Anda di halaman 1dari 68

PEMBANGUNAN

PABRIK AIR MINUM


DALAM KEMASAN

DETAIL ENGINEERING
BY DESIGN:
RR, ST
,,
L
-4- A

r:;_r,,,,,,,,a,,,,,,,,,,,,,,,,,,,,a,,,,,,,,,,,,,,,,/CL',,,,,,,,,,,,,,,, ,,,A,,,,,,,,,,,,, ////////

I
150

150
LABORATORIUM
\J KEMAS/ LOGISTIK
□ □

400
sa a a
D D
0

--E
0
325

B 0 B

800
MESIN PRODUKSI --+
- I

650
WATER TREATMENT

go
O
Ic:::::JI I

-----------------

400
oo

+ I
325

tl
KANTOR PEMASARAJ\
I
I
O O

0% 0 lc:::::Jsc:::::JI
PINTU PLAT SORONG

M UI( .,,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,lLJ,,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,,c:f /V' .,,},,,.,.,.,.,.,.,.,.,.,..!l!,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,,.,.,=i,,,,.,.,.,.,.,.,.,.,.,.,.,.,.,j -----+---------

KELUAR
200

\
150 300 300 300 300 350 300

2000

I
i A

DENAH PABRIK AIR MINUM


Skala 1: 100

By DESIGN : RR, ST
>
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
SENG SPANDEK 0.20 MM
KUDA BAJA RINGAN C 75

+ 6.45

+ 4.00

Plapond Gypsum 9 mm
Partisi aluminium + Kalsiboard

+ 3.00


150
300 900 350 300

2000

POTONGAN B-B
Skala 1 : 100

By DESIGN : RR, ST
SENG SPANDEK 0.20 MM
0.26
+ 6.45
KUDA BAJA RINGAN C 75 0.60
0.60
0.60 5.70
GORDING BAJA RINGAN 0.60
0.60
0.60 2.48
0.60
0.60
+ 4.00
0.60

Rink Balok 15/20


Plapond Gypsum 9 mm
Partisi aluminium+ Kalsiboard

+ 3.00
Kanopy Teras

Sloop 15/ 20

800

POTONGANA-A
Skala 1 : 100

By DESIGN : RR, ST
Balok Sloop 15/20 Rink Balok 15/20 Kolom Induk 20/20
20

20 20 20 20
20

15 15 15 15

POT 1 POT 1' POT 2' POT 3


POT 2
Skala 1 : 100 Skala 1 : 20 Skala 1 : Skala 1 : 20
Skala 1 : 20 20

Balok Latai 13/15 ( Atas Pintu ) Kolom dan Balok Gevel 13/13

15
13

13
13
Skala 1 : 20
Skala 1 : 20

By DESIGN : RR, ST
f l
2000

800

...1.
A
.'
I
200

DENAH PONDASI , SLOOP DAN BALOK


Ska a 1 : 100

By DESIGN : RR, ST

>
20
13

PAS BATA 1: 4
KERAMIK 40X40
KOLOM 20 X 20
BETON COR K.100
SLOOP 15/20
PASIR URUG

TANAH TIMBUN

5
10
20
35

70
55
PAS. BATU KALI/GUNUNG

PAS. BATU KOSONG 10


PASIR URUG 5
35
60
70

DETAIL A PONDASI BATU GUNUNG


Skala 1 : 20

By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
By DESIGN : RR, ST
ENGINEERING ESTIMATE (EE)

PEKERJAAN :

LOKASI :

KEDUNG BANTENG,
BANYUMAS
REKAPITULASI
RENCANA ANGGARAN BIAYA

PEKERJAAN : 'PEMBANGUNAN PABRIK AIR MINUM DALAM KEMASAN


LOKASI : KEDUNG BANTENG, BANYUMAS

NO ITEM PEKERJAAN JUMLAH HARGA


1 2 3

A. PEKERJAAN PERSIAPAN Rp 3.500.000,00


I. PEKERJAAN TANAH Rp 21.204.427,20
II. PEKERJAAN PONDASI Rp 20.401.558,66
III. PEKERJAAN BETON BERTULANG Rp 67.932.333,59
IV. PEKERJAAN DINDING BATA DAN PLESTERAN Rp 67.136.652,50
V. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 41.779.349,05
VI. PEKERJAAN PINTU BESI DAN ALUMINIUM Rp 59.620.000,00
VII. PEKERJAAN PENGECATAN Rp 17.574.924,30
VIII. PEKERJAAN ATAP DAN PLAFON Rp 113.038.976,45
IX. PEKERJAAN MEKANIKAL Rp 8.890.000,00
Jumlah Total Rp 421.078.221,75
Dibulatkan Rp 421.078.000,00

Terbilang : Empat Ratus Dua Puluh Satu Juta Tujuh Puluh Delapan Ribu Rupiah_

Disusun Oleh

RIZKA RIADIANTO, ST
RENCANA ANGGARAN BIAYA

PEKERJAAN
: 'PEMBANGUNAN PABRIK AIR MINUM DALAM KEMASAN
LOKASI : KEDUNG BANTENG, BANYUMAS

No. Uraian Pekerjaan Volume Sat. Analisa Harga Satuan Jumlah Harga

1 2 3 4 5 6 7
A. PEKERJAAN PERSIAPAN
1 Pembersihan Sebelum dan sesudah pekerjaan 1,00 Ls Taksir Rp 2.000.000,00 Rp 2.000.000,00
2 Pengukuran dan Pemasangan Bowplank 1,00 Ls Taksir Rp 1.500.000,00 Rp 1.500.000,00
Jumlah I Rp 3.500.000,00
B. PEKERJAAN RUKO 10 UNIT
I. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Gunung, dan Rolak 28,24 m3 A. 2.3.1.1 Rp 106.300,00 Rp 3.001.912,00
2 Urugan Tanah Kembali 7,06 m3 A. 2.3.1.9 Rp 75.600,00 Rp 533.736,00
3 Pasir Alas 17,96 m3 A. 2.3.1.11 Rp 192.520,00 Rp 3.457.659,20
4 Tanah Timbun 66,00 m3 A. 2.3.1.11.a. Rp 215.320,00 Rp 14.211.120,00
Jumlah III Rp 21.204.427,20
II. PEKERJAAN PONDASI
1 Pondasi Batu Gunung 18,62 m3 A. 3.2.1.2 Rp 986.675,00 Rp 18.371.888,50
2 Aanstamping 3,92 m3 A. 3.2.1.9 Rp 517.773,00 Rp 2.029.670,16
Jumlah IV Rp 20.401.558,66
III. PEKERJAAN BETON BERTULANG
1 Balok Sloof Uk. 0,15 x 0,20 M
- Beton K-225 1,68 m3 A.4.1.1.7. Rp 1.290.192,52 Rp 2.167.523,44
- Pembesian Polos 287,34 kg A. 4.1.1.17 Rp 15.653,30 Rp 4.497.837,25
- Bekisting 11,20 m2 A. 4.1.1.21 Rp 262.937,00 Rp 2.944.894,40
2 Kolom K1 Uk. 0,20 x 0,20 M
- Beton K-225 2,88 m3 A.4.1.1.7. Rp 1.290.192,52 Rp 3.715.754,47
- Pembesian Polos 1.635,91 kg A. 4.1.1.17 Rp 15.653,30 Rp 25.607.344,50
- Bekisting 28,80 m2 A. 4.1.1.22 Rp 424.396,00 Rp 12.222.604,80
3 Kolom K2 Uk. 0,13 x 0,13 M (Tembok Layar )
- Beton K-225 0,14 m3 A.4.1.1.7. Rp 1.290.192,52 Rp 174.434,03
- Pembesian Polos 39,34 kg A. 4.1.1.17 Rp 15.653,30 Rp 615.779,43
- Bekisting 1,04 m2 A. 4.1.1.22 Rp 424.396,00 Rp 441.371,84
4 Balok Latai (BLT) Uk. 0,13 x 0,15 M ( Atas Pintu )
- Beton K-175 0,59 m3 A.4.1.1.5. Rp 1.212.423,95 Rp 709.268,01
- Pembesian Polos 86,33 kg A. 4.1.1.17 Rp 15.653,30 Rp 1.351.383,82
- Bekisting 4,50 m2 A. 4.1.1.23 Rp 434.317,00 Rp 1.954.426,50
5 Ring Balok (RB) Uk 0,15 x 0,20 M
- Beton K-225 1,68 m3 A.4.1.1.7. Rp 1.290.192,52 Rp 2.167.523,44
- Pembesian Polos 287,34 kg A. 4.1.1.17 Rp 15.653,30 Rp 4.497.837,25
- Bekisting 11,20 m2 A. 4.1.1.23 Rp 434.317,00 Rp 4.864.350,40

