RENCANA ANGGARAN BIAYA

ASYA RESIDENCE

27-Dec-21

DIBUAT OLEH DIPERIKSA OLEH DISETUJUI OLEH

Bambang Haryo P Riyan K Gatut J F M. Adiwirabrata Rustiar


Safety, Health & Environment
REQUIREMENT BUDGET FOR TENDER

GENERAL INFORMATION
1 Project Name : PEMBANGUNAN PABRIK AKEBONO KARAWANG
2 Business Line : Building
3 Project Time Plan : 16 Month
4 Project Manpower : ± 350(Estimasi) Personnel
5 Project Specific Requirement : a.
b.
c.

SHE SUMMARY BUDGET


1 People Development : Rp 417,025,000
2 SHE Operation : Rp 336,465,000
3 Safety Project Protection : Rp 897,222,755
TAX :
TOTAL : Rp 1,650,712,755
MANPOWER & PEOPLE DEVELOPMENT
Duration
No Description Qtty Unit Unit Cost Total Cost Remarks
(Month)
1 SHE Manpower
- SHE Manager 0 0 Orang Bulan Budget By HC
- SHE Coordinator System 1 15 Orang Bulan Budget By HC
- SHE Coordinator Area 0 0 Orang Bulan Budget By HC
- Traffic Coordinator 0 0 Orang Bulan Budget By HC
- SHE Staff Syscom 0 0 Orang Bulan Budget By HC
- Traffic Staff Syscom 0 0 Orang Bulan Budget By HC
- SHE Staff Paramedic 0 0 Orang Bulan Budget By HC
- SHE Staff Area 2 15 Orang Bulan Budget By HC
- Traffic Staff Area 0 0 Orang Bulan Budget By HC
- Safetyman 6 14 Orang Bulan Budget By HC
- Flagman 0 0 Orang Bulan Budget By HC
- Patroli 0 0 Orang Bulan
Other
2 SHE Event
- SHE Reward 16 bulan 500,000 8,000,000
- Bulan K3 Nasional 1 Paket 7,500,000 7,500,000 Acara Tahunan
- Zero LTI award 3 Paket 5,000,000 15,000,000 Acara Tahunan
- Jumat Bersih 0 Paket 250,000 -
- TBM 0 Hari 50,000 -
- General TBM 16 bulan 200,000 3,200,000 Untuk extra fooding 1 bulan sekali
- SHE Event Lainnya 0 Paket 500,000 -
3 SHE Training
- Sertifikasi TKBT Lv.2 5 orang 4,000,000 20,000,000
- Sertifikasi Working at Height 3 orang 4,950,000 14,850,000
- Sertifikasi First Aider 1 orang 3,850,000 3,850,000
- Sertifikasi K3 Konstruksi Muda 1 orang 3,850,000 3,850,000
- Sertifikasi K3 Konstruksi Madya 1 orang 6,600,000 6,600,000
- Sertifikasi K3 Konstruksi Utama 1 orang 8,000,000 8,000,000 Tidak diperlukan
- Sertifikasi Pemadam kelas C & D 1 orang 3,000,000 3,000,000 1 Petugas Kebakaran kelas D per 100 pekerja
- Sertifikasi Scaffolder 0 orang 3,500,000 - Provide by Subcont
- Sertifikasi scaffolding Supervisor 1 orang 6,050,000 6,050,000 Untuk Supervisor
- Sertifikasi Welding Inspector 1 orang 10,725,000 10,725,000 Provide by Subcont
- Sertifikasi Juru las 0 orang 16,000,000 - Provide by Subcont
- Sertifikasi Operator K3 Migas 0 orang 16,000,000 - Tidak diperlukan
- Sertifikasi Pengawas K3 Migas 0 orang 9,900,000 - Tidak diperlukan
- Sertifikasi Teknisi K3 Listrik 1 orang 6,500,000 6,500,000 Provide by Subcont
- Training Internal P2K3 1 Batch 300,000 300,000 1 Batch per semester
- Training Internal Emergency Response Procedure 3 Batch 300,000 900,000 1 Batch per semester
- Training Internal Fire Fighting 2 Batch 300,000 600,000 1 Batch per semester
- Training Internal Basic First Aider 2 Batch 300,000 600,000 1 Batch per semester
- Training Internal Working at Height 4 Batch 300,000 1,200,000 1 Batch per semester
- Training Internal Hot Work 2 Batch 300,000 600,000 1 Batch per semester
- Perpanjangan K3 Umum 3 orang 1,500,000 4,500,000 1 Batch per semester
Total Budget 125,825,000
* sertifikasi tidak diperlukan apabila pekerja/staff telah memiliki sertifikasi

