0.1
0.2
RENCANA
JALAN/SALURAN ± 43.00 M2
BIDANG TANAH YANG TERKENA
0.3
A
CAN
REN
A
M2
KEN 0
TER 43.0
G N±
YANURA
AH SAL
0.4
TANAN/
ANG JAL
BID
L
VIII
M
LA
DA
UR
TIM
BET
PROYEK
B B B
TE
JL.
4.57
4.57 4.57
1.75 2.00 0.82 1.75 2.82 1.75 2.82 PETA SITUASI
Skala 1 : 500
1.20
1.17
1.17
1.17
2.73
2.73
1.47
1.47
1.47
1.52
Lubang Hawa
1.00
1.00
1.00
3000
Pipa 3 inch
625 625 1200
PEMILIK
2.15
2.15
2.15
Bio Filter Sarang Tawon Inlet
1500
A A
1500
1200
400
Beton Bertulang K-175
Pagar
1.15
1.15
1.15
Pipa air hujan (atap)
RENCANA
RENCANA
RENCANA
8.88
8.88
400 PVC D 4"
Outlet
Lantai kerja 5 cm
Pasir Urug 10 cm
JALAN/SALURAN ± 43.00 M2
JALAN/SALURAN ± 43.00 M2
JALAN/SALURAN ± 43.00 M2
625 625 1200
Denah IPAL
BIDANG TANAH YANG TERKENA
1.20
1.20
1.20
A A
12.61
Drainase
3.00
3.00
3000
Bak Kontrol
1.80
1.80
Inlet (Pipa D 4 inch)
Buis Beton
14.49
14.49
14.49
3.00
1500
2.88
2.88
IJUK
Outlet (Pipa D 4 inch)
PERENCANA
1.00
1.00
SIRTU
Skema Aliran IPAL
KORAL
I.P.A.L 0.80
..\..\no 10\STR.png
Skala 1 : 50
4.73
6.70
5.62
1.00
AN
A
AN
A
CA
NA GAMBAR SKALA
NC NC N
RE RE RE
A 2 A 2 NA M2
EN M EN M
DENA
E
RK .00 RK .00 RK .00
YA
TE ± 43
NG AN
R Y A
TE ± 43
NG AN
R YA R
TE ± 43
NG AN SUMUR RESAPAN
H LU H LU H LU
NA /SA
TA LAN
NA /SA
TA LAN
NA /SA
TA LAN
Skala 1 : 50
TAMPAK
G G G
AN JA AN JA AN JA 3.26
BID BID BID
0.60
POTONGAN
1.49
1.49
1.49
2.10
1.50
RENCANA PAGAR
2.81 1.90
4.36 4.36
4.71
RENCANA PAGAR I.P.A.L.
B B B Skala 1 : 100
TABULASI PERHITUNGAN INTENSITAS BANGUNAN SITUASI
DENAH LANTAI 1 DENAH LANTAI 2 DENAH ATAP RENCANA BATASAN PENJELASAN
DISETUJUI DI.PERIKSA DI.GAMBAR
Skala 1 : 100 Skala 1 : 100 Skala 1 : 100 LUAS DAERAH PERENCANAAN (LDP) 57.00 M2 57.00 M2 LUAS SERTIPIKAT
LUAS LANTAI DASAR BANGUNAN 33.88 M2 45.60 M2 LUAS IRK BIDANG BPN ± 100.00