HARGA SATUAN UPAH DAN BAHAN MATERIAL

LOKASI : KABUPATEN DOMPU


TAHUN ANGGARAN : 2023

HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
1 2 3 4
Upah Tenaga Kerja
1 Pekerja OH 170,000.00
2 Tukang Batu OH 200,000.00
3 Kepala Tukang Batu OH 250,000.00
4 Tukang Kayu OH 200,000.00
5 Kepala Tukang Kayu OH 250,000.00
6 Tukang Besi Beton OH 200,000.00
7 Kepala Tukang Besi Beton OH 250,000.00
8 Tukang alumnium OH 200,000.00
9 Kepala Tukang alumunium OH 250,000.00
10 Tukang Las OH 200,000.00
11 Kepala Tukang Las OH 250,000.00
12 Tukang Politur OH 200,000.00
13 Tukang Cat OH 200,000.00
14 Kepala Tukang Cat OH 250,000.00
15 Pemecah Batu OH 180,000.00
16 Penggergaji OH 180,000.00
17 Mandor pengisi Bronjong OH 250,000.00
18 pengisi Bronjong OH 180,000.00
19 Penganyam Bronjong OH 200,000.00
20 Kepala Penganyam Bronjong OH 250,000.00
21 Mandor OH 250,000.00
22 Sopir OH 220,000.00
23 Pembantu Sopir OH 170,000.00
24 Mekanik OH 200,000.00
25 Pembantu Mekanik OH 170,000.00
26 Operator Alat Ringan OH 200,000.00
27 Operator Alat Berat OH 220,000.00
28 Pembantu Operator OH 180,000.00
29 Pemasak Aspal OH 170,000.00
30 Penunjuk Jalan OH 170,000.00
31 Tukang Pipa OH 200,000.00
32 Tukang Bor OH 200,000.00
33 Tukang Listrik OH 200,000.00
34 Kepala Tukang Listrik OH 250,000.00
35 Penjaga Malam OH 150,000.00
36 Penggosok Tegel OH 150,000.00
37 Kepala Tukang Politur OH 250,000.00
38 Kepala Tukang Pipa OH 250,000.00
39 Tukang Cor OH 200,000.00
40 Pekerja Cor OH 180,000.00
41 Tukang Interior OH 250,000.00
42 Kepala Tukang Interior OH 300,000.00
-
1 IMB m2 20,000.00
-
Bahan Pasangan -
1 Batu Kali Belah 15-20 cm M³ 300,000.00
2 Batu Kali Alam M³ 265,000.00
3 Kerikil Pecah 5/7 cm M³ 465,000.00
4 Kerikil 5/7 cm (Stone Crusher) M³ 600,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
5 Kerikil Pecah 3/5 cm M³ 555,000.00
6 Kerikil 3/5 cm (Stone Crusher) M³ 600,000.00
7 Kerikil Pecah 2/3 cm M³ 625,000.00
8 Kerikil 2/3 cm (Stone Crusher) M³ 810,000.00
9 Kerikil Alam 0,5/1 Cm M³ 580,000.00
10 Kerikil Alam 2/3 M³ 630,000.00
11 Kerikil Sungai - Riyalti M³ 400,000.00
12 Kerikil Beton (Maks 3 cm) M³ 400,000.00
13 Kerikil Pecah 1/2 cm M³ 870,000.00
14 Batu Kali Keping / Tempel M³ 325,000.00
15 Kerikil Alam 5/7 M³ 262,000.00
16 Kerikil Alam 3/5 M³ 275,000.00
17 Kerikil Alam 2/3 Cm M³ 400,000.00
Kerikil (maksimum 30 mm) kg
18 Agregate Kasar (Stone Crusher) M³ 870,000.00
19 Agregate Halus (Stone Crusher) M³ 995,000.00
20 Agregate Klas B (20% Agg.Hls:80% Agg.Ksr) M³ 750,000.00
21 Batu Apung Kg 300,000.00
22 Batu Bata Kelas I (Press) Buah 1,000.00
23 Batu Bata Kelas II (Lokal) Buah 900.00
24 Bata ringan/Hebel, 10X20X60 m3 1,600,000.00
25 Bata ringan/Hebel, 10X20X60 bh 22,000.00
26 Pasir Beton ( Pasir Hodo ) M³ 600,000.00
27 Pasir Pasang M³ 265,000.00
28 Pasir Urug M³ 240,000.00
29 Sirtu M³ 300,000.00
30 Tanah Urug biasa M³ 155,000.00
31 Tanah Urug Pilihan M³ 232,000.00
32 Tanah Liat (TL) M³ 81,000.00
-
Bahan Pengikat campuran/Semen -
1 Semen Merah (SM) Kg 38,000.00
2 Semen Warna Kg 38,000.00
3 PC. Merk Tiga Roda Kg 1,750.00
4 PC. Merk Gresik Kg 1,750.00
5 PC. Merk Tonasa Kg 1,750.00
6 PC. Merk Holcim Kg 1,750.00
7 PC. Merk Basuwa Kg 1,700.00
8 PC. Merk Padang Kg 1,700.00
9 PC. Merk Singa Merah Kg 1,700.00
10 Semen Warna Butiran Halus Kg 38,000.00
11 Semen Warna Butiran Kasar Kg 38,000.00
12 Ornamen terawang custom m2 1,000,000.00
13 Semen-MU 380 (Plesteran) Kg 6,000.00
14 Semen-MU 200 (acian) Kg 5,000.00
15 Acian Mild Kalsium Kg 5,500.00
16 Acian Mild Kapur Kg 2,500.00
17 Pengeras Beton Kg 55,000.00
18 Perekat Beton Kg 70,000.00
-
1 Rumput Gebalan M² 60,000.00
2 Kapur Gamping/Labur Kg 7,300.00
3 Kapur Biasa Kg 4,000.00
4 Fuller (Abu Batu) Kg 5,900.00
-
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
1 Air kerja Liter 6,000.00
2 Strorox - 100 Kg 60,000.00
3 Dinding Hollow Block (HB 20) Bh 15,000.00
4 Dinding Hollow Block (HB 15) Bh 12,000.00
5 Dinding Hollow Block (HB 10) Bh 10,000.00
-
Bahan Atap -
1 Sirap Kalimantan Bh 5,800.00
2 Genteng Lokal Bh 3,850.00
3 Genteng Beton /Pres Bh 9,200.00
4 Genteng Karang Pilang/ Kodok Bh 7,600.00
5 Genteng Pejaten Sudah di cat Bh 5,800.00
6 Genteng Kaca Bh 51,000.00
7 Genteng Keramik / 25bh Bh 25,500.00
8 Genteng Keramik Glazur / 15bh Bh 20,500.00
9 Genteng Kanmuri Full Flat, Natural Bh 26,000.00
10 Genteng Karang Pilang Type Keramik Bh 31,000.00
11 Genteng Aspal Bh -
12 Genteng Bubungan Lokal Bh 9,400.00
13 Genteng Bubungan Beton Bh 10,250.00
14 Genteng Bubungan Silang Bh 8,500.00
15 Genteng Bubungan Pejaten Bh 10,800.00
16 Genteng Bubungan Keramik / 4bh Bh 53,000.00
17 Genteng Bubungan Keramik Glazur / 4bh Bh 18,100.00
18 Bubungan Genteng kanmuri Full Flat, Natura Bh 41,000.00
19 Bubungan Karang Pilang/ Kodok Bh 33,500.00
20 Genteng Bubungan Aspal Bh -
21 Genteng Metal roof 0,25 mm (Lapis Butiran) Lbr 165,000.00
22 Bubungan Metal Roof (Lapis Butiran) M' 195,000.00
23 Genteng Metal roof 0,3 mm (Lapis Butiran) Lbr 86,000.00
24 Bubungan Metal Roof (Lapis Butiran) M' 195,000.00
25 Genteng Metal roof 0,25 mm (Tanpa Lapis Butiran) Sakura Lbr 75,000.00
26 Bubungan Metal (Tanpa Lapis Butiran) M' 112,000.00
27 Atap bitumen gelombang H : 3,0 mm lbr 220,000.00
Atap bitumen gelombang H : 3,0 mm lbr 220,000.00
28 Paku fiser bitumen bh 10,000.00
29 Nok / Ridge Onduline Lbr 150,000.00
30 Sekrup / Paku bh 18,000.00
31 Asbes Type Genteng (tyluq) Lembar 93,000.00
Asbes semen M²
32 Ijuk Atap kg 51,000.00
33 Asbes Gelombang Kecil 92 x 180 cm Lembar 77,000.00
34 Asbes Gelombang Besar 105 x 240 cm Lembar 232,000.00
35 Bubungan Asbes Gelombang Kecil 92 cm Lembar 77,000.00
36 Bubungan Asbes Gelombang Besar 105 cm Lembar 112,000.00
37 Seng.Glb Besar BJL.S 20 Lembar 93,000.00
38 Seng.Glb Besar BJL.S 25 Lembar 112,000.00
39 Seng.Glb Besar BJL.S 30 Lembar 129,000.00
40 Seng.Glb Kecil BJL.S 20 Lembar 100,000.00
41 Seng Plat BJL.S 18 lebar 90 cm M' 71,000.00
42 Seng Plat BJL.S 20 lebar 90 cm M' 99,000.00
43 Seng Plat BJL.S 25 lebar 90 cm M' 129,000.00
44 Seng Plat BJL.S 28 lebar 90 cm M' 141,000.00
45 Flashing (List Seng Lipat, 2.10.62x120 cm) Bh 95,000.00
46 Seng Plat BJL.S 30 lebar 90 cm M' 160,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
47 Seng Spandek 0.25 mm lebar 80 cm M' 105,000.00
48 Seng Spandek 0.3 mm lebar 80 cm M' 116,000.00
49 Seng Spandek 0.35 mm lebar 80 cm M' 121,000.00
50 Seng Spandek 0.4 mm lebar 80 cm M' 129,000.00
51 Seng Spandek 0.25 mm lebar 80 cm, Warna M' 81,000.00
52 Seng Spandek 0.3 mm lebar 80 cm, Warna M' 91,000.00
53 Seng Spandek 0.35 mm lebar 80 cm, Warna M' 102,000.00
54 Seng Spandek 0,4 mm lebar 80 cm, Warna M' 106,000.00
55 Atap Roof Fiber Glass Lbr 153,000.00
56 Rangka Atap Roof Fiber Glass M² 195,000.00
57 Plastik Aerator M² 7,900.00
58 Atap Polycarbonat Lbr 238,000.00
59 Atap Trimdeck 0.40 TCT (Spandek) M² 129,000.00
60 Bubungan Trimdeck 0.40 TCT (Spandek) M' 72,000.00
Bubungan Trimdeck 0.40 TCT (Spandek) M' 72,000.00
61 Alumunium Foil M² 32,500.00
62 Karet Talang M' 100,000.00
63 Atap Polycarbonate (210 x 1180 cm) Lembar 470,000.00
Atap Polycarbonate M² 20,000.00
64 GRC Board bergelombang m2 140,000.00
65 Profil C 75.100 M' 32,000.00
66 Profil C 75.75 M' 21,000.00
67 Profil C 80.100 M' 42,000.00
68 Profil C 80.75 M' 38,000.00
69 Reng U 0.55 M' 12,000.00
70 Reng U 0.45 M' 9,500.00
Reng U 0.40 M' 9,500.00
71 Baut Truss Bh 800.00
72 Baut Reng Bh 800.00

Bahan Kayu dan Bambu


1 Papan Kayu Klas I M³ 6,750,000.00
2 Papan Kayu Klas II M³ 5,500,000.00
3 Papan Kayu Klas III M³ 4,300,000.00
4 Balok Kayu Klas I M³ 6,150,000.00
5 Balok Kayu Klas II M³ 4,900,000.00
6 Balok Kayu Klas III M³ 3,700,000.00
7 Dolken / Perancah Dia. 7 Cm - 4 m Batang 32,500.00
8 Papan Kayu Begisting M³ 3,090,000.00
9 Balok Kayu Begisting M³ 2,720,000.00
-
1 Lumbersering Kayu Kelas I M³ 4,080,000.00
2 Lumbersering Kayu Kelas II M³ 3,420,000.00
3 List Plafond M' 11,000.00
4 List Plafond 2/4 Profil M' 11,500.00
5 List Plafond 3/3 Profil M' 13,500.00
6 List Plafond 4/4 Profil M' 15,200.00
7 List Plafond 5/5 Profil M' 18,200.00
8 Papan Nama Bh 390,000.00
9 Bambu (Dia 12.5 cm, P 6 m) Btg 62,500.00
10 Bambu (Dia 10 cm, P 6 m) Btg 59,500.00
11 Bambu (Dia 7 cm, P 6 m) Btg 49,500.00
12 Bedek Kulitan M² 61,000.00
13 Bedek Biasa M² 53,800.00
14 Bedek Pagar M² 56,900.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
15 Bilik Bambu M² 71,000.00
-
Bahan Cetak -
1 Lubang Angin 10x20 Cm Bh 26,000.00
2 Lubang Angin 20x20 Cm Bh 18,000.00
3 Lubang Angin 20x30 Cm Bh 30,200.00
4 Buis Beton Dia. 10 Cm Bh,L= 0,5M 87,000.00
5 Buis Beton Dia. 20 Cm Bh,L= 0,5M 128,000.00
6 Buis Beton Dia. 30 Cm Bh,L= 0,5M 145,000.00
7 Buis Beton Dia. 40 Cm Bh,L= 0,5M 170,000.00
8 Buis Beton Dia. 50 Cm Bh,L= 0,5M 255,000.00
9 Buis Beton Dia. 60 Cm Bh,L= 0,5M 255,000.00
10 Buis Beton Dia. 80 Cm Bh,L= 0,5M 318,000.00
11 Penutup Buis Beton Dia. 80 Cm Bh 185,000.00
12 Batako 10 x 20 x 40 Cm Bh 6,000.00
13 Paving Blok Persegi (t = 8 cm) M2 100,000.00
14 Paving Blok Persegi (t = 6 cm) M2 90,000.00
Paving Blok Persegi (warna) M2 120,000.00
15 Paving Blok Persegi (t = 8 cm), Press M2 175,000.00
16 Paving Blok Tiga Berlian M2 230,000.00
17 Batu paras/Palimanan M2 325,000.00
18 Batu Sisir/ Bergaris, hitam M2 327,000.00
19 Lubang Angin Keramik 20 x 20 cm Bh 62,500.00
20 Lubang Angin Keramik 30 x 30 cm Bh 74,200.00
21 Glass Block Bh 81,000.00
22 Roster Terawang (15 X 20 ) Bh 38,500.00
23 Roster 30 x 30 m2 250,000.00
24 Wall Line GRC + Rangka Hollow (Terpasang) M2 1,180,000.00
25 Conblock tipe segi-empat abu-abu 8 cm, K-300 m2 200,000.00
26 Conblock tipe segi-enam abu-abu 8 cm, K-300 m2 170,000.00
27 Kisi-kisi 50x100 mm UPVC Motif Kayu m1 180,000.00
28 Kanstein/Kerb T=30 cm, P=60 cm (jalan) m1 250,000.00
29 Kanstein/Kerb T=40 cm, P=60 cm (taman) m1 150,000.00
30 Udith (Beton pracetak), lebar 80 cm, tebal = 12 cm Bh,P=1,2M 2,000,000.00
31 Udith (Beton pracetak), lebar 100 cm, tebal = 12 cm Bh,P=1,2M 2,300,000.00
-
Bahan Lantai -
1 Tegel Abu-abu 20 x 20 M² 81,000.00
2 Tegel Bergaris Abu 20 x 20 Cm M² 92,000.00
3 Tegel Warna 20 x 20 Cm M² 97,500.00
4 Tegel Bergaris Warna 20 x 20 Cm M² 97,500.00
5 Tegel Traso Klas I 30 x 30 M² 103,000.00
6 Tegel Traso Klas II 30 x 30 M² 100,000.00
7 Granite Kw I M² 465,000.00
8 Granite Kw II M² 395,000.00
9 Geotextile m2 380,000.00
10 Drainagecell m2 180,000.00
11 Hospital plint 60 x 10 x 4 Buah 180,000.00
12 Stepnose tangga 10x40 cm Buah 40,000.00
13 Karpet kg 30,000.00
14 grassblock tebal 8 cm m2 200,000.00
15 Lantai conwood deck 12" T-lock + Pengecetan M² 810,000.00
-
1 Keramik Dinding Kw I (Motif) M² 145,000.00
2 Keramik Dinding Kw II (Motif) M² 135,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
3 Keramik Dinding Kw I (Polos) M² 146,000.00
4 Keramik Dinding Kw II (Polos) M² 109,000.00
-
1 Keramik Lantai Kualitas I (Motif) M² 190,000.00
2 Keramik Lantai Kualitas II (Motif) M² 150,000.00
3 Keramik Lantai Kualitas I (Polos) M² 120,000.00
4 Keramik Lantai Kualitas II (Polos) M² 100,000.00
-
1 Keramik cutting Motif M² 175,000.00
Keramik artistik Bh 15,000.00
2 Lantai Marmer M² 750,000.00
3 Lantai Vinyl Kw I M² 850,000.00
4 Lantai Vinyl Kw II M² 550,000.00
5 Lantai parquete (dreamwood), Kw I M² 1,200,000.00
6 Lantai parquete (dreamwood), Kw II M² 1,000,000.00
7 Beton grid Pracetak K225, ( 5x40x240) M3 3,200,000.00
8 Porselin Kualitas I (Polos) M² 150,000.00
9 Plint Keramik Bh 15,000.00
10 Plint Granite Bh 36,000.00
Plint Ubin 15 x 20 cm Buah 2,000.00
Plint Ubin 10 x 30 cm Buah 2,000.00
Plint Ubin 10 x 40 cm Buah 2,700.00
11 Coral sikat Kg 11,000.00
12 Coral sikat, Warna Kg 17,000.00
13 Dinding Kalsiplank 8" Jati+ Rangka Holow + Pengecetan M² 760,000.00
14 Dinding Bahan HPL, Motif M² 233,000.00
15 Dinding Bahan HPL, Polos M² 203,000.00
16 Bahan HPL, Polos m2 87,500.00
17 Kapur Sirih Kg 30,000.00
18 Wall Paper m2 150,000.00
19 Perekat Kg 30,000.00
20 Kanstin m2 90,000.00
-
Bahan Besi -
1 Besi Beton Ulir Kg 25,000.00
2 Besi Beton polos Kg 22,000.00
3 Rangka Plafond Metal Furing m2 264,000.00
4 Rangka Plafond Besi Hollow, (galvanis) m2 213,000.00
5 Plat baja tebal 8 mm 4 feet x 8 feet lbr 1,400,000.00
6 plat baja 15x9x9,2 cm m1 350,000.00
7 Plat stainless steel m2 750,000.00
8 Pull Handle ex. Dekson type 01 bh 1,500,000.00
9 Lock Case ex. Dekson bh 200,000.00
10 Lever Handle ex. Dekson bh 200,000.00
11 Engsel Floor hange Dexson bh 1,850,000.00
12 Door Closer ex dekson bh 450,000.00
13 Slide Handle ex. Dekson bh 1,700,000.00
14 Engsel sliding bh 300,000.00
15 Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinco bh 20,000,000.00
16 Flush bolt ex. Dekson bh 150,000.00
17 Engsel kupu ex. Dekson bh 150,000.00
18 Plat timbah hitam 3 m m2 950,000.00
19 Besi Profil (Siku), kanal C Kg 62,000.00
20 Besi Baja IWF Kg 62,500.00
21 Pipa Black Steel Kg 700,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
22 Spaner Kg 45,000.00
23 Curtain Wall + kaca templet 8 mm m2 2,500,000.00
24 Kusen Alumunium Natural M' 112,000.00
25 Kusen Alumunium Warna M' 125,000.00
26 Daun pintu/jendela alumunium + kaca 5 mm, Complit (natural) m2 1,450,000.00
27 Daun pintu/jendela alumunium + kaca 5 mm, Complit (warna) m2 1,600,000.00
28 Daun pintu/jendela alumunium + kaca 8 mm, Complit (natural) m2 1,850,000.00
29 Daun pintu/jendela alumunium + kaca 8 mm, Complit (warna) m2 2,000,000.00
30 Alumunium Strip M' 83,000.00
31 Alumunium "T" M' 33,500.00
32 Kawat f 4 mm M' 100,000.00
33 Profil kaca Alumunium M' 117,000.00
34 Kawat Ikat Beton Kg 35,000.00
35 Kawat Nyamuk Besi M² 40,000.00
36 Kawat Saringan Pasir M² 45,000.00
37 Kawat Duri 50/Rol 125,000.00
38 Kawat Bronjong digalvanisir Kg 50,000.00
39 Kawat Las Kotak 164,000.00
40 Besi Strip Tebal 5 mm Kg 57,000.00
41 Besi Strip Tebal 3 x 2 mm Kg 47,000.00
42 Besi Strip Tebal 2 x 2 mm Kg 44,900.00
43 Besi Stainles Diameter 2" M' 100,000.00
44 Besi Stainles Diameter 1" M' 60,000.00
45 Besi Stainles Diameter 1/2" M' 44,900.00
46 Daun Pintu Roling door alumunium M² 630,000.00
47 Rangka Roling door alumunium M' 355,000.00
48 Pintu Harmonika, Complet M² 1,820,000.00
49 Sunscreen alluminium M² 560,000.00
50 Alluminium Composit Panel (ACP) 0,30 mm, (Interior) M² 660,000.00
51 Alluminium Composit Panel (ACP) 0,30 mm,(Exterior) M² 910,000.00
52 Wood Panel Composit (WPC) tebal 15mm M² 650,000.00
53 Pintu WCP, Complit Unit 1,900,000.00
54 sealent tube 47,000.00
55 Kawat Gerawang M² 44,500.00
56 Besi Hollow 100 x 50 Zincromate L = 6m M' 65,000.00
Besi Hollow 50 x 50 Zincromate L = 6m M' 64,000.00
57 Besi Hollow 40 x 40 Zincromate L = 6m M' 63,000.00
58 Besi Hollow 40 x 20 Zincromate L = 6m M' 50,000.00
59 Besi Hollow 40 x 40 Stenlistail L = 6m M' 130,000.00
60 Besi Hollow 20 x 20 Stenlistail L = 6m M' 63,000.00
61 Pipa 2" black steel di cat duco m1 75,000.00
62 Pipa 1"black steel dicat duco m1 50,000.00
63 Galvanis Steel 3/4" m1 50,000.00
64 Besi Stainless Ø 3/4' m1 150,000.00
65 Syntetic Grass m2 180,000.00
66 WPC 5x5 cm m1 300,000.00
67 WPC 10x5 cm m1 370,000.00
68 WPC 15x5 cm m1 550,000.00
69 WPC 20x5 cm m1 650,000.00
70 WPC Panel W15 x H2,5 cm m1 350,000.00
71 WPC door type 02 include kaca 5 mm bh 3,000,000.00
72 WPC door type 03 include kaca 5 mm bh 4,800,000.00
73 WPC door type 04b include kaca 5 mm bh 2,800,000.00
74 WPC door type 04c include kaca 5 mm bh 2,200,000.00
75 WPC door type 06 uk. 2,2 x 0,8 m bh 2,700,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
76 WPC door type 08 uk. 1.1 x 0,6 m bh 1,900,000.00
77 WPC door type 09 uk. 2,2 x 1,5 m bh 3,500,000.00
78 WPC door type 10 uk. 2,2 x 0,9 m bh 2,900,000.00
79 WPC door type 11 uk. 2,2 x 1,3 m bh 4,700,000.00
80 Kalsiboard rangka alumunium set 900,000.00
81 Besi Hollow / Square Bars 20 x 40 mm M' 23,000.00
82 Besi Hollow / Square Bars 40 x 40 mm M' 36,000.00
83 Besi Hollow / Square Bars 40 x 60 mm M' 55,000.00
83 Besi Hollow / Square Bars 50 x 50 mm M' 58,000.00
84 Besi Hollow / Square Bars 40 x 80 mm M' 86,000.00
85 Besi Hollow / Square Bars 50 x 100 mm M' 130,000.00
86 Besi Hollow / Square Bars 100 x 100 mm M' 175,000.00
86 pengelasan cm1 1,500.00
87 Steel Frame Hollow Galvanis 150x40x3 mm m1 38,000.00
88 Alumunium 4" Dark Gray ex. YKK m1 250,000.00
89 Kunci Pintu Alumunium Bh 262,000.00
90 Textile Tape M' 57,000.00
91 Siku Pintu Otomatis Bh 650,000.00
92 Karet Kaca Set 172,000.00
93 Besi Plat 3 mm Lembar 1,850,000.00
94 Besi Plat 2 mm Lembar 1,350,000.00
Besi plat baja Kg 35,000.00
95 Pintu kawat harmonika + Besi Siku M² 290,000.00
96 Plat baja, ukuran 120 x 240 cm Kg 44,500.00
97 Jarum Keras Bh 50,000.00
98 Pintu Jeruji Besi Rangka besi siku 40.40.4 + Asisories M² 550,000.00
99 Pintu Besi Pagar M² 530,000.00
100 Pagar Besi M² 510,000.00
101 Pintu Besi Pagar (dia. 16 mm) M² 1,200,000.00
102 Pagar Besi (dia. 16 mm) M² 1,100,000.00
103 Pagar Besi Pipa GI M² 875,000.00
104 Pintu Pagar Besi Pipa GI M² 935,000.00
105 Baut Sekrup Anti Karat Bh 3,550.00
106 Ventilasi Siku M2 290,000.00
107 Mata Kater Bh 112,000.00
108 Roda Pintu Dorong Bh 81,500.00
109 Mesin Bor Listirk Unit 1,600,000.00
110 Wiremesh M6/ (34,76)kg Kg 56,000.00
111 Wiremesh M8/ (61,79)kg Kg 84,000.00
112 Wiremesh M10/ (96,54)kg Kg 122,000.00
113 Bondek tebal 0.65 mm M2 122,000.00
114 Bondek tebal 0.70 mm M2 128,000.00
115 Bondek tebal 0.75 mm M2 136,000.00
116 Bondek tebal 1.00 mm M2 220,000.00
-
Bahan Langit-Langit -
1 Eternit 100 x 100 Cm Lembar 48,000.00
2 Triplek 120 x 240 x 2 mm Lembar 77,000.00
3 Triplek 120 x 240 x 3 mm Lembar 920,500.00
4 Triplek 120 x 240 x 4 mm Lembar 112,000.00
5 Triplek 120 x 240 x 6 mm Lembar 116,000.00
6 Triplek 120 x 240 x 9 mm Lembar 190,000.00
7 Triplek 120 x 240 x 12 mm Lembar 275,000.00
8 Triplek 120 x 240 x 18 mm Lembar 375,000.00
9 Calsiboard 1200 x 240 x 3.5 mm Lembar 157,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
10 Calsiboard 1200 x 240 x 6 mm Lembar 280,000.00
11 Gypsum board 1200 x 2400 x 9 mm M2 135,000.00
12 PVC/ Shunda Plafond, 1.2 mm, Putih Polos M2 261,000.00
13 PVC/ Shunda Plafond, 1.2 mm, Warna M2 305,000.00
14 Plafond Akustik 600 x 600 M2 167,000.00
15 Plafond Papan Kayu Kls II, 2 cm M2 167,000.00
16 Formika Putih 120 x 240 mm Lembar 2,296,000.00
17 Formika Warna 120 x 240 mm Lembar 300,000.00
18 Mega Teakwood 120 x 240 x 3 mm Lembar 250,000.00
Plywood tebal 4 mm, ukuran 120 cm x 240 cm Lembar 250,000.00
Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 150,000.00
Triplek tebal 9 mm, ukuran 120 cm x 240 cm Lbr 170,000.00
19 List Gypsum M' 44,500.00
20 List Plafond Gypsum Type I M' 76,000.00
21 List Plafond Gypsum Type II M' 63,000.00
22 List Plafond Shadow Line, aluminium 0.30 mm M' 7,000.00
23 Lem Kayu Kg 75,000.00
24 Lem Kg 75,000.00
25 Lem vinyl/perquete Kg 75,000.00
26 Lem Gypsum Kg 52,000.00
27 List Plafond Shadow Line, aluminium 0.30 mm M' 10,000.00
28 Kasiplank (0.8 x 20) M' 81,000.00
29 Top Cross Rail 250FX btg 45,000.00
30 Furring Chanel PN 205 btg 120,000.00
31 Furring Chanel PN 208 bh 5,000.00
32 Suspension Spring Clip 223SS bh 8,000.00
33 4 mm Soft Galv Suspension Rod PN 225 bh 8,000.00
34 Angle Bracket PN 220 bh 5,000.00
35 Wall Angle 252FX bh 20,000.00
36 Paper Tape roll 80,000.00
37 Steel Tape roll 180,000.00
38 UB Cote Read Mix kg 230,000.00
39 Papan WPC teval 7 mm lbr 450,000.00
-
Bahan Kaca -
1 Kaca Nako 5 mm M² 145,000.00
2 Kaca Polos 3 mm M² 135,000.00
3 Kaca Polos 5 mm M² 170,000.00
4 Kaca Polos 8 mm M² 200,000.00
5 Kaca Buram (ES) 5 mm Komplit M² 230,000.00
6 Kaca Riben 3 mm M² 141,000.00
7 Kaca Riben 5 mm M² 180,000.00
8 Kaca Cermin 5 mm M² 180,000.00
9 Acrilic 2mm Bening 2mmx122cmx244cm Lembar 600,000.00
10 Kaca Tempreat 8 mm, Polos M² 1,150,000.00
11 Kaca Tempreat 10 mm, Polos m2 1,500,000.00
12 Kaca Tempreat 12 mm, Polos M² 1,650,000.00
13 Kaca Tempreat 8 mm, Warna M² 1,250,000.00
14 Kaca Tempreat 12 mm, Warna M² 1,950,000.00
15 Kaca Lengkung 10 mm, Polos M² 2,150,000.00
16 Kaca Lengkung 12 mm, Polos M² 2,600,000.00
-
Bahan Finishing -
1 Amplas Lembar 11,000.00
2 Plamir Kayu Kg 53,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
3 Spritus Liter 51,000.00
4 Dempul Kg 58,000.00
5 Batu Apung Kg 290,000.00
6 Soda api Liter 68,500.00
7 Sabun Kg 38,500.00
8 Minyak Cat Liter 41,500.00
9 Residu Liter 47,000.00
10 Minyak Bekisting Liter 39,000.00
11 Meni Besi Kg 56,500.00
12 Meni Kayu Kg 56,500.00
13 Cat Kayu Mutu Menengah Kg 95,000.00
14 Cat Kayu Mutu Tinggi Kg 111,000.00
15 Cat Tembok Mutu Tinggi, (Interior) Kg 85,000.00
16 Cat Tembok Mutu Tinggi, (Exterior) Kg 132,000.00
17 Cat Tembok Mutu Menengah, (Interior) Kg 65,000.00
18 Cat Tembok Mutu Menengah, (Exterior) Kg 70,000.00
19 Cat Besi Kg 94,000.00
20 Cat Genteng Kg 65,000.00
21 Plamir Tembok/ Plafond Kg 72,000.00
22 Teer Kg 59,000.00
23 Politur Liter 59,000.00
24 Politur Jadi Liter 59,000.00
25 Minyak Cat A Spesial Liter 59,000.00
26 Cat Marka Jalan Scalato Kg 129,000.00
27 Cat Marka Jalan Biasa Kg 116,500.00
28 Cat Zigromeat Kg 153,000.00
29 Vernis Ltr 59,000.00
30 Kuas 5 Cm Bh 51,000.00
31 Rol Cat Bh 57,000.00
32 Glassbeads Kg 71,000.00
33 Roadline thener Ltr 78,000.00
34 Cat Roadline paint Ltr 117,000.00
35 Water Proofing Kg 81,000.00
36 Floor hardener 3 Kg/m2 m2 70,000.00
37 Cat Epoxy Liter 200,000.00
38 ceramic stepnoosing 100 x 200 mm m1 170,000.00
39 Grooe line 2 cm m2 35,000.00
40 Floor hardener 7 Kg/m2 m2 80,000.00
41 Fiber Bakar m2 130,000.00
42 Cat tembok dulux Watersilt Pro Kg 150,000.00
-
Bahan Pengunci -
1 kunci pintu mutu menengah Bh 195,000.00
2 kunci pintu mutu tinggi Bh 612,000.00
3 Yale 1 Slag Bh 129,000.00
4 Yale 2 Slag Bh 195,000.00
5 Kuda Terbang 1 Slag Bh 141,000.00
6 Kuda Terbang 2 Slag Bh 165,000.00
7 Royal Stel 950,000.00
8 Haag Angin Besar Stel 35,000.00
9 Haag Angin Kecil Stel 30,500.00
10 Grendel Besar Bh 44,500.00
11 Grendel Kecil Bh 35,000.00
12 Engsel Nylon Pas 41,500.00
13 Engsel H (biasa) Pas 37,500.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
14 Expagnolet Bh 129,000.00
15 Kunci Silinder Bh 90,000.00
16 Pegangan Pintu KW I Bh 300,000.00
17 Door Holder Bh 280,000.00
18 Door Closer Bh 280,000.00
19 Door Stoper Bh 71,000.00
20 Kunci Selot Besar Bh 117,000.00
21 Kunci Selot Kecil Bh 95,500.00
22 Rel Pintu Dorong M' 65,000.00
23 Lubang Pintu Intip (Door Viewer) Bh 90,000.00
-
Bahan Sanitaire -
1 Closet Duduk Biasa Bh 950,000.00
2 Closet Jongkok Teraso Bh 153,000.00
3 Closet Jongkok Porselin Bh 290,000.00
4 Wastapel (KW 1 Super) Bh 2,600,000.00
5 Wastapel Biasa Bh 535,000.00
6 Urinoir Porselin (KW 1 Super) Bh 2,950,000.00
7 Pembatas urinoir ex. TOTO A 100 bh 1,800,000.00
8 Kitchen Sink Stainless Steel ex. TOTO bh 2,600,000.00
9 Closet Duduk (KW 1 Super) Bh 3,950,000.00
10 Saringan Air Besi Bh 145,000.00
11 Saringan Air Plastik Bh 48,000.00
12 Bak Cuci Piring Teraso Bh 440,000.00
13 Bak Cuci Piring Logam, 1 lubang Bh 576,000.00
14 Bak Cuci Piring Logam, 2 lubang Bh 750,000.00
15 Resesvoir Fybg Kapasitas 1 M3 Bh 4,200,000.00
16 Septictank Kapasitas 1 M3 + peresapan Bh 5,750,000.00
17 Septictank Kapasitas 2 M3 + peresapan Bh 8,200,000.00
18 Bak Fiberglass Kap 0.5 M3 Bh 580,000.00
19 Bak Fiberglass Kap 1.0 M3 Bh 1,350,000.00
20 Bak Mandi Plastik Kap. 0,5 M3 Bh 576,000.00
21 Bak Mandi Teraso 50 x 50 cm Bh 534,000.00
22 Bak Mandi Poseslin KW I Bh 522,000.00
23 Kran Shower bh 450,000.00
24 Kran Air 1/2" Bh 43,000.00
25 Kran Air 3/4" Bh 47,000.00
26 Floor Drain ex. TOTO TX 1 BV 3 bh 480,000.00
27 Floor Drain Bh 47,000.00
28 Roof Drain Metal Bh 47,000.00
29 Seal Tape Bh 6,600.00
30 Lem Pipa Kg 81,500.00
31 Klep 3/4" Bh 36,500.00
32 Plampung Air Otomatis Bh 161,000.00
33 Tandon Air Fyberglass Kapasitas 500 Liter vertikal Bh 1,550,000.00
34 Tandon Air Fyberglass Kapasitas 1000 Liter vertikal Bh 2,200,000.00
35 Tandon Air Fyberglass Kapasitas 2000 Liter vertikal Bh 10,900,000.00
36 Tandon Air Fyberglass Kapasitas 3000 Liter vertikal Bh 14,650,000.00
37 Tandon Air Fyberglass Kapasitas 4000 Liter vertikal Bh 21,300,000.00
38 Tandon Air Fyberglass Kapasitas 5000 Liter vertikal Bh 30,250,000.00
39 Tandon Air Fyberglass Kapasitas 1000 Liter horisontal Bh 42,600,000.00
40 Tandon Air Fyberglass Kapasitas 2000 Liter horisontal Bh 58,500,000.00
41 Tandon Air Fyberglass Kapasitas 3000 Liter horisontal Bh 70,200,000.00
42 Tandon Air Fyberglass Kapasitas 4000 Liter horisontal Bh 3,500,000.00
43 Wastapel Merk Ina (KW I Super) Bh 200,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
44 Tempat Sabun (KW I) Bh 92,500.00
45 Cermin + Acessories (Antik) Bh 159,000.00
46 Gantungan Handuk + Acessories Bh 201,500.00
47 Shower spray ex. TOTO TX 403 SBPIV bh 900,000.00
48 Shower ex. TOTO TR 309 SZ bh 700,000.00
49 Paper Holder ex. TOTO TIPE TS116R bh 750,000.00
50 soap holder ex. TOTO S 156N bh 185,000.00
51 hand railing stainless steel ex. TOTO TX 3A2 bh 1,200,000.00
52 Shower Splay + Acessories Bh 503,500.00
53 Shower Set + Acessories Bh 725,000.00
54 Hand Dryer + Acessories Bh 1,600,000.00
55 Gantungan Baju + Acessories Bh 280,000.00
56 Water Drain + Acesories Bh 105,000.00
57 Pintu Fiber Glass (Wc) Bh 930,000.00
Pembuatan dan Pemasangan Pintu jeruji besi Ø12mm + Rangka kosen besi
58 siku 40.40.4 complit M2 1,600,000.00
59 Bath Tub Bh 7,300,000.00
60 Kitchen Sink 1 Bowl GS 5844 bh 1,750,000.00
61 Kran + asesories + Seal Tape set 750,000.00
62 Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA bh 4,500,000.00
63 Mirror 100x120 cm bh 350,000.00
64 Siku alumunium m1 120,000.00
65 Spoel hoek bh 12,000,000.00
66 Kran Air Antik Bh 92,000.00
67 Kran Zink Bh 420,000.00
68 Kitchenzink Bh 361,000.00
69 Kran Dinding Bh 223,000.00
70 sumur pompa tangan terpasang Bh 1,900,000.00
-
Bahan Paku -
1 Paku panjang 1 - 5 Cm Kg 56,200.00
2 Paku panjang 5 - 7 Cm Kg 50,600.00
3 Paku panjang 7 - 10 Cm Kg 50,600.00
4 Paku panjang 10 - 12 Cm Kg 50,600.00
5 Paku Sekrup Kg 57,500.00
Paku Sekrup Bh 57,500.00
6 Paku Seng Kg 68,500.00
7 Paku Asbes Kg 68,500.00
8 Skrup/Piles 1,5 Cm Doos Kecil 57,500.00
9 Skrup/Piles 2,0 Cm Doos Kecil 53,500.00
10 Paku Sumbat Bh 60,000.00
11 Baut Mur Bh 7,500.00
12 Mur baut 12 mm Bh 7,500.00
13 Mur baut 16 mm Bh 7,600.00
14 Baut Mur 18 mm Bh 9,000.00
15 Baut Mur 22 mm Bh 10,600.00
16 Besi Beugel U + Baut Mur Bh 60,800.00
17 Besi Beugel Plat + Baut Mur Bh 60,800.00
18 Paku Calsiboth Kg 57,500.00
19 Paku Baja Kg 75,000.00
20 Angker Kusen Bh 8,000.00
21 Paku Sekrup 5 cm Kg 57,500.00
22 Paku Sekrup 10 cm Kg 57,500.00
23 Paku Sekrup 1- 2,5 cm Kg 57,500.00
24 Skrup Fixer Bh 44,500.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
25 Ramset/ Dinabolt Kg 76,500.00
-
Bahan Instalasi Listrik -
1 Titik Lampu Bh 385,000.00
2 Stop Kontak Tanam Bh 244,000.00
3 Stop Kontak Luar Bh 262,000.00
4 Saklar Double Bh 155,000.00
5 Saklar Tunggal Bh 75,500.00
6 Zekering Boxes 1 Group Bh 467,000.00
7 Zekering Boxes 2 Group Bh 624,000.00
8 Zekering Boxes 3 Group Bh 770,000.00
9 Lampu Philip 18 W Bh 84,000.00
10 Lampu Philip 14 W Bh 72,000.00
11 Lampu Philip 5 W Bh 56,200.00
12 Lampu Pijar 25 W Bh 42,000.00
13 Lampu TL 40 W Bh 123,000.00
14 Lampu TL 2 x 18 W Bh 99,000.00
15 Lampu TL 2 x 36 W Bh 166,000.00
16 Lampu TL 2 x 40 W Bh 167,500.00
17 Lampu LED 2 x 14 W Bh 240,000.00
18 Lampu Sorot (Sejenis Mercury) Bh 770,000.00
19 Kabel NYA 2,5 mm Roll/50 315,000.00
20 Kabel NGA 2 x 2,5 mm Roll/50 624,000.00
21 Kabel NYM 3 x 2,5 mm Roll/50 710,000.00
22 Kabel NYM 3 x 1,5 mm Roll/50 590,000.00
23 Kabel NYM 2 x 2,5 mm Roll/50 585,000.00
24 Kabel NYM 2 x 1,5 mm Roll/50 410,000.00
25 Kabel NYM 4 x 6 mm Roll/50 1,700,000.00
26 Kabel NYM 4 x 10 mm Roll/50 2,750,000.00
27 Kabel NYY 4 x 50 mm M' 450,000.00
28 Kabel BC 50 mm M' 70,000.00
29 Kabel BC 35 mm M' 60,000.00
30 Fiting Lampu Bh 41,500.00
31 Fiting Lampu Tanam Dia. 4 " Bh 62,500.00
32 Fiting Lampu Tanam Dia. 3 " Bh 40,000.00
33 Box Panel 3 Phase, Comlite (80x120x25) Set 13,000,000.00
34 Box Panel 3 Phase, Comlite (50x70x20) Set 5,960,000.00
35 Box Panel 3 Phase, (30x40x15) Bh 1,135,000.00
36 Box Panel PVC 4 MCB, (40x60x20) Bh 410,000.00
37 MCB 6 A Bh 73,000.00
38 MCB 4 A Bh 68,500.00
39 Pemasukan Daya listrk KWH 4,600.00
40 Pemasangan Daya listrk VA 2,500.00
41 AC (Air Conditioner) Kapasiitas 2 PK Unit 14,500,000.00
42 AC (Air Conditioner) Kapasiitas 1 PK Unit 7,600,000.00
43 AC (Air Conditioner) Kapasiitas 1/2 PK Unit 11,300,000.00
44 Pas pengisap debu ruangan (Blower) + asisories complit Bh 210,000.00
45 Pas Lampu darurat + asisories complit Bh 175,000.00
46 Kabel Telepone 4 x 0.5 mm M' 32,000.00
47 Isolasi Bh 12,600.00
48 Outle TV Bh 52,500.00
49 Outle Telephone Bh 52,500.00
50 Dow ligth / PCL 13 W Bh 134,000.00
51 Dow ligth / PCL 8 W Bh 122,000.00
52 Dow ligth / LED 14 W Bh 165,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
53 Dow ligth / LED 7 W Bh 120,000.00
54 Dow ligth / LED 3 W Bh 50,000.00
55 Lampu Tempel / LED 14 W Bh 35,000.00
56 Lampu spot light/ LED 7 W Bh 400,000.00
57 Lampu strip light/ LED 7 W M' 45,000.00
58 Electroda Cooper dia. 1 inci M' 450,000.00
59 Lampu Sorot taman spot light (LED), 10 watt Bh 320,000.00
60 Lampu taman Tanam (LED), 8 watt Bh 300,000.00
61 Bollard Lighting (LED), 9 watt Bh 3,750,000.00
62 Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasangan Bh 1,300,000.00
63 Pipa Conduit PVC dia. 20 mm2 M' 3,500.00
64 Exshaust Fan 14 W bh 650,000.00
65 Wall Type Exshaust Fan 2500 CMH bh 1,200,000.00
66 Orbit Fan 60 Watt bh 850,000.00
67 Exshaust Fan 353 CFM/ 34 W bh 420,000.00
68 Pemasangan Penangkal Petir + Arde (Radius min. 50 m) Unit 25,500,000.00
69 Pemasangan Penangkal Petir + Arde (Radius min. 25 m) Unit 13,000,000.00
-
Pekerjaan Vegetasi Tanaman -
1 Lempengan Rumput M² 88,800.00
2 Sirih Gading Bh 18,000.00
3 Bakung Lele Bh 13,200.00
4 Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter Bh 26,400.00
5 Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter Bh 18,750.00
6 Adam Hawa Bh 43,200.00
7 Sikas (tinggi ± 50 cm) Bh 1,188,000.00
8 Pucuk Merah (tinggi ± 60 - 70 cm) Bh 186,000.00
9 Pisang Hias (tinggi ± 50 - 100 cm) Bh 165,000.00
10 Palem Phoenix (tinggi ± 80 - 100 cm) Bh 335,000.00
11 Pandan Bali (tinggi ± 80 - 100 cm) Bh 1,320,000.00
12 Bugenvil (tinggi ± 80 - 100 cm) Bh 498,000.00
13 Ketappang Kencana (tinggi ± 200 cm) Bh 492,000.00
14 Palem Putri (tinggi ± 200 - 300 cm) Bh 900,000.00
15 Palem Kuning (tinggi ± 150 - 200 cm) Bh 900,000.00
16 Tabebuya Kuning tinggi 4 meter Bh 1,800,000.00
17 Tanam Pohon Palem raja tinggi 3 meter Bh 1,500,000.00
18 Tanam Pohon Kamboja tinggi 5 meter Bh 2,256,000.00
19 Tanam Pohon Pisang Kipas tinggi 1,5 meter Bh 156,000.00
20 Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter Bh 22,500.00
21 Pohon Damar (Agathis dammara) Tinggi 4m Bh 995,000.00
22 Pohon Pulai (alstonia scholaris) Tinggi 6m Bh 2,280,000.00
23 Pohon Kasia Jawa (Cassia javanica) Tinggi 4m Bh 678,000.00
24 Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m Bh 1,051,200.00
25 Pohon Flamboyan (Delonix regia) Tinggi 7m Bh 1,425,600.00
26 Pohon Biola Cantik (Ficus lyrata) Tinggi 6m Bh 975,600.00
27 Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m Bh 1,278,000.00
28 Pohon Sosis (Kigelia pinnata) Tinggi 7m Bh 1,278,000.00
29 Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m Bh 1,056,000.00
30 Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m Bh 655,000.00
31 Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m Bh 1,758,000.00
32 Pohon Parahiba (Schizolobium parahyba) Tinggi 7m Bh 1,128,000.00
33 Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m Bh 816,000.00
34 Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m Bh 225,600.00
35 Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m Bh 128,000.00
36 Pohon Palem Kol (Licualis grandis) Tinggi 1,5m Bh 188,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
37 Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m Bh 2,265,600.00
38 Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m Bh 2,100,000.00
39 Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m Bh 678,000.00

1 Semak Agave (Agave angustifolia) Tinggi 300-400 mm Bh 120,000.00


2 Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm Bh 75,600.00
3 Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm Bh 63,600.00
4 Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm Bh 375,600.00
5 Semak Spineless (Spineless Yucca) Tinggi 800 mm Bh 203,000.00
6 Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm Bh 113,000.00
7 Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm Bh 23,000.00
8 Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm Bh 26,000.00
9 Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm Bh 53,000.00
10 Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm Bh 53,000.00
11 Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm Bh 23,000.00
12 Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm Bh 105,600.00
13 Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm Bh 23,000.00
14 Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm Bh 15,600.00
15 Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm Bh 87,600.00
16 Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm Bh 12,000.00
17 Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm Bh 15,600.00
18 Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm Bh 30,000.00
19 Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm Bh 23,000.00
20 Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm Bh 11,200.00
21 Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm Bh 30,000.00
22 Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250m Bh 37,000.00
23 Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm Bh 45,600.00
24 Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm Bh 55,000.00
25 Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm Bh 13,000.00
26 Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm Bh 13,000.00
27 Semak kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500m Bh 33,600.00
28 Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm Bh 53,000.00
29 Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm Bh 10,000.00
30 Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 Bh 15,600.00
31 Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm Bh 23,000.00
32 Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-150 Bh 30,000.00
33 Semak Rumput Manila (Zoysia matrella) M² 75,600.00

1 Tanaman Cemara Bh 180,000.00


2 Tanaman Karambosa hijau Bh 144,000.00
3 Tanaman Karambosa Karigata Bh 162,000.00
4 Tanaman Batang Merah Bh 30,000.00
5 Tanaman Erpah Bh 78,000.00
6 Kembang pukul sembilan Bh 504,000.00
7 Kembang rumput kuning Bh 13,000.00
8 Bunga Agave Bh 876,000.00
9 Bunga Andong Bh 51,000.00
10 Bunga Asoka Bh 180,000.00
11 Bunga Brokoli Bh 63,600.00
12 Bunga Kembang Puring Bh 150,000.00
13 Bunga Lidah mertua mini Bh 63,600.00
14 Bunga Lidah Rumpun mertua mini Bh 945,600.00
15 Bunga Puring kerupuk Bh 315,600.00
16 Bunga Rumpun sansevieria Bh 25,000.00
17 Bunga Soft india Bh 935,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
18 Bunga Kembang sepatu Bh 312,000.00
19 Pupuk daun dan kembang Zak 189,600.00
20 Pupuk kandang kg 37,000.00
21 Insektisida / Furadan kg 36,000.00
-
Bahan Tambahan -
1 Flux Oil Ltr 41,000.00
2 Minyak pelumas Ltr 70,000.00
3 Olie SAE 100 Ltr 60,000.00
4 Olie SAE 30 Ltr 75,000.00
5 Olie SAE 40 Ltr 90,000.00
6 Olie SAE 90 Ltr 100,000.00
7 Sambungan Rumah 1" Set 3,350,000.00
8 Sambungan Rumah 1/2" Set 2,000,000.00
9 Sambungan Rumah 3/4" Set 2,350,000.00
10 Aspal (AC) Kg 33,000.00
11 Kayu Bakar M³ 240,000.00
12 Sewa Stamper Hari 250,000.00
13 Sewa Alat Bor Hari 250,000.00
14 Sewa Genset Hari 500,000.00
15 Sewa Mesin Las Hari 500,000.00
16 Aspal Emulsi Kg 12,000.00
17 Alat Bantu Bina Marga Set 3,650,000.00
18 Alat Bantu Pengairan Set 3,650,000.00
19 Minyak tanah Ltr 11,000.00
20 Solar Ltr 9,600.00
21 Bensin Ltr 9,600.00
22 Pertalite Ltr 11,000.00
23 Pertamax Ltr 12,000.00
24 Pagar BRC tinggi 1,20 m M' 135,000.00
25 Tiang BRC dia. 1,50 m Buah 95,000.00
26 Three Colour Btg 75,000.00
27 Mesin Las Unit 18,200,000.00
28 Bor Listrik Unit 1,310,000.00
29 Mesin Pemotong Besi Bh 1,310,000.00
30 KWH Listrik Kwh 3,500.00
31 Mata Bor Bh 82,000.00
32 Pelicin/Lubrican Kg 128,000.00
33 Alat Bantu Penyetelan (Trucker) Set 141,000.00
34 Alat batu pekerja Ls 32,000.00
35 Blower Bh 560,000.00
36 Excause Van Bh 560,000.00
37 Passbox Bh 27,000,000.00
-
1 Pengeboran air + Pipa Casing Ø 6'' m 1,120,000.00
2 Pengeboran air + Pipa Casing Ø 4'' m 850,000.00
3 Pengeboran air + Pipa Casing Ø 3'' m 400,000.00
4 Pengeboran air + Pipa Casing Ø 2.5'' m 200,000.00
5 Mesin disel 6.5 . HP + Pompa Ebara ØINT 3'' OUT 3'' Unit 29,000,000.00
6 Mesin Pompa air 5 . HP Pompa ØINT OUT 2'' Unit 8,700,000.00
7 Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' - 30 Complit Unit 26,000,000.00
8 Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''- 20 Complit Unit 23,500,000.00
9 Mesin pompa air 5 . PK /type Hoda Unit 7,500,000.00
10 Mesin pompa air 8 . PK /type Hoda Unit 9,400,000.00
11 Slang Veleksibel Ø2.'' m 61,700.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
12 Slang Veleksibel Ø2.5.'' m 78,500.00
13 Slang Veleksibel Ø3.'' m 94,500.00
14 Mesin Jet Pump Kap. 250 watt Unit 3,900,000.00
15 Mesin Pompa Tekan Kap. 150 watt Unit 1,300,000.00
16 Sand Filter 520 ltr/mnt, (31.2 m3/jam), 2Hp - 3Hp, V 900 watt Unit 16,000,000.00
17 Sand Filter, (24.9 m3/jam), 2Hp - 3Hp, V 800 watt Unit 14,000,000.00

1 Tulisan Papan Nama, (Staenlis) - t = 1 cm + Pemasangan cm 19,000.00


2 Tulisan Papan Nama, (Galvanil) - t = 1 cm + Pemasangan cm 14,000.00
3 Tulisan Papan Nama, (Fiber) - t = 1 cm cm 9,000.00
4 Tulisan Papan Nama/ Logo, (Akrilik + lampu LED) - t = 1 cm cm 30,000.00
-
1 Genzet Outomatis zellent complit asisories 50 PK + pemasangan Unit 204,000,000.00
2 Pompa Ebara ØINT 3'' OUT 3'' Bh 9,000,000.00
3 Sewa Molen Kpst 0.3 m3 Hari 310,000.00
4 Mobilisasi Alat berat Km 310,000.00
5 Alat Berat Galian dan keprasan Jam 750,000.00
6 Alat berat Pemadatan Jam 700,000.00
7 Penatahalaman dan pembuatan taman + Bunga m2 180,000.00
8 Contaner ( tong sampah ). 2.5 X 3 x 1.5 m Bh 30,000,000.00
9 Alat bantu (Sewa Cren Kpst 7 ton) Hari 15,200,000.00
10 Mesin kompresor Bh 3,000,000.00
-

HARGA BAHAN MATERIAL TIDAK BERTEKANAN

Bahan Pipa
1 Pipa PVC ½" m 7,400.00
2 ¾" m 9,000.00
3 1" m 11,400.00
4 1 1/4" m 18,400.00
5 1½" m 23,900.00
6 2" m 35,500.00
7 2,5" m 45,500.00
8 3" m 65,100.00
9 4" m 122,000.00
10 5" m 149,800.00
11 6" m 197,900.00
12 8" m 307,900.00
13 10" m 437,500.00
14 12" m 625,100.00
15 14" m 879,500.00
16 16" m 1,099,400.00
-
1 Pipa GI 1/2" m 40,000.00
2 3/4" m 51,000.00
3 1" m 77,000.00
4 1 1/4" m 102,000.00
5 1½" m 117,000.00
6 2" m 159,000.00
7 2½" m 203,000.00
8 3" m 262,000.00
9 4" m 265,000.00
10 5" m 510,000.00
11 6" m 599,000.00
12 8" m 1,075,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
-

HARGA BAHAN MATERIAL BERTEKANAN

Bahan Pipa
1 Pipa PVC ½" m 9,900.00
2 ¾" m 18,100.00
3 1" m 22,600.00
4 1 1/4" m 25,400.00
5 1½" m 33,800.00
6 2" m 49,500.00
7 2,5" m 72,500.00
8 3" m 100,200.00
9 4" m 146,100.00
10 6" m 307,900.00
11 8" m 501,100.00
12 10" m 806,600.00
-
1 Pipa GI Medium 1/2" m 37,400.00
2 3/4" m 47,000.00
3 1" m 77,300.00
4 1 1/4" m 107,500.00
5 1½" m 123,200.00
6 2" m 131,600.00
7 2½" m 182,300.00
8 3" m 217,400.00
9 4" m 306,700.00
10 6" m 489,000.00
11 8" m 754,700.00
-
1 Pipa HDPE 1/2" m 9,700.00
2 1" m 21,700.00
3 1½" m 47,100.00
4 2" m 65,200.00
5 2.5" m 103,800.00
6 3" m 149,700.00
7 4" m 223,400.00
8 6" m 468,500.00
9 8" m 543,400.00
-
Jenis Barang -
1 Flange Socket PVC 1,5" Bh 169,600.00
2 2" Bh 219,000.00
3 3" Bh 313,300.00
4 4" Bh 361,000.00
5 6" Bh 834,900.00
6 8" Bh 1,468,200.00
7 10" Bh 2,790,900.00
8 12" Bh 5,377,000.00
-
1 Flange Spigot PVC 1,5" Bh 155,300.00
2 2" Bh 219,000.00
3 2,5" Bh 273,200.00
4 3" Bh 313,400.00
5 4" Bh 361,000.00
6 6" Bh 715,800.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
7 8" Bh 1,247,500.00
8 10" Bh 2,562,000.00
9 12" Bh 5,062,000.00
-
1 Bend PVC RR/SP/S-12,5 1"x90° Bh 68,300.00
2 Bend PVC RR/SP/S-12,6 3/4"x90° Bh 66,200.00
3 ½"x90° Bh 63,000.00
4 Bend PVC RR/SP/S-12,5 1½"x90° Bh 81,900.00
5 2"x90° Bh 133,600.00
6 3"x90° Bh 220,200.00
7 4"x90° Bh 312,900.00
8 6"x90° Bh 655,700.00
9 8"x90° Bh 1,181,400.00
10 10"x90° Bh 1,763,000.00
11 12"x90° Bh 3,050,300.00
-
1 Bend PVC RR/SP/S-12,5 1,5"x45° Bh 101,100.00
2 2"x45° Bh 115,600.00
3 3"x45° Bh 196,200.00
4 4"x45° Bh 275,600.00
5 6"x45° Bh 596,700.00
6 8"x45° Bh 1,020,200.00
7 10"x45° Bh 1,608,600.00
8 12"x45° Bh 2,753,100.00
-
1 Bend PVC RR/SP/S-12,5 2"x22,5° Bh 101,100.00
2 3"x22,5° Bh 181,700.00
3 4"x22,5° Bh 255,000.00
4 6"x22,5° Bh 495,600.00
5 8"x22,5° Bh 859,000.00
6 10"x22,5° Bh 1,330,400.00
7 12"x22,5° Bh 2,221,800.00
-
1 Bend GI All Flange 1½"x45° Bh 310,000.00
2 2"x45° Bh 363,000.00
3 2,5"x45° Bh 402,000.00
4 3"x45° Bh 429,000.00
5 4"x45° Bh 574,000.00
6 6"x45° Bh 921,000.00
7 8"x45° Bh 1,427,000.00
-
1 Bend GI All Flange 1½"x90° Bh 353,000.00
2 2"x90° Bh 452,000.00
3 2,5"x90° Bh 498,000.00
4 3"x90° Bh 526,000.00
5 4"x90° Bh 708,000.00
6 6"x90° Bh 1,147,000.00
7 8"x90° Bh 1,793,000.00
-
1 Bend GI All Flange 1½"x22,5° Bh 316,000.00
2 2"x22,5° Bh 405,000.00
3 2,5"x22,5° Bh 459,000.00
4 3"x22,5° Bh 486,000.00
5 4"x22,5° Bh 642,000.00
6 6"x22,5° Bh 1,025,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
7 8"x22,5° Bh 1,573,000.00
-
1 Bend Drat GI 1½"x45° Bh 365,000.00
2 2"x45° Bh 429,000.00
3 2,5"x45° Bh 466,000.00
4 3"x45° Bh 505,000.00
5 4"x45° Bh 676,000.00
6 6"x45° Bh 1,086,000.00
7 8"x45° Bh 1,682,000.00
-
1 Bend Drat GI 3/4"x90° Bh 11,000.00
2 1"x90° Bh 278,000.00
3 Bend Drat GI/Knee GI ½"x90° Bh 7,000.00
4 Long Bend Female dan Male ½"x90° Bh 8,000.00
5 Bend Drat GI 1½"x90° Bh 342,000.00
6 2"x90° Bh 396,000.00
7 2,5"x90° Bh 452,000.00
8 3"x90° Bh 526,000.00
9 4"x90° Bh 708,000.00
10 6"x90° Bh 1,147,000.00
11 8"x90° Bh 1,793,000.00
-
1 Sock Drat GI ½" Bh 9,000.00
2 ¾" Bh 10,000.00
3 1" Bh 13,000.00
4 1½" Bh 26,000.00
5 2" Bh 41,000.00
6 2½" Bh 65,000.00
7 3" Bh 95,000.00
8 4" Bh 159,000.00
9 6" Bh 490,000.00
10 8" Bh 858,000.00
-
1 Sock PVC Drat Luar ½" Bh 7,000.00
2 ¾" Bh 9,600.00
3 1" Bh 15,000.00
4 1½" Bh 21,000.00
5 2" Bh 28,300.00
6 2½" Bh 56,600.00
7 3" Bh 78,400.00
8 4" Bh 99,900.00
9 6" Bh 193,800.00
10 8" Bh 389,800.00
-
1 Tee All Socket PVC / RR 1"x½" Bh 45,700.00
2 1"x1" Bh 92,700.00
3 1½"x½" Bh 97,500.00
4 1½"x3/4" Bh 113,200.00
5 1½"x1" Bh 144,400.00
6 1½"x1½" Bh 191,400.00
7 2"x 1" Bh 222,600.00
8 2"x2" Bh 239,500.00
9 3"x1" Bh 285,600.00
10 3"x2" Bh 333,900.00
11 3"x3" Bh 415,800.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
12 4"x2" Bh 509,300.00
13 4"x3" Bh 582,800.00
14 4"x4" Bh 630,000.00
15 6"x2" Bh 787,500.00
16 6"x3" Bh 908,300.00
17 6"x4" Bh 976,500.00
18 6"x6" Bh 1,176,000.00
19 8"x3" Bh 1,995,000.00
20 8"x4" Bh 1,984,500.00
21 8"x6" Bh 2,436,000.00
22 8"x8" Bh 2,625,000.00
23 10"x6" Bh 6,510,000.00
24 10"x8" Bh 7,560,000.00
25 10"x10" Bh 8,820,000.00
-
1 Reduser All Socket PVC / RR 1½"x1" Bh 99,800.00
2 ½"x1" Bh 45,200.00
3 1" x 3/4" Bh 50,400.00
4 1" x 1 1/4" Bh 57,800.00
5 2"x1" Bh 123,900.00
6 2"x1½" Bh 141,800.00
7 2"x2" Bh 178,500.00
8 3"x1" Bh 189,000.00
9 3"x2" Bh 199,500.00
10 4"x2" Bh 315,000.00
11 4"x3" Bh 325,500.00
12 6"x2" Bh 504,000.00
13 6"x3" Bh 514,500.00
14 6"x4" Bh 582,800.00
15 8"x3" Bh 1,155,000.00
16 8"x4" Bh 1,050,000.00
17 8"x6" Bh 997,500.00
18 10"x6" Bh 1,680,000.00
19 10"x8" Bh 1,470,000.00
20 12"x10" Bh 6,300,000.00
-
1 Dop GI ½" Bh 6,800.00
2 1" Bh 19,400.00
3 1½" Bh 31,500.00
4 2" Bh 96,600.00
5 3" Bh 189,000.00
6 4" Bh 241,500.00
-
1 Gilbout Joint CI 2" Bh 178,500.00
2 3" Bh 224,700.00
3 4" Bh 326,600.00
4 6" Bh 535,500.00
5 8" Bh 997,500.00
6 10" Bh 1,155,000.00
7 12" Bh 1,575,000.00
8 14" Bh 2,310,000.00
9 16" Bh 2,625,000.00
-
1 Flange Las 2" Bh 93,500.00
2 2,5" Bh 101,900.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
3 3" Bh 108,200.00
4 4" Bh 136,500.00
5 6" Bh 231,000.00
6 8" Bh 215,300.00
7 10" Bh 472,500.00
8 12" Bh 535,500.00
9 16" Bh 1,050,000.00
-
1 Gate Valve CI 1½" Bh 609,000.00
2 2" Bh 813,800.00
3 2,5" Bh 1,050,000.00
4 3" Bh 1,155,000.00
5 4" Bh 1,575,000.00
6 6" Bh 2,730,000.00
7 8" Bh 4,725,000.00
8 10" Bh 6,615,000.00
9 12" Bh 8,925,000.00
10 16" Bh 2,100,000.00
-
1 Clamp Sadel CI 1½"x½" Bh 36,800.00
2 2"x ½" Bh 67,200.00
3 2"x 3/4" Bh 68,300.00
4 2"x 1" Bh 73,500.00
5 3"x ½" Bh 77,700.00
6 4"x ½" Bh 89,300.00
7 4"x 2" Bh 115,500.00
8 6"x½" Bh 136,500.00
9 6"x 1" Bh 147,000.00
10 6"x 2" Bh 168,000.00
11 8"x 2" Bh 84,000.00
12 8"x 3" Bh 892,500.00
-
1 Hidran Umum Fiberglass 1000 lt Bh 6,930,000.00
2 2000 lt Bh 10,185,000.00
3 3000 lt Bh 13,125,000.00
-
1 Profile Tank 2200 lt Bh 6,510,000.00
-
1 Water Meter 1/2" Bh 399,000.00
2 3/4" Bh 630,000.00
3 1" Bh 1,155,000.00
4 2" Bh 1,785,000.00
5 3" Bh 2,593,500.00
6 4" Bh 3,255,000.00
7 6" Bh 4,200,000.00
-
1 Manometer 1/2" Bh 2,730,000.00
-
1 Stop Kran 1/2" Bh 89,300.00
2 3/4" Bh 147,000.00
3 1" Bh 315,000.00
4 1½" Bh 624,800.00
5 2" Bh 919,800.00
6 3" Bh 1,480,500.00
7 4" Bh 1,938,300.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
8 6" Bh 2,940,000.00
-
1 Streetbox 2" Bh 115,500.00
2 3" Bh 115,500.00
3 4" Bh 141,800.00
4 6" Bh 141,800.00
5 8" Bh 257,300.00
-
1 Chek Valve 1,5" Bh 420,000.00
2 2" Bh 787,500.00
3 2,5" Bh 1,050,000.00
4 3" Bh 1,260,000.00
5 4" Bh 1,890,000.00
6 6" Bh 3,465,000.00
7 8" Bh 4,200,000.00
-
1 Valve socket 1 1/4" Bh 7,800.00
2 1" Bh 63,000.00
3 2" Bh 89,300.00
-
1 Singel Air Valve ½" Bh 383,300.00
2 ¾" Bh 573,300.00
3 1" Bh 761,300.00
4 2" Bh 1,239,000.00
5 3" Bh 1,680,000.00
-
1 Tee GI All Flange 1½"x¾" Bh 218,400.00
2 1½"x1" Bh 262,500.00
3 1½"x1½" Bh 262,500.00
4 2"x1½" Bh 367,500.00
5 2"x2" Bh 472,500.00
6 2½"x2" Bh 504,000.00
7 2½"x2½" Bh 525,000.00
8 3"x2" Bh 640,500.00
9 3"x3" Bh 682,500.00
10 4"x2" Bh 735,000.00
11 4"x3" Bh 840,000.00
12 4"x4" Bh 892,500.00
13 6"x2" Bh 945,000.00
14 6"x3" Bh 1,050,000.00
15 6"x4" Bh 1,155,000.00
16 6"x6" Bh 1,260,000.00
17 8"x3" Bh 1,575,000.00
18 8"x4" Bh 1,680,000.00
19 8"x6" Bh 1,890,000.00
20 8"x8" Bh 2,100,000.00
21 Tee GI 1/2" x 1/2" Bh 6,300.00
22 1" x 1/2" Bh 28,400.00
23 1" x 1 " Bh 68,300.00
24 1,5" x 1,5 " Bh 85,000.00
25 2" x 2" Bh 116,600.00
-
1 Packing Rubber 8" Bh 110,300.00
2 6" Bh 89,300.00
3 4" Bh 63,000.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
4 3" Bh 42,000.00
5 2,5" Bh 36,800.00
6 2" Bh 25,200.00
7 1,5" Bh 18,900.00
-
1 Socket PVC ½" Bh 18,900.00
2 1" Bh 20,000.00
3 1½" Bh 21,000.00
4 2" Bh 26,300.00
5 2½" Bh 39,900.00
6 3" Bh 57,800.00
7 4" Bh 94,500.00
8 6" Bh 173,300.00
9 8" Bh 525,000.00
-
1 Socket PVC Drat Dalam ½" Bh 18,400.00
2 1" Bh 18,400.00
3 1½" Bh 18,900.00
4 2" Bh 26,300.00
5 2½" Bh 41,000.00
6 3" Bh 56,700.00
7 4" Bh 90,300.00
8 6" Bh 189,000.00
9 8" Bh 525,000.00
-
1 Dop PVC 1" Bh 20,000.00
2 1½" Bh 29,400.00
3 2" Bh 41,000.00
4 3" Bh 63,000.00
5 4" Bh 105,000.00
6 6" Bh 194,300.00
7 8" Bh 582,800.00
-
1 Stud Flange 1,5" Bh 115,500.00
2 2" Bh 126,000.00
3 3" Bh 147,000.00
4 4" Bh 168,000.00
5 6" Bh 367,500.00
6 8" Bh 1,780,800.00
-
1 Reduser HDPE 2" x 1" Bh 161,700.00
2 2" x 1.5" Bh 207,900.00
3 3" x 2" Bh 316,000.00
4 3" x 1,5" Bh 265,700.00
5 2" x 4" Bh 532,400.00
6 4" x 3" Bh 617,400.00
7 6" x 2" Bh 1,074,200.00
8 6" x 3" Bh 857,900.00
9 6" x 4" Bh 750,800.00
-
1 Tee Coupling HDPE 1,5" x 1" Bh 326,600.00
2 1" x 1" Bh 165,900.00
3 1" x 1/2" Bh 160,700.00
-
1 Tee HDPE 1,5" x 1,5" Bh 300,300.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
2 2" x 1" Bh 354,900.00
3 2" x 1,5" Bh 371,700.00
4 2" x 2" Bh 387,500.00
5 2" x 3" Bh 420,000.00
6 2" x 4" Bh 557,600.00
7 3" x 4" Bh 642,600.00
8 3" x 3" Bh 437,900.00
9 4" x 4" Bh 867,300.00
10 6" x 4" Bh 991,200.00
11 6" x 3" Bh 746,600.00
12 8" x 2" Bh 2,208,200.00
-
1 Reduser GI 1,5" x 2" Bh 164,900.00
2 2" x 3" Bh 227,900.00
3 2,5" x 2" Bh 194,300.00
4 2,5" x 3" Bh 257,300.00
5 2" x 4" Bh 307,700.00
6 3" x 4" Bh 314,000.00
7 4" x 6" Bh 572,300.00
8 1 1/2" x 1 1/4 Bh 171,200.00
9 1 1/2" x 1 Bh 136,500.00
-
1 Bend HDPE 1,5"x90° Bh 97,700.00
2 2"x90° Bh 176,400.00
3 3"x90° Bh 279,300.00
4 4"x90° Bh 637,400.00
5 6"x90° Bh 873,600.00
6 8"x90° Bh 1,999,200.00
-
1 Bend HDPE 1,5"x45° Bh 91,400.00
2 2"x45° Bh 159,600.00
3 3"x45° Bh 264,600.00
4 4"x45° Bh 613,200.00
5 6"x45° Bh 827,400.00
6 8"x45° Bh 1,916,300.00
-
1 Dop HDPE 1" Bh 111,300.00
2 1,5" Bh 176,400.00
3 2" Bh 207,900.00
4 3" Bh 378,000.00
5 4" Bh 405,300.00
6 6" Bh 729,800.00
-
1 Konektor HDPE 1" Bh 114,500.00
2 1,5" Bh 182,700.00
3 2" Bh 228,900.00
4 3" Bh 343,400.00
5 4" Bh 457,800.00
-
1 Male Elbow HDPE 2" Bh 174,300.00
-
1 Male Adaptor HDPE (Drat Lu 3" Bh 114,500.00
2 2" Bh 109,200.00
3 1,5" Bh 83,000.00
4 1" Bh 58,800.00
HSBGN 2023
NO UPAH DAN BAHAN SATUAN
(Rp)
5 1/2" Bh 46,200.00
-
1 Female Adaptor HDPE (Drat 3" Bh 127,000.00
2 2" Bh 121,800.00
3 1,5" Bh 90,300.00
4 1" Bh 66,200.00
5 1/2" Bh 53,600.00
-
1 Pengadaan pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Unit 46,784,900.00
2 Pengadaan pompa Submersible type Centrifugal kapasitas 5 Ltr/Dtk, H 120, 3 Unit 60,821,300.00
3 Kontrol Panel Auto Unit 9,975,000.00
4 Pengadaan Kabel NYYHY Ø 4 x 2,5 mm m 51,500.00
5 Pengadaan Kabel NYYHY Ø 3 x 0,75 mm m 31,500.00
6 Pengadaan Water Level Control (WLC) Bh 52,500.00
7 Pengadaan Cord Holder (Pengikat Kabel) Bungkus 126,000.00
8 Pengadaan Pipa Pelindung Kabel m 33,600.00
9 Pemasangan dan Set Up Pompa Set 3,937,500.00
10 Kawat Sling 12 mm m 30,500.00
11 8 mm m 24,200.00
12 6 mm m 23,100.00
13 Pemasangan Kawat Sling 12 mm m 9,500.00
14 8 mm m 8,400.00
15 6 mm m 6,300.00
16 Stelan seling 12 mm Bh 579,600.00
17 8 mm Bh 411,600.00
18 6 mm Bh 148,000.00
19 Pengunci seling 12 mm Bh 77,700.00
20 8 mm Bh 55,700.00
21 6 mm Bh 34,700.00
22 Angker Besi 22 mm Bh 22,600.00
23 Pekerjaan Snai Pipa Bh 7,400.00
24 Coupling GI 1/2" Bh 13,100.00
-
1 Verlop Ring water Tank Ø 2" 3/4" x 1/2" Bh 66,200.00
2 1" x 3/4" Bh 94,500.00
3 1,5" x 1" Bh 129,200.00
-
1 Double Nepel GI 3" Bh 57,500.00
2 2,5" Bh 39,900.00
3 2" Bh 34,700.00
4 1,5" Bh 30,500.00
5 1" Bh 25,200.00
6 1/2" Bh 21,000.00
7 Water Mur 1,5" Bh 105,000.00
8 Double Nepel PVC 1/2" Bh 7,400.00
9 Knee PVC drat dalam 1/2" Bh 11,000.00
10 Knee PVC 1/2" Bh 5,800.00
11 Tap Kran Bh 34,700.00
12 Plugh Kran 1/2" 1/2" Bh 73,500.00
13 Box Water Meter Bh 72,500.00
14 Pemasangan Meteran Air 1/2" Unit 29,400.00
MATERIAL

HARGA KONSTRUKSI
(Rp)
4

150,000.00
190,000.00
230,000.00
190,000.00
230,000.00
190,000.00
230,000.00
190,000.00
230,000.00
190,000.00
230,000.00
190,000.00
190,000.00
230,000.00
160,000.00
160,000.00
230,000.00
160,000.00
190,000.00
230,000.00
230,000.00
200,000.00
160,000.00
190,000.00
160,000.00
190,000.00
200,000.00
160,000.00
160,000.00
160,000.00
190,000.00
190,000.00
190,000.00
230,000.00
140,000.00
140,000.00
230,000.00
230,000.00
190,000.00
170,000.00
250,000.00
300,000.00

18,000.00

245,000.00
230,000.00
500,000.00
570,000.00
HARGA KONSTRUKSI
(Rp)
510,000.00
590,000.00
575,000.00
750,000.00
540,000.00
570,000.00
355,000.00
345,000.00
795,000.00
285,000.00
230,000.00
240,000.00
345,000.00
450.00
800,000.00
925,000.00
720,000.00
250,000.00
950.00
850.00
1,600,000.00
19,000.00
355,000.00
225,000.00
195,000.00
240,000.00
121,000.00
192,000.00
58,000.00

15,000.00
15,000.00
1,700.00
1,700.00
1,700.00
1,700.00
1,650.00
1,650.00
1,650.00
15,700.00
15,700.00
938,000.00
4,500.00
5,000.00
5,200.00
2,000.00
49,500.00
66,500.00

38,000.00
6,000.00
3,000.00
5,000.00
HARGA KONSTRUKSI
(Rp)
3,000.00
40,000.00
8,000.00
7,000.00
6,000.00

2,800.00
1,800.00
6,800.00
5,500.00
3,900.00
45,000.00
17,000.00
15,000.00
21,000.00
10,000.00
-
6,900.00
7,900.00
6,600.00
8,800.00
31,000.00
17,000.00
35,000.00
14,000.00
-
70,000.00
75,000.00
80,000.00
85,000.00
65,000.00
70,000.00
193,000.00
193,000.00
7,000.00
90,000.00
13,000.00
68,000.00
47,300.00
29,000.00
69,000.00
199,000.00
55,000.00
95,000.00
68,000.00
80,000.00
85,000.00
75,000.00
50,000.00
76,000.00
105,000.00
120,000.00
85,000.00
135,000.00
HARGA KONSTRUKSI
(Rp)
65,000.00
75,000.00
94,000.00
104,000.00
75,000.00
87,000.00
100,000.00
110,000.00
125,000.00
266,000.00
7,000.00
203,000.00
100,000.00
60,000.00
60,000.00
13,000.00
91,000.00
420,000.00
17,000.00
90,000.00
30,000.00
19,000.00
35,000.00
25,000.00
9,000.00
7,500.00
7,000.00
500.00
400.00

5,480,000.00
3,750,000.00
2,600,000.00
5,350,000.00
3,650,000.00
2,600,000.00
11,000.00
3,262,000.00
3,182,000.00

3,715,000.00
3,150,000.00
8,500.00
9,000.00
12,000.00
14,000.00
17,000.00
200,000.00
40,000.00
34,000.00
27,500.00
57,000.00
32,000.00
35,000.00
HARGA KONSTRUKSI
(Rp)
50,000.00

15,000.00
15,500.00
20,000.00
50,000.00
75,000.00
90,000.00
110,000.00
125,000.00
130,000.00
150,000.00
175,000.00
4,500.00
80,000.00
65,000.00
110,000.00
165,000.00
200,000.00
244,000.00
265,000.00
45,000.00
55,000.00
56,000.00
18,000.00
220,000.00
1,100,000.00
127,000.00
122,000.00
132,000.00
165,000.00
125,000.00
1,800,000.00
2,000,000.00

63,000.00
74,000.00
80,000.00
80,000.00
85,000.00
83,000.00
450,000.00
380,000.00
320,000.00
82,000.00
82,000.00
32,000.00
25,000.00
140,000.00
770,000.00

140,000.00
120,000.00
HARGA KONSTRUKSI
(Rp)
130,000.00
90,000.00

140,000.00
120,000.00
130,000.00
90,000.00

160,000.00
13,000.00
600,000.00
650,000.00
400,000.00
1,000,000.00
800,000.00
3,000,000.00
103,000.00
13,000.00
30,000.00
1,900.00
1,900.00
2,600.00
10,000.00
16,000.00
720,000.00
230,000.00
195,000.00
86,700.00
25,000.00
100,000.00
25,000.00
75,000.00

19,000.00
16,000.00
250,000.00
200,000.00
1,350,000.00
315,000.00
700,000.00
1,300,000.00
185,000.00
185,000.00
1,650,000.00
350,000.00
1,500,000.00
200,000.00
18,800,000.00
110,000.00
130,000.00
750,000.00
38,000.00
38,000.00
600,000.00
HARGA KONSTRUKSI
(Rp)
35,000.00
2,150,000.00
95,000.00
110,000.00
1,100,000.00
1,150,000.00
1,100,000.00
1,200,000.00
60,000.00
15,000.00
85,000.00
95,000.00
33,000.00
29,000.00
35,000.00
100,000.00
40,000.00
160,000.00
35,000.00
26,000.00
23,000.00
90,000.00
50,000.00
35,000.00
600,000.00
300,000.00
1,750,000.00
500,000.00
550,000.00
800,000.00
550,000.00
1,600,000.00
35,000.00
23,000.00
59,000.00
32,000.00
26,000.00
13,000.00
110,000.00
39,000.00
69,000.00
44,000.00
43,000.00
94,000.00
32,000.00
132,000.00
230,000.00
350,000.00
485,000.00
574,000.00
282,000.00
2,850,000.00
4,450,000.00
2,320,000.00
1,938,000.00
HARGA KONSTRUKSI
(Rp)
2,190,000.00
1,630,000.00
3,130,000.00
2,380,000.00
4,250,000.00
800,000.00
21,500.00
29,000.00
36,000.00
50,000.00
58,000.00
140,000.00
1,300.00
32,000.00
210,000.00
220,000.00
35,000.00
570,000.00
140,000.00
1,700,000.00
1,250,000.00
33,000.00
250,000.00
24,000.00
35,000.00
540,000.00
480,000.00
453,000.00
900,000.00
800,000.00
795,000.00
850,000.00
2,000.00
250,000.00
85,000.00
57,000.00
1,350,000.00
37,000.00
66,000.00
105,000.00
110,000.00
120,000.00
130,000.00
210,000.00

27,000.00
54,000.00
67,000.00
103,000.00
106,000.00
159,000.00
240,000.00
330,000.00
135,000.00
HARGA KONSTRUKSI
(Rp)
222,000.00
100,000.00
250,000.00
280,000.00
155,000.00
80,000.00
195,000.00
270,000.00
220,000.00
220,000.00
130,000.00
159,000.00
24,000.00
53,000.00
40,000.00
5,500.00
55,000.00
55,000.00
55,000.00
30,000.00
9,500.00
25,000.00
35,000.00
85,000.00
3,000.00
6,000.00
6,000.00
2,000.00
15,000.00
55,000.00
132,000.00
165,000.00
330,000.00

141,000.00
115,000.00
170,000.00
200,000.00
215,000.00
137,000.00
165,000.00
169,000.00
130,000.00
1,000,000.00
1,250,000.00
1,500,000.00
1,100,000.00
1,800,000.00
2,000,000.00
2,500,000.00

9,000.00
29,000.00
HARGA KONSTRUKSI
(Rp)
29,000.00
35,000.00
250,000.00
66,000.00
20,000.00
20,000.00
25,000.00
18,000.00
35,000.00
35,000.00
72,000.00
90,000.00
60,000.00
127,000.00
35,000.00
55,000.00
70,000.00
42,000.00
50,000.00
37,000.00
36,000.00
37,000.00
39,000.00
110,000.00
92,000.00
130,000.00
37,000.00
29,000.00
36,000.00
50,000.00
55,000.00
85,000.00
65,000.00
44,000.00
170,000.00
160,000.00
26,000.00
57,000.00
110,000.00
120,000.00

164,000.00
555,000.00
105,000.00
165,000.00
115,000.00
137,000.00
860,000.00
14,000.00
10,000.00
24,000.00
14,000.00
21,000.00
17,000.00
HARGA KONSTRUKSI
(Rp)
104,000.00
64,000.00
270,000.00
245,000.00
245,000.00
65,000.00
90,000.00
70,000.00
42,000.00
89,000.00

830,000.00
126,000.00
260,000.00
2,400,000.00
485,000.00
2,730,000.00
1,400,000.00
2,200,000.00
3,660,000.00
120,000.00
27,000.00
395,000.00
530,000.00
650,000.00
3,890,000.00
5,350,000.00
7,650,000.00
525,000.00
1,250,000.00
530,000.00
485,000.00
475,000.00
363,000.00
19,000.00
22,000.00
40,000.00
27,000.00
45,000.00
6,000.00
80,000.00
35,000.00
155,000.00
1,430,000.00
2,100,000.00
10,155,000.00
13,685,000.00
19,910,000.00
22,000,000.00
39,850,000.00
55,100,000.00
65,710,000.00
2,750,000.00
150,000.00
HARGA KONSTRUKSI
(Rp)
69,000.00
135,000.00
170,000.00
813,000.00
565,000.00
594,000.00
160,000.00
940,000.00
455,000.00
700,000.00
1,480,000.00
245,000.00
69,000.00
850,000.00

1,555,000.00
6,800,000.00
1,570,000.00
690,000.00
3,880,000.00
270,000.00
82,000.00
11,000,000.00
67,000.00
400,000.00
360,000.00
215,000.00
1,760,000.00

33,000.00
28,000.00
28,000.00
28,000.00
35,000.00
400.00
45,000.00
45,000.00
35,000.00
35,000.00
38,000.00
5,000.00
6,000.00
7,000.00
8,000.00
10,000.00
39,000.00
39,000.00
35,000.00
85,000.00
6,000.00
35,000.00
35,000.00
35,000.00
22,000.00
HARGA KONSTRUKSI
(Rp)
75,000.00

285,000.00
210,000.00
227,000.00
39,000.00
39,000.00
420,000.00
570,000.00
710,000.00
60,000.00
49,000.00
35,000.00
25,000.00
97,000.00
95,000.00
162,000.00
165,000.00
192,000.00
710,000.00
300,000.00
577,000.00
705,000.00
577,000.00
577,000.00
396,000.00
1,650,000.00
2,675,000.00
390,000.00
55,000.00
45,000.00
22,000.00
42,000.00
32,000.00
12,000,000.00
5,850,000.00
1,100,000.00
395,000.00
70,000.00
66,000.00
2,600.00
1,600.00
14,803,000.00
11,150,000.00
7,450,000.00
166,000.00
155,000.00
30,000.00
12,000.00
50,000.00
50,000.00
130,000.00
110,000.00
152,000.00
HARGA KONSTRUKSI
(Rp)
95,000.00
40,000.00
25,000.00
300,000.00
39,000.00
350,000.00
300,000.00
270,000.00
3,580,000.00
1,200,000.00
3,000.00
535,000.00
1,100,000.00
720,000.00
315,000.00
25,000,000.00
12,500,000.00

74,000.00
15,000.00
11,000.00
22,000.00
16,000.00
36,000.00
990,000.00
155,000.00
145,000.00
290,000.00
1,100,000.00
415,000.00
410,000.00
750,000.00
750,000.00
1,500,000.00
1,250,000.00
1,880,000.00
130,000.00
19,000.00
832,000.00
1,900,000.00
565,000.00
876,000.00
1,188,000.00
813,000.00
1,065,000.00
1,065,000.00
880,000.00
545,000.00
1,465,000.00
940,000.00
680,000.00
188,000.00
107,000.00
157,000.00
HARGA KONSTRUKSI
(Rp)
1,888,000.00
1,750,000.00
565,000.00

100,000.00
63,000.00
53,000.00
313,000.00
169,000.00
94,000.00
19,000.00
22,000.00
44,000.00
44,000.00
19,000.00
88,000.00
19,000.00
13,000.00
73,000.00
9,400.00
13,000.00
25,000.00
19,000.00
95,000.00
25,000.00
32,000.00
38,000.00
47,000.00
11,500.00
11,000.00
28,000.00
44,000.00
8,500.00
13,000.00
19,000.00
25,000.00
63,000.00

150,000.00
120,000.00
135,000.00
25,000.00
65,000.00
420,000.00
11,000.00
730,000.00
42,000.00
150,000.00
53,000.00
125,000.00
53,000.00
788,000.00
263,000.00
21,000.00
781,000.00
HARGA KONSTRUKSI
(Rp)
260,000.00
158,000.00
32,000.00
30,000.00

40,000.00
47,000.00
38,000.00
51,000.00
65,000.00
75,000.00
3,100,000.00
1,855,000.00
2,163,000.00
12,000.00
198,000.00
170,000.00
210,000.00
410,000.00
410,000.00
9,000.00
3,395,000.00
3,395,000.00

10,000.00
14,700.00
120,000.00
68,000.00
46,000.00
17,000,000.00
1,132,000.00
1,132,000.00
1,600.00
57,000.00
120,000.00
114,000.00
12,000.00
550,000.00
550,000.00
24,600,000.00

1,120,000.00
850,000.00
400,000.00
200,000.00
28,800,000.00
8,865,000.00
25,905,000.00
23,350,000.00
7,351,000.00
9,615,000.00
42,000.00
HARGA KONSTRUKSI
(Rp)
60,000.00
77,000.00
3,700,000.00
1,130,000.00
15,110,000.00
13,200,000.00

18,000.00
13,000.00
8,000.00
22,500.00

203,600,000.00
8,660,000.00
283,000.00
283,000.00
680,000.00
630,000.00
170,000.00
29,100,000.00
14,200,000.00
2,500,000.00

7,400.00
9,000.00
11,400.00
18,400.00
23,900.00
35,500.00
45,600.00
65,100.00
94,900.00
149,800.00
197,900.00
307,900.00
437,500.00
625,100.00
879,500.00
1,099,400.00

24,500.00
31,500.00
48,300.00
63,800.00
73,200.00
100,000.00
127,500.00
164,500.00
238,200.00
320,700.00
381,700.00
676,300.00
HARGA KONSTRUKSI
(Rp)

9,000.00
16,600.00
20,600.00
23,100.00
30,900.00
45,200.00
66,200.00
91,500.00
133,400.00
281,200.00
457,600.00
736,500.00

34,300.00
43,100.00
70,600.00
98,200.00
112,500.00
120,300.00
166,600.00
198,500.00
280,100.00
446,600.00
689,200.00

8,900.00
19,900.00
43,100.00
59,600.00
94,900.00
136,800.00
204,100.00
427,800.00
496,200.00

151,100.00
195,200.00
279,000.00
322,000.00
743,100.00
1,306,600.00
2,930,500.00
5,645,900.00

139,000.00
195,200.00
243,600.00
279,000.00
322,000.00
637,300.00
HARGA KONSTRUKSI
(Rp)
1,110,300.00
2,690,100.00
5,315,100.00

60,700.00
57,330.00
54,000.00
80,600.00
119,000.00
196,300.00
278,900.00
584,400.00
1,051,800.00
1,851,200.00
3,202,900.00

90,400.00
103,700.00
175,400.00
245,900.00
531,400.00
908,500.00
1,689,000.00
2,890,800.00

90,400.00
162,200.00
227,200.00
441,000.00
765,100.00
1,396,900.00
2,332,900.00

283,400.00
331,800.00
367,200.00
391,500.00
523,800.00
841,300.00
1,303,200.00

321,900.00
350,600.00
385,900.00
406,900.00
549,000.00
887,600.00
1,388,100.00

244,800.00
314,300.00
356,200.00
375,900.00
497,300.00
793,800.00
HARGA KONSTRUKSI
(Rp)
1,217,200.00

283,400.00
331,800.00
361,600.00
391,400.00
523,700.00
841,300.00
1,302,000.00

8,300.00
216,100.00
4,900.00
6,100.00
263,600.00
306,500.00
350,600.00
406,900.00
549,000.00
887,600.00
1,388,100.00

6,600.00
7,200.00
9,900.00
19,800.00
27,600.00
50,700.00
73,900.00
123,500.00
379,300.00
663,700.00

5,600.00
8,300.00
13,200.00
18,800.00
25,300.00
50,700.00
70,600.00
89,300.00
173,200.00
347,300.00

40,800.00
82,700.00
87,200.00
101,400.00
129,000.00
170,900.00
198,500.00
213,900.00
255,800.00
297,700.00
370,400.00
HARGA KONSTRUKSI
(Rp)
454,200.00
520,400.00
565,600.00
714,400.00
812,600.00
871,000.00
1,051,800.00
1,851,200.00
1,779,400.00
2,176,300.00
2,403,500.00
6,186,200.00
7,238,000.00
8,085,800.00

91,600.00
40,900.00
45,200.00
54,100.00
110,300.00
129,000.00
167,600.00
171,000.00
180,800.00
285,600.00
292,200.00
454,300.00
462,000.00
531,400.00
1,058,400.00
1,006,600.00
948,200.00
1,584,300.00
1,428,800.00
5,944,700.00

6,300.00
17,600.00
28,700.00
87,200.00
175,400.00
216,100.00

162,100.00
200,700.00
292,200.00
492,900.00
940,500.00
1,084,900.00
1,493,900.00
2,209,400.00
2,435,500.00

83,800.00
91,600.00
HARGA KONSTRUKSI
(Rp)
97,000.00
122,400.00
207,300.00
195,200.00
454,200.00
492,900.00
973,600.00

549,000.00
726,600.00
952,600.00
1,098,100.00
1,461,900.00
2,435,500.00
4,235,800.00
6,075,900.00
8,673,400.00
1,949,200.00

35,300.00
60,700.00
63,900.00
66,200.00
70,600.00
81,600.00
110,300.00
130,100.00
136,700.00
151,100.00
759,700.00
841,300.00

6,195,000.00
9,154,100.00
12,252,100.00

5,847,600.00

368,200.00
584,300.00
1,104,700.00
1,657,110.00
2,313,000.00
2,963,500.00
3,768,300.00

262,400.00

62,900.00
98,200.00
243,600.00
437,700.00
643,900.00
1,036,400.00
1,357,500.00
HARGA KONSTRUKSI
(Rp)
2,058,400.00

110,300.00
110,300.00
145,500.00
145,500.00
262,400.00

379,300.00
642,800.00
928,300.00
1,110,300.00
1,695,600.00
3,099,200.00
3,800,400.00

74,900.00
63,900.00
87,200.00

391,600.00
585,500.00
778,400.00
1,271,200.00
1,728,700.00

153,300.00
186,400.00
218,300.00
270,200.00
379,300.00
407,900.00
44,000.00
453,200.00
500,500.00
531,400.00
589,900.00
647,200.00
729,900.00
822,500.00
951,500.00
1,001,100.00
1,269,000.00
1,328,600.00
1,380,300.00
1,563,300.00
5,600.00
26,500.00
63,900.00
87,200.00
104,800.00

111,300.00
86,000.00
59,500.00
HARGA KONSTRUKSI
(Rp)
39,700.00
34,200.00
24,300.00
17,600.00

17,700.00
18,300.00
19,300.00
25,600.00
39,900.00
54,200.00
90,200.00
175,400.00
521,200.00

17,200.00
17,700.00
18,800.00
25,400.00
39,700.00
54,100.00
89,300.00
175,400.00
520,400.00

18,800.00
28,700.00
38,700.00
61,800.00
97,000.00
187,500.00
559,000.00

109,200.00
124,700.00
141,200.00
156,600.00
365,000.00
726,600.00

113,600.00
145,600.00
221,600.00
186,400.00
372,700.00
432,200.00
751,900.00
600,900.00
526,000.00

333,000.00
169,800.00
164,400.00

306,500.00
HARGA KONSTRUKSI
(Rp)
362,800.00
379,300.00
395,900.00
428,900.00
568,900.00
656,000.00
446,600.00
884,200.00
1,011,100.00
761,900.00
2,251,300.00

168,700.00
198,500.00
232,700.00
262,400.00
314,300.00
320,900.00
584,400.00
175,400.00
140,000.00

118,000.00
180,800.00
285,600.00
650,500.00
890,800.00
2,038,600.00

93,800.00
163,200.00
270,200.00
625,200.00
844,500.00
1,953,700.00

113,600.00
180,800.00
212,900.00
38,700.00
413,500.00
744,300.00

116,900.00
186,400.00
233,800.00
350,600.00
467,500.00

178,600.00

116,900.00
111,300.00
85,000.00
60,700.00
HARGA KONSTRUKSI
(Rp)
47,500.00

130,100.00
124,700.00
92,700.00
68,400.00
55,200.00

49,124,000.00
63,862,000.00
10,220,000.00
48,500.00
34,300.00
46,300.00
100,400.00
34,300.00
3,974,600.00
30,900.00
24,300.00
23,100.00
9,900.00
8,800.00
6,600.00
590,900.00
420,000.00
151,100.00
79,400.00
57,400.00
36,500.00
23,100.00
6,100.00
13,300.00

68,400.00
97,000.00
132,300.00

54,100.00
37,500.00
32,000.00
28,700.00
23,100.00
19,900.00
99,300.00
7,200.00
10,500.00
5,600.00
34,300.00
72,800.00
71,800.00
28,700.00
REKAPITULASI

NAMA DINAS/ INSTANSI : -


NAMA KEGIATAN : -
NAMA PEKERJAAN : -
LOKASI PEKERJAAN : -
SUMBER DANA : -
TAHUN ANGGARAN : 2023

No. AITEM JENIS PEKERJAAN JUMLAH

1 2 3
A. PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN Rp 276,556.50
A. JUMLAH PEKERJAAN PENDAHULUAN Jumlah Rp 276,556.50

B. PEKERJAAN PEMBANGUNAN LANTAI - 1


I PEKERJAAN TANAH Rp -
II PEKERJAAN PONDASI Rp -
III PEKERJAAN BETON Rp -
IV PEKERJAAN BESI DAN ALUMINIUM Rp -
V PEKERJAAN PASANGAN DINDING Rp -
VI PEKERJAAN PLESTERAN Rp -
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp -
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp -
IX PEKERJAAN PENUTUP ATAP Rp -
X PEKERJAAN KAYU Rp -
XI PEKERJAAN KUNCI DAN KACA Rp -
XII PEKERJAAN PENGECATAN Rp -
XIII PEKERJAAN SANITASI DALAM GEDUNG Rp -
XIV PEKERJAAN INSTALASI LISTRIK Rp -
XV PEKERJAAN VEGETASI TANAMAN Rp -
XVI PEKERJAAN TAMBAHAN Rp -
B. JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1 Jumlah Rp -

JUMLAH ( REAL COST ) Rp 276,556.50


DIBULATKAN Rp 276,000.00

Terbilang : ……. rupiah

Dompu, 2023

Diperiksa/ Disetujui oleh : Dibuat oleh :


Pejabat Fungsional Penata Kelola Bangunan Gedung CV. ……………………….
dan Kawasan Pemukiman Ahli Muda Konsultan
Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Dompu

MOH. SIRAJUDDIN, ST ………………………


NIP. 19810713 201001 1 012 ………….

