Head Office :
Office Kalsel : Jl. A. Yani RT 008, RW 003, Suato Tatakan, Tapin, Kalimantan Selatan 71181
0517-2034060, Fax:0517-2034061
SH PRODUKSI OB SH PRODUKSI COAL SH PRODUKSI PIT SERVICE
DH ENGINEERING OPERATION AGM
PT. HASNUR RIUNG SINERGI
MINING CONTRACTOR
PT. HASNUR RIUNG SINERGI
`
Office 8, 7th Floor, SCBD Lot 28. Jl. Jendral Sudirman Kav, 52-53 Jakarta 12190
021-5362778, Fax: 021-5363055
Office Kalsel : Jl. A. Yani RT 008, RW 003, Suato Tatakan, Tapin, Kalimantan Selatan 71181
0517-2034060, Fax:0517-2034061
SH PRODUKSI COAL SH PRODUKSI PIT SERVICE
OPERATION AGM
GI
NO
INTRUKSI KERJA HARIAN (PIT UTARA) Revisi
Tanggal Be
Halaman
DAY / DATE/ SHIFT :
JUMAT / 21 JULI 2023 / II
HTL 034
HEX 1210
NOTES: EXPOSE K14 P27 ARAH UTARA.
HGS 016
HGS 040
Pengawas OB:
1. RIFUDI (GL) Pengawas COAL:
1. NOOR AGUS (SH)
2. ZUL (GL)
DZ 375
PERAPIHAN JALAN HW P28.
CITRA DRONE
14 JULI 2023
HEX 440
NOTES: GETTING k14 P24-25
HEX 444
NOTES: GETTING K14 P27 ARAH SELATAN.
PC200
PEMBUATAN SLOPE +10 KE 0.
HEX 436
NOTES: EXPOSE K14 027 ARAH
SELATAN.
HEX 438
NOTES: EXPOSE K13 P27 ARAH SELATAN.
PERHATIKAN SLOPE CREST 0 KE -10.
PC200
NGEMAL SLOPE CREST 0
ALOKASI SUPPORT:
1. HDZ 210
2. HEX 437
3. HEX 212
4. HEX 216
HEX 438
HEX 438
NOTES: EXPOSE K15 027 ARAH UTARA.
NOTES: EXPOSE K13 P27 ARAH SELATAN.
PERHATIKAN SLOPE CREST 0 KE -10.
PC200
PEMBUATAN SLOPE +10 KE 0.
PEMBENTUKAN JALAN
DZ 375
PERAPIHAN JALAN HW P28.
HEX 440
HGS 016
NOTES: GETTING K15 P27-26
RAMP TURUN GETINGG PERLAYAER
NO
PERHATIAKAN PATOK BENCH -20
CREST +0
HEX 444
NOTES: GETTING K14 P27 ARAH
SELATAN.
HTL 034
PC200
NGEMAL SLOPE CREST -10
HEX 1210
NOTES: LOADING MUD ARAH UTARA FLAT.
HEX 440
NOTES: GETTING K14 HABISKAN LALU
PINDAH KE ATAS
DOKUMENTASI (PIT UTARA)
DOKUMENTASI 20 JULI
2023
HEX 438
UTARA.
ELATAN.
-10.
HEX 1210
NOTES: EXPOSE K14 P28 ARAH SELATAN.
