MATA KULIAH
REKAYASA PONDASI II
NAMA TUGAS
q = 2600 Kg/m2
REKAYASA PONDASI II
DOSEN PEMBIMBING
Dr. Eng. Ir. Hendra Setiawan, ST, MT
NIP. 19750418 199303 1 002
DIPERIKSA/ASISTENSI
L1 = 5,7 m Pasir
Ɣ = 1630 Kg/m³
C = 0 Kg/m² Dr. Sukiman Nurdin, ST, M.Sc, Ph.D
NIP. 19731024 199303 1 002
= 30°
DISETUJUI
KOORDINATOR MATAH KULIAH
DREDGE
DREDGE LINE LINE M.A.T
Dr. Arifin B. ST, MT
Lempung NIP. 19701102 199903 1 004
Gambar : Skala :
Tampak
Samping 1 : 75 cm
Turap
No. Lembar Jml. Lembar