Menyetujui/ Mengetahui :
Kepala Bidang Cipta Karya Kuasa Pengguna Anggaran (KPA)
Dinas Pekerjaan Umum dan Penataan Ruang ……………………………………….
Kabupaten Dompu Kabupaten Dompu

WAHIDIN, ST ………………………
NIP. 19760522 200801 1 013 ……………………………..
RENCANA ANGGARAN BIAYA ( RAB )

NAMA DINAS/ INSTANSI :


NAMA KEGIATAN :
NAMA PEKERJAAN :
LOKASI PEKERJAAN :
SUMBER DANA : -
TAHUN ANGGARAN : 2023

HARGA SATUAN PAJAK JUMLAH HARGA


No. AITEM JENIS PEKERJAAN VOLUME SAT KODE ANALISA
PEKERJAAN (11 %) PEKERJAAN

1 2 3 4 5 6 7 = (6 x 11%) 8 = 3 x (6 + 7)
A. PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Pembongkaran, Pembersihan awal dan akhir pekerjaan 1.00 kgt Ls - - -
2 Pembuatan pagar sementara dari kayu tinggi 2 meter - m² 1. 1.1.1.1. 366,531.00 40,318.41 -
3 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter - m² 1. 1.1.1.2. 535,381.00 58,891.91 -
4 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter - m² 1. 1.1.1.3. 96,866.00 10,655.26 -
5 Pengukuran dan pemasangan Bouwplank - m' 1. 1.1.1.4. 96,261.00 10,588.71 -
6 Pembuatan kantor sementara lantai plesteran - m² 1. 1.1.1.5. 1,953,919.00 214,931.09 -
7 Pembuatan rumah jaga (konstruksi kayu ) - m² 1. 1.1.1.6. 1,574,320.00 173,175.20 -
8 Pembuatan gudang semen dan peralatan - m² 1. 1.1.1.7. 1,562,110.00 171,832.10 -
9 Pembuatan bedeng pekerja - m² 1. 1.1.1.8. 1,657,975.00 182,377.25 -
10 Pembersihan lapangan dan perataan - m² 1. 1.1.1.9. 177,650.00 19,541.50 -
11 Pembuatan steger/perancah dari bambu - m² 1. 1.1.1.10. - - -
12 Pembuatan kotak adukan ukuran 40cm x50cm x25cm - bh 1. 1.1.1.11. 205,744.00 22,631.84 -
13 Pembuatan jalan sementara - m² 1. 1.1.1.12. 231,935.00 25,512.85 -
14 Pembongkaran beton bertulang - m³ 1. 1.1.1.13. 1,184,304.00 130,273.44 -
15 Pembongkaran dinding tembok bata - m³ 1. 1.1.1.14. 118,430.40 13,027.34 -
16 Pemasangan pagar kawat jaring galvanis panjang 240 cm - m² 1. 1.1.1.15. 22,526.02 2,477.86 -
17 Pemasangan panel beton pracetak 5x50x213 cm - m² 1.1.1.1.16. - - -

1 Pembuatan Papan nama Proyek 0,8 x 1,2 cm 1.00 bh SNI.3 249,150.00 27,406.50 276,556.50
2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m - m² SNI.4b 407,693.00 44,846.23 -
3 Bongkar Usuk + Reng Untuk Dipakai Kembali - m² SNI.8 45,980.00 5,057.80 -
4 Pembongkaran Atap Seng Gelombang - m² SNI.9 18,271.00 2,009.81 -

Sub Total 276,556.50


A. JUMLAH PEKERJAAN PENDAHULUAN Jumlah Total 276,556.50

B. PEKERJAAN PEMBANGUNAN LANTAI - 1


I PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m - m³ 1. 1.5.1.1. 130,075.00 14,308.25 -
2 Penggalian tanah biasa sedalam 2 m - m³ 1. 1.5.1.2. 159,885.00 17,587.35 -
3 Menggali tanah biasa sedalam 3 m - m³ 1. 1.5.1.3. 190,201.00 20,922.11 -
4 Menggali tanah keras sedalam 1 m - m³ 1. 1.5.1.4. 173,096.00 19,040.56 -
5 Menggali tanah cadas sedalam 1 m - m³ 1. 1.5.1.5. 262,680.00 28,894.80 -
6 Menggali tanah lumpur sedalam 1 m - m³ 1. 1.5.1.6. 209,385.00 23,032.35 -
7 Pengerjaan stripping tanah tebing setinggi 1 meter - m² 1. 1.5.1.7. 9,515.00 1,046.65 -
8 Pembuangan tanah sejauh 30 meter - m³ 1. 1.5.1.8. 56,980.00 6,267.80 -
9 Pengurugan kembali galian tanah - m³ 1. 1.5.1.9. 43,358.33 4,769.42 -
10 Pemadatan tanah tanah ( per 20 cm) - m³ 1. 1.5.1.10. 95,150.00 10,466.50 -
11 Pengurugan dengan pasir urug - m³ 1. 1.5.1.11. 309,430.00 34,037.30 -
12 Pemasangan lapisan pudel campuran 1KP:3PP:7TL - m³ 1. 1.5.1.12. 406,333.40 44,696.67 -
13 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan - m² 1. 1.5.1.13. 219,945.00 24,193.95 -
14 Pengurugan 1 m3 sirtu padat - m³ 1. 1.5.1.14. 364,375.00 40,081.25 -
15 Pengurugan 1 m3 tanah padat - m³ 1. 1.5.1.15. 301,015.00 33,111.65 -

1 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat berat - m³ SNI.10.b 137,555.00 15,131.05 -
2 Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat - m³ SNI.11.b 167,365.00 18,410.15 -
3 Urugan Tanah Biasa tampa pemadatan - m³ SNI.20 207,295.00 22,802.45 -

Sub Total -
II PEKERJAAN PONDASI
1 Pemasangan pondasi batu belah campuran 1SP : 3PP - m³ 3. 3.1.1.1. 1,263,377.50 138,971.53 -
2 Pemasangan pondasi batu belah campuran 1SP : 4PP - m³ 3. 3.1.1.2. 1,199,110.00 131,902.10 -
3 Pemasangan pondasi batu belah campuran 1SP : 5PP - m³ 3. 3.1.1.3. 1,154,560.00 127,001.60 -
4 Pemasangan pondasi batu belah campuran 1SP : 6PP - m³ 3. 3.1.1.4. 1,123,237.50 123,556.13 -
5 Pemasangan pondasi batu belah campuran 1SP : 8PP - m³ 3. 3.1.1.5. 1,080,310.00 118,834.10 -
6 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP - m³ 3. 3.1.1.6. 851,189.90 93,630.89 -
7 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP - m³ 3. 3.1.1.7. 1,002,410.20 110,265.12 -
8 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP - m³ 3. 3.1.1.8. 972,577.10 106,983.48 -
9 Pemasangan batu kosong (anstamping) - m³ 3. 3.1.1.9. 646,008.00 71,060.88 -
10 Pemasangan pondasi sumuran, diameter 100 cm - m³ 3. 3.1.1.10. 3,993,517.00 439,286.87 -
11 Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% - m³ 3. 3.1.1.11. 1,512,874.00 166,416.14 -

Sub Total -
III PEKERJAAN BETON
1 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.1. 2,266,091.93 249,270.11 -
2 Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.2. 2,315,320.86 254,685.29 -
3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.3. 2,352,716.93 258,798.86 -
4 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/ - m³ 4. 4.1.1.4. 2,107,588.21 231,834.70 -
5 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.5. 2,398,268.71 263,809.56 -
6 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.6. 2,439,789.79 268,376.88 -
7 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.7. 2,474,035.14 272,143.87 -
8 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.8. 2,492,711.57 274,198.27 -
9 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.9. 2,525,185.14 277,770.37 -
10 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.10. 2,534,963.36 278,845.97 -
11 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.11. 2,670,352.14 293,738.74 -
12 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87 - m³ 4. 4.1.1.12. 2,683,375.36 295,171.29 -
13 Membuat beton kedap air dengan strorox – 100 - m³ 4. 4.1.1.13. 1,944,910.00 213,940.10 -
14 Pemasangan PVC Waterstop lebar 150 mm - m' 4. 4.1.1.14. - - -
15 Pemasangan PVC Waterstop lebar 200 mm - m' 4. 4.1.1.15. - - -
16 Membuat PVC Waterstop lebar 230 mm – 320 mm - m' 4. 4.1.1.16. - - -
17 Pembesian dengan besi polos atau besi ulir - 10 kg 4. 4.1.1.17. 253,858.00 27,924.38 -
18 Pemasangan kabel presstressed polos/strands - kg 4. 4.1.1.18. 243,804.00 26,818.44 -
19 Pemasangan jaring kawat baja (wiremesh), 6 mm - kg 4. 4.1.1.19. 53,438.00 5,878.18 -
20 Pemasangan bekisting untuk pondasi - m² 4. 4.1.1.20. 278,916.00 30,680.76 -
21 Pemasangan bekisting untuk dinding - m² 4. 4.1.1.25. - - -
22 Pemasangan bekisting untuk tangga - m² 4. 4.1.1.26. 423,973.00 46,637.03 -
23 Pemasangan jembatan untuk pengecoran beton - m² 4. 4.1.1.27. 138,523.00 15,237.53 -
24 Membuat pondasi beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.28. 6,903,061.00 759,336.71 -
25 Membuat sloof beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.29. 8,452,323.00 929,755.53 -
26 Membuat kolom beton bertulang (300 kg besi + bekisting) - m³ 4. 4.1.1.30. 12,879,603.00 1,416,756.33 -
27 Membuat balok beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.31. 9,881,498.00 1,086,964.78 -
28 Membuat kolom beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.32. 8,543,260.00 939,758.60 -
29 Membuat dinding beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.33. 8,331,301.00 916,443.11 -
30 Membuat dinding beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.34. 9,344,753.00 1,027,922.83 -
31 Membuat kolom praktis beton bertulang (11 x 11) cm - m' 4. 4.1.1.35. 131,862.50 14,504.88 -
32 Membuat ring balok beton bertulang (10 x 15) cm - m' 4. 4.1.1.36. 185,476.50 20,402.42 -

1 Membuat Beton Dengan Mutu K-250 - m³ SNI.77.a 2,928,805.00 322,168.55 -


2 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250 - m³ SNI.78.a 6,311,415.00 694,255.65 -
3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 - m³ SNI.79.a 6,787,341.00 746,607.51 -
4 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250 - m³ SNI.80.a 7,011,218.50 771,234.04 -
5 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 - m³ SNI.81.a 7,606,126.00 836,673.86 -
6 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250 - m³ SNI.82.a 8,795,941.00 967,553.51 -
7 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 - m³ SNI.83.a 9,224,853.00 1,014,733.83 -
8 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 - m³ SNI.84.a 10,414,668.00 1,145,613.48 -
9 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250 - m³ SNI.85.a 11,604,483.00 1,276,493.13 -
10 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 - m³ SNI.86.a 8,524,345.50 937,678.01 -
11 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 - m³ SNI.87.a 9,119,253.00 1,003,117.83 -
12 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 - m³ SNI.88.a 10,309,068.00 1,133,997.48 -
13 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 - m³ SNI.89.a 8,480,345.50 932,838.01 -
14 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 - m³ SNI.90.a 9,075,253.00 998,277.83 -

1 Membuat Beton Dengan Mutu K-225 - m³ SNI.77.b 2,913,438.00 320,478.18 -


2 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 - m³ SNI.78.b 6,177,066.50 679,477.32 -
3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 - m³ SNI.79.b 6,771,974.00 744,917.14 -
4 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 - m³ SNI.80.b 6,995,851.50 769,543.67 -
5 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 - m³ SNI.81.b 7,590,759.00 834,983.49 -
6 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225 - m³ SNI.82.b 8,780,574.00 965,863.14 -
7 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 - m³ SNI.83.b 9,209,486.00 1,013,043.46 -
8 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 - m³ SNI.84.b 10,399,301.00 1,143,923.11 -
9 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225 - m³ SNI.85.b 11,589,116.00 1,274,802.76 -
10 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 - m³ SNI.86.b 8,508,978.50 935,987.64 -
11 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 - m³ SNI.87.b 9,103,886.00 1,001,427.46 -
12 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 - m³ SNI.88.b 10,293,701.00 1,132,307.11 -
13 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 - m³ SNI.89.b 8,464,978.50 931,147.64 -
14 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 - m³ SNI.90.b 9,059,886.00 996,587.46 -

1 Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm) - m² SNI.151 1,039,962.00 114,395.82 -


2 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr - m³ SNI.152 2,239,430.60 246,337.37 -
3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr - m³ SNI.153 2,255,764.50 248,134.10 -
4 Pekerjaan Bekisting Sloof - m² SNI.155.a 293,216.00 32,253.76 -
5 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.156 5,650,760.50 621,583.66 -
6 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.157 5,138,353.00 565,218.83 -
7 Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.158 5,035,871.50 553,945.87 -
8 Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.159 4,625,945.50 508,854.01 -
9 Pekerjaan Bekisting Kolom - m² SNI.160.a 476,663.00 52,432.93 -
10 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.162 6,757,080.00 743,278.80 -
11 Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.163 7,632,295.00 839,552.45 -
12 Pekerjaan Bekisting Lantai - m² SNI.163.a 525,063.00 57,756.93 -
13 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.164 7,119,887.50 783,187.63 -
14 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.164.a2lp 3,794,312.50 417,374.38 -
15 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr - m³ SNI.164.b1lp 3,616,938.60 397,863.25 -
16 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.164.c1lp 3,039,933.60 334,392.70 -
17 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.164.1lp.a 5,164,555.00 568,101.05 -
18 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.164.1lp.b 4,652,147.50 511,736.23 -
19 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.165 8,188,702.50 900,757.28 -
20 Pekerjaan Bekisting Balok - m² SNI.165.a 489,863.00 53,884.93 -
21 Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.166 7,676,295.00 844,392.45 -
22 Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.167 7,163,887.50 788,027.63 -
23 Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.168 6,651,480.00 731,662.80 -
24 Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 K - m³ SNI.169 6,344,035.50 697,843.91 -
25 Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 - m³ SNI.170 6,998,887.50 769,877.63 -
26 Pek Bekisting Dinding Plat - m² SNI.170.a 482,163.00 53,037.93 -
27 Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr - m³ SNI.171 7,676,295.00 844,392.45 -
28 Pembesian dengan Besi Polos - kg SNI.173.1 21,920.80 2,411.29 -
29 Pembesian dengan Besi Ulir - kg SNI.173.2 25,385.80 2,792.44 -
30 Memasang Jaring Kawat Baja / Wiremesh 8 mm - m² SNI.173.3b 85,976.00 9,457.36 -
31 Memasang Jaring Kawat Baja / Wiremesh 10 mm - m² SNI.173.3c 129,734.00 14,270.74 -
32 Memasang Plat lantai sistem Bondex 0.65 mm - m' SNI.173.4a 343,431.00 37,777.41 -
33 Memasang Plat lantai sistem Bondex 0.70 mm - m' SNI.173.4b 354,761.00 39,023.71 -
34 Memasang Plat lantai sistem Bondex 0.75 mm - m' SNI.173.4c 366,091.00 40,270.01 -
35 Memasang Plat lantai sistem Bondex 0.100 mm - m' SNI.173.4d 456,731.00 50,240.41 -

PEKERJAAN BETON PRACETAK


1 Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2 - m² 4.4.1.2.1. 192,321.80 21,155.40 -
2 Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± - m² 4.4.1.2.2. 240,443.50 26,448.79 -
3 Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± - m² 4.4.1.2.3. 275,266.20 30,279.28 -
4 Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± - m² 4.4.1.2.4. 360,665.25 39,673.18 -
5 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) - m² 4.4.1.2.5. - - -
6 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) - m² 4.4.1.2.6. - - -
7 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) - m² 4.4.1.2.7. - - -
8 Pemasangan dan membuka bekisting komponen plat beton pracetak - bh 4.4.1.2.8. 13,772.00 1,514.92 -
9 Pemasangan dan membuka bekisting komponen balok beton pracetak - bh 4.4.1.2.9. 22,220.00 2,444.20 -
10 Pemasangan dan membuka bekisting komponen Kolom beton pracetak - bh 4.4.1.2.10. 17,996.00 1,979.56 -
11 Penuangan/menebar beton untuk komponen plat pracetak - bh 4.4.1.2.11. - - -
12 Penuangan/menebar beton untuk komponen balok pracetak - bh 4.4.1.2.12. - - -
13 Penuangan/menebar beton untuk komponen kolom pracetak - bh 4.4.1.2.13. - - -
14 Mendirikan komponen plat pracetak - bh 4.4.1.2.14. - - -
15 Mendirikan komponen balok pracetak - bh 4.4.1.2.15. - - -
16 Mendirikan komponen kolom pracetak - bh 4.4.1.2.16. - - -
17 Melangsir komponen plat pracetak ( ± 20 m) - bh 4.4.1.2.17. - - -
18 Melangsir komponen balok pracetak ( ± 20 m) - bh 4.4.1.2.18. - - -
19 Melangsir komponen kolom pracetak ( ± 20 m) - bh 4.4.1.2.19. - - -
20 Bahan grouting campuran - m³ 4.4.1.2.20. - - -
21 Bahan grouting tidak campuran - m³ 4.4.1.2.21. - - -
22 Upah melakukan grouting pada join pracetak - ttk 4.4.1.2.22. 104,786.00 11,526.46 -
23 Pemasangan Bekisting join pracetak - ttk 4.4.1.2.23. 113,929.20 12,532.21 -
24 Upah Join dengan Sling - ttk 4.4.1.2.24. 140,723.00 15,479.53 -

Sub Total -
IV PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan besi profil - kg 4.4.2.1.1. 72,787.00 8,006.57 -
2 Pemasangan rangka kuda-kuda baja IWF - kg 4.4.2.1.2. 72,787.00 8,006.57 -
3 Pengerjaan pekerjaan perakitan - kg 4.4.2.1.3. 96,382.00 10,602.02 -
4 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku - m² 4.4.2.1.4. 2,258,861.00 248,474.71 -
5 Pengerjaan pengelasan dengan las listrik - cm 4.4.2.1.5. 95,998.10 10,559.79 -
6 Pembuatan rangka jendela besi scuare tube (25 x 5) cm - m² 4.4.2.1.6. - - -
7 Pemasangan pintu rolling door besi - m² 4.4.2.1.7. 2,405,678.00 264,624.58 -
8 Pemasangan pintu lipat (folding door) bahan plastik/PVC - m² 4.4.2.1.8. - - -
9 Pemasangan sunscreen alluminium - m² 4.4.2.1.9. 751,652.00 82,681.72 -
10 Pemasangan rolling door alluminium - m² 4.4.2.1.10. 1,071,950.00 117,914.50 -
11 Pemasangan kusen pintu alluminium - m' 4.4.2.1.11. 201,511.20 22,166.23 -
12 Pemasangan pintu alluminium strip lebar 8 cm - m² 4.4.2.1.12. 1,531,003.10 168,410.34 -
13 Pemasangan pintu kaca rangka alluminium - m² 4.4.2.1.13. - - -
14 Pemasangan venetions blinds dan Vertical blinds - m² 4.4.2.1.14. - - -
15 Pemasangan terali besi strip (2 x 3) mm - m² 4.4.2.1.15. 1,150,451.34 126,549.65 -
16 Pemasangan kawat nyamuk - m² 4.4.2.1.16. 242,681.88 26,695.01 -
17 Pemasangan jendela nako & tralis - m² 4.4.2.1.17. 455,323.00 50,085.53 -
18 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm - m' 4.4.2.1.18. 257,262.50 28,298.88 -
19 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm - m' 4.4.2.1.19. 189,689.50 20,865.85 -
20 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding part - m² 4.4.2.1.20. 585,262.33 64,378.86 -
21 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon - m² 4.4.2.1.21. 695,335.67 76,486.92 -

1 Memasang Rangka Kanal - C - kg SNI.241.a 72,787.00 8,006.57 -


2 Pasang Handrail dan Railing - m' SNI.241.b 504,357.70 55,479.35 -
3 Pasang Galvanis Steel 3/4" - m' SNI.241.c 119,247.70 13,117.25 -
4 Pasang Railing Stainless - m' SNI.241.d 919,002.70 101,090.30 -
5 Pasang Tangga Hollow 5x5 cm - m' SNI.241.e 368,287.70 40,511.65 -
6 Pasang Syntetic Grass - m² SNI.241.1 38,720.00 4,259.20 -
7 Pasang WPC 5x5 cm - m' SNI.241.2 159,720.00 17,569.20 -
8 Pasang WPC 10x5 cm - m' SNI.241.3 278,300.00 30,613.00 -
9 Pasang WPC 15x5 cm - m' SNI.241.4 423,500.00 46,585.00 -
10 Pasang WPC 20x5 cm - m' SNI.241.5 586,850.00 64,553.50 -
11 Pasang WPC Panel W15 x H2,5 cm - m' SNI.241.6 694,540.00 76,399.40 -
12 Pasang Floor hardener 3 Kg/m2 - m² SNI.241.7 166,320.00 18,295.20 -
13 Pasang Efoxy waterbased flooring non slip anti abrasion - m² SNI.241.8 304,920.00 33,541.20 -
14 Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm - m² SNI.241.9 606,320.00 66,695.20 -
15 Pasang Floor hardener 7 Kg/m2 + grove line 2 cm - m² SNI.241.10 295,020.00 32,452.20 -
16 Pasang GRC Rosters 300x300x150 - m² SNI.241.11 334,264.15 36,769.06 -
17 Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu - m² SNI.241.12 1,518,308.00 167,013.88 -
18 Memasang kusen pintu alluminium Natural - m' SNI.247 183,373.85 20,171.12 -
19 Memasang Dinding kusen alluminium Natural + Kaca polos 8 mm - m² SNI.247.a 787,525.75 86,627.83 -
20 Memasang Dinding kusen alluminium Natural + Kaca temreat 8 mm, polos - m² SNI.247.b 1,755,525.75 193,107.83 -
21 Memasang Dinding kusen alluminium Natural + Kaca temreat 8 mm, warna - m² SNI.247.c 1,876,525.75 206,417.83 -
22 Memasang kusen pintu alluminium Warna - m' SNI.248 201,523.85 22,167.62 -
23 Memasang Dinding kusen alluminium Warna + Kaca polos 8 mm - m² SNI.248.a 842,823.85 92,710.62 -
24 Memasang Dinding kusen alluminium Warna + Kaca temreat 8 mm, polos - m² SNI.248.b 1,810,823.85 199,190.62 -
25 Memasang Dinding kusen alluminium Warna + Kaca temreat 8 mm, warna - m² SNI.248.c 1,949,125.75 214,403.83 -
26 Memasang Besi Hollow + Kaca tempreat 12 mm, warna - m² SNI.248.12 2,389,565.75 262,852.23 -
27 Memasang Kaca temreat 8 mm, polos - m² SNI.248.T8p 1,247,325.75 137,205.83 -
28 Memasang Kaca temreat 8 mm, Warna - m² SNI.248.T8w 1,368,325.75 150,515.83 -
29 Memasang Kaca mati 5 mm, polos - m² SNI.248.5p 243,025.75 26,732.83 -
30 Memasang Kaca mati 8 mm, polos - m² SNI.248.8p 279,325.75 30,725.83 -
31 Memasang Kaca mati Riben 5 mm - m² SNI.248.R 236,975.75 26,067.33 -
32 Memasang Kaca mati Buram/Es 5 mm - m² SNI.248.B/E 297,475.75 32,722.33 -
33 Pasang Cermin ex. TOTO TS 119 AS5 - bh SNI.249.a 242,299.75 26,652.97 -
34 Memasang Mirror 100x120 cm - bh SNI.41.5 372,619.50 40,988.15 -
35 Pasang Kaca Laminasi tebal 12 mm - bh SNI.249.b 1,852,809.75 203,809.07 -
36 Pasang kaca green glass 12 mm - m² SNI.249.c 2,217,644.00 243,940.84 -
37 Pasang kaca green glass tebal 8 mm - m² SNI.249.d 1,370,644.00 150,770.84 -
38 Pasang Pintu Engineering door / WPC - bh SNI.249.e 456,857.50 50,254.33 -
39 Pasang Pintu Green glass - bh SNI.249.f 554,482.50 60,993.08 -
40 Pasang Pintu siku alumunium powder coating - bh SNI.249.g 109,945.00 12,093.95 -
41 Pemasangan Kusen plat baja uk. 15x9x0,2 cm - m' SNI.249.1 573,309.00 63,063.99 -
42 Pemasangan Kusen Steel Frame Hollow Galvanis 150x40x3 mm - m' SNI.249.2 105,039.00 11,554.29 -
43 Pemasangan Kusen alumunium 4" YKK finishing powder coating - m' SNI.249.3 290,279.00 31,930.69 -
44 Mengerjakan pintu double UGD type P-01 - unit SNI.249.4a 21,213,291.88 2,333,462.11 -
45 Mengerjakan pintu type P-02 - unit SNI.249.4b 5,777,689.28 635,545.82 -
46 Mengerjakan pintu type P-03 - unit SNI.249.4c 4,624,264.21 508,669.06 -
47 Mengerjakan pintu type P-04A - unit SNI.249.4d 3,693,069.82 406,237.68 -
48 Mengerjakan pintu type P-04B - unit SNI.249.4e 3,693,069.82 406,237.68 -
49 Mengerjakan pintu type P-04C - unit SNI.249.4f 3,567,608.44 392,436.93 -
50 Mengerjakan pintu type P-05 - unit SNI.249.4g 2,998,939.13 329,883.30 -
51 Mengerjakan pintu type P-06 - unit SNI.249.4h 3,700,222.24 407,024.45 -
52 Mengerjakan pintu type P-07 - unit SNI.249.4i 3,712,047.24 408,325.20 -
53 Mengerjakan pintu type P-08 - unit SNI.249.4j 1,874,186.71 206,160.54 -
54 Mengerjakan pintu type P-09 - unit SNI.249.4k 4,686,098.42 515,470.83 -
55 Mengerjakan pintu type P-10 - unit SNI.249.4l 4,494,514.28 494,396.57 -
56 Mengerjakan pintu type P-11 - unit SNI.249.4m 30,052,254.84 3,305,748.03 -
57 Mengerjakan pintu type P-12 - unit SNI.249.4n 4,624,264.21 508,669.06 -
58 Mengerjakan pintu type P-S - unit SNI.249.4o 1,005,667.44 110,623.42 -
59 Memasang Daun pintu kaca 5 mm rangka alluminium, (natural) - m² SNI.250.N5 1,245,015.75 136,951.73 -
60 Memasang Daun pintu kaca 8 mm rangka alluminium, (natural) - m² SNI.250.N8 1,245,015.75 136,951.73 -
61 Memasang Daun pintu kaca 5 mm rangka alluminium, (warna) - m² SNI.250.W5 1,300,015.75 143,001.73 -
62 Memasang Daun pintu kaca 8 mm rangka alluminium, (warna) - m² SNI.250.W8 1,355,015.75 149,051.73 -
63 Memasang jendela kaca 5 mm rangka alluminium, (natural) - m² SNI.251.N 1,245,015.75 136,951.73 -
64 Memasang jendela kaca 8 mm rangka alluminium, (natural) - m² SNI.251.N8 1,245,015.75 136,951.73 -
65 Memasang jendela kaca 5 mm rangka alluminium, (warna) - m² SNI.251.W 1,300,015.75 143,001.73 -
66 Memasang jendela kaca 8 mm rangka alluminium, (warna) - m² SNI.251.W8 1,355,015.75 149,051.73 -
67 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100 - m² SNI.251.75.a 429,632.50 47,259.58 -
68 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75 - m² SNI.251.75.b 378,086.50 41,589.52 -
69 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75 - m² SNI.251.75.c 291,005.00 32,010.55 -
70 Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45 - m² SNI.251.75.d 87,081.50 9,578.97 -
71 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100 - m² SNI.251.80.a 453,062.50 49,836.88 -
72 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75 - m² SNI.251.80.b 406,202.50 44,682.28 -
73 Rangka dan Penutup Alluminium Composit Panel (ACP), Interior - m² SNI.251.ACP.a 893,942.50 98,333.68 -
74 Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior - m² SNI.251.ACP.b 1,196,442.50 131,608.68 -
75 Rangka dan Penutup Wood Panel Composit (WPC), Exterior - m² SNI.251.ACP.c 808,142.50 88,895.68 -
76 Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C - m² SNI.251.DG 443,630.00 48,799.30 -
77 Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C - m² SNI.251.DC 567,930.00 62,472.30 -

1 Pekerjaan Pasang Kawat Gerawang - m² SNI.210 68,612.50 7,547.38 -


2 Pekerjaan Pasang Jeruji Besi Pintu - m² SNI.211 794,978.25 87,447.61 -
3 Pekerjaan Pasang Kawat Duri - m² SNI.212 292,336.00 32,156.96 -
4 Pekerjaan Pagar besi Hollow (stenlistail) - m² SNI.213 1,618,493.25 178,034.26 -
5 Pekerjaan Pagar besi Hollow - m² SNI.214 749,493.25 82,444.26 -
6 Pekerjaan Pagar/ Dinding besi Hollow 100 x 50 mm - m² SNI.214.1 1,134,493.25 124,794.26 -
7 Pekerjaan Pintu Pagar besi (dia. 16 mm) - m² SNI.214.A 1,410,593.25 155,165.26 -
8 Pekerjaan Pagar besi (dia. 16 mm) - m² SNI.214.B 1,300,593.25 143,065.26 -

Sub Total -
V PEKERJAAN PASANGAN DINDING
1 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2 - m² 4. 4.4.1.1. 385,495.00 42,404.45 -
2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3 - m² 4. 4.4.1.2. 368,489.00 40,533.79 -
3 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4 - m² 4. 4.4.1.3. 357,016.00 39,271.76 -
4 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5 - m² 4. 4.4.1.4. 351,109.00 38,621.99 -
5 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6 - m² 4. 4.4.1.5. 349,140.00 38,405.40 -
6 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3 - m² 4. 4.4.1.6. 326,274.85 35,890.23 -
7 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : - m² 4. 4.4.1.7. 187,016.50 20,571.82 -
8 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : - m² 4. 4.4.1.8. 178,946.90 19,684.16 -
9 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4 - m² 4.4.4.1.9. 174,322.50 19,175.48 -
10 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5 - m² 4. 4.4.1.10. 171,414.10 18,855.55 -
11 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6 - m² 4. 4.4.1.11. 169,860.90 18,684.70 -
12 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8 - m² 4. 4.4.1.12. 166,705.00 18,337.55 -
13 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3 - m² 4. 4.4.1.13. 163,064.00 17,937.04 -
14 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1 - m² 4. 4.4.1.14. 147,045.80 16,175.04 -
15 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : - m² 4. 4.4.1.15. 149,428.40 16,437.12 -
16 Pemasangan dinding conblock HB20 campuran 1SP : 3PP - m² 4. 4.4.1.16. 449,255.40 49,418.09 -
17 Pemasangan dinding conblock HB20 campuran 1SP :4PP - m² 4. 4.4.1.17. 448,813.20 49,369.45 -
18 Pemasangan dinding conblock HB15 campuran 1SP :3PP - m² 4. 4.4.1.18. 396,876.70 43,656.44 -
19 Pemasangan dinding conblock HB15 campuran 1SP :4PP - cm² 4. 4.4.1.19. 396,306.90 43,593.76 -
20 Pemasangan dinding conblock HB10 campuran 1SP :3PP - cm² 4. 4.4.1.20. 365,092.20 40,160.14 -
21 Pemasangan dinding conblock HB10 campuran 1SP :4PP - cm² 4. 4.4.1.21. 365,366.10 40,190.27 -
22 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP - cm² 4. 4.4.1.22. 699,957.50 76,995.33 -
23 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP - cm² 4. 4.4.1.23. 699,957.50 76,995.33 -
24 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP - cm² 4. 4.4.1.24. 1,508,540.00 165,939.40 -
1 Pasangan Dinding bata berongga / roster (10 x 20) - m² SNI.27 617,540.00 67,929.40 -
2 Pemasangan dinding bata ringan tebal 10 X 20 X 60 cm + dengan mortar - m² SNI.29.R 593,291.60 65,262.08 -
3 Pasangan Dinding Batako 1 Pc : 4 Psr - m² SNI.32 141,968.75 15,616.56 -
4 Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps - m² SNI.33 259,796.90 28,577.66 -

Sub Total -
VI PEKERJAAN PLESTERAN
1 Pemasangan plesteran 1SP : 1PP tebal 15 mm. - m² 4.4.4.2.1. 121,392.48 13,353.17 -
2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. - m² 4.4.4.2.2. 112,508.88 12,375.98 -
3 Pemasangan plesteran 1SP : 3PP tebal 15mm. - m² 4.4.4.2.3. 108,673.62 11,954.10 -
4 Pemasangan plesteran 1SP : 4PP tebal 15 mm - m² 4.4.4.2.4. 106,048.80 11,665.37 -
5 Pemasangan plesteran 1SP : 5PP tebal 15 mm - m² 4.4.4.2.5. 104,569.08 11,502.60 -
6 Pemasangan plesteran 1SP : 6PP tebal 15 mm. - m² 4.4.4.2.6. 103,380.42 11,371.85 -
7 Pemasangan plesteran 1SP : 7PP tebal 15 mm - m² 4.4.4.2.7. 102,730.32 11,300.34 -
8 Pemasangan plesteran 1SP : 8PP tebal 15 mm - m² 4.4.4.2.8. 102,080.22 11,228.82 -
9 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm - m² 4.4.4.2.9. 106,078.50 11,668.64 -
10 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm - m² 4.4.4.2.10. 102,663.00 11,292.93 -
11 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm - m² 4.4.4.2.11. 94,373.73 10,381.11 -
12 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm - m² 4.4.4.2.12. 95,841.79 10,542.60 -
13 Pemasangan plesteran 1SP : 1PP tebal 20 mm - m² 4.4.4.2.13. 150,600.34 16,566.04 -
14 Pemasangan plesteran 1SP : 3PP tebal 20 mm - m² 4.4.4.2.14. 120,109.66 13,212.06 -
15 Pemasangan plesteran 1SP : 4PP tebal 20 mm. - m² 4.4.4.2.15. 141,904.40 15,609.48 -
16 Pemasangan plesteran 1SP : 5PP tebal 20 mm - m² 4.4.4.2.16. 140,013.94 15,401.53 -
17 Pemasangan plesteran 1SP : 6PP tebal 20 mm - m² 4.4.4.2.17. 138,346.56 15,218.12 -
18 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm - m² 4.4.4.2.18. 134,243.23 14,766.76 -
19 Pemasangan berapen 1SP : 5PP tebal 15 mm - m² 4.4.4.2.19. 60,602.08 6,666.23 -
20 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm - m' 4.4.4.2.20. 112,084.50 12,329.30 -
21 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm - m² 4.4.4.2.21. - - -
22 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm - m² 4.4.4.2.22. - - -
23 Pemasangan plesteran ciprat 1SP : 2PP - m² 4.4.4.2.23. 86,288.40 9,491.72 -
24 Pemasangan finishing siar pasangan bata merah - m² 4.4.4.2.24. 50,284.96 5,531.35 -
25 Pemasangan finishing siar pasangan conblock ekspose - m² 4.4.4.2.25. 23,881.00 2,626.91 -
26 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. - m² 4.4.4.2.26. 103,265.80 11,359.24 -
27 Pemasangan acian. - m² 4.4.4.2.27. 65,037.50 7,154.13 -

1 Plesteran + Acian halus dinding bata ringan/Hebel - m² SNI.34.b 197,483.00 21,723.13 -


2 Plesteran dinding bata ringan/Hebel - m² SNI.34.c 120,648.00 13,271.28 -
3 Plesteran Beton 1 PC : 2 Ps Tebal 15 mm - m² SNI.34.d 114,895.00 12,638.45 -
4 Plesteran Beton 1 PC : 3 Ps Tebal 15 mm - m² SNI.34.e 111,467.40 12,261.41 -

1 Pasang Kanstin Cetak 600x150x250 - m² SNI.41 363,728.75 40,010.16 -


2 Lapisan Geotextile - m² SNI.41.1 292,600.00 32,186.00 -
3 Lapisan Drainagecell - m² SNI.41.2 94,710.00 10,418.10 -
4 Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP - m' SNI.42.a 232,485.00 25,573.35 -
5 Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP - m' SNI.42.b 265,485.00 29,203.35 -
6 Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP - m' SNI.42.c 309,485.00 34,043.35 -
7 Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP - m' SNI.43 362,422.50 39,866.48 -
8 Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP - m' SNI.44 373,422.50 41,076.48 -
9 Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP - m' SNI.45 417,422.50 45,916.48 -

Sub Total -
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm - m² 4.4.4.3.1. 177,075.80 19,478.34 -
2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm - m² 4.4.4.3.2. 178,215.40 19,603.69 -
3 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm - m² 4.4.4.3.3. 186,224.50 20,484.70 -
4 Pemasangan lantai ubin warna ukuran 40cm x40 cm - m² 4.4.4.3.4. 218,216.90 24,003.86 -
5 Pemasangan lantai ubin warna ukuran 30cm x30cm - m² 4.4.4.3.5. 298,365.10 32,820.16 -
6 Pemasangan lantai ubin warna ukuran 20cm x20cm - m² 4.4.4.3.6. 510,284.50 56,131.30 -
7 Pemasangan lantai ubin teraso ukuran 40cm x40cm - m² 4.4.4.3.7. 224,051.30 24,645.64 -
8 Pemasangan lantai ubin teraso ukuran 30cm x30cm - m² 4.4.4.3.8. 231,774.40 25,495.18 -
9 Pemasangan lantai ubin granit ukuran 40cm x40cm - m² 4.4.4.3.9. 649,962.50 71,495.88 -
10 Pemasangan lantai ubin granit ukuran 30cm x30cm - m² 4.4.4.3.10. 660,044.00 72,604.84 -
11 Pemasangan lantai ubin teralux ukuran 40cm x40cm - m² 4.4.4.3.11. 824,994.50 90,749.40 -
12 Pemasangan lantai ubin teralux ukuran 30cm x30cm - m² 4.4.4.3.12. 836,313.50 91,994.49 -
13 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm - m² 4.4.4.3.13. 861,151.50 94,726.67 -
14 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm - m² 4.4.4.3.14. 824,994.50 90,749.40 -
15 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm - m² 4.4.4.3.15. 836,313.50 91,994.49 -
16 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm - m² 4.4.4.3.16. 52,354.50 5,759.00 -
17 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm - m² 4.4.4.3.17. 47,641.00 5,240.51 -
18 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm - m² 4.4.4.3.18. 47,842.30 5,262.65 -
19 Pemasangan plint ubin warna ukuran 10cm x 20cm - m² 4.4.4.3.19. 46,390.30 5,102.93 -
20 Pemasangan plint ubin warna ukuran 10cm x 30cm - m² 4.4.4.3.20. 51,045.50 5,615.01 -
21 Pemasangan plint ubin warna ukuran 10cm x 40cm - m² 4.4.4.3.21. 51,054.30 5,615.97 -
22 Pemasangan plint ubin teraso ukuran 10cm x 30cm - m² 4.4.4.3.22. 51,627.95 5,679.07 -
23 Pemasangan plint ubin teraso ukuran 10cm x 40cm - m² 4.4.4.3.23. 51,637.30 5,680.10 -
24 Pemasangan plint ubin granit ukuran 10cm x 40cm - m² 4.4.4.3.24. 94,196.30 10,361.59 -
25 Pemasangan plint ubin granit ukuran 10cm x 30cm - m² 4.4.4.3.25. 94,146.80 10,356.15 -
26 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm - m² 4.4.4.3.26. 111,158.30 12,227.41 -
27 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm - m² 4.4.4.3.27. 111,620.30 12,278.23 -
28 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm - m² 4.4.4.3.28. 109,046.30 11,995.09 -
29 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm - m² 4.4.4.3.29. 111,686.30 12,285.49 -
30 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm - m² 4.4.4.3.30. 111,620.30 12,278.23 -
31 Pemasangan lantai teraso cor di tempat, tebal 3cm - m² 4.4.4.3.31. - - -
32 Pemasangan lantai keramik artistik 10cm x 20cm - m² 4.4.4.3.32. 1,036,087.80 113,969.66 -
33 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm - m² 4.4.4.3.33. 1,801,412.80 198,155.41 -
34 Pemasangan lantai keramik ukuran 40cm x 40cm - m² 4.4.4.3.35.a 424,187.50 46,660.63 -
35 Pemasangan lantai keramik ukuran 33cm x 33cm - m² 4.4.4.3.34. 427,248.80 46,997.37 -
36 Pemasangan lantai keramik ukuran 30cm x 30cm - m² 4.4.4.3.35. 425,465.70 46,801.23 -
37 Pemasangan lantai keramik ukuran 20cm x 20cm - m² 4.4.4.3.36. 426,915.50 46,960.71 -
38 Pemasangan lantai keramik ukuran 10cm x 33cm untuk variasi/border - m² 4.4.4.3.37. 579,067.50 63,697.43 -
39 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm - m² 4.4.4.3.38. 1,303,711.75 143,408.29 -
40 Pemasangan plint keramik ukuran 10cm x 20cm - m' 4.4.4.3.39. 122,856.80 13,514.25 -
41 Pemasangan plint keramik ukuran 10cm x 10cm - m' 4.4.4.3.40. 63,803.30 7,018.36 -
42 Pemasangan plint keramik ukuran 5cm x 20cm - m' 4.4.4.3.41. 53,593.65 5,895.30 -
43 Pemasangan plint internal cove artistik 5cm x 5cm x 20cm - m' 4.4.4.3.42. - - -
44 Pemasangan lantai marmer ukuran 100cm x 100cm - m² 4.4.4.3.43. 943,137.80 103,745.16 -
45 Pemasangan lantai karpet - m² 4.4.4.3.44. 120,208.00 13,222.88 -
46 Pemasangan underlayer (pelapis bawah karpet) - m² 4.4.4.3.45. - - -
47 Pemasangan lantai parquet kayu - m² 4.4.4.3.46. 1,397,660.00 153,742.60 -
48 Pemasangan lantai kayu gymfloor - m² 4.4.4.3.47. 1,397,660.00 153,742.60 -
49 Pemasangan dinding porslen 11cm x 11cm - m² 4.4.4.3.48. 478,755.20 52,663.07 -
50 Pemasangan dinding porslen 10cm x 20cm - m² 4.4.4.3.49. 472,461.00 51,970.71 -
51 Pemasangan dinding porslen 20cm x 20cm - m² 4.4.4.3.50. 456,456.00 50,210.16 -
52 Pemasangan dinding keramik artistik 10cm x 20cm - m² 4.4.4.3.51. 495,781.00 54,535.91 -
53 Pemasangan dinding keramik artistik 5cm x 20cm - m² 4.4.4.3.52. 498,256.00 54,808.16 -
54 Pemasangan dinding keramik 10cm x 20cm - m² 4.4.4.3.53. 495,781.00 54,535.91 -
55 Pemasangan dinding keramik 20cm x 20cm - m² 4.4.4.3.54. 482,416.00 53,065.76 -
56 Pemasangan dinding keramik 30cm x 30cm - m² 4.4.4.3.54a. 487,036.00 53,573.96 -
57 Pemasangan dinding keramik 40cm x 40cm - m² 4.4.4.3.54b. 617,593.78 67,935.32 -
58 Pemasangan dinding marmer 100cm x 100cm - m² 4.4.4.3.55. 1,216,339.30 133,797.32 -
59 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm - m² 4.4.4.3.56. 435,460.30 47,900.63 -
60 Pemasangan dinding batu paras - m² 4.4.4.3.57. 505,395.00 55,593.45 -
61 Pemasangan dinding batu tempel hitam - m² 4.4.4.3.58. 528,495.00 58,134.45 -
62 Pemasangan lantai vynil ukuran 30cm x 30cm - m² 4.4.4.3.59. 846,928.50 93,162.14 -
63 Pemasangan wallpaper lebar 50 cm - m² 4.4.4.3.60. 122,323.67 13,455.60 -
64 Pemasangan floor harderner - m² 4.4.4.3.61. 269,434.00 29,637.74 -
65 Pemasangan plint vynil 15cm x 30cm - m² 4.4.4.3.62. 812,196.00 89,341.56 -
66 Pemasangan plint kayu tebal 2 cm lebar 10 cm - m² 4.4.4.3.63. 69,443.00 7,638.73 -
67 Memasang Paving blok tebal 8 cm - m² 4.4.4.3.64. 197,120.00 21,683.20 -

1 Pas. Lantai Tegel Abu-abu - m² SNI.46 136,580.40 15,023.84 -


2 Pas. Lantai Granite Kw I - m² SNI.47.a 602,287.40 66,251.61 -
3 Pas. Lantai Granite Kw II - m² SNI.47.b 525,287.40 57,781.61 -
4 Pasangan Lantai Keramik ( KW I Polos ) - m² SNI.48 402,523.00 44,277.53 -
5 Pasangan Lantai Keramik ( KW II Polos ) - m² SNI.49 379,423.00 41,736.53 -
6 Pasangan Lantai Keramik ( KW I Motif ) - m² SNI.50 437,173.00 48,089.03 -
7 Pasangan Lantai Keramik ( KW II Motif ) - m² SNI.51 414,815.50 45,629.71 -
8 Pasangan Lantai Marmer - m² SNI.52 928,023.80 102,082.62 -
9 Pasangan Lantai Keramik Anti Slip - m² SNI.52.a 414,815.50 45,629.71 -
10 Pasangan dinding keramik ( Kw I Motif ) - m² SNI.53 480,876.00 52,896.36 -
11 Pas. Dinding Keramik ( Kw II Motf ) - m² SNI.54 457,776.00 50,355.36 -
12 Pas. Dinding Keramik ( Kw I polos ) - m² SNI.55 469,326.00 51,625.86 -
13 Pas. Dinding Keramik ( Kw II Polos ) - m² SNI.56 292,391.00 32,163.01 -
14 Pas. Lantai Keramik Cating Motif - m² SNI.57.a 386,606.00 42,526.66 -
15 Pas. Lantai Coral Sikat - m² SNI.57.b 317,306.00 34,903.66 -
16 Pas. Lantai Coral Sikat, Warna - m² SNI.57.c 386,606.00 42,526.66 -
17 Pas. Dinding batu paras/Palimanan - m² SNI.58 518,815.00 57,069.65 -
18 Pas. Dinding batu tempel hitam bergaris - m² SNI.59 557,645.00 61,340.95 -
19 Pas. Paving Blok bata . T 8 cm - m² SNI.60.B 288,858.90 31,774.48 -
20 Pas. Paving Blok bata . T 8 cm, Press - m² SNI.60.P 383,293.90 42,162.33 -
21 Pas. Paving Blok bata . T 6 cm - m² SNI.61 272,193.90 29,941.33 -
22 Pas. Paving Blok persegi/berlian - m² SNI.62 422,178.90 46,439.68 -
23 Memasang ornamen terawang custom bahan GRC - m² SNI.62.1 1,335,317.50 146,884.93 -
24 Memasang acian motif tali air - m² SNI.62.2 65,037.50 7,154.13 -
25 Memasang plint ukuran (60 x 10x 4 ) cm - m' SNI.62.3 195,066.30 21,457.29 -
26 Memasang stepnose tangga ukuran (10 x 40) cm - m' SNI.62.4 129,676.80 14,264.45 -
27 Memasang lantai parquete ukuran (30 x 30) cm KL II - m' SNI.62.7 553,146.00 60,846.06 -
28 Pasang conblock tipe segi-empat warna 8 cm, K-300 - m² SNI.62.W 299,475.00 32,942.25 -
29 Pasang conblock tipe segi-empat abu-abu 8 cm, K-300 - m² SNI.62.A 293,975.00 32,337.25 -
30 Pasang kansten beton - m' SNI.62.7 213,552.90 23,490.82 -
31 Pasang grassblocksegi 8 tebal 8 cm - m² SNI.62.8 312,125.00 34,333.75 -

Sub Total -
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm - m² 4.4.5.1.1. 79,959.00 8,795.49 -
2 Pemasangan langit-langit akustik ukuran (30 x 30) cm - m² 4.4.5.1.2. 562,749.00 61,902.39 -
3 Pemasangan langit-langit akustik ukuran (30 x 60) cm - m² 4.4.5.1.3. 545,699.00 60,026.89 -
4 Pemasangan langit-langit akustik ukuran (60 x 120) cm - m² 4.4.5.1.4. 554,510.00 60,996.10 -
5 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & - m² 4.4.5.1.5. 69,921.50 7,691.37 -
6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm - m² 4.4.5.1.6. 391,220.50 43,034.26 -
7 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm - m² 4.4.5.1.7. 73,755.00 8,113.05 -
8 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka allumini - m² 4.4.5.1.8. 791,766.25 87,094.29 -
9 Pemasangan list langit-langit kayu profil - m' 4.4.5.1.9. 37,202.00 4,092.22 -

1 Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu - m² SNI.232 212,311.00 23,354.21 -
2 Mengerjakan List Plafond Gypsum Board Type I - m' SNI.233.a 71,965.30 7,916.18 -
3 Mengerjakan List Plafond Gypsum Board Type II - m' SNI.233.b 56,950.30 6,264.53 -
4 Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate - m² SNI.234 279,504.50 30,745.50 -
5 Memasang langit-langit WPC , rangka metal furing - m² SNI.234.a 991,795.61 109,097.52 -
6 Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow - m² SNI.234.b 2,611,752.00 287,292.72 -
7 Pasang Kaca Tempered Clear T=10 - m² SNI.234.c 1,714,152.00 188,556.72 -
8 Pasang Atap Kanopi GRC gelombang - m² SNI.234.d 305,602.00 33,616.22 -
9 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih polos - m² SNI.234.SP.1 516,202.50 56,782.28 -
10 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna - m² SNI.234.SP.2 559,102.50 61,501.28 -
11 Mengerjakan Plafond Akustik Rangka Alumunium - m² SNI.234.AQ 455,207.50 50,072.83 -
12 Pekerjaan Plafond Tripleks 3 mm + Rangka kayu - m² SNI.235.a 196,218.00 21,583.98 -
13 Pekerjaan Plafond Tripleks 5 mm + Rangka kayu - m² SNI.235.b 212,305.50 23,353.61 -
14 Pekerjaan Rangka Langit-langit - m² SNI.235.c 146,094.67 16,070.41 -
15 Pekerjaan Plafond Tripleks 5 mm - m² SNI.235.d 66,210.83 7,283.19 -
16 Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu - m² SNI.236.a 164,802.00 18,128.22 -
17 Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu - m² SNI.236.b 180,889.50 19,897.85 -
18 Pekerjaan List Plafond Kayu Profil 4/4 cm - m' SNI.238 37,257.00 4,098.27 -
19 Pekerjaan List Plafond Kayu Profil 2/4 cm - m' SNI.239 31,482.00 3,463.02 -

Sub Total -
IX PEKERJAAN PENUTUP ATAP
1 Pemasangan atap genteng palentong kecil - m² 4.4.5.2.1. 93,846.50 10,323.12 -
2 Pemasangan atap genteng kodok - m² 4.4.5.2.2. 195,723.00 21,529.53 -
3 Pemasangan atap genteng palentong besar/super - m² 4.4.5.2.3. - - -
4 Pemasangan bubung genteng palentong - m' 4.4.5.2.4. 174,196.00 19,161.56 -
5 Pemasangan bubung genteng kodok glazuur - m' 4.4.5.2.5. 172,546.00 18,980.06 -
6 Pemasangan bubung genteng palentong besar - m' 4.4.5.2.6. 174,966.00 19,246.26 -
7 Pemasangan roof light fibreglass 90x180 - m² 4.4.5.2.7. 124,960.00 13,745.60 -
8 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm - m² 4.4.5.2.8. 101,893.00 11,208.23 -
9 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm - m² 4.4.5.2.9. 99,767.80 10,974.46 -
10 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm - m² 4.4.5.2.10. 92,549.60 10,180.46 -
11 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm - m² 4.4.5.2.11. 104,137.00 11,455.07 -
12 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm - m² 4.4.5.2.12. 142,980.75 15,727.88 -
13 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm - m² 4.4.5.2.13. 123,827.00 13,620.97 -
14 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm - m² 4.4.5.2.14. 106,666.32 11,733.30 -
15 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm - m² 4.4.5.2.15. 104,639.47 11,510.34 -
16 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm - m² 4.4.5.2.16. 133,004.67 14,630.51 -
17 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm - m² 4.4.5.2.17. - - -
18 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm - m² 4.4.5.2.18. - - -
19 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm - m² 4.4.5.2.19. - - -
20 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm - m² 4.4.5.2.20. - - -
21 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm - m² 4.4.5.2.21. - - -
22 Pemasangan bubung stel gelombang 0,92m - m' 4.4.5.2.22. - - -
23 Pemasangan bubung stel gelombang 1,05m - m' 4.4.5.2.23. - - -
24 Pemasangan bubung stel gelombang 1,08m - m' 4.4.5.2.24. - - -
25 Pemasangan nok paten 0,92m - m' 4.4.5.2.25. - - -
26 Pemasangan nok paten 1,05m - m' 4.4.5.2.26. - - -
27 Pemasangan nok paten 1,08m - m' 4.4.5.2.27. - - -
28 Pemasangan nok stel rata 0,92m - m' 4.4.5.2.28. 241,901.00 26,609.11 -
29 Pemasangan nok stel rata 1,05m - m' 4.4.5.2.29. 257,118.07 28,282.99 -
30 Pemasangan genteng beton - m² 4.4.5.2.30. - - -
31 Pemasangan genteng aspal - m² 4.4.5.2.31. - - -
32 Pemasangan genteng metal - m² 4.4.5.2.32. - - -
33 Pemasangan atap sirap kayu - m² 4.4.5.2.33. - - -
34 Pemasangan nok genteng beton - m' 4.4.5.2.34. - - -
35 Pemasangan nok genteng aspal - m' 4.4.5.2.35. - - -
36 Pemasangan nok genteng metal - m' 4.4.5.2.36. 166,199.00 18,281.89 -
37 Pemasangan nok sirap - m' 4.4.5.2.37. 164,540.20 18,099.42 -
38 Pemasangan atap seng gelombang - m² 4.4.5.2.38. 176,919.60 19,461.16 -
39 Pemasangan nok atap seng - m' 4.4.5.2.39. 104,471.40 11,491.85 -
40 Pemasangan atap alumunium - m² 4.4.5.2.40. - - -
41 Pemasangan nok alumunium - m' 4.4.5.2.41. - - -
42 Pemasangan alumunium foil/sisalation - m² 4.4.5.2.42. 53,504.00 5,885.44 -

1 Pekerjaan Atap Genteng Lokal - m² SNI.215 95,953.00 10,554.83 -


2 Pekerjaan Bubungan Genteng Lokal - m² SNI.216 181,786.00 19,996.46 -
3 Pekerjaan Atap Genteng Pejaten Bali - m² SNI.217 151,723.00 16,689.53 -
4 Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. Onduline - m² SNI.217,a 364,724.98 40,119.75 -
5 Pekerjaan Bubungan Genteng Pejaten Bali - m² SNI.218 184,646.00 20,311.06 -
6 Pemasangan nok bitumen Monolayer - m' SNI.218.a 7,300,084.00 803,009.24 -
7 Pekerjaan Atap Trimdeck 0.25 TCT (Spandek) - m² SNI.219.0.25 242,715.00 26,698.65 -
8 Pekerjaan Atap Trimdeck 0.30 TCT (Spandek) - m² SNI.219.0.30 254,815.00 28,029.65 -
9 Pekerjaan Atap Trimdeck 0.35 TCT (Spandek) - m² SNI.219.0.35 277,805.00 30,558.55 -
10 Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek) - m' SNI.220 131,004.50 14,410.50 -
11 Pekerjaan Atap Genteng Kodok - m² SNI.221.a 195,723.00 21,529.53 -
12 Pekerjaan Atap Genteng kanmuri full flat - m² SNI.221.b 310,123.00 34,113.53 -
13 Pekerjaan Bubungan Genteng Kodok - m² SNI.222.a 172,546.00 18,980.06 -
14 Pekerjaan Bubungan Genteng kanmuri full flat - m² SNI.222.b 328,746.00 36,162.06 -
15 Pekerjaan Atap Seng Gelombang BJLS 20 - m² SNI.223 156,200.00 17,182.00 -
16 Memasang Bubungan Seng BJLS 20 - m' SNI.224 131,450.00 14,459.50 -
17 Pekerjaan Atap Asbes Gelombang Kecil - m² SNI.225 120,076.00 13,208.36 -
18 Memasang Bubungan Asbes Gelombang Kecil - m' SNI.226 107,085.00 11,779.35 -
19 Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran - m² SNI.227 169,543.00 18,649.73 -
20 Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. Butiran - m' SNI.228 139,348.00 15,328.28 -
21 Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran - m² SNI.229.a 186,043.00 20,464.73 -
22 Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. Butiran - m' SNI.229.b 151,448.00 16,659.28 -
23 Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura - m² SNI.230 172,733.00 19,000.63 -
24 Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm ) - m' SNI.231 133,298.00 14,662.78 -

Sub Total -
X PEKERJAAN KAYU
1 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I - m³ 4.4.6.1.1. 12,736,350.00 1,400,998.50 -
2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II - m³ 4.4.6.1.2. 10,992,300.00 1,209,153.00 -
3 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II - m² 4.4.6.1.3. 496,859.00 54,654.49 -
4 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III - m² 4.4.6.1.4. 424,259.00 46,668.49 -
5 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II - m² 4.4.6.1.5. 1,097,800.00 120,758.00 -
6 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II - m² 4.4.6.1.6. 834,790.00 91,826.90 -
7 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas II - m² 4.4.6.1.7. 1,210,000.00 133,100.00 -
8 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar s - m² 4.4.6.1.8. 907,599.00 99,835.89 -
9 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II - m² 4.4.6.1.9. 907,690.00 99,845.90 -
10 Pemasangan jalusi kusen, kayu kelas I atau II - m² 4.4.6.1.10. 949,850.00 104,483.50 -
11 Pemasangan teakwood rangkap, rangka expose kayu kelas I - m² 4.4.6.1.11. 1,013,804.00 111,518.44 -
12 Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II - m² 4.4.6.1.12. 855,844.00 94,142.84 -
13 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III benta - m³ 4.4.6.1.13. 9,381,680.00 1,031,984.80 -
14 Pemasangan konstruksi kuda-kuda expose, kayu kelas I - m³ 4.4.6.1.14. 13,678,665.00 1,504,653.15 -
15 Pemasangan konstruksi gordeng, kayu kelas II - m³ 4.4.6.1.15. 11,679,085.00 1,284,699.35 -
16 Pemasangan rangka atap genteng keramik, kayu kelas II - m² 4.4.6.1.16. 129,195.00 14,211.45 -
17 Pemasangan rangka atap genteng beton, kayu kelas II - m² 4.4.6.1.17. 137,857.50 15,164.33 -
18 Pemasangan rangka atap sirap, kayu kelas II - m² 4.4.6.1.18. 68,723.60 7,559.60 -
19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III - m² 4.4.6.1.19. 69,179.00 7,609.69 -
20 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III - m² 4.4.6.1.20. 160,138.00 17,615.18 -
21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II - m' 4.4.6.1.21. 118,195.00 13,001.45 -
22 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II - m' 4.4.6.1.22. 117,590.00 12,934.90 -
23 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III - m² 4.4.6.1.23. 197,190.00 21,690.90 -
24 Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas II - m² 4.4.6.1.24. 509,729.00 56,070.19 -
25 Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II - m² 4.4.6.1.25. 553,630.00 60,899.30 -
26 Pemasangan dinding lambrisering dari papan kayu kelas I - m² 4.4.6.1.26. 578,380.00 63,621.80 -
27 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm - m² 4.4.6.1.27. 120,692.00 13,276.12 -
28 Pemasangan dinding bilik, rangka kayu kelas III atau IV - m² 4.4.6.1.28. 152,417.65 16,765.94 -

1 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 - m² SNI.174 98,615.00 10,847.65 -


2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose ) - m² SNI.174.a 130,927.50 14,402.03 -
3 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 - m² SNI.175 107,415.00 11,815.65 -
4 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose ) - m² SNI.175.a 139,727.50 15,370.03 -
5 Mengerjakan / Memasang Usuk 5/7 cm - m² SNI.176.a 75,190.50 8,270.96 -
6 Mengerjakan / Memasang Kembali Usuk 5/7 cm - m² SNI.176.b 32,070.50 3,527.76 -
7 Mengerjakan / Memasang Reng 3/4 cm - m² SNI.176.c 32,224.50 3,544.70 -
8 Mengerjakan / Memasang Kembali Usuk 5/7 cm - m² SNI.176.d 13,744.50 1,511.90 -
9 Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II - m' SNI.178 171,935.50 18,912.91 -
10 Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II - m' SNI.179 119,020.00 13,092.20 -
11 Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II - m' SNI.179 77,275.00 8,500.25 -
12 Pekerjaan Papan Reuter (2/20) - m' SNI.180 73,920.00 8,131.20 -
13 Mengerjakan Talang Karet - m' SNI.181 274,505.00 30,195.55 -
14 Mengerjakan Talang datar/ jurai Seng BjLs 20 - m' SNI.182.a 257,180.00 28,289.80 -
15 Mengerjakan Talang 1/2 lingkaran Seng BjLs 20 - m' SNI.182.b 204,556.00 22,501.16 -
16 Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose) - m³ SNI.184 9,788,240.00 1,076,706.40 -
17 Pekerjaan Kayu Konsol, Tiang Kayu Klas II - m³ SNI.185 9,408,740.00 1,034,961.40 -
18 Pasang Kasiplank ukuran (0.8x20), 1 Lapis - m' SNI.186 96,415.00 10,605.65 -
19 Pasang Kasiplank ukuran (0.8x20), 2 Lapis - m' SNI.187 144,622.50 15,908.48 -
20 Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose) - m³ SNI.188 9,872,940.00 1,086,023.40 -
21 Pekerjaan Kayu Kusen Pintu dan Jendela - m³ SNI.189 10,712,900.00 1,178,419.00 -
22 Pekerjaan Daun Pintu dan Jendela Kaca 3 mm - m² SNI.190 868,494.00 95,534.34 -
23 Pekerjaan Daun Pintu dan Jendela Kaca 5 mm - m² SNI.191 928,994.00 102,189.34 -
24 Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela - m² SNI.192 177,575.75 19,533.33 -
25 Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela - m² SNI.193 244,125.75 26,853.83 -
26 Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela - m² SNI.193.8 280,425.75 30,846.83 -

1 Pekerjaan Memasang Alumunium strip 8 mm - m² SNI.194 862,824.88 94,910.74 -


2 Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm - m² SNI.195 1,841,994.00 202,619.34 -
3 Pekerjaan Memasang Kaca Cermin 5 mm - m² SNI.195.a 242,299.75 26,652.97 -
4 Pekerjaan Memasang Glass Blok - m² SNI.196 1,581,584.40 173,974.28 -
5 Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela - m² SNI.197 238,075.75 26,188.33 -
6 Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela - m² SNI.197.a 298,575.75 32,843.33 -
7 Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela - m² SNI.198 1,248,425.75 137,326.83 -
8 Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika - m² SNI.200 1,011,890.00 111,307.90 -
9 Pekerjaan Ram Jalusi - m² SNI.201 1,274,900.00 140,239.00 -
10 Pekerjaan Ram Jalusi Mati Kusen - m² SNI.202 843,370.00 92,770.70 -
11 Mengerjakan Daun Pintu Double Teakwood 3 mm - m² SNI.204 988,834.00 108,771.74 -
12 Pekerjaan Pintu Double Tripleks 3 mm - m² SNI.206 1,051,754.00 115,692.94 -
13 Pekerjaan Pintu Teakwood Lapis Formika - m² SNI.208 1,243,484.00 136,783.24 -
14 Pekerjaan Pintu Triplek Lapis Formika - m² SNI.209 709,104.00 78,001.44 -

Sub Total -
XI PEKERJAAN KUNCI DAN KACA
1 Pemasangan kunci tanam antik - bh 4.4.6.2.1. 761,739.00 83,791.29 -
2 Pemasangan kunci tanam biasa - bh 4.4.6.2.2. 301,565.00 33,172.15 -
3 Pemasangan kunci kamar mandi - bh 4.4.6.2.3. 269,434.00 29,637.74 -
4 Pemasangan kunci silinder - bh 4.4.6.2.4. 189,134.00 20,804.74 -
5 Pemasangan engsel pintu - bh 4.4.6.2.5. 60,922.40 6,701.46 -
6 Pemasangan engsel jendela kupu-kupu - bh 4.4.6.2.6. 36,756.50 4,043.22 -
7 Pemasangan engsel angin - bh 4.4.6.2.7. 71,186.50 7,830.52 -
8 Pemasangan spring knip - bh 4.4.6.2.8. - - -
9 Pemasangan kait angin - bh 4.4.6.2.9. 50,644.00 5,570.84 -
10 Pemasangan door closer - bh 4.4.6.2.10. 395,659.00 43,522.49 -
11 Pemasangan kunci slot - bh 4.4.6.2.11. 201,113.00 22,122.43 -
12 Pemasangan Door holder - bh 4.4.6.2.12. 395,659.00 43,522.49 -
13 Pemasangan door stop - bh 4.4.6.2.13. 97,845.00 10,762.95 -
14 Pemasangan rel pintu sorong - bh 4.4.6.2.14. 197,439.00 21,718.29 -
15 Pemasangan kunci lemari - bh 4.4.6.2.15. - - -
16 Pemasangan kaca tebal 3 mm - m² 4.4.6.2.16. 178,897.40 19,678.71 -
17 Pemasangan kaca tebal 5 mm - m² 4.4.6.2.17. 245,447.40 26,999.21 -
18 Pemasangan kaca tebal 8 mm - m² 4.4.6.2.18. 287,558.70 31,631.46 -
19 Pemasangan kaca buram tebal 12 mm - m² 4.4.6.2.19. - - -
20 Pemasangan kaca cermin tebal 5 mm - m² 4.4.6.2.20. 202,994.00 22,329.34 -
21 Pemasangan kaca cermin tebal 8 mm - m² 4.4.6.2.21. 249,403.00 27,434.33 -
22 Pemasangan kaca wireglassed tebal 5 mm - m² 4.4.6.2.22. - - -
23 Pemasangan kaca patri tebal 5 mm - m² 4.4.6.2.23. - - -
24 Pemasangan kaca tebal 8 mm - m² 4.4.6.2.17.A. 221,247.40 24,337.21 -

1 Pasang Kunci Tanam Mutu Menengah - bh SNI.265.b 290,345.00 31,937.95 -


2 Pasang Kunci Tanam Mutu Tinggi - bh SNI.265.c 720,445.00 79,248.95 -
3 Pasang Grendel Besar - bh SNI.268.1 51,606.50 5,676.72 -
4 Pasang Grendel Kecil - bh SNI.268.2 40,606.50 4,466.72 -
5 Pasang Kait Angin Besar - bh SNI.269 53,209.75 5,853.07 -
6 Pasang Kait Angin Kecil - bh SNI.270 137,032.50 15,073.58 -
7 Pasang Kunci Selot Besar - bh SNI.271 124,206.50 13,662.72 -
8 Pasang Kunci Selot Kecil - bh SNI.272 127,413.00 14,015.43 -
9 Pasang Beugel U - bh SNI.273 45,564.75 5,012.12 -
10 Pasang Beugel Plat - bh SNI.274 45,564.75 5,012.12 -
11 Pasang Angker Dia 12 MM - bh SNI.275 9,264.75 1,019.12 -
12 Pas. Baut Mur - bh SNI.276.a 8,164.75 898.12 -
13 Pas. Baut Mur 12 mm - bh SNI.276.b 9,264.75 1,019.12 -
14 Pas. Baut Mur 16 mm - bh SNI.276.c 10,364.75 1,140.12 -
15 Pas. Baut Mur 18 mm - bh SNI.276.d 11,464.75 1,261.12 -
16 Pas. Baut Mur 22 mm - bh SNI.276.e 13,664.75 1,503.12 -
17 Pasang Pintu Feber glass (Wc) - bh SNI.282 1,060,463.25 116,650.96 -

Sub Total -
XII PEKERJAAN PENGECATAN
1 Pengikisan/pengerokan permukaan cat lama - m² 4.4.7.1.1. 29,139.00 3,205.29 -
2 Pencucian bidang permukaan tembok yang pernah dicat - m² 4.4.7.1.2. 26,609.00 2,926.99 -
3 Pengerokan karat pada permukaan baja cara manual - m² 4.4.7.1.3. 27,874.00 3,066.14 -
4 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat pe - m² 4.4.7.1.4. 65,791.00 7,237.01 -
5 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat pe - m² 4.4.7.1.5. 92,477.00 10,172.47 -
6 Pelaburan bidang kayu dengan teak oil - m² 4.4.7.1.6. 46,365.00 5,100.15 -
7 Pelaburan bidang kayu dengan politur - m² 4.4.7.1.7. 64,992.40 7,149.16 -
8 Pelaburan bidang kayu dengan cat residu dan ter - m² 4.4.7.1.8. 27,643.00 3,040.73 -
9 Pelaburan bidang kayu dengan vernis - m² 4.4.7.1.9. 73,337.00 8,067.07 -
10 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup - m² 4.4.7.1.10. 38,179.90 4,199.79 -
11 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) - m² 4.4.7.1.11. 26,769.60 2,944.66 -
12 Pelaburan tembok dengan kalkarium - m² 4.4.7.1.12. 15,791.60 1,737.08 -
13 Pelaburan tembok dengan kapur sirih - m² 4.4.7.1.13. - - -
14 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) - m² 4.4.7.1.14. - - -
15 Pemasangan wallpaper - m² 4.4.7.1.15. 128,892.50 14,178.18 -
16 Pengecatan permukaan baja dengan menie besi - m² 4.4.7.1.16. 54,917.50 6,040.93 -
17 Pengecatan permukaan baja dengan menie besi dengan perancah - m² 4.4.7.1.17. 106,139.00 11,675.29 -
18 Pengecatan permukaan baja galvanis secara manual 4 lapis - m² 4.4.7.1.18. 114,717.90 12,618.97 -
19 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir - m² 4.4.7.1.19. 50,039.00 5,504.29 -
20 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis - m² 4.4.7.1.20. 286,924.00 31,561.64 -
21 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhi - m² 4.4.7.1.21. 258,599.00 28,445.89 -

1 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior) - m² SNI.252 74,485.40 8,193.39 -
2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior) - m² SNI.252.a 47,953.40 5,274.87 -
3 Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat - m² SNI.252.b 80,795.00 8,887.45 -
4 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) - m² SNI.252.c 37,283.40 4,101.17 -
5 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) - m² SNI.252.d 252,718.40 27,799.02 -
6 Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat - m² SNI.252.e 89,445.40 9,838.99 -
7 Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm rangka hollow - m² SNI.252.f 1,314,713.40 144,618.47 -
8 Measang pelapis tembak dengan HPL - m² SNI.252.g 138,637.40 15,250.11 -
9 Pemasangan Wall Paper - m² SNI.252.h 188,093.40 20,690.27 -
10 Pengecatan Cat Tekstur Fin. Kamprot Halus - m² SNI.252.i 513,693.40 56,506.27 -
11 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior - m² SNI.253 112,498.10 12,374.79 -
12 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior - m² SNI.253.a 90,388.10 9,942.69 -
13 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Eksterior - m² SNI.254 59,797.10 6,577.68 -
14 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior - m² SNI.254.a 36,213.10 3,983.44 -
15 Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat - m² SNI.254.b 72,655.00 7,992.05 -
16 Pekerjaan cat Genteng - m² SNI.255 92,776.20 10,205.38 -
17 Pekerjaan Cat Kayu 1 x Meni, 2 x Cat - m² SNI.256 67,710.50 7,448.16 -
18 Pekerjaan Cat Kayu, 1 x Cat - m² SNI.257 64,834.00 7,131.74 -
19 Pekerjaan Cat paving Blok - m² SNI.258 50,606.60 5,566.73 -
20 Mendempul dan Menggosok Kayu - m² SNI.259 22,874.50 2,516.20 -
21 Pekerjaan Politur 2 Kali - m² SNI.260 58,100.90 6,391.10 -
22 Mengecat Besi 1 x Meni, 2 x Cat - m² SNI.261 74,470.00 8,191.70 -
23 Mengecat Atap Seng Gelombang - m² SNI.262 63,151.00 6,946.61 -
24 Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil - m² SNI.263 29,121.40 3,203.35 -
25 Mengeter Kayu 2x - m² SNI.264 48,851.00 5,373.61 -

Sub Total -
XIII PEKERJAAN SANITASI DALAM GEDUNG
1 Pemasangan closet duduk/monoblock - bh 5.5.1.1.1. 5,902,380.00 649,261.80 -
2 Pemasangan closet jongkok porslen - bh 5.5.1.1 2. 856,625.00 94,228.75 -
3 Pemasangan closet jongkok teraso - bh 5.5.1.1 3. 687,940.00 75,673.40 -
4 Pemasangan urinoir - bh 5.5.1.1 4. 605,825.00 66,640.75 -
5 Pemasangan wastafel - bh 5.5.1.1 5. 4,052,675.00 445,794.25 -
6 Pemasangan bathcuip porselen - bh 5.5.1.1 6. 9,164,859.00 1,008,134.49 -
7 Pemasangan bak fibreglass vol 1 m3 - bh 5.5.1.1 7. 3,215,850.00 353,743.50 -
8 Pemasangan bak mandi batu bata vol 0,30 m3 - bh 5.5.1.1 8. 2,909,214.00 320,013.54 -
9 Pemasangan bak mandi teraso vol 0,30 m3 - bh 5.5.1.1 9. 2,273,370.00 250,070.70 -
10 Pemasangan bak air fibreglass vol 1 m3 - bh 5.5.1.1 10. 805,530.00 88,608.30 -
11 Pemasangan bak beton volume 1 m3 - bh 5.5.1.1 11. - - -
12 Pemasangan bak cuci piring stainlessteel - bh 5.5.1.1 12. 691,735.00 76,090.85 -
13 Pemasangan bak cuci piring teraso - bh 5.5.1.1 13. 794,200.00 87,362.00 -
14 Pemasangan floor drain - bh 5.5.1.1 14. 56,045.00 6,164.95 -
15 Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm - bh 5.5.1.1 15. 760,364.00 83,640.04 -
16 Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm - bh 5.5.1.1 16. 1,110,241.00 122,126.51 -
17 Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm - bh 5.5.1.1 17. 1,301,817.00 143,199.87 -
18 Pemasangan pipa galvanis diameter ½” - m' 5.5.1.1 18. 49,445.00 5,438.95 -
19 Pemasangan kran diameter ½” atau 3/4” - bh 5.5.1.1 19. 121,000.00 13,310.00 -
20 Pemasangan pipa galvanis diameter 3/4” - m' 5.5.1.1 20. 52,173.00 5,739.03 -
21 Pemasangan pipa galvanis diameter 1” - m' 5.5.1.1 21. 56,265.00 6,189.15 -
22 Pemasangan pipa galvanis diameter 1 ½” - m' 5.5.1.1 22. 102,008.50 11,220.94 -
23 Pemasangan pipa galvanis diameter 3” - m' 5.5.1.1 23. 187,885.50 20,667.41 -
24 Pemasangan pipa galvanis diameter 4” - m' 5.5.1.1 24. 238,694.50 26,256.40 -
25 Pemasangan pipa PVC tipe AW diameter 1/2” - m' 5.5.1.1 25. - - -
26 Pemasangan pipa PVC tipe AW diameter 3/4” - m' 5.5.1.1 26. 48,807.00 5,368.77 -
27 Pemasangan pipa PVC tipe AW diameter 1” - m' 5.5.1.1 27. 55,627.00 6,118.97 -
28 Pemasangan pipa PVC tipe AW diameter 11/2” - m' 5.5.1.1 28. 83,440.50 9,178.46 -
29 Pemasangan pipa PVC tipe AW diameter 2” - m' 5.5.1.1 29. 107,822.00 11,860.42 -
30 Pemasangan pipa PVC tipe AW diameter 21/2” - m' 5.5.1.1 30. 158,878.50 17,476.64 -
31 Pemasangan pipa PVC tipe AW diameter 3” - m' 5.5.1.1 31. 202,015.00 22,221.65 -
32 Pemasangan pipa PVC tipe AW diameter 4” - m' 5.5.1.1 32. 273,454.50 30,080.00 -
33 Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm - m' 5.5.1.1 33. - - -
34 Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm - m' 5.5.1.1 34. - - -
35 Pemasangan pipa beton diameter 15 – 20 cm - m' 5.5.1.1 35. 249,135.65 27,404.92 -
36 Pemasangan pipa beton diameter 30 – 100 cm - m' 5.5.1.1.36. 379,497.25 41,744.70 -

1 Memasang Kloset Duduk Biasa - bh SNI.283.B 1,782,913.00 196,120.43 -


2 Memasang Kloset Duduk (KW 1 Super) - bh SNI.283.K 5,082,693.00 559,096.23 -
3 Memasang Wastafel Biasa - bh SNI.284 1,175,515.00 129,306.65 -
4 Memasang Urinoir ex. TOTO U 57 M - bh SNI.286 3,621,475.00 398,362.25 -
5 Memasang Pembatas Urinoir ex. TOTO A 100 - bh SNI.286.a 1,566,345.00 172,297.95 -
6 Memasang Kitchen Sink Stainless Steel ex. TOTO - bh SNI.286.b 2,769,492.00 304,644.12 -
7 Memasang Kitchen Sink 1 Bowl GS 5844 - bh SNI.41.3 2,561,619.50 281,778.15 -
8 Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 - bh SNI.41.4 5,102,619.50 561,288.15 -
9 Memasang Bak Cuci Piring Logam, 1 lubang - bh SNI.286.1 734,519.50 80,797.15 -
10 Memasang Bak Cuci Piring Logam, 2 lubang - bh SNI.286.2 866,519.50 95,317.15 -
11 Memasang Bak Mandi Teraso - bh SNI.287 1,095,985.00 120,558.35 -
12 Memasang Bak Mandi Fiberglass - bh SNI.288 1,707,200.00 187,792.00 -
13 Memasang Bak Mandi Plastik - bh SNI.289 1,713,690.00 188,505.90 -
14 Memasang Kran ex. TOTO T2613 - bh SNI.290.a 425,810.00 46,839.10 -
15 Memasang Floor Drain - bh SNI.291 56,045.00 6,164.95 -
16 Memasang Floor Drain ex. TOTO TX 1 BV 3 - bh SNI.291.a 70,345.00 7,737.95 -
17 Memasang Saringan Air Besi - bh SNI.292 158,345.00 17,417.95 -
18 Memasang Shower spray ex. TOTO TX 403 SBPIV - bh SNI.292.1 920,810.00 101,289.10 -
19 Memasang Spoel hoek - bh SNI.292.2 12,256,310.00 1,348,194.10 -
20 Memasang shower ex. TOTO TR 309 SZ - bh SNI.292.3 648,010.00 71,281.10 -
21 Memasang Paper Holder ex. TOTO TIPE TS116R - bh SNI.292.4 679,745.00 74,771.95 -
22 Memasang soap holder ex. TOTO S 156N - bh SNI.292.5 202,345.00 22,257.95 -
23 Memasang hand railing stainless steel ex. TOTO TX 3A2 - bh SNI.292.6 1,060,345.00 116,637.95 -
24 Memasang Tandon Air kap. 500 Liter - bh SNI.293.a 1,599,345.00 175,927.95 -
25 Memasang Tandon Air kap. 1000 Liter - bh SNI.293.b 2,336,345.00 256,997.95 -
26 Memasang Pipa GI dia 1/2" - m' SNI.294.G 81,627.88 8,979.07 -
27 Memasang Pipa GI dia 2" - m' SNI.298.Ga 164,677.88 18,114.57 -

Sub Total -
XIV PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu - bh Ls 285,000.00 31,350.00 -
2 Stop Kontak Tanam - bh Ls 210,000.00 23,100.00 -
3 Stop Kontak Luar - bh Ls 227,000.00 24,970.00 -
4 Saklar Double - bh Ls 39,000.00 4,290.00 -
5 Saklar Tunggal - bh Ls 39,000.00 4,290.00 -
6 Zekering Boxes 1 Group - bh Ls 420,000.00 46,200.00 -
7 Zekering Boxes 2 Group - bh Ls 570,000.00 62,700.00 -
8 Zekering Boxes 3 Group - bh Ls 710,000.00 78,100.00 -
9 Lampu Philip 18 W - bh Ls 60,000.00 6,600.00 -
10 Lampu Philip 14 W - bh Ls 49,000.00 5,390.00 -
11 Lampu Philip 5 W - bh Ls 35,000.00 3,850.00 -
12 Lampu Pijar 25 W - bh Ls 25,000.00 2,750.00 -
13 Lampu TL 40 W - bh Ls 97,000.00 10,670.00 -
14 Lampu TL 2 x 18 W - bh Ls 95,000.00 10,450.00 -
15 Lampu TL 2 x 36 W - bh Ls 162,000.00 17,820.00 -
16 Lampu TL 2 x 40 W - bh Ls 165,000.00 18,150.00 -
17 Lampu LED 2 x 14 W - bh Ls 192,000.00 21,120.00 -
18 Lampu Sorot (Sejenis Mercury) - bh Ls 710,000.00 78,100.00 -
19 Kabel NYA 2,5 mm - roll/50 Ls 300,000.00 33,000.00 -
20 Kabel NGA 2 x 2,5 mm - roll/50 Ls 577,000.00 63,470.00 -
21 Kabel NYM 3 x 2,5 mm - roll/50 Ls 705,000.00 77,550.00 -
22 Kabel NYM 3 x 1,5 mm - roll/50 Ls 577,000.00 63,470.00 -
23 Kabel NYM 2 x 2,5 mm - roll/50 Ls 577,000.00 63,470.00 -
24 Kabel NYM 2 x 1,5 mm - roll/50 Ls 396,000.00 43,560.00 -
25 Kabel NYM 4 x 6 mm - roll/50 Ls 1,650,000.00 181,500.00 -
26 Kabel NYM 4 x 10 mm - roll/50 Ls 2,675,000.00 294,250.00 -
27 Kabel NYY 4 x 50 mm - m' Ls 390,000.00 42,900.00 -
28 Kabel BC 50 mm - m' Ls 55,000.00 6,050.00 -
29 Kabel BC 35 mm - m' Ls 45,000.00 4,950.00 -
30 Fiting Lampu - bh Ls 22,000.00 2,420.00 -
31 Fiting Lampu Tanam Dia. 4 " - bh Ls 42,000.00 4,620.00 -
32 Fiting Lampu Tanam Dia. 3 " - bh Ls 32,000.00 3,520.00 -
33 Box Panel 3 Phase, Comlite (80x120x25) - set Ls 12,000,000.00 1,320,000.00 -
34 Box Panel 3 Phase, Comlite (50x70x20) - set Ls 5,850,000.00 643,500.00 -
35 Box Panel 3 Phase, (30x40x15) - bh Ls 1,100,000.00 121,000.00 -
36 Box Panel PVC 4 MCB, (40x60x20) - bh Ls 395,000.00 43,450.00 -
37 MCB 6 A - bh Ls 70,000.00 7,700.00 -
38 MCB 4 A - bh Ls 66,000.00 7,260.00 -
39 Pemasukan Daya listrk - kwh Ls 2,600.00 286.00 -
40 Pemasangan Daya listrk - va Ls 1,600.00 176.00 -
41 AC (Air Conditioner) Kapasiitas 2 PK - unit Ls - - -
42 AC (Air Conditioner) Kapasiitas 1 PK - unit Ls - - -
43 AC (Air Conditioner) Kapasiitas 1/2 PK - unit Ls - - -
44 Pas pengisap debu ruangan (Blower) + asisories complit - bh Ls 166,000.00 18,260.00 -
45 Pas Lampu darurat + asisories complit - bh Ls 155,000.00 17,050.00 -
46 Kabel Telepone 4 x 0.5 mm - m' Ls 30,000.00 3,300.00 -
47 Isolasi - bh Ls 12,000.00 1,320.00 -
48 Outle TV - bh Ls 50,000.00 5,500.00 -
49 Outle Telephone - bh Ls 50,000.00 5,500.00 -
50 Dow ligth / PCL 13 W - bh Ls 130,000.00 14,300.00 -
51 Dow ligth / PCL 8 W - bh Ls 110,000.00 12,100.00 -
52 Dow ligth / LED 14 W - bh Ls 152,000.00 16,720.00 -
53 Dow ligth / LED 7 W - bh Ls 95,000.00 10,450.00 -
54 Dow ligth / LED 3 W - bh Ls 40,000.00 4,400.00 -
55 Lampu Tempel / LED 14 W - bh Ls 25,000.00 2,750.00 -
56 Lampu spot light/ LED 7 W - bh Ls 300,000.00 33,000.00 -
57 Lampu strip light/ LED 7 W - m' Ls 39,000.00 4,290.00 -
58 Electroda Cooper dia. 1 inci - m' Ls 350,000.00 38,500.00 -
59 Lampu Sorot taman spot light (LED), 10 watt - bh Ls 300,000.00 33,000.00 -
60 Lampu taman Tanam (LED), 8 watt - bh Ls 270,000.00 29,700.00 -
61 Bollard Lighting (LED), 9 watt - bh Ls 3,580,000.00 393,800.00 -
62 Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasan - bh Ls 1,200,000.00 132,000.00 -
63 Pipa Conduit PVC dia. 20 mm2 - m' Ls 3,000.00 330.00 -
64 Exshaust Fan 14 W - bh Ls 535,000.00 58,850.00 -
65 Wall Type Exshaust Fan 2500 CMH - bh Ls 1,100,000.00 121,000.00 -
66 Orbit Fan 60 Watt - bh Ls 720,000.00 79,200.00 -
67 Exshaust Fan 353 CFM/ 34 W - bh Ls 315,000.00 34,650.00 -
68 Pemasangan Penangkal Petir + Arde (Radius min. 50 m) - unit Ls 25,000,000.00 2,750,000.00 -
69 Pemasangan Penangkal Petir + Arde (Radius min. 25 m) - unit Ls 12,500,000.00 1,375,000.00 -
Sub Total -
XV PEKERJAAN VEGETASI TANAMAN
1 Tanam Pohon Kamboja tinggi 5 meter - bh SNI.302 2,148,465.00 236,331.15 -
2 Tanam Pohon Tabebuya tinggi 4 meter - bh SNI.302.1 1,730,465.00 190,351.15 -
3 Tanam Pohon Palem raja tinggi 3 meter - bh SNI.302.2 1,455,465.00 160,101.15 -
4 Tanam Pohon Pisang Kipas tinggi 1,5 meter - bh SNI.302.3 223,465.00 24,581.15 -
5 Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter - bh SNI.302.4 67,320.00 7,405.20 -
6 Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter - bh SNI.302.5 70,620.00 7,768.20 -
7 Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter - bh SNI.302.6 64,020.00 7,042.20 -
8 Pohon Damar (Agathis dammara) Tinggi 4m - bh SNI.302.a 929,049.00 102,195.39 -
9 Pohon Pulai (alstonia scholaris) Tinggi 6m - bh SNI.302.b 2,103,849.00 231,423.39 -
10 Pohon Kasia Jawa (Cassia javanica) Tinggi 4m - bh SNI.302.c 635,349.00 69,888.39 -
11 Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m - bh SNI.302.d 977,449.00 107,519.39 -
12 Pohon Flamboyan (Delonix regia) Tinggi 7m - bh SNI.302.e 1,320,649.00 145,271.39 -
13 Pohon Biola Cantik (Ficus lyrata) Tinggi 6m - bh SNI.302.f 908,149.00 99,896.39 -
14 Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m - bh SNI.302.g 1,185,349.00 130,388.39 -
15 Pohon Sosis (Kigelia pinnata) Tinggi 7m - bh SNI.302.h 1,185,349.00 130,388.39 -
16 Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m - bh SNI.302.i 981,849.00 108,003.39 -
17 Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m - bh SNI.302.j 613,349.00 67,468.39 -
18 Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m - bh SNI.302.k 1,625,349.00 178,788.39 -
19 Pohon Parahiba (Schizolobium parahyba) Tinggi 7m - bh SNI.302.l 1,047,849.00 115,263.39 -
20 Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m - bh SNI.302.m 761,849.00 83,803.39 -
21 Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m - bh SNI.302.n 220,649.00 24,271.39 -
22 Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 1,5m - bh SNI.302.o 838,849.00 92,273.39 -
23 Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m - bh SNI.302.p 131,549.00 14,470.39 -
24 Pohon Palem Kol (Licualis grandis) Tinggi 1,5m - bh SNI.302.q 186,549.00 20,520.39 -
25 Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m - bh SNI.302.r 2,090,649.00 229,971.39 -
26 Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m - bh SNI.302.s 1,938,849.00 213,273.39 -
27 Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m - bh SNI.302.t 635,349.00 69,888.39 -
28 Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m - bh SNI.302.u 635,349.00 69,888.39 -
29 Semak Agave (Agave angustifolia) Tinggi 300-400 mm - bh SNI.302.1a 1,134,265.00 124,769.15 -
30 Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm - bh SNI.302.1b 727,265.00 79,999.15 -
31 Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm - bh SNI.302.1c 617,265.00 67,899.15 -
32 Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm - bh SNI.302.1d 3,477,265.00 382,499.15 -
33 Semak Spineless (Spineless Yucca) Tinggi 800 mm - bh SNI.302.1e 1,893,265.00 208,259.15 -
34 Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm - bh SNI.302.1f 1,068,265.00 117,509.15 -
35 Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm - bh SNI.302.1g 243,265.00 26,759.15 -
36 Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm - bh SNI.302.1h 276,265.00 30,389.15 -
37 Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm - bh SNI.302.1i 518,265.00 57,009.15 -
38 Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm - bh SNI.302.1j 518,265.00 57,009.15 -
39 Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm - bh SNI.302.1k 243,265.00 26,759.15 -
40 Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm - bh SNI.302.1l 1,002,265.00 110,249.15 -
41 Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm - bh SNI.302.1m 243,265.00 26,759.15 -
42 Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm - bh SNI.302.1n 177,265.00 19,499.15 -
43 Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm - bh SNI.302.1o 837,265.00 92,099.15 -
44 Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm - bh SNI.302.1p 137,665.00 15,143.15 -
45 Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm - bh SNI.302.1q 177,265.00 19,499.15 -
46 Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm - bh SNI.302.1r 309,265.00 34,019.15 -
47 Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm - bh SNI.302.1s 243,265.00 26,759.15 -
48 Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm - bh SNI.302.1t 1,079,265.00 118,719.15 -
49 Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm - bh SNI.302.1v 309,265.00 34,019.15 -
50 Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250mm - bh SNI.302.1x 386,265.00 42,489.15 -
51 Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm - bh SNI.302.1y 452,265.00 49,749.15 -
52 Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm - bh SNI.302.1z 551,265.00 60,639.15 -
53 Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm - bh SNI.302.2a 160,765.00 17,684.15 -
54 Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm - bh SNI.302.2b 155,265.00 17,079.15 -
55 Semak kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500mm - bh SNI.302.2c 342,265.00 37,649.15 -
56 Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm - bh SNI.302.2d 518,265.00 57,009.15 -
57 Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm - bh SNI.302.2e 127,765.00 14,054.15 -
58 Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 - bh SNI.302.2f 177,265.00 19,499.15 -
59 Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm - bh SNI.302.2g 243,265.00 26,759.15 -
60 Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-150 - bh SNI.302.2h 309,265.00 34,019.15 -
61 Semak Rumput Manila (Zoysia matrella) - m² SNI.302.3a 101,200.00 11,132.00 -
Sub Total -
XVI PEKERJAAN TAMBAHAN
1 Biaya Pengeboran air + Pipa Casing Ø 6'' - m' SNI.Ls.1 1,558,535.00 171,438.85 -
2 Biaya Pengeboran air + Pipa Casing Ø 4'' - m' SNI.Ls.2 1,091,585.00 120,074.35 -
3 Biaya Pengeboran air + Pipa Casing Ø 3'' - m' SNI.Ls.3 547,415.00 60,215.65 -
4 Biaya Pengeboran air + Pipa Casing Ø 2.5'' - m' SNI.Ls.4 295,240.00 32,476.40 -
5 Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar ) - bh SNI.Ls.5 38,016,000.00 4,181,760.00 -
6 Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase - bh SNI.Ls.6 54,036,400.00 5,944,004.00 -
7 Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit pemasa - bh SNI.Ls.7 28,495,500.00 3,134,505.00 -
8 Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 Complit - bh SNI.Ls.8 25,685,000.00 2,825,350.00 -
Sub Total -
B. JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1 Jumlah Total -
BAC-UP DATA

NAMA DINAS/ INSTANSI : -


NAMA KEGIATAN : -
NAMA PEKERJAAN : -
LOKASI PEKERJAAN : -
SUMBER DANA : -
TAHUN ANGGARAN : 2023

URAIYAN KUANTITAS
VOLUME KODE HARGA SATUAN PAJAK JUMLAH HARGA
No. AITEM JENIS PEKERJAAN BAC-UP
SAT
ANALISA PEKERJAAN (10 %) SATUAN
L1/B
P/B T N/B JUMLAH
L2

A. PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Pembongkaran, Pembersihan awal dan akhir pekerjaan 1.00 kgt Ls - - - 1.00 X 1.00 X 1.00 1.00 1.00
2 Pembuatan pagar sementara dari kayu tinggi 2 meter - m² 1. 1.1.1.1. 366,531.00 40,318.41 - - X 1.00 X 1.00 1.00 -
3 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter - m² 1. 1.1.1.2. 535,381.00 58,891.91 - - X 1.00 X 1.00 1.00 -
4 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter - m² 1. 1.1.1.3. 96,866.00 10,655.26 - - X 1.00 X 1.00 1.00 -
5 Pengukuran dan pemasangan Bouwplank - m' 1. 1.1.1.4. 96,261.00 10,588.71 - - X 1.00 X 1.00 1.00 -
6 Pembuatan kantor sementara lantai plesteran - m² 1. 1.1.1.5. 1,953,919.00 214,931.09 - - X 1.00 X 1.00 1.00 -
7 Pembuatan rumah jaga (konstruksi kayu ) - m² 1. 1.1.1.6. 1,574,320.00 173,175.20 - - X 1.00 X 1.00 1.00 -
8 Pembuatan gudang semen dan peralatan - m² 1. 1.1.1.7. 1,562,110.00 171,832.10 - - X 1.00 X 1.00 1.00 -
9 Pembuatan bedeng pekerja - m² 1. 1.1.1.8. 1,657,975.00 182,377.25 - - X 1.00 X 1.00 1.00 -
10 Pembersihan lapangan dan perataan - m² 1. 1.1.1.9. 177,650.00 19,541.50 - - X 1.00 X 1.00 1.00 -
11 Pembuatan steger/perancah dari bambu - m² 1. 1.1.1.10. - - - - X 1.00 X 1.00 1.00 -
12 Pembuatan kotak adukan ukuran 40cm x50cm x25cm - bh 1. 1.1.1.11. 205,744.00 22,631.84 - - X 1.00 X 1.00 1.00 -
13 Pembuatan jalan sementara - m² 1. 1.1.1.12. 231,935.00 25,512.85 - - X 1.00 X 1.00 1.00 -
14 Pembongkaran beton bertulang - m³ 1. 1.1.1.13. 1,184,304.00 130,273.44 - - X 1.00 X 1.00 1.00 -
15 Pembongkaran dinding tembok bata - m³ 1. 1.1.1.14. 118,430.40 13,027.34 - - X 1.00 X 1.00 1.00 -
16 Pemasangan pagar kawat jaring galvanis panjang 240 cm - m² 1. 1.1.1.15. 22,526.02 2,477.86 - - X 1.00 X 1.00 1.00 -
17 Pemasangan panel beton pracetak 5x50x213 cm - m² 1.1.1.1.16. - - - - X 1.00 X 1.00 1.00 -

1 Pembuatan Papan nama Proyek 0,8 x 1,2 cm 1.00 bh SNI.3 249,150.00 27,406.50 276,556.50 1.00 X 1.00 X 1.00 1.00 1.00
2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m m² SNI.4b 407,693.00 44,846.23 - - X 1.00 X 1.00 1.00 -
3 Bongkar Usuk + Reng Untuk Dipakai Kembali m² SNI.8 45,980.00 5,057.80 - - X 1.00 X 1.00 1.00 -
4 Pembongkaran Atap Seng Gelombang m² SNI.9 18,271.00 2,009.81 - - X 1.00 X 1.00 1.00 -

