NO. PAKET KONSULTAN SUPERVISI PENYEDIA JASA DIGAMBAR: DIAJUKAN: DIPERIKSA: DIPERIKSA & DISETUJUI: MENGETAHUI: NO. GAMBAR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SHOP DRAWING
D I R E K T O R A T J E N D E R A L B I N A M A R G A NO. RUAS JML. LEMBAR
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PEMBANGUNAN JALAN BEBAS
JUDUL GAMBAR:
S A T U A N K E R J A P E L A K S A N A A N J A L A N N A S I O N A L W I L A Y A H 1 HAMBATAN SEKSI 6B : OUTER RING NAMA RUAS OUTER RING ROAD IKN - SP.3 ITCI SKALA
jl. Pattimura No. 23 Rt.01 Samarinda. Telp. (0541)-7261116, e-mail: wilayah1_kaltim@yahoo.com ROAD IKN - SP.3 ITCI Deri Fadillah Irsan Tri Afriadi Zulkifly Lubis Noer Ali, S.T. Ginanjar Habib Supriadi, S.T., M.T. TIPIKAL PENANGANAN PADA GALIAN 1:100
PROVINSI KALIMANTAN TIMUR DRAFTER DEPUTY MANAJER TEKNIK (1) MANAJER PROYEK TEAM LEADER NIP. 19850109 201012 1 002 CLEAR ZONE
ANUGERAH KRIDAPRADANA, KSO ABIPRAYA - BUMI KARSA - CPA, KSO
6.00 6.00
VARIATIF 3.00 10.00 3.00 6.00 6.00 5.00 ROUNDING 46.50 ROUNDING 5.00 6.00 6.00 3.00 VARIATIF
15.00
SHOTCRETE MEDIAN
3.00 7.50 1.50 9.75 3.00 9.75 1.50 7.50 3.00
1
2
BAHU LUAR JALUR LALU LINTAS BAHU RUBEJA SALURAN RUBEJA BAHU JALUR LALU LINTAS BAHU LUAR
-4.00% DALAM MEDIAN DALAM
SHOTCRETE
SHOTCRETE
1 1
2 2
-4.00%
CL -4.00%
SHOTCRETE SHOTCRETE
1
1
2 2
6 6
1 1
1 1
3 3
SALURAN MEDIAN
AC-WC Modifikasi PG 70, t = 4 cm
AC-BC Modifikasi PG 70, t = 6 cm
SUBDRAIN AC-Base, t = 15 cm
Lapis Fondasi Agregat Kelas A, t = 15 cm
Lapis Fondasi Agregat Kelas B, t = 15 cm
Timbunan Pilihan = 30 cm
Catatan :
1. Shotcrete dipasang pada lereng galian yang memiliki jenis
tanah pasir atau clayshale
2. Pemasangan shotcrete menyesuaikan posisi aktual pada
lapisan pasir atau clayshale
WIREMESH M6
GEOKOMPOSIT STRIPDRAIN
SI
Strip drain Pemasangan PIPA PE
RFORA
Bottom of
excavation lifts t= 10cm
150mm
BETON DECKING
150mm
wire mesh 2
DETAIL OVERLAP WIRE MESH DAN STRIP DRAIN
PIN BAJA
PAKET PEKERJAAN NO. PAKET KONSULTAN SUPERVISI PENYEDIA JASA DIGAMBAR: DIAJUKAN: DIPERIKSA: DIPERIKSA & DISETUJUI: MENGETAHUI: NO. GAMBAR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SHOP DRAWING
D I R E K T O R A T J E N D E R A L B I N A M A R G A NO. RUAS JML. LEMBAR
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PEMBANGUNAN JALAN BEBAS
JUDUL GAMBAR:
