PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
DAFTAR GAMBAR
MEKANIKAL
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DG 0 0 0 1
³
CONTROL
PANEL
TO PANEL PUMP TO PANEL PUMP TO PANEL PUMP
TEMPERATURE
KEMENTRIAN PEKERJAAN UMUM
HL/OFF KAP. HL/OFF HL/OFF
L/ON LS
CONTROL
4 M3 LS L/ON LS L/ON DAN PERUMAHAN RAKYAT
PRESSURE DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
STORAGE
ROOFTANK CLEAN WATER TANK ROOFTANK CLEAN WATER ROOFTANK CLEAN WATER
KAP. 1x2 m3 HL HL KAP. 1x2 m3 HL KAP. 1x2 m3 PENGGUNA JASA
HP
L L L
OVER FLOW
OVER FLOW
OVER FLOW
PG PG
ISTP-1/2
GP
IHP-1/2
GP
DRAIN DRAIN DRAIN
PG
GP
GP
BP-1 BP-2 BP-3
PG
GP
GP
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
DIPERIKSA OLEH :
TIM TEKNIS
WM
DISETUJUI :
NAMA GAMBAR
DIAGRAM SISTEM
AIR BERSIH
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 1
WM
PG PENGGUNA JASA
NAMA PEKERJAAN
CONTROL
PANEL
TO PANEL PUMP TO PANEL PUMP TO PANEL PUMP
TEMPERATURE
HL/OFF CONTROL KAP. HL/OFF HL/OFF
L/ON LS 4 M3 LS L/ON LS L/ON KETERANGAN
PRESSURE
STORAGE
ROOFTANK CLEAN WATER TANK ROOFTANK CLEAN WATER ROOFTANK CLEAN WATER
KAP. 1x2 m3 HL HL KAP. 1x2 m3 HL KAP. 1x2 m3
HP
L L L
OVER FLOW
OVER FLOW
OVER FLOW
PG PG
ISTP-1/2
GP
IHP-1/2
GP
DRAIN DRAIN DRAIN KONSULTAN PERENCANA
SPARE SPARE SPARE
GP
BP-1/2
GP
PENANGGUNG JAWAB
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
NAMA GAMBAR
DIAGRAM SISTEM
AIR PANAS
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
GS FD FD GS FD FD GS FD FD GS FD FD
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
KONSULTAN PERENCANA
GS FD FD GS FD FD GS FD FD GS FD FD
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
PENANGGUNG JAWAB
GS GS GS GS
TENAGA AHLI ARSITEKTUR
FD FD FD FD FD FD FD FD
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø100
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
SIRAM TAMAN SIRAM TAMAN
OVER FLOW OVER FLOW
KE BAK PENAMPUNG KE BAK PENAMPUNG
OVER FLOW OVER FLOW OVER FLOW OVER FLOW
KE DRAINASE KE RESAPAN KE RESAPAN KE DRAINASE
STP STP
TAMAN SANITA TAMAN SANITA
6 m3/daY 6 m3/daY
RESAPAN BAK PENAMPUNG EQUALISASI TANK EQUALISASI TANK BAK PENAMPUNG RESAPAN
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
DIAGRAM SISTEM
AIR KOTOR
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
FD FD
Ø50 Ø50
KONSULTAN PERENCANA
PENANGGUNG JAWAB
DIGAMBAR OLEH :
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
DIAGRAM SISTEM
AIR HUJAN
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 4
AAV
IHB IHB
FE FE FE
OHB OHB
HP HP NAMA PEKERJAAN
IHB IHB
HYDRANT HYDRANT
SC SC
FE FE FE
FHØ100
SCØ100
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
DIAGRAM SISTEM
PEMADAM KEBAKARAN
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 5
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
OU OU
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
ME
- NTS
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
JUMLAH LEMBAR
NTS ME-DS 0 0 0 6
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
FIRE SWITCH
LOAD 1000 kg
FIRE SWITCH
PENANGGUNG JAWAB