Duration
No Description Qtty Unit Unit Cost Total Cost Remarks
(Month)
1 Tenaga Harian
5 orang (5,2jt/bulan) UMR Karawang Bara, Budget by HC /
- Harian railing struktur 4 14 Orang/bulan Rp 5,200,000 Rp 291,200,000
Operation
- Harian umum 0 Orang/bulan Rp 20,000,000 Rp -
Total Budget 291,200,000
SHE OPERATION
No Description Qtty Unit Unit Cost Total Cost Remarks
A Mandatory Program
1 SHE Pocket Book 0 Pcs Rp 30,000 Rp - Soft File
2 JSA & PTW Forms 528 Pcs Rp 80,000 Rp 42,240,000 11 spv x 16 bulan x 3 (PTW General + PTW Khusus + JSA) = 495
Berita acara Plenggaran Golden Rules 5 Book Rp 80,000 Rp 400,000
3 Safety Tagging 0
Electrical tagging 880 Pcs Rp 5,000 Rp 4,400,000 1 tag/unit/3 month (150 tagging) + 10 % of red tag = 165 Tagging x 16/3 = 880
Body Harness tagging 250 Pcs Rp 5,000 Rp 1,250,000 ± 50 x 16/3 pcs FBH / 3 months
Heavy Equipment tagging 60 Pcs Rp 10,000 Rp 600,000 1 tag/unit/3 month (55 tagging) + 10% of red tag = 60 Tagging/3 bulan
4 Safety Signboard 5 Pcs Rp 500,000 Rp 2,500,000
5 P2K3 Forum 5 Unit Rp 2,000,000 Rp 10,000,000 Pengesahan ke disnaker
6 Emergency Drill 3 Unit Rp 2,500,000 Rp 7,500,000
7 Safety Campaign 10 Unit Rp 250,000 Rp 2,500,000
8 Neon-Box 2 Pcs Rp 2,500,000 Rp 5,000,000 Untuk akses masuk ke proyek
9 SHE Performance Board 1 Pcs Rp 500,000 Rp 500,000
10 SHE Information Board 1 Pcs Rp 500,000 Rp 500,000
11 Safety Sign 100 Pcs Rp 25,000 Rp 2,500,000
12 Traffic Sign 4 Pcs Rp 500,000 Rp 2,000,000 Asumsi 1 gate 2 rambu
13 Papan Nomor Opening 0 Pcs Rp 100,000 Rp -
14 Safety Quality Corner 0 Unit Rp 15,000,000 Rp -
15 Kartu Green Card 0 Pcs Rp 1,000 Rp - SHE Mobile
16 Mesin laminating Safety Card. 1 Pcs Rp 1,500,000 Rp 1,500,000
17 Printer Safety Card 1 Pcs Rp 1,500,000 Rp 1,500,000
18 Material printer 30 Pcs Rp 30,000 Rp 900,000
19 Material laminating 15 pack Rp 100,000 Rp 1,500,000
20 Green card box 0 Pcs Rp 500,000 Rp -
21 Besi fatigue test 0 Pcs Rp 500,000 Rp -
22 Maskot SHE 0 Pcs Rp 500,000 Rp -
23 Rebar Cap 0 Pcs Rp 20,000 Rp -
24 Akun SHE Mobile 0 Account Rp 20,000 Rp -
B Personal Protective Equipment
1 Sticker Induction 500 Pcs Rp 1,500 Rp 750,000
2 Safety Glassess 25 Pcs Rp 50,000 Rp 1,250,000
