DES 2022 JAN 23 NO NAMA MESIN 19 20 21 22 23 24 25 26 27 28 29 30 2 3 Remarks Plan Overhoul cleaning watercup 2 tahun perpanjang ijin operasional Boiler 1 Boiler Plan Actual Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai 2 Mixing Caramel 1 Actual Selesai, oli belum datang Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai 3 Mixing Caramel 2 Actual Selesai, oli belum datang Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai 4 Mixing Caramel 3 Actual Selesai, oli belum datang Plan Ganti rod eye, seal pompa, oli gearbox, setting conveyor dan gear pompa 5 Filling ICWN 01 Actual Selesai, seal pompa belum datang Plan Setting conveyor, rotary couple, dan servis vacuum 6 Blow & Shuck 01 Actual Selesai Plan Ganti rod eye, seal pompa, oli gearbox, setting conveyor dan gear pompa 7 Filling ICWN 04 Actual Selesai, seal pompa belum datang Plan Setting conveyor, rotary couple, dan servis vacuum 8 Blow & Shuck 04 Actual Selesai Plan Ganti bearing, penambahan oli & grease 9 Mesin Label ICWN 01 Actual Selesai Plan Ganti bearing, penambahan oli & grease 10 Mesin Label ICWN 02 Actual Selesai Plan Ganti bearing, penambahan oli & grease 11 Mesin Label Ex Jakarta 03 Actual Selesai Plan Ganti bearing, penambahan oli & grease 12 Mesin Label Ex Jakarta 04 Actual Selesai Plan Ganti bearing, penambahan oli & grease 13 Mesin Label Ex Jakarta 05 Actual Selesai Plan Ganti bearing, penambahan oli & grease 14 Mesin Label Ex Jakarta 06 Actual Selesai Plan Cleaning kondensor, servis pompa cooling dan hot water 15 Bongkar Kondensor HVAC Actual Selesai Plan Cleaning evaporator 16 CU. Cooling tangki 3000 Actual Selesai Plan Ganti oli, ganti filter oli, filter separator dan setting vanbelt 17 Mesin Kompresor Actual Oli dan filter oli belum datang