PROYEK MNC LIDO - PEKERJAAN GALIAN, URUKAN &

KSO STC-NRC MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME KETERANGAN


NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D NO. TT DO/POB

BESI D 10 X 12 MTR :
2 25 Jul 20 Deforme Bars /Besi Ulir D10 x 12 Mtr PT.Krakatau WOS H 1933 DP u/Box Culvert 179 Btg 259 Pob-0162
3 25 Sep 20 Deforme Bars /Besi Ulir D10 x 12 Mtr PT.Krakatau WOS A 9176 Y u/Box Culvert 2210 44 Btg 330 Pob-0176

Jumlah 223 Btg


BESI D 13 X 12 MTR :
3 25 Jul 20 Deforme Bars /Besi Ulir D13 x 12 Mtr PT.Krakatau WOS H 1933 DP 100 Btg 259 Pob-0162
4 25 Sep 20 Deforme Bars /Besi Ulir D13 x 12 Mtr PT.Krakatau WOS A 9176 Y 2210 134 Btg 330 Pob-0176

Jumlah 234 Btg


BESI D 16 X 12 MTR :
4 25 Jul 20 Deforme Bars /Besi Ulir D16 x 12 Mtr PT.Krakatau WOS H 1933 DP 94 Btg 259 Pob-0162
5 25 Sep 20 Deforme Bars /Besi Ulir D16 x 12 Mtr PT.Krakatau WOS A 9176 Y 2210 35 Btg 330 Pob-0176

Jumlah 129 Btg


BESI D 19 X 12 MTR :
5 25 Jul 20 Deforme Bars /Besi Ulir D19 x 12 Mtr PT.Krakatau WOS H 1933 DP 769 Btg 259 Pob-0162
6 25 Sep 20 Deforme Bars /Besi Ulir D19 x 12 Mtr PT.Krakatau WOS A 9176 Y 2210 525 Btg 330 Pob-0176

Jumlah 1,294 Btg


BESI D 22 X 12 MTR :
7 25 Sep 20 Deforme Bars /Besi Ulir D19 x 12 Mtr PT.Krakatau WOS A 9176 Y 2210 367 Btg 330 Pob-0176

Jumlah 367 Btg


BESI D 25 X 12 MTR :
7 25 Jul 20 Deforme Bars /Besi Ulir D25 x 12 Mtr PT.Krakatau WOS H 1933 DP 367 Btg 259 Pob-0162

Jumlah 367 Btg

7 27-Jul-20 Sika Grout 215 @25 Kg PT.KSO STC - NRC B 1250 BMD u/Test beban 4 Zak 260 spb-0179
Kiriman lalu 7 Zak +
Jumlah 11 Zak

Bogor tg; 25 September 2020


PROYEK MNC LIDO - PEKERJAAN GALIAN, URUKAN &
KSO STC-NRC MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME KETERANGAN


NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D NO. TT DO/POB

2 24 Aug 20 Kawat Bendrat / Kawat Beton @ 20 Kg PT.Adhi Surya Bajat S 8188 RB u/Pembesian 145 620 Kg 298 Pob-0178

Bogor tg; 25 September 2020


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN & MAKRO
KSO STC-NRC DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
ASAL NO VOLUME No.Surat KETERANGAN
NO TGL NAMA BARANG JAM VOLUME VOLUME
Jalan
BARANG KEND. PJ LBR T/D NO. TT DO/POB

I. STRUKTUR :
12 15-Sep-19 Batu Belah Navisa Jasa Prima B 9112 WYT 08,00 5.80 2.30 1.67 3286 32.74 Ton 22.278 M3 172 POB-0028
13 " " " B 9446 NYT 08,03 6.30 2.30 1.59 3287 30.83 Ton 23.039 M3 173 "
14 16-Sep-19 Batu Belah Navisa Jasa Prima B 6446 NYT 07,46 6.30 2.30 1.61 3434 33.45 Ton 23.329 M3 176 POB-0028
15 " " " F 9335 SA 07,50 6.00 2.30 1.63 3432 31.39 Ton 22.494 M3 177 "
16 " " " B 9445 NYT 07,53 6.30 2.30 1.62 3431 32.18 Ton 23.474 M3 178 "
17 " " " B 9212 SYT 07,59 6.00 2.30 1.65 3435 31.71 Ton 22.770 M3 179 "
18 " " " F 9312 SA 08,03 6.00 2.30 1.71 3436 34.47 Ton 23.598 M3 180 "
19 18-Sep-19 Batu Belah Navisa Jasa Prima F 9313 SA 07,41 6.25 2.35 1.68 2903 33.44 Ton 24.675 M3 194 POB-0028
20 " " " F 9315 SA 07,44 6.00 2.40 1.64 2907 31.85 Ton 23.616 M3 195 "
21 19-Sep-19 Batu Belah Navisa Jasa Prima B 9147 WYT 07,50 5.80 2.30 1.80 2915 34.44 Ton 24.012 M3 196 POB-0028
22 " " " F 9335 SA 07,53 6.00 2.30 1.59 2913 31.07 Ton 21.942 M3 197 "
23 " " " F 9315 SA 07,56 6.00 2.40 1.63 2912 32.26 Ton 23.472 M3 198 "
24 " " " B 9446 NYT 07,59 6.30 2.30 1.62 2911 33.82 Ton 23.474 M3 199 "
25 " " " B 9445 NYT 08,02 6.30 2.30 1.60 2914 33.21 Ton 23.184 M3 200 "
26 " " " B 9212 SYT 08,05 6.00 2.30 1.61 2916 30.06 Ton 22.218 M3 201 "
27 " " " B 9168 NYT 18,41 6.30 2.30 1.63 2925 31.37 Ton 23.619 M3 202 "

Kebutuhan Tota l : M3 Ton Total s/d minggu ini 518.29 m3 371.19 m3 1.396
Subdrai & Sedimen Trap 400 559

Bogor tg; 25 September 2019


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN & MAKRO
KSO STC-NRC DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
ASAL NO VOLUME KETERANGAN
NO TGL NAMA BARANG JAM VOLUME VOLUME
BARANG KEND. PJ LBR T/D No.SJ NO. TT DO/POB

I. PASIR URUG :

Kebutuhan Total : M3 Ton Total s/d minggu ini 0.00 Ton 0.00 m3 #DIV/0!
328 #DIV/0!

Bogor tg; 25 September 2019


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN & MAKRO
KSO STC-NRC DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
ASAL NO VOLUME No.Surat KETERANGAN
NO TGL NAMA BARANG JAM VOLUME VOLUME
Jalan
BARANG KEND. PJ LBR T/D NO. TT DO/POB

I. STRUKTUR :
1 20-Sep-19 Sirtu Navisa Jasa Prima B 9159 NYT 07,52 6.30 2.30 1.58 2929 42.76 Ton 22.894 M3 208 POB-0060
3 21-Sep-19 Sirtu Navisa Jasa Prima F 9388 FF 08,14 6.00 2.35 1.73 2935 38.65 Ton 24.393 M3 224 POB-0060

M3 Ton

Kebutuhan Total 7,927 12,683 Total s/d minggu ini 81.41 Ton 47.287 m3 1.72

Bogor tg; 25 September 2019


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
KSO STC-NRC URUKAN & MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

B. Beton K300 : sudah tagih tgl ; 26 Nop 20


1 5-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 14,33 15,40 32085 3.0 M3 304 Pob-0179
2 7-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM425 15,16 16,55 31120 3.0 M3 306 Pob-0179
3 8-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 14,05 15,20 31210 3.0 M3 307 Pob-0179
1 11-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 15,07 16,52 31303 3.0 M3 310 Pob-0179
2 12-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM231 13,40 14,59 31356 4.0 M3 311 Pob-0179

REV : 00
Bogor tgl ; 26 Nopember 2020
Dibuat Oleh,

Sarwan
Logistik

A. Beton : K175 sudah tagih tgl ; 26 Nop 20


1 28-Jul-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM354 u/Lt kerja Boc Cul 29365 3.0 M3 261 Pob-0146
2 30-Jul-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM352 u/Lt kerja Boc Cul 29444 3.0 M3 263 Pob-0146
3 5-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM420 u/Lt kerja Boc Cul 29712 3.0 M3 265 Pob-0146
4 5-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM422 u/Lt kerja Boc Cul 29724 3.0 M3 266 Pob-0146
5 8-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM420 u/Lt kerja Boc Cul 29796 3.0 M3 269 Pob-0146
6 13-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM367 u/Lt kerja Boc Cul 30050 3.0 M3 271 Pob-0146
7 13-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM354 u/Lt kerja Boc Cul 30057 3.0 M3 272 Pob-0146
8 15-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM231 u/Lt kerja Boc Cul 30151 3.0 M3 274 Pob-0146
9 21-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM426 u/Lt kerja Boc Cul 30457 4.0 M3 295 Pob-0146
10 24-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM126 u/Lt kerja Boc Cul 30614 4.0 M3 297 Pob-0146
11 26-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM352 u/Lt kerja Boc Cul 30693 4.0 M3 299 Pob-0146
12 28-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM399 u/Lt kerja Boc Cul 30785 5.0 M3 301 Pob-0146
13 31-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM367 u/Lt kerja Boc Cul 30935 3.5 M3 302 Pob-0146
1 15-Sep-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM422 u/Lt kerja Boc Cul 31438 4.0 M3 315 Pob-0146