3 Ear Plug 25 Pcs Rp 22,000 Rp 550,000
4 Ear Muff 10 Pcs Rp 429,000 Rp 4,290,000
5 Dust Mask N95 6 Box Rp 400,000 Rp 2,400,000
6 Masker Karbon 25 Pcs Rp 100,000 Rp 2,500,000
7 Painting Respirator 15 Pcs Rp 70,000 Rp 1,050,000
8 Painting Respirator Cartridge 0 Pcs Rp 30,000 Rp -
9 Helm Safety Putih 48 Pcs Rp 90,000 Rp 4,320,000 43 Untuk Staff, 5 Untuk Visitor
10 Helm Safety Merah 13 Pcs Rp 90,000 Rp 1,170,000 10 Untuk SHE, 3 Untuk spare
11 Helm Safety Kuning 50 Pcs Rp 70,000 Rp 3,500,000 Untuk spare (helm pekerja disediakan oleh subkon)
12 Helm Safety Hijau 50 Pcs Rp 70,000 Rp 3,500,000 Untuk spare (helm pekerja disediakan oleh subkon)
13 Helm Safety Biru 0 Pcs Rp 70,000 Rp - Untuk spare (helm pekerja disediakan oleh subkon)
14 Helm Safety Orange 0 Pcs Rp 70,000 Rp - Untuk spare (helm pekerja disediakan oleh subkon)
15 Helm Safety Abu-abu 50 Pcs Rp 70,000 Rp 3,500,000 Untuk spare (helm pekerja disediakan oleh subkon)
16 Rompi Safety Staff 43 Pcs Rp 180,000 Rp 7,740,000
17 Rompi Safety Pekerja 50 Pcs Rp 180,000 Rp 9,000,000 Untuk spare (rompi pekerja disediakan oleh subkon)
18 Rompi Safety SHE 13 Pcs Rp 180,000 Rp 2,340,000 10 Untuk SHE, 3 Untuk spare
19 Rompi Safety Visitor 5 Pcs Rp 180,000 Rp 900,000 5 untuk visitor
20 Safety shoes Krusher Texas 52 Pairs Rp 460,000 Rp 23,920,000 46 untuk staff 5 untuk visitor
21 Safety Boot Petrova 50 Pairs Rp 250,000 Rp 12,500,000 Untuk spare (Sepatu boots pekerja disediakan oleh subkon)
22 Full Body Harness double lanyard + absorber 50 Pcs Rp 500,000 Rp 25,000,000 Untuk Staff dan spare subcont bekerja di ketinggian
23 Cut resistance glove 25 Pairs Rp 60,000 Rp 1,500,000
24 Sarung tangan las/Heat Resistance Glove 30 Pairs Rp 125,000 Rp 3,750,000 Untuk kebutuhan pekerjaan fabrikasi
25 Welding Apron 30 Pcs Rp 125,000 Rp 3,750,000 Untuk kebutuhan pekerjaan fabrikasi
26 Nitrile Glove 10 Dzn Rp 30,000 Rp 300,000 Untuk kebutuhan pekerjaan fabrikasi
27 Face Shield 30 Pcs Rp 140,000 Rp 4,200,000 Untuk kebutuhan pekerjaan fabrikasi
28 Sarung Tangan Kain 50 Dzn Rp 30,000 Rp 1,500,000
29 Black vest 0 Pcs Rp 180,000 Rp -
30 Black Helmet 0 Pcs Rp 90,000 Rp -
