Jumlah Harga
No. Uraian
(Rp)
JUMLAH A + B 28,909,500.00
PPN 10% 2,890,950.00
TOTAL 31,800,450.00
DIBULATKAN 31,800,000.00
I TENAGA AHLI
1 Team Leader (Teknik Sipil) OB 1.00 1.00 7,150,000.00 1.00 7,150,000.00 - - 1.00 7,150,000.00 1.00 7,150,000.00 - -
II TENAGA PENDUKUNG
1 Estimator OB 1.00 1.00 5,720,000.00 1.00 5,720,000.00 - - 1.00 5,720,000.00 1.00 5,720,000.00 - -
2 Surveyor OB 0.50 2.00 4,719,000.00 1.00 4,719,000.00 - - 1.00 4,719,000.00 1.00 4,719,000.00 - -
3 Drafter OB 1.00 1.00 2,860,000.00 1.00 2,860,000.00 1.00 2,860,000.00 1.00 2,860,000.00
4 Opt. Komputer 1.00 1.00 1,716,000.00 1.00 1,716,000.00 1.00 1,716,000.00 1.00 1,716,000.00
Jumlah II 15,015,000.00 - 15,015,000.00 15,015,000.00 -
II TENAGA PENDUKUNG
1 Estimator 1.00 OB 1.00 5,720,000.00 5,720,000.00
2 Surveyor 2.00 OB 1.00 4,719,000.00 4,719,000.00
3 Drafter 1.00 OB 1.00 2,860,000.00 2,860,000.00
Opt. Komputer 1.00 OB 1.00 1,716,000.00 1,716,000.00
2 MAHYUNI, ST Estimator
MINGGU
MINGGU
MINGGU
MINGGU
3 AMIN Surveyor
4 AMAT Surveyor
I MADE DARSANA,ST
Direktur
TIME SHEET
2 MAHYUNI, ST Estimator
MINGGU
MINGGU
MINGGU
MINGGU
3 AMIN Surveyor
4 AMAT Surveyor
I MADE DARSANA,ST
Direktur
PERINCIAN BIAYA BEBAN PERSONIL PER-BULAN
Jumlah Harga Komulatif Yang lalu Tagihan Invoice ini Komulatif Sekarang Sisa Dana
No. Uraian
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)