Kebutuhan Total (M3) 49.0 Jumlah 48.5 m3 0.5

REV : 00
Bogor tgl ; 26 Nopember 2020
Dibuat Oleh,

Sarwan
Logistik

C. Beton K300 INTEGRAL: sudah tagih tgl ; 26 Nop 20


Beton Readymix K300 Integral NFA
1 19-Sep-20 PT.Waskita Beton P TM192 11,29 11,49 31647 6.0 M3 318 Pob-0179
Slump 8+2
2 " sda sda TM342 12,31 13,12 31648 6.0 M3 319 Pob-0179
3 " sda sda TM426 14,05 14,52 31649 6.0 M3 320 Pob-0179
4 " sda sda TM343 15,56 16,17 31654 6.0 M3 321 Pob-0179
5 " sda sda TM425 17,39 17,58 31660 6.0 M3 322 Pob-0179
6 " sda sda TM426 18,17 18,45 31663 6.0 M3 323 Pob-0179
7 " sda sda TM352 19,38 20,30 31669 5.0 M3 324 Pob-0179
Kebutuhan Total (M3) Jumlah 41.0 m3 (41.0)

REV : 00
Bogor tgl ; 26 Nopember 2020
Dibuat Oleh,
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

Sarwan
Logistik
C. Beton K300 INTEGRAL: sudah tagih tgl ; 26 Nop 20
Beton Readymix K300 Integral NFA
1 28-Sep-20 PT.Waskita Beton P TM422 10,22 10,52 31935 6.0 M3 334 Pob-0179
Slump 8+2
2 " sda sda TM427 11,26 11,52 31939 6.0 M3 335 Pob-0179
3 " sda sda TM364 12,18 12,36 31940 6.0 M3 336 Pob-0179
4 " sda sda TM231 13,24 13,45 31941 6.0 M3 337 Pob-0179
5 " sda sda TM192 14,07 14,14 31942 6.0 M3 338 Pob-0179
6 " sda sda TM367 14,46 15,11 31944 6.0 M3 339 Pob-0179
7 " sda sda TM420 15,35 16,27 31946 5.0 M3 340 Pob-0179
Beton Readymix K300 Integral NFA
1 2-Oct-20 PT.Waskita Beton P TM399 09,47 10,06 32145 6.0 M3 345 Pob-0179
Slump 8+2
2 " sda sda TM364 10,12 10,23 32146 6.0 M3 346 Pob-0179
3 " sda sda TM231 10,28 10,37 32148 6.0 M3 347 Pob-0179
4 " sda sda TM354 10,54 11,07 32152 6.0 M3 348 Pob-0179
5 " sda sda TM192 11,28 11,37 32156 6.0 M3 349 Pob-0179
6 " sda sda TM194 14,13 14,22 32160 6.0 M3 350 Pob-0179
7 " sda sda TM420 14,28 15,07 32161 6.0 M3 351 Pob-0179
Beton Readymix K300 Integral NFA
8 2-Oct-20 PT.Waskita Beton P TM354 15,15 15,26 32164 6.0 M3 352 Pob-0179
Slump 8+2
9 " sda sda TM343 15,29 15,39 32167 6.0 M3 353 Pob-0179
10 " sda sda TM342 15,44 15,54 32168 6.0 M3 354 Pob-0179
11 " sda sda TM367 15,56 16,06 32169 6.0 M3 355 Pob-0179
12 " sda sda TM422 16,25 16,36 32173 6.0 M3 356 Pob-0179
13 " sda sda TM365 16,45 16,54 32174 6.0 M3 357 Pob-0179
14 " sda sda TM192 17,57 18,06 32175 6.0 M3 358 Pob-0179
15 " sda sda TM399 17,11 17,16 32176 4.0 M3 359 Pob-0179
Beton Readymix K300 Integral NFA
1 6-Oct-20 PT.Waskita Beton P TM365 09,57 10,08 32321 6.0 M3 366 Pob-0179
Slump 8+2
2 " sda sda TM399 10,14 10,52 32322 6.0 M3 367 Pob-0179
3 " sda sda TM343 10,56 11,11 32323 6.0 M3 368 Pob-0179
4 " sda sda TM192 11,18 11,27 32324 6.0 M3 369 Pob-0179
5 " sda sda TM422 11,33 11,41 32325 6.0 M3 370 Pob-0179
6 " sda sda TM342 12,00 12,06 32326 6.0 M3 371 Pob-0179
7 " sda sda TM194 13,26 13,34 32327 3.5 M3 372 Pob-0179
Beton Readymix K300 Integral NFA
1 15-Oct-20 PT.Waskita Beton P TM126 10,38 10,53 32648 6.0 M3 379 Pob-0179
Slump 8+2
2 " sda sda TM426 11,01 11,13 32649 6.0 M3 380 Pob-0179
3 " sda sda TM427 11,19 11,28 32650 6.0 M3 381 Pob-0179
4 " sda sda TM364 11,32 11,45 32651 6.0 M3 382 Pob-0179
5 " sda sda TM367 11,45 11,54 32652 6.0 M3 383 Pob-0179
6 " sda sda TM126 12,11 12,18 32653 6.0 M3 384 Pob-0179
7 " sda sda TM365 12,22 12,29 32654 6.0 M3 385 Pob-0179
8 " sda sda TM426 12,31 13,17 32655 6.0 M3 386 Pob-0179
Beton Readymix K300 Integral NFA
9 15-Oct-20 PT.Waskita Beton P TM427 13,21 13,27 32656 6.0 M3 387 Pob-0179
Slump 8+2
10 " sda sda TM126 13,56 14,05 32659 6.0 M3 388 Pob-0179
11 " sda sda TM365 14,10 14,16 32660 6.0 M3 389 Pob-0179
12 " sda sda TM352 14,18 14,32 32661 6.0 M3 390 Pob-0179
13 " sda sda TM426 14,34 14,42 32662 6.0 M3 391 Pob-0179
14 " sda sda TM427 15,00 15,25 32663 6.0 M3 392 Pob-0179

