Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA


PEKERJAAN : PENGADAAN ALAT LISTRIK PJU
VOLUME : 1 PAKET
TA. : 2023 KABUPATEN : BULUKUMBA

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SATUAN PAJAK
(Rp.) (Rp.)

I. PENGADAAN ALAT LISTRIK PJU


1 Begel/Cleam Tiang Lampu, Tiang Besi 2,5 Inchi 20.00 Bh 67,747.75 11% 1,504,000.00
2 Begel/Cleam Tiang Lampu, Tiang Beton 8 Inchi 20.00 Bh 96,500.00 11% 1,930,000.00
3 Fitting Lampu E40 Merk Vato 95.00 Pcs 41,739.30 11% 3,965,233.30
4 Isolasi Listrik Nasional 10.00 Bh 11,000.00 11% 110,000.00
5 Kabel NYM 2 x 2,5 mm (Eterna) 20.00 Roll 497,500.00 11% 9,950,000.00
6 Kabel NFA2X (Twisted) 2 x 10 , (Supreme) 5,010.00 m' 8,600.00 11% 43,086,000.00
7 Kap Lampu Hijau E 40 83.00 Bh 30,300.00 11% 2,514,900.00
8 Lampu Capsule Led 50 Watt (In-Lite) 1,200.00 Bh 145,000.00 11% 174,000,000.00
9 Lampu Capsule Led 50 Watt (Luby) 1,241.00 Bh 138,000.00 11% 171,258,000.00
10 Lampu PJU Led 90W 57.00 Bh 3,885,590.21 11% 221,478,641.77
11 ARM Lampu Jalan 1,5 Meter 80.00 Bh 91,694.15 11% 7,335,532.10
12 Schneider MCB (Easy-9) 1P 32A 50.00 Bh 82,000.00 11% 4,100,000.00
13 Photocell 3 A (Selcon) 50.00 Bh 124,300.00 11% 6,215,000.00
14 Timer Theben 181 60.00 Pcs 331,800.00 11% 19,908,000.00
15 Kontaktor LC1D40AM7, AC1, 60A, AC3: 40A (Schneider) 30.00 Bh 747,923.09 11% 22,437,692.84

(A) Jumlah Harga Pekerjaan ( termasuk pajak, Biaya Umum dan Keuntungan ) 689,793,000.00

(B) DIBULATKAN 689,793,000.00

Terbilang : Enam Ratus Delapan Puluh Satu Juta Tujuh Ratus Tiga Puluh Sembilan Ribu Seratus Lima Puluh Rupiah

Bulukumba, September 2023


DISETUJUI OLEH,, DIBUAT OLEH,
PEJABAT PEMBUAT KOMITMEN (PPK) PT. ANGKASA GLOBAL CONSULTANT

ANDI ALAMSYAH, ST., MAP MUH. RIZAL RAHMAN, ST., MSP


NIP. 19831115 201101 1 004 Direktur

DIKETAHUI,
KEPALA DINAS PERHUBUNGAN
KAB. BULUKUMBA

Drs. MUHAMMAD AMRI


Pangkat : Pembina Utama Muda
NIP. 19650414 199303 1 013

Anda mungkin juga menyukai