Jumlah V Rp 67.932.333,59
IV. PEKERJAAN DINDING BATA DAN PLESTERAN
1 Pemasangan dinding bata merah tebal 1/2 batu campuran 1SP : 4PP 224,65 M2 A. 4.4.1.9 Rp 134.840,00 Rp 30.291.806,00
2 Plesteran dinding bata merah tebal 1/2 batu campuran 1SP : 4PP 449,30 M2 A. 4.4.2.4 Rp 82.005,00 Rp 36.844.846,50
Jumlah VI Rp 67.136.652,50
V. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Rabat Beton K.100 Tebal = 3 cm 6,00 M3 A.4.1.1.1 Rp 1.030.791,51 Rp 6.184.749,05
2 Pemasangan lantai keramik ukuran 40 cm x 40 cm 200,00 M2 A.4.4.3.4 Rp 177.973,00 Rp 35.594.600,00
Jumlah VII Rp 41.779.349,05
VI. PEKERJAAN PINTU BESI DAN ALUMINIUM
1 Pekerjaan Pintu Besi Plat Tempahan (P1) 1,00 Unit Taksir Rp 7.000.000,00 Rp 7.000.000,00
2 Pekerjaan Pintu Besi Plat Tempahan (P2) 1,00 Unit Taksir Rp 1.200.000,00 Rp 1.200.000,00
3 Pekerjaan Skat Dinding Partisi Aluminium dan Kalsiboard / Sesaui gambar 144,00 M2 Taksir Rp 280.000,00 Rp 40.320.000,00
4 Pekerjaan Kanopy Teras besi Hollow / Sesaui gambar 42,00 M2 Taksir Rp 250.000,00 Rp 10.500.000,00
5 Pekerjaan Ventilasi Kayu Terpasang (V1) 4,00 M2 Taksir Rp 150.000,00 Rp 600.000,00
Jumlah IX Rp 59.620.000,00
VII. PEKERJAAN PENGECATAN
1 Perkerjaan Pengecatan Dinding Beton 449,30 M2 A. 4.7.1.10 Rp 29.339,50 Rp 13.182.237,35
2 Perkerjaan Pengecatan Langit-Langit 71,50 M2 A. 4.7.1.10 Rp 29.339,50 Rp 2.097.774,25
3 Perkerjaan Pengecatan kayu 52,71 M2 A. 4.7.1.4 Rp 43.535,00 Rp 2.294.912,70
Jumlah X Rp 17.574.924,30

EE 1/
2
No. Uraian Pekerjaan Volume Sat. Analisa Harga Satuan Jumlah Harga

1 2 3 4 5 6 7
VIII. PEKERJAAN ATAP DAN PLAFON
1 Rangka Plafon Furing 20/40 mm 71,50 M2 Taksir Rp 110.000,00 Rp 7.865.000,00
2 Plafon Gypsum Lengkap Terpasang 71,50 M2 A.4.5.1.7. Rp 69.991,80 Rp 5.004.413,70
3 List Plafon 48,00 M' A. 4.5.1.9 Rp 41.851,00 Rp 2.008.848,00
4 Rangka Atap Baja Ringan C 75 239,40 M2 A.4.2.1.22. Rp 293.527,75 Rp 70.270.543,35
5 Penutup Atap Gelombang 0.3 mm Lengkap Terpasang 239,40 M2 A.4.5.2.38a Rp 94.742,00 Rp 22.681.234,80
7 List Plank 3/20 cm 61,80 M' A. 4.6.1.22 Rp 84.287,00 Rp 5.208.936,60
Jumlah X Rp 113.038.976,45
IX. PEKERJAAN MEKANIKAL
1 Pemasukan Arus Listrik 4 ampere 1,00 Ls Taksir Rp 2.200.000,00 Rp 2.200.000,00
2 Box Panel 1,00 Ls Taksir Rp 1.000.000,00 Rp 1.000.000,00
3 Lampu HE 23 w 15,00 Unit Taksir Rp 50.000,00 Rp 750.000,00
4 Saklar 1 Kutub 15,00 Unit Taksir Rp 15.000,00 Rp 225.000,00
5 Saklar 2 Kutub 4,00 Unit Taksir Rp 25.000,00 Rp 100.000,00
6 Saklar 3 Kutub 4,00 Unit Taksir Rp 35.000,00 Rp 140.000,00
7 Stop Kontak 5,00 Unit Taksir Rp 25.000,00 Rp 125.000,00
Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm
8 15,00 Unit Taksir Rp 290.000,00 Rp 4.350.000,00
dan kelengkapan instalasi terpasang.
Jumlah XI Rp 8.890.000,00
TOTAL PEKERJAAN RUKO Rp 421.078.221,75
DIBULATKAN Rp 421.078.000,00

EE 2/
2
HARGA SATUAN UPAH, BARANG, & PERALATAN

KABUPATEN BANYUMAS

NILAI
NO. URAIAN SATUAN HARGA MERK DAN TIPE SPESIFIKASI KET
TKDN
A. UPAH
Kepala Tukang OH Rp 155.000,00 Lokal 100,00% - WNI
Mandor OH Rp 142.000,00 Lokal 100,00% - WNI
Pekerja OH Rp 137.000,00 Lokal 100,00% - WNI
Tukang OH Rp 147.000,00 Lokal 100,00% - WNI

B. HARGA BAHAN
Air Liter Rp 100,00 Lokal 100,00% Mineral -
Bataco bh Rp 6.000,00 Lokal 100,00% Mutu Beton Klas C / K.175 -
Batu Bata bh Rp 700,00 Lokal 100,00% Batu Bata Kota Subulussalam dan samosir -
Batu Belah/ Kali m3 Rp 240.000,00 Lokal 100,00% Batu tidak rapuh, batu gunung, koral, batu besi -
Besi Polos kg Rp 12.500,00 KS Besi Beton Polos 59,56% BjTP 24 Dia. 08 s/d 36 mm -
Besi Ulir kg Rp 14.700,00 KS Besi Beton Ulir 59,56% BjTS 40 Dia.10 s/d 36 mm -
Cat Dasar kg Rp 36.000,00 Nippon Vinilex Pro1000 35,88% Copolymer Vinyl Acrylic Emulsion Paint -
Cat Dasar Menie kg Rp 42.000,00 Nippon Paint Protective Coating 35,88% Copolymer Vinyl Acrylic Emulsion Paint -
Cat Penutup kg Rp 33.600,00 Nippon Vinilex Pro1000 46,02% Copolymer Vinyl Acrylic Emulsion Paint -
Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang Rp 20.000,00 Lokal 100,00% Diameter 8 - 10 cm kayu keras -
Engsel Pintu Bh Rp 50.000,00 Glass Hinge 25,06% Engsel Bracket; Powder Coating Red -
Engsel Jendela Bh Rp 40.000,00 Glass Hinge 25,06% Engsel Bracket; Powder Coating Red -
Floor drain Bh Rp 23.700,00 52,20% Bahan Kuningan ; uk. 2”, 3”, 4”
APLUS, INDOGYPS, FUJI GYPSUM, APLUS JASON Gypsum Indogyps 9 x 1200 x 2400 mm, 9 x 1220 x 2440 mm, 12 x 1200
Gypsum Board 9 mm Lembar Rp 106.200,00 31,23%
& Aplus Gypsum x
2400 mm dan 12 x 1220 x 2440 mm
Kaca Tebal 5 mm m2 Rp 159.600,00 Kaca Mutu M 61,31% SNI 15-4756-1998 Tebal 2 mm, 3mm, 4mm, 5 mm -
Kait Angin Bh Rp 35.000,00 Slickpack 30,40% Weir -
Kawat Beton kg Rp 25.000,00 Kawat Bendrat 59,85% Kawat Diameter Ø 0.9 mm – Ø 3.4 mm -
Kayu Klas I (Seumantok/Ulin/dll) m3 Rp 4.391.000,00 Lokal 100,00% Klas - I -
Kayu Klas II (Kamper/Kruing/dll) m3 Rp 3.307.000,00 Lokal 100,00% Klas - II -
Kayu Klas III (Borneo/dll) m3 Rp 3.079.000,00 Lokal 100,00% Klas - III -
Kayu Klas IV (Sengon/dll) m3 Rp 2.500.000,00 Lokal 100,00% Klas - IV -
Kayu Balok 5/7 btg Rp 77.035,09 Lokal 100,00% Klas - II -
Keramik 30x30 (Polished) Merk Platinum Bh Rp 6.480,00 Platinum Ubin Lantai Keramik 83,76% SNI ISO 13006:2010 Uk. 30 cm x 30 cm, 40 cm x 40 -
cm
Keramik 30x30 (Unpolished) Merk Platinum Bh Rp 6.480,00 Platinum Ubin Lantai Keramik 83,76% SNI ISO 13006:2010 Uk. 30 cm x 30 cm, 40 cm x 40 -
cm
Keramik 40x40 (Polished) Merk Platinum Bh Rp 14.400,00 Platinum Ubin Lantai Keramik 83,76% SNI ISO 13006:2010 Uk. 30 cm x 30 cm, 40 cm x 40 -
cm
Keramik 40x40 (Unpolished) Merk Platinum Bh Rp 14.400,00 Platinum Ubin Lantai Keramik 83,76% SNI ISO 13006:2010 Uk. 30 cm x 30 cm, 40 cm x 40 -
cm
Keramik Uk. 20 x 20 (Unpolished) Merk Platinum Bh Rp 2.640,00 Arwana Keramik Lantai 91.17% SNI ISO 13006:2010 Keramik Lantai 20x20 cm -
Keramik Uk. 20 x 25 (Unpolished) Merk Platinum Bh Rp 3.600,00 Asia Tile Ubin Dinding Keramik 89,65% SNI ISO 13006:2010 Uk. 20 cm x 25 cm -
Keramik Uk. 25 x 25 (Unpolished) Merk Platinum Bh Rp 5.000,00 Asia Tile Ubin Dinding Keramik 89,65% SNI ISO 13006:2010 Uk. 25 cm x 25 cm -
Keramik Uk. 25 x 50 (polished) Merk Platinum Bh Rp 16.250,00 Asia Tile Ubin Dinding Keramik 89,65% SNI ISO 13006:2010 Uk. 25 cm x 50 cm -
Kerikil m3 Rp 408.000,00 Lokal 100,00% PBI - 1971 NI -2 -
Kerikil kg Rp 302,22 Lokal 100,00% PBI - 1971 NI -2 -
Kertas Amplas Lbr Rp 4.800,00 Industri Kertas Khusus 30,34% Velcro -
Kuas cat Bh Rp 45.000,00 Abco Extershield 20,98% Cat Tembok Extershield -
Kunci Tanam Biasa Bh Rp 180.000,00 Cylinder Linner 78,11% Tebal 1,5 mm -
Kloset Jongkok Kualitas Biasa Merk INA unit Rp 360.000,00 NA Kloset Jongkok 79,72% C2
Kran Air Ø 1/2" Besi bh Rp 54.000,00 FUJI/ BARINDO Ulir 93,74% Ukuran ½”
NILAI
NO. URAIAN SATUAN HARGA MERK DAN TIPE SPESIFIKASI KET
TKDN
Lampu HE 23 Watt Merk Hannocht Bh Rp 47.000,00 Lampu Hemat Energi (LHE) 29,65% Twister -
Lampu HE 11 Watt Merk Hannocht Bh Rp 35.000,00 Lampu Hemat Energi (LHE) 29,65% Twister -
Lem Kayu kg Rp 30.000,00 Aqualon PVC 45,83% Kemasan Kaleng 400 gr -
List Kayu Profil m' Rp 25.000,00 NTEGRA GROUP WB-10.829 100,00% Kayu Klas I, Klas II, III. -
Minyak Bekisting liter Rp 12.000,00 NG LUBE SAE 40 45,20% Density at 15°C : 0.8853 kg/l. -
Paku Kayu kg Rp 20.000,00 Paku Kayu 58,75% SNI 05-323-1999 13 x 0,9 s/d 260 x 8,6 mm -
Paku Seng kg Rp 60.000,00 TMS High Tensile Stud Bolt 31,65% Dia ½” s/d 4” ASTM A193 / A193M : B7, B7M, B8, -
B8M
Paku Skrup gypsum kg Rp 80.000,00 WILSON Sekrup Gypsum 60,25% Ukuran : 6X1”, 6X1½”, 6X2” -
Pasir Beton m3 Rp 145.000,00 Lokal 100,00% Peraturan Beton Indonesia (PBI) -
Pasir Beton kg Rp 103,57 Lokal 100,00% Peraturan Beton Indonesia (PBI) -
Pasir Pasang m3 Rp 145.000,00 Lokal 100,00% Peraturan Beton Indonesia (PBI) -
Pasir Urug m3 Rp 125.000,00 Lokal 100,00% Peraturan Beton Indonesia (PBI) -
Plamur kg Rp 36.000,00 Nippon Paint Matex 35,88% Wall Filler (Putty) Untuk Tembok Luar dan Dalam -
Plywood 6 mm Lembar Rp 100.000,00 Kayu Keras 83,72% 1220x2440x15,0 mm ; Kayu Jabon (9 Lapis), Face -
Back
Plywood 9 mm Lbr Rp 150.000,00 Kayu Keras 83,72% 1220x2440x15,0 mm ; Kayu Jabon (9 Lapis), Face -
Back
Rangka Atap Baja Ringan canai dingin C75 kg Rp 22.350,00 TASO, SAKURATRUSS, KASO, JOLI Reng TH30 A32, TH30 A30, TH40 A4 67,34% BjLAS G550 AS 100
Sealant tube Rp 9.600,00 PROPAN PROSEAL Proseal 57,12% Acrylic Multipurpose Sealant; Solid by volume = -
70%;
Sealtip bh Rp 5.200,00 FUJI Ulir 93,85% Ukuran ½” -
Semen Portland 40kg Merk Semen Padang Zak Rp 70.000,00 Padang Cement Indonesia PCC (Portland Composite Cement) 79,14% SNI 7064:2014 Kemasan Bag 50 Kg -
Semen Portland 40kg Merk Semen Padang Kg Rp 1.750,00 Padang Cement Indonesia PCC (Portland Composite Cement) 79,14% SNI 7064:2014 Kemasan Bag 50 Kg -
Semen Warna 40kg Zak Rp 156.000,00 Semen Gresik PCC (Portland Commposite Cement) 91,90% SNI 7064:2014 Kemasan Zak 40 Kg -
Semen Warna 40kg Kg Rp 3.900,00 Semen Gresik PCC (Portland Commposite Cement) 91,90% SNI 7064:2014 Kemasan Zak 40 Kg -
Seng Gelombang 0.3 mm Lbr Rp 95.000,00 MULTI ROOF Atap Metal 2x5 50,69% G300 (warna); Ketebalan 0,25-0,40 mm
Nok genteng metal Bh Rp 66.000,00 MULTI ROOF Atap Metal 2x5 50,69% G300 (warna); Ketebalan 0,25-0,40 mm
Tanah Timbun m3 Rp 144.000,00 Lokal 100,00% Tidak Berbutir -
Tanah Timbun Pilihan m3 Rp 144.000,00 Lokal 100,00% Berbutir -

