Anda di halaman 1dari 6

DEPARTEMEN ENERGI DAN SUMBER DAYA MINERAL

DIREKTORAT JENDRAL MINYAK DAN GAS BUMI


DATA RENCANA PENUTUPAN PERMANENT SUMUR PERTAMBANGAN DARATAN

Perusahaan : PT Pertamina Hulu Energi


Wilayah Kerja : Daratan (Onshore), Tuban Jawa Timur
Nama Sumur : South Bungoh-1
Jenis Sumur : Eksplorasi
Koordinat Permukaan
- Grid Coordinate System: : UTM
- Location Lat/Long: : S 7° 6’ 36”, E 112° 36’ 7”
- Location Grid N/E Y/X: : N 9 213 839.60 m, E 676 919.10 m

Koordinat Akhir/Dasar Sumur


- Grid Coordinate System: : UTM
- Location Lat/Long: : S 7° 7’ 4”, E 112° 35’ 7”
- Location Grid N/E Y/X: : N 9 214 773.7 m, E 676 919.10 m

Kedalaman Air : -
Elevasi Meja Putar : 26.3 ft
Kedalaman Akhir : 4297 ftMD / 4099 ftTVD
Tanggal Mulai Bor : 16/12/2007
Tanggal Selesai Bor : 11/03/2008
Tanggal Rencana P&A : W2 Februari 2021
Jenis Instalasi Pemboran : Vertical Type
Pengawas Pekerjaan : -
Alasan Ditinggalkan : 1. Berdasarkan Surat No. 223/GRM/VIII/2020 dari PT
Garam Indonesia perihal Penyelesaian Pembongkaran
dan Pengamanan atas SB-1 tanggal 28 Agustus 2020.
2. Berdasarkan Risalah Rapat antara Divisi Perencanaan
Eksplorasi dengan PHE TEJ (SKK Migas - PHE TEJ)
tanggal 08 Mei 2020 perihal “Diskusi Full Review
Rencana Permanen P&A Sumur Put On Production
(POP) Bungoh, Lengowangi, Gondang, Bogomiring
Structure PHE TEJ (“KKKS”)”.
Pipa Selubung
Pipa Selubung Lubang Sumur Penyemenan
Kedalaman Kedalaman Jumlah Densitas
Ukuran (ft MD RT) Ukuran (ft MD RT) semen Slurry Keterangan
(inch) (inch)
Dari Sampai Dari Sampai (Sacks) (ppg)
30 0 84 Driven 0 84 - - Cement to Surface
20 0 275 26 84 275 Cement to Surface
13-3/8 0 795.21 17-1/2 275 795.21 Cement to Surface
50-300 13-15
9-5/8 0 3529 12-1/4 795.21 3529 Cement to Surface
7 3303 4293 8-1/2 3529 4293 Cement to TOL 7”

Rencana Sumbat Semen (Cement Plug)

Interval (ft) Penyemenan Fluida diatas sumbat semen


Densitas
Jumlah Densitas
Dari Sampai Slurry Jenis Fluida Keterangan
(Barrel) (ppg)
(ppg)
0 150 10-11 13-15 - - Cement Plug to Surface

*Note : Selubung pipa 7”, 9-5/8”, 13-3/8” sudah dilakukan penyemenan pada saat pemboran eksplorasi (16 Des 2007 –
11 Mar 2008), dan akan dilakukan sumbat semen dari kedalaman 150’ sampai permukaan (0’ – 150’).

Mengetahui,

Riko Meidiya Putra


Wakil Kepala Teknik Tambang
Summary (scope) pelaksanaan penutupan sumur :
1. Moving Rig
2. Killing well and Observe Well
3. ND X-mast tree/Abandon Cap, NU BOP and Function Test BOP
4. POOH and L/D Existing String
5. RIH Open End for Cementing Job
6. Cementing Job/ Cement Plug, WOC
7. N/D BOP
8. Cutting Casing 20”, 13-3/8”, & 9-5/8”
9. Cementing Job/ Cement Cellar to Surface, WOC
10. Remove Substructure, Closed Cement at Cellar with Iron Plate
11. Rig Down
Peta Lokasi :

SOUTH BUNGOH-
1

Lokasi Lapangan dan Kepala Sumur :


Skematik Penampang Sumur :

SOUTHBUNGOH - 1
WELLBORE DIAGRAM
(Current)

KB = 26.30'
GL = 7.5'
30" CSG, 310 PPF, X-52 R3 @ 84' KB

8 jts of 2-7/8" Tubing

20" CSG 94 PPF, K-55, BTC, R3


@ 275' KB

10.8 ppg CF

Cement Plug @ 300' - 400' KB (100')

13 ⅜" CSG, 68 PPF, K-55, BTC, R3 10.8 ppg CF


@ 795.21' KB

Cement Plug @ 1000' - 1100' KB (100')

10.8 ppg CF

Cement Plug @ 2200' - 2300' KB (100')

9 5/8" BP @ 2300 ' KB

2416' - 2430' KB (14 ft)


10.8 ppg CF DST - 4

2470' - 2496' KB (26 ft)

TOP OF 7" LINER @ 3303' MD

9 ⅝" CSG, 47 PPF, L-80, BTC, R3


@ 3529' KB

Cement Plug @ 3596' KB


7" BP @ 3646 ' KB

10.8 ppg 3696' - 3730' KB (34 ft) DST - 3

Cement Plug @ 3790' KB


7" BP @ 3830 ' KB

11 ppg 3880' - 3916' KB (36 ft) DST - 2

7" BP @ 4054' KB

12.3 ppg 4204.56' - 4218.56' KB (14 ft) DST - 1

7" CSG, 26 PPF, L-80, BTC, R3 @ 4293 ft MD

PBTD @ 4297' KB

N0T TO SCALE March , 2008

Penampang Sumur Aktual


SOUTHBUNGOH - 1
WELLBORE DIAGRAM
P&A

Cement Plug (150')


30" CSG, 310 PPF, X-52 R3 @ 84' KB

20" CSG 94 PPF, K-55, BTC, R3


@ 275' KB

10.8 ppg CF

Cement Plug @ 300' - 400' KB (100')

13 ⅜" CSG, 68 PPF, K-55, BTC, R3 10.8 ppg CF


@ 795.21' KB

Cement Plug @ 1000' - 1100' KB (100')

10.8 ppg CF

Cement Plug @ 2200' - 2300' KB (100')

9 5/8" BP @ 2300 ' KB

2416' - 2430' KB (14 ft)


10.8 ppg CF DST - 4

2470' - 2496' KB (26 ft)

TOP OF 7" LINER @ 3303' MD

9 ⅝" CSG, 47 PPF, L-80, BTC, R3


@ 3529' KB

Cement Plug @ 3596' KB


7" BP @ 3646 ' KB

10.8 ppg 3696' - 3730' KB (34 ft) DST - 3

Cement Plug @ 3790' KB


7" BP @ 3830 ' KB

11 ppg 3880' - 3916' KB (36 ft) DST - 2

7" BP @ 4054' KB

12.3 ppg 4204.56' - 4218.56' KB (14 ft) DST - 1

7" CSG, 26 PPF, L-80, BTC, R3 @ 4293 ft MD

PBTD @ 4297' KB

N0T TO SCALE April , 2020

Penampang Sumur Usulan

Anda mungkin juga menyukai