Anda di halaman 1dari 10

PEKERJAAN

1. Jalan Perkerasan Beton, Nagari Sialang Gaung/Padang Bintungan IV


( Panjang = 413,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,12 m )
Biaya Rp 177,878,024.43 30.15%
2. Jalan Perkerasan Beton, Nagari Sialang Gaung/Padang Bintungan II
( Panjang = 765,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,12 m )
Biaya Rp 308,620,523.35 52.30%
3. Jalan Perkerasan Beton, Nagari Sialang Gaung/Padang Bintungan V
( Panjang = 150,00 m, Lebar = 4,00 m, Tebal/Tinggi = 0,12 m )
( Panjang = 50,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,12 m )
Biaya Rp 103,573,738.93 17.55%

KEGIATAN
PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH

LOKASI
NAGARI SIALANG GAUNG
KECAMATAN KOTO BARU
KABUPATEN DHARMASRAYA
PROVINSI SUMATERA BARAT

TAHUN ANGGARAN 2020


TAHUN ANGGARAN 2020
PEKERJAAN
1. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Lubuk Aur
( Ruas 1, Panjang = 243,70 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
( Ruas 2, Panjang = 175,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 3, Panjang = 215,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 4, Panjang = 110,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 322,229,028.96 54.61%
2. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Bunga Tanjung
( Panjang = 416,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 167,304,329.52 28.35%
3. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Karya Utama
( Panjang = 215,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 100,558,905.71 17.04%

KEGIATAN
PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH

LOKASI
NAGARI GUNUNG MEDAN
KECAMATAN SITIUNG
KABUPATEN DHARMASRAYA
PROVINSI SUMATERA BARAT

TAHUN ANGGARAN 2020


TAHUN ANGGARAN 2020
PEKERJAAN
1. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Lubuk Aur
( Ruas 1, Panjang = 243,70 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
( Ruas 2, Panjang = 175,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 3, Panjang = 215,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 4, Panjang = 110,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 322,229,028.96 54.61%
2. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Bunga Tanjung
( Panjang = 416,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 167,304,329.52 28.35%
3. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Karya Utama
( Panjang = 215,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 100,558,905.71 17.04%

KEGIATAN
PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH

LOKASI
NAGARI GUNUNG MEDAN
KECAMATAN SITIUNG
KABUPATEN DHARMASRAYA
PROVINSI SUMATERA BARAT

TAHUN ANGGARAN 2020


TAHUN ANGGARAN 2020
PEKERJAAN
1. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Lubuk Aur
( Ruas 1, Panjang = 243,70 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
( Ruas 2, Panjang = 175,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 3, Panjang = 215,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 4, Panjang = 110,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 322,229,028.96 54.61%
2. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Bunga Tanjung
( Panjang = 416,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 167,304,329.52 28.35%
3. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Karya Utama
( Panjang = 215,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 100,558,905.71 17.04%

KEGIATAN
PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH

LOKASI
NAGARI GUNUNG MEDAN
KECAMATAN SITIUNG
KABUPATEN DHARMASRAYA
PROVINSI SUMATERA BARAT

TAHUN ANGGARAN 2020


TAHUN ANGGARAN 2020
PEKERJAAN
1. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Lubuk Aur
( Ruas 1, Panjang = 243,70 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
( Ruas 2, Panjang = 175,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 3, Panjang = 215,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
( Ruas 4, Panjang = 110,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 322,229,028.96 54.61%
2. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Bunga Tanjung
( Panjang = 416,00 m, Lebar = 2,50 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 167,304,329.52 28.35%
3. Jalan Perkerasan Beton, Nagari Gunung Medan/Jorong Karya Utama
( Panjang = 215,00 m, Lebar = 3,00 m, Tebal/Tinggi = 0,15 m )
Biaya Rp 100,558,905.71 17.04%

KEGIATAN
PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH

LOKASI
NAGARI GUNUNG MEDAN
KECAMATAN SITIUNG
KABUPATEN DHARMASRAYA
PROVINSI SUMATERA BARAT

TAHUN ANGGARAN 2020


TAHUN ANGGARAN 2020