Sub Total 276,556.50


A. JUMLAH PEKERJAAN PENDAHULUAN Jumlah Total 276,556.50

B. PEKERJAAN PEMBANGUNAN LANTAI - 1


I PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m - m³ 1. 1.5.1.1. 130,075.00 14,308.25 - - X 1.00 X 1.00 1.00 -
2 Penggalian tanah biasa sedalam 2 m - m³ 1. 1.5.1.2. 159,885.00 17,587.35 - - X 1.00 X 1.00 1.00 -
3 Menggali tanah biasa sedalam 3 m - m³ 1. 1.5.1.3. 190,201.00 20,922.11 - - X 1.00 X 1.00 1.00 -
4 Menggali tanah keras sedalam 1 m - m³ 1. 1.5.1.4. 173,096.00 19,040.56 - - X 1.00 X 1.00 1.00 -
5 Menggali tanah cadas sedalam 1 m - m³ 1. 1.5.1.5. 262,680.00 28,894.80 - - X 1.00 X 1.00 1.00 -
6 Menggali tanah lumpur sedalam 1 m - m³ 1. 1.5.1.6. 209,385.00 23,032.35 - - X 1.00 X 1.00 1.00 -
7 Pengerjaan stripping tanah tebing setinggi 1 meter - m² 1. 1.5.1.7. 9,515.00 1,046.65 - - X 1.00 X 1.00 1.00 -
8 Pembuangan tanah sejauh 30 meter - m³ 1. 1.5.1.8. 56,980.00 6,267.80 - - X 1.00 X 1.00 1.00 -
9 Pengurugan kembali galian tanah - m³ 1. 1.5.1.9. 43,358.33 4,769.42 - - X 1.00 X 1.00 1.00 -
10 Pemadatan tanah tanah ( per 20 cm) - m³ 1. 1.5.1.10. 95,150.00 10,466.50 - - X 1.00 X 1.00 1.00 -
11 Pengurugan dengan pasir urug - m³ 1. 1.5.1.11. 309,430.00 34,037.30 - - X 1.00 X 1.00 1.00 -
12 Pemasangan lapisan pudel campuran 1KP:3PP:7TL - m³ 1. 1.5.1.12. 406,333.40 44,696.67 - - X 1.00 X 1.00 1.00 -
13 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan - m² 1. 1.5.1.13. 219,945.00 24,193.95 - - X 1.00 X 1.00 1.00 -
Sub Total -
II PEKERJAAN PONDASI
1 Pemasangan pondasi batu belah campuran 1SP : 3PP - m³ 3. 3.1.1.1. 1,263,377.50 138,971.53 - - X 1.00 X 1.00 1.00 -
2 Pemasangan pondasi batu belah campuran 1SP : 4PP - m³ 3. 3.1.1.2. 1,199,110.00 131,902.10 - - X 1.00 X 1.00 1.00 -
3 Pemasangan pondasi batu belah campuran 1SP : 5PP - m³ 3. 3.1.1.3. 1,154,560.00 127,001.60 - - X 1.00 X 1.00 1.00 -
4 Pemasangan pondasi batu belah campuran 1SP : 6PP - m³ 3. 3.1.1.4. 1,123,237.50 123,556.13 - - X 1.00 X 1.00 1.00 -
5 Pemasangan pondasi batu belah campuran 1SP : 8PP - m³ 3. 3.1.1.5. 1,080,310.00 118,834.10 - - X 1.00 X 1.00 1.00 -
6 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP - m³ 3. 3.1.1.6. 851,189.90 93,630.89 - - X 1.00 X 1.00 1.00 -
7 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP - m³ 3. 3.1.1.7. 1,002,410.20 110,265.12 - - X 1.00 X 1.00 1.00 -
8 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP - m³ 3. 3.1.1.8. 972,577.10 106,983.48 - - X 1.00 X 1.00 1.00 -
9 Pemasangan batu kosong (anstamping) - m³ 3. 3.1.1.9. 646,008.00 71,060.88 - - X 1.00 X 1.00 1.00 -
10 Pemasangan pondasi sumuran, diameter 100 cm - m³ 3. 3.1.1.10. 3,993,517.00 439,286.87 - - X 1.00 X 1.00 1.00 -
11 Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : - m³ 3. 3.1.1.11. 1,512,874.00 166,416.14 - - X 1.00 X 1.00 1.00 -
Sub Total -
III PEKERJAAN BETON
1 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, - m³ 4. 4.1.1.1. 2,266,091.93 249,270.11 - - X 1.00 X 1.00 1.00 -
2 Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, - m³ 4. 4.1.1.2. 2,315,320.86 254,685.29 - - X 1.00 X 1.00 1.00 -
3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm - m³ 4. 4.1.1.3. 2,352,716.93 258,798.86 - - X 1.00 X 1.00 1.00 -
4 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump - m³ 4. 4.1.1.4. 2,107,588.21 231,834.70 - - X 1.00 X 1.00 1.00 -
5 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm - m³ 4. 4.1.1.5. 2,398,268.71 263,809.56 - - X 1.00 X 1.00 1.00 -
6 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm - m³ 4. 4.1.1.6. 2,439,789.79 268,376.88 - - X 1.00 X 1.00 1.00 -
7 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm - m³ 4. 4.1.1.7. 2,474,035.14 272,143.87 - - X 1.00 X 1.00 1.00 -
8 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm - m³ 4. 4.1.1.8. 2,492,711.57 274,198.27 - - X 1.00 X 1.00 1.00 -
9 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm - m³ 4. 4.1.1.9. 2,525,185.14 277,770.37 - - X 1.00 X 1.00 1.00 -
10 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm - m³ 4. 4.1.1.10. 2,534,963.36 278,845.97 - - X 1.00 X 1.00 1.00 -
11 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm - m³ 4. 4.1.1.11. 2,670,352.14 293,738.74 - - X 1.00 X 1.00 1.00 -
12 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm - m³ 4. 4.1.1.12. 2,683,375.36 295,171.29 - - X 1.00 X 1.00 1.00 -
13 Membuat beton kedap air dengan strorox – 100 - m³ 4. 4.1.1.13. 1,944,910.00 213,940.10 - - X 1.00 X 1.00 1.00 -
14 Pemasangan PVC Waterstop lebar 150 mm - m' 4. 4.1.1.14. - - - - X 1.00 X 1.00 1.00 -
15 Pemasangan PVC Waterstop lebar 200 mm - m' 4. 4.1.1.15. - - - - X 1.00 X 1.00 1.00 -
16 Membuat PVC Waterstop lebar 230 mm – 320 mm - m' 4. 4.1.1.16. - - - - X 1.00 X 1.00 1.00 -
17 Pembesian dengan besi polos atau besi ulir - 10 kg 4. 4.1.1.17. 253,858.00 27,924.38 - - X 1.00 X 1.00 1.00 -
18 Pemasangan kabel presstressed polos/strands - kg 4. 4.1.1.18. 243,804.00 26,818.44 - - X 1.00 X 1.00 1.00 -
19 Pemasangan jaring kawat baja (wiremesh), 6 mm - kg 4. 4.1.1.19. 53,438.00 5,878.18 - - X 1.00 X 1.00 1.00 -
20 Pemasangan bekisting untuk pondasi - m² 4. 4.1.1.20. 278,916.00 30,680.76 - - X 1.00 X 1.00 1.00 -
21 Pemasangan bekisting untuk dinding - m² 4. 4.1.1.25. - - - - X 1.00 X 1.00 1.00 -
22 Pemasangan bekisting untuk tangga - m² 4. 4.1.1.26. 423,973.00 46,637.03 - - X 1.00 X 1.00 1.00 -
23 Pemasangan jembatan untuk pengecoran beton - m² 4. 4.1.1.27. 138,523.00 15,237.53 - - X 1.00 X 1.00 1.00 -
24 Membuat pondasi beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.28. 6,903,061.00 759,336.71 - - X 1.00 X 1.00 1.00 -
25 Membuat sloof beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.29. 8,452,323.00 929,755.53 - - X 1.00 X 1.00 1.00 -
26 Membuat kolom beton bertulang (300 kg besi + bekisting) - m³ 4. 4.1.1.30. 12,879,603.00 1,416,756.33 - - X 1.00 X 1.00 1.00 -
27 Membuat balok beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.31. 9,881,498.00 1,086,964.78 - - X 1.00 X 1.00 1.00 -
28 Membuat kolom beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.32. 8,543,260.00 939,758.60 - - X 1.00 X 1.00 1.00 -
29 Membuat dinding beton bertulang (150 kg besi + bekisting) - m³ 4. 4.1.1.33. 8,331,301.00 916,443.11 - - X 1.00 X 1.00 1.00 -
30 Membuat dinding beton bertulang (200 kg besi + bekisting) - m³ 4. 4.1.1.34. 9,344,753.00 1,027,922.83 - - X 1.00 X 1.00 1.00 -
31 Membuat kolom praktis beton bertulang (11 x 11) cm - m' 4. 4.1.1.35. 131,862.50 14,504.88 - - X 1.00 X 1.00 1.00 -
32 Membuat ring balok beton bertulang (10 x 15) cm - m' 4. 4.1.1.36. 185,476.50 20,402.42 - - X 1.00 X 1.00 1.00 -
Sub Total -
PEKERJAAN BETON PRACETAK
1 Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175 - m² 4.4.1.2.1. 192,321.80 21,155.40 - - X 1.00 X 1.00 1.00 -
2 Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 1 - m² 4.4.1.2.2. 240,443.50 26,448.79 - - X 1.00 X 1.00 1.00 -
3 Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 1 - m² 4.4.1.2.3. 275,266.20 30,279.28 - - X 1.00 X 1.00 1.00 -
4 Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 1 - m² 4.4.1.2.4. 360,665.25 39,673.18 - - X 1.00 X 1.00 1.00 -
5 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) - m² 4.4.1.2.5. - - - - X 1.00 X 1.00 1.00 -
6 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pak - m² 4.4.1.2.6. - - - - X 1.00 X 1.00 1.00 -
7 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pa - m² 4.4.1.2.7. - - - - X 1.00 X 1.00 1.00 -
8 Pemasangan dan membuka bekisting komponen plat beton prace - bh 4.4.1.2.8. 13,772.00 1,514.92 - - X 1.00 X 1.00 1.00 -
9 Pemasangan dan membuka bekisting komponen balok beton pra - bh 4.4.1.2.9. 22,220.00 2,444.20 - - X 1.00 X 1.00 1.00 -
10 Pemasangan dan membuka bekisting komponen Kolom beton pr - bh 4.4.1.2.10. 17,996.00 1,979.56 - - X 1.00 X 1.00 1.00 -
11 Penuangan/menebar beton untuk komponen plat pracetak - bh 4.4.1.2.11. - - - - X 1.00 X 1.00 1.00 -
12 Penuangan/menebar beton untuk komponen balok pracetak - bh 4.4.1.2.12. - - - - X 1.00 X 1.00 1.00 -
13 Penuangan/menebar beton untuk komponen kolom pracetak - bh 4.4.1.2.13. - - - - X 1.00 X 1.00 1.00 -
14 Mendirikan komponen plat pracetak - bh 4.4.1.2.14. - - - - X 1.00 X 1.00 1.00 -
15 Mendirikan komponen balok pracetak - bh 4.4.1.2.15. - - - - X 1.00 X 1.00 1.00 -
16 Mendirikan komponen kolom pracetak - bh 4.4.1.2.16. - - - - X 1.00 X 1.00 1.00 -
17 Melangsir komponen plat pracetak ( ± 20 m) - bh 4.4.1.2.17. - - - - X 1.00 X 1.00 1.00 -
18 Melangsir komponen balok pracetak ( ± 20 m) - bh 4.4.1.2.18. - - - - X 1.00 X 1.00 1.00 -
19 Melangsir komponen kolom pracetak ( ± 20 m) - bh 4.4.1.2.19. - - - - X 1.00 X 1.00 1.00 -
20 Bahan grouting campuran - m³ 4.4.1.2.20. - - - - X 1.00 X 1.00 1.00 -
21 Bahan grouting tidak campuran - m³ 4.4.1.2.21. - - - - X 1.00 X 1.00 1.00 -
22 Upah melakukan grouting pada join pracetak - ttk 4.4.1.2.22. 104,786.00 11,526.46 - - X 1.00 X 1.00 1.00 -
23 Pemasangan Bekisting join pracetak - ttk 4.4.1.2.23. 113,929.20 12,532.21 - - X 1.00 X 1.00 1.00 -
24 Upah Join dengan Sling - ttk 4.4.1.2.24. 140,723.00 15,479.53 - - X 1.00 X 1.00 1.00 -
Sub Total -
IV PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan besi profil - kg 4.4.2.1.1. 72,787.00 8,006.57 - - X 1.00 X 1.00 1.00 -
2 Pemasangan rangka kuda-kuda baja IWF - kg 4.4.2.1.2. 72,787.00 8,006.57 - - X 1.00 X 1.00 1.00 -
3 Pengerjaan pekerjaan perakitan - kg 4.4.2.1.3. 96,382.00 10,602.02 - - X 1.00 X 1.00 1.00 -
4 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja - m² 4.4.2.1.4. 2,258,861.00 248,474.71 - - X 1.00 X 1.00 1.00 -
5 Pengerjaan pengelasan dengan las listrik - cm 4.4.2.1.5. 95,998.10 10,559.79 - - X 1.00 X 1.00 1.00 -
6 Pembuatan rangka jendela besi scuare tube (25 x 5) cm - m² 4.4.2.1.6. - - - - X 1.00 X 1.00 1.00 -
7 Pemasangan pintu rolling door besi - m² 4.4.2.1.7. 2,405,678.00 264,624.58 - - X 1.00 X 1.00 1.00 -
8 Pemasangan pintu lipat (folding door) bahan plastik/PVC - m² 4.4.2.1.8. - - - - X 1.00 X 1.00 1.00 -
9 Pemasangan sunscreen alluminium - m² 4.4.2.1.9. 751,652.00 82,681.72 - - X 1.00 X 1.00 1.00 -
10 Pemasangan rolling door alluminium - m² 4.4.2.1.10. 1,071,950.00 117,914.50 - - X 1.00 X 1.00 1.00 -
11 Pemasangan kusen pintu alluminium - m' 4.4.2.1.11. 201,511.20 22,166.23 - - X 1.00 X 1.00 1.00 -
12 Pemasangan pintu alluminium strip lebar 8 cm - m² 4.4.2.1.12. 1,531,003.10 168,410.34 - - X 1.00 X 1.00 1.00 -
13 Pemasangan pintu kaca rangka alluminium - m² 4.4.2.1.13. - - - - X 1.00 X 1.00 1.00 -
14 Pemasangan venetions blinds dan Vertical blinds - m² 4.4.2.1.14. - - - - X 1.00 X 1.00 1.00 -
15 Pemasangan terali besi strip (2 x 3) mm - m² 4.4.2.1.15. 1,150,451.34 126,549.65 - - X 1.00 X 1.00 1.00 -
16 Pemasangan kawat nyamuk - m² 4.4.2.1.16. 242,681.88 26,695.01 - - X 1.00 X 1.00 1.00 -
17 Pemasangan jendela nako & tralis - m² 4.4.2.1.17. 455,323.00 50,085.53 - - X 1.00 X 1.00 1.00 -
18 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm - m' 4.4.2.1.18. 257,262.50 28,298.88 - - X 1.00 X 1.00 1.00 -
19 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 leba - m' 4.4.2.1.19. 189,689.50 20,865.85 - - X 1.00 X 1.00 1.00 -
20 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm - m² 4.4.2.1.20. 585,262.33 64,378.86 - - X 1.00 X 1.00 1.00 -
21 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 c - m² 4.4.2.1.21. 695,335.67 76,486.92 - - X 1.00 X 1.00 1.00 -
Sub Total -
V PEKERJAAN PASANGAN DINDING
1 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.1. 385,495.00 42,404.45 - - X 1.00 X 1.00 1.00 -
2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.2. 368,489.00 40,533.79 - - X 1.00 X 1.00 1.00 -
3 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.3. 357,016.00 39,271.76 - - X 1.00 X 1.00 1.00 -
4 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.4. 351,109.00 38,621.99 - - X 1.00 X 1.00 1.00 -
5 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.5. 349,140.00 38,405.40 - - X 1.00 X 1.00 1.00 -
6 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu cam - m² 4. 4.4.1.6. 326,274.85 35,890.23 - - X 1.00 X 1.00 1.00 -
7 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam - m² 4. 4.4.1.7. 187,016.50 20,571.82 - - X 1.00 X 1.00 1.00 -
8 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam - m² 4. 4.4.1.8. 178,946.90 19,684.16 - - X 1.00 X 1.00 1.00 -
9 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu cam - m² 4.4.4.1.9. 174,322.50 19,175.48 - - X 1.00 X 1.00 1.00 -
10 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam - m² 4. 4.4.1.10. 171,414.10 18,855.55 - - X 1.00 X 1.00 1.00 -
11 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu camp - m² 4. 4.4.1.11. 169,860.90 18,684.70 - - X 1.00 X 1.00 1.00 -
12 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam - m² 4. 4.4.1.12. 166,705.00 18,337.55 - - X 1.00 X 1.00 1.00 -
13 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam - m² 4. 4.4.1.13. 163,064.00 17,937.04 - - X 1.00 X 1.00 1.00 -
14 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu cam - m² 4. 4.4.1.14. 147,045.80 16,175.04 - - X 1.00 X 1.00 1.00 -
15 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu ca - m² 4. 4.4.1.15. 149,428.40 16,437.12 - - X 1.00 X 1.00 1.00 -
16 Pemasangan dinding conblock HB20 campuran 1SP : 3PP - m² 4. 4.4.1.16. 449,255.40 49,418.09 - - X 1.00 X 1.00 1.00 -
17 Pemasangan dinding conblock HB20 campuran 1SP :4PP - m² 4. 4.4.1.17. 448,813.20 49,369.45 - - X 1.00 X 1.00 1.00 -
18 Pemasangan dinding conblock HB15 campuran 1SP :3PP - m² 4. 4.4.1.18. 396,876.70 43,656.44 - - X 1.00 X 1.00 1.00 -
19 Pemasangan dinding conblock HB15 campuran 1SP :4PP - cm² 4. 4.4.1.19. 396,306.90 43,593.76 - - X 1.00 X 1.00 1.00 -
20 Pemasangan dinding conblock HB10 campuran 1SP :3PP - cm² 4. 4.4.1.20. 365,092.20 40,160.14 - - X 1.00 X 1.00 1.00 -
21 Pemasangan dinding conblock HB10 campuran 1SP :4PP - cm² 4. 4.4.1.21. 365,366.10 40,190.27 - - X 1.00 X 1.00 1.00 -
22 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1 - cm² 4. 4.4.1.22. 699,957.50 76,995.33 - - X 1.00 X 1.00 1.00 -
23 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1 - cm² 4. 4.4.1.23. 699,957.50 76,995.33 - - X 1.00 X 1.00 1.00 -
24 Pemasangan dinding bata berongga ekspose 12x11x24 campura - cm² 4. 4.4.1.24. 1,508,540.00 165,939.40 - - X 1.00 X 1.00 1.00 -
Sub Total -
VI PEKERJAAN PLESTERAN
1 Pemasangan plesteran 1SP : 1PP tebal 15 mm. - m² 4.4.4.2.1. 121,392.48 13,353.17 - - X 1.00 X 1.00 1.00 -
2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. - m² 4.4.4.2.2. 112,508.88 12,375.98 - - X 1.00 X 1.00 1.00 -
3 Pemasangan plesteran 1SP : 3PP tebal 15mm. - m² 4.4.4.2.3. 108,673.62 11,954.10 - - X 1.00 X 1.00 1.00 -
4 Pemasangan plesteran 1SP : 4PP tebal 15 mm - m² 4.4.4.2.4. 106,048.80 11,665.37 - - X 1.00 X 1.00 1.00 -
5 Pemasangan plesteran 1SP : 5PP tebal 15 mm - m² 4.4.4.2.5. 104,569.08 11,502.60 - - X 1.00 X 1.00 1.00 -
6 Pemasangan plesteran 1SP : 6PP tebal 15 mm. - m² 4.4.4.2.6. 103,380.42 11,371.85 - - X 1.00 X 1.00 1.00 -
7 Pemasangan plesteran 1SP : 7PP tebal 15 mm - m² 4.4.4.2.7. 102,730.32 11,300.34 - - X 1.00 X 1.00 1.00 -
8 Pemasangan plesteran 1SP : 8PP tebal 15 mm - m² 4.4.4.2.8. 102,080.22 11,228.82 - - X 1.00 X 1.00 1.00 -
9 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm - m² 4.4.4.2.9. 106,078.50 11,668.64 - - X 1.00 X 1.00 1.00 -
10 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm - m² 4.4.4.2.10. 102,663.00 11,292.93 - - X 1.00 X 1.00 1.00 -
11 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm - m² 4.4.4.2.11. 94,373.73 10,381.11 - - X 1.00 X 1.00 1.00 -
12 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm - m² 4.4.4.2.12. 95,841.79 10,542.60 - - X 1.00 X 1.00 1.00 -
13 Pemasangan plesteran 1SP : 1PP tebal 20 mm - m² 4.4.4.2.13. 150,600.34 16,566.04 - - X 1.00 X 1.00 1.00 -
14 Pemasangan plesteran 1SP : 3PP tebal 20 mm - m² 4.4.4.2.14. 120,109.66 13,212.06 - - X 1.00 X 1.00 1.00 -
15 Pemasangan plesteran 1SP : 4PP tebal 20 mm. - m² 4.4.4.2.15. 141,904.40 15,609.48 - - X 1.00 X 1.00 1.00 -
16 Pemasangan plesteran 1SP : 5PP tebal 20 mm - m² 4.4.4.2.16. 140,013.94 15,401.53 - - X 1.00 X 1.00 1.00 -
17 Pemasangan plesteran 1SP : 6PP tebal 20 mm - m² 4.4.4.2.17. 138,346.56 15,218.12 - - X 1.00 X 1.00 1.00 -
18 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm - m² 4.4.4.2.18. 134,243.23 14,766.76 - - X 1.00 X 1.00 1.00 -
19 Pemasangan berapen 1SP : 5PP tebal 15 mm - m² 4.4.4.2.19. 60,602.08 6,666.23 - - X 1.00 X 1.00 1.00 -
20 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm - m' 4.4.4.2.20. 112,084.50 12,329.30 - - X 1.00 X 1.00 1.00 -
21 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm - m² 4.4.4.2.21. - - - - X 1.00 X 1.00 1.00 -
22 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm - m² 4.4.4.2.22. - - - - X 1.00 X 1.00 1.00 -
23 Pemasangan plesteran ciprat 1SP : 2PP - m² 4.4.4.2.23. 86,288.40 9,491.72 - - X 1.00 X 1.00 1.00 -
24 Pemasangan finishing siar pasangan bata merah - m² 4.4.4.2.24. 50,284.96 5,531.35 - - X 1.00 X 1.00 1.00 -
25 Pemasangan finishing siar pasangan conblock ekspose - m² 4.4.4.2.25. 23,881.00 2,626.91 - - X 1.00 X 1.00 1.00 -
26 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2 - m² 4.4.4.2.26. 103,265.80 11,359.24 - - X 1.00 X 1.00 1.00 -
27 Pemasangan acian. - m² 4.4.4.2.27. 65,037.50 7,154.13 - - X 1.00 X 1.00 1.00 -
Sub Total -
VII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm - m² 4.4.4.3.1. 177,075.80 19,478.34 - - X 1.00 X 1.00 1.00 -
2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm - m² 4.4.4.3.2. 178,215.40 19,603.69 - - X 1.00 X 1.00 1.00 -
3 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm - m² 4.4.4.3.3. 186,224.50 20,484.70 - - X 1.00 X 1.00 1.00 -
4 Pemasangan lantai ubin warna ukuran 40cm x40 cm - m² 4.4.4.3.4. 218,216.90 24,003.86 - - X 1.00 X 1.00 1.00 -
5 Pemasangan lantai ubin warna ukuran 30cm x30cm - m² 4.4.4.3.5. 298,365.10 32,820.16 - - X 1.00 X 1.00 1.00 -
6 Pemasangan lantai ubin warna ukuran 20cm x20cm - m² 4.4.4.3.6. 510,284.50 56,131.30 - - X 1.00 X 1.00 1.00 -
7 Pemasangan lantai ubin teraso ukuran 40cm x40cm - m² 4.4.4.3.7. 224,051.30 24,645.64 - - X 1.00 X 1.00 1.00 -
8 Pemasangan lantai ubin teraso ukuran 30cm x30cm - m² 4.4.4.3.8. 231,774.40 25,495.18 - - X 1.00 X 1.00 1.00 -
9 Pemasangan lantai ubin granit ukuran 40cm x40cm - m² 4.4.4.3.9. 649,962.50 71,495.88 - - X 1.00 X 1.00 1.00 -
10 Pemasangan lantai ubin granit ukuran 30cm x30cm - m² 4.4.4.3.10. 660,044.00 72,604.84 - - X 1.00 X 1.00 1.00 -
11 Pemasangan lantai ubin teralux ukuran 40cm x40cm - m² 4.4.4.3.11. 824,994.50 90,749.40 - - X 1.00 X 1.00 1.00 -
12 Pemasangan lantai ubin teralux ukuran 30cm x30cm - m² 4.4.4.3.12. 836,313.50 91,994.49 - - X 1.00 X 1.00 1.00 -
13 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm - m² 4.4.4.3.13. 861,151.50 94,726.67 - - X 1.00 X 1.00 1.00 -
14 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm - m² 4.4.4.3.14. 824,994.50 90,749.40 - - X 1.00 X 1.00 1.00 -
15 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm - m² 4.4.4.3.15. 836,313.50 91,994.49 - - X 1.00 X 1.00 1.00 -
16 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm - m² 4.4.4.3.16. 52,354.50 5,759.00 - - X 1.00 X 1.00 1.00 -
17 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm - m² 4.4.4.3.17. 47,641.00 5,240.51 - - X 1.00 X 1.00 1.00 -
18 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm - m² 4.4.4.3.18. 47,842.30 5,262.65 - - X 1.00 X 1.00 1.00 -
19 Pemasangan plint ubin warna ukuran 10cm x 20cm - m² 4.4.4.3.19. 46,390.30 5,102.93 - - X 1.00 X 1.00 1.00 -
20 Pemasangan plint ubin warna ukuran 10cm x 30cm - m² 4.4.4.3.20. 51,045.50 5,615.01 - - X 1.00 X 1.00 1.00 -
21 Pemasangan plint ubin warna ukuran 10cm x 40cm - m² 4.4.4.3.21. 51,054.30 5,615.97 - - X 1.00 X 1.00 1.00 -
22 Pemasangan plint ubin teraso ukuran 10cm x 30cm - m² 4.4.4.3.22. 51,627.95 5,679.07 - - X 1.00 X 1.00 1.00 -
23 Pemasangan plint ubin teraso ukuran 10cm x 40cm - m² 4.4.4.3.23. 51,637.30 5,680.10 - - X 1.00 X 1.00 1.00 -
24 Pemasangan plint ubin granit ukuran 10cm x 40cm - m² 4.4.4.3.24. 94,196.30 10,361.59 - - X 1.00 X 1.00 1.00 -
25 Pemasangan plint ubin granit ukuran 10cm x 30cm - m² 4.4.4.3.25. 94,146.80 10,356.15 - - X 1.00 X 1.00 1.00 -
26 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm - m² 4.4.4.3.26. 111,158.30 12,227.41 - - X 1.00 X 1.00 1.00 -
27 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm - m² 4.4.4.3.27. 111,620.30 12,278.23 - - X 1.00 X 1.00 1.00 -
28 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm - m² 4.4.4.3.28. 109,046.30 11,995.09 - - X 1.00 X 1.00 1.00 -
29 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm - m² 4.4.4.3.29. 111,686.30 12,285.49 - - X 1.00 X 1.00 1.00 -
30 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm - m² 4.4.4.3.30. 111,620.30 12,278.23 - - X 1.00 X 1.00 1.00 -
31 Pemasangan lantai teraso cor di tempat, tebal 3cm - m² 4.4.4.3.31. - - - - X 1.00 X 1.00 1.00 -
32 Pemasangan lantai keramik artistik 10cm x 20cm - m² 4.4.4.3.32. 1,036,087.80 113,969.66 - - X 1.00 X 1.00 1.00 -
33 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 2 - m² 4.4.4.3.33. 1,801,412.80 198,155.41 - - X 1.00 X 1.00 1.00 -
34 Pemasangan lantai keramik ukuran 40cm x 40cm - m² 4.4.4.3.35.a 424,187.50 46,660.63 - - X 1.00 X 1.00 1.00 -
35 Pemasangan lantai keramik ukuran 33cm x 33cm - m² 4.4.4.3.34. 427,248.80 46,997.37 - - X 1.00 X 1.00 1.00 -
36 Pemasangan lantai keramik ukuran 30cm x 30cm - m² 4.4.4.3.35. 425,465.70 46,801.23 - - X 1.00 X 1.00 1.00 -
37 Pemasangan lantai keramik ukuran 20cm x 20cm - m² 4.4.4.3.36. 426,915.50 46,960.71 - - X 1.00 X 1.00 1.00 -
38 Pemasangan lantai keramik ukuran 10cm x 33cm untuk variasi/b - m² 4.4.4.3.37. 579,067.50 63,697.43 - - X 1.00 X 1.00 1.00 -
39 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm - m² 4.4.4.3.38. 1,303,711.75 143,408.29 - - X 1.00 X 1.00 1.00 -
40 Pemasangan plint keramik ukuran 10cm x 20cm - m' 4.4.4.3.39. 122,856.80 13,514.25 - - X 1.00 X 1.00 1.00 -
41 Pemasangan plint keramik ukuran 10cm x 10cm - m' 4.4.4.3.40. 63,803.30 7,018.36 - - X 1.00 X 1.00 1.00 -
42 Pemasangan plint keramik ukuran 5cm x 20cm - m' 4.4.4.3.41. 53,593.65 5,895.30 - - X 1.00 X 1.00 1.00 -
43 Pemasangan plint internal cove artistik 5cm x 5cm x 20cm - m' 4.4.4.3.42. - - - - X 1.00 X 1.00 1.00 -
44 Pemasangan lantai marmer ukuran 100cm x 100cm - m² 4.4.4.3.43. 943,137.80 103,745.16 - - X 1.00 X 1.00 1.00 -
45 Pemasangan lantai karpet - m² 4.4.4.3.44. 120,208.00 13,222.88 - - X 1.00 X 1.00 1.00 -
46 Pemasangan underlayer (pelapis bawah karpet) - m² 4.4.4.3.45. - - - - X 1.00 X 1.00 1.00 -
47 Pemasangan lantai parquet kayu - m² 4.4.4.3.46. 1,397,660.00 153,742.60 - - X 1.00 X 1.00 1.00 -
48 Pemasangan lantai kayu gymfloor - m² 4.4.4.3.47. 1,397,660.00 153,742.60 - - X 1.00 X 1.00 1.00 -
49 Pemasangan dinding porslen 11cm x 11cm - m² 4.4.4.3.48. 478,755.20 52,663.07 - - X 1.00 X 1.00 1.00 -
50 Pemasangan dinding porslen 10cm x 20cm - m² 4.4.4.3.49. 472,461.00 51,970.71 - - X 1.00 X 1.00 1.00 -
51 Pemasangan dinding porslen 20cm x 20cm - m² 4.4.4.3.50. 456,456.00 50,210.16 - - X 1.00 X 1.00 1.00 -
52 Pemasangan dinding keramik artistik 10cm x 20cm - m² 4.4.4.3.51. 495,781.00 54,535.91 - - X 1.00 X 1.00 1.00 -
53 Pemasangan dinding keramik artistik 5cm x 20cm - m² 4.4.4.3.52. 498,256.00 54,808.16 - - X 1.00 X 1.00 1.00 -
54 Pemasangan dinding keramik 10cm x 20cm - m² 4.4.4.3.53. 495,781.00 54,535.91 - - X 1.00 X 1.00 1.00 -
55 Pemasangan dinding keramik 20cm x 20cm - m² 4.4.4.3.54. 482,416.00 53,065.76 - - X 1.00 X 1.00 1.00 -
56 Pemasangan dinding keramik 30cm x 30cm - m² 4.4.4.3.54a. 487,036.00 53,573.96 - - X 1.00 X 1.00 1.00 -
57 Pemasangan dinding keramik 40cm x 40cm - m² 4.4.4.3.54b. 617,593.78 67,935.32 - - X 1.00 X 1.00 1.00 -
58 Pemasangan dinding marmer 100cm x 100cm - m² 4.4.4.3.55. 1,216,339.30 133,797.32 - - X 1.00 X 1.00 1.00 -
59 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm - m² 4.4.4.3.56. 435,460.30 47,900.63 - - X 1.00 X 1.00 1.00 -
60 Pemasangan dinding batu paras - m² 4.4.4.3.57. 505,395.00 55,593.45 - - X 1.00 X 1.00 1.00 -
61 Pemasangan dinding batu tempel hitam - m² 4.4.4.3.58. 528,495.00 58,134.45 - - X 1.00 X 1.00 1.00 -
62 Pemasangan lantai vynil ukuran 30cm x 30cm - m² 4.4.4.3.59. 846,928.50 93,162.14 - - X 1.00 X 1.00 1.00 -
63 Pemasangan wallpaper lebar 50 cm - m² 4.4.4.3.60. 122,323.67 13,455.60 - - X 1.00 X 1.00 1.00 -
64 Pemasangan floor harderner - m² 4.4.4.3.61. 269,434.00 29,637.74 - - X 1.00 X 1.00 1.00 -
65 Pemasangan plint vynil 15cm x 30cm - m² 4.4.4.3.62. 812,196.00 89,341.56 - - X 1.00 X 1.00 1.00 -
66 Pemasangan plint kayu tebal 2 cm lebar 10 cm - m² 4.4.4.3.63. 69,443.00 7,638.73 - - X 1.00 X 1.00 1.00 -
67 Memasang Paving blok tebal 8 cm - m² 4.4.4.3.64. 197,120.00 21,683.20 - - X 1.00 X 1.00 1.00 -
Sub Total -
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan - m² 4.4.5.1.1. 79,959.00 8,795.49 - - X 1.00 X 1.00 1.00 -
2 Pemasangan langit-langit akustik ukuran (30 x 30) cm - m² 4.4.5.1.2. 562,749.00 61,902.39 - - X 1.00 X 1.00 1.00 -
3 Pemasangan langit-langit akustik ukuran (30 x 60) cm - m² 4.4.5.1.3. 545,699.00 60,026.89 - - X 1.00 X 1.00 1.00 -
4 Pemasangan langit-langit akustik ukuran (60 x 120) cm - m² 4.4.5.1.4. 554,510.00 60,996.10 - - X 1.00 X 1.00 1.00 -
5 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, teb - m² 4.4.5.1.5. 69,921.50 7,691.37 - - X 1.00 X 1.00 1.00 -
6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm - m² 4.4.5.1.6. 391,220.50 43,034.26 - - X 1.00 X 1.00 1.00 -
7 Pemasangan langit-langit gypsum board ukuran (120x240x9) m - m² 4.4.5.1.7. 73,755.00 8,113.05 - - X 1.00 X 1.00 1.00 -
8 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut - m² 4.4.5.1.8. 791,766.25 87,094.29 - - X 1.00 X 1.00 1.00 -
9 Pemasangan list langit-langit kayu profil - m' 4.4.5.1.9. 37,202.00 4,092.22 - - X 1.00 X 1.00 1.00 -
Sub Total -
IX PEKERJAAN PENUTUP ATAP
1 Pemasangan atap genteng palentong kecil - m² 4.4.5.2.1. 93,846.50 10,323.12 - - X 1.00 X 1.00 1.00 -
2 Pemasangan atap genteng kodok - m² 4.4.5.2.2. 195,723.00 21,529.53 - - X 1.00 X 1.00 1.00 -
3 Pemasangan atap genteng palentong besar/super - m² 4.4.5.2.3. - - - - X 1.00 X 1.00 1.00 -
4 Pemasangan bubung genteng palentong - m' 4.4.5.2.4. 174,196.00 19,161.56 - - X 1.00 X 1.00 1.00 -
5 Pemasangan bubung genteng kodok glazuur - m' 4.4.5.2.5. 172,546.00 18,980.06 - - X 1.00 X 1.00 1.00 -
6 Pemasangan bubung genteng palentong besar - m' 4.4.5.2.6. 174,966.00 19,246.26 - - X 1.00 X 1.00 1.00 -
7 Pemasangan roof light fibreglass 90x180 - m² 4.4.5.2.7. 124,960.00 13,745.60 - - X 1.00 X 1.00 1.00 -
8 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm - m² 4.4.5.2.8. 101,893.00 11,208.23 - - X 1.00 X 1.00 1.00 -
9 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm - m² 4.4.5.2.9. 99,767.80 10,974.46 - - X 1.00 X 1.00 1.00 -
10 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm - m² 4.4.5.2.10. 92,549.60 10,180.46 - - X 1.00 X 1.00 1.00 -
11 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm - m² 4.4.5.2.11. 104,137.00 11,455.07 - - X 1.00 X 1.00 1.00 -
12 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm - m² 4.4.5.2.12. 142,980.75 15,727.88 - - X 1.00 X 1.00 1.00 -
13 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm - m² 4.4.5.2.13. 123,827.00 13,620.97 - - X 1.00 X 1.00 1.00 -
14 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm - m² 4.4.5.2.14. 106,666.32 11,733.30 - - X 1.00 X 1.00 1.00 -
15 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm - m² 4.4.5.2.15. 104,639.47 11,510.34 - - X 1.00 X 1.00 1.00 -
16 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm - m² 4.4.5.2.16. 133,004.67 14,630.51 - - X 1.00 X 1.00 1.00 -
17 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm - m² 4.4.5.2.17. - - - - X 1.00 X 1.00 1.00 -
18 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm - m² 4.4.5.2.18. - - - - X 1.00 X 1.00 1.00 -
19 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm - m² 4.4.5.2.19. - - - - X 1.00 X 1.00 1.00 -
20 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm - m² 4.4.5.2.20. - - - - X 1.00 X 1.00 1.00 -
21 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm - m² 4.4.5.2.21. - - - - X 1.00 X 1.00 1.00 -
22 Pemasangan bubung stel gelombang 0,92m - m' 4.4.5.2.22. - - - - X 1.00 X 1.00 1.00 -
23 Pemasangan bubung stel gelombang 1,05m - m' 4.4.5.2.23. - - - - X 1.00 X 1.00 1.00 -
24 Pemasangan bubung stel gelombang 1,08m - m' 4.4.5.2.24. - - - - X 1.00 X 1.00 1.00 -
25 Pemasangan nok paten 0,92m - m' 4.4.5.2.25. - - - - X 1.00 X 1.00 1.00 -
26 Pemasangan nok paten 1,05m - m' 4.4.5.2.26. - - - - X 1.00 X 1.00 1.00 -
27 Pemasangan nok paten 1,08m - m' 4.4.5.2.27. - - - - X 1.00 X 1.00 1.00 -
28 Pemasangan nok stel rata 0,92m - m' 4.4.5.2.28. 241,901.00 26,609.11 - - X 1.00 X 1.00 1.00 -
29 Pemasangan nok stel rata 1,05m - m' 4.4.5.2.29. 257,118.07 28,282.99 - - X 1.00 X 1.00 1.00 -
30 Pemasangan genteng beton - m² 4.4.5.2.30. - - - - X 1.00 X 1.00 1.00 -
31 Pemasangan genteng aspal - m² 4.4.5.2.31. - - - - X 1.00 X 1.00 1.00 -
32 Pemasangan genteng metal - m² 4.4.5.2.32. - - - - X 1.00 X 1.00 1.00 -
33 Pemasangan atap sirap kayu - m² 4.4.5.2.33. - - - - X 1.00 X 1.00 1.00 -
34 Pemasangan nok genteng beton - m' 4.4.5.2.34. - - - - X 1.00 X 1.00 1.00 -
35 Pemasangan nok genteng aspal - m' 4.4.5.2.35. - - - - X 1.00 X 1.00 1.00 -
36 Pemasangan nok genteng metal - m' 4.4.5.2.36. 166,199.00 18,281.89 - - X 1.00 X 1.00 1.00 -
37 Pemasangan nok sirap - m' 4.4.5.2.37. 164,540.20 18,099.42 - - X 1.00 X 1.00 1.00 -
38 Pemasangan atap seng gelombang - m² 4.4.5.2.38. 176,919.60 19,461.16 - - X 1.00 X 1.00 1.00 -
39 Pemasangan nok atap seng - m' 4.4.5.2.39. 104,471.40 11,491.85 - - X 1.00 X 1.00 1.00 -
40 Pemasangan atap alumunium - m² 4.4.5.2.40. - - - - X 1.00 X 1.00 1.00 -
41 Pemasangan nok alumunium - m' 4.4.5.2.41. - - - - X 1.00 X 1.00 1.00 -
42 Pemasangan alumunium foil/sisalation - m² 4.4.5.2.42. 53,504.00 5,885.44 - - X 1.00 X 1.00 1.00 -
Sub Total -
X PEKERJAAN KAYU
1 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu - m³ 4.4.6.1.1. 12,736,350.00 1,400,998.50 - - X 1.00 X 1.00 1.00 -
2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu - m³ 4.4.6.1.2. 10,992,300.00 1,209,153.00 - - X 1.00 X 1.00 1.00 -
3 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II - m² 4.4.6.1.3. 496,859.00 54,654.49 - - X 1.00 X 1.00 1.00 -
4 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas I - m² 4.4.6.1.4. 424,259.00 46,668.49 - - X 1.00 X 1.00 1.00 -
5 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau - m² 4.4.6.1.5. 1,097,800.00 120,758.00 - - X 1.00 X 1.00 1.00 -
6 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I - m² 4.4.6.1.6. 834,790.00 91,826.90 - - X 1.00 X 1.00 1.00 -
7 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I - m² 4.4.6.1.7. 1,210,000.00 133,100.00 - - X 1.00 X 1.00 1.00 -
8 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tert - m² 4.4.6.1.8. 907,599.00 99,835.89 - - X 1.00 X 1.00 1.00 -
9 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I a - m² 4.4.6.1.9. 907,690.00 99,845.90 - - X 1.00 X 1.00 1.00 -
10 Pemasangan jalusi kusen, kayu kelas I atau II - m² 4.4.6.1.10. 949,850.00 104,483.50 - - X 1.00 X 1.00 1.00 -
11 Pemasangan teakwood rangkap, rangka expose kayu kelas I - m² 4.4.6.1.11. 1,013,804.00 111,518.44 - - X 1.00 X 1.00 1.00 -
12 Pemasangan teakwood rangkap lapis formika, rangka expose kay - m² 4.4.6.1.12. 855,844.00 94,142.84 - - X 1.00 X 1.00 1.00 -
13 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II - m³ 4.4.6.1.13. 9,381,680.00 1,031,984.80 - - X 1.00 X 1.00 1.00 -
14 Pemasangan konstruksi kuda-kuda expose, kayu kelas I - m³ 4.4.6.1.14. 13,678,665.00 1,504,653.15 - - X 1.00 X 1.00 1.00 -
15 Pemasangan konstruksi gordeng, kayu kelas II - m³ 4.4.6.1.15. 11,679,085.00 1,284,699.35 - - X 1.00 X 1.00 1.00 -
16 Pemasangan rangka atap genteng keramik, kayu kelas II - m² 4.4.6.1.16. 129,195.00 14,211.45 - - X 1.00 X 1.00 1.00 -
17 Pemasangan rangka atap genteng beton, kayu kelas II - m² 4.4.6.1.17. 137,857.50 15,164.33 - - X 1.00 X 1.00 1.00 -
18 Pemasangan rangka atap sirap, kayu kelas II - m² 4.4.6.1.18. 68,723.60 7,559.60 - - X 1.00 X 1.00 1.00 -
19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II - m² 4.4.6.1.19. 69,179.00 7,609.69 - - X 1.00 X 1.00 1.00 -
20 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II a - m² 4.4.6.1.20. 160,138.00 17,615.18 - - X 1.00 X 1.00 1.00 -
21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas - m' 4.4.6.1.21. 118,195.00 13,001.45 - - X 1.00 X 1.00 1.00 -
22 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas - m' 4.4.6.1.22. 117,590.00 12,934.90 - - X 1.00 X 1.00 1.00 -
23 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II - m² 4.4.6.1.23. 197,190.00 21,690.90 - - X 1.00 X 1.00 1.00 -
24 Pemasangan dinding pemisah teakwood rangkap, rangka kayu ke - m² 4.4.6.1.24. 509,729.00 56,070.19 - - X 1.00 X 1.00 1.00 -
25 Pemasangan dinding pemisah plywood rangkap, rangka kayu kel - m² 4.4.6.1.25. 553,630.00 60,899.30 - - X 1.00 X 1.00 1.00 -
26 Pemasangan dinding lambrisering dari papan kayu kelas I - m² 4.4.6.1.26. 578,380.00 63,621.80 - - X 1.00 X 1.00 1.00 -
27 Pemasangan dinding lambrisering dari plywood ukuran (120 x - m² 4.4.6.1.27. 120,692.00 13,276.12 - - X 1.00 X 1.00 1.00 -
28 Pemasangan dinding bilik, rangka kayu kelas III atau IV - m² 4.4.6.1.28. 152,417.65 16,765.94 - - X 1.00 X 1.00 1.00 -
Sub Total -
XI PEKERJAAN KUNCI DAN KACA
1 Pemasangan kunci tanam antik - bh 4.4.6.2.1. 761,739.00 83,791.29 - - X 1.00 X 1.00 1.00 -
2 Pemasangan kunci tanam biasa - bh 4.4.6.2.2. 301,565.00 33,172.15 - - X 1.00 X 1.00 1.00 -
3 Pemasangan kunci kamar mandi - bh 4.4.6.2.3. 269,434.00 29,637.74 - - X 1.00 X 1.00 1.00 -
4 Pemasangan kunci silinder - bh 4.4.6.2.4. 189,134.00 20,804.74 - - X 1.00 X 1.00 1.00 -
5 Pemasangan engsel pintu - bh 4.4.6.2.5. 60,922.40 6,701.46 - - X 1.00 X 1.00 1.00 -
6 Pemasangan engsel jendela kupu-kupu - bh 4.4.6.2.6. 36,756.50 4,043.22 - - X 1.00 X 1.00 1.00 -
7 Pemasangan engsel angin - bh 4.4.6.2.7. 71,186.50 7,830.52 - - X 1.00 X 1.00 1.00 -
8 Pemasangan spring knip - bh 4.4.6.2.8. - - - - X 1.00 X 1.00 1.00 -
9 Pemasangan kait angin - bh 4.4.6.2.9. 50,644.00 5,570.84 - - X 1.00 X 1.00 1.00 -
10 Pemasangan door closer - bh 4.4.6.2.10. 395,659.00 43,522.49 - - X 1.00 X 1.00 1.00 -
11 Pemasangan kunci slot - bh 4.4.6.2.11. 201,113.00 22,122.43 - - X 1.00 X 1.00 1.00 -
12 Pemasangan Door holder - bh 4.4.6.2.12. 395,659.00 43,522.49 - - X 1.00 X 1.00 1.00 -
13 Pemasangan door stop - bh 4.4.6.2.13. 97,845.00 10,762.95 - - X 1.00 X 1.00 1.00 -
14 Pemasangan rel pintu sorong - bh 4.4.6.2.14. 197,439.00 21,718.29 - - X 1.00 X 1.00 1.00 -
15 Pemasangan kunci lemari - bh 4.4.6.2.15. - - - - X 1.00 X 1.00 1.00 -
16 Pemasangan kaca tebal 3 mm - m² 4.4.6.2.16. 178,897.40 19,678.71 - - X 1.00 X 1.00 1.00 -
17 Pemasangan kaca tebal 5 mm - m² 4.4.6.2.17. 245,447.40 26,999.21 - - X 1.00 X 1.00 1.00 -
18 Pemasangan kaca tebal 8 mm - m² 4.4.6.2.18. 287,558.70 31,631.46 - - X 1.00 X 1.00 1.00 -
19 Pemasangan kaca buram tebal 12 mm - m² 4.4.6.2.19. - - - - X 1.00 X 1.00 1.00 -
20 Pemasangan kaca cermin tebal 5 mm - m² 4.4.6.2.20. 202,994.00 22,329.34 - - X 1.00 X 1.00 1.00 -
21 Pemasangan kaca cermin tebal 8 mm - m² 4.4.6.2.21. 249,403.00 27,434.33 - - X 1.00 X 1.00 1.00 -
22 Pemasangan kaca wireglassed tebal 5 mm - m² 4.4.6.2.22. - - - - X 1.00 X 1.00 1.00 -
23 Pemasangan kaca patri tebal 5 mm - m² 4.4.6.2.23. - - - - X 1.00 X 1.00 1.00 -
24 Pemasangan kaca tebal 8 mm - m² 4.4.6.2.17.A. 221,247.40 24,337.21 - - X 1.00 X 1.00 1.00 -
Sub Total -
XII PEKERJAAN PENGECATAN
1 Pengikisan/pengerokan permukaan cat lama - m² 4.4.7.1.1. 29,139.00 3,205.29 - - X 1.00 X 1.00 1.00 -
2 Pencucian bidang permukaan tembok yang pernah dicat - m² 4.4.7.1.2. 26,609.00 2,926.99 - - X 1.00 X 1.00 1.00 -
3 Pengerokan karat pada permukaan baja cara manual - m² 4.4.7.1.3. 27,874.00 3,066.14 - - X 1.00 X 1.00 1.00 -
4 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, - m² 4.4.7.1.4. 65,791.00 7,237.01 - - X 1.00 X 1.00 1.00 -
5 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, - m² 4.4.7.1.5. 92,477.00 10,172.47 - - X 1.00 X 1.00 1.00 -
6 Pelaburan bidang kayu dengan teak oil - m² 4.4.7.1.6. 46,365.00 5,100.15 - - X 1.00 X 1.00 1.00 -
7 Pelaburan bidang kayu dengan politur - m² 4.4.7.1.7. 64,992.40 7,149.16 - - X 1.00 X 1.00 1.00 -
8 Pelaburan bidang kayu dengan cat residu dan ter - m² 4.4.7.1.8. 27,643.00 3,040.73 - - X 1.00 X 1.00 1.00 -
9 Pelaburan bidang kayu dengan vernis - m² 4.4.7.1.9. 73,337.00 8,067.07 - - X 1.00 X 1.00 1.00 -
10 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 la - m² 4.4.7.1.10. 38,179.90 4,199.79 - - X 1.00 X 1.00 1.00 -
11 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) - m² 4.4.7.1.11. 26,769.60 2,944.66 - - X 1.00 X 1.00 1.00 -
12 Pelaburan tembok dengan kalkarium - m² 4.4.7.1.12. 15,791.60 1,737.08 - - X 1.00 X 1.00 1.00 -
13 Pelaburan tembok dengan kapur sirih - m² 4.4.7.1.13. - - - - X 1.00 X 1.00 1.00 -
14 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) - m² 4.4.7.1.14. - - - - X 1.00 X 1.00 1.00 -
15 Pemasangan wallpaper - m² 4.4.7.1.15. 128,892.50 14,178.18 - - X 1.00 X 1.00 1.00 -
16 Pengecatan permukaan baja dengan menie besi - m² 4.4.7.1.16. 54,917.50 6,040.93 - - X 1.00 X 1.00 1.00 -
17 Pengecatan permukaan baja dengan menie besi dengan perancah - m² 4.4.7.1.17. 106,139.00 11,675.29 - - X 1.00 X 1.00 1.00 -
18 Pengecatan permukaan baja galvanis secara manual 4 lapis - m² 4.4.7.1.18. 114,717.90 12,618.97 - - X 1.00 X 1.00 1.00 -
19 Pengecatan permukaan baja galvanis secara manual sistem 1 lapi - m² 4.4.7.1.19. 50,039.00 5,504.29 - - X 1.00 X 1.00 1.00 -
20 Pengecatan permukaan baja galvanis secara manual sistem 3 lap - m² 4.4.7.1.20. 286,924.00 31,561.64 - - X 1.00 X 1.00 1.00 -
21 Pengecatan permukaan baja galvanis secara semprot sistem 3 lap - m² 4.4.7.1.21. 258,599.00 28,445.89 - - X 1.00 X 1.00 1.00 -
Sub Total -
XIII PEKERJAAN SANITASI DALAM GEDUNG
1 Pemasangan closet duduk/monoblock - bh 5.5.1.1.1. 5,902,380.00 649,261.80 - - X 1.00 X 1.00 1.00 -
2 Pemasangan closet jongkok porslen - bh 5.5.1.1 2. 856,625.00 94,228.75 - - X 1.00 X 1.00 1.00 -
3 Pemasangan closet jongkok teraso - bh 5.5.1.1 3. 687,940.00 75,673.40 - - X 1.00 X 1.00 1.00 -
4 Pemasangan urinoir - bh 5.5.1.1 4. 605,825.00 66,640.75 - - X 1.00 X 1.00 1.00 -
5 Pemasangan wastafel - bh 5.5.1.1 5. 4,052,675.00 445,794.25 - - X 1.00 X 1.00 1.00 -
6 Pemasangan bathcuip porselen - bh 5.5.1.1 6. 9,164,859.00 1,008,134.49 - - X 1.00 X 1.00 1.00 -
7 Pemasangan bak fibreglass vol 1 m3 - bh 5.5.1.1 7. 3,215,850.00 353,743.50 - - X 1.00 X 1.00 1.00 -
8 Pemasangan bak mandi batu bata vol 0,30 m3 - bh 5.5.1.1 8. 2,909,214.00 320,013.54 - - X 1.00 X 1.00 1.00 -
9 Pemasangan bak mandi teraso vol 0,30 m3 - bh 5.5.1.1 9. 2,273,370.00 250,070.70 - - X 1.00 X 1.00 1.00 -
10 Pemasangan bak air fibreglass vol 1 m3 - bh 5.5.1.1 10. 805,530.00 88,608.30 - - X 1.00 X 1.00 1.00 -
11 Pemasangan bak beton volume 1 m3 - bh 5.5.1.1 11. - - - - X 1.00 X 1.00 1.00 -
12 Pemasangan bak cuci piring stainlessteel - bh 5.5.1.1 12. 691,735.00 76,090.85 - - X 1.00 X 1.00 1.00 -
13 Pemasangan bak cuci piring teraso - bh 5.5.1.1 13. 794,200.00 87,362.00 - - X 1.00 X 1.00 1.00 -
14 Pemasangan floor drain - bh 5.5.1.1 14. 56,045.00 6,164.95 - - X 1.00 X 1.00 1.00 -
15 Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm - bh 5.5.1.1 15. 760,364.00 83,640.04 - - X 1.00 X 1.00 1.00 -
16 Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 - bh 5.5.1.1 16. 1,110,241.00 122,126.51 - - X 1.00 X 1.00 1.00 -
17 Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 - bh 5.5.1.1 17. 1,301,817.00 143,199.87 - - X 1.00 X 1.00 1.00 -
18 Pemasangan pipa galvanis diameter ½” - m' 5.5.1.1 18. 49,445.00 5,438.95 - - X 1.00 X 1.00 1.00 -
19 Pemasangan kran diameter ½” atau 3/4” - bh 5.5.1.1 19. 121,000.00 13,310.00 - - X 1.00 X 1.00 1.00 -
20 Pemasangan pipa galvanis diameter 3/4” - m' 5.5.1.1 20. 52,173.00 5,739.03 - - X 1.00 X 1.00 1.00 -
21 Pemasangan pipa galvanis diameter 1” - m' 5.5.1.1 21. 56,265.00 6,189.15 - - X 1.00 X 1.00 1.00 -
22 Pemasangan pipa galvanis diameter 1 ½” - m' 5.5.1.1 22. 102,008.50 11,220.94 - - X 1.00 X 1.00 1.00 -
23 Pemasangan pipa galvanis diameter 3” - m' 5.5.1.1 23. 187,885.50 20,667.41 - - X 1.00 X 1.00 1.00 -
24 Pemasangan pipa galvanis diameter 4” - m' 5.5.1.1 24. 238,694.50 26,256.40 - - X 1.00 X 1.00 1.00 -
25 Pemasangan pipa PVC tipe AW diameter 1/2” - m' 5.5.1.1 25. - - - - X 1.00 X 1.00 1.00 -
26 Pemasangan pipa PVC tipe AW diameter 3/4” - m' 5.5.1.1 26. 48,807.00 5,368.77 - - X 1.00 X 1.00 1.00 -
27 Pemasangan pipa PVC tipe AW diameter 1” - m' 5.5.1.1 27. 55,627.00 6,118.97 - - X 1.00 X 1.00 1.00 -
28 Pemasangan pipa PVC tipe AW diameter 11/2” - m' 5.5.1.1 28. 83,440.50 9,178.46 - - X 1.00 X 1.00 1.00 -
29 Pemasangan pipa PVC tipe AW diameter 2” - m' 5.5.1.1 29. 107,822.00 11,860.42 - - X 1.00 X 1.00 1.00 -
30 Pemasangan pipa PVC tipe AW diameter 21/2” - m' 5.5.1.1 30. 158,878.50 17,476.64 - - X 1.00 X 1.00 1.00 -
31 Pemasangan pipa PVC tipe AW diameter 3” - m' 5.5.1.1 31. 202,015.00 22,221.65 - - X 1.00 X 1.00 1.00 -
32 Pemasangan pipa PVC tipe AW diameter 4” - m' 5.5.1.1 32. 273,454.50 30,080.00 - - X 1.00 X 1.00 1.00 -
33 Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm - m' 5.5.1.1 33. - - - - X 1.00 X 1.00 1.00 -
34 Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm - m' 5.5.1.1 34. - - - - X 1.00 X 1.00 1.00 -
35 Pemasangan pipa beton diameter 15 – 20 cm - m' 5.5.1.1 35. 249,135.65 27,404.92 - - X 1.00 X 1.00 1.00 -
36 Pemasangan pipa beton diameter 30 – 100 cm - m' 5.5.1.1.36. 379,497.25 41,744.70 - - X 1.00 X 1.00 1.00 -
Sub Total -
XIV PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu - bh Ls 285,000.00 31,350.00 - - X 1.00 X 1.00 1.00 -
2 Stop Kontak Tanam - bh Ls 210,000.00 23,100.00 - - X 1.00 X 1.00 1.00 -
3 Stop Kontak Luar - bh Ls 227,000.00 24,970.00 - - X 1.00 X 1.00 1.00 -
4 Saklar Double - bh Ls 39,000.00 4,290.00 - - X 1.00 X 1.00 1.00 -
5 Saklar Tunggal - bh Ls 39,000.00 4,290.00 - - X 1.00 X 1.00 1.00 -
6 Zekering Boxes 1 Group - bh Ls 420,000.00 46,200.00 - - X 1.00 X 1.00 1.00 -
7 Zekering Boxes 2 Group - bh Ls 570,000.00 62,700.00 - - X 1.00 X 1.00 1.00 -
8 Zekering Boxes 3 Group - bh Ls 710,000.00 78,100.00 - - X 1.00 X 1.00 1.00 -
9 Lampu Philip 18 W - bh Ls 60,000.00 6,600.00 - - X 1.00 X 1.00 1.00 -
10 Lampu Philip 14 W - bh Ls 49,000.00 5,390.00 - - X 1.00 X 1.00 1.00 -
11 Lampu Philip 5 W - bh Ls 35,000.00 3,850.00 - - X 1.00 X 1.00 1.00 -
12 Lampu Pijar 25 W - bh Ls 25,000.00 2,750.00 - - X 1.00 X 1.00 1.00 -
13 Lampu TL 40 W - bh Ls 97,000.00 10,670.00 - - X 1.00 X 1.00 1.00 -
14 Lampu TL 2 x 18 W - bh Ls 95,000.00 10,450.00 - - X 1.00 X 1.00 1.00 -
15 Lampu TL 2 x 36 W - bh Ls 162,000.00 17,820.00 - - X 1.00 X 1.00 1.00 -
16 Lampu TL 2 x 40 W - bh Ls 165,000.00 18,150.00 - - X 1.00 X 1.00 1.00 -
17 Lampu LED 2 x 14 W - bh Ls 192,000.00 21,120.00 - - X 1.00 X 1.00 1.00 -
18 Lampu Sorot (Sejenis Mercury) - bh Ls 710,000.00 78,100.00 - - X 1.00 X 1.00 1.00 -
19 Kabel NYA 2,5 mm - roll/50 Ls 300,000.00 33,000.00 - - X 1.00 X 1.00 1.00 -
20 Kabel NGA 2 x 2,5 mm - roll/50 Ls 577,000.00 63,470.00 - - X 1.00 X 1.00 1.00 -
21 Kabel NYM 3 x 2,5 mm - roll/50 Ls 705,000.00 77,550.00 - - X 1.00 X 1.00 1.00 -
22 Kabel NYM 3 x 1,5 mm - roll/50 Ls 577,000.00 63,470.00 - - X 1.00 X 1.00 1.00 -
23 Kabel NYM 2 x 2,5 mm - roll/50 Ls 577,000.00 63,470.00 - - X 1.00 X 1.00 1.00 -
24 Kabel NYM 2 x 1,5 mm - roll/50 Ls 396,000.00 43,560.00 - - X 1.00 X 1.00 1.00 -
25 Kabel NYM 4 x 6 mm - roll/50 Ls 1,650,000.00 181,500.00 - - X 1.00 X 1.00 1.00 -
26 Kabel NYM 4 x 10 mm - roll/50 Ls 2,675,000.00 294,250.00 - - X 1.00 X 1.00 1.00 -
27 Kabel NYY 4 x 50 mm - m' Ls 390,000.00 42,900.00 - - X 1.00 X 1.00 1.00 -
28 Kabel BC 50 mm - m' Ls 55,000.00 6,050.00 - - X 1.00 X 1.00 1.00 -
29 Kabel BC 35 mm - m' Ls 45,000.00 4,950.00 - - X 1.00 X 1.00 1.00 -
30 Fiting Lampu - bh Ls 22,000.00 2,420.00 - - X 1.00 X 1.00 1.00 -
31 Fiting Lampu Tanam Dia. 4 " - bh Ls 42,000.00 4,620.00 - - X 1.00 X 1.00 1.00 -
32 Fiting Lampu Tanam Dia. 3 " - bh Ls 32,000.00 3,520.00 - - X 1.00 X 1.00 1.00 -
33 Box Panel 3 Phase, Comlite (80x120x25) - set Ls 12,000,000.00 1,320,000.00 - - X 1.00 X 1.00 1.00 -
34 Box Panel 3 Phase, Comlite (50x70x20) - set Ls 5,850,000.00 643,500.00 - - X 1.00 X 1.00 1.00 -
35 Box Panel 3 Phase, (30x40x15) - bh Ls 1,100,000.00 121,000.00 - - X 1.00 X 1.00 1.00 -
36 Box Panel PVC 4 MCB, (40x60x20) - bh Ls 395,000.00 43,450.00 - - X 1.00 X 1.00 1.00 -
37 MCB 6 A - bh Ls 70,000.00 7,700.00 - - X 1.00 X 1.00 1.00 -
38 MCB 4 A - bh Ls 66,000.00 7,260.00 - - X 1.00 X 1.00 1.00 -
39 Pemasukan Daya listrk - kwh Ls 2,600.00 286.00 - - X 1.00 X 1.00 1.00 -
40 Pemasangan Daya listrk - va Ls 1,600.00 176.00 - - X 1.00 X 1.00 1.00 -
41 AC (Air Conditioner) Kapasiitas 2 PK - unit Ls - - - - X 1.00 X 1.00 1.00 -
42 AC (Air Conditioner) Kapasiitas 1 PK - unit Ls - - - - X 1.00 X 1.00 1.00 -
43 AC (Air Conditioner) Kapasiitas 1/2 PK - unit Ls - - - - X 1.00 X 1.00 1.00 -
44 Pas pengisap debu ruangan (Blower) + asisories complit - bh Ls 166,000.00 18,260.00 - - X 1.00 X 1.00 1.00 -
45 Pas Lampu darurat + asisories complit - bh Ls 155,000.00 17,050.00 - - X 1.00 X 1.00 1.00 -
46 Kabel Telepone 4 x 0.5 mm - m' Ls 30,000.00 3,300.00 - - X 1.00 X 1.00 1.00 -
47 Isolasi - bh Ls 12,000.00 1,320.00 - - X 1.00 X 1.00 1.00 -
48 Outle TV - bh Ls 50,000.00 5,500.00 - - X 1.00 X 1.00 1.00 -
49 Outle Telephone - bh Ls 50,000.00 5,500.00 - - X 1.00 X 1.00 1.00 -
50 Dow ligth / PCL 13 W - bh Ls 130,000.00 14,300.00 - - X 1.00 X 1.00 1.00 -
51 Dow ligth / PCL 8 W - bh Ls 110,000.00 12,100.00 - - X 1.00 X 1.00 1.00 -
52 Dow ligth / LED 14 W - bh Ls 152,000.00 16,720.00 - - X 1.00 X 1.00 1.00 -
53 Dow ligth / LED 7 W - bh Ls 95,000.00 10,450.00 - - X 1.00 X 1.00 1.00 -
54 Dow ligth / LED 3 W - bh Ls 40,000.00 4,400.00 - - X 1.00 X 1.00 1.00 -
55 Lampu Tempel / LED 14 W - bh Ls 25,000.00 2,750.00 - - X 1.00 X 1.00 1.00 -
56 Lampu spot light/ LED 7 W - bh Ls 300,000.00 33,000.00 - - X 1.00 X 1.00 1.00 -
57 Lampu strip light/ LED 7 W - m' Ls 39,000.00 4,290.00 - - X 1.00 X 1.00 1.00 -
58 Electroda Cooper dia. 1 inci - m' Ls 350,000.00 38,500.00 - - X 1.00 X 1.00 1.00 -
59 Lampu Sorot taman spot light (LED), 10 watt - bh Ls 300,000.00 33,000.00 - - X 1.00 X 1.00 1.00 -
60 Lampu taman Tanam (LED), 8 watt - bh Ls 270,000.00 29,700.00 - - X 1.00 X 1.00 1.00 -
61 Bollard Lighting (LED), 9 watt - bh Ls 3,580,000.00 393,800.00 - - X 1.00 X 1.00 1.00 -
62 Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + P - bh Ls 1,200,000.00 132,000.00 - - X 1.00 X 1.00 1.00 -
63 Pipa Conduit PVC dia. 20 mm2 - m' Ls 3,000.00 330.00 - - X 1.00 X 1.00 1.00 -
64 Exshaust Fan 14 W - bh Ls 535,000.00 58,850.00 - - X 1.00 X 1.00 1.00 -
65 Wall Type Exshaust Fan 2500 CMH - bh Ls 1,100,000.00 121,000.00 - - X 1.00 X 1.00 1.00 -
66 Orbit Fan 60 Watt - bh Ls 720,000.00 79,200.00 - - X 1.00 X 1.00 1.00 -
67 Exshaust Fan 353 CFM/ 34 W - bh Ls 315,000.00 34,650.00 - - X 1.00 X 1.00 1.00 -
68 Pemasangan Penangkal Petir + Arde (Radius min. 50 m) - unit Ls 25,000,000.00 2,750,000.00 - - X 1.00 X 1.00 1.00 -
69 Pemasangan Penangkal Petir + Arde (Radius min. 25 m) - unit Ls 12,500,000.00 1,375,000.00 - - X 1.00 X 1.00 1.00 -
Sub Total -
XV PEKERJAAN VEGETASI TANAMAN
1 Tanam Pohon Kamboja tinggi 5 meter - bh SNI.302 2,148,465.00 236,331.15 - - X 1.00 X 1.00 1.00 -
2 Tanam Pohon Tabebuya tinggi 4 meter - bh SNI.302.1 1,730,465.00 190,351.15 - - X 1.00 X 1.00 1.00 -
3 Tanam Pohon Palem raja tinggi 3 meter - bh SNI.302.2 1,455,465.00 160,101.15 - - X 1.00 X 1.00 1.00 -
4 Tanam Pohon Pisang Kipas tinggi 1,5 meter - bh SNI.302.3 223,465.00 24,581.15 - - X 1.00 X 1.00 1.00 -
5 Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter - bh SNI.302.4 67,320.00 7,405.20 - - X 1.00 X 1.00 1.00 -
6 Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter - bh SNI.302.5 70,620.00 7,768.20 - - X 1.00 X 1.00 1.00 -
7 Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter - bh SNI.302.6 64,020.00 7,042.20 - - X 1.00 X 1.00 1.00 -
8 Pohon Damar (Agathis dammara) Tinggi 4m - bh SNI.302.a 929,049.00 102,195.39 - - X 1.00 X 1.00 1.00 -
9 Pohon Pulai (alstonia scholaris) Tinggi 6m - bh SNI.302.b 2,103,849.00 231,423.39 - - X 1.00 X 1.00 1.00 -
10 Pohon Kasia Jawa (Cassia javanica) Tinggi 4m - bh SNI.302.c 635,349.00 69,888.39 - - X 1.00 X 1.00 1.00 -
11 Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m - bh SNI.302.d 977,449.00 107,519.39 - - X 1.00 X 1.00 1.00 -
12 Pohon Flamboyan (Delonix regia) Tinggi 7m - bh SNI.302.e 1,320,649.00 145,271.39 - - X 1.00 X 1.00 1.00 -
13 Pohon Biola Cantik (Ficus lyrata) Tinggi 6m - bh SNI.302.f 908,149.00 99,896.39 - - X 1.00 X 1.00 1.00 -
14 Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m - bh SNI.302.g 1,185,349.00 130,388.39 - - X 1.00 X 1.00 1.00 -
15 Pohon Sosis (Kigelia pinnata) Tinggi 7m - bh SNI.302.h 1,185,349.00 130,388.39 - - X 1.00 X 1.00 1.00 -
16 Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m - bh SNI.302.i 981,849.00 108,003.39 - - X 1.00 X 1.00 1.00 -
17 Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6 - bh SNI.302.j 613,349.00 67,468.39 - - X 1.00 X 1.00 1.00 -
18 Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m - bh SNI.302.k 1,625,349.00 178,788.39 - - X 1.00 X 1.00 1.00 -
19 Pohon Parahiba (Schizolobium parahyba) Tinggi 7m - bh SNI.302.l 1,047,849.00 115,263.39 - - X 1.00 X 1.00 1.00 -
20 Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m - bh SNI.302.m 761,849.00 83,803.39 - - X 1.00 X 1.00 1.00 -
21 Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m - bh SNI.302.n 220,649.00 24,271.39 - - X 1.00 X 1.00 1.00 -
22 Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 1,5m - bh SNI.302.o 838,849.00 92,273.39 - - X 1.00 X 1.00 1.00 -
23 Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m - bh SNI.302.p 131,549.00 14,470.39 - - X 1.00 X 1.00 1.00 -
24 Pohon Palem Kol (Licualis grandis) Tinggi 1,5m - bh SNI.302.q 186,549.00 20,520.39 - - X 1.00 X 1.00 1.00 -
25 Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m - bh SNI.302.r 2,090,649.00 229,971.39 - - X 1.00 X 1.00 1.00 -
26 Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m - bh SNI.302.s 1,938,849.00 213,273.39 - - X 1.00 X 1.00 1.00 -
27 Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m - bh SNI.302.t 635,349.00 69,888.39 - - X 1.00 X 1.00 1.00 -
28 Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m - bh SNI.302.u 635,349.00 69,888.39 - - X 1.00 X 1.00 1.00 -
29 Semak Agave (Agave angustifolia) Tinggi 300-400 mm - bh SNI.302.1a 1,134,265.00 124,769.15 - - X 1.00 X 1.00 1.00 -
30 Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-30 - bh SNI.302.1b 727,265.00 79,999.15 - - X 1.00 X 1.00 1.00 -
31 Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm - bh SNI.302.1c 617,265.00 67,899.15 - - X 1.00 X 1.00 1.00 -
32 Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500 - bh SNI.302.1d 3,477,265.00 382,499.15 - - X 1.00 X 1.00 1.00 -
33 Semak Spineless (Spineless Yucca) Tinggi 800 mm - bh SNI.302.1e 1,893,265.00 208,259.15 - - X 1.00 X 1.00 1.00 -
34 Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm - bh SNI.302.1f 1,068,265.00 117,509.15 - - X 1.00 X 1.00 1.00 -
35 Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm - bh SNI.302.1g 243,265.00 26,759.15 - - X 1.00 X 1.00 1.00 -
36 Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm - bh SNI.302.1h 276,265.00 30,389.15 - - X 1.00 X 1.00 1.00 -
37 Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm - bh SNI.302.1i 518,265.00 57,009.15 - - X 1.00 X 1.00 1.00 -
38 Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm - bh SNI.302.1j 518,265.00 57,009.15 - - X 1.00 X 1.00 1.00 -
39 Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm - bh SNI.302.1k 243,265.00 26,759.15 - - X 1.00 X 1.00 1.00 -
40 Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 70 - bh SNI.302.1l 1,002,265.00 110,249.15 - - X 1.00 X 1.00 1.00 -
41 Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800 - bh SNI.302.1m 243,265.00 26,759.15 - - X 1.00 X 1.00 1.00 -
42 Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm - bh SNI.302.1n 177,265.00 19,499.15 - - X 1.00 X 1.00 1.00 -
43 Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm - bh SNI.302.1o 837,265.00 92,099.15 - - X 1.00 X 1.00 1.00 -
44 Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 40 - bh SNI.302.1p 137,665.00 15,143.15 - - X 1.00 X 1.00 1.00 -
45 Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300m - bh SNI.302.1q 177,265.00 19,499.15 - - X 1.00 X 1.00 1.00 -
46 Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300 - bh SNI.302.1r 309,265.00 34,019.15 - - X 1.00 X 1.00 1.00 -
47 Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 10 - bh SNI.302.1s 243,265.00 26,759.15 - - X 1.00 X 1.00 1.00 -
48 Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm - bh SNI.302.1t 1,079,265.00 118,719.15 - - X 1.00 X 1.00 1.00 -
49 Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm - bh SNI.302.1v 309,265.00 34,019.15 - - X 1.00 X 1.00 1.00 -
50 Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") - bh SNI.302.1x 386,265.00 42,489.15 - - X 1.00 X 1.00 1.00 -
51 Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-6 - bh SNI.302.1y 452,265.00 49,749.15 - - X 1.00 X 1.00 1.00 -
52 Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300 - bh SNI.302.1z 551,265.00 60,639.15 - - X 1.00 X 1.00 1.00 -
53 Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400 - bh SNI.302.2a 160,765.00 17,684.15 - - X 1.00 X 1.00 1.00 -
54 Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi - bh SNI.302.2b 155,265.00 17,079.15 - - X 1.00 X 1.00 1.00 -
55 Semak kembang Air Mancur Merah (Russelia equisetiformis) - bh SNI.302.2c 342,265.00 37,649.15 - - X 1.00 X 1.00 1.00 -
56 Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-50 - bh SNI.302.2d 518,265.00 57,009.15 - - X 1.00 X 1.00 1.00 -
57 Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm - bh SNI.302.2e 127,765.00 14,054.15 - - X 1.00 X 1.00 1.00 -
58 Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 - bh SNI.302.2f 177,265.00 19,499.15 - - X 1.00 X 1.00 1.00 -
59 Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-40 - bh SNI.302.2g 243,265.00 26,759.15 - - X 1.00 X 1.00 1.00 -
60 Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-15 - bh SNI.302.2h 309,265.00 34,019.15 - - X 1.00 X 1.00 1.00 -
61 Semak Rumput Manila (Zoysia matrella) - m² SNI.302.3a 101,200.00 11,132.00 - - X 1.00 X 1.00 1.00 -
Sub Total -
XVI PEKERJAAN TAMBAHAN
1 Biaya Pengeboran air + Pipa Casing Ø 6'' - m' SNI.Ls.1 1,558,535.00 171,438.85 - - X 1.00 X 1.00 1.00 -
2 Biaya Pengeboran air + Pipa Casing Ø 4'' - m' SNI.Ls.2 1,091,585.00 120,074.35 - - X 1.00 X 1.00 1.00 -
3 Biaya Pengeboran air + Pipa Casing Ø 3'' - m' SNI.Ls.3 547,415.00 60,215.65 - - X 1.00 X 1.00 1.00 -
4 Biaya Pengeboran air + Pipa Casing Ø 2.5'' - m' SNI.Ls.4 295,240.00 32,476.40 - - X 1.00 X 1.00 1.00 -
5 Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar - bh SNI.Ls.5 38,016,000.00 4,181,760.00 - - X 1.00 X 1.00 1.00 -
6 Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, - bh SNI.Ls.6 54,036,400.00 5,944,004.00 - - X 1.00 X 1.00 1.00 -
7 Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 - bh SNI.Ls.7 28,495,500.00 3,134,505.00 - - X 1.00 X 1.00 1.00 -
8 Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1 - bh SNI.Ls.8 25,685,000.00 2,825,350.00 - - X 1.00 X 1.00 1.00 -
Sub Total -
B. JUMLAH PEKERJAAN PEMBANGUNAN LANTAI - 1 Jumlah Total 0
HARGA SATUAN BAHAN DAN MATERIAL
KABUPATEN DOMPU
TAHUN ANGGARAN 2023

HARGA
NO. BAHAN DAN MATERIAL SATUAN 2023
(Rp)
1 2 3 4
Bahan dan Material
1 Air Liter 3,000.00
2 Akustik 30 cm x 30 cm Lembar 38,750.00
3 Akustik 30 cm x 60 cm Lembar 77,500.00
4 Akustik 60 cm x 120 cm Lembar 310,000.00
5 Alluminium strip m’ 60,000.00
6 Amplas Lbr 9,000.00
7 Asbes semen m2 47,300.00
8 Bak mandi Sudut fibre buah 525,000.00
9 Bambu Æ 6-8/600 cm Bt 27,500.00
10 Bata merah Buah 850.00
11 Bata pelapis dinding Buah 950.00
12 Batu belah 10/15 m3 245,000.00
13 Batu paras m2 244,000.00
14 Batu pecah 5/7 m3 230,000.00
15 Batu tempel hitam m2 265,000.00
16 Besi baja IWF Kg 38,000.00
17 Besi beton polos kg 16,000.00
18 Besi beton ulir kg 19,000.00
19 Besi plat baja Kg 33,000.00
20 Besi profil Kg 38,000.00
21 Besi Hollow 40. 40. 2 m 26,000.00
22 Besi strip 2 x 3 mm kg 26,000.00
23 Bilik bambu m2 50,000.00
24 Cat dasar kg 72,000.00
25 Cat Catylac 5kg kg 35,000.00
26 Cat Kayu Emko kg 70,000.00
27 Cat meni kg 35,000.00
28 Cat meni besi kg 35,000.00
29 Cat penutup Kg 72,000.00
30 Cermin wastafel m2 135,000.00
31 Dolken (kaso), φ (8-10) cm, panjang 4 m Batang 11,000.00
32 Dolken kayu galam, φ (8-10) cm, panjang 4 m Batang 11,000.00
33 Engsel jendela nilon set 10,500.00
34 Engsel pintu nilon set 21,000.00
35 Floor drain bh 27,000.00
36 Floor hardener kg 40,000.00
HARGA
37 Formika BAHAN DAN MATERIAL Lembar
SATUAN 195,000.00
38 Gorong-gorong diameter 20 m1 150,000.00
39 Gorong-gorong diameter 30 m1 180,000.00
40 Gypsum board 9 mm Lembar 100,000.00
41 Handel pintu buah 245,000.00
42 Ijuk kg 29,000.00
43 Jaring kawat baja dilas, 6 mm kg 37,000.00
44 Jendela nako (rangka + kaca 5 mm) m2 141,000.00
45 Kaca Tebal 3 mm m2 115,000.00
46 Kaca Tebal 5 mm m2 170,000.00
47 Kait angin psng 10,000.00
48 AMIK m3 6,000.00
49 Kapur Padam m3 6,000.00
50 Karpet m2 25,000.00
51 Kawat beton kg 33,000.00
52 Kawat diameter 4 mm kg 85,000.00
53 Kawat duri (rol 40 m) rol 100,000.00
54 kawat las kg 160,000.00
55 Kawat nyamuk m2 29,000.00
56 Kayu jati kayu kls I m3 5,350,000.00
57 Kayu kamper m3 5,480,000.00
58 kayu kruwing m3 4,250,000.00
59 kayu tahun m3 2,600,000.00
60 Keramik artistik Buah 13,000.00
61 Kerikil (Batu Pecah 2-3 cm manual) m3 570,000.00
62 Kerikil (maksimum 30 mm) kg 450.00
63 Kitchen sink 1 lubang Royal buah 530,000.00
64 Kloset duduk/monoblok bh 3,660,000.00
65 Kloset jongkok porselin bh 260,000.00
66 Kloset jongkok teraso Bh 126,000.00
67 Koral beton m3 345,000.00
68 Kran Air bh 22,000.00
69 Kunci tanam artistik bh 555,000.00
70 Lem kg 55,000.00
71 Lem kayu Kg 55,000.00
72 Lem vinyl kg 55,000.00
73 List kayu 2/4 m’ 8,500.00
74 List kayu 4/4 profil m’ 14,000.00
75 Marmer m2 600,000.00
76 Meni besi Kg 35,000.00
77 Minyak bekisting liter 18,000.00
78 Minyak pelumas Liter 47,000.00
79 Mosaik Buah 140,000.00
80 Paku kg 28,000.00
81 Paku 1 cm - 2,5 cm kg 33,000.00
HARGA
82 Paku 10 cm BAHAN DAN MATERIAL Kg
SATUAN 28,000.00
83 Paku 12 cm kg 28,000.00
84 Paku 5 cm - 10 cm kg 28,000.00
85 Paku 5 cm - 12 cm kg 28,000.00
86 Paku 5 cm - 7 cm Kg 28,000.00
87 Paku 5 cm dan 10 cm kg 28,000.00
88 Paku 5 cm dan 7 cm kg 28,000.00
89 Paku 5 cm sampai 10 cm kg 28,000.00
90 Paku 7 cm – 10 cm kg 28,000.00
91 Paku biasa kg 28,000.00
92 Paku biasa 1/2" - 1" kg 33,000.00
93 Paku biasa 2"- 5" Kg 28,000.00
94 Paku Pancing60x230 kg 45,000.00
95 Paku Sekrup kg 35,000.00
96 Paku Seng (paku payung) kg 45,000.00
97 Paku skrup kg 35,000.00
98 Paku skrup 1 cm – 2,5 cm Buah 400.00
99 Paku skrup 10 cm kg 35,000.00
100 Paku tripleks kg 33,000.00
101 Paku usuk/reng kg 28,000.00
102 Parquet kw I m2 1,000,000.00
103 Parquet kw II m2 800,000.00
104 Pasir beton (hodo) m3 355,000.00
105 Pasir beton (hodo) kg 260.00
106 Pasir pasang m3 225,000.00
107 Pasir urug m3 195,000.00
108 Paving blok sakura warna m2 75,000.00
109 Pintu gulung besi m2 1,750,000.00
110 Plamur / Dempul kayu kg 29,000.00
111 Plamur / Dempul tembok kg 50,000.00
112 Plint Ubin 15 x 20 cm Buah 1,900.00
113 Plint Ubin 10 x 30 cm Buah 1,900.00
114 Plint Ubin 10 x 40 cm Buah 2,600.00
115 Plint ubin Portland Semen warna 10 x 20 cm Buah 1,600.00
116 Plint ubin Portland Semen warna 10 x 30 cm Buah 2,400.00
117 Plint ubin Portland Semen warna 10 x 40 cm Buah 3,200.00
118 Plitur jadi liter 37,000.00
119 Plywood tebal 4 mm, ukuran 120 cm x 240 cm Lembar 220,000.00
120 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 130,000.00
121 Triplek tebal 9 mm, ukuran 120 cm x 240 cm Lbr 159,000.00
122 Politur jadi Ltr 37,000.00
123 Porselin kw I, motif Buah 140,000.00
124 Porselin kw II, motif Buah 120,000.00
125 PC. Merk Tiga Roda kg 1,700.00
126 Profil alluminium, warna m 110,000.00
HARGA
127 Profil Alluminium "T"BAHAN DAN MATERIAL m’
SATUAN 15,000.00
128 Profil kaca m 95,000.00
129 Ramset Buah 750.00
130 Reng (2 x 3) cm panjang 4 m m3 3,750,000.00
131 Residu Lt 25,000.00
132 Rolling door alluminium 0,8 mm m2 600,000.00
133 Roster 10 x 25 buah 18,000.00
134 Sabun kg 20,000.00
135 Seal tape bh 6,000.00
136 Sealant Tube 35,000.00
137 Semen Merah kg 15,000.00
138 Semen warna kg 15,000.00
139 Seng BJLS 0,2 mm lebar 90 cm m' 76,000.00
140 Seng BJLS 0,30 mm lebar 55 cm m' 67,500.00
141 Seng gelombang bljs 32 Lbr 120,000.00
142 Seng plat m’ 135,000.00
143 Sewa Alat Las Listrik Jam 51,300.00
144 Sirtu (Tak Diayak) m3 240,000.00
145 skrup fixer buah 22,000.00
146 Slot pintu kuda terbang 2 x kunci buah 137,000.00
147 Slot pintu Yale buah 165,000.00
148 Soda api kg 66,000.00
149 Solar Liter 6,500.00
150 Strorox – 100 kg 40,000.00
151 Sunscreen alluminium m2 500,000.00
152 Tanah Liat m3 58,000.00
153 Teakwood tebal 4 mm, Ukuran 120 cm x 240 cm Lembar 220,000.00
154 Tripleks 120 x 240 tebal 3mm Lembar 67,000.00
155 Thinner Super #REF! 39,000.00
156 Ubin granit 40 x 40cm Buah 72,000.00
157 Ubin granit 30 x 30cm Buah 40,500.00
158 Ubin teraso 40 x 40cm Buah 13,600.00
159 Ubin teraso 30 x 30cm Buah x
160 Ubin warna Buah 12,800.00
161 Ubin abu-abu 20 x 20 cm Buah 2,600.00
162 Ubin abu-abu 30 x 30 cm Buah 5,700.00
163 Ubin abu-abu 40 x 40 cm Buah 10,100.00
164 Ubin teralux kerang 30 x 30 cm Buah 54,000.00
165 Ubin teralux kerang 40 x 40 cm Buah 96,000.00
166 Ubin teralux marmer 30 x 30 cm Buah 54,000.00
167 Ubin teralux marmer 40 x 40 cm Buah 96,000.00
168 Ubin teralux marmer 60 x 60 cm Buah 216,000.00
169 Vinyl kw I Buah 58,500.00
170 Vinyl kw II Buah 36,000.00
171 Vinyl karet Buah 400,000.00
HARGA
172 Wall paper BAHAN DAN MATERIAL m
SATUAN 50,000.00
173 Wastafel bh 2,400,000.00
174 Door closer ex. Cisa set 245,000.00
175 Door stoper ex. Cisa set 65,000.00
176 Kuas Eterna 3" buah 25,000.00
177 hak angin buah 7,000.00
HARGA SATUAN UPAH DAN BAHAN MATERIAL
LOKASI : KABUPATEN DOMPU
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO UPAH DAN BAHAN SATUAN
( Rp. )
1 2 3 4

Upah Tenaga Kerja


1 Pekerja OH 150,000.00
2 Tukang Batu OH 190,000.00
3 Kepala Tukang Batu OH 230,000.00
4 Tukang Kayu OH 190,000.00
5 Kepala Tukang Kayu OH 230,000.00
6 Tukang Besi Beton OH 190,000.00
7 Kepala Tukang Besi Beton OH 230,000.00
8 Tukang alumnium OH 190,000.00
9 Kepala Tukang alumunium OH 230,000.00
10 Tukang Las OH 190,000.00
11 Kepala Tukang Las OH 230,000.00
12 Tukang Politur OH 190,000.00
13 Tukang Cat OH 190,000.00
14 Kepala Tukang Cat OH 230,000.00
15 Pemecah Batu OH 160,000.00
16 Penggergaji OH 160,000.00
17 Mandor pengisi Bronjong OH 230,000.00
18 pengisi Bronjong OH 160,000.00
19 Penganyam Bronjong OH 190,000.00
20 Kepala Penganyam Bronjong OH 230,000.00
21 Mandor OH 230,000.00
22 Sopir OH 200,000.00
23 Pembantu Sopir OH 160,000.00
24 Mekanik OH 190,000.00
25 Pembantu Mekanik OH 160,000.00
26 Operator Alat Ringan OH 190,000.00
27 Operator Alat Berat OH 200,000.00
28 Pembantu Operator OH 160,000.00
29 Pemasak Aspal OH 160,000.00
30 Penunjuk Jalan OH 160,000.00
31 Tukang Pipa OH 190,000.00
32 Tukang Bor OH 190,000.00
33 Tukang Listrik OH 190,000.00
34 Kepala Tukang Listrik OH 230,000.00
35 Penjaga Malam OH 140,000.00
36 Penggosok Tegel OH 140,000.00
37 Kepala Tukang Politur OH 230,000.00
38 Kepala Tukang Pipa OH 230,000.00
39 Tukang Cor OH 190,000.00
40 Pekerja Cor OH 170,000.00
41 Tukang Interior OH 250,000.00
42 Kepala Tukang Interior OH 300,000.00

1 IMB IMB m2 18,000.00

Bahan Pasangan
1 Batu Kali Belah 15-20 cm M³ 245,000.00
2 Batu Kali Alam M³ 230,000.00
3 Kerikil Pecah 5/7 cm M³ 500,000.00
4 Kerikil 5/7 cm (Stone Crusher) M³ 570,000.00
5 Kerikil Pecah 3/5 cm M³ 510,000.00
6 Kerikil 3/5 cm (Stone Crusher) M³ 590,000.00
7 Kerikil Pecah 2/3 cm M³ 575,000.00
8 Kerikil 2/3 cm (Stone Crusher) M³ 750,000.00
9 Kerikil Alam 0,5/1 Cm M³ 540,000.00
10 Kerikil Alam 2/3 M³ 570,000.00
11 Kerikil Sungai - Riyalti M³ 355,000.00
12 Kerikil Beton (Maks 3 cm) M³ 345,000.00
13 Kerikil Pecah 1/2 cm M³ 795,000.00
14 Batu Kali Keping / Tempel M³ 285,000.00
15 Kerikil Alam 5/7 M³ 230,000.00
16 Kerikil Alam 3/5 M³ 240,000.00
17 Kerikil Alam 2/3 Cm M³ 345,000.00
Kerikil (maksimum 30 mm) Kg 450.00
18 Agregate Kasar (Stone Crusher) M³ 800,000.00
19 Agregate Halus (Stone Crusher) M³ 925,000.00
20 Agregate Klas B (20% Agg.Hls:80% Agg.Ksr) M³ 720,000.00
21 Batu Apung Kg 250,000.00
22 Batu Bata Kelas I (Press) Buah 950.00
23 Batu Bata Kelas II (Lokal) Buah 850.00
24 Bata ringan/Hebel, 10X20X60 m3 1,600,000.00
25 Bata ringan/Hebel, 10X20X60 bh 19,000.00
26 Pasir Beton ( Pasir Hodo ) M³ 355,000.00
27 Pasir Pasang M³ 225,000.00
28 Pasir Urug M³ 195,000.00
29 Sirtu M³ 240,000.00
30 Tanah Urug biasa M³ 121,000.00
31 Tanah Urug Pilihan M³ 192,000.00
32 Tanah Liat (TL) M³ 58,000.00

Bahan Pengikat campuran/Semen


1 Semen Merah (SM) Kg 15,000.00
2 Semen Warna Kg 15,000.00
3 PC. Merk Tiga Roda Kg 1,700.00
4 PC. Merk Gresik Kg 1,700.00
5 PC. Merk Tonasa Kg 1,700.00
6 PC. Merk Holcim Kg 1,700.00
7 PC. Merk Basuwa Kg 1,650.00
8 PC. Merk Padang Kg 1,650.00
9 PC. Merk Singa Merah Kg 1,650.00
10 Semen Warna Butiran Halus Kg 15,700.00
11 Semen Warna Butiran Kasar Kg 15,700.00
12 Ornamen terawang custom m2 938,000.00
13 Semen-MU 380 (Plesteran), 40kg Kg 4,500.00
14 Semen-MU 200 (acian), 40kg Kg 5,000.00
15 Acian Mild Kalsium Kg 5,200.00
16 Acian Mild Kapur Kg 2,000.00
17 Pengeras Beton Kg 49,500.00
18 Perekat Beton Kg 66,500.00

1 Rumput Gebalan M² 38,000.00


2 Kapur Gamping/Labur Kg 6,000.00
3 Kapur Biasa Kg 3,000.00
4 Fuller (Abu Batu) Kg 5,000.00

1 Air kerja Liter 3,000.00


2 Strorox - 100 Kg 40,000.00
3 Dinding Hollow Block (HB 20) Bh 8,000.00
4 Dinding Hollow Block (HB 15) Bh 7,000.00
5 Dinding Hollow Block (HB 10) Bh 6,000.00

Bahan Atap
1 Sirap Kalimantan Bh 2,800.00
2 Genteng Lokal Bh 1,800.00
3 Genteng Beton /Pres Bh 6,800.00
4 Genteng Karang Pilang/ Kodok Bh 5,500.00
5 Genteng Pejaten Sudah di cat Bh 3,900.00
6 Genteng Kaca Bh 45,000.00
7 Genteng Keramik / 25bh Bh 17,000.00
8 Genteng Keramik Glazur / 15bh Bh 15,000.00
9 Genteng Kanmuri Full Flat, Natural Bh 21,000.00
10 Genteng Karang Pilang Type Keramik Bh 10,000.00
11 Genteng Aspal Bh -
12 Genteng Bubungan Lokal Bh 6,900.00
13 Genteng Bubungan Beton Bh 7,900.00
14 Genteng Bubungan Silang Bh 6,600.00
15 Genteng Bubungan Pejaten Bh 8,800.00
16 Genteng Bubungan Keramik / 4bh Bh 31,000.00
17 Genteng Bubungan Keramik Glazur / 4bh Bh 17,000.00
18 Bubungan Genteng kanmuri Full Flat, Natura Bh 35,000.00
19 Bubungan Karang Pilang/ Kodok Bh 14,000.00
20 Genteng Bubungan Aspal Bh -
21 Genteng Metal roof 0,25 mm (Lapis Butiran) Lbr 70,000.00
22 Bubungan Metal Roof (Lapis Butiran) M' 75,000.00
23 Genteng Metal roof 0,3 mm (Lapis Butiran) Lbr 80,000.00
24 Bubungan Metal Roof (Lapis Butiran) M' 85,000.00
25 Genteng Metal roof 0,25 mm (Tanpa Lapis Butiran) Sakura Lbr 65,000.00
26 Bubungan Metal (Tanpa Lapis Butiran) M' 70,000.00
27 Atap bitumen gelombang H : 3,0 mm lbr 193,000.00
28 Atap bitumen gelombang H : 3,0 mm lbr 193,000.00
29 Paku fiser bitumen bh 7,000.00
30 Nok / Ridge Onduline Lbr 90,000.00
31 Sekrup / Paku bh 13,000.00
32 Asbes Type Genteng (tyluq) Lembar 68,000.00
Asbes semen M² 47,300.00
33 Ijuk Atap kg 29,000.00
34 Asbes Gelombang Kecil 92 x 180 cm Lembar 69,000.00
35 Asbes Gelombang Besar 105 x 240 cm Lembar 199,000.00
36 Bubungan Asbes Gelombang Kecil 92 cm Lembar 55,000.00
37 Bubungan Asbes Gelombang Besar 105 cm Lembar 95,000.00
38 Seng.Glb Besar BJL.S 20 Lembar 68,000.00
39 Seng.Glb Besar BJL.S 25 Lembar 80,000.00
40 Seng.Glb Besar BJL.S 30 Lembar 85,000.00
41 Seng.Glb Kecil BJL.S 20 Lembar 75,000.00
42 Seng Plat BJL.S 18 lebar 90 cm M' 50,000.00
43 Seng Plat BJL.S 20 lebar 90 cm M' 76,000.00
44 Seng Plat BJL.S 25 lebar 90 cm M' 105,000.00
45 Seng Plat BJL.S 28 lebar 90 cm M' 120,000.00
46 Flashing (List Seng Lipat, 2.10.62x120 cm) Bh 85,000.00
47 Seng Plat BJL.S 30 lebar 90 cm M' 135,000.00
48 Seng Spandek 0.25 mm lebar 80 cm M' 65,000.00
49 Seng Spandek 0.3 mm lebar 80 cm M' 75,000.00
50 Seng Spandek 0.35 mm lebar 80 cm M' 94,000.00
51 Seng Spandek 0.4 mm lebar 80 cm M' 104,000.00
52 Seng Spandek 0.25 mm lebar 80 cm, Warna M' 75,000.00
53 Seng Spandek 0.3 mm lebar 80 cm, Warna M' 87,000.00
54 Seng Spandek 0.35 mm lebar 80 cm, Warna M' 100,000.00
55 Seng Spandek 0,4 mm lebar 80 cm, Warna M' 110,000.00
56 Atap Roof Fiber Glass Lbr 125,000.00
57 Rangka Atap Roof Fiber Glass M² 266,000.00
58 Plastik Aerator M² 7,000.00
59 Atap Polycarbonat Lbr 203,000.00
60 Atap Trimdeck 0.40 TCT (Spandek) M² 100,000.00
61 Bubungan Trimdeck 0.40 TCT (Spandek) M' 60,000.00
62 Bubungan Trimdeck 0.40 TCT (Spandek) M' 60,000.00
63 Alumunium Foil M² 13,000.00
64 Karet Talang M' 91,000.00
65 Atap Polycarbonate (210 x 1180 cm) Lembar 420,000.00
Atap Polycarbonate m2 17,000.00
66 GRC Board bergelombang m2 90,000.00
67 Profil C 75.100 M' 30,000.00
68 Profil C 75.75 M' 19,000.00
69 Profil C 80.100 M' 35,000.00
70 Profil C 80.75 M' 25,000.00
71 Reng U 0.55 M' 9,000.00
72 Reng U 0.45 M' 7,500.00
73 Reng U 0.40 M' 7,000.00
74 Baut Truss Bh 500.00
Baut Reng Bh 400.00

Bahan Kayu dan Bambu


1 Papan Kayu Klas I M³ 5,480,000.00
2 Papan Kayu Klas II M³ 4,250,000.00
3 Papan Kayu Klas III M³ 2,600,000.00
4 Balok Kayu Klas I M³ 5,350,000.00
5 Balok Kayu Klas II M³ 4,000,000.00
6 Balok Kayu Klas III M³ 2,600,000.00
7 Dolken / Perancah Dia. 7 Cm - 4 m Batang 11,000.00
8 Papan Kayu Begisting M³ 3,090,000.00
9 Balok Kayu Begisting M³ 2,720,000.00

1 Lumbersering Kayu Kelas I M³ 3,715,000.00


2 Lumbersering Kayu Kelas II M³ 3,150,000.00
3 List Plafond M' 8,500.00
4 List Plafond 2/4 Profil M' 9,000.00
5 List Plafond 3/3 Profil M' 12,000.00
6 List Plafond 4/4 Profil M' 14,000.00
7 List Plafond 5/5 Profil M' 17,000.00
8 Papan Nama Bh 200,000.00
9 Bambu (Dia 12.5 cm, P 6 m) Btg 40,000.00
10 Bambu (Dia 10 cm, P 6 m) Btg 34,000.00
11 Bambu (Dia 7 cm, P 6 m) Btg 27,500.00
12 Bedek Kulitan M² 57,000.00
13 Bedek Biasa M² 32,000.00
14 Bedek Pagar M² 35,000.00
15 Bilik Bambu M² 50,000.00

Bahan Cetak
1 Lubang Angin 10x20 Cm Bh 15,000.00
2 Lubang Angin 20x20 Cm Bh 15,500.00
3 Lubang Angin 20x30 Cm Bh 20,000.00
4 Buis Beton Dia. 10 Cm Bh,L= 0,5M 50,000.00
5 Buis Beton Dia. 20 Cm Bh,L= 0,5M 75,000.00
6 Buis Beton Dia. 30 Cm Bh,L= 0,5M 90,000.00
7 Buis Beton Dia. 40 Cm Bh,L= 0,5M 110,000.00
8 Buis Beton Dia. 50 Cm Bh,L= 0,5M 125,000.00
9 Buis Beton Dia. 60 Cm Bh,L= 0,5M 130,000.00
10 Buis Beton Dia. 80 Cm Bh,L= 0,5M 150,000.00
11 Penutup Buis Beton Dia. 80 Cm Bh 175,000.00
12 Batako 10 x 20 x 40 Cm Bh 4,500.00
13 Paving Blok Persegi (t = 8 cm) M2 80,000.00
14 Paving Blok Persegi (t = 6 cm) M2 65,000.00
Paving Blok Persegi (warna) M2 110,000.00
15 Paving Blok Persegi (t = 8 cm), Press M2 165,000.00
16 Paving Blok Tiga Berlian M2 200,000.00
17 Batu paras/Palimanan M2 244,000.00
18 Batu Sisir/ Bergaris, hitam M2 265,000.00
19 Lubang Angin Keramik 20 x 20 cm Bh 45,000.00
20 Lubang Angin Keramik 30 x 30 cm Bh 55,000.00
21 Glass Block Bh 56,000.00
22 Roster Terawang (15 X 20 ) Bh 18,000.00
23 Roster 30 x 30 m2 220,000.00
24 Wall Line GRC + Rangka Hollow (Terpasang) M2 1,100,000.00
25 Conblock tipe segi-empat abu-abu 8 cm, K-300 m2 127,000.00
26 Conblock tipe segi-enam abu-abu 8 cm, K-300 m2 122,000.00
27 Kisi-kisi 50x100 mm UPVC Motif Kayu m1 132,000.00
28 Kanstein/Kerb T=30 cm, P=60 cm (jalan) m1 165,000.00
29 Kanstein/Kerb T=40 cm, P=60 cm (taman) m1 125,000.00
30 Udith (Beton pracetak), lebar 80 cm, tebal = 12 cm Bh,P=1,2M 1,800,000.00
31 Udith (Beton pracetak), lebar 100 cm, tebal = 12 cm Bh,P=1,2M 2,000,000.00

Bahan Lantai
1 Tegel Abu-abu 20 x 20 M² 63,000.00
2 Tegel Bergaris Abu 20 x 20 Cm M² 74,000.00
3 Tegel Warna 20 x 20 Cm M² 80,000.00
4 Tegel Bergaris Warna 20 x 20 Cm M² 80,000.00
5 Tegel Traso Klas I 30 x 30 M² 85,000.00
6 Tegel Traso Klas II 30 x 30 M² 83,000.00
7 Granite Kw I M² 450,000.00
8 Granite Kw II M² 380,000.00
9 Geotextile m2 320,000.00
10 Drainagecell m2 82,000.00
11 Hospital plint 60 x 10 x 4 Buah 82,000.00
12 Stepnose tangga 10x40 cm Buah 32,000.00
13 Karpet kg 25,000.00
14 grassblock tebal 8 cm m2 140,000.00
15 Lantai conwood deck 12" T-lock + Pengecetan M² 770,000.00

1 Keramik Dinding Kw I (Motif) M² 140,000.00


2 Keramik Dinding Kw II (Motif) M² 120,000.00
3 Keramik Dinding Kw I (Polos) M² 130,000.00
4 Keramik Dinding Kw II (Polos) M² 90,000.00

1 Keramik Lantai Kualitas I (Motif) M² 140,000.00


2 Keramik Lantai Kualitas II (Motif) M² 120,000.00
3 Keramik Lantai Kualitas I (Polos) M² 110,000.00
4 Keramik Lantai Kualitas II (Polos) M² 90,000.00

1 Keramik cutting Motif M² 160,000.00


Keramik artistik Bh 13,000.00
2 Lantai Marmer M² 600,000.00
3 Lantai Vinyl Kw I M² 650,000.00
4 Lantai Vinyl Kw II M² 400,000.00
5 Lantai parquete (dreamwood), Kw I M² 1,000,000.00
6 Lantai parquete (dreamwood), Kw II M² 800,000.00
7 Beton grid Pracetak K225, ( 5x40x240) M3 3,000,000.00
8 Porselin Kualitas I (Polos) M² 103,000.00
9 Plint Keramik Bh 13,000.00
10 Plint Granite Bh 30,000.00
Plint Ubin 15 x 20 cm Bh 1,900.00
Plint Ubin 10 x 30 cm Bh 1,900.00
Plint Ubin 10 x 40 cm Bh 2,600.00
11 Coral sikat Kg 10,000.00
12 Coral sikat, Warna Kg 16,000.00
13 Dinding Kalsiplank 8" Jati+ Rangka Holow + Pengecetan M² 720,000.00
14 Dinding Bahan HPL, Motif M² 230,000.00
15 Dinding Bahan HPL, Polos M² 195,000.00
16 Bahan HPL, Polos m2 86,700.00
17 Kapur Sirih Kg 25,000.00
18 Wall Paper m2 100,000.00
19 Perekat Kg 25,000.00
20 Kanstin m2 75,000.00

Bahan Besi
1 Besi Beton Ulir Kg 19,000.00
2 Besi Beton polos Kg 16,000.00
3 Rangka Plafond Metal Furing m2 250,000.00
4 Rangka Plafond Besi Hollow, (galvanis) m2 200,000.00
5 Plat baja tebal 8 mm 4 feet x 8 feet lbr 1,350,000.00
6 plat baja 15x9x9,2 cm m1 315,000.00
7 Plat stainless steel m2 700,000.00
8 Pull Handle ex. Dekson type 01 bh 1,300,000.00
9 Lock Case ex. Dekson bh 185,000.00
10 Lever Handle ex. Dekson bh 185,000.00
11 Engsel Floor hange Dexson bh 1,650,000.00
12 Door Closer ex dekson bh 350,000.00
13 Slide Handle ex. Dekson bh 1,500,000.00
14 Engsel sliding bh 200,000.00
15 Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinco bh 18,800,000.00
16 Flush bolt ex. Dekson bh 110,000.00
17 Engsel kupu ex. Dekson bh 130,000.00
18 Plat timbah hitam 3 m m2 750,000.00
19 Besi Profil (Siku), kanal C Kg 38,000.00
20 Besi Baja IWF Kg 38,000.00
21 Pipa Black Steel Kg 600,000.00
22 Spaner Kg 35,000.00
23 Curtain Wall + kaca templet 8 mm m2 2,150,000.00
24 Kusen Alumunium Natural M' 95,000.00
25 Kusen Alumunium Warna M' 110,000.00
26 Daun pintu/jendela alumunium + kaca 5 mm, (natural) m2 1,100,000.00
27 Daun pintu/jendela alumunium + kaca 5 mm, (warna) m2 1,150,000.00
28 Daun pintu/jendela alumunium + kaca 8 mm, (natural) m2 1,100,000.00
29 Daun pintu/jendela alumunium + kaca 8 mm, (warna) m2 1,200,000.00
30 Alumunium Strip M' 60,000.00
31 Alumunium "T" M' 15,000.00
32 Kawat f 4 mm M' 85,000.00
33 Profil kaca Alumunium M' 95,000.00
34 Kawat Ikat Beton Kg 33,000.00
35 Kawat Nyamuk Besi M² 29,000.00
36 Kawat Saringan Pasir M² 35,000.00
37 Kawat Duri 50/Rol 100,000.00
38 Kawat Bronjong digalvanisir Kg 40,000.00
39 Kawat Las Kotak 160,000.00
40 Besi Strip Tebal 5 mm Kg 35,000.00
41 Besi Strip Tebal 3 x 2 mm Kg 26,000.00
42 Besi Strip Tebal 2 x 2 mm Kg 23,000.00
43 Besi Stainles Diameter 2" M' 90,000.00
44 Besi Stainles Diameter 1" M' 50,000.00
45 Besi Stainles Diameter 1/2" M' 35,000.00
46 Daun Pintu Roling door alumunium M² 600,000.00
47 Rangka Roling door alumunium M' 300,000.00
48 Pintu Harmonika, Complet M² 1,750,000.00
49 Sunscreen alluminium M² 500,000.00
50 Alluminium Composit Panel (ACP) 0,30 mm, (Interior) M² 550,000.00
51 Alluminium Composit Panel (ACP) 0,30 mm,(Exterior) M² 800,000.00
52 Wood Panel Composit (WPC) tebal 15mm M² 550,000.00
53 Pintu WCP, Complit Unit 1,600,000.00
54 sealent tube 35,000.00
55 Kawat Gerawang M² 23,000.00
56 Besi Hollow 100 x 50 Zincromate L = 6m M' 59,000.00
57 Besi Hollow 50 x 50 Zincromate L = 6m M' 32,000.00
58 Besi Hollow 40 x 40 Zincromate L = 6m M' 26,000.00
59 Besi Hollow 40 x 20 Zincromate L = 6m M' 13,000.00
60 Besi Hollow 40 x 40 Stenlistail L = 6m M' 110,000.00
61 Besi Hollow 20 x 20 Stenlistail L = 6m M' 39,000.00
62 Pipa 2" black steel di cat duco m1 69,000.00
63 Pipa 1"black steel dicat duco m1 44,000.00
64 Galvanis Steel 3/4" m1 43,000.00
65 Besi Stainless Ø 3/4' m1 94,000.00
66 Syntetic Grass m2 32,000.00
67 WPC 5x5 cm m1 132,000.00
68 WPC 10x5 cm m1 230,000.00
69 WPC 15x5 cm m1 350,000.00
70 WPC 20x5 cm m1 485,000.00
71 WPC Panel W15 x H2,5 cm m1 574,000.00
72 WPC door type 02 include kaca 5 mm bh
73 WPC door type 03 include kaca 5 mm bh
74 WPC door type 04b include kaca 5 mm bh
75 WPC door type 04c include kaca 5 mm bh
76 WPC door type 06 uk. 2,2 x 0,8 m bh
77 WPC door type 08 uk. 1.1 x 0,6 m bh
78 WPC door type 09 uk. 2,2 x 1,5 m bh
79 WPC door type 10 uk. 2,2 x 0,9 m bh
80 WPC door type 11 uk. 2,2 x 1,3 m bh
81 Kalsiboard rangka alumunium set
82 Besi Hollow / Square Bars 20 x 40 mm M'
83 Besi Hollow / Square Bars 40 x 40 mm M' 21,500.00
84 Besi Hollow / Square Bars 40 x 60 mm M' 29,000.00
85 Besi Hollow / Square Bars 50 x 50 mm M' 36,000.00
86 Besi Hollow / Square Bars 40 x 80 mm M' 50,000.00
87 Besi Hollow / Square Bars 50 x 100 mm M' 58,000.00
88 Besi Hollow / Square Bars 100 x 100 mm M' 140,000.00
89 pengelasan cm1 1,300.00
90 Steel Frame Hollow Galvanis 150x40x3 mm m1 32,000.00
91 Alumunium 4" Dark Gray ex. YKK m1 210,000.00
92 Kunci Pintu Alumunium Bh 220,000.00
93 Textile Tape M' 35,000.00
94 Siku Pintu Otomatis Bh 570,000.00
95 Karet Kaca Set 140,000.00
96 Besi Plat 3 mm Lembar 1,700,000.00
97 Besi Plat 2 mm Lembar 1,250,000.00
Besi plat baja Kg 33,000.00
98 Pintu kawat harmonika + Besi Siku M² 250,000.00
99 Plat baja, ukuran 120 x 240 cm Kg 24,000.00
100 Jarum Keras Bh 35,000.00
101 Pintu Jeruji Besi Rangka besi siku 40.40.4 + Asisories M² 540,000.00
102 Pintu Besi Pagar M² 480,000.00
103 Pagar Besi M² 453,000.00
104 Pintu Besi Pagar (dia. 16 mm) M² 900,000.00
105 Pagar Besi (dia. 16 mm) M² 800,000.00
106 Pagar Besi Pipa GI M² 795,000.00
107 Pintu Pagar Besi Pipa GI M² 850,000.00
108 Baut Sekrup Anti Karat Bh 2,000.00
109 Ventilasi Siku M2 250,000.00
110 Mata Kater Bh 85,000.00
111 Roda Pintu Dorong Bh 57,000.00
112 Mesin Bor Listirk Unit 1,350,000.00
113 Wiremesh M6/ (34,76)kg Kg 37,000.00
114 Wiremesh M8/ (61,79)kg Kg 66,000.00
115 Wiremesh M10/ (96,54)kg Kg 105,000.00
116 Bondek tebal 0.65 mm M2 110,000.00
117 Bondek tebal 0.70 mm M2 120,000.00
118 Bondek tebal 0.75 mm M2 130,000.00
119 Bondek tebal 1.00 mm M2 210,000.00

Bahan Langit-Langit
1 Eternit 100 x 100 Cm Lembar 27,000.00
2 Triplek 120 x 240 x 2 mm Lembar 54,000.00
3 Triplek 120 x 240 x 3 mm Lembar 67,000.00
4 Triplek 120 x 240 x 4 mm Lembar 103,000.00
5 Triplek 120 x 240 x 6 mm Lembar 106,000.00
6 Triplek 120 x 240 x 9 mm Lembar 159,000.00
7 Triplek 120 x 240 x 12 mm Lembar 240,000.00
8 Triplek 120 x 240 x 18 mm Lembar 330,000.00
9 Calsiboard 1200 x 240 x 3.5 mm Lembar 135,000.00
10 Calsiboard 1200 x 240 x 6 mm Lembar 222,000.00
11 Gypsum board 1200 x 2400 x 9 mm M2 100,000.00
12 PVC Plafond, 10 mm, Putih Polos M2 250,000.00
13 PVC Plafond, 10 mm, Warna M2 280,000.00
14 Plafond Akustik 600 x 600 M2 155,000.00
15 Plafond Papan Kayu Kls II, 2 cm M2 80,000.00
16 Formika Putih 120 x 240 mm Lembar 195,000.00
17 Formika Warna 120 x 240 mm Lembar 270,000.00
18 Mega Teakwood 120 x 240 x 3 mm Lembar 220,000.00
Plywood tebal 4 mm, ukuran 120 cm x 240 cm Lembar 220,000.00
Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 130,000.00
Triplek tebal 9 mm, ukuran 120 cm x 240 cm Lembar 159,000.00
19 List Gypsum M' 24,000.00
20 List Plafond Gypsum Type I M' 53,000.00
21 List Plafond Gypsum Type II M' 40,000.00
22 List Plafond Shadow Line, aluminium 0.30 mm M' 5,500.00
23 Lem Kayu Kg 55,000.00
24 Lem Kg 55,000.00
25 Lem vinyl/perquete Kg 55,000.00
26 Lem Gypsum Kg 30,000.00
27 List Plafond Shadow Line, aluminium 0.30 mm M' 9,500.00
28 Kasiplank (0.8 x 20) M' 25,000.00
29 Top Cross Rail 250FX btg 35,000.00
30 Furring Chanel PN 205 btg 85,000.00
31 Furring Chanel PN 208 bh 3,000.00
32 Suspension Spring Clip 223SS bh 6,000.00
33 4 mm Soft Galv Suspension Rod PN 225 bh 6,000.00
34 Angle Bracket PN 220 bh 2,000.00
35 Wall Angle 252FX bh 15,000.00
36 Paper Tape roll 55,000.00
37 Steel Tape roll 132,000.00
38 UB Cote Read Mix kg 165,000.00
39 Papan WPC teval 7 mm lbr 330,000.00

Bahan Kaca
1 Kaca Nako 5 mm M² 141,000.00
2 Kaca Polos 3 mm M² 115,000.00
3 Kaca Polos 5 mm M² 170,000.00
4 Kaca Polos 8 mm M² 200,000.00
5 Kaca Buram (ES) 5 mm Komplit M² 215,000.00
6 Kaca Riben 3 mm M² 137,000.00
7 Kaca Riben 5 mm M² 165,000.00
8 Kaca Cermin 5 mm M² 169,000.00
9 Acrilic 2mm Bening 2mmx122cmx244cm Lembar 130,000.00
10 Kaca Tempreat 8 mm, Polos M² 1,000,000.00
11 Kaca Tempreat 10 mm, Polos m2 1,250,000.00
12 Kaca Tempreat 12 mm, Polos M² 1,500,000.00
13 Kaca Tempreat 8 mm, Warna M² 1,100,000.00
14 Kaca Tempreat 12 mm, Warna M² 1,800,000.00
15 Kaca Lengkung 10 mm, Polos M² 2,000,000.00
16 Kaca Lengkung 12 mm, Polos M² 2,500,000.00

Bahan Finishing
1 Amplas Lembar 9,000.00
2 Plamir Kayu Kg 29,000.00
3 Spritus Liter 29,000.00
4 Dempul Kg 35,000.00
5 Batu Apung Kg 250,000.00
6 Soda api Liter 66,000.00
7 Sabun Kg 20,000.00
8 Minyak Cat Liter 20,000.00
9 Residu Liter 25,000.00
10 Minyak Bekisting Liter 18,000.00
11 Meni Besi Kg 35,000.00
12 Meni Kayu Kg 35,000.00
13 Cat Kayu Mutu Menengah Kg 72,000.00
14 Cat Kayu Mutu Tinggi Kg 90,000.00
15 Cat Tembok Mutu Tinggi, (Interior) Kg 60,000.00
16 Cat Tembok Mutu Tinggi, (Exterior) Kg 127,000.00
17 Cat Tembok Mutu Menengah, (Interior) Kg 35,000.00
18 Cat Tembok Mutu Menengah, (Exterior) Kg 55,000.00
19 Cat Besi Kg 70,000.00
20 Cat Genteng Kg 42,000.00
21 Plamir Tembok/ Plafond Kg 50,000.00
22 Teer Kg 37,000.00
23 Politur Liter 36,000.00
24 Politur Jadi Liter 37,000.00
25 Minyak Cat A Spesial Liter 39,000.00
26 Cat Marka Jalan Scalato Kg 110,000.00
27 Cat Marka Jalan Biasa Kg 92,000.00
28 Cat Zigromeat Kg 130,000.00
29 Vernis Ltr 37,000.00
30 Kuas 5 Cm Bh 29,000.00
31 Rol Cat Bh 36,000.00
32 Glassbeads Kg 50,000.00
33 Roadline thener Ltr 55,000.00
34 Cat Roadline paint Ltr 85,000.00
35 Water Proofing Kg 65,000.00
36 Floor hardener 3 Kg/m2 m2 44,000.00
37 Cat Epoxy Liter 170,000.00
38 ceramic stepnoosing 100 x 200 mm m1 160,000.00
39 Grooe line 2 cm m2 26,000.00
40 Floor hardener 7 Kg/m2 m2 57,000.00
41 Fiber Bakar m2 110,000.00
42 Cat tembok dulux Watersilt Pro Kg 120,000.00

Bahan Pengunci
1 kunci pintu mutu menengah Bh 164,000.00
2 kunci pintu mutu tinggi Bh 555,000.00
3 Yale 1 Slag Bh 105,000.00
4 Yale 2 Slag Bh 165,000.00
5 Kuda Terbang 1 Slag Bh 115,000.00
6 Kuda Terbang 2 Slag Bh 137,000.00
7 Royal Stel 860,000.00
8 Haag Angin Besar Stel 14,000.00
9 Haag Angin Kecil Stel 10,000.00
10 Grendel Besar Bh 24,000.00
11 Grendel Kecil Bh 14,000.00
12 Engsel Nylon Pas 21,000.00
13 Engsel H (biasa) Pas 17,000.00
14 Expagnolet Bh 104,000.00
15 Kunci Silinder Bh 64,000.00
16 Pegangan Pintu KW I Bh 270,000.00
17 Door Holder Bh 245,000.00
18 Door Closer Bh 245,000.00
19 Door Stoper Bh 65,000.00
20 Kunci Selot Besar Bh 90,000.00
21 Kunci Selot Kecil Bh 70,000.00
22 Rel Pintu Dorong M' 42,000.00
23 Lubang Pintu Intip (Door Viewer) Bh 89,000.00

Bahan Sanitaire
1 Closet Duduk Biasa Bh 830,000.00
2 Closet Jongkok Teraso Bh 126,000.00
3 Closet Jongkok Porselin Bh 260,000.00
4 Wastapel (KW 1 Super) Bh 2,400,000.00
5 Wastapel Biasa Bh 485,000.00
6 Urinoir Porselin (KW 1 Super) Bh 2,730,000.00
7 Pembatas urinoir ex. TOTO A 100 bh 1,400,000.00
8 Kitchen Sink Stainless Steel ex. TOTO bh 2,200,000.00
9 Closet Duduk (KW 1 Super) Bh 3,660,000.00
10 Saringan Air Besi Bh 120,000.00
11 Saringan Air Plastik Bh 27,000.00
12 Bak Cuci Piring Teraso Bh 395,000.00
13 Bak Cuci Piring Logam, 1 lubang Bh 530,000.00
14 Bak Cuci Piring Logam, 2 lubang Bh 650,000.00
15 Resesvoir Fybg Kapasitas 1 M3 Bh 3,890,000.00
16 Septictank Kapasitas 1 M3 + peresapan Bh 5,350,000.00
17 Septictank Kapasitas 2 M3 + peresapan Bh 7,650,000.00
18 Bak Fiberglass Kap 0.5 M3 Bh 525,000.00
19 Bak Fiberglass Kap 1.0 M3 Bh 1,250,000.00
20 Bak Mandi Plastik Kap. 0,5 M3 Bh 530,000.00
21 Bak Mandi Teraso 50 x 50 cm Bh 485,000.00
22 Bak Mandi Poseslin KW I Bh 475,000.00
23 Kran Shower bh 363,000.00
24 Kran Air 1/2" Bh 19,000.00
25 Kran Air 3/4" Bh 22,000.00
26 Floor Drain ex. TOTO TX 1 BV 3 bh 40,000.00
27 Floor Drain Bh 27,000.00
28 Roof Drain Metal Bh 45,000.00
29 Seal Tape Bh 6,000.00
30 Lem Pipa Kg 80,000.00
31 Klep 3/4" Bh 35,000.00
32 Plampung Air Otomatis Bh 155,000.00
33 Tandon Air Fyberglass Kapasitas 500 Liter vertikal Bh 1,430,000.00
34 Tandon Air Fyberglass Kapasitas 1000 Liter vertikal Bh 2,100,000.00
35 Tandon Air Fyberglass Kapasitas 2000 Liter vertikal Bh 10,155,000.00
36 Tandon Air Fyberglass Kapasitas 3000 Liter vertikal Bh 13,685,000.00
37 Tandon Air Fyberglass Kapasitas 4000 Liter vertikal Bh 19,910,000.00
38 Tandon Air Fyberglass Kapasitas 5000 Liter vertikal Bh 22,000,000.00
39 Tandon Air Fyberglass Kapasitas 1000 Liter horisontal Bh 39,850,000.00
40 Tandon Air Fyberglass Kapasitas 2000 Liter horisontal Bh 55,100,000.00
41 Tandon Air Fyberglass Kapasitas 3000 Liter horisontal Bh 65,710,000.00
42 Tandon Air Fyberglass Kapasitas 4000 Liter horisontal Bh 2,750,000.00
43 Wastapel Merk Ina (KW I Super) Bh 150,000.00
44 Tempat Sabun (KW I) Bh 69,000.00
45 Cermin + Acessories (Antik) Bh 135,000.00
46 Gantungan Handuk + Acessories Bh 170,000.00
47 Shower spray ex. TOTO TX 403 SBPIV bh 813,000.00
48 Shower ex. TOTO TR 309 SZ bh 565,000.00
49 Paper Holder ex. TOTO TIPE TS116R bh 594,000.00
50 soap holder ex. TOTO S 156N bh 160,000.00
51 hand railing stainless steel ex. TOTO TX 3A2 bh 940,000.00
52 Shower Splay + Acessories Bh 455,000.00
53 Shower Set + Acessories Bh 700,000.00
54 Hand Dryer + Acessories Bh 1,480,000.00
55 Gantungan Baju + Acessories Bh 245,000.00
56 Water Drain + Acesories Bh 69,000.00
57 Pintu Fiber Glass (Wc) Bh 850,000.00
58 Pembuatan dan Pemasangan Pintu jeruji besi Ø12mm + Rangka kosen besi siku 40 M2 1,555,000.00
59 Bath Tub Bh 6,800,000.00
60 Kitchen Sink 1 Bowl GS 5844 bh 1,570,000.00
61 Kran + asesories + Seal Tape set 690,000.00
62 Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA bh 3,880,000.00
63 Mirror 100x120 cm bh 270,000.00
64 Siku alumunium m1 82,000.00
65 Spoel hoek bh 11,000,000.00
66 Kran Air Antik Bh 67,000.00
67 Kran Zink Bh 400,000.00
68 Kitchenzink Bh 360,000.00
69 Kran Dinding Bh 215,000.00
70 sumur pompa tangan terpasang Bh 1,760,000.00

Bahan Paku
1 Paku panjang 1 - 5 Cm Kg 33,000.00
2 Paku panjang 5 - 7 Cm Kg 28,000.00
3 Paku panjang 7 - 10 Cm Kg 28,000.00
4 Paku panjang 10 - 12 Cm Kg 28,000.00
5 Paku Sekrup Kg 35,000.00
Paku Sekrup Bh 400.00
6 Paku Seng Kg 45,000.00
7 Paku Asbes Kg 45,000.00
8 Skrup/Piles 1,5 Cm Doos Kecil 35,000.00
9 Skrup/Piles 2,0 Cm Doos Kecil 35,000.00
10 Paku Sumbat Bh 38,000.00
11 Baut Mur Bh 5,000.00
12 Mur baut 12 mm Bh 6,000.00
13 Mur baut 16 mm Bh 7,000.00
14 Baut Mur 18 mm Bh 8,000.00
15 Baut Mur 22 mm Bh 10,000.00
16 Besi Beugel U + Baut Mur Bh 39,000.00
17 Besi Beugel Plat + Baut Mur Bh 39,000.00
18 Paku Calsiboth Kg 35,000.00
19 Paku Baja Kg 85,000.00
20 Angker Kusen Bh 6,000.00
21 Paku Sekrup 5 cm Kg 35,000.00
22 Paku Sekrup 10 cm Kg 35,000.00
23 Paku Sekrup 1- 2,5 cm Kg 35,000.00
24 Skrup Fixer Bh 22,000.00
25 Ramset/ Dinabolt Kg 75,000.00