C. SEWA ALAT
Pompa dan conveyor beton hari Rp 8.000.000,00 Abatek Vibrator 26.88% Kapasitas 1000-1500 buah/7 jam kerja -
Waterpass hari Rp 100.000,00 nScienPro Sanitarian Kit / Kesling Kit 16.33% Alat Ukur -
Molen hari Rp 380.000,00 HERCULES HCO 2D - 40 KG 51,92% Buka Atas, Double Pully (Tanpa Motor Penggerak) -
Stamper hari Rp 250.000,00 Fujimori, Extron Fujimori STT-5, Extron TPR-5 41,05% Dimensi 610 x 430 x 1080 mm; ukuran plat 280 x
320 mm; berat 73 kg (dengan engine); mesin Honda
GX 160 / Robin EY20 (5 HP); kapasitas tangki bensin
± 3,8
liter
ANALISA
HARGA SATUAN PEKERJAAN

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,100 Rp 137.000,00 Rp 13.700,00
Mandor L.04 OH 0,050 Rp 142.000,00 Rp 7.100,00
Jumlah Tenaga Kerja 20.800,00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) Rp 20.800,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 20.800,00

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,100 Rp 137.000,00 Rp 13.700,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 30.660,00
B BAHAN
Kayu Balok 5/7 m3 0,012 Rp 2.500.000,00 Rp 30.000,00
Paku 2"-3" kg 0,020 Rp 20.000,00 Rp 400,00
Kayu Papan 3/20 klas IV m3 0,007 Rp 3.079.000,00 Rp 21.553,00
Jumlah Harga Bahan 51.953,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 82.613,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 82.613,00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A. 2.3.1.1 Penggalian 1 m3 Tanah Biasa sedalam 1 m
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,750 Rp 137.000,00 Rp 102.750,00
Mandor L.04 OH 0,025 Rp 142.000,00 Rp 3.550,00
Jumlah Tenaga Kerja 106.300,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 106.300,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 106.300,00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,900 Rp 137.000,00 Rp 123.300,00
Mandor L.04 OH 0,045 Rp 142.000,00 Rp 6.390,00
Jumlah Tenaga Kerja 129.690,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat

10/1
D Jumlah (A + B + C) Rp 129.690,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 129.690,00

A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan galian
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,500 Rp 137.000,00 Rp 68.500,00
Mandor L.04 OH 0,050 Rp 142.000,00 Rp 7.100,00
Jumlah Tenaga Kerja 75.600,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 75.600,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 75.600,00

A. 2.3.1.10 Pemadatan tanah 1 m3 tanah ( per 20 cm)


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,500 Rp 137.000,00 Rp 68.500,00
Mandor L.04 OH 0,050 Rp 142.000,00 Rp 7.100,00
Jumlah Tenaga Kerja 75.600,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN
Pemadat timbunan (Stamper) Sewa hari 0,050 Rp 250.000,00 Rp 12.500,00
Jumlah Harga Alat 12.500,00
D Jumlah (A + B + C) Rp 88.100,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 88.100,00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,500 Rp 137.000,00 Rp 68.500,00
Mandor L.04 OH 0,050 Rp 142.000,00 Rp 7.100,00
Jumlah Tenaga Kerja 75.600,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) Rp 75.600,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 75.600,00

A. 2.3.1.11 Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Mandor L.04 OH 0,010 Rp 142.000,00 Rp 1.420,00
Jumlah Tenaga Kerja 42.520,00
B BAHAN
Pasir Urug m3 1,200 Rp 125.000,00 Rp 150.000,00
Jumlah Harga Bahan 150.000,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 192.520,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 192.520,00

A. 2.3.1.11.a. Pengurugan 1 m3 Tanah Timbun

10/2
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Mandor L.04 OH 0,010 Rp 142.000,00 Rp 1.420,00
Jumlah Tenaga Kerja 42.520,00
B BAHAN
Tanah Timbun m3 1,200 Rp 144.000,00 Rp 172.800,00
Jumlah Harga Bahan 172.800,00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) Rp 215.320,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 215.320,00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A. 3.2.1.2 Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,500 Rp 137.000,00 Rp 205.500,00
Tukang L.02 OH 0,750 Rp 147.000,00 Rp 110.250,00
Kepala Tukang L.03 OH 0,075 Rp 155.000,00 Rp 11.625,00
Mandor L.04 OH 0,075 Rp 142.000,00 Rp 10.650,00
Jumlah Tenaga Kerja 338.025,00
B BAHAN
Batu Belah/ Kali m3 1,200 Rp 240.000,00 Rp 288.000,00
Semen Portland Kg 163,000 Rp 1.750,00 Rp 285.250,00
Pasir Pasang m3 0,520 Rp 145.000,00 Rp 75.400,00
mlah Harga Bahan 648.650,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 986.675,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 986.675,00

A. 3.2.1.9 Pemasangan 1m3 batu kosong (Aanstamping)


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,780 Rp 137.000,00 Rp 106.860,00
Tukang L.02 OH 0,390 Rp 147.000,00 Rp 57.330,00
Kepala Tukang L.03 OH 0,039 Rp 155.000,00 Rp 6.045,00
Mandor L.04 OH 0,039 Rp 142.000,00 Rp 5.538,00
Jumlah Tenaga Kerja 175.773,00
B BAHAN
Batu Belah/ Kali m3 1,200 Rp 240.000,00 Rp 288.000,00
Pasir Urug m3 0,432 Rp 125.000,00 Rp 54.000,00
Jumlah Harga Bahan 342.000,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 517.773,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 517.773,00