31 Rompi Rigger 4 Pcs Rp 300,000 Rp 1,200,000
C First Aid & Emergency Facility
1 Tas P3K + isi 4 box Rp 1,000,000 Rp 4,000,000 1 Tas/100 org (40 staff + 350 worker = 390 org)
2 Patient Bed 1 Unit Rp 1,875,000 Rp 1,875,000 Untuk Ruang p3k
SHE OPERATION
No Description Qtty Unit Unit Cost Total Cost Remarks
3 Lampu Kerja 0 Unit Rp 1,875,000 Rp -
4 Sterilisator 0 Unit Rp 2,500,000 Rp -
5 Lemari Es 0 Unit Rp 2,500,000 Rp -
6 Lemari Peralatan P3K 1 Unit Rp 3,000,000 Rp 3,000,000 Untuk Ruang p3k
7 Wastafel 1 Unit Rp 2,000,000 Rp 2,000,000
8 Perlengkapan untuk isi P3K 4 set Rp 1,250,000 Rp 5,000,000 1 office
9 Meja dan Kursi 1 Set Rp 1,000,000 Rp 1,000,000
10 Folding Stretcher 2 pcs Rp 2,000,000 Rp 4,000,000
11 Basket Stretcher 0 pcs Rp 18,750,000 Rp -
12 APAR 6kg 30 unit Rp 300,000 Rp 9,000,000 Estimasi 1 lantai 2 apar dengan kondisi konstruksi
13 APAB 25kg 2 unit Rp 2,895,000 Rp 5,790,000 untuk ruang penyimpanan B3 dan tangki solar
14 Oksigen 1 unit Rp 1,000,000 Rp 1,000,000 Untuk emergency
15 Kursi roda 0 Unit Rp 10,000,000 Rp -
16 Fire blanket 3 pcs Rp 250,000 Rp 750,000 Untuk kebutuhan fabrikasi
17 Masker medis 10 box Rp 50,000 Rp 500,000
18 Swab antigen 10 box Rp 300,000 Rp 3,000,000
19 Hazmat suit 1 pcs Rp 125,000 Rp 125,000
20 Face Shield covid 2 pcs Rp 15,000 Rp 30,000
21 Swab test PCR 0 Pcs Rp 300,000 Rp -
D SHE Tools
1 LOTO Padlock 8 Pcs Rp 200,000 Rp 1,600,000
2 LOTO Station 2 Pcs Rp 2,500,000 Rp 5,000,000 Untuk diruang mekanik
3 Kunci Rachet 14/17 4 pcs Rp 500,000 Rp 2,000,000 Untuk modifikasi rambu
4 Pliers/Tang Gegep 4 pcs Rp 62,500 Rp 250,000 Untuk modifikasi rambu
5 Bor tangan 0 unit Rp 512,500 Rp -
6 Trafo Las 0 unit Rp 2,125,000 Rp - Tidak diperlukan
7 Welding electrode holder 0 pcs Rp 100,000 Rp - Tidak diperlukan
8 Welding electrode 0 box Rp 37,500 Rp - Tidak diperlukan
9 Cutting wheel 0 pcs Rp 3,250,000 Rp - Tidak diperlukan
10 Mesin Fogging 0 unit Rp 5,000,000 Rp -
11 Laser distance meter 0 Unit Rp 100,000 Rp -
12 Lux Meter 1 unit Rp 1,250,000 Rp 1,250,000 Untuk pengukuran lingkungan
13 Sound Level meter 1 unit Rp 1,875,000 Rp 1,875,000 Untuk pengukuran lingkungan
14 Ohm Meter 1 unit Rp 1,250,000 Rp 1,250,000 Untuk pengukuran grounding
