REKAPITULASI

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI


LOKASI : JL TANJUNG RAYA
TAHUN ANGGARAN : 2022

JUMLAH
N O. URAIAN PEKERJAAN HARGA
( Rp )

1 2 3

I PEMBANGUNAN RUMAH 2 LANTAI 767,391,896.46


II PEKERJAAN TAMBAHAN #NAME?
III PEKERJAAN STRUKTUR BETON BERTULANG #NAME?

(A) JUMLAH HARGA PEKERJAAN #NAME?

(B) PEMBULATAN #NAME?

TERBILANG : SATU MILYAR TIGA PULUH SEMBILAN JUTA SERATUS EMPAT PULUH EMPAT RIBU RUPIAH
REKAPITULASI ANALISA BIAYA KONSTRUKSI ( ABK )

### #NAME?
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI
LOKASI : JL TANJUNG RAYA
TAHUN ANGGARAN : 2022

NO KODE ANALISA URAIAN PEKERJAAN

1 2 3
A. PEKERJAAN PERSIAPAN
1 P. Ps. 02 #REF!
B. PEKERJAAN TANAH
1 P. T. 01 #REF!
2 P. T. 09 #REF!
3 P. T. 13 #REF!
C. PEKERJAAN PONDASI TIANG TONGKAT
1 P. TT. 02 #REF!
D. PEKERJAAN BETON BERTULANG
1 P. BB. 03 #REF!
E. PEKERJAAN DINDING
1 P. Dnd. 01 #REF!
F. PEKERJAAN PLESTERAN
1 P. Pls. 08 #REF!
G. PEKERJAAN KAYU
1 P. K. 06 #REF!
2 P. K. 08 #REF!
3 P. K. 25 #REF!
4 P. K. 27 #REF!
5 P. K. 33 #REF!
6 P. K. 35 #REF!
7 P. K. 42 #REF!
H. PEKERJAAN PENUTUP ATAP
1 P. PA. 12 #REF!
2 P. PA. 07 #REF!
I. PEKERJAAN PLAFOND
1 P. Pf. 01 #REF!
2 P. Pf. 04 #REF!
J. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 P. LD. 04 #REF!
K. PEKERJAAN PENGECATAN
1 P. Ct. 04 #REF!
#REF!
2 P. Ct. 11
#REF!

Rekapitulasi 2
TULASI ANALISA BIAYA KONSTRUKSI ( ABK )

HARGA SATUAN

(Rp)
4
A. PEKERJAAN PERSIAPAN
#REF!
B. PEKERJAAN TANAH
#REF!
#REF!
#REF!
C. PEKERJAAN PONDASI TIANG TONGKAT
#REF!
D. PEKERJAAN BETON BERTULANG
#REF!
E. PEKERJAAN DINDING
#REF!
F. PEKERJAAN PLESTERAN
#REF!
G. PEKERJAAN KAYU
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
H. PEKERJAAN PENUTUP ATAP
#REF!
#REF!
I. PEKERJAAN PLAFOND
#REF!
#REF!
PEKERJAAN PENUTUP LANTAI DAN DINDING
#REF!
K. PEKERJAAN PENGECATAN
#REF!

#REF!

Rekapitulasi 3
TIME SCHEDULE
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI
LOKASI : JL TANJUNG RAYA
TYPE : 225 M2
TAHUN ANGGARAN : 2022
PERIODE LAPORAN : JULI - NOVEMBER 2020

TAHUN 2022
MINGGU KE
BOBOT 1 2 3 4 5 6 7 8 9 10 11 12
No. URAIAN PEKERJAAN (%) 17 Jan 24 Jan 31 Jan 07 Feb 14 Feb 21 Feb 28 Feb 07 Mar 14 Mar 21 Mar 28 Mar 04 Apr
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
23 Jan 30 Jan 06 Feb 13 Feb 20 Feb 27 Feb 06 Mar 13 Mar 20 Mar 27 Mar 03 Apr 10 Apr

### I PEKERJAAN PENDAHULUAN 0.06 0.06

### II PEKERJAAN PONDASI 6.44 1.01 2.72 2.72

### III PEKERJAAN STRUKTUR BETON BERTULANG 18.35 3.06 3.06 3.06 3.06 3.06 3.06

### IV PEKERJAAN LANTAI 19.92 4.58 5.11

### V PEKERJAAN DINDING DAN PLESTERAN 20.75 4.21 4.21 2.47 2.47 2.47 2.47 2.47

### VI PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 5.34 1.78 1.78 1.78

### VII PEKERJAAN PLAFOND 4.33 1.08

### VIII PEKERJAAN SANITASI 1.75

### IX PEKERJAAN INSTALASI LISTRIK 2.10

### X PEKERJAAN PINTU, JENDELA DAN VENTILASI 6.55 1.64 1.64 1.64

### XI PEKERJAAN PENGECATAN 9.08

### XII PEKERJAAN LAIN - LAIN 5.35

###
JUMLAH 100.00
Rencana Kemajuan Kerja perminggu 1.07 2.72 2.72 3.06 7.64 7.27 7.27 12.27 7.30 5.88 4.24 5.19
Rencana Kemajuan Kerja Perminggu Komulatif 1.07 3.79 6.50 9.56 17.20 24.47 31.73 44.01 51.31 57.19 61.43 66.62
SCHEDULE

TAHUN 2022
MINGGU KE
13 14 15 16 17 18 19 20 21 22 23 24
KET
11 Apr 18 Apr 25 Apr 02 Mei 09 Mei 16 Mei 23 Mei 30 Mei 06 Jun 13 Jun 20 Jun 27 Jun
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
17 Apr 24 Apr 01 Mei 08 Mei 15 Mei 22 Mei 29 Mei 05 Jun 12 Jun 19 Jun 26 Jun 03 Jul
100%

6.91 3.31

1.08 1.08 1.08 50%

0.58 0.58 0.58

1.05 1.05

1.64

1.82 1.82 1.82 1.82 1.82

1.34 1.34 1.34 1.34

0%
2.72 2.13 3.95 1.82 2.40 2.40 1.82 6.91 4.65 1.92 1.34 1.34
69.34 71.47 75.42 77.23 79.63 82.03 83.84 90.75 95.40 97.32 98.66 100.00
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI

TYPE : 225 M2

LOKASI : JL TANJUNG RAYA

TAHUN ANGGARAN : 2022

VOLUME HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN
JUMLAH SAT (Rp.) (Rp.)
1 2 3 5 6
A PEMBANGUNAN RUMAH 2 LANTAI
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank 1.00 M' 500,000.00 500,000.00
SUB JUMLAH 500,000.00

II PEKERJAAN PONDASI
1 Pondasi P1
- Galian Tanah Pondasi 21.00 M3 93,750.00 1,968,750.00
- Urugan Kembali Galian Tanah Pondasi 7.00 M3 67,500.00 472,500.00
- Pasir Urug T = 10 cm 2.10 M3 244,800.00 514,080.00
- Pengecoran Lantai Kerja Beton, T = 5 cm 1.05 M3 1,232,376.83 1,293,995.67
- Bekisting Pondasi 22.18 M2 213,699.00 4,738,989.02
- Tulangan Dia. 12 mm 845.65 Kg 17,081.25 14,444,690.06
- Tulangan Dia. 6 mm 23.20 Kg 17,081.25 396,287.19
- Pengecoran Pondasi Beton 4.75 M3 1,402,309.05 6,655,358.74
- Cerucuk dia. 10-12 cm - 8 meter 252.00 Btg 86,250.00 21,735,000.00
SUB JUMLAH 52,219,650.68

III PEKERJAAN STRUKTUR BETON BERTULANG


1 Balok Sloof Uk. 20/65
Pemasangan Bekisting 95.00 M2 169,746.00 16,125,870.00
Tulangan Dia. 12 mm 655.96 Kg 17,081.25 11,204,548.43
Tulangan Dia. 6 mm 163.05 Kg 17,081.25 2,785,130.61
Pengecoran Beton 9.50 M3 1,150,000.00 10,925,000.00

2 Balok Uk. 15/30


Pemasangan Bekisting 58.80 M2 169,746.00 9,981,064.80
Tulangan Dia. 12 mm 435.00 Kg 17,081.25 7,430,384.75
Tulangan Dia. 6 mm 95.70 Kg 17,081.25 1,634,684.64
Pengecoran Beton 4.41 M3 1,150,000.00 5,071,500.00

3 Ring Balok Uk. 10/20


Pemasangan Bekisting 46.64 M2 169,746.00 7,916,953.44
Tulangan Dia. 10 mm 261.40 Kg 17,081.25 4,464,970.43
Tulangan Dia. 6 mm 72.15 Kg 17,081.25 1,232,331.84
Pengecoran Beton 3.18 M3 1,150,000.00 3,657,000.00

4 Kolom Uk. 20/20 (K1)


Pemasangan Bekisting 124.64 M2 169,746.00 21,157,141.44
Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 937.45 Kg 17,081.25 16,012,900.35
Tulangan Dia. 6 mm 229.50 Kg 17,081.25 3,920,098.01
Pengecoran Beton 6.23 M3 1,150,000.00 7,166,800.00

5 Kolom Uk. 15/45 (K2)


Pemasangan Bekisting 19.68 M2 169,746.00 3,340,601.28
Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 98.68 Kg 17,081.25 1,685,568.46
Tulangan Dia. 6 mm 24.16 Kg 17,081.25 412,641.90
Pengecoran Beton 1.11 M3 1,150,000.00 1,273,050.00

6 Kolom Praktis (K3)


Pemasangan Bekisting 2.82 M2 169,746.00 479,091.11
Tulangan Dia. 8 mm 62.14 Kg 17,081.25 1,061,483.54
Tulangan Dia. 6 mm 31.82 Kg 17,081.25 543,479.57
Pengecoran Beton 0.50 M3 1,150,000.00 579,600.00