A. 3.2.1.9a Pemasangan 1m3 Gravel 7-15cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,780 Rp 137.000,00 Rp 106.860,00

Tukang L.02 OH 0,390 Rp 147.000,00 Rp 57.330,00


Kepala Tukang L.03 OH 0,039 Rp 155.000,00 Rp 6.045,00
Mandor L.04 OH 0,039 Rp 142.000,00 Rp 5.538,00
Jumlah Tenaga Kerja 175.773,00
B BAHAN
Gravel 7-15cm m3 1,200 Rp -
Jumlah Harga Bahan 0,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 175.773,00
10/3
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 175.773,00

A. 3.2.1.9b Pemasangan 1m3 Gravel 15-30cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,780 Rp 137.000,00 Rp 106.860,00
Tukang L.02 OH 0,390 Rp 147.000,00 Rp 57.330,00
Kepala Tukang L.03 OH 0,039 Rp 155.000,00 Rp 6.045,00
Mandor L.04 OH 0,039 Rp 142.000,00 Rp 5.538,00
Jumlah Tenaga Kerja 175.773,00
B BAHAN
Gravel 15-30cm m3 1,200 Rp -
Jumlah Harga Bahan 0,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 175.773,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 175.773,00

A. 3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3KR dan 40% Batu Belah
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 3,400 Rp 137.000,00 Rp 465.800,00
Tukang L.02 OH 0,850 Rp 147.000,00 Rp 124.950,00
Kepala Tukang L.03 OH 0,085 Rp 155.000,00 Rp 13.175,00
Mandor L.04 OH 0,170 Rp 142.000,00 Rp 24.140,00
Jumlah Tenaga Kerja 628.065,00
B BAHAN
Batu Belah/ Kali m3 0,480 Rp 240.000,00 Rp 115.200,00
Semen Portland kg 194,000 Rp 1.750,00 Rp 339.500,00
Pasir Beton m3 0,312 Rp 145.000,00 Rp 45.240,00
Kerikil m3 0,468 Rp 408.000,00 Rp 190.944,00
Besi Polos kg 0,000 Rp - Rp -
Kawat Beton kg 0,000 Rp - Rp -
Jumlah Harga Bahan 690.884,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.318.949,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.318.949,00

A. 3.2.1.11 Pemasangan 1m3 pondasi sumuran, diameter 100 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2,400 Rp 137.000,00 Rp 328.800,00
Tukang L.02 OH 0,800 Rp 147.000,00 Rp 117.600,00
Kepala Tukang L.03 OH 0,080 Rp 155.000,00 Rp 12.400,00
Mandor L.04 OH 0,119 Rp 142.000,00 Rp 16.898,00
Jumlah Tenaga Kerja 475.698,00
B BAHAN
Batu Belah/ Kali m3 0,450 Rp 240.000,00 Rp 108.000,00

Semen Portland kg 194,000 Rp 1.750,00 Rp 339.500,00


Pasir Beton m3 0,312 Rp 145.000,00 Rp 45.240,00
Kerikil m3 0,468 Rp 408.000,00 Rp 190.944,00
Jumlah Harga Bahan 683.684,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.159.382,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.159.382,00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3

10/4
A. 4.1.1.1 Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00
Jumlah Tenaga Kerja 282.601,00
B BAHAN
Semen Portland kg 247 Rp 1.750,00 Rp 432.250,00
Pasir Beton kg 869 Rp 103,57 Rp 90.003,57
Kerikil kg 999 Rp 302,22 Rp 301.920,00
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 845.673,57
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.128.274,57
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.128.274,57

A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w/c = 0.78
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00
Jumlah Tenaga Kerja 282.601,00
B BAHAN
Semen Portland kg 276 Rp 1.750,00 Rp 483.000,00
Pasir Beton kg 828 Rp 103,57 Rp 85.757,14
Kerikil kg 1.012 Rp 302,22 Rp 305.848,89
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 896.106,03
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.178.707,03
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.178.707,03

A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00

Jumlah Tenaga Kerja 282.601,00


B BAHAN
Semen Portland kg 299 Rp 1.750,00 Rp 523.250,00
Pasir Beton kg 799 Rp 103,57 Rp 82.753,57
Kerikil kg 1.017 Rp 302,22 Rp 307.360,00
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 934.863,57
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.217.464,57
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.217.464,57

A.4.1.1.1 Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100),slump (3 - 6) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA

10/5
Pekerja L.01 OH 1,200 Rp 137.000,00 Rp 164.400,00
Tukang L.02 OH 0,200 Rp 147.000,00 Rp 29.400,00
Kepala Tukang L.03 OH 0,020 Rp 155.000,00 Rp 3.100,00
Mandor L.04 OH 0,060 Rp 142.000,00 Rp 8.520,00
Jumlah Tenaga Kerja 205.420,00
B BAHAN
Semen Portland kg 230 Rp 1.750,00 Rp 402.500,00
Pasir Beton kg 893 Rp 103,57 Rp 92.489,29
Kerikil kg 1.027 Rp 302,22 Rp 310.382,22
Air Liter 200 Rp 100,00 Rp 20.000,00
Jumlah Harga Bahan 825.371,51
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.030.791,51
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.030.791,51

A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,323 Rp 137.000,00 Rp 181.251,00
Tukang L.02 OH 0,189 Rp 147.000,00 Rp 27.783,00
Kepala Tukang L.03 OH 0,019 Rp 155.000,00 Rp 2.945,00
Mandor L.04 OH 0,132 Rp 142.000,00 Rp 18.744,00
Jumlah Tenaga Kerja 230.723,00
B BAHAN
Semen Portland kg 326 Rp 1.750,00 Rp 570.500,00
Pasir Beton kg 760 Rp 103,57 Rp 78.714,29
Kerikil kg 1.029 Rp 302,22 Rp 310.986,67
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 981.700,95
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.212.423,95
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.212.423,95

A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00
Jumlah Tenaga Kerja 282.601,00
B BAHAN

Semen Portland kg 352 Rp 1.750,00 Rp 616.000,00


Pasir Beton kg 731 Rp 103,57 Rp 75.710,71
Kerikil kg 1.031 Rp 302,22 Rp 311.591,11
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 1.024.801,83
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.307.402,83
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.307.402,83

A.4.1.1.6 1 m³ Beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c =0,61
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,019 Rp 155.000,00 Rp 2.945,00
Mandor L.04 OH 0,132 Rp 142.000,00 Rp 18.744,00
Jumlah Tenaga Kerja 288.164,00

10/6
B BAHAN
Semen Portland M.15 kg 352 Rp 1.750,00 Rp 616.000,00
Pasir Beton M.14.a kg 731 Rp 103,57 Rp 75.710,71
Kerikil M.12 kg 1.031 Rp 302,22 Rp 311.591,11
Air M.02 Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 1.024.801,83
C PERALATAN
Molen kapasitas 0,3 m3 E.29.b Sewa hari 0,25 302.949,11 75.737,28
Jumlah Harga Alat 75.737,28
D Jumlah (A + B + C) Rp 1.388.703,10
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.388.703,10

A.4.1.1.7. Membuat 1 m3 beton mutu Fc=19.3 Mpa (K 225), Slump (12±2) cm, w/c = 0.58, menggunakan molen
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,323 Rp 137.000,00 Rp 181.251,00
Tukang L.02 OH 0,189 Rp 147.000,00 Rp 27.783,00
Kepala Tukang L.03 OH 0,019 Rp 155.000,00 Rp 2.945,00
Mandor L.04 OH 0,132 Rp 142.000,00 Rp 18.744,00
Jumlah Tenaga Kerja 230.723,00
B BAHAN
Semen Portland kg 371 Rp 1.750,00 Rp 649.250,00
Pasir Beton kg 698 Rp 103,57 Rp 72.292,86
Kerikil kg 1.047 Rp 302,22 Rp 316.426,67
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 1.059.469,52
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.290.192,52
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.290.192,52

A.4.1.1.8. Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00
Jumlah Tenaga Kerja 282.601,00
B BAHAN
Semen Portland kg 384 Rp 1.750,00 Rp 672.000,00
Pasir Beton kg 692 Rp 103,57 Rp 71.671,43

Kerikil kg 1.039 Rp 302,22 Rp 314.008,89


Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 1.079.180,32
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.361.781,32
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.361.781,32

Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56 menggunakan Ready Mixed dan
A.4.1.1.8.a.
pompa beton
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,000 Rp 137.000,00 Rp 137.000,00
Tukang L.02 OH 0,250 Rp 147.000,00 Rp 36.750,00
Kepala Tukang L.03 OH 0,025 Rp 155.000,00 Rp 3.875,00
Mandor L.04 OH 0,100 Rp 142.000,00 Rp 14.200,00
Jumlah Tenaga Kerja 191.825,00
B BAHAN
Campuran Beton Ready Mixed M.09.x m3 1,020 Rp 1.059.469,52 Rp 1.080.658,91
Jumlah Harga Bahan 1.080.658,91
C PERALATAN
10/7
Pompa dan conveyor beton E.35 Sewa hari 0,12 8.000.000,00 960.000,00

Jumlah Harga Alat 960.000,00


D Jumlah (A + B + C) Rp 2.232.483,91
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 2.232.483,91

A. 4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,650 Rp 137.000,00 Rp 226.050,00
Tukang L.02 OH 0,275 Rp 147.000,00 Rp 40.425,00
Kepala Tukang L.03 OH 0,028 Rp 155.000,00 Rp 4.340,00
Mandor L.04 OH 0,083 Rp 142.000,00 Rp 11.786,00
Jumlah Tenaga Kerja 282.601,00
B BAHAN
Semen Portland kg 406 Rp 1.750,00 Rp 710.500,00
Pasir Beton kg 684 Rp 103,57 Rp 70.842,86
Kerikil kg 1.026 Rp 302,22 Rp 310.080,00
Air Liter 215 Rp 100,00 Rp 21.500,00
Jumlah Harga Bahan 1.112.922,86
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 1.395.523,86
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 1.395.523,86

