Kebutuhan Ruang 04-10-2023
Kebutuhan Ruang 04-10-2023
RUANG UTILITAS
RESERVOAR BAWAH BASEMENT 1 x V x 1 8 1 8 asumsi
GENSET BASEMENT 1 x V x 1 20 1 20 asumsi
LISTRIK PANEL BASEMENT 1 x V x 1 ORANG 9 1 9 asumsi 113.1
LVMDP BASEMENT 1 x V x 1 9 1 9 asumsi
SHAFT UTILITAS BS 1 & BS 2 x X x 1 4 1 4 asumsi
TANGGA VV V XX 8 16 1 16 asumsi
SAMPAH VV V XX 1 9 1 9 asumsi
TOTAL LUAS 87
DITAMBAH 30% SIRKULASI 26.1
KAMAR ATLET vvv vvv vvv 5 60 96 5760 asumsi
KAMAR PENYEWA vvv vvv vvv 5 60 1 60 asumsi
KAMAR PELATIH vvv vvv vvv 3 60 1 60 asumsi
TOWER LANTAI 3 ORANG 7746.7
KAMAR OFFICIAL vvv vvv vvv 1 60 1 60 asumsi
JANITOR VV V XX 2 9 1 9 asumsi
GUDANG VV V XX 2 10 1 10 SNI
TOTAL LUAS 5959
DITAMBAH 30% SIRKULASI 1787.7
STANDAR
NO JENIS RUANG KAPASITAS JUMLAH UNIT
BESARAN
LANTAI DASAR
1 HALL 0.8 m2 / orang 500 Orang 1 unit
2 LOBBY 1 m2 / orang
Meja Resepsionis 0.8 m2 Meja 10 Orang 1 unit
Kursi Resepsionis 0.5 x 0.5 m2 kursi
Ruang Kepala
3
Operasional
Meja 0,8 m2 x 2 m2 4 unit
Kursi 0,5 m2 x 0,5 m2 4 unit
LUAS RUANG
(TOTAL LUAS +
PERHITUNGAN BESARAN SIRKULASI TOTAL SIRKULASI) SUMBER
M2
LANTAI DASAR
0.8 m2 x 500 = 400 m2 30% 520 TSB
Orang 1 m2 x 10 = 10 m2
Meja 0.8 m2 x 10 = 8 m2 20% 596.75
Kursi 0.5 x 0.5 x 5 = 1.25 m2
0,8 x 2 x 4 = 6.4 m2
20% 8.8
0,5 x 0,5 x 4 = 1 m2
20 m2 x 1 = 20 m2
30% 26
ATM Center 40 m2 x 1 = 40 M2
20% 114.4
Toko Sourvenir 24 m2 x 2 = 48 m2
1.7 m2 x 6 = 10.2 m2
0.7 m2 x 5 = 3.5 m2 30% 24.6
1.3 m2 x 4 = 5.2 m2
1.7 m2 x 8 = 13.6 m2
30% 24.4
1.3 m2 x 4 = 5.2 m2
LANTAI 2
1.35 m2 x 5 = 6.75 m2
0.72 m2 x 5 = 3.6 m2
0.75 m2 x 5 = 3.75 m2
30% 53.4
1.8 m2 x 4 = 7.2 m2
0.6 m2 x 30 = 18 m2
0.9 m2 x 2 = 1.8 m2
1 m2 x 50 = 50 m2
30% 75.4
0.8 m2 x 10 = 8 m2
30% 98,2
0,63 m 2 x 120 = 75,6 m 2
25
16
25
140
100 578
21
20
63
168
10 m2 x 1 = 10 m2
30% 26
10 m2 x 1 = 10 m2
1 m2 x 50 = 50 m2
30% 75.4
0.8 m2 x 10 = 8 m2
30% 109.2
0,7 m 2 x 120 = 84 m 2
L 3365.334
SKEMA MATRIK HUBUNGAN RUANG
1 HALL
2 LOBBY
3 R. KEPALA OPERASIONAL
4 R. STAFF OPERASIONAL
5 R. SEKRETARIAT
6 ATM CENTER
7 TOKO SOURVENIR
8 DINING ROOM
9 R. FITNES
10 MUSHOLA
11 LAUNDRY
12 KAMAR TIDUR
13 R. ENGINEERING
14 R. KEAMANAN
15 HOUSE KEEPING OFFICE
Hubungan langsung
Hubungan tidak langsung
Tidak ada hubungan