32,789.78
25,671.40
5,145.44
29,877.18
19,971.81
20,293.83
46,880.24
Bahan baku Sampah Tahunan (ton/tahun)(E) Recycling Rate(D+E)/A P1/P2
102,879.64 40.74 P 2
5,048.50 15.49 P 2
0.00 P 2
2,737.50 21.02 P 2
1,000.47 25.23 P 2
3.85 P 2
458.81 28.41 P 2
36,613.41 24.11 P 2
13.87 15.37 P 2
33.95 36.96 P 2