A. 4.1.1.17 Pembesian 10 kg dengan besi polos


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,070 Rp 137.000,00 Rp 9.590,00
Tukang L.02 OH 0,070 Rp 147.000,00 Rp 10.290,00
Kepala Tukang L.03 OH 0,007 Rp 155.000,00 Rp 1.085,00
Mandor L.04 OH 0,004 Rp 142.000,00 Rp 568,00
Jumlah Tenaga Kerja 21.533,00
B BAHAN
Besi Polos kg 10,500 Rp 12.500,00 Rp 131.250,00
Kawat Beton kg 0,150 Rp 25.000,00 Rp 3.750,00
Jumlah Harga Bahan 135.000,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 156.533,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 156.533,00
G Harga Satuan per kg besi F : 10 kg Rp 15.653,30

A. 4.1.1.17a Pembesian 10 kg dengan besi ulir


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,070 Rp 137.000,00 Rp 9.590,00
Tukang L.02 OH 0,070 Rp 147.000,00 Rp 10.290,00
Kepala Tukang L.03 OH 0,007 Rp 155.000,00 Rp 1.085,00
Mandor L.04 OH 0,004 Rp 142.000,00 Rp 568,00
Jumlah Tenaga Kerja 21.533,00
B BAHAN
Besi Ulir kg 10,500 Rp 14.700,00 Rp 154.350,00
Kawat Beton kg 0,150 Rp 25.000,00 Rp 3.750,00
Jumlah Harga Bahan 158.100,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 179.633,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 179.633,00
G Harga Satuan per kg besi F : 10 kg Rp 17.963,30

A. 4.1.1.20 Pemasangan 1m2 bekesting untuk pondasi


10/8
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,520 Rp 137.000,00 Rp 71.240,00
Tukang L.02 OH 0,260 Rp 147.000,00 Rp 38.220,00
Kepala Tukang L.03 OH 0,026 Rp 155.000,00 Rp 4.030,00
Mandor L.04 OH 0,026 Rp 142.000,00 Rp 3.692,00
Jumlah Tenaga Kerja 117.182,00
B BAHAN
Kayu Klas III m3 0,040 Rp 3.079.000,00 Rp 123.160,00
Paku 5 - 10 cm kg 0,300 Rp 20.000,00 Rp 6.000,00
Minyak Bekisting liter 0,100 Rp 12.000,00 Rp 1.200,00
Jumlah Harga Bahan 130.360,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 247.542,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) F : 2 kali Rp 247.542,00

A. 4.1.1.21 Pemasangan 1m2 bekesting untuk sloof


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,520 Rp 137.000,00 Rp 71.240,00
Tukang L.02 OH 0,260 Rp 147.000,00 Rp 38.220,00
Kepala Tukang L.03 OH 0,026 Rp 155.000,00 Rp 4.030,00
Mandor L.04 OH 0,026 Rp 142.000,00 Rp 3.692,00
Jumlah Tenaga Kerja 117.182,00
B BAHAN
Kayu Klas III m3 0,045 Rp 3.079.000,00 Rp 138.555,00
Paku 5 - 10 cm kg 0,300 Rp 20.000,00 Rp 6.000,00
Minyak Bekisting liter 0,100 Rp 12.000,00 Rp 1.200,00
Jumlah Harga Bahan 145.755,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 262.937,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 262.937,00

10/9
A. 4.1.1.22 Pemasangan 1m2 bekesting untuk kolom
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,660 Rp 137.000,00 Rp 90.420,00
Tukang L.02 OH 0,330 Rp 147.000,00 Rp 48.510,00
Kepala Tukang L.03 OH 0,033 Rp 155.000,00 Rp 5.115,00
Mandor L.04 OH 0,033 Rp 142.000,00 Rp 4.686,00
Jumlah Tenaga Kerja 148.731,00
B BAHAN
Kayu Klas III m3 0,040 Rp 3.079.000,00 Rp 123.160,00
Paku 5 - 10 cm kg 0,400 Rp 20.000,00 Rp 8.000,00
Minyak Bekisting liter 0,200 Rp 12.000,00 Rp 2.400,00
Balok Kayu Klas II m3 0,015 Rp 3.307.000,00 Rp 49.605,00
Plywood 9 mm Lbr 0,350 Rp 150.000,00 Rp 52.500,00

Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang 2,000 Rp 40.000,00


Rp 20.000,00
Jumlah Harga Bahan 275.665,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 424.396,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 424.396,00

A. 4.1.1.23 Pemasangan 1m2 bekesting untuk balok


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,660 Rp 137.000,00 Rp 90.420,00
Tukang L.02 OH 0,330 Rp 147.000,00 Rp 48.510,00
Kepala Tukang L.03 OH 0,033 Rp 155.000,00 Rp 5.115,00
Mandor L.04 OH 0,033 Rp 142.000,00 Rp 4.686,00
Jumlah Tenaga Kerja 148.731,00
B BAHAN
Kayu Klas III m3 0,040 Rp 3.079.000,00 Rp 123.160,00
Paku 5 - 10 cm kg 0,400 Rp 20.000,00 Rp 8.000,00
Minyak Bekisting liter 0,200 Rp 12.000,00 Rp 2.400,00
Balok Kayu Klas II m3 0,018 Rp 3.307.000,00 Rp 59.526,00
Plywood 9 mm Lbr 0,350 Rp 150.000,00 Rp 52.500,00

Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang 2,000 20.000,00 Rp 40.000,00


Rp
Jumlah Harga Bahan 285.586,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 434.317,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 434.317,00

A. 4.1.1.24 Pemasangan 1m2 bekesting untuk lantai


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,660 Rp 137.000,00 Rp 90.420,00
Tukang L.02 OH 0,330 Rp 147.000,00 Rp 48.510,00
Kepala Tukang L.03 OH 0,033 Rp 155.000,00 Rp 5.115,00
Mandor L.04 OH 0,033 Rp 142.000,00 Rp 4.686,00
Jumlah Tenaga Kerja 148.731,00
B BAHAN
Kayu Klas III m3 0,040 Rp 3.079.000,00 Rp 123.160,00
Paku 5 - 10 cm kg 0,400 Rp 20.000,00 Rp 8.000,00
Minyak Bekisting liter 0,200 Rp 12.000,00 Rp 2.400,00
Balok kayu Klas II m3 0,015 Rp 3.307.000,00 Rp 49.605,00
Plywood 9 mm Lbr 0,350 Rp 150.000,00 Rp 52.500,00

Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang 6,000 Rp 120.000,00


Rp 20.000,00
Jumlah Harga Bahan 355.665,00
C PERALATAN

Jumlah Harga Alat

10/10
D Jumlah (A + B + C) Rp 504.396,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 504.396,00

A. 4.1.1.26 Pemasangan 1m2 bekesting untuk tangga


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,660 Rp 137.000,00 Rp 90.420,00
Tukang L.02 OH 0,330 Rp 147.000,00 Rp 48.510,00
Kepala Tukang L.03 OH 0,033 Rp 155.000,00 Rp 5.115,00
Mandor L.04 OH 0,033 Rp 142.000,00 Rp 4.686,00
Jumlah Tenaga Kerja 148.731,00
B BAHAN
Kayu Klas III m3 0,030 Rp 3.079.000,00 Rp 92.370,00
Paku 5 - 10 cm kg 0,400 Rp 20.000,00 Rp 8.000,00
Minyak Bekisting liter 0,150 Rp 12.000,00 Rp 1.800,00
Balok Kayu Klas II m3 0,015 Rp 3.307.000,00 Rp 49.605,00
Plywood 9 mm Lbr 0,350 Rp 150.000,00 Rp 52.500,00

Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang 2,000 Rp 40.000,00


Rp 20.000,00
Jumlah Harga Bahan 244.275,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 393.006,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 393.006,00

A. 4.1.1.37 Pemasangan 1m2 jembatan untuk pengecoran beton


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,150 Rp 137.000,00 Rp 20.550,00
Tukang L.02 OH 0,050 Rp 147.000,00 Rp 7.350,00
Kepala Tukang L.03 OH 0,005 Rp 155.000,00 Rp 775,00
Mandor L.04 OH 0,008 Rp 142.000,00 Rp 1.136,00
Jumlah Tenaga Kerja 29.811,00
B BAHAN
Kayu Klas III m3 0,0264 Rp 3.079.000,00 Rp 81.285,60
Paku 5 - 10 cm kg 0,600 Rp 20.000,00 Rp 12.000,00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 m Batang 0,500 Rp 20.000,00 Rp 10.000,00
Jumlah Harga Bahan 103.285,60
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 133.096,60
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 133.096,60

A.4.1.1.25 1 m3 Membongkar bekisting/menyiram beton


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,000 Rp 137.000,00 Rp 137.000,00
Jumlah Tenaga Kerja 137.000,00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 137.000,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 137.000,00

10/11
A.4.2.1.22. Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 0,734 Rp 137.000,00 Rp 100.558,00
Tukang besi L.03 0,734 Rp 147.000,00 Rp 107.898,00
Kepala tukang L.03 0,073 Rp 155.000,00 Rp 11.315,00
Mandor L.04 0,037 Rp 142.000,00 Rp 5.254,00
Jumlah Tenaga Kerja 225.025,00
B BAHAN
Baja ringan canai dingin C75 kg 3,065 Rp 22.350,00 Rp 68.502,75
Jumlah Harga Bahan 68.502,75
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 293.527,75
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 293.527,75

