MOLOSIPAT (BTS. PROV. GORONTALO) -
52.021 39.06 3.30 - - - - 175.60 0.00 82.00 - 3.20
LAMBUNU

52.022 LAMBUNU - MEPANGA 22.80 14.33 5.50 1.30 2.00 - 219.40 20.00 29.80 4720.00 -

52.023 MEPANGA - TINOMBO 22.50 23.23 3.70 6.10 0.50 0.30 443.20 17.20 7.00 - -
(KSO)
NO/JMLH
NO GAMBAR DAFTAR GAMBAR
GAMBAR III JEMBATAN > 6 M
III 01 BERKALA JEMBATAN
I UMUM 52022 - LAMBUNU - MEPANGA
I.1 DAFTAR ISI 01 - 06 JEMBATAN S. OGODAKO 01 - 01
I.2 LEGENDA 02 - 06 52023 - MEPANGA - TINOMBO
I.3 SINGKATAN 03 - 06 JEMBATAN S. LAMBORI -
01 01
I.4 PETA LOKASI PEKERJAAN 04 - 06
I.5 PETA LOKASI QUARY 05 - 06
III 02 REHABILITASI JEMBATAN
I.6 PENJELASAN UMUM 06 - 06
52.021 - MOLOSIPAT (BTS. PROV. GORONTALO) - LAMBUNU
JEMBATAN S. TAOPA 01 - 01
II PAVEMENT
52022 - LAMBUNU - MEPANGA
II - 01 RUTIN MAINTENANCE
JEMBATAN S. OGOTION 01 - 02
52.021 - MOLOSIPAT (BTS. PROV. GORONTALO) - LAMBUNU 01 - 03
JEMBATAN S. LAMBANAU 02 - 02
52022 - LAMBUNU - MEPANGA 02 - 03
52023 - MEPANGA - TINOMBO
52023 - MEPANGA - TINOMBO 03 - 03
JEMBATAN S. AMBESIA 01 - 01
II - 02 RUTIN KONDISI
52.021 - MOLOSIPAT (BTS. PROV. GORONTALO) - LAMBUNU - IV OFF PAVEMENT
01 03
52022 - LAMBUNU - MEPANGA 02 - 03 IV 01 REHABILITASI/ BERKALA JEMBATAN < 6 M
52023 - MEPANGA - TINOMBO 03 - 03 52022 - LAMBUNU - MEPANGA
DRAINASE / CROSS DRAIN / BAHU (STA. 15+500 - STA. 19+500) 01 - 01
II - 03 HOLDING 52.021 - MOLOSIPAT (BTS. PROV. GORONTALO) - LAMBUNU
52022 - LAMBUNU - MEPANGA 01 - 02 JEMBATAN S. TOMPENG 01 - 01
52023 - MEPANGA - TINOMBO 02 - 02

II - 04 MINOR REHABILITASI
52022 - LAMBUNU - MEPANGA (STA. 5+300 - STA. 5+600) 01 - 07
52022 - LAMBUNU - MEPANGA (STA. 21+700 - STA. 22+700) 02 - 07
52023 - MEPANGA - TINOMBO (STA. 16+600 - STA. 18+100) 03 - 07
52023 - MEPANGA - TINOMBO (STA. 22+400 - STA. 23+400) 04 - 07
52023 - MEPANGA - TINOMBO (STA. 26+200 - STA. 26+900) 05 - 07
52023 - MEPANGA - TINOMBO (STA. 27+400 - STA. 28+900) 06 - 07
52023 - MEPANGA - TINOMBO (STA. 36+100 - STA. 37+500) 07 - 07

II - 05 MAJOR REHABILITASI
52022 - LAMBUNU - MEPANGA (STA. 15+800 - STA. 16+200) 01 - 04
52022 - LAMBUNU - MEPANGA (STA. 17+500 - STA. 18+500) 02 - 04
52022 - LAMBUNU - MEPANGA (STA. 25+000 - STA. 25+600) 03 - 04
52023 - MEPANGA - TINOMBO (STA. 53+400 - STA. 53+900) 04 - 04

II - 06 REKONSTRUKSI
52023 - MEPANGA - TINOMBO (STA. 6+600 - STA. 6+900) 01 - 01
K
o
d
e K
e
gi
a
t
n
/
O
u
p
P
k
LOKASI QUARRY
NO LOKASI QUARRI KM CADANGAN MATERIAL
- SIRTU
1 TINOMBO 215+000 - PASIR
- BATU KALI
- SIRTU
2 S. LAMBUNU 317+200 - PASIR
- BOULDER
- SIRTU
3 S. DONGGULU 325+200 - PASIR
- BATU KALI
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
0+000

0+100

0+200

0+300

0+400

0+500

0+600

0+700

0+800

0+900

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.80 6.40 7.70 5.20 7.30 8.00 6.10 5.00 4.00 5.00
IRI Oposite SEMESTER-1 TAHUN 2023 7.40 5.60 6.90 5.30 5.30 5.80 4.00 5.80 3.50 3.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.6 6.0 7.3 5.3 6.3 6.9 5.1 5.4 3.8 4.4
6+900