7 Pembuatan Tangga
Pemasangan Bekisting 9.55 M2 169,746.00 1,620,463.21
Tulangan Dia. 10 mm - 15 Cm 201.43 Kg 17,081.25 3,440,694.98
Wiremesh M5 29.82 Kg 18,179.75 542,120.15
Pengecoran Beton 1.74 M3 1,150,000.00 1,998,815.00
Pemasangan Keramik Uk. 30 x 60 3.60 M2 305,017.00 1,098,061.20
SUB JUMLAH 148,762,049.11

IV PEKERJAAN LANTAI
1 Lantai 1
Mengurug Pasir 77.03 M3 244,800.00 18,855,720.00
Wiremesh M5 252.41 Kg 18,179.75 4,588,659.80
Pengecoran Lantai 11.85 M3 1,150,000.00 13,627,500.00
Pemasangan SPC Flooring 4mm 40.00 M2 396,500.00 15,860,000.00
Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 74.50 M2 305,017.00 22,723,766.50
Pemasangan Keramik Lantai WC Uk. 25/25 6.00 M2 216,973.00 1,301,838.00
Pemasangan Keramik Dinding WC Uk. 25/50 39.34 M2 216,973.00 8,535,717.82
2 Lantai 2
Pemasangan Bekisting 112.50 M2 169,746.00 19,096,425.00
Wiremesh M5 2 Rangkap 479.25 Kg 18,179.75 8,712,645.19
Pengecoran Lantai 10.08 M3 1,150,000.00 11,586,250.00
Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 95.00 M2 305,017.00 28,976,615.00
Pemasangan Keramik Uk. 40/40 Tempat Jemur 14.00 M2 180,615.75 2,528,620.50
Pemasangan Keramik Lantai WC Uk. 25/25 3.75 M2 216,973.00 813,648.75
Pemasangan Keramik Dinding WC Uk. 25/50 19.67 M2 216,973.00 4,267,858.91
SUB JUMLAH 161,475,265.47
VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
JUMLAH SAT (Rp.) (Rp.)
1 2 3 5 6

V PEKERJAAN DINDING DAN PLESTERAN


1 Lantai 1
Dinding Batako Press Uk 7 322.20 M2 98,793.00 31,831,104.60
Pekerjaan Plester 644.40 M2 68,397.60 44,075,413.44
Acian Luar 196.80 M2 58,480.00 11,508,864.00
Krawang Rooster Uk. 15 x 30 15.00 Bh 25,000.00 375,000.00
2 Lantai 2
Dinding Batako Press Uk 7 291.20 M2 98,793.00 28,768,521.60
Pekerjaan Plester 582.40 M2 68,397.60 39,834,762.24
Acian Luar 196.80 M2 58,480.00 11,508,864.00
Krawang Rooster Uk. 15 x 30 12.00 Bh 25,000.00 300,000.00
SUB JUMLAH 168,202,529.88

VI PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1 Rangka Atap Baja Ringan 155.00 M2 127,750.00 19,801,250.00
2 Penutup Atap 2x4 Zincalume 0.25 155.00 M2 112,750.00 17,476,250.00
3 Nok Perabung Atap 55.00 M' 45,000.00 2,475,000.00
4 Listplank GRC 20cm 54.00 M' 65,000.00 3,510,000.00
SUB JUMLAH 43,262,500.00

VII PEKERJAAN PLAFOND


1 Lantai 1
Rangka Plafond Hollow 112.50 M2 87,250.00 9,815,625.00
Plafond Gypsum 9mm/GRC 4mm 112.50 M2 51,095.00 5,748,187.50
2 Lantai 2
Rangka Plafond Hollow 141.50 M2 87,250.00 12,345,875.00
Plafond Gypsum 9mm/GRC 4mm 141.50 M2 51,095.00 7,229,942.50
SUB JUMLAH 35,139,630.00

VIII PEKERJAAN SANITASI


1 Kloset Jongkok 1.00 Unit 517,500.00 517,500.00
2 Kloset Duduk ex INA/Amstad 2.00 Unit 2,250,000.00 4,500,000.00
3 Kran Air 6.00 Bh 85,000.00 510,000.00
4 Floor Drain 5.00 Bh 85,000.00 425,000.00
5 Septictank Gorong-Gorong 6.00 Sambung 200,000.00 1,200,000.00
6 Instalasi Air Kotor 1.00 Lsm 3,500,000.00 3,500,000.00
7 Instalasi Air Bersih 1.00 Lsm 3,500,000.00 3,500,000.00
SUB JUMLAH 14,152,500.00

IX PEKERJAAN INSTALASI LISTRIK


1 Lampu Downlight 17-18 Watt 21.00 Unit 132,250.00 2,777,250.00
2 Lampu Downlight 12-13 Watt 3.00 Unit 90,000.00 270,000.00
3 Stop Kontak 9.00 Bh 34,500.00 310,500.00
4 Saklar Tunggal 9.00 Bh 40,250.00 362,250.00
5 Saklar Ganda 8.00 Bh 40,250.00 322,000.00
6 Instalasi Titik Listrik, Incluede Material Kabel 74.00 Titik 175,000.00 12,950,000.00
SUB JUMLAH 16,992,000.00

X PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kusen Pintu dan Jendela Kayu Bengkirai 138.06 M' 95,000.00 13,115,700.00
2 Pintu Utama 2 Daun Uk 1,30 x 2,00 Meter (PJ1) 2.00 Unit 1,300,000.00 2,600,000.00
Daun Jendela Uk. 0.35 x 1,7 Meter (Kayu Bengkirai) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 2.72 M2
3 Pintu 1 Daun Uk 0.80 x 2,00 Meter (P2) 7.00 Unit 1,150,000.00 8,050,000.00
4 Pintu Garasi Lipat 5 Daun Uk 2,75 x 2,00 Meter (PL) 1.00 Unit 5,750,000.00 5,750,000.00
5 Pintu Kaca Balkon Lt2 2 Daun 2,00 x 2,00 Meter (PJ2) 2.00 Unit 1,300,000.00 2,600,000.00
Kaca t = 5 mm 8.40 M2 200,000.00 1,680,000.00
6 Pintu WC UPVC 3.00 Unit 1,250,000.00 3,750,000.00
7 Jendela (J1)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 1.40 M2 200,000.00 280,000.00
8 Jendela (J2)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 6.00 Unit 550,000.00 3,300,000.00
Kaca t = 5 mm 4.20 M2 200,000.00 840,000.00
9 Jendela (J3)
Daun Jendela Uk. 1,20 x 1,60 Meter (Aluminium) 1.00 Unit 550,000.00 550,000.00
Kaca t = 5 mm 1.92 M2 200,000.00 384,000.00
10 Ventilasi WC Uk 0,40 x 0,60 (V) 3.00 Unit 300,000.00 900,000.00
11 Kunci Pintu Set 11.00 Unit 225,000.00 2,475,000.00
12 Engsel Pintu 44.00 Bh 65,000.00 2,860,000.00
13 Engsel Jendela 22.00 Bh 40,000.00 880,000.00
14 Slot Jendela 22.00 Bh 20,000.00 440,000.00
15 Tarikan Jendela 22.00 Bh 20,000.00 440,000.00
SUB JUMLAH 53,094,700.00

XI PEKERJAAN PENGECATAN
1 Cat Tembok Baru Interior ex Nippon/Setara 613.40 M2 55,703.33 34,168,424.67
2 Cat Tembok Baru Exterior/Waterproof ex Mowilex 393.60 M2 65,000.00 25,584,000.00
3 Cat PJV ex Propan 1.00 LS 3,500,000.00 3,500,000.00
4 Cat Plafond ex Nippon 254.00 M2 40,703.33 10,338,646.67
SUB JUMLAH 73,591,071.33
XIIPEKERJAAN LAIN - LAIN
1 Pemasangan Batu Alam Fasad Depan ex Palimanan+Coating Anti Jamur 19.10 M2 450,000.00 8,595,000.00
2 Pagar Balkon Lantai 2 Hollow Galvanis + Kaca 8mm 7.00 M' 850,000.00 5,950,000.00
3 Pemasangan Cutting ACP Fasad Depan 5.10 M2 1,750,000.00 8,925,000.00
4 Cor Meja Kompor Dapur, Finish Top Table Granit 60x120, 5.50 M' 1,000,000.00 5,500,000.00
Back Splash Tinggi 70cm
5 Cor Carport, Finish Keramik 40x40 Kasar 20.00 M2 300,000.00 6,000,000.00
6 Pekerjaan Railing 18.00 M' 450,000.00 8,100,000.00
7 Pekerjaan Papan Lantai Kayu Belian (K. Tidur Utama) 1.00 Lsm 339,000.00 339,000.00
SUB JUMLAH 43,409,000.00

JUMLAH(A) 810,800,000.00

SPACECO.ID
VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
JUMLAH SAT (Rp.) (Rp.)
1 2 3 5 6

FEBRYAN DHARMA PUTRA


REKAPITULASI CONTRACT CHANGE ORDER

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI

TYPE : 225 M2

LOKASI : JL TANJUNG RAYA

TAHUN ANGGARAN : 2022

HARGA KONTRAK HARGA


ASLI ADDENDUM-1 KETERANGAN
NO. URAIAN PEKERJAAN
PERUBAHAN
(Rp.) (Rp.)
1 2 3 4 5
A PEMBANGUNAN RUMAH 2 LANTAI
I PEKERJAAN PENDAHULUAN 500,000.00 500,000.00
II PEKERJAAN PONDASI 52,219,650.68 52,219,650.68
III PEKERJAAN STRUKTUR BETON BERTULANG 148,762,049.11 167,940,251.57 Perubahan Ukuran Ring Balok
IV PEKERJAAN LANTAI 161,475,265.47 161,475,265.47
V PEKERJAAN DINDING DAN PLESTERAN 168,202,529.88 168,202,529.88
VI PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 43,262,500.00 43,262,500.00
VII PEKERJAAN PLAFOND 35,139,630.00 35,139,630.00
VIII PEKERJAAN SANITASI 14,152,500.00 14,152,500.00
IX PEKERJAAN INSTALASI LISTRIK 16,992,000.00 16,992,000.00
X PEKERJAAN PINTU, JENDELA DAN VENTILASI 53,094,700.00 62,677,219.00 Ganti Material Aluminium
XI PEKERJAAN PENGECATAN 73,591,071.33 73,591,071.33
XII PEKERJAAN LAIN - LAIN 43,409,000.00 82,409,000.00 List Profil Beton

