CATATAN :
NAMA PROYEK :
RC Wing Wall JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
RC Wing Wall
(DESIGN AND BUILD)
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
PEMBERI TUGAS :
11
2.4
A 5°
A B C
PT. JASAMARGA JOGJA SOLO
Diketa ui :
HARTOPO
Team Leader
ENG.
A B OKA CANDRA S
-1.59% C
General Superintendent
Drafter M. KHARIS
LC Beton kelas E
Selected Material UNDERPASS JALAN DESA
Replacement 7.0 X 3.6 AKSES IC KLATEN
Setting Out Points A (Outlet) B Sta 0+217 (AKSES KLATEN) C (Inlet)
STA 0+223.62
ED=174.838 X=455047.347 ED=174.637 X=455059.984 ED=174.404 X=455074.684
DENAH & POTONGAN
EG=176.871 Y=9151306.710 EG=176.637 Y=9151311.835 EG=176.386 Y=9151317.799
NO REF. GAMBAR
Lembar :
SKALA 1:250
AK-SJK-1.1-SD-30181 1 dari 20
SHOP DRAWING
CATATAN :
PEMBERI TUGAS :
11
A 2.4
5°
A B C
HARTOPO
Team Leader
ENG.
Toll RAMP
RC Wing wall
RC Wing wall
OKA CANDRA S
General Superintendent
A B -1.59% C
PEM ESTU WASKITA AJI
Drafter M. KHARIS
Judul Gambar :
AK-SJK-1.1-SD-30182 2 dari 20
SHOP DRAWING
CATATAN :
0.30
0.30
-LC fc'-10Mpa -BJTS fy-420Mpa
Rubber Sheet Rubber Sheet -Dinding fc'-20Mpa
-WingWall fc'-20Mpa
- Plat Injak fc'-20Mpa
0.70
0.70
0.70
0.30
0.30
Ikatan Bendrat silang minimun selang-seling
0.15
LC 10Cm LC 10Cm (loncat 1 persilangan)
0.15
0.30
0.30
0.50 0.50 NAMA PROYEK :
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
3.60
5.07
3.67
3.67
5.07
PEMBERI TUGAS :
0.15
0.15
0°
45.0
45.0
0°
0.77
0.70
0.70
1.56 1.56
℄
Underpass
8.40
0.70 7.00 0.70 HARTOPO
Team Leader
ENG.
0.50
KONTRAKTOR DESIGN & BUILD :
0.70
0.70
0.70
0.15
0.15
0.15 0.15 PT. ADHI KARYA (Persero) Tbk
Dia ukan :
3.60
3.67
3.67
OKA CANDRA S
General Superintendent
0.15
Judul Gambar :
0.77
0.70
0.70
STA 0+223.62
BOX STRUKTUR DETAIL (2 DARI 2)
Skala :
28/08/2023
Size :
Tgl Revisi
Rev :
----
AK-SJK-1.1-SD-30183 3 dari 20
SHOP DRAWING
CATATAN :
2.40
1.00
3.50
B Ikatan Bendrat silang minimun selang-seling
2.40
0.60
3.50
(loncat 1 persilangan)
0.60
NAMA PROYEK :
0.50
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
0.50
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
PEMBERI TUGAS :
0.50
0.50
0.60
3.50
0.60
2.40
MUHAMMAD AHDAL MASRUHIN
1.00 1.00
3.50
2.40
SKALA 1:200
HARTOPO
5.00 0.56
Team Leader
0.60 4.00 1.00
ENG.
RC Wing wall KONTRAKTOR DESIGN & BUILD :
1.20
Beton kelas C-2
8
4.8
2.80 PT. ADHI KARYA (Persero) Tbk
Dia ukan :
5.40
6.00
6.00
3.60
2.60
OKA CANDRA S
General Superintendent
0.60 2.40
PEM ESTU WASKITA AJI
1.20
6.00
0.60
Drafter M. KHARIS
0.10
0.10
Judul Gambar :
0.20
0.20
NO REF. GAMBAR
AK-SJK-1.1-SD-30184 4 dari 20
SHOP DRAWING
CATATAN :
5.00
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
PEMBERI TUGAS :
11
2.4
A P3 5° P4
A B C
PT. JASAMARGA JOGJA SOLO
Diketa ui :
P5 P6
5.00
MUHAMMAD AHDAL MASRUHIN
RC Wing Wall RC Wing Wall Pemimpin Proyek
KONSULTAN PENGAWAS :
P7 23.28 P8
RO L GA GA
AIN T O T L
O
M
DENAH HARTOPO
SKALA 1:300
Team Leader
ENG.