7+000

7+100

7+200

7+300

7+400

7+500

7+600

7+700

7+800

STATION
IRI Normal SEMESTER-1 TAHUN 2023 9.90 9.30 8.70 8.20 8.30 8.50 7.30 5.50 3.00 6.60
IRI Oposite SEMESTER-1 TAHUN 2023 5.00 5.80 7.00 8.70 8.50 8.70 7.00 5.00 3.20 6.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.5 7.6 7.9 8.5 8.4 8.6 7.2 5.3 3.1 6.3
8+200

8+300

8+400

8+500

8+600

8+700

8+800

8+900

9+000

9+100

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 8.20 8.50 8.90 10.10 6.80 3.80 7.90 7.00 8.00
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 8.10 8.30 8.00 9.70 5.30 3.80 5.80 6.00 5.30
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.9 8.2 8.4 8.5 9.9 6.1 3.8 6.9 6.5 6.7
10+000

10+100
9+200

9+300

9+400

9+500

9+600

9+700

9+800

9+900

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 7.60 7.80 8.00 6.80 7.60 8.00 9.50 8.80 7.00
IRI Oposite SEMESTER-1 TAHUN 2023 6.40 5.30 7.00 8.00 6.20 6.70 8.00 10.10 7.10 5.90
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.2 6.5 7.4 8.0 6.5 7.2 8.0 9.8 8.0 6.5
10+400

10+500

10+600

10+700

10+800

10+900

11+000

11+100

11+200

11+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 3.80 4.10 5.00 5.50 8.10 7.50 7.60 8.10 8.00
IRI Oposite SEMESTER-1 TAHUN 2023 8.20 3.60 3.60 5.00 7.00 8.10 7.50 7.50 8.10 8.90
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.1 3.7 3.9 5.0 6.3 8.1 7.5 7.6 8.1 8.5
15+500

15+600

15+700

15+800

15+900

16+000

16+100

16+200

16+300

16+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 5.40 6.80 7.00 8.50 10.10 10.40 10.90 8.00 6.90 7.80
IRI Oposite SEMESTER-1 TAHUN 2023 4.50 6.50 6.80 8.00 10.90 10.60 8.00 7.60 5.90 5.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 5.0 6.7 6.9 8.3 10.5 10.5 9.5 7.8 6.4 6.8
15+500

15+600

15+700

15+800

15+900

16+000

16+100

16+200

16+300

16+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 5.40 6.80 7.00 8.50 10.10 10.40 10.90 8.00 6.90 7.80
IRI Oposite SEMESTER-1 TAHUN 2023 4.50 6.50 6.80 8.00 10.90 10.60 8.00 7.60 5.90 5.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 5.0 6.7 6.9 8.3 10.5 10.5 9.5 7.8 6.4 6.8
18+500

18+600

18+700

18+800

18+900

19+000

19+100

19+200

19+300

19+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 5.60 7.20 5.60 4.80 6.20 4.60 4.00 4.00 7.80
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 5.90 7.40 5.90 8.00 7.00 4.90 4.00 5.90 7.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.0 5.8 7.3 5.8 6.4 6.6 4.8 4.0 5.0 7.4
20+400

20+500

20+600

20+700

20+800

20+900

21+000

21+100

21+200

21+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 4.00 5.10 6.10 5.40 4.80 6.30 5.10 6.80 7.50
IRI Oposite SEMESTER-1 TAHUN 2023 7.50 4.90 5.80 5.50 5.30 5.50 4.00 5.60 5.40 8.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.8 4.5 5.5 5.8 5.4 5.2 5.2 5.4 6.1 7.8
22+700

22+800

22+900

23+000

23+100

23+200

23+300

23+400

23+500

23+600

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.40 7.00 8.70 6.80 7.30 7.80 7.90 7.80 7.40 7.30
IRI Oposite SEMESTER-1 TAHUN 2023 7.50 6.60 8.60 6.40 6.80 6.50 6.80 8.00 7.30 6.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.5 6.8 8.7 6.6 7.1 7.2 7.4 7.9 7.4 7.1
24+200

24+300

24+400

24+500

24+600

24+700

24+800

24+900

25+000

25+100

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.60 6.00 5.80 5.10 4.00 5.60 5.90 8.30 9.10 12.10
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 6.50 5.50 4.00 4.00 5.70 5.20 8.50 9.50 9.60
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.7 6.3 5.7 4.6 4.0 5.7 5.6 8.4 9.3 10.9
26+300

26+400

26+500

26+600

26+700

26+800

26+900

27+000

27+100

27+200

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.10 7.50 6.50 6.50 7.30 6.50 11.80 5.20 7.80 5.80
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 4.00 5.40 5.60 6.00 5.80 4.80 5.00 8.90 6.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.0 5.8 6.0 6.1 6.7 6.2 8.3 5.1 8.4 5.9
32+700

32+800

32+900

33+000

33+100

33+200

33+300

33+400

33+500

33+600

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 4.60 5.60 6.50 6.40 5.00 4.60 4.20 4.60 4.20
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 5.60 8.00 6.80 6.60 5.90 5.40 6.60 5.00 7.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.0 5.1 6.8 6.7 6.5 5.5 5.0 5.4 4.8 5.6
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
1+300