15 Anemometer 1 unit Rp 1,250,000 Rp 1,250,000
16 Flow meter 5 unit Rp 300,000 Rp 1,500,000
17 Gas Detector 0 unit Rp 20,000,000 Rp -
18 Megaphone 2 set Rp 625,000 Rp 1,250,000 Untuk kebutuhan TBM
19 Drone 0 Unit Rp 35,000,000 Rp - Tidak diperlukan
20 Thermometer Digital 3 Unit Rp 200,000 Rp 600,000
21 Alcohol and drug test 0 Unit Rp 1,000,000 Rp -
E Other Requirement
1 Pengelolaan Limbah B3 6 Paket Rp 3,000,000 Rp 18,000,000
2 Mobil patroli 0 Unit Rp 108,000,000 Rp -
3 Stick lamp 4 Pcs Rp 75,000 Rp 300,000
4 Sewa ambulan + paramedic 0 Bulan Rp 30,000,000 Rp -
5 Bendera K3, Acset & Indonesia 4 Set Rp 400,000 Rp 1,600,000 1 Office,1 Site, 2 spare
6 Kerjasama (MoU) dengan Rumah Sakit 0 Ls Rp 60,000,000 Rp -
7 Perizinan aktivitas / pekerjaan 0 Ls Rp 100,000,000 Rp -
8 Pengurusan komplain eksternal 0 Ls Rp 100,000,000 Rp -
9 Pelaporan & Penyelidikan Insiden 0 Ls Rp 50,000,000 Rp -
10 Kerjasama Damkar 0 Ls Rp 15,000,000 Rp -
11 Meeting SHE Subkon, Konsultan 0 Bulan Rp 100,000 Rp -
12 Surat Pengesahan P2K3 1 Set Rp 1,000,000 Rp 1,000,000 Untuk pengesahan ke disnaker
13 Meeting P2K3 dan Verifikasi ke Disnaker 5 Set Rp 500,000 Rp 2,500,000
14 Penyalur Petir dan Sertifikasi 2 Set Rp 8,000,000 Rp 16,000,000 Untuk fulfill Legal Compliance
15 Sertifikasi Tangki Timbun 0 Set Rp 5,000,000 Rp - Untuk fulfill Legal Compliance
16 Pembuatan Dokumen 0 Set Rp 5,000,000 Rp -
17 Pengukuran Lingkungan 3 Paket Rp 5,000,000 Rp 15,000,000 Untuk fulfill Legal Compliance dilakukan per semester
18 Rest Area 2 Unit Rp 1,500,000 Rp 3,000,000
19 TPS B3 1 Unit Rp 5,000,000 Rp 5,000,000
20 Rumah Tabung Gas Bertekanan 1 Unit Rp 1,500,000 Rp 1,500,000
Total Budget Rp 336,465,000
SAFETY PROTECTION*
TRAFFIC
Jumlah Kebutuhan
No. Item Unit Harga Satuan Harga Total Remarks
Jumlah
1 Pagar 0 Meter 750,000 -
2 Pagar MCB 0 pcs 400,000 -
3 Lampu selang 0 Meter 25,000 -
4 Safety road barrier (MCB) 0 pcs 600,000 -
5 Movable plastic barrier (MPB) 0 pcs 750,000 -
6 Sewa Hiab Crane + Tenaga harian 0 Unit/hari 400,000 -
7 Rubber Cone 30 pcs 170,000 5,100,000 Untuk spare
8 Safety line 50 roll 112,500 5,625,000
TOTAL 10,725,000