Kebutuhan Total (M3) Jumlah 252.5 m3

REV : 00
Bogor tgl ; 26 Nopember 2020
Dibuat Oleh,

Sarwan
Logistik
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

C. Beton K300 INTEGRAL: sudah tagih tgl ; 26 Nop 20

Beton Readymix K300 Integral NFA


1 21-Oct-20 PT.Waskita Beton P TM425 10,38 10,52 32782 6.0 M3 397 Pob-0179
Slump 8+2
2 " sda sda TM231 11,07 11,20 32783 6.0 M3 398 Pob-0179
3 " sda sda TM420 11,29 11,40 32785 6.0 M3 399 Pob-0179
4 " sda sda TM352 11,43 12,02 32784 6.0 M3 400 Pob-0179
5 " sda sda TM342 13,17 13,30 32790 5.0 M3 401 Pob-0179
6 " sda sda TM352 13,40 13,49 32793 5.0 M3 402 Pob-0179
7 " sda sda TM426 13,54 14,20 32794 3.0 M3 403 Pob-0179
Beton Readymix K300 Integral NFA
1 24-Oct-20 PT.Waskita Beton P TM192 10,09 10,22 32868 6.0 M3 408 Pob-0179
Slump 8+2
2 " sda sda TM342 10,26 10,42 32869 6.0 M3 409 Pob-0179
3 " sda sda TM231 10,56 11,10 32870 6.0 M3 410 Pob-0179
4 " sda sda TM420 11,14 11,31 32871 6.0 M3 411 Pob-0179
5 " sda sda TM352 11,35 11,52 32872 6.0 M3 412 Pob-0179
6 " sda sda TM425 11,58 12,09 32873 6.0 M3 413 Pob-0179
7 " sda sda TM343 12,16 12,40 32874 6.0 M3 414 Pob-0179
8 " sda sda TM427 12,50 13,00 32875 5.0 M3 415 Pob-0179
Beton Readymix K300 Integral NFA
1 26-Oct-20 PT.Waskita Beton P TM352 10,15 10,28 32911 6.0 M3 417 Pob-0179
Slump 8+2
2 " sda sda TM427 10,44 11,00 32926 6.0 M3 418 Pob-0179
3 " sda sda TM420 11,10 11,24 32929 6.0 M3 419 Pob-0179
4 " sda sda TM342 11,27 11,43 32930 6.0 M3 420 Pob-0179
5 " sda sda TM352 11,46 12,00 32931 6.0 M3 421 Pob-0179
6 " sda sda TM427 12,10 12,21 32932 5.0 M3 422 Pob-0179
7 " sda sda TM420 12,55 13,01 32933 3.5 M3 423 Pob-0179
8 " sda sda TM352 13,49 13,59 32935 2.5 M3 424 Pob-0179
Beton Readymix K300 Integral NFA
1 30-Oct-20 PT.Waskita Beton P TM342 10,41 10,56 32981 6.0 M3 430 Pob-0179
Slump 8+2
2 " sda sda TM420 11,06 11,17 32982 6.0 M3 431 Pob-0179
3 " sda sda TM192 11,21 11,32 32983 6.0 M3 432 Pob-0179
4 " sda sda TM425 12,22 12,34 32984 6.0 M3 433 Pob-0179
5 " sda sda TM343 13,11 13,30 32985 5.0 M3 434 Pob-0179
Beton Readymix K300 Integral NFA
1 2-Nov-20 PT.Waskita Beton P TM342 10,31 10,51 33030 6.0 M3 436 Pob-0179
Slump 8+2
2 " sda sda TM420 11,08 11,24 33033 6.0 M3 437 Pob-0179
3 " sda sda TM427 11,40 11,54 33034 6.0 M3 438 Pob-0179
4 " sda sda TM364 12,02 12,18 33035 6.0 M3 439 Pob-0179
5 " sda sda TM425 12,27 12,45 33036 6.0 M3 440 Pob-0179
6 " sda sda TM342 13,15 13,40 33037 6.0 M3 441 Pob-0179
7 " sda sda TM343 13,44 14,02 33038 5.0 M3 442 Pob-0179
8 " sda sda TM427 14,40 14,49 33041 2.5 M3 443 Pob-0179
Beton Readymix K300 Integral NFA
14 3-Nov-20 PT.Waskita Beton P TM425 11,44 12,14 33059 6.0 M3 445 Pob-0179
Slump 8+2
15 " sda sda TM231 12,19 12,43 33062 6.0 M3 446 Pob-0179
16 " sda sda TM343 13,02 13,28 33065 6.0 M3 447 Pob-0179
17 " sda sda TM427 13,52 14,20 33066 6.0 M3 448 Pob-0179
18 " sda sda TM231 14,23 14,44 33073 6.0 M3 449 Pob-0179
19 " sda sda TM427 15,42 16,07 33082 6.0 M3 450 Pob-0179
20 " sda sda TM343 16,11 16,29 33083 6.0 M3 451 Pob-0179
21 " sda sda TM342 17,41 17,58 33089 5.0 M3 452 Pob-0179
22 " sda sda TM425 18,05 18,23 33090 4.0 M3 453 Pob-0179
1 3-Nov-20 Beton Readymix K300 Slump 10 + 2 CmPT.Waskita Beton P TM231 u/Pedestrian 33091 3.0 M3 12282 Pob-0179
Beton Readymix K300 Integral NFA
23 5-Nov-20 PT.Waskita Beton P TM343 13,59 14,15 33127 6.0 M3 455 Pob-0179
Slump 8+2
24 " sda sda TM425 14,25 14,42 33128 6.0 M3 456 Pob-0179
25 " sda sda TM420 14,46 15,02 33129 6.0 M3 457 Pob-0179
26 " sda sda TM231 15,05 15,24 33130 6.0 M3 458 Pob-0179
27 " sda sda TM343 16,06 16,22 33136 4.0 M3 459 Pob-0179
Beton Readymix K300 Integral NFA
1 10-Nov-20 PT.Waskita Beton P TM420 12,03 12,16 968 5.0 M3 463 Pob-0179
Slump 8+2
2 " sda sda TM352 12,21 12,35 969 5.0 M3 464 Pob-0179
3 " sda sda TM126 12,39 12,55 970 5.0 M3 465 Pob-0179
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

4 " sda sda TM427 13,59 14,17 981 6.0 M3 466 Pob-0179
5 " sda sda TM399 16,18 16,52 987 6.0 M3 467 Pob-0179
6 " sda sda TM192 16,57 17,27 984 6.0 M3 468 Pob-0179
7 " sda sda TM133 17,36 18,05 990 6.0 M3 469 Pob-0179
8 " sda sda TM354 18,24 19,03 995 6.0 M3 470 Pob-0179
9 " sda sda TM420 19,39 20,00 996 6.0 M3 471 Pob-0179
Beton Readymix K300 Integral NFA
10 12-Nov-20 PT.Waskita Beton P TM364 12,29 12,46 33297 6.0 M3 473 Pob-0179
Slump 8+2
11 " sda sda TM192 12,56 13,25 33298 6.0 M3 474 Pob-0179
12 " sda sda TM343 13,36 14,12 33299 6.0 M3 475 Pob-0179
13 " sda sda TM342 14,16 14,48 33300 6.0 M3 476 Pob-0179
Beton Readymix K300 Integral NFA
1 13-Nov-20 PT.Waskita Beton P TM192 13,46 13,51 33341 6.0 M3 479 Pob-0179
Slump 8+2
2 " sda sda TM426 13,56 14,05 33342 6.0 M3 480 Pob-0179
3 " sda sda TM364 14,27 14,35 33346 6.0 M3 481 Pob-0179
4 " sda sda TM420 14,39 14,46 33347 5.0 M3 482 Pob-0179
5 " sda sda TM342 14,55 15,05 33348 4.0 M3 483 Pob-0179
6 " sda sda TM426 15,26 15,36 33351 3.5 M3 484 Pob-0179

Kebutuhan Total (M3) Jumlah 385.0 m3

REV : 00
Bogor tgl ; 26 Nopember 2020
Dibuat Oleh,

Sarwan
Logistik
PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
KSO STC-NRC URUKAN & MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

A. Beton : K175
1 28-Jul-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM354 u/Lt kerja Boc Cul 29365 3.0 M3 261 Pob-0146
2 30-Jul-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM352 u/Lt kerja Boc Cul 23231 3.0 M3 263 Pob-0146
3 5-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM420 u/Lt kerja Boc Cul 29712 3.0 M3 265 Pob-0146
4 5-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM422 u/Lt kerja Boc Cul 29724 3.0 M3 266 Pob-0146
5 8-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM420 u/Lt kerja Boc Cul 29795 3.0 M3 269 Pob-0146
6 13-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM367 u/Lt kerja Boc Cul 30050 3.0 M3 271 Pob-0146
7 13-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM354 u/Lt kerja Boc Cul 30057 3.0 M3 272 Pob-0146
8 15-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM231 u/Lt kerja Boc Cul 30151 3.0 M3 274 Pob-0146
9 21-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM426 u/Lt kerja Boc Cul 30457 4.0 M3 295 Pob-0146
10 24-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM126 u/Lt kerja Boc Cul 30614 4.0 M3 297 Pob-0146
11 26-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM352 u/Lt kerja Boc Cul 30693 4.0 M3 299 Pob-0146
12 28-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM399 u/Lt kerja Boc Cul 30785 5.0 M3 301 Pob-0146
13 31-Aug-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM367 u/Lt kerja Boc Cul 30935 3.5 M3 302 Pob-0146
1 15-Sep-20 Beton Readymix K175 Slump 10+2 PT.Waskita Beton P TM422 u/Lt kerja Boc Cul 31438 4.0 M3 315 Pob-0146

Kebutuhan Total (M3) 49.0 Jumlah 48.5 m3 0.5

B. Beton K300 :
1 5-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 14,33 15,40 32085 3.0 M3 304 Pob-0179
2 7-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM425 15,16 16,55 31120 3.0 M3 306 Pob-0179
3 8-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 14,05 15,20 31210 3.0 M3 307 Pob-0179
1 11-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM342 15,07 16,52 31303 3.0 M3 310 Pob-0179
2 12-Sep-20 Beton Readymix K300 NFA Slump 10+2
PT.Waskita Beton Precast TM231 13,40 14,59 31356 4.0 M3 311 Pob-0179