HEX 440
NOTES: GETTING K15 P27-26 OP
RAMP TURUN GETINGG PERLAYAER
NO
PERHATIAKAN PATOK BENCH -20
NO
INTRUKSI KERJA HARIAN (PIT TENGAH) Revisi
Tanggal Berlaku
Halaman
DAY / DATE/ SHIFT :
JUMAT / 21 JULI 2023 / II
CITRA DRONE
14 JULI 2023
Pengawas OB:
1. RIJALI (SH)
2. HENDRIKA (FGDP)
Pengawas COAL:
1. NOOR AGUS (SH)
HEX 219
NOTE: GETTING K13 P38
LOADING FLAT
HEX 455
NOTE: EXPOSE K11 P40 AL = 1.9
RL = 0
BENTUK SLOPE CREST +10 KE BENCH 0, SLOPE
DEGREE = 45. LANGSIR MINOR SEAM K11
NO FLEET HAULER LOKASI MATERIAL AL RL Dumping Point Distance (m) Volume
1 HEX 1207 5 K12 P35 OB -30.0 -30 (FLAT) OPD TENGAH P36 2242 5000
2 OPSI PERALIHAN HEX 1207 5 BP P35 MD -28.0 -35 OPD TENGAH MUDCELL P37 2229 4000
3 HEX 455 5 K11 LW P40 OB 0 0 (FLAT) IPD TENGAH P33 1320 3840
4 HEX 446 GENERAL SUPPORT HEX 1207 APABILA LOADING LUMPUR
5 HEX 446/219 9 K13 P36 CO -30.0 -30 (FLAT) ROM 3886 1500
: HRS-FRM-ENG-012
:0
: 21/07/2023
:-
Activity Plan
HEX 219
NOTE: GETTING K13 P38 LOADING FLAT
CREST -10
HEX 1207
NOTE: LOADING MUD BP P35
CREST -20
MATERIAL
BLENDINGAN
HEX 455
NOTE: EXPOSE K11 P40 AL = 5
RL = 0
LOADING FLAT, BENTUK SLOPE 45 DEGREE
DARI CREST +10 KE 0.
WAJIB BENTUK SLOPE!
CREST +10
E/ SHIFT
SELASA / 18 JULI 2023 / II
NO : HRS-FRM-ENG-012
INTRUKSI KERJA HARIAN (PIT SELATAN) Revisi :0
Tanggal Berlaku : 01/07/2023
Halaman
DAY / DATE/ SHIFT : JUMAT / 21 JULI 2023 / II
Pengawas OB:
HEX 1206
NOTE: EXPOSE K16 HW P41
LOADING RAMP PEMBENTUKAN JALAN
HEX 452
NOTE: GETTING K15 P43 ARAH SELATAN
(HATI HATI DENGAN HANGING COAL)
HTL 016
HTL 015 OPSI HEX 454
NOTE: LOADING MUD LW P43 (LAHAN FAHRI)
HTL 046
HEX 1212
NOTE: EXPOSE K16 HW P45 HEX 445
NOTE: GETTING K15 P43
ARAH SELATAN (RAMP) (HATI HATI DENGAN PATOK CREST 0)
OPSI HEX 445
NOTE: GETTING K16 P46 (BOTTOM PIT)
HGS HTL
ALOKASI SUPPORT:
1. HDZ 028
2. HDZ 207
3. HEX 217 (CUTTING)
NO
1 HEX 1206 5 HW P41 OB -6 RAMP OPD TENGAH P39 1983 5000 STRIPPING HW
2 HEX 1212 5 K16 HW P44 OB -17 -30 OPD TENGAH P39 2420 5000 EXPOSE K16 H
3 HEX 454 7 K16 P42 OB 8 -10 OPD SELATAN P44 1820 2000 EXPOSE K
4 HEX 445 (N/A) K15 P42 CO 11.7 FLAT ROM 4200 1500 GETTING K15
5 HEX 453 (N/A) K16 P43 CO 4.2 0 ROM 4272 1500 GETTING K16
6 HEX 452 (N/A) K16 P43 CO -4.0 -10 ROM 4307 1500 GETTING K16
1. RIJALI (SH)
: HRS-FRM-ENG-012
:0
: 01/07/2023
CITRA DRONE
14 JULI 2023
HEX 454
NOTE: EXPOSE K16 P42 (LOADING MATERIAL