S A T U A N K E R J A P E L A K S A N A A N J A L A N N A S I O N A L W I L A Y A H 1 HAMBATAN SEKSI 6B : OUTER RING NAMA RUAS OUTER RING ROAD IKN - SP.3 ITCI SKALA
jl. Pattimura No. 23 Rt.01 Samarinda. Telp. (0541)-7261116, e-mail: wilayah1_kaltim@yahoo.com ROAD IKN - SP.3 ITCI Deri Fadillah Irsan Tri Afriadi Zulkifly Lubis Noer Ali, S.T. Ginanjar Habib Supriadi, S.T., M.T. TIPIKAL PENANGANAN PADA GALIAN 1:100
PROVINSI KALIMANTAN TIMUR DRAFTER DEPUTY MANAJER TEKNIK (1) MANAJER PROYEK TEAM LEADER NIP. 19850109 201012 1 002 NON CLEAR ZONE
ANUGERAH KRIDAPRADANA, KSO ABIPRAYA - BUMI KARSA - CPA, KSO
3.61 3.62
VARIATIF 5.00 3.00 10.00 5.00 ROUNDING 46.50 ROUNDING 5.00 VARIATIF
15.00
MEDIAN
SHOTCRETE
3.00 7.50 1.50 9.75 3.00 9.75 1.50 7.50 3.00
1 BAHU LUAR JALUR LALU LINTAS BAHU RUBEJA SALURAN RUBEJA BAHU JALUR LALU LINTAS BAHU LUAR
1 -4.00% DALAM MEDIAN DALAM
SHOTCRETE
1
1
-4.00%
CL
SHOTCRETE SHOTCRETE
1
2 6
1 1
6 1
2
SALURAN MEDIAN
AC-WC Modifikasi PG 70, t = 4 cm
AC-BC Modifikasi PG 70, t = 6 cm
SUBDRAIN AC-Base, t = 15 cm
Lapis Fondasi Agregat Kelas A, t = 15 cm
Lapis Fondasi Agregat Kelas B, t = 15 cm
Timbunan Pilihan = 30 cm
Catatan :
1. Shotcrete dipasang pada lereng galian yang memiliki jenis
tanah pasir atau clayshale
2. Pemasangan shotcrete menyesuaikan posisi aktual pada
TIPIKAL POTONGAN MELINTANG
lapisan pasir atau clayshale PENANGANAN LERENG
PADA DAERAH GALIAN NON CLEAR ZONE
SKALA 1 : 100
WIREMESH M6
GEOKOMPOSIT STRIPDRAIN
GEOKOMPOSIT STRIPDRAIN
Svn ≤ Sv
BETON DECKING
150mm
wire mesh 1
wire mesh 2
DETAIL OVERLAP WIRE MESH DAN STRIP DRAIN
PIN BAJA
PAKET PEKERJAAN NO. PAKET KONSULTAN SUPERVISI PENYEDIA JASA DIGAMBAR: DIAJUKAN: DIPERIKSA: DIPERIKSA & DISETUJUI: MENGETAHUI: NO. GAMBAR
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SHOP DRAWING
D I R E K T O R A T J E N D E R A L B I N A M A R G A NO. RUAS JML. LEMBAR
BALAI BESAR PELAKSANAAN JALAN NASIONAL KALIMANTAN TIMUR PEMBANGUNAN JALAN BEBAS
JUDUL GAMBAR:
S A T U A N K E R J A P E L A K S A N A A N J A L A N N A S I O N A L W I L A Y A H 1 HAMBATAN SEKSI 6B : OUTER RING NAMA RUAS OUTER RING ROAD IKN - SP.3 ITCI SKALA
jl. Pattimura No. 23 Rt.01 Samarinda. Telp. (0541)-7261116, e-mail: wilayah1_kaltim@yahoo.com ROAD IKN - SP.3 ITCI Deri Fadillah Irsan Tri Afriadi Zulkifly Lubis Noer Ali, S.T. Ginanjar Habib Supriadi, S.T., M.T. TIPIKAL PENANGANAN PADA GALIAN 1:100