Kebutuhan Total (M3) 17.0 Jumlah 16.0 m3 1.0

C. Beton K300 INTEGRAL:


Beton Readymix K300 Integral NFA
1 19-Sep-20 PT.Waskita Beton P TM192 11,29 11,49 31647 6.0 M3 318 Pob-0179
Slump 8+2
2 " sda sda TM342 12,31 13,12 31648 6.0 M3 319 Pob-0179
3 " sda sda TM426 14,05 14,52 31649 6.0 M3 320 Pob-0179
4 " sda sda TM343 15,56 16,17 31654 6.0 M3 321 Pob-0179
5 " sda sda TM425 17,39 17,58 31660 6.0 M3 322 Pob-0179
6 " sda sda TM426 18,17 18,45 31663 6.0 M3 323 Pob-0179
7 " sda sda TM352 19,38 20,30 31669 5.0 M3 324 Pob-0179
Beton Readymix K300 Integral NFA
1 28-Sep-20 PT.Waskita Beton P TM422 10,22 10,52 31935 6.0 M3 334 Pob-0179
Slump 8+2
2 " sda sda TM427 11,26 11,52 31939 6.0 M3 335 Pob-0179
3 " sda sda TM364 12,18 12,36 31940 6.0 M3 336 Pob-0179
4 " sda sda TM231 13,24 13,45 31941 6.0 M3 337 Pob-0179
5 " sda sda TM192 14,07 14,14 31942 6.0 M3 338 Pob-0179
6 " sda sda TM367 14,46 15,11 31944 6.0 M3 339 Pob-0179
7 " sda sda TM420 15,35 16,27 31946 5.0 M3 340 Pob-0179
Beton Readymix K300 Integral NFA
1 2-Oct-20 PT.Waskita Beton P TM399 09,47 10,06 32145 6.0 M3 345 Pob-0179
Slump 8+2
2 " sda sda TM364 10,12 10,23 32146 6.0 M3 346 Pob-0179
3 " sda sda TM231 10,28 10,37 32148 6.0 M3 347 Pob-0179
4 " sda sda TM354 10,54 11,07 32152 6.0 M3 348 Pob-0179
5 " sda sda TM192 11,28 11,37 32156 6.0 M3 349 Pob-0179
6 " sda sda TM194 14,13 14,22 32160 6.0 M3 350 Pob-0179
7 " sda sda TM420 14,28 15,07 32161 6.0 M3 351 Pob-0179
Beton Readymix K300 Integral NFA
8 2-Oct-20 PT.Waskita Beton P TM354 15,15 15,26 32164 6.0 M3 352 Pob-0179
Slump 8+2
9 " sda sda TM343 15,29 15,39 32167 6.0 M3 353 Pob-0179
10 " sda sda TM342 15,44 15,54 32168 6.0 M3 354 Pob-0179
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

11 " sda sda TM367 15,56 16,06 32169 6.0 M3 355 Pob-0179
12 " sda sda TM422 16,25 16,36 32173 6.0 M3 356 Pob-0179
13 " sda sda TM365 16,45 16,54 32174 6.0 M3 357 Pob-0179
14 " sda sda TM192 17,57 18,06 32175 6.0 M3 358 Pob-0179
15 " sda sda TM399 17,11 17,16 32176 4.0 M3 359 Pob-0179
Beton Readymix K300 Integral NFA
1 6-Oct-20 PT.Waskita Beton P TM365 09,57 10,08 32321 6.0 M3 366 Pob-0179
Slump 8+2
2 " sda sda TM399 10,14 10,52 32322 6.0 M3 367 Pob-0179
3 " sda sda TM343 10,56 11,11 32323 6.0 M3 368 Pob-0179
4 " sda sda TM192 11,18 11,27 32324 6.0 M3 369 Pob-0179
5 " sda sda TM422 11,33 11,41 32325 6.0 M3 370 Pob-0179
6 " sda sda TM342 12,00 12,06 32326 6.0 M3 371 Pob-0179
7 " sda sda TM194 13,26 13,34 32327 3.5 M3 372 Pob-0179
Beton Readymix K300 Integral NFA
1 15-Oct-20 PT.Waskita Beton P TM126 10,38 10,53 32648 6.0 M3 379 Pob-0179
Slump 8+2
2 " sda sda TM426 11,01 11,13 32649 6.0 M3 380 Pob-0179
3 " sda sda TM427 11,19 11,28 32650 6.0 M3 381 Pob-0179
4 " sda sda TM364 11,32 11,45 32651 6.0 M3 382 Pob-0179
5 " sda sda TM367 11,45 11,54 32652 6.0 M3 383 Pob-0179
6 " sda sda TM126 12,11 12,18 32653 6.0 M3 384 Pob-0179
7 " sda sda TM365 12,22 12,29 32654 6.0 M3 385 Pob-0179
8 " sda sda TM426 12,31 13,17 32655 6.0 M3 386 Pob-0179
Beton Readymix K300 Integral NFA
9 15-Oct-20 PT.Waskita Beton P TM427 13,21 13,27 32656 6.0 M3 387 Pob-0179
Slump 8+2
10 " sda sda TM126 13,56 14,05 32659 6.0 M3 388 Pob-0179
11 " sda sda TM365 14,10 14,16 32660 6.0 M3 389 Pob-0179
12 " sda sda TM352 14,18 14,32 32661 6.0 M3 390 Pob-0179
13 " sda sda TM426 14,34 14,42 32662 6.0 M3 391 Pob-0179
14 " sda sda TM427 15,00 15,25 32663 6.0 M3 392 Pob-0179
Beton Readymix K300 Integral NFA
1 21-Oct-20 PT.Waskita Beton P TM425 10,38 10,52 32782 6.0 M3 397 Pob-0179
Slump 8+2
2 " sda sda TM231 11,07 11,20 32783 6.0 M3 398 Pob-0179
3 " sda sda TM420 11,29 11,40 32785 6.0 M3 399 Pob-0179
4 " sda sda TM352 11,43 12,02 32784 6.0 M3 400 Pob-0179
5 " sda sda TM342 13,17 13,30 32790 5.0 M3 401 Pob-0179
6 " sda sda TM352 13,40 13,49 32793 5.0 M3 402 Pob-0179
7 " sda sda TM426 13,54 14,20 32794 3.0 M3 403 Pob-0179
Beton Readymix K300 Integral NFA
1 24-Oct-20 PT.Waskita Beton P TM192 10,09 10,22 32868 6.0 M3 408 Pob-0179
Slump 8+2
2 " sda sda TM342 10,26 10,42 32869 6.0 M3 409 Pob-0179
3 " sda sda TM231 10,56 11,10 32870 6.0 M3 410 Pob-0179
4 " sda sda TM420 11,14 11,31 32871 6.0 M3 411 Pob-0179
5 " sda sda TM352 11,35 11,52 32872 6.0 M3 412 Pob-0179
6 " sda sda TM425 11,58 12,09 32873 6.0 M3 413 Pob-0179
7 " sda sda TM343 12,16 12,40 32874 6.0 M3 414 Pob-0179
8 " sda sda TM427 12,50 13,00 32875 5.0 M3 415 Pob-0179
Beton Readymix K300 Integral NFA
1 26-Oct-20 PT.Waskita Beton P TM352 10,15 10,28 32911 6.0 M3 417 Pob-0179
Slump 8+2
2 " sda sda TM427 10,44 11,00 32926 6.0 M3 418 Pob-0179
3 " sda sda TM420 11,10 11,24 32929 6.0 M3 419 Pob-0179
4 " sda sda TM342 11,27 11,43 32930 6.0 M3 420 Pob-0179
5 " sda sda TM352 11,46 12,00 32931 6.0 M3 421 Pob-0179
6 " sda sda TM427 12,10 12,21 32932 5.0 M3 422 Pob-0179
7 " sda sda TM420 12,55 13,01 32933 3.5 M3 423 Pob-0179
8 " sda sda TM352 13,49 13,59 32935 2.5 M3 424 Pob-0179
Beton Readymix K300 Integral NFA
1 30-Oct-20 PT.Waskita Beton P TM342 10,41 10,56 32981 6.0 M3 430 Pob-0179
Slump 8+2
2 " sda sda TM420 11,06 11,17 32982 6.0 M3 431 Pob-0179
3 " sda sda TM192 11,21 11,32 32983 6.0 M3 432 Pob-0179
4 " sda sda TM425 12,22 12,34 32984 6.0 M3 433 Pob-0179
5 " sda sda TM343 13,11 13,30 32985 5.0 M3 434 Pob-0179
Beton Readymix K300 Integral NFA
1 2-Nov-20 PT.Waskita Beton P TM342 10,31 10,51 33030 6.0 M3 436 Pob-0179
Slump 8+2
2 " sda sda TM420 11,08 11,24 33033 6.0 M3 437 Pob-0179
3 " sda sda TM427 11,40 11,54 33034 6.0 M3 438 Pob-0179
4 " sda sda TM364 12,02 12,18 33035 6.0 M3 439 Pob-0179
5 " sda sda TM425 12,27 12,45 33036 6.0 M3 440 Pob-0179
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

