28,403 0.18 . 28,403 - -
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-602 1.00 m2 Pasang kaca cermin, tebal 8 mm 215,048 0.20 . 31,238 - 183,810
1.10 m2 Kaca cermin 5 mm 183,810 M.4.521 . . .
0.02 oh Pekerja 1,737 L.4.001 . . .
0.17 oh Tukang kayu 26,054 L.4.016 . . .
0.02 oh Kepala tukang 3,257 L.4.036 . . .
0.00 oh Mandor 190 L.4.035 . . .
SNI-2002 S-603 1.00 m2 Pasang kaca "wireglass", tebal 5 mm 284,373 0.18 . 28,403 - 255,970
1.10 m2 Kaca wire glass 255,970 M.4.528 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
SNI-2002 S-604 1.00 m2 Pasang kaca patri, tebal 5 mm 120,033 0.18 . 28,403 - 91,630
1.10 m2 Kaca patri 5mm 91,630 M.4.523 . . .
0.02 oh Pekerja 1,580 L.4.001 . . .
0.15 oh Tukang kayu 23,685 L.4.016 . . .
0.02 oh Kepala tukang 2,961 L.4.036 . . .
0.00 oh Mandor 178 L.4.035 . . .
. . . .
. . . .
DAFTAR ANALISA TAMBAHAN . . . .
Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Data Empiris/Data Pelaksanaan Di Lapangan . . . .
. . . .
. . . .
. . . .
STANDAR ID Koef. Unit Uraian - - . - - -
. . . .
AK-I.2016.(1) A-001 1.00 Ls Pekerjaan Mobilisasi dan demobilisasi 3,224,000 - . - - 3,224,000
2.00 Ls Upah Kerja Mobiliasasi/Demobilisasi 1,782,000 M.4.608 . . .
2.00 Ls Alat Kerja Mobilisasi/Demobilisasi 882,000 M.4.609 . . .
2.00 Ls Bahan Kerja Mobilisasi/Demobilisasi 560,000 M.4.610 . . .
AK-I.2016.(2) A-002 1.00 unit Pekerjaan Pasangan Pintu utama type P1 2,365,660 1.40 . 202,660 105,000 2,058,000
1.00 set Pintu Utama (Kusen+Panel) Type P1 2,058,000 M.4.622 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.50 Oh Pekerja 52,650 L.4.001 . . .
0.80 Oh Tukang Kayu 126,320 L.4.016 . . .
0.10 Oh Mandor 23,690 L.4.035 . . .
AK-I.2016.(3) A-003 1.00 unit Pekerjaan Pasangan Pintu Ruangan type P2 2,099,660 1.40 . 202,660 105,000 1,792,000
1.00 set Pintu Utama (Kusen+Panel) Type P2 1,792,000 M.4.623 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .

www.mitra-arsitek.com 198/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 Oh Pekerja 52,650 L.4.001 . . .
0.80 Oh Tukang Kayu 126,320 L.4.016 . . .
0.10 Oh Mandor 23,690 L.4.035 . . .
AK-I.2016.(4) A-004 1.00 unit Pekerjaan Pasangan Pintu WC type P3 1,407,660 1.40 . 202,660 105,000 1,100,000
1.00 set Pintu Utama (Kusen+Panel) Type P3 1,100,000 M.4.624 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.50 Oh Pekerja 52,650 L.4.001 . . .
0.80 Oh Tukang Kayu 126,320 L.4.016 . . .
0.10 Oh Mandor 23,690 L.4.035 . . .
AK-I.2016.(5) A-005 unit Pekerjaan Pasangan Jendela type J1 1,190,275 0.95 . 138,175 52,500 999,600
1.00 set Jendela Type J1 999,600 M.4.625 . . .
0.20 Ls Perlengkapan 52,500 T.4.012 . . .
0.30 Oh Pekerja 31,590 L.4.001 . . .
0.60 Oh Tukang Kayu 94,740 L.4.016 . . .
0.05 Oh Mandor 11,845 L.4.035 . . .
AK-I.2016.(6) A-006 unit Pekerjaan Pasangan Jendela type J2 888,553 1.37 . 195,553 105,000 588,000
1.00 set Jendela Type J2 588,000 M.4.626 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.50 Oh Pekerja 52,650 L.4.001 . . .
0.80 Oh Tukang Kayu 126,320 L.4.016 . . .
0.07 Oh Mandor 16,583 L.4.035 . . .
AK-I.2016.(7) A-007 1.00 unit Pekerjaan Pasangan Jendela type J3 3,024,510 1.70 . 239,510 210,000 2,575,000
1.00 set Jendela Type J3 2,575,000 M.4.627 . . .
0.80 Ls Perlengkapan 210,000 T.4.012 . . .
0.70 Oh Pekerja 73,710 L.4.001 . . .
0.90 Oh Tukang Kayu 142,110 L.4.016 . . .
0.10 Oh Mandor 23,690 L.4.035 . . .
AK-I.2016.(8) A-008 1.00 unit Pekerjaan Pasangan Lubang Angin/Roster 41,742 0.07 . 11,317 2,625 27,800
1.00 Unit Lubang Angin 27,800 M.4.628 . . .
0.01 Ls Perlengkapan 2,625 T.4.012 . . .
0.01 Oh Pekerja 1,053 L.4.001 . . .
0.05 Oh Tukang Batu 7,895 L.4.007 . . .
0.01 Oh Mandor 2,369 L.4.035 . . .
AK-I.2016.(9) A-009 unit Pekerjaan Pasangan Shower Mandi 204,113 0.33 . 41,463 26,250 136,400
1.00 Unit Shower Mandi 136,400 M.4.619 . . .
0.10 Ls Perlengkapan 26,250 T.4.012 . . .
0.20 Oh Pekerja 21,060 L.4.001 . . .
0.10 Oh Tukang Pipa 14,480 L.4.020 . . .
0.03 Oh Mandor 5,923 L.4.035 . . .
AK-I.2016.(10) A-010 unit Pekerjaan Pasangan Tangki Air 1,589,773 0.78 . 94,773 157,500 1,337,500
1.00 Unit Tangki Air 1,337,500 M.4.620 . . .
0.60 Ls Perlengkapan 157,500 T.4.012 . . .
0.50 Oh Pekerja 52,650 L.4.001 . . .
0.25 Oh Tukang Pipa 36,200 L.4.020 . . .
0.03 Oh Mandor 5,923 L.4.035 . . .
AK-I.2016.(11) A-011 unit Pekerjaan Pasangan Pompa Air 792,818 0.62 . 75,818 105,000 612,000
1.00 Unit Pompa Air 612,000 M.4.621 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.40 Oh Pekerja 42,120 L.4.001 . . .
0.20 Oh Tukang Pipa 28,960 L.4.020 . . .

www.mitra-arsitek.com 199/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 Oh Mandor 4,738 L.4.035 . . .
AK-I.2016.(12) A-012 m3 Pekerjaan Septik Tank Volume 1 m3 8,499,500 1.00 . - - 8,499,500
1.00 oh/m3 Upah Kerja Pembuatan Septik Tank 1,500,000 M.4.611 . . .
1.00 Ls Alat Kerja Pembuatan Septik Tank 499,500 M.4.612 . . .
1.00 Ls Bahan Kerja Pembuatan Septik Tank 6,500,000 M.4.613 . . .
AK-I.2016.(13) A-013 m3 Pekerjaan Sumur Resapan Air Hujan/Limbah Volume 1 m3 6,062,000 1.00 . - - 6,062,000
1.00 oh/m3 Upah Kerja Pembuatan Sumur Resapan Limbah 1,122,000 M.4.614 . . .
1.00 Ls Alat Kerja Pembuatan Sumur Resapan Limbah 350,000 M.4.615 . . .
1.00 Ls Bahan Kerja Pembuatan Sumur Resapan Limbah 4,590,000 M.4.616 . . .
AK-I.2016.(14) A-014 Unit Pekerjaan Pasangan Box MCB 567,578 0.62 . 81,078 105,000 381,500
1.00 Unit MCB + Box 381,500 M.4.629 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.40 Oh Pekerja 42,120 L.4.001 . . .
0.20 Oh Tukang Listrik 34,220 L.4.019 . . .
0.02 Oh Mandor 4,738 L.4.035 . . .
AK-I.2016.(15) A-015 btg Pekerjaan Pasangan Pembumian (Grounding) 849,078 0.62 . 81,078 105,000 663,000
1.00 btg Tembaga dia.1/2"-1.5m 663,000 M.4.630 . . .
0.40 Ls Perlengkapan 105,000 T.4.012 . . .
0.40 Oh Pekerja 42,120 L.4.001 . . .
0.20 Oh Tukang Listrik 34,220 L.4.019 . . .
0.02 Oh Mandor 4,738 L.4.035 . . .
AK-I.2016.(16) A-016 m1 Pekerjaan Instalasi Kabel NYM-3x2.5m2 22,748 0.03 . 4,291 3,938 14,520
1.10 m1 Kabel NYM 3x2,5 mm2-SNI 14,520 M.4.631 . . .
0.02 Ls Perlengkapan 3,938 T.4.012 . . .
0.02 Oh Pekerja 2,106 L.4.001 . . .
0.01 Oh Tukang Listrik 1,711 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(17) A-017 m1 Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 19,126 0.03 . 4,291 2,625 12,210
1.10 m1 Kabel NYM 2x1,5 mm2-SNI 12,210 M.4.632 . . .
0.01 Ls Perlengkapan 2,625 T.4.012 . . .
0.02 Oh Pekerja 2,106 L.4.001 . . .
0.01 Oh Tukang Listrik 1,711 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(18) A-018 Unit Pekerjaan Pasangan Fitting Lampu 39,158 0.06 . 8,108 5,250 25,800
1.00 unit Fitting Lampu 25,800 M.4.512 . . .
0.02 Ls Perlengkapan 5,250 T.4.012 . . .
0.04 Oh Pekerja 4,212 L.4.001 . . .
0.02 Oh Tukang Listrik 3,422 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(19) A-019 unit Pekerjaan Pasangan Saklar Lampu 42,408 0.06 . 8,108 6,300 28,000
1.00 unit Saklar Listrik 28,000 M.4.633 . . .
0.02 Ls Perlengkapan 6,300 T.4.012 . . .
0.04 Oh Pekerja 4,212 L.4.001 . . .
0.02 Oh Tukang Listrik 3,422 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(20) A-020 unit Pekerjaan Pasangan Lampu 5 W 33,085 0.05 . 6,160 2,625 24,300
1.00 unit Lampu 5W 24,300 M.4.634 . . .
0.01 Ls Perlengkapan 2,625 T.4.012 . . .
0.04 Oh Pekerja 4,212 L.4.001 . . .
0.01 Oh Tukang Listrik 1,711 L.4.019 . . .

www.mitra-arsitek.com 200/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 Oh Mandor 237 L.4.035 . . .
AK-I.2016.(21) A-021 unit Pekerjaan Pasangan Lampu 15 W 46,285 0.05 . 6,160 2,625 37,500
1.00 unit Lampu 15W 37,500 M.4.635 . . .
0.01 Ls Perlengkapan 2,625 T.4.012 . . .
0.04 Oh Pekerja 4,212 L.4.001 . . .
0.01 Oh Tukang Listrik 1,711 L.4.019 . . .
0.00 Oh Mandor 237 L.4.035 . . .
AK-I.2016.(22) A-022 unit Pekerjaan Pasangan Lampu 20 W 56,985 0.05 . 6,160 2,625 48,200
1.00 unit Lampu 20W 48,200 M.4.636 . . .
0.01 Ls Perlengkapan 2,625 T.4.012 . . .
0.04 Oh Pekerja 4,212 L.4.001 . . .
0.01 Oh Tukang Listrik 1,711 L.4.019 . . .
0.00 Oh Mandor 237 L.4.035 . . .
AK-I.2016.(23) A-023 unit Pekerjaan Pasangan Colokan Listrik (Receiptackle) 47,881 0.06 . 8,318 6,563 33,000
1.00 unit Receiptackle 33,000 M.4.637 . . .
0.03 Ls Perlengkapan 6,563 T.4.012 . . .
0.04 Oh Pekerja 4,423 L.4.001 . . .
0.02 Oh Tukang Listrik 3,422 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(24) A-024 unit Pekerjaan Pasangan Air Conditioner 3,470,881 0.06 . 8,318 6,563 3,456,000
1.00 unit Air Conditioner 3,456,000 M.4.638 . . .
0.03 Ls Perlengkapan 6,563 T.4.012 . . .
0.04 Oh Pekerja 4,423 L.4.001 . . .
0.02 Oh Tukang Listrik 3,422 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(25) A-025 unit Pekerjaan Pasangan Exhaust Fan 809,881 0.06 . 8,318 6,563 795,000
1.00 unit Exhaust Fan 795,000 M.4.639 . . .
0.03 Ls Perlengkapan 6,563 T.4.012 . . .
0.04 Oh Pekerja 4,423 L.4.001 . . .
0.02 Oh Tukang Listrik 3,422 L.4.019 . . .
0.00 Oh Mandor 474 L.4.035 . . .
AK-I.2016.(26) A-026 Ls Penyambungan Instalasi Listrik PLN 5,390,000 - . - - 5,390,000
1.00 Ls Biaya Pengurusan Daya Listrik PLN 5,390,000 M.4.617 . . .
AK-I.2016.(27) A-027 Ls Penyambungan Instalasi Air PDAM 2,450,000 - . - - 2,450,000
1.00 Ls Biaya Pengurusan Instalasai PDAM 2,450,000 M.4.618 . . .
AK-I.2016.(28) A-028 m2 Pekerjaan Pekerjaan Plamir (1 Lapis) 25,855 0.11 . 16,585 - 9,270
0.10 kg Plamir 5,920 M.4.399 . . .
0.50 Lbr Amplas 3,350 M.4.548 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.07 oh Tukang Cat 10,136 L.4.010 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
AK-I.2016.(29) A-029 m2 Pekerjaan Cat Anti Lumut dan Waterproofing 21,923 0.11 . 16,585 248 5,090
0.10 kg Cat Anti Bocor+Waterproofing 1,740 M.4.640 . . .
0.50 Lbr Amplas 3,350 M.4.548 . . .
0.01 ea Rol Cat 248 T.4.032 . . .
0.02 oh Pekerja 2,106 L.4.001 . . .
0.07 oh Tukang Cat 10,136 L.4.010 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .

www.mitra-arsitek.com 201/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-I.2016.(30) A-030 pohon Pekerjaan Menanam Pohon Perdu 578,273 0.52 . 72,773 10,500 495,000
1.00 unit Pohon Perdu 495,000 M.4.641 . . .
0.04 Ls Perlengkapan 10,500 T.4.012 . . .
0.20 oh Pekerja 21,060 L.4.001 . . .
0.30 oh Tukang Batu 47,370 L.4.007 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.01 oh Mandor 2,369 L.4.035 . . .
A.2.2.1.9.a A-031 1.00 m2 Pembersihan Area Kerja Pasca Konstruksi 16,847 0.13 . 16,847 - -
0.10 OH Pekerja 10,530 L.4.001 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
. . . .
. . . .
ANALISA SATUAN PEKERJAAN BAJA . . . .
A.4.2.1.1.(a) A-032 1.00 kg Pekerjaan perakitan baja siku 32,876 0.11 . 14,176 252 18,448
1.03 kg Baja Siku 16,195 M.4.126 . . .
0.04 kg Kawat las listrik 1,836 M.4.150 . . .
0.03 ltr solar 273 M.4.563 . . .
0.00 ltr Minyak pelumas 144 M.4.557 . . .
0.00 unit Sewa alat las 252 T.4.020 . . .
0.03 oh tukang las 4,344 L.4.017 . . .
0.01 oh Kepala Tukang 1,579 L.4.036 . . .
0.08 oh pekerja 7,898 L.4.001 . . .
0.00 oh mandor 355 L.4.035 . . .
A.4.2.1.1.(b) A-033 1.00 kg Pekerjaan Perakitan baja WF 32,631 0.10 . 12,136 420 20,075
1.03 kg Baja WF 18,655 M.4.127 . . .
0.03 kg Kawat las listrik 1,148 M.4.150 . . .
0.02 ltr solar 182 M.4.563 . . .
0.00 ltr Minyak pelumas 90 M.4.557 . . .
0.00 unit Sewa alat las 420 T.4.020 . . .
0.02 oh Tukang las 2,896 L.4.017 . . .
0.01 oh Kepala Tukang 987 L.4.036 . . .
0.08 oh pekerja 7,898 L.4.001 . . .
0.00 oh mandor 355 L.4.035 . . .
A.4.2.1.1.(c) A-034 1.00 cm Pemotongan Baja dengan Las Oxy Acetilene 14,857 0.01 . 798 1,680 12,379
0.003 Cyl Gas Oxigen 4,535 M.4.564 . . .
0.004 Cyl Gas Aceteline 7,844 M.4.565 . . .
0.01 jam Sewa alat las 1,680 T.4.020 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.002 oh Tukang Las 290 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 47 L.4.035 . . .
A.4.2.1.1.(d) A-035 1.00 cm Pemotongan Baja dengan Mesin Gerinda Potong 3,050 0.01 . 798 2,253 -
0.017 jam Sewa mesin gerinda potong 2,253 T.4.031 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.002 oh Tukang Las 290 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 47 L.4.035 . . .
A.4.2.1.1.(e) A-036 1.00 cm Penyambungan Pengelasan Busur Las Listrik (Arc Welding) 5,907 0.01 . 798 2,856 2,253
0.04 kg Kawat las listrik 1,836 M.4.150 . . .