PROVINSI KALIMANTAN TIMUR DRAFTER DEPUTY MANAJER TEKNIK (1) MANAJER PROYEK TEAM LEADER NIP. 19850109 201012 1 002 NON CLEAR ZONE
ANUGERAH KRIDAPRADANA, KSO ABIPRAYA - BUMI KARSA - CPA, KSO
3.61 3.62
VARIATIF 2.00 5.00 5.00 ROUNDING 46.50 ROUNDING 5.00 VARIATIF
15.00
MEDIAN
3.00 7.50 1.50 9.75 3.00 9.75 1.50 7.50 3.00
BAHU LUAR JALUR LALU LINTAS BAHU RUBEJA SALURAN RUBEJA BAHU JALUR LALU LINTAS BAHU LUAR
DALAM MEDIAN DALAM
SHOTCRETE &
SOIL NAILING
2
-4.00%
CL
1
SHOTCRETE SHOTCRETE
1
1
2
1
SALURAN MEDIAN
AC-WC Modifikasi PG 70, t = 4 cm
Soil Nailing L=10 m AC-BC Modifikasi PG 70, t = 6 cm
dipasang tiap 2.5 m SUBDRAIN AC-Base, t = 15 cm
Lapis Fondasi Agregat Kelas A, t = 15 cm
Lapis Fondasi Agregat Kelas B, t = 15 cm
Timbunan Pilihan = 30 cm
Catatan :
1. Shotcrete dipasang pada lereng galian yang memiliki jenis
TIPIKAL POTONGAN MELINTANG
tanah pasir atau clayshale
2. Pemasangan shotcrete menyesuaikan posisi aktual pada PENANGANAN LERENG
lapisan pasir atau clayshale
PADA DAERAH GALIAN NON CLEAR ZONE
Strip drain Pemasangan
SKALA 1 : 100 wiremesh M6
Overlap minimal 300mm
Sh 0.30 m Geocomposite
Sv Svo ≤ Sv
drainage strips
Bottom of
excavation lifts
Svn ≤ Sv
Bottom of
excavation lifts
150mm
150mm
Sho
tcre
te
Kepala Soil Nailing Mu
r
SOIL NAILS SQUARE PATTERN ON WALL FACE
pen dan c Strip Spasi Strip Drain Sesuai dengan Desain
utu incin dra
Pelat besi dig p yang in
alva wire mesh 1
nis Gro
u ting Grouting sesuai desain
WIREMESH M6
m
ak
s fc' = 28 MPa (umur 28 hari) GEOKOMPOSIT STRIPDRAIN
wire mesh 2
Bas im
um
ma e
ks Grouting sesuai desain (Ga plate 60
im
um
60 fc' = 28 MPa (umur 28 hari)
lvan
is)
0m
m
SHOTCRETE FC' 28 Mpa PENUTUP UJUNG DETAIL OVERLAP WIRE MESH DAN STRIP DRAIN
0m Grou t = 10cm PIPA PERFORASI
m ting DISELIMUTI
Wir GEOTEKSTIL
em KEMIRINGAN
esh C
m ent
PIPA PERFORASI MIN. 10° sd 15°
C ak ra DIAMETER 50mm (2 INC)
ma entra sim
liz
ks liz Bar um ers
im ers
um s cha 60 spa
60 pas ir spa 0m si
0m i
m
cer Kemiringan m
soil nail sesuai
Kemiringan desain 2:1 RFORAS
I
soil nail sesuai PIPA PE
ma
ks
im
um
m
ak DETAIL PEMASANGAN SULING-SULING DENGAN
60 sim
0m
m
um PIPA PERFORASI
60
0m
m
GEOKOMPOSIT STRIPDRAIN
in
sa
Min
de
00 M t= 10cm
su
mm
ain
in.
Se
50
es
0m
id
m
ua
BETON DECKING
s
Se
DETAIL A WIREMESH M6
PIN BAJA
DIPASANG SESUAI KEBUTUHAN LAPANGAN
PIN BAJA