GRAND TOTAL 810,800,000.00 878,561,000.00

SPACECO.ID

FEBRYAN DHARMA PUTRA


CONTRACT CHANGE ORDER (CCO-1)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI

TYPE : 225 M2

LOKASI : JL TANJUNG RAYA

TAHUN ANGGARAN : 2022

VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN


NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.) ADDENDUM
1 2 3 5 6 7
A PEMBANGUNAN RUMAH 2 LANTAI
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank 1.00 M' 500,000.00 500,000.00
SUB JUMLAH 500,000.00

II PEKERJAAN PONDASI
1 Pondasi P1
- Galian Tanah Pondasi 21.00 M3 93,750.00 1,968,750.00
- Urugan Kembali Galian Tanah Pondasi 7.00 M3 67,500.00 472,500.00
- Pasir Urug T = 10 cm 2.10 M3 244,800.00 514,080.00
- Pengecoran Lantai Kerja Beton, T = 5 cm 1.05 M3 1,232,376.83 1,293,995.67
- Bekisting Pondasi 22.18 M2 213,699.00 4,738,989.02
- Tulangan Dia. 12 mm 845.65 Kg 17,081.25 14,444,690.06
- Tulangan Dia. 6 mm 23.20 Kg 17,081.25 396,287.19
- Pengecoran Pondasi Beton 4.75 M3 1,402,309.05 6,655,358.74
- Cerucuk dia. 10-12 cm - 8 meter 252.00 Btg 86,250.00 21,735,000.00
SUB JUMLAH 52,219,650.68

III PEKERJAAN STRUKTUR BETON BERTULANG


1 Balok Sloof Uk. 20/65
Pemasangan Bekisting 95.00 M2 169,746.00 16,125,870.00
Tulangan Dia. 12 mm 655.96 Kg 17,081.25 11,204,548.43
Tulangan Dia. 6 mm 163.05 Kg 17,081.25 2,785,130.61
Pengecoran Beton 9.50 M3 1,150,000.00 10,925,000.00

2 Balok Uk. 15/30


Pemasangan Bekisting 58.80 M2 169,746.00 9,981,064.80
Tulangan Dia. 12 mm 435.00 Kg 17,081.25 7,430,384.75
Tulangan Dia. 6 mm 95.70 Kg 17,081.25 1,634,684.64
Pengecoran Beton 4.41 M3 1,150,000.00 5,071,500.00

3 Ring Balok Uk. 10/20


Pemasangan Bekisting 46.64 M2 169,746.00 Dihilangkan
Tulangan Dia. 10 mm 261.40 Kg 17,081.25 Dihilangkan
Tulangan Dia. 6 mm 72.15 Kg 17,081.25 Dihilangkan
Pengecoran Beton 3.18 M3 1,150,000.00 Dihilangkan

4 Ring Balok Uk. 15/30


Pemasangan Bekisting 63.60 M2 169,746.00 10,795,845.60 Pengganti
Tulangan Dia. 10 mm 261.40 Kg 17,081.25 4,464,970.43 Pengganti
Tulangan Dia. 6 mm 103.51 Kg 17,081.25 1,768,128.29 Pengganti
Pengecoran Beton 4.77 M3 1,150,000.00 5,485,500.00 Pengganti

5 Kolom Uk. 20/20 (K1)


Pemasangan Bekisting 124.64 M2 169,746.00 21,157,141.44
Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 937.45 Kg 17,081.25 16,012,900.35
Tulangan Dia. 6 mm 229.50 Kg 17,081.25 3,920,098.01
Pengecoran Beton 6.23 M3 1,150,000.00 7,166,800.00

6 Kolom Uk. 15/45 (K2)


Pemasangan Bekisting 19.68 M2 169,746.00 3,340,601.28
Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 98.68 Kg 17,081.25 1,685,568.46
Tulangan Dia. 6 mm 24.16 Kg 17,081.25 412,641.90
Pengecoran Beton 1.11 M3 1,150,000.00 1,273,050.00

7 Kolom Praktis (K3)


Pemasangan Bekisting 2.82 M2 169,746.00 479,091.11
Tulangan Dia. 8 mm 62.14 Kg 17,081.25 1,061,483.54
Tulangan Dia. 6 mm 31.82 Kg 17,081.25 543,479.57
Pengecoran Beton 0.50 M3 1,150,000.00 579,600.00

8 Talang Beton Kaki Atap


Pemasangan Bekisting 9.99 M2 169,746.00 1,696,399.09 Item Baru
Tulangan Dia. 8 mm 371.87 Kg 17,081.25 6,352,052.27 Item Baru
Pengecoran Beton 5.12 M3 1,150,000.00 5,886,562.50 Item Baru

9 Pembuatan Tangga
Pemasangan Bekisting 9.55 M2 169,746.00 1,620,463.21
Tulangan Dia. 10 mm - 15 Cm 201.43 Kg 17,081.25 3,440,694.98
Wiremesh M5 29.82 Kg 18,179.75 542,120.15
Pengecoran Beton 1.74 M3 1,150,000.00 1,998,815.00
Pemasangan Keramik Uk. 30 x 60 3.60 M2 305,017.00 1,098,061.20
SUB JUMLAH 167,940,251.57

IV PEKERJAAN LANTAI
1 Lantai 1
Mengurug Pasir 77.03 M3 244,800.00 18,855,720.00
Wiremesh M5 252.41 Kg 18,179.75 4,588,659.80
Pengecoran Lantai 11.85 M3 1,150,000.00 13,627,500.00
Pemasangan SPC Flooring 4mm 40.00 M2 396,500.00 15,860,000.00
Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 74.50 M2 305,017.00 22,723,766.50
Pemasangan Keramik Lantai WC Uk. 25/25 6.00 M2 216,973.00 1,301,838.00
Pemasangan Keramik Dinding WC Uk. 25/50 39.34 M2 216,973.00 8,535,717.82
2 Lantai 2
Pemasangan Bekisting 112.50 M2 169,746.00 19,096,425.00
Wiremesh M5 2 Rangkap 479.25 Kg 18,179.75 8,712,645.19
Pengecoran Lantai 10.08 M3 1,150,000.00 11,586,250.00
Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 95.00 M2 305,017.00 28,976,615.00
Pemasangan Keramik Uk. 40/40 Tempat Jemur 14.00 M2 180,615.75 2,528,620.50
Pemasangan Keramik Lantai WC Uk. 25/25 3.75 M2 216,973.00 813,648.75
Pemasangan Keramik Dinding WC Uk. 25/50 19.67 M2 216,973.00 4,267,858.91
VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.) ADDENDUM
1 2 3 5 6 7
SUB JUMLAH 161,475,265.47
VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.) ADDENDUM
1 2 3 5 6 7

V PEKERJAAN DINDING DAN PLESTERAN


1 Lantai 1
Dinding Batako Press Uk 7 322.20 M2 98,793.00 31,831,104.60
Pekerjaan Plester 644.40 M2 68,397.60 44,075,413.44
Acian Luar 196.80 M2 58,480.00 11,508,864.00
Krawang Rooster Uk. 15 x 30 15.00 Bh 25,000.00 375,000.00
2 Lantai 2
Dinding Batako Press Uk 7 291.20 M2 98,793.00 28,768,521.60
Pekerjaan Plester 582.40 M2 68,397.60 39,834,762.24
Acian Luar 196.80 M2 58,480.00 11,508,864.00
Krawang Rooster Uk. 15 x 30 12.00 Bh 25,000.00 300,000.00
SUB JUMLAH 168,202,529.88

VI PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1 Rangka Atap Baja Ringan 155.00 M2 127,750.00 19,801,250.00
2 Penutup Atap 2x4 Zincalume 0.25 155.00 M2 112,750.00 17,476,250.00
3 Nok Perabung Atap 55.00 M' 45,000.00 2,475,000.00
4 Listplank GRC 20cm 54.00 M' 65,000.00 3,510,000.00
SUB JUMLAH 43,262,500.00

VII PEKERJAAN PLAFOND


1 Lantai 1
Rangka Plafond Hollow 112.50 M2 87,250.00 9,815,625.00
Plafond Gypsum 9mm/GRC 4mm 112.50 M2 51,095.00 5,748,187.50
2 Lantai 2
Rangka Plafond Hollow 141.50 M2 87,250.00 12,345,875.00
Plafond Gypsum 9mm/GRC 4mm 141.50 M2 51,095.00 7,229,942.50
SUB JUMLAH 35,139,630.00

VIII PEKERJAAN SANITASI


1 Kloset Jongkok 1.00 Unit 517,500.00 517,500.00
2 Kloset Duduk ex INA/Amstad 2.00 Unit 2,250,000.00 4,500,000.00
3 Kran Air 6.00 Bh 85,000.00 510,000.00
4 Floor Drain 5.00 Bh 85,000.00 425,000.00
5 Septictank Gorong-Gorong 6.00 Sambung 200,000.00 1,200,000.00
6 Instalasi Air Kotor 1.00 Lsm 3,500,000.00 3,500,000.00
7 Instalasi Air Bersih 1.00 Lsm 3,500,000.00 3,500,000.00
SUB JUMLAH 14,152,500.00

IX PEKERJAAN INSTALASI LISTRIK


1 Lampu Downlight 17-18 Watt 21.00 Unit 132,250.00 2,777,250.00
2 Lampu Downlight 12-13 Watt 3.00 Unit 90,000.00 270,000.00
3 Stop Kontak 9.00 Bh 34,500.00 310,500.00
4 Saklar Tunggal 9.00 Bh 40,250.00 362,250.00
5 Saklar Ganda 8.00 Bh 40,250.00 322,000.00
6 Instalasi Titik Listrik, Incluede Material Kabel 74.00 Titik 175,000.00 12,950,000.00
SUB JUMLAH 16,992,000.00

X PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kusen Pintu dan Jendela Kayu Bengkirai 38.60 M' 95,000.00 3,667,000.00
2 Kusen Pintu dan Jendela Aluminium 106.42 M' 145,000.00 15,431,219.00 Ganti Bahan
3 Pintu Utama 2 Daun Uk 1,30 x 2,00 Meter (PJ1) 2.00 Unit 1,300,000.00 2,600,000.00
Daun Jendela Uk. 0.35 x 1,7 Meter (Kayu Bengkirai) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 2.72 M2
4 Pintu 1 Daun Uk 0.80 x 2,00 Meter (P2) 7.00 Unit 1,150,000.00 8,050,000.00
5 Pintu Garasi Lipat 5 Daun Uk 2,75 x 2,00 Meter (PL) 1.00 Unit 5,750,000.00 5,750,000.00
6 Pintu Kaca Balkon Lt2 2 Daun 2,00 x 2,00 Meter (PJ2) 2.00 Unit 1,300,000.00 2,600,000.00
Kaca t = 5 mm 8.40 M2 200,000.00 1,680,000.00
7 Pintu WC UPVC 3.00 Unit 1,250,000.00 3,750,000.00
8 Jendela (J1)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 2.00 Unit 950,000.00 1,900,000.00 Ganti Bahan
Kaca t = 5 mm 1.40 M2 200,000.00 280,000.00
9 Jendela (J2)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 6.00 Unit 950,000.00 5,700,000.00 Ganti Bahan
Kaca t = 5 mm 4.20 M2 200,000.00 840,000.00
10 Jendela (J3)
Daun Jendela Uk. 1,20 x 1,60 Meter (Aluminium) 1.00 Unit 950,000.00 950,000.00 Ganti Bahan
Kaca t = 5 mm 1.92 M2 200,000.00 384,000.00
11 Ventilasi WC Uk 0,40 x 0,60 (V) 3.00 Unit 300,000.00 900,000.00
12 Kunci Pintu Set 11.00 Unit 225,000.00 2,475,000.00
13 Engsel Pintu 44.00 Bh 65,000.00 2,860,000.00
14 Engsel Jendela 22.00 Bh 40,000.00 880,000.00
15 Slot Jendela 22.00 Bh 20,000.00 440,000.00
16 Tarikan Jendela 22.00 Bh 20,000.00 440,000.00
SUB JUMLAH 62,677,219.00

XI PEKERJAAN PENGECATAN
1 Cat Tembok Baru Interior ex Nippon/Setara 613.40 M2 55,703.33 34,168,424.67
2 Cat Tembok Baru Exterior/Waterproof ex Mowilex 393.60 M2 65,000.00 25,584,000.00
3 Cat PJV ex Propan 1.00 LS 3,500,000.00 3,500,000.00
4 Cat Plafond ex Nippon 254.00 M2 40,703.33 10,338,646.67
SUB JUMLAH 73,591,071.33
XII PEKERJAAN LAIN - LAIN
1 Pemasangan Batu Alam Fasad Depan ex Palimanan+Coating Anti Jamur 19.10 M2 450,000.00 8,595,000.00
2 Pagar Balkon Lantai 2 Hollow Galvanis + Kaca 8mm 7.00 M' 850,000.00 5,950,000.00
3 Pemasangan Cutting ACP Fasad Depan 5.10 M2 1,750,000.00 8,925,000.00
4 Cor Meja Kompor Dapur, Finish Top Table Granit 60x120, 5.50 M' 1,000,000.00 5,500,000.00
Back Splash Tinggi 70cm
5 Cor Carport, Finish Keramik 40x40 Kasar 20.00 M2 300,000.00 6,000,000.00
6 Pekerjaan Railing 18.00 M' 450,000.00 8,100,000.00
7 Pekerjaan Papan Lantai Kayu Belian (K. Tidur Utama) 1.00 Lsm 339,000.00 339,000.00
8 Listplank Profil Beton 48.75 M 800,000.00 39,000,000.00 Item Baru
SUB JUMLAH 82,409,000.00

JUMLAH(A) 878,561,000.00

SPACECO.ID
VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.) ADDENDUM
1 2 3 5 6 7

FEBRYAN DHARMA PUTRA


Email : Spaceconceptor.id | Phone : 0561 - 711657 | HP / WA : 0812 57 834 631

ADDENDUM
KONTRAK ASAL
VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.)
X PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Kusen Pintu dan Jendela Kayu Bengkirai 138.06 M' 95,000.00 13,115,700.00
2 Pintu Utama 2 Daun Uk 1,30 x 2,00 Meter (PJ1) 2.00 Unit 1,300,000.00 2,600,000.00
Daun Jendela Uk. 0.35 x 1,7 Meter (Kayu Bengkirai) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 2.72 M2
3 Pintu 1 Daun Uk 0.80 x 2,00 Meter (P2) 7.00 Unit 1,150,000.00 8,050,000.00
4 Pintu Garasi Lipat 5 Daun Uk 2,75 x 2,00 Meter (PL) 1.00 Unit 5,750,000.00 5,750,000.00
5 Pintu Kaca Balkon Lt2 2 Daun 2,00 x 2,00 Meter (PJ2) 2.00 Unit 1,300,000.00 2,600,000.00
Kaca t = 5 mm 8.40 M2 200,000.00 1,680,000.00
6 Pintu WC UPVC 3.00 Unit 1,250,000.00 3,750,000.00
7 Jendela (J1)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 1.40 M2 200,000.00 280,000.00
8 Jendela (J2)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 6.00 Unit 550,000.00 3,300,000.00
Kaca t = 5 mm 4.20 M2 200,000.00 840,000.00
9 Jendela (J3)
Daun Jendela Uk. 1,20 x 1,60 Meter (Aluminium) 1.00 Unit 550,000.00 550,000.00
Kaca t = 5 mm 1.92 M2 200,000.00 384,000.00
10 Ventilasi WC Uk 0,40 x 0,60 (V) 3.00 Unit 300,000.00 900,000.00
11 Kunci Pintu Set 11.00 Unit 225,000.00 2,475,000.00
12 Engsel Pintu 44.00 Bh 65,000.00 2,860,000.00
13 Engsel Jendela 22.00 Bh 40,000.00 880,000.00
14 Slot Jendela 22.00 Bh 20,000.00 440,000.00
15 Tarikan Jendela 22.00 Bh 20,000.00 440,000.00
SUB JUMLAH 53,094,700.00

ADDENDUM PERUBAHAN MATERIAL JENDELA ALUMINIUM


VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN
JUMLAH UNIT (Rp.) (Rp.) ADDENDUM
X PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Kusen Pintu dan Jendela Kayu Bengkirai 38.60 M' 95,000.00 3,667,000.00
2 Kusen Jendela Aluminium 106.42 M' 145,000.00 15,431,219.00 Ganti Bahan
3 Pintu Utama 2 Daun Uk 1,30 x 2,00 Meter (PJ1) 2.00 Unit 1,300,000.00 2,600,000.00
Daun Jendela Uk. 0.35 x 1,7 Meter (Kayu Bengkirai) 2.00 Unit 550,000.00 1,100,000.00
Kaca t = 5 mm 2.72 M2
4 Pintu 1 Daun Uk 0.80 x 2,00 Meter (P2) 7.00 Unit 1,150,000.00 8,050,000.00
5 Pintu Garasi Lipat 5 Daun Uk 2,75 x 2,00 Meter (PL) 1.00 Unit 5,750,000.00 5,750,000.00
6 Pintu Kaca Balkon Lt2 2 Daun 2,00 x 2,00 Meter (PJ2) 2.00 Unit 1,300,000.00 2,600,000.00
Kaca t = 5 mm 8.40 M2 200,000.00 1,680,000.00
7 Pintu WC UPVC 3.00 Unit 1,250,000.00 3,750,000.00
8 Jendela (J1)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 2.00 Unit 950,000.00 1,900,000.00 Ganti Bahan
Kaca t = 5 mm 1.40 M2 200,000.00 280,000.00
9 Jendela (J2)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 6.00 Unit 950,000.00 5,700,000.00 Ganti Bahan
Kaca t = 5 mm 4.20 M2 200,000.00 840,000.00
10 Jendela (J3)
Daun Jendela Uk. 1,20 x 1,60 Meter (Aluminium) 1.00 Unit 950,000.00 950,000.00 Ganti Bahan
Kaca t = 5 mm 1.92 M2 200,000.00 384,000.00
11 Ventilasi WC Uk 0,40 x 0,60 (V) 3.00 Unit 300,000.00 900,000.00
12 Kunci Pintu Set 11.00 Unit 225,000.00 2,475,000.00
13 Engsel Pintu 44.00 Bh 65,000.00 2,860,000.00
14 Engsel Jendela 22.00 Bh 40,000.00 880,000.00
15 Slot Jendela 22.00 Bh 20,000.00 440,000.00
16 Tarikan Jendela 22.00 Bh 20,000.00 440,000.00
SUB JUMLAH 62,677,219.00
JUMLAH HARGA PEKERJAAN PINTU DAN JENDELA (KONTRAK ASAL) Rp 53,094,700.00 ,-
JUMLAH HARGA PEKERJAAN PINTU DAN JENDELA (ADDENDUM PERUBAHAN MATERIAL) Rp 62,677,219.00 ,-
SELISIH HARGA Rp 9,582,519.00 ,-
Email : Spaceconceptor.id | Phone : 0561 - 711657 | HP / WA : 0812 57 834 631

ADDENDUM
ADDENDUM LIST PROFIL BETON
JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN
(Rp.) ADDENDUM
I PEKERJAAN LIST PROFIL BETON
1 Ring Balok Uk. 10/20 Hilang / Ukuran Lama
Pemasangan Bekisting Hilang / Ukuran Lama
Tulangan Dia. 10 mm Hilang / Ukuran Lama
Tulangan Dia. 6 mm Hilang / Ukuran Lama
Pengecoran Beton Hilang / Ukuran Lama

2 Ring Balok Uk. 15/30


Pemasangan Bekisting 10,795,845.60 Berubah / Ukuran Baru
Tulangan Dia. 10 mm 4,464,970.43 Berubah / Ukuran Baru
Tulangan Dia. 6 mm 1,768,128.29 Berubah / Ukuran Baru
Pengecoran Beton 5,485,500.00 Berubah / Ukuran Baru

3 Talang Beton Kaki Atap


Pemasangan Bekisting 1,696,399.09 Item Baru
Tulangan Dia. 8 mm 6,352,052.27 Item Baru
Pengecoran Beton 5,886,562.50 Item Baru

8 Listplank Profil Beton 39,000,000.00 Item Baru

PENAMBAHAN HARGA LIST PROFIL BETON Rp 58,178,202.46 ,-


ADDENDUM
PROYEK : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI
KLIEN : BU ERVI
ALAMAT : JL. TANJUNG RAYA II, GG. H. HARUN

Email : Spaceconceptor.id | Phone : 0561 - 711657 | HP / WA : 0812 57 834 631

NO ITEM PEKERJAAN VOL SAT PRICE (Rp.)