RAILING
Jumlah Kebutuhan
No. Item Unit Harga Satuan Harga Total Remarks
Railing Catch Net Crash Deck Void Stairway

1 Swivel Clamp 56 0 0 0 0 pcs 25,000 1,388,850


2 Fixed Clamp 130 0 0 0 0 pcs 25,000 3,240,650
3 Pipa Blacksteel 1,5" 0 0 0 0 0 tubes 250,000 -
4 Pipa Galvanis 1,5" 446 0 0 0 0 tubes 310,000 138,267,233 Pipa Galvanis dengan tebal 3mm
5 Plywood 18mm 15 0 0 0 0 Sheet 204,000 3,060,000
6 Hollow Pipe Asago 0 0 0 0 0 pcs 100,000 -
7 Kawat Harmoni Asago 0 0 0 0 0 roll 75,000 -
8 Sling 3,986 0 0 0 0 m 25,000 99,650,000
9 Turnbuckle Asago 0 0 0 0 0 pcs 60,000 -
10 Dynabolt 10mm 278 0 0 0 0 pcs 3,500 972,195
11 Asiba Plank 0 0 0 0 0 pcs 250,000 -
12 Clamp Cover 185 0 0 0 0 pcs 20,000 3,703,600
13 Wire clip 1,329 0 0 0 0 pcs 7,000 9,300,667
14 Safety Net biru 22,027 m 7,000 154,189,560
15 Safety Net hijau 500 m 7,000 3,500,000 Untuk kebutuhan greenzone + Proteksi warga
16 Terpal 0 roll 680,000 -
17 Knockdown railing (3m) 0 Pcs 200,000 -
18 Plat baja 2mm 1 sheet 750,000 750,000
19 Knockdown railing (1m) 0 Pcs 45,000 -
20 Asago/Safety Wing 0 Pcs 900,000 -
21 Safety Screen 0 Pcs 900,000,000 -
22 Besi Siku 7mm 20 pcs 80,000 1,600,000
23 Jaring Hiu 4,980 m 93,750 466,875,000
TOTAL 886,497,755
GRAND TOTAL 897,222,755
*)Note: Asumsi semua material beli baru
Safety Net
(a) (b) (c)
P L T
(m) (m) (m)
Lt 2 500.00 166.00 1.20
Lt 3 58.30 76.60 1.20
Lt 4 49.00 76.00 1.20
Lt 5 - - 1.20
Lt 6 - - 1.20
Lt 7 - - 1.20
Lt 8 - -
Lt 9 - -
Lt 10 - -
Lt 11 - -
Pit Lift - - 1.20
Bongkaran 5.00
Tangga - - 1.20
TOTAL

Railing Perimeter Gedung


(a) (b) (c)

P L Keliling (2*P+L)
(m) (m) m
Plant 250.00 83.00 666.00
WWTP 29.15 38.30 134.90
B. Service 24.50 38.00 125.00
Lt 5
Lt 6
Lt 7
Lt 8
Lt 9
GWT 0.00
STP 0.00
TOTAL Keseluruhan 925.90
Railing Perimeter
Pipa Galvanis (H) 308.63 pcs
Pipa Galvanis (V) 92.59 pcs
Clamp 185.18 pcs
Safety Net 1,111.08 m2
Dynabolt Railing 277.77 pcs
Plat Baja 1
Wire Clips 999.00
Sling Lifeline 666.00 Kebutuhan keliling 1 lantai, estimasi untuk l

Total Railing (H+V) 446.02 pcs

100.8
168
268.8 45

40 cm 1 siku = 1 tiang lifeline


15
(d) (e) (f)
Luas 1 (PxT) Luas 2 (LxT) Luas total
(m2) (m2) (m2)
600.00 199.20 799.20
69.96 91.92 161.88
58.80 91.20 150.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1,111.08

(d) € (f)

Safety Factor
Total + safety Factor Jumlah Lantai
m
666.00 1.00
134.90 1.00
125.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
10.00
Proteksi Perimeter
Asago
Sling
55.55 Swivel Wire Clips
129.63 Fixed

n keliling 1 lantai, estimasi untuk lifeline saat pekerjaan struktur

Proteksi Tambahan Sisi warga


Pipa V
Pipa H
Clamp
safety net hijau

ku = 1 tiang lifeline
(i) (i)
Jumlah Lantai Total Kebutuhan Akhir
(Pcs)
1.00 799.20
1.00 161.88
1.00 150.00
1.00 -
1.00 -
1.00 -
-
-
-
-
54.00 -
1.00 - Kebutuhan untuk setengah gedung untuk spare
1.00 -
62.00 1,111.08