CLEANING DAN EXPOSE) (HATI
- HATI MINOR SEAM)
STRIPPING HW P41
EXPOSE K16 HW P44
EXPOSE K16 P42
GETTING K15 P42
GETTING K16 P43
GETTING K16 P43
DOKUMENTASI (PIT SELATAN)
DAY / DATE/ SHIFT
JUMAT / 21 JULI 2023 / II
DOKUMENTASI DRONE 19 JULI
2023
HEX 445
NOTE: GETTING K15 P43
ARAH SELATAN (RAMP) (HATI
HATI DENGAN PATOK CREST 0)
HEX 1206
NOTE: EXPOSE K16 HW P41 LOADING RAMP
PEMBENTUKAN JALAN
HEX 454
NOTE: EXPOSE K16 P42 (LOADING
MATERIAL CLEANING DAN EXPOSE) (HATI
- HATI MINOR SEAM)
HEX 452
NOTE: GETTING K16 P43
HEX 453
NOTE: GETTING K16 P43 ARAH
SELATAN
HEX 1212
NOTE: EXPOSE K16 HW P45
HGS 022
DOKUMENTASI (PIT SELATAN)
DAILY DUMPING PLAN (OPD UTARA)
DAY / DATE/ SHIFT
JUM'AT / 21 JULI 2023 / II
Pengawas Disposal :
1. Suhartono (SH)
2. Andre (GL)
DUMPING POINT LUMPUR CAIR HEX1210 PASTIKAN DUMPING LUMPUR KEDALAM MUDCELL
HEX 1210
1. RAMP TURUN KE BENCH DIBAWAH
2. LAYERING MATERIAL BAIK LAYERING FREE DUMP
HEX439 & HEX436
1. DUMPING FLAT RL+55 MENUTUP AREA MUD CELL LAMA
2. PELEBARAN KE SISI BARAT RL+55
3. PENINGGIAN SISI BARAT MUD CELL AKTIF
D UTARA) No.
Revisi
Tanggal Berlaku
: HRS-FRM-ENG-013
:0
7/21/2023
MUDCELL 48 50 MD 2 1210
UPDATE PATOK
Patok AL RL Keterangan
BATAS DUMPING
BATAS DUMPING
BOUNDARY DISPOSAL
Keterangan
PASTIKAN TIDAK FREE DUMP DI DISPOSAL
PASTIKAN TIDAK DUMPING LUMPUR CAIR DILUAR AREA MUDCELL
PASTIKAN DUMPINGAN SISI TIMUR MUDCELL TIDAK OVER DARI BATAS TOE LINE
PASTIKAN TIDAK DUMPING MATERIAL OB KEDALAM MUDCELL PASTIKAN DUMPINGAN
TIDAK MELEBIHI BATAS PATOK SURVEY
DOKUMENTASI (OPD UTARA)
AREA MUDCELL
2. Ali (GL)
3. Audy Dhata (GL)
OPD OHT TENGAH (RAMP SMOOTH) HEX 1212
AL: +61 RL: +65
NOTE: UNTUK MATERIAL BAGUS/KERING RAMP TURUN DAHULU UNTUK MENGISI RL
+55 LALU LANJUT RL +60 +65 DAN +70
OPD TENGAH DAN SELATAN (MUD CELL) HEX 436/HEX 453/HEX 1205
AL: 45 RL: +50
NOTE: MATERIAL CAIR/LUMPUR DUMPING HABIS
OPD OHT TENGAH (OPSI LAYER +60 PENINGGIAN DINDING MUDCELL) HEX 1206
AL: +55 RL: +60
NOTE: LAYER KE +60 UNTUK MENINGGIKAN DINDING MUDCELL, MATERIAL BAGUS DAN WAJIB BAIK
LAYER ARAH UTARA
DAILY DUMPING PLAN (OPD TENGAH)
DAY / DATE/ SHIFT JUMAT / 21 JULI 2023 / II
Pengawas Disposal :
CITRA DRONE
1. Suhartono (SH) 17 JULI 2023
2. Ali (GL)
3. Audy Dhata (GL)
OPD OHT TENGAH (RAMP SMOOTH) HEX 1212
AL: +61 RL: +65
NOTE: UNTUK MATERIAL BAGUS/KERING RAMP TURUN DAHULU UNTUK MENGISI RL