LOAD 1000 kg
FIRE SWITCH
LOAD 1000 kg
DIGAMBAR OLEH :
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
DIAGRAM SISTEM
LIFT
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DS 0 0 0 7
KEMENTRIAN PEKERJAAN UMUM
R.PANEL DAN PERUMAHAN RAKYAT
&
GENSET
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
NAMA PEKERJAAN
H
3600
G
RUANG
SAMPAH
6 7 8 9 10 11 12 KETERANGAN
KLINIK BANGSAL ISOLASI
5700
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
E KONSULTAN PERENCANA
TAMAN TAMAN
5430
FFL-0.300 FFL-0.300
NK
D KORIDOR KORIDOR
2400
FFL±0.000 FFL±0.000
C R PANEL LOBBY R PANEL
PENANGGUNG JAWAB
FFL±0.000 WC RUANG
SERBAGUNA MARKET PENGELOLA
RUANG UMUM JENAZAH
1 2 3 4 5 FFL±0.000 FFL±0.000 FFL±0.000 MUSHOLLA RUANG
SAMPAH FFL±0.000 SAMPAH
B
MAIN
3600
ENTRANCE
FFL±0.000 DIGAMBAR OLEH :
A TENAGA AHLI ARSITEKTUR
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR BERSIH LANTAI 1 DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT AIR BERSIH
- DETAIL SHAFT LANTAI 1
LEMBAR KE
SKALA KODE NO. GAMBAR
ME
- SKALA 1 : 30
JUMLAH LEMBAR
1 : 300 ME-AB 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+3.300
FFL+3.300
TR NK NK
F
2400
KORIDOR KORIDOR
FFL+3.300 FFL+3.300
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+3.300
NK
D KORIDOR KORIDOR
2400
FFL+3.300 FFL+3.300
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
1000 3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR BERSIH LANTAI 2 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR BERSIH
LANTAI 2
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AB 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+6.600
FFL+6.600
TR TR
F
2400
KORIDOR KORIDOR
FFL+6.600 FFL+6.600
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+6.600
NK
D KORIDOR KORIDOR
2400
FFL+6.600 FFL+6.600
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+6.600
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR BERSIH LANTAI 3 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR BERSIH
LANTAI 3
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AB 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
NAMA PEKERJAAN
5700
F
2400
E KETERANGAN
TR
ROOF TOP ³
5430
³ VOID ³ VOID
FFL+9.470
D
2400
C KONSULTAN PERENCANA
5700
B
3600
PENANGGUNG JAWAB
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR BERSIH ATAP DAK DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR BERSIH
ATAK DAK
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AB 0 0 0 4
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
NAMA PEKERJAAN
5700
F
2400
E KETERANGAN
ROOF TANK ³
5430
³ ³
EL.+13.070
D
2400
C KONSULTAN PERENCANA
5700
B
3600
PENANGGUNG JAWAB
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR BERSIH ATAP DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR BERSIH
ATAP
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AB 0 0 0 5
R.PANEL
&
GENSET
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
R.POMPA
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
BAK
TAMAN SANITA
PENAMPUNGAN
NAMA PEKERJAAN
RUANG
SAMPAH
6 7 8 9 10 11 12