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,600 Rp 137.000,00 Rp 82.200,00
Tukang L.02 OH 0,200 Rp 147.000,00 Rp 29.400,00
Kepala Tukang L.03 OH 0,020 Rp 155.000,00 Rp 3.100,00
Mandor L.04 OH 0,030 Rp 142.000,00 Rp 4.260,00
Jumlah Tenaga Kerja 118.960,00
B BAHAN
Batu Bata m3 140,000 Rp 700,00 Rp 98.000,00
Semen Portland Kg 43,500 Rp 1.750,00 Rp 76.125,00
Pasir Pasang m3 0,080 Rp 145.000,00 Rp 11.600,00
Jumlah Harga Bahan 185.725,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 304.685,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 304.685,00

A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,600 Rp 137.000,00 Rp 82.200,00
Tukang L.02 OH 0,200 Rp 147.000,00 Rp 29.400,00
Kepala Tukang L.03 OH 0,020 Rp 155.000,00 Rp 3.100,00
Mandor L.04 OH 0,030 Rp 142.000,00 Rp 4.260,00
Jumlah Tenaga Kerja 118.960,00
B BAHAN
Batu Bata m3 140,000 Rp 700,00 Rp 98.000,00
Semen Portland Kg 26,550 Rp 1.750,00 Rp 46.462,50
Pasir Pasang m3 0,093 Rp 145.000,00 Rp 13.485,00
Jumlah Harga Bahan 157.947,50
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 276.907,50
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 276.907,50

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 59.480,00

10/12
B BAHAN
Batu Bata bh 70,000 Rp 700,00 Rp 49.000,00
Semen Portland kg 18,950 Rp 1.750,00 Rp 33.162,50
Pasir Pasang m3 0,038 Rp 145.000,00 Rp 5.510,00
Jumlah Harga Bahan 87.672,50
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 147.152,50
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 147.152,50

A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 59.480,00
B BAHAN
Batu Bata bh 70,000 Rp 700,00 Rp 49.000,00
Semen Portland kg 14,370 Rp 1.750,00 Rp 25.147,50
Pasir Pasang m3 0,040 Rp 145.000,00 Rp 5.800,00
Jumlah Harga Bahan 79.947,50
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 139.427,50
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 139.427,50

A. 4.4.1.9 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 59.480,00
B BAHAN
Batu Bata bh 70,000 Rp 700,00 Rp 49.000,00
Semen Portland kg 11,500 Rp 1.750,00 Rp 20.125,00
Pasir Pasang m3 0,043 Rp 145.000,00 Rp 6.235,00
Jumlah Harga Bahan 75.360,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 134.840,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 134.840,00

A. 4.4.1.23.a Pemasangan 1 M2 dinding terawang (rooster) 0,2 x 0,2 x 11 campuran 1SP :4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 59.480,00
B BAHAN
Bata berongga bh 26,000 Rp 6.000,00 Rp 156.000,00

Semen Portland kg 11,000 Rp 1.750,00 Rp 19.250,00


Pasir Pasang m3 0,035 Rp 145.000,00 Rp 5.075,00
Jumlah Harga Bahan 180.325,00
C PERALATAN

10/13
Jumlah Harga Alat
D Jumlah (A + B + C) Rp 239.805,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 239.805,00

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1 Pemasangan 1 m2 Plesteran 1SP : 1PP tebal 15 mm
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 67.605,00
B BAHAN
Semen Portland kg 15,504 Rp 1.750,00 Rp 27.132,00
Pasir Pasang m3 0,016 Rp 145.000,00 Rp 2.320,00
Jumlah Harga Bahan 29.452,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 97.057,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 97.057,00

A. 4.4.2.2 Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 67.605,00
B BAHAN
Semen Portland kg 10,224 Rp 1.750,00 Rp 17.892,00
Pasir Pasang m3 0,020 Rp 145.000,00 Rp 2.900,00
Jumlah Harga Bahan 20.792,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 88.397,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 88.397,00

A. 4.4.2.3 Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 15 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 67.605,00
B BAHAN
Semen Portland kg 7,776 Rp 1.750,00 Rp 13.608,00
Pasir Pasang m3 0,023 Rp 145.000,00 Rp 3.335,00
Jumlah Harga Bahan 16.943,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 84.548,00

E Overhead & Profit (10%) 0% x D Rp -


F Harga Satuan Pekerjaan (D+E) Rp 84.548,00

A. 4.4.2.4 Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,300 Rp 137.000,00 Rp 41.100,00

10/14
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,015 Rp 142.000,00 Rp 2.130,00
Jumlah Tenaga Kerja 67.605,00
B BAHAN
Semen Portland kg 6,240 Rp 1.750,00 Rp 10.920,00
Pasir Pasang m3 0,024 Rp 145.000,00 Rp 3.480,00
Jumlah Harga Bahan 14.400,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 82.005,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 82.005,00

A. 4.4.2.27 Pemasangan 1 m2 Acian


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,200 Rp 137.000,00 Rp 27.400,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,010 Rp 142.000,00 Rp 1.420,00
Jumlah Tenaga Kerja 45.070,00
B BAHAN
Semen Portland kg 3,250 Rp 1.750,00 Rp 5.687,50
Jumlah Harga Bahan 5.687,50
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 50.757,50
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 50.757,50

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.4 Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,250 Rp 137.000,00 Rp 34.250,00
Tukang L.02 OH 0,125 Rp 147.000,00 Rp 18.375,00
Kepala Tukang L.03 OH 0,013 Rp 155.000,00 Rp 2.015,00
Mandor L.04 OH 0,013 Rp 142.000,00 Rp 1.846,00
Jumlah Tenaga Kerja 56.486,00
B BAHAN
Keramik 40x40 Bh 6,630 Rp 14.400,00 Rp 95.472,00
Semen Portland kg 9,800 Rp 1.750,00 Rp 17.150,00
Semen Warna Kg 0,600 Rp 3.900,00 Rp 2.340,00
Pasir Pasang M3 0,045 Rp 145.000,00 Rp 6.525,00
Jumlah Harga Bahan 121.487,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 177.973,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 177.973,00

A.4.4.3.5 Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA

Pekerja L.01 OH 0,260 Rp 137.000,00 Rp 35.620,00


Tukang L.02 OH 0,130 Rp 147.000,00 Rp 19.110,00
Kepala Tukang L.03 OH 0,013 Rp 155.000,00 Rp 2.015,00
Mandor L.04 OH 0,013 Rp 142.000,00 Rp 1.846,00
Jumlah Tenaga Kerja 58.591,00
B BAHAN
Ubin warna Bh 11,870 Rp 6.480,00 Rp 76.917,60
Semen Portland kg 10,000 Rp 1.750,00 Rp 17.500,00
Semen Warna Kg 0,600 Rp 3.900,00 Rp 2.340,00

10/15
Pasir Pasang M3 0,045 Rp 145.000,00 Rp 6.525,00
Jumlah Harga Bahan 103.282,60
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 161.873,60
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 161.873,60

A.4.4.3.6 Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,270 Rp 137.000,00 Rp 36.990,00
Tukang L.02 OH 0,135 Rp 147.000,00 Rp 19.845,00
Kepala Tukang L.03 OH 0,014 Rp 155.000,00 Rp 2.170,00
Mandor L.04 OH 0,014 Rp 142.000,00 Rp 1.988,00
Jumlah Tenaga Kerja 60.993,00
B BAHAN
Ubin warna Bh 16,000 Rp 5.000,00 Rp 80.000,00
Semen Portland kg 10,400 Rp 1.750,00 Rp 18.200,00
Semen Warna Kg 1,000 Rp 3.900,00 Rp 3.900,00
Pasir Pasang M3 0,045 Rp 145.000,00 Rp 6.525,00
Jumlah Harga Bahan 108.625,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 169.618,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 169.618,00

A. 4.4.3.54 Pemasangan 1 m2 dinding keramik 25 cm x 50 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,900 Rp 137.000,00 Rp 123.300,00
Tukang L.02 OH 0,450 Rp 147.000,00 Rp 66.150,00
Kepala Tukang L.03 OH 0,045 Rp 155.000,00 Rp 6.975,00
Mandor L.04 OH 0,045 Rp 142.000,00 Rp 6.390,00
Jumlah Tenaga Kerja 202.815,00
B BAHAN
Keramik artistik Bh 8,000 Rp 16.250,00 Rp 130.000,00
Semen Portland kg 9,300 Rp 1.750,00 Rp 16.275,00
Pasir Pasang m3 0,018 Rp 145.000,00 Rp 2.610,00
Semen Warna kg 1,940 Rp 3.900,00 Rp 7.566,00
Jumlah Harga Bahan 156.451,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 359.266,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 359.266,00

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,700 Rp 137.000,00 Rp 95.900,00
Tukang L.02 OH 0,350 Rp 147.000,00 Rp 51.450,00

Kepala Tukang L.03 OH 0,035 Rp 155.000,00 Rp 5.425,00


Mandor L.04 OH 0,035 Rp 142.000,00 Rp 4.970,00
Jumlah Tenaga Kerja 157.745,00
B BAHAN
Batu tempel hitam m2 1,100 Rp 133.000,00 Rp 146.300,00
Semen Portland kg 9,300 Rp 1.750,00 Rp 16.275,00
Pasir Pasang m3 0,039 Rp 145.000,00 Rp 5.655,00
Jumlah Harga Bahan 168.230,00
C PERALATAN

Jumlah Harga Alat

10/16
D Jumlah (A + B + C) Rp 325.975,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 325.975,00

A. 4.4.3.54.a Pemasangan 1 m2 dinding keramik 30 cm x 30 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,900 Rp 137.000,00 Rp 123.300,00
Tukang L.02 OH 0,450 Rp 147.000,00 Rp 66.150,00
Kepala Tukang L.03 OH 0,045 Rp 155.000,00 Rp 6.975,00
Mandor L.04 OH 0,045 Rp 142.000,00 Rp 6.390,00
Jumlah Tenaga Kerja 202.815,00
B BAHAN
Keramik Bh 11,870 Rp 6.480,00 Rp 76.917,60
Semen Portland kg 9,300 Rp 1.750,00 Rp 16.275,00
Pasir Pasang m3 0,039 Rp 145.000,00 Rp 5.655,00
Semen Warna kg 2,000 Rp 3.900,00 Rp 7.800,00
Jumlah Harga Bahan 106.647,60
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 309.462,60
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 309.462,60