+55 LALU LANJUT RL +60 +65 DAN +70
OPD TENGAH DAN SELATAN (MUD CELL) HEX 436/HEX 453/HEX 1205
AL: 45 RL: +50
NOTE: MATERIAL CAIR/LUMPUR DUMPING HABIS
OPD OHT TENGAH (OPSI LAYER +60 PENINGGIAN DINDING MUDCELL) HEX 1206
AL: +55 RL: +60
NOTE: LAYER KE +60 UNTUK MENINGGIKAN DINDING MUDCELL, MATERIAL BAGUS DAN WAJIB BAIK
LAYER ARAH UTARA
No. : HRS-FRM-ENG-013
Revisi :0
Tanggal Berlaku 7/21/2023
Halaman : 3 dari 4
DUMPING POINT DT
Area AL RL Material Jumlah Fleet No. Fleet
UPDATE PATOK
Patok AL RL Keterangan
BATAS DUMPING
TOE LINE BENCH
BATAS DUMPING
BATAS DUMPING
Keterangan
PASTIKAN TIDAK FREE DUMP DI DISPOSAL
PASTIKAN TIDAK MELEBIHI BATAS PITA SURVEY
PASTIKAN DUMPINGAN TIDAK OVER DARI BATAS TOE LINE
DAILY DUMPING PLAN OPD TENGAH
RL = +70
RL = +55
RL = +55
RL = +65
RL = +60
DAILY DUMPING PLAN (OPD SELATAN)
DAY / DATE/ SHIFT JUMAT / 21 JULI 2023 / II
Pengawas Disposal : CITRA DRONE
1. Miftakhul Munir (SH) 17 JULI 2023
2. Antalgin (GL)
3. Widodo (GL)
OPD OHT SELATAN SISI TIMUR (RL +65) HEX 1212
NOTE: LANJUT LAYER KE +65 DAN PERHATIKAN PATOK TOE +65 DUMPING ARAH UTARA DAN TIMUR
PERAPIAN BENCH +50 DAN +55 NOTE: PERAPIAN BENCH +55 DAN +50 DAN SLOPING
PERHATIKAN PATOK TOE +50 DAN +55
RL: +60
RL: +45
OPD OHT SELATAN SISI SELATAN (RL +50
DAN +55)
HEX 454/1212
NOTE: PERAPIHAN SLOPING DAN PEMENUHAN LAYER +50 DAN +55,
PERHATIKAN PATOK TOE +50 DAN +55 PERHATIKAN WILAYAH REKLAMASI DAN JALAN ASPAL
DAILY DUMPING PLAN (OPD SELATAN)
DAY / DATE/ SHIFT JUMAT / 21 JULI 2023 / II
gawas Disposal : CITRA DRONE
ftakhul Munir (SH) 17 JULI 2023
ntalgin (GL)
idodo (GL)
HT SELATAN SISI TIMUR (RL +65) HEX 1212
ANJUT LAYER KE +65 DAN PERHATIKAN PATOK TOE +65 DUMPING ARAH UTARA DAN TIMUR
AN BENCH +50 DAN +55 NOTE: PERAPIAN BENCH +55 DAN +50 DAN SLOPING
IKAN PATOK TOE +50 DAN +55
DUMPING POINT DT
Area AL RL Material Jumlah Fleet No. Fleet
UPDATE PATOK
Patok AL RL Keterangan
BATAS DUMPING
TOE LINE BENCH +35
BATAS DUMPING
BATAS DUMPING
Keterangan
PASTIKAN TIDAK FREE DUMP DI DISPOSAL
PASTIKAN TIDAK MELEBIHI BATAS PITA SURVEY
PASTIKAN DUMPINGAN TIDAK OVER DARI BATAS TOE LINE
DOKUMENTASI OPD SELATAN
OPD SELATAN
AL: +62
RL: +60
RL: +55
RL: +50
RL: +45
RL: +65
TAN
Dokumentasi D rone
19 JULI 202 3
Dokumentasi Dro ne
19 JULI 2023
IKH PIT SERVICE
DAY / DATE :
JUMAT / 21 JULI 2023 / II
REHANDLING SOIL
REHANDLING SOIL DISPOSAL SECTION 3
IL
IL DISPOSAL SECTION 3