www.mitra-arsitek.com 202/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 ltr Solar 273 M.4.563 . . .
0.004 ltr Minyak pelumas 144 M.4.557 . . .
0.017 jam Sewa alat las 2,856 T.4.020 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.002 oh Tukang Las 290 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 47 L.4.035 . . .
A.4.2.1.1.(f) A-037 1.00 cm Penyambungan Pengelasan Las Gas (Gas Welding) 10,959 0.01 . 798 2,856 7,306
0.04 kg Kawat las gas 1,872 M.4.151 . . .
0.001 Cyl Gas Oxigen 1,512 M.4.564 . . .
0.002 Cyl Gas Aceteline 3,922 M.4.565 . . .
0.017 jam Sewa alat las 2,856 T.4.020 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.002 oh Tukang Las 290 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 47 L.4.035 . . .
A.4.2.1.1.(g) A-038 1.00 cm Pekerjaan Sambungan Dengan Solder (Pateri Lunak) 17,634 0.01 . 1,869 1,680 14,085
0.01 kg Kawat Solder (Timah) 9,100 M.4.566 . . .
0.002 Cyl Gas Oxigen 3,024 M.4.564 . . .
0.001 Cyl Gas Aceteline 1,961 M.4.565 . . .
0.01 jam Sewa alat las 1,680 T.4.020 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.007 oh Tukang Las 1,014 L.4.017 . . .
0.001 oh Kepala Tukang 197 L.4.036 . . .
0.001 oh Mandor 237 L.4.035 . . .
A.4.2.1.1.(h) A-039 1.00 cm Pekerjaan Sambungan Dengan Brazing (Pateri Keras) 35,639 0.01 . 1,869 1,680 32,090
0.01 kg Kawat Brazing (Kuningan) 10,640 M.4.567 . . .
0.009 Cyl Gas Oxigen 13,606 M.4.564 . . .
0.004 Cyl Gas Aceteline 7,844 M.4.565 . . .
0.01 jam Sewa alat las 1,680 T.4.020 . . .
0.004 oh Pekerja 421 L.4.001 . . .
0.007 oh Tukang Las 1,014 L.4.017 . . .
0.001 oh Kepala Tukang 197 L.4.036 . . .
0.001 oh Mandor 237 L.4.035 . . .
A.4.2.1.1.(i) A-040 1.00 m2 Meratakan Permukaan Baja dengan Gerinda 105,769 0.27 . 31,459 22,300 52,010
0.7 bh Batu Gerinda 52,010 M.4.551 . . .
0.5 jam Sewa Perlengkapan Gerinda 22,300 T.4.030 . . .
0.2 oh Pekerja 21,060 L.4.001 . . .
0.05 oh Tukang Las 7,240 L.4.017 . . .
0.01 oh Kepala Tukang 1,974 L.4.036 . . .
0.005 oh Mandor 1,185 L.4.035 . . .

AHSP PUPR 2022 (Permen PUPR No.1 th 2022)


A.1.1.1.11 K-001 1.00 m2 Pembuatan1 m2 Steger/Perancah dari Bambu sd Tinggi 6 meter 513,636 3.25 . 472,425 - 41,211
1.00 OH Pekerja 105,300 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
0.20 OH Kepala Tukang 39,480 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.25 Batang Bambu Ø 6 - 8 / 600 cm 36,375 M.4.041 . . .

www.mitra-arsitek.com 203/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.19 m3 Tali ijuk 4,836 M.4.602 . . .
A.1.1.1.15 K-002 1.00 m2 Pemasangan 1m2 Pagar BRC Galvanis 31,804 0.09 . 15,399 - 16,405
0.04 OH Pekerja 4,423 L.4.001 . . .
0.00 OH Tukang Kayu 632 L.4.016 . . .
0.00 OH Kepala Tukang 395 L.4.036 . . .
0.04 OH Mandor 9,950 L.4.035 . . .
0.14 Lbr Kawat jaring 16,405 M.4.148 . . .
A.1.1.1.16 K-003 1.00 m2 Pemasangan 1 m2 Panel Beton Pracetak 50x50x240cm untuk Pagar 487,883 0.53 . 66,095 - 421,788
0.38 OH Pekerja 39,488 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 4,501 L.4.035 . . .
0.99 Lbr Panel Beton Pracetak 162,690 M.4.540 . . .
0.53 Batang Kolom Beton Pracetak 110,093 M.4.539 . . .
45.00 Kg Semen 90,000 M.4.033 . . .
0.07 m3 Pasir beton 21,601 M.4.028 . . .
0.15 m3 Kerikil 37,405 M.4.024 . . .
A.1.5.1.13 K-004 1.00 m2 Pemasangan 1 m2 Lapisan Ijuk Tebal 10cm untuk Bidang Resapan1,254,149 0.17 . 19,349 - 1,234,800
0.15 OH Pekerja 15,795 L.4.001 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
6.00 kg Ijuk 1,234,800 M.4.019 . . .
A.3.2.1.9 K-005 1.00 m3 Pemasangan 1 m3 Batu Kosong (Aanstamping) untuk Pondasi Gedung608,709 1.25 . 160,653 - 448,056
0.78 OH Pekerja 82,134 L.4.001 . . .
0.39 OH Tukang Batu 61,581 L.4.007 . . .
0.04 OH Kepala Tukang 7,699 L.4.036 . . .
0.04 OH Mandor 9,239 L.4.035 . . .
1.20 m3 Batu belah 333,360 M.4.013 . . .
0.43 m3 Pasir urug 114,696 M.4.032 . . .
A.4.1.1.1 K-006 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 7.4 Mpa (K100) 1,347,357 2.04 . 242,357 - 1,105,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
247.00 kg Semen 494,000 M.4.033 . . .
869.00 kg Pasir Beton (kg) 260,700 M.4.029 . . .
999.00 kg Kerikil (kg) 199,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.2 K-007 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 9.8 Mpa (K125) 1,395,657 2.04 . 242,357 - 1,153,300
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
276.00 kg Semen 552,000 M.4.033 . . .
828.00 kg Pasir Beton (kg) 248,400 M.4.029 . . .
1012 kg Kerikil (kg) 202,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.3 K-008 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 12.2 Mpa (K150) 1,433,957 2.04 . 242,357 - 1,191,600
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .

www.mitra-arsitek.com 204/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Mandor 19,663 L.4.035 . . .
299.00 kg Semen 598,000 M.4.033 . . .
799.00 kg Pasir Beton (kg) 239,700 M.4.029 . . .
1017 kg Kerikil (kg) 203,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.5 K-009 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 14.5 Mpa (K175) 1,478,657 2.04 . 242,357 - 1,236,300
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
326.00 kg Semen 652,000 M.4.033 . . .
760.00 kg Pasir Beton (kg) 228,000 M.4.029 . . .
1029 kg Kerikil (kg) 205,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.6. K-010 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 16.9 Mpa (K200) 1,522,357 2.04 . 242,357 - 1,280,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
352.00 kg Semen 704,000 M.4.033 . . .
731.00 kg Pasir Beton (kg) 219,300 M.4.029 . . .
1031 kg Kerikil (kg) 206,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.7. K-011 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 19.3 Mpa (K225) 1,553,657 2.04 . 242,357 - 1,311,300
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
371.00 kg Semen 742,000 M.4.033 . . .
698.00 kg Pasir Beton (kg) 209,400 M.4.029 . . .
1047 kg Kerikil (kg) 209,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.8. K-012 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 21.7 Mpa (K250) 1,576,257 2.04 . 242,357 - 1,333,900
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
384.00 kg Semen 768,000 M.4.033 . . .
692.00 kg Pasir Beton (kg) 207,600 M.4.029 . . .
1039 kg Kerikil (kg) 207,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.9. K-013 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 24.0 Mpa (K275) 1,615,257 2.04 . 242,357 - 1,372,900
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
406.00 kg Semen 812,000 M.4.033 . . .
684.00 kg Pasir Beton (kg) 205,200 M.4.029 . . .
1,026.00 kg Kerikil (kg) 205,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .

www.mitra-arsitek.com 205/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.1.1.10. K-014 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 26.4 Mpa (K300) 1,627,357 2.04 . 242,357 - 1,385,000
1.65 OH Pekerja 173,745 L.4.001 . . .
0.28 OH Tukang Batu 43,423 L.4.007 . . .
0.03 OH Kepala Tukang 5,527 L.4.036 . . .
0.08 OH Mandor 19,663 L.4.035 . . .
413.00 kg Semen 826,000 M.4.033 . . .
681.00 kg Pasir Beton (kg) 204,300 M.4.029 . . .
1021 kg Kerikil (kg) 204,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.13. K-015 1.00 m3 Pembuatan 1 m3 Beton Kedap Air dengan Aditif Kedap Air 1,651,851 2.59 . 308,179 - 1,343,672
2.10 OH Pekerja 221,130 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.11 OH Mandor 24,875 L.4.035 . . .
400.00 kg Semen 800,000 M.4.033 . . .
0.48 m3 Pasir beton 140,112 M.4.028 . . .
0.80 m3 Kerikil 204,960 M.4.024 . . .
1.20 kg Strorox - 100 51,600 M.4.601 . . .
210.00 Liter Air 147,000 M.4.001 . . .
A.4.1.1.17. K-016 1.00 kg Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- 13,246
M8 0.01 . 1,155 - 12,091
0.00 OH Pekerja 263 L.4.001 . . .
0.00 OH Tukang Besi 398 L.4.008 . . .
0.00 OH Kepala Tukang 494 L.4.036 . . .
1.02 kg Jaring kawat baja dilas 11,934 M.4.591 . . .
0.01 kg Kawat beton 157 M.4.143 . . .
A.4.1.1.18. K-017 … m2 Pemasangan 1 m2 Bekisting untuk Pondasi Telapak Beton BangunanGedung
189,882 0.83 . 107,102 - 82,780
0.52 OH Pekerja 54,756 L.4.001 . . .
0.26 OH Tukang Kayu 41,054 L.4.016 . . .
0.03 OH Kepala Tukang 5,132 L.4.036 . . .
0.03 OH Mandor 6,159 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.30 kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
0.10 Liter Minyak bekisting 580 M.4.556 . . .
A.4.1.1.19. K-018 … m2 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung 199,152 0.83 . 107,102 - 92,050
0.52 OH Pekerja 54,756 L.4.001 . . .
0.26 OH Tukang Kayu 41,054 L.4.016 . . .
0.03 OH Kepala Tukang 5,132 L.4.036 . . .
0.03 OH Mandor 6,159 L.4.035 . . .
0.05 m3 Papan kayu 3/20 Kelas III 83,430 M.4.106 . . .
0.30 kg Paku Biasa 2" - 5" 8,040 M.4.158 . . .
0.10 Liter Minyak bekisting 580 M.4.556 . . .
A.4.1.1.20. K-019 … m2 Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung 370,677 1.06 . 135,937 - 234,740
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 74,160 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Liter Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .

www.mitra-arsitek.com 206/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.21. K-020 … m2 Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung 393,537 1.06 . 135,937 - 257,600
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Kayu balok 5/7 kelas III 85,680 M.4.083 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Liter Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 68,040 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.22. K-021 … m2 Pemasangan 1 m2 Bekisting untuk Plat lantai Beton Bangunan Gedung
497,517 1.06 . 135,937 - 361,580
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.04 m3 Kayu kelas III (papan) 101,000 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Liter Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
6.00 Batang Dolken kayu Ø 8-10/400 cm 150,000 M.4.042 . . .
A.4.1.1.23. K-022 … m2 Pemasangan 1 m2 Bekisting untuk Dinding Sheerwall 435,767 1.06 . 135,937 19,600 280,230
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 75,750 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.20 Liter Minyak bekisting 1,160 M.4.556 . . .
0.02 m3 Balok kayu kelas II 75,600 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
3.00 Batang Dolken kayu Ø 8-10/400 cm 75,000 M.4.042 . . .
4.00 Buah Penjaga jarak bekisting / spacer 19,600 T.4.009 . . .
A.4.1.1.25. K-023 … m2 Pemasangan 1 m2 Bekisting untuk Tangga Beton Bangunan Gedung371,977 1.06 . 135,937 - 236,040
0.66 OH Pekerja 69,498 L.4.001 . . .
0.33 OH Tukang Kayu 52,107 L.4.016 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.03 OH Mandor 7,818 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 75,750 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,720 M.4.158 . . .
0.15 Liter Minyak bekisting 870 M.4.556 . . .
0.02 m3 Balok kayu kelas II 56,700 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 42,000 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 50,000 M.4.042 . . .
A.4.1.1.28 K-024 … m2 Pemasangan bekisting 1 m2 Jembatan untuk Pengecoran Beton 121,812 0.21 . 26,572 - 95,240
0.15 OH Pekerja 15,795 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .

www.mitra-arsitek.com 207/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 66,660 M.4.097 . . .
0.60 kg Paku Biasa 2" - 5" 16,080 M.4.158 . . .
0.50 Batang Dolken kayu Ø 8-10/400 cm 12,500 M.4.042 . . .
A.4.1.2.5. K-025 … m2 Pembuatan 1 m2 Bekisting untuk Pelat Beton Pracetak Komponen Modular
271,103 Bangunan
0.09 Gedung
. (5 kali pakai)
14,554 - 256,549
0.01 OH Pekerja 737 L.4.001 . . .
0.08 OH Tukang Kayu 12,000 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.01 m3 Lantai kerja tebal 10cm 6,300 M.4.595 . . .
9.39 Kg Besi hollow 50.50.3 200,092 M.4.133 . . .
0.01 m3 Kaso 5/7 Kelas II 18,375 M.4.057 . . .
0.08 Lbr Phel film 12mm 11,600 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
3.88 buah Baut Ramset / Dina Bolt 19,022 M.4.130 . . .
A.4.1.2.6. K-026 … m2 Pembuatan 1 m2 Bekisting untuk Balok Beton Pracetak (10-12 kali pakai)
37,846 0.05 . 7,448 - 30,399
0.00 OH Pekerja 421 L.4.001 . . .
0.04 OH Tukang Kayu 6,000 L.4.016 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 18,375 M.4.057 . . .
0.04 Lbr Phel film 12mm 6,235 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
0.05 kg Paku Biasa 2" - 5" 1,233 M.4.158 . . .
0.69 buah Baut Ramset / Dina Bolt 3,396 M.4.130 . . .
A.4.1.2.7. K-027 … m2 Pembuatan 1 m2 Bekisting untuk Kolom Beton Pracetak (10-12 Kali 34,896
Pakai) 0.05 . 7,448 - 27,449
0.00 OH Pekerja 421 L.4.001 . . .
0.04 OH Tukang Kayu 6,000 L.4.016 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
0.00 m3 Kaso 5/7 Kelas II 14,700 M.4.057 . . .
0.05 Lbr Phel film 12mm 6,960 M.4.361 . . .
0.20 L Minyak bekisting 1,160 M.4.556 . . .
0.05 Kg Paku Biasa 2" - 5" 1,233 M.4.158 . . .
0.69 buah Baut Ramset / Dina Bolt 3,396 M.4.130 . . .
A.4.1.2.8. K-028 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Pelat Beton Pracetak9,608 0.08 . 9,608 - -
0.05 OH Pekerja 5,581 L.4.001 . . .
0.02 OH Tukang Kayu 2,842 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.9. K-029 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Balok Beton15,293 Pracetak 0.12 . 15,293 - -
0.09 OH Pekerja 9,372 L.4.001 . . .
0.03 OH Tukang Kayu 4,737 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.10. K-030 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Kolom Beton12,450 Pracetak 0.10 . 12,450 - -
0.07 OH Pekerja 7,476 L.4.001 . . .
0.02 OH Tukang Kayu 3,790 L.4.016 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
A.4.1.2.11. K-031 … m3 Penuangan/Menebar Beton 1 m3 untuk Pelat Beton Pracetak 87,807 0.54 . 87,807 - -
0.06 OH Pekerja 6,739 L.4.001 . . .

