SCRAPING, FILLING & OVERLAY (SFO)

PAKET-2 PADA JALAN TOL TANGERANG - MERAK


TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA SCRAPING, FILLING & OVERLAY (SFO)
NOMOR KONTRAK 23/PJ/M-1/VII/2021 NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
LOKASI PEKERJAAN KM 92+415 - 92+265 B/L1 MERAK TAHUN 2021

KM. 85+400-85+700 A/L1


JENIS PEKERJAAN SCRAP, FILL & OVERLAY NOMOR REQUEST 16/RR/SFO-W2/VIII/2021
TGL. REQUEST 17 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 18 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 864 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 61 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 181 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 108 m3

MARKA 18 m2

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20 org 2. AC - BC
Power Broom 2.00 Surveyor 1 org 3. AC - WC
Air Compresor 2.00 Foreman 4 org 4. Marka Thermoplastic
Asp. Distributor 2.00 Flagman 10 org
Asphalt Finisher 2.00 Labour 40 org
Tandem Roller 2.00 Driver 23 org
P. Tire Roller 4.00 Patroli Cabang 1 org
Trailler 1.00 PJR 1 org
Dump Truck 36.00 Site Manager 2 org
Alat Bantu 1.00 Konsultan 4 org
Alat Survay Owner 0 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : 150 x 3.6 m km 92+415 s/d 92+265 jalur B/L1

300 x 3.6 m km 85+400 s/d 85+700 jalur A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA SCRAPING, FILLING & OVERLAY (SFO)
NOMOR KONTRAK 23/PJ/M-1/VII/2021 NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
LOKASI PEKERJAAN 92+265 sd 92+108 B/L1 MERAK TAHUN 2021

85+700 sd 86+000 A/L1


JENIS PEKERJAAN SCRAP, FILL & OVERLAY NOMOR REQUEST 17/RR/SFO-W2/VIII/2021
TGL. REQUEST 18 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 19 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 884 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 64 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 185 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 111 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 36.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 157 x 3.6 92+265 sd 92+108 B/L1

km 300 x 3.6 85+700 sd 86+000 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
90+259 sd 89+902 B/L1 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
LOKASI PEKERJAAN MERAK TAHUN 2021
86+000 sd 86+200 A/L1

JENIS PEKERJAAN NOMOR REQUEST 18/RR/SFO-W2/VIII/2021


SCRAP, FILL & OVERLAY
TGL. REQUEST 19 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 20 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 802 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 0 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 226 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 100 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 23.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 357 x 3.6 90+259 sd 89+902 B/L1

km 200 x 3.6 86+000 sd 86+200 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
89+275 sd 89+235 B/L2 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
86+620 sd 86+540 B/L1 MERAK TAHUN 2021
LOKASI PEKERJAAN
86+000 sd 86+200 A/L1
86+795 sd 86+850 A/L1
JENIS PEKERJAAN NOMOR REQUEST 19/RR/SFO-W2/VIII/2021
SCRAP, FILL & OVERLAY
TGL. REQUEST 20 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 21 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 540 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 33 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 152 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 82 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 20.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 40 x 3.6 89+275 sd 89+235 B/L2
km 80 x 3.6 86+620 sd 86+540 B/L1
km 200 x 3.6 86+000 sd 86+200 A/L1
km 55 x 3.6 86+795 sd 86+850 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
86+540 sd 86+384 B/L1 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
LOKASI PEKERJAAN MERAK TAHUN 2021
87+300 sd 87+500 A/L1

JENIS PEKERJAAN NOMOR REQUEST 20/RR/SFO-W2/VIII/2021


SCRAP, FILL & OVERLAY
TGL. REQUEST 21 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 22 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 513 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 64 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 144 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 92 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 22.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 156 x 3.6 86+540 sd 86+384 B/L1

km 200 x 3.6 87+300 sd 87+500 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
78+757 sd 78+607 B/L1 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
LOKASI PEKERJAAN MERAK TAHUN 2021
87+594 sd 87+889 A/L1

JENIS PEKERJAAN NOMOR REQUEST 21/RR/SFO-W2/VIII/2021


SCRAP, FILL & OVERLAY
TGL. REQUEST 22 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 23 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 641 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 0 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 180 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 80 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 19.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 150 x 3.6 78+757 sd 78+607 B/L1

km 295 x 3.6 87+594 sd 87+889 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
78+595 sd 78+464 B/L1 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
78+413 sd 78+390 B/L1 MERAK TAHUN 2021
LOKASI PEKERJAAN
91+000 sd 91+300 A/L1