KLINIK BANGSAL ISOLASI
KAFETARIA FISIOTERAPI 10 BED DAPUR LAUNDRY
FFL±0.000
LOBBY LIFT FFL±0.000 FFL±0.000 FFL±0.000 FFL±0.000
KETERANGAN
FFL±0.000
NK NK
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
MAIN
ENTRANCE
FFL±0.000
Equalizing Tank Equalizing Tank
DIGAMBAR OLEH :
TIM TEKNIS
DISETUJUI :
JUMLAH LEMBAR
1 : 300 ME-AK 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+3.300
FFL+3.300
TR NK NK
F
2400
KORIDOR KORIDOR
FFL+3.300 FFL+3.300
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+3.300
NK
D KORIDOR KORIDOR
2400
FFL+3.300 FFL+3.300
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
1000 3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR KOTOR LANTAI 2 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR KOTOR
LANTAI 2
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AK 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+6.600
FFL+6.600
TR TR
F
2400
KORIDOR KORIDOR
FFL+6.600 FFL+6.600
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+6.600
NK
D KORIDOR KORIDOR
2400
FFL+6.600 FFL+6.600
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+6.600
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR KOTOR LANTAI 3 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT AIR KOTOR
LANTAI 3
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AK 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
KETERANGAN
G
RUANG
SAMPAH
6 7 8 9 10 11 12
KLINIK BANGSAL ISOLASI
5700
TAMAN TAMAN
FFL-0.300 FFL-0.300
NK
D KORIDOR KORIDOR PENANGGUNG JAWAB
2400
FFL±0.000 WC RUANG
SERBAGUNA MARKET PENGELOLA
RUANG UMUM JENAZAH
1 2 3 4 5 FFL±0.000 FFL±0.000 FFL±0.000 MUSHOLLA RUANG
SAMPAH FFL±0.000 SAMPAH
B
MAIN DIGAMBAR OLEH :
3600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR HUJAN LANTAI 1
DIPERIKSA OLEH :
TIM TEKNIS
ME
- SKALA 1 : 300
DISETUJUI :
NAMA GAMBAR
LAYOUT AIR HUJAN
LANTAI 1
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AH 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
KETERANGAN
G
15 16 17 18 19 20 21 22 NURSE
23 24 25 26 27 28 29 30
5700
STATION
LOBBY LIFT FFL+3.300
FFL+3.300
TR NK NK TR
F
2400
VOID VOID
FFL+3.300
NK
D KORIDOR KORIDOR PENANGGUNG JAWAB
2400
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
DIGAMBAR OLEH :
3600
A
1000 3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR HUJAN LANTAI 2
DIPERIKSA OLEH :
TIM TEKNIS
ME
- SKALA 1 : 300
DISETUJUI :
NAMA GAMBAR
LAYOUT AIR HUJAN
LANTAI 2
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AH 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
KETERANGAN
G
15 16 17 18 19 20 21 22 NURSE
23 24 25 26 27 28 29 30
5700
STATION
LOBBY LIFT FFL+6.600
FFL+6.600
TR TR
F
2400
VOID VOID
FFL+6.600
NK
D KORIDOR KORIDOR PENANGGUNG JAWAB
2400
FFL+6.600
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
DIGAMBAR OLEH :
3600
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR HUJAN LANTAI 3
DIPERIKSA OLEH :
TIM TEKNIS
ME
- SKALA 1 : 300
DISETUJUI :
NAMA GAMBAR
LAYOUT AIR HUJAN
LANTAI 3
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AH 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