1+400

1+500

1+600

1+700

1+800

1+900

2+000

2+100

2+200

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 5.20 3.70 3.60 5.10 5.70 5.30 4.90 3.90 5.70
IRI Oposite SEMESTER-1 TAHUN 2023 8.80 4.30 3.80 4.00 5.00 4.80 5.20 5.30 5.80 5.20
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.4 4.8 3.8 3.8 5.1 5.3 5.3 5.1 4.9 5.5
4+600

4+700

4+800

4+900

5+000

5+100

5+200

5+300

5+400

5+500

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.50 7.00 3.60 4.80 3.80 7.30 4.20 5.60 6.20 3.40
IRI Oposite SEMESTER-1 TAHUN 2023 7.60 6.90 4.40 4.80 4.00 5.80 3.80 5.50 5.50 3.90
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.6 7.0 4.0 4.8 3.9 6.6 4.0 5.6 5.9 3.7
6+900

7+000

7+100

7+200

7+300

7+400

7+500

7+600

7+700

7+800

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.90 4.30 5.10 4.50 4.20 5.20 6.60 5.40 3.80 4.60
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 4.80 4.30 3.90 3.90 3.20 3.20 3.10 4.20 5.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.9 4.6 4.7 4.2 4.1 4.2 4.9 4.3 4.0 4.8
11+300

11+400

11+500

11+600

11+700

11+800

11+900

12+000

12+100

12+200

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 4.90 5.20 6.40 5.60 4.00 5.80 8.10 4.00 4.40
IRI Oposite SEMESTER-1 TAHUN 2023 6.60 5.70 5.30 4.00 3.90 4.00 4.80 5.20 3.60 3.60
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.3 5.3 5.3 5.2 4.8 4.0 5.3 6.7 3.8 4.0
14+500

14+600

14+700

14+800

14+900

15+000

15+100

15+200

15+300

15+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.70 6.00 8.00 8.90 8.50 6.80 3.00 4.70 3.70 4.40
IRI Oposite SEMESTER-1 TAHUN 2023 7.30 6.10 8.00 8.50 8.30 6.50 3.80 5.00 3.80 3.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.0 6.1 8.0 8.7 8.4 6.7 3.4 4.9 3.8 4.1
15+700

15+800

15+900

16+000

16+100

16+200

16+300

16+400

16+500

16+600

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 3.80 7.60 8.00 7.50 8.20 3.20 4.10 5.60 8.00
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 5.60 7.80 8.80 8.10 7.30 3.80 5.10 5.50 7.10
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.9 4.7 7.7 8.4 7.8 7.8 3.5 4.6 5.6 7.6
19+900

20+000

20+100

20+200

20+300

20+400

20+500

20+600

20+700

20+800

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.30 7.80 6.30 6.30 7.80 8.00 6.10 6.00 5.00 5.30
IRI Oposite SEMESTER-1 TAHUN 2023 8.70 8.00 6.80 6.70 6.60 6.50 7.80 5.70 5.20 5.60
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.5 7.9 6.6 6.5 7.2 7.3 7.0 5.9 5.1 5.5
21+500

21+600

21+700

21+800

21+900

22+000

22+100

22+200

22+300

22+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.70 8.50 8.00 8.00 7.70 7.10 7.00 7.40 8.00 8.20
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 8.20 8.00 8.00 7.50 7.00 6.20 7.00 7.00 8.30
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.3 8.4 8.0 8.0 7.6 7.1 6.6 7.2 7.5 8.3
23+400

23+500

23+600

23+700

23+800

23+900

24+000

24+100

24+200

24+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.30 8.00 7.20 7.20 6.20 5.00 5.10 5.00 6.20 6.20
IRI Oposite SEMESTER-1 TAHUN 2023 7.00 7.00 7.70 7.50 6.70 5.20 5.00 6.00 6.90 6.70
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.2 7.5 7.5 7.4 6.5 5.1 5.1 5.5 6.6 6.5
32+100

32+200

32+300

32+400

32+500

32+600

32+700

32+800

32+900

33+000

STATION
IRI Normal SEMESTER-1 TAHUN 2023 6.50 4.00 4.00 3.10 3.30 4.00 5.60 6.20 4.90 5.00
IRI Oposite SEMESTER-1 TAHUN 2023 8.40 3.90 5.10 5.30 5.50 4.00 5.10 5.70 4.50 5.20
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.5 4.0 4.6 4.2 4.4 4.0 5.4 6.0 4.7 5.1
33+100

33+200

33+300

33+400

33+500

33+600

33+700

33+800

33+900

34+000

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 8.00 7.10 5.50 6.20 5.70 6.40 6.20 5.50 4.80
IRI Oposite SEMESTER-1 TAHUN 2023 7.60 5.50 4.00 4.50 7.20 5.10 4.50 6.60 5.00 5.20
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.8 6.8 5.6 5.0 6.7 5.4 5.5 6.4 5.3 5.0
34+600