JENIS PEKERJAAN NOMOR REQUEST 22/RR/SFO-W2/VIII/2021


SCRAP, FILL & OVERLAY
TGL. REQUEST 01 Januari 1900
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 02 Januari 1900

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 654 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 88 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 122 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 93 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 22.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 131 x 3.6 78+595 sd 78+464 B/L1
km 23 x 3.6 78+413 sd 78+390 B/L1
km 300 x 3.6 91+000 sd 91+300 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
78+370 sd 78+317 B/L1 SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
78+310 sd 78+209 B/L1 MERAK TAHUN 2021
LOKASI PEKERJAAN
78+193 sd 78+120 B/L1
91+600 sd 91+300 A/L1
JENIS PEKERJAAN NOMOR REQUEST 23/RR/SFO-W2/VIII/2021
SCRAP, FILL & OVERLAY
TGL. REQUEST 24 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 25 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 759 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 130 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 122 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 111 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 26.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 53 x 3.6 78+370 sd 78+317 B/L1
km 101 x 3.6 78+310 sd 78+209 B/L1
km 73 x 3.6 78+193 sd 78+120 B/L1
km 300 x 3.6 91+600 sd 91+300 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)


SCRAPING, FILLING & OVERLAY (SFO)
PAKET-2 PADA JALAN TOL TANGERANG - MERAK
TAHUN 2021

REQUEST OF WORK
KONTRAKTOR PT. ROADMIXINDO RAYA
NOMOR KONTRAK 23/PJ/M-1/VII/2021
78+155 sd 78+120 B/OS SCRAPING, FILLING & OVERLAY (SFO)
NAMA PROYEK PAKET-2 PADA JALAN TOL TANGERANG -
80+840 sd 80+722 B/L1 MERAK TAHUN 2021
LOKASI PEKERJAAN
91+700 sd 91+968 A/L1

JENIS PEKERJAAN NOMOR REQUEST 24/RR/SFO-W2/VIII/2021


SCRAP, FILL & OVERLAY
TGL. REQUEST 25 Agustus 2021
DATA PENDUKUNG TGL. RENC. PELAKSANAAN 26 Agustus 2021

NO. NO ITEM PEMBAYARAN URAIAN PEKERJAAN VOLUME SATUAN KETERANGAN

DIV. I APD & PERLENGKAPAN K-3 1 Ls

DIV. 6 BITUMEN LAPIS PENGIKAT (TACK COAT) 591 Ltr

ASPAL CONCRETE BINDER COURSE (AC-BC) SCRAP 77 Ton

ASPAL CONCRETE WEARING COURSE (AC-WC) SCRAP 109 Ton

DIV. 7 A PENGERUKAN PERKERASAN LAMA ( SCRAP) 82 m3

PERALATAN YANG DIGUNAKAN TENAGA KERJA MATERIAL


ALAT JUMLAH JABATAN JUMLAH
AMP 1.00 Pelaksana 4.00 org 1. Tack coat CRS-1
Cold Milling 2.00 Operator Alat 20.00 org 2. AC - BC
Power Broom 2.00 Surveyor 1.00 org 3. AC - WC
Air Compresor 2.00 Foreman 4.00 org
Asp. Distributor 2.00 Flagman 10.00 org
Asphalt Finisher 2.00 Labour 40.00 org
Tandem Roller 2.00 Driver 23.00 org
P. Tire Roller 4.00 Patroli Cabang 1.00 org
Trailler 1.00 PJR 1.00 org
Dump Truck 19.00 Site Manager 2.00 org
Alat Bantu 1.00 Konsultan 4.00 org
Alat Survay Owner 0.00 org
CATATAN HASIL PENGECEKAN PENANGGUNG JAWAB
1. Surveyor : km 35 x 2.5 78+155 sd 78+120 B/OS
km 118 x 3.6 80+840 sd 80+722 B/L1
km 268 x 3.6 91+700 sd 91+968 A/L1

2. Inspektor :

( )
Engineer
3. Lab. Technician : Tgl.

( )
Soil and Material Engineer
DISETUJUI / DITOLAK dengan catatan (Konsultan)

DISETUJUI / DITOLAK dengan catatan (SKJ)

PEMILIK PROYEK PROJECT MANAGEMENT CONSULTANT KONTRAKTOR PELAKSANA


PT. Marga Mandalasakti PT. Astra Tol Nusantara-PT. Astra Infra Solutions PT. Roadmixindo Raya

(........................................) (........................................) (........................................)