Railing Pit Lift


(g)

Total Keseluruhan Keliling


(m)
666.00 Lt 1
134.90 Lt 2
125.00 Lt 3
0.00 Lt 4
0.00 Lt 5
0.00 Lt 6
0.00 Lt 7
0.00 Lt 8
0.00 Lt 9
0.00 Lt 10
925.90 Total Keseluruhan
rimeter Railing Pit Lift
Pipa Galvanis (H)
Pipa Galvanis (V)
Clamp
Safety Net
Dynabolt Railing
Plat Baja
Wire Clips
Sling Lifeline

Total Railing (H+V)


mbahan Sisi warga
*Note : untuk keperluan safety net sudah masu
untuk setengah gedung untuk spare jika subkontraktor bekisting tidak menyiapkan jaring bongkaran

(a) (b) (c) (d) €

Safety
Factor
P L Keliling (2*P+L) Total + safety Factor
(m) (m) m m
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - -
-
-
- 0 swivel
- - Fixed
-
-
-
-

0 pcs

k keperluan safety net sudah masuk ke perhitungan perimeter


Crash Deck
(f) (g) (a)

Jumlah Lantai Total Keseluruhan Keliling P


(Pcs) (m) (m)
6.00 - Lt 1
6.00 - Lt 2
6.00 - Lt 3 3.50
6.00 - Lt 4
6.00 - Lt 5
6.00 - Lt 6 3.50
6.00 - Lt 7
6.00 - Lt 8
6.00 - Lt 9
- Lt 10
54.00 - Total Keseluruhan 7.00
Jaring 147.00
1.5
(b) (c) (d) € (f) (g)

Safety
Factor
L Keliling (2*P+L) Total + safety Factor
Jumlah LantaiTotal Keseluruhan Keliling
(m) m m (Pcs) (m)
-
-
3.50 6.00 73.50
- -
-
3.50 6.00 73.50
-
-
-
-
7.00 - 12.00 147.00
m
roll/m
Railling Tangga Gedung Type 1 & 2
(a) (b) (c) (d) €

P1 B1 B2 B3 P2 B4

(m) (m) m m
Lt.1 - Lt.2
B1 B2 B3 P1 B4 B5
Lt.2 - Lt.3
Lt.3 - Lt.4
Lt.4 - Lt.5
Lt.5 - Lt.6
Lt.6 - Lt.7
Lt.7 - Lt.8
Lt.8 - Lt.9
Total Keseluruhan

Total Panjang 0.00 0.00 0.00


Total Lebar 0.00 0.00 0.00
Railing Tangga
Pipa Galvanis (H) 0
Pipa Galvanis (V) 0
Clamp 0 0 Fixed
Safety Net - 0 Swivel
Dynabolt Railing 0
Plat Baja 0
Wire Clips -
Sling Lifeline -

Total Railing (H+V) 0 pcs

*Note : untuk keperluan safety net sudah masuk ke perhitungan perimeter


(f) (g)

Jumlah Total
JUMLAH
B5 P3 Titik Keseluruhan
SISI
Tangga Keliling

(Pcs) (m)
2.00 2.00 0.00 Dimensi berbeda
B6 P2
2.00 2.00 0.00
2.00 2.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Railling Tangga Gedung Type 3 & 4
(a) (b) (c) (d) €

P1 B1 B2 B3 P2 B4 B5

(m) (m) m m
Lt.1 - Lt.2
B1 B2 B3 P1 B4 B5 B6
Lt.2 - Lt.3
Lt.3 - Lt.4

Total Keseluruhan

Total Panjang 0.00


Total Lebar 0.00
(f) (g)

Jumlah Total
P3 JUMLAH SISI Titik Keseluruh
Tangga an Keliling

(Pcs) (m)
2.00 2.00 0.00
P2
2.00 2.00 0.00
2.00 2.00 0.00

0.00