34+700

34+800

34+900

35+000

35+100

35+200

35+300

35+400

35+500

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.50 5.90 6.30 6.40 5.70 7.80 9.00 6.20 5.20 3.80
IRI Oposite SEMESTER-1 TAHUN 2023 7.80 5.70 6.10 6.80 7.00 7.20 9.60 6.50 6.70 5.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.2 5.8 6.2 6.6 6.4 7.5 9.3 6.4 6.0 4.4
37+900

38+000

38+100

38+200

38+300

38+400

38+500

38+600

38+700

38+800

STATION
IRI Normal SEMESTER-1 TAHUN 2023 6.80 4.00 3.90 3.10 4.30 4.00 7.80 3.80 5.00 6.70
IRI Oposite SEMESTER-1 TAHUN 2023 7.50 4.30 5.00 4.00 4.00 4.00 4.60 3.80 5.20 3.90
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.2 4.2 4.5 3.6 4.2 4.0 6.2 3.8 5.1 5.3
55+000

55+100

55+200

55+300

55+400

55+500

55+600

55+700

55+800

55+900

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.80 7.00 6.10 7.30 5.40 5.90 5.80 6.30 6.70 4.00
IRI Oposite SEMESTER-1 TAHUN 2023 6.50 5.40 5.60 6.80 5.50 6.30 6.80 6.30 5.70 4.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.2 6.2 5.9 7.1 5.5 6.1 6.3 6.3 6.2 4.0
(KSO)
(KSO)
(KSO)
(KSO)
5+300

5+400

5+500

5+600

5+700

5+800

5+900

6+000

6+100

6+200

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.90 9.20 10.10 3.80 6.50 6.20 7.00 6.00 6.10 7.00
IRI Oposite SEMESTER-1 TAHUN 2023 8.30 8.00 8.70 3.50 6.60 6.80 6.50 4.80 4.40 6.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.6 8.6 9.4 3.7 6.6 6.5 6.8 5.4 5.3 6.9
(KSO)
(KSO)
(KSO)
21+700

21+800

21+900

22+000

22+100

22+200

22+300

22+400

22+500

22+600

STATION
IRI Normal SEMESTER-1 TAHUN 2023 6.90 6.70 6.00 8.00 10.80 8.30 7.90 8.10 8.10 8.20
IRI Oposite SEMESTER-1 TAHUN 2023 8.30 7.00 9.40 8.50 10.20 8.90 7.90 7.80 8.40 8.10
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.6 6.9 7.7 8.3 10.5 8.6 7.9 8.0 8.3 8.2
(KSO)
(KSO)
(KSO)
16+600

16+700

16+800

16+900

17+000

17+100

17+200

17+300

17+400

17+500

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.00 8.50 7.60 8.00 8.10 7.80 7.50 7.80 7.50 8.10
IRI Oposite SEMESTER-1 TAHUN 2023 7.10 6.80 6.40 8.00 8.10 8.00 6.80 9.10 7.20 8.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.6 7.7 7.0 8.0 8.1 7.9 7.2 8.5 7.4 8.1
17+600

17+700

17+800

17+900

18+000

18+100

18+200

18+300

18+400

18+500

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.60 6.80 8.00 7.20 7.40 6.00 7.30 5.70 4.30 3.80
IRI Oposite SEMESTER-1 TAHUN 2023 8.20 10.30 9.20 7.60 7.00 6.30 6.00 6.20 4.60 5.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 7.9 8.6 8.6 7.4 7.2 6.2 6.7 6.0 4.5 4.4
(KSO)
(KSO)
(KSO)
(KSO)
22+400

22+500

22+600

22+700

22+800

22+900

23+000

23+100

23+200

23+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.20 8.70 7.60 7.00 8.20 7.50 6.50 7.60 8.20 6.20
IRI Oposite SEMESTER-1 TAHUN 2023 8.30 8.40 8.00 7.50 8.00 7.90 6.40 7.60 7.20 6.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.3 8.6 7.8 7.3 8.1 7.7 6.5 7.6 7.7 6.5
(KSO)
(KSO)
(KSO)
(KSO)
26+200

26+300

26+400

26+500

26+600

26+700

26+800

26+900

27+000

27+100

STATION
IRI Normal SEMESTER-1 TAHUN 2023 7.80 8.50 9.80 6.80 8.10 8.50 9.00 6.80 6.50 7.20
IRI Oposite SEMESTER-1 TAHUN 2023 5.10 8.00 9.50 8.00 8.30 8.50 8.30 4.50 5.20 5.10
IRI RATA-RATA SEMESTER-1 TAHUN 2023 6.5 8.3 9.7 7.4 8.2 8.5 8.7 5.7 5.9 6.2
(KSO)
(KSO)
(KSO)
(KSO)
27+400

27+500

27+600

27+700

27+800

27+900

28+000

28+100

28+200

28+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.20 5.70 6.80 5.00 8.30 8.70 12.60 8.80 9.10 7.50
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 6.30 6.80 5.20 8.00 8.50 9.60 8.90 8.40 7.60
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.1 6.0 6.8 5.1 8.2 8.6 11.1 8.9 8.8 7.6
28+400