Bahan Instalasi Listrik


1 Titik Lampu Bh 285,000.00
2 Stop Kontak Tanam Bh 210,000.00
3 Stop Kontak Luar Bh 227,000.00
4 Saklar Double Bh 39,000.00
5 Saklar Tunggal Bh 39,000.00
6 Zekering Boxes 1 Group Bh 420,000.00
7 Zekering Boxes 2 Group Bh 570,000.00
8 Zekering Boxes 3 Group Bh 710,000.00
9 Lampu Philip 18 W Bh 60,000.00
10 Lampu Philip 14 W Bh 49,000.00
11 Lampu Philip 5 W Bh 35,000.00
12 Lampu Pijar 25 W Bh 25,000.00
13 Lampu TL 40 W Bh 97,000.00
14 Lampu TL 2 x 18 W Bh 95,000.00
15 Lampu TL 2 x 36 W Bh 162,000.00
16 Lampu TL 2 x 40 W Bh 165,000.00
17 Lampu LED 2 x 14 W Bh 192,000.00
18 Lampu Sorot (Sejenis Mercury) Bh 710,000.00
19 Kabel NYA 2,5 mm Roll/50 300,000.00
20 Kabel NGA 2 x 2,5 mm Roll/50 577,000.00
21 Kabel NYM 3 x 2,5 mm Roll/50 705,000.00
22 Kabel NYM 3 x 1,5 mm Roll/50 577,000.00
23 Kabel NYM 2 x 2,5 mm Roll/50 577,000.00
24 Kabel NYM 2 x 1,5 mm Roll/50 396,000.00
25 Kabel NYM 4 x 6 mm Roll/50 1,650,000.00
26 Kabel NYM 4 x 10 mm Roll/50 2,675,000.00
27 Kabel NYY 4 x 50 mm M' 390,000.00
28 Kabel BC 50 mm M' 55,000.00
29 Kabel BC 35 mm M' 45,000.00
30 Fiting Lampu Bh 22,000.00
31 Fiting Lampu Tanam Dia. 4 " Bh 42,000.00
32 Fiting Lampu Tanam Dia. 3 " Bh 32,000.00
33 Box Panel 3 Phase, Comlite (80x120x25) Set 12,000,000.00
34 Box Panel 3 Phase, Comlite (50x70x20) Set 5,850,000.00
35 Box Panel 3 Phase, (30x40x15) Bh 1,100,000.00
36 Box Panel PVC 4 MCB, (40x60x20) Bh 395,000.00
37 MCB 6 A Bh 70,000.00
38 MCB 4 A Bh 66,000.00
39 Pemasukan Daya listrk KWH 2,600.00
40 Pemasangan Daya listrk VA 1,600.00
41 AC (Air Conditioner) Kapasiitas 2 PK Unit
42 AC (Air Conditioner) Kapasiitas 1 PK Unit
43 AC (Air Conditioner) Kapasiitas 1/2 PK Unit
44 Pas pengisap debu ruangan (Blower) + asisories complit Bh 166,000.00
45 Pas Lampu darurat + asisories complit Bh 155,000.00
46 Kabel Telepone 4 x 0.5 mm M' 30,000.00
47 Isolasi Bh 12,000.00
48 Outle TV Bh 50,000.00
49 Outle Telephone Bh 50,000.00
50 Dow ligth / PCL 13 W Bh 130,000.00
51 Dow ligth / PCL 8 W Bh 110,000.00
52 Dow ligth / LED 14 W Bh 152,000.00
53 Dow ligth / LED 7 W Bh 95,000.00
54 Dow ligth / LED 3 W Bh 40,000.00
55 Lampu Tempel / LED 14 W Bh 25,000.00
56 Lampu spot light/ LED 7 W Bh 300,000.00
57 Lampu strip light/ LED 7 W M' 39,000.00
58 Electroda Cooper dia. 1 inci M' 350,000.00
59 Lampu Sorot taman spot light (LED), 10 watt Bh 300,000.00
60 Lampu taman Tanam (LED), 8 watt Bh 270,000.00
61 Bollard Lighting (LED), 9 watt Bh 3,580,000.00
62 Fire Detector, Sprinkler + Accessories (Hose Nozzle) 1,5" + Pipa GI + Pemasanga Bh 1,200,000.00
63 Pipa Conduit PVC dia. 20 mm2 M' 3,000.00
64 Exshaust Fan 14 W bh 535,000.00
65 Wall Type Exshaust Fan 2500 CMH bh 1,100,000.00
66 Orbit Fan 60 Watt bh 720,000.00
67 Exshaust Fan 353 CFM/ 34 W bh 315,000.00
68 Pemasangan Penangkal Petir + Arde (Radius min. 50 m) Unit 25,000,000.00
69 Pemasangan Penangkal Petir + Arde (Radius min. 25 m) Unit 12,500,000.00

Pekerjaan Vegetasi Tanaman


1 Lempengan Rumput M² 74,000.00
2 Sirih Gading Bh 15,000.00
3 Bakung Lele Bh 11,000.00
4 Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter Bh 22,000.00
5 Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter Bh 16,000.00
6 Adam Hawa Bh 36,000.00
7 Sikas (tinggi ± 50 cm) Bh 990,000.00
8 Pucuk Merah (tinggi ± 60 - 70 cm) Bh 155,000.00
9 Pisang Hias (tinggi ± 50 - 100 cm) Bh 145,000.00
10 Palem Phoenix (tinggi ± 80 - 100 cm) Bh 290,000.00
11 Pandan Bali (tinggi ± 80 - 100 cm) Bh 1,100,000.00
12 Bugenvil (tinggi ± 80 - 100 cm) Bh 415,000.00
13 Ketappang Kencana (tinggi ± 200 cm) Bh 410,000.00
14 Palem Putri (tinggi ± 200 - 300 cm) Bh 750,000.00
15 Palem Kuning (tinggi ± 150 - 200 cm) Bh 750,000.00
16 Tabebuya Kuning tinggi 4 meter Bh 1,500,000.00
17 Tanam Pohon Palem raja tinggi 3 meter Bh 1,250,000.00
18 Tanam Pohon Kamboja tinggi 5 meter Bh 1,880,000.00
19 Tanam Pohon Pisang Kipas tinggi 1,5 meter Bh 130,000.00
20 Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter Bh 19,000.00
21 Pohon Damar (Agathis dammara) Tinggi 4m Bh 832,000.00
22 Pohon Pulai (alstonia scholaris) Tinggi 6m Bh 1,900,000.00
23 Pohon Kasia Jawa (Cassia javanica) Tinggi 4m Bh 565,000.00
24 Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m Bh 876,000.00
25 Pohon Flamboyan (Delonix regia) Tinggi 7m Bh 1,188,000.00
26 Pohon Biola Cantik (Ficus lyrata) Tinggi 6m Bh 813,000.00
27 Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m Bh 1,065,000.00
28 Pohon Sosis (Kigelia pinnata) Tinggi 7m Bh 1,065,000.00
29 Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m Bh 880,000.00
30 Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tinggi 6m Bh 545,000.00
31 Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m Bh 1,465,000.00
32 Pohon Parahiba (Schizolobium parahyba) Tinggi 7m Bh 940,000.00
33 Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m Bh 680,000.00
34 Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m Bh 188,000.00
35 Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m Bh 107,000.00
36 Pohon Palem Kol (Licualis grandis) Tinggi 1,5m Bh 157,000.00
37 Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m Bh 1,888,000.00
38 Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m Bh 1,750,000.00
39 Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1,5m Bh 565,000.00

1 Semak Agave (Agave angustifolia) Tinggi 300-400 mm Bh 100,000.00


2 Semak Paku Sarang Burung (Asplenium nidus) Tinggi 250-300mm Bh 63,000.00
3 Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 mm Bh 53,000.00
4 Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 1500-2500 mm Bh 313,000.00
5 Semak Spineless (Spineless Yucca) Tinggi 800 mm Bh 169,000.00
6 Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm Bh 94,000.00
7 Semak Honje Merah (Alpinia purpurata) Tinggi 700-800mm Bh 19,000.00
8 Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm Bh 22,000.00
9 Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm Bh 44,000.00
10 Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm Bh 44,000.00
11 Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300mm Bh 19,000.00
12 Semak Bunga Pagoda (Cleorodendrum paniculatum) Tinggi 700-800mm Bh 88,000.00
13 Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700-800mm Bh 19,000.00
14 Semak Pacing Merah (Costus woodsonii) Tinggi 400-500mm Bh 13,000.00
15 Semak Sirih Gading (Epipremnum aureum) Tinggi 300-500mm Bh 73,000.00
16 Semak Heliconia Bunga Pink (Heliconia chartacea) Tinggi 400-500mm Bh 9,400.00
17 Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250-300mm Bh 13,000.00
18 Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250-300mm Bh 25,000.00
19 Semak Alang Mini (Ophiopogon japonicus "dwarf") Tinggi 100-150mm Bh 19,000.00
20 Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm Bh 95,000.00
21 Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250-300mm Bh 25,000.00
22 Semak Daun Philo "Burle Marx" (Philadendron "Burle Marx") Tinggi 200-250mm Bh 32,000.00
23 Semak Daun Philo Besar (Philadendron sellaum) Tinggi 500-600mm Bh 38,000.00
24 Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 300-400mm Bh 47,000.00
25 Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300-400mm Bh 11,500.00
26 Semak Melati Jepang (Pseuderanthemum reticulatum) Tinggi 400-500mm Bh 11,000.00
27 Semak kembang Air Mancur Merah (Russelia equisetiformis) Tinggi 400-500mm Bh 28,000.00
28 Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 400-500mm Bh 44,000.00
29 Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500mm Bh 8,500.00
30 Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 Bh 13,000.00
31 Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 300-400mm Bh 19,000.00
32 Semak Kembang Coklat (Zephyranthes candida) Tinggi 100-150 Bh 25,000.00
33 Semak Rumput Manila (Zoysia matrella) M² 63,000.00

1 Tanaman Cemara Bh 150,000.00


2 Tanaman Karambosa hijau Bh 120,000.00
3 Tanaman Karambosa Karigata Bh 135,000.00
4 Tanaman Batang Merah Bh 25,000.00
5 Tanaman Erpah Bh 65,000.00
6 Kembang pukul sembilan Bh 420,000.00
7 Kembang rumput kuning Bh 11,000.00
8 Bunga Agave Bh 730,000.00
9 Bunga Andong Bh 42,000.00
10 Bunga Asoka Bh 150,000.00
11 Bunga Brokoli Bh 53,000.00
12 Bunga Kembang Puring Bh 125,000.00
13 Bunga Lidah mertua mini Bh 53,000.00
14 Bunga Lidah Rumpun mertua mini Bh 788,000.00
15 Bunga Puring kerupuk Bh 263,000.00
16 Bunga Rumpun sansevieria Bh 21,000.00
17 Bunga Soft india Bh 781,000.00
18 Bunga Kembang sepatu Bh 260,000.00
19 Pupuk daun dan kembang Zak 158,000.00
20 Pupuk kandang kg 32,000.00
21 Insektisida / Furadan kg 30,000.00

Bahan Tambahan
1 Flux Oil Ltr 40,000.00
2 Minyak pelumas Ltr 47,000.00
3 Olie SAE 100 Ltr 38,000.00
4 Olie SAE 30 Ltr 51,000.00
5 Olie SAE 40 Ltr 65,000.00
6 Olie SAE 90 Ltr 75,000.00
7 Sambungan Rumah 1" Set 3,100,000.00
8 Sambungan Rumah 1/2" Set 1,855,000.00
9 Sambungan Rumah 3/4" Set 2,163,000.00
10 Aspal (AC) Kg 12,000.00
11 Kayu Bakar M³ 198,000.00
12 Sewa Stamper Hari 170,000.00
13 Sewa Alat Bor Hari 210,000.00
14 Sewa Genset Hari 410,000.00
15 Sewa Mesin Las Hari 410,000.00
16 Aspal Emulsi Kg 9,000.00
17 Alat Bantu Bina Marga Set 3,395,000.00
18 Alat Bantu Pengairan Set 3,395,000.00
19 Minyak tanah Ltr 6,000.00
20 Solar Ltr 6,500.00
21 Bensin Ltr 6,500.00
22 Pertalite Ltr 7,800.00
23 Pertamax Ltr 9,500.00
24 Pagar BRC tinggi 1,20 m M' 120,000.00
25 Tiang BRC dia. 1,50 m Buah 68,000.00
26 Three Colour Btg 46,000.00
27 Mesin Las Unit 17,000,000.00
28 Bor Listrik Unit 1,132,000.00
29 Mesin Pemotong Besi Bh 1,132,000.00
30 KWH Listrik Kwh 1,600.00
31 Mata Bor Bh 57,000.00
32 Pelicin/Lubrican Kg 120,000.00
33 Alat Bantu Penyetelan (Trucker) Set 114,000.00
34 Alat batu pekerja Ls 12,000.00
35 Blower Bh 550,000.00
36 Excause Van Bh 550,000.00
37 Passbox Bh 24,600,000.00

1 Pengeboran air + Pipa Casing Ø 6'' m 1,120,000.00


2 Pengeboran air + Pipa Casing Ø 4'' m 850,000.00
3 Pengeboran air + Pipa Casing Ø 3'' m 400,000.00
4 Pengeboran air + Pipa Casing Ø 2.5'' m 200,000.00
5 Mesin disel 6.5 . HP + Pompa Ebara ØINT 3'' OUT 3'' Unit 28,800,000.00
6 Mesin Pompa air 5 . HP Pompa ØINT OUT 2'' Unit 8,700,000.00
7 Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' - 30 Complit Unit 25,905,000.00
8 Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''- 20 Complit Unit 23,350,000.00
9 Mesin pompa air 5 . PK /type Hoda Unit 7,351,000.00
10 Mesin pompa air 8 . PK /type Hoda Unit 9,400,000.00
11 Slang Veleksibel Ø2.'' m 42,000.00
12 Slang Veleksibel Ø2.5.'' m 60,000.00
13 Slang Veleksibel Ø3.'' m 77,000.00
14 Mesin Jet Pump Kap. 250 watt Unit 3,700,000.00
15 Mesin Pompa Tekan Kap. 150 watt Unit 1,130,000.00
16 Sand Filter 520 ltr/mnt, (31.2 m3/jam), 2Hp - 3Hp, V 900 watt Unit 15,110,000.00
17 Sand Filter, (24.9 m3/jam), 2Hp - 3Hp, V 800 watt Unit 13,200,000.00

1 Tulisan Papan Nama, (Staenlis) - t = 1 cm + Pemasangan cm 18,000.00


2 Tulisan Papan Nama, (Galvanil) - t = 1 cm + Pemasangan cm 13,000.00
3 Tulisan Papan Nama, (Fiber) - t = 1 cm cm 8,000.00
4 Tulisan Papan Nama/ Logo, (Akrilik + lampu LED) - t = 1 cm cm 22,500.00

1 Genzet Outomatis zellent complit asisories 50 PK + pemasangan Unit 203,600,000.00


2 Pompa Ebara ØINT 3'' OUT 3'' Bh 8,660,000.00
3 Sewa Molen Kpst 0.3 m3 Hari 283,000.00
4 Mobilisasi Alat berat Km 283,000.00
5 Alat Berat Galian dan keprasan Jam 680,000.00
6 Alat berat Pemadatan Jam 630,000.00
7 Penatahalaman dan pembuatan taman + Bunga m2 170,000.00
8 Contaner ( tong sampah ). 2.5 X 3 x 1.5 m Bh 29,100,000.00
9 Alat bantu (Sewa Cren Kpst 7 ton) Hari 14,200,000.00
10 Mesin kompresor Bh 2,500,000.00

HARGA BAHAN MATERIAL TIDAK BERTEKANAN

Bahan Pipa
1 Pipa PVC ½" m 7,400.00
2 ¾" m 9,000.00
3 1" m 11,400.00
4 1 1/4" m 18,400.00
5 1½" m 23,900.00
6 2" m 35,500.00
7 2,5" m 45,600.00
8 3" m 65,100.00
9 4" m 94,900.00
10 5" m 149,800.00
11 6" m 197,900.00
12 8" m 307,900.00
13 10" m 437,500.00
14 12" m 625,100.00
15 14" m 879,500.00
16 16" m 1,099,400.00

1 Pipa GI 1/2" m 24,500.00


2 3/4" m 31,500.00
3 1" m 48,300.00
4 1 1/4" m 63,800.00
5 1½" m 73,200.00
6 2" m 100,000.00
7 2½" m 127,500.00
8 3" m 164,500.00
9 4" m 238,200.00
10 5" m 320,700.00
11 6" m 381,700.00
12 8" m 676,300.00

HARGA BAHAN MATERIAL BERTEKANAN

Bahan Pipa
1 Pipa PVC ½" m 9,000.00
2 ¾" m 16,600.00
3 1" m 20,600.00
4 1 1/4" m 23,100.00
5 1½" m 30,900.00
6 2" m 45,200.00
7 2,5" m 66,200.00
8 3" m 91,500.00
9 4" m 133,400.00
10 6" m 281,200.00
11 8" m 457,600.00
12 10" m 736,500.00

1 Pipa GI Medium 1/2" m 34,300.00


2 3/4" m 43,100.00
3 1" m 70,600.00
4 1 1/4" m 98,200.00
5 1½" m 112,500.00
6 2" m 120,300.00
7 2½" m 166,600.00
8 3" m 198,500.00
9 4" m 280,100.00
10 6" m 446,600.00
11 8" m 689,200.00

1 Pipa HDPE 1/2" m 8,900.00


2 1" m 19,900.00
3 1½" m 43,100.00
4 2" m 59,600.00
5 2.5" m 94,900.00
6 3" m 136,800.00
7 4" m 204,100.00
8 6" m 427,800.00
9 8" m 496,200.00

Jenis Barang
1 Flange Socket PVC 1,5" Bh 151,100.00
2 2" Bh 195,200.00
3 3" Bh 279,000.00
4 4" Bh 322,000.00
5 6" Bh 743,100.00
6 8" Bh 1,306,600.00
7 10" Bh 2,930,500.00
8 12" Bh 5,645,900.00

1 Flange Spigot PVC 1,5" Bh 139,000.00


2 2" Bh 195,200.00
3 2,5" Bh 243,600.00
4 3" Bh 279,000.00
5 4" Bh 322,000.00
6 6" Bh 637,300.00
7 8" Bh 1,110,300.00
8 10" Bh 2,690,100.00
9 12" Bh 5,315,100.00

1 Bend PVC RR/SP/S-12,5 1"x90° Bh 60,700.00


2 Bend PVC RR/SP/S-12,6 3/4"x90° Bh 57,330.00
3 ½"x90° Bh 54,000.00
4 Bend PVC RR/SP/S-12,5 1½"x90° Bh 80,600.00
5 2"x90° Bh 119,000.00
6 3"x90° Bh 196,300.00
7 4"x90° Bh 278,900.00
8 6"x90° Bh 584,400.00
9 8"x90° Bh 1,051,800.00
10 10"x90° Bh 1,851,200.00
11 12"x90° Bh 3,202,900.00

1 Bend PVC RR/SP/S-12,5 1,5"x45° Bh 90,400.00


2 2"x45° Bh 103,700.00
3 3"x45° Bh 175,400.00
4 4"x45° Bh 245,900.00
5 6"x45° Bh 531,400.00
6 8"x45° Bh 908,500.00
7 10"x45° Bh 1,689,000.00
8 12"x45° Bh 2,890,800.00

1 Bend PVC RR/SP/S-12,5 2"x22,5° Bh 90,400.00


2 3"x22,5° Bh 162,200.00
3 4"x22,5° Bh 227,200.00
4 6"x22,5° Bh 441,000.00
5 8"x22,5° Bh 765,100.00
6 10"x22,5° Bh 1,396,900.00
7 12"x22,5° Bh 2,332,900.00

1 Bend GI All Flange 1½"x45° Bh 283,400.00


2 2"x45° Bh 331,800.00
3 2,5"x45° Bh 367,200.00
4 3"x45° Bh 391,500.00
5 4"x45° Bh 523,800.00
6 6"x45° Bh 841,300.00
7 8"x45° Bh 1,303,200.00

1 Bend GI All Flange 1½"x90° Bh 321,900.00


2 2"x90° Bh 350,600.00
3 2,5"x90° Bh 385,900.00
4 3"x90° Bh 406,900.00
5 4"x90° Bh 549,000.00
6 6"x90° Bh 887,600.00
7 8"x90° Bh 1,388,100.00

1 Bend GI All Flange 1½"x22,5° Bh 244,800.00


2 2"x22,5° Bh 314,300.00
3 2,5"x22,5° Bh 356,200.00
4 3"x22,5° Bh 375,900.00
5 4"x22,5° Bh 497,300.00
6 6"x22,5° Bh 793,800.00
7 8"x22,5° Bh 1,217,200.00
1 Bend Drat GI 1½"x45° Bh 283,400.00
2 2"x45° Bh 331,800.00
3 2,5"x45° Bh 361,600.00
4 3"x45° Bh 391,400.00
5 4"x45° Bh 523,700.00
6 6"x45° Bh 841,300.00
7 8"x45° Bh 1,302,000.00

1 Bend Drat GI 3/4"x90° Bh 8,300.00


2 1"x90° Bh 216,100.00
3 Bend Drat GI/Knee GI ½"x90° Bh 4,900.00
4 Long Bend Female dan Male GI ½"x90° Bh 6,100.00
5 Bend Drat GI 1½"x90° Bh 263,600.00
6 2"x90° Bh 306,500.00
7 2,5"x90° Bh 350,600.00
8 3"x90° Bh 406,900.00
9 4"x90° Bh 549,000.00
10 6"x90° Bh 887,600.00
11 8"x90° Bh 1,388,100.00

1 Sock Drat GI ½" Bh 6,600.00


2 ¾" Bh 7,200.00
3 1" Bh 9,900.00
4 1½" Bh 19,800.00
5 2" Bh 27,600.00
6 2½" Bh 50,700.00
7 3" Bh 73,900.00
8 4" Bh 123,500.00
9 6" Bh 379,300.00
10 8" Bh 663,700.00

1 Sock PVC Drat Luar ½" Bh 5,600.00


2 ¾" Bh 8,300.00
3 1" Bh 13,200.00
4 1½" Bh 18,800.00
5 2" Bh 25,300.00
6 2½" Bh 50,700.00
7 3" Bh 70,600.00
8 4" Bh 89,300.00
9 6" Bh 173,200.00
10 8" Bh 347,300.00

1 Tee All Socket PVC / RR 1"x½" Bh 40,800.00


2 1"x1" Bh 82,700.00
3 1½"x½" Bh 87,200.00
4 1½"x3/4" Bh 101,400.00
5 1½"x1" Bh 129,000.00
6 1½"x1½" Bh 170,900.00
7 2"x 1" Bh 198,500.00
8 2"x2" Bh 213,900.00
9 3"x1" Bh 255,800.00
10 3"x2" Bh 297,700.00
11 3"x3" Bh 370,400.00
12 4"x2" Bh 454,200.00
13 4"x3" Bh 520,400.00
14 4"x4" Bh 565,600.00
15 6"x2" Bh 714,400.00
16 6"x3" Bh 812,600.00
17 6"x4" Bh 871,000.00
18 6"x6" Bh 1,051,800.00
19 8"x3" Bh 1,851,200.00
20 8"x4" Bh 1,779,400.00
21 8"x6" Bh 2,176,300.00
22 8"x8" Bh 2,403,500.00
23 10"x6" Bh 6,186,200.00
24 10"x8" Bh 7,238,000.00
25 10"x10" Bh 8,085,800.00

1 Reduser All Socket PVC / RR 1½"x1" Bh 91,600.00


2 ½"x1" Bh 40,900.00
3 1" x 3/4" Bh 45,200.00
4 1" x 1 1/4" Bh 54,100.00
5 2"x1" Bh 110,300.00
6 2"x1½" Bh 129,000.00
7 2"x2" Bh 167,600.00
8 3"x1" Bh 171,000.00
9 3"x2" Bh 180,800.00
10 4"x2" Bh 285,600.00
11 4"x3" Bh 292,200.00
12 6"x2" Bh 454,300.00
13 6"x3" Bh 462,000.00
14 6"x4" Bh 531,400.00
15 8"x3" Bh 1,058,400.00
16 8"x4" Bh 1,006,600.00
17 8"x6" Bh 948,200.00
18 10"x6" Bh 1,584,300.00
19 10"x8" Bh 1,428,800.00
20 12"x10" Bh 5,944,700.00

1 Dop GI ½" Bh 6,300.00


2 1" Bh 17,600.00
3 1½" Bh 28,700.00
4 2" Bh 87,200.00
5 3" Bh 175,400.00
6 4" Bh 216,100.00

1 Gilbout Joint CI 2" Bh 162,100.00


2 3" Bh 200,700.00
3 4" Bh 292,200.00
4 6" Bh 492,900.00
5 8" Bh 940,500.00
6 10" Bh 1,084,900.00
7 12" Bh 1,493,900.00
8 14" Bh 2,209,400.00
9 16" Bh 2,435,500.00

1 Flange Las 2" Bh 83,800.00


2 2,5" Bh 91,600.00
3 3" Bh 97,000.00
4 4" Bh 122,400.00
5 6" Bh 207,300.00
6 8" Bh 195,200.00
7 10" Bh 454,200.00
8 12" Bh 492,900.00
9 16" Bh 973,600.00

1 Gate Valve CI 1½" Bh 549,000.00


2 2" Bh 726,600.00
3 2,5" Bh 952,600.00
4 3" Bh 1,098,100.00
5 4" Bh 1,461,900.00
6 6" Bh 2,435,500.00
7 8" Bh 4,235,800.00
8 10" Bh 6,075,900.00
9 12" Bh 8,673,400.00
10 16" Bh 1,949,200.00

1 Clamp Sadel CI 1½"x½" Bh 35,300.00


2 2"x ½" Bh 60,700.00
3 2"x 3/4" Bh 63,900.00
4 2"x 1" Bh 66,200.00
5 3"x ½" Bh 70,600.00
6 4"x ½" Bh 81,600.00
7 4"x 2" Bh 110,300.00
8 6"x½" Bh 130,100.00
9 6"x 1" Bh 136,700.00
10 6"x 2" Bh 151,100.00
11 8"x 2" Bh 759,700.00
12 8"x 3" Bh 841,300.00

1 Hidran Umum Fiberglass 1000 lt Bh 6,195,000.00


2 2000 lt Bh 9,154,100.00
3 3000 lt Bh 12,252,100.00

1 Profile Tank 2200 lt Bh 5,847,600.00

1 Water Meter 1/2" Bh 368,200.00


2 3/4" Bh 584,300.00
3 1" Bh 1,104,700.00
4 2" Bh 1,657,110.00
5 3" Bh 2,313,000.00
6 4" Bh 2,963,500.00
7 6" Bh 3,768,300.00

1 Manometer 1/2" Bh 262,400.00

1 Stop Kran 1/2" Bh 62,900.00


2 3/4" Bh 98,200.00
3 1" Bh 243,600.00
4 1½" Bh 437,700.00
5 2" Bh 643,900.00
6 3" Bh 1,036,400.00
7 4" Bh 1,357,500.00
8 6" Bh 2,058,400.00

1 Streetbox 2" Bh 110,300.00


2 3" Bh 110,300.00
3 4" Bh 145,500.00
4 6" Bh 145,500.00
5 8" Bh 262,400.00

1 Chek Valve 1,5" Bh 379,300.00


2 2" Bh 642,800.00
3 2,5" Bh 928,300.00
4 3" Bh 1,110,300.00
5 4" Bh 1,695,600.00
6 6" Bh 3,099,200.00
7 8" Bh 3,800,400.00

1 Valve socket 1 1/4" Bh 74,900.00


2 1" Bh 63,900.00
3 2" Bh 87,200.00

1 Singel Air Valve ½" Bh 391,600.00


2 ¾" Bh 585,500.00
3 1" Bh 778,400.00
4 2" Bh 1,271,200.00
5 3" Bh 1,728,700.00

1 Tee GI All Flange 1½"x¾" Bh 153,300.00


2 1½"x1" Bh 186,400.00
3 1½"x1½" Bh 218,300.00
4 2"x1½" Bh 270,200.00
5 2"x2" Bh 379,300.00
6 2½"x2" Bh 407,900.00
7 2½"x2½" Bh 44,000.00
8 3"x2" Bh 453,200.00
9 3"x3" Bh 500,500.00
10 4"x2" Bh 531,400.00
11 4"x3" Bh 589,900.00
12 4"x4" Bh 647,200.00
13 6"x2" Bh 729,900.00
14 6"x3" Bh 822,500.00
15 6"x4" Bh 951,500.00
16 6"x6" Bh 1,001,100.00
17 8"x3" Bh 1,269,000.00
18 8"x4" Bh 1,328,600.00
19 8"x6" Bh 1,380,300.00
20 8"x8" Bh 1,563,300.00
21 Tee GI 1/2" x 1/2" Bh 5,600.00
22 1" x 1/2" Bh 26,500.00
23 1" x 1 " Bh 63,900.00
24 1,5" x 1,5 " Bh 87,200.00
25 2" x 2" Bh 104,800.00

1 Packing Rubber 8" Bh 111,300.00


2 6" Bh 86,000.00
3 4" Bh 59,500.00
4 3" Bh 39,700.00
5 2,5" Bh 34,200.00
6 2" Bh 24,300.00
7 1,5" Bh 17,600.00

1 Socket PVC ½" Bh 17,700.00


2 1" Bh 18,300.00
3 1½" Bh 19,300.00
4 2" Bh 25,600.00
5 2½" Bh 39,900.00
6 3" Bh 54,200.00
7 4" Bh 90,200.00
8 6" Bh 175,400.00
9 8" Bh 521,200.00

1 Socket PVC Drat Dalam ½" Bh 17,200.00


2 1" Bh 17,700.00
3 1½" Bh 18,800.00
4 2" Bh 25,400.00
5 2½" Bh 39,700.00
6 3" Bh 54,100.00
7 4" Bh 89,300.00
8 6" Bh 175,400.00
9 8" Bh 520,400.00

1 Dop PVC 1" Bh 18,800.00


2 1½" Bh 28,700.00
3 2" Bh 38,700.00
4 3" Bh 61,800.00
5 4" Bh 97,000.00
6 6" Bh 187,500.00
7 8" Bh 559,000.00

1 Stud Flange 1,5" Bh 109,200.00


2 2" Bh 124,700.00
3 3" Bh 141,200.00
4 4" Bh 156,600.00
5 6" Bh 365,000.00
6 8" Bh 726,600.00

1 Reduser HDPE 2" x 1" Bh 113,600.00


2 2" x 1.5" Bh 145,600.00
3 3" x 2" Bh 221,600.00
4 3" x 1,5" Bh 186,400.00
5 2" x 4" Bh 372,700.00
6 4" x 3" Bh 432,200.00
7 6" x 2" Bh 751,900.00
8 6" x 3" Bh 600,900.00
9 6" x 4" Bh 526,000.00

1 Tee Coupling HDPE 1,5" x 1" Bh 333,000.00


2 1" x 1" Bh 169,800.00
3 1" x 1/2" Bh 164,400.00

1 Tee HDPE 1,5" x 1,5" Bh 306,500.00


2 2" x 1" Bh 362,800.00
3 2" x 1,5" Bh 379,300.00
4 2" x 2" Bh 395,900.00
5 2" x 3" Bh 428,900.00
6 2" x 4" Bh 568,900.00
7 3" x 4" Bh 656,000.00
8 3" x 3" Bh 446,600.00
9 4" x 4" Bh 884,200.00
10 6" x 4" Bh 1,011,100.00
11 6" x 3" Bh 761,900.00
12 8" x 2" Bh 2,251,300.00

1 Reduser GI 1,5" x 2" Bh 168,700.00


2 2" x 3" Bh 198,500.00
3 2,5" x 2" Bh 232,700.00
4 2,5" x 3" Bh 262,400.00
5 2" x 4" Bh 314,300.00
6 3" x 4" Bh 320,900.00
7 4" x 6" Bh 584,400.00
8 1 1/2" x 1 1/4 Bh 175,400.00
9 1 1/2" x 1 Bh 140,000.00

1 Bend HDPE 1,5"x90° Bh 118,000.00


2 2"x90° Bh 180,800.00
3 3"x90° Bh 285,600.00
4 4"x90° Bh 650,500.00
5 6"x90° Bh 890,800.00
6 8"x90° Bh 2,038,600.00

1 Bend HDPE 1,5"x45° Bh 93,800.00


2 2"x45° Bh 163,200.00
3 3"x45° Bh 270,200.00
4 4"x45° Bh 625,200.00
5 6"x45° Bh 844,500.00
6 8"x45° Bh 1,953,700.00

1 Dop HDPE 1" Bh 113,600.00


2 1,5" Bh 180,800.00
3 2" Bh 212,900.00
4 3" Bh 38,700.00
5 4" Bh 413,500.00
6 6" Bh 744,300.00

1 Konektor HDPE 1" Bh 116,900.00


2 1,5" Bh 186,400.00
3 2" Bh 233,800.00
4 3" Bh 350,600.00
5 4" Bh 467,500.00

1 Male Elbow HDPE 2" Bh 178,600.00

1 Male Adaptor HDPE (Drat Luar) 3" Bh 116,900.00


2 2" Bh 111,300.00
3 1,5" Bh 85,000.00
4 1" Bh 60,700.00
5 1/2" Bh 47,500.00
1 Female Adaptor HDPE (Drat Dalam) 3" Bh 130,100.00
2 2" Bh 124,700.00
3 1,5" Bh 92,700.00
4 1" Bh 68,400.00
5 1/2" Bh 55,200.00

1 Pengadaan pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Pha Unit 49,124,000.00
2 Pengadaan pompa Submersible type Centrifugal kapasitas 5 Ltr/Dtk, H 120, 3 Pha Unit 63,862,000.00
3 Kontrol Panel Auto Unit 10,220,000.00
4 Pengadaan Kabel NYYHY Ø 4 x 2,5 mm m 48,500.00
5 Pengadaan Kabel NYYHY Ø 3 x 0,75 mm m 34,300.00
6 Pengadaan Water Level Control (WLC) Bh 46,300.00
7 Pengadaan Cord Holder (Pengikat Kabel) Bungkus 100,400.00
8 Pengadaan Pipa Pelindung Kabel m 34,300.00
9 Pemasangan dan Set Up Pompa Set 3,974,600.00
10 Kawat Sling 12 mm m 30,900.00
11 8 mm m 24,300.00
12 6 mm m 23,100.00
13 Pemasangan Kawat Sling 12 mm m 9,900.00
14 8 mm m 8,800.00
15 6 mm m 6,600.00
16 Stelan seling 12 mm Bh 590,900.00
17 8 mm Bh 420,000.00
18 6 mm Bh 151,100.00
19 Pengunci seling 12 mm Bh 79,400.00
20 8 mm Bh 57,400.00
21 6 mm Bh 36,500.00
22 Angker Besi 22 mm Bh 23,100.00
23 Pekerjaan Snai Pipa Bh 6,100.00
24 Coupling GI 1/2" Bh 13,300.00

1 Verlop Ring water Tank Ø 2" 3/4" x 1/2" Bh 68,400.00


2 1" x 3/4" Bh 97,000.00
3 1,5" x 1" Bh 132,300.00

1 Double Nepel GI 3" Bh 54,100.00


2 2,5" Bh 37,500.00
3 2" Bh 32,000.00
4 1,5" Bh 28,700.00
5 1" Bh 23,100.00
6 1/2" Bh 19,900.00
7 Water Mur 1,5" Bh 99,300.00
8 Double Nepel PVC 1/2" Bh 7,200.00
9 Knee PVC drat dalam 1/2" Bh 10,500.00
10 Knee PVC 1/2" Bh 5,600.00
11 Tap Kran Bh 34,300.00
12 Plugh Kran 1/2" 1/2" Bh 72,800.00
13 Box Water Meter Bh 71,800.00
14 Pemasangan Meteran Air 1/2" Unit 28,700.00
DAFTAR HARGA SATUAN PEKERJAAN
KABUPATEN DOMPU
TAHUN ANGGARAN 2023

HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5

I 1. 1.1.1. HARGA SATUAN PEKERJAAN PERSIAPAN


1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m² 1. 1.1.1.1. 366,531.00
2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m² 1. 1.1.1.2. 535,381.00
3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m² 1. 1.1.1.3. 96,866.00
4 Pengukuran dan pemasangan 1 m’ Bouwplank m' 1. 1.1.1.4. 96,261.00
5 Pembuatan 1 m2 kantor sementara lantai plesteran m² 1. 1.1.1.5. 1,953,919.00
6 Pembuatan 1 m2 rumah jaga (konstruksi kayu ) m² 1. 1.1.1.6. 1,574,320.00
7 Pembuatan 1 m2 gudang semen dan peralatan m² 1. 1.1.1.7. 1,562,110.00
8 Pembuatan 1 m2 bedeng pekerja m² 1. 1.1.1.8. 1,657,975.00
9 Pembersihan 1 m2 lapangan dan perataan m² 1. 1.1.1.9. 177,650.00
10 Pembuatan 1 m2 steger/perancah dari bambu m² 1. 1.1.1.10. -
11 Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm bh 1. 1.1.1.11. 205,744.00
12 Pembuatan 1 m2 jalan sementara m² 1. 1.1.1.12. 231,935.00
13 Pembongkaran 1 m3 beton bertulang m³ 1. 1.1.1.13. 1,184,304.00
14 Pembongkaran 1 m3 dinding tembok bata m³ 1. 1.1.1.14. 118,430.40
15 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm m² 1. 1.1.1.15. 22,526.02
16 Pemasangan 1 m2 panel beton pracetak 5x50x213 cm m² 1.1.1.1.16. -

1 1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm bh SNI.3 249,150.00


2 1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m m² SNI.4b 407,693.00
3 1 m2 Bongkar Usuk + Reng Untuk Dipakai Kembali m² SNI.8 45,980.00
4 1 M2 Pembongkaran Atap Seng Gelombang m² SNI.9 18,271.00

II 1. 1.5.1. HARGA SATUAN PEKERJAAN TANAH


1 Penggalian 1 m3 tanah biasa sedalam 1 m m³ 1. 1.5.1.1. 130,075.00
2 Penggalian 1 m3 tanah biasa sedalam 2 m m³ 1. 1.5.1.2. 159,885.00
3 Menggali 1 m3 tanah biasa sedalam 3 m m³ 1. 1.5.1.3. 190,201.00
4 Menggali 1 m3 tanah keras sedalam 1 m m³ 1. 1.5.1.4. 173,096.00
5 Menggali 1 m3 tanah cadas sedalam 1 m m³ 1. 1.5.1.5. 262,680.00
6 Menggali 1 m3 tanah lumpur sedalam 1 m m³ 1. 1.5.1.6. 209,385.00
7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter m² 1. 1.5.1.7. 9,515.00
8 Pembuangan 1 m3 tanah sejauh 30 meter m³ 1. 1.5.1.8. 56,980.00
9 Pengurugan kembali 1 m3 galian tanah m³ 1. 1.5.1.9. 43,358.33
10 Pemadatan tanah 1 m3 tanah ( per 20 cm) m³ 1. 1.5.1.10. 95,150.00
11 Pengurugan 1 m3 dengan pasir urug m³ 1. 1.5.1.11. 309,430.00
12 Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL m³ 1. 1.5.1.12. 406,333.40
13 Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan m² 1. 1.5.1.13. 219,945.00
14 Pengurugan 1 m3 sirtu padat m³ 1. 1.5.1.14. 364,375.00
15 Pengurugan 1 m3 tanah padat m³ 1. 1.5.1.15. 301,015.00

1 1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat m³ SNI.10.b 137,555.00
berat
2 1 M3 Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat m³ SNI.11.b 167,365.00

3 1 M3 Galian Tanah Biasa sedalam 3 M' m³ SNI.12 190,201.00


4 1 M3 Urugan Tanah Biasa tampa pemadatan m³ SNI.20 207,295.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
5 1 M3 Urug dengan pasir urug m³ SNI.21 309,430.00

III 3. 3.1.1. HARGA SATUAN PEKERJAAN PONDASI


1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m³ 3. 3.1.1.1. 1,263,377.50
2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m³ 3. 3.1.1.2. 1,199,110.00
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m³ 3. 3.1.1.3. 1,154,560.00
4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m³ 3. 3.1.1.4. 1,123,237.50
5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP m³ 3. 3.1.1.5. 1,080,310.00
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP m³ 3. 3.1.1.6. 851,189.90
7 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP m³ 3. 3.1.1.7. 1,002,410.20
8 Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP m³ 3. 3.1.1.8. 972,577.10
9 Pemasangan 1 m3 batu kosong (anstamping) m³ 3. 3.1.1.9. 646,008.00
10 Pemasangan 1 m3 pondasi sumuran, diameter 100 cm m³ 3. 3.1.1.10. 3,993,517.00
11 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr m³ 3. 3.1.1.11. 1,512,874.00
dan 40% batu belah

1 1 M2 Pasangan Dinding bata berongga / roster (10 x 20) SNI.27 617,540.00

IV 4. 4.1.1. HARGA SATUAN PEKERJAAN BETON


1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.1. 2,266,091.93
0,87
2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.2. 2,315,320.86
0,87
3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.3. 2,352,716.93
0,87
4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) m³ 4. 4.1.1.4. 2,107,588.21
cm, w/c = 0,87
5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.5. 2,398,268.71
0,87
6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.6. 2,439,789.79
0,87
7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.7. 2,474,035.14
0,87
8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.8. 2,492,711.57
0,87
9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.9. 2,525,185.14
0,87
10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.10. 2,534,963.36
0,87
11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.11. 2,670,352.14
0,87
12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = m³ 4. 4.1.1.12. 2,683,375.36
0,87
13 Membuat 1 m3 beton kedap air dengan strorox – 100 m³ 4. 4.1.1.13. 1,944,910.00
14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm m' 4. 4.1.1.14. -
15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm m' 4. 4.1.1.15. -
16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm m' 4. 4.1.1.16. -
17 Pembesian 10 kg dengan besi polos atau besi ulir kg 4. 4.1.1.17. 253,858.00
18 Pemasangan 10 kg kabel presstressed polos/strands kg 4. 4.1.1.18. 243,804.00
19 Pemasangan 10 kg jaring kawat baja (wiremesh), 6 mm kg 4. 4.1.1.19. 53,438.00
20 Pemasangan 1 m2 bekisting untuk pondasi m² 4. 4.1.1.20. 278,916.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
21 Pemasangan 1 m2 bekisting untuk sloof (3 x Pakai) m² 4. 4.1.1.21. 97,738.67
22 Pemasangan 1 m2 bekisting untuk kolom (3 x Pakai) m² 4. 4.1.1.22. 151,187.67
23 Pemasangan 1 m2 bekisting untuk balok (3 x Pakai) m² 4. 4.1.1.23. 154,047.67
24 Pemasangan 1 m2 bekisting untuk lantai (3 x Pakai) m² 4. 4.1.1.24. 167,321.00
25 Pemasangan 1 m2 bekisting untuk dinding m² 4. 4.1.1.25. -
26 Pemasangan 1 m2 bekisting untuk tangga m² 4. 4.1.1.26. 423,973.00
27 Pemasangan 1 m2 jembatan untuk pengecoran beton m² 4. 4.1.1.27. 138,523.00
28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) m³ 4. 4.1.1.28. 6,903,061.00
29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) m³ 4. 4.1.1.29. 8,452,323.00
30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) m³ 4. 4.1.1.30. 12,879,603.00
31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) m³ 4. 4.1.1.31. 9,881,498.00
32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) m³ 4. 4.1.1.32. 8,543,260.00
33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m³ 4. 4.1.1.33. 8,331,301.00
34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) m³ 4. 4.1.1.34. 9,344,753.00
35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m' 4. 4.1.1.35. 131,862.50
36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m' 4. 4.1.1.36. 185,476.50

1 1 M3 Membuat Beton Dengan Mutu K-250 SNI.77.a 2,928,805.00


2 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250 SNI.78.a 6,311,415.00

3 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 SNI.79.a 6,787,341.00

4 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250 SNI.80.a 7,011,218.50

5 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250 SNI.81.a 7,606,126.00

6 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250 SNI.82.a 8,795,941.00

7 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 SNI.83.a 9,224,853.00

8 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 SNI.84.a 10,414,668.00

9 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250 SNI.85.a 11,604,483.00

10 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 SNI.86.a 8,524,345.50

11 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 SNI.87.a 9,119,253.00

12 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250 SNI.88.a 10,309,068.00

13 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250 SNI.89.a 8,480,345.50

14 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250 SNI.90.a 9,075,253.00

1 1 M3 Membuat Beton Dengan Mutu K-225 SNI.77.b 2,913,438.00


2 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 SNI.78.b 6,177,066.50

3 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 SNI.79.b 6,771,974.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
4 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225 SNI.80.b 6,995,851.50

5 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225 SNI.81.b 7,590,759.00

6 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225 SNI.82.b 8,780,574.00

7 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 SNI.83.b 9,209,486.00

8 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 SNI.84.b 10,399,301.00

9 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225 SNI.85.b 11,589,116.00

10 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 SNI.86.b 8,508,978.50

11 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 SNI.87.b 9,103,886.00

12 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225 SNI.88.b 10,293,701.00

13 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225 SNI.89.b 8,464,978.50

14 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225 SNI.90.b 9,059,886.00

1 1 M2 Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm) SNI.151 1,039,962.00


2 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr SNI.152 2,239,430.60
3 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr SNI.153 2,255,764.50
4 1 M2 Pekerjaan Bekisting Sloof SNI.155.a 293,216.00
5 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.156 5,650,760.50
Ps : 3 Kr
6 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.157 5,138,353.00
Ps : 3 Kr
7 1 M3 Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.158 5,035,871.50
Ps : 3 Kr
8 1 M3 Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.159 4,625,945.50
Ps : 3 Kr
9 1 M2 Pekerjaan Bekisting Kolom SNI.160.a 476,663.00
10 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.162 6,757,080.00
Ps : 3 Kr
11 1 M3 Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.163 7,632,295.00
Ps : 3 Kr
12 1 M2 Pekerjaan Bekisting Lantai SNI.163.a 525,063.00
13 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.164 7,119,887.50
Ps : 3 Kr
14 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.164.a2lp 3,794,312.50
Ps : 3 Kr
15 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr SNI.164.b1lp 3,616,938.60

16 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.164.c1lp 3,039,933.60


Ps : 3 Kr
17 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.164.1lp.a 5,164,555.00
Ps : 3 Kr
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
18 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.164.1lp.b 4,652,147.50
Ps : 3 Kr
19 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.165 8,188,702.50
Ps : 3 Kr
20 1 M2 Pekerjaan Bekisting Balok SNI.165.a 489,863.00
21 1 M3 Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.166 7,676,295.00
Ps : 3 Kr
22 1 M3 Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.167 7,163,887.50
Ps : 3 Kr
23 1 M3 Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.168 6,651,480.00
Ps : 3 Kr
24 1 M3 Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.169 6,344,035.50
Ps : 3 Kr
25 1 M3 Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 SNI.170 6,998,887.50
Ps : 3 Kr
26 1 M2 Pek Bekisting Dinding Plat SNI.170.a 482,163.00
27 1 M3 Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 SNI.171 7,676,295.00
Kr
28 10 Kg Pembesian dengan Besi Polos SNI.173.1 21,920.80
29 10 Kg Pembesian dengan Besi Ulir SNI.173.2 25,385.80
30 Memasang 1 M2 Jaring Kawat Baja / Wiremesh 6 mm SNI.173.3a 53,438.00
31 Memasang 1 M2 Jaring Kawat Baja / Wiremesh 8 mm SNI.173.3b 85,976.00
32 Memasang 1 M2 Jaring Kawat Baja / Wiremesh 10 mm SNI.173.3c 129,734.00
33 Memasang 1 M Plat lantai sistem Bondex 0.65 mm SNI.173.4a 343,431.00
34 Memasang 1 M Plat lantai sistem Bondex 0.70 mm SNI.173.4b 354,761.00
35 Memasang 1 M Plat lantai sistem Bondex 0.75 mm SNI.173.4c 366,091.00
36 Memasang 1 M Plat lantai sistem Bondex 100 mm SNI.173.4d 456,731.00

4.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) m² 4.4.1.2.1. 192,321.80
slump (12 ± 2) cm
2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) m² 4.4.1.2.2. 240,443.50
slump (12 ± 2) cm
3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) m² 4.4.1.2.3. 275,266.20
slump (12 ± 2) cm
4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) m² 4.4.1.2.4. 360,665.25
slump (12 ± 2) cm
5 Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai) m² 4.4.1.2.5. -
6 Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai) m² 4.4.1.2.6. -

7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) m² 4.4.1.2.7. -

8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak bh 4.4.1.2.8. 13,772.00

9 Pemasangan dan membuka bekisting 1 buah komponen balok beton bh 4.4.1.2.9. 22,220.00
pracetak
10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton bh 4.4.1.2.10. 17,996.00
pracetak
11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak bh 4.4.1.2.11. -
12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak bh 4.4.1.2.12. -
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak bh 4.4.1.2.13. -

14 Mendirikan 1 buah komponen plat pracetak bh 4.4.1.2.14. -


15 Mendirikan 1 buah komponen balok pracetak bh 4.4.1.2.15. -
16 Mendirikan 1 buah komponen kolom pracetak bh 4.4.1.2.16. -
17 Melangsir 1 buah komponen plat pracetak ( ± 20 m) bh 4.4.1.2.17. -
18 Melangsir 1 buah komponen balok pracetak ( ± 20 m) bh 4.4.1.2.18. -
19 Melangsir 1 buah komponen kolom pracetak ( ± 20 m) bh 4.4.1.2.19. -
20 Bahan 1 m3 grouting campuran m³ 4.4.1.2.20. -
21 Bahan 1 m3 grouting tidak campuran m³ 4.4.1.2.21. -
22 Upah melakukan 1 titik grouting pada join pracetak ttk 4.4.1.2.22. 104,786.00
23 Pemasangan 1 titik Bekisting join pracetak ttk 4.4.1.2.23. 113,929.20
24 Upah 1 titik Join dengan Sling ttk 4.4.1.2.24. 140,723.00

V 4.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


1 Pemasangan 1 kg besi profil kg 4.4.2.1.1. 72,787.00
2 Pemasangan 1 kg rangka kuda-kuda baja IWF kg 4.4.2.1.2. 72,787.00
3 Pengerjaan 100 kg pekerjaan perakitan kg 4.4.2.1.3. 96,382.00
4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m² 4.4.2.1.4. 2,258,861.00
5 Pengerjaan 10 cm pengelasan dengan las listrik cm 4.4.2.1.5. 95,998.10
6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm m² 4.4.2.1.6. -
7 Pemasangan 1 m2 pintu rolling door besi m² 4.4.2.1.7. 2,405,678.00
8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC m² 4.4.2.1.8. -
9 Pemasangan 1 m2 sunscreen alluminium m² 4.4.2.1.9. 751,652.00
10 Pemasangan 1 m2 rolling door alluminium m² 4.4.2.1.10. 1,071,950.00
11 Pemasangan 1 m kusen pintu alluminium m' 4.4.2.1.11. 201,511.20
12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m² 4.4.2.1.12. 1,531,003.10
13 Pemasangan 1 m2 pintu kaca rangka alluminium m² 4.4.2.1.13. -
14 Pemasangan 1 m2 venetions blinds dan Vertical blinds m² 4.4.2.1.14. -
15 Pemasangan 1 m2 terali besi strip (2 x 3) mm m² 4.4.2.1.15. 1,150,451.34
16 Pemasangan 1 m2 kawat nyamuk m² 4.4.2.1.16. 242,681.88
17 Pemasangan 1 m2 jendela nako & tralis m² 4.4.2.1.17. 455,323.00
18 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m' 4.4.2.1.18. 257,262.50
19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m' 4.4.2.1.19. 189,689.50
20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, m² 4.4.2.1.20. 585,262.33
dinding partisi
21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, m² 4.4.2.1.21. 695,335.67
plafon

1 Memasang 1 Kg Rangka Kanal - C SNI.241.a 72,787.00


2 Pasang 1 m Handrail dan Railing SNI.241.b 504,357.70
3 Pasang 1 m Galvanis Steel 3/4" SNI.241.c 119,247.70
4 Pasang 1 m Railing Stainless SNI.241.d 919,002.70
5 Pasang 1 m Tangga Hollow 5x5 cm SNI.241.e 368,287.70
6 1 m2 Pasang Syntetic Grass SNI.241.1 38,720.00
7 1 m Pasang WPC 5x5 cm SNI.241.2 159,720.00
8 1 m Pasang WPC 10x5 cm SNI.241.3 278,300.00
9 1 m Pasang WPC 15x5 cm SNI.241.4 423,500.00
10 1 m Pasang WPC 20x5 cm SNI.241.5 586,850.00
11 1 m Pasang WPC Panel W15 x H2,5 cm SNI.241.6 694,540.00
12 1 m2 Pasang Floor hardener 3 Kg/m2 SNI.241.7 166,320.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
13 1 m2 Pasang Efoxy waterbased flooring non slip anti abrasion SNI.241.8 304,920.00
14 1 m2 Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm SNI.241.9 606,320.00

15 1 m2 Pasang Floor hardener 7 Kg/m2 + grove line 2 cm SNI.241.10 295,020.00


16 Pasang GRC Rosters 300x300x150 SNI.241.11 334,264.15
17 Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu SNI.241.12 1,518,308.00
18 Memasang 1 m kusen pintu alluminium Natural SNI.247 183,373.85
19 Memasang 1 m2 Dinding kusen alluminium Natural + Kaca polos 8 mm SNI.247.a 787,525.75

20 Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, SNI.247.b 1,755,525.75
polos
21 Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, SNI.247.c 1,876,525.75
warna
22 Memasang 1 m kusen pintu alluminium Warna SNI.248 201,523.85
23 Memasang 1 m2 Dinding kusen alluminium Warna + Kaca polos 8 mm SNI.248.a 842,823.85

24 Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, SNI.248.b 1,810,823.85
polos
25 Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, SNI.248.c 1,949,125.75
warna
26 Memasang 1 m2 Besi Hollow + Kaca tempreat 12 mm, warna SNI.248.12 2,389,565.75
27 Memasang 1 m2 Kaca temreat 8 mm, polos SNI.248.T8p 1,247,325.75
28 Memasang 1 m2 Kaca temreat 8 mm, Warna SNI.248.T8w 1,368,325.75
29 Memasang 1 m2 Kaca mati 5 mm, polos SNI.248.5p 243,025.75
30 Memasang 1 m2 Kaca mati 8 mm, polos SNI.248.8p 279,325.75
31 Memasang 1 m2 Kaca mati Riben 5 mm SNI.248.R 236,975.75
32 Memasang 1 m2 Kaca mati Buram/Es 5 mm SNI.248.B/E 297,475.75
33 Pasang 1 Buah Cermin ex. TOTO TS 119 AS5 SNI.249.a 242,299.75
34 Pasang 1 Buah Kaca Laminasi tebal 12 mm SNI.249.b 1,852,809.75
35 Pasang 1 m2 kaca green glass 12 mm SNI.249.c 2,217,644.00
36 Pasang 1 m2 kaca green glass tebal 8 mm SNI.249.d 1,370,644.00
37 Pasang 1 bh Pintu Engineering door / WPC SNI.249.e 456,857.50
38 Pasang 1 bh Pintu Green glass SNI.249.f 554,482.50
39 Pasang 1 bh Pintu siku alumunium powder coating SNI.249.g 109,945.00
40 Pemasangan 1 m1 Kusen plat baja uk. 15x9x0,2 cm SNI.249.1 573,309.00
41 Pemasangan 1 m1 Kusen Steel Frame Hollow Galvanis 150x40x3 mm SNI.249.2 105,039.00
42 Pemasangan 1 m1 Kusen alumunium 4" YKK finishing powder coating SNI.249.3 290,279.00
43 Mengerjakan 1 Unit pintu double UGD type P-01 SNI.249.4a 21,213,291.88
44 Mengerjakan 1 Unit pintu type P-02 SNI.249.4b 5,777,689.28
45 Mengerjakan 1 Unit pintu type P-03 SNI.249.4c 4,624,264.21
46 Mengerjakan 1 Unit pintu type P-04A SNI.249.4d 3,693,069.82
47 Mengerjakan 1 Unit pintu type P-04B SNI.249.4e 3,693,069.82
48 Mengerjakan 1 Unit pintu type P-04C SNI.249.4f 3,567,608.44
49 Mengerjakan 1 Unit pintu type P-05 SNI.249.4g 2,998,939.13
50 Mengerjakan 1 Unit pintu type P-06 SNI.249.4h 3,700,222.24
51 Mengerjakan 1 Unit pintu type P-07 SNI.249.4i 3,712,047.24
52 Mengerjakan 1 Unit pintu type P-08 SNI.249.4j 1,874,186.71
53 Mengerjakan 1 Unit pintu type P-09 SNI.249.4k 4,686,098.42
54 Mengerjakan 1 Unit pintu type P-10 SNI.249.4l 4,494,514.28
55 Mengerjakan 1 Unit pintu type P-11 SNI.249.4m 30,052,254.84
56 Mengerjakan 1 Unit pintu type P-12 SNI.249.4n 4,624,264.21
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
57 Mengerjakan 1 Unit pintu type P-S SNI.249.4o 1,005,667.44
58 Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (natural) SNI.250.N5 1,245,015.75
59 Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (natural) SNI.250.N8 1,245,015.75
60 Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (warna) SNI.250.W5 1,300,015.75
61 Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (warna) SNI.250.W8 1,355,015.75
62 Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (natural) SNI.251.N 1,245,015.75
63 Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (natural) SNI.251.N8 1,245,015.75
64 Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (warna) SNI.251.W 1,300,015.75
65 Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (warna) SNI.251.W8 1,355,015.75
66 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100 SNI.251.75.a 429,632.50
67 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75 SNI.251.75.b 378,086.50
68 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75 SNI.251.75.c 291,005.00
69 1 M2 Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45 SNI.251.75.d 87,081.50
70 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100 SNI.251.80.a 453,062.50
71 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75 SNI.251.80.b 406,202.50
72 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Interior SNI.251.ACP.a 893,942.50
73 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior SNI.251.ACP.b 1,196,442.50
74 1 M2 Rangka dan Penutup Wood Panel Composit (WPC), Exterior SNI.251.ACP.c 808,142.50
75 1 M2 Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C SNI.251.DG 443,630.00
76 1 M2 Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C SNI.251.DC 567,930.00

1 1 M2 Pekerjaan Pasang Kawat Gerawang SNI.210 68,612.50


2 1 M2 Pekerjaan Pasang Jeruji Besi Pintu SNI.211 794,978.25
3 1 M2 Pekerjaan Pasang Kawat Duri SNI.212 292,336.00
4 1 M2 Pekerjaan Pagar besi Hollow (stenlistail) SNI.213 1,618,493.25
5 1 M2 Pekerjaan Pagar besi Hollow SNI.214 749,493.25
6 1 M2 Pekerjaan Pagar/ Dinding besi Hollow 100 x 50 mm SNI.214.1 1,134,493.25
7 1 M2 Pekerjaan Pintu Pagar besi (dia. 16 mm) SNI.214.A 1,410,593.25
8 1 M2 Pekerjaan Pagar besi (dia. 16 mm) SNI.214.B 1,300,593.25

VI 4.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.1. 385,495.00
1SP : 2PP
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.2. 368,489.00
1SP : 3PP
3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.3. 357,016.00
1SP : 4PP
4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.4. 351,109.00
1SP : 5PP
5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.5. 349,140.00
1SP : 6PP
6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran m² 4. 4.4.1.6. 326,274.85
1SP : 3KP : 10PP
7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran m² 4. 4.4.1.7. 187,016.50
1SP : 2PP
8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran m² 4. 4.4.1.8. 178,946.90
1SP : 3PP
9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran m² 4.4.4.1.9. 174,322.50
1SP :4PP
10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran m² 4. 4.4.1.10. 171,414.10
1SP :5PP
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran m² 4. 4.4.1.11. 169,860.90
1SP : 6PP
12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran m² 4. 4.4.1.12. 166,705.00
1SP :8PP
13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran m² 4. 4.4.1.13. 163,064.00
1SP : 3KP :10PP
14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran m² 4. 4.4.1.14. 147,045.80
1SM : 1KP :1PP
15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran m² 4. 4.4.1.15. 149,428.40
1SM : 1KP :2PP
16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP m² 4. 4.4.1.16. 449,255.40
17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP m² 4. 4.4.1.17. 448,813.20
18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP m² 4. 4.4.1.18. 396,876.70
19 Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP cm² 4. 4.4.1.19. 396,306.90
20 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP cm² 4. 4.4.1.20. 365,092.20
21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP cm² 4. 4.4.1.21. 365,366.10
22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran cm² 4. 4.4.1.22. 699,957.50
23 1SP :3PP
Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran cm² 4. 4.4.1.23. 699,957.50
24 1SP :4PP
Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran cm² 4. 4.4.1.24. 1,508,540.00
1SP :3PP
1 1 M2 Pasangan Dinding bata berongga / roster (10 x 20) SNI.27 617,540.00
2 Pemasangan 1 m2 dinding bata ringan tebal 10 X 20 X 60 cm + dengan SNI.29.R 593,291.60
3 mortar
1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 3 PP SNI.30 383,889.00
4 1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 4 PP SNI.31 372,416.00
5 1 M2 Pasangan Dinding Batako 1 Pc : 4 Psr SNI.32 141,968.75
6 1 M2 Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps SNI.33 259,796.90

VII 4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. m² 4.4.4.2.1. 121,392.48
2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. m² 4.4.4.2.2. 112,508.88
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. m² 4.4.4.2.3. 108,673.62
4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m² 4.4.4.2.4. 106,048.80
5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm m² 4.4.4.2.5. 104,569.08
6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m² 4.4.4.2.6. 103,380.42
7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm m² 4.4.4.2.7. 102,730.32
8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm m² 4.4.4.2.8. 102,080.22
9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm m² 4.4.4.2.9. 106,078.50
10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm m² 4.4.4.2.10. 102,663.00
11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm m² 4.4.4.2.11. 94,373.73
12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm m² 4.4.4.2.12. 95,841.79
13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm m² 4.4.4.2.13. 150,600.34
14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm m² 4.4.4.2.14. 120,109.66
15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. m² 4.4.4.2.15. 141,904.40
16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm m² 4.4.4.2.16. 140,013.94
17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm m² 4.4.4.2.17. 138,346.56
18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm m² 4.4.4.2.18. 134,243.23
19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm m² 4.4.4.2.19. 60,602.08
20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm m' 4.4.4.2.20. 112,084.50
21 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm m² 4.4.4.2.21. -
22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm m² 4.4.4.2.22. -
23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m² 4.4.4.2.23. 86,288.40
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
24 Pemasangan 1 m2 finishing siar pasangan bata merah m² 4.4.4.2.24. 50,284.96
25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose m² 4.4.4.2.25. 23,881.00
26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. m² 4.4.4.2.26. 103,265.80
27 Pemasangan 1 m2 acian. m² 4.4.4.2.27. 65,037.50

1 1 M2 Acian halus dengan Pc SNI.34.a 65,037.50


2 1 M2 Plesteran + Acian halus dinding bata ringan/Hebel SNI.34.b 197,483.00
3 1 M2 Plesteran dinding bata ringan/Hebel SNI.34.c 120,648.00
4 1 M2 Plesteran Beton 1 PC : 2 Ps Tebal 15 mm SNI.34.d 114,895.00
5 1 M2 Plesteran Beton 1 PC : 3 Ps Tebal 15 mm SNI.34.e 111,467.40
6 1 M2 Siar Pas batu Kali SNI.35.a 103,265.80
7 1 m2 Finishing Siar pasangan bata merah SNI.35.b 50,284.96

1 Pasang Kanstin Cetak 600x150x250 SNI.41 363,728.75


2 Lapisan Geotextile SNI.41.1 292,600.00
3 Lapisan Drainagecell SNI.41.2 94,710.00
4 Memasang Kitchen Sink 1 Bowl GS 5844 SNI.41.3 2,561,619.50
5 Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My SNI.41.4 5,102,619.50
1 By TEKA
6 Memasang Mirror 100x120 cm SNI.41.5 372,619.50
7 1 m1 Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP SNI.42.a 232,485.00
8 1 m1 Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP SNI.42.b 265,485.00
9 1 m1 Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP SNI.42.c 309,485.00
10 1 m1 Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP SNI.43 362,422.50
11 1 m1 Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP SNI.44 373,422.50
12 1 m1 Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP SNI.45 417,422.50

VIII 4.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP


DINDING
1 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm m² 4.4.4.3.1. 177,075.80
2 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm m² 4.4.4.3.2. 178,215.40
3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm m² 4.4.4.3.3. 186,224.50
4 Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm m² 4.4.4.3.4. 218,216.90
5 Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm m² 4.4.4.3.5. 298,365.10
6 Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm m² 4.4.4.3.6. 510,284.50
7 Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm m² 4.4.4.3.7. 224,051.30
8 Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm m² 4.4.4.3.8. 231,774.40
9 Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm m² 4.4.4.3.9. 649,962.50
10 Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm m² 4.4.4.3.10. 660,044.00
11 Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm m² 4.4.4.3.11. 824,994.50
12 Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm m² 4.4.4.3.12. 836,313.50
13 Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm m² 4.4.4.3.13. 861,151.50
14 Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm m² 4.4.4.3.14. 824,994.50
15 Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm m² 4.4.4.3.15. 836,313.50
16 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm m² 4.4.4.3.16. 52,354.50
17 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m² 4.4.4.3.17. 47,641.00
18 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm m² 4.4.4.3.18. 47,842.30
19 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm m² 4.4.4.3.19. 46,390.30
20 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm m² 4.4.4.3.20. 51,045.50
21 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm m² 4.4.4.3.21. 51,054.30
22 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm m² 4.4.4.3.22. 51,627.95
23 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm m² 4.4.4.3.23. 51,637.30
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
24 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm m² 4.4.4.3.24. 94,196.30
25 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm m² 4.4.4.3.25. 94,146.80
26 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm m² 4.4.4.3.26. 111,158.30
27 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm m² 4.4.4.3.27. 111,620.30
28 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm m² 4.4.4.3.28. 109,046.30
29 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm m² 4.4.4.3.29. 111,686.30
30 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m² 4.4.4.3.30. 111,620.30
31 Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm m² 4.4.4.3.31. -
32 Pemasangan 1m2 lantai keramik artistik 10cm x 20cm m² 4.4.4.3.32. 1,036,087.80
33 Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm m² 4.4.4.3.33. 1,801,412.80
34 Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm m² 4.4.4.3.35.a 424,187.50
35 Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm m² 4.4.4.3.34. 427,248.80
36 Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm m² 4.4.4.3.35. 425,465.70
37 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m² 4.4.4.3.36. 426,915.50
38 Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border m² 4.4.4.3.37. 579,067.50
39 Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm m² 4.4.4.3.38. 1,303,711.75
40 Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm m' 4.4.4.3.39. 122,856.80
41 Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm m' 4.4.4.3.40. 63,803.30
42 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m' 4.4.4.3.41. 53,593.65
43 Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm m' 4.4.4.3.42. -
44 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm m² 4.4.4.3.43. 943,137.80
45 Pemasangan 1 m2 lantai karpet m² 4.4.4.3.44. 120,208.00
46 Pemasangan 1 m2 underlayer (pelapis bawah karpet) m² 4.4.4.3.45. -
47 Pemasangan 1 m2 lantai parquet kayu m² 4.4.4.3.46. 1,397,660.00
48 Pemasangan 1 m2 lantai kayu gymfloor m² 4.4.4.3.47. 1,397,660.00
49 Pemasangan 1 m2 dinding porslen 11cm x 11cm m² 4.4.4.3.48. 478,755.20
50 Pemasangan 1 m2 dinding porslen 10cm x 20cm m² 4.4.4.3.49. 472,461.00
51 Pemasangan 1 m2 dinding porslen 20cm x 20cm m² 4.4.4.3.50. 456,456.00
52 Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm m² 4.4.4.3.51. 495,781.00
53 Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm m² 4.4.4.3.52. 498,256.00
54 Pemasangan 1 m2 dinding keramik 10cm x 20cm m² 4.4.4.3.53. 495,781.00
55 Pemasangan 1 m2 dinding keramik 20cm x 20cm m² 4.4.4.3.54. 482,416.00
56 Pemasangan 1 m2 dinding keramik 30cm x 30cm m² 4.4.4.3.54a. 487,036.00
57 Pemasangan 1 m2 dinding keramik 40cm x 40cm m² 4.4.4.3.54b. 617,593.78
58 Pemasangan 1 m2 dinding marmer 100cm x 100cm m² 4.4.4.3.55. 1,216,339.30
59 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m² 4.4.4.3.56. 435,460.30
60 Pemasangan 1 m2 dinding batu paras m² 4.4.4.3.57. 505,395.00
61 Pemasangan 1 m2 dinding batu tempel hitam m² 4.4.4.3.58. 528,495.00
62 Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm m² 4.4.4.3.59. 846,928.50
63 Pemasangan 1 m2 wallpaper lebar 50 cm m² 4.4.4.3.60. 122,323.67
64 Pemasangan 1m2 floor harderner m² 4.4.4.3.61. 269,434.00
65 Pemasangan 1 m’ plint vynil 15cm x 30cm m² 4.4.4.3.62. 812,196.00
66 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm m² 4.4.4.3.63. 69,443.00
67 Memasang 1 m2 Paving blok tebal 8 cm m² 4.4.4.3.64. 197,120.00

1 1 M2 Pas. Lantai Tegel Abu-abu SNI.46 136,580.40


2 1 M2 Pas. Lantai Granite Kw I SNI.47.a 602,287.40
3 1 M2 Pas. Lantai Granite Kw II SNI.47.b 525,287.40
4 1 M2 Pasangan Lantai Keramik ( KW I Polos ) SNI.48 402,523.00
5 1 M2 Pasangan Lantai Keramik ( KW II Polos ) SNI.49 379,423.00
6 1 M2 Pasangan Lantai Keramik ( KW I Motif ) SNI.50 437,173.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
7 1 M2 Pasangan Lantai Keramik ( KW II Motif ) SNI.51 414,815.50
8 1 M2 Pasangan Lantai Marmer SNI.52 928,023.80
9 1 M2 Pasangan Lantai Keramik Anti Slip SNI.52.a 414,815.50
10 1 M2 Pasangan dinding keramik ( Kw I Motif ) SNI.53 480,876.00
11 1 M2 Pas. Dinding Keramik ( Kw II Motf ) SNI.54 457,776.00
12 1 M2 Pas. Dinding Keramik ( Kw I polos ) SNI.55 469,326.00
13 1 M2 Pas. Dinding Keramik ( Kw II Polos ) SNI.56 292,391.00
14 1 M2 Pas. Lantai Keramik Cating Motif SNI.57.a 386,606.00
15 1 M2 Pas. Lantai Coral Sikat SNI.57.b 317,306.00
16 1 M2 Pas. Lantai Coral Sikat, Warna SNI.57.c 386,606.00
17 1 M2 Pas. Dinding batu paras/Palimanan SNI.58 518,815.00
18 1 M2 Pas. Dinding batu tempel hitam bergaris SNI.59 557,645.00
19 1 M2 Pas. Paving Blok bata . T 8 cm SNI.60.B 288,858.90
20 1 M2 Pas. Paving Blok bata . T 8 cm, Press SNI.60.P 383,293.90
21 1 M2 Pas. Paving Blok bata . T 6 cm SNI.61 272,193.90
22 1 M2 Pas. Paving Blok persegi/berlian SNI.62 422,178.90
23 1 m2 Memasang ornamen terawang custom bahan GRC SNI.62.1 1,335,317.50
24 1 m2 Memasang acian motif tali air SNI.62.2 65,037.50
25 1 m Memasang plint ukuran (60 x 10x 4 ) cm SNI.62.3 195,066.30
26 1 m Memasang stepnose tangga ukuran (10 x 40) cm SNI.62.4 129,676.80
27 1 m2 Memasang lantai karpet SNI.62.5 182,908.00
28 1 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I SNI.62.6 846,928.50
29 1 m2 Memasang lantai parquete ukuran (30 x 30) cm KL II SNI.62.7 553,146.00
30 1 m2 Pasang conblock tipe segi-empat warna 8 cm, K-300 SNI.62.W 299,475.00
31 1 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-300 SNI.62.A 293,975.00
32 1 m Pasang kansten beton SNI.62.7 213,552.90
33 1 m2 Pasang grassblocksegi 8 tebal 8 cm SNI.62.8 312,125.00

IX A.4.5.1. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm m² 4.4.5.1.1. 79,959.00
2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm m² 4.4.5.1.2. 562,749.00
3 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm m² 4.4.5.1.3. 545,699.00
4 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm m² 4.4.5.1.4. 554,510.00
5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 m² 4.4.5.1.5. 69,921.50
mm & 6 mm
6 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m² 4.4.5.1.6. 391,220.50
7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, m² 4.4.5.1.7. 73,755.00
tebal 9 mm
8 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka m² 4.4.5.1.8. 791,766.25
alluminium
9 Pemasangan 1 m’ list langit-langit kayu profil m' 4.4.5.1.9. 37,202.00

1 1 m2 Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu SNI.232 212,311.00

2 1 m' Mengerjakan List Plafond Gypsum Board Type I SNI.233.a 71,965.30


3 1 m' Mengerjakan List Plafond Gypsum Board Type II SNI.233.b 56,950.30
4 1 m2 Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate SNI.234 279,504.50

5 1 m2 Memasang langit-langit WPC , rangka metal furing SNI.234.a 991,795.61


6 1 m2 Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow SNI.234.b 2,611,752.00
7 1 m2 Pasang Kaca Tempered Clear T=10 SNI.234.c 1,714,152.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
8 1 m2 Pasang Atap Kanopi GRC gelombang SNI.234.d 305,602.00
9 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih SNI.234.SP.1 516,202.50
polos
10 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna SNI.234.SP.2 559,102.50

11 1 m2 Mengerjakan Plafond Akustik Rangka Alumunium SNI.234.AQ 455,207.50


12 1 M2 Pekerjaan Plafond Tripleks 3 mm + Rangka kayu SNI.235.a 196,218.00
13 1 M2 Pekerjaan Plafond Tripleks 5 mm + Rangka kayu SNI.235.b 212,305.50
14 1 M2 Pekerjaan Rangka Langit-langit SNI.235.c 146,094.67
15 1 M2 Pekerjaan Plafond Tripleks 5 mm SNI.235.d 66,210.83
16 1 M2 Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu SNI.236.a 164,802.00
17 1 M2 Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu SNI.236.b 180,889.50
18 1 M' Pekerjaan List Plafond Kayu Profil 4/4 cm SNI.238 37,257.00
19 1 M' Pekerjaan List Plafond Kayu Profil 2/4 cm SNI.239 31,482.00

X 4.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 atap genteng palentong kecil m² 4.4.5.2.1. 93,846.50
2 Pemasangan 1 m2 atap genteng kodok m² 4.4.5.2.2. 195,723.00
3 Pemasangan 1 m2 atap genteng palentong besar/super m² 4.4.5.2.3. -
4 Pemasangan 1 m’ bubung genteng palentong m' 4.4.5.2.4. 174,196.00
5 Pemasangan 1 m’ bubung genteng kodok glazuur m' 4.4.5.2.5. 172,546.00
6 Pemasangan 1 m’ bubung genteng palentong besar m' 4.4.5.2.6. 174,966.00
7 Pemasangan 1 m2 roof light fibreglass 90x180 m² 4.4.5.2.7. 124,960.00
8 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm m² 4.4.5.2.8. 101,893.00
9 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm m² 4.4.5.2.9. 99,767.80
10 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm m² 4.4.5.2.10. 92,549.60
11 Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm m² 4.4.5.2.11. 104,137.00
12 Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm m² 4.4.5.2.12. 142,980.75
13 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm m² 4.4.5.2.13. 123,827.00
14 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm m² 4.4.5.2.14. 106,666.32
15 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm m² 4.4.5.2.15. 104,639.47
16 Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm m² 4.4.5.2.16. 133,004.67
17 Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm m² 4.4.5.2.17. -
18 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm m² 4.4.5.2.18. -
19 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm m² 4.4.5.2.19. -
20 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm m² 4.4.5.2.20. -
21 Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm m² 4.4.5.2.21. -
22 Pemasangan 1 m’ bubung stel gelombang 0,92m m' 4.4.5.2.22. -
23 Pemasangan 1 m’ bubung stel gelombang 1,05m m' 4.4.5.2.23. -
24 Pemasangan 1 m’ bubung stel gelombang 1,08m m' 4.4.5.2.24. -
25 Pemasangan 1 m’ nok paten 0,92m m' 4.4.5.2.25. -
26 Pemasangan 1 m’ nok paten 1,05m m' 4.4.5.2.26. -
27 Pemasangan 1 m’ nok paten 1,08m m' 4.4.5.2.27. -
28 Pemasangan 1 m’ nok stel rata 0,92m m' 4.4.5.2.28. 241,901.00
29 Pemasangan 1 m’ nok stel rata 1,05m m' 4.4.5.2.29. 257,118.07
30 Pemasangan 1 m2 genteng beton m² 4.4.5.2.30. -
31 Pemasangan 1 m2 genteng aspal m² 4.4.5.2.31. -
32 Pemasangan 1 m2 genteng metal m² 4.4.5.2.32. -
33 Pemasangan 1 m2 atap sirap kayu m² 4.4.5.2.33. -
34 Pemasangan 1 m’ nok genteng beton m' 4.4.5.2.34. -
35 Pemasangan 1 m’ nok genteng aspal m' 4.4.5.2.35. -
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
36 Pemasangan 1 m’ nok genteng metal m' 4.4.5.2.36. 166,199.00
37 Pemasangan 1 m’ nok sirap m' 4.4.5.2.37. 164,540.20
38 Pemasangan 1 m2 atap seng gelombang m² 4.4.5.2.38. 176,919.60
39 Pemasangan 1 m’nok atap seng m' 4.4.5.2.39. 104,471.40
40 Pemasangan 1 m2 atap alumunium m² 4.4.5.2.40. -
41 Pemasangan 1 m’ nok alumunium m' 4.4.5.2.41. -
42 Pemasangan 1 m2 alumunium foil/sisalation m² 4.4.5.2.42. 53,504.00

1 1 M2 Pekerjaan Atap Genteng Lokal SNI.215 95,953.00


2 1 M2 Pekerjaan Bubungan Genteng Lokal SNI.216 181,786.00
3 1 M2 Pekerjaan Atap Genteng Pejaten Bali SNI.217 151,723.00
4 1m² Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. SNI.217,a 364,724.98
Onduline
5 1 M2 Pekerjaan Bubungan Genteng Pejaten Bali SNI.218 184,646.00
6 1 m Pemasangan nok bitumen Monolayer SNI.218.a 7,300,084.00
7 1 M2 Pekerjaan Atap Trimdeck 0.25 TCT (Spandek) SNI.219.0.25 242,715.00
8 1 M2 Pekerjaan Atap Trimdeck 0.30 TCT (Spandek) SNI.219.0.30 254,815.00
9 1 M2 Pekerjaan Atap Trimdeck 0.35 TCT (Spandek) SNI.219.0.35 277,805.00
10 1 M' Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek) SNI.220 131,004.50
11 1 M2 Pekerjaan Atap Genteng Kodok SNI.221.a 195,723.00
12 1 M2 Pekerjaan Atap Genteng kanmuri full flat SNI.221.b 310,123.00
13 1 M2 Pekerjaan Bubungan Genteng Kodok SNI.222.a 172,546.00
14 1 M2 Pekerjaan Bubungan Genteng kanmuri full flat SNI.222.b 328,746.00
15 1 M2 Pekerjaan Atap Seng Gelombang BJLS 20 SNI.223 156,200.00
16 1 M' Memasang Bubungan Seng BJLS 20 SNI.224 131,450.00
17 1 M2 Pekerjaan Atap Asbes Gelombang Kecil SNI.225 120,076.00
18 1 M' Memasang Bubungan Asbes Gelombang Kecil SNI.226 107,085.00
19 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran SNI.227 169,543.00

20 1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. SNI.228 139,348.00
Butiran
21 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran SNI.229.a 186,043.00

22 1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. SNI.229.b 151,448.00
Butiran
23 1 m2 Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura SNI.230 172,733.00
24 1 m' Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm ) SNI.231 133,298.00

XI 4.4.6.1. HARGA SATUAN PEKERJAAN KAYU


1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu m³ 4.4.6.1.1. 12,736,350.00
kelas I
2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu m³ 4.4.6.1.2. 10,992,300.00
kelas II atau III
3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II m² 4.4.6.1.3. 496,859.00
4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III m² 4.4.6.1.4. 424,259.00
5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II m² 4.4.6.1.5. 1,097,800.00
6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau m² 4.4.6.1.6. 834,790.00
II
7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau m² 4.4.6.1.7. 1,210,000.00
8 II
Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup m² 4.4.6.1.8. 907,599.00
(lebar sampai 90 cm)
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II m² 4.4.6.1.9. 907,690.00
10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II m² 4.4.6.1.10. 949,850.00
11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I m² 4.4.6.1.11. 1,013,804.00
12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu m² 4.4.6.1.12. 855,844.00
13 kelas II
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III m³ 4.4.6.1.13. 9,381,680.00
bentang 6 meter
14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I m³ 4.4.6.1.14. 13,678,665.00
15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II m³ 4.4.6.1.15. 11,679,085.00
16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m² 4.4.6.1.16. 129,195.00
17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m² 4.4.6.1.17. 137,857.50
18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II m² 4.4.6.1.18. 68,723.60
19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III m² 4.4.6.1.19. 69,179.00
20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III m² 4.4.6.1.20. 160,138.00
21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II m' 4.4.6.1.21. 118,195.00
22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II m' 4.4.6.1.22. 117,590.00
23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau m² 4.4.6.1.23. 197,190.00
24 III
Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II m² 4.4.6.1.24. 509,729.00
25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II m² 4.4.6.1.25. 553,630.00
26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I m² 4.4.6.1.26. 578,380.00
27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m² 4.4.6.1.27. 120,692.00
28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV m² 4.4.6.1.28. 152,417.65

1 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 SNI.174 98,615.00


2 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose ) SNI.174.a 130,927.50
3 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 SNI.175 107,415.00
4 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose ) SNI.175.a 139,727.50
5 1 M2 Mengerjakan / Memasang Usuk 5/7 cm SNI.176.a 75,190.50
6 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm SNI.176.b 32,070.50
7 1 M2 Mengerjakan / Memasang Reng 3/4 cm SNI.176.c 32,224.50
8 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm SNI.176.d 13,744.50
9 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II SNI.178 171,935.50
10 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II SNI.179 119,020.00
11 1 M' Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II SNI.179 77,275.00

12 1 M' Pekerjaan Papan Reuter (2/20) SNI.180 73,920.00


13 1 M' Mengerjakan Talang Karet SNI.181 274,505.00
14 1 M' Mengerjakan Talang datar/ jurai Seng BjLs 20 SNI.182.a 257,180.00
15 1 M' Mengerjakan Talang 1/2 lingkaran Seng BjLs 20 SNI.182.b 204,556.00
16 1 M3 Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose) SNI.184 9,788,240.00
17 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II SNI.185 9,408,740.00
18 1 M' Pasang Kasiplank ukuran (0.8x20), 1 Lapis SNI.186 96,415.00
19 1 M' Pasang Kasiplank ukuran (0.8x20), 2 Lapis SNI.187 144,622.50
20 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose) SNI.188 9,872,940.00
21 1 M3 Pekerjaan Kayu Kusen Pintu dan Jendela SNI.189 10,712,900.00
22 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 3 mm SNI.190 868,494.00
23 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 5 mm SNI.191 928,994.00
24 1 M2 Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela SNI.192 177,575.75
25 1 M2 Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela SNI.193 244,125.75
26 1 M2 Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela SNI.193.8 280,425.75

1 1 M2 Pekerjaan Memasang Alumunium strip 8 mm SNI.194 862,824.88


HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
2 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm SNI.195 1,841,994.00
3 1 M2 Pekerjaan Memasang Kaca Cermin 5 mm SNI.195.a 242,299.75
4 1 M2 Pekerjaan Memasang Glass Blok SNI.196 1,581,584.40
5 1 M2 Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela SNI.197 238,075.75
6 1 M2 Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela SNI.197.a 298,575.75
7 1 M2 Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela SNI.198 1,248,425.75
8 1 M2 Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika SNI.200 1,011,890.00
9 1 M2 Pekerjaan Ram Jalusi SNI.201 1,274,900.00
10 1 M2 Pekerjaan Ram Jalusi Mati Kusen SNI.202 843,370.00
11 1 M2 Mengerjakan Daun Pintu Double Teakwood 3 mm SNI.204 988,834.00
12 1 M2 Pekerjaan Pintu Double Tripleks 3 mm SNI.206 1,051,754.00
13 1 M2 Pekerjaan Pintu Teakwood Lapis Formika SNI.208 1,243,484.00
14 1 M2 Pekerjaan Pintu Triplek Lapis Formika SNI.209 709,104.00

XII 4.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 Pemasangan 1 buah kunci tanam antik bh 4.4.6.2.1. 761,739.00
2 Pemasangan 1 buah kunci tanam biasa bh 4.4.6.2.2. 301,565.00
3 Pemasangan 1 buah kunci kamar mandi bh 4.4.6.2.3. 269,434.00
4 Pemasangan 1 buah kunci silinder bh 4.4.6.2.4. 189,134.00
5 Pemasangan 1 buah engsel pintu bh 4.4.6.2.5. 60,922.40
6 Pemasangan 1 buah engsel jendela kupu-kupu bh 4.4.6.2.6. 36,756.50
7 Pemasangan 1 buah engsel angin bh 4.4.6.2.7. 71,186.50
8 Pemasangan 1 buah spring knip bh 4.4.6.2.8. -
9 Pemasangan 1 buah kait angin bh 4.4.6.2.9. 50,644.00
10 Pemasangan 1 buah door closer bh 4.4.6.2.10. 395,659.00
11 Pemasangan 1 buah kunci slot bh 4.4.6.2.11. 201,113.00
12 Pemasangan 1 buah Door holder bh 4.4.6.2.12. 395,659.00
13 Pemasangan 1 buah door stop bh 4.4.6.2.13. 97,845.00
14 Pemasangan 1 buah rel pintu sorong bh 4.4.6.2.14. 197,439.00
15 Pemasangan 1 buah kunci lemari bh 4.4.6.2.15. -
16 Pemasangan 1 m2 kaca tebal 3 mm m² 4.4.6.2.16. 178,897.40
17 Pemasangan 1 m2 kaca tebal 5 mm m² 4.4.6.2.17. 245,447.40
18 Pemasangan 1 m2 kaca tebal 8 mm m² 4.4.6.2.18. 287,558.70
19 Pemasangan 1 m2 kaca buram tebal 12 mm m² 4.4.6.2.19. -
20 Pemasangan 1 m2 kaca cermin tebal 5 mm m² 4.4.6.2.20. 202,994.00
21 Pemasangan 1 m2 kaca cermin tebal 8 mm m² 4.4.6.2.21. 249,403.00
22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm m² 4.4.6.2.22. -
23 Pemasangan 1 m2 kaca patri tebal 5 mm m² 4.4.6.2.23. -
24 Pemasangan 1 m2 kaca tebal 8 mm m² 4.4.6.2.17.A. 221,247.40

1 1 Bh. Pasang Kunci Tanam Mutu Menengah SNI.265.b 290,345.00


2 1 Bh. Pasang Kunci Tanam Mutu Tinggi SNI.265.c 720,445.00
3 1 Bh. Pasang Grendel Besar SNI.268.1 51,606.50
4 1 Bh. Pasang Grendel Kecil SNI.268.2 40,606.50
5 1 Bh. Pasang Kait Angin Besar SNI.269 53,209.75
6 1 Bh. Pasang Kait Angin Kecil SNI.270 137,032.50
7 1 Bh. Pasang Kunci Selot Besar SNI.271 124,206.50
8 1 Bh. Pasang Kunci Selot Kecil SNI.272 127,413.00
9 1 Bh. Pasang Beugel U SNI.273 45,564.75
10 1 Bh. Pasang Beugel Plat SNI.274 45,564.75
11 1 Bh. Pasang Angker Dia 12 MM SNI.275 9,264.75
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
12 1 Bh. Pas. Baut Mur SNI.276.a 8,164.75
13 1 Bh. Pas. Baut Mur 12 mm SNI.276.b 9,264.75
14 1 Bh. Pas. Baut Mur 16 mm SNI.276.c 10,364.75
15 1 Bh. Pas. Baut Mur 18 mm SNI.276.d 11,464.75
16 1 Bh. Pas. Baut Mur 22 mm SNI.276.e 13,664.75
17 1 Bh. Pasang Pintu Feber glass (Wc) SNI.282 1,060,463.25

XIII 4.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN


1 1 m2 Pengikisan/pengerokan permukaan cat lama m² 4.4.7.1.1. 29,139.00
2 1 m2 Pencucian bidang permukaan tembok yang pernah dicat m² 4.4.7.1.2. 26,609.00
3 1 m2 Pengerokan karat pada permukaan baja cara manual m² 4.4.7.1.3. 27,874.00
4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis m² 4.4.7.1.4. 65,791.00
cat penutup)
5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis m² 4.4.7.1.5. 92,477.00
cat penutup)
6 Pelaburan 1 m2 bidang kayu dengan teak oil m² 4.4.7.1.6. 46,365.00
7 Pelaburan 1 m2 bidang kayu dengan politur m² 4.4.7.1.7. 64,992.40
8 Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m² 4.4.7.1.8. 27,643.00
9 Pelaburan 1 m2 bidang kayu dengan vernis m² 4.4.7.1.9. 73,337.00
10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat m² 4.4.7.1.10. 38,179.90
penutup)
11 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) m² 4.4.7.1.11. 26,769.60
12 Pelaburan 1 m2 tembok dengan kalkarium m² 4.4.7.1.12. 15,791.60
13 Pelaburan 1 m2 tembok dengan kapur sirih m² 4.4.7.1.13. -
14 Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) m² 4.4.7.1.14. -
15 Pemasangan 1 m2 wallpaper m² 4.4.7.1.15. 128,892.50
16 Pengecatan 1 m2 permukaan baja dengan menie besi m² 4.4.7.1.16. 54,917.50
17 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah m² 4.4.7.1.17. 106,139.00
18 Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis m² 4.4.7.1.18. 114,717.90
19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat m² 4.4.7.1.19. 50,039.00
mutakhir
20 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis m² 4.4.7.1.20. 286,924.00
21 Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat m² 4.4.7.1.21. 258,599.00
mutakhir

1 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior) SNI.252 74,485.40


2 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior) SNI.252.a 47,953.40
3 1 M2 Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat SNI.252.b 80,795.00
4 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) SNI.252.c 37,283.40
5 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen) SNI.252.d 252,718.40
6 1 m² Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 SNI.252.e 89,445.40
Lapis Cat Penutup anti bakteri)
7 1 m² Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm SNI.252.f 1,314,713.40
rangka hollow
8 1 m² Measang pelapis tembak dengan HPL SNI.252.g 138,637.40
9 1 m² Pemasangan Wall Paper SNI.252.h 188,093.40
10 #REF! SNI.252.i 513,693.40
11 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior SNI.253 112,498.10

12 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior SNI.253.a 90,388.10
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
13 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, SNI.254 59,797.10
Eksterior
14 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior SNI.254.a 36,213.10

15 1 M2 Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat SNI.254.b 72,655.00


16 1 M2 Pekerjaan cat Genteng SNI.255 92,776.20
17 1 M2 Pekerjaan Cat Kayu 1 x Meni, 2 x Cat SNI.256 67,710.50
18 1 M2 Pekerjaan Cat Kayu, 1 x Cat SNI.257 64,834.00
19 1 M2 Pekerjaan Cat paving Blok SNI.258 50,606.60
20 1 M2 Mendempul dan Menggosok Kayu SNI.259 22,874.50
21 1 M2 Pekerjaan Politur 2 Kali SNI.260 58,100.90
22 1 M2 Mengecat Besi 1 x Meni, 2 x Cat SNI.261 74,470.00
23 10 M2 Mengecat Atap Seng Gelombang SNI.262 63,151.00
24 1 M2 Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil SNI.263 29,121.40
25 1 M2 Mengeter Kayu 2x SNI.264 48,851.00

XIV 5.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan 1 buah closet duduk/monoblock bh 5.5.1.1.1. 5,902,380.00
2 Pemasangan 1 buah closet jongkok porslen bh 5.5.1.1 2. 856,625.00
3 Pemasangan 1 buah closet jongkok teraso bh 5.5.1.1 3. 687,940.00
4 Pemasangan 1 buah urinoir bh 5.5.1.1 4. 605,825.00
5 Pemasangan 1 buah wastafel bh 5.5.1.1 5. 4,052,675.00
6 Pemasangan 1 buah bathcuip porselen bh 5.5.1.1 6. 9,164,859.00
7 Pemasangan 1 buah bak fibreglass vol 1 m3 bh 5.5.1.1 7. 3,215,850.00
8 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 bh 5.5.1.1 8. 2,909,214.00
9 Pemasangan 1 buah bak mandi teraso vol 0,30 m3 bh 5.5.1.1 9. 2,273,370.00
10 Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 5.5.1.1 10. 805,530.00
11 Pemasangan 1 buah bak beton volume 1 m3 bh 5.5.1.1 11. -
12 Pemasangan 1 buah bak cuci piring stainlessteel bh 5.5.1.1 12. 691,735.00
13 Pemasangan 1 buah bak cuci piring teraso bh 5.5.1.1 13. 794,200.00
14 Pemasangan 1 buah floor drain bh 5.5.1.1 14. 56,045.00
15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 5.5.1.1 15. 760,364.00
16 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm bh 5.5.1.1 16. 1,110,241.00
17 Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm bh 5.5.1.1 17. 1,301,817.00
18 Pemasangan 1 m’ pipa galvanis diameter ½” m' 5.5.1.1 18. 49,445.00
19 Pemasangan 1 buah kran diameter ½” atau 3/4” bh 5.5.1.1 19. 121,000.00
20 Pemasangan 1 m pipa galvanis diameter 3/4” m' 5.5.1.1 20. 52,173.00
21 Pemasangan 1 m’ pipa galvanis diameter 1” m' 5.5.1.1 21. 56,265.00
22 Pemasangan 1 m’ pipa galvanis diameter 1 ½” m' 5.5.1.1 22. 102,008.50
23 Pemasangan 1 m’ pipa galvanis diameter 3” m' 5.5.1.1 23. 187,885.50
24 Pemasangan 1 m’ pipa galvanis diameter 4” m' 5.5.1.1 24. 238,694.50
25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m' 5.5.1.1 25. -
26 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m' 5.5.1.1 26. 48,807.00
27 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m' 5.5.1.1 27. 55,627.00
28 Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” m' 5.5.1.1 28. 83,440.50
29 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m' 5.5.1.1 29. 107,822.00
30 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 5.5.1.1 30. 158,878.50
31 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m' 5.5.1.1 31. 202,015.00
32 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m' 5.5.1.1 32. 273,454.50
33 Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm m' 5.5.1.1 33. -
34 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm m' 5.5.1.1 34. -
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
35 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm m' 5.5.1.1 35. 249,135.65
36 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm m' 5.5.1.1.36. 379,497.25

1 Memasang 1 Bh Kloset Duduk Biasa SNI.283.B 1,782,913.00


2 Memasang 1 Bh Kloset Duduk (KW 1 Super) SNI.283.K 5,082,693.00
3 Memasang 1 Bh Wastafel Biasa SNI.284 1,175,515.00
4 Memasang 1 buah Urinoir ex. TOTO U 57 M SNI.286 3,621,475.00
5 Memasang 1 bh Pembatas Urinoir ex. TOTO A 100 SNI.286.a 1,566,345.00
6 Memasang 1 buah Kitchen Sink Stainless Steel ex. TOTO SNI.286.b 2,769,492.00
7 Memasang 1 Bh Bak Cuci Piring Logam, 1 lubang SNI.286.1 734,519.50
8 Memasang 1 Bh Bak Cuci Piring Logam, 2 lubang SNI.286.2 866,519.50
9 Memasang 1 Bh Bak Mandi Teraso SNI.287 1,095,985.00
10 Memasang 1 Bh Bak Mandi Fiberglass SNI.288 1,707,200.00
11 Memasang 1 Bh Bak Mandi Plastik SNI.289 1,713,690.00
12 Memasang 1 bh Kran ex. TOTO T2613 SNI.290.a 425,810.00
13 Memasang 1 Bh Floor Drain SNI.291 56,045.00
14 Memasang 1 bh Floor Drain ex. TOTO TX 1 BV 3 SNI.291.a 70,345.00
15 Memasang 1 Bh Saringan Air Besi SNI.292 158,345.00
16 Memasang 1 bh Shower spray ex. TOTO TX 403 SBPIV SNI.292.1 920,810.00
17 Memasang 1 bh Spoel hoek SNI.292.2 12,256,310.00
18 Memasang 1 bh shower ex. TOTO TR 309 SZ SNI.292.3 648,010.00
19 Memasang 1 bh Paper Holder ex. TOTO TIPE TS116R SNI.292.4 679,745.00
20 Memasang 1 bh soap holder ex. TOTO S 156N SNI.292.5 202,345.00
21 Memasang 1 bh hand railing stainless steel ex. TOTO TX 3A2 SNI.292.6 1,060,345.00
22 Memasang 1 Bh Tandon Air kap. 500 Liter SNI.293.a 1,599,345.00
23 Memasang 1 Bh Tandon Air kap. 1000 Liter SNI.293.b 2,336,345.00
24 Memasang 1 m' Pipa GI dia 1/2" SNI.294.G 81,627.88
25 Memasang 1 m' Pipa GI dia 2" SNI.298.Ga 164,677.88

XV PEKERJAAN VEGETASI TANAMAN


1 1 bh Tanam Pohon Kamboja tinggi 5 meter SNI.302 2,148,465.00
2 1 bh Tanam Pohon Tabebuya tinggi 4 meter SNI.302.1 1,730,465.00
3 1 bh Tanam Pohon Palem raja tinggi 3 meter SNI.302.2 1,455,465.00
4 1 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter SNI.302.3 223,465.00
5 1 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter SNI.302.4 67,320.00
6 1 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter SNI.302.5 70,620.00
7 1 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter SNI.302.6 64,020.00
8 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.a 929,049.00
9 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.b 2,103,849.00
10 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.c 635,349.00
11 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.d 977,449.00
12 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.e 1,320,649.00
13 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.f 908,149.00
14 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.g 1,185,349.00
15 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.h 1,185,349.00
16 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.i 981,849.00
17 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.j 613,349.00
18 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.k 1,625,349.00
19 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.l 1,047,849.00
20 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.m 761,849.00
21 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.n 220,649.00
HARGA SATUAN
KODE 2023
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp.)

