10
O P MTA
25
15
Jl. Surabaya Malang, Desa Kepulungan Kec.
Ø12-15
Gempol Kab. Pasuruan Provinsi Jawa Timur
PIPA Ø4" TUTUP KONTROL
DARI KLOSET 30X30 TANAH URUG
150
175
Ø12-15
70
230
150
230
SLOOF 15/30 PIPA UDARA Ø1"
Ø12-15 Ø12-15 6Ø12 Ø8-15 GALVANIS
25
15
LANTAI KERJA
5
15
PASIR URUG PIPA VENTILASI MENEMPEL VERTIKAL
DITANAM DI DALAM DINDING TERDEKAT
40 15 150 15 40
230
15
20
260
PLAT BETON t = 10 cm
PT. GRAHA ENERGI HIJAU
25
TUL.Ø10 - 15 (SILANG)
Jl. Kertajaya Indah Timur P-211 Surabaya
POTONGAN O email. grahaenergihijau@gmail.com
SKALA 1 : 20
10
25 15 125 15 100 15 80 15 25 MTA
415
PIPA UDARA Ø1"
GALVANIS VELDY JOSEPH
Direktur
Ø12-15
DENAH SEPTIKTANK PIPA VENTILASI MENEMPEL VERTIKAL
DITANAM DI DALAM DINDING TERDEKAT
SKALA 1 : 20
TANAH URUG
150
PLAT BETON t = 10 cm
175
TUTUP KONTROL
TUL.Ø10 - 15 (SILANG) 30X30
SUTITO
Ø12-15
Project Manager
15 15
TANAH URUG Konsultan Perencanaan
10
MTA
23
15 PIPA Ø3"
KE RESAPAN Ø12-15 Ø12-15
SLOOF 15/30
6Ø12 Ø8-15
PIPA Ø4" 25
DARI KLOSET
15
BALOK 15/25
4Ø10 Beg. Ø6-150 LANTAI KERJA
5
15
PASIR URUG
25
PAS. BATA
TENAGA AHLI
150
TRASSRAM 40 15 150 15 40
127
Ø12-15 180 1. ARSITEK
185
230 Prihadi Utomo, ST
260 SKA no 1.1.101.2.159.30.1158230
SKK 74321 2142.02 9 00119665 2023
70
SLOOF 15/30
6Ø12 Beg. Ø8-15
SLOOF 15/30
6Ø12 Beg. Ø8-15 POTONGAN P 2. STRUKTUR
Ø12-15 Ø12-15 SKALA 1 : 20 Yuliono, ST
25 SKK 74321 2142.02 9 00119664 2023
15 5 15
3. MEKANIKAL
Syifa Nurul Faiizi, ST
SKK 74321 2144.99 9 00006374 2023
4. ELEKTRIKAL
Agus Sulistyo, ST
40 15 125 15 100 15 80 15 40 SKA 1.4.402.4.144.41.134546
365
415
445 LANTAI KERJA
PASIR URUG
3Ø12
GEDUNG SPPBE DAN SARANA PENDUKUNGNYA
3Ø12
POTONGAN N
20
Ø8-15
SKALA 1 : 20
30
Ø8-15
20
12 200 12 Ø10-150 Ø10-150
30
12
DINDING BETON KEPALA DINAS PENANAMAN MODAL DAN PELAYANAN
PLAT BETON t = 8cm
MTA t= 12 CM
12 60
TUL. Ø10 - 15 TUTUP KONTROL TERPADU SATU PINTU KABUPATEN PASURUAN
(SILANG) 30X30 SALURAN DARI PDAM -0.65 Ø10-150
PIPA PVC Ø 3/4PELAMPUNG
"
200
200
12 80 12 KERAMIK
224
MTA
8
Ø10-150
4 SALURAN KE TANDON AIR
20X33
PIPA Ø3" PIPA Ø3" PAS. BATA
ATAS PIPA PVC Ø 3/4 "
KE RESAPAN KE RESAPAN TRASSRAM FOOT VALVE
- 0.05 - 0.03 Ø10-150 Ø10-150 ±0.00
60
12
lantai kerja
pasir urug
12
IJUK
TANAH URUG
12 200 12 KEPALA DINAS SUMBER DAYA AIR, CIPTA KARYA DAN
PAS. BATA
TATA RUANG KABUPATEN PASURUAN
TANPA SPESI IJUK
DENAH GROUND WATER
KERIKIL
PAS. BATA
TANPA SPESI TANK (GWT) POTONGAN M
SKALA 1 : 50
218
SKALA 1 : 50
210
100
KERIKIL KERIKIL
TUTUP KONTROL
200
30X30
BESI PIPA BESI PIPA
BESI PIPA Ø 1 12 " BESI PIPA Ø 1 12 "
Ø2" Ø2" Pintu Plat Baja 2 mm KEPALA BIDANG CIPTA KARYA
PAS. BATA
PLAT BETON t = 8cm
TRASSRAM KABUPATEN PASURUAN
30
.50
.24
8 50
30 30 80 30 30 1.60
140
1.00 Tangga Besi SALURAN KE TANDON AIR
30 30 80 30 30 Pelampung ATAS PIPA PVC Ø 3/4 " A3
200
200 PBG-351412-06112023-01
AFIFA, ELIS,
DET. TANGGA GWT DETAIL M
AMEL, FARIDA