Setting Out Points A (Outlet) B Sta 0+217 (AKSES KLATEN) C (Inlet) KONTRAKTOR DESIGN & BUILD :
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30185 5 dari 20
SHOP DRAWING
CATATAN :
5.00
W5
PAKET 1.1 KARTASURA - KLATEN
W1 UP1 UP4 STA 0+000 s/d 22+300
W6
PEMBERI TUGAS :
W2 11
2.4
P3 5° P4
A B C
PT. JASAMARGA JOGJA SOLO
Diketa ui :
P5 P6
W7
W3
UP2 UP3 W8
5.00
W4
RC Wing Wall MUHAMMAD AHDAL MASRUHIN
RC Wing Wall Pemimpin Proyek
KONSULTAN PENGAWAS :
P7 23.28 P8
RO L GA GA
AIN T O T L
O
M
DENAH HARTOPO
SKALA 1:300
Team Leader
ENG.
Setting Out Points A (Outlet) B Sta 0+217 (AKSES KLATEN) C (Inlet) KONTRAKTOR DESIGN & BUILD :
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30186 6 dari 20
SHOP DRAWING
CATATAN :
0.05
0.15 0.15
D19-100B13 B13 D19-100
2700 B3 D19-100 2700 NAMA PROYEK :
1800
1800
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
0.60
760 8300 760 (DESIGN AND BUILD)
1100 1100 E E JALAN TOL SOLO - YOGYAKARTA
0.19
220 200 200 220
760
760
8651 PAKET 1.1 KARTASURA - KLATEN
12 8 0 B8 D13-100 D13-100 B8 STA 0+000 s/d 22+300
80 12 F B10 D13-100 F
760
0.20@19=3.40
4970
4970
600 B5 D19-100 D19-100 B5
PT. JASAMARGA JOGJA SOLO
5.07
B5 D19-100 B9 D13-400/400 B5a D19-100 D19-100B5a
100 B9 D13-400/400 Diketa ui :
B6 D16-200 D16-200 B6
760
B1' D19-100
8651 B7 2D13 B2 B2' D19-100 2D13 B7
760
760
1800
1800
8300
B10 D13-100 D13-100 B8 B6a 8D16
760 760 B8 D13-100
0.19
2700 B1 D19-100 2700 MUHAMMAD AHDAL MASRUHIN
0.60
D D Pemimpin Proyek
B11 D13-100 D13-100B11
KONSULTAN PENGAWAS :
0.05
C C
HARTOPO
Team Leader
ENG.
0.02(gap)
Pembesian Dalam
0.25 0.25 PT. ADHI KARYA (Persero) Tbk
600 B10 D13-150 600
0.30
Dia ukan :
600
600
4020
0.25
8300
600
B4 D19-100
0.05
8651
0.02(gap)
100
0.25
0.30
B4' D19-100
OKA CANDRA S
4970
4970
50
0.30
100 8651
Drafter M. KHARIS
600
600
NAMA PROYEK :
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
PEMBERI TUGAS :
D16-200 B6 B6 D16-200
D13-100 B11
HARTOPO
Team Leader
ENG.
D13-100 B11
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30188 8 dari 20
SHOP DRAWING
CATATAN :
PEMBERI TUGAS :
D19-100 B1 B2 D19-100
D16-200 B6 HARTOPO
Team Leader
ENG.
D19-100 B3 B4 D19-100
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
D13-100 B11 B4' D19-100
NO REF. GAMBAR
AK-SJK-1.1-SD-30189 9 dari 20
SHOP DRAWING
CATATAN :
0.50
-Dinding fc'-20Mpa
0.54
-WingWall fc'-20Mpa
- Plat Injak fc'-20Mpa
NAMA PROYEK :
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
3.12 23.57 2.82 STA 0+000 s/d 22+300
PEMBERI TUGAS :
Det-2
B12 7D13
HARTOPO
0.50
Team Leader
ENG.
SKALA 1:100
OKA CANDRA S
General Superintendent
Judul Gambar :
0.50
D19-100 B13
STA 0+223.62
PEMBESIAN UNDERPASS (4 DARI 6)
23.57
NO REF. GAMBAR
AK-SJK-1.1-SD-30190 10 dari 20
SHOP DRAWING
CATATAN :
PEMBERI TUGAS :
B1 B1' D19-100
POTONGAN G-G
SKALA 1:100
PT. ESKAPINDO MATRA CE
PT. HERDA CARTER INDONESIA
Diperiksa & Disetu ui :
0.56
0.56
0.05
0.05 0.46 0.05
0.05
HARTOPO
Team Leader
B15 6D13
ENG.
