Gambar :
POLITEKNIK NEGERI GEOMETRIK JALAN
UJUNG PANDANG KONTRUKSI SIPIL Digambar Oleh :
potongan memanjang Skala : 1:20.000
JURUSAN D4 / 2b JASA
TEKNIK SIPIL KONSTRUKSI MUHAMMAD MUNTASHIR INDIRA RAMADINA S.P RIZKY HADIJAH FAHMI, S.T., M.T.
412 21 050 412 21 045 19911223 201803 2 001 Tanggal
U
STA
0+0
00
A 32.7
68
54.5
42
STA
0+1
00
32.1
94
102.281
STA
0+2
00
1500
STA
0+3
00
990
sta 0+100
STA
0+4
00
STA
0+5
00 960
STA
0+6
00
+950.000
+940.000
+930.000
+920.000
+910.000
+900.000
+890.000
+880.000
+870.000
+860.000
+850.000 ELEVASI EXISTING (Awal)
+830.000
+820.000
+810.000
BM+800.000
DIAGRAM
SUPER ELEVASI
+934.14
+940.00
+928.28
+922.42
+916.57
+910.71
+904.85
+899.00
+895.59
ELEVASI EXTENSION
-5.86% -5.86% -5.86% -5.85% -5.86% -5.86% -5.85% -3.40%
(Rencana)
+938.000
+905.000
+902.50
+892.86
+899.00
+896.50
ELEVASI EXISTING
+918.75
+955.00
+902.27
-17.00% -19.25% -13.75% -8.50% -3.64% 9.64% -3.50% 3.27%
(Awal)