Anda di halaman 1dari 18

PEMBAN

TU Pembantu
TUKANG KEPALA Tukang
BATU(Kul TUKANG Tukang Tukang Kayu/las
i) TUKANG KAYU BATU PEKERJA Batu Besi konstruksi
NO L.27 L.18 L.10 L.02 L.36 L.17 L.20 L.28
112,500.00
1 0.1000 0.1000 0.0100 0.0050 8.0000 0.6000 0.0200 0.5200
2 0.9000 0.0200 0.0600 0.0450 0.1000 0.0330 0.6600
3 0.2500 0.0330 0.0100 0.0083 0.1000 0.0070 0.6600
4 0.3000 0.2600 0.0100 0.0100 0.0200 0.0020 0.6600
5 1.0000 0.3300 0.0060 0.1000 0.0330 0.4500 0.0150
6 1.5000 0.3300 0.0100 0.0090 0.2750 1.2500 0.0150
7 0.3000 0.3300 0.0260 0.0150 0.4500 0.0050
8 0.2000 0.1500 0.0330 0.0830 0.3500 0.0500
9 0.1800 0.1500 0.0330 0.0450 0.3500 0.0100
10 0.2970 0.5000 0.0330 0.0350 0.0900 0.0500
11 0.1650 0.5000 0.0280 0.0300 0.1000 0.0200
12 0.9000 0.1000 0.0450 0.0050 1.4500 0.0600
13 0.7000 0.5000 0.0350 0.0050 0.0100
14 0.6200 0.2000 0.0350 0.0030 0.2000
15 0.0900 0.1000 0.0350 0.1000
16 0.0600 0.0500 0.0060 0.0600
17 0.0100 0.0060 0.0001 0.0100
18 0.0040 0.4000 0.0002 0.0100
19 0.0100 0.4000 0.0100
20 1.2000 0.1500
Kuli 8.7860 4.4590 0.5753 0.3983 3.9180 1.7620 3.1150
KEPALA PEMBANT KEPALA KEPALA PEMBANT
Mandor TUKANG U TUKANG TUKANG TUKANG MANDOR TUKANG U TUKANG
Kayu KAYU CAT CAT CAT CAT BESI MANDOR BESI
L.03 L.11 L.30 L.19 L.13 L.05 L.12 L.01 L.29
180,000.00 157,500.00 112,500.00 135,000.00 157,500.00 180,000.00 135,000.00 180,000.00 112,500.00
0.0010 0.0050 0.0200 0.0630 0.0063 0.0030 0.2500 0.0050 0.0070
0.0010 0.0060 0.1700 0.2880 0.0288 0.0100 0.0007 0.0050 0.2000
0.0008 0.0400 0.0100 0.0050 1.2500
0.0008 0.0400 0.0600
0.0005 0.0150 0.0750
0.0030 0.0150 0.0100
0.0500 0.0100
0.0500 0.0260
0.0100 0.0330
0.0500 0.0330
0.0200 0.0330
0.0100 0.0030
0.0030
0.0030
0.0005
0.0002
0.0500
0.2500

0.0071 0.3110 0.1900 0.3510 0.0351 0.0130 0.2607 0.6047


MANDOR
BESI
L.04
180,000.00
0.0004
RAB
NCANA ANGGARAN DAN BIAYA
PROYEK : PEMBANGUNAN KANTOR BUMDES LOKASI : MOJOKERTO
TAHUN : 2023-2024

HAFRGA
PEKER VOLUM JUMLA
NO SAT
JAAN E H
SATUAN

1 2 4 5 6 7

PEKER
JAAN
PERSIA
PAN

1
I Pengu
kuran
70,375 70,375.
dan 1 Ls Rp Rp
.0 0
Pemas
angan
Boupla

70,375.
JUMLAH Rp
0

PEKER
JAAN
TANAH
DAN
GALIAN

1
Galia
109,350 1,661,5
n 15,194 M3 M3 Rp Rp Rp Rp
.0 07.6
Tana
h

II
2
Galian
II ponda
si
Strous 109,350 92,706.
0.848 M3 M3 Rp Rp Rp Rp
Pile 3 .0 9
Urug
Tanah
Kemba
li

4 Urug
29,625 38,571.
Pasir 1,302
.0 8
Padat

137,550 1,933,9
14,060
.0 25.5
3,726,7
JUMLAH Rp
11.8

PEKER
JAAN
III
BONGK
ARAN

1
Bong
karan 130,500 1,044,0
8 M3 Rp Rp Rp Rp
bang .0 00.0
unan
lama

2
Pem
ebrsi
han
720,000 720,000
dan 1 Ls
.0 .0
Angk
ut
Bong
karan

1,764,0
JUMLAH Rp
00.0
M3 M2 872,516 Rp Rp 7,882,4
Rp Rp Rp Rp
M2 M2 .0 Rp Rp 84.1
125,636 716,881
.4 .3
PEKERAAN
PASANGAN 125,636 28,868,
DAN .4 732.0
PLESTERAN