1 2 3 4 5
22 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.o 838,849.00
23 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.p 131,549.00
24 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.q 186,549.00
25 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.r 2,090,649.00
26 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.s 1,938,849.00
27 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.t 635,349.00
28 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm SNI.302.u 635,349.00
29 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1a 1,134,265.00
30 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1b 727,265.00
31 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1c 617,265.00
32 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1d 3,477,265.00
33 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1e 1,893,265.00
34 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1f 1,068,265.00
35 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1g 243,265.00
36 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1h 276,265.00
37 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1i 518,265.00
38 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1j 518,265.00
39 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1k 243,265.00
40 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1l 1,002,265.00
41 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1m 243,265.00
42 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1n 177,265.00
43 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1o 837,265.00
44 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1p 137,665.00
45 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1q 177,265.00
46 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1r 309,265.00
47 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1s 243,265.00
48 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1t 1,079,265.00
49 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1v 309,265.00
50 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1x 386,265.00
51 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1y 452,265.00
52 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.1z 551,265.00
53 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2a 160,765.00
54 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2b 155,265.00
55 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2c 342,265.00
56 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2d 518,265.00
57 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2e 127,765.00
58 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2f 177,265.00
59 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2g 243,265.00
60 1 bh Tanam semak , lubang polibag 15 x 15 cm SNI.302.2h 309,265.00
61 1 m2 Tanam rumput SNI.302.3a 101,200.00

XVI PEKERJAAN TAMBAHAN


1 1 M' Biaya Pengeboran air + Pipa Casing Ø 6'' SNI.Ls.1 1,558,535.00
2 1 M' Biaya Pengeboran air + Pipa Casing Ø 4'' SNI.Ls.2 1,091,585.00
3 1 M' Biaya Pengeboran air + Pipa Casing Ø 3'' SNI.Ls.3 547,415.00
4 1 M' Biaya Pengeboran air + Pipa Casing Ø 2.5'' SNI.Ls.4 295,240.00
5 1 Bh' Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar ) SNI.Ls.5 38,016,000.00
6 1 Bh' Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 SNI.Ls.6 54,036,400.00
7 Phase
1 Bh' Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit SNI.Ls.7 28,495,500.00
8 pemasangan
1 Bh' Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 SNI.Ls.8 25,685,000.00
Complit pemasangan
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PERSIAPAN
SNI.3 1 Bh Pembuatan Papan nama Proyek 0,8 x 1,2 cm
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 Bh Papan Nama 200,000.00 200,000.00
B TENAGA
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
C PERALATAN

Jumlah ( A + B + C ) 226,500.00
Keuntungan & Overhead 10 % 22,650.00
Jumlah ……………………… 249,150.00

SNI.4a 1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m, (beton cor)
Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.200 OH Pekerja 150,000.00 30,000.00
0.400 OH Tk Kayu 190,000.00 76,000.00
0.020 OH Kp Tukang 230,000.00 4,600.00
0.020 OH Mandor 230,000.00 4,600.00
B BAHAN
1.250 Btg Dolken 11,000.00 13,750.00
2.500 Kg Semen Pc 1,700.00 4,250.00
1.200 Lbr Seng gelombang 68,000.00 81,600.00
0.005 m3 Pasir 225,000.00 1,125.00
0.009 m3 Kerikil 345,000.00 3,105.00
0.072 m3 Kayu 5/7 2,600,000.00 187,200.00
0.060 Kg Paku 5 - 7 cm 28,000.00 1,680.00
C PERALATAN
-
Jumlah ( A + B + C ) 407,910.00
Keuntungan & Overhead 10 % 40,791.00
Jumlah ……………………… 448,701.00

SNI.4b 1 m2 Pagar Pengaman Lokasi Dari seng gelombang tinggi 2m


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.150 m3 Pekerja 150,000.00 22,500.00
0.300 m3 Tk Kayu 190,000.00 57,000.00
0.015 m3 Kp Tukang 230,000.00 3,450.00
0.015 m3 Mandor 230,000.00 3,450.00
B BAHAN
1.250 Btg Dolken 11,000.00 13,750.00
1.200 Lbr Seng gelombang 68,000.00 81,600.00
0.072 m3 Kayu 5/7 2,600,000.00 187,200.00
0.060 Kg Paku 5 - 7 cm 28,000.00 1,680.00
0 PERALATAN
-
Jumlah ( A + B + C ) 370,630.00
Keuntungan & Overhead 10 % 37,063.00
Jumlah ……………………… 407,693.00

SNI.5 1 m2 . Pembuatan Direksiket/Kantor sementara


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
1.000 OH Pekerja 150,000.00 150,000.00
1.000 OH Tk Kayu 190,000.00 190,000.00
0.300 OH Kp Tukang 230,000.00 69,000.00
0.050 OH Mandor 28,000.00 1,400.00
B BAHAN
0.168 m3 Kayu 5/7 2,600,000.00 436,800.00
0.080 kg Paku 5 - 7 cm 28,000.00 2,240.00
0.250 lbr seng gelombang 68,000.00 17,000.00
0.046 lbr Triplek 5mm 106,000.00 4,876.00
30.500 kg semen Pc 1,700.00 51,850.00
0.200 m3 Pasir 225,000.00 45,000.00
0.150 m3 Kerikil 345,000.00 51,750.00
30.000 bh Bata merah 850.00 25,500.00
C PERALATAN
-
Jumlah ( A + B + C ) 1,045,416.00
Keuntungan & Overhead 10 % 104,541.60
Jumlah ……………………… 1,149,957.60
PEKERJAAN PEMBONGKARAN BANGUNAN LAMA
SNI.6 1 M3 Pembongkaran Dinding Tembok Bata Merah Lama
Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
3.334 OH Pekerja 150,000.00 500,025.00
0.333 OH Mandor 230,000.00 76,670.50
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 576,695.50
Keuntungan & Overhead 10 % 57,669.55
Jumlah ……………………… 634,365.05

SNI.7 1 M3 Pembongkaran Beton Bertulang Lama


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
6.667 OH Pekerja 150,000.00 1,000,050.00
0.667 OH Mandor 230,000.00 153,341.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 1,153,391.00
Keuntungan & Overhead 10 % 115,339.10
Jumlah ……………………… 1,268,730.10

SNI.8 1 m2 Bongkar Usuk + Reng Untuk Dipakai Kembali


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.200 OH Pekerja 150,000.00 30,000.00
0.050 OH Tukang Kayu 190,000.00 9,500.00
0.005 OH Kepala Tukang Kayu 230,000.00 1,150.00
0.005 OH Mandor 230,000.00 1,150.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 41,800.00
Keuntungan & Overhead 10 % 4,180.00
Jumlah ……………………… 45,980.00

SNI.9 1 M2 Pembongkaran Atap Seng Gelombang


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.100 OH Pekerja 150,000.00 15,000.00
0.007 OH Mandor 230,000.00 1,610.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 16,610.00
Keuntungan & Overhead 10 % 1,661.00
Jumlah ……………………… 18,271.00

PEKERJAAN TANAH DAN PASIR


SNI.10.a 1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan manual
Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.750 OH Pekerja 150,000.00 112,500.00
0.025 OH Mandor 230,000.00 5,750.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 118,250.00
Keuntungan & Overhead 10 % 11,825.00
Jumlah ……………………… 130,075.00

SNI.10.b 1 M3 Galian Tanah Biasa sedalam 0.5 - 1 M' - Dengan mengunakan alat berat
Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.750 OH Pekerja 150,000.00 112,500.00
0.025 OH Mandor 230,000.00 5,750.00
B BAHAN

C PERALATAN
0.010 Jam Alat Berat Galian dan keprasan 680,000.00 6,800.00

Jumlah ( A + B + C ) 125,050.00
Keuntungan & Overhead 10 % 12,505.00
Jumlah ……………………… 137,555.00

SNI.11.a 1 M3 Galian Tanah Biasa sedalam 2 M', Dengan Manual


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.900 OH Pekerja 150,000.00 135,000.00
0.045 OH Mandor 230,000.00 10,350.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 145,350.00
Keuntungan & Overhead 10 % 14,535.00
Jumlah ……………………… 159,885.00

SNI.11.b 1 M3 Galian Tanah Biasa sedalam 2 M' - Dengan mengunakan alat berat
Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
0.900 OH Pekerja 150,000.00 135,000.00
0.045 OH Mandor 230,000.00 10,350.00
B BAHAN

C PERALATAN
0.010 Jam Alat Berat Galian dan keprasan 680,000.00 6,800.00

Jumlah ( A + B + C ) 152,150.00
Keuntungan & Overhead 10 % 15,215.00
Jumlah ……………………… 167,365.00

SNI.12 1 M3 Galian Tanah Biasa sedalam 3 M'


Koefisen satuan Uraian Harga satuan Jumlah harga
A TENAGA
1.050 OH Pekerja 150,000.00 157,500.00
0.067 OH Mandor 230,000.00 15,410.00
B BAHAN

C PERALATAN

Jumlah ( A + B + C ) 172,910.00
Keuntungan & Overhead 10 % 17,291.00
Jumlah ……………………… 190,201.00

SNI.20 1 M3 Urugan Tanah Biasa tampa pemadatan


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.200 M³ Tanah Urug 121,000.00 145,200.00
B TENAGA
0.250 OH Pekerja 150,000.00 37,500.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN

Jumlah ( A + B + C ) 188,450.00
Keuntungan & Overhead 10 % 18,845.00
Jumlah ……………………… 207,295.00

SNI.21 1 M3 Urug dengan pasir urug


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.200 M³ Pasir Urug 195,000.00 234,000.00
B TENAGA
0.300 OH Pekerja 150,000.00 45,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 281,300.00
Keuntungan & Overhead 10 % 28,130.00
Jumlah ……………………… 309,430.00

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI


SNI.27 1 M2 Pasangan Dinding bata berongga / roster (10 x 20)
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
30.000 Bh Roster 15,000.00 450,000.00
14.000 Kg Semen 1,700.00 23,800.00
0.032 M³ Pasir Pasang 225,000.00 7,200.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 561,400.00
Keuntungan & Overhead 10 % 56,140.00
Jumlah ……………………… 617,540.00

SNI.27.b 1 M2 Pasangan Dinding bata berongga / roster (20 x 20)


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
30.000 Bh Roster 15,500.00 465,000.00
14.000 Kg Semen 1,700.00 23,800.00
0.032 M³ Pasir Pasang 225,000.00 7,200.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 576,400.00
Keuntungan & Overhead 10 % 57,640.00
Jumlah ……………………… 634,040.00

SNI.27.c 1 M2 Pasangan Dinding bata berongga / roster (30 x 30)


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
30.000 Bh Roster 20,000.00 600,000.00
14.000 Kg Semen 1,700.00 23,800.00
0.032 M³ Pasir Pasang 225,000.00 7,200.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 711,400.00
Keuntungan & Overhead 10 % 71,140.00
Jumlah ……………………… 782,540.00

SNI.29.R Pemasangan 1 m2 dinding bata ringan tebal 10 X 20 X 60 cm + dengan mortar


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
8.400 Biji Bata ringan/Hebel, 10X20X60 19,000.00 159,600.00
0.063 Kg Mortar siap pakai 5,000.00 316.00
B TENAGA
1.300 OH Tukang Batu 190,000.00 247,000.00
0.130 OH Kepala Tukang 230,000.00 29,900.00
0.671 OH Pekerja 150,000.00 100,650.00
0.003 OH Mandor 230,000.00 690.00
C PERALATAN
0.100 Ls Alat bantu 12,000.00 1,200.00
Jumlah ( A + B + C ) 539,356.00
Keuntungan & Overhead 10 % 53,935.60
Jumlah ……………………… 593,291.60

SNI.30 1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 3 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
140.000 Biji Bata Merah 950.00 133,000.00
32.950 Kg Semen 1,700.00 56,015.00
0.091 M³ Pasir Pasang 225,000.00 20,475.00
B TENAGA
0.200 OH Tukang Batu 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.600 OH Pekerja 150,000.00 90,000.00
0.030 OH Mandor 230,000.00 6,900.00
C PERALATAN

Jumlah ( A + B + C ) 348,990.00
Keuntungan & Overhead 10 % 34,899.00
Jumlah ……………………… 383,889.00
SNI.31 1 m2 Pas Bata Merah ukuran (5x11x22) cm tebal 1 bata, spesi 1 PC : 4 PP
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
140.000 Biji Bata Merah 950.00 133,000.00
26.550 Kg Semen 1,700.00 45,135.00
0.093 M³ Pasir Pasang 225,000.00 20,925.00
B TENAGA
0.200 OH Tukang Batu 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.600 OH Pekerja 150,000.00 90,000.00
0.030 OH Mandor 230,000.00 6,900.00
C PERALATAN

Jumlah ( A + B + C ) 338,560.00
Keuntungan & Overhead 10 % 33,856.00
Jumlah ……………………… 372,416.00

SNI.32 1 M2 Pasangan Dinding Batako 1 Pc : 4 Psr


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
12.500 Biji Batako 4,500.00 56,250.00
5.750 Kg Semen 1,700.00 9,775.00
0.022 M³ Pasir Pasang 225,000.00 4,837.50
B TENAGA
0.080 OH Tukang Batu 190,000.00 15,200.00
0.008 OH Kepala Tukang 230,000.00 1,840.00
0.256 OH Pekerja 150,000.00 38,400.00
0.012 OH Mandor 230,000.00 2,760.00
C PERALATAN

Jumlah ( A + B + C ) 129,062.50
Keuntungan & Overhead 10 % 12,906.25
Jumlah ……………………… 141,968.75

SNI.33 1 M2 Pasangan Rollag 1 Bata Merah 1 Pc : 3 Ps


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
140.000 Biji Bata Merah 950.00 133,000.00
14.370 Kg Semen 1,700.00 24,429.00
0.040 M³ Pasir Pasang 225,000.00 9,000.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 236,179.00
Keuntungan & Overhead 10 % 23,617.90
Jumlah ……………………… 259,796.90

SNI.34.a 1 M2 Acian halus dengan Pc


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
3.250 Kg Semen Pc 1,700.00 5,525.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 59,125.00
Keuntungan & Overhead 10 % 5,912.50
Jumlah ……………………… 65,037.50

SNI.34.b 1 M2 Plesteran + Acian halus dinding bata ringan/Hebel


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
6.240 Kg Semen-MU 380 , 40 Kg 4,500.00 28,080.00
3.250 Kg Semen-MU 200 , 40 Kg 5,000.00 16,250.00
B TENAGA
0.250 OH Tukang Batu 190,000.00 47,500.00
0.025 OH Kepala Tukang Batu 230,000.00 5,750.00
0.500 OH Pekerja 150,000.00 75,000.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN
0.100 Ls Alat bantu 12,000.00 1,200.00
Jumlah ( A + B + C ) 179,530.00
Keuntungan & Overhead 10 % 17,953.00
Jumlah ……………………… 197,483.00

SNI.34.c 1 M2 Plesteran dinding bata ringan/Hebel


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
6.240 Kg Semen-MU 380 , 40 Kg 4,500.00 28,080.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang Batu 230,000.00 3,450.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN
0.100 Ls Mandor 12,000.00 1,200.00
Jumlah ( A + B + C ) 109,680.00
Keuntungan & Overhead 10 % 10,968.00
Jumlah ……………………… 120,648.00

SNI.34.d 1 M2 Plesteran Beton 1 PC : 2 Ps Tebal 15 mm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
9.300 Kg Semen Pc 1,700.00 15,810.00
0.018 M3 Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.200 OH Tukang Batu 190,000.00 38,000.00
0.020 OH Kepala Tukang Batu 230,000.00 4,600.00
0.260 OH Pekerja 150,000.00 39,000.00
0.013 OH Mandor 230,000.00 2,990.00
C PERALATAN

Jumlah ( A + B + C ) 104,450.00
Keuntungan & Overhead 10 % 10,445.00
Jumlah ……………………… 114,895.00

SNI.34.e 1 M2 Plesteran Beton 1 PC : 3 Ps Tebal 15 mm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
7.070 Kg Semen Pc 1,700.00 12,019.00
0.021 M3 Pasir Pasang 225,000.00 4,725.00
B TENAGA
0.200 OH Tukang Batu 190,000.00 38,000.00
0.020 OH Kepala Tukang Batu 230,000.00 4,600.00
0.260 OH Pekerja 150,000.00 39,000.00
0.013 OH Mandor 230,000.00 2,990.00
C PERALATAN

Jumlah ( A + B + C ) 101,334.00
Keuntungan & Overhead 10 % 10,133.40
Jumlah ……………………… 111,467.40

SNI.35.a 1 M2 Siar Pas batu Kali


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
6.340 Kg Semen 1,700.00 10,778.00
0.012 m3 Pasir Pasang 225,000.00 2,700.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang Batu 230,000.00 3,450.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 93,878.00
Keuntungan & Overhead 10 % 9,387.80
Jumlah ……………………… 103,265.80

SNI.35.b 1 m2 Finishing Siar pasangan bata merah


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
3.108 Kg Semen Portland 1,700.00 5,283.60
B TENAGA
0.075 OH Tukang Batu 190,000.00 14,250.00
0.008 OH Kepala Tukang Batu 230,000.00 1,840.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
C PERALATAN
Jumlah ( A + B + C ) 45,713.60
Keuntungan & Overhead 10 % 4,571.36
Jumlah ……………………… 50,284.96

SNI.41 Pasang Kanstin Cetak 600x150x250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.667 m1 Kanstein 165,000.00 275,000.00
0.008 m3 Pasir pasang 225,000.00 1,687.50
0.750 kg PC 1,700.00 1,275.00
0.050 m3 Pasir urug 195,000.00 9,750.00
B TENAGA
0.050 OH Tukang Batu 190,000.00 9,500.00
0.005 OH Kepala Tukang Batu 230,000.00 1,150.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 330,662.50
Keuntungan & Overhead 10 % 33,066.25
Jumlah ……………………… 363,728.75

SNI.41.1 Lapisan Geotextile


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Geotextile 320,000.00 250,000.00
B TENAGA
0.050 OH Upang pasang 320,000.00 16,000.00
C PERALATAN

Jumlah ( A + B + C ) 266,000.00
Keuntungan & Overhead 10 % 26,600.00
Jumlah ……………………… 292,600.00

SNI.41.2 Lapisan Drainagecell


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Drainagecell 82,000.00 82,000.00
B TENAGA
0.050 OH Upang pasang 82,000.00 4,100.00
C PERALATAN

Jumlah ( A + B + C ) 86,100.00
Keuntungan & Overhead 10 % 8,610.00
Jumlah ……………………… 94,710.00

SNI.41.3 Memasang Kitchen Sink 1 Bowl GS 5844


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 bh Kitchen Sink 1 Bowl GS 5844 1,570,000.00 1,570,000.00
1.000 set Kran + asesories + Seal Tape 690,000.00 690,000.00
B TENAGA
0.300 OH Tukang Batu 190,000.00 57,000.00
0.030 OH Kepala Tukang Batu 230,000.00 6,900.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
C PERALATAN

Jumlah ( A + B + C ) 2,328,745.00
Keuntungan & Overhead 10 % 232,874.50
Jumlah ……………………… 2,561,619.50

SNI.41.4 Memasang Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen Tap My 1 By TEKA
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 bh Kitchen Sink Single Bowl Zenit Ris 1B 1D 86 with Kitchen 3,880,000.00 3,880,000.00
1.000 set Kran + asesories + Seal Tape 690,000.00 690,000.00
B TENAGA
0.300 OH Tukang Batu 190,000.00 57,000.00
0.030 OH Kepala Tukang Batu 230,000.00 6,900.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
C PERALATAN

Jumlah ( A + B + C ) 4,638,745.00
Keuntungan & Overhead 10 % 463,874.50
Jumlah ……………………… 5,102,619.50
SNI.41.5 Memasang Mirror 100x120 cm
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 bh Mirror 100x120 cm 270,000.00 270,000.00
B TENAGA
0.300 OH Tukang Batu 190,000.00 57,000.00
0.030 OH Kepala Tukang Batu 230,000.00 6,900.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
C PERALATAN

Jumlah ( A + B + C ) 338,745.00
Keuntungan & Overhead 10 % 33,874.50
Jumlah ……………………… 372,619.50

SNI.42.a 1 m1 Pasang Buis beton Ø20 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 20 Cm 75,000.00 150,000.00
1.250 Kg Semen 1,700.00 2,125.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 211,350.00
Keuntungan & Overhead 10 % 21,135.00
Jumlah ……………………… 232,485.00

SNI.42.b 1 m1 Pasang Buis beton Ø 30 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 30 Cm 90,000.00 180,000.00
1.250 Kg Semen 1,700.00 2,125.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 241,350.00
Keuntungan & Overhead 10 % 24,135.00
Jumlah ……………………… 265,485.00

SNI.42.c 1 m1 Pasang Buis beton Ø 40 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 40 Cm 110,000.00 220,000.00
1.250 Kg Semen 1,700.00 2,125.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 281,350.00
Keuntungan & Overhead 10 % 28,135.00
Jumlah ……………………… 309,485.00

SNI.43 1 m1 Pasang Buis beton Ø 50 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 50 Cm 125,000.00 250,000.00
2.500 Kg Semen 1,700.00 4,250.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 230,000.00 46,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 329,475.00
Keuntungan & Overhead 10 % 32,947.50
Jumlah ……………………… 362,422.50

SNI.44 1 m1 Pasang Buis beton Ø 60 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 60 Cm 130,000.00 260,000.00
2.500 Kg Semen 1,700.00 4,250.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 230,000.00 46,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 339,475.00
Keuntungan & Overhead 10 % 33,947.50
Jumlah ……………………… 373,422.50

SNI.45 1 m1 Pasang Buis beton Ø 80 cm, spesi 1 PC : 4 PP


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.000 Bh Buis Beton Dia. 80 Cm 150,000.00 300,000.00
2.500 Kg Semen 1,700.00 4,250.00
0.025 M³ Pasir Pasang 225,000.00 5,625.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.200 OH Pekerja 230,000.00 46,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 379,475.00
Keuntungan & Overhead 10 % 37,947.50
Jumlah ……………………… 417,422.50

PEKERJAAN LANTAI & DINDING


SNI.46 1 M2 Pas. Lantai Tegel Abu-abu
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Tegel Abu-abu 63,000.00 63,000.00
11.870 kg PC 1,700.00 20,179.00
0.045 M³ Pasir Pasang 225,000.00 10,125.00
B TENAGA
0.035 OH Tukang Batu 190,000.00 6,650.00
0.013 OH Kepala Tukang 230,000.00 2,990.00
0.120 OH Pekerja 150,000.00 18,000.00
0.014 OH Mandor 230,000.00 3,220.00
C PERALATAN

Jumlah ( A + B + C ) 124,164.00
Keuntungan & Overhead 10 % 12,416.40
Jumlah ……………………… 136,580.40

SNI.47.a 1 M2 Pas. Lantai Granite Kw I


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Granite Kw I 450,000.00 450,000.00
11.870 kg PC 1,700.00 20,179.00
0.045 M³ Pasir Pasang 225,000.00 10,125.00
B TENAGA
0.125 OH Tukang Batu 190,000.00 23,750.00
0.013 OH Kepala Tukang 230,000.00 2,990.00
0.250 OH Pekerja 150,000.00 37,500.00
0.013 OH Mandor 230,000.00 2,990.00
C PERALATAN

Jumlah ( A + B + C ) 547,534.00
Keuntungan & Overhead 10 % 54,753.40
Jumlah ……………………… 602,287.40

SNI.47.b 1 M2 Pas. Lantai Granite Kw II


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Granite Kw II 380,000.00 380,000.00
11.870 kg PC 1,700.00 20,179.00
0.045 M³ Pasir Pasang 225,000.00 10,125.00
B TENAGA
0.125 OH Tukang Batu 190,000.00 23,750.00
0.013 OH Kepala Tukang 230,000.00 2,990.00
0.250 OH Pekerja 150,000.00 37,500.00
0.013 OH Mandor 230,000.00 2,990.00
C PERALATAN

Jumlah ( A + B + C ) 477,534.00
Keuntungan & Overhead 10 % 47,753.40
Jumlah ……………………… 525,287.40

SNI.48 1 M2 Pasangan Lantai Keramik ( KW I Polos )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Lantai Kualitas I (Polos) 110,000.00 115,500.00
14.150 Kg PC 1,700.00 24,055.00
2.000 Kg Semen Warna 15,000.00 30,000.00
0.039 M³ Pasir Pasang 225,000.00 8,775.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 365,930.00
Keuntungan & Overhead 10 % 36,593.00
Jumlah ……………………… 402,523.00

SNI.49 1 M2 Pasangan Lantai Keramik ( KW II Polos )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Lantai Kualitas II (Polos) 90,000.00 94,500.00
14.150 Kg PC 1,700.00 24,055.00
2.000 Kg Semen Warna 15,000.00 30,000.00
0.039 M³ Pasir Pasang 225,000.00 8,775.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 344,930.00
Keuntungan & Overhead 10 % 34,493.00
Jumlah ……………………… 379,423.00

SNI.50 1 M2 Pasangan Lantai Keramik ( KW I Motif )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Lantai Kualitas I (Motif) 140,000.00 147,000.00
14.150 Kg PC 1,700.00 24,055.00
2.000 Kg Semen Warna 15,000.00 30,000.00
0.039 M³ Pasir Pasang 225,000.00 8,775.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 397,430.00
Keuntungan & Overhead 10 % 39,743.00
Jumlah ……………………… 437,173.00

SNI.51 1 M2 Pasangan Lantai Keramik ( KW II Motif )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Lantai Kualitas II (Motif) 120,000.00 126,000.00
14.150 Kg PC 1,700.00 24,055.00
2.000 Kg Semen Warna 15,000.00 30,000.00
0.042 M³ Pasir Pasang 225,000.00 9,450.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 377,105.00
Keuntungan & Overhead 10 % 37,710.50
Jumlah ……………………… 414,815.50

SNI.52 1 M2 Pasangan Lantai Marmer


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Lantai Marmer 600,000.00 630,000.00
8.190 Kg PC 1,700.00 13,923.00
0.134 Kg Semen Warna 15,000.00 2,010.00
0.045 M³ Pasir Pasang 225,000.00 10,125.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 843,658.00
Keuntungan & Overhead 10 % 84,365.80
Jumlah ……………………… 928,023.80

SNI.52.a 1 M2 Pasangan Lantai Keramik Anti Slip


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Lantai Anti Slip Kualitas II 120,000.00 126,000.00
14.150 Kg PC 1,700.00 24,055.00
2.000 Kg Semen Warna 15,000.00 30,000.00
0.042 M³ Pasir Pasang 225,000.00 9,450.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 377,105.00
Keuntungan & Overhead 10 % 37,710.50
Jumlah ……………………… 414,815.50

SNI.53 1 M2 Pasangan dinding keramik ( Kw I Motif )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Dinding Kw I (Motif) 140,000.00 147,000.00
9.300 Kg PC 1,700.00 15,810.00
1.940 Kg Semen Warna 15,000.00 29,100.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.900 OH Pekerja 150,000.00 135,000.00
0.045 OH Mandor 230,000.00 10,350.00
C PERALATAN

Jumlah ( A + B + C ) 437,160.00
Keuntungan & Overhead 10 % 43,716.00
Jumlah ……………………… 480,876.00

SNI.54 1 M2 Pas. Dinding Keramik ( Kw II Motf )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Dinding Kw II (Motif) 120,000.00 126,000.00
9.300 Kg PC 1,700.00 15,810.00
1.940 Kg Semen Warna 15,000.00 29,100.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.900 OH Pekerja 150,000.00 135,000.00
0.045 OH Mandor 230,000.00 10,350.00
C PERALATAN

Jumlah ( A + B + C ) 416,160.00
Keuntungan & Overhead 10 % 41,616.00
Jumlah ……………………… 457,776.00

SNI.55 1 M2 Pas. Dinding Keramik ( Kw I polos )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik 10 x 20 cm 130,000.00 136,500.00
9.300 Kg PC 1,700.00 15,810.00
1.940 Kg Semen Warna 15,000.00 29,100.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.900 OH Pekerja 150,000.00 135,000.00
0.045 OH Mandor 230,000.00 10,350.00
C PERALATAN

Jumlah ( A + B + C ) 426,660.00
Keuntungan & Overhead 10 % 42,666.00
Jumlah ……………………… 469,326.00

SNI.56 1 M2 Pas. Dinding Keramik ( Kw II Polos )


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik Dinding Kw II (Polos) 90,000.00 94,500.00
9.300 Kg PC 1,700.00 15,810.00
1.940 Kg Semen Warna 15,000.00 29,100.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
C PERALATAN

Jumlah ( A + B + C ) 265,810.00
Keuntungan & Overhead 10 % 26,581.00
Jumlah ……………………… 292,391.00

SNI.57.a 1 M2 Pas. Lantai Keramik Cating Motif


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Keramik cutting Motif 160,000.00 168,000.00
9.300 Kg PC 1,700.00 15,810.00
2.750 Kg Semen Warna 15,000.00 41,250.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
C PERALATAN

Jumlah ( A + B + C ) 351,460.00
Keuntungan & Overhead 10 % 35,146.00
Jumlah ……………………… 386,606.00

SNI.57.b 1 M2 Pas. Lantai Coral Sikat


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
10.500 Kg Coral sikat 10,000.00 105,000.00
9.300 Kg PC 1,700.00 15,810.00
2.750 Kg Semen Warna 15,000.00 41,250.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
C PERALATAN

Jumlah ( A + B + C ) 288,460.00
Keuntungan & Overhead 10 % 28,846.00
Jumlah ……………………… 317,306.00

SNI.57.c 1 M2 Pas. Lantai Coral Sikat, Warna


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
10.500 Kg Coral sikat, Warna 16,000.00 168,000.00
9.300 Kg PC 1,700.00 15,810.00
2.750 Kg Semen Warna 15,000.00 41,250.00
0.018 M³ Pasir Pasang 225,000.00 4,050.00
B TENAGA
0.450 OH Tukang Batu 190,000.00 85,500.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
C PERALATAN

Jumlah ( A + B + C ) 351,460.00
Keuntungan & Overhead 10 % 35,146.00
Jumlah ……………………… 386,606.00

SNI.58 1 M2 Pas. Dinding batu paras/Palimanan


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Batu paras/Palimanan 244,000.00 256,200.00
11.750 Kg PC 1,700.00 19,975.00
0.035 M³ Pasir Pasang 225,000.00 7,875.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 471,650.00
Keuntungan & Overhead 10 % 47,165.00
Jumlah ……………………… 518,815.00

SNI.59 1 M2 Pas. Dinding batu tempel hitam bergaris


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.100 m2 Batu Sisir/ Bergaris, hitam 265,000.00 291,500.00
11.750 Kg PC 1,700.00 19,975.00
0.035 M³ Pasir Pasang 225,000.00 7,875.00
B TENAGA
0.350 OH Tukang Batu 190,000.00 66,500.00
0.035 OH Kepala Tukang 230,000.00 8,050.00
0.700 OH Pekerja 150,000.00 105,000.00
0.035 OH Mandor 230,000.00 8,050.00
C PERALATAN

Jumlah ( A + B + C ) 506,950.00
Keuntungan & Overhead 10 % 50,695.00
Jumlah ……………………… 557,645.00

SNI.60.B 1 M2 Pas. Paving Blok bata . T 8 cm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.010 m2 Paving Blok Persegi (t = 8 cm) 80,000.00 80,800.00
B TENAGA
0.500 OH Tukang Batu 190,000.00 95,000.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.500 OH Pekerja 150,000.00 75,000.00
0.001 OH Mandor 230,000.00 299.00
C PERALATAN

Jumlah ( A + B + C ) 262,599.00
Keuntungan & Overhead 10 % 26,259.90
Jumlah ……………………… 288,858.90

SNI.60.P 1 M2 Pas. Paving Blok bata . T 8 cm, Press


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.010 m2 Paving Blok Persegi (t = 8 cm), Press 165,000.00 166,650.00
B TENAGA
0.500 OH Tukang Batu 190,000.00 95,000.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.500 OH Pekerja 150,000.00 75,000.00
0.001 OH Mandor 230,000.00 299.00
C PERALATAN

Jumlah ( A + B + C ) 348,449.00
Keuntungan & Overhead 10 % 34,844.90
Jumlah ……………………… 383,293.90
SNI.61 1 M2 Pas. Paving Blok bata . T 6 cm
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.010 m2 Paving Blok Persegi (t = 6 cm) 65,000.00 65,650.00
B TENAGA
0.500 OH Tukang Batu 190,000.00 95,000.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.500 OH Pekerja 150,000.00 75,000.00
0.001 OH Mandor 230,000.00 299.00
C PERALATAN

Jumlah ( A + B + C ) 247,449.00
Keuntungan & Overhead 10 % 24,744.90
Jumlah ……………………… 272,193.90

SNI.62 1 M2 Pas. Paving Blok persegi/berlian


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.010 m2 Paving Blok Tiga Berlian 200,000.00 202,000.00
B TENAGA
0.500 OH Tukang Batu 190,000.00 95,000.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.500 OH Pekerja 150,000.00 75,000.00
0.001 OH Mandor 230,000.00 299.00
C PERALATAN

Jumlah ( A + B + C ) 383,799.00
Keuntungan & Overhead 10 % 38,379.90
Jumlah ……………………… 422,178.90

SNI.62.1 1 m2 Memasang ornamen terawang custom bahan GRC


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Ornamen terawang custom 938,000.00 984,900.00
11.000 kg Portland Cement 1,700.00 18,700.00
0.035 m3 Pasir Pasang 225,000.00 7,875.00
B TENAGA
0.750 OH Tukang Batu 190,000.00 142,500.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.300 OH Pekerja 150,000.00 45,000.00
0.015 OH Mandor 230,000.00 3,450.00
C PERALATAN

Jumlah ( A + B + C ) 1,213,925.00
Keuntungan & Overhead 10 % 121,392.50
Jumlah ……………………… 1,335,317.50

SNI.62.2 1 m2 Memasang acian motif tali air


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
3.250 kg Portland Cement 1,700.00 5,525.00
B TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
C PERALATAN

Jumlah ( A + B + C ) 59,125.00
Keuntungan & Overhead 10 % 5,912.50
Jumlah ……………………… 65,037.50

SNI.62.3 1 m Memasang plint ukuran (60 x 10x 4 ) cm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.700 Buah Hospital plint 60 x 10 x 4 82,000.00 139,400.00
1.140 kg Portland Cement 1,700.00 1,938.00
0.003 m3 Pasir Pasang 225,000.00 675.00
0.100 kg Semen warna 15,000.00 1,500.00
B TENAGA
0.090 OH Tukang Batu 190,000.00 17,100.00
0.009 OH Kepala Tukang 230,000.00 2,070.00
0.090 OH Pekerja 150,000.00 13,500.00
0.005 OH Mandor 230,000.00 1,150.00
C PERALATAN

Jumlah ( A + B + C ) 177,333.00
Keuntungan & Overhead 10 % 17,733.30
Jumlah ……………………… 195,066.30

SNI.62.4 1 m Memasang stepnose tangga ukuran (10 x 40) cm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
2.650 Buah Stepnose tangga 10x40 cm 32,000.00 84,800.00
1.140 kg Portland Cement 1,700.00 1,938.00
0.003 m3 Pasir Pasang 225,000.00 675.00
0.100 kg Semen warna 15,000.00 1,500.00
B TENAGA
0.010 OH Tukang Batu 190,000.00 1,900.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.100 OH Pekerja 150,000.00 15,000.00
0.003 OH Mandor 230,000.00 575.00
C PERALATAN

Jumlah ( A + B + C ) 117,888.00
Keuntungan & Overhead 10 % 11,788.80
Jumlah ……………………… 129,676.80

SNI.62.5 1 m2 Memasang lantai karpet


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.050 m2 Karpet 25,000.00 26,250.00
0.350 kg Lem 55,000.00 19,250.00
B TENAGA
0.470 OH Tukang Kayu 190,000.00 89,300.00
0.017 OH Kepala Tukang 230,000.00 3,910.00
0.170 OH Pekerja 150,000.00 25,500.00
0.009 OH Mandor 230,000.00 2,070.00
C PERALATAN

Jumlah ( A + B + C ) 166,280.00
Keuntungan & Overhead 10 % 16,628.00
Jumlah ……………………… 182,908.00

SNI.62.6 1 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
11.870 Buah Lantai Vinyl Kw I 58,500.00 694,395.00
0.350 kg Lem vinyl 55,000.00 19,250.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
C PERALATAN

Jumlah ( A + B + C ) 769,935.00
Keuntungan & Overhead 10 % 76,993.50
Jumlah ……………………… 846,928.50

SNI.62.7 1 m2 Memasang lantai parquete ukuran (30 x 30) cm KL II


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
11.870 Buah Lantai Vinyl Kw II 36,000.00 427,320.00
0.350 kg Lem perquete 55,000.00 19,250.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
C PERALATAN

Jumlah ( A + B + C ) 502,860.00
Keuntungan & Overhead 10 % 50,286.00
Jumlah ……………………… 553,146.00

SNI.62.W 1 m2 Pasang conblock tipe segi-empat warna 8 cm, K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Conblock tipe segi-empat abu-abu 8 cm, K-300 127,000.00 127,000.00
0.050 m3 Pasir urug 225,000.00 11,250.00
B TENAGA
0.250 OH Tukang Batu 190,000.00 47,500.00
0.025 OH Kepala Tukang 230,000.00 5,750.00
0.500 OH Pekerja 150,000.00 75,000.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN

Jumlah ( A + B + C ) 272,250.00
Keuntungan & Overhead 10 % 27,225.00
Jumlah ……………………… 299,475.00

SNI.62.A 1 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 Conblock tipe segi-enam abu-abu 8 cm, K-300 122,000.00 122,000.00
0.050 m3 Pasir urug 225,000.00 11,250.00
B TENAGA
0.250 OH Tukang Batu 190,000.00 47,500.00
0.025 OH Kepala Tukang 230,000.00 5,750.00
0.500 OH Pekerja 150,000.00 75,000.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN

Jumlah ( A + B + C ) 267,250.00
Keuntungan & Overhead 10 % 26,725.00
Jumlah ……………………… 293,975.00

SNI.62.7 1 m Pasang kansten beton


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.667 m2 Kanstin 75,000.00 125,000.00
2.670 m3 Semen 1,700.00 4,539.00
0.030 m3 Batu kali 245,000.00 7,350.00
0.050 m3 pasir urug 195,000.00 9,750.00
B TENAGA
0.150 OH Tukang Batu 190,000.00 28,500.00
0.025 OH Kepala Tukang 230,000.00 5,750.00
0.050 OH Pekerja 150,000.00 7,500.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN

Jumlah ( A + B + C ) 194,139.00
Keuntungan & Overhead 10 % 19,413.90
Jumlah ……………………… 213,552.90

SNI.62.8 1 m2 Pasang grassblocksegi 8 tebal 8 cm


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.000 m2 grassblock tebal 8 cm 140,000.00 140,000.00
0.050 m3 Pasir urug 195,000.00 9,750.00
B TENAGA
0.250 OH Tukang Batu 190,000.00 47,500.00
0.025 OH Kepala Tukang 230,000.00 5,750.00
0.500 OH Pekerja 150,000.00 75,000.00
0.025 OH Mandor 230,000.00 5,750.00
C PERALATAN

Jumlah ( A + B + C ) 283,750.00
Keuntungan & Overhead 10 % 28,375.00
Jumlah ……………………… 312,125.00

PEKERJAAN KONSTRUKSI BETON


SNI.63.a 1 M3 Membuat Beton Dengan Mutu K-300
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
413.000 Kg Semen 1,700.00 702,100.00
1.021 M³ Kerikil Pecah 2/3 750,000.00 765,750.00
0.681 M³ Pasir Beton 355,000.00 241,755.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,694,445.00
Keuntungan & Overhead 10 % 269,444.50
Jumlah ……………………… 2,963,889.50

SNI.64.a 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
130.000 Kg Besi beton ulir 19,000.00 2,470,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.753 OH Pekerja 150,000.00 412,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.910 OH Tukang besi 190,000.00 172,900.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.210 OH Mandor 230,000.00 48,300.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,769,545.00
Keuntungan & Overhead 10 % 576,954.50
Jumlah ……………………… 6,346,499.50

SNI.65.a 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,202,205.00
Keuntungan & Overhead 10 % 620,220.50
Jumlah ……………………… 6,822,425.50

SNI.66.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,405,730.00
Keuntungan & Overhead 10 % 640,573.00
Jumlah ……………………… 7,046,303.00

SNI.67.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,946,555.00
Keuntungan & Overhead 10 % 694,655.50
Jumlah ……………………… 7,641,210.50

SNI.68.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,028,205.00
Keuntungan & Overhead 10 % 802,820.50
Jumlah ……………………… 8,831,025.50

SNI.69.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,418,125.00
Keuntungan & Overhead 10 % 841,812.50
Jumlah ……………………… 9,259,937.50

SNI.70.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,499,775.00
Keuntungan & Overhead 10 % 949,977.50
Jumlah ……………………… 10,449,752.50

SNI.71.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
250.000 Kg Besi beton ulir 19,000.00 4,750,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.733 OH Pekerja 150,000.00 559,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.750 OH Tukang besi 190,000.00 332,500.00
0.227 OH Kepala Tukang 230,000.00 52,210.00
0.265 OH Mandor 230,000.00 60,950.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 10,581,425.00
Keuntungan & Overhead 10 % 1,058,142.50
Jumlah ……………………… 11,639,567.50

SNI.72.a 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,781,300.00
Keuntungan & Overhead 10 % 778,130.00
Jumlah ……………………… 8,559,430.00

SNI.73.a 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,322,125.00
Keuntungan & Overhead 10 % 832,212.50
Jumlah ……………………… 9,154,337.50

SNI.74.a 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,403,775.00
Keuntungan & Overhead 10 % 940,377.50
Jumlah ……………………… 10,344,152.50

SNI.75.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,741,300.00
Keuntungan & Overhead 10 % 774,130.00
Jumlah ……………………… 8,515,430.00

SNI.76.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-300


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
413.000 Kg Semen portland 1,700.00 702,100.00
0.681 m3 Pasir beton 355,000.00 241,755.00
1.021 m3 Koral beton 750,000.00 765,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,282,125.00
Keuntungan & Overhead 10 % 828,212.50
Jumlah ……………………… 9,110,337.50

SNI.63.b 1 M3 Membuat Beton Dengan Mutu K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
406.000 Kg Semen 1,700.00 690,200.00
1.026 M³ Kerikil Pecah 2/3 750,000.00 769,500.00
0.684 M³ Pasir Beton 355,000.00 242,820.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,687,360.00
Keuntungan & Overhead 10 % 268,736.00
Jumlah ……………………… 2,956,096.00

SNI.64.b 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
130.000 Kg Besi beton ulir 19,000.00 2,470,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.753 OH Pekerja 150,000.00 412,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.910 OH Tukang besi 190,000.00 172,900.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.210 OH Mandor 230,000.00 48,300.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,762,460.00
Keuntungan & Overhead 10 % 576,246.00
Jumlah ……………………… 6,338,706.00

SNI.65.b 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,195,120.00
Keuntungan & Overhead 10 % 619,512.00
Jumlah ……………………… 6,814,632.00

SNI.66.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,398,645.00
Keuntungan & Overhead 10 % 639,864.50
Jumlah ……………………… 7,038,509.50

SNI.67.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,939,470.00
Keuntungan & Overhead 10 % 693,947.00
Jumlah ……………………… 7,633,417.00

SNI.68.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,021,120.00
Keuntungan & Overhead 10 % 802,112.00
Jumlah ……………………… 8,823,232.00

SNI.69.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,411,040.00
Keuntungan & Overhead 10 % 841,104.00
Jumlah ……………………… 9,252,144.00

SNI.70.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,492,690.00
Keuntungan & Overhead 10 % 949,269.00
Jumlah ……………………… 10,441,959.00

SNI.71.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1 0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
2 3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
250.000 Kg Besi beton ulir 19,000.00 4,750,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.733 OH Pekerja 150,000.00 559,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.750 OH Tukang besi 190,000.00 332,500.00
0.227 OH Kepala Tukang 230,000.00 52,210.00
0.265 OH Mandor 230,000.00 60,950.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 10,574,340.00
Keuntungan & Overhead 10 % 1,057,434.00
Jumlah ……………………… 11,631,774.00

SNI.72.b 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,774,215.00
Keuntungan & Overhead 10 % 777,421.50
Jumlah ……………………… 8,551,636.50

SNI.73.b 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,315,040.00
Keuntungan & Overhead 10 % 831,504.00
Jumlah ……………………… 9,146,544.00
SNI.74.b 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-275
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,396,690.00
Keuntungan & Overhead 10 % 939,669.00
Jumlah ……………………… 10,336,359.00

SNI.75.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,734,215.00
Keuntungan & Overhead 10 % 773,421.50
Jumlah ……………………… 8,507,636.50

SNI.76.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-275


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
406.000 Kg Semen portland 1,700.00 690,200.00
0.684 m3 Pasir beton 355,000.00 242,820.00
1.026 m3 Koral beton 750,000.00 769,500.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,275,040.00
Keuntungan & Overhead 10 % 827,504.00
Jumlah ……………………… 9,102,544.00

SNI.77.a 1 M3 Membuat Beton Dengan Mutu K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
384.000 Kg Semen 1,700.00 652,800.00
1.039 M³ Kerikil Pecah 2/3 750,000.00 779,250.00
0.692 M³ Pasir Beton 355,000.00 245,660.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,662,550.00
Keuntungan & Overhead 10 % 266,255.00
Jumlah ……………………… 2,928,805.00

SNI.78.a 1 M3 Pekerjaan Pondasi Beton Bertulang ( 130 Kg Besi + Bekisting) M-K250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
130.000 Kg Besi beton ulir 19,000.00 2,470,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.753 OH Pekerja 150,000.00 412,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.910 OH Tukang besi 190,000.00 172,900.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.210 OH Mandor 230,000.00 48,300.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,737,650.00
Keuntungan & Overhead 10 % 573,765.00
Jumlah ……………………… 6,311,415.00

SNI.79.a 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,170,310.00
Keuntungan & Overhead 10 % 617,031.00
Jumlah ……………………… 6,787,341.00

SNI.80.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,373,835.00
Keuntungan & Overhead 10 % 637,383.50
Jumlah ……………………… 7,011,218.50

SNI.81.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,914,660.00
Keuntungan & Overhead 10 % 691,466.00
Jumlah ……………………… 7,606,126.00

SNI.82.a 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,996,310.00
Keuntungan & Overhead 10 % 799,631.00
Jumlah ……………………… 8,795,941.00

SNI.83.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,386,230.00
Keuntungan & Overhead 10 % 838,623.00
Jumlah ……………………… 9,224,853.00

SNI.84.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,467,880.00
Keuntungan & Overhead 10 % 946,788.00
Jumlah ……………………… 10,414,668.00

SNI.85.a 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
250.000 Kg Besi beton ulir 19,000.00 4,750,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.733 OH Pekerja 150,000.00 559,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.750 OH Tukang besi 190,000.00 332,500.00
0.227 OH Kepala Tukang 230,000.00 52,210.00
0.265 OH Mandor 230,000.00 60,950.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 10,549,530.00
Keuntungan & Overhead 10 % 1,054,953.00
Jumlah ……………………… 11,604,483.00

SNI.86.a 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,749,405.00
Keuntungan & Overhead 10 % 774,940.50
Jumlah ……………………… 8,524,345.50

SNI.87.a 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,290,230.00
Keuntungan & Overhead 10 % 829,023.00
Jumlah ……………………… 9,119,253.00

SNI.88.a 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,371,880.00
Keuntungan & Overhead 10 % 937,188.00
Jumlah ……………………… 10,309,068.00

SNI.89.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,709,405.00
Keuntungan & Overhead 10 % 770,940.50
Jumlah ……………………… 8,480,345.50

SNI.90.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-250


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
384.000 Kg Semen portland 1,700.00 652,800.00
0.692 m3 Pasir beton 355,000.00 245,660.00
1.039 m3 Koral beton 750,000.00 779,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,250,230.00
Keuntungan & Overhead 10 % 825,023.00
Jumlah ……………………… 9,075,253.00

SNI.77.b 1 M3 Membuat Beton Dengan Mutu K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
371.000 Kg Semen 1,700.00 630,700.00
1.047 M³ Kerikil Pecah 2/3 750,000.00 785,250.00
0.698 M³ Pasir Beton 355,000.00 247,790.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,648,580.00
Keuntungan & Overhead 10 % 264,858.00
Jumlah ……………………… 2,913,438.00
SNI.78.b 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,615,515.00
Keuntungan & Overhead 10 % 561,551.50
Jumlah ……………………… 6,177,066.50

SNI.79.b 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,156,340.00
Keuntungan & Overhead 10 % 615,634.00
Jumlah ……………………… 6,771,974.00

SNI.80.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,359,865.00
Keuntungan & Overhead 10 % 635,986.50
Jumlah ……………………… 6,995,851.50

SNI.81.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,900,690.00
Keuntungan & Overhead 10 % 690,069.00
Jumlah ……………………… 7,590,759.00

SNI.82.b 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,982,340.00
Keuntungan & Overhead 10 % 798,234.00
Jumlah ……………………… 8,780,574.00

SNI.83.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,372,260.00
Keuntungan & Overhead 10 % 837,226.00
Jumlah ……………………… 9,209,486.00

SNI.84.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,453,910.00
Keuntungan & Overhead 10 % 945,391.00
Jumlah ……………………… 10,399,301.00

SNI.85.b 1 M3 Pekerjaan Kolom Beton Bertulang ( 250 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
250.000 Kg Besi beton ulir 19,000.00 4,750,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.733 OH Pekerja 150,000.00 559,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.750 OH Tukang besi 190,000.00 332,500.00
0.227 OH Kepala Tukang 230,000.00 52,210.00
0.265 OH Mandor 230,000.00 60,950.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 10,535,560.00
Keuntungan & Overhead 10 % 1,053,556.00
Jumlah ……………………… 11,589,116.00

SNI.86.b 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,735,435.00
Keuntungan & Overhead 10 % 773,543.50
Jumlah ……………………… 8,508,978.50
SNI.87.b 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,276,260.00
Keuntungan & Overhead 10 % 827,626.00
Jumlah ……………………… 9,103,886.00

SNI.88.b 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton ulir 19,000.00 3,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 9,357,910.00
Keuntungan & Overhead 10 % 935,791.00
Jumlah ……………………… 10,293,701.00

SNI.89.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton ulir 19,000.00 2,375,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,695,435.00
Keuntungan & Overhead 10 % 769,543.50
Jumlah ……………………… 8,464,978.50

SNI.90.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,236,260.00
Keuntungan & Overhead 10 % 823,626.00
Jumlah ……………………… 9,059,886.00

SNI.91 1 M3 Membuat Beton Dengan Mutu K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
352.000 Kg Semen 1,700.00 598,400.00
1.031 M³ Kerikil Pecah 2/3 750,000.00 773,250.00
0.731 M³ Pasir Beton 355,000.00 259,505.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,615,995.00
Keuntungan & Overhead 10 % 261,599.50
Jumlah ……………………… 2,877,594.50

SNI.92 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,207,930.00
Keuntungan & Overhead 10 % 520,793.00
Jumlah ……………………… 5,728,723.00

SNI.93 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M-K200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,673,755.00
Keuntungan & Overhead 10 % 567,375.50
Jumlah ……………………… 6,241,130.50

SNI.94 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,952,280.00
Keuntungan & Overhead 10 % 595,228.00
Jumlah ……………………… 6,547,508.00

SNI.95 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,418,105.00
Keuntungan & Overhead 10 % 641,810.50
Jumlah ……………………… 7,059,915.50

SNI.96 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,349,755.00
Keuntungan & Overhead 10 % 734,975.50
Jumlah ……………………… 8,084,730.50

SNI.97 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,423,850.00
Keuntungan & Overhead 10 % 742,385.00
Jumlah ……………………… 8,166,235.00

SNI.98 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,889,675.00
Keuntungan & Overhead 10 % 788,967.50
Jumlah ……………………… 8,678,642.50

SNI.99 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,821,325.00
Keuntungan & Overhead 10 % 882,132.50
Jumlah ……………………… 9,703,457.50

SNI.100 1 M3 Pekerjaan Balok Beton Bertulang ( 120 Kg Besi + Bekisting) M-K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
120.000 Kg Besi Beton polos 16,000.00 1,920,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.823 OH Pekerja 150,000.00 423,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.840 OH Tukang besi 190,000.00 159,600.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.213 OH Mandor 230,000.00 48,990.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,234,685.00
Keuntungan & Overhead 10 % 723,468.50
Jumlah ……………………… 7,958,153.50

SNI.101 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K-200


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,327,850.00
Keuntungan & Overhead 10 % 732,785.00
Jumlah ……………………… 8,060,635.00

SNI.102 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 200
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,725,325.00
Keuntungan & Overhead 10 % 872,532.50
Jumlah ……………………… 9,597,857.50

SNI.103 1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 200
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
120.000 Kg Besi Beton polos 16,000.00 1,920,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.823 OH Pekerja 150,000.00 423,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.840 OH Tukang besi 190,000.00 159,600.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.213 OH Mandor 230,000.00 48,990.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,194,685.00
Keuntungan & Overhead 10 % 719,468.50
Jumlah ……………………… 7,914,153.50

SNI.104 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 200
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
352.000 Kg Semen portland 1,700.00 598,400.00
0.731 m3 Pasir beton 355,000.00 259,505.00
1.031 m3 Koral beton 750,000.00 773,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,753,675.00
Keuntungan & Overhead 10 % 775,367.50
Jumlah ……………………… 8,529,042.50

SNI.105 1 M3 Membuat Beton Dengan Mutu K- 175


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
326.000 Kg Semen 1,700.00 554,200.00
1.029 M³ Kerikil Pecah 2/3 750,000.00 771,750.00
0.760 M³ Pasir Beton 355,000.00 269,800.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,580,590.00
Keuntungan & Overhead 10 % 258,059.00
Jumlah ……………………… 2,838,649.00

SNI.106 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,172,525.00
Keuntungan & Overhead 10 % 517,252.50
Jumlah ……………………… 5,689,777.50

SNI.107 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M- K 175


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,638,350.00
Keuntungan & Overhead 10 % 563,835.00
Jumlah ……………………… 6,202,185.00

SNI.108 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,916,875.00
Keuntungan & Overhead 10 % 591,687.50
Jumlah ……………………… 6,508,562.50

SNI.109 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,382,700.00
Keuntungan & Overhead 10 % 638,270.00
Jumlah ……………………… 7,020,970.00

SNI.110 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,314,350.00
Keuntungan & Overhead 10 % 731,435.00
Jumlah ……………………… 8,045,785.00

SNI.111 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,388,445.00
Keuntungan & Overhead 10 % 738,844.50
Jumlah ……………………… 8,127,289.50

SNI.112 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,854,270.00
Keuntungan & Overhead 10 % 785,427.00
Jumlah ……………………… 8,639,697.00

SNI.113 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,785,920.00
Keuntungan & Overhead 10 % 878,592.00
Jumlah ……………………… 9,664,512.00
SNI.114 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,292,445.00
Keuntungan & Overhead 10 % 729,244.50
Jumlah ……………………… 8,021,689.50

SNI.115 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,758,270.00
Keuntungan & Overhead 10 % 775,827.00
Jumlah ……………………… 8,534,097.00

SNI.116 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,689,920.00
Keuntungan & Overhead 10 % 868,992.00
Jumlah ……………………… 9,558,912.00

SNI.117 1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
120.000 Kg Besi Beton polos 16,000.00 1,920,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.823 OH Pekerja 150,000.00 423,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.840 OH Tukang besi 190,000.00 159,600.00
0.136 OH Kepala Tukang 230,000.00 31,280.00
0.213 OH Mandor 230,000.00 48,990.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,159,280.00
Keuntungan & Overhead 10 % 715,928.00
Jumlah ……………………… 7,875,208.00

SNI.118 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 175
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
326.000 Kg Semen portland 1,700.00 554,200.00
0.760 m3 Pasir beton 355,000.00 269,800.00
1.029 m3 Koral beton 750,000.00 771,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,718,270.00
Keuntungan & Overhead 10 % 771,827.00
Jumlah ……………………… 8,490,097.00

SNI.119 1 M3 Membuat Beton Dengan Mutu K- 150


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
299.000 Kg Semen 1,700.00 508,300.00
1.017 M³ Kerikil Pecah 2/3 750,000.00 762,750.00
0.799 M³ Pasir Beton 355,000.00 283,645.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A +B+C) 2,539,535.00
Keuntungan & Overhead 10 % 253,953.50
Jumlah ……………………… 2,793,488.50

SNI.120 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,131,470.00
Keuntungan & Overhead 10 % 513,147.00
Jumlah ……………………… 5,644,617.00

SNI.121 1 M3 Pekerjaan Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting) M- K 150


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,597,295.00
Keuntungan & Overhead 10 % 559,729.50
Jumlah ……………………… 6,157,024.50

SNI.122 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,875,820.00
Keuntungan & Overhead 10 % 587,582.00
Jumlah ……………………… 6,463,402.00

SNI.123 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,341,645.00
Keuntungan & Overhead 10 % 634,164.50
Jumlah ……………………… 6,975,809.50

SNI.124 1 M3 Pekerjaan Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) M-K 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.243 OH Pekerja 150,000.00 486,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.185 OH Kepala Tukang 230,000.00 42,550.00
0.238 OH Mandor 230,000.00 54,740.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,273,295.00
Keuntungan & Overhead 10 % 727,329.50
Jumlah ……………………… 8,000,624.50

SNI.125 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.088 OH Tukang besi 190,000.00 16,625.00
0.061 OH Kepala Tukang 230,000.00 13,972.50
0.170 OH Mandor 230,000.00 39,100.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,169,302.50
Keuntungan & Overhead 10 % 716,930.25
Jumlah ……………………… 7,886,232.75

SNI.126 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.105 OH Tukang besi 190,000.00 19,950.00
0.063 OH Kepala Tukang 230,000.00 14,375.00
0.171 OH Mandor 230,000.00 39,330.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,599,510.00
Keuntungan & Overhead 10 % 759,951.00
Jumlah ……………………… 8,359,461.00

SNI.127 1 M3 Pekerjaan Kolom Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.140 OH Tukang besi 190,000.00 26,600.00
0.066 OH Kepala Tukang 230,000.00 15,180.00
0.173 OH Mandor 230,000.00 39,790.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,459,925.00
Keuntungan & Overhead 10 % 845,992.50
Jumlah ……………………… 9,305,917.50

SNI.128 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.088 OH Tukang besi 190,000.00 16,625.00
0.061 OH Kepala Tukang 230,000.00 13,972.50
0.170 OH Mandor 230,000.00 39,100.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,073,302.50
Keuntungan & Overhead 10 % 707,330.25
Jumlah ……………………… 7,780,632.75

SNI.129 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.105 OH Tukang besi 190,000.00 19,950.00
0.063 OH Kepala Tukang 230,000.00 14,375.00
0.171 OH Mandor 230,000.00 39,330.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,503,510.00
Keuntungan & Overhead 10 % 750,351.00
Jumlah ……………………… 8,253,861.00

SNI.130 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi Beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.383 OH Pekerja 150,000.00 507,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.140 OH Tukang besi 190,000.00 26,600.00
0.066 OH Kepala Tukang 230,000.00 15,180.00
0.173 OH Mandor 230,000.00 39,790.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,363,925.00
Keuntungan & Overhead 10 % 836,392.50
Jumlah ……………………… 9,200,317.50

SNI.131 1 M3 Pekerjaan Lantai Beton Bertulang ( 120 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
120.000 Kg Besi Beton polos 16,000.00 1,920,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.823 OH Pekerja 150,000.00 423,450.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.084 OH Tukang besi 190,000.00 15,960.00
0.060 OH Kepala Tukang 230,000.00 13,892.00
0.170 OH Mandor 230,000.00 39,054.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,947,261.00
Keuntungan & Overhead 10 % 694,726.10
Jumlah ……………………… 7,641,987.10

SNI.132 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 150
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
299.000 Kg Semen portland 1,700.00 508,300.00
0.799 m3 Pasir beton 355,000.00 283,645.00
1.017 m3 Koral beton 750,000.00 762,750.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.105 OH Tukang besi 190,000.00 19,950.00
0.063 OH Kepala Tukang 230,000.00 14,375.00
0.171 OH Mandor 230,000.00 39,330.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,463,510.00
Keuntungan & Overhead 10 % 746,351.00
Jumlah ……………………… 8,209,861.00

SNI.133 1 M3 Membuat Beton Dengan Mutu K- 125


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
247.000 Kg Semen 1,700.00 419,900.00
0.740 M³ Kerikil Pecah 2/3 750,000.00 555,000.00
0.621 M³ Pasir Beton 355,000.00 220,455.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,180,195.00
Keuntungan & Overhead 10 % 218,019.50
Jumlah ……………………… 2,398,214.50

SNI.134 1 M3 Pekerjaan Pondasi Beton Bertulang ( 110 Kg Besi + Bekisting) M-K 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
110.000 Kg Besi Beton polos 16,000.00 1,760,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.613 OH Pekerja 150,000.00 391,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.770 OH Tukang besi 190,000.00 146,300.00
0.122 OH Kepala Tukang 230,000.00 28,060.00
0.202 OH Mandor 230,000.00 46,460.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 4,492,635.00
Keuntungan & Overhead 10 % 449,263.50
Jumlah ……………………… 4,941,898.50

SNI.135 1 M3 Pekerjaan Pondasi Beton Bertulang ( 125 Kg Besi + Bekisting) M- K 125


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
1.500 kg Paku 5 cm - 12 cm 28,000.00 42,000.00
0.400 Ltr Minyak bekisting 18,000.00 7,200.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 4,772,130.00
Keuntungan & Overhead 10 % 477,213.00
Jumlah ……………………… 5,249,343.00

SNI.136 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) M-K 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.718 OH Pekerja 150,000.00 407,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,516,480.00
Keuntungan & Overhead 10 % 551,648.00
Jumlah ……………………… 6,068,128.00

SNI.137 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) M-K 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 5,982,305.00
Keuntungan & Overhead 10 % 598,230.50
Jumlah ……………………… 6,580,535.50

SNI.138 1 M3 Pekerjaan Sloof Beton Bertulang ( 175 Kg Besi + Bekisting) M-K 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
175.000 Kg Besi Beton polos 16,000.00 2,800,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.068 OH Pekerja 150,000.00 460,200.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.168 OH Kepala Tukang 230,000.00 38,525.00
0.228 OH Mandor 230,000.00 52,440.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,448,130.00
Keuntungan & Overhead 10 % 644,813.00
Jumlah ……………………… 7,092,943.00

SNI.139 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,988,050.00
Keuntungan & Overhead 10 % 698,805.00
Jumlah ……………………… 7,686,855.00

SNI.140 1 M3 Pekerjaan Kolom Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,453,875.00
Keuntungan & Overhead 10 % 745,387.50
Jumlah ……………………… 8,199,262.50
SNI.141 1 M3 Pekerjaan Kolom Beton Bertulang ( 175 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi Beton polos 16,000.00 2,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.208 OH Pekerja 150,000.00 481,200.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,919,700.00
Keuntungan & Overhead 10 % 791,970.00
Jumlah ……………………… 8,711,670.00

SNI.142 1 M3 Pekerjaan Balok Beton Bertulang ( 125 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi Beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.858 OH Pekerja 150,000.00 428,700.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,892,050.00
Keuntungan & Overhead 10 % 689,205.00
Jumlah ……………………… 7,581,255.00

SNI.143 1 M3 Pekerjaan Balok Beton Bertulang ( 150 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi Beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,357,875.00
Keuntungan & Overhead 10 % 735,787.50
Jumlah ……………………… 8,093,662.50

SNI.144 1 M3 Pekerjaan Balok Beton Bertulang ( 175 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi Beton polos 16,000.00 2,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kawat beton 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.208 OH Pekerja 150,000.00 481,200.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,823,700.00
Keuntungan & Overhead 10 % 782,370.00
Jumlah ……………………… 8,606,070.00

SNI.145 1 M3 Pekerjaan Lantai Beton Bertulang ( 110 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
110.000 Kg Besi Beton polos 16,000.00 1,760,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.753 OH Pekerja 150,000.00 412,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.770 OH Tukang besi 190,000.00 146,300.00
0.129 OH Kepala Tukang 230,000.00 29,670.00
0.209 OH Mandor 230,000.00 48,070.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,572,555.00
Keuntungan & Overhead 10 % 657,255.50
Jumlah ……………………… 7,229,810.50

SNI.146 1 M3 Pekerjaan Lantai Beton Bertulang ( 130 Kg Besi + Bekisting) M-K- 125
Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
130.000 Kg Besi Beton polos 16,000.00 2,080,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 750,000.00 555,000.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.910 OH Tukang besi 190,000.00 172,900.00
0.143 OH Kepala Tukang 230,000.00 32,890.00
0.217 OH Mandor 230,000.00 49,910.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 6,945,215.00
Keuntungan & Overhead 10 % 694,521.50
Jumlah ……………………… 7,639,736.50

SNI.147 1 M3 Pekerjaan Dinding Beton Bertulang ( 150 Kg Besi + Bekisting) M - K 225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.240 m3 Kayu Kelas III 2,600,000.00 624,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
14.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 154,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.033 OH Pekerja 150,000.00 454,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,126,260.00
Keuntungan & Overhead 10 % 812,626.00
Jumlah ……………………… 8,938,886.00

SNI.148 1 M3 Pekerjaan Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) M - K - 225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi beton ulir 19,000.00 3,325,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
3.208 OH Pekerja 150,000.00 481,200.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,817,085.00
Keuntungan & Overhead 10 % 881,708.50
Jumlah ……………………… 9,698,793.50

SNI.149 1 M3 Pekerjaan Tangga Beton Bertulang ( 150 Kg Besi + Bekisting) M - K - 225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton ulir 19,000.00 2,850,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 8,238,740.00
Keuntungan & Overhead 10 % 823,874.00
Jumlah ……………………… 9,062,614.00

SNI.150 1 M3 Pekerjaan Tangga Beton Bertulang ( 130 Kg Besi + Bekisting) M - K - 225


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
130.000 Kg Besi beton ulir 19,000.00 2,470,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
371.000 Kg Semen portland 1,700.00 630,700.00
0.698 m3 Pasir beton 355,000.00 247,790.00
1.047 m3 Koral beton 750,000.00 785,250.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
2.893 OH Pekerja 150,000.00 433,950.00
0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.910 OH Tukang besi 190,000.00 172,900.00
0.143 OH Kepala Tukang 230,000.00 32,890.00
0.217 OH Mandor 230,000.00 49,910.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 7,843,600.00
Keuntungan & Overhead 10 % 784,360.00
Jumlah ……………………… 8,627,960.00

SNI.151 1 M2 Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Tebal = 5 Cm)


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
10.000 Kg Semen 1,700.00 17,000.00
0.044 M³ Batu Kerikil 575,000.00 25,300.00
0.026 M³ Pasir Beton 355,000.00 9,230.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.020 OH Tukang Batu 190,000.00 3,800.00
0.002 OH Kepala Tukang 230,000.00 460.00
1.150 OH Pekerja 150,000.00 172,500.00
0.006 OH Mandor 230,000.00 1,380.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 945,420.00
Keuntungan & Overhead 10 % 94,542.00
Jumlah ……………………… 1,039,962.00

SNI.152 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
200.000 Kg Semen 1,700.00 340,000.00
0.862 M³ Batu Kerikil 575,000.00 495,650.00
0.522 M³ Pasir Beton 355,000.00 185,310.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.250 OH Tukang Batu 190,000.00 47,500.00
0.220 OH Kepala Tukang 230,000.00 50,600.00
1.320 OH Pekerja 150,000.00 198,000.00
0.013 OH Mandor 230,000.00 3,036.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,035,846.00
Keuntungan & Overhead 10 % 203,584.60
Jumlah ……………………… 2,239,430.60

SNI.153 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr


Koefisen satuan Uraian Harga satuan Jumlah harga
A BAHAN
247.000 Kg Semen 1,700.00 419,900.00
0.740 M³ Batu Kerikil 575,000.00 425,500.00
0.621 M³ Pasir Beton 355,000.00 220,455.00
215.000 Ltr Air kerja 3,000.00 645,000.00
B TENAGA
0.189 OH Tukang Batu 190,000.00 35,910.00
0.019 OH Kepala Tukang 230,000.00 4,370.00
1.323 OH Pekerja 150,000.00 198,450.00
0.132 OH Mandor 230,000.00 30,360.00
C PERALATAN
0.250 Hri Sewa Molen Kpst 0.3 m3 283,000.00 70,750.00
Jumlah ( A + B + C ) 2,050,695.00
Keuntungan & Overhead 10 % 205,069.50
Jumlah ……………………… 2,255,764.50

SNI.156 1 M3 Pekerjaan Sloof Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
150.000 Kg Besi beton polos 16,000.00 2,400,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00

2.893 OH Pekerja 150,000.00 433,950.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.150 OH Kepala Tukang 230,000.00 34,500.00
0.218 OH Mandor 230,000.00 50,140.00
Jumlah ( A + B + C ) 5,137,055.00
Keuntungan & Overhead 10 % 513,705.50
Jumlah ……………………… 5,650,760.50

SNI.157 1 M3 Pekerjaan Sloof Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
125.000 Kg Besi beton polos 16,000.00 2,000,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00

2.718 OH Pekerja 150,000.00 407,700.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.133 OH Kepala Tukang 230,000.00 30,475.00
0.208 OH Mandor 230,000.00 47,840.00
Jumlah ( A + B + C ) 4,671,230.00
Keuntungan & Overhead 10 % 467,123.00
Jumlah ……………………… 5,138,353.00

SNI.158 1 M3 Pekerjaan Sloof Beton Bertulang ( 120 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
120.000 Kg Besi beton polos 16,000.00 1,920,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00

2.683 OH Pekerja 150,000.00 402,450.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.840 OH Tukang besi 190,000.00 159,600.00
0.129 OH Kepala Tukang 230,000.00 29,670.00
0.206 OH Mandor 230,000.00 47,380.00
Jumlah ( A + B + C ) 4,578,065.00
Keuntungan & Overhead 10 % 457,806.50
Jumlah ……………………… 5,035,871.50

SNI.159 1 M3 Pekerjaan Sloof Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.270 m3 Kayu Kelas III (papan) 2,600,000.00 702,000.00
2.000 kg Paku 5 cm - 12 cm 28,000.00 56,000.00
0.600 Ltr Minyak bekisting 18,000.00 10,800.00
100.000 Kg Besi beton polos 16,000.00 1,600,000.00
3.000 Kg Kawat beton 33,000.00 99,000.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00

2.543 OH Pekerja 150,000.00 381,450.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.260 OH Tukang kayu 190,000.00 49,400.00
0.700 OH Tukang besi 190,000.00 133,000.00
0.115 OH Kepala Tukang 230,000.00 26,450.00
0.198 OH Mandor 230,000.00 45,540.00
Jumlah ( A + B + C ) 4,205,405.00
Keuntungan & Overhead 10 % 420,540.50
Jumlah ……………………… 4,625,945.50

SNI.162 1 M3 Pekerjaan Kolom Beton Bertulang ( 125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu Kelas III 2,600,000.00 832,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00
0.120 m3 Kayu balok kelas II 4,000,000.00 480,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
32.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 352,000.00

2.858 OH Pekerja 150,000.00 428,700.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
Jumlah ( A + B + C ) 6,142,800.00
Keuntungan & Overhead 10 % 614,280.00
Jumlah ……………………… 6,757,080.00

SNI.163 1 M3 Pekerjaan Lantai Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi beton polos 16,000.00 2,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00

3.208 OH Pekerja 150,000.00 481,200.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
Jumlah ( A + B + C ) 6,938,450.00
Keuntungan & Overhead 10 % 693,845.00
Jumlah ……………………… 7,632,295.00

SNI.164 1 M3 Pekerjaan Lantai Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.240 m3 Kayu terentang 2,600,000.00 624,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
24.000 Btg Dolken dia 8 cm - 4 m 11,000.00 264,000.00

3.033 OH Pekerja 150,000.00 454,950.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
Jumlah ( A + B + C ) 6,472,625.00
Keuntungan & Overhead 10 % 647,262.50
Jumlah ……………………… 7,119,887.50

SNI.164.a2lp 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


100.000 Kg Besi beton polos 16,000.00 1,600,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00

2.683 OH Pekerja 150,000.00 402,450.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.700 OH Tukang besi 190,000.00 133,000.00
0.122 OH Kepala Tukang 230,000.00 28,060.00
0.205 OH Mandor 230,000.00 47,150.00
Jumlah ( A + B + C ) 3,449,375.00
Keuntungan & Overhead 10 % 344,937.50
Jumlah ……………………… 3,794,312.50

SNI.164.b1lp 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi ) BT, 1 Pc : 2 Ps : 3 Kr


100.000 Kg Besi beton polos 16,000.00 1,600,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00

0.200 OH Tenaga 2,740,105.00 548,021.00


Jumlah ( A + B + C ) 3,288,126.00
Keuntungan & Overhead 10 % 328,812.60
Jumlah ……………………… 3,616,938.60

SNI.164.c1lp 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


75.000 Kg Besi beton polos 16,000.00 1,200,000.00
1.125 Kg Kawat beton 33,000.00 37,125.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00

0.200 OH Tenaga 2,302,980.00 460,596.00


Jumlah ( A + B + C ) 2,763,576.00
Keuntungan & Overhead 10 % 276,357.60
Jumlah ……………………… 3,039,933.60

SNI.164.1lp.a 1 M3 Pekerjaan Lantai Beton Bertulang ( 100 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.120 m3 Kayu terentang 2,600,000.00 312,000.00
1.600 Kg Paku biasa 2 " - 5 " 28,000.00 44,800.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
100.000 Kg Besi beton polos 16,000.00 1,600,000.00
1.125 Kg Kawat beton 33,000.00 37,125.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.080 m3 Kayu balok kelas II 4,000,000.00 320,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
12.000 Btg Dolken dia 8 cm - 4 m 11,000.00 132,000.00

2.683 OH Pekerja 150,000.00 402,450.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.700 OH Tukang besi 190,000.00 133,000.00
0.122 OH Kepala Tukang 230,000.00 28,060.00
0.205 OH Mandor 230,000.00 47,150.00
Jumlah ( A + B + C ) 4,695,050.00
Keuntungan & Overhead 10 % 469,505.00
Jumlah ……………………… 5,164,555.00

SNI.164.1lp.b 1 M3 Pekerjaan Lantai Beton Bertulang ( 75 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.120 m3 Kayu terentang 2,600,000.00 312,000.00
1.600 Kg Paku biasa 2 " - 5 " 28,000.00 44,800.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
75.000 Kg Besi beton polos 16,000.00 1,200,000.00
1.125 Kg Kawat beton 33,000.00 37,125.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.080 m3 Kayu balok kelas II 4,000,000.00 320,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
12.000 Btg Dolken dia 8 cm - 4 m 11,000.00 132,000.00

2.508 OH Pekerja 150,000.00 376,200.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.525 OH Tukang besi 190,000.00 99,750.00
0.105 OH Kepala Tukang 230,000.00 24,035.00
0.195 OH Mandor 230,000.00 44,850.00
Jumlah ( A + B + C ) 4,229,225.00
Keuntungan & Overhead 10 % 422,922.50
Jumlah ……………………… 4,652,147.50

SNI.165 1 M3 Pekerjaan Balok Beton Bertulang ( 200 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
200.000 Kg Besi beton polos 16,000.00 3,200,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

3.383 OH Pekerja 150,000.00 507,450.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.400 OH Tukang besi 190,000.00 266,000.00
0.192 OH Kepala Tukang 230,000.00 44,160.00
0.245 OH Mandor 230,000.00 56,350.00
Jumlah ( A + B + C ) 7,444,275.00
Keuntungan & Overhead 10 % 744,427.50
Jumlah ……………………… 8,188,702.50

SNI.166 1 M3 Pekerjaan Balok Beton Bertulang (175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi beton polos 16,000.00 2,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

3.208 OH Pekerja 150,000.00 481,200.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
Jumlah ( A + B + C ) 6,978,450.00
Keuntungan & Overhead 10 % 697,845.00
Jumlah ……………………… 7,676,295.00

SNI.167 1 M3 Pekerjaan Balok Beton Bertulang (150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kayu balok kelas II 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

3.033 OH Pekerja 150,000.00 454,950.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
Jumlah ( A + B + C ) 6,512,625.00
Keuntungan & Overhead 10 % 651,262.50
Jumlah ……………………… 7,163,887.50

SNI.168 1 M3 Pekerjaan Balok Beton Bertulang (125 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
125.000 Kg Besi beton polos 16,000.00 2,000,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kayu balok kelas II 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

2.858 OH Pekerja 150,000.00 428,700.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.875 OH Tukang besi 190,000.00 166,250.00
0.140 OH Kepala Tukang 230,000.00 32,085.00
0.215 OH Mandor 230,000.00 49,450.00
Jumlah ( A + B + C ) 6,046,800.00
Keuntungan & Overhead 10 % 604,680.00
Jumlah ……………………… 6,651,480.00

SNI.169 1 M3 Pekerjaan Balok Beton Bertulang (110 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
110.000 Kg Besi beton polos 16,000.00 1,760,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Kayu balok kelas II 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

2.753 OH Pekerja 150,000.00 412,950.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
0.770 OH Tukang besi 190,000.00 146,300.00
0.129 OH Kepala Tukang 230,000.00 29,670.00
0.209 OH Mandor 230,000.00 48,070.00
Jumlah ( A + B + C ) 5,767,305.00
Keuntungan & Overhead 10 % 576,730.50
Jumlah ……………………… 6,344,035.50

SNI.170 1 M3 Pek Dinding Plat Beton Bertulang ( 150 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr
0.240 m3 Kayu Kelas III 2,600,000.00 624,000.00
3.200 Kg Paku 5 cm - 12 cm 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
150.000 Kg Besi beton polos 16,000.00 2,400,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 KR/Koral beton 575,000.00 425,500.00
0.160 m3 Kayu balok kelas II 4,000,000.00 640,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
14.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 154,000.00

3.033 OH Pekerja 150,000.00 454,950.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.050 OH Tukang besi 190,000.00 199,500.00
0.157 OH Kepala Tukang 230,000.00 36,110.00
0.225 OH Mandor 230,000.00 51,750.00
Jumlah ( A + B + C ) 6,362,625.00
Keuntungan & Overhead 10 % 636,262.50
Jumlah ……………………… 6,998,887.50

SNI.171 1 M3 Pek Tangga Beton Bertulang ( 175 Kg Besi + Bekisting) BT, 1 Pc : 2 Ps : 3 Kr


0.320 m3 Kayu terentang kelas III 2,600,000.00 832,000.00
3.200 Kg Paku biasa 2 " - 5 " 28,000.00 89,600.00
1.600 Ltr Minyak bekisting 18,000.00 28,800.00
175.000 Kg Besi beton polos 16,000.00 2,800,000.00
2.250 Kg Kawat beton 33,000.00 74,250.00
247.000 Kg Semen portland 1,700.00 419,900.00
0.621 m3 Pasir beton 355,000.00 220,455.00
0.740 m3 Koral beton 575,000.00 425,500.00
0.140 m3 Kayu balok kelas II 4,000,000.00 560,000.00
2.800 Lbr Plywood tebal 9 mm 159,000.00 445,200.00
16.000 Btg Dolken dia 8 cm - 4 m 11,000.00 176,000.00

3.208 OH Pekerja 150,000.00 481,200.00


0.189 OH Tukang batu 190,000.00 35,910.00
0.330 OH Tukang kayu 190,000.00 62,700.00
1.225 OH Tukang besi 190,000.00 232,750.00
0.175 OH Kepala Tukang 230,000.00 40,135.00
0.235 OH Mandor 230,000.00 54,050.00
Jumlah ( A + B + C ) 6,978,450.00
Keuntungan & Overhead 10 % 697,845.00
Jumlah ……………………… 7,676,295.00

SNI.155.a 1 M2 Pekerjaan Bekisting Sloof


0.045 m3 Kayu Kelas III (papan) 2,600,000.00 117,000.00
0.300 kg Paku 5 cm - 12 cm 28,000.00 8,400.00
0.100 Ltr Minyak bekisting 18,000.00 1,800.00

0.520 OH Pekerja 150,000.00 78,000.00


0.260 OH Tukang kayu 190,000.00 49,400.00
0.026 OH Kepala Tukang 230,000.00 5,980.00
0.026 OH Mandor 230,000.00 5,980.00
Jumlah ( A + B + C ) 266,560.00
Keuntungan & Overhead 10 % 26,656.00
Jumlah ……………………… 293,216.00

SNI.160.a 1 M2 Pekerjaan Bekisting Kolom


0.040 m3 Kayu Kelas III 2,600,000.00 104,000.00
0.400 Kg Paku 5 cm - 12 cm 28,000.00 11,200.00
0.200 Ltr Minyak bekisting 18,000.00 3,600.00
0.015 m3 Kayu balok kelas II 4,000,000.00 60,000.00
0.350 Lbr Plywood tebal 9 mm 159,000.00 55,650.00
2.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 22,000.00

0.660 OH Pekerja 150,000.00 99,000.00


0.330 OH Tukang kayu 190,000.00 62,700.00
0.033 OH Kepala Tukang 230,000.00 7,590.00
0.033 OH Mandor 230,000.00 7,590.00
Jumlah ( A + B + C ) 433,330.00
Keuntungan & Overhead 10 % 43,333.00
Jumlah ……………………… 476,663.00

SNI.163.a 1 M2 Pekerjaan Bekisting Lantai


0.040 m3 Kayu terentang 2,600,000.00 104,000.00
0.400 Kg Paku biasa 2 " - 5 " 28,000.00 11,200.00
0.200 Ltr Minyak bekisting 18,000.00 3,600.00
0.015 m3 Kayu balok kelas II 4,000,000.00 60,000.00
0.350 Lbr Plywood tebal 9 mm 159,000.00 55,650.00
6.000 Btg Dolken dia 8 cm - 4 m 11,000.00 66,000.00

0.660 OH Pekerja 150,000.00 99,000.00


0.330 OH Tukang kayu 190,000.00 62,700.00
0.033 OH Kepala Tukang 230,000.00 7,590.00
0.033 OH Mandor 230,000.00 7,590.00
Jumlah ( A + B + C ) 477,330.00
Keuntungan & Overhead 10 % 47,733.00
Jumlah ……………………… 525,063.00

SNI.165.a 1 M2 Pekerjaan Bekisting Balok


0.040 m3 Kayu terentang kelas III 2,600,000.00 104,000.00
0.400 Kg Paku biasa 2 " - 5 " 28,000.00 11,200.00
0.200 Ltr Minyak bekisting 18,000.00 3,600.00
0.018 m3 Kayu balok kelas II 4,000,000.00 72,000.00
0.350 Lbr Plywood tebal 9 mm 159,000.00 55,650.00
2.000 Btg Dolken dia 8 cm - 4 m 11,000.00 22,000.00

0.660 OH Pekerja 150,000.00 99,000.00


0.330 OH Tukang kayu 190,000.00 62,700.00
0.033 OH Kepala Tukang 230,000.00 7,590.00
0.033 OH Mandor 230,000.00 7,590.00
Jumlah ( A + B + C ) 445,330.00
Keuntungan & Overhead 10 % 44,533.00
Jumlah ……………………… 489,863.00

SNI.170.a 1 M2 Pek Bekisting Dinding Plat


0.030 m3 Kayu Kelas III 2,600,000.00 78,000.00
0.400 Kg Paku 5 cm - 12 cm 28,000.00 11,200.00
0.200 Ltr Minyak bekisting 18,000.00 3,600.00
0.020 m3 Kayu balok kelas II 4,000,000.00 80,000.00
0.350 Lbr Plywood tebal 9 mm 159,000.00 55,650.00
3.000 Btg Dolken kayu galam f (8-10) cm, 4 m 11,000.00 33,000.00

0.660 OH Pekerja 150,000.00 99,000.00


0.330 OH Tukang kayu 190,000.00 62,700.00
0.033 OH Kepala Tukang 230,000.00 7,590.00
0.033 OH Mandor 230,000.00 7,590.00
Jumlah ( A + B + C ) 438,330.00
Keuntungan & Overhead 10 % 43,833.00
Jumlah ……………………… 482,163.00

SNI.173.1 10 Kg Pembesian dengan Besi Polos


10.500 Kg Besi beton polos 16,000.00 168,000.00
0.150 Kg Kawat beton 33,000.00 4,950.00

0.070 OH Pekerja 150,000.00 10,500.00


0.070 OH Tukang besi 190,000.00 13,300.00
0.007 OH Kepala Tukang 230,000.00 1,610.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 199,280.00
Keuntungan & Overhead 10 % 19,928.00
Jumlah ……………………… 219,208.00
Jumlah 1 Kg Pembesian besi polos 21,920.80

SNI.173.2 10 Kg Pembesian dengan Besi Ulir


10.500 Kg Besi beton ulir 19,000.00 199,500.00
0.150 Kg Kawat beton 33,000.00 4,950.00

0.070 OH Pekerja 150,000.00 10,500.00


0.070 OH Tukang besi 190,000.00 13,300.00
0.007 OH Kepala Tukang 230,000.00 1,610.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 230,780.00
Keuntungan & Overhead 10 % 23,078.00
Jumlah ……………………… 253,858.00
Jumlah 1 Kg Pembesian besi ulir 25,385.80

SNI.173.3a Memasang 1 M2 Jaring Kawat Baja / Wiremesh 6 mm


1.020 Kg Jaring Kawat Baja/ Wiremesh 6 mm 37,000.00 37,740.00
0.050 Kg Kawat beton 33,000.00 1,650.00

0.025 OH Pekerja 150,000.00 3,750.00


0.025 OH Tukang besi 190,000.00 4,750.00
0.002 OH Kepala Tukang 230,000.00 460.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 48,580.00
Keuntungan & Overhead 10 % 4,858.00
Jumlah ……………………… 53,438.00

SNI.173.3b Memasang 1 M2 Jaring Kawat Baja / Wiremesh 8 mm


1.020 Kg Jaring Kawat Baja/ Wiremesh 8 mm 66,000.00 67,320.00
0.050 Kg Kawat beton 33,000.00 1,650.00

0.025 OH Pekerja 150,000.00 3,750.00


0.025 OH Tukang besi 190,000.00 4,750.00
0.002 OH Kepala Tukang 230,000.00 460.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 78,160.00
Keuntungan & Overhead 10 % 7,816.00
Jumlah ……………………… 85,976.00
SNI.173.3c Memasang 1 M2 Jaring Kawat Baja / Wiremesh 10 mm
1.020 Kg Jaring Kawat Baja/ Wiremesh 10 mm 105,000.00 107,100.00
0.050 Kg Kawat beton 33,000.00 1,650.00

0.025 OH Pekerja 150,000.00 3,750.00


0.025 OH Tukang besi 190,000.00 4,750.00
0.002 OH Kepala Tukang 230,000.00 460.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 117,940.00
Keuntungan & Overhead 10 % 11,794.00
Jumlah ……………………… 129,734.00

SNI.173.4a Memasang 1 M Plat lantai sistem Bondex 0.65 mm


1.030 M2 Plat Bondex tebal 0.65 mm 110,000.00 113,300.00
0.040 M3 Kayu terentang kelas III 2,600,000.00 104,000.00
0.100 Kg Paku biasa 2 " - 5 " 28,000.00 2,800.00
0.004 M3 Kayu balok kelas II 4,000,000.00 16,000.00
0.090 Lbr Plywood 9 mm 159,000.00 14,310.00
1.500 Btg Dolken dia 8 cm - 4 m 11,000.00 16,500.00

0.170 OH Pekerja 150,000.00 25,500.00


0.080 OH Tukang kayu 190,000.00 15,200.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 312,210.00
Keuntungan & Overhead 10 % 31,221.00
Jumlah ……………………… 343,431.00

SNI.173.4b Memasang 1 M Plat lantai sistem Bondex 0.70 mm


1.030 M2 Plat Bondex tebal 0.70 mm 120,000.00 123,600.00
0.040 M3 Kayu terentang kelas III 2,600,000.00 104,000.00
0.100 Kg Paku biasa 2 " - 5 " 28,000.00 2,800.00
0.004 M3 Kayu balok kelas II 4,000,000.00 16,000.00
0.090 Lbr Plywood 9 mm 159,000.00 14,310.00
1.500 Btg Dolken dia 8 cm - 4 m 11,000.00 16,500.00

0.170 OH Pekerja 150,000.00 25,500.00


0.080 OH Tukang kayu 190,000.00 15,200.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 322,510.00
Keuntungan & Overhead 10 % 32,251.00
Jumlah ……………………… 354,761.00

SNI.173.4c Memasang 1 M Plat lantai sistem Bondex 0.75 mm


1.030 M2 Plat Bondex tebal 0.75 mm 130,000.00 133,900.00
0.040 M3 Kayu terentang kelas III 2,600,000.00 104,000.00
0.100 Kg Paku biasa 2 " - 5 " 28,000.00 2,800.00
0.004 M3 Kayu balok kelas II 4,000,000.00 16,000.00
0.090 Lbr Plywood 9 mm 159,000.00 14,310.00
1.500 Btg Dolken dia 8 cm - 4 m 11,000.00 16,500.00

0.170 OH Pekerja 150,000.00 25,500.00


0.080 OH Tukang kayu 190,000.00 15,200.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 332,810.00
Keuntungan & Overhead 10 % 33,281.00
Jumlah ……………………… 366,091.00

SNI.173.4d Memasang 1 M Plat lantai sistem Bondex 100 mm


1.030 M2 Plat Bondex tebal 100 mm 210,000.00 216,300.00
0.040 M3 Kayu terentang kelas III 2,600,000.00 104,000.00
0.100 Kg Paku biasa 2 " - 5 " 28,000.00 2,800.00
0.004 M3 Kayu balok kelas II 4,000,000.00 16,000.00
0.090 Lbr Plywood 9 mm 159,000.00 14,310.00
1.500 Btg Dolken dia 8 cm - 4 m 11,000.00 16,500.00

0.170 OH Pekerja 150,000.00 25,500.00


0.080 OH Tukang kayu 190,000.00 15,200.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 415,210.00
Keuntungan & Overhead 10 % 41,521.00
Jumlah ……………………… 456,731.00

PEKERJAAN KAYU
SNI.174 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3
BAHAN
0.012 M³ Kayu Klas II 4,000,000.00 48,000.00
0.150 Kg Paku 7 - 12 cm 28,000.00 4,200.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.100 OH Pekerja 150,000.00 15,000.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 89,650.00
Keuntungan & Overhead 10 % 8,965.00
Jumlah ……………………… 98,615.00

SNI.174.a 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 2/3 ( Expose )


BAHAN
0.012 M³ Kayu Klas II 4,000,000.00 48,000.00
0.150 Kg Paku 7 - 12 cm 28,000.00 4,200.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 119,025.00
Keuntungan & Overhead 10 % 11,902.50
Jumlah ……………………… 130,927.50

SNI.175 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.150 Kg Paku 7 - 12 cm 28,000.00 4,200.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.100 OH Pekerja 150,000.00 15,000.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 97,650.00
Keuntungan & Overhead 10 % 9,765.00
Jumlah ……………………… 107,415.00

SNI.175.a 1 M2 Mengerjakan / Memasang Usuk 5/7, Reng 3/4 ( Expose )


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.150 Kg Paku 7 - 12 cm 28,000.00 4,200.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 127,025.00
Keuntungan & Overhead 10 % 12,702.50
Jumlah ……………………… 139,727.50

SNI.176.a 1 M2 Mengerjakan / Memasang Usuk 5/7 cm


BAHAN
0.010 M³ Kayu Klas II 4,000,000.00 39,200.00
0.105 Kg Paku 7 - 12 cm 28,000.00 2,940.00
TENAGA
0.070 OH Tukang Kayu 190,000.00 13,300.00
0.007 OH Kepala Tukang Kayu 230,000.00 1,610.00
0.070 OH Pekerja 150,000.00 10,500.00
0.004 OH Mandor 230,000.00 805.00
Jumlah ( A + B + C ) 68,355.00
Keuntungan & Overhead 10 % 6,835.50
Jumlah ……………………… 75,190.50

SNI.176.b 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm


BAHAN
0.105 Kg Paku 7 - 12 cm 28,000.00 2,940.00
TENAGA
0.070 OH Tukang Kayu 190,000.00 13,300.00
0.007 OH Kepala Tukang Kayu 230,000.00 1,610.00
0.070 OH Pekerja 150,000.00 10,500.00
0.004 OH Mandor 230,000.00 805.00
Jumlah ( A + B + C ) 29,155.00
Keuntungan & Overhead 10 % 2,915.50
Jumlah ……………………… 32,070.50

SNI.176.c 1 M2 Mengerjakan / Memasang Reng 3/4 cm


BAHAN
0.004 M³ Kayu Klas II 4,000,000.00 16,800.00
0.045 Kg Paku 7 - 12 cm 28,000.00 1,260.00
TENAGA
0.030 OH Tukang Kayu 190,000.00 5,700.00
0.003 OH Kepala Tukang Kayu 230,000.00 690.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
Jumlah ( A + B + C ) 29,295.00
Keuntungan & Overhead 10 % 2,929.50
Jumlah ……………………… 32,224.50

SNI.176.d 1 M2 Mengerjakan / Memasang Kembali Usuk 5/7 cm


BAHAN
0.045 Kg Paku 7 - 12 cm 28,000.00 1,260.00
TENAGA
0.030 OH Tukang Kayu 190,000.00 5,700.00
0.003 OH Kepala Tukang Kayu 230,000.00 690.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
Jumlah ( A + B + C ) 12,495.00
Keuntungan & Overhead 10 % 1,249.50
Jumlah ……………………… 13,744.50

SNI.178 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 3/20 ) Kayu Klas II
BAHAN
0.015 M³ Papan Kayu Klas II 4,250,000.00 61,625.00
0.060 Kg Paku 7 - 12 cm 28,000.00 1,680.00
TENAGA
0.250 OH Tukang Kayu 190,000.00 47,500.00
0.025 OH Kepala Tukang Kayu 230,000.00 5,750.00
0.150 OH Pekerja 150,000.00 22,500.00
0.075 OH Mandor 230,000.00 17,250.00
Jumlah ( A + B + C ) 156,305.00
Keuntungan & Overhead 10 % 15,630.50
Jumlah ……………………… 171,935.50

SNI.179 1 M' Pekerjaan Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II
BAHAN
0.009 M³ Papan Kayu Klas II 4,250,000.00 36,550.00
0.050 Kg Paku 7 - 12 cm 28,000.00 1,400.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.025 OH Kepala Tukang Kayu 230,000.00 5,750.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 108,200.00
Keuntungan & Overhead 10 % 10,820.00
Jumlah ……………………… 119,020.00

SNI.179.a 1 M' Memasang Kembali Papan Lisplank Dua Lapis ( 2 x 2/20 ) Kayu Klas II
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.025 OH Kepala Tukang Kayu 230,000.00 5,750.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 70,250.00
Keuntungan & Overhead 10 % 7,025.00
Jumlah ……………………… 77,275.00

SNI.180 1 M' Pekerjaan Papan Reuter (2/20)


BAHAN
0.004 M³ Papan Kayu Klas II 4,250,000.00 18,700.00
0.025 Kg Paku 7 - 12 cm 28,000.00 700.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 67,200.00
Keuntungan & Overhead 10 % 6,720.00
Jumlah ……………………… 73,920.00

SNI.181 1 M' Mengerjakan Talang Karet


BAHAN
0.019 M³ Papan Kayu Klas II 4,250,000.00 80,750.00
0.015 Kg Paku Biasa 1cm - 2,5 cm 28,000.00 420.00
1.050 M' Karet Talang 91,000.00 95,550.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.200 OH Pekerja 150,000.00 30,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 249,550.00
Keuntungan & Overhead 10 % 24,955.00
Jumlah ……………………… 274,505.00

SNI.182.a 1 M' Mengerjakan Talang datar/ jurai Seng BjLs 20


BAHAN
0.019 M³ Papan Kayu Klas II 4,250,000.00 80,750.00
0.015 Kg Paku Biasa 1cm - 2,5 cm 28,000.00 420.00
1.050 M' Seng Plat BjLs 20 76,000.00 79,800.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.200 OH Pekerja 150,000.00 30,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 233,800.00
Keuntungan & Overhead 10 % 23,380.00
Jumlah ……………………… 257,180.00

SNI.182.b 1 M' Mengerjakan Talang 1/2 lingkaran Seng BjLs 20


BAHAN
0.500 Kg Besi strip 35,000.00 17,500.00
0.015 Kg Paku Biasa 1cm - 2,5 cm 28,000.00 420.00
1.050 M' Seng Plat BjLs 20 76,000.00 79,800.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 185,960.00
Keuntungan & Overhead 10 % 18,596.00
Jumlah ……………………… 204,556.00

SNI.184 1 M3 Pekerjaan Kayu Kuda - Kuda, Gording Kayu Klas II (Expose)


BAHAN
1.100 M³ Kayu Klas II 4,000,000.00 4,400,000.00
15.000 Kg Besi Strip 35,000.00 525,000.00
0.800 Kg Paku 7 - 12 cm 28,000.00 22,400.00
TENAGA
14.000 OH Tukang Kayu 190,000.00 2,660,000.00
1.400 OH Kepala Tukang Kayu 230,000.00 322,000.00
6.000 OH Pekerja 150,000.00 900,000.00
0.300 OH Mandor 230,000.00 69,000.00
Jumlah ( A + B + C ) 8,898,400.00
Keuntungan & Overhead 10 % 889,840.00
Jumlah ……………………… 9,788,240.00

SNI.185 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II


BAHAN
1.200 M³ Kayu Klas II 4,000,000.00 4,800,000.00
0.800 Kg Paku 7 - 12 cm 28,000.00 22,400.00
TENAGA
1.500 OH Tukang Kayu 190,000.00 285,000.00
5.000 OH Kepala Tukang Kayu 230,000.00 1,150,000.00
15.000 OH Pekerja 150,000.00 2,250,000.00
0.200 OH Mandor 230,000.00 46,000.00
Jumlah ( A + B + C ) 8,553,400.00
Keuntungan & Overhead 10 % 855,340.00
Jumlah ……………………… 9,408,740.00

SNI.186 1 M' Pasang Kasiplank ukuran (0.8x20), 1 Lapis


BAHAN
1.100 M' Kasi plank 25,000.00 27,500.00
0.050 Kg Paku 5 cm - 10 cm 28,000.00 1,400.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.100 OH Pekerja 150,000.00 15,000.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 87,650.00
Keuntungan & Overhead 10 % 8,765.00
Jumlah ……………………… 96,415.00

SNI.187 1 M' Pasang Kasiplank ukuran (0.8x20), 2 Lapis


BAHAN
1.650 M' Kasi plank 25,000.00 41,250.00
0.075 Kg Paku 5 cm - 10 cm 28,000.00 2,100.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 131,475.00
Keuntungan & Overhead 10 % 13,147.50
Jumlah ……………………… 144,622.50

SNI.188 1 M3 Pekerjaan Kayu Konsol, Tiang Kayu Klas II (Expose)


BAHAN
1.200 M³ Kayu Klas II 4,000,000.00 4,800,000.00
0.800 Kg Paku 7 - 12 cm 28,000.00 22,400.00
TENAGA
1.600 OH Tukang Kayu 190,000.00 304,000.00
6.000 OH Kepala Tukang Kayu 230,000.00 1,380,000.00
16.000 OH Pekerja 150,000.00 2,400,000.00
0.300 OH Mandor 230,000.00 69,000.00
Jumlah ( A + B + C ) 8,975,400.00
Keuntungan & Overhead 10 % 897,540.00
Jumlah ……………………… 9,872,940.00

SNI.189 1 M3 Pekerjaan Kayu Kusen Pintu dan Jendela


BAHAN
1.200 M³ Kayu Klas II 4,000,000.00 4,800,000.00
1.000 Kg Lem Kayu 55,000.00 55,000.00
1.250 Kg Paku 7 - 12 cm 28,000.00 35,000.00
TENAGA
18.000 OH Tukang Kayu 190,000.00 3,420,000.00
2.000 OH Kepala Tukang Kayu 230,000.00 460,000.00
6.000 OH Pekerja 150,000.00 900,000.00
0.300 OH Mandor 230,000.00 69,000.00
Jumlah ( A + B + C ) 9,739,000.00
Keuntungan & Overhead 10 % 973,900.00
Jumlah ……………………… 10,712,900.00

SNI.190 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 3 mm


BAHAN
0.024 M³ Papan Kayu Klas II 4,250,000.00 102,000.00
0.030 Kg Paku 28,000.00 840.00
0.300 Kg Lem Kayu 55,000.00 16,500.00
1.000 M² Kaca 3 mm 115,000.00 115,000.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.200 OH Kepala Tukang Kayu 230,000.00 46,000.00
0.800 OH Pekerja 150,000.00 120,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 789,540.00
Keuntungan & Overhead 10 % 78,954.00
Jumlah ……………………… 868,494.00

SNI.191 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca 5 mm


BAHAN
0.024 M³ Papan Kayu Klas II 4,250,000.00 102,000.00
0.030 Kg Paku 28,000.00 840.00
0.300 Kg Lem Kayu 55,000.00 16,500.00
1.000 M² Kaca 5 mm 170,000.00 170,000.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.200 OH Kepala Tukang Kayu 230,000.00 46,000.00
0.800 OH Pekerja 150,000.00 120,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 844,540.00
Keuntungan & Overhead 10 % 84,454.00
Jumlah ……………………… 928,994.00

SNI.192 1 M2 Pekerjaan Memasang Kaca Mati 3 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca 3 mm 115,000.00 126,500.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 161,432.50
Keuntungan & Overhead 10 % 16,143.25
Jumlah ……………………… 177,575.75

SNI.193 1 M2 Pekerjaan Memasang Kaca Mati 5 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca 5 mm 170,000.00 187,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 221,932.50
Keuntungan & Overhead 10 % 22,193.25
Jumlah ……………………… 244,125.75

SNI.193.8 1 M2 Pekerjaan Memasang Kaca Mati 8 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca 8 mm 200,000.00 220,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 254,932.50
Keuntungan & Overhead 10 % 25,493.25
Jumlah ……………………… 280,425.75

SNI.194 1 M2 Pekerjaan Memasang Alumunium strip 8 mm


BAHAN
12.500 M² Alumunium Strip 60,000.00 750,000.00
0.050 m sealent 275.00 13.75
TENAGA
0.150 OH Tukang alumunium 190,000.00 28,500.00
0.015 OH Kepala Tukang alumunium 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 784,386.25
Keuntungan & Overhead 10 % 78,438.63
Jumlah ……………………… 862,824.88

SNI.195 1 M2 Pekerjaan Daun Pintu dan Jendela Kaca Tempered 8 mm


BAHAN
0.024 M³ Papan Kayu Klas II 4,250,000.00 102,000.00
0.030 Kg Paku 28,000.00 840.00
0.300 Kg Lem Kayu 55,000.00 16,500.00
1.000 M² Kaca Tempered 8 mm Polos 1,000,000.00 1,000,000.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.200 OH Kepala Tukang Kayu 230,000.00 46,000.00
0.800 OH Pekerja 150,000.00 120,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 1,674,540.00
Keuntungan & Overhead 10 % 167,454.00
Jumlah ……………………… 1,841,994.00

SNI.195.a 1 M2 Pekerjaan Memasang Kaca Cermin 5 mm


BAHAN
1.100 M² Kaca Cermin 5 mm 169,000.00 185,900.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 220,272.50
Keuntungan & Overhead 10 % 22,027.25
Jumlah ……………………… 242,299.75

SNI.196 1 M2 Pekerjaan Memasang Glass Blok


BAHAN
25.000 bh Glas Blok 20 x 20 cm 56,000.00 1,400,000.00
TENAGA
0.165 OH Tukang batu 190,000.00 31,350.00
0.017 OH Kepala Tukang batu 230,000.00 3,795.00
0.017 OH Pekerja 150,000.00 2,475.00
0.001 OH Mandor 230,000.00 184.00
Jumlah ( A + B + C ) 1,437,804.00
Keuntungan & Overhead 10 % 143,780.40
Jumlah ……………………… 1,581,584.40

SNI.197 1 M2 Pekerjaan Memasang Kaca Mati Riben 5 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca Ryben 5 mm 165,000.00 181,500.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 216,432.50
Keuntungan & Overhead 10 % 21,643.25
Jumlah ……………………… 238,075.75

SNI.197.a 1 M2 Pekerjaan Memasang Kaca Mati Buram 5 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca Buram 5 mm 215,000.00 236,500.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 271,432.50
Keuntungan & Overhead 10 % 27,143.25
Jumlah ……………………… 298,575.75

SNI.198 1 M2 Pekerjaan Memasang Kaca Mati Tempered 8 mm Pintu / Jendela


BAHAN
0.020 Kg Paku 28,000.00 560.00
1.100 M² Kaca Tempered 8mm 1,000,000.00 1,100,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 1,134,932.50
Keuntungan & Overhead 10 % 113,493.25
Jumlah ……………………… 1,248,425.75

SNI.200 1 M2 Pekerjaan Daun Pintu Panil dan Krepyak Kayu Klas II Lap. Formika
BAHAN
0.080 M³ Papan Kayu Klas II 4,250,000.00 340,000.00
0.050 Kg Paku 1- 3 Cm 28,000.00 1,400.00
0.500 Lbr Formika 195,000.00 97,500.00
TENAGA
1.500 OH Tukang Kayu 190,000.00 285,000.00
0.150 OH Kepala Tukang Kayu 230,000.00 34,500.00
1.000 OH Pekerja 150,000.00 150,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 919,900.00
Keuntungan & Overhead 10 % 91,990.00
Jumlah ……………………… 1,011,890.00

SNI.201 1 M2 Pekerjaan Ram Jalusi


BAHAN
0.060 M³ Papan Kayu Klas II 4,250,000.00 255,000.00
TENAGA
3.000 OH Tukang Kayu 190,000.00 570,000.00
0.300 OH Kepala Tukang Kayu 230,000.00 69,000.00
1.000 OH Pekerja 150,000.00 150,000.00
0.500 OH Mandor 230,000.00 115,000.00
Jumlah ( A + B + C ) 1,159,000.00
Keuntungan & Overhead 10 % 115,900.00
Jumlah ……………………… 1,274,900.00

SNI.202 1 M2 Pekerjaan Ram Jalusi Mati Kusen


BAHAN
0.060 M³ Papan Kayu Klas II 4,250,000.00 255,000.00
0.150 Kg Paku 1/2" - 1" 33,000.00 4,950.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.200 OH Kepala Tukang Kayu 230,000.00 46,000.00
0.500 OH Pekerja 150,000.00 75,000.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 766,700.00
Keuntungan & Overhead 10 % 76,670.00
Jumlah ……………………… 843,370.00

SNI.204 1 M2 Mengerjakan Daun Pintu Double Teakwood 3 mm


BAHAN
0.025 M³ Papan Kayu Klas II 4,250,000.00 106,250.00
1.000 Lbr Teakwood 120x240x3 mm 220,000.00 220,000.00
0.300 Kg Lem Kayu 55,000.00 16,500.00
0.030 Kg Paku 1/2" - 1" 33,000.00 990.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.200 OH Kepala Tukang Kayu 230,000.00 46,000.00
0.800 OH Pekerja 150,000.00 120,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 898,940.00
Keuntungan & Overhead 10 % 89,894.00
Jumlah ……………………… 988,834.00

SNI.206 1 M2 Pekerjaan Pintu Double Tripleks 3 mm


BAHAN
0.025 M³ Papan Kayu Klas II 4,250,000.00 106,250.00
2.000 Lbr Tripleks 120x240x3 mm 67,000.00 134,000.00
0.300 Kg Lem Kayu 55,000.00 16,500.00
0.030 Kg Paku 1/2" - 1" 33,000.00 990.00
TENAGA
2.000 OH Tukang Kayu 190,000.00 380,000.00
0.040 OH Kepala Tukang Kayu 230,000.00 9,200.00
2.000 OH Pekerja 150,000.00 300,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 956,140.00
Keuntungan & Overhead 10 % 95,614.00
Jumlah ……………………… 1,051,754.00

SNI.208 1 M2 Pekerjaan Pintu Teakwood Lapis Formika


BAHAN
0.025 M³ Papan Kayu Klas II 4,250,000.00 106,250.00
0.500 Lbr Formika 195,000.00 97,500.00
1.000 Lbr Teakwood 120x240x3 mm 220,000.00 220,000.00
0.800 Kg Lem Kayu 55,000.00 44,000.00
0.030 Kg Paku 1/2" - 1" 33,000.00 990.00
TENAGA
2.500 OH Tukang Kayu 190,000.00 475,000.00
0.250 OH Kepala Tukang Kayu 230,000.00 57,500.00
0.800 OH Pekerja 150,000.00 120,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 1,130,440.00
Keuntungan & Overhead 10 % 113,044.00
Jumlah ……………………… 1,243,484.00

SNI.209 1 M2 Pekerjaan Pintu Triplek Lapis Formika


BAHAN
0.025 M³ Papan Kayu Klas II 4,250,000.00 106,250.00
0.500 Lbr Formika 195,000.00 97,500.00
1.000 Lbr Tripleks 120x240x3 mm 67,000.00 67,000.00
0.300 Ltr Lem Kayu 55,000.00 16,500.00
0.030 Kg Paku 1/2" - 1" 33,000.00 990.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.040 OH Kepala Tukang Kayu 230,000.00 9,200.00
2.000 OH Pekerja 150,000.00 300,000.00
0.040 OH Mandor 230,000.00 9,200.00
Jumlah ( A + B + C ) 644,640.00
Keuntungan & Overhead 10 % 64,464.00
Jumlah ……………………… 709,104.00

SNI.210 1 M2 Pekerjaan Pasang Kawat Gerawang


BAHAN
1.100 Lbr Kawat Gerawang 23,000.00 25,300.00
0.020 Kg Paku 1/2" - 1" 33,000.00 660.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.100 OH Pekerja 150,000.00 15,000.00
0.001 OH Mandor 230,000.00 115.00
Jumlah ( A + B + C ) 62,375.00
Keuntungan & Overhead 10 % 6,237.50
Jumlah ……………………… 68,612.50
SNI.211 1 M2 Pekerjaan Pasang Jeruji Besi Pintu
BAHAN
1.000 M2 Jeruji Pintu Besi 540,000.00 540,000.00
TENAGA
0.500 OH Tukang Las 190,000.00 95,000.00
0.050 OH Kepala Tukang 230,000.00 11,500.00
0.500 OH Pekerja 150,000.00 75,000.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 722,707.50
Keuntungan & Overhead 10 % 72,270.75
Jumlah ……………………… 794,978.25

SNI.212 1 M2 Pekerjaan Pasang Kawat Duri


BAHAN
0.175 Rol Kawat Duri 100,000.00 17,500.00
0.150 Kg Kawat Ikat Beton 33,000.00 4,950.00
TENAGA
0.650 OH Tukang Besi 190,000.00 123,500.00
0.065 OH Kepala Tukang 230,000.00 14,950.00
0.650 OH Pekerja 150,000.00 97,500.00
0.032 OH Mandor 230,000.00 7,360.00
Jumlah ( A + B + C ) 265,760.00
Keuntungan & Overhead 10 % 26,576.00
Jumlah ……………………… 292,336.00

SNI.213 1 M2 Pekerjaan Pagar besi Hollow (stenlistail)


BAHAN
6.000 M' Besi hollow 40 x 40 mm 110,000.00 660,000.00
11.000 M' Besi hollow 40 x 20 mm 39,000.00 429,000.00
TENAGA
1.050 OH Tukang Besi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 1,471,357.50
Keuntungan & Overhead 10 % 147,135.75
Jumlah ……………………… 1,618,493.25

SNI.214 1 M2 Pekerjaan Pagar besi Hollow


BAHAN
6.000 M' Besi hollow 40 x 40 mm 26,000.00 156,000.00
11.000 M' Besi hollow 40 x 20 mm 13,000.00 143,000.00
TENAGA
1.050 OH Tukang Besi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 681,357.50
Keuntungan & Overhead 10 % 68,135.75
Jumlah ……………………… 749,493.25

SNI.214.1 1 M2 Pekerjaan Pagar/ Dinding besi Hollow 100 x 50 mm


BAHAN
11.000 M' Besi hollow 100 x 50 mm 59,000.00 649,000.00
TENAGA
1.050 OH Tukang Besi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 1,031,357.50
Keuntungan & Overhead 10 % 103,135.75
Jumlah ……………………… 1,134,493.25

SNI.214.A 1 M2 Pekerjaan Pintu Pagar besi (dia. 16 mm)


BAHAN
1.000 M2 Pintu Besi Pagar (dia. 16 mm) 900,000.00 900,000.00
TENAGA
1.050 OH Tukang Besi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 1,282,357.50
Keuntungan & Overhead 10 % 128,235.75
Jumlah ……………………… 1,410,593.25

SNI.214.B 1 M2 Pekerjaan Pagar besi (dia. 16 mm)


BAHAN
1.000 M2 Pagar Besi (dia. 16 mm) 800,000.00 800,000.00
TENAGA
1.050 OH Tukang Besi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.005 OH Mandor 230,000.00 1,207.50
Jumlah ( A + B + C ) 1,182,357.50
Keuntungan & Overhead 10 % 118,235.75
Jumlah ……………………… 1,300,593.25

PEKERJAAN ATAP
SNI.215 1 M2 Pekerjaan Atap Genteng Lokal
BAHAN
26.000 Bh Genteng Lokal 1,800.00 46,800.00
TENAGA
0.075 OH Tukang Kayu 190,000.00 14,250.00
0.008 OH Kepala Tukang Kayu 230,000.00 1,840.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 87,230.00
Keuntungan & Overhead 10 % 8,723.00
Jumlah ……………………… 95,953.00