A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFONT)


A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,100 Rp 137.000,00 Rp 13.700,00
Tukang L.02 OH 0,050 Rp 147.000,00 Rp 7.350,00
Kepala Tukang L.03 OH 0,005 Rp 155.000,00 Rp 775,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 22.535,00
B BAHAN
Gypsum board Lembar 0,364 Rp 106.200,00 Rp 38.656,80
Paku skrup kg 0,110 Rp 80.000,00 Rp 8.800,00
Jumlah Harga Bahan 47.456,80
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 69.991,80
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 69.991,80

A. 4.5.1.9 Pemasangan 1 m' List Langit-langit kayu profil


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,050 Rp 137.000,00 Rp 6.850,00
Tukang L.02 OH 0,050 Rp 147.000,00 Rp 7.350,00
Kepala Tukang L.03 OH 0,005 Rp 155.000,00 Rp 775,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 15.401,00

B BAHAN
List Kayu Profil m' 1,050 Rp 25.000,00 Rp 26.250,00
Paku Kayu kg 0,010 Rp 20.000,00 Rp 200,00
Jumlah Harga Bahan 26.450,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 41.851,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 41.851,00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.38a emasangan 1 M2 atap seng gelombang

10/17
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,120 Rp 137.000,00 Rp 16.440,00
Tukang L.03 OH 0,060 Rp 147.000,00 Rp 8.820,00
Kepala Tukang L.11 OH 0,006 Rp 155.000,00 Rp 930,00
Mandor L.15 OH 0,006 Rp 142.000,00 Rp 852,00
Jumlah Tenaga Kerja 27.042,00
B BAHAN
seng gelombang 0.3mm lbr 0,700 Rp 95.000,00 Rp 66.500,00
Paku biasa ½”-1” kg 0,020 Rp 60.000,00 Rp 1.200,00
Jumlah Harga Bahan 67.700,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 94.742,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 94.742,00

A.4.5.2.40. Pemasangan 1 m’nok atap seng


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,150 Rp 137.000,00 Rp 20.550,00
Tukang L.03 OH 0,070 Rp 147.000,00 Rp 10.290,00
Kepala Tukang L.11 OH 0,007 Rp 155.000,00 Rp 1.085,00
Mandor L.15 OH 0,006 Rp 142.000,00 Rp 852,00
Jumlah Tenaga Kerja 32.777,00
B BAHAN
Seng pelat 3”x6” BJLS 30 Lbr 0,300 Rp 66.000,00 Rp 19.800,00
Paku biasa ½”-1” Kg 0,040 Rp 20.000,00 Rp 800,00
Jumlah Harga Bahan 20.600,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 53.377,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 53.377,00

A.4.6.1. HARGA SATUAN PEKERJAAN KAYU


A. 4.6.1.1 Pembuatan dan Pemasangan Konstruksi Kayu 1m3 (kusen pintu dan kusen jendela, Perkayuan kayu Klas I)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 7,000 Rp 137.000,00 Rp 959.000,00
Tukang L.03 OH 21,000 Rp 147.000,00 Rp 3.087.000,00
Kepala Tukang L.03 OH 2,100 Rp 155.000,00 Rp 325.500,00
Mandor L.04 OH 0,350 Rp 142.000,00 Rp 49.700,00
Jumlah Tenaga Kerja 4.421.200,00
B BAHAN
Kayu Klas I m3 1,100 Rp 4.391.000,00 Rp 4.830.100,00
Paku 10 cm kg 1,250 Rp 20.000,00 Rp 25.000,00
Lem Kayu kg 1,000 Rp 30.000,00 Rp 30.000,00
Jumlah Harga Bahan 4.885.100,00

C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 9.306.300,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 9.306.300,00

A. 4.6.1.2 Pembuatan dan Pemasangan Konstruksi Kayu 1m3 (kusen pintu dan kusen jendela, Perkayuan kayu Klas II)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 6,000 Rp 137.000,00 Rp 822.000,00
Tukang L.03 OH 18,000 Rp 147.000,00 Rp 2.646.000,00
Kepala Tukang L.03 OH 1,800 Rp 155.000,00 Rp 279.000,00
Mandor L.04 OH 0,300 Rp 142.000,00 Rp 42.600,00
Jumlah Tenaga Kerja 3.789.600,00

10/18
B BAHAN
Kayu Klas II m3 1,200 Rp 3.307.000,00 Rp 3.968.400,00
Paku 10 cm kg 1,250 Rp 20.000,00 Rp 25.000,00
Lem Kayu kg 1,000 Rp 30.000,00 Rp 30.000,00
Jumlah Harga Bahan 4.023.400,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 7.813.000,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 7.813.000,00

A. 4.6.1.10 Pemasangan 1m2 jalusi kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,670 Rp 137.000,00 Rp 91.790,00
Tukang L.03 OH 2,000 Rp 147.000,00 Rp 294.000,00
Kepala Tukang L.03 OH 0,200 Rp 155.000,00 Rp 31.000,00
Mandor L.04 OH 0,335 Rp 142.000,00 Rp 47.570,00
Jumlah Tenaga Kerja 464.360,00
B BAHAN
Papan Kayu m3 0,060 Rp 3.307.000,00 Rp 198.420,00
Lem Kayu kg 0,150 Rp 30.000,00 Rp 4.500,00
Jumlah Harga Bahan 202.920,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 667.280,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 667.280,00

A. 4.6.1.17 Pemasangan 1 m2 rangka atap genteng beton, kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,100 Rp 137.000,00 Rp 13.700,00
Tukang L.03 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 30.660,00
B BAHAN `
Kayu Kaso 5x7 cm klas II m3 0,014 Rp 3.307.000,00 Rp 46.298,00
Kayu Reng 3x4 cm klas II m3 0,057 Rp 3.307.000,00 Rp 188.499,00
Paku 5 - 10 cm kg 0,250 Rp 20.000,00 Rp 5.000,00
Jumlah Harga Bahan 239.797,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 270.457,00
E Overhead & Profit (10%) 0% x D Rp -

10/19
F Harga Satuan Pekerjaan (D+E) Rp270.457,00

A. 4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm , kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,200 Rp 137.000,00 Rp 27.400,00
Tukang L.03 OH 0,300 Rp 147.000,00 Rp 44.100,00
Kepala Tukang L.03 OH 0,030 Rp 155.000,00 Rp 4.650,00
Mandor L.04 OH 0,010 Rp 142.000,00 Rp 1.420,00
Jumlah Tenaga Kerja 77.570,00
B BAHAN `
Kayu Kaso 5x7 cm klas II m3 0,0163 Rp 3.307.000,00 Rp 53.904,10
Paku 7 - 10 cm kg 0,250 Rp 20.000,00 Rp 5.000,00
Jumlah Harga Bahan 58.904,10
C PERALATAN

Jumlah Harga Alat 0,00


D Jumlah (A + B + C) Rp 136.474,10
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 136.474,10

A. 4.6.1.22 Pemasangan 1 m Listplank ukuran (3 x 20) cm, Kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,100 Rp 137.000,00 Rp 13.700,00
Tukang L.03 OH 0,200 Rp 147.000,00 Rp 29.400,00
Kepala Tukang L.03 OH 0,020 Rp 155.000,00 Rp 3.100,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 46.910,00
B BAHAN `
Kayu Papan 3/20 klas II m3 0,0110 Rp 3.307.000,00 Rp 36.377,00
Paku 5 - 7 cm kg 0,050 Rp 20.000,00 Rp 1.000,00
Jumlah Harga Bahan 37.377,00
C PERALATAN

Jumlah Harga Alat 0,00


D Jumlah (A + B + C) Rp 84.287,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 84.287,00

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,025 Rp 137.000,00 Rp 3.425,00
Tukang L.03 OH 0,075 Rp 147.000,00 Rp 11.025,00
Kepala Tukang L.03 OH 0,008 Rp 155.000,00 Rp 1.240,00
Mandor L.04 OH 0,001 Rp 142.000,00 Rp 142,00
Jumlah Tenaga Kerja 15.832,00
B BAHAN `
Playwood 9 mm lbr 0,4000 Rp 150.000,00 Rp 60.000,00
Paku sekrup kg 0,050 Rp 80.000,00 Rp 4.000,00
Jumlah Harga Bahan 64.000,00
C PERALATAN

Jumlah Harga Alat 0,00


D Jumlah (A + B + C) Rp 79.832,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 79.832,00

A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A. 4.6.2.2 Pemasangan 1 buah kunci tanam biasa
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,010 Rp 137.000,00 Rp 1.370,00
Tukang L.02 OH 0,500 Rp 147.000,00 Rp 73.500,00
Kepala Tukang L.03 OH 0,050 Rp 155.000,00 Rp 7.750,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 83.330,00

10/20
B BAHAN
Kunci Tanam Biasa Bh 1,000 Rp -
Jumlah Harga Bahan 0,00
C PERALATAN

Jumlah Harga Alat 0,00


D Jumlah (A + B + C) Rp 83.330,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 83.330,00

A. 4.6.2.4 Pemasangan 1 buah engsel pintu


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,015 Rp 137.000,00 Rp 2.055,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,0008 Rp 142.000,00 Rp 113,60
Jumlah Tenaga Kerja 26.543,60
B BAHAN
Engsel Pintu Bh 1,000 Rp -
Jumlah Harga Bahan 0,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 26.543,60
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 26.543,60

