Anda di halaman 1dari 2

NAMA : TRI ANANDA PARSAULIAN NAPITUPULU

NIT : 20090950

KELAS : BRAVO

PRODI : D4 MTU

MANAJEMEN BISNIS ANGKUTAN

TUGAS/ LATIHAN SOAL :


PESAWAT ( A) KAPASITAS TEMPAT DUDUK 120Y DIOPERASIKAN DENGAN RUTEQG-422/ JKT-BIK
DENGAN JARAK TERBANG 1.800 KMS DITEMPUH DALAM 5 JAM, DENGAN MEMBAWA
PENUMPANG 90 PAX, SEDANGKAN PESAWAT (B) DENGAN KAPASITAS YANG SAMA
DIOPERASIKAN PADA RUTE CGK-SOC-KOE-CGK ( QG-244/CGK-SOC SLF 85% JARAK 600KMS
DITEMPUH SELAMA 1 JAM, QG-315/SOC-KOE SLF 80% JARAK 800 KMS DITEMPUH SELAMA 2
JAM, DAN QG-413/KOE-CGK SLF 80% JARAK 1.000 KMS DITEMPUH SELAMA 2 JAM
TARIP :
 CGK-BIK = RP. 2.500.000,-
 CGK-SOC = RP. 900.000,-
 SOC-KOE = RP.1.200.000,-
 KOE-CGK = RP.1.500.000,-

PERTANYAAN :
1. HITUNG PENDAPATAN MASING2 PESAWAT

A/C FLT NO RUTE ∑ PAX SLF (%) TARIP (RP) PENDAPATAN (RP)
A QG-422 JKT-BIK 90 90% 2.500.000 225.000.000
B QG-244 CGK-SOC 85 85% 900.000 76.500.000
QG-315 SOC-KOE 85 80% 1.200.000 96.000.000
QG-413 KOE-CGK 85 80% 1.500.000 120.000.000
TOTAL (B) : 306.000.000

2. HITUNG YIELD MASING2 FLT NOMOR ( FLIGHT NUMBER )


YIELD PESAWAT (A) :
QG-422 ( JKT-BIK) : RP. 2.500.000 / 1.800 = RP. 1.388,89
YIELD PESAWAT (B) :
QG-244 ( CGK-SOC ) : RP. 900.000 / 600 = RP. 1.500
QG-315 ( SOC-KOE) : RP. 1.200.000 / 800 = RP. 1.500
QG-413 ( KOE-CGK) : RP. 1.500.000 / 1.000 = RP. 1.500
3. HITUNG PENDAPATAN SETIAP FLIGHT PER JAMNYA
PESAWAT A
JKT-BIK = Rp. 225.000.000 = Rp. 45.000.000
5 jam
PESAWAT B
CGK-SOC = Rp. 76.500.000 = Rp. 76.500.000
1 jam
SOC-KOE = Rp. 96.000.000 = Rp. 48.000.000
2 jam
KOE-CGK = Rp. 120.000.000 = Rp. 60.000.000
2 jam

4. HITUNG PENDAPATAN MASING2 PESAWAT PER KMS ( BUKAN PER FLIGHT )


PESAWAT A
JKT-BIK = Rp. 225.000.000 = Rp. 125.000
1.800 kms
PESAWAT B
CGK-SOC = Rp. 76.500.000 = Rp. 127.500
600 kms
SOC-KOE = Rp. 96.000.000 = Rp. 120.000
800 kms
KOE-CGK = Rp. 120.000.000 = Rp. 120.000
1.000 kms

5. HITUNG SEATKMS PENJUALAN SETIAP FLIGHT ( SETIAP RUTE )


PESAWAT A
QG-422 (JKT-BIK) = 90 x 1.800 = 162.000
PESAWAT B
QG-244 (CGK-SOC) = 85 x 600 = 51.000
QG-315 (SOC-KOE) = 80 x 800 = 64.000
QG-413 (KOE-CGK) = 80 x 1.000 = 80.000

Anda mungkin juga menyukai