PROGRESS DOWNTIME 2022


DES 2022 JAN 23
NO NAMA MESIN 19 20 21 22 23 24 25 26 27 28 29 30 2 3 Remarks
Plan Overhoul cleaning watercup 2 tahun perpanjang ijin operasional Boiler
1 Boiler Plan
Actual
Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai
2 Mixing Caramel 1
Actual Selesai, oli belum datang
Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai
3 Mixing Caramel 2
Actual Selesai, oli belum datang
Plan Ganti bearing mixer, bearing scraper, teflon, oli hidrolik dan setting rantai
4 Mixing Caramel 3
Actual Selesai, oli belum datang
Plan Ganti rod eye, seal pompa, oli gearbox, setting conveyor dan gear pompa
5 Filling ICWN 01
Actual Selesai, seal pompa belum datang
Plan Setting conveyor, rotary couple, dan servis vacuum
6 Blow & Shuck 01
Actual Selesai
Plan Ganti rod eye, seal pompa, oli gearbox, setting conveyor dan gear pompa
7 Filling ICWN 04
Actual Selesai, seal pompa belum datang
Plan Setting conveyor, rotary couple, dan servis vacuum
8 Blow & Shuck 04
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
9 Mesin Label ICWN 01
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
10 Mesin Label ICWN 02
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
11 Mesin Label Ex Jakarta 03
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
12 Mesin Label Ex Jakarta 04
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
13 Mesin Label Ex Jakarta 05
Actual Selesai
Plan Ganti bearing, penambahan oli & grease
14 Mesin Label Ex Jakarta 06
Actual Selesai
Plan Cleaning kondensor, servis pompa cooling dan hot water
15 Bongkar Kondensor HVAC
Actual Selesai
Plan Cleaning evaporator
16 CU. Cooling tangki 3000
Actual Selesai
Plan Ganti oli, ganti filter oli, filter separator dan setting vanbelt
17 Mesin Kompresor
Actual Oli dan filter oli belum datang

: Mesin Utility