SNI.216 1 M2 Pekerjaan Bubungan Genteng Lokal


BAHAN
6.000 Bh Bubungan Genteng Lokal 6,900.00 41,400.00
8.000 Kg Pc 1,700.00 13,600.00
0.032 M³ Pasir 225,000.00 7,200.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 165,260.00
Keuntungan & Overhead 10 % 16,526.00
Jumlah ……………………… 181,786.00

SNI.217 1 M2 Pekerjaan Atap Genteng Pejaten Bali


BAHAN
25.000 Bh Genteng Pejaten 3,900.00 97,500.00
TENAGA
0.075 OH Tukang Kayu 190,000.00 14,250.00
0.008 OH Kepala Tukang Kayu 230,000.00 1,840.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 137,930.00
Keuntungan & Overhead 10 % 13,793.00
Jumlah ……………………… 151,723.00

SNI.217,a 1m² Pasang Atap Genteng Bitumen Monoleyer model gelombang ex. Onduline
BAHAN
0.878 lbr Atap bitumen gelombang H : 3,0 mm 193,000.00 169,427.48
15.802 bh Paku fiser bitumen 7,000.00 110,610.69
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.200 OH Pekerja 150,000.00 30,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 331,568.17
Keuntungan & Overhead 10 % 33,156.82
Jumlah ……………………… 364,724.98

SNI.218 1 M2 Pekerjaan Bubungan Genteng Pejaten Bali


BAHAN
5.000 Bh Bubungan Genteng Pejaten 8,800.00 44,000.00
8.000 Kg Semen Portland 1,700.00 13,600.00
0.032 M³ Pasir 225,000.00 7,200.00
TENAGA
0.200 OH Tukang Batu 190,000.00 38,000.00
0.020 OH Kepala Tukang Batu 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 167,860.00
Keuntungan & Overhead 10 % 16,786.00
Jumlah ……………………… 184,646.00

SNI.218.a 1 m Pemasangan nok bitumen Monolayer


BAHAN
72.760 Lbr Nok / Ridge Onduline 90,000.00 6,548,400.00
1.200 bh Sekrup / Paku 13,000.00 15,600.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.250 OH Pekerja 150,000.00 37,500.00
0.013 OH Mandor 230,000.00 2,990.00
Jumlah ( A + B + C ) 6,636,440.00
Keuntungan & Overhead 10 % 663,644.00
Jumlah ……………………… 7,300,084.00

SNI.219.0.25 1 M2 Pekerjaan Atap Trimdeck 0.25 TCT (Spandek)


BAHAN
1.100 M2 Penutup Atap Trimdeck 65,000.00 71,500.00
12.000 Bh Paku Mata Bor Tahan Karat 2,000.00 24,000.00
0.001 Unit Mesin Bor Baut 1,350,000.00 1,350.00
TENAGA
0.500 OH Tukang Besi 190,000.00 95,000.00
0.050 OH Kepala Tukang Besi 230,000.00 11,500.00
0.100 OH Pekerja 150,000.00 15,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 220,650.00
Keuntungan & Overhead 10 % 22,065.00
Jumlah ……………………… 242,715.00

SNI.219.0.30 1 M2 Pekerjaan Atap Trimdeck 0.30 TCT (Spandek)


BAHAN
1.100 M2 Penutup Atap Trimdeck 75,000.00 82,500.00
12.000 Bh Paku Mata Bor Tahan Karat 2,000.00 24,000.00
0.001 Unit Mesin Bor Baut 1,350,000.00 1,350.00
TENAGA
0.500 OH Tukang Besi 190,000.00 95,000.00
0.050 OH Kepala Tukang Besi 230,000.00 11,500.00
0.100 OH Pekerja 150,000.00 15,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 231,650.00
Keuntungan & Overhead 10 % 23,165.00
Jumlah ……………………… 254,815.00

SNI.219.0.35 1 M2 Pekerjaan Atap Trimdeck 0.35 TCT (Spandek)


BAHAN
1.100 M2 Penutup Atap Trimdeck 94,000.00 103,400.00
12.000 Bh Paku Mata Bor Tahan Karat 2,000.00 24,000.00
0.001 Unit Mesin Bor Baut 1,350,000.00 1,350.00
TENAGA
0.500 OH Tukang Besi 190,000.00 95,000.00
0.050 OH Kepala Tukang Besi 230,000.00 11,500.00
0.100 OH Pekerja 150,000.00 15,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 252,550.00
Keuntungan & Overhead 10 % 25,255.00
Jumlah ……………………… 277,805.00

SNI.220 1 M' Pekerjaan Memasang Bubungan Trimdeck 0.35 TCT (Spandek)


BAHAN
1.100 M1 Bubungan Atap Trimdeck 60,000.00 66,000.00
5.460 Bh Paku Mata Bor Tahan Karat 2,000.00 10,920.00
TENAGA
0.055 OH Tukang Besi 190,000.00 10,450.00
0.006 OH Kepala Tukang Besi 230,000.00 1,265.00
0.200 OH Pekerja 150,000.00 30,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 119,095.00
Keuntungan & Overhead 10 % 11,909.50
Jumlah ……………………… 131,004.50

SNI.221.a 1 M2 Pekerjaan Atap Genteng Kodok


BAHAN
25.000 Bh Genteng Kodok 5,500.00 137,500.00
TENAGA
0.075 OH Tukang Kayu 190,000.00 14,250.00
0.008 OH Kepala Tukang Kayu 230,000.00 1,840.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 177,930.00
Keuntungan & Overhead 10 % 17,793.00
Jumlah ……………………… 195,723.00
SNI.221.b 1 M2 Pekerjaan Atap Genteng kanmuri full flat
BAHAN
11.500 Bh Genteng Kanmuri 21,000.00 241,500.00
TENAGA
0.075 OH Tukang Kayu 190,000.00 14,250.00
0.008 OH Kepala Tukang Kayu 230,000.00 1,840.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 281,930.00
Keuntungan & Overhead 10 % 28,193.00
Jumlah ……………………… 310,123.00

SNI.222.a 1 M2 Pekerjaan Bubungan Genteng Kodok


BAHAN
5.000 Bh Bubungan Genteng Kodok 6,600.00 33,000.00
8.000 Kg Semen Portland 1,700.00 13,600.00
0.032 M³ Pasir 225,000.00 7,200.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 156,860.00
Keuntungan & Overhead 10 % 15,686.00
Jumlah ……………………… 172,546.00

SNI.222.b 1 M2 Pekerjaan Bubungan Genteng kanmuri full flat


BAHAN
5.000 Bh Bubungan Genteng kanmuri 35,000.00 175,000.00
8.000 Kg Semen Portland 1,700.00 13,600.00
0.032 M³ Pasir 225,000.00 7,200.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 298,860.00
Keuntungan & Overhead 10 % 29,886.00
Jumlah ……………………… 328,746.00

SNI.223 1 M2 Pekerjaan Atap Seng Gelombang BJLS 20


BAHAN
0.900 Lbr Seng BJLS 20 mm 75,000.00 67,500.00
0.070 Kg Paku Seng 45,000.00 3,150.00
TENAGA
0.015 OH Tukang Kayu 190,000.00 2,850.00
0.150 OH Kepala Tukang Kayu 230,000.00 34,500.00
0.150 OH Pekerja 150,000.00 22,500.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 142,000.00
Keuntungan & Overhead 10 % 14,200.00
Jumlah ……………………… 156,200.00

SNI.224 1 M' Memasang Bubungan Seng BJLS 20


BAHAN
0.900 Lbr Seng BJLS 20 mm 50,000.00 45,000.00
0.070 Kg Paku Seng 45,000.00 3,150.00
TENAGA
0.015 OH Tukang Kayu 190,000.00 2,850.00
0.150 OH Kepala Tukang Kayu 230,000.00 34,500.00
0.150 OH Pekerja 150,000.00 22,500.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 119,500.00
Keuntungan & Overhead 10 % 11,950.00
Jumlah ……………………… 131,450.00

SNI.225 1 M2 Pekerjaan Atap Asbes Gelombang Kecil


BAHAN
0.750 Lbr Asbes Gelombang Kecil 69,000.00 51,750.00
0.120 Kg Paku Asbes 45,000.00 5,400.00
TENAGA
0.070 OH Tukang Kayu 190,000.00 13,300.00
0.070 OH Kepala Tukang Kayu 230,000.00 16,100.00
0.140 OH Pekerja 150,000.00 21,000.00
0.007 OH Mandor 230,000.00 1,610.00
Jumlah ( A + B + C ) 109,160.00
Keuntungan & Overhead 10 % 10,916.00
Jumlah ……………………… 120,076.00
SNI.226 1 M' Memasang Bubungan Asbes Gelombang Kecil
BAHAN
1.000 Lbr Bubungan Asbes Gelombang Kecil 55,000.00 55,000.00
0.120 Kg Paku Asbes 45,000.00 5,400.00
TENAGA
0.067 OH Tukang Kayu 190,000.00 12,730.00
0.007 OH Kepala Tukang Kayu 230,000.00 1,610.00
0.140 OH Pekerja 150,000.00 21,000.00
0.007 OH Mandor 230,000.00 1,610.00
Jumlah ( A + B + C ) 97,350.00
Keuntungan & Overhead 10 % 9,735.00
Jumlah ……………………… 107,085.00

SNI.227 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 2.5 mm ) lapisan butiran


BAHAN
1.500 Lbr Genteng metal roof 70,000.00 105,000.00
0.200 kg Paku biasa 1/2"=1" 33,000.00 6,600.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 154,130.00
Keuntungan & Overhead 10 % 15,413.00
Jumlah ……………………… 169,543.00

SNI.228 1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 2.5 mm ) lap. Butiran
BAHAN
1.100 m' Bubungan Genteng metal roof 75,000.00 82,500.00
0.050 kg Paku biasa 1/2"=1" 33,000.00 1,650.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 126,680.00
Keuntungan & Overhead 10 % 12,668.00
Jumlah ……………………… 139,348.00

SNI.229.a 1 m2 Mengerjakan atap genteng Metalroof ( Tebal 3 mm ) lapisan butiran


BAHAN
1.500 Lbr Genteng metal roof 80,000.00 120,000.00
0.200 kg Paku biasa 1/2"=1" 33,000.00 6,600.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 169,130.00
Keuntungan & Overhead 10 % 16,913.00
Jumlah ……………………… 186,043.00

SNI.229.b 1 m' Mengerjakan bubungan Genteng Metal roof ( Tebal 3 mm ) lap. Butiran
BAHAN
1.100 m' Bubungan Genteng metal roof 85,000.00 93,500.00
0.050 kg Paku biasa 1/2"=1" 33,000.00 1,650.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 137,680.00
Keuntungan & Overhead 10 % 13,768.00
Jumlah ……………………… 151,448.00

SNI.230 1 m2 Mengerjakan atap genteng Metal ( Tebal 2.5 mm ) Sakura


BAHAN
1.660 Lbr Genteng Metal anti karat (sakura) 65,000.00 107,900.00
0.200 kg Paku biasa 1/2"=1" 33,000.00 6,600.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 157,030.00
Keuntungan & Overhead 10 % 15,703.00
Jumlah ……………………… 172,733.00
SNI.231 1 m' Mengerjakan bubungan Genteng Metal ( Tebal 2.5 mm )
BAHAN
1.100 m' Bubungan Genteng Metal anti karat 70,000.00 77,000.00
0.050 kg Paku biasa 1/2"=1" 33,000.00 1,650.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.010 OH Kepala tukang 230,000.00 2,300.00
0.140 OH Pekerja 150,000.00 21,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 121,180.00
Keuntungan & Overhead 10 % 12,118.00
Jumlah ……………………… 133,298.00

SNI.232 1 m2 Mengerjakan Plafond Gypsum Board, tebal 9 mm + rangka kayu


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 4-6 Cm 28,000.00 560.00
0.364 Lbr Gypsum Board Tebal 9 mm 100,000.00 36,400.00
0.110 kg Paku Sekrup 35,000.00 3,850.00
TENAGA
0.300 OH Tukang 190,000.00 57,000.00
0.030 OH Kepala tukang 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 193,010.00
Keuntungan & Overhead 10 % 19,301.00
Jumlah ……………………… 212,311.00

SNI.233.a 1 m' Mengerjakan List Plafond Gypsum Board Type I


BAHAN
1.050 m' List Gypsum Type I 53,000.00 55,650.00
0.064 kg Lem Gypsum 30,000.00 1,920.00
TENAGA
0.021 OH Tukang 190,000.00 3,990.00
0.002 OH Kepala tukang 230,000.00 483.00
0.021 OH Pekerja 150,000.00 3,150.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 65,423.00
Keuntungan & Overhead 10 % 6,542.30
Jumlah ……………………… 71,965.30

SNI.233.b 1 m' Mengerjakan List Plafond Gypsum Board Type II


BAHAN
1.050 m' List Gypsum Type II 40,000.00 42,000.00
0.064 kg Lem Gypsum 30,000.00 1,920.00
TENAGA
0.021 OH Tukang 190,000.00 3,990.00
0.002 OH Kepala tukang 230,000.00 483.00
0.021 OH Pekerja 150,000.00 3,150.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 51,773.00
Keuntungan & Overhead 10 % 5,177.30
Jumlah ……………………… 56,950.30

SNI.234 1 m2 Mengerjakan Plafond Gypsum Rangka Hollow 40x40 Zincromate


BAHAN
2.750 M' Besi Holow 40x40 zincromate 26,000.00 71,500.00
1.100 M2 Gypsum Board Tebal 9 mm 100,000.00 110,000.00
0.110 kg Paku Sekrup 35,000.00 3,850.00
0.064 kg Lem Gypsum 30,000.00 1,920.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala tukang 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 254,095.00
Keuntungan & Overhead 10 % 25,409.50
Jumlah ……………………… 279,504.50

SNI.234.a 1 m2 Memasang langit-langit WPC , rangka metal furing


BAHAN
0.250 btg Top Cross Rail 250FX 35,000.00 8,750.00
0.370 btg Furring Chanel PN 205 85,000.00 31,450.00
1.700 bh Furring Chanel PN 208 3,000.00 5,100.00
0.810 bh Suspension Spring Clip 223SS 6,000.00 4,860.00
0.810 bh 4 mm Soft Galv Suspension Rod PN 225 6,000.00 4,860.00
0.810 bh Angle Bracket PN 220 2,000.00 1,620.00
0.810 bh Wall Angle 252FX 15,000.00 12,150.00
0.050 roll Paper Tape 55,000.00 2,750.00
0.075 roll Steel Tape 132,000.00 9,900.00
0.003 kg UB Cote Read Mix 165,000.00 495.00
1.754 lbr Papan WPC teval 7 mm 330,000.00 578,947.37
TENAGA
0.500 OH Tukang Kayu 190,000.00 95,000.00
0.075 OH Kepala tukang 230,000.00 17,250.00
0.780 OH Pekerja 150,000.00 117,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 901,632.37
Keuntungan & Overhead 10 % 90,163.24
Jumlah ……………………… 991,795.61

SNI.234.b 1 m2 Pasang Atap Kaca Laminasi / Laminated 12 mm rangka hollow


BAHAN
4.400 m1 Rangka Hollow 5 x 100 mm 140,000.00 616,000.00
1.050 m2 Kaca Laminated 12 mm 1,500,000.00 1,575,000.00
TENAGA
0.800 OH Tukang Besi 190,000.00 152,000.00
0.080 OH Kepala tukang Besi 230,000.00 18,400.00
0.080 OH Pekerja 150,000.00 12,000.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 2,374,320.00
Keuntungan & Overhead 10 % 237,432.00
Jumlah ……………………… 2,611,752.00

SNI.234.c 1 m2 Pasang Kaca Tempered Clear T=10


BAHAN
1.100 m2 Kaca Tempered Clear T=10 1,250,000.00 1,375,000.00
TENAGA
0.800 OH Tukang Kayu 190,000.00 152,000.00
0.080 OH Kepala tukang Kayu 230,000.00 18,400.00
0.080 OH Pekerja 150,000.00 12,000.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 1,558,320.00
Keuntungan & Overhead 10 % 155,832.00
Jumlah ……………………… 1,714,152.00

SNI.234.d 1 m2 Pasang Atap Kanopi GRC gelombang


BAHAN
1.050 m2 GRC Board bergelombang 90,000.00 94,500.00
TENAGA
0.800 OH Tukang Kayu 190,000.00 152,000.00
0.080 OH Kepala tukang Kayu 230,000.00 18,400.00
0.080 OH Pekerja 150,000.00 12,000.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 277,820.00
Keuntungan & Overhead 10 % 27,782.00
Jumlah ……………………… 305,602.00

SNI.234.SP.1 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Putih polos
BAHAN
2.750 M' Besi Holow 40x40 zincromate 26,000.00 71,500.00
1.300 M2 PVC Plafond, 10 mm, Putih Polos 250,000.00 325,000.00
0.170 kg Paku Sekrup 35,000.00 5,950.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala tukang 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 469,275.00
Keuntungan & Overhead 10 % 46,927.50
Jumlah ……………………… 516,202.50

SNI.234.SP.2 1 m2 Mengerjakan PVC Plafond Rangka Hollow 40x40 Zincromate, Warna


BAHAN
2.750 M' Besi Holow 40x40 zincromate 26,000.00 71,500.00
1.300 M2 PVC Plafond, 10 mm, Warna 280,000.00 364,000.00
0.170 kg Paku Sekrup 35,000.00 5,950.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala tukang 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 508,275.00
Keuntungan & Overhead 10 % 50,827.50
Jumlah ……………………… 559,102.50
SNI.234.AQ 1 m2 Mengerjakan Plafond Akustik Rangka Alumunium
BAHAN
3.600 M' Rangka Alumunium "T" 15,000.00 54,000.00
1.300 Lbr Plafond Akustik 600 x 600 155,000.00 201,500.00
0.150 kg Kawat f 4 mm 85,000.00 12,750.00
1.050 kg Ramset/ Dinabolt 75,000.00 78,750.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala tukang 230,000.00 4,600.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 413,825.00
Keuntungan & Overhead 10 % 41,382.50
Jumlah ……………………… 455,207.50

SNI.235.a 1 M2 Pekerjaan Plafond Tripleks 3 mm + Rangka kayu


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 4-6 Cm 28,000.00 560.00
0.015 Kg Paku Panjang 1-3 Cm 33,000.00 495.00
0.375 Lbr Tripleks 3 mm 67,000.00 25,125.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 178,380.00
Keuntungan & Overhead 10 % 17,838.00
Jumlah ……………………… 196,218.00

SNI.235.b 1 M2 Pekerjaan Plafond Tripleks 5 mm + Rangka kayu


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 4-6 Cm 28,000.00 560.00
0.015 Kg Paku Panjang 1-3 Cm 33,000.00 495.00
0.375 Lbr Tripleks 5 mm 106,000.00 39,750.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 193,005.00
Keuntungan & Overhead 10 % 19,300.50
Jumlah ……………………… 212,305.50

SNI.235.c 1 M2 Pekerjaan Rangka Langit-langit


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 7-10 Cm 28,000.00 560.00
TENAGA
0.230 OH Tukang Kayu 190,000.00 43,700.00
0.023 OH Kepala Tukang Kayu 230,000.00 5,290.00
0.170 OH Pekerja 150,000.00 25,500.00
0.008 OH Mandor 230,000.00 1,763.33
Jumlah ( A + B + C ) 132,813.33
Keuntungan & Overhead 10 % 13,281.33
Jumlah ……………………… 146,094.67

SNI.235.d 1 M2 Pekerjaan Plafond Tripleks 5 mm


BAHAN
0.015 Kg Paku Panjang 1-5 Cm 33,000.00 495.00
0.375 Lbr Tripleks 5 mm 106,000.00 39,750.00
TENAGA
0.070 OH Tukang Kayu 190,000.00 13,300.00
0.007 OH Kepala Tukang Kayu 230,000.00 1,610.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 536.67
Jumlah ( A + B + C ) 60,191.67
Keuntungan & Overhead 10 % 6,019.17
Jumlah ……………………… 66,210.83

SNI.236.a 1 M2 Pekerjaan Plafond Miring Tripleks 3 mm + Rangka kayu


BAHAN
0.015 Kg Paku Panjang 1-3 Cm 33,000.00 495.00
0.007 M³ Kayu Klas II 4,000,000.00 28,000.00
0.375 Lbr Tripleks 3 mm 67,000.00 25,125.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 149,820.00
Keuntungan & Overhead 10 % 14,982.00
Jumlah ……………………… 164,802.00

SNI.236.b 1 M2 Pekerjaan Plafond Miring Tripleks 5 mm + Rangka kayu


BAHAN
0.015 Kg Paku Panjang 1-3 Cm 33,000.00 495.00
0.007 M³ Kayu Klas II 4,000,000.00 28,000.00
0.375 Lbr Tripleks 5 mm 106,000.00 39,750.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 164,445.00
Keuntungan & Overhead 10 % 16,444.50
Jumlah ……………………… 180,889.50

SNI.237.a 1 M2 Pekerjaan Dinding Double Tripleks 3 mm + Rangka kayu


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 4-6 Cm 33,000.00 660.00
0.030 Kg Paku Panjang 1-3 Cm 33,000.00 990.00
0.750 Lbr Tripleks 3 mm 67,000.00 50,250.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 204,100.00
Keuntungan & Overhead 10 % 20,410.00
Jumlah ……………………… 224,510.00

SNI.237.b 1 M2 Pekerjaan Dinding Double Tripleks 5 mm + Rangka kayu


BAHAN
0.014 M³ Kayu Klas II 4,000,000.00 56,000.00
0.020 Kg Paku Panjang 4-6 Cm 33,000.00 660.00
0.030 Kg Paku Panjang 1-3 Cm 33,000.00 990.00
0.750 Lbr Tripleks 5 mm 106,000.00 79,500.00
TENAGA
0.300 OH Tukang Kayu 190,000.00 57,000.00
0.030 OH Kepala Tukang Kayu 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 233,350.00
Keuntungan & Overhead 10 % 23,335.00
Jumlah ……………………… 256,685.00

SNI.238 1 M' Pekerjaan List Plafond Kayu Profil 4/4 cm


BAHAN
1.050 M³ List Profil 4/4 cm 14,000.00 14,700.00
0.010 Kg Paku Panjang 1-3 Cm 33,000.00 330.00
TENAGA
0.050 OH Tukang Kayu 190,000.00 9,500.00
0.005 OH Kepala Tukang Kayu 230,000.00 1,150.00
0.050 OH Pekerja 150,000.00 7,500.00
0.003 OH Mandor 230,000.00 690.00
Jumlah ( A + B + C ) 33,870.00
Keuntungan & Overhead 10 % 3,387.00
Jumlah ……………………… 37,257.00

SNI.239 1 M' Pekerjaan List Plafond Kayu Profil 2/4 cm


BAHAN
1.050 M³ List Profil 2/4 cm 9,000.00 9,450.00
0.010 Kg Paku Panjang 1-3 Cm 33,000.00 330.00
TENAGA
0.050 OH Tukang Kayu 190,000.00 9,500.00
0.005 OH Kepala Tukang Kayu 230,000.00 1,150.00
0.050 OH Pekerja 150,000.00 7,500.00
0.003 OH Mandor 230,000.00 690.00
Jumlah ( A + B + C ) 28,620.00
Keuntungan & Overhead 10 % 2,862.00
Jumlah ……………………… 31,482.00
PEKERJAAN ALUMUNIUM dan BESI
SNI.241.a Memasang 1 Kg Rangka Kanal - C
BAHAN
1.150 M³ Besi Kanal C 38,000.00 43,700.00
TENAGA
0.060 OH Tukang Las Konstruksi 190,000.00 11,400.00
0.006 OH Kepala Tukang 230,000.00 1,380.00
0.060 OH Pekerja 150,000.00 9,000.00
0.003 OH Mandor 230,000.00 690.00
Jumlah ( A + B + C ) 66,170.00
Keuntungan & Overhead 10 % 6,617.00
Jumlah ……………………… 72,787.00

SNI.241.b Pasang 1 m Handrail dan Railing


BAHAN
2.650 m1 Pipa 2" black steel di cat duco 69,000.00 182,850.00
4.400 m1 Pipa 1"black steel dicat duco 44,000.00 193,600.00
10% Harga (Perlengkapan) 56,500.00 5,650.00
TENAGA
0.250 OH Tukang Las Konstruksi 190,000.00 47,500.00
0.115 OH Kepala Tukang 230,000.00 26,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 207.00
Jumlah ( A + B + C ) 458,507.00
Keuntungan & Overhead 10 % 45,850.70
Jumlah ……………………… 504,357.70

SNI.241.c Pasang 1 m Galvanis Steel 3/4"


BAHAN
1.100 m1 Galvanis Steel 3/4" 43,000.00 47,300.00
15% Harga (Perlengkapan) 43,000.00 6,450.00
TENAGA
0.150 OH Tukang Las Konstruksi 190,000.00 28,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.150 OH Pekerja 150,000.00 22,500.00
0.001 OH Mandor 230,000.00 207.00
Jumlah ( A + B + C ) 108,407.00
Keuntungan & Overhead 10 % 10,840.70
Jumlah ……………………… 119,247.70

SNI.241.d Pasang 1 m Railing Stainless


BAHAN
8.075 m1 Besi Stainless Ø 3/4' 94,000.00 759,050.00
TENAGA
0.250 OH Tukang Las Konstruksi 190,000.00 47,500.00
0.115 OH Kepala Tukang 230,000.00 26,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 207.00
Jumlah ( A + B + C ) 835,457.00
Keuntungan & Overhead 10 % 83,545.70
Jumlah ……………………… 919,002.70

SNI.241.e Pasang 1 m Tangga Hollow 5x5 cm


BAHAN
8.075 m1 Hollow 5x5 cm 32,000.00 258,400.00
TENAGA
0.250 OH Tukang Las Konstruksi 190,000.00 47,500.00
0.115 OH Kepala Tukang 230,000.00 26,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 207.00
Jumlah ( A + B + C ) 334,807.00
Keuntungan & Overhead 10 % 33,480.70
Jumlah ……………………… 368,287.70

SNI.241.1 1 m2 Pasang Syntetic Grass


BAHAN
1.000 m2 Syntetic Grass 32,000.00 32,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 3,200.00 3,200.00
Jumlah ( A + B + C ) 35,200.00
Keuntungan & Overhead 10 % 3,520.00
Jumlah ……………………… 38,720.00

SNI.241.2 1 m Pasang WPC 5x5 cm


BAHAN
1.000 m1 WPC 5x5 cm 132,000.00 132,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 13,200.00 13,200.00
Jumlah ( A + B + C ) 145,200.00
Keuntungan & Overhead 10 % 14,520.00
Jumlah ……………………… 159,720.00

SNI.241.3 1 m Pasang WPC 10x5 cm


BAHAN
1.000 m1 WPC 10x5 cm 230,000.00 230,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 23,000.00 23,000.00
Jumlah ( A + B + C ) 253,000.00
Keuntungan & Overhead 10 % 25,300.00
Jumlah ……………………… 278,300.00

SNI.241.4 1 m Pasang WPC 15x5 cm


BAHAN
1.000 m1 WPC 15x5 cm 350,000.00 350,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 35,000.00 35,000.00
Jumlah ( A + B + C ) 385,000.00
Keuntungan & Overhead 10 % 38,500.00
Jumlah ……………………… 423,500.00

SNI.241.5 1 m Pasang WPC 20x5 cm


BAHAN
1.000 m1 WPC 20x5 cm 485,000.00 485,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 48,500.00 48,500.00
Jumlah ( A + B + C ) 533,500.00
Keuntungan & Overhead 10 % 53,350.00
Jumlah ……………………… 586,850.00

SNI.241.6 1 m Pasang WPC Panel W15 x H2,5 cm


BAHAN
1.000 m1 WPC Panel W15 x H2,5 cm 574,000.00 574,000.00
TENAGA
1.000 ls Biaya pasang / Alat bantu 57,400.00 57,400.00
Jumlah ( A + B + C ) 631,400.00
Keuntungan & Overhead 10 % 63,140.00
Jumlah ……………………… 694,540.00

SNI.241.7 1 m2 Pasang Floor hardener 3 Kg/m2


BAHAN
1.000 m2 Floor hardener 3 Kg/m2 44,000.00 44,000.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.020 OH Mandor 230,000.00 4,600.00
Jumlah ( A + B + C ) 151,200.00
Keuntungan & Overhead 10 % 15,120.00
Jumlah ……………………… 166,320.00

SNI.241.8 1 m2 Pasang Efoxy waterbased flooring non slip anti abrasion


BAHAN
1.000 m2 Cat Epoxy 170,000.00 170,000.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.020 OH Mandor 230,000.00 4,600.00
Jumlah ( A + B + C ) 277,200.00
Keuntungan & Overhead 10 % 27,720.00
Jumlah ……………………… 304,920.00

SNI.241.9 1 m2 Pasang Floor hardener 3 Kg/m2 + ceramic stepnoosing 100 x 200 mm


BAHAN
1.000 m2 Floor hardener 3 Kg/m2 44,000.00 44,000.00
2.500 m1 ceramic stepnoosing 100 x 200 mm 160,000.00 400,000.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.020 OH Mandor 230,000.00 4,600.00
Jumlah ( A + B + C ) 551,200.00
Keuntungan & Overhead 10 % 55,120.00
Jumlah ……………………… 606,320.00

SNI.241.10 1 m2 Pasang Floor hardener 7 Kg/m2 + grove line 2 cm


BAHAN
1.000 m2 Floor hardener 7 Kg/m2 57,000.00 57,000.00
4.000 m2 Grooe line 2 cm 26,000.00 104,000.00
TENAGA
0.200 OH Tukang 190,000.00 38,000.00
0.020 OH Kepala Tukang 230,000.00 4,600.00
0.400 OH Pekerja 150,000.00 60,000.00
0.020 OH Mandor 230,000.00 4,600.00
Jumlah ( A + B + C ) 268,200.00
Keuntungan & Overhead 10 % 26,820.00
Jumlah ……………………… 295,020.00

SNI.241.11 Pasang GRC Rosters 300x300x150


BAHAN
1.000 m2 Roster 30 x 30 220,000.00 220,000.00
4% Biaya Perlengkapan 220,000.00 8,800.00
0.045 kg PC 1,700.00 76.50
TENAGA
1.000 ls Upah Pasang 75,000.00 75,000.00
Jumlah ( A + B + C ) 303,876.50
Keuntungan & Overhead 10 % 30,387.65
Jumlah ……………………… 334,264.15

SNI.241.12 Pasang Kisi-kisi 50x100 mm UPVC Motif Kayu


BAHAN
10.000 m1 Kisi-kisi 50x100 mm UPVC Motif Kayu 132,000.00 1,320,000.00
4% Biaya Perlengkapan 132,000.00 5,280.00
TENAGA
1.000 ls Upah Pasang 55,000.00 55,000.00
Jumlah ( A + B + C ) 1,380,280.00
Keuntungan & Overhead 10 % 138,028.00
Jumlah ……………………… 1,518,308.00

SNI.242 Mengerjakan 100 kg pekerjaan perakitan


BAHAN
1.000 Ltr Solar 6,500.00 6,500.00
0.100 Ltr Minyak pelumas 47,000.00 4,700.00
0.800 jam Sewa Alat 410,000.00 328,000.00
TENAGA
0.100 OH Tukang Besi konstruksi 190,000.00 19,000.00
0.001 OH Kepala Tukang 230,000.00 230.00
0.100 OH Pekerja 150,000.00 15,000.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 374,580.00
Keuntungan & Overhead 10 % 37,458.00
Jumlah ……………………… 412,038.00

SNI.243 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
BAHAN
15.000 Kg Besi siku 38,000.00 570,000.00
32.800 Kg Besi plat baja 2 mm 23,000.00 754,400.00
0.050 Kg kawat las 160,000.00 8,000.00
TENAGA
1.050 OH Tukang Las Konstruksi 190,000.00 199,500.00
0.105 OH Kepala Tukang 230,000.00 24,150.00
1.050 OH Pekerja 150,000.00 157,500.00
0.052 OH Mandor 230,000.00 11,960.00
Jumlah ( A + B + C ) 1,725,510.00
Keuntungan & Overhead 10 % 172,551.00
Jumlah ……………………… 1,898,061.00

SNI.244 Mengerjakan 10 cm pengelasan dengan las listrik


BAHAN
0.300 Ltr Solar 6,500.00 1,950.00
0.040 Ltr Minyak pelumas 47,000.00 1,880.00
0.400 kg Kawat las listrik 160,000.00 64,000.00
0.170 jam Sewa Alat 410,000.00 69,700.00
TENAGA
0.020 OH Tukang Besi konstruksi 190,000.00 3,800.00
0.002 OH Kepala Tukang 230,000.00 460.00
0.040 OH Pekerja 150,000.00 6,000.00
0.002 OH Mandor 230,000.00 460.00
Jumlah ( A + B + C ) 148,250.00
Keuntungan & Overhead 10 % 14,825.00
Jumlah ……………………… 163,075.00

SNI.245 Memasang 1 m2 rolling door alluminium


BAHAN
1.000 M2 Rolling door alluminium 600,000.00 600,000.00
TENAGA
1.000 OH Tukang Alumunium 190,000.00 190,000.00
0.100 OH Kepala Tukang 230,000.00 23,000.00
1.000 OH Pekerja 150,000.00 150,000.00
0.050 OH Mandor 230,000.00 11,500.00
Jumlah ( A + B + C ) 974,500.00
Keuntungan & Overhead 10 % 97,450.00
Jumlah ……………………… 1,071,950.00

SNI.246 Memasang 1 m2 sunscreen alluminium


BAHAN
1.000 M2 Sunscreen alluminium 500,000.00 500,000.00
TENAGA
0.800 OH Tukang Alumunium 190,000.00 152,000.00
0.080 OH Kepala Tukang 230,000.00 18,400.00
0.080 OH Pekerja 150,000.00 12,000.00
0.004 OH Mandor 230,000.00 920.00
Jumlah ( A + B + C ) 683,320.00
Keuntungan & Overhead 10 % 68,332.00
Jumlah ……………………… 751,652.00

SNI.247 Memasang 1 m kusen pintu alluminium Natural


BAHAN
1.100 m Kusen Alumunium Natural 95,000.00 104,500.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.043 OH Tukang Alumunium 190,000.00 8,170.00
0.004 OH Kepala Tukang 230,000.00 989.00
0.043 OH Pekerja 150,000.00 6,450.00
0.002 OH Mandor 230,000.00 494.50
Jumlah ( A + B + C ) 166,703.50
Keuntungan & Overhead 10 % 16,670.35
Jumlah ……………………… 183,373.85

SNI.247.a Memasang 1 m2 Dinding kusen alluminium Natural + Kaca polos 8 mm


BAHAN
4.400 m Kusen Alumunium Natural 95,000.00 418,000.00
1.100 m2 Kaca Polos 8 mm 200,000.00 220,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 715,932.50
Keuntungan & Overhead 10 % 71,593.25
Jumlah ……………………… 787,525.75

SNI.247.b Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, polos
BAHAN
4.400 m Kusen Alumunium Natural 95,000.00 418,000.00
1.100 m2 Kaca Tempreat 8 mm, Polos 1,000,000.00 1,100,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,595,932.50
Keuntungan & Overhead 10 % 159,593.25
Jumlah ……………………… 1,755,525.75

SNI.247.c Memasang 1 m2 Dinding kusen alluminium Natural + Kaca temreat 8 mm, warna
BAHAN
4.400 m Kusen Alumunium Natural 95,000.00 418,000.00
1.100 m2 Kaca Tempreat 8 mm, Warna 1,100,000.00 1,210,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,705,932.50
Keuntungan & Overhead 10 % 170,593.25
Jumlah ……………………… 1,876,525.75

SNI.248 Memasang 1 m kusen pintu alluminium Warna


BAHAN
1.100 m Kusen Alumunium Warna 110,000.00 121,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.043 OH Tukang Alumunium 190,000.00 8,170.00
0.004 OH Kepala Tukang 230,000.00 989.00
0.043 OH Pekerja 150,000.00 6,450.00
0.002 OH Mandor 230,000.00 494.50
Jumlah ( A + B + C ) 183,203.50
Keuntungan & Overhead 10 % 18,320.35
Jumlah ……………………… 201,523.85

SNI.248.a Memasang 1 m2 Dinding kusen alluminium Warna + Kaca polos 8 mm


BAHAN
4.400 m Kusen Alumunium Warna 110,000.00 484,000.00
1.100 m2 Kaca Polos 8 mm 200,000.00 220,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.043 OH Tukang Alumunium 190,000.00 8,170.00
0.004 OH Kepala Tukang 230,000.00 989.00
0.043 OH Pekerja 150,000.00 6,450.00
0.002 OH Mandor 230,000.00 494.50
Jumlah ( A + B + C ) 766,203.50
Keuntungan & Overhead 10 % 76,620.35
Jumlah ……………………… 842,823.85

SNI.248.b Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, polos
BAHAN
4.400 m Kusen Alumunium Warna 110,000.00 484,000.00
1.100 m2 Kaca Tempreat 8 mm, Polos 1,000,000.00 1,100,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.043 OH Tukang Alumunium 190,000.00 8,170.00
0.004 OH Kepala Tukang 230,000.00 989.00
0.043 OH Pekerja 150,000.00 6,450.00
0.002 OH Mandor 230,000.00 494.50
Jumlah ( A + B + C ) 1,646,203.50
Keuntungan & Overhead 10 % 164,620.35
Jumlah ……………………… 1,810,823.85

SNI.248.c Memasang 1 m2 Dinding kusen alluminium Warna + Kaca temreat 8 mm, warna
BAHAN
4.400 m Kusen Alumunium Warna 110,000.00 484,000.00
1.100 m2 Kaca Tempreat 8 mm, Warna 1,100,000.00 1,210,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,771,932.50
Keuntungan & Overhead 10 % 177,193.25
Jumlah ……………………… 1,949,125.75

SNI.248.12 Memasang 1 m2 Besi Hollow + Kaca tempreat 12 mm, warna


BAHAN
4.400 m Besi Hollow 26,000.00 114,400.00
1.100 m2 Kaca Tempreat 12 mm, Warna 1,800,000.00 1,980,000.00
2.000 bh Skrup fixer 22,000.00 44,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 2,172,332.50
Keuntungan & Overhead 10 % 217,233.25
Jumlah ……………………… 2,389,565.75

SNI.248.T8p Memasang 1 m2 Kaca temreat 8 mm, polos


BAHAN
1.100 m2 Kaca Tempreat 8 mm, Polos 1,000,000.00 1,100,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,133,932.50
Keuntungan & Overhead 10 % 113,393.25
Jumlah ……………………… 1,247,325.75

SNI.248.T8w Memasang 1 m2 Kaca temreat 8 mm, Warna


BAHAN
1.100 m2 Kaca Tempreat 8 mm, Warna 1,100,000.00 1,210,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,243,932.50
Keuntungan & Overhead 10 % 124,393.25
Jumlah ……………………… 1,368,325.75

SNI.248.5p Memasang 1 m2 Kaca mati 5 mm, polos


BAHAN
1.100 m2 Kaca 5 mm, Polos 170,000.00 187,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 220,932.50
Keuntungan & Overhead 10 % 22,093.25
Jumlah ……………………… 243,025.75

SNI.248.8p Memasang 1 m2 Kaca mati 8 mm, polos


BAHAN
1.100 m2 Kaca 8 mm, Polos 200,000.00 220,000.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 253,932.50
Keuntungan & Overhead 10 % 25,393.25
Jumlah ……………………… 279,325.75

SNI.248.R Memasang 1 m2 Kaca mati Riben 5 mm


BAHAN
1.100 m2 Kaca Riben 5 mm 165,000.00 181,500.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 215,432.50
Keuntungan & Overhead 10 % 21,543.25
Jumlah ……………………… 236,975.75

SNI.248.B/E Memasang 1 m2 Kaca mati Buram/Es 5 mm


BAHAN
1.100 m2 Kaca Buram/Es 5 mm 215,000.00 236,500.00
0.060 tube Sealant 35,000.00 2,100.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 270,432.50
Keuntungan & Overhead 10 % 27,043.25
Jumlah ……………………… 297,475.75

SNI.249 Memasang 1 m2 pintu alluminium strip


BAHAN
4.400 m Kusen Alumunium Natural 95,000.00 418,000.00
8.750 m' alluminium strip 60,000.00 525,000.00
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 974,832.50
Keuntungan & Overhead 10 % 97,483.25
Jumlah ……………………… 1,072,315.75

SNI.249.a Pasang 1 Buah Cermin ex. TOTO TS 119 AS5


BAHAN
1.100 m2 Kaca Cermin 5 mm 169,000.00 185,900.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 220,272.50
Keuntungan & Overhead 10 % 22,027.25
Jumlah ……………………… 242,299.75

SNI.249.b Pasang 1 Buah Kaca Laminasi tebal 12 mm


BAHAN
1.100 m2 Laminasi tebal 12 mm 1,500,000.00 1,650,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 1,684,372.50
Keuntungan & Overhead 10 % 168,437.25
Jumlah ……………………… 1,852,809.75

SNI.249.c Pasang 1 m2 kaca green glass 12 mm


BAHAN
1.100 m2 Kaca green glass 12 mm 1,800,000.00 1,980,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 2,016,040.00
Keuntungan & Overhead 10 % 201,604.00
Jumlah ……………………… 2,217,644.00

SNI.249.d Pasang 1 m2 kaca green glass tebal 8 mm


BAHAN
1.100 m2 Kaca temperet 8 mm 1,100,000.00 1,210,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 1,246,040.00
Keuntungan & Overhead 10 % 124,604.00
Jumlah ……………………… 1,370,644.00

SNI.249.e Pasang 1 bh Pintu Engineering door / WPC


TENAGA
1.500 OH Tukang 190,000.00 285,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.750 OH Pekerja 150,000.00 112,500.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 415,325.00
Keuntungan & Overhead 10 % 41,532.50
Jumlah ……………………… 456,857.50

SNI.249.f Pasang 1 bh Pintu Green glass


TENAGA
2.500 OH Tukang 190,000.00 475,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.075 OH Pekerja 150,000.00 11,250.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 504,075.00
Keuntungan & Overhead 10 % 50,407.50
Jumlah ……………………… 554,482.50

SNI.249.g Pasang 1 bh Pintu siku alumunium powder coating


BAHAN
1.000 m1 Siku alumunium 82,000.00 82,000.00
TENAGA
0.500 OH Tukang 190,000.00 95,000.00
0.010 OH Kepala Tukang 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 99,950.00
Keuntungan & Overhead 10 % 9,995.00
Jumlah ……………………… 109,945.00

SNI.249.1 Pemasangan 1 m1 Kusen plat baja uk. 15x9x0,2 cm


BAHAN
1.000 m1 plat baja 15x9x9,2 cm 315,000.00 315,000.00
15.000 cm1 pengelasan 1,300.00 19,500.00
TENAGA
0.800 OH Tukang 190,000.00 152,000.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 521,190.00
Keuntungan & Overhead 10 % 52,119.00
Jumlah ……………………… 573,309.00

SNI.249.2 Pemasangan 1 m1 Kusen Steel Frame Hollow Galvanis 150x40x3 mm


BAHAN
1.050 m1 Steel Frame Hollow Galvanis 150x40x3 mm 32,000.00 33,600.00
1.000 ls Alat bantu 12,000.00 12,000.00
TENAGA
0.080 OH Tukang 190,000.00 15,200.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 95,490.00
Keuntungan & Overhead 10 % 9,549.00
Jumlah ……………………… 105,039.00

SNI.249.3 Pemasangan 1 m1 Kusen alumunium 4" YKK finishing powder coating


BAHAN
1.000 m1 Alumunium 4" Dark Gray ex. YKK 210,000.00 210,000.00
2.000 bh Sekrup 2,000.00 4,000.00
TENAGA
0.080 OH Tukang 190,000.00 15,200.00
0.045 OH Kepala Tukang 230,000.00 10,350.00
0.150 OH Pekerja 150,000.00 22,500.00
0.008 OH Mandor 230,000.00 1,840.00
Jumlah ( A + B + C ) 263,890.00
Keuntungan & Overhead 10 % 26,389.00
Jumlah ……………………… 290,279.00

SNI.249.4a Mengerjakan 1 Unit pintu double UGD type P-01


BAHAN
4.920 m2 Kaca green glass 12 mm 1,500,000.00 7,380,000.00
1.000 m2 Plat stainless steel 700,000.00 700,000.00
2.000 bh Pull Handle ex. Dekson type 01 1,300,000.00 2,600,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
2.000 bh Engsel Floor hange Dexson 1,650,000.00 3,300,000.00
1.050 m2 Kaca green glass 8 mm 1,000,000.00 1,050,000.00
TENAGA
10.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 2,960,845.80
2.000 bh Pasang Daun Pintu 554,482.50 1,108,965.00
Jumlah ( A + B + C ) 19,284,810.80
Keuntungan & Overhead 10 % 1,928,481.08
Jumlah ……………………… 21,213,291.88

SNI.249.4b Mengerjakan 1 Unit pintu type P-02


BAHAN
2.000 bh WPC door type 02 include kaca 5 mm 0.00 0.00
0.720 m2 Plate stainless steel 700,000.00 504,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
2.000 bh Lever Handle ex. Dekson 185,000.00 370,000.00
6.000 bh Engsel kupu ex. Dekson 130,000.00 780,000.00
2.000 bh Door Closer ex dekson 350,000.00 700,000.00
TENAGA
6.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,799,729.80
2.000 bh Pasang Daun Pintu 456,857.50 913,715.00
Jumlah ( A + B + C ) 5,252,444.80
Keuntungan & Overhead 10 % 525,244.48
Jumlah ……………………… 5,777,689.28

SNI.249.4c Mengerjakan 1 Unit pintu type P-03


BAHAN
1.000 bh WPC door type 03 include kaca 5 mm 0.00 0.00
0.520 m2 Plate stainless steel 700,000.00 364,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
6.000 bh Engsel kupu ex. Dekson 130,000.00 780,000.00
1.000 bh Door Closer ex dekson 350,000.00 350,000.00
TENAGA
5.700 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,654,590.30
1.500 bh Pasang Daun Pintu 456,857.50 685,286.25
Jumlah ( A + B + C ) 4,203,876.55
Keuntungan & Overhead 10 % 420,387.66
Jumlah ……………………… 4,624,264.21

SNI.249.4d Mengerjakan 1 Unit pintu type P-04A


BAHAN
1.000 bh WPC door type 02 include kaca 5 mm 0.00 0.00
0.360 m2 Plate stainless steel 700,000.00 252,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
1.000 bh Door Closer ex dekson 350,000.00 350,000.00
TENAGA
5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,538,478.70
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 3,357,336.20
Keuntungan & Overhead 10 % 335,733.62
Jumlah ……………………… 3,693,069.82

SNI.249.4e Mengerjakan 1 Unit pintu type P-04B


BAHAN
1.000 bh WPC door type 04b include kaca 5 mm 0.00 0.00
0.360 m2 Plate stainless steel 700,000.00 252,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
1.000 bh Door Closer ex dekson 350,000.00 350,000.00
TENAGA
5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,538,478.70
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 3,357,336.20
Keuntungan & Overhead 10 % 335,733.62
Jumlah ……………………… 3,693,069.82

SNI.249.4f Mengerjakan 1 Unit pintu type P-04C


BAHAN
1.000 bh WPC door type 04c include kaca 5 mm 0.00 0.00
0.280 m2 Plate stainless steel 700,000.00 196,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
1.000 bh Door Closer ex dekson 350,000.00 350,000.00
TENAGA
5.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,480,422.90
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 3,243,280.40
Keuntungan & Overhead 10 % 324,328.04
Jumlah ……………………… 3,567,608.44

SNI.249.4g Mengerjakan 1 Unit pintu type P-05


BAHAN
1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 0.00 0.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
TENAGA
5.200 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,509,450.80
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 2,726,308.30
Keuntungan & Overhead 10 % 272,630.83
Jumlah ……………………… 2,998,939.13
SNI.249.4h Mengerjakan 1 Unit pintu type P-06
BAHAN
1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 0.00 0.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
0.400 m2 Kaca es 215,000.00 86,000.00
TENAGA
7.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 2,060,980.90
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 3,363,838.40
Keuntungan & Overhead 10 % 336,383.84
Jumlah ……………………… 3,700,222.24

SNI.249.4i Mengerjakan 1 Unit pintu type P-07


BAHAN
1.000 bh WPC door type 06 uk. 2,2 x 0,8 m 0.00 0.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
3.000 bh Engsel kupu ex. Dekson 130,000.00 390,000.00
0.450 m2 Kaca es 215,000.00 96,750.00
TENAGA
7.100 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 2,060,980.90
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 3,374,588.40
Keuntungan & Overhead 10 % 337,458.84
Jumlah ……………………… 3,712,047.24

SNI.249.4j Mengerjakan 1 Unit pintu type P-08


BAHAN
1.000 bh WPC door type 08 uk. 1.1 x 0,6 m 0.00 0.00
2.000 bh Engsel kupu ex. Dekson 130,000.00 260,000.00
TENAGA
3.400 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 986,948.60
1.000 bh Pasang Daun Pintu 456,857.50 456,857.50
Jumlah ( A + B + C ) 1,703,806.10
Keuntungan & Overhead 10 % 170,380.61
Jumlah ……………………… 1,874,186.71

SNI.249.4k Mengerjakan 1 Unit pintu type P-09


BAHAN
1.000 bh WPC door type 09 uk. 2,2 x 1,5 m 0.00 0.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Slide Handle ex. Dekson 1,500,000.00 1,500,000.00
1.000 bh Engsel sliding 200,000.00 200,000.00
TENAGA
5.900 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,712,646.10
1.450 bh Pasang Daun Pintu 456,857.50 662,443.38
Jumlah ( A + B + C ) 4,260,089.48
Keuntungan & Overhead 10 % 426,008.95
Jumlah ……………………… 4,686,098.42

SNI.249.4l Mengerjakan 1 Unit pintu type P-10


BAHAN
1.000 bh WPC door type 10 uk. 2,2 x 0,9 m 0.00 0.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Slide Handle ex. Dekson 1,500,000.00 1,500,000.00
1.000 bh Engsel sliding 200,000.00 200,000.00
TENAGA
5.300 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,538,478.70
1.450 bh Pasang Daun Pintu 456,857.50 662,443.38
Jumlah ( A + B + C ) 4,085,922.08
Keuntungan & Overhead 10 % 408,592.21
Jumlah ……………………… 4,494,514.28

SNI.249.4m Mengerjakan 1 Unit pintu type P-11


BAHAN
1.000 bh Pintu plat baja tebal 5,5 mm lapis timah hitam ex. Bostinc 18,800,000.00 18,800,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
5.000 bh Flush bolt ex. Dekson 110,000.00 550,000.00
15.000 bh Engsel kupu ex. Dekson 130,000.00 1,950,000.00
TENAGA
8.700 m1 Pasang kusen pintu plat baja uk. 15x9x0,2 cm lapis timah 573,309.00 4,987,788.30
1.450 bh Pasang Daun Pintu 456,857.50 662,443.38
Jumlah ( A + B + C ) 27,320,231.68
Keuntungan & Overhead 10 % 2,732,023.17
Jumlah ……………………… 30,052,254.84
SNI.249.4n Mengerjakan 1 Unit pintu type P-12
BAHAN
1.000 bh WPC door type 11 uk. 2,2 x 1,3 m 0.00 0.00
0.520 m2 Plate stainless steel 700,000.00 364,000.00
1.000 bh Lock Case ex. Dekson 185,000.00 185,000.00
1.000 bh Lever Handle ex. Dekson 185,000.00 185,000.00
6.000 bh Engsel kupu ex. Dekson 130,000.00 780,000.00
1.000 bh Door Closer ex dekson 350,000.00 350,000.00
TENAGA
5.700 m1 Pasang kusen pintu alumunium 4" finishing Powder coatin 290,279.00 1,654,590.30
1.500 bh Pasang Daun Pintu 456,857.50 685,286.25
Jumlah ( A + B + C ) 4,203,876.55
Keuntungan & Overhead 10 % 420,387.66
Jumlah ……………………… 4,624,264.21

SNI.249.4o Mengerjakan 1 Unit pintu type P-S


BAHAN
1.000 set Kalsiboard rangka alumunium 0.00 0.00
2.000 bh Engsel kupu ex. Dekson 130,000.00 260,000.00
TENAGA
3.800 m1 Pasang kusen pintu siku alumunium finishing Powder 82,000.00 311,600.00
1.500 bh Pasang Daun Pintu 228,428.75 342,643.13
Jumlah ( A + B + C ) 914,243.13
Keuntungan & Overhead 10 % 91,424.31
Jumlah ……………………… 1,005,667.44

SNI.250.N5 Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (natural)


BAHAN
1.000 M2 1,100,000.00 1,100,000.00
Daun pintu/jendela alumunium + kaca 5 mm, (natural)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,131,832.50
Keuntungan & Overhead 10 % 113,183.25
Jumlah ……………………… 1,245,015.75

SNI.250.N8 Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (natural)


BAHAN
1.000 M2 1,100,000.00 1,100,000.00
Daun pintu/jendela alumunium + kaca 8 mm, (natural)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,131,832.50
Keuntungan & Overhead 10 % 113,183.25
Jumlah ……………………… 1,245,015.75

SNI.250.W5 Memasang 1 m2 Daun pintu kaca 5 mm rangka alluminium, (warna)


BAHAN
1.000 M2 1,150,000.00 1,150,000.00
Daun pintu/jendela alumunium + kaca 5 mm, (warna)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,181,832.50
Keuntungan & Overhead 10 % 118,183.25
Jumlah ……………………… 1,300,015.75

SNI.250.W8 Memasang 1 m2 Daun pintu kaca 8 mm rangka alluminium, (warna)


BAHAN
1.000 M2 1,200,000.00 1,200,000.00
Daun pintu/jendela alumunium + kaca 8 mm, (warna)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,231,832.50
Keuntungan & Overhead 10 % 123,183.25
Jumlah ……………………… 1,355,015.75
SNI.251.N Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (natural)
BAHAN
1.000 M2 1,100,000.00 1,100,000.00
Daun pintu/jendela alumunium + kaca 5 mm, (natural)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,131,832.50
Keuntungan & Overhead 10 % 113,183.25
Jumlah ……………………… 1,245,015.75

SNI.251.N8 Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (natural)


BAHAN
1.000 M2 1,100,000.00 1,100,000.00
Daun pintu/jendela alumunium + kaca 8 mm, (natural)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,131,832.50
Keuntungan & Overhead 10 % 113,183.25
Jumlah ……………………… 1,245,015.75

SNI.251.W Memasang 1 m2 jendela kaca 5 mm rangka alluminium, (warna)


BAHAN
1.000 M2 1,150,000.00 1,150,000.00
Daun pintu/jendela alumunium + kaca 5 mm, (warna)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,181,832.50
Keuntungan & Overhead 10 % 118,183.25
Jumlah ……………………… 1,300,015.75

SNI.251.W8 Memasang 1 m2 jendela kaca 8 mm rangka alluminium, (warna)


BAHAN
1.000 M2 1,200,000.00 1,200,000.00
Daun pintu/jendela alumunium + kaca 8 mm, (warna)
TENAGA
0.085 OH Tukang Alumunium 190,000.00 16,150.00
0.009 OH Kepala Tukang 230,000.00 1,955.00
0.085 OH Pekerja 150,000.00 12,750.00
0.004 OH Mandor 230,000.00 977.50
Jumlah ( A + B + C ) 1,231,832.50
Keuntungan & Overhead 10 % 123,183.25
Jumlah ……………………… 1,355,015.75

SNI.251.75.a 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.100


BAHAN
4.260 M1 Profil C 75.100 30,000.00 127,800.00
4.930 M1 Reng U 0.45 7,500.00 36,975.00
14.000 Bh Baut Truss 7,000.00 98,000.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.400 OH Tukang Alumunium 190,000.00 76,000.00
0.040 OH Kepala Tukang 230,000.00 9,200.00
0.140 OH Pekerja 150,000.00 21,000.00
0.070 OH Mandor 230,000.00 16,100.00
Jumlah ( A + B + C ) 390,575.00
Keuntungan & Overhead 10 % 39,057.50
Jumlah ……………………… 429,632.50

SNI.251.75.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75


BAHAN
4.260 M1 Profil C 75.75 19,000.00 80,940.00
4.930 M1 Reng U 0.45 7,500.00 36,975.00
14.000 Bh Baut Truss 7,000.00 98,000.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.400 OH Tukang Alumunium 190,000.00 76,000.00
0.040 OH Kepala Tukang 230,000.00 9,200.00
0.140 OH Pekerja 150,000.00 21,000.00
0.070 OH Mandor 230,000.00 16,100.00
Jumlah ( A + B + C ) 343,715.00
Keuntungan & Overhead 10 % 34,371.50
Jumlah ……………………… 378,086.50

SNI.251.75.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 75.75


BAHAN
4.260 M1 Profil C 75.75 19,000.00 80,940.00
4.930 M1 Reng U 0.45 7,500.00 36,975.00
14.000 Bh Baut Truss 7,000.00 98,000.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.400 OH Tukang Alumunium 190,000.00 76,000.00
0.040 OH Kepala Tukang 230,000.00 9,200.00
0.140 OH Pekerja 150,000.00 21,000.00
0.070 OH Mandor 230,000.00 16,100.00
Jumlah ( A + B + C ) 343,715.00
Keuntungan & Overhead 10 % 34,371.50
Jumlah ……………………… 378,086.50

SNI.251.75.c 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) Usuk C 75


BAHAN
4.260 M1 Profil C 75.75 19,000.00 80,940.00
14.000 Bh Baut Truss 7,000.00 98,000.00
TENAGA
0.280 OH Tukang Alumunium 190,000.00 53,200.00
0.028 OH Kepala Tukang 230,000.00 6,440.00
0.098 OH Pekerja 150,000.00 14,700.00
0.049 OH Mandor 230,000.00 11,270.00
Jumlah ( A + B + C ) 264,550.00
Keuntungan & Overhead 10 % 26,455.00
Jumlah ……………………… 291,005.00

SNI.251.75.d 1 M2 Rangka Reng Aluzing Aluminium (Baja ringan) Reng U 0.45


BAHAN
4.930 M1 Reng U 0.45 7,500.00 36,975.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.120 OH Tukang Alumunium 190,000.00 22,800.00
0.012 OH Kepala Tukang 230,000.00 2,760.00
0.042 OH Pekerja 150,000.00 6,300.00
0.021 OH Mandor 230,000.00 4,830.00
Jumlah ( A + B + C ) 79,165.00
Keuntungan & Overhead 10 % 7,916.50
Jumlah ……………………… 87,081.50

SNI.251.80.a 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.100


BAHAN
4.260 M1 Profil C 80.100 35,000.00 149,100.00
4.930 M1 Reng U 0.45 7,500.00 36,975.00
14.000 Bh Baut Truss 7,000.00 98,000.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.400 OH Tukang Alumunium 190,000.00 76,000.00
0.040 OH Kepala Tukang 230,000.00 9,200.00
0.140 OH Pekerja 150,000.00 21,000.00
0.070 OH Mandor 230,000.00 16,100.00
Jumlah ( A + B + C ) 411,875.00
Keuntungan & Overhead 10 % 41,187.50
Jumlah ……………………… 453,062.50

SNI.251.80.b 1 M2 Rangka Kuda-kuda Aluzing Aluminium (Baja ringan) C 80.75


BAHAN
4.260 M1 Profil C 80.75 25,000.00 106,500.00
4.930 M1 Reng U 0.45 7,500.00 36,975.00
14.000 Bh Baut Truss 7,000.00 98,000.00
11.000 Bh Baut Reng 500.00 5,500.00
TENAGA
0.400 OH Tukang Alumunium 190,000.00 76,000.00
0.040 OH Kepala Tukang 230,000.00 9,200.00
0.140 OH Pekerja 150,000.00 21,000.00
0.070 OH Mandor 230,000.00 16,100.00
Jumlah ( A + B + C ) 369,275.00
Keuntungan & Overhead 10 % 36,927.50
Jumlah ……………………… 406,202.50

SNI.251.ACP.a 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Interior


BAHAN
6.000 M' Besi Holow 40x40 zincromate 26,000.00 156,000.00
1.100 M2 Alluminium Composit Panel (ACP) 0,30 mm, (Interior) 550,000.00 605,000.00
0.200 kg Paku Sekrup 35,000.00 7,000.00
0.250 tube Sealant 35,000.00 8,750.00
TENAGA
0.150 OH Tukang 190,000.00 28,500.00
0.015 OH Kepala tukang 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 812,675.00
Keuntungan & Overhead 10 % 81,267.50
Jumlah ……………………… 893,942.50

SNI.251.ACP.b 1 M2 Rangka dan Penutup Alluminium Composit Panel (ACP), Exterior


BAHAN
6.000 M' Besi Holow 40x40 zincromate 26,000.00 156,000.00
1.100 M2 Alluminium Composit Panel (ACP) 0,30 mm, (Exterior) 800,000.00 880,000.00
0.200 kg Paku Sekrup 35,000.00 7,000.00
0.250 tube Sealant 35,000.00 8,750.00
TENAGA
0.150 OH Tukang 190,000.00 28,500.00
0.015 OH Kepala tukang 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 1,087,675.00
Keuntungan & Overhead 10 % 108,767.50
Jumlah ……………………… 1,196,442.50

SNI.251.ACP.c 1 M2 Rangka dan Penutup Wood Panel Composit (WPC), Exterior


BAHAN
6.000 M' Besi Holow 40x40 zincromate 13,000.00 78,000.00
1.100 M2 Wood Panel Composit 550,000.00 605,000.00
0.200 kg Paku Sekrup 35,000.00 7,000.00
0.250 tube Sealant 35,000.00 8,750.00
TENAGA
0.150 OH Tukang 190,000.00 28,500.00
0.015 OH Kepala tukang 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.008 OH Mandor 230,000.00 1,725.00
Jumlah ( A + B + C ) 734,675.00
Keuntungan & Overhead 10 % 73,467.50
Jumlah ……………………… 808,142.50

SNI.251.DG 1 M2 Pekerjaan Dinding Double Gypsum 9 mm + Rangka profil C


BAHAN
4.400 m Profil C 19,000.00 83,600.00
0.100 Kg Paku Sekrup 35,000.00 3,500.00
2.200 M2 Gypsum board 1200 x 2400 x 9 mm 100,000.00 220,000.00
TENAGA
0.300 OH Tukang 190,000.00 57,000.00
0.030 OH Kepala Tukang 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 403,300.00
Keuntungan & Overhead 10 % 40,330.00
Jumlah ……………………… 443,630.00

SNI.251.DC 1 M2 Pekerjaan Dinding Double Calsiboart 6 mm + Rangka profil C


BAHAN
4.400 m Profil C 19,000.00 83,600.00
0.100 Kg Paku Sekrup 35,000.00 3,500.00
1.500 Lbr Calsiboard 1200 x 240 x 6 mm 222,000.00 333,000.00
TENAGA
0.300 OH Tukang 190,000.00 57,000.00
0.030 OH Kepala Tukang 230,000.00 6,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 516,300.00
Keuntungan & Overhead 10 % 51,630.00
Jumlah ……………………… 567,930.00

PEKERJAAN PENGECATAN/FINISING
SNI.252 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Eksterior)
BAHAN
0.260 Kg Cat Tembok Mutu Tinggi, (Exterior) 127,000.00 33,020.00
0.100 Kg Plamir Tembok 50,000.00 5,000.00
0.100 Kg Cat Dasar 127,000.00 12,700.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 67,714.00
Keuntungan & Overhead 10 % 6,771.40
Jumlah ……………………… 74,485.40

SNI.252.a 1 M2 Pekerjaan Cat Tembok Baru 1 x Dasar, 2 x Cat, (Interior)


BAHAN
0.260 Kg Cat Tembok Mutu Tinggi, (Interior) 60,000.00 15,600.00
0.100 Kg Plamir Tembok 50,000.00 5,000.00
0.100 Kg Cat Dasar 60,000.00 6,000.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 43,594.00
Keuntungan & Overhead 10 % 4,359.40
Jumlah ……………………… 47,953.40

SNI.252.b 1 M2 Pekerjaan Cat Plafond Baru 1 x Dasar, 2 x Cat


BAHAN
0.260 Kg Cat Plafond 60,000.00 15,600.00
0.100 Kg Plamir Plafond 50,000.00 5,000.00
0.100 Kg Cat Dasar 60,000.00 6,000.00
TENAGA
0.200 OH Tukang Cat 190,000.00 38,000.00
0.020 OH Kepala Tukang Cat 230,000.00 4,600.00
0.013 OH Pekerja 150,000.00 1,950.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 73,450.00
Keuntungan & Overhead 10 % 7,345.00
Jumlah ……………………… 80,795.00

SNI.252.c 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen)


BAHAN
0.260 Kg Cat Dak, (Water Proofing) 65,000.00 16,900.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 33,894.00
Keuntungan & Overhead 10 % 3,389.40
Jumlah ……………………… 37,283.40

SNI.252.d 1 M2 Pekerjaan Cat Dak Beton, (Water Proofing/ Sunscreen)


BAHAN
1.050 m2 Fiber Bakar 110,000.00 115,500.00
1.000 bh Kuas 29,000.00 29,000.00
1.050 m2 Waterproofing 65,000.00 68,250.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 229,744.00
Keuntungan & Overhead 10 % 22,974.40
Jumlah ……………………… 252,718.40

SNI.252.e 1 m² Pengecatan Tembok Baru anti bakteri ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup anti bakteri)
BAHAN
0.100 Kg Plamir 50,000.00 5,000.00
0.100 Kg Cat Dasar 127,000.00 12,700.00
0.100 Lbr Ampelas 9,000.00 900.00
0.360 Kg Cat Tembok berbahan anti bakteri 127,000.00 45,720.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 81,314.00
Keuntungan & Overhead 10 % 8,131.40
Jumlah ……………………… 89,445.40

SNI.252.f 1 m² Memasang pelapis tembok dengan plat timbal hitam tebal 3 mm rangka hollow
BAHAN
1.100 m2 Plat timbah hitam 3 m 750,000.00 825,000.00
1.100 m2 Triplek rebal 6 mm 106,000.00 116,600.00
6.400 m1 Hollow 40 x 40 tebal 1 mm 26,000.00 166,400.00
4.400 m1 Hollow 20 x 40 tebal 1 mm 13,000.00 57,200.00
10.000 cm Pengelasan 1,300.00 13,000.00
TENAGA
0.063 OH Tukang Besi 190,000.00 11,970.00
0.006 OH Kepala Tukang Besi 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 1,195,194.00
Keuntungan & Overhead 10 % 119,519.40
Jumlah ……………………… 1,314,713.40

SNI.252.g 1 m² Measang pelapis tembak dengan HPL


BAHAN
1.200 m3 HPL 86,700.00 104,040.00
0.200 Kg Kapur Sirih 25,000.00 5,000.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 126,034.00
Keuntungan & Overhead 10 % 12,603.40
Jumlah ……………………… 138,637.40

SNI.252.h 1 m² Pemasangan Wall Paper


BAHAN
1.200 m3 Wall Paper 100,000.00 150,000.00
0.200 Kg Perekat 25,000.00 4,000.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 170,994.00
Keuntungan & Overhead 10 % 17,099.40
Jumlah ……………………… 188,093.40

SNI.252.i 1 m2 Pengecatan Cat Tekstur Fin. Kamprot Halus


BAHAN
0.260 kg Cat tembok dulux Watersilt Pro 120,000.00 150,000.00
4.320 kg PC 1,700.00 150,000.00
0.006 m3 Pasir pasang 225,000.00 150,000.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.020 OH Pekerja 150,000.00 3,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 466,994.00
Keuntungan & Overhead 10 % 46,699.40
Jumlah ……………………… 513,693.40

SNI.253 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Eksterior


0.180 Kg Cat Tembok 127,000.00 22,860.00
0.120 Kg Cat Dasar 127,000.00 15,240.00
0.042 OH Tukang Cat 190,000.00 7,980.00
0.004 OH Kepala Tukang Cat 230,000.00 966.00
0.028 OH Pekerja 150,000.00 4,200.00
0.003 OH Mandor 230,000.00 575.00
51,821.00
1 M2 Pekerjaan Mengikis/ Mengerok Permukaan Cat Tembok Lama
0.050 Kg Soda api 66,000.00 3,300.00
0.150 OH Pekerja 150,000.00 22,500.00
0.003 OH Mandor 230,000.00 575.00
26,375.00
1 M2 Pekerjaan Mencuci Bidang Permukaan Tembok yang pernah di cat
0.050 Kg Sabun 20,000.00 1,000.00
0.150 OH Pekerja 150,000.00 22,500.00
0.003 OH Mandor 230,000.00 575.00
24,075.00

Jumlah 1 M2 Cat Tembok 1 x Cat ( I + II + III ) 102,271.00


Jumlah ( A + B + C ) 102,271.00
Keuntungan & Overhead 10 % 10,227.10
Jumlah ……………………… 112,498.10
SNI.253.a 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Berjamur ) - Lama, Interior
0.180 Kg Cat Tembok 60,000.00 10,800.00
0.120 Kg Cat Dasar 60,000.00 7,200.00
0.042 OH Tukang Cat 190,000.00 7,980.00
0.004 OH Kepala Tukang Cat 230,000.00 966.00
0.028 OH Pekerja 150,000.00 4,200.00
0.003 OH Mandor 230,000.00 575.00
31,721.00
1 M2 Pekerjaan Mengikis/ Mengerok Permukaan Cat Tembok Lama
0.050 Kg Soda api 66,000.00 3,300.00
0.150 OH Pekerja 150,000.00 22,500.00
0.003 OH Mandor 230,000.00 575.00
26,375.00
1 M2 Pekerjaan Mencuci Bidang Permukaan Tembok yang pernah di cat
0.050 Kg Sabun 20,000.00 1,000.00
0.150 OH Pekerja 150,000.00 22,500.00
0.003 OH Mandor 230,000.00 575.00
24,075.00

Jumlah 1 M2 Cat Tembok 1 x Cat ( I + II + III ) 82,171.00


Jumlah ( A + B + C ) 82,171.00
Keuntungan & Overhead 10 % 8,217.10
Jumlah ……………………… 90,388.10

SNI.254 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Eksterior
BAHAN
0.200 Kg Cat Tembok 127,000.00 25,400.00
0.120 Kg Cat Dasar 127,000.00 15,240.00
TENAGA
0.042 OH Tukang Cat 190,000.00 7,980.00
0.004 OH Kepala Tukang Cat 230,000.00 966.00
0.028 OH Pekerja 150,000.00 4,200.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 54,361.00
Keuntungan & Overhead 10 % 5,436.10
Jumlah ……………………… 59,797.10

SNI.254.a 1 M2 Pekerjaan Cat Tembok 1 x Cat ( Tembok Tak Berjamur ) - Lama, Interior
BAHAN
0.200 Kg Cat Tembok 60,000.00 12,000.00
0.120 Kg Cat Dasar 60,000.00 7,200.00
TENAGA
0.042 OH Tukang Cat 190,000.00 7,980.00
0.004 OH Kepala Tukang Cat 230,000.00 966.00
0.028 OH Pekerja 150,000.00 4,200.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 32,921.00
Keuntungan & Overhead 10 % 3,292.10
Jumlah ……………………… 36,213.10

SNI.254.b 1 M2 Pekerjaan Cat Plafond Lama 1 x Dasar, 2 x Cat


BAHAN
0.200 Kg Cat Tembok 60,000.00 12,000.00
0.120 Kg Cat Dasar 60,000.00 7,200.00
TENAGA
0.200 OH Tukang Cat 190,000.00 38,000.00
0.020 OH Kepala Tukang Cat 230,000.00 4,600.00
0.013 OH Pekerja 150,000.00 1,950.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 66,050.00
Keuntungan & Overhead 10 % 6,605.00
Jumlah ……………………… 72,655.00

SNI.255 1 M2 Pekerjaan cat Genteng


BAHAN
0.180 Kg Cat Genteng 42,000.00 7,560.00
0.120 Kg Cat Dasar 60,000.00 7,200.00
TENAGA
0.200 OH Tukang Cat 190,000.00 38,000.00
0.020 OH Kepala Tukang Cat 230,000.00 4,600.00
0.167 OH Pekerja 150,000.00 25,050.00
0.008 OH Mandor 230,000.00 1,932.00
Jumlah ( A + B + C ) 84,342.00
Keuntungan & Overhead 10 % 8,434.20
Jumlah ……………………… 92,776.20

SNI.256 1 M2 Pekerjaan Cat Kayu 1 x Meni, 2 x Cat


BAHAN
0.200 Kg Cat Meni 35,000.00 7,000.00
0.260 Kg Cat Kayu 90,000.00 23,400.00
0.170 Kg Cat Dasar 72,000.00 12,240.00
0.150 Kg Plamir Kayu 29,000.00 4,350.00
0.020 Kg Minyak Cat 20,000.00 400.00
TENAGA
0.009 OH Tukang Cat 190,000.00 1,710.00
0.006 OH Kepala Tukang Cat 230,000.00 1,380.00
0.070 OH Pekerja 150,000.00 10,500.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 61,555.00
Keuntungan & Overhead 10 % 6,155.50
Jumlah ……………………… 67,710.50

SNI.257 1 M2 Pekerjaan Cat Kayu, 1 x Cat


BAHAN
0.170 Kg Cat Kayu 90,000.00 15,300.00
0.150 Kg Plamir 29,000.00 4,350.00
0.170 Kg Cat Dasar 72,000.00 12,240.00
TENAGA
0.075 OH Tukang Cat 190,000.00 14,250.00
0.008 OH Kepala Tukang Cat 230,000.00 1,725.00
0.070 OH Pekerja 150,000.00 10,500.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 58,940.00
Keuntungan & Overhead 10 % 5,894.00
Jumlah ……………………… 64,834.00

SNI.258 1 M2 Pekerjaan Cat paving Blok


BAHAN
0.260 Kg Cat Penutup 2 x 42,000.00 10,920.00
TENAGA
0.100 OH Tukang Cat 190,000.00 19,000.00
0.010 OH Kepala Tukang Cat 230,000.00 2,300.00
0.087 OH Pekerja 150,000.00 13,050.00
0.003 OH Mandor 230,000.00 736.00
Jumlah ( A + B + C ) 46,006.00
Keuntungan & Overhead 10 % 4,600.60
Jumlah ……………………… 50,606.60

SNI.259 1 M2 Mendempul dan Menggosok Kayu


BAHAN
0.080 Kg Dempul Jadi 35,000.00 2,800.00
0.020 Kg Minyak Cat 20,000.00 400.00
0.010 Kg Batu Apung 250,000.00 2,500.00
TENAGA
0.040 OH Tukang Cat 190,000.00 7,600.00
0.004 OH Kepala Tukang Cat 230,000.00 920.00
0.040 OH Pekerja 150,000.00 6,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 20,795.00
Keuntungan & Overhead 10 % 2,079.50
Jumlah ……………………… 22,874.50

SNI.260 1 M2 Pekerjaan Politur 2 Kali


BAHAN
0.150 Ltr Politur 36,000.00 5,400.00
0.372 Ltr Politur Jadi 37,000.00 13,764.00
2.000 Lbr Amplas 9,000.00 18,000.00
TENAGA
0.060 OH Tukang Cat 190,000.00 11,400.00
0.016 OH Kepala Tukang Cat 230,000.00 3,680.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 52,819.00
Keuntungan & Overhead 10 % 5,281.90
Jumlah ……………………… 58,100.90

SNI.261 1 M2 Mengecat Besi 1 x Meni, 2 x Cat


BAHAN
0.100 Kg Cat Meni Besi 35,000.00 3,500.00
0.160 Kg Cat Besi 70,000.00 11,200.00
0.270 Ltr Minyak Cat 20,000.00 5,400.00
1.000 Lbr Amplas 20,000.00 20,000.00
0.050 Bh Kuas 20,000.00 1,000.00
TENAGA
0.100 OH Tukang Cat 190,000.00 19,000.00
0.010 OH Kepala Tukang Cat 230,000.00 2,300.00
0.020 OH Pekerja 150,000.00 3,000.00
0.010 OH Mandor 230,000.00 2,300.00
Jumlah ( A + B + C ) 67,700.00
Keuntungan & Overhead 10 % 6,770.00
Jumlah ……………………… 74,470.00

SNI.262 10 M2 Mengecat Atap Seng Gelombang


BAHAN
1.420 Kg Cat Meni Besi 35,000.00 49,700.00
1.000 Kg Cat Besi 70,000.00 70,000.00
0.250 Ltr Minyak Cat 20,000.00 5,000.00
TENAGA
1.200 OH Tukang Cat 190,000.00 228,000.00
0.120 OH Kepala Tukang Cat 230,000.00 27,600.00
1.200 OH Pekerja 150,000.00 180,000.00
0.060 OH Mandor 230,000.00 13,800.00
Jumlah ( A + B + C ) 574,100.00
Keuntungan & Overhead 10 % 57,410.00
Jumlah ……………………… 631,510.00
M2 Mengecat Besi 1 x Meni 63,151.00

SNI.263 1 M2 Pekerjaan Pelaburan Bidang Kayu dengan Teak Oil


BAHAN
0.360 Ltr Teak Oil 18,000.00 6,480.00
TENAGA
0.063 OH Tukang Cat 190,000.00 11,970.00
0.006 OH Kepala Tukang Cat 230,000.00 1,449.00
0.040 OH Pekerja 150,000.00 6,000.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 26,474.00
Keuntungan & Overhead 10 % 2,647.40
Jumlah ……………………… 29,121.40

SNI.264 1 M2 Mengeter Kayu 2x


BAHAN
0.350 Ltr Teer Arang 37,000.00 12,950.00
TENAGA
0.060 OH Tukang Cat 190,000.00 11,400.00
0.016 OH Kepala Tukang Cat 230,000.00 3,680.00
0.100 OH Pekerja 150,000.00 15,000.00
0.006 OH Mandor 230,000.00 1,380.00
Jumlah ( A + B + C ) 44,410.00
Keuntungan & Overhead 10 % 4,441.00
Jumlah ……………………… 48,851.00

PEKERJAAN PAS.KUNCI
SNI.265.b 1 Bh. Pasang Kunci Tanam Mutu Menengah
BAHAN
1.000 bh Kunci tanam mutu menengah 164,000.00 164,000.00
TENAGA
0.500 OH Tukang Kayu 190,000.00 95,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 263,950.00
Keuntungan & Overhead 10 % 26,395.00
Jumlah ……………………… 290,345.00

SNI.265.c 1 Bh. Pasang Kunci Tanam Mutu Tinggi


BAHAN
1.000 bh Kunci tanam mutu tinggi 555,000.00 555,000.00
TENAGA
0.500 OH Tukang Kayu 190,000.00 95,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 654,950.00
Keuntungan & Overhead 10 % 65,495.00
Jumlah ……………………… 720,445.00

SNI.268.1 1 Bh. Pasang Grendel Besar


BAHAN
1.000 bh Grendel Besar 24,000.00 24,000.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.001 OH Mandor 230,000.00 115.00
Jumlah ( A + B + C ) 46,915.00
Keuntungan & Overhead 10 % 4,691.50
Jumlah ……………………… 51,606.50

SNI.268.2 1 Bh. Pasang Grendel Kecil


BAHAN
1.000 bh Grendel Kecil 14,000.00 14,000.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.001 OH Mandor 230,000.00 115.00
Jumlah ( A + B + C ) 36,915.00
Keuntungan & Overhead 10 % 3,691.50
Jumlah ……………………… 40,606.50

SNI.269 1 Bh. Pasang Kait Angin Besar


BAHAN
1.000 set Kait Angin Besar 14,000.00 14,000.00
TENAGA
0.150 OH Tukang Kayu 190,000.00 28,500.00
0.015 OH Kepala Tukang Kayu 230,000.00 3,450.00
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 48,372.50
Keuntungan & Overhead 10 % 4,837.25
Jumlah ……………………… 53,209.75

SNI.270 1 Bh. Pasang Kait Angin Kecil


BAHAN
1.000 set Kait Angin Kecil 10,000.00 10,000.00
TENAGA
0.500 OH Tukang Kayu 190,000.00 95,000.00
0.050 OH Kepala Tukang Kayu 230,000.00 11,500.00
0.050 OH Pekerja 150,000.00 7,500.00
0.003 OH Mandor 230,000.00 575.00
Jumlah ( A + B + C ) 124,575.00
Keuntungan & Overhead 10 % 12,457.50
Jumlah ……………………… 137,032.50

SNI.271 1 Bh. Pasang Kunci Selot Besar


BAHAN
1.000 bh Kunci Selot Besar 90,000.00 90,000.00
TENAGA
0.100 OH Tukang Kayu 190,000.00 19,000.00
0.010 OH Kepala Tukang Kayu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.001 OH Mandor 230,000.00 115.00
Jumlah ( A + B + C ) 112,915.00
Keuntungan & Overhead 10 % 11,291.50
Jumlah ……………………… 124,206.50

SNI.272 1 Bh. Pasang Kunci Selot Kecil


BAHAN
1.000 bh Kunci Selot Kecil 70,000.00 70,000.00
TENAGA
0.200 OH Tukang Kayu 190,000.00 38,000.00
0.020 OH Kepala Tukang Kayu 230,000.00 4,600.00
0.020 OH Pekerja 150,000.00 3,000.00
0.001 OH Mandor 230,000.00 230.00
Jumlah ( A + B + C ) 115,830.00
Keuntungan & Overhead 10 % 11,583.00
Jumlah ……………………… 127,413.00

SNI.273 1 Bh. Pasang Beugel U


BAHAN
1.000 bh Beugel U 39,000.00 39,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 41,422.50
Keuntungan & Overhead 10 % 4,142.25
Jumlah ……………………… 45,564.75

SNI.274 1 Bh. Pasang Beugel Plat


BAHAN
1.000 bh Beugel U 39,000.00 39,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 41,422.50
Keuntungan & Overhead 10 % 4,142.25
Jumlah ……………………… 45,564.75

SNI.275 1 Bh. Pasang Angker Dia 12 MM


BAHAN
1.000 bh Angkur Dia 12 mm 6,000.00 6,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 8,422.50
Keuntungan & Overhead 10 % 842.25
Jumlah ……………………… 9,264.75

SNI.276.a 1 Bh. Pas. Baut Mur


BAHAN
1.000 bh Baut Mur 5,000.00 5,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 7,422.50
Keuntungan & Overhead 10 % 742.25
Jumlah ……………………… 8,164.75

SNI.276.b 1 Bh. Pas. Baut Mur 12 mm


BAHAN
1.000 bh Paku Sekrup 10 cm 6,000.00 6,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 8,422.50
Keuntungan & Overhead 10 % 842.25
Jumlah ……………………… 9,264.75

SNI.276.c 1 Bh. Pas. Baut Mur 16 mm


BAHAN
1.000 bh Paku Sekrup 1- 2,5 cm 7,000.00 7,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 9,422.50
Keuntungan & Overhead 10 % 942.25
Jumlah ……………………… 10,364.75

SNI.276.d 1 Bh. Pas. Baut Mur 18 mm


BAHAN
1.000 bh Skrup Fixer 8,000.00 8,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 10,422.50
Keuntungan & Overhead 10 % 1,042.25
Jumlah ……………………… 11,464.75

SNI.276.e 1 Bh. Pas. Baut Mur 22 mm


BAHAN
1.000 bh Baut Mur 22 mm 10,000.00 10,000.00
TENAGA
0.015 OH Pekerja 150,000.00 2,250.00
0.001 OH Mandor 230,000.00 172.50
Jumlah ( A + B + C ) 12,422.50
Keuntungan & Overhead 10 % 1,242.25
Jumlah ……………………… 13,664.75

SNI.282 1 Bh. Pasang Pintu Feber glass (Wc)


BAHAN
1.000 bh Pintu Fiber Glass (Wc) 850,000.00 850,000.00
TENAGA
0.500 OH Tukang Kayu 190,000.00 95,000.00
0.050 OH Kepala Tukang Kayu 230,000.00 11,500.00
0.050 OH Pekerja 150,000.00 7,500.00
0.000 OH Mandor 230,000.00 57.50
Jumlah ( A + B + C ) 964,057.50
Keuntungan & Overhead 10 % 96,405.75
Jumlah ……………………… 1,060,463.25
PEKERJAAN SANITAIR
SNI.283.B Memasang 1 Bh Kloset Duduk Biasa
BAHAN
1.000 Bh Kloset Duduk biasa 830,000.00 830,000.00
6% Harga Kloset Perlengkapan 49,800.00
TENAGA
1.100 OH Tukang Batu 190,000.00 209,000.00
0.001 OH Kepala Tukang Batu 230,000.00 230.00
3.300 OH Pekerja 150,000.00 495,000.00
0.160 OH Mandor 230,000.00 36,800.00
Jumlah ( A + B + C ) 1,620,830.00
Keuntungan & Overhead 10 % 162,083.00
Jumlah ……………………… 1,782,913.00

SNI.283.K Memasang 1 Bh Kloset Duduk (KW 1 Super)


BAHAN
1.000 Bh Kloset Duduk (Kw 1 super) 3,660,000.00 3,660,000.00
6% Harga Kloset Perlengkapan 219,600.00
TENAGA
1.100 OH Tukang Batu 190,000.00 209,000.00
0.001 OH Kepala Tukang Batu 230,000.00 230.00
3.300 OH Pekerja 150,000.00 495,000.00
0.160 OH Mandor 230,000.00 36,800.00
Jumlah ( A + B + C ) 4,620,630.00
Keuntungan & Overhead 10 % 462,063.00
Jumlah ……………………… 5,082,693.00

SNI.283.U Memasang 1 Bh Urinoir Porselin (KW 1 Super)


BAHAN
1.000 Bh Kloset Duduk 2,730,000.00 2,730,000.00
6% Harga Kloset Perlengkapan 163,800.00
TENAGA
1.100 OH Tukang Batu 190,000.00 209,000.00
0.001 OH Kepala Tukang Batu 230,000.00 230.00
3.300 OH Pekerja 150,000.00 495,000.00
0.160 OH Mandor 230,000.00 36,800.00
Jumlah ( A + B + C ) 3,634,830.00
Keuntungan & Overhead 10 % 363,483.00
Jumlah ……………………… 3,998,313.00

SNI.284 Memasang 1 Bh Wastafel Biasa


BAHAN
1.000 Bh Wastafel biasa 485,000.00 485,000.00
12% Harga Wastafel Perlengkapan 58,200.00
6.000 Kg Semen Portland 1,700.00 10,200.00
0.010 M3 Pasir Pasang 225,000.00 2,250.00
TENAGA
1.450 OH Tukang Batu 190,000.00 275,500.00
0.150 OH Kepala Tukang Batu 230,000.00 34,500.00
1.200 OH Pekerja 150,000.00 180,000.00
0.100 OH Mandor 230,000.00 23,000.00
Jumlah ( A + B + C ) 1,068,650.00
Keuntungan & Overhead 10 % 106,865.00
Jumlah ……………………… 1,175,515.00

SNI.286 Memasang 1 buah Urinoir ex. TOTO U 57 M


BAHAN
1.000 bh Urinoir 2,730,000.00 2,730,000.00
6% Harga Wastafel Perlengkapan 163,800.00
6.000 Kg Semen Portland 1,700.00 10,200.00
0.010 m3 Pasir Pasang 225,000.00 2,250.00
TENAGA
1.000 OH Tukang Batu 190,000.00 190,000.00
0.100 OH Kepala Tukang Batu 230,000.00 23,000.00
1.000 OH Pekerja 150,000.00 150,000.00
0.100 OH Mandor 230,000.00 23,000.00
Jumlah ( A + B + C ) 3,292,250.00
Keuntungan & Overhead 10 % 329,225.00
Jumlah ……………………… 3,621,475.00

SNI.286.a Memasang 1 bh Pembatas Urinoir ex. TOTO A 100


BAHAN
1.000 bh Pembatas urinoir ex. TOTO A 100 1,400,000.00 1,400,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 1,423,950.00
Keuntungan & Overhead 10 % 142,395.00
Jumlah ……………………… 1,566,345.00

SNI.286.b Memasang 1 buah Kitchen Sink Stainless Steel ex. TOTO


BAHAN
1.000 bh Kitchen Sink Stainless Steel ex. TOTO 2,200,000.00 2,200,000.00
6% Harga Wastafel Perlengkapan 132,000.00
TENAGA
0.700 OH Tukang Batu 190,000.00 133,000.00
0.054 OH Kepala Tukang Batu 230,000.00 12,420.00
0.100 OH Pekerja 150,000.00 15,000.00
0.110 OH Mandor 230,000.00 25,300.00
Jumlah ( A + B + C ) 2,517,720.00
Keuntungan & Overhead 10 % 251,772.00
Jumlah ……………………… 2,769,492.00

SNI.286.1 Memasang 1 Bh Bak Cuci Piring Logam, 1 lubang


1.000 Bh Bak Cuci Piring Logam, 1 lubang 530,000.00 530,000.00
1.000 Set Water Drain + Acesories 69,000.00 69,000.00
0.300 OH Tukang Batu 190,000.00 57,000.00
0.030 OH Kepala Tukang Batu 230,000.00 6,900.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
Jumlah ( A + B + C ) 667,745.00
Keuntungan & Overhead 10 % 66,774.50
Jumlah ……………………… 734,519.50

SNI.286.2 Memasang 1 Bh Bak Cuci Piring Logam, 2 lubang


1.000 Bh Bak Cuci Piring Logam, 2 lubang 650,000.00 650,000.00
1.000 Set Water Drain + Acesories 69,000.00 69,000.00
0.300 OH Tukang Batu 190,000.00 57,000.00
0.030 OH Kepala Tukang Batu 230,000.00 6,900.00
0.030 OH Pekerja 150,000.00 4,500.00
0.002 OH Mandor 230,000.00 345.00
Jumlah ( A + B + C ) 787,745.00
Keuntungan & Overhead 10 % 78,774.50
Jumlah ……………………… 866,519.50

SNI.287 Memasang 1 Bh Bak Mandi Teraso


BAHAN
1.000 Bh Bak Teraso 485,000.00 485,000.00
6.000 Kg Semen Portland 1,700.00 10,200.00
0.010 M3 Pasir Pasang 225,000.00 2,250.00
TENAGA
0.750 OH Tukang Batu 190,000.00 142,500.00
0.070 OH Kepala Tukang Batu 230,000.00 16,100.00
2.100 OH Pekerja 150,000.00 315,000.00
0.110 OH Mandor 230,000.00 25,300.00
Jumlah ( A + B + C ) 996,350.00
Keuntungan & Overhead 10 % 99,635.00
Jumlah ……………………… 1,095,985.00

SNI.288 Memasang 1 Bh Bak Mandi Fiberglass


BAHAN
1.000 Bh Bak Fiberglass 525,000.00 525,000.00
18% Harga Bak Perlengkapan 94,500.00
TENAGA
2.700 OH Tukang Batu 190,000.00 513,000.00
0.540 OH Kepala Tukang Batu 230,000.00 124,200.00
1.800 OH Pekerja 150,000.00 270,000.00
0.110 OH Mandor 230,000.00 25,300.00
Jumlah ( A + B + C ) 1,552,000.00
Keuntungan & Overhead 10 % 155,200.00
Jumlah ……………………… 1,707,200.00

SNI.289 Memasang 1 Bh Bak Mandi Plastik


BAHAN
1.000 Bh Bak Plastik 530,000.00 530,000.00
18% Harga Bak Perlengkapan 95,400.00
TENAGA
2.700 OH Tukang Batu 190,000.00 513,000.00
0.540 OH Kepala Tukang Batu 230,000.00 124,200.00
1.800 OH Pekerja 150,000.00 270,000.00
0.110 OH Mandor 230,000.00 25,300.00
Jumlah ( A + B + C ) 1,557,900.00
Keuntungan & Overhead 10 % 155,790.00
Jumlah ……………………… 1,713,690.00
SNI.290.a Memasang 1 bh Kran ex. TOTO T2613
BAHAN
1.000 bh Kran Shower 363,000.00 363,000.00
0.025 bh Seal tape 6,000.00 150.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 387,100.00
Keuntungan & Overhead 10 % 38,710.00
Jumlah ……………………… 425,810.00

SNI.291 Memasang 1 Bh Floor Drain


BAHAN
1.000 Bh Floor Drain 27,000.00 27,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 50,950.00
Keuntungan & Overhead 10 % 5,095.00
Jumlah ……………………… 56,045.00

SNI.291.a Memasang 1 bh Floor Drain ex. TOTO TX 1 BV 3


BAHAN
1.000 bh Floor Drain ex. TOTO TX 1 BV 3 40,000.00 40,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 63,950.00
Keuntungan & Overhead 10 % 6,395.00
Jumlah ……………………… 70,345.00

SNI.292 Memasang 1 Bh Saringan Air Besi


BAHAN
1.000 Bh Saringan Air Besi 120,000.00 120,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 143,950.00
Keuntungan & Overhead 10 % 14,395.00
Jumlah ……………………… 158,345.00

SNI.292.1 Memasang 1 bh Shower spray ex. TOTO TX 403 SBPIV


BAHAN
1.000 bh Shower spray ex. TOTO TX 403 SBPIV 813,000.00 813,000.00
0.025 bh Seal tape 6,000.00 150.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 837,100.00
Keuntungan & Overhead 10 % 83,710.00
Jumlah ……………………… 920,810.00

SNI.292.2 Memasang 1 bh Spoel hoek


BAHAN
1.000 bh Spoel hoek 11,000,000.00 11,000,000.00
0.025 bh Seal tape 6,000.00 150.00
TENAGA
0.650 OH Tukang Batu 190,000.00 123,500.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.100 OH Pekerja 150,000.00 15,000.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 11,142,100.00
Keuntungan & Overhead 10 % 1,114,210.00
Jumlah ……………………… 12,256,310.00

SNI.292.3 Memasang 1 bh shower ex. TOTO TR 309 SZ


BAHAN
1.000 bh Shower ex. TOTO TR 309 SZ 565,000.00 565,000.00
0.025 bh Seal tape 6,000.00 150.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 589,100.00
Keuntungan & Overhead 10 % 58,910.00
Jumlah ……………………… 648,010.00

SNI.292.4 Memasang 1 bh Paper Holder ex. TOTO TIPE TS116R


BAHAN
1.000 bh Paper Holder ex. TOTO TIPE TS116R 594,000.00 594,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 617,950.00
Keuntungan & Overhead 10 % 61,795.00
Jumlah ……………………… 679,745.00

SNI.292.5 Memasang 1 bh soap holder ex. TOTO S 156N


BAHAN
1.000 bh soap holder ex. TOTO S 156N 160,000.00 160,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 183,950.00
Keuntungan & Overhead 10 % 18,395.00
Jumlah ……………………… 202,345.00

SNI.292.6 Memasang 1 bh hand railing stainless steel ex. TOTO TX 3A2


BAHAN
1.000 bh hand railing stainless steel ex. TOTO TX 3A2 940,000.00 940,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 963,950.00
Keuntungan & Overhead 10 % 96,395.00
Jumlah ……………………… 1,060,345.00

SNI.293.a Memasang 1 Bh Tandon Air kap. 500 Liter


BAHAN
1.000 Bh Tandon Air Kap. 500 Liter 1,430,000.00 1,430,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 1,453,950.00
Keuntungan & Overhead 10 % 145,395.00
Jumlah ……………………… 1,599,345.00

SNI.293.b Memasang 1 Bh Tandon Air kap. 1000 Liter


BAHAN
1.000 Bh Tandon Air Kap. 1000 Liter 2,100,000.00 2,100,000.00
TENAGA
0.100 OH Tukang Batu 190,000.00 19,000.00
0.010 OH Kepala Tukang Batu 230,000.00 2,300.00
0.010 OH Pekerja 150,000.00 1,500.00
0.005 OH Mandor 230,000.00 1,150.00
Jumlah ( A + B + C ) 2,123,950.00
Keuntungan & Overhead 10 % 212,395.00
Jumlah ……………………… 2,336,345.00

SNI.294.G Memasang 1 m' Pipa GI dia 1/2"


BAHAN
1.000 m' Pipa GI dia 1/2" 24,500.00 24,500.00
0.167 Bh Seel tipe 6,000.00 1,000.00
TENAGA
0.152 OH Tukang Pipa 190,000.00 28,857.83
0.015 OH Kepala Tukang Pipa 230,000.00 3,496.00
0.091 OH Pekerja 150,000.00 13,670.00
0.012 OH Mandor 230,000.00 2,683.33
Jumlah ( A + B + C ) 74,207.17
Keuntungan & Overhead 10 % 7,420.72
Jumlah ……………………… 81,627.88

SNI.298.Ga Memasang 1 m' Pipa GI dia 2"


BAHAN
1.000 m' Pipa GI dia 2" 100,000.00 100,000.00
0.167 Bh Seel tipe 6,000.00 1,000.00
TENAGA
0.152 OH Tukang Pipa 190,000.00 28,857.83
0.015 OH Kepala Tukang Pipa 230,000.00 3,496.00
0.091 OH Pekerja 150,000.00 13,670.00
0.012 OH Mandor 230,000.00 2,683.33
Jumlah ( A + B + C ) 149,707.17
Keuntungan & Overhead 10 % 14,970.72
Jumlah ……………………… 164,677.88

PEKERJAAN LAIN - LAIN


SNI.299 1 M' Pagar BRC tinggi 1,20 m
1.000 M' Pagar BRC 120,000.00 120,000.00
2.000 OH Tukang Besi 190,000.00 380,000.00
0.200 OH Kepala Tukang Besi 230,000.00 46,000.00
0.067 OH Pekerja 150,000.00 10,005.00
0.003 OH Mandor 230,000.00 759.00
Jumlah ( A + B + C ) 556,764.00
Keuntungan & Overhead 10 % 55,676.40
Jumlah ……………………… 612,440.40

SNI.300 1 M2 Fabrikasi Besi


2.000 Kg Besi Siku 38,000.00 76,000.00
0.003 Unit Mesin Pemotong Besi 1,132,000.00 3,169.60
0.002 Buah Las Listrik 17,000,000.00 28,339.00
0.002 Unit Mesin Bor 1,132,000.00 2,603.60
0.080 Buah Mata Bor 57,000.00 4,560.00
15.000 KWh Listrik 1,600.00 24,000.00
1.500 OH Tukang Las 190,000.00 285,000.00
0.150 OH Kepala Tukang Las 230,000.00 34,500.00
2.000 OH Pekerja Terlatih 150,000.00 300,000.00
Jumlah ( A + B + C ) 758,172.20
Keuntungan & Overhead 10 % 75,817.22
Jumlah ……………………… 833,989.42

SNI.301.3 3 M3 Kawat Bronjong 3 mm


25.000 Kg Kawat Galvanis Tebal 3 mm 40,000.00 1,000,000.00
6.000 Bh Dolken/ Perancah 11,000.00 66,000.00
2.000 OH Penganyam 190,000.00 380,000.00
2.600 OH Pekerja Pengayam 150,000.00 390,000.00
0.080 OH Mandor Pengayam 230,000.00 18,400.00
3.000 M3 Batu Kali 230,000.00 690,000.00
4.500 OH Pekerja Pengisi 150,000.00 675,000.00
0.075 OH Mandor Pengisi 230,000.00 17,250.00
Jumlah ( A + B + C ) 3,236,650.00
Keuntungan & Overhead 10 % 323,665.00
Jumlah ……………………… 3,560,315.00

SNI.301.4 3 M3 Kawat Bronjong 4 mm


45.000 Kg Kawat Galvanis Tebal 4 mm 40,000.00 1,800,000.00
6.000 Bh Dolken/ Perancah 11,000.00 66,000.00
2.200 OH Penganyam 190,000.00 418,000.00
2.000 OH Pekerja Pengayam 150,000.00 300,000.00
0.080 OH Mandor Pengayam 230,000.00 18,400.00
3.000 M3 Batu Kali 230,000.00 690,000.00
4.500 OH Pekerja Pengisi 150,000.00 675,000.00
0.075 OH Mandor Pengisi 230,000.00 17,250.00
Jumlah ( A + B + C ) 3,984,650.00
Keuntungan & Overhead 10 % 398,465.00
Jumlah ……………………… 4,383,115.00

SNI.301.5 3 M3 Kawat Bronjong 5 mm


70.000 Kg Kawat Galvanis Tebal 5 mm 40,000.00 2,800,000.00
6.000 Bh Dolken/ Perancah 11,000.00 66,000.00
2.500 OH Penganyam 190,000.00 475,000.00
2.000 OH Pekerja Pengayam 150,000.00 300,000.00
0.080 OH Mandor Pengayam 230,000.00 18,400.00
3.000 M3 Batu Kali 230,000.00 690,000.00
4.500 OH Pekerja Pengisi 150,000.00 675,000.00
0.075 OH Mandor Pengisi 230,000.00 17,250.00
Jumlah ( A + B + C ) 5,041,650.00
Keuntungan & Overhead 10 % 504,165.00
Jumlah ……………………… 5,545,815.00

PEKERJAAN VEGETASI TANAMAN


SNI.302 1 bh Tanam Pohon Kamboja tinggi 5 meter
BAHAN
1.000 bh Tanam Pohon Kamboja tinggi 5 meter 1,880,000.00 1,880,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 kg Insektisida / Furadan 30,000.00 150.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.100 OH Pekerja 150,000.00 15,000.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 1,953,150.00
Keuntungan & Overhead 10 % 195,315.00
Jumlah ……………………… 2,148,465.00

SNI.302.1 1 bh Tanam Pohon Tabebuya tinggi 4 meter


BAHAN
1.000 bh Tanam Pohon Tabebuya tinggi 4 meter 1,500,000.00 1,500,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 kg Insektisida / Furadan 30,000.00 150.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.100 OH Pekerja 150,000.00 15,000.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 1,573,150.00
Keuntungan & Overhead 10 % 157,315.00
Jumlah ……………………… 1,730,465.00

SNI.302.2 1 bh Tanam Pohon Palem raja tinggi 3 meter


BAHAN
1.000 bh Tanam Pohon Palem raja tinggi 3 meter 1,250,000.00 1,250,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 kg Insektisida / Furadan 30,000.00 150.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.100 OH Pekerja 150,000.00 15,000.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 1,323,150.00
Keuntungan & Overhead 10 % 132,315.00
Jumlah ……………………… 1,455,465.00

SNI.302.3 1 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter


BAHAN
1.000 bh Tanam Pohon Pisang Kipas tinggi 1,5 meter 130,000.00 130,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 kg Insektisida / Furadan 30,000.00 150.00
TENAGA
0.100 OH Tukang 190,000.00 19,000.00
0.075 OH Kepala Tukang 230,000.00 17,250.00
0.100 OH Pekerja 150,000.00 15,000.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 203,150.00
Keuntungan & Overhead 10 % 20,315.00
Jumlah ……………………… 223,465.00

SNI.302.4 1 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter


BAHAN
1.000 bh Tanam perdu Honje Merah tinggi 0,7 - 0,8 meter 19,000.00 19,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
TENAGA
0.050 OH Tukang 190,000.00 9,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.050 OH Pekerja 150,000.00 7,500.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 61,200.00
Keuntungan & Overhead 10 % 6,120.00
Jumlah ……………………… 67,320.00

SNI.302.5 1 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter


BAHAN
1.000 bh Tanam perdu Bakung Lele tinggi 0,25 - 0,3 meter 22,000.00 22,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
TENAGA
0.050 OH Tukang 190,000.00 9,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.050 OH Pekerja 150,000.00 7,500.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 64,200.00
Keuntungan & Overhead 10 % 6,420.00
Jumlah ……………………… 70,620.00

SNI.302.6 1 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter


BAHAN
1.000 bh Tanam perdu Pisang Hias tinggi 0,7 - 0,8 meter 16,000.00 16,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
TENAGA
0.050 OH Tukang 190,000.00 9,500.00
0.015 OH Kepala Tukang 230,000.00 3,450.00
0.050 OH Pekerja 150,000.00 7,500.00
0.025 OH Mandor 230,000.00 5,750.00
Jumlah ( A + B + C ) 58,200.00
Keuntungan & Overhead 10 % 5,820.00
Jumlah ……………………… 64,020.00

SNI.302.a 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Damar (Agathis dammara) Tinggi 4m 832,000.00 832,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 kg Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 844,590.00
Keuntungan & Overhead 10 % 84,459.00
Jumlah ……………………… 929,049.00

SNI.302.b 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Pulai (alstonia scholaris) Tinggi 6m 1,900,000.00 1,900,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,912,590.00
Keuntungan & Overhead 10 % 191,259.00
Jumlah ……………………… 2,103,849.00

SNI.302.c 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Kasia Jawa (Cassia javanica) Tinggi 4m 565,000.00 565,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 577,590.00
Keuntungan & Overhead 10 % 57,759.00
Jumlah ……………………… 635,349.00

SNI.302.d 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Kayu Kamper (Cinnamamum camphara) Tinggi 6m 876,000.00 876,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 888,590.00
Keuntungan & Overhead 10 % 88,859.00
Jumlah ……………………… 977,449.00

SNI.302.e 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Flamboyan (Delonix regia) Tinggi 7m 1,188,000.00 1,188,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,200,590.00
Keuntungan & Overhead 10 % 120,059.00
Jumlah ……………………… 1,320,649.00
SNI.302.f 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm
BAHAN
1.000 bh Pohon Biola Cantik (Ficus lyrata) Tinggi 6m 813,000.00 813,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 825,590.00
Keuntungan & Overhead 10 % 82,559.00
Jumlah ……………………… 908,149.00

SNI.302.g 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Beringin Bodi (Ficus religiosa) Tinggi 6m 1,065,000.00 1,065,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,077,590.00
Keuntungan & Overhead 10 % 107,759.00
Jumlah ……………………… 1,185,349.00

SNI.302.h 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Sosis (Kigelia pinnata) Tinggi 7m 1,065,000.00 1,065,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,077,590.00
Keuntungan & Overhead 10 % 107,759.00
Jumlah ……………………… 1,185,349.00

SNI.302.i 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Bungur (Lagerstroemia speciasa) Tinggi 5m 880,000.00 880,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 892,590.00
Keuntungan & Overhead 10 % 89,259.00
Jumlah ……………………… 981,849.00

SNI.302.j 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Flamboyan Kuning (Peltophorum pterocarpum) Tin 545,000.00 545,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 557,590.00
Keuntungan & Overhead 10 % 55,759.00
Jumlah ……………………… 613,349.00