1 Penambahan Biaya Untuk Material Jendela Aluminium 7.00 Unit 9,582,519
2 Penambahan Biaya Untuk Material Pintu Balkon Aluminium 1.00 Unit 1,508,050

TOTAL BIAYA 11,090,000


*NB: Point no.1 detail item dapat dilihat di addendum sebelumnya

SPACECO.ID

FEBRYAN DHARMA PUTRA


HARGA SATUAN BAHAN DAN UPAH

NO TENAGA KERJA SATUAN HARGA


(Rp)

A. UPAH
1 Mandor Lapangan Org/hari 150,000.00
2 Kepala Tukang Org/hari 150,000.00
3 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari 135,000.00
4 Pekerja / Buruh Lapangan Tak terlatih Org/hari 120,000.00

HARGA
NO MATERIAL SATUAN
(Rp)

B. BAHAN PENGISI
1 Batu pecah 1/2 cm M³ 690,000.00
2 Pasir Urug M³ 184,000.00
3 Pasir Beton M³ 184,000.00
4 Semen PC Zak 92,000.00
5 Semen PC Kg 1,840.00
6 Semen Warna Kg 16,100.00
7 Batako Press 7 Uk 38 x 17 x 6.5 Bh 2,070.00
8 Keramik Granit 60 x 60 cm ex Warna Abu/Cream Buah 46,000.00
Keramik Granit 60 x 60 cm ex Warna Putih Corak Marble Buah 79,062.50
9 Keramik 40 x 40 cm Buah 12,458.33
10 Keramik 40 x 40 cm Buah 13,416.67
11 Keramik Lantai WC 25 x 25 cm Buah 11,270.00
Keramik Dinding WC 25 x 50 cm Buah 16,531.25
12 Sewa Molen Hari 172,500.00

C. BAHAN KAYU
1 Balok Kayu Klas II Mabang (Ketam) M³ 5,433,750.00
2 Ky. Klas III Uk. 4/6 - 4 m ( Tidak Ketam ) M³ 2,511,600.00
3 Papan Mal Klas III M³ 2,760,000.00
4 Kayu cerucuk /dolken ø8 - Pj. 4 M Btg 9,775.00
5 Kayu cerucuk /dolken ø10 - 12 - Pj. 8 M Btg 74,750.00
6 Kayu cerucuk /dolken ø12 - Pj. 8 M Btg 86,250.00
7 Woodplank M' 23,000.00

D. BAHAN CAT
1 Cat kilat Kg 80,500.00
2 Plamur Kg 17,250.00
3 Cat dasar Kg 46,000.00
4 Cat tembok Interior ex Mowilex/Setara Kg 76,666.67
5 Cat tembok Exterior ex Mowilex/Setara Kg 146,944.44
6 Dempul ex Kingkong Kg 6,670.00
7 Meni Kg 63,250.00
8 Oker Kg 23,000.00
9 Lem Kayu Kg 28,750.00
10 Kuas Buah 40,250.00
11 Tiner HD Kg 40,250.00
12 Amplas Lbr 8,050.00
-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Tulangan Beton Kg 14,000.00
2 Kawat Beton Kg 28,750.00
3 Baut f 5/8"pf = 20 cm Btg 5,750.00
4 Wiremesh M6 Kg 16,675.00
HARGA
NO MATERIAL SATUAN
(Rp)

-
F. BAHAN PENGANTUNG -
1 Engsel pintu ex Belluci Bh 51,750.00
2 Engsel Jendela ex Belluci Bh 34,500.00
3 Slot Jendela Bh 17,250.00
4 Handle Jendela Bh 20,000.00
5 Hak Angin Bh 14,400.00
6 Kunci tanam 1 slag Bh 264,500.00
7 Paku campuran 1" - 5 " Kg 26,450.00
8 Paku GRC Kg 34,500.00
9 Sekrup Kg 60,000.00
-
HARGA
NO MATERIAL SATUAN
(Rp)

G. BAHAN ATAP -
1 Atap Zincalume 2x4 Tebal 0.25 Lbr 51,750.00
2 Seng Plat Bh 40,250.00
-
H. BAHAN PLAFOND -
1 Gypsum Board ex Elephant Lbr 78,200.00
2 GRC Board (120 x 240 x 4) Lbr 92,000.00
3 Plywood 9mm Lbr 327,750.00
-
I. BAHAN MINYAK (TANPA KEUNTUNGAN) -
1 Minyak solar Ltr 10,350.00
-
J. BAHAN ALAT-ALAT LISTRIK -
1 Lampu Downlight 17 Watt ex Philips Buah 132,250.00
Lampu Downlight 12 Watt ex Philips 90,000.00
2 Fitting Lampu ex Broco/Panasonic Buah 28,750.00
3 Saklar Double ex Broco/Panasonic Buah 40,250.00
4 Saklar Engkel ex Broco/Panasonic Buah 40,250.00
5 Stop Kontak ex Broco/Panasonic Buah 34,500.00
-
K. BAHAN SANITASI -
1 Kloset Jongkok ex TOTO Buah 517,500.00
2 Kran Air ex ONDA Buah 97,750.00
3 Floor Drain Buah 138,000.00
4 Kloset Duduk ex INA / AMSTAD Buah 2,587,500.00
NO PEKERJAAN PERHITU
A PEMBANGUNAN RUMAH 2 LANTAI
1 PEKERJAAN PENDAHULUAN
- Pengukuran dan Pemasangan Bowplank
2 PEKERJAAN PONDASI
- Pondasi P1
- Galian Tanah Pondasi 1x
- Urugan Kembali Galian Tanah Pondasi
- Pasir Urug T = 10 cm 1x
- Pengecoran Lantai Kerja Beton, T = 5 cm 1x
- Bekisting Pondasi 1x
0.2 x

- Tulangan Dia. 12 mm 2.15 x


1.6 x

- Tulangan Dia. 6 mm 0.56 x


- Pengecoran Pondasi Beton 1X
0.2 X

- Cerucuk dia. 10-12 cm - 8 meter 12 X

3 PEKERJAAN STRUKTUR BETON BERTULANG LEBAR


- Balok Sloof Uk. 20/65 0.2 x
Pemasangan Bekisting DIA BESI TINGGI SLOOF 0.5 x
Tulangan Dia. 12 mm 12 462.0454545455 5x
Tulangan Dia. 10 mm 10 4
Tulangan Dia. 6 mm 6 177.6557575758 1.16 x
Pengecoran Beton K-175 0.2 x

- Balok Sloof Uk. 20/40


Pemasangan Bekisting 0.75 x
Tulangan Dia. 12 mm 12 6x
Tulangan Dia. 6 mm 6 0.66 x
Pengecoran Beton K-175 0.15 x

- Balok Uk. 15/30 0.15


Pemasangan Bekisting 0.75 x
Tulangan Dia. 12 mm 12 436.9166666667 5x
Tulangan Dia. 6 mm 6 104.272 0.66 x
Pengecoran Beton K-175 0.15 x

- Balok Uk. 15/20


Pemasangan Bekisting 0.55 x
Tulangan Dia. 10 mm 10 4x
Tulangan Dia. 6 mm 6 0.46 x
Pengecoran Beton K-175 0.15 x

- Ring Balok Uk. 10/20


Pemasangan Bekisting 0.55 x
Tulangan Dia. 10 mm 10 4x
Tulangan Dia. 6 mm 6 0.46 x
Pengecoran Beton K-175 0.15 x

- Ring Balok Uk. 15/30


Pemasangan Bekisting 0.75 x
Tulangan Dia. 10 mm 10 4x
Tulangan Dia. 6 mm 6 0.66 x
Pengecoran Beton K-175 0.15 x

- Ring Balok Praktis Uk. 10/10


Pemasangan Bekisting 0.2 x
Tulangan Dia. 10 mm 12 4x
Tulangan Dia. 6 mm 6 0.24 x
Pengecoran Beton K-175 0.1 x

- Kolom Uk. 20/20 (K1)


Pemasangan Bekisting
0.2 x

Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 12 4x


Tulangan Extra Dia. 10 mm 10 4x

Tulangan Dia. 6 mm 0.56 x

Pengecoran Beton K-175 0.2 x


0.2 x

- Kolom Uk. 15/45 (K2)


Pemasangan Bekisting 0.15 0.45
1.2 x

Tulangan Dia. 12 mm, Tul Extra Dia. 10 mm 12 4x


Tulangan Extra Dia. 10 mm 10 4x
Tulangan Dia. 6 mm 0.56 x

Pengecoran Beton K-175 0.2 x


0.15 x

- Kolom Praktis (K3)


Pemasangan Bekisting 0.07 x
0.07 x

Tulangan Dia. 8 mm 8 4x
6 4x

Tulangan Dia. 6 mm 0.24 x


0.24 x

Pengecoran Beton K-175 0.1 x


0.1 x

- Dack Beton
Pemasangan Bekisting
Wiremesh M5 2 Rangkap 2.13 x
Pengecoran Beton K-175 0.1 x