KETERANGAN
G
5700
F
2400
KONSULTAN PERENCANA
E
TR
ROOF TOP
5430
VOID VOID
FFL+9.470
D PENANGGUNG JAWAB
2400
B
DIGAMBAR OLEH :
3600
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT AIR HUJAN ATAP DAK
DIPERIKSA OLEH :
TIM TEKNIS
ME
- SKALA 1 : 300
DISETUJUI :
NAMA GAMBAR
LAYOUT AIR HUJAN
LANTAI DAK
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 MEP 0 0 0 4
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
KETERANGAN
G
5700
F
2400
KONSULTAN PERENCANA
E
ROOF TANK
5430
EL.+13.070
D PENANGGUNG JAWAB
2400
B
DIGAMBAR OLEH :
3600
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT ATAP
DIPERIKSA OLEH :
TIM TEKNIS
ME
- SKALA 1 : 300
DISETUJUI :
NAMA GAMBAR
LAYOUT
AIR HUJAN ATAP
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-AH 0 0 0 5
KEMENTRIAN PEKERJAAN UMUM
R.PANEL
& DAN PERUMAHAN RAKYAT
GENSET
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
NAMA PEKERJAAN
H
3600
G
RUANG
SAMPAH
6 7 8 9 10 11 12 KETERANGAN
KLINIK BANGSAL ISOLASI
5700
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
E KONSULTAN PERENCANA
TAMAN TAMAN
5430
FFL-0.300 FFL-0.300
NK
D KORIDOR KORIDOR
2400
FFL±0.000 FFL±0.000
C R PANEL LOBBY R PANEL
PENANGGUNG JAWAB
FFL±0.000 WC RUANG
SERBAGUNA MARKET PENGELOLA
RUANG UMUM JENAZAH
1 2 3 4 5 FFL±0.000 FFL±0.000 FFL±0.000 MUSHOLLA RUANG
SAMPAH FFL±0.000 SAMPAH
B
MAIN
3600
ENTRANCE
FFL±0.000 DIGAMBAR OLEH :
A TENAGA AHLI ARSITEKTUR
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT PEMADAM KEBAKARAN LANTAI 1 DIPERIKSA OLEH :
ME
- SKALA 1 : 300
TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT PEMADAM KEBAKARAN
- DETAIL SHAFT LANTAI 1
LEMBAR KE
ME
- SKALA 1 : 30 SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-PK 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+3.300
FFL+3.300
TR NK NK
F
2400
KORIDOR KORIDOR
FFL+3.300 FFL+3.300
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+3.300
NK
D KORIDOR KORIDOR
2400
FFL+3.300 FFL+3.300
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
1000 3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT PEMADAM KEBAKARAN LANTAI 2 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT PEMADAM KEBAKARAN
LANTAI 2
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-PK 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
H
3600
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NAMA PEKERJAAN
NURSE
5700
STATION
LOBBY LIFT FFL+6.600
FFL+6.600
TR TR
F
2400
KORIDOR KORIDOR
FFL+6.600 FFL+6.600
E KETERANGAN
TR
HALL
5430
VOID VOID
FFL+6.600
NK
D KORIDOR KORIDOR
2400
FFL+6.600 FFL+6.600
C KONSULTAN PERENCANA
KAFETARIA
5700
FFL+6.600
FFL+3.300
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
B
3600
PENANGGUNG JAWAB
A
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT PEMADAM KEBAKARAN LANTAI 3 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL SHAFT
ME
- SKALA 1 : 30
NAMA GAMBAR
LAYOUT PEMADAM KEBAKARAN
LANTAI 3
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-PK 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN
AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50
3600
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
E KONSULTAN PERENCANA
TAMAN TAMAN
5430
FFL-0.300 FFL-0.300
NK
D KORIDOR KORIDOR
2400
FFL±0.000 FFL±0.000
PENANGGUNG JAWAB
C R PANEL IU.1-1 LOBBY R PANEL
EF.1-1 EF.1-3 EF.1-4
IU.1-2 IU.1-3 EF.1-5 EF.1-6 IU.1-4 IU.1-5 EF.1-7 IU.1-6 IU.1-7 EF.1-15 TENAGA AHLI ARSITEKTUR
LOUNGE IU.1-9 FCC
RUANG MINI KANTOR
5700
ENTRANCE
FFL±0.000 DIGAMBAR OLEH :
PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN
A AC Ø50 AC Ø50 AC Ø50 TENAGA AHLI ARSITEKTUR
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT TATA UDARA LANTAI 1 DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT TATA UDARA
LANTAI 1
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-TU 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN
AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50
3600
G EF.2-36
KETERANGAN
Ø25
15 16 Ø25 Ø25
17 18 Ø25 Ø25
19 20 Ø25 Ø25
21 22 Ø25 NURSE Ø25
23 24 Ø25 Ø25
25 26 Ø25 Ø25
27 28 Ø25 Ø25
29 30 Ø25
5700
STATION
LOBBY LIFT FFL+3.300
EF.2-17EF.2-18 EF.2-19EF.2-20 EF.2-21EF.2-22 EF.2-23EF.2-24 FFL+3.300 EF.2-25EF.2-26 EF.2-27EF.2-28 EF.2-29EF.2-30 EF.2-31EF.2-32
TR NK IU.2-17 IU.2-18 IU.2-19 IU.2-20 IU.2-21 IU.2-22 IU.2-23 IU.2-24 IU.2-25 IU.2-26 IU.2-27 IU.2-28 IU.2-29 IU.2-30 IU.2-31 IU.2-32 NK
F
2400
KORIDOR KORIDOR
FFL+3.300 FFL+3.300
E KONSULTAN PERENCANA
TR
HALL
5430
VOID VOID
FFL+3.300
NK
D KORIDOR KORIDOR
2400
FFL+3.300 FFL+3.300
PENANGGUNG JAWAB
C
IU.2-1 EF.2-1 EF.2-2 IU.2-2 IU.2-3 EF.2-3 EF.2-4 IU.2-4 IU.2-5 EF.2-5 EF.2-6 IU.2-6 IU.2-7 EF.2-7 EF.2-8 IU.2-8 IU.2-9 EF.2-9 EF.2-10IU.2-10 IU.2-11EF.2-11EF.2-12IU.2-12 IU.2-13EF.2-13EF.2-14IU.2-14 IU.2-15EF.2-15EF.2-16IU.2-16 TENAGA AHLI ARSITEKTUR
KAFETARIA
5700
FFL+3.300
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
EF.2-34 EF.2-35
B
3600
1000 3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000 1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT TATA UDARA LANTAI 2 DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT TATA UDARA
LANTAI 2
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-TU 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN
AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50
3600
G EF.3-36
KETERANGAN
Ø25
15 16 Ø25 Ø25
17 18 Ø25 Ø25
19 20 Ø25 Ø25
21 22 Ø25 NURSE Ø25
23 24 Ø25 Ø25
25 26 Ø25 Ø25
27 28 Ø25 Ø25
29 30 Ø25
5700
STATION
LOBBY LIFT FFL+6.600
EF.3-17EF.3-18 EF.3-19EF.3-20 EF.3-21EF.3-22 EF.3-23EF.3-24 FFL+6.600 EF.3-25EF.3-26 EF.3-27EF.3-28 EF.3-29EF.3-30 EF.3-31EF.3-32
TR IU.3-17 IU.3-18 IU.3-19 IU.3-20 IU.3-21 IU.3-22 IU.3-23 IU.3-24 IU.3-25 IU.3-26 IU.3-27 IU.3-28 IU.3-29 IU.3-30 IU.3-31 IU.3-32 TR
F
2400
KORIDOR KORIDOR
FFL+6.600 FFL+6.600
E KONSULTAN PERENCANA
TR
HALL
5430
VOID VOID
FFL+6.600
NK
D KORIDOR KORIDOR
2400
FFL+6.600 FFL+6.600
PENANGGUNG JAWAB
C
IU.3-1 EF.3-1 EF.3-2 IU.3-2 IU.3-3 EF.3-3 EF.3-4 IU.3-4 IU.3-5 EF.3-5 EF.3-6 IU.3-6 IU.3-7 EF.3-7 EF.3-8 IU.3-8 IU.3-9 EF.3-9 EF.3-10IU.3-10 IU.3-11EF.3-11EF.3-12IU.3-12 IU.3-13EF.3-13EF.3-14IU.3-14 IU.3-15EF.3-15EF.3-16IU.3-16 TENAGA AHLI ARSITEKTUR