SNI.302.k 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Kamboja Putih (Plumeria obtusa) Tinggi 5m 1,465,000.00 1,465,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,477,590.00
Keuntungan & Overhead 10 % 147,759.00
Jumlah ……………………… 1,625,349.00

SNI.302.l 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Parahiba (Schizolobium parahyba) Tinggi 7m 940,000.00 940,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 952,590.00
Keuntungan & Overhead 10 % 95,259.00
Jumlah ……………………… 1,047,849.00

SNI.302.m 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Tabebuya Pink (Tabebuia rosea) Tinggi 4m 680,000.00 680,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 692,590.00
Keuntungan & Overhead 10 % 69,259.00
Jumlah ……………………… 761,849.00

SNI.302.n 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Bambu Kuning (Bambusa vulgaris) Tinggi 2,5m 188,000.00 188,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 200,590.00
Keuntungan & Overhead 10 % 20,059.00
Jumlah ……………………… 220,649.00

SNI.302.o 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Palem Kuning (Chrysalidacarpus lutescens) Tinggi 750,000.00 750,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 762,590.00
Keuntungan & Overhead 10 % 76,259.00
Jumlah ……………………… 838,849.00

SNI.302.p 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Pakis Monyet (Cibotium barometz) Tinggi 0,8m 107,000.00 107,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 119,590.00
Keuntungan & Overhead 10 % 11,959.00
Jumlah ……………………… 131,549.00

SNI.302.q 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Palem Kol (Licualis grandis) Tinggi 1,5m 157,000.00 157,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 169,590.00
Keuntungan & Overhead 10 % 16,959.00
Jumlah ……………………… 186,549.00

SNI.302.r 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Palem Sadeng (Livistona rotundifolia) Tinggi 3m 1,888,000.00 1,888,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,900,590.00
Keuntungan & Overhead 10 % 190,059.00
Jumlah ……………………… 2,090,649.00

SNI.302.s 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Palem Kurma (Phoenix sylvestris) Tinggi 2m 1,750,000.00 1,750,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 1,762,590.00
Keuntungan & Overhead 10 % 176,259.00
Jumlah ……………………… 1,938,849.00

SNI.302.t 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Pisang Kipas (Ravenala madagascariensis) Tinggi 1 565,000.00 565,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 577,590.00
Keuntungan & Overhead 10 % 57,759.00
Jumlah ……………………… 635,349.00

SNI.302.u 1 bh Tanam pelindung tinggi > 2 m, lubang 60 x 60 cm


BAHAN
1.000 bh Pohon Pisang Hias (Strelitzia nicolai) Tinggi 1,5m 565,000.00 565,000.00
0.080 kg Pupuk kandang 32,000.00 2,560.00
0.001 ls Insektisida / Furadan 30,000.00 30.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 10,000.00 10,000.00
Jumlah ( A + B + C ) 577,590.00
Keuntungan & Overhead 10 % 57,759.00
Jumlah ……………………… 635,349.00

SNI.302.1a 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Agave (Agave angustifolia) Tinggi 300-400 mm 100,000.00 1,000,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 1,031,150.00
Keuntungan & Overhead 10 % 103,115.00
Jumlah ……………………… 1,134,265.00

SNI.302.1b 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Paku Sarang Burung (Asplenium nidus) Tinggi 25 63,000.00 630,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 661,150.00
Keuntungan & Overhead 10 % 66,115.00
Jumlah ……………………… 727,265.00

SNI.302.1c 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Fox Tail Agave (Agave attenuata) Tinggi 200-300 53,000.00 530,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 561,150.00
Keuntungan & Overhead 10 % 56,115.00
Jumlah ……………………… 617,265.00

SNI.302.1d 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Giant Arum (Typhonodarum lindleyanum) Tinggi 313,000.00 3,130,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 3,161,150.00
Keuntungan & Overhead 10 % 316,115.00
Jumlah ……………………… 3,477,265.00

SNI.302.1e 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Spineless (Spineless Yucca) Tinggi 800 mm 169,000.00 1,690,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 1,721,150.00
Keuntungan & Overhead 10 % 172,115.00
Jumlah ……………………… 1,893,265.00

SNI.302.1f 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Sente (Alocosia macrorrhiza) Tinggi 700-800mm 94,000.00 940,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 971,150.00
Keuntungan & Overhead 10 % 97,115.00
Jumlah ……………………… 1,068,265.00

SNI.302.1g 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Honje Merah (Alpinia purpurata) Tinggi 700-800m 19,000.00 190,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 221,150.00
Keuntungan & Overhead 10 % 22,115.00
Jumlah ……………………… 243,265.00

SNI.302.1h 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Kacang Emas (Arachis pintai) Tinggi 50-100mm 22,000.00 220,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 251,150.00
Keuntungan & Overhead 10 % 25,115.00
Jumlah ……………………… 276,265.00

SNI.302.1i 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Bromelia Merah (Bromelia sp.) Tinggi 150-200mm 44,000.00 440,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 471,150.00
Keuntungan & Overhead 10 % 47,115.00
Jumlah ……………………… 518,265.00

SNI.302.1j 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Pisang Hias (Calathea lutea) Tinggi 700-800mm 44,000.00 440,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 471,150.00
Keuntungan & Overhead 10 % 47,115.00
Jumlah ……………………… 518,265.00

SNI.302.1k 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Kalatea Belang (Calathea zebrina) Tinggi 250-300 19,000.00 190,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 221,150.00
Keuntungan & Overhead 10 % 22,115.00
Jumlah ……………………… 243,265.00

SNI.302.1l 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Bunga Pagoda (Cleorodendrum paniculatum) Ting 88,000.00 880,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 911,150.00
Keuntungan & Overhead 10 % 91,115.00
Jumlah ……………………… 1,002,265.00

SNI.302.1m 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak hanjuang Merah (Cordyline frusticosa) Tinggi 700 19,000.00 190,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 221,150.00
Keuntungan & Overhead 10 % 22,115.00
Jumlah ……………………… 243,265.00

SNI.302.1n 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Pacing Merah (Costus woodsonii) Tinggi 400-500 13,000.00 130,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 161,150.00
Keuntungan & Overhead 10 % 16,115.00
Jumlah ……………………… 177,265.00

SNI.302.1o 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Sirih Gading (Epipremnum aureum) Tinggi 300-5 73,000.00 730,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 761,150.00
Keuntungan & Overhead 10 % 76,115.00
Jumlah ……………………… 837,265.00

SNI.302.1p 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Heliconia Bunga Pink (Heliconia chartacea) Tingg 9,400.00 94,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 125,150.00
Keuntungan & Overhead 10 % 12,515.00
Jumlah ……………………… 137,665.00

SNI.302.1q 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Bakung Lele (Hymenocallis littoralis) Tinggi 250- 13,000.00 130,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 161,150.00
Keuntungan & Overhead 10 % 16,115.00
Jumlah ……………………… 177,265.00

SNI.302.1r 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Pakis Kelabang (Nephrolepis exaltata) Tinggi 250 25,000.00 250,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 281,150.00
Keuntungan & Overhead 10 % 28,115.00
Jumlah ……………………… 309,265.00

SNI.302.1s 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Alang Mini (Ophiopogon japonicus "dwarf") Tingg 19,000.00 190,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 221,150.00
Keuntungan & Overhead 10 % 22,115.00
Jumlah ……………………… 243,265.00

SNI.302.1t 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Aralia (Osmoxylon lineare) Tinggi 400-500mm 95,000.00 950,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 981,150.00
Keuntungan & Overhead 10 % 98,115.00
Jumlah ……………………… 1,079,265.00

SNI.302.1v 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Pandan Pigmi (Pandanus pygmaeus) Tinggi 250- 25,000.00 250,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 281,150.00
Keuntungan & Overhead 10 % 28,115.00
Jumlah ……………………… 309,265.00

SNI.302.1x 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Daun Philo "Burle Marx" (Philadendron "Burle Mar 32,000.00 320,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 351,150.00
Keuntungan & Overhead 10 % 35,115.00
Jumlah ……………………… 386,265.00

SNI.302.1y 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Daun Philo Besar (Philadendron sellaum) Tinggi 38,000.00 380,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 411,150.00
Keuntungan & Overhead 10 % 41,115.00
Jumlah ……………………… 452,265.00

SNI.302.1z 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Daun Philo Xenadu (Philadendron xenadu) Tinggi 47,000.00 470,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 501,150.00
Keuntungan & Overhead 10 % 50,115.00
Jumlah ……………………… 551,265.00

SNI.302.2a 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Cendrawasih (Phyllanthus myrtifolius) Tinggi 300 11,500.00 115,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 146,150.00
Keuntungan & Overhead 10 % 14,615.00
Jumlah ……………………… 160,765.00

SNI.302.2b 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Melati Jepang (Pseuderanthemum reticulatum) Ti 11,000.00 110,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 141,150.00
Keuntungan & Overhead 10 % 14,115.00
Jumlah ……………………… 155,265.00

SNI.302.2c 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak kembang Air Mancur Merah (Russelia equisetiform 28,000.00 280,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 311,150.00
Keuntungan & Overhead 10 % 31,115.00
Jumlah ……………………… 342,265.00

SNI.302.2d 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Wali Songo Var. (Schefflera arbaricola) Tinggi 40 44,000.00 440,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 471,150.00
Keuntungan & Overhead 10 % 47,115.00
Jumlah ……………………… 518,265.00

SNI.302.2e 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Lee Kuan Yew (Vernonia elliptica) Tinggi 300-500 8,500.00 85,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 116,150.00
Keuntungan & Overhead 10 % 11,615.00
Jumlah ……………………… 127,765.00

SNI.302.2f 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Lili Brazil (Dianella tasmanica) Tinggi 250-300 13,000.00 130,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 161,150.00
Keuntungan & Overhead 10 % 16,115.00
Jumlah ……………………… 177,265.00

SNI.302.2g 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Opiopagon Hijau (Ophiopagon jaburan) Tinggi 30 19,000.00 190,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 221,150.00
Keuntungan & Overhead 10 % 22,115.00
Jumlah ……………………… 243,265.00

SNI.302.2h 1 bh Tanam semak , lubang polibag 15 x 15 cm


BAHAN
10.000 bh Semak Kembang Coklat (Zephyranthes candida) Tinggi 10 25,000.00 250,000.00
0.500 kg Pupuk kandang 32,000.00 16,000.00
0.005 ls Insektisida / Furadan 30,000.00 150.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 15,000.00 15,000.00
Jumlah ( A + B + C ) 281,150.00
Keuntungan & Overhead 10 % 28,115.00
Jumlah ……………………… 309,265.00

SNI.302.3a 1 m2 Tanam rumput


BAHAN
1.000 m2 Semak Rumput Manila (Zoysia matrella) 63,000.00 63,000.00
0.750 kg Pupuk kandang 32,000.00 24,000.00
TENAGA
1.000 ls Upah tanam vegetasi pohon 5,000.00 5,000.00
Jumlah ( A + B + C ) 92,000.00
Keuntungan & Overhead 10 % 9,200.00
Jumlah ……………………… 101,200.00

PEKERJAAN TAMBAHAN
SNI.Ls.1 1 M' Biaya Pengeboran air + Pipa Casing Ø 6''
1.000 m' Biaya Pengeboran air 1,120,000.00 1,120,000.00
1.000 m' Pipa PVC dia 6" 197,900.00 197,900.00
Perlengkapan (35 % x harga pipa) 69,265.00
1.000 Ls 29,685.00 29,685.00
Biaya pemasangan sebesar 15% dari harga material
Jumlah ( A + B + C ) 1,416,850.00
Keuntungan & Overhead 10 % 141,685.00
Jumlah ……………………… 1,558,535.00

SNI.Ls.2 1 M' Biaya Pengeboran air + Pipa Casing Ø 4''


1.000 m Biaya Pengeboran air 850,000.00 850,000.00
1.000 m' Pipa PVC dia 4" 94,900.00 94,900.00
Perlengkapan (35 % x harga pipa) 33,215.00
1.000 Ls 14,235.00 14,235.00
Biaya pemasangan sebesar 15% dari harga material

Jumlah ( A + B + C ) 992,350.00
Keuntungan & Overhead 10 % 99,235.00
Jumlah ……………………… 1,091,585.00

SNI.Ls.3 1 M' Biaya Pengeboran air + Pipa Casing Ø 3''


1.000 m Biaya Pengeboran air 400,000.00 400,000.00
1.000 m' Pipa PVC dia 3" 65,100.00 65,100.00
Perlengkapan (35 % x harga pipa) 22,785.00
1.000 Ls 9,765.00 9,765.00
Biaya pemasangan sebesar 15% dari harga material

Jumlah ( A + B + C ) 497,650.00
Keuntungan & Overhead 10 % 49,765.00
Jumlah ……………………… 547,415.00

SNI.Ls.4 1 M' Biaya Pengeboran air + Pipa Casing Ø 2.5''


1.000 m Biaya Pengeboran air 200,000.00 200,000.00
1.000 m' Pipa PVC dia 2.5" 45,600.00 45,600.00
Perlengkapan (35 % x harga pipa) 15,960.00
1.000 Ls 6,840.00 6,840.00
Biaya pemasangan sebesar 15% dari harga material

Jumlah ( A + B + C ) 268,400.00
Keuntungan & Overhead 10 % 26,840.00
Jumlah ……………………… 295,240.00

SNI.Ls.5 1 Bh' Mesin tenaga disel YEP-3 + Pompa Ebra Ø Q3'' ( setara Yanmar )
1.000 zet Mesin tenaga disel 6.5 Pk YEP-3 + Pompa Ebra Ø Q3'' 28,800,000.00 28,800,000.00
( setara Yanmar )

1.000 Ls Biaya Asisories dan Perakitan 20% dari harga bahan 5,760,000.00 5,760,000.00

Jumlah ( A + B + C ) 34,560,000.00
Keuntungan & Overhead 10 % 3,456,000.00
Jumlah ……………………… 38,016,000.00

SNI.Ls.6 1 Bh' Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, H 100, 3 Phase
1.000 zet Pompa Submersible type Centrifugal kapasitas 3 Ltr/Dtk, 49,124,000.00 49,124,000.00
H 100, 3 Phase

Jumlah ( A + B + C ) 49,124,000.00
Keuntungan & Overhead 10 % 4,912,400.00
Jumlah ……………………… 54,036,400.00

SNI.Ls.7 1 Bh' Mesin tenaga Listerik disel + Pompa Outo matis Jet pam - 30 Complit pemasangan
1.000 zet Mesin disel+Pompa Outo matis Jet pam ØINT OUT1.5'' - 25,905,000.00 25,905,000.00
30 Complit

Jumlah ( A + B + C ) 25,905,000.00
Keuntungan & Overhead 10 % 2,590,500.00
Jumlah ……………………… 28,495,500.00

SNI.Ls.8 1 Bh' Mesin tenaga disel + Pompa Outo matis ( setara sanyo ) ØINT 1''- 25 Complit pemasangan
1.000 zet Mesin disel+Pompa Outo matis ( setara sanyo ) ØINT 1''- 23,350,000.00 23,350,000.00
20 Complit

Jumlah ( A + B + C ) 23,350,000.00
Keuntungan & Overhead 10 % 2,335,000.00
Jumlah ……………………… 25,685,000.00
1. 1.1.1. HARGA SATUAN PEKERJAAN PERSIAPAN

1. 1.1.1.1. Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Kayu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 107,200.00
B BAHAN
Dolken kayu Batang 1.25 11,000.00 13,750.00
f 8-10/400 cm
Semen portland Kg 5 1,700.00 8,500.00
Pasir beton m 3
0.005 355,000.00 1,775.00
Koral beton m3 0.009 345,000.00 3,105.00
Kayu 5/7 m3 0.072 2,600,000.00 187,200.00
Paku biasa 2” – 5” Kg 0.06 28,000.00 1,680.00
Residu Liter 0.4 25,000.00 10,000.00
JUMLAH HARGA BAHAN 226,010.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 333,210.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 33,321.00
F Harga Satuan Pekerjaan (D+E) 366,531.00 m²

1. 1.1.1.2. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Kayu L.02 OH 0.4 190,000.00 76,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 115,200.00
B BAHAN
Dolken kayu Batang 1.25 11,000.00 13,750.00
f 8-10/400 cm
Semen portland Kg 2.5 1,700.00 4,250.00
Seng gelombang Lbr 1.2 120,000.00 144,000.00
Pasir beton m3 0.005 355,000.00 1,775.00
Koral beton m3 0.009 345,000.00 3,105.00
Kayu 5/7 m3 0.072 2,600,000.00 187,200.00
Paku biasa 2” – 5” Kg 0.06 28,000.00 1,680.00
Meni besi Liter 0.45 35,000.00 15,750.00
JUMLAH HARGA BAHAN 371,510.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 486,710.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 48,671.00
F Harga Satuan Pekerjaan (D+E) 535,381.00 m²

1. 1.1.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Kayu L.02 OH 0.3 190,000.00 57,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 96,200.00
B BAHAN
Dolken kayu f Batang 1 11,000.00 11,000.00
8-10/400 cm
Semen portland Kg 2 1,700.00 3,400.00
Kawat duri M’ 25 2,500.00 62,500.00
Pasir beton m 3
0.005 355,000.00 1,775.00
Koral beton m3 0.009 345,000.00 3,105.00
Paku biasa 2” – 5” Kg 0.06 28,000.00 1,680.00
JUMLAH HARGA BAHAN 83,460.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 88,060.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,806.00
F Harga Satuan Pekerjaan (D+E) 96,866.00 m²

1. 1.1.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang Kayu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
Kayu balok 5/7 m3 0.012 2,600,000.00 31,200.00
Paku 2”-3” Kg 0.02 33,000.00 660.00
Kayu papan 3/20 m3 0.007 2,600,000.00 18,200.00
JUMLAH HARGA BAHAN 50,060.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,510.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,751.00
F Harga Satuan Pekerjaan (D+E) 96,261.00 m'

1. 1.1.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2 150,000.00 300,000.00
Tukang Kayu L.02 OH 2 190,000.00 380,000.00
Tukang batu L.02 OH 1 190,000.00 190,000.00
Kepala Tukang L.03 OH 0.3 230,000.00 69,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 950,500.00
B BAHAN
Dolken kayu diameter 8- Batang 1.25 11,000.00 13,750.00
10/400 cm
Kayu m3 0.18 2,600,000.00 468,000.00
Paku biasa Kg 0.08 28,000.00 2,240.00
Besi strip Kg 1.1 33,000.00 36,300.00
Semen Portland Kg 35 1,700.00 59,500.00
Pasir pasang m3 0.15 225,000.00 33,750.00
Pasir beton m3 0.1 355,000.00 35,500.00
Koral beton m3 0.15 345,000.00 51,750.00
Bata merah Bh 30 850.00 25,500.00
Seng plat Lbr 0.25 135,000.00 33,750.00
Jendela naco Bh 0.2 141,000.00 28,200.00
Kaca polos m2 0.08 115,000.00 9,200.00
Kunci tanam Bh 0.15 137,000.00 20,550.00
Plywood 4mm Lbr 0.06 130,000.00 7,800.00
JUMLAH HARGA BAHAN 825,790.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,776,290.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 177,629.00
F Harga Satuan Pekerjaan (D+E) 1,953,919.00 m²

1. 1.1.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu )

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Kayu L.02 OH 1.5 190,000.00 285,000.00
Kepala tukang L.03 OH 0.15 230,000.00 34,500.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 481,000.00
B BAHAN
Dolken kayu f Batang 3 11,000.00 33,000.00
8-10/400 cm
Kayu m3 0.276 2,600,000.00 717,600.00
Paku biasa Kg 0.7 28,000.00 19,600.00
Seng gelombang Lbr 1.5 120,000.00 180,000.00
JUMLAH HARGA BAHAN 950,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,431,200.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 143,120.00
F Harga Satuan Pekerjaan (D+E) 1,574,320.00 m²

1. 1.1.1.7. Pembuatan 1 m2 gudang semen dan peralatan

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Kayu L.02 OH 2 190,000.00 380,000.00
Kepala Tukang L.03 OH 0.2 230,000.00 46,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 587,500.00
B BAHAN
Dolken kayu diameter 8- Batang 1.7 11,000.00 18,700.00
10/400 cm
Kayu m3 0.21 2,600,000.00 546,000.00
Paku biasa Kg 0.3 28,000.00 8,400.00
Semen Portland Kg 10.5 1,700.00 17,850.00
Pasir beton m3 0.03 355,000.00 10,650.00
Koral beton m3 0.05 345,000.00 17,250.00
Seng gelombang Lbr 1.5 120,000.00 180,000.00
Seng plat Lbr 0.25 135,000.00 33,750.00
JUMLAH HARGA BAHAN 832,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,420,100.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 142,010.00
F Harga Satuan Pekerjaan (D+E) 1,562,110.00 m²

1. 1.1.1.8. Pembuatan 1 m2 bedeng pekerja


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Kayu L.02 OH 2 190,000.00 380,000.00
Kepala Tukang L.03 OH 0.2 230,000.00 46,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 587,500.00
B BAHAN
Dolken kayu diameter 8- Batang 1.25 11,000.00 13,750.00
10/400 cm
Kayu m3 0.186 2,600,000.00 483,600.00
Paku biasa Kg 0.3 28,000.00 8,400.00
Semen Portland Kg 18 1,700.00 30,600.00
Pasir beton m 3
0.03 355,000.00 10,650.00
Koral beton m3 0.05 345,000.00 17,250.00
Seng gelombang Lbr 1.5 120,000.00 180,000.00
Plywood 4mm Lbr 1.35 130,000.00 175,500.00
JUMLAH HARGA BAHAN 919,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,507,250.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 150,725.00
F Harga Satuan Pekerjaan (D+E) 1,657,975.00 m²

1. 1.1.1.9. Pembersihan 1 m2 lapangan dan perataan

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 161,500.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 161,500.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,150.00
F Harga Satuan Pekerjaan (D+E) 177,650.00 m²

1. 1.1.1.10. Pembuatan 1 m2 steger/perancah dari bambu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Kayu L.02 OH 0.017 190,000.00 3,230.00
Kepala Tukang L.03 OH 0.002 230,000.00 460.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 44,180.00
B BAHAN
Bambu diameter 6- Batang 1 27,500.00 27,500.00
8/600 cm
Tali ijuk m3 0.25 -
JUMLAH HARGA BAHAN 27,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 71,680.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,168.00
F Harga Satuan Pekerjaan (D+E) - m²

1. 1.1.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Tukang Kayu L.02 OH 0.3 190,000.00 57,000.00
Kepala Tukang L.03 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 63,900.00
B BAHAN
Kayu papan kelas III m3 0.036 2,600,000.00 93,600.00
Kayu balok 5/7 kelas III m 3
0.0105 2,600,000.00 27,300.00
Paku biasa kg 0.08 28,000.00 2,240.00
JUMLAH HARGA BAHAN 123,140.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 187,040.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,704.00
F Harga Satuan Pekerjaan (D+E) 205,744.00 bh

1. 1.1.1.12. Pembuatan 1 m2 jalan sementara

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 1 150,000.00 150,000.00
Mandor L.04 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 151,150.00
B BAHAN
Batu belah m3 0.15 245,000.00 36,750.00
Batu pecah m3 0.09 230,000.00 20,700.00
Pasir pasang m3
0.01 225,000.00 2,250.00
JUMLAH HARGA BAHAN 59,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 210,850.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 21,085.00
F Harga Satuan Pekerjaan (D+E) 231,935.00 m²

1. 1.1.1.13. Pembongkaran 1 m3 beton bertulang

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 6.667 150,000.00 1,000,050.00
Mandor L.04 0.333 230,000.00 76,590.00
JUMLAH TENAGA KERJA 1,076,640.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,076,640.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 107,664.00
F Harga Satuan Pekerjaan (D+E) 1,184,304.00 m³

1. 1.1.1.14. Pembongkaran 1 m3 dinding tembok bata

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 0.667 150,000.00 100,005.00
Mandor L.04 0.033 230,000.00 7,659.00
JUMLAH TENAGA KERJA 107,664.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,664.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,766.40
F Harga Satuan Pekerjaan (D+E) 118,430.40 m³

1. 1.1.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 0.042 150,000.00 6,300.00
Tukang L.02 0.004 190,000.00 760.00
Kepala Tukang L.03 0.002 230,000.00 460.00
Mandor L.04 0.042 230,000.00 9,660.00
JUMLAH TENAGA KERJA 17,180.00
B BAHAN
Kawat jaring Lbr 0.1434 23,000.00 3,298.20
JUMLAH HARGA BAHAN 3,298.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,478.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,047.82
F Harga Satuan Pekerjaan (D+E) 22,526.02 m²

1.1.1.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x213 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 0.375 150,000.00 56,250.00
Tukang L.02 0.125 190,000.00 23,750.00
Kepala Tukang L.03 0.012 230,000.00 2,760.00
Mandor L.04 0.019 230,000.00 4,370.00
JUMLAH TENAGA KERJA 87,130.00
B BAHAN
Panel beton pracetak Lbr 0.986 -
Kolom beton pracetak Batang 0.525 -
Semen PC Kg 45 1,700.00 76,500.00
Pasir beton m3 0.074 355,000.00 26,270.00
Koral m3 0.146 345,000.00 50,370.00
JUMLAH HARGA BAHAN 153,140.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 240,270.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 24,027.00
F Harga Satuan Pekerjaan (D+E) - m²
1. 1.5.1. HARGA SATUAN PEKERJAAN TANAH

1. 1.5.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.75 150,000.00 112,500.00
Mandor L.04 OH 0.025 230,000.00 5,750.00
JUMLAH TENAGA KERJA 118,250.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 118,250.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,825.00
F Harga Satuan Pekerjaan (D+E) 130,075.00 m³

1. 1.5.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 145,350.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 145,350.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,535.00
F Harga Satuan Pekerjaan (D+E) 159,885.00 m³

1. 1.5.1.3. Menggali 1 m3 tanah biasa sedalam 3 m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.05 150,000.00 157,500.00
Mandor L.04 OH 0.067 230,000.00 15,410.00
JUMLAH TENAGA KERJA 172,910.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 172,910.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,291.00
F Harga Satuan Pekerjaan (D+E) 190,201.00 m³

1. 1.5.1.4. Menggali 1 m3 tanah keras sedalam 1 m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Mandor L.04 OH 0.032 230,000.00 7,360.00
JUMLAH TENAGA KERJA 157,360.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 157,360.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,736.00
F Harga Satuan Pekerjaan (D+E) 173,096.00 m³

1. 1.5.1.5. Menggali 1 m3 tanah cadas sedalam 1 m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Mandor L.04 OH 0.06 230,000.00 13,800.00
JUMLAH TENAGA KERJA 238,800.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 238,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 23,880.00
F Harga Satuan Pekerjaan (D+E) 262,680.00 m³

1. 1.5.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.2 150,000.00 180,000.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 190,350.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 190,350.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 19,035.00
F Harga Satuan Pekerjaan (D+E) 209,385.00 m³

1. 1.5.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 8,650.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,650.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 865.00
F Harga Satuan Pekerjaan (D+E) 9,515.00 m²

1. 1.5.1.8. Pembuangan 1 m3 tanah sejauh 30 meter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.33 150,000.00 49,500.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 51,800.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,180.00
F Harga Satuan Pekerjaan (D+E) 56,980.00 m³

1. 1.5.1.9. Pengurugan kembali 1 m3 galian tanah

Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Mandor L.04 OH 0.008 230,000.00 1,916.67
JUMLAH TENAGA KERJA 39,416.67
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 39,416.67
E Overhead & Profit (Contoh 10 %) 0.10 x D 3,941.67
F Harga Satuan Pekerjaan (D+E) 43,358.33 m³

1. 1.5.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.5 150,000.00 75,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 86,500.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 86,500.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 8,650.00
F Harga Satuan Pekerjaan (D+E) 95,150.00 m³

1. 1.5.1.11. Pengurugan 1 m3 dengan pasir urug

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 47,300.00
B BAHAN
Pasir urug 1.2 195,000.00 234,000.00
JUMLAH HARGA BAHAN 234,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 281,300.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 28,130.00
F Harga Satuan Pekerjaan (D+E) 309,430.00 m³

1. 1.5.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.8 150,000.00 120,000.00
Tukang L.02 OH 0.4 190,000.00 76,000.00
Kepala Tukang L.03 OH 0.04 230,000.00 9,200.00
Mandor L.04 OH 0.08 230,000.00 18,400.00
JUMLAH TENAGA KERJA 223,600.00
B BAHAN
Kapur Padam m3 0.135 6,000.00 810.00
Pasir Pasang m3 0.4 225,000.00 90,000.00
Tanah Liat m3 0.948 58,000.00 54,984.00
JUMLAH HARGA BAHAN 145,794.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 369,394.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 36,939.40
F Harga Satuan Pekerjaan (D+E) 406,333.40 m³

1. 1.5.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 25,950.00
B BAHAN
Ijuk m3 6 29,000.00 174,000.00
JUMLAH HARGA BAHAN 174,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 199,950.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 19,995.00
F Harga Satuan Pekerjaan (D+E) 219,945.00 m²

1. 1.5.1.14. Pengurugan 1 m3 sirtu padat

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Mandor L.04 OH 0.025 230,000.00 5,750.00
JUMLAH TENAGA KERJA 43,250.00
B BAHAN
Sirtu m3 1.2 240,000.00 288,000.00
JUMLAH HARGA BAHAN 288,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,250.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 33,125.00
F Harga Satuan Pekerjaan (D+E) 364,375.00 m³

1. 1.5.1.15. Pengurugan 1 m3 tanah padat

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Mandor L.04 OH 0.025 230,000.00 5,750.00
JUMLAH TENAGA KERJA 43,250.00
B BAHAN
Tanah cadas m3 1.2 192,000.00 230,400.00
JUMLAH HARGA BAHAN 230,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 273,650.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 27,365.00
F Harga Satuan Pekerjaan (D+E) 301,015.00 m³
3. 3.1.1. HARGA SATUAN PEKERJAAN PONDASI

3. 3.1.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 202 1,700.00 343,400.00
Pasir Pasang m3 0.485 225,000.00 109,125.00
JUMLAH HARGA BAHAN 746,525.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,148,525.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 114,852.50
F Harga Satuan Pekerjaan (D+E) 1,263,377.50 m³

3. 3.1.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 163 1,700.00 277,100.00
Pasir Pasang m3 0.52 225,000.00 117,000.00
JUMLAH HARGA BAHAN 688,100.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,090,100.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 109,010.00
F Harga Satuan Pekerjaan (D+E) 1,199,110.00 m³

3. 3.1.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 136 1,700.00 231,200.00
Pasir Pasang m3 0.544 225,000.00 122,400.00
JUMLAH HARGA BAHAN 647,600.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,049,600.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 104,960.00
F Harga Satuan Pekerjaan (D+E) 1,154,560.00 m³

3. 3.1.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 117 1,700.00 198,900.00
Pasir Pasang m3 0.561 225,000.00 126,225.00
JUMLAH HARGA BAHAN 619,125.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,021,125.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 102,112.50
F Harga Satuan Pekerjaan (D+E) 1,123,237.50 m³

3. 3.1.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 91 1,700.00 154,700.00
Pasir Pasang m3 0.584 225,000.00 131,400.00
JUMLAH HARGA BAHAN 580,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 982,100.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 98,210.00
F Harga Satuan Pekerjaan (D+E) 1,080,310.00 m³

3. 3.1.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Kapur m3 0.17 6,000.00 1,020.00
Semen Portlan Kg 0.17 1,700.00 289.00
Pasir Pasang m3 0.34 225,000.00 76,500.00
JUMLAH HARGA BAHAN 371,809.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 773,809.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 77,380.90
F Harga Satuan Pekerjaan (D+E) 851,189.90 m³

3. 3.1.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 61 1,700.00 103,700.00
Kapur m 3
0.147 6,000.00 882.00
Pasir Pasang m3 0.492 225,000.00 110,700.00
JUMLAH HARGA BAHAN 509,282.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 911,282.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 91,128.20
F Harga Satuan Pekerjaan (D+E) 1,002,410.20 m³

3. 3.1.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.5 150,000.00 225,000.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala Tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 402,000.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Semen Portlan Kg 41 1,700.00 69,700.00
Kapur m3 0.131 6,000.00 786.00
Pasir Pasang m 3
0.523 225,000.00 117,675.00
JUMLAH HARGA BAHAN 482,161.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 884,161.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 88,416.10
F Harga Satuan Pekerjaan (D+E) 972,577.10 m³

3. 3.1.1.9. Pemasangan 1 m3 batu kosong (anstamping)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.78 150,000.00 117,000.00
Tukang Batu L.02 OH 0.39 190,000.00 74,100.00
Kepala Tukang L.03 OH 0.039 230,000.00 8,970.00
Mandor L.04 OH 0.039 230,000.00 8,970.00
JUMLAH TENAGA KERJA 209,040.00
B BAHAN
Batu belah m3 1.2 245,000.00 294,000.00
Pasir urug m3 0.432 195,000.00 84,240.00
JUMLAH HARGA BAHAN 378,240.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 587,280.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 58,728.00
F Harga Satuan Pekerjaan (D+E) 646,008.00 m³

3. 3.1.1.10. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.4 150,000.00 510,000.00
Tukang Batu L.02 OH 0.85 190,000.00 161,500.00
Kepala Tukang L.03 OH 0.085 230,000.00 19,550.00
Mandor L.04 OH 0.17 230,000.00 39,100.00
JUMLAH TENAGA KERJA 730,150.00
B BAHAN
Batu belah m3 0.48 245,000.00 117,600.00
Semen Portlan Kg 194 1,700.00 329,800.00
Pasir Beton m3 0.312 355,000.00 110,760.00
Kerikil m 3
0.468 570,000.00 266,760.00
Besi beton Kg 126 16,000.00 2,016,000.00
Kawat beton Kg 1.8 33,000.00 59,400.00
JUMLAH HARGA BAHAN 2,900,320.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,630,470.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 363,047.00
F Harga Satuan Pekerjaan (D+E) 3,993,517.00 m³

3. 3.1.1.11. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.4 150,000.00 360,000.00
Tukang Batu L.02 OH 0.8 190,000.00 152,000.00
Kepala Tukang L.03 OH 0.08 230,000.00 18,400.00
Mandor L.04 OH 0.119 230,000.00 27,370.00
JUMLAH TENAGA KERJA 557,770.00
B BAHAN
Batu belah m3 0.45 245,000.00 110,250.00
Semen Portlan Kg 194 1,700.00 329,800.00
Pasir Beton m 3
0.312 355,000.00 110,760.00
Kerikil m3 0.468 570,000.00 266,760.00
JUMLAH HARGA BAHAN 817,570.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,375,340.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 137,534.00
F Harga Satuan Pekerjaan (D+E) 1,512,874.00 m³
4. 4.1.1. HARGA SATUAN PEKERJAAN BETON

4. 4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 247 1,700.00 419,900.00
Pasir Beton kg 869 253.57 220,353.57
Kerikil (Maks 30mm) kg 999 450.00 449,550.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,734,803.57
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,060,083.57


E Overhead & Profit (Contoh 10 %) 0.10 x D 206,008.36
F Harga Satuan Pekerjaan (D+E) 2,266,091.93 m³

4. 4.1.1.2. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
1. Semen Portland kg 276 1,700.00 469,200.00
2. Pasir Beton kg 828 253.57 209,957.14
3. Kerikil(Maks 30mm) kg 1012 450.00 455,400.00
4. Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,779,557.14
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,104,837.14


E Overhead & Profit (Contoh 10 %) 0.10 x D 210,483.71
F Harga Satuan Pekerjaan (D+E) 2,315,320.86 m³

4. 4.1.1.3. Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 299 1,700.00 508,300.00
Pasir Beton kg 799 253.57 202,603.57
Kerikil(Maks 30mm) kg 1017 450.00 457,650.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,813,553.57
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,138,833.57


E Overhead & Profit (Contoh 10 %) 0.10 x D 213,883.36
F Harga Satuan Pekerjaan (D+E) 2,352,716.93 m³

CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

4. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.2 150,000.00 180,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.06 230,000.00 13,800.00
JUMLAH TENAGA KERJA 236,400.00
B BAHAN
Semen Portland kg 230 1,700.00 391,000.00
Pasir Beton kg 893 253.57 226,439.29
Kerikil (Maks 30mm) kg 1027 450.00 462,150.00
Air Liter 200 3,000.00 600,000.00
JUMLAH HARGA BAHAN 1,679,589.29
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,915,989.29
E Overhead & Profit (Contoh 10 %) 0.10 x D 191,598.93
F Harga Satuan Pekerjaan (D+E) 2,107,588.21 m³

4. 4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 326 1,700.00 554,200.00
Pasir Beton kg 760 253.57 192,714.29
Kerikil (Maks 30mm) kg 1029 450.00 463,050.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,854,964.29
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,180,244.29


E Overhead & Profit (Contoh 10 %) 0.10 x D 218,024.43
F Harga Satuan Pekerjaan (D+E) 2,398,268.71 m³

4. 4.1.1.6. Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 352 1,700.00 598,400.00
Pasir Beton kg 731 253.57 185,360.71
Kerikil (Maks 30mm) kg 1031 450.00 463,950.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,892,710.71
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,217,990.71


E Overhead & Profit (Contoh 10 %) 0.10 x D 221,799.07
F Harga Satuan Pekerjaan (D+E) 2,439,789.79 m³
4. 4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 371 1,700.00 630,700.00
Pasir Beton kg 698 253.57 176,992.86
Kerikil (Maks 30mm) kg 1047 450.00 471,150.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,923,842.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,249,122.86


E Overhead & Profit (Contoh 10 %) 0.10 x D 224,912.29
F Harga Satuan Pekerjaan (D+E) 2,474,035.14 m³

4. 4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 384 1,700.00 652,800.00
Pasir Beton kg 692 253.57 175,471.43
Kerikil (Maks 30mm) kg 1039 450.00 467,550.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,940,821.43
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,266,101.43


E Overhead & Profit (Contoh 10 %) 0.10 x D 226,610.14
F Harga Satuan Pekerjaan (D+E) 2,492,711.57 m³

4. 4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 406 1,700.00 690,200.00
Pasir Beton kg 684 253.57 173,442.86
Kerikil (Maks 30mm) kg 1026 450.00 461,700.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,970,342.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,295,622.86


E Overhead & Profit (Contoh 10 %) 0.10 x D 229,562.29
F Harga Satuan Pekerjaan (D+E) 2,525,185.14 m³

4. 4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.65 150,000.00 247,500.00
Tukang Batu L.02 OH 0.275 190,000.00 52,250.00
Kepala Tukang L.03 OH 0.028 230,000.00 6,440.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 325,280.00
B BAHAN
Semen Portland kg 413 1,700.00 702,100.00
Pasir Beton m3 681 253.57 172,682.14
Kerikil (Maks 30mm) m3 1021 450.00 459,450.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 1,979,232.14
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,304,512.14


E Overhead & Profit (Contoh 10 %) 0.10 x D 230,451.21
F Harga Satuan Pekerjaan (D+E) 2,534,963.36 m³

4. 4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.1 150,000.00 315,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala Tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.105 230,000.00 24,150.00
JUMLAH TENAGA KERJA 413,700.00
B BAHAN
Semen Portland kg 439 1,700.00 746,300.00
Pasir Beton kg 670 253.57 169,892.86
Kerikil (Maks 30mm) kg 1006 450.00 452,700.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 2,013,892.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,427,592.86


E Overhead & Profit (Contoh 10 %) 0.10 x D 242,759.29
F Harga Satuan Pekerjaan (D+E) 2,670,352.14 m³

4. 4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.1 150,000.00 315,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala Tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.105 230,000.00 24,150.00
JUMLAH TENAGA KERJA 413,700.00
B BAHAN
Semen Portland kg 448 1,700.00 761,600.00
Pasir Beton kg 667 253.57 169,132.14
Kerikil (Maks 30mm) kg 1000 450.00 450,000.00
Air Liter 215 3,000.00 645,000.00
JUMLAH HARGA BAHAN 2,025,732.14
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,439,432.14


E Overhead & Profit (Contoh 10 %) 0.10 x D 243,943.21
F Harga Satuan Pekerjaan (D+E) 2,683,375.36 m³

4. 4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox – 100

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.1 150,000.00 315,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala Tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.105 230,000.00 24,150.00
JUMLAH TENAGA KERJA 413,700.00
B BAHAN
Semen Portland kg 400 1,700.00 680,000.00
Pasir Beton m3 0.48 355,000.00 170,400.00
Kerikil (2cm/3cm) m3 0.8 570,000.00 456,000.00
Strorox – 100 kg 1.2 40,000.00 48,000.00
JUMLAH HARGA BAHAN 1,354,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,768,100.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 176,810.00
F Harga Satuan Pekerjaan (D+E) 1,944,910.00 m³

4. 4.1.1.14. Pemasangan 1 m’ PVC Waterstop lebar 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang Batu/Pipa L.02 OH 0.03 190,000.00 5,700.00
Kepala Tukang L.03 OH 0.003 230,000.00 690.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 16,080.00
B BAHAN
Waterstop lebar 150 mm m 1.05 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,080.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,608.00
F Harga Satuan Pekerjaan (D+E) - m'

4. 4.1.1.15. Pemasangan 1 m’ PVC Waterstop lebar 200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 150,000.00 10,500.00
Tukang Batu/Pipa L.02 OH 0.035 190,000.00 6,650.00
Kepala Tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 19,680.00
B BAHAN
Waterstop lebar 200 mm m 1.05 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,680.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,968.00
F Harga Satuan Pekerjaan (D+E) - m'

4. 4.1.1.16. Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.08 150,000.00 12,000.00
Tukang Batu L.02 OH 0.04 190,000.00 7,600.00
Kepala Tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 21,440.00
B BAHAN
Waterstop lebar 230 mm m 1.05 -
- 320 mm
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,440.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,144.00
F Harga Satuan Pekerjaan (D+E) - m'

4. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 150,000.00 10,500.00
Tukang Besi L.02 OH 0.07 190,000.00 13,300.00
Kepala Tukang L.03 OH 0.007 230,000.00 1,610.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 26,330.00
B BAHAN
Besi beton (polos/ulir) kg 10.5 19,000.00 199,500.00
Kawat beton kg 0.15 33,000.00 4,950.00
JUMLAH HARGA BAHAN 204,450.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 230,780.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 23,078.00
F Harga Satuan Pekerjaan (D+E) 253,858.00 kg

4. 4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Tukang Besi L.02 OH 0.05 190,000.00 9,500.00
Kepala Tukang L.03 OH 0.005 230,000.00 1,150.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 18,840.00
B BAHAN
Besi beton (polos/ulir) kg 10.5 19,000.00 199,500.00
Kawat beton kg 0.1 33,000.00 3,300.00
JUMLAH HARGA BAHAN 202,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 221,640.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 22,164.00
F Harga Satuan Pekerjaan (D+E) 243,804.00 kg

4. 4.1.1.19. Pemasangan 10 kg jaring kawat baja (wiremesh), 6 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.025 150,000.00 3,750.00
Tukang Besi L.02 OH 0.025 190,000.00 4,750.00
Kepala Tukang L.03 OH 0.002 230,000.00 460.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 9,190.00
B BAHAN
1.   Jaring kawat baja kg 1.02 37,000.00 37,740.00
dilas
2.   Kawat beton kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 39,390.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,580.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,858.00
F Harga Satuan Pekerjaan (D+E) 53,438.00 kg
4. 4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.52 150,000.00 78,000.00
Tukang Kayu L.02 OH 0.26 190,000.00 49,400.00
Kepala Tukang L.03 OH 0.026 230,000.00 5,980.00
Mandor L.04 OH 0.026 230,000.00 5,980.00
JUMLAH TENAGA KERJA 139,360.00
B BAHAN
Kayu kelas III m3 0.04 2,600,000.00 104,000.00
Paku 5 – 10 cm kg 0.3 28,000.00 8,400.00
Minyak bekisting Liter 0.1 18,000.00 1,800.00
JUMLAH HARGA BAHAN 114,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 253,560.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 25,356.00
F Harga Satuan Pekerjaan (D+E) 278,916.00 m²

4. 4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof (3 x Pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.52 150,000.00 78,000.00
Tukang Kayu L.02 OH 0.26 190,000.00 49,400.00
Kepala Tukang L.03 OH 0.026 230,000.00 5,980.00
Mandor L.04 OH 0.026 230,000.00 5,980.00
JUMLAH TENAGA KERJA 139,360.00
B BAHAN
Kayu kelas III m3 0.045 2,600,000.00 117,000.00
Paku 5 cm – 10 cm kg 0.3 28,000.00 8,400.00
Minyak bekisting Liter 0.1 18,000.00 1,800.00
JUMLAH HARGA BAHAN 127,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 266,560.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 26,656.00
F Harga Satuan Pekerjaan (D+E) 97,738.67 m²

4. 4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom (3 x Pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.66 150,000.00 99,000.00
Tukang Kayu L.02 OH 0.33 190,000.00 62,700.00
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.033 230,000.00 7,590.00
JUMLAH TENAGA KERJA 176,880.00
B BAHAN
Kayu kelas III m3 0.04 2,600,000.00 104,000.00
Paku 5 cm – 12 cm kg 0.4 28,000.00 11,200.00
Minyak bekisting Liter 0.2 18,000.00 3,600.00
Balok kayu kelas II m3 0.015 2,600,000.00 39,000.00
Plywood tebal 9 mm Lbr 0.35 159,000.00 55,650.00
Dolken kayu Batang 2 11,000.00 22,000.00
8-10cm –panj 4 m
JUMLAH HARGA BAHAN 235,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 412,330.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 41,233.00
F Harga Satuan Pekerjaan (D+E) 151,187.67 m²

4. 4.1.1.23. Pemasangan 1 m2 bekisting untuk balok (3 x Pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.66 150,000.00 99,000.00
Tukang Kayu L.02 OH 0.33 190,000.00 62,700.00
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.033 230,000.00 7,590.00
JUMLAH TENAGA KERJA 176,880.00
B BAHAN
Kayu kelas III m3 0.04 2,600,000.00 104,000.00
Paku 5 cm – 12 cm kg 0.4 28,000.00 11,200.00
Minyak bekisting Liter 0.2 18,000.00 3,600.00
Balok kayu kelas II m3 0.018 2,600,000.00 46,800.00
Plywood tebal 9 mm Lbr 0.35 159,000.00 55,650.00
Dolken kayu g Batang 2 11,000.00 22,000.00
8–10)cm panj4 m
JUMLAH HARGA BAHAN 243,250.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 420,130.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 42,013.00
F Harga Satuan Pekerjaan (D+E) 154,047.67 m²
4. 4.1.1.24. Pemasangan 1 m2 bekisting untuk lantai (3 x Pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.66 150,000.00 99,000.00
Tukang Kayu L.02 OH 0.33 190,000.00 62,700.00
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.033 230,000.00 7,590.00
JUMLAH TENAGA KERJA 176,880.00
B BAHAN
Kayu kelas III m3 0.04 2,600,000.00 104,000.00
Paku 5 cm – 12 cm kg 0.4 28,000.00 11,200.00
Minyak bekisting Liter 0.2 18,000.00 3,600.00
Balok kayu kelas II m3 0.015 2,600,000.00 39,000.00
Plywood tebal 9 mm Lbr 0.35 159,000.00 55,650.00
Dolken kayu galam, 8–10 Batang 6 11,000.00 66,000.00
cm panj4 m
JUMLAH HARGA BAHAN 279,450.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 456,330.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 45,633.00
F Harga Satuan Pekerjaan (D+E) 167,321.00 m²

4. 4.1.1.25. Pemasangan 1 m2 bekisting untuk dinding

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.66 150,000.00 99,000.00
Tukang Kayu L.02 OH 0.33 190,000.00 62,700.00
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.033 230,000.00 7,590.00
JUMLAH TENAGA KERJA 176,880.00
B BAHAN
Kayu kelas III m3 0.03 2,600,000.00 78,000.00
Paku 5 cm – 12 cm kg 0.4 28,000.00 11,200.00
Minyak bekisting Liter 0.2 18,000.00 3,600.00
Balok kayu kelas II m3 0.02 2,600,000.00 52,000.00
Plywood tebal 9 mm Lbr 0.35 159,000.00 55,650.00
Dolken kayu , 3 11,000.00 33,000.00
8–10 cm, panj4 m Batang
Penjaga jarak 4 - -
bekisting/spacer Buah
JUMLAH HARGA BAHAN 233,450.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 410,330.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 41,033.00
F Harga Satuan Pekerjaan (D+E) - m²

4. 4.1.1.26. Pemasangan 1 m2 bekisting untuk tangga

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.66 150,000.00 99,000.00
Tukang Kayu L.02 OH 0.33 190,000.00 62,700.00
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.033 230,000.00 7,590.00
JUMLAH TENAGA KERJA 176,880.00
B BAHAN
Kayu kelas III m3 0.03 2,600,000.00 78,000.00
Paku 5 cm – 12 cm kg 0.4 28,000.00 11,200.00
Minyak bekisting Liter 0.15 18,000.00 2,700.00
Balok kayu kelas II m3 0.015 2,600,000.00 39,000.00
Plywood tebal 9 mm Lbr 0.35 159,000.00 55,650.00
Dolken kayu, Batang 2 11,000.00 22,000.00
8–10 cm,panj4 m
JUMLAH HARGA BAHAN 208,550.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 385,430.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 38,543.00
F Harga Satuan Pekerjaan (D+E) 423,973.00 m²

4. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.02 OH 0.05 190,000.00 9,500.00
Kepala Tukang L.03 OH 0.005 230,000.00 1,150.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 34,990.00
B BAHAN
Kayu kelas III (papan) m3 0.0264 2,600,000.00 68,640.00
Paku 5 cm – 12 cm kg 0.6 28,000.00 16,800.00
Dolken kayu , Batang 0.5 11,000.00 5,500.00
8–10 panj 4m
JUMLAH HARGA BAHAN 90,940.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,930.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,593.00
F Harga Satuan Pekerjaan (D+E) 138,523.00 m²

4. 4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.3 150,000.00 795,000.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.3 190,000.00 247,000.00
Tukang besi L.02 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.262 230,000.00 60,260.00
Mandor L.04 OH 0.265 230,000.00 60,950.00
JUMLAH TENAGA KERJA 1,414,960.00
B BAHAN
Kayu kelas III m3 0.2 2,600,000.00 520,000.00
Paku 5 cm – 12 cm kg 1.5 28,000.00 42,000.00
Minyak bekisting Liter 0.4 18,000.00 7,200.00
Besi beton polos kg 157.5 19,000.00 2,992,500.00
Kawat beton kg 2.25 33,000.00 74,250.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
JUMLAH HARGA BAHAN 4,860,550.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 6,275,510.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 627,551.00
F Harga Satuan Pekerjaan (D+E) 6,903,061.00 m³

4. 4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.65 150,000.00 847,500.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.56 190,000.00 296,400.00
Tukang besi L.02 OH 1.4 190,000.00 266,000.00
Kepala tukang L.03 OH 0.323 230,000.00 74,290.00
Mandor L.04 OH 0.283 230,000.00 65,090.00
JUMLAH TENAGA KERJA 1,601,530.00
B BAHAN
Kayu kelas III m3 0.27 2,600,000.00 702,000.00
Paku 5 cm – 12 cm kg 2 28,000.00 56,000.00
Minyak bekisting Liter 0.6 18,000.00 10,800.00
Besi beton polos kg 210 19,000.00 3,990,000.00
Kawat beton kg 3 33,000.00 99,000.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
JUMLAH HARGA BAHAN 6,082,400.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 7,683,930.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 768,393.00
F Harga Satuan Pekerjaan (D+E) 8,452,323.00 m³

4. 4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 7.05 150,000.00 1,057,500.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.65 190,000.00 313,500.00
Tukang besi L.02 OH 2.1 190,000.00 399,000.00
Kepala tukang L.03 OH 0.403 230,000.00 92,690.00
Mandor L.04 OH 0.353 230,000.00 81,190.00
JUMLAH TENAGA KERJA 1,996,130.00
B BAHAN
Kayu kelas III m3 0.4 2,600,000.00 1,040,000.00
Paku 5 cm – 12cm kg 4 28,000.00 112,000.00
Minyak bekisting Liter 2 18,000.00 36,000.00
Besi beton polos kg 315 19,000.00 5,985,000.00
Kawat beton kg 4.5 33,000.00 148,500.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
Kayu kelas II balok M3 0.15 2,600,000.00 390,000.00
Plywood 9 mm Lbr 3.5 159,000.00 556,500.00
Dolken kayu Batang 20 11,000.00 220,000.00
(8-10) cm, panj4 m
JUMLAH HARGA BAHAN 9,712,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,708,730.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 1,170,873.00
F Harga Satuan Pekerjaan (D+E) 12,879,603.00 m³

4. 4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.35 150,000.00 952,500.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.65 190,000.00 313,500.00
Tukang besi L.02 OH 1.4 190,000.00 266,000.00
Kepala tukang L.03 OH 0.333 230,000.00 76,590.00
Mandor L.04 OH 0.318 230,000.00 73,140.00
JUMLAH TENAGA KERJA 1,733,980.00
B BAHAN
Kayu kelas III m3 0.32 2,600,000.00 832,000.00
Paku 5 cm – 12 cm kg 3.2 28,000.00 89,600.00
Minyak bekisting Liter 1.6 18,000.00 28,800.00
Besi beton polos kg 210 19,000.00 3,990,000.00
Kawat beton kg 3 33,000.00 99,000.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
Kayu kelas II balok m3 0.14 2,600,000.00 364,000.00
Plywood 9 mm Lembar 2.8 159,000.00 445,200.00
Dolken kayu Batang 16 11,000.00 176,000.00
(8-10) cm, panj 4 m
JUMLAH HARGA BAHAN 7,249,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,983,180.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 898,318.00
F Harga Satuan Pekerjaan (D+E) 9,881,498.00 m³

4. 4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.3 150,000.00 795,000.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.3 190,000.00 247,000.00
Tukang besi L.02 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.265 230,000.00 60,950.00
Mandor L.04 OH 0.265 230,000.00 60,950.00
JUMLAH TENAGA KERJA 1,415,650.00
B BAHAN
Kayu kelas III m3 0.32 2,600,000.00 832,000.00
Paku 5 cm – 12 cm kg 3.2 28,000.00 89,600.00
Minyak bekisting Liter 1.6 18,000.00 28,800.00
Besi beton polos kg 157.5 19,000.00 2,992,500.00
Kawat beton kg 2.25 33,000.00 74,250.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
Kayu kelas II balok m3 0.12 2,600,000.00 312,000.00
Plywood 9 mm Lembar 2.8 159,000.00 445,200.00
Dolken kayu Batang 32 11,000.00 352,000.00
(8-10) cm, panjang 4 m

JUMLAH HARGA BAHAN 6,350,950.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,766,600.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 776,660.00
F Harga Satuan Pekerjaan (D+E) 8,543,260.00 m³

4. 4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.3 150,000.00 795,000.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.3 190,000.00 247,000.00
Tukang besi L.02 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.262 230,000.00 60,260.00
Mandor L.04 OH 0.265 230,000.00 60,950.00
JUMLAH TENAGA KERJA 1,414,960.00
B BAHAN
Kayu kelas III m3 0.24 2,600,000.00 624,000.00
Paku 5 cm – 12 cm kg 3.2 28,000.00 89,600.00
Minyak bekisting Liter 1.6 18,000.00 28,800.00
Besi beton polos kg 157.5 19,000.00 2,992,500.00
Kawat beton kg 2.25 33,000.00 74,250.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
Kayu kelas II balok m3 0.16 2,600,000.00 416,000.00
Plywood 9 mm Lembar 2.8 159,000.00 445,200.00
Dolken kayu Batang 24 11,000.00 264,000.00
(8-10) cm, panjang 4 m
JUMLAH HARGA BAHAN 6,158,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,573,910.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 757,391.00
F Harga Satuan Pekerjaan (D+E) 8,331,301.00 m³

4. 4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.65 150,000.00 847,500.00
Tukang batu L.02 OH 0.275 190,000.00 52,250.00
Tukang kayu L.02 OH 1.56 190,000.00 296,400.00
Tukang besi L.02 OH 1.4 190,000.00 266,000.00
Kepala tukang L.03 OH 0.323 230,000.00 74,290.00
Mandor L.04 OH 0.283 230,000.00 65,090.00
JUMLAH TENAGA KERJA 1,601,530.00
B BAHAN
Kayu kelas III m3 0.25 2,600,000.00 650,000.00
Paku 5 cm – 12 cm kg 3 28,000.00 84,000.00
Minyak bekisting Liter 1.2 18,000.00 21,600.00
Besi beton polos kg 210 19,000.00 3,990,000.00
Kawat beton kg 3 33,000.00 99,000.00
Semen Portland kg 336 1,700.00 571,200.00
Pasir Beton m3 0.54 355,000.00 191,700.00
Kerikil m3 0.81 570,000.00 461,700.00
Kayu kelas II balok m3 0.105 2,600,000.00 273,000.00
Plywood 9 mm Lembar 2.5 159,000.00 397,500.00
Dolken kayu Batang 14 11,000.00 154,000.00
(8-10) cm, panj 4 m
JUMLAH HARGA BAHAN 6,893,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,495,230.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 849,523.00
F Harga Satuan Pekerjaan (D+E) 9,344,753.00 m³

4. 4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.18 150,000.00 27,000.00
Tukang batu L.02 OH 0.02 190,000.00 3,800.00
Tukang kayu L.02 OH 0.02 190,000.00 3,800.00
Tukang besi L.02 OH 0.02 190,000.00 3,800.00
Kepala tukang L.03 OH 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.009 230,000.00 2,070.00
JUMLAH TENAGA KERJA 41,850.00
B BAHAN
Kayu kelas III m3 0.002 2,600,000.00 5,200.00
Paku 5 cm – 12 cm kg 0.01 28,000.00 280.00
Minyak bekisting Liter 18,000.00 -
Besi beton polos kg 3 19,000.00 57,000.00
Kawat beton kg 0.045 33,000.00 1,485.00
Semen Portland kg 4 1,700.00 6,800.00
Pasir Beton m3 0.006 355,000.00 2,130.00
Kerikil m3 0.009 570,000.00 5,130.00
JUMLAH HARGA BAHAN 78,025.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 119,875.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,987.50
F Harga Satuan Pekerjaan (D+E) 131,862.50 m'

4. 4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.297 150,000.00 44,550.00
Tukang batu L.02 OH 0.033 190,000.00 6,270.00
Tukang kayu L.02 OH 0.033 190,000.00 6,270.00
Tukang besi L.02 OH 0.033 190,000.00 6,270.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,110.00
B BAHAN
Kayu kelas III m3 0.003 2,600,000.00 7,800.00
Paku 5 cm – 12 cm kg 0.02 28,000.00 560.00
Minyak bekisting Liter 18,000.00 -
Besi beton polos kg 3.6 19,000.00 68,400.00
Kawat beton kg 0.05 33,000.00 1,650.00
Semen Portland kg 5.5 1,700.00 9,350.00
Pasir Beton m3 0.009 355,000.00 3,195.00
Kerikil m3 0.015 570,000.00 8,550.00
JUMLAH HARGA BAHAN 99,505.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 168,615.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,861.50
F Harga Satuan Pekerjaan (D+E) 185,476.50 m'

4.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK

4.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.132 150,000.00 19,800.00
Tukang batu L.02 OH 0.022 190,000.00 4,180.00
Kepala tukang L.03 OH 0.002 230,000.00 460.00
Mandor L.04 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 26,050.00
B BAHAN
Semen PC Kg 26.08 1,700.00 44,336.00
Pasir beton Kg 60.8 260.00 15,808.00
Kerikil (maks 30mm) Kg 82.32 450.00 37,044.00
Air L 17.2 3,000.00 51,600.00
JUMLAH HARGA BAHAN 148,788.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 174,838.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,483.80
F Harga Satuan Pekerjaan (D+E) 192,321.80 m²

4.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.165 150,000.00 24,750.00
Tukang batu L.02 OH 0.028 190,000.00 5,320.00
Kepala tukang L.03 OH 0.003 230,000.00 690.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 32,600.00
B BAHAN
Semen PC Kg 32.6 1,700.00 55,420.00
Pasir beton Kg 76 260.00 19,760.00
Kerikil (maks 30mm) Kg 102.9 450.00 46,305.00
Air L 21.5 3,000.00 64,500.00
JUMLAH HARGA BAHAN 185,985.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 218,585.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 21,858.50
F Harga Satuan Pekerjaan (D+E) 240,443.50 m²

4.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.198 150,000.00 29,700.00
Tukang batu L.02 OH 0.033 190,000.00 6,270.00
Kepala tukang L.03 OH 0.003 230,000.00 690.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 38,960.00
B BAHAN
Semen PC Kg 32.12 1,700.00 54,604.00
Pasir beton Kg 91.2 260.00 23,712.00
Kerikil (maks 30mm) Kg 123.48 450.00 55,566.00
Air L 25.8 3,000.00 77,400.00
JUMLAH HARGA BAHAN 211,282.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 250,242.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 25,024.20
F Harga Satuan Pekerjaan (D+E) 275,266.20 m²

4.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.248 150,000.00 37,200.00
Tukang batu L.02 OH 0.041 190,000.00 7,790.00
Kepala tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 48,900.00
B BAHAN
Semen PC Kg 48.9 1,700.00 83,130.00
Pasir beton Kg 114 260.00 29,640.00
Kerikil (maks 30mm) Kg 154.35 450.00 69,457.50
Air L 32.25 3,000.00 96,750.00
JUMLAH HARGA BAHAN 278,977.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 327,877.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 32,787.75
F Harga Satuan Pekerjaan (D+E) 360,665.25 m²

4.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.007 150,000.00 1,050.00
Tukang batu L.02 OH 0.076 190,000.00 14,440.00
Kepala tukang L.03 OH 0.008 230,000.00 1,840.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 17,560.00
B BAHAN
Lantai kerja tebal 10cm m3 0.08 -
Besi hollow 50.50.3 Kg 9.394 -
Kayu kaso 5/7 m3 0.005 2,600,000.00 13,000.00
Phenol film 12mm Lbr 0.08 -
Minyak bekisting L 0.2 18,000.00 3,600.00
Dinabolt dia 12mm Bh 3.882 -
(10-15cm)
JUMLAH HARGA BAHAN 16,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,160.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 3,416.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.004 150,000.00 600.00
Tukang batu L.02 OH 0.038 190,000.00 7,220.00
Kepala tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 8,970.00
B BAHAN
Kayu kaso 5/7 m3 0.005 2,600,000.00 13,000.00
Phenol film 12mm Lbr 0.043 -
Minyak bekisting L 0.2 18,000.00 3,600.00
Dinabolt dia 12mm Bh 0.693 -
(10-15cm)
JUMLAH HARGA BAHAN 16,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,570.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,557.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.004 150,000.00 600.00
Tukang batu L.02 OH 0.038 190,000.00 7,220.00
Kepala tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 8,970.00
B BAHAN
Kayu kaso 5/7 m3 0.004 2,600,000.00 10,400.00
Phenol film 12mm Lbr 0.048 -
Minyak bekisting L 0.2 18,000.00 3,600.00
Paku 5-7cm Kg 0.046 28,000.00 1,288.00
Dinabolt dia 12mm Bh 0.693 -
(10-15cm)
JUMLAH HARGA BAHAN 15,288.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,258.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,425.80
F Harga Satuan Pekerjaan (D+E) - m²

4.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.053 150,000.00 7,950.00
Tukang kayu OH 0.018 190,000.00 3,420.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 12,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 12,520.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 1,252.00
F Harga Satuan Pekerjaan (D+E) 13,772.00 bh

4.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.089 150,000.00 13,350.00
Tukang kayu OH 0.03 190,000.00 5,700.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 20,200.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 20,200.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 2,020.00
F Harga Satuan Pekerjaan (D+E) 22,220.00 bh
4.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.071 150,000.00 10,650.00
Tukang kayu OH 0.024 190,000.00 4,560.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 16,360.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,360.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,636.00
F Harga Satuan Pekerjaan (D+E) 17,996.00 bh

4.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.064 150,000.00 9,600.00
Tukang batu L.02 OH 0.244 190,000.00 46,360.00
Tukang vibrator L.02 OH 0.128 -
Kepala Tukang L.03 OH 0.034 230,000.00 7,820.00
Mandor L.04 OH 0.073 230,000.00 16,790.00
JUMLAH TENAGA KERJA 80,570.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,570.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,057.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.069 150,000.00 10,350.00
Tukang batu L.02 OH 0.242 190,000.00 45,980.00
Tukang vibrator L.02 OH 0.138 -
Kepala Tukang L.03 OH 0.037 230,000.00 8,510.00
Mandor L.04 OH 0.073 230,000.00 16,790.00
JUMLAH TENAGA KERJA 81,630.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 81,630.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,163.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.061 150,000.00 9,150.00
Tukang batu L.02 OH 0.213 190,000.00 40,470.00
Tukang vibrator L.02 OH 0.122 -
Kepala Tukang L.03 OH 0.033 230,000.00 7,590.00
Mandor L.04 OH 0.073 230,000.00 16,790.00
JUMLAH TENAGA KERJA 74,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 74,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,400.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.14. Mendirikan 1 buah komponen plat pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.067 150,000.00 10,050.00
Tukang batu L.02 OH 0.067 190,000.00 12,730.00
Tukang erection L.02 OH 0.134 -
Kepala Tukang L.03 OH 0.067 230,000.00 15,410.00
Mandor L.04 OH 0.067 230,000.00 15,410.00
JUMLAH TENAGA KERJA 53,600.00
B BAHAN
Solar L 6.676 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.067 -
Sewa pipe support UH 1.1 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,600.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,360.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.15. Mendirikan 1 buah komponen balok pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.061 150,000.00 9,150.00
Tukang batu L.02 OH 0.061 190,000.00 11,590.00
Tukang erection L.02 OH 0.122 -
Operator crane OH 0.061 -
Pembantu operator OH 0.061 -
crane
Kepala Tukang L.03 OH 0.061 230,000.00 14,030.00
Mandor L.04 OH 0.061 230,000.00 14,030.00
JUMLAH TENAGA KERJA 48,800.00
B BAHAN
Solar L 6.11 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.061 - -
Sewa chaffolding UH 1.1 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,880.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.16. Mendirikan 1 buah komponen kolom pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.083 150,000.00 12,450.00
Tukang batu L.02 OH 0.083 190,000.00 15,770.00
Tukang erection L.02 OH 0.166 -
Operator crane OH 0.083 -
Pembantu operator OH 0.083 -
crane
Kepala Tukang L.03 OH 0.083 230,000.00 19,090.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 66,400.00
B BAHAN
Solar L 8.277 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.083 - -
Sewa pipe support UH 2.2 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,400.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,640.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.019 150,000.00 2,850.00
Tukang batu L.02 OH 0.038 190,000.00 7,220.00
Operator crane OH 0.019 -
Pembantu operator OH 0.019 -
crane
JUMLAH TENAGA KERJA 10,070.00
B BAHAN
Solar L 1.897 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.019 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,070.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,007.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.019 150,000.00 2,850.00
Tukang batu L.02 OH 0.038 190,000.00 7,220.00
Operator crane OH 0.019 -
Pembantu operator OH 0.019 -
crane
JUMLAH TENAGA KERJA 10,070.00
B BAHAN
Solar L 1.897 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.019 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,070.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,007.00
F Harga Satuan Pekerjaan (D+E) - bh
4.4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.019 150,000.00 2,850.00
Tukang batu L.02 OH 0.038 190,000.00 7,220.00
Operator crane OH 0.019 -
Pembantu operator OH 0.019 -
crane
JUMLAH TENAGA KERJA 10,070.00
B BAHAN
Solar L 1.897 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.019 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,070.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,007.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.1.2.20. Bahan 1 m3 grouting campuran

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,200.00 -
Screening Kg 650 -
Air L 350 3,000.00 1,050,000.00
JUMLAH HARGA BAHAN 1,050,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,050,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 105,000.00
F Harga Satuan Pekerjaan (D+E) - m³

4.4.1.2.21. Bahan 1 m3 grouting tidak campuran

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,850.00 -
Air L 400 3,000.00 1,200,000.00
JUMLAH HARGA BAHAN 1,200,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,200,000.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 120,000.00
F Harga Satuan Pekerjaan (D+E) - m³

4.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Tukang batu L.02 OH 0.367 190,000.00 69,730.00
Kepal tukang L.03 OH 0.074 230,000.00 17,020.00
Mandor L.04 OH 0.037 230,000.00 8,510.00
JUMLAH TENAGA KERJA 95,260.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 95,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,526.00
F Harga Satuan Pekerjaan (D+E) 104,786.00 ttk

4.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja 0.147 150,000.00 22,050.00
Tukang kayu L.02 OH 0.147 190,000.00 27,930.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 54,580.00
B BAHAN
Kayu kaso 5/7 m3 0.012 2,600,000.00 31,200.00
Papan cor m3 0.004 2,600,000.00 10,400.00
Paku 5-7cm Kg 0.264 28,000.00 7,392.00
JUMLAH HARGA BAHAN 48,992.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 103,572.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 10,357.20
F Harga Satuan Pekerjaan (D+E) 113,929.20 ttk
4.4.1.2.24. Upah 1 titik Join dengan Sling

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja 0.22 150,000.00 33,000.00
Tukang kayu L.02 OH 0.22 190,000.00 41,800.00
Tukang besi L.02 OH 0.22 230,000.00 50,600.00
Mandor L.04 OH 0.011 230,000.00 2,530.00
JUMLAH TENAGA KERJA 127,930.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,930.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,793.00
F Harga Satuan Pekerjaan (D+E) 140,723.00 ttk
4.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

4.4.2.1.1. Pemasangan 1 kg besi profil

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang Las L.03 OH 0.06 190,000.00 11,400.00
Konstruksi
Kepala tukang 0.006 230,000.00 1,380.00
L.03 OH
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 22,470.000
B BAHAN
Besi Profil Kg 1.15 38,000.00 43,700.00
JUMLAH HARGA BAHAN 43,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 66,170.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,617.00
F Harga Satuan Pekerjaan (D+E) 72,787.00 kg

4.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang Las L.03 OH 0.06 190,000.00 11,400.00
Kepala tukang L.03 OH 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 22,470.00
B BAHAN
Besi Baja IWF Kg 1.15 38,000.00 43,700.00
JUMLAH HARGA BAHAN 43,700.00
C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,170.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,617.00
F Harga Satuan Pekerjaan (D+E) 72,787.00 kg

4.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang Las L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.001 230,000.00 230.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 35,380.000
B BAHAN
Solar Liter 1 6,500.00 6,500.00
Minyak pelumas Liter 0.1 47,000.00 4,700.00
JUMLAH HARGA BAHAN 11,200.00
C PERALATAN
1.    Sewa alat Jam 0.8 51,300.00 41,040.00
JUMLAH HARGA ALAT 41,040.00

D Jumlah (A+B+C) 87,620.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,762.00
F Harga Satuan Pekerjaan (D+E) 96,382.00 kg

4.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.05 150,000.00 157,500.00
Tukang Las L.03 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.105 230,000.00 24,150.00
Mandor L.04 OH 0.052 230,000.00 11,960.00
JUMLAH TENAGA KERJA 393,110.00
B BAHAN
Besi siku L 30.30.3 Kg 15 38,000.00 570,000.00
Besi plat baja Kg 32.8 33,000.00 1,082,400.00
Kawat las Kg 0.05 160,000.00 8,000.00
JUMLAH HARGA BAHAN 1,660,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,053,510.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 205,351.00
F Harga Satuan Pekerjaan (D+E) 2,258,861.00 m²

4.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 150,000.00 6,000.00
Tukang Las L.03 OH 0.02 190,000.00 3,800.00
Kepala tukang L.03 OH 0.002 230,000.00 460.00
Mandor L.04 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 10,720.00
B BAHAN
Kawat las listrik Kg 0.4 160,000.00 64,000.00
Solar Liter 0.3 6,500.00 1,950.00
Minyak pelumas Liter 0.04 47,000.00 1,880.00
JUMLAH HARGA BAHAN 67,830.00
C PERALATAN
Sewa alat Jam 0.17 51,300.00 8,721.00
JUMLAH HARGA ALAT 8,721.00

D Jumlah (A+B+C) 87,271.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,727.10
F Harga Satuan Pekerjaan (D+E) 95,998.10 cm

4.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.65 150,000.00 97,500.00
Tukang Las L.03 OH 0.65 190,000.00 123,500.00
Kepala tukang L.03 OH 0.065 230,000.00 14,950.00
Mandor L.04 OH 0.032 230,000.00 7,360.00
JUMLAH TENAGA KERJA 243,310.00
B BAHAN
Besi scuare tube m 4.76 - -
Besi lis kaca (1 x 1) m 4.522 - -
cm
Pengelasan cm 20 9,599.81 191,996.20
JUMLAH HARGA BAHAN 191,996.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 435,306.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 43,530.62
F Harga Satuan Pekerjaan (D+E) - m²

4.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.2 150,000.00 180,000.00
Tukang Las L.03 OH 1.2 190,000.00 228,000.00
Kepala tukang L.03 OH 0.12 230,000.00 27,600.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 436,980.00
B BAHAN
Pintu gulung besi m2 1 1,750,000.00 1,750,000.00
JUMLAH HARGA BAHAN 1,750,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,186,980.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 218,698.00
F Harga Satuan Pekerjaan (D+E) 2,405,678.00 m²

4.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.44 150,000.00 66,000.00
Tukang L.03 OH 0.44 190,000.00 83,600.00
Kepala tukang L.03 OH 0.044 230,000.00 10,120.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 164,780.00
B BAHAN
Pintu lipat m2 1 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 164,780.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,478.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.08 150,000.00 12,000.00
Tukang L.03 OH 0.8 190,000.00 152,000.00
Kepala tukang L.03 OH 0.08 230,000.00 18,400.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 183,320.00
B BAHAN
Sunscreen m2 1 500,000.00 500,000.00
alluminium
JUMLAH HARGA BAHAN 500,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 683,320.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 68,332.00
F Harga Satuan Pekerjaan (D+E) 751,652.00 m²

4.4.2.1.10. Pemasangan 1 m2 rolling door alluminium


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Khusus 1 190,000.00 190,000.00
Alumunium L.03 OH
Kepala tukang L.03 OH 0.1 230,000.00 23,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 374,500.00
B BAHAN
Rolling dor alluminium m2 1 600,000.00 600,000.00

JUMLAH HARGA BAHAN 600,000.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 974,500.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 97,450.00
F Harga Satuan Pekerjaan (D+E) 1,071,950.00 m²

4.4.2.1.11. Pemasangan 1 m kusen pintu alluminium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.043 150,000.00 6,450.00
Tukang Khusus 0.043 190,000.00 8,170.00
Alumunium L.03 OH
Kepala tukang L.03 OH 0.0043 230,000.00 989.00
Mandor L.04 OH 0.0021 230,000.00 483.00
JUMLAH TENAGA KERJA 16,092.00
B BAHAN
Profil alluminium m 1.1 110,000.00 121,000.00
Skrup fixer buah 2 22,000.00 44,000.00
Sealant Tube 0.06 35,000.00 2,100.00
JUMLAH HARGA BAHAN 167,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 183,192.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,319.20
F Harga Satuan Pekerjaan (D+E) 201,511.20 m'

4.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.085 150,000.00 12,750.00
Tukang Khusus 0.085 190,000.00 16,150.00
Allumunium L.03 OH
Kepala tukang L.03 OH 0.0085 230,000.00 1,955.00
Mandor L.04 OH 0.0042 230,000.00 966.00
JUMLAH TENAGA KERJA 31,821.00
B BAHAN
Profil alluminium m 4.4 110,000.00 484,000.00
Alluminium strip m 14.6 60,000.00 876,000.00
JUMLAH HARGA BAHAN 1,360,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,391,821.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 139,182.10
F Harga Satuan Pekerjaan (D+E) 1,531,003.10 m²

4.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.085 150,000.00 12,750.00
Tukang 0.085 190,000.00 16,150.00
Allumunium/Kaca L.03 OH
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 32,120.00
B BAHAN
Pintu alluminium m 4.4 110,000.00 484,000.00
Profil kaca m 4.5 95,000.00 427,500.00
Sealant Tube 0.27 35,000.00 9,450.00
JUMLAH HARGA BAHAN 920,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 953,070.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 95,307.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang L.03 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 131,190.00
B BAHAN
1.   Venetions blinds m2 1 - -
dan vertical blinds
(tirai)

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,190.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 13,119.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.67 150,000.00 250,500.00
Tukang Las L.03 OH 1.67 190,000.00 317,300.00
Kepala tukang L.03 OH 0.167 230,000.00 38,410.00
Mandor L.04 OH 0.083 230,000.00 19,090.00
JUMLAH TENAGA KERJA 625,300.00
B BAHAN
Besi strip kg 6.177 26,000.00 160,602.00
Pengelasan cm 27.08 9,599.81 259,962.85
JUMLAH HARGA BAHAN 420,564.85
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,045,864.85


E Overhead & Profit (Contoh 10 %) 0.10 x D 104,586.49
F Harga Satuan Pekerjaan (D+E) 1,150,451.34 m²

4.4.2.1.16. Pemasangan 1 m2 kawat nyamuk

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
Kawat nyamuk m2 1.1 29,000.00 31,900.00
Pengelasan cm 11.11 9,599.81 106,653.89
Baja strip (0,2 x 2) cm kg 1.716 26,000.00 44,616.00
JUMLAH HARGA BAHAN 183,169.89
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 220,619.89


E Overhead & Profit (Contoh 10 %) 0.10 x D 22,061.99
F Harga Satuan Pekerjaan (D+E) 242,681.88 m²

4.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 72,830.00
B BAHAN
Jendela nako 141,000.00 155,100.00
(rangka + kaca 5 mm) m2 1.1
Paku skrup buah 10 400.00 4,000.00
1 cm – 2,5 cm
Besi strip m 7 26,000.00 182,000.00
JUMLAH HARGA BAHAN 341,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 413,930.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 41,393.00
F Harga Satuan Pekerjaan (D+E) 455,323.00 m²

4.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 72,830.00
B BAHAN
Seng plat m 1.05 76,000.00 79,800.00
Paku 1 cm - 2,5 cm kg 0.015 33,000.00 495.00
Papan kayu kelas II m3 0.019 4,250,000.00 80,750.00
JUMLAH HARGA BAHAN 161,045.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 233,875.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 23,387.50
F Harga Satuan Pekerjaan (D+E) 257,262.50 m'

4.4.2.1.19. Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang L.03 OH 0.3 190,000.00 57,000.00
Kepala tukang L.03 OH 0.03 230,000.00 6,900.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 88,240.00
B BAHAN
Seng plat m 1.05 67,500.00 70,875.00
Paku 1 cm – 2,5 cm kg 0.01 33,000.00 330.00
Besi strip kg 0.5 26,000.00 13,000.00
JUMLAH HARGA BAHAN 84,205.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 172,445.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,244.50
F Harga Satuan Pekerjaan (D+E) 189,689.50 m'

4.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Besi L.02 OH 0.25 190,000.00 47,500.00
Kepala Tukang L.03 OH 0.025 230,000.00 5,750.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 93,740.00
B BAHAN
Rangka metal hollow M1 3.5 62,616.67 219,158.33
40.40.2 mm
Assesoris (perkuatan, las Ls 100%xran 219,158.33 219,158.33
dll) gka
JUMLAH HARGA BAHAN 438,316.67
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 532,056.67


E Overhead & Profit (Contoh 10 %) 0.10 x D 53,205.67
F Harga Satuan Pekerjaan (D+E) 585,262.33 m²
4.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang Besi L.02 OH 0.35 190,000.00 66,500.00
Kepala Tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 131,190.00
B BAHAN
Rangka metal hollow M1 4 62,616.67 250,466.67
40.40.2 mm
Assesoris (perkuatan, las Ls 100%xran 250,466.67 250,466.67
dll) gka

JUMLAH HARGA BAHAN 500,933.33


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 632,123.33


E Overhead & Profit (Contoh 10 %) 0.10 x D 63,212.33
F Harga Satuan Pekerjaan (D+E) 695,335.67 m²
4.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

4. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 43.5 1,700.00 73,950.00
Pasir Pasang m3 0.08 225,000.00 18,000.00
JUMLAH HARGA BAHAN 210,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 350,450.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 35,045.00
F Harga Satuan Pekerjaan (D+E) 385,495.00

4. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 32.95 1,700.00 56,015.00
Pasir Pasang m3 0.091 225,000.00 20,475.00
JUMLAH HARGA BAHAN 195,490.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 334,990.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 33,499.00
F Harga Satuan Pekerjaan (D+E) 368,489.00
4. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 26.55 1,700.00 45,135.00
Pasir Pasang m3 0.093 225,000.00 20,925.00
JUMLAH HARGA BAHAN 185,060.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 324,560.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 32,456.00
F Harga Satuan Pekerjaan (D+E) 357,016.00

4. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 22.2 1,700.00 37,740.00
Pasir Pasang m3 0.102 225,000.00 22,950.00
JUMLAH HARGA BAHAN 179,690.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 319,190.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 31,919.00
F Harga Satuan Pekerjaan (D+E) 351,109.00

4. 4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 18.5 1,700.00 31,450.00
Pasir Pasang m3 0.122 225,000.00 27,450.00
JUMLAH HARGA BAHAN 177,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 317,400.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 31,740.00
F Harga Satuan Pekerjaan (D+E) 349,140.00

4. 4.4.1.6. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN
Bata merah bh 140 850.00 119,000.00
Semen Portlan Kg 10.08 1,700.00 17,136.00
Kapur Padam m3 0.0275 6,000.00 165.00
Pasir Pasang m3 0.0925 225,000.00 20,812.50
JUMLAH HARGA BAHAN 157,113.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 296,613.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 29,661.35
F Harga Satuan Pekerjaan (D+E) 326,274.85

4. 4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portlan Kg 18.95 1,700.00 32,215.00
Pasir Pasang m3 0.038 225,000.00 8,550.00
JUMLAH HARGA BAHAN 100,265.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 170,015.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,001.50
F Harga Satuan Pekerjaan (D+E) 187,016.50

4. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portlan Kg 14.37 1,700.00 24,429.00
Pasir Pasang m3 0.04 225,000.00 9,000.00
JUMLAH HARGA BAHAN 92,929.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,679.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,267.90
F Harga Satuan Pekerjaan (D+E) 178,946.90
4.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portlan Kg 11.5 1,700.00 19,550.00
Pasir Pasang m3 0.043 225,000.00 9,675.00
JUMLAH HARGA BAHAN 88,725.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 158,475.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,847.50
F Harga Satuan Pekerjaan (D+E) 174,322.50

4. 4.4.1.10. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portlan Kg 9.68 1,700.00 16,456.00
Pasir Pasang m3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 86,081.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 155,831.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,583.10
F Harga Satuan Pekerjaan (D+E) 171,414.10

4. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portland Kg 8.32 1,700.00 14,144.00
Pasir Pasang m3 0.049 225,000.00 11,025.00
JUMLAH HARGA BAHAN 84,669.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 154,419.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,441.90
F Harga Satuan Pekerjaan (D+E) 169,860.90

4. 4.4.1.12. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portland Kg 6.5 1,700.00 11,050.00
Pasir Pasang m3 0.05 225,000.00 11,250.00
JUMLAH HARGA BAHAN 81,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 151,550.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,155.00
F Harga Satuan Pekerjaan (D+E) 166,705.00

4. 4.4.1.13. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Portlan Kg 4.5 1,700.00 7,650.00
Kapur Padam m3 0.015 6,000.00 90.00
Pasir Pasang m3 0.05 225,000.00 11,250.00
JUMLAH HARGA BAHAN 78,490.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 148,240.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,824.00
F Harga Satuan Pekerjaan (D+E) 163,064.00

4. 4.4.1.14. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Merah Kg 0.018 15,000.00 270.00
Kapur Padam m3 0.018 6,000.00 108.00
Pasir Pasang m3 0.018 225,000.00 4,050.00
JUMLAH HARGA BAHAN 63,928.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 133,678.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 13,367.80
F Harga Satuan Pekerjaan (D+E) 147,045.80

4. 4.4.1.15. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen Merah Kg 0.014 15,000.00 210.00
Kapur Padam m3 0.014 6,000.00 84.00
Pasir Pasang m3 0.028 225,000.00 6,300.00
JUMLAH HARGA BAHAN 66,094.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,844.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 13,584.40
F Harga Satuan Pekerjaan (D+E) 149,428.40

4. 4.4.1.16. Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang Batu L.02 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 88,590.00
B BAHAN
HB-20 bh 12.5 8,000.00 100,000.00
Semen Portland Kg 30.32 1,700.00 51,544.00
Pasir Pasang m3 0.728 225,000.00 163,800.00
Besi angker diameter 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 319,824.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 408,414.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 40,841.40
F Harga Satuan Pekerjaan (D+E) 449,255.40

4. 4.4.1.17. Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang Batu L.02 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 88,590.00
B BAHAN
HB-20 m3 12.5 8,000.00 100,000.00
Semen Portland Kg 24.26 1,700.00 41,242.00
Pasir Pasang m3 0.772 225,000.00 173,700.00
Besi angker dia 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 319,422.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 408,012.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 40,801.20
F Harga Satuan Pekerjaan (D+E) 448,813.20

4. 4.4.1.18. Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.32 150,000.00 48,000.00
Tukang Batu L.02 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.016 230,000.00 3,680.00
JUMLAH TENAGA KERJA 77,240.00
B BAHAN
HB-15 m3 16.667 7,000.00 116,669.00
Semen Portland Kg 22.74 1,700.00 38,658.00
Pasir Pasang m3 0.55 225,000.00 123,750.00
Besi angker dia 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 283,557.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 360,797.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 36,079.70
F Harga Satuan Pekerjaan (D+E) 396,876.70

4. 4.4.1.19. Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.32 150,000.00 48,000.00
Tukang Batu L.02 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.016 230,000.00 3,680.00
JUMLAH TENAGA KERJA 77,240.00
B BAHAN
HB-15 m3 16.667 7,000.00 116,669.00
Semen Portland Kg 18.2 1,700.00 30,940.00
Pasir Pasang m3 0.582 225,000.00 130,950.00
Besi angker dia 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 283,039.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 360,279.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 36,027.90
F Harga Satuan Pekerjaan (D+E) 396,306.90

4. 4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
HB-10 m3 25 6,000.00 150,000.00
Semen Portland Kg 15.16 1,700.00 25,772.00
Pasir Pasang m3 0.364 225,000.00 81,900.00
Besi angker dia 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 262,152.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,902.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 33,190.20
F Harga Satuan Pekerjaan (D+E) 365,092.20

4. 4.4.1.21. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
HB-10 m3 25 6,000.00 150,000.00
Semen Portland Kg 12.13 1,700.00 20,621.00
Pasir Pasang m3 0.388 225,000.00 87,300.00
Besi angker dia 8 Kg 0.28 16,000.00 4,480.00
JUMLAH HARGA BAHAN 262,401.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 332,151.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 33,215.10
F Harga Satuan Pekerjaan (D+E) 365,366.10

4. 4.4.1.22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata rooster m3 30 18,000.00 540,000.00
Semen Portland Kg 11 1,700.00 18,700.00
Pasir Pasang m 3
0.035 225,000.00 7,875.00
JUMLAH HARGA BAHAN 566,575.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 636,325.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 63,632.50
F Harga Satuan Pekerjaan (D+E) 699,957.50

4. 4.4.1.23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata berongga m3 30 18,000.00 540,000.00
Semen Portland Kg 11 1,700.00 18,700.00
Pasir Pasang m3 0.035 225,000.00 7,875.00
JUMLAH HARGA BAHAN 566,575.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 636,325.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 63,632.50
F Harga Satuan Pekerjaan (D+E) 699,957.50
4. 4.4.1.24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.02 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
Bata rooster m3 70 18,000.00 1,260,000.00
Semen Portland Kg 14 1,700.00 23,800.00
Pasir Pasang m3 0.032 225,000.00 7,200.00
JUMLAH HARGA BAHAN 1,291,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,371,400.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 137,140.00
F Harga Satuan Pekerjaan (D+E) 1,508,540.00



ran 1SP : 3KP : 10PP




ran 1SP : 3KP :10PP


ran 1SM : 1KP :1PP

uran 1SM : 1KP :2PP




cm²

cm²
cm²

cm²

cm²
cm²
4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

4.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.

No .Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 15.504 1,700.00 26,356.80
2.       PP m3 0.016 225,000.00 3,600.00
JUMLAH HARGA BAHAN 29,956.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,356.80


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,035.68
F Harga Satuan Pekerjaan (D+E) 121,392.48 m²

4.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 10.224 1,700.00 17,380.80
2.       PP m3 0.02 225,000.00 4,500.00
JUMLAH HARGA BAHAN 21,880.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 102,280.80


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,228.08
F Harga Satuan Pekerjaan (D+E) 112,508.88 m²

4.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah
(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 7.776 1,700.00 13,219.20
2.       PP m3 0.023 225,000.00 5,175.00
JUMLAH HARGA BAHAN 18,394.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,794.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,879.42
F Harga Satuan Pekerjaan (D+E) 108,673.62 m²

4.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 6.24 1,700.00 10,608.00
2.       PP m3 0.024 225,000.00 5,400.00
JUMLAH HARGA BAHAN 16,008.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,408.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,640.80
F Harga Satuan Pekerjaan (D+E) 106,048.80 m²

4.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


4.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 5.184 1,700.00 8,812.80
2.       PP m3 0.026 225,000.00 5,850.00
JUMLAH HARGA BAHAN 14,662.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 95,062.80


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,506.28
F Harga Satuan Pekerjaan (D+E) 104,569.08 m²

4.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 4.416 1,700.00 7,507.20
2.       PP m3
0.027 225,000.00 6,075.00
JUMLAH HARGA BAHAN 13,582.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,982.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,398.22
F Harga Satuan Pekerjaan (D+E) 103,380.42 m²

4.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 3.936 1,700.00 6,691.20
2.       PP m 3
0.028 225,000.00 6,300.00
JUMLAH HARGA BAHAN 12,991.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,391.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,339.12
F Harga Satuan Pekerjaan (D+E) 102,730.32 m²

4.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
1.       PC Kg 3.456 1,700.00 5,875.20
2.       PP m 3
0.029 225,000.00 6,525.00
JUMLAH HARGA BAHAN 12,400.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,800.20


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,280.02
F Harga Satuan Pekerjaan (D+E) 102,080.22 m²

4.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.36 150,000.00 54,000.00
Tukang Batu L.03 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 83,700.00
B BAHAN
1.       PC Kg 5.76 1,700.00 9,792.00
2.       KP m3 0.003 6,000.00 18.00
3.       PP m3 0.013 225,000.00 2,925.00
JUMLAH HARGA BAHAN 12,735.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,435.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,643.50
F Harga Satuan Pekerjaan (D+E) 106,078.50 m²

4.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.36 150,000.00 54,000.00
Tukang Batu L.03 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 83,700.00
B BAHAN
1.       PC Kg 3 1,700.00 5,100.00
2.       KP m3 0.005 6,000.00 30.00
3.       PP m3 0.02 225,000.00 4,500.00
JUMLAH HARGA BAHAN 9,630.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,330.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,333.00
F Harga Satuan Pekerjaan (D+E) 102,663.00 m²

4.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.36 150,000.00 54,000.00
Tukang Batu L.03 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 83,700.00
B BAHAN
1.       SM m3 0.009 1,700.00 15.30
2.       KP m3 0.009 6,000.00 54.00
3.       PP m3 0.009 225,000.00 2,025.00
JUMLAH HARGA BAHAN 2,094.30
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,794.30


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,579.43
F Harga Satuan Pekerjaan (D+E) 94,373.73 m²

4.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.36 150,000.00 54,000.00
Tukang Batu L.03 OH 0.12 190,000.00 22,800.00
Kepala Tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 83,700.00
B BAHAN
1.       SM m3 0.007 1,700.00 11.90
2.       KP m 3
0.007 6,000.00 42.00
3.       PP m3 0.015 225,000.00 3,375.00
JUMLAH HARGA BAHAN 3,428.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,128.90


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,712.89
F Harga Satuan Pekerjaan (D+E) 95,841.79 m²

4.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Batu L.03 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 107,660.00
B BAHAN
1.       PC Kg 13.632 1,700.00 23,174.40
2.       PP m3 0.027 225,000.00 6,075.00
JUMLAH HARGA BAHAN 29,249.40
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 136,909.40
E Overhead & Profit (Contoh 10 %) 0.10 x D 13,690.94
F Harga Satuan Pekerjaan (D+E) 150,600.34 m²

4.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.03 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 84,590.00
B BAHAN
1.       PC Kg 10.368 1,700.00 17,625.60
2.       PP m3 0.031 225,000.00 6,975.00
JUMLAH HARGA BAHAN 24,600.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,190.60


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,919.06
F Harga Satuan Pekerjaan (D+E) 120,109.66 m²

4.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Batu L.03 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 107,660.00
B BAHAN
1.       PC Kg 8.32 1,700.00 14,144.00
2.       PP m3 0.032 225,000.00 7,200.00
JUMLAH HARGA BAHAN 21,344.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 129,004.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,900.40
F Harga Satuan Pekerjaan (D+E) 141,904.40 m²
4.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Batu L.03 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 107,660.00
B BAHAN
1.       PC Kg 6.912 1,700.00 11,750.40
2.       PP m3 0.035 225,000.00 7,875.00
JUMLAH HARGA BAHAN 19,625.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,285.40


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,728.54
F Harga Satuan Pekerjaan (D+E) 140,013.94 m²

4.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Batu L.03 OH 0.2 190,000.00 38,000.00
Kepala Tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 107,660.00
B BAHAN
1.       PC Kg 5.888 1,700.00 10,009.60
2.       PP m3 0.036 225,000.00 8,100.00
JUMLAH HARGA BAHAN 18,109.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,769.60


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,576.96
F Harga Satuan Pekerjaan (D+E) 138,346.56 m²

4.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah
(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.44 150,000.00 66,000.00
Tukang Batu L.03 OH 0.22 190,000.00 41,800.00
Kepala Tukang L.03 OH 0.022 230,000.00 5,060.00
Mandor L.04 OH 0.022 230,000.00 5,060.00
JUMLAH TENAGA KERJA 117,920.00
B BAHAN
1.       SM m3 0.009 1,700.00 15.30
2.       KP m 3
0.009 6,000.00 54.00
3.       PP m3 0.018 225,000.00 4,050.00
JUMLAH HARGA BAHAN 4,119.30
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 122,039.30


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,203.93
F Harga Satuan Pekerjaan (D+E) 134,243.23 m²

4.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Batu L.03 OH 0.075 190,000.00 14,250.00
Kepala Tukang L.03 OH 0.008 230,000.00 1,840.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 40,430.00
B BAHAN
PC Kg 5.184 1,700.00 8,812.80
PP m3 0.026 225,000.00 5,850.00
JUMLAH HARGA BAHAN 14,662.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,092.80


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,509.28
F Harga Satuan Pekerjaan (D+E) 60,602.08 m²

4.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.08 150,000.00 12,000.00
Tukang Batu L.03 OH 0.4 190,000.00 76,000.00
Kepala Tukang L.03 OH 0.04 230,000.00 9,200.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 98,120.00
B BAHAN
Semen PC Kg 0.5 1,700.00 850.00
Pasir pasang m3 0.013 225,000.00 2,925.00
JUMLAH HARGA BAHAN 3,775.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,895.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,189.50
F Harga Satuan Pekerjaan (D+E) 112,084.50 m²

4.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.45 150,000.00 67,500.00
Tukang Batu L.03 OH 0.225 190,000.00 42,750.00
Kepala Tukang L.03 OH 0.023 230,000.00 5,290.00
Mandor L.04 OH 0.023 230,000.00 5,290.00
JUMLAH TENAGA KERJA 120,830.00
B BAHAN
Semen PC Kg 10 1,700.00 17,000.00
Batu granit Kg 15 -
JUMLAH HARGA BAHAN 17,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 137,830.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 13,783.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.45 150,000.00 67,500.00
Tukang Batu L.03 OH 0.225 190,000.00 42,750.00
Kepala Tukang L.03 OH 0.023 230,000.00 5,290.00
Mandor L.04 OH 0.023 230,000.00 5,290.00
JUMLAH TENAGA KERJA 120,830.00
B BAHAN
Semen PC Kg 10 1,700.00 17,000.00
Batu traso Kg 15 -
JUMLAH HARGA BAHAN 17,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 137,830.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 13,783.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Semen PC Kg 4.32 1,700.00 7,344.00
Pasir pasang Kg 0.006 225,000.00 1,350.00
JUMLAH HARGA BAHAN 8,694.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 78,444.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,844.40
F Harga Satuan Pekerjaan (D+E) 86,288.40 m²

4.4.4.2.24. Pemasangan 1 m2 finishing siar pasangan bata merah

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Batu L.03 OH 0.075 190,000.00 14,250.00
Kepala Tukang L.03 OH 0.008 230,000.00 1,840.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 40,430.00
B BAHAN
Semen PC Kg 3.108 1,700.00 5,283.60
JUMLAH HARGA BAHAN 5,283.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,713.60


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,571.36
F Harga Satuan Pekerjaan (D+E) 50,284.96 m²

4.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.07 150,000.00 10,500.00
Tukang Batu L.03 OH 0.035 190,000.00 6,650.00
Kepala Tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 18,990.00
B BAHAN
Semen PC Kg 1.6 1,700.00 2,720.00
JUMLAH HARGA BAHAN 2,720.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,710.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,171.00
F Harga Satuan Pekerjaan (D+E) 23,881.00 m²

4.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang Batu L.03 OH 0.15 190,000.00 28,500.00
Kepala Tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 80,400.00
B BAHAN
Semen PC Kg 6.34 1,700.00 10,778.00
Pasir pasang m3 0.012 225,000.00 2,700.00
JUMLAH HARGA BAHAN 13,478.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 93,878.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 9,387.80
F Harga Satuan Pekerjaan (D+E) 103,265.80 m²

4.4.4.2.27. Pemasangan 1 m2 acian.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Batu L.03 OH 0.1 190,000.00 19,000.00
Kepala Tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 53,600.00
B BAHAN
Semen PC Kg 3.25 1,700.00 5,525.00
JUMLAH HARGA BAHAN 5,525.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,125.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,912.50
F Harga Satuan Pekerjaan (D+E) 65,037.50 m²
4.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

4.4.4.3.1. Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin abu-abu Bh 6.63 10,100.00 66,963.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 93,748.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 160,978.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,097.80
F Harga Satuan Pekerjaan (D+E) 177,075.80 m²

4.4.4.3.2. Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin abu-abu Bh 11.87 5,700.00 67,659.00
Semen Portlan kg 10 1,700.00 17,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 94,784.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,014.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,201.40
F Harga Satuan Pekerjaan (D+E) 178,215.40 m²
4.4.4.3.3. Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.27 150,000.00 40,500.00
Tukang Batu L.02 OH 0.135 190,000.00 25,650.00
Kepala tukang L.03 OH 0.014 230,000.00 3,220.00
Mandor L.04 OH 0.014 230,000.00 3,220.00
JUMLAH TENAGA KERJA 72,590.00
B BAHAN
Ubin abu-abu Bh 26.5 2,600.00 68,900.00
Semen Portlan kg 10.4 1,700.00 17,680.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 96,705.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,295.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,929.50
F Harga Satuan Pekerjaan (D+E) 186,224.50 m²

4.4.4.3.4. Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin warna Bh 6.63 12,800.00 84,864.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Semen warna Kg 1.3 15,000.00 19,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 131,149.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 198,379.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 19,837.90
F Harga Satuan Pekerjaan (D+E) 218,216.90 m²
4.4.4.3.5. Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.02 OH 0.13 190,000.00 24,700.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 69,680.00
B BAHAN
Ubin warna Bh 11.87 12,800.00 151,936.00
Semen Portlan kg 10 1,700.00 17,000.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 201,561.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 271,241.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 27,124.10
F Harga Satuan Pekerjaan (D+E) 298,365.10 m²

4.4.4.3.6. Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.27 150,000.00 40,500.00
Tukang Batu L.02 OH 0.135 190,000.00 25,650.00
Kepala tukang L.03 OH 0.014 230,000.00 3,220.00
Mandor L.04 OH 0.014 230,000.00 3,220.00
JUMLAH TENAGA KERJA 72,590.00
B BAHAN
Ubin warna Bh 26.5 12,800.00 339,200.00
Semen Portlan kg 10.4 1,700.00 17,680.00
Semen warna Kg 1.62 15,000.00 24,300.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 391,305.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 463,895.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 46,389.50
F Harga Satuan Pekerjaan (D+E) 510,284.50 m²
4.4.4.3.7. Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin teraso Bh 6.63 13,600.00 90,168.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Semen warna Kg 1.3 15,000.00 19,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 136,453.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 203,683.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 20,368.30
F Harga Satuan Pekerjaan (D+E) 224,051.30 m²

4.4.4.3.8. Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.02 OH 0.13 190,000.00 24,700.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 69,680.00
B BAHAN
Ubin teraso Bh 11.87 7,700.00 91,399.00
Semen Portlan kg 10 1,700.00 17,000.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 141,024.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 210,704.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 21,070.40
F Harga Satuan Pekerjaan (D+E) 231,774.40 m²
4.4.4.3.9. Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin granit Bh 6.63 72,000.00 477,360.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Semen warna Kg 1.3 15,000.00 19,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 523,645.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 590,875.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 59,087.50
F Harga Satuan Pekerjaan (D+E) 649,962.50 m²

4.4.4.3.10. Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.02 OH 0.13 190,000.00 24,700.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 69,680.00
B BAHAN
Ubin granit Bh 11.87 40,500.00 480,735.00
Semen Portlan kg 10 1,700.00 17,000.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 530,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 600,040.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 60,004.00
F Harga Satuan Pekerjaan (D+E) 660,044.00 m²
4.4.4.3.11. Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin teralux Bh 6.63 96,000.00 636,480.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Semen warna Kg 1.3 15,000.00 19,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 682,765.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 749,995.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 74,999.50
F Harga Satuan Pekerjaan (D+E) 824,994.50 m²

4.4.4.3.12. Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.02 OH 0.13 190,000.00 24,700.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 69,680.00
B BAHAN
Ubin teralux Bh 11.87 54,000.00 640,980.00
Semen Portlan kg 10 1,700.00 17,000.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 690,605.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 760,285.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 76,028.50
F Harga Satuan Pekerjaan (D+E) 836,313.50 m²
4.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.24 150,000.00 36,000.00
Tukang Batu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.012 230,000.00 2,760.00
JUMLAH TENAGA KERJA 64,320.00
B BAHAN
Ubin teralux marmer Bh 3.1 216,000.00 669,600.00
Semen Portlan kg 9.6 1,700.00 16,320.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 718,545.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 782,865.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 78,286.50
F Harga Satuan Pekerjaan (D+E) 861,151.50 m²

4.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.125 190,000.00 23,750.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 67,230.00
B BAHAN
Ubin teralux marmer Bh 6.63 96,000.00 636,480.00
Semen Portlan kg 9.8 1,700.00 16,660.00
Semen warna Kg 1.3 15,000.00 19,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 682,765.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 749,995.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 74,999.50
F Harga Satuan Pekerjaan (D+E) 824,994.50 m²
4.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.26 150,000.00 39,000.00
Tukang Batu L.02 OH 0.13 190,000.00 24,700.00
Kepala tukang L.03 OH 0.013 230,000.00 2,990.00
Mandor L.04 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 69,680.00
B BAHAN
Ubin teralux marmer Bh 11.87 54,000.00 640,980.00
Semen Portlan kg 10 1,700.00 17,000.00
Semen warna Kg 1.5 15,000.00 22,500.00
Pasir pasang M3 0.045 225,000.00 10,125.00
JUMLAH HARGA BAHAN 690,605.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 760,285.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 76,028.50
F Harga Satuan Pekerjaan (D+E) 836,313.50 m²

4.4.4.3.16. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin PC Bh 5.3 1,900.00 10,070.00
Semen Portland kg 1.65 1,700.00 2,805.00
Pasir pasang M3 0.004 225,000.00 900.00
JUMLAH HARGA BAHAN 13,775.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,595.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,759.50
F Harga Satuan Pekerjaan (D+E) 52,354.50 m²

4.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin PC Bh 3.53 1,900.00 6,707.00
Semen Portland kg 1.24 1,700.00 2,108.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 9,490.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,310.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,331.00
F Harga Satuan Pekerjaan (D+E) 47,641.00 m²

4.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin PC Bh 2.65 2,600.00 6,890.00
Semen Portlan kg 1.24 1,700.00 2,108.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 9,673.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,493.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,349.30
F Harga Satuan Pekerjaan (D+E) 47,842.30 m²

4.4.4.3.19. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin warna Bh 2.65 1,600.00 4,240.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 8,353.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,173.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,217.30
F Harga Satuan Pekerjaan (D+E) 46,390.30 m²

4.4.4.3.20. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin warna Bh 3.53 2,400.00 8,472.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 12,585.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,405.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,640.50
F Harga Satuan Pekerjaan (D+E) 51,045.50 m²

4.4.4.3.21. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin warna Bh 2.65 3,200.00 8,480.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 12,593.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,413.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,641.30
F Harga Satuan Pekerjaan (D+E) 51,054.30 m²

4.4.4.3.22. Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin teraso Bh 3.53 2,550.00 9,001.50
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 13,114.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,934.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,693.45
F Harga Satuan Pekerjaan (D+E) 51,627.95 m²

4.4.4.3.23. Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin teraso Bh 2.65 3,400.00 9,010.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 13,123.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,943.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,694.30
F Harga Satuan Pekerjaan (D+E) 51,637.30 m²

4.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin granit Bh 2.65 18,000.00 47,700.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 51,813.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,633.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,563.30
F Harga Satuan Pekerjaan (D+E) 94,196.30 m²

4.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint ubin granit Bh 3.53 13,500.00 47,655.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 51,768.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,588.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,558.80
F Harga Satuan Pekerjaan (D+E) 94,146.80 m²

4.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint teralux kerang Bh 2.63 24,000.00 63,120.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 67,233.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,053.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,105.30
F Harga Satuan Pekerjaan (D+E) 111,158.30 m²

4.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint teralux kerang Bh 3.53 18,000.00 63,540.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 67,653.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,473.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,147.30
F Harga Satuan Pekerjaan (D+E) 111,620.30 m²

4.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint teralux marmer Bh 1.7 36,000.00 61,200.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 65,313.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 99,133.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,913.30
F Harga Satuan Pekerjaan (D+E) 109,046.30 m²

4.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint teralux marmer Bh 2.65 24,000.00 63,600.00
Semen Portland kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 67,713.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,533.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,153.30
F Harga Satuan Pekerjaan (D+E) 111,686.30 m²