28+500

28+600

28+700

28+800

28+900

29+000

29+100

29+200

29+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 6.00 7.80 7.20 7.90 6.60 5.50 3.90 3.60 3.60 5.80
IRI Oposite SEMESTER-1 TAHUN 2023 6.60 7.20 8.10 7.50 5.40 5.70 3.10 3.80 3.80 5.60
IRI RATA-RATA SEMESTER-1 TAHUN 2023 6.3 7.5 7.7 7.7 6.0 5.6 3.5 3.7 3.7 5.7
(KSO)
(KSO)
(KSO)
(KSO)
36+100

36+200

36+300

36+400

36+500

36+600

36+700

36+800

36+900

37+000

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.10 10.30 8.60 8.30 8.00 8.30 7.00 6.50 7.20 8.10
IRI Oposite SEMESTER-1 TAHUN 2023 8.10 11.00 8.60 8.40 6.00 7.80 5.00 6.20 6.00 8.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.1 10.7 8.6 8.4 7.0 8.1 6.0 6.4 6.6 8.1
37+100

37+200

37+300

37+400

37+500

37+600

37+700

37+800

37+900

38+000

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.80 8.90 8.00 5.20 5.30 4.60 5.50 5.70 6.80 4.00
IRI Oposite SEMESTER-1 TAHUN 2023 8.90 8.70 8.10 6.00 5.70 4.00 6.30 6.30 7.50 4.30
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.9 8.8 8.1 5.6 5.5 4.3 5.9 6.0 7.2 4.2
(KSO)
(KSO)
(KSO)
(KSO)
15+800

15+900

16+000

16+100

16+200

16+300

16+400

16+500

16+600

16+700

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.50 10.10 10.40 10.90 8.00 6.90 7.80 9.20 8.30 8.60
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 10.90 10.60 8.00 7.60 5.90 5.80 5.80 5.60 6.00
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.3 10.5 10.5 9.5 7.8 6.4 6.8 7.5 7.0 7.3
(KSO)
(KSO)
PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 01
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 0+000 - 0+350

15
2.
122 000
.000

14
8.
00
118.0

0
00

114.0
00

14
CT

0.
00
0
TC = 1

0
=
110.0

00
00 13

2.
6

0
.0

15

00
15
00

8.

0
14

00
+5
106.0

4.
13
00

14
2.
5+507

00
50

22
42
0
+5

50

6,904.7
.00
140.000
.35
15

136

. 15+8
128
.0

9
0 0 00
102.00
15+50 00
.4

2.
0

X = 25
13
03

TC
96.000 00

15+

136.000
MEPAN 8.
0
UNU

pit Sta
=1

22
00 12
LAMB
0
G A 96.0 CT
Y = 53 4.
00

6,804.7
12

600
=1 ,802.65

5+
5+ 6

132
591

56

2
.00

Im
2
.64

X = 25
0

6,754.7
128
4.3
3

Garis
.00

CT
31
94.000

0
Y = 53

X = 25
,802.65

=1
12
6

TC
4.0
120

00
22

90.000

5+8
=
.0

CT
6,654.7

15
116

00
0

+8

69.4
=
.00
86.000
80

15
120

30
+ .00
X = 25

+7
0
15

.2

5
67

0
88
.22
116.000
Y = 53
,752.65

8
11
6

108

2.0
.00
80.000

00

TC = 15
0
98
.00 112.000

15+
0 TC

CT = 15
0
= .00
15+ 112

6
655

50

+
94 .90
.00

728.872
750
0 1 108.000
0
.00
15+

+694.87
108
90

22
.0
00

6,854.7
AWAL PEKERJAAN 104.0
00
15+700
86
.0
0
X = 256835.00

0
0 0
KORDINAT .00

X = 25
104
Y = 53
Y = 53779.00
80 ,752.65
.0
00 6
0
.00
100

10
0.0
00

76
.0
00

117.635

120.902

124.580
Elevasi
Rencana
100.07

100.83

101.91

104.16

107.24

110.45

113.92

117.45

120.72

124.40
94.59

94.79

96.36

98.78

99.63

Elevasi
Eksisting

STA. 15+500 15+550 15+600 15+650 15+700 15+750 15+800 15+850


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 02
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
POTONGAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 0+000 - 0+350
137.0 137.0
136.0 136.0
135.0 135.0
134.0 134.0
133.0 133.0
132.0 132.0
131.0 131.0
130.0 130.0
129.0 129.0
128.0 128.0
127.0 127.0
126.0 126.0
125.0 125.0
124.0 124.0
123.0 123.0
122.0 122.0
121.0 121.0
120.0 120.0
119.0 % 119.0
.09
118.0 13 118.0
117.0 117.0
116.0 116.0
115.0 115.0
114.0 114.0
113.0 113.0
112.0 112.0
111.0 111.0
110.0 % 110.0
.06
13
109.0 109.0
108.0 108.0
107.0 107.0
106.0 106.0
105.0 105.0
104.0 104.0
103.0 103.0
102.0 102.0
101.0 101.0
3.96%
100.0 1.84% 100.0
99.0 99.0
98.0 98.0
97.0 % 97.0
8.09
96.0 96.0
95.0 95.0
-1.10%
94.0 94.0
93.0 93.0
92.0 92.0
91.0 91.0
90.0 90.0