KAFETARIA
5700
FFL+6.600
FFL+3.300
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
1 2 3 4 5 4 5 6 7 8 9 10 11 12 13 14
EF.3-34 EF.3-35
B
3600
DIGAMBAR OLEH :
PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN PIPA TEGAK DRAIN
A AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 AC Ø50 TENAGA AHLI ARSITEKTUR
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT TATA UDARA LANTAI 3 DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT TATA UDARA
LANTAI 3
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-TU 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
G
KETERANGAN
5700
F
OU.3-17
OU.2-17
OU.1-11
OU.1-12
OU.3-18
OU.3-19
OU.2-19
OU.1-13
OU.1-14
OU.2-20
OU.3-20
OU.3-21
OU.2-21
OU.1-15
OU.1-16
OU.3-23
OU.2-23
OU.1-17
OU.2-24
OU.3-24
OU.3-25
OU.2-25
OU.1-18
OU.1-19
OU.2-26
OU.3-26
OU.3-27
OU.2-27
OU.1-20
OU.2-28
OU.3-28
OU.3-29
OU.2-29
OU.3-30
OU.3-31
OU.2-31
OU.2-32
OU.3-32
OU.2-18
OU.2-22
OU.3-22
OU.2-30
2400
E KONSULTAN PERENCANA
TR
ROOF TOP
5430
VOID VOID
FFL+9.470
OU.1-10
OU.2-10
OU.3-11
OU.2-12
OU.3-13
OU.2-14
OU.3-15
OU.2-16
OU.3-10
OU.2-11
OU.3-12
OU.2-13
OU.3-14
OU.2-15
OU.3-16
OU.1-1
OU.1-2
OU.2-2
OU.1-3
OU.1-4
OU.1-5
OU.1-6
OU.1-7
OU.2-6
OU.3-6
OU.1-8
OU.1-9
OU.3-1
OU.2-1
OU.3-2
OU.3-3
OU.2-4
OU.3-4
OU.3-5
OU.3-7
OU.2-8
OU.3-9
OU.2-3
OU.2-5
OU.2-7
OU.3-8
OU.2-9
2400
PENANGGUNG JAWAB
C
TENAGA AHLI ARSITEKTUR
5700
B
3600
DIGAMBAR OLEH :
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT OUTDOOR UNIT ATAP DAK DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT OUTDOOR UNIT
ATAP DAK
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-TU 0 0 0 4
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
POWER (WATT) 30 32
TYPE WALL FAN CEILLING FAN - SCHEDULE AC & EF DIPERIKSA OLEH :
TIM TEKNIS
JUMLAH (UNIT) 11 18 ME
- NTS
- -
JUMLAH LEMBAR
NTS ME-TU 0 0 0 5
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
H
3600
G
RUANG KETERANGAN
SAMPAH
6 7 8 9 10 11 12
KLINIK BANGSAL ISOLASI
5700
KORIDOR KORIDOR
FFL±0.000 FFL±0.000
E KONSULTAN PERENCANA
TAMAN TAMAN
5430
FFL-0.300 FFL-0.300
NK
D KORIDOR KORIDOR
2400
FFL±0.000 FFL±0.000
PENANGGUNG JAWAB
C R PANEL LOBBY R PANEL TENAGA AHLI ARSITEKTUR
FFL±0.000 WC RUANG
SERBAGUNA MARKET PENGELOLA
RUANG UMUM JENAZAH
1 2 3 4 5 FFL±0.000 FFL±0.000 FFL±0.000 MUSHOLLA RUANG
SAMPAH FFL±0.000 SAMPAH
B
MAIN
3600
ENTRANCE
FFL±0.000 DIGAMBAR OLEH :
3000 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 3000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
- LAYOUT LIFT DIPERIKSA OLEH :
ME
- SKALA 1 : 300 TIM TEKNIS
DISETUJUI :
NAMA GAMBAR
LAYOUT LIFT
DI LANTAI 1
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 300 ME-LF 0 0 0 1
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
≤
≤
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
PENANGGUNG JAWAB
DIGAMBAR OLEH :
TIM TEKNIS
DISETUJUI :
- DETAIL LIFT
NAMA GAMBAR
DETAIL LIFT
ME
- NTS
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-LF 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