www.mitra-arsitek.com 208/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.24 OH Tukang Batu 38,528 L.4.007 . . .
0.13 OH Tukang vibrator 18,534 L.4.024 . . .
0.03 OH Kepala Tukang 6,712 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.12. K-032 … m3 Penuangan/Menebar Beton 1 m3 untuk Balok Beton Pracetak 90,057 0.56 . 90,057 - -
0.07 OH Pekerja 7,266 L.4.001 . . .
0.24 OH Tukang Batu 38,212 L.4.007 . . .
0.14 OH Tukang vibrator 19,982 L.4.024 . . .
0.04 OH Kepala Tukang 7,304 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.13. K-033 … m3 Penuangan/Menebar Beton 1 m3 untuk Kolom Beton Pracetak 81,530 0.50 . 81,530 - -
0.06 OH Pekerja 6,423 L.4.001 . . .
0.21 OH Tukang Batu 33,633 L.4.007 . . .
0.12 OH Tukang vibrator 17,666 L.4.024 . . .
0.03 OH Kepala Tukang 6,514 L.4.036 . . .
0.07 OH Mandor 17,294 L.4.035 . . .
A.4.1.2.14. K-034 … bh Pemasangan 1 buah Komponen untuk Pelat Beton Pracetak Beserta 519,806
Indeks Kenaikan
0.54 Lantai
. Ereksi Pelat Hingga
84,65524 Lantai
435,151 -
0.07 OH Operator crane 9,702 L.4.039 . . .
0.07 OH Pembantu operator crane 8,817 L.4.043 . . .
0.07 OH Pekerja 7,055 L.4.001 . . .
0.07 OH Tukang Batu 10,579 L.4.007 . . .
0.13 OH Tukang ereksi 19,403 L.4.011 . . .
0.07 OH Kepala Tukang 13,226 L.4.036 . . .
0.07 OH Mandor 15,872 L.4.035 . . .
0.07 unit hari Sewa Crane 86,671 T.4.024 . . .
1.10 buah hari Sewa pipe support 348,480 T.4.027 . . .
A.4.1.2.15. K-035 … bh Pemasangan 1 buah Komponen Balok Pracetak Beserta Indeks Kenaikan
183,813
Lantai 0.49
Ereksi. Balok Hingga 24 Lantai
77,074 106,740 -
0.06 OH Operator crane 8,833 L.4.039 . . .
0.06 OH Pembantu operator crane 8,028 L.4.043 . . .
0.06 OH Pekerja 6,423 L.4.001 . . .
0.06 OH Tukang Batu 9,632 L.4.007 . . .
0.12 OH Tukang ereksi 17,666 L.4.011 . . .
0.06 OH Kepala Tukang 12,041 L.4.036 . . .
0.06 OH Mandor 14,451 L.4.035 . . .
0.06 unit hari Sewa crane 78,910 T.4.024 . . .
1.10 unit hari Scafolding 27,830 T.4.019 . . .
A.4.1.2.17. K-036 … bh Pemindahan 1 buah Komponen untuk Pelat Pracetak (± 20 m) 32,579 0.06 . 8,001 24,578 -
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang Batu 6,000 L.4.007 . . .
0.02 unit hari Sewa crane 24,578 T.4.024 . . .
A.4.1.2.18. K-037 … bh Pemindahan 1 buah Komponen untuk Balok Pracetak ( ± 20 m) 32,579 0.06 . 8,001 24,578 -
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang Batu 6,000 L.4.007 . . .
0.02 unit hari Sewa crane 24,578 T.4.024 . . .
A.4.1.2.19. K-038 … bh Pemindahan 1 buah Komponen untuk Kolom Pracetak ( ± 20 m) 32,579 0.06 . 8,001 24,578 -
0.02 OH Pekerja 2,001 L.4.001 . . .
0.04 OH Tukang Batu 6,000 L.4.007 . . .
0.02 unit hari Sewa crane 24,578 T.4.024 . . .
A.4.1.2.22. K-039 … bh Upah 1 titik Pekerjaan Grout pada Joint Beton Pracetak 81,322 0.48 . 81,322 - -
0.37 OH Tukang Batu 57,949 L.4.007 . . .

www.mitra-arsitek.com 209/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Kepala Tukang 14,608 L.4.036 . . .
0.04 OH Mandor 8,765 L.4.035 . . .
A.4.1.2.23. K-040 … titik Pemasangan 1 titik Bekisting Joint Pracetak 104,611 0.31 . 42,836 - 61,775
0.15 OH Pekerja 15,479 L.4.001 . . .
0.15 OH Tukang Kayu 23,211 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 44,100 M.4.057 . . .
0.00 m3 Kayu papan kelas III 10,600 M.4.103 . . .
0.26 Kg Paku Biasa 2" - 5" 7,075 M.4.158 . . .
A.4.1.2.24. K-041 … titik Upah 1 titik Joint dengan Sling 64,292 0.47 . 64,292 - -
0.22 OH Pekerja 23,166 L.4.001 . . .
0.02 OH Tukang Kayu 3,474 L.4.016 . . .
0.22 OH Tukang Besi 35,046 L.4.008 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
A.4.2.1.1. K-042 … kg Pembuatan 1 kg Baja Profil 44,149 0.19 . 23,219 - 20,930
0.06 OH Pekerja 6,318 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,688 L.4.018 . . .
0.01 OH Kepala Tukang 1,184 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.06 OH Pekerja 6,318 L.4.001 . . .
1.15 Kg Baja WF 20,930 M.4.127 . . .
A.4.2.1.7. K-043 … m2 Pemasangan 1 m2 Pintu Rolling Door Besi 880,729 2.53 . 325,229 - 555,500
1.20 OH Pekerja 126,360 L.4.001 . . .
1.20 OH Tukang Las 173,760 L.4.017 . . .
0.12 OH Kepala Tukang 23,688 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.00 m2 Pintu gulung besi 555,500 M.4.176 . . .
A.4.2.1.9. K-044 … m2 Pemasangan 1 m2 Rolling door Aluminium 862,985 2.15 . 296,185 - 566,800
1.00 OH Pekerja 105,300 L.4.001 . . .
1.00 OH Tukang Besi 159,300 L.4.008 . . .
0.10 OH Kepala Tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 m2 Rolling door alluminium 566,800 M.4.180 . . .
A.4.2.1.8. K-045 … m2 Pemasangan 1 m2 Pintu Lipat (Folding Door) BAHAN Plastik/PVC 639,705 0.95 . 129,705 - 510,000
0.44 OH Pekerja 46,332 L.4.001 . . .
0.44 OH Tukang Kayu 69,476 L.4.016 . . .
0.04 OH Kepala Tukang 8,686 L.4.036 . . .
0.02 OH Mandor 5,212 L.4.035 . . .
1.00 m2 Pintu lipat 510,000 M.4.585 . . .
A.4.2.1.9. K-046 … m2 Pemasangan 1 m2 Sunscreen Aluminium 425,104 0.96 . 152,604 - 272,500
0.08 OH Pekerja 8,424 L.4.001 . . .
0.80 OH Tukang Besi 127,440 L.4.008 . . .
0.08 OH Kepala Tukang 15,792 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.00 m2 Sunscreen alumunium 272,500 M.4.184 . . .
A.4.2.1.15. K-047 … m2 Pemasangan 1 m2 Teralis Besi strip (20 x 3) mm 680,724 3.59 . 470,296 - 210,428
1.67 OH Pekerja 175,851 L.4.001 . . .
1.67 OH Tukang Las 241,816 L.4.017 . . .
0.17 OH Kepala Tukang 32,966 L.4.036 . . .

www.mitra-arsitek.com 210/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Mandor 19,663 L.4.035 . . .
6.18 kg Baja strip (0,2 x 2) cm 85,860 M.4.128 . . .
27.08 cm Pengelasan 124,568 M.4.596 . . .
A.4.2.1.16. K-048 … m2 Pemasangan 1 m2 Kawat Nyamuk 119,317 0.22 . 29,619 - 89,698
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Besi 15,930 L.4.008 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.10 m2 Kawat nyamuk 14,740 M.4.152 . . .
11.11 cm Pengelasan 51,106 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 23,852 M.4.128 . . .
A.4.2.1.17. K-049 … m2 Pemasangan 1 m2 Jendela Nako dan Tralis 156,245 0.42 . 57,105 - 99,140
0.20 OH Pekerja 21,060 L.4.001 . . .
0.20 OH Tukang Besi 31,860 L.4.008 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.10 m2 Jendela nako (rangka + kaca 5 mm) 65,340 M.4.577 . . .
10.00 buah Paku skrup 1 cm – 2,5 cm 6,000 M.4.167 . . .
2.00 kg Baja strip (0,2 x 2) cm 27,800 M.4.128 . . .
A.4.2.1.18. K-050 … m1 Pemasangan 1 m’ Talang Datar/Jurai Seng bjls 28 Lebar 90cm 159,794 0.42 . 57,105 - 102,690
0.20 OH Pekerja 21,060 L.4.001 . . .
0.20 OH Tukang Atap 31,860 L.4.006 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 51,975 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu papan kelas III 50,350 M.4.103 . . .
A.4.2.1.19. K-051 … m1 Pemasangan 1 m Talang ½ Lingkaran D-15cm. Seng Pelat bjls 30 130,570 0.49 . 71,402 - 59,168
0.15 OH Pekerja 15,795 L.4.001 . . .
0.30 OH Tukang Atap 47,790 L.4.006 . . .
0.03 OH Kepala Tukang 5,922 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 51,975 M.4.368 . . .
0.01 kg Paku Biasa ½" - 1" 243 M.4.157 . . .
0.50 kg Baja strip (0,2 x 2) cm 6,950 M.4.128 . . .
A.4.2.1.20. K-052 … m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x120cm.
403,465 untuk 0.54Partisi
. 74,165 283,100 46,200
0.25 OH Pekerja 26,325 L.4.001 . . .
0.25 OH Tukang Besi 39,825 L.4.008 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
3.50 m’ Hollow 4/4 46,200 M.4.141 . . .
1.00 Ls Alat Bantu/Perlengkapan Umum 283,100 T.4.001 . . .
A.4.2.1.21. K-053 … m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x60cm.
439,683 untuk 0.75
Plafond
. 103,783 283,100 52,800
0.35 OH Pekerja 36,855 L.4.001 . . .
0.35 OH Tukang Besi 55,755 L.4.008 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
4.00 m’ Hollow 4/4 52,800 M.4.141 . . .
1.00 Ls Alat Bantu/Perlengkapan Umum 283,100 T.4.001 . . .
A.4.2.1.22. K-054 … m2 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin)
440,782
Profil C75
1.58 . 217,392 45,450 177,940

www.mitra-arsitek.com 211/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.73 OH Pekerja 77,290 L.4.001 . . .
0.73 OH Tukang Besi 116,926 L.4.008 . . .
0.07 OH Kepala Tukang 14,410 L.4.036 . . .
0.04 OH Mandor 8,765 L.4.035 . . .
8.20 m Baja Ringan-C Truss 177,940 M.4.125 . . .
0.10 % Alat Rangka Atap Baja Canai Dingin 45,450 T.4.002 . . .
A.4.2.1.23. K-055 … m2 Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai
446,426
Dingin)1.63
Profil .C75 225,206 45,450 175,770
0.76 OH Pekerja 80,070 L.4.001 . . .
0.76 OH Tukang Besi 121,132 L.4.008 . . .
0.08 OH Kepala Tukang 15,002 L.4.036 . . .
0.04 OH Mandor 9,002 L.4.035 . . .
8.10 m Baja Ringan-C Truss 175,770 M.4.125 . . .
0.10 % Alat Rangka Atap Baja Canai Dingin 45,450 T.4.002 . . .
A.4.2.1.24. K-056 … m1 Pemasangan 1 m Kusen Aluminium 42,342 0.09 . 12,724 - 29,618
0.04 OH Pekerja 4,528 L.4.001 . . .
0.04 OH Tukang Besi 6,850 L.4.008 . . .
0.00 OH Kepala Tukang 849 L.4.036 . . .
0.00 OH Mandor 497 L.4.035 . . .
1.10 m Profil Alluminium "T" 14,630 M.4.177 . . .
2.00 buah Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 14,388 M.4.598 . . .
A.4.2.1.25. K-057 … m2 Pemasangan 1 m2 Pintu Aluminium Strip Lebar 8 cm 466,204 0.18 . 25,164 - 441,040
0.09 OH Pekerja 8,951 L.4.001 . . .
0.09 OH Tukang Besi 13,541 L.4.008 . . .
0.01 OH Kepala Tukang 1,678 L.4.036 . . .
0.00 OH Mandor 995 L.4.035 . . .
4.40 m Profil Alluminium "T" 58,520 M.4.177 . . .
14.60 m Aluminium strip 382,520 M.4.122 . . .
A.4.2.1.26. K-058 … m2 Pemasangan 1 m2 Pintu kaca Rangka Aluminium 2,447,748 0.18 . 25,452 - 2,422,296
0.09 OH Pekerja 8,951 L.4.001 . . .
0.09 OH Tukang Besi 13,541 L.4.008 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
4.40 m Pintu alluminium 2,059,200 M.4.174 . . .
4.50 m Profil kaca 298,350 M.4.529 . . .
0.27 Tube Sealant 64,746 M.4.598 . . .
A.4.2.1.27. K-059 … m2 Pemasangan 1 m2 Venetions Blinds dan Vertical Blinds 185,333 0.75 . 112,533 - 72,800
0.35 OH Pekerja 36,855 L.4.001 . . .
0.35 OH Tukang Interior 64,505 L.4.015 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
1.00 m2 Venetions blinds dan vertical blinds (tirai) 72,800 M.4.604 . . .
A.4.4.1.1. K-060 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu dengan Mortar0.85
350,791 tipe M.fc’
. 17. 2 Mpa ( Setara Campuran 1SP
105,815 - : 2PP). 244,976
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
43.50 Kg Semen 87,000 M.4.033 . . .
0.08 m3 Pasir pasang 17,976 M.4.030 . . .

www.mitra-arsitek.com 212/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.2. K-061 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu
dengan Mortar 0.85
332,163 tipe S.fc’
. 12. 5 Mpa ( Setara Campuran 1SP -: 3PP)
105,815 226,348
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
32.95 Kg Semen 65,900 M.4.033 . . .
0.09 m3 Pasir pasang 20,448 M.4.030 . . .
A.4.4.1.3. K-062 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan
Mortar tipe
319,812 0.85 N.fc’
. 5.2 Mpa ( Setara105,815
Campuran 1SP : 4PP)
- 213,997
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
26.55 Kg Semen 53,100 M.4.033 . . .
0.09 m3 Pasir pasang 20,897 M.4.030 . . .
A.4.4.1.4. K-063 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan
Mortar tipe
313,134 0.85 O.. fc’ 2.4 Mpa ( Setara Campuran 1SP : -5PP)
105,815 207,319
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
22.20 Kg Semen 44,400 M.4.033 . . .
0.10 m3 Pasir pasang 22,919 M.4.030 . . .
A.4.4.1.5 K-064 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batuCampuran
310,228 1SP :0.85
6PP . 105,815 - 204,413
0.60 OH Pekerja 63,180 L.4.001 . . .
0.20 OH Tukang Batu 31,580 L.4.007 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
18.50 Kg Semen 37,000 M.4.033 . . .
0.12 m3 Pasir pasang 27,413 M.4.030 . . .
A.4.4.1.7 K-065 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan
Mortar0.43
169,346 tipe M.fc’
. 17. 7 Mpa ( Setara Campuran 1SP
52,908 - : 2PP). 116,439
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
18.95 Kg Semen 37,900 M.4.033 . . .
0.04 m3 Pasir pasang 8,539 M.4.030 . . .
A.4.4.1.8 K-066 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan
Mortar0.43
160,636 tipe S.. fc’ 12. 5 Mpa ( Setara Campuran 1SP- : 3PP).
52,908 107,728
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
14.37 Kg Semen 28,740 M.4.033 . . .
0.04 m3 Pasir pasang 8,988 M.4.030 . . .
A.4.4.1.9 K-067 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan
Mortar0.43
155,570 tipe N.fc’
. 5.2 Mpa ( Setara52,908
Campuran 1SP :- 4PP) 102,662
0.30 OH Pekerja 31,590 L.4.001 . . .

www.mitra-arsitek.com 213/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
11.50 Kg Semen 23,000 M.4.033 . . .
0.04 m3 Pasir pasang 9,662 M.4.030 . . .
A.4.4.1.10 K-068 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm Tebal ½ Batu dengan

152,379Mortar 0.43
tipe O.. fc’ 2.4 Mpa ( Setara52,908
Campuran 1SP :- 5PP) 99,472
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
9.68 Kg Semen 19,360 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.1.11 K-069 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm tebal ½ BatuCampuran
150,558 1SP :0.43
6PP . 52,908 - 97,650
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
8.32 Kg Semen 16,640 M.4.033 . . .
0.05 m3 Pasir pasang 11,010 M.4.030 . . .
A.4.4.1.16. K-070 … m2 Pemasangan 1m2 Dinding Conblock HB20 dengan Mortar Tipe S.fc’429,545
12.