117.635

120.902

124.580
Elevasi
Rencana
100.07

100.83

101.91

104.16

107.24

110.45

113.92

117.45

120.72

124.40
94.59

94.79

96.36

98.78

99.63

Elevasi
Eksisting

STA. 15+500 15+550 15+600 15+650 15+700 15+750 15+800 15+850


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 03
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 15+850 - 16+200

18
8.
00
0

.656
00
3,852

4.722
176.0
Y=5

57,05
18
0 4.
172.00 00
0
164.000
.656

X=2
3,802
Y=5
0
168.00
152.0

2
00 180.0

4.72
00
160.000
148

57,20
.0 164.000
00
0
160.00

X=2
C
TCT=
.000
156

= 15+924.413
.65 6

TC
3,852 00

15+9
140
156.0
Y=5
.00

CT =
0 148.000

T
=
4.722

144.000

C = 16

CT = 16+188.751
16+

16+
136
29.81 50 000
15+9
.000 168

16+0
.000
56,90

024
00
152.0
0
16+10

+169
132
6
.000
X=2

7
15+900
164

561 .
.00

5.90
0
16+15
0

.962

Garis Impit Sta. 16+200


128.000

TC =

9
16+050

CT
0 5
+8

=
5+96

15+
5

13

CT = 1
6.0

TC =
.1

0 0
Sta

LAMBUNU

9
CT = 15+869.4

7.149
A

99.
NG
0

13

16+0
it
.00

2
00

.00

6+123
EPA
mp

38
128

0
4.0
12

4
160.000
M
sI

12

9
8.
00
ri

5.30
0
Ga

.329
120.000
156.000
TC

8
12
=1 4.0

4.722
00
5+8
50

30.2 116
.000 X = 257098.42 AKHIR PEKERJAAN

57,05
67 12 BM. Y = 53775.87
152.000
0.0
00
Z= 150.637 X = 257191.74

X=2
X = 257098.42 KORDINAT
112
.000 8.0
00 Y = 53757.84
11
6.0
6
14 BM. Y = 53775.87
52.65
00

00 Y = 53,7 Z= 150.637
108.0 11
2.0
00 00
4.0
4.722

14

14
.722
104.000

8
0

.0
56,95
00

00
2.
11

57,154
00

X=2

140.000
0
8.

10
10

8.0

X=2
00

.656 .656
3,752 3,702
Y=5 Y=5
0
00

AN 00

14
4.

132.000
RJA
10

4.0
.722

100.0
EKE 56835 0
00

00
P
0

AL 2 79.0
00
6,854

=
0.

W X 537
10

A
T =
INA Y
5
X=2

R D
KO
.656
3,752
Y=5

117.635

120.902

124.580
Elevasi
Rencana
100.07

100.83

101.91

104.16

107.24

110.45

113.92

117.45

120.72

124.40
94.59

94.79

96.36

98.78

99.63

Elevasi
Eksisting

STA. 15+850 15+900 15+950 16+000 16+050 16+100 16+150 16+200


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 04
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
POTONGAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 15+850 - 16+200
168.0 168.0
167.0 167.0
166.0 166.0
165.0 165.0
164.0 164.0
163.0 163.0
162.0 162.0
161.0 161.0
160.0 160.0
159.0 159.0
158.0 158.0
.1 5%
157.0 12 157.0
156.0 156.0
155.0 155.0
154.0 154.0
153.0 153.0
152.0 152.0
151.0 151.0
-0.77%
150.0 150.0
149.0 149.0
148.0 148.0
147.0 147.0
146.0 146.0
1%
145.0
15.2 145.0
144.0 144.0
143.0 143.0
142.0 142.0
141.0 141.0
140.0 140.0
139.0 139.0
.05%
138.0 12 138.0
137.0 137.0
136.0 136.0
135.0 135.0
134.0 134.0
133.0 133.0
132.0 132.0
131.0 131.0
130.0 130.0
%
.51
129.0 15 129.0
128.0 128.0
127.0 127.0
126.0 126.0
125.0 125.0
PERKERASAN EKSISTING : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb)
124.0 + 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb) 124.0
123.0
PERKERASAN PELEBARAN : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb) 123.0
+ 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb)
122.0 + 30.0 cm Lapis Fondasi Aggregat Kelas A 122.0
121.0 121.0
124.580

128.493

132.254

135.920

139.181

142.630

146.357

149.186

150.370

150.249

150.909

153.054

155.944

158.982

162.063
Elevasi
Rencana
124.40

128.31

132.07

135.74

139.00

142.45

146.18

149.01

150.19

150.07

150.73

152.87

155.76

158.80

161.88
Elevasi
Eksisting

STA. 15+850 15+900 15+950 16+000 16+050 16+100 16+150 16+200


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 05
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 16+200 - 16+550

240.000
20
0.
00
0
236.000

56
Y = 53,802.6 236.000
.722

19 232.000
6.
56 00
Y = 53,802.6 0
X = 257,254

232.000
.722

19 228.000
X = 257,204

2.
00
0
0
228.00

0
224.00
18 220.000
8.0
00
220.000 56
Y = 53,752.6
TC

.722
216.000
18 216.000
CT = 1
= 16

4.0
00

X = 257,504
212.000 212.000
56
Y = 53,752.6
+16

18
6

.722
0.0
00
+188.7

208.000 208.000
9.

