Identity Summary
Revenue Summary
Jumlah Pelanggan Revenue Jumlah Pelanggan Revenue Jumlah Pelanggan Efesiensi Jumlah Pelanggan Revenue
OSP Builder
Harga Satuan Harga Total
No. Diskripsi Spesifikasi Teknis Satuan / Jenis Volume Material Jasa Material Jasa
D NETWORK DEVICES -
1 Simple ODC Design As LA Unit -
2 Medium ODC Design As LA Unit
-
Bill of Quantity
Identity Summary
Revenue Summary
Jumlah Pelanggan Revenue Jumlah Pelanggan Revenue Jumlah Pelanggan Efesiensi Jumlah Pelanggan Revenue
OSP Builder
Harga Satuan Harga Total
No. Diskripsi Spesifikasi Teknis Satuan / Jenis Volume Material Jasa Material Jasa
D NETWORK DEVICES -
1 Simple ODC Design As LA Unit -
2 Medium ODC Design As LA Unit
Identity Summary
Revenue Summary
Potensi Revenue dari Sales (Must Win) Potensi Revenue dari Sales (Non Must Migrasi Pihak ke-3 Potensi Revenue dari Lainnya
Win)
Jumlah Pelanggan Revenue Jumlah Pelanggan Revenue Jumlah Pelanggan Efesiensi Jumlah Pelanggan Revenue
OSP Builder
Harga Satuan Harga Total
No. Diskripsi Spesifikasi Teknis Satuan / Jenis Volume Material Jasa Material Jasa
D NETWORK DEVICES -
1 Simple ODC Design As LA Unit -
2 Medium ODC Design As LA Unit
B. INDIRECT COST
1 Survey dan Design Lot
2 Perijinan Dinas Pekerjaan Umum Meter
3 Perijinan Jasa Marga Crosing
4 Perijinan PJKA Crosing
5 Perijinan Private Area Lot
6 Perijinan Satpol PP Lot
C. DIRECT COST
C.1 OSP AERIAL METHOD
1 Tiang 7 ( Material besi / Wajib di Label ) Batang
2 Tiang 9 ( Material besi / Wajib di Label ) Batang
Aksesoris Tiang Penyediaan dan Pemasangan
3 Paket
( dead end / suspensen )
Slack Support Penyediaan dan pemasangan slack
4 support material galvanis minimal 3 Paket
mm
Riser Pipe 2" Untuk Kabel Aerial to Buried Btg
D NETWORK DEVICES
1 Simple ODC Design As LA Unit
2 Medium ODC Design As LA Unit
Sub Total
Total
PPN
Grand Total
OSP Builder
Harga Satuan Harga Total
- 65,000,000
- -
13,000 5,000 65,000,000
-
-
-
- -
18,224,000 179,984,750
681,000 17,954,000 95,336,000
274 275,000 75,350,000
9 300,000 2,700,000
- -
- -
- - -
- - -
61,535,000
270,000 15,113,750
1 270,000 30,000 270,000 30,000
2 10,000 20,000
- - -
- -
-
- -
4
150,000 663,750
- -
- - -
- - -
8,000,000
1 5,000,000 5,000,000
1
2,000,000 2,000,000
1
1,000,000 1,000,000
-
-
-
-
-
-
-
-
18,494,000 244,984,750
263,478,750 ###
263,478,750
Bill of Quantity
B. INDIRECT COST
1 Survey dan Design Lot
2 Perijinan Dinas Pekerjaan Umum Meter
3 Perijinan Jasa Marga Crosing
4 Perijinan PJKA Crosing
5 Perijinan Private Area Lot
6 Perijinan Satpol PP Lot
C. DIRECT COST
C.1 OSP AERIAL METHOD
1 Tiang 7 ( Material besi / Wajib di Label ) Batang
2 Tiang 9 ( Material besi / Wajib di Label ) Batang
Aksesoris Tiang Penyediaan dan Pemasangan
3 Paket
( dead end / suspensen )
Slack Support Penyediaan dan pemasangan slack
4 support material galvanis minimal 3 Paket
mm
Riser Pipe 2" Untuk Kabel Aerial to Buried Btg
8 SFP-10G/10Km Pcs
9 SFP-10G/40Km Pcs
10 SFP-10G/80Km Pcs
Sub Total
Total
PPN
Grand Total
OSP Builder
Harga Satuan Harga Total
- 65,000,000
- -
13,000 5,000 65,000,000
-
-
-
- -
18,224,000 179,984,750
681,000 17,954,000 95,336,000
274 275,000 75,350,000
9 300,000 2,700,000
- -
- -
- - -
- - -
61,535,000
270,000 15,113,750
2 10,000 20,000
- - -
- -
- -
4 150,000 663,750
- -
- - -
- - -
8,000,000
1 5,000,000 5,000,000
1 2,000,000 2,000,000
1 1,000,000 1,000,000
-
-
18,494,000 244,984,750
263,478,750 ###
263,478,750