1.20
1.10
1.20
1.10
B15 6D13
OKA CANDRA S
0.05
General Superintendent
0.05
Drafter M. KHARIS
Judul Gambar :
DETAIL 1 DETAIL 2
SKALA 1:20 SKALA 1:20 UNDERPASS JALAN DESA
7.0 X 3.6 AKSES IC KLATEN
STA 0+223.62
PEMBESIAN UNDERPASS (5 DARI 6)
NO REF. GAMBAR
AK-SJK-1.1-SD-30191 11 dari 20
SHOP DRAWING
CATATAN :
NAMA PROYEK :
JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
STA 0+000 s/d 22+300
PEMBERI TUGAS :
HARTOPO
Team Leader
ENG.
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30192 12 dari 20
5.00 0.02 (Gap) SHOP DRAWING
0.05 49@100=4.90 0.05 CATATAN :
0.05
0.05
S4 D16-600 S1A S1B S1C D19-100 Ikatan Bendrat silang minimum selang-seling
(Loncat 1 persilangan)
0.30
0.20
0.25
0.35
ED : Elevasi Desain
A A EG : Existing Ground
0.50
0.05
S2A S2B S2C D19-100 Mutu Beton Mutu Baja
0.05
0.05
S3 D16-100
-LC fc'-10Mpa -BJTS fy-420Mpa
-Dinding fc'-20Mpa
-WingWall fc'-20Mpa
POTONGAN PLAT INJAK 1 Rubber Sheet - Plat Injak fc'-20Mpa
PEMBERI TUGAS :
D16-600 S4
5.00
MUHAMMAD AHDAL MASRUHIN
D19-100 S1A
Pemimpin Proyek
D19-100 S2A KONSULTAN PENGAWAS :
D16-100 S3 HARTOPO
Team Leader
POTONGAN A-A ENG.
SKALA 1:50
KONTRAKTOR DESIGN & BUILD :
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30193 13 dari 20
5.00 0.02 (Gap) SHOP DRAWING
0.05 49@100=4.90 0.05 CATATAN :
0.05
0.05
S4 D16-600 S1A S1B S1C D19-100 Ikatan Bendrat silang minimum selang-seling
(Loncat 1 persilangan)
0.30
0.20
0.25
0.35
ED : Elevasi Desain
A A EG : Existing Ground
0.50
0.05
S2A S2B S2C D19-100 Mutu Beton Mutu Baja
0.05
0.05
S3 D16-100
-LC fc'-10Mpa -BJTS fy-420Mpa
-Dinding fc'-20Mpa
-WingWall fc'-20Mpa
POTONGAN PLAT INJAK 2 Rubber Sheet - Plat Injak fc'-20Mpa
5000
MUHAMMAD AHDAL MASRUHIN
D19-100 S1A
Pemimpin Proyek
D19-100 S2A KONSULTAN PENGAWAS :
D16-100 HARTOPO
S3
POTONGAN A-A Team Leader
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30194 14 dari 20
SHOP DRAWING
CATATAN :
5.00
0.60 Ikatan Bendrat silang minimum selang-seling
D16-200 W6
0.05 0.50 0.05 4.00 1.00 (Loncat 1 persilangan)
0.93 0.05
W8 2D16 ED : Elevasi Desain
EG : Existing Ground
2.80
(loncat 1 persilangan)
D16-200 W5
NAMA PROYEK :
W5 D16-200 JASA KONSTRUKSI TERINTERGRASI RANCANG BANGUN
(DESIGN AND BUILD)
W6 D16-200 JALAN TOL SOLO - YOGYAKARTA
PAKET 1.1 KARTASURA - KLATEN
5.40
6.00
PEMBERI TUGAS :
W4 D16-200
2.60
Diketa ui :
3.12
W4 D16-200
0.60
KONSULTAN PENGAWAS :
W1 32 D16
0.10
0.10
0.20
0.20
W7 D13-400 PT. ESKAPINDO MATRA CE
W1 32 D16 W2 D16-200 PT. HERDA CARTER INDONESIA
HARTOPO
Team Leader
ENG.
OKA CANDRA S
General Superintendent
Drafter M. KHARIS
Judul Gambar :
NO REF. GAMBAR
AK-SJK-1.1-SD-30195 15 dari 20