1
Pasan
gan
Ponda
44,050. 10,121,
si bt 9.0
0 809.0
kali 2
Pasan
gan
Rollag
IV
3
Pasa
ngan
dindi
ng 5.7
bata
Hebe
l 10 x
20

4
Plest
eran
dan 229.8
Acian
dindi
ng

229.8
47,589,
JUMLAH Rp
906.4
PEKER
JAAN
BETON
1 M1 M3 Rp Rp
Ponda M3 M3 Rp Rp
si M3 M3 Rp Rp
3,095,6
Strous 27 M3 M3 Rp 114,655.0 Rp Rp
85.0
Pile 2 M3 M3 Rp Rp
Sloof M3 M3 Rp Rp
20/40 M3 M3 Rp Rp

3
12,100,
Sloof 3,277 Rp 3,692,906.3
915.2
20/30

4
Kolo
1,329,4
m 0.360 Rp 3,692,906.3
46
20/40
Lt-1

5
Kolom
praktis
6,417,1
15/20 1,728 Rp 3,713,637.5
65.6
6
Balok
20/40

7
Balok 1,404 Rp 114,655.0 160.976
20/30

8 Plat
V Tebal
12 cm
13,906,
Lt-2 9 3,277 Rp 4,244,000.0
739
Kolom
20/40
Lt-2
10
Kolom
praktis
15/20 1,527,8
0.360 Rp 4,244,000.0
Lt-2 11 40
Balok
20/30
Lt-2

12
Rink
24,221,
Balk 6,931 Rp 3,494,592.5
720
Lt-2
15/15

13 Plat
Kanopi
Tebal
6,238,9
12 cm 1,680 Rp 3,713,637.5
11
Lt-atap
14 Plat
Tangga
0.315 Rp 114,655.0 36.116
8,005,8
1,886 Rp 4,244,000.0
82
1,274,5
9,200 Rp 138,542.5
91
8,944,7
2,560 Rp 3,494,592.5
59
6,856,3
1,962 Rp 3,494,592.5
90
94,117,
JUMLAH Rp
136

NO PEKERJAAN

VOLUME SAT

HAFRGA SATUAN

JUMLAH

1 2 4 5 6 7

VI PEKERJAAN KERAMIK DAN PELAPIS DINDING


1 Pemasangan Keramik Lantai 60x60 polos Lt-1
2 Pemasangan Keramik Lantai 60x60 Kasar Lt-1
3 Pemasangan Keramik dinding 20 x 20 Lt-1
4 Pemasangan Plin Keramik 10x60 Lt- 1
5 Pemasangan Keramik Lantai 60x60 polos Lt-2
6 Pemasangan Keramik Lantai 60x60 Kasar Lt-2
7 Pemasangan Keramik dinding 20 x 20 Lt-2
8 Pemasangan Plin Keramik 10x60 Lt-2 9 PemasanganKeramik Tangga

46,184 M2 Rp

23,580 M2 Rp

15.000
M2 Rp
41.726
m1 Rp
40.784
M2 Rp
23,580 M2 Rp

30,000 M2 Rp

53,680 m1 Rp
21,900 M2 Rp

249,239.5

249,239.5

265,951.9

57,590.9

249,239.5

249,239.5

265,951.9
57,590.9
249,239.5
JUMLAH

Rp 11,510,877.1

Rp 5,877,067.4

Rp 3,989,278.5

Rp 2,403,037.9

Rp 10,164,983.8

Rp 5,877,067.4

Rp 7,978,557.0

Rp 3,091,479.5
Rp 5,458,345.1
Rp 56,350,693.6

VII PEKERJAAN KUSEN PINTU DAN JENDELA


1K ### kg Rp

43,192. Rp

4,837,576.8

2 Kusen Aluminium 12 cm
3 Pemasangan Pintu Rolling Door
4 Pemasangan Daun Jendela rangka Alluminium
5 Pemasangan Daun Pintu kaca rangka aluminium
6 Pemasangan Kaca riben 5 mm 7 Pemasangan engsel pintu
8 Pemasangan kunci silinder
9 Pemasangan Handle Pintu tarik Stainless
10 Pemasangan engsel jendela kupu- 11 Pemasangan door closer
12 Pemasangan kunci slot
###
###
###