X = 257,404
962

+550
17 204.000
00

6 204.000
.0
00
51

. 16+2

200.000
16+500

TC = 1

CT = 16

Garis Impit Sta. 16


172.0
00 196.000
MEPAN 16+450
pit Sta

168.000
GA 16+25 192.000 LAMBUNU
6+304
0

+356.4
16+400
188.000
Garis Im

184.000

CT = 16+529.031
160.0

TC = 16+
.724
00
16+30
0

25
156.000
160
.000 16+350 188.000

CT = 16+
TC = 1
156
.000

490.964
152.000 184.000

6+411.3
180.000
.722

420.596
176.000
56
Y = 53,702.6
X = 257,254

.722
176.000
15

17
172.0
2.0

00

X = 257,354
00

168 172.000
56 .000
Y = 53,702.6
16

.722
4 .00
0
160.000

X = 257,554
.722
X = 257,504
56
Y = 53,652.6
162.063

Elevasi
Rencana
161.88

164.62

166.76

168.74

171.12

173.88

176.87

180.00

183.19

186.12

188.37

190.11

191.68

193.42

195.54
Elevasi
Eksisting

STA. 16+200 16+250 16+300 16+350 16+400 16+450 16+500 16+550


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 06
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI DAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 16+200 - 16+550
207.0 207.0
206.0 206.0
205.0 205.0
204.0 204.0
203.0 203.0
202.0 202.0
201.0 201.0
200.0 200.0
199.0 199.0
198.0 198.0
197.0 197.0
196.0 196.0
4%
195.0 8.8 195.0
194.0 194.0
193.0 193.0
192.0 192.0
191.0 191.0
190.0 190.0
6 .58%
189.0 189.0
%
188.0 7.90 188.0
187.0 187.0
186.0 186.0
185.0 185.0
184.0 184.0
183.0 183.0
182.0 182.0
181.0 181.0
180.0 180.0
%
.88
179.0 12 179.0
178.0 178.0
177.0 177.0
176.0 176.0
175.0 175.0
174.0 174.0
173.0 173.0
172.0 172.0
171.0 171.0
170.0 170.0
169.0 169.0
%
168.0 8.07 168.0
167.0 167.0
166.0 166.0
165.0 165.0
164.0 164.0
163.0 163.0
162.0 162.0
161.0 161.0
160.0 160.0
162.063

Elevasi
Rencana
161.88

164.62

166.76

168.74

171.12

173.88

176.87

180.00

183.19

186.12

188.37

190.11

191.68

193.42

195.54
Elevasi
Eksisting

STA. 16+200 16+250 16+300 16+350 16+400 16+450 16+500 16+550


(KSO)
(KSO)
(KSO)
(KSO)
17+500

17+600

17+700

17+800

17+900

18+000

18+100

18+200

18+300

18+400

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.30 8.80 8.10 8.90 7.80 8.50 8.90 9.50 10.90 8.10
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 9.10 8.90 8.40 10.20 8.90 11.80 9.80 10.90 8.90
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.2 9.0 8.5 8.7 9.0 8.7 10.4 9.7 10.9 8.5
(KSO)
(KSO)
PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 07
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI DAN POTONGAN
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA MEMANJANG JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 17+250 - 17+600
0
.00

56
6
25

52.6

56
53,3

N
02. 6
2
4.72

Y=

53, 3

6
5
.722 58,1

5
02.6
,104 2
X=

Y=
258

56
X=

53,2

52.6
260.000

Y=
0

53,1
0
2 4.0
4.72 26
5
58,1 17+550

Y=
2
X= 0
00

CT =
8.
26 260
.00
0

TC = 17+261.

17+
264.00
0 17+35 26
0 4.0

3
00

09.7
26
8.0

C
260

a. 17+250
.00 00

T
4
0

=
00
17+3

T
871
256

C
17
.000
TC =

0
=

60
17+

+
517.

17

7+
TC =

63
MEPANGA 924

.1
Garis Impit St

.49

ta
28 22

71
0.0 54.7

tS
26

17+
LA

8
00
00 8. 58,1

.62
28 27 00 2

pi
4.0
00 M 2. 0 X=

5
00

Im
BU

27
28 0

6
17+
3
8.0

6.0
00

56
CT

34.6
N

00
29

ris
2.0
=1 U

52.6
00 C

Ga
7+ 29
256 6.0 TC T =
.000 00

1
377

53,0
30

1
.62 0.00 = 17
4 0
30 17 +

17+

Y=
4.0
00 +6 60
10 8.1

4
256.000

00
.6 14
CT = 24
TC AWAL PEKERJAAN

260.000
=1 17+
472.
414
7+ 137 X = 258085.22
KORDINAT

284.000
288.000
292.00
300.00

296
304.000
.77
Y = 53151.07

308
22
9 04.7

.000
56

.00
.722 58,1

0
0
26

02.6
=2

0
,054
56

4.