6 " sda sda TM342 13,15 13,40 33037 6.0 M3 441 Pob-0179
7 " sda sda TM343 13,44 14,02 33038 5.0 M3 442 Pob-0179
8 " sda sda TM427 14,40 14,49 33041 2.5 M3 443 Pob-0179
Beton Readymix K300 Integral NFA
14 3-Nov-20 PT.Waskita Beton P TM425 11,44 12,14 33059 6.0 M3 445 Pob-0179
Slump 8+2
15 " sda sda TM231 12,19 12,43 33062 6.0 M3 446 Pob-0179
16 " sda sda TM343 13,02 13,28 33065 6.0 M3 447 Pob-0179
17 " sda sda TM427 13,52 14,20 33066 6.0 M3 448 Pob-0179
18 " sda sda TM231 14,23 14,44 33073 6.0 M3 449 Pob-0179
19 " sda sda TM427 15,42 16,07 33082 6.0 M3 450 Pob-0179
20 " sda sda TM343 16,11 16,29 33083 6.0 M3 451 Pob-0179
21 " sda sda TM342 17,41 17,58 33089 5.0 M3 452 Pob-0179
22 " sda sda TM425 18,05 18,23 33090 4.0 M3 453 Pob-0179
1 3-Nov-20 Beton Readymix K300 Slump 10 + 2 CmPT.Waskita Beton P TM231 u/Pedestrian 33091 3.0 M3 12282 Pob-0179
Beton Readymix K300 Integral NFA
23 5-Nov-20 PT.Waskita Beton P TM343 13,59 14,15 33127 6.0 M3 455 Pob-0179
Slump 8+2
24 " sda sda TM425 14,25 14,42 33128 6.0 M3 456 Pob-0179
25 " sda sda TM420 14,46 15,02 33129 6.0 M3 457 Pob-0179
26 " sda sda TM231 15,05 15,24 33130 6.0 M3 458 Pob-0179
27 " sda sda TM343 16,06 16,22 33136 4.0 M3 459 Pob-0179
Beton Readymix K300 Integral NFA
1 10-Nov-20 PT.Waskita Beton P TM420 12,03 12,16 968 5.0 M3 463 Pob-0179
Slump 8+2
2 " sda sda TM352 12,21 12,35 969 5.0 M3 464 Pob-0179
3 " sda sda TM126 12,39 12,55 970 5.0 M3 465 Pob-0179
4 " sda sda TM427 13,59 14,17 981 6.0 M3 466 Pob-0179
5 " sda sda TM399 16,18 16,52 987 6.0 M3 467 Pob-0179
6 " sda sda TM192 16,57 17,27 984 6.0 M3 468 Pob-0179
7 " sda sda TM133 17,36 18,05 990 6.0 M3 469 Pob-0179
8 " sda sda TM354 18,24 19,03 995 6.0 M3 470 Pob-0179
9 " sda sda TM420 19,39 20,00 996 6.0 M3 471 Pob-0179
Beton Readymix K300 Integral NFA
10 12-Nov-20 PT.Waskita Beton P TM364 12,29 12,46 33297 6.0 M3 473 Pob-0179
Slump 8+2
11 " sda sda TM192 12,56 13,25 33298 6.0 M3 474 Pob-0179
12 " sda sda TM343 13,36 14,12 33299 6.0 M3 475 Pob-0179
13 " sda sda TM342 14,16 14,48 33300 6.0 M3 476 Pob-0179
Beton Readymix K300 Integral NFA
1 13-Nov-20 PT.Waskita Beton P TM192 13,46 13,51 33341 6.0 M3 479 Pob-0179
Slump 8+2
2 " sda sda TM426 13,56 14,05 33342 6.0 M3 480 Pob-0179
3 " sda sda TM364 14,27 14,35 33346 6.0 M3 481 Pob-0179
4 " sda sda TM420 14,39 14,46 33347 5.0 M3 482 Pob-0179
5 " sda sda TM342 14,55 15,05 33348 4.0 M3 483 Pob-0179
6 " sda sda TM426 15,26 15,36 33351 3.5 M3 484 Pob-0179
Beton Readymix K300 Integral NFA
7 16-Nov-20 PT.Waskita Beton P TM192 10,47 11,04 33398 6.0 M3 487 Pob-0179
Slump 8+2
8 " sda sda TM231 11,12 11,34 33401 6.0 M3 488 Pob-0179
9 " sda sda TM352 11,39 11,59 33402 6.0 M3 489 Pob-0179
10 " sda sda TM425 12,12 12,35 33403 6.0 M3 490 Pob-0179
Beton Readymix K300 Integral NFA
11 18-Nov-20 PT.Waskita Beton P TM342 10,22 10,35 33427 6.0 M3 492 Pob-0179
Slump 8+2
12 " sda sda TM352 10,54 11,05 33430 6.0 M3 493 Pob-0179
13 " sda sda TM425 12,55 13,04 33437 6.0 M3 494 Pob-0179
14 " sda sda TM342 13,47 14,13 33438 6.0 M3 495 Pob-0179
15 " sda sda TM352 14,22 14,42 33439 6.0 M3 496 Pob-0179
16 " sda sda TM231 14,54 15,18 33440 6.0 M3 497 Pob-0179
17 " sda sda TM427 15,31 15,58 33441 6.0 M3 498 Pob-0179
18 " sda sda TM425 16,11 16,35 33442 5.0 M3 499 Pob-0179
Beton Readymix K300 Integral NFA
1 20-Nov-20 PT.Waskita Beton P TM 399 11,39 11,48 1357 5.0 M3 504 Pob-0179
Slump 8+2
2 " sda sda TM345 11,57 12,03 1358 5.0 M3 505 Pob-0179
3 " sda sda TM126 13,40 13,56 1359 5.0 M3 506 Pob-0179
4 " sda sda TM427 12,10 12,19 1362 5.0 M3 507 Pob-0179
5 " sda sda TM422 12,25 13,06 1363 4.5 M3 508 Pob-0179
Beton Readymix K300 Integral NFA
6 25-Nov-20 PT.Waskita Beton P TM342 10,01 10,26 33559 6.0 M3 512 Pob-0179
Slump 8+2
7 " sda sda TM343 10,32 10,46 33560 6.0 M3 513 Pob-0179
8 " sda sda TM427 10,50 11,07 33561 6.0 M3 514 Pob-0179
9 " sda sda TM192 11,12 11,23 33562 6.0 M3 515 Pob-0179
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

10 " sda sda TM364 11,35 11,44 33563 6.0 M3 516 Pob-0179
11 " sda sda TM425 11,46 11,55 33564 2.5 M3 517 Pob-0179
Beton Readymix K300 Integral NFA
1 30-Nov-20 PT.Waskita Beton P TM231 11,18 11,30 33697 6.0 M3 520 Pob-0179
Slump 8+2
2 " sda sda TM343 11,38 11,53 33698 6.0 M3 521 Pob-0179
3 " sda sda TM427 12,02 12,14 33699 6.0 M3 522 Pob-0179
4 " sda sda TM192 12,20 12,29 33701 6.0 M3 523 Pob-0179
5 " sda sda TM425 12,33 12,42 33702 6.0 M3 524 Pob-0179
6 " sda sda TM426 12,46 12,53 33703 6.0 M3 525 Pob-0179
7 " sda sda TM342 13,32 13,56 33706 6.0 M3 526 Pob-0179
8 " sda sda TM343 14,25 14,34 33707 3.0 M3 527 Pob-0179
9 " sda sda TM427 14,47 15,03 33708 3.5 M3 528 Pob-0179
Beton Readymix K300 Integral NFA
1 5-Dec-20 PT.Waskita Beton P TM 192 10,45 11,08 33781 6.0 M3 530 Pob-0179
Slump 8+2
2 " sda sda TM343 11,11 11,28 33782 6.0 M3 531 Pob-0179
3 " sda sda TM364 11,32 11,52 33783 6.0 M3 532 Pob-0179
4 " sda sda TM231 11,56 12,13 33784 6.0 M3 533 Pob-0179
5 " sda sda TM426 12,18 12,32 33785 6.0 M3 534 Pob-0179
6 " sda sda TM354 13,10 13,22 33789 4.0 M3 535 Pob-0179
7 " sda sda TM365 13,26 13,35 33790 3.0 M3 536 Pob-0179
Beton Readymix K300 Integral NFA
1 14-Dec-20 PT.Waskita Beton P TM343 10,47 11,10 33929 6.0 M3 539 Pob-0179
Slump 8+2
2 " sda sda TM192 11,15 11,36 33930 6.0 M3 540 Pob-0179
3 " sda sda TM427 11,43 12,08 33931 6.0 M3 541 Pob-0179
4 " sda sda TM342 12,14 12,39 33932 6.0 M3 542 Pob-0179
5 " sda sda TM231 12,46 13,09 33933 6.0 M3 543 Pob-0179
6 " sda sda TM352 13,13 13,35 33934 6.0 M3 544 Pob-0179
7 " sda sda TM420 13,52 14,20 33936 6.0 M3 545 Pob-0179
8 " sda sda TM425 14,25 14,45 33938 4.0 M3 546 Pob-0179
9 " sda sda TM426 14,51 15,11 33939 3.0 M3 547 Pob-0179
Beton Readymix K300 Integral NFA
1 18-Dec-20 PT.Waskita Beton P TM420 13,45 14,08 34008 6.0 M3 554 Pob-0179
Slump 8+2
2 " sda sda TM364 14,44 15,03 34009 6.0 M3 555 Pob-0179
3 " sda sda TM192 14,14 14,40 34010 6.0 M3 556 Pob-0179
4 " sda sda TM352 16,03 16,25 34017 6.0 M3 557 Pob-0179
5 " sda sda TM231 16,28 16,45 34019 4.0 M3 558 Pob-0179
6 " sda sda TM343 16,49 17,05 34020 3.0 M3 559 Pob-0179
Beton Readymix K300 Integral NFA
7 19-Dec-20 PT.Waskita Beton P TM192 11,35 12,05 34043 5.0 M3 561 Pob-0179
Slump 8+2
Beton Readymix K300 Integral NFA
8 24-Dec-20 PT.Waskita Beton P TM 231 10,08 10,27 34103 6.0 M3 563 Pob-0179
Slump 8+2
9 " sda sda TM 343 10,00 10,54 34104 6.0 M3 564 Pob-0179
10 " sda sda TM364 10,58 11,25 34105 6.0 M3 565 Pob-0179
11 " sda sda TM420 11,30 11,49 34106 6.0 M3 566 Pob-0179
12 " sda sda TM231 11,55 12,14 34113 6.0 M3 567 Pob-0179
13 " sda sda TM426 12,44 13,02 34116 6.0 M3 568 Pob-0179
14 " sda sda TM343 13,10 13,30 34117 6.0 M3 569 Pob-0179
15 " sda sda TM364 13,33 14,22 34118 6.5 M3 570 Pob-0179
Beton Readymix K300 Integral NFA
1 26-Dec-20 PT.Waskita Beton P TM192 15,27 15,46 34163 6.0 M3 572 Pob-0179
Slump 8+2
2 " sda sda TM420 14,03 14,21 34164 6.0 M3 573 Pob-0179
3 " sda sda TM422 14,43 15,01 34169 6.0 M3 574 Pob-0179
4 " sda sda TM354 15,04 15,24 34170 6.0 M3 575 Pob-0179
5 " sda sda TM425 15,49 16,03 34171 6.0 M3 576 Pob-0179
6 " sda sda TM422 16,26 16,41 34173 6.5 M3 577 Pob-0179
7 " sda sda TM352 16,45 17,19 34174 6.0 M3 578 Pob-0179
Beton Readymix K300 Integral NFA
8 29-Dec-20 PT.Waskita Beton P TM192 10,27 10,44 34191 6.0 M3 580 Pob-0179
Slump 8+2
9 " sda sda TM352 10,51 11,12 34192 6.0 M3 581 Pob-0179
10 " sda sda TM231 11,16 11,31 34193 6.0 M3 582 Pob-0179
11 " sda sda TM426 11,36 12,00 34194 6.0 M3 583 Pob-0179
12 " sda sda TM343 12,14 12,33 34195 6.0 M3 584 Pob-0179
13 " sda sda TM343 12,58 13,21 34196 6.0 M3 585 Pob-0179
14 " sda sda TM343 14,38 14,47 34201 4.0 M3 586 Pob-0179
Beton Readymix K300 Integral NFA
15 29-Dec-20 PT.Waskita Beton P TM426 14,21 14,49 34231 6.0 M3 587 Pob-0179
Slump 8+2
KODE PROYEK : P61.1903
PROYEK : MNC LIDO MAKRO DRAIN