5 Mpa ( Setara
0.53 Campuran
. 1SP : 3PP)67,765 - 361,780
0.35 OH Pekerja 36,855 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
12.50 buah Hollow Block 20 133,750 M.4.537 . . .
30.32 Kg Semen 60,640 M.4.033 . . .
0.73 m3 Pasir pasang 163,582 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.17. K-071 … m2 Pemasangan 1m2 Dinding Conblock HB20 Campuran1SP :4PP dengan
Mortar Tipe
427,312 N.fc’. 5.2 Mpa ( Setara Campuran
0.53 67,765 1SP : 4PP)
- 359,546
0.35 OH Pekerja 36,855 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
12.50 buah Hollow Block 20 133,750 M.4.537 . . .
24.26 Kg Semen 48,520 M.4.033 . . .
0.77 m3 Pasir pasang 173,468 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.18. K-072 … m2 Pemasangan 1m2 Dinding Conblock HB15 dengan Mortar Tipe S. fc’316,676
12.

5 Mpa ( Setara
0.47 .Campuran 1SP : 3PP) 58,803 - 257,873
0.32 OH Pekerja 33,696 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
12.50 buah Hollow Block 15 85,000 M.4.536 . . .
22.74 Kg Semen 45,480 M.4.033 . . .
0.55 m3 Pasir pasang 123,585 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.19. K-073 … m2 Pemasangan 1 m2 Dinding Conblock HB15 dengan Mortar Tipe N. fc’ 5.2 Mpa ( 0.47
314,787 Setara. Campuran 1SP : 4PP) 58,803 - 255,983

www.mitra-arsitek.com 214/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.32 OH Pekerja 33,696 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
12.50 buah Hollow Block 15 85,000 M.4.536 . . .
18.20 Kg Semen 36,400 M.4.033 . . .
0.58 m3 Pasir pasang 130,775 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.20. K-074 … m2 Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe S. fc’ 12.

5 Mpa (Setara
260,076 0.43 .Campuran 1SP : 3PP) 52,908 - 207,169
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
12.50 buah Hollow Block 10 91,250 M.4.535 . . .
15.16 Kg Semen 30,320 M.4.033 . . .
0.36 m3 Pasir pasang 81,791 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.21. K-075 … m2 Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe N. fc’
5.2 Mpa (Setara
259,409 0.43 Campuran
. 1SP : 4PP)52,908 - 206,502
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
12.50 buah Hollow Block 10 91,250 M.4.535 . . .
12.13 Kg Semen 24,260 M.4.033 . . .
0.39 m3 Pasir pasang 87,184 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,808 M.4.131 . . .
A.4.4.1.22. K-076 … m2 Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan

Mortar Tipe S.fc’0.43


106,772 12. 5 Mpa
. ( Setara Campuran
52,9081SP : 3PP) - 53,865
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
30.00 buah Bata rooster 24,000 M.4.009 . . .
11.00 Kg Semen 22,000 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
A.4.4.1.23. K-077 … m2 Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan Mortar
Tipe N.fc’0.43
337,772 5.2 Mpa
. ( Setara Campuran 1SP : 4PP)
52,908 - 284,865
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
30.00 buah Terawang (roster) 255,000 M.4.547 . . .
11.00 Kg Semen 22,000 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
A.4.4.1.24. K-078 … m2 Pemasangan 1 m2 Dinding bata Berongga Ekspose 12x11x24 dengan

Mortar Tipe 0.48


222,980 S.fc’ 12.
. 5 Mpa ( Setara Campuran
61,790 1SP : 3PP)- 161,190
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
70.00 buah Bata Berongga 126,000 M.4.006 . . .
14.00 Kg Semen 28,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .

www.mitra-arsitek.com 215/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A. 4.4.1.25. K-079 … m2 Pemasangan 1 m2 Dinding Bata Ringan Tebal 7.5cm dengan Mortar281,759
Siap Pakai 0.82 . 94,355 28,310 159,095
0.67 OH Pekerja 70,551 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.05 m3 Bata ringan tebal 7,5 cm 153,655 M.4.005 . . .
0.47 Kg Mortar siap pakai 5,440 M.4.027 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.4.1.26. K-080 … m2 Pemasangan 1m2 Dinding Bata Ringan Tebal 10cm dengan Mortar Siap
307,881
Pakai 0.82 . 94,460 28,310 185,111
0.67 OH Pekerja 70,656 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
0.06 m3 Bata ringan tebal 7,5 cm 184,386 M.4.005 . . .
0.06 Kg Mortar siap pakai 725 M.4.027 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.4.2.19. K-081 … m2 Pemasangan 1 m2 Berapen 1SP : 5PP Tebal 15 mm 47,322 0.24 . 31,112 - 16,210
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Batu 11,843 L.4.007 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
5.18 Kg Semen 10,368 M.4.033 . . .
0.03 m3 Pasir pasang 5,842 M.4.030 . . .
A.4.4.2.20. K-082 … m2 Pemasangan 1 m’ Plesteran Skoning 1SP : 3PP Lebar 10 cm 84,349 0.52 . 80,428 - 3,921
0.08 OH Pekerja 8,424 L.4.001 . . .
0.40 OH Tukang Batu 63,160 L.4.007 . . .
0.04 OH Kepala Tukang 7,896 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
0.50 Kg Semen 1,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,921 M.4.030 . . .
A.4.4.2.21. K-083 … m2 Pemasangan1 m2 Plesteran Granit 1SP : 2 granit Tebal 10 mm 186,401 0.72 . 92,901 - 93,500
0.45 OH Pekerja 47,385 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.02 OH Mandor 5,449 L.4.035 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
15.00 Kg Serbuk Batu 73,500 M.4.016 . . .
A.4.4.2.22. K-084 … m2 Pemasangan1 m2 Plesteran Traso 1SP : 2 Traso Tebal 10 mm 186,401 0.72 . 92,901 - 93,500
0.45 OH Pekerja 47,385 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.02 OH Mandor 5,449 L.4.035 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
15.00 Kg Serbuk Batu 73,500 M.4.016 . . .
A.4.4.2.23. K-085 … m2 Pemasangan1 m2 Plesteran Ciprat (Kamprotan)1SP : 2PP 62,896 0.43 . 52,908 - 9,988
0.30 OH Pekerja 31,590 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
4.32 Kg Semen 8,640 M.4.033 . . .

www.mitra-arsitek.com 216/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 Kg Pasir pasang 1,348 M.4.030 . . .
A.4.4.2.24. K-086 … m2 Pemasangan Finishing 1 m2 Dinding Siar Pasangan Bata Merah 37,328 0.24 . 31,112 - 6,216
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Batu 11,843 L.4.007 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
3.11 Kg Semen 6,216 M.4.033 . . .
A.4.4.2.25. K-087 … m2 Pemasangan Finishing 1m2 Dinding Siar Pasangan Conblock Ekspose17,835 0.11 . 14,635 - 3,200
0.07 OH Pekerja 7,371 L.4.001 . . .
0.04 OH Tukang Batu 5,527 L.4.007 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.60 Kg Semen 3,200 M.4.033 . . .
A.4.4.2.26. K-088 … m2 Pemasangan 1m2 Finishing Siar Pasangan Batu Kali. Campuran1SP :77,166
2PP 0.48 . 61,790 - 15,376
0.30 OH Pekerja 31,590 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
6.34 Kg Semen 12,680 M.4.033 . . .
0.01 m3 Pasir pasang 2,696 M.4.030 . . .
A.4.4.3.1. K-089 … m2 Pemasangan 1m2 lantai ubin PC Abu-abu Ukuran 40cm x40cm 322,752 0.40 . 51,708 - 271,044
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 buah Ubin Abu-abu 241,332 M.4.454 . . .
9.80 kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.2. K-090 … m2 Pemasangan 1m2 Lantai Ubin PC Abu-abu Ukuran 30cm x 30 cm 513,888 0.40 . 51,708 - 462,180
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh Ubin Abu-abu 432,068 M.4.454 . . .
10.00 kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.3. K-091 … m2 Pemasangan 1m2 Lantai ubin PC Abu-abu Ukuran 20cm x 20 cm 1,051,339 0.43 . 55,828 - 995,512
0.27 OH Pekerja 28,431 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala Tukang 2,764 L.4.036 . . .
0.01 OH Mandor 3,317 L.4.035 . . .
26.50 buah Ubin Abu-abu 964,600 M.4.454 . . .
10.40 kg Semen 20,800 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.5. K-092 … m2 Pemasangan 1m2 Lantai ubin Warna Ukuran 30cm x 30cm 1,390,922 0.42 . 53,551 - 1,337,372
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh Ubin Warna 1,305,700 M.4.474 . . .

www.mitra-arsitek.com 217/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 20,000 M.4.033 . . .
0.60 Kg Semen Warna 1,560 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.6. K-093 … m2 Pemasangan 1m2 Lantai ubin Warna Ukuran 20cm x 20cm 3,004,339 0.43 . 55,828 - 2,948,512
0.27 OH Pekerja 28,431 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala Tukang 2,764 L.4.036 . . .
0.01 OH Mandor 3,317 L.4.035 . . .
26.50 Bh Ubin Warna 2,915,000 M.4.474 . . .
10.40 kg Semen 20,800 M.4.033 . . .
1.00 Kg Semen Warna 2,600 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.7. K-094 … m2 Pemasangan 1m2 Lantai Ubin Teraso Ukuran 40cm x 40cm 1,026,923 0.40 . 51,708 - 975,215
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh Ubin Teraso 942,123 M.4.471 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.8. K-095 … m2 Pemasangan 1m2 Lantai Ubin Teraso Ukuran 30cm x 30cm 1,774,289 0.42 . 53,551 - 1,720,739
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh Ubin teraso 1,686,727 M.4.471 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.9. K-096 … m2 Pemasangan 1m2 Lantai Ubin Granit Ukuran 40cm x 40cm 2,201,096 0.40 . 51,708 - 2,149,388
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh Ubin granit 2,116,296 M.4.455 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.10. K-097 … m2 Pemasangan 1m2 Lantai Ubin Granit Ukuran 30cm x 30cm 3,876,466 0.42 . 53,551 - 3,822,916
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh Ubin Granit 3,788,904 M.4.455 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.12. K-098 … m2 Pemasangan 1m2 Lantai Ubin Teralux Ukuran 30cm x30cm 157,595 0.42 . 53,551 - 104,045
0.26 OH Pekerja 27,378 L.4.001 . . .

www.mitra-arsitek.com 218/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh Plint ubin teralux kerang 70,033 M.4.434 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.13. K-099 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm220,903 0.38 . 49,432 - 171,472
0.24 OH Pekerja 25,272 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 2,843 L.4.035 . . .
3.10 Bh ubin teralux marmer ukuran 60cm x60cm 138,260 M.4.470 . . .
9.60 kg Semen 19,200 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.14. K-100 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 40cm x40cm338,066 0.40 . 51,708 - 286,358
0.25 OH Pekerja 26,325 L.4.001 . . .
0.13 OH Tukang Batu 19,738 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 253,266 M.4.469 . . .
9.80 kg Semen 19,600 M.4.033 . . .
1.30 Kg Semen Warna 3,380 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.15. K-101 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm484,020 0.42 . 53,551 - 430,470
0.26 OH Pekerja 27,378 L.4.001 . . .
0.13 OH Tukang Batu 20,527 L.4.007 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.01 OH Mandor 3,080 L.4.035 . . .
11.87 Bh ubin teralux marmer ukuran 30cm x30cm 396,458 M.4.468 . . .
10.00 kg Semen 20,000 M.4.033 . . .
1.50 Kg Semen Warna 3,900 M.4.036 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
A.4.4.3.16. K-102 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 20 s.d. <30 cm 49,928 0.19 . 26,649 - 23,279
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
5.30 Bh Plint Ubin 19,080 M.4.424 . . .
1.65 kg Semen 3,300 M.4.033 . . .
0.00 m3 Pasir pasang 899 M.4.030 . . .
A.4.4.3.17. K-103 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 30 s.d. <40 cm 42,511 0.19 . 26,649 - 15,862
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint Ubin 12,708 M.4.424 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .

www.mitra-arsitek.com 219/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.18. K-104 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 40 s.d. <50 cm 39,343 0.19 . 26,649 - 12,694
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint Ubin 9,540 M.4.424 . . .
1.24 kg Semen 2,480 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.19. K-105 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 20 s.d. <30cm 48,943 0.19 . 26,649 - 22,294
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
5.30 Bh Plint Ubin 19,080 M.4.424 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.20. K-106 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 30 s.d. <40cm 42,571 0.19 . 26,649 - 15,922
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint Ubin 12,708 M.4.424 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.21. K-107 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 40 s.d. <50 cm 39,403 0.19 . 26,649 - 12,754
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint Ubin 9,540 M.4.424 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.22. K-108 … m1 Pemasangan 1 m’ Plint Ubin Teraso Ukuran 30 s.d. <40cm 46,807 0.19 . 26,649 - 20,158
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint Ubin teraso 16,944 M.4.441 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.23. K-109 … m1 Pemasangan 1 m’ Plint Ubin Teraso Ukuran 40 s.d. <50 cm 42,583 0.19 . 26,649 - 15,934
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint Ubin teraso 12,720 M.4.441 . . .

www.mitra-arsitek.com 220/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.24. K-110 … m1 Pemasangan 1 m’ Plint Ubin Granit Ukuran 30 s.d. <40 cm 75,753 0.19 . 26,649 - 49,104
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint Ubin granit 45,890 M.4.425 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.25. K-111 … m1 Pemasangan 1 m’ Plint Ubin Granit Ukuran 40 s.d. <50cm 64,313 0.19 . 26,649 - 37,664
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint Ubin granit 34,450 M.4.425 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.26. K-112 … m1 Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 30 s.d. <40cm 50,690 0.19 . 26,649 - 24,041
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin teralux kerang 20,827 M.4.434 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.27. K-113 … m1 Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 40 s.d. <50cm 45,380 0.19 . 26,649 - 18,731
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.63 Bh Plint ubin teralux kerang 15,517 M.4.434 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.28. K-114 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 30 s.d. <40cm 77,165 0.19 . 26,649 - 50,516
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
3.53 Bh Plint ubin teralux marmer 47,302 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.29. K-115 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 40 s.d. <50cm 65,373 0.19 . 26,649 - 38,724
0.09 OH Pekerja 9,477 L.4.001 . . .