4.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 33,820.00
B BAHAN
Plint teralux marmer Bh 3.53 18,000.00 63,540.00
Semen Portlan kg 1.14 1,700.00 1,938.00
Semen warna Kg 0.1 15,000.00 1,500.00
Pasir pasang M3 0.003 225,000.00 675.00
JUMLAH HARGA BAHAN 67,653.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,473.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,147.30
F Harga Satuan Pekerjaan (D+E) 111,620.30 m²

4.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.36 150,000.00 54,000.00
Tukang Batu L.02 OH 0.18 190,000.00 34,200.00
Kepala tukang L.03 OH 0.018 230,000.00 4,140.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 96,480.00
B BAHAN
Teraso cor M3 0.036 - -
Semen warna Kg 0.1 15,000.00 1,500.00
JUMLAH HARGA BAHAN 1,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,980.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,798.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 53 13,000.00 689,000.00
Semen Portlan Kg 8.19 1,700.00 13,923.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 2.75 15,000.00 41,250.00
JUMLAH HARGA BAHAN 754,298.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 941,898.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 94,189.80
F Harga Satuan Pekerjaan (D+E) 1,036,087.80 m²

4.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 106 13,000.00 1,378,000.00
Semen Portlan Kg 8.19 1,700.00 13,923.00
Pasir pasang M 3
0.045 225,000.00 10,125.00
Semen warna Kg 3.2 15,000.00 48,000.00
JUMLAH HARGA BAHAN 1,450,048.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,637,648.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 163,764.80
F Harga Satuan Pekerjaan (D+E) 1,801,412.80 m²

4.4.4.3.35.a Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 6.625 22,400.00 148,400.00
Semen Portland Kg 10 1,700.00 17,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 1.5 15,000.00 22,500.00
JUMLAH HARGA BAHAN 198,025.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 385,625.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 38,562.50
F Harga Satuan Pekerjaan (D+E) 424,187.50 m²

4.4.4.3.34. Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 10 15,246.00 152,460.00
Semen Portland Kg 8.19 1,700.00 13,923.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 1.62 15,000.00 24,300.00
JUMLAH HARGA BAHAN 200,808.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 388,408.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 38,840.80
F Harga Satuan Pekerjaan (D+E) 427,248.80 m²

4.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 11.87 12,600.00 149,562.00
Semen Portland Kg 10 1,700.00 17,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 1.5 15,000.00 22,500.00
JUMLAH HARGA BAHAN 199,187.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 386,787.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 38,678.70
F Harga Satuan Pekerjaan (D+E) 425,465.70 m²

4.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 26.5 5,600.00 148,400.00
Semen Portlan Kg 10.4 1,700.00 17,680.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 1.62 15,000.00 24,300.00
JUMLAH HARGA BAHAN 200,505.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 388,105.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 38,810.50
F Harga Satuan Pekerjaan (D+E) 426,915.50 m²

4.4.4.3.37. Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.05 150,000.00 157,500.00
Tukang Batu L.02 OH 0.525 190,000.00 99,750.00
Kepala tukang L.03 OH 0.053 230,000.00 12,190.00
Mandor L.04 OH 0.053 230,000.00 12,190.00
JUMLAH TENAGA KERJA 281,630.00
B BAHAN
Ubin keramik Bh 33 4,620.00 152,460.00
Semen Portlan Kg 9.8 1,700.00 16,660.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 4.37 15,000.00 65,550.00
JUMLAH HARGA BAHAN 244,795.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 526,425.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 52,642.50
F Harga Satuan Pekerjaan (D+E) 579,067.50 m²

4.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Ubin keramik Bh 11.87 78,750.00 934,762.50
Semen Portlan Kg 14.15 1,700.00 24,055.00
Pasir pasang M3 0.039 225,000.00 8,775.00
Semen warna Kg 2 15,000.00 30,000.00
JUMLAH HARGA BAHAN 997,592.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,185,192.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 118,519.25
F Harga Satuan Pekerjaan (D+E) 1,303,711.75 m²

4.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 39,800.00
B BAHAN
Plint keramik Bh 5.3 13,000.00 68,900.00
Semen Portlan Kg 1.14 1,700.00 1,938.00
Pasir pasang M3 0.003 225,000.00 675.00
Semen warna Kg 0.025 15,000.00 375.00
JUMLAH HARGA BAHAN 71,888.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,688.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,168.80
F Harga Satuan Pekerjaan (D+E) 122,856.80 m'

4.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 39,800.00
B BAHAN
Plint keramik Bh 10.6 1,400.00 14,840.00
Semen Portland Kg 1.14 1,700.00 1,938.00
Pasir pasang M3 0.003 225,000.00 675.00
Semen warna Kg 0.05 15,000.00 750.00
JUMLAH HARGA BAHAN 18,203.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,003.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,800.30
F Harga Satuan Pekerjaan (D+E) 63,803.30 m'

4.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 150,000.00 13,500.00
Tukang Batu L.02 OH 0.09 190,000.00 17,100.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 39,800.00
B BAHAN
Plint keramik Bh 5.3 1,400.00 7,420.00
Semen Portland Kg 0.57 1,700.00 969.00
Pasir pasang M3 0.0015 225,000.00 337.50
Semen warna Kg 0.013 15,000.00 195.00
JUMLAH HARGA BAHAN 8,921.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,721.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,872.15
F Harga Satuan Pekerjaan (D+E) 53,593.65 m'

4.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.75 150,000.00 112,500.00
Tukang Batu L.02 OH 0.75 190,000.00 142,500.00
Kepala tukang L.03 OH 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.038 230,000.00 8,740.00
JUMLAH TENAGA KERJA 280,990.00
B BAHAN
Internal cove Bh 5.3 - -
Semen Portlan Kg 1.14 1,700.00 1,938.00
Pasir pasang M3 0.003 225,000.00 675.00
Semen warna Kg 0.1 15,000.00 1,500.00
JUMLAH HARGA BAHAN 4,113.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 285,103.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 28,510.30
F Harga Satuan Pekerjaan (D+E) - m'

4.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Marmer Bh 1.06 600,000.00 636,000.00
Semen Portlan Kg 8.19 1,700.00 13,923.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Semen warna Kg 0.65 15,000.00 9,750.00
JUMLAH HARGA BAHAN 669,798.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 857,398.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 85,739.80
F Harga Satuan Pekerjaan (D+E) 943,137.80 m²

4.4.4.3.44. Pemasangan 1 m2 lantai karpet

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.17 150,000.00 25,500.00
Tukang Kayu L.02 OH 0.17 190,000.00 32,300.00
Kepala tukang L.03 OH 0.017 230,000.00 3,910.00
Mandor L.04 OH 0.009 230,000.00 2,070.00
JUMLAH TENAGA KERJA 63,780.00
B BAHAN
Karpet m2 1.05 25,000.00 26,250.00
Lem Kg 0.35 55,000.00 19,250.00
JUMLAH HARGA BAHAN 45,500.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,280.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,928.00
F Harga Satuan Pekerjaan (D+E) 120,208.00 m²

4.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang Kayu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Underlayer m2 1.05 - -
Lem Kg 0.35 55,000.00 19,250.00
JUMLAH HARGA BAHAN 19,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,190.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,419.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Kayu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Parquet m2 1.05 1,000,000.00 1,050,000.00
Lem Kg 0.6 55,000.00 33,000.00
JUMLAH HARGA BAHAN 1,083,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,270,600.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 127,060.00
F Harga Satuan Pekerjaan (D+E) 1,397,660.00 m²

4.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Kayu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Parquet m2 1.05 1,000,000.00 1,050,000.00
Lem Kg 0.6 55,000.00 33,000.00
JUMLAH HARGA BAHAN 1,083,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,270,600.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 127,060.00
F Harga Satuan Pekerjaan (D+E) 1,397,660.00 m²

4.4.4.3.48. Pemasangan 1 m2 dinding porslen 11cm x 11cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Batu L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 268,000.00
B BAHAN
Porslen Bh 86 1,452.00 124,872.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 1.5 15,000.00 22,500.00
JUMLAH HARGA BAHAN 167,232.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 435,232.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 43,523.20
F Harga Satuan Pekerjaan (D+E) 478,755.20 m²
4.4.4.3.49. Pemasangan 1 m2 dinding porslen 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Porslen Bh 53 2,400.00 127,200.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 2.75 15,000.00 41,250.00
JUMLAH HARGA BAHAN 188,310.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 429,510.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 42,951.00
F Harga Satuan Pekerjaan (D+E) 472,461.00 m²

4.4.4.3.50. Pemasangan 1 m2 dinding porslen 20cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Porslen Bh 26 4,800.00 124,800.00
Semen Portland Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 1.94 15,000.00 29,100.00
JUMLAH HARGA BAHAN 173,760.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 414,960.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 41,496.00
F Harga Satuan Pekerjaan (D+E) 456,456.00 m²
4.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 53 2,800.00 148,400.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 2.75 15,000.00 41,250.00
JUMLAH HARGA BAHAN 209,510.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 450,710.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 45,071.00
F Harga Satuan Pekerjaan (D+E) 495,781.00 m²

4.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 106 1,400.00 148,400.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 2.9 15,000.00 43,500.00
JUMLAH HARGA BAHAN 211,760.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 452,960.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 45,296.00
F Harga Satuan Pekerjaan (D+E) 498,256.00 m²
4.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 53 2,800.00 148,400.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 2.75 15,000.00 41,250.00
JUMLAH HARGA BAHAN 209,510.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 450,710.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 45,071.00
F Harga Satuan Pekerjaan (D+E) 495,781.00 m²

4.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 26.5 5,600.00 148,400.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 1.94 15,000.00 29,100.00
JUMLAH HARGA BAHAN 197,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 438,560.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 43,856.00
F Harga Satuan Pekerjaan (D+E) 482,416.00 m²
4.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.3 150,000.00 195,000.00
Tukang Batu L.02 OH 0.65 190,000.00 123,500.00
Kepala tukang L.03 OH 0.065 230,000.00 14,950.00
Mandor L.04 OH 0.065 230,000.00 14,950.00
JUMLAH TENAGA KERJA 348,400.00
B BAHAN
Marmer Bh 1.06 600,000.00 636,000.00
Semen Portlan Kg 12.44 1,700.00 21,148.00
Pasir Pasang M3 0.025 225,000.00 5,625.00
Semen warna Kg 0.65 15,000.00 9,750.00
Paku 12cm Bh 3.03 28,000.00 84,840.00
JUMLAH HARGA BAHAN 757,363.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,105,763.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 110,576.30
F Harga Satuan Pekerjaan (D+E) 1,216,339.30 m²

4.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang Batu L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 268,000.00
B BAHAN
Bata pelapis Bh 63 950.00 59,850.00
Semen Portlan Kg 12.44 1,700.00 21,148.00
Pasir Pasang M3 0.025 225,000.00 5,625.00
Semen warna Kg 2.75 15,000.00 41,250.00
JUMLAH HARGA BAHAN 127,873.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 395,873.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 39,587.30
F Harga Satuan Pekerjaan (D+E) 435,460.30 m²
4.4.4.3.54a. Pemasangan 1 m2 dinding keramik 30cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 12.11 12,600.00 152,600.00
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 1.94 15,000.00 29,100.00
JUMLAH HARGA BAHAN 201,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 442,760.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 44,276.00
F Harga Satuan Pekerjaan (D+E) 487,036.00 m²

4.4.4.3.54b. Pemasangan 1 m2 dinding keramik 40cm x 40cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.9 150,000.00 135,000.00
Tukang Batu L.02 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.045 230,000.00 10,350.00
JUMLAH TENAGA KERJA 241,200.00
B BAHAN
Keramik artistik Bh 12.11 22,400.00 271,288.89
Semen Portlan Kg 9.3 1,700.00 15,810.00
Pasir Pasang M3 0.018 225,000.00 4,050.00
Semen warna Kg 1.94 15,000.00 29,100.00
JUMLAH HARGA BAHAN 320,248.89
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 561,448.89


E Overhead & Profit (Contoh 10 %) 0.10 x D 56,144.89
F Harga Satuan Pekerjaan (D+E) 617,593.78 m²
4.4.4.3.57. Pemasangan 1 m2 dinding batu paras

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Batu paras Bh 1.1 221,818.18 244,000.00
Semen Portlan Kg 11.75 1,700.00 19,975.00
Pasir Pasang M3 0.035 225,000.00 7,875.00
JUMLAH HARGA BAHAN 271,850.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 459,450.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 45,945.00
F Harga Satuan Pekerjaan (D+E) 505,395.00 m²

4.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang Batu L.02 OH 0.35 190,000.00 66,500.00
Kepala tukang L.03 OH 0.035 230,000.00 8,050.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 187,600.00
B BAHAN
Batu temple hitam Bh 1.1 240,909.09 265,000.00
Semen Portlan Kg 11.75 1,700.00 19,975.00
Pasir Pasang M3 0.035 225,000.00 7,875.00
JUMLAH HARGA BAHAN 292,850.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 480,450.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 48,045.00
F Harga Satuan Pekerjaan (D+E) 528,495.00 m²

4.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Batu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 56,290.00
B BAHAN
Vynil Bh 11.87 58,500.00 694,395.00
Lem Kg 0.35 55,000.00 19,250.00
JUMLAH HARGA BAHAN 713,645.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 769,935.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 76,993.50
F Harga Satuan Pekerjaan (D+E) 846,928.50 m²

4.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang Batu L.02 OH 0.175 190,000.00 33,250.00
Kepala tukang L.03 OH 0.017 230,000.00 3,910.00
Mandor L.04 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 90,120.00
B BAHAN
Wallpaper m 2.2 3,333.33 7,333.33
Lem Kg 0.25 55,000.00 13,750.00
JUMLAH HARGA BAHAN 21,083.33
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,203.33


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,120.33
F Harga Satuan Pekerjaan (D+E) 122,323.67 m²

4.4.4.3.61. Pemasangan 1m2 floor harderner

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang Batu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Floor harderner Kg 5 40,000.00 200,000.00
JUMLAH HARGA BAHAN 200,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 244,940.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 24,494.00
F Harga Satuan Pekerjaan (D+E) 269,434.00 m²

4.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.08 150,000.00 12,000.00
Tukang Batu L.02 OH 0.08 190,000.00 15,200.00
Kepala tukang L.03 OH 0.008 230,000.00 1,840.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 29,960.00
B BAHAN
Vynil Bh 1.76 400,000.00 704,000.00
Lem Kg 0.08 55,000.00 4,400.00
JUMLAH HARGA BAHAN 708,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 738,360.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 73,836.00
F Harga Satuan Pekerjaan (D+E) 812,196.00 m²

4.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang Batu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Papan kayu kelas 1 M3 0.003 5,480,000.00 16,440.00
Paku/skrup 5cm Kg 0.05 35,000.00 1,750.00
JUMLAH HARGA BAHAN 18,190.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,130.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,313.00
F Harga Satuan Pekerjaan (D+E) 69,443.00 m²

4.4.4.3.64. Memasang 1 m2 Paving blok tebal 8 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Batu L.02 OH 0.2 190,000.00 38,000.00
Kepala Tukang Batu L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 84,700.00
B BAHAN
Paving Block Warna m2 1 75,000.00 75,000.00
Pasir Isian/Urugan m3 0.1 195,000.00 19,500.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 179,200.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,920.00
F Harga Satuan Pekerjaan (D+E) 197,120.00 m²
A.4.5.1. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

4.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.03 150,000.00 4,500.00
Tukang kayu L.02 OH 0.07 190,000.00 13,300.00
Kepala tukang L.03 OH 0.007 230,000.00 1,610.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 20,330.00
B BAHAN
Asbes semen m2 1.1 47,300.00 52,030.00
Paku tripleks kg 0.01 33,000.00 330.00
JUMLAH HARGA BAHAN 52,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,269.00
F Harga Satuan Pekerjaan (D+E) 79,959.00

4.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang kayu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Akustik Lembar 12 38,750.00 465,000.00
Paku tripleks kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 466,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 511,590.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 51,159.00
F Harga Satuan Pekerjaan (D+E) 562,749.00

4.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang kayu L.02 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Akustik Lembar 5.8 77,500.00 449,500.00
Paku tripleks kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 451,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 496,090.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 49,609.00
F Harga Satuan Pekerjaan (D+E) 545,699.00

4.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.02 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
Akustik Lembar 1.5 310,000.00 465,000.00
Paku tripleks kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 466,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 504,100.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 50,410.00
F Harga Satuan Pekerjaan (D+E) 554,510.00

4.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.02 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
Tripleks Lembar 0.375 67,000.00 25,125.00
Paku tripleks kg 0.03 33,000.00 990.00
JUMLAH HARGA BAHAN 26,115.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,565.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,356.50
F Harga Satuan Pekerjaan (D+E) 69,921.50

4.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.8 150,000.00 120,000.00
Tukang kayu L.02 OH 0.8 190,000.00 152,000.00
Kepala tukang L.03 OH 0.08 230,000.00 18,400.00
Mandor L.04 OH 0.04 230,000.00 9,200.00
JUMLAH TENAGA KERJA 299,600.00
B BAHAN
Kayu papan m3 0.015 3,715,000.00 55,725.00
Paku tripleks kg 0.01 33,000.00 330.00
JUMLAH HARGA BAHAN 56,055.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 355,655.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 35,565.50
F Harga Satuan Pekerjaan (D+E) 391,220.50

4.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.02 OH 0.05 190,000.00 9,500.00
Kepala tukang L.03 OH 0.005 230,000.00 1,150.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 26,800.00
B BAHAN
Gypsum board Lembar 0.364 100,000.00 36,400.00
Paku skrup kg 0.11 35,000.00 3,850.00
JUMLAH HARGA BAHAN 40,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,050.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,705.00
F Harga Satuan Pekerjaan (D+E) 73,755.00

4.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.5 150,000.00 75,000.00
Tukang Besi L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.025 230,000.00 5,750.00
JUMLAH TENAGA KERJA 187,250.00
B BAHAN
Profil Allum"T" m 3.6 15,000.00 54,000.00
Kawat dia 4 mm kg 0.15 85,000.00 12,750.00
Ramset Buah 1.05 750.00 787.50
Akustik60 x 120 Lembar 1.5 310,000.00 465,000.00
JUMLAH HARGA BAHAN 532,537.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 719,787.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 71,978.75
F Harga Satuan Pekerjaan (D+E) 791,766.25

4.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Tukang Kayu L.02 OH 0.05 190,000.00 9,500.00
Kepala tukang L.03 OH 0.005 230,000.00 1,150.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 18,840.00
B BAHAN
List kayu profil m 1.05 14,000.00 14,700.00
Paku kg 0.01 28,000.00 280.00
JUMLAH HARGA BAHAN 14,980.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,820.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 3,382.00
F Harga Satuan Pekerjaan (D+E) 37,202.00

4.4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40

Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)






m'
4.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

4.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.11 OH 0.0075 230,000.00 1,725.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 40,315.00
B BAHAN
Genteng palentong Bh 25 1,800.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,315.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,531.50
F Harga Satuan Pekerjaan (D+E) 93,846.50 m²

4.4.5.2.2. Pemasangan 1 m2 atap genteng kodok

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.11 OH 0.008 230,000.00 1,840.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 40,430.00
B BAHAN
Genteng kodok Bh 25 5,500.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 177,930.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,793.00
F Harga Satuan Pekerjaan (D+E) 195,723.00 m²

4.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.11 OH 0.008 230,000.00 1,840.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 40,430.00
B BAHAN
Genteng super Bh 18 3,900.00 70,200.00
JUMLAH HARGA BAHAN 70,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,630.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,063.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.11 OH 0.02 230,000.00 4,600.00
Mandor L.15 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 103,060.00
B BAHAN
Genteng bubung Bh 5 6,900.00 34,500.00
Semen Portlan Kg 8 1,700.00 13,600.00
Pasir pasang M3 0.032 225,000.00 7,200.00
JUMLAH HARGA BAHAN 55,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 158,360.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,836.00
F Harga Satuan Pekerjaan (D+E) 174,196.00 m'

4.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.11 OH 0.02 230,000.00 4,600.00
Mandor L.15 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 103,060.00
B BAHAN
Genteng bubung Bh 5 6,600.00 33,000.00
Semen Portlan Kg 8 1,700.00 13,600.00
Pasir pasang M3 0.032 225,000.00 7,200.00
JUMLAH HARGA BAHAN 53,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 156,860.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,686.00
F Harga Satuan Pekerjaan (D+E) 172,546.00 m'

4.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.11 OH 0.02 230,000.00 4,600.00
Mandor L.15 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 103,060.00
B BAHAN
Genteng bubung Bh 4 8,800.00 35,200.00
Semen Portlan Kg 8 1,700.00 13,600.00
Pasir pasang M3 0.032 225,000.00 7,200.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,060.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,906.00
F Harga Satuan Pekerjaan (D+E) 174,966.00 m'

4.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.067 190,000.00 12,730.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 36,950.00
B BAHAN
Rooflight 90x180 Lbr 0.6 125,000.00 75,000.00
Paku biasa ½”-1” Kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 76,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 113,600.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,360.00
F Harga Satuan Pekerjaan (D+E) 124,960.00 m²

4.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.11 OH 0.008 230,000.00 1,840.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 38,930.00
B BAHAN
Asbes gel 92x250 Lbr 0.5 96,600.00 48,300.00
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 53,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,630.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,263.00
F Harga Satuan Pekerjaan (D+E) 101,893.00 m²

4.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.11 OH 0.008 230,000.00 1,840.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 38,930.00
B BAHAN
Asbes gel 92x225 Lbr 0.6 77,280.00 46,368.00
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 51,768.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,698.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,069.80
F Harga Satuan Pekerjaan (D+E) 99,767.80 m²

4.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 92x200 Lbr 0.6 68,693.33 41,216.00
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 46,616.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 84,136.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,413.60
F Harga Satuan Pekerjaan (D+E) 92,549.60 m²

4.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 92x180 Lbr 0.75 69,000.00 51,750.00
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 57,150.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,670.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,467.00
F Harga Satuan Pekerjaan (D+E) 104,137.00 m²

4.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 105x300 Lbr 0.35 248,750.00 87,062.50
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 92,462.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 129,982.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,998.25
F Harga Satuan Pekerjaan (D+E) 142,980.75 m²

4.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 105x270 Lbr 0.42 165,833.33 69,650.00
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 75,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 112,570.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,257.00
F Harga Satuan Pekerjaan (D+E) 123,827.00 m²

4.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 105x240 Lbr 0.44 122,839.51 54,049.38
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 59,449.38
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,969.38


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,696.94
F Harga Satuan Pekerjaan (D+E) 106,666.32 m²

4.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 105x210 Lbr 0.51 102,366.26 52,206.79
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 57,606.79
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 95,126.79


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,512.68
F Harga Satuan Pekerjaan (D+E) 104,639.47 m²

4.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 105x150 Lbr 0.8 97,491.67 77,993.34
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 83,393.34
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 120,913.34


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,091.33
F Harga Satuan Pekerjaan (D+E) 133,004.67 m²

4.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 108x300 Lbr 0.37 -
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 5,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,920.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,292.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 108x300 Lbr 0.38 -
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 5,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,920.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,292.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 108x240 Lbr 0.46 -
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 5,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,920.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,292.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 108x210 Lbr 0.49 -
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 5,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,920.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,292.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Asbes gel 108x180 Lbr 0.57 -
Paku pancing 6x23 Kg 0.12 45,000.00 5,400.00
JUMLAH HARGA BAHAN 5,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,920.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,292.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Bubung stel gel. Lbr 2.4 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Bubung stel gel. Lbr 2.1 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Bubung stel gel. Lbr 2.05 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Nok paten 92cm Lbr 1.2 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Nok paten 105cm Lbr 1.2 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Nok paten 108cm Lbr 1.2 -
Paku skrup 3,5” Bh 6 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,260.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,026.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang Kayu L.03 OH 0.15 190,000.00 28,500.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 47,410.00
B BAHAN
Nok paten 92cm Lbr 1.1 135,000.00 148,500.00
Paku skrup 3,5” Bh 6 4,000.00 24,000.00
JUMLAH HARGA BAHAN 172,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 219,910.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 21,991.00
F Harga Satuan Pekerjaan (D+E) 241,901.00 m'

4.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 150,000.00 12,600.00
Tukang Kayu L.03 OH 0.125 190,000.00 23,750.00
Kepala tukang L.11 OH 0.013 230,000.00 2,990.00
Mandor L.15 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 40,260.00
B BAHAN
Nok paten 92cm Lbr 1.1 154,076.09 169,483.70
Paku skrup 3,5” Bh 6 4,000.00 24,000.00
JUMLAH HARGA BAHAN 193,483.70
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 233,743.70


E Overhead & Profit (Contoh 10 %) 0.10 x D 23,374.37
F Harga Satuan Pekerjaan (D+E) 257,118.07 m'

4.4.5.2.30. Pemasangan 1 m2 genteng beton

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Kayu L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.11 OH 0.01 230,000.00 2,300.00
Mandor L.15 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 53,600.00
B BAHAN
Genteng beton Bh 11 -
Paku biasa 2”-5” Kg 0.03 28,000.00 840.00
JUMLAH HARGA BAHAN 840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,440.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,444.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.31. Pemasangan 1 m2 genteng aspal

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Kayu L.03 OH 0.3 190,000.00 57,000.00
Kepala tukang L.11 OH 0.003 230,000.00 690.00
Mandor L.15 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 89,990.00
B BAHAN
Genteng aspal Bh 6.9 -
Plywood 6mm Lbr 0.35 -
Paku biasa ½”-1” Kg 0.03 33,000.00 990.00
Plastic aerator Bh 0.5 -
JUMLAH HARGA BAHAN 990.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,980.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,098.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.32. Pemasangan 1 m2 genteng metal

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang Kayu L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.11 OH 0.01 230,000.00 2,300.00
Mandor L.15 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 51,530.00
B BAHAN
Genteng metal Bh 1.02 -
Paku biasa ½”-1” Kg 0.2 33,000.00 6,600.00
JUMLAH HARGA BAHAN 6,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,130.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,813.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.33. Pemasangan 1 m2 atap sirap kayu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.166 150,000.00 24,900.00
Tukang Kayu L.03 OH 0.25 190,000.00 47,500.00
Kepala tukang L.11 OH 0.025 230,000.00 5,750.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 79,990.00
B BAHAN
Sirap kayu Bh 30 -
Paku biasa ½”-1” Kg 0.2 33,000.00 6,600.00
JUMLAH HARGA BAHAN 6,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 86,590.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,659.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.34. Pemasangan 1 m’ nok genteng beton

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang Kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.11 OH 0.02 230,000.00 4,600.00
Mandor L.15 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 107,200.00
B BAHAN
Nok genteng beton Bh 3.5 -
Paku biasa ½”-1” Kg 0.05 33,000.00 1,650.00
Semen PC Kg 10.8 1,700.00 18,360.00
Pasir pasang M3 0.032 225,000.00 7,200.00
Semen warna Kg 1 15,000.00 15,000.00
JUMLAH HARGA BAHAN 42,210.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,410.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,941.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.35. Pemasangan 1 m’ nok genteng aspal

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.125 150,000.00 18,750.00
Tukang Kayu L.03 OH 0.25 190,000.00 47,500.00
Kepala tukang L.11 OH 0.025 230,000.00 5,750.00
Mandor L.15 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 73,380.00
B BAHAN
Nok genteng aspal Bh 2 - -
Paku biasa ½”-1” Kg 0.05 33,000.00 1,650.00
Kayu balok borneo M3 0.0035 -
JUMLAH HARGA BAHAN 1,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,030.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,503.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.36. Pemasangan 1 m’ nok genteng metal

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang Kayu L.03 OH 0.15 190,000.00 28,500.00
Kepala tukang L.11 OH 0.015 230,000.00 3,450.00
Mandor L.15 OH 0.013 230,000.00 2,990.00
JUMLAH TENAGA KERJA 72,440.00
B BAHAN
Nok genteng metal Bh 1.1 70,000.00 77,000.00
Paku biasa ½”-1” Kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 78,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 151,090.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 15,109.00
F Harga Satuan Pekerjaan (D+E) 166,199.00 m'

4.4.5.2.37. Pemasangan 1 m’ nok sirap

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.125 150,000.00 18,750.00
Tukang Kayu L.03 OH 0.25 190,000.00 47,500.00
Kepala tukang L.11 OH 0.025 230,000.00 5,750.00
Mandor L.15 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 73,380.00
B BAHAN
Seng plat 3 x 6” Lbr 0.4 182,880.00 73,152.00
Paku biasa ½”-1” Kg 0.05 33,000.00 1,650.00
Paku biasa 2”-5” Kg 0.05 28,000.00 1,400.00
JUMLAH HARGA BAHAN 76,202.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,582.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,958.20
F Harga Satuan Pekerjaan (D+E) 164,540.20 m'

4.4.5.2.38. Pemasangan 1 m2 atap seng gelombang

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang Kayu L.03 OH 0.06 190,000.00 11,400.00
Kepala tukang L.11 OH 0.006 230,000.00 1,380.00
Mandor L.15 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 32,160.00
B BAHAN
Seng gel 3”x6” Lbr 0.7 182,880.00 128,016.00
Paku biasa ½”-1” Kg 0.02 33,000.00 660.00
JUMLAH HARGA BAHAN 128,676.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 160,836.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,083.60
F Harga Satuan Pekerjaan (D+E) 176,919.60 m²

4.4.5.2.39. Pemasangan 1 m’nok atap seng

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.07 190,000.00 13,300.00
Kepala tukang L.11 OH 0.007 230,000.00 1,610.00
Mandor L.15 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 38,790.00
B BAHAN
Seng plat 3”x6”bjls28 Lbr 0.3 182,880.00 54,864.00
Paku biasa ½”-1” Kg 0.04 33,000.00 1,320.00
JUMLAH HARGA BAHAN 56,184.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,974.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,497.40
F Harga Satuan Pekerjaan (D+E) 104,471.40 m'

4.4.5.2.40. Pemasangan 1 m2 atap alumunium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.75 190,000.00 142,500.00
Kepala tukang L.11 OH 0.08 230,000.00 18,400.00
Mandor L.15 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 184,780.00
B BAHAN
Almn gel tbl0,55 Lbr 1.05 -
Paku hak panj 15cm Kg 0.02 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 184,780.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,478.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.5.2.41. Pemasangan 1 m’ nok alumunium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang Kayu L.03 OH 1 190,000.00 190,000.00
Kepala tukang L.11 OH 0.1 230,000.00 23,000.00
Mandor L.15 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 239,500.00
B BAHAN
Nok standar 40x18 Bh 1.2 -
Paku hak panj 15cm Kg 0.04 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 239,500.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 23,950.00
F Harga Satuan Pekerjaan (D+E) - m'

4.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang Kayu L.03 OH 0.05 190,000.00 9,500.00
Kepala tukang L.11 OH 0.005 230,000.00 1,150.00
Mandor L.15 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 34,990.00
B BAHAN
Alumunium foil M2 1.05 13,000.00 13,650.00
JUMLAH HARGA BAHAN 13,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,640.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,864.00
F Harga Satuan Pekerjaan (D+E) 53,504.00 m²
4.4.6.1. HARGA SATUAN PEKERJAAN KAYU

4.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 7 150,000.00 1,050,000.00
Tukang kayu L.03 OH 21 190,000.00 3,990,000.00
Kepala tukang L.03 OH 2.1 230,000.00 483,000.00
Mandor L.04 OH 0.35 230,000.00 80,500.00
JUMLAH TENAGA KERJA 5,603,500.00
B BAHAN
Balok kayu m3 1.1 5,350,000.00 5,885,000.00
Paku 10 cm Kg 1.25 28,000.00 35,000.00
Lem kayu Kg 1 55,000.00 55,000.00
JUMLAH HARGA BAHAN 5,975,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 11,578,500.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,157,850.00
F Harga Satuan Pekerjaan (D+E) 12,736,350.00 m³

4.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6 150,000.00 900,000.00
Tukang kayu L.03 OH 18 190,000.00 3,420,000.00
Kepala tukang L.03 OH 1.8 230,000.00 414,000.00
Mandor L.04 OH 0.3 230,000.00 69,000.00
JUMLAH TENAGA KERJA 4,803,000.00
B BAHAN
Balok kayu II m3 1.2 4,250,000.00 5,100,000.00
Paku 10 cm Kg 1.25 28,000.00 35,000.00
Lem kayu Kg 1 55,000.00 55,000.00
JUMLAH HARGA BAHAN 5,190,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,993,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 999,300.00
F Harga Satuan Pekerjaan (D+E) 10,992,300.00 m³

4.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang kayu L.03 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.105 230,000.00 24,150.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 280,290.00
B BAHAN
Papan kayu m3 0.04 4,250,000.00 170,000.00
Paku 5 – 7 cm Kg 0.05 28,000.00 1,400.00
JUMLAH HARGA BAHAN 171,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 451,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 45,169.00
F Harga Satuan Pekerjaan (D+E) 496,859.00 m²

4.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.35 150,000.00 52,500.00
Tukang kayu L.03 OH 1.05 190,000.00 199,500.00
Kepala tukang L.03 OH 0.105 230,000.00 24,150.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 280,290.00
B BAHAN
Papan kayu m3 0.04 2,600,000.00 104,000.00
Paku 5 – 7 cm Kg 0.05 28,000.00 1,400.00
JUMLAH HARGA BAHAN 105,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 385,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 38,569.00
F Harga Satuan Pekerjaan (D+E) 424,259.00 m²

4.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang kayu L.03 OH 3 190,000.00 570,000.00
Kepala tukang L.03 OH 0.3 230,000.00 69,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 800,500.00
B BAHAN
Papan kayu II m3 0.04 4,250,000.00 170,000.00
Lem kayu Kg 0.5 55,000.00 27,500.00
JUMLAH HARGA BAHAN 197,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 998,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 99,800.00
F Harga Satuan Pekerjaan (D+E) 1,097,800.00 m²

4.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.8 150,000.00 120,000.00
Tukang kayu L.03 OH 2.4 190,000.00 456,000.00
Kepala tukang L.03 OH 0.24 230,000.00 55,200.00
Mandor L.04 OH 0.04 230,000.00 9,200.00
JUMLAH TENAGA KERJA 640,400.00
B BAHAN
Papan kayu II m3 0.024 4,250,000.00 102,000.00
Lem kayu Kg 0.3 55,000.00 16,500.00
JUMLAH HARGA BAHAN 118,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 758,900.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 75,890.00
F Harga Satuan Pekerjaan (D+E) 834,790.00 m²

4.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang kayu L.03 OH 3 190,000.00 570,000.00
Kepala tukang L.03 OH 0.3 230,000.00 69,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 800,500.00
B BAHAN
Papan kayu II m3 0.064 4,250,000.00 272,000.00
Lem kayu Kg 0.5 55,000.00 27,500.00
JUMLAH HARGA BAHAN 299,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,100,000.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 110,000.00
F Harga Satuan Pekerjaan (D+E) 1,210,000.00 m²

4.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.7 150,000.00 105,000.00
Tukang kayu L.03 OH 2.1 190,000.00 399,000.00
Kepala tukang L.03 OH 0.21 230,000.00 48,300.00
Mandor L.04 OH 0.035 230,000.00 8,050.00
JUMLAH TENAGA KERJA 560,350.00
B BAHAN
Papan kayu m3 0.025 4,250,000.00 106,250.00
Paku 1 cm – 2,5 cm kg 0.03 33,000.00 990.00
Lem kayu kg 0.5 55,000.00 27,500.00
Plywood tebal 4 mm Lembar 1 130,000.00 130,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 264,740.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 825,090.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 82,509.00
F Harga Satuan Pekerjaan (D+E) 907,599.00 m²

4.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.8 150,000.00 120,000.00
Tukang kayu L.03 OH 2.4 190,000.00 456,000.00
Kepala tukang L.03 OH 0.24 230,000.00 55,200.00
Mandor L.04 OH 0.04 230,000.00 9,200.00
JUMLAH TENAGA KERJA 640,400.00
B BAHAN
Papan kayu II m3 0.0256 4,250,000.00 108,800.00
Paku 1 cm – 2,5 cm kg 0.03 33,000.00 990.00
Lem kayu kg 0.5 55,000.00 27,500.00
Plywood 4 mm Lembar 1 130,000.00 130,000.00
(90 x 220) cm
JUMLAH HARGA BAHAN 267,290.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 907,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) 907,690.00 m²

4.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.67 150,000.00 100,500.00
Tukang kayu L.03 OH 2 190,000.00 380,000.00
Kepala tukang L.03 OH 0.2 230,000.00 46,000.00
Mandor L.04 OH 0.335 230,000.00 77,050.00
JUMLAH TENAGA KERJA 603,550.00
B BAHAN
Papan kayu II m3 0.06 4,250,000.00 255,000.00
Paku 1 – 2,5 cm kg 0.15 33,000.00 4,950.00
JUMLAH HARGA BAHAN 259,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 863,500.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 86,350.00
F Harga Satuan Pekerjaan (D+E) 949,850.00 m²

4.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.8 150,000.00 120,000.00
Tukang kayu L.03 OH 2.4 190,000.00 456,000.00
Kepala tukang L.03 OH 0.24 230,000.00 55,200.00
Mandor L.04 OH 0.04 230,000.00 9,200.00
JUMLAH TENAGA KERJA 640,400.00
B BAHAN
Papan kayu m3 0.025 5,350,000.00 133,750.00
Paku 1 – 2,5 cm kg 0.03 33,000.00 990.00
Lem kayu kg 0.3 55,000.00 16,500.00
Teakwood 4 mm 130,000.00 130,000.00
90 x 220 cm Lembar 1
JUMLAH HARGA BAHAN 281,240.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 921,640.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 92,164.00
F Harga Satuan Pekerjaan (D+E) 1,013,804.00 m²

4.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.85 150,000.00 127,500.00
Tukang kayu L.03 OH 2.55 190,000.00 484,500.00
Kepala tukang L.03 OH 0.255 230,000.00 58,650.00
Mandor L.04 OH 0.043 230,000.00 9,890.00
JUMLAH TENAGA KERJA 680,540.00
B BAHAN
Papan kayu m3 0.025 4,250,000.00 106,250.00
Paku 1 – 2,5 cm kg 0.03 33,000.00 990.00
Lem kayu kg 0.8 55,000.00 44,000.00
Teakwood 4 mm 130,000.00 130,000.00
90 x 220 cm Lembar 1
Formika Lembar 0.5 195,000.00 97,500.00
JUMLAH HARGA BAHAN 97,500.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 778,040.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 77,804.00
F Harga Satuan Pekerjaan (D+E) 855,844.00 m²

4.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4 150,000.00 600,000.00
Tukang kayu L.03 OH 12 190,000.00 2,280,000.00
Kepala tukang L.03 OH 1.2 230,000.00 276,000.00
Mandor L.04 OH 0.2 230,000.00 46,000.00
JUMLAH TENAGA KERJA 3,202,000.00
B BAHAN
Balok kayu II m3 1.1 4,250,000.00 4,675,000.00
Besi strip tebal kg 15 33,000.00 495,000.00
5mm
Paku 12 cm kg 5.6 28,000.00 156,800.00
JUMLAH HARGA BAHAN 5,326,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,528,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 852,880.00
F Harga Satuan Pekerjaan (D+E) 9,381,680.00 m³

4.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.7 150,000.00 1,005,000.00
Tukang kayu L.03 OH 20.1 190,000.00 3,819,000.00
Kepala tukang L.03 OH 2.01 230,000.00 462,300.00
Mandor L.04 OH 0.335 230,000.00 77,050.00
JUMLAH TENAGA KERJA 5,363,350.00
B BAHAN
Balok kayu m3 1.2 5,350,000.00 6,420,000.00
Besi strip tebal kg 15 33,000.00 495,000.00
5mm
Paku 12 cm kg 5.6 28,000.00 156,800.00
JUMLAH HARGA BAHAN 7,071,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 12,435,150.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,243,515.00
F Harga Satuan Pekerjaan (D+E) 13,678,665.00 m³

4.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.7 150,000.00 1,005,000.00
Tukang kayu L.03 OH 20.1 190,000.00 3,819,000.00
Kepala tukang L.03 OH 2.01 230,000.00 462,300.00
Mandor L.04 OH 0.335 230,000.00 77,050.00
JUMLAH TENAGA KERJA 5,363,350.00
B BAHAN
Balok kayu m3 1.1 4,250,000.00 4,675,000.00
Besi strip tebal 5 kg 15 33,000.00 495,000.00
mm
Paku 12 cm kg 3 28,000.00 84,000.00
JUMLAH HARGA BAHAN 5,254,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,617,350.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,061,735.00
F Harga Satuan Pekerjaan (D+E) 11,679,085.00 m³

4.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
1. Kaso-kaso 5 x 7cm m3 0.014 4,250,000.00 59,500.00
2. Reng 2 x 3 cm m3 0.0036 3,750,000.00 13,500.00
3. Paku 5 dan 10 cm kg 0.25 28,000.00 7,000.00
JUMLAH HARGA BAHAN 80,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 117,450.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,745.00
F Harga Satuan Pekerjaan (D+E) 129,195.00 m²

4.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.03 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 37,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 4,250,000.00 59,500.00
Reng (3 x 4) cm m3 0.0057 3,750,000.00 21,375.00
Paku 5 dan 10 cm kg 0.25 28,000.00 7,000.00
JUMLAH HARGA BAHAN 87,875.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,325.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 12,532.50
F Harga Satuan Pekerjaan (D+E) 137,857.50 m²

4.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.12 150,000.00 18,000.00
Tukang kayu L.03 OH 0.12 190,000.00 22,800.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 44,940.00
B BAHAN
Kayu kelas II m3 0.014 4,250,000.00 59,500.00
Paku 5 - 10 cm m3 0.057 28,000.00 1,596.00
JUMLAH HARGA BAHAN 61,096.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,476.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 6,247.60
F Harga Satuan Pekerjaan (D+E) 68,723.60 m²

4.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang kayu L.03 OH 0.3 190,000.00 57,000.00
Kepala tukang L.03 OH 0.03 230,000.00 6,900.00
Mandor L.04 OH 0.075 230,000.00 17,250.00
JUMLAH TENAGA KERJA 103,650.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 2,600,000.00 40,040.00
Paku 7 cm – 10 cm kg 0.2 28,000.00 5,600.00
JUMLAH HARGA BAHAN 45,640.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 62,890.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 6,289.00
F Harga Satuan Pekerjaan (D+E) 69,179.00 m²

4.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang kayu L.03 OH 0.3 190,000.00 57,000.00
Kepala tukang L.03 OH 0.03 230,000.00 6,900.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 96,200.00
B BAHAN
Kaso-kaso m3 0.0163 2,600,000.00 42,380.00
5 x 7 cm
Paku 7 – 10 cm kg 0.25 28,000.00 7,000.00
JUMLAH HARGA BAHAN 49,380.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 145,580.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,558.00
F Harga Satuan Pekerjaan (D+E) 160,138.00 m²

4.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 58,750.00
B BAHAN
Papan kayu II m3 0.0108 4,250,000.00 45,900.00
Paku 5 dan 7 cm kg 0.1 28,000.00 2,800.00

JUMLAH HARGA BAHAN 48,700.00


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,450.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,745.00
F Harga Satuan Pekerjaan (D+E) 118,195.00 m'

4.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.03 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 58,750.00
B BAHAN
Papan kayu II m3 0.011 4,250,000.00 46,750.00
Paku 5 dan 7 cm kg 0.05 28,000.00 1,400.00
JUMLAH HARGA BAHAN 48,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,900.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,690.00
F Harga Satuan Pekerjaan (D+E) 117,590.00 m'

4.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang kayu L.03 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 120,190.00
B BAHAN
Balok kayu III m3 0.028 2,600,000.00 72,800.00
Paku 5 dan 7 cm kg 0.15 28,000.00 4,200.00
JUMLAH HARGA BAHAN 77,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 197,190.00
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) 197,190.00 m²

4.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang kayu L.03 OH 0.45 190,000.00 85,500.00
Kepala tukang L.03 OH 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 120,190.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 4,250,000.00 119,000.00
Paku 5 dan 10 kg 0.15 28,000.00 4,200.00
Teakwood 4 mm, Lembar 0.86 220,000.00 189,200.00
120 x 240
Lem kayu kg 0.56 55,000.00 30,800.00
JUMLAH HARGA BAHAN 343,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 463,390.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 46,339.00
F Harga Satuan Pekerjaan (D+E) 509,729.00 m²

4.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.2 150,000.00 30,000.00
Tukang kayu L.03 OH 0.6 190,000.00 114,000.00
Kepala tukang L.03 OH 0.06 230,000.00 13,800.00
Mandor L.04 OH 0.01 230,000.00 2,300.00
JUMLAH TENAGA KERJA 160,100.00
B BAHAN
Balok kayu, m3 0.028 4,250,000.00 119,000.00
6 x 12
Paku kg 0.15 28,000.00 4,200.00
5 dan 10
Plywood 4 mm, Lembar 0.86 220,000.00 189,200.00
120 x 240
Lem kayu kg 0.56 55,000.00 30,800.00
JUMLAH HARGA BAHAN 343,200.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 503,300.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 50,330.00
F Harga Satuan Pekerjaan (D+E) 553,630.00 m²
4.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.6 150,000.00 90,000.00
Tukang kayu L.03 OH 1.8 190,000.00 342,000.00
Kepala tukang L.03 OH 0.18 230,000.00 41,400.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 480,300.00
B BAHAN
Papan kayu m3 0.007 5,350,000.00 37,450.00
Paku 5 dan 10 kg 0.1 28,000.00 2,800.00
Paku skrup 10 cm kg 0.15 35,000.00 5,250.00
JUMLAH HARGA BAHAN 45,500.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 525,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 52,580.00
F Harga Satuan Pekerjaan (D+E) 578,380.00 m²

4.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.025 150,000.00 3,750.00
Tukang kayu L.03 OH 0.075 190,000.00 14,250.00
Kepala tukang L.03 OH 0.008 230,000.00 1,840.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 20,070.00
B BAHAN
Plywood 4 mm m3 0.4 220,000.00 88,000.00
Paku 1 dan 2,5 kg 0.05 33,000.00 1,650.00
JUMLAH HARGA BAHAN 89,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,720.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,972.00
F Harga Satuan Pekerjaan (D+E) 120,692.00 m²

4.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV

Harga Satuan Jumlah

No Uraian Kode Satuan Koefisien


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.03 OH 0.05 190,000.00 9,500.00
Kepala tukang L.03 OH 0.005 230,000.00 1,150.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 26,800.00
B BAHAN
Bilik bambu m2 1.5 50,000.00 75,000.00
Kaso-kaso 5 x 7 m3 0.014 2,600,000.00 36,400.00
Paku kg 0.012 28,000.00 336.00
List kayu 2/4 m3 0.003 8,500.00 25.50
JUMLAH HARGA BAHAN 111,761.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,561.50
E Overhead & Profit (Contoh 10 %) 0.10 x D 13,856.15
F Harga Satuan Pekerjaan (D+E) 152,417.65 m²
4.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

4.4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang kayu L.02 OH 0.6 190,000.00 114,000.00
Kepala tukang L.03 OH 0.06 230,000.00 13,800.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 137,490.00
B BAHAN
Kunci tanam antik Bh 1 555,000.00 555,000.00
JUMLAH HARGA BAHAN 555,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 692,490.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 69,249.00
F Harga Satuan Pekerjaan (D+E) 761,739.00 bh

4.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.01 150,000.00 1,500.00
Tukang kayu L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 109,150.00
B BAHAN
Kunci tanam biasa Bh 1 165,000.00 165,000.00
JUMLAH HARGA BAHAN 165,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 274,150.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 27,415.00
F Harga Satuan Pekerjaan (D+E) 301,565.00 bh

4.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 150,000.00 750.00
Tukang kayu L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 107,940.00
B BAHAN
Kunci tanam KM Bh 1 137,000.00 137,000.00
JUMLAH HARGA BAHAN 137,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 244,940.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 24,494.00
F Harga Satuan Pekerjaan (D+E) 269,434.00 bh

4.4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 150,000.00 750.00
Tukang kayu L.02 OH 0.5 190,000.00 95,000.00
Kepala tukang L.03 OH 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 107,940.00
B BAHAN
Kunci silinder Bh 1 64,000.00 64,000.00
JUMLAH HARGA BAHAN 64,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,940.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 17,194.00
F Harga Satuan Pekerjaan (D+E) 189,134.00 bh

4.4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.0008 230,000.00 184.00
JUMLAH TENAGA KERJA 34,384.00
B BAHAN
Engsel pintu Bh 1 21,000.00 21,000.00
JUMLAH HARGA BAHAN 21,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,384.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,538.40
F Harga Satuan Pekerjaan (D+E) 60,922.40 bh

4.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.01 150,000.00 1,500.00
Tukang kayu L.02 OH 0.1 190,000.00 19,000.00
Kepala tukang L.03 OH 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.0005 230,000.00 115.00
JUMLAH TENAGA KERJA 22,915.00
B BAHAN
Engsel kupu-kupu Bh 1 10,500.00 10,500.00
JUMLAH HARGA BAHAN 10,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,415.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 3,341.50
F Harga Satuan Pekerjaan (D+E) 36,756.50 bh

4.4.6.2.7. Pemasangan 1 buah engsel angin

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Tukang kayu L.02 0.2 190,000.00 38,000.00
Kepala tukang L.03 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.0005 230,000.00 115.00
JUMLAH TENAGA KERJA 57,715.00
B BAHAN
Engsel angin Bh 1 7,000.00 7,000.00
JUMLAH HARGA BAHAN 7,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 64,715.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 6,471.50
F Harga Satuan Pekerjaan (D+E) 71,186.50 bh

4.4.6.2.8. Pemasangan 1 buah spring knip

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 0.15 190,000.00 28,500.00
Kepala tukang L.03 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 36,040.00
B BAHAN
Spring knip Bh 1 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,040.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 3,604.00
F Harga Satuan Pekerjaan (D+E) - bh

4.4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 0.15 190,000.00 28,500.00
Kepala tukang L.03 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 36,040.00
B BAHAN
Kait angin Bh 1 10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,040.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,604.00
F Harga Satuan Pekerjaan (D+E) 50,644.00 bh

4.4.6.2.10. Pemasangan 1 buah door closer


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Tukang kayu L.02 0.5 190,000.00 95,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 114,690.00
B BAHAN
Door closer set 1 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 359,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 35,969.00
F Harga Satuan Pekerjaan (D+E) 395,659.00 bh

4.4.6.2.11. Pemasangan 1 buah kunci slot

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 150,000.00 3,000.00
Tukang kayu L.02 0.2 190,000.00 38,000.00
Kepala tukang L.03 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.001 230,000.00 230.00
JUMLAH TENAGA KERJA 45,830.00
B BAHAN
Kunci slot Bh 1 137,000.00 137,000.00
JUMLAH HARGA BAHAN 137,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 182,830.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,283.00
F Harga Satuan Pekerjaan (D+E) 201,113.00 bh

4.4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Tukang kayu L.02 0.5 190,000.00 95,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 114,690.00
B BAHAN
Door holder Bh 1 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 359,690.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 35,969.00
F Harga Satuan Pekerjaan (D+E) 395,659.00 bh

4.4.6.2.13. Pemasangan 1 buah door stop

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.01 150,000.00 1,500.00
Tukang kayu L.02 0.1 190,000.00 19,000.00
Kepala tukang L.03 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 23,950.00
B BAHAN
Door stop Bh 1 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 88,950.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,895.00
F Harga Satuan Pekerjaan (D+E) 97,845.00 bh

4.4.6.2.14. Pemasangan 1 buah rel pintu sorong

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang kayu L.02 0.6 190,000.00 114,000.00
Kepala tukang L.03 0.06 230,000.00 13,800.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 137,490.00
B BAHAN
Rel pintu sorong Set 1 42,000.00 42,000.00
JUMLAH HARGA BAHAN 42,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 179,490.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 17,949.00
F Harga Satuan Pekerjaan (D+E) 197,439.00 bh

4.4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.025 150,000.00 3,750.00
Tukang kayu L.02 0.25 190,000.00 47,500.00
Kepala tukang L.03 0.025 230,000.00 5,750.00
Mandor L.04 OH 0.0013 230,000.00 299.00
JUMLAH TENAGA KERJA 57,299.00
B BAHAN
Kunci lemari Set 1 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,299.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 5,729.90
F Harga Satuan Pekerjaan (D+E) - bh

4.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 0.15 190,000.00 28,500.00
Kepala tukang L.03 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.0008 230,000.00 184.00
JUMLAH TENAGA KERJA 34,384.00
B BAHAN
Kaca tebal 3mm m2 1.1 115,000.00 126,500.00
SEalant Kg 0.05 35,000.00 1,750.00
JUMLAH HARGA BAHAN 128,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,634.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 16,263.40
F Harga Satuan Pekerjaan (D+E) 178,897.40 m²
4.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.0008 230,000.00 184.00
JUMLAH TENAGA KERJA 34,384.00
B BAHAN
Kaca tebal 5 mm m2 1.1 170,000.00 187,000.00
SEalant Kg 0.05 35,000.00 1,750.00
JUMLAH HARGA BAHAN 188,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 223,134.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 22,313.40
F Harga Satuan Pekerjaan (D+E) 245,447.40 m²

4.4.6.2.17.A. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.0008 230,000.00 184.00
JUMLAH TENAGA KERJA 34,384.00
B BAHAN
Kaca tebal 5 mm m2 1.1 150,000.00 165,000.00
SEalant Kg 0.05 35,000.00 1,750.00
JUMLAH HARGA BAHAN 166,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 201,134.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 20,113.40
F Harga Satuan Pekerjaan (D+E) 221,247.40 m²

4.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.017 150,000.00 2,550.00
Tukang kayu L.02 OH 0.17 190,000.00 32,300.00
Kepala tukang L.03 OH 0.017 230,000.00 3,910.00
Mandor L.04 OH 0.0009 230,000.00 207.00
JUMLAH TENAGA KERJA 38,967.00
B BAHAN
Kaca tebal 8 mm m2 1.1 200,000.00 220,000.00
SEalant Kg 0.07 35,000.00 2,450.00
JUMLAH HARGA BAHAN 222,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 261,417.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 26,141.70
F Harga Satuan Pekerjaan (D+E) 287,558.70 m²

4.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.025 150,000.00 3,750.00
Tukang kayu L.02 OH 0.25 190,000.00 47,500.00
Kepala tukang L.03 OH 0.025 230,000.00 5,750.00
Mandor L.04 OH 0.0013 230,000.00 299.00
JUMLAH TENAGA KERJA 57,299.00
B BAHAN
Kaca buram 12 mm m2 1.1 -
SEalant Kg 0.07 35,000.00 2,450.00
JUMLAH HARGA BAHAN 2,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,749.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 5,974.90
F Harga Satuan Pekerjaan (D+E) - m²

4.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 36,040.00
B BAHAN
Kaca cermin 5 mm m2 1.1 135,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 184,540.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,454.00
F Harga Satuan Pekerjaan (D+E) 202,994.00 m²

4.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.017 150,000.00 2,550.00
Tukang kayu L.02 OH 0.17 190,000.00 32,300.00
Kepala tukang L.03 OH 0.017 230,000.00 3,910.00
Mandor L.04 OH 0.009 230,000.00 2,070.00
JUMLAH TENAGA KERJA 40,830.00
B BAHAN
Kaca cermin 8 mm m2 1.1 169,000.00 185,900.00
JUMLAH HARGA BAHAN 185,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 226,730.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 22,673.00
F Harga Satuan Pekerjaan (D+E) 249,403.00 m²

4.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 150,000.00 2,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 36,040.00
B BAHAN
Kaca wireglassed 5 mm m2 1.1 -

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,040.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 3,604.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.075 150,000.00 11,250.00
Tukang kayu L.02 OH 0.15 190,000.00 28,500.00
Kepala tukang L.03 OH 0.015 230,000.00 3,450.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 44,120.00
B BAHAN
Kaca patri 5mm m2 1.1 170,000.00 187,000.00
Sealant Kg 0.05 35,000.00 1,750.00
JUMLAH HARGA BAHAN 188,750.00

C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 232,870.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 23,287.00
F Harga Satuan Pekerjaan (D+E) - m²
4.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

4.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 23,190.00
B BAHAN
Soda api Kg 0.05 66,000.00 3,300.00
JUMLAH HARGA BAHAN 3,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 26,490.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,649.00
F Harga Satuan Pekerjaan (D+E) 29,139.00 m²

4.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 23,190.00
B BAHAN
Sabun Kg 0.05 20,000.00 1,000.00
JUMLAH HARGA BAHAN 1,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,190.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,419.00
F Harga Satuan Pekerjaan (D+E) 26,609.00 m²

4.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Mandor L.04 OH 0.008 230,000.00 1,840.00
JUMLAH TENAGA KERJA 24,340.00
B BAHAN
Sabun Kg 0.05 20,000.00 1,000.00
JUMLAH HARGA BAHAN 1,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,340.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,534.00
F Harga Satuan Pekerjaan (D+E) 27,874.00 m²

4.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 150,000.00 10,500.00
Tukang cat L.02 OH 0.009 190,000.00 1,710.00
Kepala tukang L.03 OH 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 14,280.00
B BAHAN
Cat menie Kg 0.2 35,000.00 7,000.00
Plamuur Kg 0.15 29,000.00 4,350.00
Cat dasar Kg 0.17 72,000.00 12,240.00
Cat penutup Kg 0.26 72,000.00 18,720.00
Kuas Bh 0.01 25,000.00 250.00
Pengencer Kg 0.03 39,000.00 1,170.00
Ampelas Lbr 0.2 9,000.00 1,800.00
JUMLAH HARGA BAHAN 45,530.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,810.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,981.00
F Harga Satuan Pekerjaan (D+E) 65,791.00 m²

4.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 150,000.00 10,500.00
Tukang cat L.02 OH 0.105 190,000.00 19,950.00
Kepala tukang L.03 OH 0.004 230,000.00 920.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 32,060.00
B BAHAN
Cat menie Kg 0.2 35,000.00 7,000.00
Plamuur Kg 0.15 29,000.00 4,350.00
Cat dasar Kg 0.17 72,000.00 12,240.00
Cat penutup Kg 0.35 72,000.00 25,200.00
Kuas Bh 0.01 25,000.00 250.00
Pengencer Kg 0.03 39,000.00 1,170.00
Ampelas Lbr 0.2 9,000.00 1,800.00
JUMLAH HARGA BAHAN 52,010.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 84,070.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,407.00
F Harga Satuan Pekerjaan (D+E) 92,477.00 m²

4.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 150,000.00 6,000.00
Tukang cat L.02 OH 0.063 190,000.00 11,970.00
Kepala tukang L.03 OH 0.063 230,000.00 14,490.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 33,150.00
B BAHAN
Teak oil L 0.36 25,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,150.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,215.00
F Harga Satuan Pekerjaan (D+E) 46,365.00 m²

4.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 150,000.00 6,000.00
Tukang cat L.02 OH 0.06 190,000.00 11,400.00
Kepala tukang L.03 OH 0.016 230,000.00 3,680.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 21,770.00
B BAHAN
Politur L 0.15 37,000.00 5,550.00
Politur jadi L 0.372 37,000.00 13,764.00
Ampelas Lbr 2 9,000.00 18,000.00
JUMLAH HARGA BAHAN 37,314.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,084.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,908.40
F Harga Satuan Pekerjaan (D+E) 64,992.40 m²

4.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.1 150,000.00 15,000.00
Mandor L.04 OH 0.006 230,000.00 1,380.00
JUMLAH TENAGA KERJA 16,380.00
B BAHAN
Residu atau ter L 0.35 25,000.00 8,750.00
JUMLAH HARGA BAHAN 8,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,130.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 2,513.00
F Harga Satuan Pekerjaan (D+E) 27,643.00 m²

4.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.16 150,000.00 24,000.00
Tukang cat L.02 OH 0.16 190,000.00 30,400.00
Kepala tukang L.03 OH 0.016 230,000.00 3,680.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 58,770.00
B BAHAN
Vernis L 0.15 37,000.00 5,550.00
Dempul Kg 0.05 29,000.00 1,450.00
Ampelas Lbr 0.1 9,000.00 900.00
JUMLAH HARGA BAHAN 7,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,670.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 6,667.00
F Harga Satuan Pekerjaan (D+E) 73,337.00 m²

4.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 150,000.00 3,000.00
Tukang cat L.02 OH 0.063 190,000.00 11,970.00
Kepala tukang L.03 OH 0.0063 230,000.00 1,449.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 17,109.00
B BAHAN
Plamuur Kg 0.1 50,000.00 5,000.00
Cat dasar Kg 0.1 35,000.00 3,500.00
Cat penutup Kg 0.26 35,000.00 9,100.00
JUMLAH HARGA BAHAN 17,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,709.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 3,470.90
F Harga Satuan Pekerjaan (D+E) 38,179.90 m²

4.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.028 150,000.00 4,200.00
Tukang cat L.02 OH 0.042 190,000.00 7,980.00
Kepala tukang L.03 OH 0.0042 230,000.00 966.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 13,836.00
B BAHAN
Cat dasar Kg 0.12 35,000.00 4,200.00
Cat penutup Kg 0.18 35,000.00 6,300.00
JUMLAH HARGA BAHAN 10,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 24,336.00
E Overhead & Profit (Contoh 10 %) 0.10 x D 2,433.60
F Harga Satuan Pekerjaan (D+E) 26,769.60 m²

4.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.028 150,000.00 4,200.00
Tukang cat L.02 OH 0.042 190,000.00 7,980.00
Kepala tukang L.03 OH 0.0042 230,000.00 966.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 13,836.00
B BAHAN
Kalkarium Kg 0.1 5,200.00 520.00
JUMLAH HARGA BAHAN 520.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 14,356.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 1,435.60
F Harga Satuan Pekerjaan (D+E) 15,791.60 m²

4.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 150,000.00 22,500.00
Tukang cat L.02 OH 0.001 190,000.00 190.00
Kepala tukang L.03 OH 0.0001 230,000.00 23.00
Mandor L.04 OH 0.0025 230,000.00 575.00
JUMLAH TENAGA KERJA 23,288.00
B BAHAN
Kapur sirih Kg 0.15 2,000.00 300.00
Ampelas Lbr 0.1 9,000.00 900.00
Alang-alang Ikat 0.25 - -
JUMLAH HARGA BAHAN 1,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,488.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 2,448.80
F Harga Satuan Pekerjaan (D+E) - m²
4.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 150,000.00 6,000.00
Tukang cat L.02 OH 0.005 190,000.00 950.00
Kepala tukang L.03 OH 0.0005 230,000.00 115.00
Mandor L.04 OH 0.0025 230,000.00 575.00
JUMLAH TENAGA KERJA 7,640.00
B BAHAN
Kapur sirih Kg 0.3 2,000.00 600.00
Ampelas Lbr 0.2 9,000.00 1,800.00
Alang-alang Ikat 0.25 - -
JUMLAH HARGA BAHAN 2,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,040.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 1,004.00
F Harga Satuan Pekerjaan (D+E) - m²

4.4.7.1.15. Pemasangan 1 m2 wallpaper

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 150,000.00 3,000.00
Tukang cat L.02 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.0025 230,000.00 575.00
JUMLAH TENAGA KERJA 46,175.00
B BAHAN
Wall paper m2 1.2 50,000.00 60,000.00
Lem Kg 0.2 55,000.00 11,000.00
JUMLAH HARGA BAHAN 71,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 117,175.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,717.50
F Harga Satuan Pekerjaan (D+E) 128,892.50 m²

4.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 150,000.00 3,000.00
Tukang cat L.02 OH 0.2 190,000.00 38,000.00
Kepala tukang L.03 OH 0.02 230,000.00 4,600.00
Mandor L.04 OH 0.0025 230,000.00 575.00
JUMLAH TENAGA KERJA 46,175.00
B BAHAN
Menie besi Kg 0.1 35,000.00 3,500.00
Kwas Bh 0.01 25,000.00 250.00
JUMLAH HARGA BAHAN 3,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,925.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,992.50
F Harga Satuan Pekerjaan (D+E) 54,917.50 m²

4.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang cat L.02 OH 0.225 190,000.00 42,750.00
Kepala tukang L.02 OH 0.0225 230,000.00 5,175.00
Mandor L.04 OH 0.0075 230,000.00 1,725.00
JUMLAH TENAGA KERJA 87,150.00
B BAHAN
Menie besi Kg 0.1 35,000.00 3,500.00
Pengencer L 0.01 39,000.00 390.00
Kwas Bh 0.01 25,000.00 250.00
Perancah kayu m3 0.002 2,600,000.00 5,200.00
JUMLAH HARGA BAHAN 9,340.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,490.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,649.00
F Harga Satuan Pekerjaan (D+E) 106,139.00 m²

4.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.25 150,000.00 37,500.00
Tukang cat L.02 OH 0.25 190,000.00 47,500.00
Kepala tukang L.03 OH 0.025 230,000.00 5,750.00
Mandor L.04 OH 0.0013 230,000.00 299.00
JUMLAH TENAGA KERJA 91,049.00
B BAHAN
Menie A Kg 0.1 35,000.00 3,500.00
Menie B Kg 0.1 35,000.00 3,500.00
Cat Kg 0.08 70,000.00 5,600.00
Kwas Bh 0.01 25,000.00 250.00
Pengencer L 0.01 39,000.00 390.00
JUMLAH HARGA BAHAN 13,240.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,289.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 10,428.90
F Harga Satuan Pekerjaan (D+E) 114,717.90 m²

4.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang cat L.02 OH 0.06 190,000.00 11,400.00
Kepala tukang L.03 OH 0.012 230,000.00 2,760.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 23,850.00
B BAHAN
Cat Kg 0.3 70,000.00 21,000.00
Kwas Bh 0.01 25,000.00 250.00
Pengencer L 0.01 39,000.00 390.00
JUMLAH HARGA BAHAN 21,640.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,490.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,549.00
F Harga Satuan Pekerjaan (D+E) 50,039.00 m²

4.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang cat L.02 OH 0.8 190,000.00 152,000.00
Kepala tukang L.03 OH 0.08 230,000.00 18,400.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 235,000.00
B BAHAN
Cat dasar Kg 0.11 70,000.00 7,700.00
Cat antara Kg 0.17 70,000.00 11,900.00
Cat penutup Kg 0.08 70,000.00 5,600.00
Kwas Bh 0.01 25,000.00 250.00
Pengencer L 0.01 39,000.00 390.00
JUMLAH HARGA BAHAN 25,840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 260,840.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 26,084.00
F Harga Satuan Pekerjaan (D+E) 286,924.00 m²

4.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 150,000.00 60,000.00
Tukang cat L.02 OH 0.7 190,000.00 133,000.00
Kepala tukang L.03 OH 0.07 230,000.00 16,100.00
Mandor L.04 OH 0.02 230,000.00 4,600.00
JUMLAH TENAGA KERJA 213,700.00
B BAHAN
Cat dasar Kg 0.3 70,000.00 21,000.00
Pengencer L 0.01 39,000.00 390.00
JUMLAH HARGA BAHAN 21,390.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 235,090.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 23,509.00
F Harga Satuan Pekerjaan (D+E) 258,599.00 m²
5.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

5.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.3 150,000.00 495,000.00
Tukang batu L.02 1.1 190,000.00 209,000.00
Kepala tukang L.03 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.16 230,000.00 36,800.00
JUMLAH TENAGA KERJA 743,100.00
B BAHAN
Closet duduk Unit 1 3,660,000.00 3,660,000.00
Perlengkapan Ls 6% x 3,660,000.00 219,600.00
closet
JUMLAH HARGA BAHAN 4,622,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 5,365,800.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 536,580.00
F Harga Satuan Pekerjaan (D+E) 5,902,380.00 bh

5.5.1.1 2. Pemasangan 1 buah closet jongkok porslen

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang batu L.02 1.5 190,000.00 285,000.00
Kepala tukang L.03 0.15 230,000.00 34,500.00
Mandor L.04 OH 0.16 230,000.00 36,800.00
JUMLAH TENAGA KERJA 506,300.00
B BAHAN
Closet jongkok Unit 1 260,000.00 260,000.00
Semen Portland Kg 6 1,700.00 10,200.00
Pasir pasang M3 0.01 225,000.00 2,250.00
JUMLAH HARGA BAHAN 272,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 778,750.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 77,875.00
F Harga Satuan Pekerjaan (D+E) 856,625.00 bh
5.5.1.1 3. Pemasangan 1 buah closet jongkok teraso

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang batu L.02 1.5 190,000.00 285,000.00
Kepala tukang L.03 0.15 230,000.00 34,500.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 481,000.00
B BAHAN
Closet jongkok Unit 1 126,000.00 126,000.00
Semen Portland Kg 6 1,700.00 10,200.00
Pasir pasang M3 0.01 225,000.00 2,250.00
Bata merah Bh 7 850.00 5,950.00
JUMLAH HARGA BAHAN 144,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 625,400.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 62,540.00
F Harga Satuan Pekerjaan (D+E) 687,940.00 bh

5.5.1.1 4. Pemasangan 1 buah urinoir

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1 150,000.00 150,000.00
Tukang batu L.02 1 190,000.00 190,000.00
Kepala tukang L.03 0.1 230,000.00 23,000.00
Mandor L.04 OH 0.05 230,000.00 11,500.00
JUMLAH TENAGA KERJA 374,500.00
B BAHAN
Urinoir Unit 1 126,000.00 126,000.00
Semen Portland Kg 6 1,700.00 10,200.00
Pasir pasang M3 0.01 225,000.00 2,250.00
Perlengkapan % 30 126,000.00 37,800.00
JUMLAH HARGA BAHAN 176,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 550,750.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 55,075.00
F Harga Satuan Pekerjaan (D+E) 605,825.00 bh

5.5.1.1 5. Pemasangan 1 buah wastafel

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.2 150,000.00 180,000.00
Tukang batu L.02 1.45 190,000.00 275,500.00
Kepala tukang L.03 0.15 230,000.00 34,500.00
Mandor L.04 OH 0.06 230,000.00 13,800.00
JUMLAH TENAGA KERJA 503,800.00
B BAHAN
Wastafel Unit 1.2 2,400,000.00 2,880,000.00
Semen Portland Kg 6 1,700.00 10,200.00
Pasir pasang M3 0.01 225,000.00 2,250.00
Perlengkapan % 12 2,400,000.00 288,000.00
JUMLAH HARGA BAHAN 3,180,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,684,250.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 368,425.00
F Harga Satuan Pekerjaan (D+E) 4,052,675.00 bh

5.5.1.1 6. Pemasangan 1 buah bathcuip porselen

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.075 150,000.00 11,250.00
Tukang batu L.02 0.75 190,000.00 142,500.00
Kepala tukang L.03 0.075 230,000.00 17,250.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 171,690.00
B BAHAN
Bathcup Unit 1 6,800,000.00 6,800,000.00
Perlengkapan % 20 6,800,000.00 1,360,000.00
JUMLAH HARGA BAHAN 8,160,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,331,690.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 833,169.00
F Harga Satuan Pekerjaan (D+E) 9,164,859.00 bh
5.5.1.1 7. Pemasangan 1 buah bak fibreglass vol 1 m3

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3 150,000.00 450,000.00
Tukang batu L.02 4.5 190,000.00 855,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.9 230,000.00 207,000.00
JUMLAH TENAGA KERJA 1,523,500.00
B BAHAN
Bak fibreglass Unit 1 1,250,000.00 1,250,000.00
Perlengkapan % 12 1,250,000.00 150,000.00
JUMLAH HARGA BAHAN 1,400,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,923,500.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 292,350.00
F Harga Satuan Pekerjaan (D+E) 3,215,850.00 bh

5.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6 150,000.00 900,000.00
Tukang batu L.02 3 190,000.00 570,000.00
Kepala tukang L.03 0.3 230,000.00 69,000.00
Mandor L.04 OH 0.03 230,000.00 6,900.00
JUMLAH TENAGA KERJA 1,545,900.00
B BAHAN
Bata merah M3 150 850.00 127,500.00
Semen portlan Kg 120 1,700.00 204,000.00
Pasir pasang M3 0.3 225,000.00 67,500.00
Porselen 11x11 bh 360 1,694.00 609,840.00
Semen warna Kg 6 15,000.00 90,000.00
JUMLAH HARGA BAHAN 1,098,840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,644,740.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 264,474.00
F Harga Satuan Pekerjaan (D+E) 2,909,214.00 bh
5.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3 150,000.00 450,000.00
Tukang batu L.02 4.5 190,000.00 855,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.9 230,000.00 207,000.00
JUMLAH TENAGA KERJA 1,523,500.00
B BAHAN
Bak teraso Unit 1 485,000.00 485,000.00
Perlengkapan % 12 485,000.00 58,200.00
JUMLAH HARGA BAHAN 543,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,066,700.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 206,670.00
F Harga Satuan Pekerjaan (D+E) 2,273,370.00 bh

5.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.3 150,000.00 45,000.00
Tukang batu L.02 0.45 190,000.00 85,500.00
Kepala tukang L.03 0.045 230,000.00 10,350.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 144,300.00
B BAHAN
Bak air fibreglass Unit 1 525,000.00 525,000.00
Perlengkapan % 12 525,000.00 63,000.00
JUMLAH HARGA BAHAN 588,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 732,300.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 73,230.00
F Harga Satuan Pekerjaan (D+E) 805,530.00 bh

5.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.5 150,000.00 525,000.00
Tukang batu L.02 4.5 190,000.00 855,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.018 230,000.00 4,140.00
JUMLAH TENAGA KERJA 1,395,640.00
B BAHAN
Beton 1:2:3 M3 0.9 2,474,035.14 2,226,631.63
Baja tulangan Kg 180 16,000.00 2,880,000.00
Kayu bekisting M2 8 52,000.00 416,000.00
Ubin porselen Bh 500 140,000.00 70,000,000.00
Perlengkapan % 10 70,000,000.00 7,000,000.00
JUMLAH HARGA BAHAN 82,522,631.63
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,918,271.63


E Overhead & Profit (Contoh 10 %) 0.10 x D 8,391,827.16
F Harga Satuan Pekerjaan (D+E) - bh

5.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.03 150,000.00 4,500.00
Tukang batu L.02 0.3 190,000.00 57,000.00
Kepala tukang L.03 0.03 230,000.00 6,900.00
Mandor L.04 OH 0.015 230,000.00 3,450.00
JUMLAH TENAGA KERJA 71,850.00
B BAHAN
Bak cuci piring Unit 1 530,000.00 530,000.00
Waterdrain Bh 1 27,000.00 27,000.00
JUMLAH HARGA BAHAN 557,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 628,850.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 62,885.00
F Harga Satuan Pekerjaan (D+E) 691,735.00 bh

5.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 150,000.00 7,500.00
Tukang batu L.02 0.5 190,000.00 95,000.00
Kepala tukang L.03 0.05 230,000.00 11,500.00
Mandor L.04 OH 0.025 230,000.00 5,750.00
JUMLAH TENAGA KERJA 119,750.00
B BAHAN
Bak cuci piring Unit 1 530,000.00 530,000.00
Waterdrain Bh 1 27,000.00 27,000.00
Semen portland Kg 20 1,700.00 34,000.00
Pasir pasang M3 0.05 225,000.00 11,250.00
JUMLAH HARGA BAHAN 602,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 722,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 72,200.00
F Harga Satuan Pekerjaan (D+E) 794,200.00 bh

5.5.1.1 14. Pemasangan 1 buah floor drain

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.01 150,000.00 1,500.00
Tukang batu L.02 0.1 190,000.00 19,000.00
Kepala tukang L.03 0.01 230,000.00 2,300.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 23,950.00
B BAHAN
Floor drain Unit 1 27,000.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,950.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,095.00
F Harga Satuan Pekerjaan (D+E) 56,045.00 bh

5.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.16 150,000.00 324,000.00
Tukang batu L.02 0.72 190,000.00 136,800.00
Kepala tukang L.03 0.072 230,000.00 16,560.00
Mandor L.04 OH 0.011 230,000.00 2,530.00
JUMLAH TENAGA KERJA 479,890.00
B BAHAN
Bata merah bh 40 850.00 34,000.00
Semen portland Kg 44 1,700.00 74,800.00
Pasir pasang M3 0.07 225,000.00 15,750.00
Pasir beton M3 0.06 355,000.00 21,300.00
Kerikil M3 0.07 570,000.00 39,900.00
Baja tulangan Kg 1.6 16,000.00 25,600.00
JUMLAH HARGA BAHAN 211,350.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 691,240.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 69,124.00
F Harga Satuan Pekerjaan (D+E) 760,364.00 bh

5.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.2 150,000.00 480,000.00
Tukang batu L.02 1.15 190,000.00 218,500.00
Kepala tukang L.03 0.011 230,000.00 2,530.00
Mandor L.04 OH 0.016 230,000.00 3,680.00
JUMLAH TENAGA KERJA 704,710.00
B BAHAN
Bata merah bh 70 850.00 59,500.00
Semen portland Kg 77 1,700.00 130,900.00
Pasir pasang M3 0.13 225,000.00 29,250.00
Pasir beton M3 0.09 355,000.00 31,950.00
Kerikil M3 0.02 570,000.00 11,400.00
Baja tulangan Kg 2.6 16,000.00 41,600.00
JUMLAH HARGA BAHAN 304,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,009,310.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 100,931.00
F Harga Satuan Pekerjaan (D+E) 1,110,241.00 bh
5.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.2 150,000.00 480,000.00
Tukang batu L.02 1.15 190,000.00 218,500.00
Kepala tukang L.03 0.011 230,000.00 2,530.00
Mandor L.04 OH 0.016 230,000.00 3,680.00
JUMLAH TENAGA KERJA 704,710.00
B BAHAN
Bata merah bh 123 850.00 104,550.00
Semen portland Kg 114 1,700.00 193,800.00
Pasir pasang M3 0.184 225,000.00 41,400.00
Pasir beton M3 0.12 355,000.00 42,600.00
Kerikil M3 0.033 570,000.00 18,810.00
Baja tulangan Kg 4.85 16,000.00 77,600.00
JUMLAH HARGA BAHAN 478,760.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,183,470.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 118,347.00
F Harga Satuan Pekerjaan (D+E) 1,301,817.00 bh

5.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 150,000.00 8,100.00
Tukang batu L.02 0.09 190,000.00 17,100.00
Kepala tukang L.03 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.027 230,000.00 6,210.00
JUMLAH TENAGA KERJA 33,480.00
B BAHAN
Pipa galvanis ½” M 1.2 7,400.00 8,880.00
Perlengkapan % 35 7,400.00 2,590.00
JUMLAH HARGA BAHAN 11,470.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,950.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,495.00
F Harga Satuan Pekerjaan (D+E) 49,445.00 m'

5.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.01 150,000.00 1,500.00
Tukang batu L.02 0.4 190,000.00 76,000.00
Kepala tukang L.03 0.04 230,000.00 9,200.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 87,850.00
B BAHAN
Kran air M 1 22,000.00 22,000.00
Sealtape Buah 0.025 6,000.00 150.00
JUMLAH HARGA BAHAN 22,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,000.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 11,000.00
F Harga Satuan Pekerjaan (D+E) 121,000.00 bh

5.5.1.1 20. Pemasangan 1 m pipa galvanis diameter 3/4”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 150,000.00 8,100.00
Tukang batu L.02 0.09 190,000.00 17,100.00
Kepala tukang L.03 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.027 230,000.00 6,210.00
JUMLAH TENAGA KERJA 33,480.00
B BAHAN
Pipa galvanis 3/4” M 1.2 9,000.00 10,800.00
Perlengkapan % 35 9,000.00 3,150.00
JUMLAH HARGA BAHAN 13,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,430.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,743.00
F Harga Satuan Pekerjaan (D+E) 52,173.00 m'
5.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 150,000.00 8,100.00
Tukang batu L.02 0.09 190,000.00 17,100.00
Kepala tukang L.03 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.027 230,000.00 6,210.00
JUMLAH TENAGA KERJA 33,480.00
B BAHAN
Pipa galvanis 1” M 1.2 11,400.00 13,680.00
Perlengkapan % 35 11,400.00 3,990.00
JUMLAH HARGA BAHAN 17,670.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,150.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,115.00
F Harga Satuan Pekerjaan (D+E) 56,265.00 m'

5.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.108 150,000.00 16,200.00
Tukang batu L.02 0.18 190,000.00 34,200.00
Kepala tukang L.03 0.018 230,000.00 4,140.00
Mandor L.04 OH 0.005 230,000.00 1,150.00
JUMLAH TENAGA KERJA 55,690.00
B BAHAN
Pipa galvanis 11/2” M 1.2 23,900.00 28,680.00

Perlengkapan % 35 23,900.00 8,365.00


JUMLAH HARGA BAHAN 37,045.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,735.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,273.50
F Harga Satuan Pekerjaan (D+E) 102,008.50 m'

5.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.135 150,000.00 20,250.00
Tukang batu L.02 0.225 190,000.00 42,750.00
Kepala tukang L.03 0.023 230,000.00 5,290.00
Mandor L.04 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 69,900.00
B BAHAN
Pipa galvanis 3” M 1.2 65,100.00 78,120.00
Perlengkapan % 35 65,100.00 22,785.00
JUMLAH HARGA BAHAN 100,905.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 170,805.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 17,080.50
F Harga Satuan Pekerjaan (D+E) 187,885.50 m'

5.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.135 150,000.00 20,250.00
Tukang batu L.02 0.225 190,000.00 42,750.00
Kepala tukang L.03 0.023 230,000.00 5,290.00
Mandor L.04 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 69,900.00
B BAHAN
Pipa galvanis 4” M 1.2 94,900.00 113,880.00
Perlengkapan % 35 94,900.00 33,215.00
JUMLAH HARGA BAHAN 147,095.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 216,995.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 21,699.50
F Harga Satuan Pekerjaan (D+E) 238,694.50 m'

5.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.036 150,000.00 5,400.00
Tukang batu L.02 0.06 190,000.00 11,400.00
Kepala tukang L.03 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 18,640.00
B BAHAN
Pipa PVC 1/2” M 1.2 9,000.00 10,800.00
Perlengkapan % 35 9,000.00 3,150.00
JUMLAH HARGA BAHAN 13,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 32,590.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 3,259.00
F Harga Satuan Pekerjaan (D+E) - m'

5.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.036 150,000.00 5,400.00
Tukang batu L.02 0.06 190,000.00 11,400.00
Kepala tukang L.03 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 18,640.00
B BAHAN
Pipa PVC 3/4” M 1.2 16,600.00 19,920.00
Perlengkapan % 35 16,600.00 5,810.00
JUMLAH HARGA BAHAN 25,730.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,370.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 4,437.00
F Harga Satuan Pekerjaan (D+E) 48,807.00 m'

5.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.036 150,000.00 5,400.00
Tukang batu L.02 0.06 190,000.00 11,400.00
Kepala tukang L.03 0.006 230,000.00 1,380.00
Mandor L.04 OH 0.002 230,000.00 460.00
JUMLAH TENAGA KERJA 18,640.00
B BAHAN
Pipa PVC 1” M 1.2 20,600.00 24,720.00
Perlengkapan % 35 20,600.00 7,210.00
JUMLAH HARGA BAHAN 31,930.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,570.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 5,057.00
F Harga Satuan Pekerjaan (D+E) 55,627.00 m'

5.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 150,000.00 8,100.00
Tukang batu L.02 0.09 190,000.00 17,100.00
Kepala tukang L.03 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 27,960.00
B BAHAN
Pipa PVC 11/2” M 1.2 30,900.00 37,080.00
Perlengkapan % 35 30,900.00 10,815.00
JUMLAH HARGA BAHAN 47,895.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,855.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 7,585.50
F Harga Satuan Pekerjaan (D+E) 83,440.50 m'

5.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 150,000.00 8,100.00
Tukang batu L.02 0.09 190,000.00 17,100.00
Kepala tukang L.03 0.009 230,000.00 2,070.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 27,960.00
B BAHAN
Pipa PVC 2” M 1.2 45,200.00 54,240.00
Perlengkapan % 35 45,200.00 15,820.00
JUMLAH HARGA BAHAN 70,060.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,020.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 9,802.00
F Harga Satuan Pekerjaan (D+E) 107,822.00 m'

5.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.081 150,000.00 12,150.00
Tukang batu L.02 0.135 190,000.00 25,650.00
Kepala tukang L.03 0.0135 230,000.00 3,105.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 41,825.00
B BAHAN
Pipa PVC 21/2” M 1.2 66,200.00 79,440.00
Perlengkapan % 35 66,200.00 23,170.00
JUMLAH HARGA BAHAN 102,610.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,435.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 14,443.50
F Harga Satuan Pekerjaan (D+E) 158,878.50 m'

5.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.081 150,000.00 12,150.00
Tukang batu L.02 0.135 190,000.00 25,650.00
Kepala tukang L.03 0.0135 230,000.00 3,105.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 41,825.00
B BAHAN
Pipa PVC 3” M 1.2 91,500.00 109,800.00
Perlengkapan % 35 91,500.00 32,025.00
JUMLAH HARGA BAHAN 141,825.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 183,650.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 18,365.00
F Harga Satuan Pekerjaan (D+E) 202,015.00 m'

5.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.081 150,000.00 12,150.00
Tukang batu L.02 0.135 190,000.00 25,650.00
Kepala tukang L.03 0.0135 230,000.00 3,105.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 41,825.00
B BAHAN
Pipa PVC 4” M 1.2 133,400.00 160,080.00
Perlengkapan % 35 133,400.00 46,690.00
JUMLAH HARGA BAHAN 206,770.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 248,595.00


E Overhead & Profit (Contoh 10 %) 0.10 x D 24,859.50
F Harga Satuan Pekerjaan (D+E) 273,454.50 m'

5.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.08 150,000.00 12,000.00
Tukang batu L.02 0.04 190,000.00 7,600.00
Kepala tukang L.03 0.004 230,000.00 920.00
Mandor L.04 OH 0.004 230,000.00 920.00
JUMLAH TENAGA KERJA 21,440.00
B BAHAN
Pipa tanah Bh 1.6 -
Semen portlan Kg 35 1,700.00 59,500.00
Pasir pasang M3 0.014 225,000.00 3,150.00
Pasir urug M3 0.014 195,000.00 2,730.00
JUMLAH HARGA BAHAN 65,380.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 86,820.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 8,682.00
F Harga Satuan Pekerjaan (D+E) - m'

5.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 150,000.00 9,000.00
Tukang batu L.02 0.03 190,000.00 5,700.00
Kepala tukang L.03 0.003 230,000.00 690.00
Mandor L.04 OH 0.003 230,000.00 690.00
JUMLAH TENAGA KERJA 16,080.00
B BAHAN
Pipa tanah dia 15 Bh 1.6 -
Semen portlan Kg 0.68 1,700.00 1,156.00
Pasir pasang M3 0.013 225,000.00 2,925.00
Pasir urug M3 0.011 195,000.00 2,145.00
JUMLAH HARGA BAHAN 6,226.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,306.00


E Overhead & Profit (Contoh 10 %) 0.10 xD 2,230.60
F Harga Satuan Pekerjaan (D+E) - m'

5.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 150,000.00 21,000.00
Tukang batu L.02 0.07 190,000.00 13,300.00
Kepala tukang L.03 0.007 230,000.00 1,610.00
Mandor L.04 OH 0.007 230,000.00 1,610.00
JUMLAH TENAGA KERJA 37,520.00
B BAHAN
Pipa tanah dia 20 Bh 1.1 150,000.00 165,000.00
Bata merah M3 0.027 850.00 22.95
Semen portlan Kg 3.92 1,700.00 6,664.00
Pasir pasang M3 0.056 225,000.00 12,600.00
Pasir urug M3 0.024 195,000.00 4,680.00
JUMLAH HARGA BAHAN 188,966.95
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 226,486.95


E Overhead & Profit (Contoh 10 %) 0.10 x D 22,648.70
F Harga Satuan Pekerjaan (D+E) 249,135.65 m'

5.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.38 150,000.00 57,000.00
Tukang batu L.02 0.19 190,000.00 36,100.00
Kepala tukang L.03 0.019 230,000.00 4,370.00
Mandor L.04 OH 0.019 230,000.00 4,370.00
JUMLAH TENAGA KERJA 101,840.00
B BAHAN
Pipa tanah dia 30 Bh 1.1 180,000.00 198,000.00
Bata merah M3 0.55 850.00 467.50
Semen portlan Kg 10.3 1,700.00 17,510.00
Pasir pasang M3 0.061 225,000.00 13,725.00
Pasir urug M3 0.069 195,000.00 13,455.00
JUMLAH HARGA BAHAN 243,157.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 344,997.50


E Overhead & Profit (Contoh 10 %) 0.10 x D 34,499.75
F Harga Satuan Pekerjaan (D+E) 379,497.25 m'
6.6.1.1. HARGA SATUAN PEKERJAAN SISTEM DISTRIBUSI JARINGAN LISTRIK

6.6.1.1.1. Pemasangan 1 buah MCCB

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.3 #REF! -
Tukang batu L.02 1.1 #REF! -
Kepala tukang L.03 0.01 #REF! -
Mandor L.04 OH 0.16 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Closet duduk Unit 1 3,660,000.00 -
Perlengkapan Ls 6% x 3,660,000.00 -
closet
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - bh

6.6.2.1. HARGA SATUAN PEKERJAAN SISTEM PENCAHAYAAN

6.6.2.1.1. Pemasangan 1 buah titik lampu

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.5 #REF! -
Tukang batu L.02 4.5 #REF! -
Kepala tukang L.03 0.05 #REF! -
Mandor L.04 OH 0.018 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Beton 1:2:3 M3 0.9 2,474,035.14 -
Baja tulangan Kg 180 Err:509 -
Kayu bekisting M2 8 52,000.00 -
Ubin porselen Bh 500 140,000.00 -
Perlengkapan % 10 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - bh

6.6.3.1. HARGA SATUAN PEKERJAAN SISTEM KOMUNIKASI

6.6.3.1.1. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.081 #REF! -
Tukang batu L.02 0.135 #REF! -
Kepala tukang L.03 0.0135 #REF! -
Mandor L.04 OH 0.004 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC 3” M 1.2 Err:509 -
Perlengkapan % 35 Err:509 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - m'

6.6.4.1. HARGA SATUAN PEKERJAAN PENCEGAHAN PETIR

6.6.4.1.1. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.38 #REF! -
Tukang batu L.02 0.19 #REF! -
Kepala tukang L.03 0.019 #REF! -
Mandor L.04 OH 0.019 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa tanah dia 30 Bh 1.1 180,000.00 -
Bata merah M3 0.55 850.00 -
Semen portlan Kg 10.3 1,700.00 -
Pasir pasang M3 0.061 225,000.00 -
Pasir urug M3 0.069 195,000.00 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - m'
9.9.1.1. HARGA SATUAN PEKERJAAN PAVING, PERPARKIRAN, PEDESTRIAN

9.9.1.1.1. Pemasangan paving, perparkiran, pedestrian

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.3 #REF! -
Tukang batu L.02 1.1 #REF! -
Kepala tukang L.03 0.01 #REF! -
Mandor L.04 OH 0.16 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Closet duduk Unit 1 3,660,000.00 -
Perlengkapan Ls 6% x 3,660,000.00 -
closet
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - m²

9.9.2.1. HARGA SATUAN PEKERJAAN PAGAR DAN GERBANG

9.9.2.1.1. Pemasangan pagar dan gerbang

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.075 #REF! -
Tukang batu L.02 0.75 #REF! -
Kepala tukang L.03 0.075 #REF! -
Mandor L.04 OH 0.003 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Bathcup Unit 1 Err:509 -
Perlengkapan % 20 Err:509 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 xD -
F Harga Satuan Pekerjaan (D+E) - bh

9.9.3.1. HARGA SATUAN PEKERJAAN PERTAMANAN DAN LANDSCAPING

9.9.3.1.1. Pembuatan pertamanan dan landscaping

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.5 #REF! -
Tukang batu L.02 4.5 #REF! -
Kepala tukang L.03 0.05 #REF! -
Mandor L.04 OH 0.018 #REF! -
JUMLAH TENAGA KERJA -
B BAHAN
Beton 1:2:3 M3 0.9 2,474,035.14 -
Baja tulangan Kg 180 Err:509 -
Kayu bekisting M2 8 52,000.00 -
Ubin porselen Bh 500 140,000.00 -
Perlengkapan % 10 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 10 %) 0.10 x D -
F Harga Satuan Pekerjaan (D+E) - bh
10.10.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

10.10.4.1.1. Pemasangan 1 m pipa PVC Ø 63 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.081 #REF! #REF!
Tukang pipa L.02 OH 0.041 #REF! #REF!
Mandor L.04 OH 0.008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 63 mm m 1 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.006
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada tambahan p

10.10.4.1.2. Pemasangan 1 m pipa PVC Ø 90 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.094 #REF! #REF!
Tukang pipa L.02 OH 0.047 #REF! #REF!
Mandor L.04 OH 0.009 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 90 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.008
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.3. Pemasangan 1 m pipa PVC Ø 110 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.105 #REF! #REF!
Tukang pipa L.02 OH 0.053 #REF! #REF!
Mandor L.04 OH 0.011 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 110 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.01
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.4. Pemasangan 1 m pipa PVC Ø 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.118 #REF! #REF!
Tukang pipa L.02 OH 0.059 #REF! #REF!
Mandor L.04 OH 0.012 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 150 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.012
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.5. Pemasangan 1 m pipa PVC Ø 200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.189 #REF! #REF!
Tukang pipa L.02 OH 0.095 #REF! #REF!
Mandor L.04 OH 0.019 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.024
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.6. Pemasangan 1 m pipa PVC Ø 250 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.256 #REF! #REF!
Tukang pipa L.02 OH 0.128 #REF! #REF!
Mandor L.04 OH 0.026 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 250 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.034
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.7. Pemasangan 1 m pipa PVC Ø 300 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.294 #REF! #REF!
Tukang pipa L.02 OH 0.147 #REF! #REF!
Mandor L.04 OH 0.029 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 300 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.04
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.8. Pemasangan 1 m pipa PVC Ø 400 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.544 #REF! #REF!
Tukang pipa L.02 OH 0.272 #REF! #REF!
Mandor L.04 OH 0.054 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 400 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.08
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.9. Pemasangan 1 m pipa PVC Ø 450 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.669 #REF! #REF!
Tukang pipa L.02 OH 0.335 #REF! #REF!
Mandor L.04 OH 0.067 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 450 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.1
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.809 #REF! #REF!
Tukang pipa L.02 OH 0.405 #REF! #REF!
Mandor L.04 OH 0.081 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.122
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.957 #REF! #REF!
Tukang pipa L.02 OH 0.479 #REF! #REF!
Mandor L.04 OH 0.096 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 600 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.145
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.618 #REF! #REF!
Tukang pipa L.02 OH 0.809 #REF! #REF!
Mandor L.04 OH 0.162 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 800 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.25
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.691 #REF! #REF!
Tukang pipa L.02 OH 0.846 #REF! #REF!
Mandor L.04 OH 0.169 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 900 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.262
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.895 #REF! #REF!
Tukang pipa L.02 OH 0.948 #REF! #REF!
Mandor L.04 OH 0.19 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1000 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.294
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.099 #REF! #REF!
Tukang pipa L.02 OH 1.05 #REF! #REF!
Mandor L.04 OH 0.21 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.327
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.303 #REF! #REF!
Tukang pipa L.02 OH 1.152 #REF! #REF!
Mandor L.04 OH 0.23 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.359
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.035 #REF! #REF!
Tukang pipa L.02 OH 0.017 #REF! #REF!
Mandor L.04 OH 0.003 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 63 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.019
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 #REF! #REF!
Tukang pipa L.02 OH 0.02 #REF! #REF!
Mandor L.04 OH 0.004 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.019
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.045 #REF! #REF!
Tukang pipa L.02 OH 0.023 #REF! #REF!
Mandor L.04 OH 0.005 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 125 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.019
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.062 #REF! #REF!
Tukang pipa L.02 OH 0.031 #REF! #REF!
Mandor L.04 OH 0.006 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 150 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.019
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.102 #REF! #REF!
Tukang pipa L.02 OH 0.051 #REF! #REF!
Mandor L.04 OH 0.01 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.019
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.133 #REF! #REF!
Tukang pipa L.02 OH 0.067 #REF! #REF!
Mandor L.04 OH 0.013 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 250 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.042
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.17 #REF! #REF!
Tukang pipa L.02 OH 0.085 #REF! #REF!
Mandor L.04 OH 0.017 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 300 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.065
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.29 #REF! #REF!
Tukang pipa L.02 OH 0.145 #REF! #REF!
Mandor L.04 OH 0.029 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 400 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.152
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.359 #REF! #REF!
Tukang pipa L.02 OH 0.18 #REF! #REF!
Mandor L.04 OH 0.036 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 450 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.2
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.433 #REF! #REF!
Tukang pipa L.02 OH 0.216 #REF! #REF!
Mandor L.04 OH 0.043 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.251
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.512 #REF! #REF!
Tukang pipa L.02 OH 0.256 #REF! #REF!
Mandor L.04 OH 0.051 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.307
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.893 #REF! #REF!
Tukang pipa L.02 OH 0.446 #REF! #REF!
Mandor L.04 OH 0.089 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 800 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.573
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.353 #REF! #REF!
Tukang pipa L.02 OH 0.677 #REF! #REF!
Mandor L.04 OH 0.135 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 900 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.883
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.659 #REF! #REF!
Tukang pipa L.02 OH 0.83 #REF! #REF!
Mandor L.04 OH 0.166 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1000 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 1.093
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.818 #REF! #REF!
Tukang pipa L.02 OH 0.909 #REF! #REF!
Mandor L.04 OH 0.182 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 1.205
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.37 #REF! #REF!
Tukang pipa L.02 OH 1.185 #REF! #REF!
Mandor L.04 OH 0.237 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 1.584
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.345 #REF! #REF!
Tukang pipa L.02 OH 0.172 #REF! #REF!
Mandor L.04 OH 0.034 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 63 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.4 #REF! #REF!
Tukang pipa L.02 OH 0.2 #REF! #REF!
Mandor L.04 OH 0.04 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.448 #REF! #REF!
Tukang pipa L.02 OH 0.224 #REF! #REF!
Mandor L.04 OH 0.045 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 125 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.506 #REF! #REF!
Tukang pipa L.02 OH 0.253 #REF! #REF!
Mandor L.04 OH 0.051 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 150 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.796 #REF! #REF!
Tukang pipa L.02 OH 0.398 #REF! #REF!
Mandor L.04 OH 0.08 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.949 #REF! #REF!
Tukang pipa L.02 OH 0.475 #REF! #REF!
Mandor L.04 OH 0.095 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 250 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.958 #REF! #REF!
Tukang pipa L.02 OH 0.479 #REF! #REF!
Mandor L.04 OH 0.096 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 300 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.212 #REF! #REF!
Tukang pipa L.02 OH 0.606 #REF! #REF!
Mandor L.04 OH 0.121 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 400 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.353 #REF! #REF!
Tukang pipa L.02 OH 0.676 #REF! #REF!
Mandor L.04 OH 0.135 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 450 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.469 #REF! #REF!
Tukang pipa L.02 OH 0.735 #REF! #REF!
Mandor L.04 OH 0.147 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.327 #REF! #REF!
Tukang pipa L.02 OH 0.664 #REF! #REF!
Mandor L.04 OH 0.133 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 600 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.327 #REF! #REF!
Tukang pipa L.02 OH 1.163 #REF! #REF!
Mandor L.04 OH 0.233 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 800 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.623 #REF! #REF!
Tukang pipa L.02 OH 1.312 #REF! #REF!
Mandor L.04 OH 0.262 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 900 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.911 #REF! #REF!
Tukang pipa L.02 OH 1.456 #REF! #REF!
Mandor L.04 OH 0.291 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1000 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.47. Pemasangan 1 m pipa GIP Ø 1100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.2 #REF! #REF!
Tukang pipa L.02 OH 1.6 #REF! #REF!
Mandor L.04 OH 0.32 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.488 #REF! #REF!
Tukang pipa L.02 OH 1.744 #REF! #REF!
Mandor L.04 OH 0.349 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF!
handle crane 2 T hari
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.489 #REF! #REF!
Tukang pipa L.02 OH 0.098 #REF! #REF!
Mandor L.04 OH 0.049 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.38
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.547 #REF! #REF!
Tukang pipa L.02 OH 0.109 #REF! #REF!
Mandor L.04 OH 0.055 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 125 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.38
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.613 #REF! #REF!
Tukang pipa L.02 OH 0.123 #REF! #REF!
Mandor L.04 OH 0.061 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 150 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.38
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.855 #REF! #REF!
Tukang pipa L.02 OH 0.171 #REF! #REF!
Mandor L.04 OH 0.085 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 200 mm M 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.38
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.951 #REF! #REF!
Tukang pipa L.02 OH 0.19 #REF! #REF!
Mandor L.04 OH 0.095 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 250 mm M 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.05
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.973 #REF! #REF!
Tukang pipa L.02 OH 0.195 #REF! #REF!
Mandor L.04 OH 0.097 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 300 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.071
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.545 #REF! #REF!
Tukang pipa L.02 OH 0.309 #REF! #REF!
Operator alat berat L.08 OH 0.093 #REF! #REF!
Mandor L.04 OH 0.154 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 400 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.023
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.031
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.813 #REF! #REF!
Tukang pipa L.02 OH 0.363 #REF! #REF!
Operator alat berat L.08 OH 0.143 #REF! #REF!
Mandor L.04 OH 0.181 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 450 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.029 #REF! #REF!
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & hari 0.039 #REF! #REF!
handle crane 2 T
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.047 #REF! #REF!
Tukang pipa L.02 OH 0.409 #REF! #REF!
Operator alat berat L.08 OH 0.193 #REF! #REF!
Mandor L.04 OH 0.205 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.034
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T
hari 0.045
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.58. Pemasangan 1 m pipa DCI Ø 600 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.011 #REF! #REF!
Tukang pipa L.02 OH 0.402 #REF! #REF!
Operator alat berat L.08 OH 0.293 #REF! #REF!
Mandor L.04 OH 0.201 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 600 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.058
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T
hari 0.077
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.59. Pemasangan 1 m pipa DCI Ø800 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.859 #REF! #REF!
Tukang pipa L.02 OH 0.772 #REF! #REF!
Operator alat berat L.08 OH 0.493 #REF! #REF!
Mandor L.04 OH 0.386 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 800 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.084
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.225
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.60. Pemasangan 1 m pipa DCI Ø900 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4.995 #REF! #REF!
Tukang pipa L.02 OH 0.999 #REF! #REF!
Operator alat berat L.08 OH 0.593 #REF! #REF!
Mandor L.04 OH 0.499 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 900 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.093
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.248
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.61. Pemasangan 1 m pipa DCI Ø1000 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.931 #REF! #REF!
Tukang pipa L.02 OH 1.186 #REF! #REF!
Operator alat berat L.08 OH 0.793 #REF! #REF!
Mandor L.04 OH 0.693 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1000 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.112
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.298
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.62. Pemasangan 1 m pipa DCI Ø1100 mm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.949 #REF! #REF!
Tukang pipa L.02 OH 1.39 #REF! #REF!
Operator alat berat L.08 OH 0.793 #REF! #REF!
Mandor L.04 OH 0.695 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.152
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.304
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.63. Pemasangan 1 m pipa DCI Ø1200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 8.056 #REF! #REF!
Tukang pipa L.02 OH 1.611 #REF! #REF!
Operator alat berat L.08 OH 0.893 #REF! #REF!
Mandor L.04 OH 0.806 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.18
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.36
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'
10.10.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.499 #REF! #REF!
Tukang pipa L.02 OH 0.1 #REF! #REF!
Mandor L.04 OH 0.05 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 63 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.579 #REF! #REF!
Tukang pipa L.02 OH 0.116 #REF! #REF!
Mandor L.04 OH 0.058 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'
10.10.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.648 #REF! #REF!
Tukang pipa L.02 OH 0.13 #REF! #REF!
Mandor L.04 OH 0.065 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 125 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.708 #REF! #REF!
Tukang pipa L.02 OH 0.142 #REF! #REF!
Mandor L.04 OH 0.071 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 150 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.113 #REF! #REF!
Tukang pipa L.02 OH 0.223 #REF! #REF!
Mandor L.04 OH 0.111 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.69. Pemasangan 1 m pipa baja Ø 250 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.325 #REF! #REF!
Tukang pipa L.02 OH 0.265 #REF! #REF!
Mandor L.04 OH 0.133 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 250 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.415 #REF! #REF!
Tukang pipa L.02 OH 0.283 #REF! #REF!
Mandor L.04 OH 0.141 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 300 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.004
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.366 #REF! #REF!
Tukang pipa L.02 OH 0.473 #REF! #REF!
Mandor L.04 OH 0.237 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 400 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.027
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.039
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.231 #REF! #REF!
Tukang pipa L.02 OH 0.446 #REF! #REF!
Mandor L.04 OH 0.223 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 450 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.026
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.037
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.432 #REF! #REF!
Tukang pipa L.02 OH 0.486 #REF! #REF!
Mandor L.04 OH 0.243 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 500 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.029
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.045
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 15 %) 15% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm


Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.208 #REF! #REF!
Tukang pipa L.02 OH 0.442 #REF! #REF!
Mandor L.04 OH 0.221 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 600 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.027
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.039
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.897 #REF! #REF!
Tukang pipa L.02 OH 0.779 #REF! #REF!
Mandor L.04 OH 0.39 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 800 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.046
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.098
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'
10.10.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4.403 #REF! #REF!
Tukang pipa L.02 OH 0.081 #REF! #REF!
Mandor L.04 OH 0.44 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 900 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.052
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.115
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4.895 #REF! #REF!
Tukang pipa L.02 OH 0.979 #REF! #REF!
Mandor L.04 OH 0.489 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1000 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.058
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.133
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'
10.10.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.387 #REF! #REF!
Tukang pipa L.02 OH 1.077 #REF! #REF!
Mandor L.04 OH 0.539 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1100 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.064
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.15
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'

10.10.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm

Harga Satuan Jumlah


(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.897 #REF! #REF!
Tukang pipa L.02 OH 1.176 #REF! #REF!
Mandor L.04 OH 0.588 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1200 mm m 1 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type #REF! #REF!
225 kap 0,5 -1,0 m3 hari 0.07
Sewa Tripot/Tackel & #REF! #REF!
handle crane 2 T hari 0.167
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit (Contoh 10 %) 0.10 x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF! m'
KETERANGAN :

PPN 10 0.10 x D
Overhead & Profit (Contoh 10 %) 10 0.10 x D