Doc : : Gedung beladiri dojo


Judul Dokument Penulangan Pondasi Telapak FP2

PONDASI TELAPAK TYPE FP2


Perhitungan moment untuk pondasi

Pembebanan
Balok sloof = 0,25.0,50.2400 = 108 kg/m'
Tembok = 1.250 = 250 kg/m'
q 358 kg/m'
Statika L = 3 m
Mtum = 1/8 x 358 x 3^2 = 402.75 kgm

Kontrol Kekuatan Pondasi dengan Daya dukung tanah


Diasumsikan pondasi 0.9 x 1.5 m, kedalaman 1.5 m
adalah sebagai berikut
Mu = 417 kgm fc' (beton) 20.75 Mpa
Pu = 3644.6 kg fy' (baja) 420 Mpa
b = 0.9 m d' 30 mm
h = 1.5 m tpond 300 mm
kolom 250 / 450 mm s tanah 125.83 kg/cm2

bc = 450 = 1.8
250
Vu = 36.45 kN
Mu = 4.17 kNm
s tanah = 125.83 x 100 = 12583 kNm2
d = 300 - 30 = 270 mm
bo = 4 x (270 + 250) = 2080 mm

f Vmin = 0.6 x 1/3 x sqrt(20.75) x 2080 x 270


= 306985.1699 N

f Vc = 0.6 x (1 + 1/1.8) x 1/6 x sqrt(20.75) x 2080 x 270


= 397943.7387 N > 306985.17 N OK

f maks = 36.45 + 4.17


0.9 x 1.5 1/6 x 0.9 x 1.5^2
= 27.00 + 12.36
= 39.35 kN/m2 < 12583 kN/m2 OK
No. Doc : : Gedung beladiri dojo
Judul Dokument Penulangan Pondasi Telapak FP2

Statika

Mu = 417 kgm fc' (beton) 20.75 Mpa


Pu = 3644.6 kg fy' (baja) 420 Mpa
b = 0.9 m d' 30 mm
h = 1.5 m tpond 300 mm
kolom 250 / 450 mm s tanah 125.83 kg/cm2

bc = 450 = 1.8
250
Vu = 36.45 kN
Mu = 4.17 kNm
s tanah = 125.83 x 100 = 12583 kNm2
d = 300 - 30 = 270 mm
bo = 4 x (270 + 250) = 2080 mm

f Vmin = 0.6 x 1/3 x sqrt(20.75) x 2080 x 270


= 306985.1699 N

f Vc = 0.6 x (1 + 1/1.8) x 1/6 x sqrt(20.75) x 2080 x 270


= 397943.7387 N > 306985.17 N OK

f maks = 36.45 + 4.17


0.9 x 1.5 1/6 x 0.9 x 1.5^2
= 27.00 + 12.36
= 39.35 kN/m2 < 12583 kN/m2 OK

f min = 27.00 - 12.36


= 14.64 kN/m2
Diambil q = 39.35 kN/m2

Mu = 1/2 x 39.35 x (0.5x0.9)^2


= 3.98 kNm
No. Doc : : Gedung beladiri dojo
Judul Dokument Penulangan Pondasi Telapak FP2

Penulangan

Penulangan lapangan
Mu 398.45 kgm b 1000 mm
fc' (beton) 20.75 Mpa h 300 mm
fy' (baja) 420 Mpa d' 30 mm

pmin = 1,4 / 420 = 0.0033


pmaks = 0,75 x (0,85 x 20.75)/420 x 0,85 x [600/(600+420)]
= 0.0157

Mu = 398.45 kgm = 3.98 kNm


d = 300 - 30 = 270 mm
j = 0.8
Rn = (3.98 x 10^6) = 0.0683 Mpa
(0,8 x 1000 x 270^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 0.0683)/20.75]}
= 0.0033
p = 0.0033 x 20.75/420 = 0.0002 > 0.0033
< 0.0157
ppakai = 0.0033
As = 0.0033 x 1000 x 270 = 900.00 mm2
As' = 0,4 x 900.00 = 360.00 mm2

Penulangan
mm2 mm
Lapangan X (tul atas) 900.00 D13 - 125 ( 1,062 mm2 ) M10
Tumpuan X (tul atas) 900.00 D13 - 125 ( 1,062 mm2 ) M10
Tumpuan X (tul bagi) 360.00 D8 - 150 ( 335 mm2 ) M5