ASAL NO JAM KETERANGAN


NO TGL NAMA BARANG NO. SJ VOLUME
BARANG KEND./ TM Bongkar Selesai NO. TT DO

16 " sda sda TM420 15,18 15,48 34232 6.0 M3 588 Pob-0179
Beton Readymix K300 Integral NFA
1 5-Jan-21 PT.Waskita Beton Pr TM 420 12.19 12.31 34233 6.0 M3 591 Pob-0179
Slump 8+2
2 5-Jan-21 Sda Sda TM 342 13.02 13.38 34234 6.0 M3 592 Pob-0179
3 5-Jan-21 Sda Sda TM 343 11.09 11.31 34235 6.0 M3 593 Pob-0179
4 5-Jan-21 Sda Sda TM 251 13.49 14.17 34236 4.5 M3 594 Pob-0179
5 5-Jan-21 Sda Sda TM 352 15.03 15.25 34237 6.0 M3 595 Pob-0179
Beton Readymix K300 Integral NFA
1 9-Jan-21 PT.Waskita Beton Pr TM426 10.53 11.14 34413 6.0 M3 596 Pob-0179
Slump 8+2
2 " Sda Sda TM343 11.31 11.40 34414 6.0 M3 597 Pob-0179
3 " Sda Sda TM420 11.44 11.59 34415 6.0 M3 598 Pob-0179
4 " Sda Sda TM192 14.18 14.50 34418 6.0 M3 599 Pob-0179
5 " Sda Sda TM343 14.55 15.19 34419 6.0 M3 600 Pob-0179
6 " Sda Sda TM420 15.35 16.04 34420 6.0 M3 601 Pob-0179
7 " Sda Sda TM342 17.19 17.32 34422 6.0 M3 602 Pob-0179
8 " Sda Sda TM231 17.48 18.03 34423 6.0 M3 603 Pob-0179
9 " Sda Sda TM426 18.21 18.31 34424 3.0 M3 604 Pob-0179

Kebutuhan Total (M3) 1,331.0 Jumlah 1,199.5 m3 132

REV : 00
Bogor tgl ;
Mengetahui, Diperiksa, Dibuat Oleh,

Abdul Haris Taning Sarwan


SPM Deputy PM Construction Manager Logistik

Jumlah Total Readymix : K175 + K300 + K300 Integral 1,264.0 M3


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
KSO STC-NRC URUKAN & MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME KETERANGAN


NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D NO. TT DO/POB

1 5-Sep-19 Bambu Ø8/6 x 400Lido Bangunan B 9221 BDF u/ Theme Park Subdrain6162 207 Btg 69 POB-0031
2 22-Oct-19 Bambu Pj 6 Mtr TB. Lido Bangunan B 9221 BDF u/ Sedimen Trap 17943 20 Lbr 1 spb-0015
3 5-Nov-19 Bambu Lido Bangunan B 9053 BDD u/ Surveyor 17368 50 Btg 13 POB-0019
4 18-Dec-19 Bambu Lido Bangunan B 9053 BDD u/ Surveyor 16559 50 Btg 65 POB-0056
2 6 Jul 20 Bambu Panjang 6 MTb.Lido Bangunan B 9558 BAI u/Survey 15420 10 Btg 248 Pob-0158

Jumlah 337 Btg

Bogor tg; 25 September 2019


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
KSO STC-NRC URUKAN & MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME KETERANGAN


NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D NO. TT DO/POB

1 20-Jan-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1856 DF u/ Pek Pancang Makro 145 13 Btg 98 spb-0063
2 21-Jan-20 " " H 1860 DF " 152 13 Btg 102 "
3 21-Jan-20 " " B 9176 TEA " 122 14 Btg 105 "
4 28-Feb-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P B 9882 SJ u/ Pek Pancang Makro 649 4 Btg 141 spb-0063
5 28-Feb-20 " " H 1839 AS " 252 4 Btg 142 "
6 28-Feb-20 " " H 1914 BS " 255 4 Btg 143 "
7 28-Feb-20 " " H 1861 DF " 648 4 Btg 144 "
8 29-Feb-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1860 DF " 515 4 Btg 145 "
9 29-Feb-20 " " H 1847 DF " 513 4 Btg 146 "
10 4-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1839 AS " 272 4 Btg 151 "
11 4-Mar-20 " " H 1859 DF " 697 4 Btg 152 "
12 5-Feb-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1858 DF " 708 4 Btg 154 "
13 6-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1863 DF u/ Pek Pancang Makro 534 4 Btg 162 spb-0063
14 6-Mar-20 " " H 1839 AS " 281 4 Btg 163 "
15 7-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1858 DF " 740 4 Btg 164 "
16 7-Mar-20 " " H 1847 DF " 540 4 Btg 165 "
17 7-Mar-20 " " H 1860 DF " 536 4 Btg 166 "
6 11-Mar-20 " " H 1837 BS " 304 4 Btg 167 "
7 11-Mar-20 " " H 1910 BS " 808 4 Btg 168 "
8 11-Mar-20 " " H 1855 DF " 553 4 Btg 169 "
9 12-Mar-20 " " H 1839 AS " 309 4 Btg 171 "
1 13-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1854 DF u/ Pek Pancang Makro 568 4 Btg 174 spb-0063
2 13-Mar-20 " " H 1859 DF " 863 4 Btg 175 "
3 15-Mar-20 " " H 1837 BS " 321 5 Btg 177 "
4 18-Mar-20 " " H 1994 BS " 332 4 Btg 183 "
5 19-Mar-20 " " H 1930 BS " 928 4 Btg 184 "
6 19-Mar-20 " " H 1937 BS " 334 4 Btg 185 "
7 19-Mar-20 " " H 1863 DF " 616 4 Btg 186 "
1 21-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 620 4 Btg 188 spb-0063
2 21-Mar-20 " " H 1930 BS " 342 4 Btg 189 "
3 23-Mar-20 " " H 1886 GH " 991 4 Btg 191 "
1 27-Mar-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 657 8 Btg 195 spb-0063
2 27-Mar-20 " " H 1795 AP " 929 4 Btg 196 "
3 28-Mar-20 " " H 1859 DF " 1066 4 Btg 197 "
4 28-Mar-20 " " H 1935 BS " 373 4 Btg 198 "
5 28-Mar-20 " " H 1887 BS " 372 4 Btg 199 "
6 31-Mar-20 " " H 1923 BS " 379 7 Btg 200 "
7 31-Mar-20 " " H 1886 GH " 1075 4 Btg 201 "
8 2-Apr-20 " " H 1858 AS " 1117 4 Btg 205 "
9 2-Apr-20 " " H 1987 AS " 1118 9 Btg 205 "
1 3-Apr-20 Spun Pile 500 A1 Midle 10 Mtr PT. Waskita Beton P H 1997 AS u/ Pek Pancang Makro 1123 9 Btg 209 spb-0063