- Pembuatan Tangga
Pemasangan Bekisting 3.584 +
Tulangan Dia. 10 mm - 15 Cm 193.333333333
Wiremesh M5 2.13 x
Pengecoran Beton K-175 1.5381 x
Pemasangan Keramik Uk. 30 x 60 0.3 +

3 PEKERJAAN LANTAI
Lantai 1
- Mengurug Pasir 118.5
- Wiremesh M5 118.5 X
- Pengecoran Lantai 118.5
- Pemasangan SPC Flooring 4mm 2.63 m2/box 40
- Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 74.5
- Pemasangan Keramik Lantai WC Uk. 25/25 6
- Pemasangan Keramik Dinding WC Uk. 25/50 9+
Lantai 2
- Pemasangan Bekisting 112.5
- Wiremesh M5 2 Rangkap 2.13 X
- Pengecoran Lantai 100.75
- Pemasangan Keramik Granit Uk. 60/60 ex Warna Abu 95 -
- Pemasangan Keramik Uk. 40/40 Tempat Jemur 14
- Pemasangan Keramik Lantai WC Uk. 25/25 3.75 +
- Pemasangan Keramik Dinding WC Uk. 25/50 9+

5 PEKERJAAN DINDING DAN PLESTERAN


Lantai 1 panjang dinding
- Dinding Batako Press Uk 7 76 x
2x

- Pekerjaan Plester
- Acian Luar
- Krawang Rooster Uk. 15 x 30
Lantai 2
- Dinding Batako Press Uk 7 76 x
4x

- Pekerjaan Plester
- Acian Luar
- Krawang Rooster Uk. 15 x 30

6 PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


- Rangka Atap Baja Ringan 155 +
- Penutup Atap 2x4 Zincalume 0.25
Nok Perabung Atap
Listplank GRC 20cm

7 PEKERJAAN PLAFOND
Lantai 1
- Rangka Plafond Hollow 112.5
- Plafond Gypsum 9mm/GRC 4mm
Lantai 2
- Rangka Plafond Hollow 106.5 +
- Plafond Gypsum 9mm/GRC 4mm

9 PEKERJAAN PINTU, JENDELA DAN VENTILASI


- Kusen Pintu dan Jendela Kayu Bengkirai 138.06
- Pintu Utama 2 Daun Uk 1,30 x 2,00 Meter (PJ1) 1.3 +
Daun Jendela Uk. 0.35 x 1,7 Meter (Kayu Bengkirai) 0.4
Kaca t = 5 mm 0.4
- Pintu 1 Daun Uk 0.80 x 2,00 Meter (P2) 0.9
- Pintu Garasi Lipat 5 Daun Uk 2,75 x 2,00 Meter (PL) 2.5
Pintu Kaca Balkon Lt2 2 Daun 2,00 x 2,00 Meter (PJ2) 2+
Kaca t = 5 mm 2
- Pintu WC UPVC
- Jendela (J1)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 0.5
Kaca t = 5 mm 0.5 x
- Jendela (J2)
Daun Jendela Uk. 0.50 x 1,4 Meter (Aluminium) 0.5
Kaca t = 5 mm 0.5 x
- Jendela (J3)
Daun Jendela Uk. 1,20 x 1,60 Meter (Aluminium) 1.2
Kaca t = 5 mm 1.2 x
- Ventilasi WC Uk 0,40 x 0,60 (V) 0.4
0.4
10 PEKERJAAN PENGUNCI DAN PENGGANTUNG
- Kunci Pintu Set
- Engsel Pintu
- Engsel Jendela
- Slot Jendela
- Tarikan Jendela

11 PEKERJAAN SANITASI
- Kloset Jongkok
- Kran Air
- Floor Drain
- Septictank Gorong-Gorong
- Instalasi Air Kotor
- Instalasi Air Bersih
12 PEKERJAAN INSTALASI LISTRIK
- Lampu Downlight 17-18 Watt
- Lampu Downlight 12-13 Watt
- Lampu Downlight 17-18 Watt
- Lampu Downlight 17-18 Watt
- Fitting Lampu
- Stop Kontak
- Saklar Tunggal
- Saklar Ganda
- Instalasi Titik Listrik, Incluede Material Kabel
13 PEKERJAAN PENGECATAN
- Cat Tembok Baru Interior ex Nippon/Setara
- Cat Tembok Baru Exterior/Waterproof ex Mowile 48 8.2
Cat PJV
- Cat Plafond ex Nippon

B PEMBUATAN BAK PENAMPUNGAN


1 PEKERJAAN PONDASI
Galian Tanah Pondasi 4x
Urugan Kembali Galian Tanah Pondasi
Pasir Urug T = 10 cm 1x
Pengecoran Lantai Kerja Beton K-100, T = 5 cm 1x
Bekisting Pondasi 1x
Tulangan Dia. 13 mm 2.15 x
Pengecoran Pondasi Beton K-175 1X
Cerucuk dia. 8 - 10 cm - 8 meter 9X

3 PEKERJAAN STRUKTUR BETON BERTULANG


- Balok Sloof Uk. 15/15
Pemasangan Bekisting 0.3 x
Tulangan Dia. 13 mm 4x
Tulangan Dia. 8 mm 0.36 x
Pengecoran Beton K-175 0.15 x

- Ring Balok Uk. 15/15


Pemasangan Bekisting 0.3 x
Tulangan Dia. 13 mm 4x
Tulangan Dia. 8 mm 0.36 x
Pengecoran Beton K-175 0.15 x

- Kolom Uk. 20/20


Pemasangan Bekisting 0.8 x
Tulangan Dia. 13 mm 4x
Tulangan Dia. 8 mm 0.56 x
Pengecoran Beton K-175 0.2 x

3 PEKERJAAN LANTAI
- Mengurug Pasir T = 10 Cm 4.3
- Pengecoran Lt. Beton K-175 4.3
- Pemasangan Lantai Keramik Uk. 20/20 Unpolished

4 PEKERJAAN DINDING BETON


- Pemasangan Bekisting 10.6 x
- Wiremesh M5 2 Lapis 2.13 x
- Pemasangan Keramik Dinding Uk. 20/20 Unpolished 12.4 x
5 PEKERJAAN PLAT BETON PENTUUP ATAS
- Pemasangan Bekisting 2.1075
- Tulangan dia. 13 mm - 15 Cm 30 x
- Pengecoran Lt. Beton K-175 2.1075 x
- Pembuatan dan Pemasangan Menhole

C PEMBUATAN DUDUKAN TANGKI AIR


1 PEKERJAAN STRUKTUR BETON BERTULANG
- Balok Uk. 15/30
Pemasangan Bekisting 0.6 x
Tulangan Dia. 13 mm 4x
Tulangan Dia. 8 mm 0.66 x
Pengecoran Beton K-175 0.15 x

- Balok Uk. 15/20


Pemasangan Bekisting 0.4 x
Tulangan Dia. 13 mm 4x
Tulangan Dia. 8 mm 0.46 x
Pengecoran Beton K-175 0.15 x

2 PEKERJAAN LANTAI
- Pemasangan Bekisting
- Wiremesh M5 2 Lapis 2.13 x
- Pengecoran Beton K-175 3.20 x
PERHITUNGAN VOLUME VOLUME SAT.

1.00 Lsm

1x 1 21 21.00 m3
7.00 m3
1x 0.1 21 2.10 m3
1x 0.05 21 1.05 m3
0.2 x 4 21 16.80
0.65 x 4 21 10.92
22.18 m2
15 x 0.006165 x 169 21 705.62
4x 0.006165 x 169 21 140.03
845.65 Kg
5x 0.006165 x 64 21 23.20 Kg
1X 0.2 21 4.20
0.2 X 0.65 21 0.55
4.75 m3
21 252.00 Btg

TINGGI PANJANG
0.5 95
95 x 2 95.00 m2
95 x 0.006165 x 144 421.69 Kg
95 x 0.006165 100 234.27 Kg
633.33333333333 x 0.006165 x 36 163.05 Kg
0.5 x 95 9.50 m3

46 27.60 m2
46 x 0.006165 x 144 245.02 Kg
306.66666666667 x 0.006165 x 36 44.92 Kg
0.3 x 46 2.07 m3

0.3 98
98 58.80 m2
98 x 0.006165 x 144 435.00 Kg
653.33333333333 x 0.006165 x 36 95.70 Kg
0.3 x 98 4.41 m3
70.85 31.17 m2
70.85 x 0.006165 x 100 174.72 Kg
472.33333333333 x 0.006165 x 64 85.73 Kg
0.2 x 70.85 2.13 m3

106 46.64 m2
106 x 0.006165 x 100 261.40 Kg
706.66666666667 x 0.006165 x 36 72.15 Kg
0.2 x 106 3.18 m3

106 63.60 m2
106 x 0.006165 x 100 261.40 Kg
706.66666666667 x 0.006165 x 36 103.51 Kg
0.3 x 106 4.77 m3

17 2.72 m2
17 x 0.006165 x 100 41.92 Kg
113.33333333333 x 0.006165 x 64 10.73 Kg
0.1 x 17 0.17 m3

0.00
8.2 x 19 124.64
124.64 m2
8.2 x 0.006165 x 144 x 19 553.25
8.2 x 0.006165 x 100 x 19 384.20
937.45 Kg
54.666666666667 x 0.006165 x 64 x 19 229.50

229.50 Kg
0.2 x 0x 0 0.00
0.2 x 8.2 x 19 6.23
6.23 m3

0.00
8.2 x 2 19.68
19.68 m2
8.2 x 0.006165 x 144 x 2 58.24
8.2 x 0.006165 x 100 x 2 40.44
98.68 Kg
54.666666666667 x 0.006165 x 64 x 2 24.16

24.16 Kg
0.2 x 0x 0 0.00
0.45 x 8.2 x 2 1.11
1.11 m3

4.2 x 6 1.76
4.2 x 6 1.76
2.82 m2
4.2 x 0.006165 x 64 x 6 39.77
4.2 x 0.006165 x 36 x 6 22.37
62.14 Kg
28 x 0.006165 x 64 x 6 15.91
28 x 0.006165 x 64 x 6 15.91
31.82 Kg
0.1 x 4.2 x 6 0.25
0.1 x 4.2 x 6 0.25
0.50 m3