A. 4.6.2.9 Pemasangan 1 buah kait angin


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,015 Rp 137.000,00 Rp 2.055,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,008 Rp 142.000,00 Rp 1.136,00
Jumlah Tenaga Kerja 27.566,00
B BAHAN
Kait Angin Bh 1,000 Rp -
Jumlah Harga Bahan 0,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 27.566,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 27.566,00

A. 4.6.2.17 Pemasangan 1 m2 kaca tebal 5mm


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,015 Rp 137.000,00 Rp 2.055,00
Tukang L.02 OH 0,150 Rp 147.000,00 Rp 22.050,00
Kepala Tukang L.03 OH 0,015 Rp 155.000,00 Rp 2.325,00
Mandor L.04 OH 0,0008 Rp 142.000,00 Rp 113,60
Jumlah Tenaga Kerja 26.543,60
B BAHAN
Kaca Tebal 5 mm m2 1,100 Rp 159.600,00 Rp 175.560,00
Sealant kg 0,050 Rp 9.600,00 Rp 480,00
Jumlah Harga Bahan 176.040,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 202.583,60

E Overhead & Profit (10%) 0% x D Rp -


F Harga Satuan Pekerjaan (D+E) Rp 202.583,60

A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN


A. 4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga

10/21
A TENAGA
Pekerja L.01 OH 0,070 Rp 137.000,00 Rp 9.590,00
Tukang L.02 OH 0,009 Rp 147.000,00 Rp 1.323,00
Kepala Tukang L.03 OH 0,006 Rp 155.000,00 Rp 930,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 12.269,00
B BAHAN
Cat Menie kg 0,200 Rp 42.000,00 Rp 8.400,00
Plamur kg 0,150 Rp 36.000,00 Rp 5.400,00
Cat Dasar kg 0,170 Rp 36.000,00 Rp 6.120,00
Cat Penutup kg 0,260 Rp 33.600,00 Rp 8.736,00
Kuas cat Bh 0,010 Rp 45.000,00 Rp 450,00
Pengencer kg 0,030 Rp 40.000,00 Rp 1.200,00
Kertas Amplas Lbr 0,200 Rp 4.800,00 Rp 960,00
Jumlah Harga Bahan 31.266,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 43.535,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 43.535,00

A. 4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,020 Rp 137.000,00 Rp 2.740,00
Tukang L.02 OH 0,063 Rp 147.000,00 Rp 9.261,00
Kepala Tukang L.03 OH 0,0063 Rp 155.000,00 Rp 976,50
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 13.403,50
B BAHAN
Plamur kg 0,100 Rp 36.000,00 Rp 3.600,00
Cat Dasar kg 0,100 Rp 36.000,00 Rp 3.600,00
Cat Penutup kg 0,260 Rp 33.600,00 Rp 8.736,00
Jumlah Harga Bahan 15.936,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 29.339,50
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 29.339,50

A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,028 Rp 137.000,00 Rp 3.836,00
Tukang L.02 OH 0,042 Rp 147.000,00 Rp 6.174,00
Kepala Tukang L.03 OH 0,0042 Rp 155.000,00 Rp 651,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 11.087,00
B BAHAN
Cat Dasar kg 0,120 Rp 36.000,00 Rp 4.320,00
Cat Penutup kg 0,180 Rp 33.600,00 Rp 6.048,00
Jumlah Harga Bahan 10.368,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 21.455,00

E Overhead & Profit (10%) 0% x D Rp -


F Harga Satuan Pekerjaan (D+E) Rp 21.455,00

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,020 Rp 137.000,00 Rp 2.740,00
Tukang L.02 OH 0,200 Rp 147.000,00 Rp 29.400,00

10/22
Kepala Tukang L.03 OH 0,0200 Rp 155.000,00 Rp 3.100,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 355,00
Jumlah Tenaga Kerja 35.595,00
B BAHAN
Menie besi kg 0,100 Rp 42.000,00 Rp 4.200,00
Kwas buah 0,010 Rp 35.000,00 Rp 350,00
Jumlah Harga Bahan 4.550,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 40.145,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 40.145,00

A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,070 Rp 137.000,00 Rp 9.590,00
Tukang L.02 OH 0,009 Rp 147.000,00 Rp 1.323,00
Kepala Tukang L.03 OH 0,0060 Rp 155.000,00 Rp 930,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 12.269,00
B BAHAN
Cat menie Kg 0,200 Rp 42.000,00 Rp 8.400,00
Plamuur Kg 0,150 Rp 36.000,00 Rp 5.400,00
Cat dasar Kg 0,170 Rp 36.000,00 Rp 6.120,00
Cat penutup Kg 0,260 Rp 33.600,00 Rp 8.736,00
Kuas buah 0,010 Rp 35.000,00 Rp 350,00
Pengencer Kg 0,030 Rp 40.000,00 Rp 1.200,00
Ampelas Lbr 0,200 Rp 7.500,00 Rp 1.500,00
Jumlah Harga Bahan 31.706,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 43.975,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 43.975,00

A.4.7.1.9 Pelaburan 1 m2 bidang kayu dengan vernis


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,160 Rp 137.000,00 Rp 21.920,00
Tukang L.02 OH 0,160 Rp 147.000,00 Rp 23.520,00
Kepala Tukang L.03 OH 0,0160 Rp 155.000,00 Rp 2.480,00
Mandor L.04 OH 0,003 Rp 142.000,00 Rp 426,00
Jumlah Tenaga Kerja 48.346,00
B BAHAN
Vernis Ltr 0,260 Rp 42.000,00 Rp 10.920,00
Dempul Kg 0,010 Rp 35.000,00 Rp 350,00
Ampelas Lbr 0,200 Rp 7.500,00 Rp 1.500,00
Jumlah Harga Bahan 12.770,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 61.116,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 61.116,00

10/23
A.5.1.1.2 Pemasangan 1 buah closet jongkok
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1,000 Rp 137.000,00 Rp 137.000,00
Tukang L.02 OH 1,500 Rp 147.000,00 Rp 220.500,00
Kepala Tukang L.03 OH 0,150 Rp 155.000,00 Rp 23.250,00
Mandor L.04 OH 0,050 Rp 142.000,00 Rp 7.100,00
Jumlah Tenaga Kerja 387.850,00
B BAHAN
Closet Jongkok Unit 1,000 Rp 360.000,00 Rp 360.000,00
Semen Portland kg 6,000 Rp 1.750,00 Rp 10.500,00
Pasir pasang m3 0,010 Rp 145.000,00 Rp 1.450,00
Bata merah buah 7,000 Rp 700,00 Rp 4.900,00
Jumlah Harga Bahan 376.850,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 764.700,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 764.700,00

A.5.1.1.14 Pemasangan 1 buah floor drain


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,010 Rp 137.000,00 Rp 1.370,00
Tukang L.02 OH 0,100 Rp 147.000,00 Rp 14.700,00
Kepala Tukang L.03 OH 0,010 Rp 155.000,00 Rp 1.550,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 18.330,00
B BAHAN
Floor drain Unit 1 Rp 23.700,00 Rp 23.700,00
Jumlah Harga Bahan 23.700,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 42.030,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 42.030,00

A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,010 Rp 137.000,00 Rp 1.370,00
Tukang L.02 OH 0,400 Rp 147.000,00 Rp 58.800,00
Kepala Tukang L.03 OH 0,040 Rp 155.000,00 Rp 6.200,00
Mandor L.04 OH 0,005 Rp 142.000,00 Rp 710,00
Jumlah Tenaga Kerja 67.080,00
B BAHAN
Kran air M 1 Rp 54.000,00 Rp 54.000,00
Sealtape Bh 0,025 Rp 5.200,00 Rp 130,00
Jumlah Harga Bahan 54.130,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 121.210,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 121.210,00

A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,600 Rp 137.000,00 Rp 82.200,00
Tukang L.02 OH 1,800 Rp 147.000,00 Rp 264.600,00
Kepala Tukang L.03 OH 0,180 Rp 155.000,00 Rp 27.900,00

10/24
Mandor L.04 OH 0,030 Rp 142.000,00 Rp 4.260,00
Jumlah Tenaga Kerja 378.960,00
B BAHAN
Papan kayu m3 0,007 Rp 3.079.000,00 Rp 21.553,00
Paku 5 dan 10 kg 0,100 Rp 20.000,00 Rp 2.000,00
Tidak dipakai Paku skrup 10 cm kg 0,150 Rp - Rp -
Jumlah Harga Bahan 23.553,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 402.513,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 402.513,00

A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,150 Rp 137.000,00 Rp 20.550,00
Tukang L.02 OH 0,450 Rp 147.000,00 Rp 66.150,00
Kepala Tukang L.03 OH 0,0450 Rp 155.000,00 Rp 6.975,00
Mandor L.04 OH 0,008 Rp 142.000,00 Rp 1.136,00
Jumlah Tenaga Kerja 94.811,00
B BAHAN
Papan kayu m3 0,007 Rp 3.079.000,00 Rp 21.553,00
Paku 5 dan 7 kg 0,100 Rp 20.000,00 Rp 2.000,00
Jumlah Harga Bahan 23.553,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 118.364,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 118.364,00

A.4.4.3.46 Pemasangan 1 m2 lantai parquet kayu


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0,700 Rp 137.000,00 Rp 95.900,00
Tukang L.02 OH 0,350 Rp 147.000,00 Rp 51.450,00
Kepala Tukang L.03 OH 0,0350 Rp 155.000,00 Rp 5.425,00
Mandor L.04 OH 0,035 Rp 142.000,00 Rp 4.970,00
Jumlah Tenaga Kerja 157.745,00
B BAHAN
Parquet m2 1,050 Rp 270.000,00 Rp 283.500,00
Lem Kayu Kg 0,600 Rp 30.000,00 Rp 18.000,00
Jumlah Harga Bahan 301.500,00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) Rp 459.245,00
E Overhead & Profit (10%) 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 459.245,00

10/25