www.mitra-arsitek.com 221/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
2.65 Bh Plint ubin teralux marmer 35,510 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.30. K-116 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm 52,643 0.19 . 26,649 - 25,994
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.70 Bh Plint ubin teralux marmer 22,780 M.4.437 . . .
1.14 kg Semen 2,280 M.4.033 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
A.4.4.3.31. K-117 … m2 Pemasangan 1m2 Lantai Teraso Cor di Tempat. Tebal 3cm 109,687 0.58 . 74,147 - 35,540
0.36 OH Pekerja 37,908 L.4.001 . . .
0.18 OH Tukang Batu 28,422 L.4.007 . . .
0.02 OH Kepala Tukang 3,553 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 m3 Bahan teraso cor 35,280 M.4.530 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
A.4.4.3.32. K-118 … m2 Pemasangan 1m2 Lantai Keramik Artistik 10 s.d. <20cm 292,407 1.12 . 144,176 - 148,232
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
10.60 Bh Ubin Keramik 113,420 M.4.458 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
3.20 Kg Semen Warna 8,320 M.4.036 . . .
A.4.4.3.33. K-119 … m2 Pemasangan 1m2 Lantai Keramik Artistik Ukuran 20 s.d. <30 cm 744,917 1.12 . 144,176 - 600,742
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
53.00 Bh Ubin Keramik 567,100 M.4.458 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.35. K-120 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 20 s.d. <30cm 187,622 1.12 . 144,176 - 43,447
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 Dus Ubin Keramik 11,235 M.4.458 . . .
10.40 Kg Semen 20,800 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.50 Kg Semen Warna 1,300 M.4.036 . . .

www.mitra-arsitek.com 222/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.36. K-121 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm 186,822 1.12 . 144,176 - 42,647
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 Dus Ubin Keramik 11,235 M.4.458 . . .
10.00 Kg Semen 20,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.50 Kg Semen Warna 1,300 M.4.036 . . .
A.4.4.3.37. K-122 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40 cm untukVariasi/border
610,654 1.68 . 216,480 - 394,174
1.05 OH Pekerja 110,565 L.4.001 . . .
0.53 OH Tukang Batu 82,898 L.4.007 . . .
0.05 OH Kepala Tukang 10,462 L.4.036 . . .
0.05 OH Mandor 12,556 L.4.035 . . .
33.00 Bh Ubin Keramik 353,100 M.4.458 . . .
9.80 Kg Semen 19,600 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
4.37 Kg Semen Warna 11,362 M.4.036 . . .
A.4.4.3.39. K-123 … m1 Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <20cm 105,886 0.22 . 31,782 - 74,104
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
10.60 Bh Plint keramik ukuran 10cm x 20cm 71,020 M.4.422 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.05 Kg Semen Warna 130 M.4.036 . . .
A.4.4.3.40. K-124 … m1 Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <30 cm 62,891 0.22 . 31,782 - 31,109
0.09 OH Pekerja 9,477 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
5.30 Bh Plint ubin Pc abu-abu ukuran 10cm x 30cm 28,090 M.4.430 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.03 Kg Semen Warna 65 M.4.036 . . .
A.4.4.3.41. K-125 … m1 Pemasangan 1 m’ Plint Internal Cove Artistik 5cm x 5cm x 20cm 263,111 1.61 . 221,207 - 41,904
0.75 OH Pekerja 78,975 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.04 OH Mandor 9,002 L.4.035 . . .
5.30 Bh Internal Cove 38,690 M.4.590 . . .
1.14 Kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 674 M.4.030 . . .
0.10 Kg Semen Warna 260 M.4.036 . . .
A.4.4.3.42. K-126 … m2 Pemasangan 1 m2 Lantai Marmer Ukuran 100cm x 100cm 652,785 1.12 . 144,176 - 508,610
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .

www.mitra-arsitek.com 223/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.06 buah Marmer 481,770 M.4.416 . . .
8.19 Kg Semen 16,380 M.4.033 . . .
0.05 m3 Pasir pasang 10,112 M.4.030 . . .
0.13 Kg Semen Warna 348 M.4.036 . . .
A.4.4.3.43. K-127 … m2 Pemasangan 1 m2 Lantai Karpet 125,692 0.37 . 50,232 - 75,460
0.17 OH Pekerja 17,901 L.4.001 . . .
0.17 OH Tukang Kayu 26,843 L.4.016 . . .
0.02 OH Kepala Tukang 3,356 L.4.036 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.05 m2 Karpet 70,035 M.4.355 . . .
0.35 Kg Lem 5,425 M.4.552 . . .
A.4.4.3.44. K-128 … m2 Pemasangan 1 m2 Underlayer (Pelapis Bawah Karpet) 71,354 0.26 . 35,374 - 35,980
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Kayu 18,948 L.4.016 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
1.05 m2 underlayer (pelapis bawah karpet) 30,555 M.4.373 . . .
0.35 Kg Lem 5,425 M.4.552 . . .
A.4.4.3.45. K-129 … m2 Pemasangan 1 m2 Lantai Parquet Kayu Solid 167,666 1.12 . 144,176 - 23,490
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Kayu 55,265 L.4.016 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 m2 Parquet kayu 15,750 M.4.359 . . .
0.60 Kg Lem kayu 7,740 M.4.553 . . .
A.4.4.3.46. K-130 … m2 Pemasangan 1 m2 Lantai Kayu Gymfloor 474,686 1.12 . 144,176 - 330,510
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Kayu 55,265 L.4.016 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.05 m2 Parquet kayu gymfloor 322,770 M.4.360 . . .
0.60 Kg Lem Kayu 7,740 M.4.553 . . .
A.4.4.3.47. K-131 … m2 Pemasangan 1 m2 Dinding Porselen 11cm x 11cm 236,840 1.60 . 205,965 - 30,875
1.00 OH Pekerja 105,300 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.05 buah Porselen (11 x 11) cm 6,930 M.4.449 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
0.50 Kg Semen Warna 1,300 M.4.036 . . .
A.4.4.3.48. K-132 … m2 Pemasangan 1 m2 Dinding Porselen 10cm x 20cm 501,363 1.44 . 185,369 - 315,995
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
53.00 buah Porselen Dinding 10x20 286,200 M.4.450 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .

www.mitra-arsitek.com 224/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.49. K-133 … m2 Pemasangan 1 m2 Dinding Porselen 20cm x 20cm 408,057 1.44 . 185,369 - 222,689
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
26.00 buah Porselen Dinding 20x20 195,000 M.4.451 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
1.94 Kg Semen Warna 5,044 M.4.036 . . .
A.4.4.3.50. K-134 … m2 Pemasangan 1 m2 Dinding Keramik Artistik 10cm x 20cm 360,763 1.44 . 185,369 - 175,395
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
52.00 buah keramik artistik 10cm x 10cm atau 5cm x 20cm 145,600 M.4.406 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.51. K-135 … m2 Pemasangan 1 m2 Dinding Keramik Artistik 5cm x 20cm 290,353 1.44 . 185,369 - 104,985
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.10 m2 Keramik Dinding artistik 74,800 M.4.410 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.90 Kg Semen Warna 7,540 M.4.036 . . .
A.4.4.3.52. K-136 … m2 Pemasangan 1 m2 Dinding Keramik 10cm x 20cm 307,563 1.44 . 185,369 - 122,195
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.10 m2 keramik artistik 10cm x 20cm 92,400 M.4.407 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.53. K-137 … m2 Pemasangan 1 m2 Dinding Keramik 20cm x 20cm 282,577 1.44 . 185,369 - 97,209
0.90 OH Pekerja 94,770 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.05 OH Mandor 10,661 L.4.035 . . .
1.10 m2 keramik Dinding 20cm x 20cm 69,520 M.4.409 . . .
9.30 Kg Semen 18,600 M.4.033 . . .
0.02 m3 Pasir pasang 4,045 M.4.030 . . .
1.94 Kg Semen Warna 5,044 M.4.036 . . .
A.4.4.3.54. K-138 … m2 Pemasangan 1 m2 Dinding Marmer 100cm x 100cm 862,916 2.08 . 267,755 - 595,162
1.30 OH Pekerja 136,890 L.4.001 . . .
0.65 OH Tukang Batu 102,635 L.4.007 . . .
0.07 OH Kepala Tukang 12,831 L.4.036 . . .
0.07 OH Mandor 15,399 L.4.035 . . .

www.mitra-arsitek.com 225/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.06 buah Marmer 481,770 M.4.416 . . .
12.44 Kg Semen 24,880 M.4.033 . . .
0.03 m3 Pasir pasang 5,618 M.4.030 . . .
0.65 Kg Semen Warna 1,690 M.4.036 . . .
3.03 buah Paku Biasa 2" - 5" 81,204 M.4.158 . . .
A.4.4.3.55. K-139 … m2 Pemasangan 1 m2 Dinding Bata Pelapis (Super) 3cm x 7cm x 24cm 294,013 1.60 . 205,965 - 88,048
1.00 OH Pekerja 105,300 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
63.00 buah Bata pelapis Dinding 3cm x 7cm x 24cm 50,400 M.4.008 . . .
12.44 Kg Semen 24,880 M.4.033 . . .
0.03 m3 Pasir pasang 5,618 M.4.030 . . .
2.75 Kg Semen Warna 7,150 M.4.036 . . .
A.4.4.3.56. K-140 … m2 Pemasangan 1 m2 Dinding Batu Paras 272,340 1.12 . 144,176 - 128,165
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.10 Buah Batu paras 96,800 M.4.015 . . .
11.75 Kg Semen 23,500 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
A.4.4.3.57. K-141 … m2 Pemasangan 1 m2 Dinding Batu Tempel Hitam 492,230 1.12 . 144,176 - 348,055
0.70 OH Pekerja 73,710 L.4.001 . . .
0.35 OH Tukang Batu 55,265 L.4.007 . . .
0.04 OH Kepala Tukang 6,909 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
1.10 Buah Batu alam / tempel 316,690 M.4.011 . . .
11.75 Kg Semen 23,500 M.4.033 . . .
0.04 m3 Pasir pasang 7,865 M.4.030 . . .
A.4.4.3.58. K-142 … m2 Pemasangan 1 m2 Lantai Vynil Ukuran 30cm x 30cm 382,121 0.32 . 44,336 - 337,785
0.15 OH Pekerja 15,795 L.4.001 . . .
0.15 OH Tukang Batu 23,685 L.4.007 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
11.87 buah plint vynil 15cm x 30cm 332,360 M.4.447 . . .
0.35 Kg Lem 5,425 M.4.552 . . .
A.4.4.3.59. K-143 … m2 Pemasangan 1 m2 Wallpaper lebar 50 cm 158,432 0.54 . 68,317 - 90,115
0.35 OH Pekerja 36,855 L.4.001 . . .
0.18 OH Tukang Batu 27,633 L.4.007 . . .
0.02 OH Kepala Tukang 3,356 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
2.20 m’ Wallpaper 86,240 M.4.374 . . .
0.25 Kg Lem 3,875 M.4.552 . . .
A.4.4.3.60. K-144 … m2 Pemasangan 1m2 Floor Harderner 55,374 0.26 . 35,374 - 20,000
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
5.00 Kg Floor hardener 20,000 M.4.587 . . .

www.mitra-arsitek.com 226/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.61. K-145 … m1 Pemasangan 1 m’ Plint Vynil 15cm x 30cm 111,623 0.17 . 23,583 - 88,040
0.08 OH Pekerja 8,424 L.4.001 . . .
0.08 OH Tukang Batu 12,632 L.4.007 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
3.10 buah plint vynil 15cm x 30cm 86,800 M.4.447 . . .
0.08 Kg Lem 1,240 M.4.552 . . .
A.4.4.3.62. K-146 … m1 Pemasangan 1 m’ Plint Kayu Tebal 2 cm Lebar 10cm 56,020 0.26 . 35,374 - 20,646
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Batu 18,948 L.4.007 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.00 m3 Kayu Papan kelas I 19,796 M.4.101 . . .
0.05 Kg Paku skrup 5 cm 850 M.4.169 . . .
A.4.4.3.63. K-147 … m2 Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm 291,981 0.80 . 115,453 28,310 148,218
0.25 OH Pekerja 26,325 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.01 m2 Paving block 6 cm 133,623 M.4.542 . . .
0.05 m3 Pasir beton 14,595 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.4.3.64. K-148 … m2 Pemasangan 1 m2 Pavingblock (Blok Beton) Natural tebal 8cm 197,177 1.05 . 141,778 28,310 27,089
0.50 OH Pekerja 52,650 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.01 m2 Paving block 8 cm natural 3,737 M.4.544 . . .
0.08 m3 Pasir beton 23,352 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.4.3.65. K-149 … m2 Pemasangan 1 m2 Paving Block ( Blok Beton) Berwarna Tebal 6cm 294,910 0.80 . 115,453 28,310 151,147
0.25 OH Pekerja 26,325 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.01 m2 Paving block 6cm berwarna 136,552 M.4.543 . . .
0.05 m3 Pasir beton 14,595 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.4.3.66. K-150 … m2 Pemasangan 1 m2 Pavingblock (Blok Beton) Berwarna Tebal 8cm 314,539 1.05 . 141,778 28,310 144,451
0.50 OH Pekerja 52,650 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.01 m2 Paving block 8 cm berwarna 121,099 M.4.541 . . .
0.08 m3 Pasir beton 23,352 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.5.1.1. K-151 … m2 Pemasangan1 m2 Langit-Langit Serat Semen. Tebal 4 mm. 5 mm. dan
144,163
6 mm 0.11 . 16,541 28,310 99,312
0.03 OH Pekerja 3,159 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .

www.mitra-arsitek.com 227/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 948 L.4.035 . . .
1.10 m2 Serat semen 99,110 M.4.578 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
0.10 % Alat Bantu/Perlengkapan Umum 28,310 T.4.001 . . .
A.4.5.1.2. K-152 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 30 cm 446,974 0.26 . 35,374 - 411,600
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Kayu 18,948 L.4.016 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
12.00 Lembar Akustik ukuran 30 x 30 cm 411,600 M.4.340 . . .
A.4.5.1.3. K-153 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 60 cm 234,314 0.26 . 35,374 - 198,940
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Kayu 18,948 L.4.016 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
5.80 Lembar Akustik ukuran 30 x 30 cm 198,940 M.4.340 . . .
A.4.5.1.4. K-154 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 60 x 120 cm 80,929 0.22 . 29,479 - 51,450
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.50 Lembar Akustik ukuran 30 x 30 cm 51,450 M.4.340 . . .
A.4.5.1.5. K-155 … m2 Pemasangan 1 m2 Langit-Langit Kayu Lapis. Tebal 3 mm. 4 mm dan 6mm
63,235 0.22 . 29,479 - 33,756
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.38 Lembar Multiplek 33,150 M.4.358 . . .
0.03 kg Paku tripleks 606 M.4.171 . . .
A.4.5.1.6. K-156 … m2 Pemasangan 1 m2 Langit-Langit Lambrisering Kayu. tebal 9 mm 399,200 1.72 . 235,828 - 163,372
0.80 OH Pekerja 84,240 L.4.001 . . .
0.80 OH Tukang Kayu 126,320 L.4.016 . . .
0.08 OH Kepala Tukang 15,792 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.02 m3 Kayu jati papan (klas 1) 163,170 M.4.095 . . .
0.01 kg Paku tripleks 202 M.4.171 . . .
A.4.5.1.7. K-157 … m2 Pemasangan 1 m2 Langit-Langit Papan Gipsum. Tebal 9 mm 51,745 0.16 . 20,597 - 31,148
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.36 Lembar Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 99 M.4.165 . . .
A.4.5.1.10. K-158 … m1 Pemasangan 1 m’ List Langit-Langit Kayu profil 18,381 0.11 . 14,858 - 3,523
0.05 OH Pekerja 5,265 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.05 m List Kayu profil 3,255 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 268 M.4.158 . . .

www.mitra-arsitek.com 228/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.1.12. K-159 … m2 Pemasangan 1 m2 Langit-langit Akustik Uk. 60x120cm Berikut Rangka
408,418
Aluminium
1.08 . 148,093 - 260,325
0.50 OH Pekerja 52,650 L.4.001 . . .
0.50 OH Tukang Besi 79,650 L.4.008 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
3.60 m Profil Alluminium "T" 47,880 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,700 M.4.145 . . .
1.05 Buah Baut Ramset / Dina Bolt 5,145 M.4.130 . . .
1.50 Lembar Akustik Uk. 60 cm x 120 cm 201,600 M.4.339 . . .
A.4.5.2.1. K-160 … m2 Pemasangan 1 m2 Atap genteng Palentong Kecil 98,513 0.24 . 31,013 - 67,500
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,481 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
25.00 buah Genteng palentong 67,500 M.4.494 . . .
A.4.5.2.2. K-161 … m2 Pemasangan1 m2 Atap Genteng Kodok Glazuur 68,612 0.24 . 31,112 - 37,500
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
25.00 buah Genteng kodok 37,500 M.4.492 . . .
A.4.5.2.3. K-162 … m2 Pemasangan1 m2 Atap Genteng Palentong Besar/Morando 63,512 0.24 . 31,112 - 32,400
0.15 OH Pekerja 15,795 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
12.00 buah Genteng palentong 32,400 M.4.494 . . .
A.4.5.2.4. K-163 … m1 Pemasangan 1 m’ Bubung Genteng Palentong Kecil 125,812 0.62 . 78,122 - 47,690
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
5.00 Buah Genteng Bubung 24,500 M.4.488 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
A.4.5.2.5. K-164 … m1 Pemasangan 1 m’ Bubung Genteng Kodok Glazuur 125,812 0.62 . 78,122 - 47,690
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
5.00 buah Genteng Bubung 24,500 M.4.488 . . .
8.00 Kg Semen 16,000 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
A.4.5.2.6. K-165 … m1 Pemasangan 1 m’ Bubung Genteng Palentong Besar 120,912 0.62 . 78,122 - 42,790
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
4.00 buah Genteng Bubung 19,600 M.4.488 . . .
8.00 Kg Semen 16,000 M.4.033 . . .