30.78 m2
2x 30.78 131.12 Kg
30.78 3.08 m3

1+ 3.349 + 4 9.55 m2
x 0.006165 x 169 201.43 Kg
14 29.82 Kg
1+ 0.2 1.74 m3
0.6 + 20 3.60 m2

x 0.65 77.03 m3
2.13 x 1 252.41 Kg
x 0.1 11.85 m3
40.00 m2
74.50 m2
6.00 m2
12 39.34 m2
112.50 m2
2X 112.5 479.25 Kg
x 0.1 10.08 m3
0 95.00 m2
14.00 m2
0 3.75 m2
12 19.67 m3

tinggi dinding - pjv


4.2 - 0 319.20
1.5 3.00
322.20 m2
644.40 m2
196.80
24.00 Bh

3.8 0 288.80
0.6 2.40
291.20 m2
582.40 m2
196.80
24.00 Bh

0+ 0+ 0 155.00 m2
155.00 m2
55.00
54.00

112.50 m2
112.50 m2
0.00
35 141.50 m2
141.50 m2

KUSEN KACA TOTAL KUSEN


138.06 m'
2.1 5.5 M' 5.5 1.00 unit
1.7 3.8 7.6 2.00 unit
1.7 1.36 2.72 M2
2.1 5.1 35.7 7.00 unit
2.1 6.7 6.7 1.00 unit
2.1 10.2 20.4 2.00 unit
2.1 4.2 8.40 unit
0 0 3.00 unit
0
1.4 6.2 2.00 unit
1.4 1.4 0 1.40 m2
0
1.4 3.8 22.8 6.00 unit
1.4 3.8 3.3 15.96 4.20 m2
0 0
1.6 11.2 11.2 1.00 unit
1.6 1.92 0 1.92 m2
0.6 2 6 3.00 UNIT
0.6 0.24 138.06 0.72 m2
99.46
38.6 11.00 bh
44.00 bh
22.00 bh
22.00 Bh
22.00 Bh

1.00 unit
6.00 bh
4.00 bh
6.00 Sambung
1.00 lsm
1.00 lsm

21.00 bh
3.00 bh
0.00 bh
0.00 bh
24.00 Bh
9.00 bh
9.00 bh
8.00 bh
74.00 Ttk

613.40 m2
393.60 m2
7500000.00 LS
254.00 m2

3x 2.85 1 34.20 m3
13.07 m3
1x 0.1 6 0.60 m3
1x 0.05 6 0.30 m3
0.2 x 4 6 3.84 M2
15 x 0.006165 x 169 6 201.60 KG
1X 0.2 6 1.20 M3
6+ 26 80.00 Btg

5 1.20 m2
5x 0.006165 x 169 20.84 Kg
33.333333333333 x 0.006165 x 64 4.73 Kg
0.15 x 5 0.11 m3

12 2.88 m2
12 x 0.006165 x 169 50.01 Kg
80 x 0.006165 x 64 11.36 Kg
0.15 x 12 0.27 m3

2.35 x 6 9.02 m2
2.35 x 0.006165 x 169 x 6 58.76 Kg
15.666666666667 x 0.006165 x 64 x 6 20.77 Kg
0.2 x 2.35 x 6 0.56 m3

x 0.1 0.43 m3
x 0.05 0.22 m3
6.00 m2

2.4 x 2 39.86 m2
24.9 x 2 106.12 Kg
2.4 x 1 29.14 m2
x 2 3.37 m2
0.0 x 169 x 2 62.51 Kg
0.2 x 2 0.63 m3
2.00 Unit

8 2.40 m2
8x 0.006165 x 169 33.34 Kg
53.333333333333 x 0.006165 x 64 13.89 Kg
0.3 x 8 0.36 m3

1.85 0.37 m2
1.85 x 0.006165 x 169 7.71 Kg
12.333333333333 x 0.006165 x 64 2.24 Kg
0.2 x 1.85 0.06 m3

3.20 m3
3.20 x 2 13.63 Kg
0.1 0.32 m3
TABEL BESI
6 2.66
8 4.74
10 7.4
12 10.7

13 12.5
16 19
Listplank Beton Balok 10/15 Sengkang Overstek
48.75 0.73 0.15
34 Buah
19.50 Bekisting
120.22 Tul. 10 mm
13.06 Tul. 6 mm

5.11875 Plat
256.464 Tul. 10 mm
115.4088 Tul. 10 mm
371.8728 Kg
9.99375 Bekisting
A.2.3.1 Pekerjaan Tanah

A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 120,000.00 90,000.00
2. Mandor L.04 OH 0.025 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 93,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 93,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 93,750.00

A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah


Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali koefisien pekerjaan galian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 120,000.00 60,000.00
2. Mandor L.04 OH 0.050 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 67,500.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 67,500.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 67,500.00

A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 75,000.00 22,500.00
2. Mandor L.04 OH 0.010 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 24,000.00
B BAHAN
1. Pasir urug 1.200 184,000.00 220,800.00
Jumlah Harga Bahan 220,800.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 244,800.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 244,800.00
A.4.1.1 Pekerjaan Beton

A.4.1.1.4.a Pembuatan 1 m³ lantai kerja beton mutu fc 7,4 Mpa (K100) menggunakan molen
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.960 120,000.00 115,200.00
2. Tukang Batu L.02 OH 0.130 135,000.00 17,550.00
3. Kepala Tukang L.03 OH 0.013 150,000.00 1,950.00
4. Mandor L.04 OH 0.048 150,000.00 7,200.00
Jumlah Harga Tenaga Kerja 141,900.00
B BAHAN
1. Semen portland Kg 230.000 1,840.00 423,200.00
2. Pasir beton Kg 893.000 131.43 117,365.71
3. kerikil (maks 30 mm) Kg 1,027.000 511.11 524,911.11
4. Air Ltr 200.000 -
Jumlah Harga Bahan 1,065,476.83
C PERALATAN
1. Molen sewa-hari 0.250 100,000.00 25,000.00
Jumlah Harga Alat 25,000.00

D Jumlah ( A + B + C ) 1,232,376.83
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,232,376.83

A.4.1.1.5.a Pembuatan 1 m³ beton mutu fc 14,5 Mpa (K175) menggunakan molen


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 50,000.00 82,500.00
2. Tukang Batu L.02 OH 0.275 125,000.00 34,375.00
3. Kepala Tukang L.03 OH 0.028 150,000.00 4,200.00
4. Mandor L.04 OH 0.083 150,000.00 12,450.00

Jumlah Harga Tenaga Kerja 133,525.00

B BAHAN
1. Semen portland Kg 326.000 1,840.00 599,840.00
2. Pasir beton Kg 760.000 131.43 99,885.71
3. kerikil (maks 30 mm) Kg 1,029.000 511.11 525,933.33
4. Air Ltr 215.000 -
Jumlah Harga Bahan 1,225,659.05
C PERALATAN
1. Molen sewa-hari 0.250 172,500.00 43,125.00
Jumlah Harga Alat 43,125.00

D Jumlah ( A + B + C ) 1,402,309.05
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,402,309.05
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 120,000.00 8,400.00
2. Tukang Besi L.02 OH 0.070 135,000.00 9,450.00
3. Kepala Tukang L.03 OH 0.007 150,000.00 1,050.00
4. Mandor L.04 OH 0.004 150,000.00 600.00
Jumlah Harga Tenaga Kerja 19,500.00
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 14,000.00 147,000.00
2. Kawat beton Kg 0.150 28,750.00 4,312.50
Jumlah Harga Bahan 151,312.50
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 170,812.50
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 170,812.50

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.025 120,000.00 3,000.00
2. Tukang Besi L.02 OH 0.025 135,000.00 3,375.00
3. Kepala Tukang L.03 OH 0.025 150,000.00 3,750.00
4. Mandor L.04 OH 0.001 150,000.00 150.00
Jumlah Harga Tenaga Kerja 10,275.00
B BAHAN
1. Jaring kawat baja dilas Kg 10.200 16,675.00 170,085.00
2. Kawat beton Kg 0.050 28,750.00 1,437.50
Jumlah Harga Bahan 171,522.50
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 181,797.50
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 181,797.50
A.4.1.1.20 Pemasangan 1 m² bekisting untuk pondasi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.520 120,000.00 62,400.00
2. Tukang Kayu L.02 OH 0.260 135,000.00 35,100.00
3. Kepala Tukang L.03 OH 0.026 150,000.00 3,900.00
4. Mandor L.04 OH 0.026 150,000.00 3,900.00
Jumlah Harga Tenaga Kerja 105,300.00
B BAHAN
1. Kayu kelas III m³ 0.040 2,511,600.00 100,464.00
2. Paku 5 - 10 cm Kg 0.300 26,450.00 7,935.00
3. Minyak bekisting Ltr 0.100 -
Jumlah Harga Bahan 108,399.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 213,699.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 213,699.00

A.4.1.1.21.a Pemasangan 1 m² bekisting untuk sloof (pemakaian berulang)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.520 120,000.00 62,400.00
2. Tukang Kayu L.02 OH 0.260 135,000.00 35,100.00
3. Kepala Tukang L.03 OH 0.026 150,000.00 3,900.00
4. Mandor L.04 OH 0.026 150,000.00 3,900.00
Jumlah Harga Tenaga Kerja 105,300.00
B BAHAN
1. Kayu kelas III m³ 0.023 2,511,600.00 56,511.00
2. Paku 5 - 10 cm Kg 0.300 26,450.00 7,935.00
3. Minyak bekisting Ltr 0.100 -
Jumlah Harga Bahan 64,446.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 169,746.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 169,746.00
A.4.1.1.23.a Pemasangan 1 m² bekisting untuk balok (dengan papan mal)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.660 120,000.00 79,200.00
2. Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
3. Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
4. Mandor L.04 OH 0.033 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 133,650.00
B BAHAN
1. Kayu kelas III m³ 0.058 2,511,600.00 145,672.80
2. Paku 5 - 12 cm Kg 0.400 26,450.00 10,580.00
3. Minyak bekisting Ltr 0.200 -
4. Papan mal m³ 0.017 2,760,000.00 46,920.00
5. Dolken kayu Ø 8-10 / 400 cm Btg 2.000 9,775.00 19,550.00
Jumlah Harga Bahan 222,722.80
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 356,372.80
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 356,372.80