5700
5700
5700
KONSULTAN PERENCANA
PENANGGUNG JAWAB
EF TENAGA AHLI ARSITEKTUR
IU
WG
DIGAMBAR OLEH :
4200 4200 4200 TENAGA AHLI ARSITEKTUR
DIPERIKSA OLEH :
TIM TEKNIS
NAMA GAMBAR
DETAIL MEKANIKAL
KAMAR TIPIKAL
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
1 : 60 ME-DT 0 0 0 1
EF.4
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
EF.3 &
GENSET
NAMA PEKERJAAN
Fire
Extinguisher-1 KETERANGAN
25 Kg
EF.1
R.POMPA
EF.2
KE ROOFTANK GEDUNG
∅150
∅100 ∅65 ∅65
∅50
∅200
PENANGGUNG JAWAB
DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
JUMLAH LEMBAR
1 : 75 ME-DT 0 0 0 2
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
URINOIR
WASTAFEL WATER CLOSET
CLEAN OUT
KLEM PIPA
500
PIPA SERVICE
DIGAMBAR OLEH :
MANHOLE MANHOLE
DIPERIKSA OLEH :
TIM TEKNIS
DISETUJUI :
JUMLAH LEMBAR
NTS ME-DT 0 0 0 3
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
BP
BP
Ø65 ST Ø65 Ø65
Ø80 Ø80 Ø80 DIGAMBAR OLEH :
Ø80
DIPERIKSA OLEH :
TIM TEKNIS
- DETAIL ROOFTANK
ME
- NTS
DISETUJUI :
NAMA GAMBAR
DETAIL ROOFTANK
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DT 0 0 0 4
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
paku rivet DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
VAN DER HEYDEN
COUPLING
KAP. : 6 kg
SEAMESSE CONNECTION
WORMALD
VARIABLE SPRAY
TYPE NOZZLE Ø65
CONCRETE
MANHOLE
paku rivet
(450 x 450)mm
HYDRANT
GROUND LEVEL GROUND LEVEL NAMA PEKERJAAN
HYDRANT BOX
REINFORCED CONCRETE
CV Ø100
BSP Ø100
BSP Ø100
120 CM
LINE HOSE (Ø65x30M)
GROUND LEVEL
PENANGGUNG JAWAB
INTERCOM OUTLET
FROM PIPE RISER Ø40 MANUAL PUSH BUTTON TENAGA AHLI ARSITEKTUR
VARIABLE SPRAY INDICATOR LAMP
TYPE NOZZLE Ø40 ALARM BELL HYDRANT PILLAR
G
1250
E. : FLOW CONTROL.
MANHOLE
(450 x 450)mm
F. : DRAIN COCK
G. : PRESSURE REDUCING.
GROUND LEVEL GROUND LEVEL F H
H. : ISOLATION VALVE.
GV Ø100
REINFORCED CONCRETE
A
TIM TEKNIS
FLOOR FINISH
DRAIN PIPES Ø25
PLAT LANTAI
NAMA GAMBAR
DETAIL
PEMADAM KEBAKARAN
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DT 0 0 0 5
AIR INLET
KEMENTRIAN PEKERJAAN UMUM
AIR OUTLET DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
NAMA PEKERJAAN
REFRIGRANT PIPE
DUCTING KETERANGAN
EXHAUST FAN
SUPPORT
KONSULTAN PERENCANA
CEILLING
PENANGGUNG JAWAB
NTS
SUPPORT
AIR INLET SUPPORT DIGAMBAR OLEH :
FAN BLADE
DIPERIKSA OLEH :
AIR OUTLET
JUMLAH LEMBAR
NTS ME-DT 0 0 0 6
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
MANHOLE
DISINFECTAN TUBE
PENGGUNA JASA
INFLOW
OUTFLOW
NAMA PEKERJAAN
1500
1500
KETERANGAN
1500
4000
KONSULTAN PERENCANA
DIGAMBAR OLEH :
1500
1500
DIPERIKSA OLEH :
TIM TEKNIS
4000 1350
JUMLAH LEMBAR
NTS ME-DT 0 0 0 7
KEMENTRIAN PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PENYEDIAAN PERUMAHAN
PENGGUNA JASA
MANHOLE MANHOLE
NAMA PEKERJAAN
KETERANGAN
KONSULTAN PERENCANA
1000
800
PENANGGUNG JAWAB
10000
10200 DIGAMBAR OLEH :
DIPERIKSA OLEH :
TIM TEKNIS
850
600
10000
DISETUJUI :
10200 PPK PENGEMBANGAN KEBIJAKAN
DAN PENGEMBANGAN
NAMA GAMBAR
DETAIL WATER METER,
BAK KONTROL & TAMAN SANITA
LEMBAR KE
SKALA KODE NO. GAMBAR
JUMLAH LEMBAR
NTS ME-DT 0 0 0 8