3,800

52,440
6,000
2,000
2,000

24,000
2,000
28,000

M'. Rp
M2 Rp
M2 Rp

M2 Rp

M2 Rp
Bh Rp
Bh Rp
Bh Rp

Bh Rp
Bh Rp
Bh Rp

146,747.8
250,000.0
568,230.0

568,230.0

98,194.0
69,444.0
195,227.5
231,540.0

93,790.0
319,040.0
65,280.0
JUMLAH

Rp 4,226,335.2
Rp 11,400,000.0
Rp 6,153,930.9

Rp 2,159,274.0

Rp 5,149,293.4
Rp 416,664.0
Rp 390,455.0
Rp 463,080.0

Rp 2,250,960.0
Rp 638,080.0
Rp 1,827,840.0
Rp 37,447,569.3

VIII PEKERJAAN PENUTUP ATAP

1
Rangk
a Atap
10,900,
Baja 61 M2 Rp 178,114.0 Rp
576.8
Ringan
C75x0.
75m

2
Penutu
p Atap
8,686,1
Galval 61 M2 Rp 141,930.0 Rp
16.0
ume
Lebar
75 cm

Tebal
0.5m
m
3
Pemas
842,400
angan 32 M2 Rp 26,000.0 Rp
.0
woodpl
ank

20,429,
JUMLAH Rp
092.8

VOLUM HAFRGA
NO PEKERJAAN SAT JUMLAH
E SATUAN
1 2 4 5 6 7

PEKERJAAN
IX PEMASANGAN
PLAFON
1 Pemasangan
langit-langit
calsi board 52,300. 7,297,3
139,528 M2 Rp Rp
ukuran 5 84.2
(120x240x9)
mm, tebal 4,5
2
Pemasangan 25,320. 3,894,2
153,800 M'. Rp Rp
list langit- 0 16.0
langit gypsum
11,191,
JUMLAH Rp
600.2

PEKERJAAN
X
PENGECATAN
1 Pengecatan
tembok baru
( 1lapis
18,947. 1,741,4
plamuur, 1 91,912 M2 Rp Rp
3 79.7
lapis cat
dasar, 2 lapis
cat
2 Pengecatan
96,433. 13,295,
tembok baru 137,868 M2 Rp Rp
0 024.9
exterior
15,036,
JUMLAH Rp
504.5

PEKERJAAN PELAPIS
XI
DINDING EXTERIOR
Pemasa
921,12 59,292,
1 ngan 64,370 M2 Rp Rp
5.0 816.3
ACP
59,292,
JUMLAH Rp
816.3
PEKERJAAN
XII
UTILITAS
1 Septik Tank 1,500,0 1,500,0
1 Unt Rp Rp
&bResapan 00.0 00.0
2 Pipa 3/4 in
35,000. 210,000
slauran air 6 Ljr Rp Rp
0 .0
bersih
3 Pipa 1 in
35,000. 140,000
slauran air 4 Ljr Rp Rp
0 .0
bersih
4 Pipa 3 in
75,000. 225,000
saluran 3 Ljr Rp Rp
0 .0
pembuangan
5 Pipa 4 in
135,000 540,000
saluran 4 Ljr Rp Rp
.0 .0
pembuangan
87,475. 174,950
6 Stop kran 1 in 2 Bh Rp Rp
0 .0
7 Pemasangan
120,175 360,525
1 buah kran 3 Bh Rp Rp
.0 .0
diameter
½” atau 3/4”
450,000 1,350,0
8 Showe 3/4 in 3 Bh Rp Rp
.0 00.0
9 Floor drain 3 92,100. 184,200
2 Bh Rp Rp
in 0 .0
10 Closed 175,000 350,000
2 Bh Rp Rp
Jongkok .0 .0
11 Pemasangan 1,680,9 6,723,6
4 Unt Rp Rp
wastafel 13.0 52.0
11,758,
JUMLAH Rp
327.0

PEKERJAAN
XIII
MEKANIKAL DAN
ELEKTRIKAL
450,000 450,000
1 Panel Listrik 1 Uni Rp Rp
.0 .0
250,000 500,000
2 kabel NYM 2 Rol Rp Rp
.0 .0
750,000 750,000
3 Pompa Air 1 Uni Rp Rp
.0 .0
19,000. 114,000
4 Stop Kontak 6 Uni Rp Rp
0 .0
22,000. 176,000
5 Saklar Seri 8 Uni Rp Rp
0 .0
6 Saklar 18,000. 72,000.
4 Bh Rp Rp
single 0 0
7 Lampu
145,000 1,450,0
Down Ligt 10 10 Bh Rp Rp
.0 00.0
watt
8 Lampu
35,000. 70,000.
Spoot Light 5 2 Bh Rp Rp
0 0
watt
9 Lampu TL 185,000 1,480,0
8 Bh Rp Rp
Leed 20 watt .0 00.0
10 Pipa
condoit dan 12 Bh Rp 750.0 Rp 9,000.0
acesories
5,071,0
JUMLAH Rp
00.0

PEKER VOLUM HARGA


NO SAT JUMLAH
JAAN E SATUAN
1 2 4 5 6 7

XIV BOP
(Pere
ncan
aan,
Peng
awas
an
Peke
rjaan
dan
Pelap
oran)

Pajak
(PPN
dan 21,747, 21,747,
6% Rp Rp
PPH) 132,- 132,-

45,306, 45,306,
Rp Rp
525,- 525,-
67,053,
JUMLAH Rp
657,-
429,525
JUMLAH TOTAL Rp
,857,-