A.4.1.1.23.a.1 Pemasangan 1 m² bekisting untuk kolom (dengan papan mal pemakaian berulang)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.660 120,000.00 79,200.00
2. Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
3. Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
4. Mandor L.04 OH 0.033 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 133,650.00
B BAHAN
1. Kayu kelas III m³ 0.029 2,511,600.00 72,836.40
2. Paku 5 - 12 cm Kg 0.400 26,450.00 10,580.00
3. Minyak bekisting Ltr 0.200 -
4. Papan mal m³ 0.009 2,760,000.00 23,460.00
5. Dolken kayu Ø 8-10 / 400 cm Btg 1.000 9,775.00 9,775.00
Jumlah Harga Bahan 116,651.40
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 250,301.40
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 250,301.40
A.4.1.1.24.a.1 Pemasangan 1 m² bekisting untuk lantai (dengan papan mal pemakaian berulang)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.660 120,000.00 79,200.00
2. Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
3. Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
4. Mandor L.04 OH 0.033 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 133,650.00
B BAHAN
1. Kayu kelas III m³ 0.030 2,511,600.00 75,975.90
2. Paku 5 - 12 cm Kg 0.400 26,450.00 10,580.00
3. Minyak bekisting Ltr 0.200 -
4. Papan mal m³ 0.009 2,760,000.00 24,840.00
5. Dolken kayu Ø 8-10 / 400 cm Btg 2.000 9,775.00 19,548.05
Jumlah Harga Bahan 130,943.95
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 264,593.95
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 264,593.95

A.4.1.1.26.a Pemasangan 1 m² bekisting untuk tangga (Pemakaian Berulang)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.660 120,000.00 79,200.00
2. Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
3. Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
4. Mandor L.04 OH 0.033 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 133,650.00
B BAHAN
1. Kayu kelas III m³ 0.015 2,511,600.00 37,674.00
2. Paku 5 - 12 cm Kg 0.400 26,450.00 10,580.00
3. Minyak bekisting Ltr 0.150 10,350.00 1,552.50
4. Balok kayu kelas II m³ 0.008 5,433,750.00 40,753.13
5. Plywood tebal 9 mm Lbr 0.175 327,750.00 57,356.25
6. Dolken kayu Ø 8-10 / 400 cm Btg 1.000 9,775.00 9,775.00
Jumlah Harga Bahan 157,690.88
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 291,340.88
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 291,340.88
A.4.4.1 Pekerjaan Dinding Pasangan

A.4.4.1.21.b Pemasangan 1 m² dinding Batako 20/40/7 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
1. Pekerja L.01 OH 0.320 120,000.00 38,400.00
2. Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
3. Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4. Mandor L.04 OH 0.015 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 54,150.00
B BAHAN
1. Batako 20/40/7 bh 12.500 2,070.00 25,875.00
2. Semen portland Kg 7.500 1,840.00 13,800.00
3. Pasir pasang m³ 0.027 184,000.00 4,968.00
Jumlah Harga Bahan 44,643.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 98,793.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 98,793.00
A.4.4.2 Pekerjaan Plesteran

A.4.4.2.4 Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 100,000.00 30,000.00
2. Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
3. Kepala Tukang L.03 OH 0.015 150,000.00 2,250.00
4. Mandor L.04 OH 0.015 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 52,500.00
B BAHAN
1. Semen portland Kg 6.240 1,840.00 11,481.60
2. Pasir pasang m³ 0.024 184,000.00 4,416.00
Jumlah Harga Bahan 15,897.60
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 68,397.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 68,397.60

A.4.4.2.27 Pemasangan 1 m² acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 100,000.00 30,000.00
2. Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
3. Kepala Tukang L.03 OH 0.015 150,000.00 2,250.00
4. Mandor L.04 OH 0.015 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 52,500.00
B BAHAN
1. Semen portland Kg 3.250 1,840.00 5,980.00
Jumlah Harga Bahan 5,980.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 58,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 58,480.00
A.4.4.3 Pekerjaan Penutup Lantai & Penutup Dinding

A.4.4.3.4 Pemasangan 1 m² lantai ubin warna 40 x 40 cm


Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1. Pekerja L.01 OH 0.250 120,000.00
2. Tukang Batu L.02 OH 0.125 135,000.00
3. Kepala Tukang L.03 OH 0.013 150,000.00
4. Mandor L.04 OH 0.013 150,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1. keramik 40x40 Bh 6.630 12,458.33
2. Semen portland Kg 9.800 1,840.00
3. Pasir pasang m³ 0.045 184,000.00
4. Semen warna Kg 1.300 16,100.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat

D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.4.a Pemasangan 1 m² lantai ubin warna 40 x 40 cm Unpolished


Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1. Pekerja L.01 OH 0.250 120,000.00
2. Tukang Batu L.02 OH 0.125 135,000.00
3. Kepala Tukang L.03 OH 0.013 150,000.00
4. Mandor L.04 OH 0.013 150,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1. keramik 40x40 Unpolished Bh 6.630 13,416.67
2. Semen portland Kg 9.800 1,840.00
3. Pasir pasang m³ 0.045 184,000.00
4. Semen warna Kg 1.300 16,100.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat

D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.36 Pemasangan 1 m² lantai keramik 20 x 20 cm


Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1. Pekerja L.01 OH 0.250 120,000.00
2. Tukang Batu L.02 OH 0.125 135,000.00
3. Kepala Tukang L.03 OH 0.013 150,000.00
4. Mandor L.04 OH 0.013 150,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1. Ubin keramik Bh 10.000 11,270.00
2. Semen portland Kg 10.400 1,840.00
3. Pasir pasang m³ 0.045 184,000.00
4. Semen warna Kg 1.620 16,100.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat

D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)

30,000.00
16,875.00
1,950.00
1,950.00
50,775.00

82,598.75
18,032.00
8,280.00
20,930.00
129,840.75

-
-

180,615.75
-
180,615.75

Jumlah Harga
(Rp)

30,000.00
16,875.00
1,950.00
1,950.00
50,775.00

88,952.50
18,032.00
8,280.00
20,930.00
136,194.50

-
-

186,969.50
-
186,969.50

Jumlah Harga
(Rp)

30,000.00
16,875.00
1,950.00
1,950.00
50,775.00

112,700.00
19,136.00
8,280.00
26,082.00
166,198.00
-
-

216,973.00
-
216,973.00
A.4.5.2 Pekerjaan Penutup Atap

A.4.5.2.41.b Pemasangan 1 m2 atap Zincalume


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 120,000.00 12,000.00
2. Tukang Kayu L.02 OH 0.100 135,000.00 13,500.00
3. Kepala Tukang L.03 OH 0.080 150,000.00 12,000.00
4. Mandor L.04 OH 0.006 150,000.00 900.00
Jumlah Harga Tenaga Kerja 38,400.00
B BAHAN
1. Zincalume Gelombang Persegi Bh 1.700 51,750.00 87,975.00
2. Paku biasa ½" - 1" Kg 0.020 26,450.00 529.00
Jumlah Harga Bahan 88,504.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 126,904.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 126,904.00

A.4.5.2.39 Pemasangan 1 m' nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.150 120,000.00 18,000.00
2. Tukang Kayu L.02 OH 0.070 135,000.00 9,450.00
3. Kepala Tukang L.03 OH 0.007 150,000.00 1,050.00
4. Mandor L.04 OH 0.006 150,000.00 900.00
Jumlah Harga Tenaga Kerja 29,400.00
B BAHAN
1. Seng plat 3" x 6" bjls 28 Lbr 0.300 40,250.00 12,075.00
2. Paku biasa ½" - 1" Kg 0.040 26,450.00 1,058.00
Jumlah Harga Bahan 13,133.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 42,533.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 42,533.00
A.4.6.1 Pekerjaan Kayu

A.4.6.1.22.b Pemasangan 1 m' Wood Plank


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 120,000.00 12,000.00
2. Tukang Kayu L.02 OH 0.200 135,000.00 27,000.00
3. Kepala Tukang L.03 OH 0.020 150,000.00 3,000.00
4. Mandor L.04 OH 0.005 150,000.00 750.00
Jumlah Harga Tenaga Kerja 42,750.00
B BAHAN
1. Woodplank m 1.000 23,000.00 23,000.00
2. Sekrup Kg 0.050 60,000.00 3,000.00
Jumlah Harga Bahan 26,000.00
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 68,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 68,750.00
A.4.7.1 Pekerjaan Pengecatan

A.4.7.1.10 Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.020 120,000.00 2,400.00
2. Tukang Cat L.02 OH 0.150 125,000.00 18,750.00
3. Kepala Tukang L.03 OH 0.0063 150,000.00 945.00
4. Mandor L.04 OH 0.003 150,000.00 450.00
Jumlah Harga Tenaga Kerja 22,545.00
B BAHAN
1. Plamur Kg 0.100 17,250.00 1,725.00
2. Cat dasar Kg 0.100 46,000.00 4,600.00
3. Cat penutup Kg 0.350 76,666.67 26,833.33
Jumlah Harga Bahan 33,158.33
C PERALATAN
-
Jumlah Harga Alat -

D Jumlah ( A + B + C ) 55,703.33
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 55,703.33
PEKERJAAN PLAFOND (P.Pf.)

1m2 Langit-langit GRC (P.Pf. 05)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 120,000.00 0.100 12,000.00
2 Tukang Kayu OH 130,000.00 0.050 6,500.00
3 Kepala Tukang OH 150,000.00 0.005 750.00
4 Mandor OH 150,000.00 0.005 750.00
Jumlah 20,000.00
B BAHAN
1 GRC Board (120 x 240 x 4) Lbr 75,000.00 0.364 27,300.00
2 Paku GRC Kg 34,500.00 0.110 3,795.00
Jumlah 31,095.00
C Jumlah A + B 51,095.00