www.mitra-arsitek.com 229/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
A.4.5.2.7. K-166 … m2 Pemasangan 1 m2 Roof Light Fibreglass 90cm x180cm 101,576 0.22 . 28,361 - 73,215
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 10,579 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
0.60 Lbr Rooflight 90x180 72,000 M.4.509 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.8. K-167 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 250cm x 5mm
139,691 0.23 . 30,059 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.9. K-168 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 225cm x 5mm
139,691 0.23 . 30,059 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.10. K-169 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 200cm x 5mm138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.11. K-170 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 180cm x 5mm138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.12. K-171 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 300cm x 5 mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.15. K-172 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 240cm x 5mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .

www.mitra-arsitek.com 230/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.2.17. K-173 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 210cm x 5mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.18. K-174 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 150cm x 5mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.19. K-175 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 300cm x 6mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.20. K-176 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 270cm x 6mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.21. K-177 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 240cm x 6mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.22. K-178 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 210cm x 6mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.23. K-179 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 180cm x 6mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.5.2.24. K-180 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 92 cm 74,937 0.23 . 32,097 - 42,840

www.mitra-arsitek.com 231/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.40 Lbr Bubung stel gel. 37,440 M.4.480 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.25. K-181 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 105 cm 70,257 0.23 . 32,097 - 38,160
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.10 Lbr Bubung stel gel. 32,760 M.4.480 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.26. K-182 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 108 cm 68,697 0.23 . 32,097 - 36,600
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
2.00 Lbr Bubung stel gel. 31,200 M.4.480 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.27. K-183 … m1 Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 92 cm 84,577 0.23 . 32,097 - 52,480
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 Lbr Nok Paten 47,080 M.4.503 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.28. K-184 … m1 Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 105cm 88,857 0.23 . 32,097 - 56,760
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 Lbr Nok Paten 51,360 M.4.503 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.29. K-185 … m1 Pemasangan 1 m’ Nok/Bubung Paten(Permanen) 108 cm 88,857 0.23 . 32,097 - 56,760
0.08 OH Pekerja 8,845 L.4.001 . . .
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 Lbr Nok Paten 51,360 M.4.503 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.30. K-186 … m1 Pemasangan 1 m’ Nok/Bubung Setel Rata 92cm 122,989 0.27 . 37,729 - 85,260
0.10 OH Pekerja 10,530 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 Lbr Nok metal 79,860 M.4.502 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.31. K-187 … m1 Pemasangan 1 m’ Nok/Bubung Setel Rata 105 cm 117,357 0.23 . 32,097 - 85,260
0.08 OH Pekerja 8,845 L.4.001 . . .

www.mitra-arsitek.com 232/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Kayu 19,738 L.4.016 . . .
0.01 OH Kepala Tukang 2,566 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 Lbr Nok metal 79,860 M.4.502 . . .
6.00 buah Paku sekrup 5,400 M.4.165 . . .
A.4.5.2.32. K-188 … m2 Pemasangan 1 m2 Genteng Beton 71,697 0.32 . 41,193 - 30,504
0.20 OH Pekerja 21,060 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
11.00 buah Genteng Beton 29,700 M.4.485 . . .
0.03 Kg Paku Biasa 2" - 5" 804 M.4.158 . . .
A.4.5.2.33. K-189 … m2 Pemasangan 1 m2 Genteng Aspal 80x100cm 122,380 0.51 . 71,391 - 50,989
0.20 OH Pekerja 21,060 L.4.001 . . .
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.00 OH Kepala Tukang 592 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
1.50 Buah Genteng aspal 4,200 M.4.484 . . .
0.35 Lbr Plywood 120x240 tbl. 6 mm 28,560 M.4.366 . . .
0.03 Kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 buah Plastic aerator 17,500 M.4.363 . . .
A.4.5.2.35. K-190 … m2 Pemasangan 1 m2 Atap Sirap Kayu 146,645 0.45 . 63,785 - 82,860
0.17 OH Pekerja 17,480 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
30.00 buah Sirap kayu 78,000 M.4.510 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.36. K-191 … m2 Pemasangan 1 m’ Nok/Bubung Genteng Beton 168,541 0.64 . 82,386 - 86,155
0.40 OH Pekerja 42,120 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
3.50 buah Nok Genteng beton 53,550 M.4.499 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
10.80 Kg Semen 21,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,190 M.4.030 . . .
1.00 Kg Semen Warna 2,600 M.4.036 . . .
A.4.5.2.37. K-192 … m1 Pemasangan 1 m’ Nok/Bubung Genteng Aspal 124,936 0.41 . 58,994 - 65,943
0.13 OH Pekerja 13,163 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
2.00 buah Nok genteng aspal 52,600 M.4.498 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.00 m3 Kayu balok borneo 12,128 M.4.084 . . .
A.4.5.2.38. K-193 … m1 Pemasangan 1 m’ Nok/Bubung Genteng Metal 155,056 0.43 . 56,051 - 99,005
0.25 OH Pekerja 26,325 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .

www.mitra-arsitek.com 233/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 3,080 L.4.035 . . .
1.10 buah nok genteng metal 97,790 M.4.501 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.39. K-194 … m1 Pemasangan 1 m’ Nok/Bubung Atap Sirap 80,009 0.41 . 58,994 - 21,015
0.13 OH Pekerja 13,163 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 19,800 M.4.368 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.40. K-195 … m2 Pemasangan 1 m2 Atap Seng Gelombang 105cm x180cm 59,852 0.19 . 24,716 - 35,136
0.12 OH Pekerja 12,636 L.4.001 . . .
0.06 OH Tukang Kayu 9,474 L.4.016 . . .
0.01 OH Kepala Tukang 1,184 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 34,650 M.4.368 . . .
0.02 Kg Paku Biasa ½" - 1" 486 M.4.157 . . .
A.4.5.2.41. K-196 … m1 Pemasangan 1 m’ Nok/Bubung Atap Seng 45,473 0.23 . 29,651 - 15,822
0.15 OH Pekerja 15,795 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.30 Lbr Seng Gelombang 3" x 6" BJLS 28 14,850 M.4.368 . . .
0.04 Kg Paku Biasa ½" - 1" 972 M.4.157 . . .
A.4.5.2.42. K-197 … m2 Pemasangan 1 m2 Atap Aluminium Gelombang 95cm x 180cm 272,960 0.99 . 151,433 - 121,527
0.15 OH Pekerja 15,795 L.4.001 . . .
0.75 OH Tukang Kayu 118,425 L.4.016 . . .
0.08 OH Kepala Tukang 15,792 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.75 Lbr Atap Alluminium Gelombang tebal 0.55 121,275 M.4.478 . . .
0.02 Kg Paku Pancing 60 x 230 252 M.4.162 . . .
A.4.5.2.43. K-198 … m1 Pemasangan 1 m’ Nok/Bubung Atap Aluminium Gelombang 287,387 1.25 . 200,015 - 87,372
0.10 OH Pekerja 10,530 L.4.001 . . .
1.00 OH Tukang Kayu 157,900 L.4.016 . . .
0.10 OH Kepala Tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.20 buah Nok metal 87,120 M.4.502 . . .
0.02 Kg Paku Pancing 60 x 230 252 M.4.162 . . .
A.4.5.2.44. K-199 … m2 Pemasangan 1 m2 Lapisan Aluminium Foil 59,857 0.21 . 26,572 - 33,285
0.15 OH Pekerja 15,795 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.05 m2 Aluminium foil 33,285 M.4.121 . . .
A.4.5.2.45. K-200 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 270cm x 4mm
138,467 0.22 . 28,835 - 109,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Kayu 11,053 L.4.016 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m2 Serat Semen 108,120 M.4.578 . . .

www.mitra-arsitek.com 234/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,512 M.4.162 . . .
A.4.6.1.1. K-201 … m3 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela. 8,754,855
Kayu Kelas30.45
I . 4,550,455 - 4,204,400
7.00 OH Pekerja 737,100 L.4.001 . . .
21.00 OH Tukang Kayu 3,315,900 L.4.016 . . .
2.10 OH Kepala Tukang 414,540 L.4.036 . . .
0.35 OH Mandor 82,915 L.4.035 . . .
1.10 m3 Balok kayu kelas II 4,158,000 M.4.078 . . .
1.25 Kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 Kg Lem kayu 12,900 M.4.553 . . .
A.4.6.1.2. K-202 … m3 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela8,482,790
Kayu Kelas II
26.10
atau III
. 3,900,390 - 4,582,400
6.00 OH Pekerja 631,800 L.4.001 . . .
18.00 OH Tukang Kayu 2,842,200 L.4.016 . . .
1.80 OH Kepala Tukang 355,320 L.4.036 . . .
0.30 OH Mandor 71,070 L.4.035 . . .
1.20 m3 Balok kayu kelas II 4,536,000 M.4.078 . . .
1.25 Kg Paku Biasa 2" - 5" 33,500 M.4.158 . . .
1.00 Kg Lem kayu 12,900 M.4.553 . . .
A.4.6.1.3. K-203 … m2 Pembuatan dan Pemasangan 1 m2 Pintu Klamp Standar Kayu Kelas384,381
II 1.52 . 227,641 - 156,740
0.35 OH Pekerja 36,855 L.4.001 . . .
1.05 OH Tukang Kayu 165,795 L.4.016 . . .
0.11 OH Kepala Tukang 20,727 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 m3 Kayu Papan kelas II 155,400 M.4.102 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.4. K-204 … m2 Pembuatan dan Pemasangan 1 m2 Pintu Klamp Sederhana Kayu Kelas 384,381
III 1.52 . 227,641 - 156,740
0.35 OH Pekerja 36,855 L.4.001 . . .
1.05 OH Tukang Kayu 165,795 L.4.016 . . .
0.11 OH Kepala Tukang 20,727 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.04 m3 Kayu Papan kelas II 155,400 M.4.102 . . .
0.05 Kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.5. K-205 … m2 Pembuatan 1 m2 Daun Pintu Panel. Kayu Kelas I atau II 810,515 4.35 . 650,065 - 160,450
1.00 OH Pekerja 105,300 L.4.001 . . .
3.00 OH Tukang Kayu 473,700 L.4.016 . . .
0.30 OH Kepala Tukang 59,220 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
0.04 m3 Kayu papan 3/20 154,000 M.4.100 . . .
0.50 Kg Lem kayu 6,450 M.4.553 . . .
A.4.6.1.6. K-206 … m2 Pembuatan 1 m2 Pintu dan Jendela Kaca. Kayu Kelas I atau II 616,322 3.48 . 520,052 - 96,270
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang Kayu 378,960 L.4.016 . . .
0.24 OH Kepala Tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.02 m3 Kayu papan 3/20 92,400 M.4.100 . . .
0.30 Kg Lem kayu 3,870 M.4.553 . . .
A.4.6.1.7. K-207 … m2 Pembuatan 1 m2 Pintu dan Jendela Jalusi Kayu Kelas I atau II 902,915 4.35 . 650,065 - 252,850
1.00 OH Pekerja 105,300 L.4.001 . . .
3.00 OH Tukang Kayu 473,700 L.4.016 . . .
0.30 OH Kepala Tukang 59,220 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .

www.mitra-arsitek.com 235/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.06 m3 Kayu papan 3/20 246,400 M.4.100 . . .
0.50 Kg Lem kayu 6,450 M.4.553 . . .
A.4.6.1.8. K-208 … m2 Pembuatan 1 m2 Daun pintu Plywood Rangkap. Rangka Kayu Kelas636,450
II Tertutup 3.05
(Lebar. Sampai 90cm) 455,046 - 181,404
0.70 OH Pekerja 73,710 L.4.001 . . .
2.10 OH Tukang Kayu 331,590 L.4.016 . . .
0.21 OH Kepala Tukang 41,454 L.4.036 . . .
0.04 OH Mandor 8,292 L.4.035 . . .
0.03 m3 Kayu Papan kelas II 97,125 M.4.102 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 Lembar Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
A.4.6.1.9. K-209 … m2 Pembuatan 1m2 Pintu Plywood Rangkap. Rangka Expose Kayu Kelas 702,891
I atau II 3.48 . 520,052 - 182,839
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang Kayu 378,960 L.4.016 . . .
0.24 OH Kepala Tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.03 m3 Kayu papan 3/20 98,560 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,450 M.4.553 . . .
1.00 Lembar Plywood 120x240 tbl. 4 mm 77,100 M.4.365 . . .
A.4.6.1.10. K-210 … m2 Pembuatan dan Pemasangan 1 m2 Jalusi Kusen Kayu Kelas I atau II739,838 3.21 . 505,193 - 234,645
0.67 OH Pekerja 70,551 L.4.001 . . .
2.00 OH Tukang Kayu 315,800 L.4.016 . . .
0.20 OH Kepala Tukang 39,480 L.4.036 . . .
0.34 OH Mandor 79,362 L.4.035 . . .
0.06 m3 Kayu papan 3/20 231,000 M.4.100 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
A.4.6.1.11. K-211 … m2 Pembuatan 1 m2 Teakwood Rangkap. Rangka Expose Kayu Kelas I 683,001 3.48 . 520,052 - 162,949
0.80 OH Pekerja 84,240 L.4.001 . . .
2.40 OH Tukang Kayu 378,960 L.4.016 . . .
0.24 OH Kepala Tukang 47,376 L.4.036 . . .
0.04 OH Mandor 9,476 L.4.035 . . .
0.03 m3 Kayu papan 3/20 96,250 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,870 M.4.553 . . .
1.00 Lembar Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
A.4.6.1.12. K-212 … m2 Pembuatan 1 m2 Teakwood Rangkap Lapis Formika. Rangka Expose 771,573
Kayu Kelas3.70
II . 552,674 - 218,899
0.85 OH Pekerja 89,505 L.4.001 . . .
2.55 OH Tukang Kayu 402,645 L.4.016 . . .
0.26 OH Kepala Tukang 50,337 L.4.036 . . .
0.04 OH Mandor 10,187 L.4.035 . . .
0.03 m3 Kayu papan 3/20 96,250 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,320 M.4.553 . . .
1.00 Lembar Teakwood 4 mm 90 x 220 cm 62,100 M.4.370 . . .
0.50 Lembar Formika 49,500 M.4.351 . . .
A.4.6.1.13. K-213 … m3 Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional. Kayu Kelas
7,116,840
I.II dan III17.40
Bentang
. Sampai Dengan2,600,260
6 Meter - 4,516,580
4.00 OH Pekerja 421,200 L.4.001 . . .
12.00 OH Tukang Kayu 1,894,800 L.4.016 . . .
1.20 OH Kepala Tukang 236,880 L.4.036 . . .