Jumlah 210 Btg

1 20-Jan-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P B 9884 SJ u/ Pek Pancang Makro 147 11 Btg 99 spb-0063
2 21-Jan-20 " " H 1858 DF " 151 11 Btg 103 "
3 22-Jan-20 " " H 1930 BS " 118 3 Btg 107 "
4 28-Feb-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P B 9882 SJ u/ Pek Pancang Makro 649 5 Btg 141 spb-0063
5 28-Feb-20 " " H 1839 AS " 252 5 Btg 142 "
6 28-Feb-20 " " H 1914 BS " 255 5 Btg 143 "
7 28-Feb-20 " " H 1861 DF " 648 5 Btg 144 "
8 29-Feb-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1860 DF " 515 5 Btg 145 "
9 29-Feb-20 " " H 1847 DF " 513 5 Btg 146 "
10 4-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1839 AS " 272 5 Btg 151 "
11 4-Mar-20 " " H 1859 DF " 697 5 Btg 152 "
12 5-Feb-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1858 DF " 708 5 Btg 154 "
13 6-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1863 DF u/ Pek Pancang Makro 534 5 Btg 162 spb-0063
14 6-Mar-20 " " H 1839 AS " 281 5 Btg 163 "
15 7-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1858 DF " 740 5 Btg 164 "
16 7-Mar-20 " " H 1847 DF " 540 5 Btg 165 "
17 7-Mar-20 " " H 1860 DF " 536 5 Btg 166 "
15 11-Mar-20 " " H 1837 BS " 304 5 Btg 167 "
16 11-Mar-20 " " H 1910 BS " 808 5 Btg 168 "
17 11-Mar-20 " " H 1855 DF " 553 5 Btg 169 "
18 12-Mar-20 " " H 1839 AS " 309 5 Btg 171 "
8 13-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1854 DF u/ Pek Pancang Makro 568 5 Btg 174 spb-0063
9 13-Mar-20 " " H 1859 DF " 863 5 Btg 175 "
10 15-Mar-20 " " H 1837 BS " 321 5 Btg 177 spb-0063
11 18-Mar-20 " " H 1994 BS " 332 5 Btg 183 "
12 19-Mar-20 " " H 1930 BS " 928 5 Btg 184 "
13 19-Mar-20 " " H 1937 BS " 334 5 Btg 185 "
14 19-Mar-20 " " H 1863 DF " 616 5 Btg 186 "
1 21-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 620 5 Btg 188 spb-0063
2 21-Mar-20 " " H 1930 BS " 342 5 Btg 189 "
3 23-Mar-20 " " H 1886 GH " 991 5 Btg 191 "
10 27-Mar-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 657 3 Btg 195 spb-0063
11 27-Mar-20 " " H 1795 AP " 929 5 Btg 196 "
12 28-Mar-20 " " H 1859 DF " 1066 5 Btg 197 "
13 28-Mar-20 " " H 1935 BS " 373 5 Btg 198 "
14 28-Mar-20 " " H 1887 BS " 372 5 Btg 199 "
15 31-Mar-20 " " H 1923 BS " 379 7 Btg 200 "
16 31-Mar-20 " " H 1886 GH " 1075 5 Btg 201 "
17 2-Apr-20 " " H 1858 AS " 1117 5 Btg 205 "
18 2-Apr-20 " " H 1987 AS " 1118 1 Btg 205 "
2 3-Apr-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P H 1997 AS u/ Pek Pancang Makro 1123 4 Btg 209 spb-0063
1 15-Jun-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P B 9529 SQ u/ Pek Pancang Makro 807 14 Btg 234 Pob-0134
2 15-Jun-20 Spun Pile 500 A1 Midle 12 Mtr PT. Waskita Beton P B 727 UIY u/ Pek Pancang Makro 808 12 Btg 235 Pob-0134

Jumlah 236 Btg

1 21-Jan-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1920 GF u/ Pek Pancang Makro 146 11 Btg 101 spb-0063
2 21-Jan-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1847 DF u/ Pek Pancang Makro 150 11 Btg 104 spb-0063
3 22-Jan-20 " " H 1930 BS " 118 10 Btg 107 spb-0063
4 28-Feb-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P B 9882 SJ u/ Pek Pancang Makro 649 5 Btg 141 spb-0063
5 28-Feb-20 " " H 1839 AS " 252 5 Btg 142 "
6 28-Feb-20 " " H 1914 BS " 255 5 Btg 143 "
7 28-Feb-20 " " H 1861 DF " 648 5 Btg 144 "
8 29-Feb-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1860 DF " 515 5 Btg 145 "
9 29-Feb-20 " " H 1847 DF " 513 5 Btg 146 "
10 4-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1839 AS " 272 5 Btg 151 "
11 4-Mar-20 " " H 1859 DF " 697 4 Btg 152 "
12 5-Feb-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1858 DF " 708 5 Btg 154 "
13 6-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1863 DF u/ Pek Pancang Makro 534 5 Btg 162 spb-0063
14 6-Mar-20 " " H 1839 AS " 281 5 Btg 163 "
15 7-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1858 DF " 740 5 Btg 164 "
16 7-Mar-20 " " H 1847 DF " 540 5 Btg 165 "
17 7-Mar-20 " " H 1860 DF " 536 5 Btg 166 "
24 11-Mar-20 " " H 1837 BS " 304 5 Btg 167 "
25 11-Mar-20 " " H 1910 BS " 808 5 Btg 168 "
26 11-Mar-20 " " H 1855 DF " 553 5 Btg 169 "
27 12-Mar-20 " " H 1839 AS " 309 5 Btg 171 "
15 13-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1854 DF u/ Pek Pancang Makro 568 5 Btg 174 spb-0063
16 13-Mar-20 " " H 1859 DF " 863 5 Btg 175 "
17 15-Mar-20 " " H 1837 BS " 321 4 Btg 177 "
18 18-Mar-20 " " H 1994 BS " 332 5 Btg 183 "
19 19-Mar-20 " " H 1930 BS " 928 5 Btg 184 "
20 19-Mar-20 " " H 1937 BS " 334 5 Btg 185 "
21 19-Mar-20 " " H 1863 DF " 616 5 Btg 186 "
1 21-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 620 5 Btg 188 spb-0063
2 21-Mar-20 " " H 1930 BS " 342 5 Btg 189 "
3 23-Mar-20 " " H 1886 GH " 991 5 Btg 191 "
19 27-Mar-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1860 DF u/ Pek Pancang Makro 657 3 Btg 195 spb-0063
20 27-Mar-20 " " H 1795 AP " 929 5 Btg 196 "
21 28-Mar-20 " " H 1859 DF " 1066 5 Btg 197 "
22 28-Mar-20 " " H 1935 BS " 373 5 Btg 198 "
23 28-Mar-20 " " H 1887 BS " 372 5 Btg 199 "
24 31-Mar-20 " " H 1923 BS " 379 1 Btg 200 "
25 31-Mar-20 " " H 1886 GH " 1075 5 Btg 201 "
26 2-Apr-20 " " H 1858 AS " 1117 5 Btg 205 "
27 2-Apr-20 " " H 1987 AS " 1118 4 Btg 205 "
3 3-Apr-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P H 1997 AS u/ Pek Pancang Makro 1123 2 Btg 209 spb-0063
3 15-Jun-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P B 727 UIY u/ Pek Pancang Makro 808 1 Btg 235 Pob-0134
4 15-Jun-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P B 9023 JN u/ Pek Pancang Makro 809 13 Btg 236 Pob-0134
5 15-Jun-20 Spun Pile 500 A1 Bottom 12 Mtr PT. Waskita Beton P B 9003 JN u/ Pek Pancang Makro 810 13 Btg 237 Pob-0134

Jumlah 237 Btg


Bogor tg; 04 April 2020
PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
KSO STC-NRC URUKAN & MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME KETERANGAN


NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D NO. TT DO/POB

9 5-Sep-19 Kayu Dolken Ø10/8Lido Bangunan B 9488 UDE u/ Theme Park Subdrain 6158 400 Btg 68 POB-0031
5 6 Mar 20 Kayu Gelam uk : Ø8Tb.Lido bangunan B 9056 KA u/ Makro Drain 200 Btg 161 Pob-0112

Jumlah 3 600 Btg

Bogor tg; 25 September 2019


PROYEK MNC L
KSO STC-NRC & MAKR

LAPORAN PENERIMAAN BAHAN


PROYEK : INFRASTRUKTUR MNC LIDO - THEME PARK
KODE PROYEK : P61.1903
ASAL NO VOLUME
NO TGL NAMA BARANG JAM
BARANG KEND. PJ

1 11-Sep-19 Bronjong Uk :2 x 1.0 x 1.0 m 09,03 u/ SedimenTheme

Mengetahui, Diperiksa,

Abdul Haris Taning


SPM DPM CM
PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN
& MAKRO DRAINASE AREA THEME PARK

BAHAN

VOLUME No.Surat KETERANGAN


VOLUME
LBR T/D jalan NO. TT DO/POB

u/ SedimenTheme 75 150 Unit

Jumlah 150 Unit

REV : 00
Bogor tgl ; 12 September 2019
Dibuat Oleh,

Sarwan
Logistik
PROYEK MNC LIDO
KSO STC-NRC URUKAN & MAKRO D

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P08.1803
ASAL NO VOLUME
NO TGL NAMA BARANG JAM
BARANG KEND. PJ LBR

Jumlah 0.000
PROYEK MNC LIDO CITY - PEKERJAAN GALIAN,
URUKAN & MAKRO DRAINASE AREA THEME PARK

BAHAN

VOLUME KETERANGAN
VOLUME
T/D NO. TT DO/POB

M2 0 Roll

Bogor tg; 10 September 2019


PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN &
KSO STC-NRC MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
ASAL NO VOLUME No.Surat KETERANGAN
NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D Jalan NO. TT DO/POB

1 19 Sep 20 Semen Conch @50 kg Tb.Lido Bangunan F 8114 AN u/bek.Box Culvert 21491 60 Zak 317 spb-0202

Total s/d minggu ini 60 Zak

Bogor tg; 12 September 2020


KARTU STOCK BENDRAT
Proyek : G3TV ( LOKASI MNC TV )
Periode : S/d 01 Desember 2012

No Dipakai
Tanggal Jenis Besi Asal Barang Sat. Dikirim Sisa Stok Lokasi Keterangan
Bon
Mandor Volume
* 18 Juni 2012 Bendrat @ 25 kg Bima Maruya Rol 1 - - Global TV
37 25 Juni 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/Ikatan beton deging
* 26 Juni 2012 Bendrat @ 25 kg Bima Maruya Rol 12 - - - Global TV
27 Juni 2012 Bendrat @ 25 kg Bima Maruya Rol 23 - - - Global TV
57 29 Juni 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/Ikatan beton deging
76 2 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel Tie beam
93 5 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Stel Caping beam
101 7 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel Tie beam
137 16 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Pail cap
145 17 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel kolom
151 19 Juli 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel kolom
162 19 Juli 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel kolom
175 22 Juli 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel kolom
185 23 Juli 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel balok & kolom
193 25 Juli 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel pail cap
221 29 Juli 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel balok & kolom
235 31 Juli 2012 Bendrat @ 25 kg Rol - Narko 3 - Global TV u/ Setel plat & kolom basemen 2
243 1 Agst 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel plat & kolom basemen 2
248 2 Agst 2012 Bendrat @ 25 kg Rol - Wignyo 1 - Global TV u/ Ikat Stop Cor
255 5 Agst 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel balok & kolom basemen 2
270 6 Agst 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel balok & kolom basemen 2
275 8 Agst 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel kolom basemen 2
299 10 Agst 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel kolom & pail cap basemen 2
307 29 Agst 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Setel balok Lt basemen &psg caping beam
308 30 Agst 2012 Bendrat @ 25 kg Rol - Eko Santoso 1 - Global TV u/ ikatan roling ( K3 )
318 30 Agst 2012 Bendrat @ 25 kg Rol - Wignyo 1 - Global TV u/ ikatan pagar dll
320 31 Agst 2012 Bendrat @ 25 kg Rol - Narko 1 - Global TV u/ Setel kolom, balok basemen 2
* 31 Agst 2012 Bendrat @ 25 kg Bima Maruya Rol 18 - - - Global TV
326 31 Agst 2012 Bendrat @ 25 kg Rol - Narko 2 - Global TV u/ Stel Prikes kolom, balok basemen 2
329 1 Sept 2012 Bendrat @ 25 kg Rol - Narko 4 - Global TV u/ Stel Plat + Prikes kolom, balok basemen 2
344 4 Sept 2012 Bendrat @ 25 kg Rol - Narko 4 - Global TV u/ Prikes kolom + stel drop panel basemen 2

* 4 Sept 2012 Bendrat @ 25 kg Bima Maruya Rol 2 - - - Global TV


376 8 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt. Basemen 2
394 12 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt. Basemen 2
* 14 Sept 2012 Bendrat @ 25 kg Bima Maruya Rol 40 - - Global TV
423 17 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt. Basemen 1
425 18 Sept 2012 Bendrat @ 25 kg Rol - Wignyo 1 - Global TV u/ Pasang stop cor
450 21 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian basemen Lt 1
466 23 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt. basemen
472 25 Sept 2012 Bendrat @ 25 kg Rol - Taufik 1 - Global TV u/ Stop cor
493 27 Sept 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian mad fond basemen
KARTU STOCK BENDRAT
Proyek : G3TV ( LOKASI MNC TV )
Periode : S/d 01 Desember 2012

No Dipakai
Tanggal Jenis Besi Asal Barang Sat. Dikirim Sisa Stok Lokasi Keterangan
Bon
Mandor Volume
* 1 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian plat basemen
* 2 Okt 2012 Bendrat @ 25 kg Rol - Taufik 1 - Global TV u/ Pembesian ( ikat ulang akibat pembersihan lahan )

* 5 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian basemen


* 9 Okt 2012 Bendrat @ 25 kg Mitra Logam Pratama Rol 40 - - - Global TV Truk B 9379 QW
566 11 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt1 + basemen1
587 15 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt1 As 26 -28
601 18 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Prikes kolom Lt 2 ke Lt 3
002 22 Okt 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Prikes core wall Lt 2 ke Lt 3
003 1 Nop 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Stel balok Lt Mezanine + precers kolom
5 Nop 2012 Bendrat @ 25 kg Rol - Narko 5 - Global TV u/ Pembesian Lt 1
7 Nop 2012 Bendrat @ 25 kg Rol - Narko 3 - Global TV u/ Precers core wall Lt 2 ke Lt 3

BTG 136.00 121.00 15.00


JUMLAH
KG

Jakarta ; 01 Desember 2012


Dilaporkan oleh

.........................
Logistik gudang
PROYEK MNC LIDO CITY - PEKERJAAN GALIAN, URUKAN &
KSO STC-NRC MAKRO DRAINASE AREA THEME PARK

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903
ASAL NO VOLUME No.Surat KETERANGAN
NO TGL NAMA BARANG JAM VOLUME
BARANG KEND. PJ LBR T/D Jalan NO. TT DO/POB

1 15 Aug 20 Batako Press Lokal Tb.Lido bangunan F 8114 AN u/Bek.BC 18678 1,000 Bh 273 Pob-0177

Total s/d minggu ini 1,000 Bh

Bogor tg; 12 Januari 19


PROYEK MNC
KSO STC-NRC MAKRO

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME
NO TGL NAMA BARANG JAM
BARANG KEND. PJ

27-Jul-20 Sika Grout 215 @25 Kg PT.KSO STC - NRC B 1250 BMD u/Test beban
7 27-Jul-20 Sika Grout 215 @25 Kg PT.KSO STC - NRC B 1250 BMD u/Test beban

Jumlah
PROYEK MNC LIDO - PEKERJAAN GALIAN, URUKAN &
MAKRO DRAINASE AREA THEME PARK

N BAHAN

VOLUME KETERANGAN
VOLUME
LBR T/D NO. TT DO/POB

u/Test beban 7 Zak


u/Test beban 4 Zak 260 spb-0179

Jumlah 11 Zak

Bogor tg; 25 September 2020


PROYEK MNC
KSO STC-NRC MAKRO

LAPORAN PENERIMAAN BAHAN


KODE PROYEK : P61.1903

ASAL NO VOLUME
NO TGL NAMA BARANG JAM
BARANG KEND. PJ

8 30-Sep-20 Nitobond / Adibong ex.Fosroq @20 Kg KSO STC - NRC S 8188 RB

Jumlah
PROYEK MNC LIDO - PEKERJAAN GALIAN, URUKAN &
MAKRO DRAINASE AREA THEME PARK

N BAHAN

VOLUME KETERANGAN
VOLUME
LBR T/D NO. TT DO/POB

3 Pail 343 spb-0206

Jumlah 3 Pail

Bogor tg; 25 September 2020