www.mitra-arsitek.com 236/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 OH Mandor 47,380 L.4.035 . . .
1.10 m3 Balok kayu kelas II 4,158,000 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 150,080 M.4.158 . . .
A.4.6.1.14. K-214 … m3 Pemasangan 1 m3 Konstruksi Kuda-kuda Expose. Kayu Kelas I 9,250,016 29.15 . 4,355,436 - 4,894,580
6.70 OH Pekerja 705,510 L.4.001 . . .
20.10 OH Tukang Kayu 3,173,790 L.4.016 . . .
2.01 OH Kepala Tukang 396,774 L.4.036 . . .
0.34 OH Mandor 79,362 L.4.035 . . .
1.20 m3 Balok kayu kelas II 4,536,000 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 150,080 M.4.158 . . .
A.4.6.1.15. K-215 … m3 Pemasangan 1 m3 Konstruksi Gordeng. Kayu kelas II 6,007,056 10.44 . 1,560,156 - 4,446,900
2.40 OH Pekerja 252,720 L.4.001 . . .
7.20 OH Tukang Kayu 1,136,880 L.4.016 . . .
0.72 OH Kepala Tukang 142,128 L.4.036 . . .
0.12 OH Mandor 28,428 L.4.035 . . .
1.10 m3 Balok kayu kelas II 4,158,000 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 208,500 M.4.128 . . .
3.00 kg Paku Biasa 2" - 5" 80,400 M.4.158 . . .
A.4.6.1.16. K-216 … m2 Pemasangan 1 m2 Rangka Atap Genteng Keramik. Kayu kelas II 126,321 0.22 . 29,479 - 96,842
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 90,125 M.4.059 . . .
0.00 m3 Reng bengkirai 2/3 17 M.4.048 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.17. K-217 … m2 Pemasangan 1 m2 Rangka Atap Genteng Beton Kayu Kelas II 126,356 0.22 . 29,479 - 96,877
0.10 OH Pekerja 10,530 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 90,125 M.4.059 . . .
0.01 m3 Reng bengkirai 3/4 52 M.4.049 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.18. K-218 … m2 Pemasangan 1 m2 Rangka Atap Sirap. Kayu Kelas II 647,109 0.26 . 35,374 - 611,735
0.12 OH Pekerja 12,636 L.4.001 . . .
0.12 OH Tukang Kayu 18,948 L.4.016 . . .
0.01 OH Kepala Tukang 2,369 L.4.036 . . .
0.01 OH Mandor 1,421 L.4.035 . . .
0.17 m3 Kaso 5/7 Kelas II 606,375 M.4.057 . . .
0.20 m3 Paku Biasa 2" - 5" 5,360 M.4.158 . . .
A.4.6.1.19. K-219 … m2 Pemasangan 1 m2 Rangka Langit-Langit 50x100cm. Kayu kelas II atau
191,352
III 0.56 . 86,855 - 104,498
0.15 OH Pekerja 15,795 L.4.001 . . .
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.03 OH Kepala Tukang 5,922 L.4.036 . . .
0.08 OH Mandor 17,768 L.4.035 . . .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 99,138 M.4.059 . . .
0.20 kg Paku Biasa 2" - 5" 5,360 M.4.158 . . .

www.mitra-arsitek.com 237/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.6.1.20. K-220 … m2 Pemasangan 1 m2 Rangka Langit-Langit 60x60cm. Kayu Kelas II atau
188,352
III 0.54 . 76,721 - 111,631
0.20 OH Pekerja 21,060 L.4.001 . . .
0.30 OH Tukang Kayu 47,370 L.4.016 . . .
0.03 OH Kepala Tukang 5,922 L.4.036 . . .
0.01 OH Mandor 2,369 L.4.035 . . .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 104,931 M.4.059 . . .
0.25 kg Paku Biasa 2" - 5" 6,700 M.4.158 . . .
A.4.6.1.21. K-221 … m1 Pemasangan 1 m’ Lisplank Ukuran 3x20cm. Kayu Kelas I atau Kelas 91,503
II 0.33 . 47,243 - 44,260
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu papan 3/20 41,580 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
A.4.6.1.22. K-222 … m1 Pemasangan 1 m’ Lisplank Ukuran 3x30cm. Kayu Kelas I atau Kelas 90,933
II 0.33 . 47,243 - 43,690
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
0.01 m3 Kayu papan 3/20 42,350 M.4.100 . . .
0.05 kg Paku Biasa 2" - 5" 1,340 M.4.158 . . .
A.4.6.1.23. K-223 … m2 Pemasangan 1 m2 Rangka Dinding Pemisah 60x120cm Kayu kelas II207,488
atau III 0.65 . 97,628 - 109,860
0.15 OH Pekerja 15,795 L.4.001 . . .
0.45 OH Tukang Kayu 71,055 L.4.016 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.03 m3 Balok kayu kelas II 105,840 M.4.078 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
A.4.6.1.25. K-224 … m2 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu303,698
Kelas II 0.65 . 97,628 - 206,070
0.15 OH Pekerja 15,795 L.4.001 . . .
0.45 OH Tukang Kayu 71,055 L.4.016 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 128,520 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,020 M.4.158 . . .
0.86 Lembar Plywood 120x240 tbl. 4 mm 66,306 M.4.365 . . .
0.56 kg Lem kayu 7,224 M.4.553 . . .
A.4.6.1.26. K-225 … m2 Pemasangan 1 m2 Dinding Lambrisering dari Papan Kayu Kelas I 421,799 2.61 . 390,039 - 31,760
0.60 OH Pekerja 63,180 L.4.001 . . .
1.80 OH Tukang Kayu 284,220 L.4.016 . . .
0.18 OH Kepala Tukang 35,532 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
0.01 m3 Kayu papan 3/20 26,950 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,680 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,130 M.4.168 . . .
A.4.6.1.27. K-226 … m2 Pemasangan 1 m2 Dinding Lambrisering dari Plywood (Kayu Lapis) Ukuran
52,866 120x240cm
0.11 . 16,291 - 36,575
0.03 OH Pekerja 2,633 L.4.001 . . .
0.08 OH Tukang Kayu 11,843 L.4.016 . . .
0.01 OH Kepala Tukang 1,579 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .

www.mitra-arsitek.com 238/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.40 lembar Multiplek 35,360 M.4.358 . . .
0.05 kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.6.1.28. K-227 … m2 Pemasangan 1 m2 Dinding Bilik. Rangka Kayu Kelas III atau IV 250,243 0.16 . 20,597 - 229,647
0.10 OH Pekerja 10,530 L.4.001 . . .
0.05 OH Tukang Kayu 7,895 L.4.016 . . .
0.01 OH Kepala Tukang 987 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.50 m2 Bilik bambu 122,700 M.4.350 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 90,125 M.4.059 . . .
0.01 kg Paku Biasa 2" - 5" 322 M.4.158 . . .
0.00 m3 List kayu 2/4 16,500 M.4.043 . . .
A.4.6.2.1. K-228 … bh Pemasangan 1 Buah Kunci Tanam Antik 383,613 0.72 . 113,613 - 270,000
0.06 OH Pekerja 6,318 L.4.001 . . .
0.60 OH Tukang Kayu 94,740 L.4.016 . . .
0.06 OH Kepala Tukang 11,844 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 buah Kunci tanam antik 270,000 M.4.582 . . .
A.4.6.2.2. K-229 … bh Pemasangan 1 Buah Kunci Tanam Biasa 234,058 0.57 . 91,058 - 143,000
0.01 OH Pekerja 1,053 L.4.001 . . .
0.50 OH Tukang Kayu 78,950 L.4.016 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 buah Kunci tanam biasa 143,000 M.4.583 . . .
A.4.6.2.3. K-230 … bh Pemasangan 1 Buah Kunci Tanam Kamar Mandi 138,557 0.56 . 90,057 - 48,500
0.01 OH Pekerja 527 L.4.001 . . .
0.50 OH Tukang Kayu 78,950 L.4.016 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 buah Kunci tanam KM 48,500 M.4.584 . . .
A.4.6.2.4. K-231 … bh Pemasangan 1 Buah Kunci Tanam Silinder 164,357 0.56 . 90,057 - 74,300
0.01 OH Pekerja 527 L.4.001 . . .
0.50 OH Tukang Kayu 78,950 L.4.016 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 buah Kunci silinder 74,300 M.4.580 . . .
A.4.6.2.5. K-232 … bh Pemasangan 1 Buah Engsel Pintu 47,015 0.18 . 28,415 - 18,600
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.00 buah Engsel pintu 18,600 M.4.574 . . .
A.4.6.2.6. K-233 … bh Pemasangan 1 Buah Engsel Jendela Kupu-Kupu 29,035 0.12 . 18,935 - 10,100
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.00 OH Mandor 118 L.4.035 . . .
1.00 buah Engsel jendela 10,100 M.4.572 . . .
A.4.6.2.7. K-234 … bh Pemasangan 1 Buah Engsel Angin 54,076 0.32 . 46,176 - 7,900
0.10 OH Pekerja 10,530 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .

www.mitra-arsitek.com 239/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 118 L.4.035 . . .
1.00 buah Engsel angin 7,900 M.4.571 . . .
A.4.6.2.8. K-235 … bh Pemasangan 1 Buah Spring Knip untuk Jendela 38,321 0.19 . 30,121 - 8,200
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 buah Spring knip 8,200 M.4.600 . . .
A.4.6.2.9. K-236 … bh Pemasangan 1 Buah Kait Angin 35,921 0.19 . 30,121 - 5,800
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.00 buah Kait angin 5,800 M.4.142 . . .
A.4.6.2.10. K-237 … bh Pemasangan 1 Buah Doorcloser 367,296 0.60 . 94,796 - 272,500
0.05 OH Pekerja 5,265 L.4.001 . . .
0.50 OH Tukang Kayu 78,950 L.4.016 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 set Door closer 272,500 M.4.568 . . .
A.4.6.2.11. K-238 … bh Pemasangan 1 Buah Kunci Slot (Grendel) untuk Jendela 91,871 0.24 . 37,871 - 54,000
0.02 OH Pekerja 2,106 L.4.001 . . .
0.20 OH Tukang Kayu 31,580 L.4.016 . . .
0.02 OH Kepala Tukang 3,948 L.4.036 . . .
0.00 OH Mandor 237 L.4.035 . . .
1.00 buah Kunci slot 54,000 M.4.581 . . .
A.4.6.2.12. K-239 … bh Pemasangan 1 Buah Doorholder 196,696 0.60 . 94,796 - 101,900
0.05 OH Pekerja 5,265 L.4.001 . . .
0.50 OH Tukang Kayu 78,950 L.4.016 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 buah Door holder 101,900 M.4.569 . . .
A.4.6.2.13. K-240 … bh Pemasangan 1 Buah Doorstop 126,902 0.13 . 20,002 - 106,900
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang Kayu 15,790 L.4.016 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 buah Door stop 106,900 M.4.570 . . .
A.4.6.2.14. K-241 … bh Pemasangan 1 Buah Rel Pintu Dorong 329,613 0.72 . 113,613 - 216,000
0.06 OH Pekerja 6,318 L.4.001 . . .
0.60 OH Tukang Kayu 94,740 L.4.016 . . .
0.06 OH Kepala Tukang 11,844 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Set Rel pintu dorong 216,000 M.4.179 . . .
A.4.6.2.15. K-242 … bh Pemasangan 1 Buah Kunci Lemari 59,950 0.30 . 47,350 - 12,600
0.03 OH Pekerja 2,633 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .

www.mitra-arsitek.com 240/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Set Kunci lemari 12,600 M.4.579 . . .
A.4.6.2.16. K-243 … m2 Pemasangan 1 m2 Kaca Polos Tebal 3 mm 137,425 0.18 . 28,415 - 109,010
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.10 m2 Kaca Tebal 3mm 97,020 M.4.525 . . .
0.05 Tube Sealant 11,990 M.4.598 . . .
A.4.6.2.17. K-244 … m2 Pemasangan 1 m2 Kaca Polos Tebal 5 mm 173,725 0.18 . 28,415 - 145,310
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.00 OH Mandor 190 L.4.035 . . .
1.10 m2 Kaca tebal 5 mm 133,320 M.4.526 . . .
0.05 Tube Sealant 11,990 M.4.598 . . .
A.4.6.2.18. K-245 … m2 Pemasangan 1 m2 Kaca Polos Tebal 8mm 258,978 0.20 . 32,202 - 226,776
0.02 OH Pekerja 1,790 L.4.001 . . .
0.17 OH Tukang Kayu 26,843 L.4.016 . . .
0.02 OH Kepala Tukang 3,356 L.4.036 . . .
0.00 OH Mandor 213 L.4.035 . . .
1.10 m2 Kaca tebal 8 mm 209,990 M.4.527 . . .
0.07 Tube Sealant 16,786 M.4.598 . . .
A.4.6.2.19. K-246 … m2 Pemasangan 1 m2 Kaca Buram Tebal 12mm 247,286 0.30 . 47,350 - 199,936
0.03 OH Pekerja 2,633 L.4.001 . . .
0.25 OH Tukang Kayu 39,475 L.4.016 . . .
0.03 OH Kepala Tukang 4,935 L.4.036 . . .
0.00 OH Mandor 308 L.4.035 . . .
1.10 m2 Kaca buram 12 mm 183,150 M.4.520 . . .
0.07 Tube Sealant 16,786 M.4.598 . . .
A.4.6.2.20. K-247 … m2 Pemasangan 1 m2 Kaca Cermin Tebal 5mm 213,931 0.19 . 30,121 - 183,810
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.10 m2 Kaca cermin 5 mm 183,810 M.4.521 . . .
A.4.6.2.22. K-248 … m2 Pemasangan 1 m2 Kaca Cermin Tebal 8mm 290,091 0.21 . 34,121 - 255,970
0.02 OH Pekerja 1,790 L.4.001 . . .
0.17 OH Tukang Kayu 26,843 L.4.016 . . .
0.02 OH Kepala Tukang 3,356 L.4.036 . . .
0.01 OH Mandor 2,132 L.4.035 . . .
1.10 m2 Kaca cermin 8 mm 255,970 M.4.522 . . .
A.4.6.2.23. K-249 … m2 Pemasangan 1 m2 Kaca Wireglassed Tebal 5mm 286,091 0.19 . 30,121 - 255,970
0.02 OH Pekerja 1,580 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.01 OH Mandor 1,895 L.4.035 . . .
1.10 m2 Kaca wire glass 255,970 M.4.528 . . .
A.4.6.2.24. K-250 … m2 Pemasangan 1 m2 Kaca Patri Tebal 5mm 139,111 0.24 . 35,491 - 103,620
0.08 OH Pekerja 7,898 L.4.001 . . .
0.15 OH Tukang Kayu 23,685 L.4.016 . . .

www.mitra-arsitek.com 241/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 2,961 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.10 m2 Kaca patri 5mm 91,630 M.4.523 . . .
0.05 Tube Sealant 11,990 M.4.598 . . .
A.4.7.1.22. K-251 … m2 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3170,650
Lapis Cat Terakhir
1.19 . 162,036 - 8,614
0.40 OH Pekerja 42,120 L.4.001 . . .
0.70 OH Tukang Cat 101,360 L.4.010 . . .
0.07 OH Kepala Tukang 13,818 L.4.036 . . .
0.02 OH Mandor 4,738 L.4.035 . . .
0.30 Kg Cat dasar 8,250 M.4.378 . . .
0.01 L Pengencer 364 M.4.398 . . .
A.5.1.1.1. K-252 … m2 Pemasangan 1 Buah Closet Duduk/MoNoblock 2,758,204 1.77 . 266,218 16,986 2,475,000
0.50 OH Pekerja 52,650 L.4.001 . . .
1.10 OH Tukang Batu 173,690 L.4.007 . . .
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.16 OH Mandor 37,904 L.4.035 . . .
1.00 Unit Kloset duduk / monoblock 2,475,000 M.4.191 . . .
0.06 Ls Alat Bantu/Perlengkapan Umum 16,986 T.4.001 . . .
A.5.1.1.2. K-253 … bh Pemasangan 1 Buah Closet Jongkok Porselen 676,164 2.81 . 409,664 - 266,500
1.00 OH Pekerja 105,300 L.4.001 . . .
1.50 OH Tukang Batu 236,850 L.4.007 . . .
0.15 OH Kepala Tukang 29,610 L.4.036 . . .
0.16 OH Mandor 37,904 L.4.035 . . .
1.00 Unit Kloset jongkok porselen 166,500 M.4.192 . . .
100.00 bh Bata merah 100,000 M.4.007 . . .
A.5.1.1.3. K-254 … bh Pemasangan 1 Buah Closet Jongkok Teraso 650,105 2.70 . 383,605 - 266,500
1.00 OH Pekerja 105,300 L.4.001 . . .
1.50 OH Tukang Batu 236,850 L.4.007 . . .
0.15 OH Kepala Tukang 29,610 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 Unit Kloset jongkok porselen 166,500 M.4.192 . . .
100.00 bh Bata merah 100,000 M.4.007 . . .
A.5.1.1.4. K-255 … bh Pemasangan 1 Buah UriNoir 1,667,032 2.15 . 294,785 - 1,372,247
1.00 OH Pekerja 105,300 L.4.001 . . .
1.00 OH Tukang Batu 157,900 L.4.007 . . .
0.10 OH Kepala Tukang 19,740 L.4.036 . . .
0.05 OH Mandor 11,845 L.4.035 . . .
1.00 Unit Urinoir 1,358,000 M.4.200 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
A.5.1.1.5. K-256 … bh Pemasangan 1 Buah Wastafel 2,188,186 2.86 . 399,139 - 1,789,047
1.20 OH Pekerja 126,360 L.4.001 . . .
1.45 OH Tukang Batu 228,955 L.4.007 . . .
0.15 OH Kepala Tukang 29,610 L.4.036 . . .
0.06 OH Mandor 14,214 L.4.035 . . .
1.20 Unit Wastafel 1,774,800 M.4.201 . . .
6.00 Kg Semen 12,000 M.4.033 . . .
0.01 m3 Pasir pasang 2,247 M.4.030 . . .
A.5.1.1.6. K-257 … bh Pemasangan 1 Buah Bak Mandi Teraso Volume 0.30 m3 1,471,402 8.45 . 1,249,530 33,972 187,900
3.00 OH Pekerja 315,900 L.4.001 . . .

www.mitra-arsitek.com 242/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
4.50 OH Tukang Batu 710,550 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.90 OH Mandor 213,210 L.4.035 . . .
1.00 Unit Bak mandi teraso 187,900 M.4.187 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,972 T.4.001 . . .
A.5.1.1.7. K-258 … bh Pemasangan 1 Buah Bak Fibreglass Volume 0.3 m3 1,625,902 8.45 . 1,249,530 33,972 342,400
3.00 OH Pekerja 315,900 L.4.001 . . .
4.50 OH Tukang Batu 710,550 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.90 OH Mandor 213,210 L.4.035 . . .
1.00 Unit Bak fiberglass 342,400 M.4.186 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,972 T.4.001 . . .
A.5.1.1.8. K-259 … bh Pemasangan 1buah Bak Mandi Pasangan Bata Volume 0.30 m3 4,005,237 9.33 . 1,171,827 - 2,833,410
6.00 OH Pekerja 631,800 L.4.001 . . .
3.00 OH Tukang Batu 473,700 L.4.007 . . .
0.30 OH Kepala Tukang 59,220 L.4.036 . . .
0.03 OH Mandor 7,107 L.4.035 . . .
150.00 buah Bata merah 150,000 M.4.007 . . .
120.00 Kg Semen 240,000 M.4.033 . . .
0.30 m3 Pasir pasang 67,410 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,376,000 M.4.449 . . .
A.5.1.1.9. K-260 … bh Pemasangan 1 Buah Bathtub Porselen 2,809,338 0.90 . 141,838 - 2,667,500
0.08 OH Pekerja 7,898 L.4.001 . . .
0.75 OH Tukang Batu 118,425 L.4.007 . . .
0.08 OH Kepala Tukang 14,805 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.00 Unit Bathcuip 2,667,500 M.4.188 . . .
A.5.1.1.10. K-261 … bh Pemasangan 1 buah Bak Beton volume 1 m3 9,213,634 8.07 . 1,093,234 - 8,120,400
3.50 OH Pekerja 368,550 L.4.001 . . .
4.50 OH Tukang Batu 710,550 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.02 OH Mandor 4,264 L.4.035 . . .
0.90 m3 Beton 1:2:3 1,198,800 M.4.531 . . .
180.00 Kg Besi beton 2,430,000 M.4.132 . . .
0.40 m3 Papan kayu 3/20 Kelas III 741,600 M.4.106 . . .
500.00 buah Porselen Dinding 20x20 3,750,000 M.4.451 . . .
A.5.1.1.11. K-262 … bh Pemasangan 1 Buah Bak Air Fibreglass Volume 1 m3 491,454 0.81 . 115,082 33,972 342,400
0.30 OH Pekerja 31,590 L.4.001 . . .
0.45 OH Tukang Batu 71,055 L.4.007 . . .
0.05 OH Kepala Tukang 8,883 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
1.00 Unit Bak fiberglass 342,400 M.4.186 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,972 T.4.001 . . .
A.5.1.1.16. K-263 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 30x30cm Tinggi 35cm
558,732
dengan Tutup
2.96 Beton
. 357,955 - 200,777
2.16 OH Pekerja 227,448 L.4.001 . . .
0.72 OH Tukang Batu 113,688 L.4.007 . . .
0.07 OH Kepala Tukang 14,213 L.4.036 . . .
0.01 OH Mandor 2,606 L.4.035 . . .
40.00 buah Bata merah 40,000 M.4.007 . . .
44.00 Kg Semen 88,000 M.4.033 . . .

www.mitra-arsitek.com 243/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 m3 Pasir pasang 15,729 M.4.030 . . .
0.06 m3 Pasir beton 17,514 M.4.028 . . .
0.07 m3 Kerikil 17,934 M.4.024 . . .
1.60 Kg Besi beton 21,600 M.4.132 . . .
A.5.1.1.17. K-264 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 45cm x 45cm tinggi844,213
50cm dengan4.38
Tutup
. Beton 524,507 - 319,706
3.20 OH Pekerja 336,960 L.4.001 . . .
1.15 OH Tukang Batu 181,585 L.4.007 . . .
0.01 OH Kepala Tukang 2,171 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
77.00 Kg Semen 154,000 M.4.033 . . .
0.13 m3 Pasir pasang 29,211 M.4.030 . . .
0.09 m3 Pasir beton 26,271 M.4.028 . . .
0.02 m3 Kerikil 5,124 M.4.024 . . .
2.60 Kg Besi beton 35,100 M.4.132 . . .
A.5.1.1.18. K-265 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 60cm x 60cm Tinggi
1,025,809
65cm dengan
4.38
Tutup
. Beton 524,507 - 501,302
3.20 OH Pekerja 336,960 L.4.001 . . .
1.15 OH Tukang Batu 181,585 L.4.007 . . .
0.01 OH Kepala Tukang 2,171 L.4.036 . . .
0.02 OH Mandor 3,790 L.4.035 . . .
123.00 buah Bata merah 123,000 M.4.007 . . .
114.00 Kg Semen 228,000 M.4.033 . . .
0.18 m3 Pasir pasang 41,345 M.4.030 . . .
0.12 m3 Pasir beton 35,028 M.4.028 . . .
0.03 m3 Kerikil 8,455 M.4.024 . . .
4.85 Kg Besi beton 65,475 M.4.132 . . .
A.5.1.1.19. K-266 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter ½” 154,395 0.18 . 28,070 99,085 27,240
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 m Pipa galvanis ½” 27,240 M.4.212 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.20. K-267 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter ¾ ” 157,515 0.18 . 28,070 99,085 30,360
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 m Pipa galvanis 3/4” 30,360 M.4.213 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.21. K-268 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 1” 176,595 0.18 . 28,070 99,085 49,440
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.03 OH Mandor 6,396 L.4.035 . . .
1.20 m Pipa galvanis 1” 49,440 M.4.214 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.22. K-269 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 1 ½” 238,537 0.31 . 44,532 99,085 94,920
0.11 OH Pekerja 11,372 L.4.001 . . .
0.18 OH Tukang Batu 28,422 L.4.007 . . .

www.mitra-arsitek.com 244/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 3,553 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.20 m Pipa galvanis 11/2” 94,920 M.4.215 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.23. K-270 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 3” 278,627 0.39 . 55,942 99,085 123,600
0.14 OH Pekerja 14,216 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m Pipa galvanis 3” 123,600 M.4.216 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.24. K-271 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 4” 312,707 0.39 . 55,942 99,085 157,680
0.14 OH Pekerja 14,216 L.4.001 . . .
0.23 OH Tukang Batu 35,528 L.4.007 . . .
0.02 OH Kepala Tukang 4,540 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.20 m Pipa galvanis 4” 157,680 M.4.217 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.25. K-272 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter ½” 119,168 0.10 . 14,923 99,085 5,160
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang Batu 9,474 L.4.007 . . .
0.01 OH Kepala Tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.20 m Pipa PVC 1/2" 5,160 M.4.203 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.26. K-273 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter ¾ ” 119,168 0.10 . 14,923 99,085 5,160
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang Batu 9,474 L.4.007 . . .
0.01 OH Kepala Tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.20 m Pipa PVC 1/2" 5,160 M.4.203 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.27. K-274 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1” 121,088 0.10 . 14,923 99,085 7,080
0.04 OH Pekerja 3,791 L.4.001 . . .
0.06 OH Tukang Batu 9,474 L.4.007 . . .
0.01 OH Kepala Tukang 1,184 L.4.036 . . .
0.00 OH Mandor 474 L.4.035 . . .
1.20 m Pipa PVC 1” 7,080 M.4.205 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.28. K-275 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1½” 129,150 0.16 . 22,385 99,085 7,680
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.20 m Pipa PVC 11/2” 7,680 M.4.206 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.29. K-276 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2” 130,110 0.16 . 22,385 99,085 8,640
0.05 OH Pekerja 5,686 L.4.001 . . .
0.09 OH Tukang Batu 14,211 L.4.007 . . .
0.01 OH Kepala Tukang 1,777 L.4.036 . . .

www.mitra-arsitek.com 245/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 711 L.4.035 . . .
1.20 m Pipa PVC 2” 8,640 M.4.207 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.30. K-277 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2½” 141,903 0.23 . 33,458 99,085 9,360
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala Tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 m Pipa PVC 21/2” 9,360 M.4.208 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.31. K-278 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3” 144,063 0.23 . 33,458 99,085 11,520
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala Tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 m Pipa PVC 3” 11,520 M.4.210 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.32. K-279 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4” 144,063 0.23 . 33,458 99,085 11,520
0.08 OH Pekerja 8,529 L.4.001 . . .
0.14 OH Tukang Batu 21,317 L.4.007 . . .
0.01 OH Kepala Tukang 2,665 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.20 m Pipa PVC 3” 11,520 M.4.210 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 99,085 T.4.001 . . .
A.5.1.1.33. K-280 … bh Pemasangan 1 buah Bak Cuci Piring Stainlessteel 557,405 0.38 . 60,005 - 497,400
0.03 OH Pekerja 3,159 L.4.001 . . .
0.30 OH Tukang Batu 47,370 L.4.007 . . .
0.03 OH Kepala Tukang 5,922 L.4.036 . . .
0.02 OH Mandor 3,554 L.4.035 . . .
1.00 Unit Bak cuci piring 421,400 M.4.185 . . .
1.00 buah Waterdrain 76,000 M.4.202 . . .
A.5.1.1.34. K-281 … bh Pemasangan 1 buah Bak Cuci Piring Teraso 648,643 0.63 . 100,008 - 548,635
0.05 OH Pekerja 5,265 L.4.001 . . .
0.50 OH Tukang Batu 78,950 L.4.007 . . .
0.05 OH Kepala Tukang 9,870 L.4.036 . . .
0.03 OH Mandor 5,923 L.4.035 . . .
1.00 Unit Bak cuci piring 421,400 M.4.185 . . .
1.00 buah Waterdrain 76,000 M.4.202 . . .
20.00 Kg Semen 40,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,235 M.4.030 . . .
A.5.1.1.35. K-282 … bh Pemasangan 1 buah Kran Diameter ½” atau ¾ ” 99,186 0.46 . 73,294 - 25,893
0.01 OH Pekerja 1,053 L.4.001 . . .
0.40 OH Tukang Batu 63,160 L.4.007 . . .
0.04 OH Kepala Tukang 7,896 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 Buah Kran air 25,800 M.4.194 . . .
0.03 Buah Sealtape 93 M.4.599 . . .
A.5.1.1.36 K-283 … bh Pemasangan 1 buah Floor Drain 83,002 0.13 . 20,002 - 63,000
0.01 OH Pekerja 1,053 L.4.001 . . .
0.10 OH Tukang Batu 15,790 L.4.007 . . .

www.mitra-arsitek.com 246/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 1,974 L.4.036 . . .
0.01 OH Mandor 1,185 L.4.035 . . .
1.00 Unit Floor drain 63,000 M.4.189 . . .
A.5.1.1.37. K-284 … m1 Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah Ǿ 20 cm 171,580 0.13 . 16,477 - 155,103
0.08 OH Pekerja 8,424 L.4.001 . . .
0.04 OH Tukang Batu 6,316 L.4.007 . . .
0.00 OH Kepala Tukang 790 L.4.036 . . .
0.00 OH Mandor 948 L.4.035 . . .
1.60 m1 Pipa Tanah 78,240 M.4.198 . . .
35.00 Kg Semen 70,000 M.4.033 . . .
0.01 m3 Pasir pasang 3,146 M.4.030 . . .
0.01 m3 Pasir urug 3,717 M.4.032 . . .
A.5.1.1.38. K-285 … m1 Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah diameter 15 cm98,300 0.10 . 12,358 - 85,942
0.06 OH Pekerja 6,318 L.4.001 . . .
0.03 OH Tukang Batu 4,737 L.4.007 . . .
0.00 OH Kepala Tukang 592 L.4.036 . . .
0.00 OH Mandor 711 L.4.035 . . .
1.60 m1 Pipa tanah 78,240 M.4.198 . . .
0.93 Kg Semen 1,860 M.4.033 . . .
0.01 m3 Pasir pasang 2,921 M.4.030 . . .
0.01 m3 Pasir urug 2,921 M.4.032 . . .
A.5.1.1.39. K-286 … m1 Pemasangan 1 m’ Pipa Beton Diameter 15 – 20 cm 103,467 0.22 . 28,835 - 74,632
0.14 OH Pekerja 14,742 L.4.001 . . .
0.07 OH Tukang Batu 11,053 L.4.007 . . .
0.01 OH Kepala Tukang 1,382 L.4.036 . . .
0.01 OH Mandor 1,658 L.4.035 . . .
1.10 m1 Pipa tanah 53,790 M.4.198 . . .
0.03 m3 Bata merah 27 M.4.007 . . .
0.93 Kg Semen 1,860 M.4.033 . . .
0.06 m3 Pasir pasang 12,583 M.4.030 . . .
0.02 m3 Pasir urug 6,372 M.4.032 . . .
A.5.1.1.40. K-287 … m1 Pemasangan 1 m’ Pipa Beton Diameter 30 – 100 cm 185,233 0.61 . 78,267 - 106,966
0.38 OH Pekerja 40,014 L.4.001 . . .
0.19 OH Tukang Batu 30,001 L.4.007 . . .
0.02 OH Kepala Tukang 3,751 L.4.036 . . .
0.02 OH Mandor 4,501 L.4.035 . . .
1.10 m1 Pipa tanah 53,790 M.4.198 . . .
0.55 m3 Bata merah 550 M.4.007 . . .
10.30 Kg Semen 20,600 M.4.033 . . .
0.06 m3 Pasir pasang 13,707 M.4.030 . . .
0.07 m3 Pasir urug 18,320 M.4.032 . . .
A.6.1.1.1. K-288 … bh Pemasangan 1 buah MCCB 830,000 - . 171,100 - 658,900
1.00 % Tukang Listrik 171,100 L.4.019 . . .
3.00 btg Pipa listrik 5/8” 37,500 M.4.519 . . .
15.00 m Kabel NYM 3x2,5 mm2-SNI 198,000 M.4.631 . . .
1.00 buah Tee Doos 1,500 M.4.518 . . .
2.00 buah L.Bow 21,200 M.4.195 . . .
24.00 buah Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 buah MCB + Box 381,500 M.4.629 . . .
A.6.2.1.1 K-289 … titik Pemasangan 1 Buah Titik Lampu 649,800 - . 171,100 - 478,700

www.mitra-arsitek.com 247/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 % Tukang Listrik 171,100 L.4.019 . . .
3.00 btg Pipa listrik 5/8” 37,500 M.4.519 . . .
24.00 m Kabel NYM 3x2,5 mm2-SNI 316,800 M.4.631 . . .
3.00 buah Tee Doos 4,500 M.4.518 . . .
4.00 buah L.Bow 42,400 M.4.195 . . .
3.00 buah Las Dop 3,000 M.4.515 . . .
24.00 buah Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 buah Mongkok (Listrik) 1,500 M.4.516 . . .
1.00 buah Saklar Listrik 28,000 M.4.633 . . .
1.00 buah Fitting Lampu 25,800 M.4.512 . . .

www.mitra-arsitek.com 248/248