17+650
58 X

00
=2 CT = 17+645.551
02.6

0
450

53,1
X
17+
53,3

56

Y=
02.6
Y=

TC = 17+655.495

53,2
22
04.7
58,0

Y=
2
X=
276.0 CT 276.0
00 =
8.0
26 17+
275.0 677 275.0
.71
4
274.0 274.0
273.0 273.0
%
272.0 8.44 272.0
271.0 271.0
270.0 270.0
269.0 % 269.0
.73
268.0 10 268.0
267.0 267.0
266.0 266.0
265.0 % 265.0
.98
264.0
10 264.0
263.0 263.0
262.0 262.0
261.0 261.0
260.0 % 260.0
.82
259.0
13 259.0
258.0 258.0
257.0 257.0
256.0 PERKERASAN EKSISTING : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb) 256.0
+ 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb)
255.0 3.55% PERKERASAN PELEBARAN : 4.0 cm Laston Lapis Aus Asbuton 255.0
(AC-WC Asb)
254.0 -0.37% + 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb) 254.0
+ 30.0 cm Lapis Fondasi Aggregat Kelas A
253.0 253.0
252.0 252.0

266.424

269.093

271.485

273.596

275.953
Elevasi
Rencana
255.26

254.70

254.03

253.81

254.13

254.64

255.45

257.32

260.29

263.50

266.24

268.91

271.31

273.46

275.77
Elevasi
Eksisting

STA. 17+250 17+300 17+350 17+400 17+450 17+500 17+550 17+600


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 08
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 17+600 - 17+950

N
288 32
.00 8.0
0 00

32
4.0
0 0
32
0 .00
0
31
6.0
00
X

6
6

.65
= 31

.65
284.00 25 2 .00
0

02
0

02
8,0

8
9

,
54

52
,
52
.72

=
280.000 30

=
2 8.

Y
00

Y
0 X
=
25

30
7

4.
,95

00
0
4.7
22
X 280.000
56

=
2.6

25
8,1
284.000
,05

54
00
53

.72 .0

CT =
2 268
=

CT = 1
288.000

TC = 17
Y

.000
TC

272

TC = 17+728.

17+7
CT = 17+677.714

292.000

CT = 17+704.
TC = 17+698.377
=

7+905
.000
17+

276
17+800

a. 17+950
296.000

67
00

872.142
655

.883
7+6

17+ 17+850

.159
00 276.000
4.0 650
.49

26
a. 1

17+900
0
17+750
.00 280.000
68

641
5

2
t St

773
A

Garis Impit St
ANG 17+700 284.00
0 LAMBUNU
MEP
pi

TC == 17+6

CT = 17
CT

284

TC =
288 .000
is Im

304.000
292 .000
CT

CT = 17+9
.000

TC = 1
308.000
17+ 08.11

=
Gar

296.000

17+7
0 308.00
17+

.00 312.000 0

+822.27
80
610. 4

2 312.000
00 300.0

7+921
4.0

6
00
6

28

.65
85.78
316.000
TC

00
45.

8.0

52
624

28

50.345
00 304

,8
=

2.0
CT

.00 320.000 316.000

52
29 0
51

296.000
17

.029
00

=
6.0
=

29

Y
+5

308.000 X 324.000
00 300.000
17

= 320.000 X
0.0 25
30
=
71
+5

8,1 328.000 25
00
4.0
7,9
.62

04 304.000
30
63

.72
4 4.7 0
92
332.0
6

2
00
.49

22
. 308.000

17

6
56

.65
.000
8

00
+5
2.6

312.0 324

02
0

17

,0
3,1

00

53
.0 0 00
316 0
5

= 36.0 8.0

=
=

3 32
TC

Y
Y
51. 22

00
X
2.0
=
T X = JAAN
531 085.

25 33
07

8,0
00
6.0
04 0
.00
Y = 58

.72 340 33
ER
2

2
00
PEK

0.0
34

00
AL

4.0
34
AW

INA
RD

00
348.0
KO

29
6.0

3 7
0

.1
0
29

72
2.
00
28

+4
0
8.
00

17
TC = 17+414.779

28

0
4.
17+450

00

=
280

CT
.000
276.00
0
275.953

278.289

280.882

282.863

284.187

285.577

287.696

290.944

294.593

297.952

301.667
301.671

305.219

308.612

312.430

316.518
Elevasi
Rencana
275.77

278.11

280.70

282.68

284.01

285.40

287.52

290.76

294.41

297.77

301.49

305.04

308.43

312.25

316.34
Elevasi
Eksisting

STA. 17+600 17+650 17+700 17+750 17+800 17+850 17+900 17+950


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 09
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
POTONGAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 17+600 - 17+950
319.0 319.0
318.0 318.0
317.0 317.0
316.0 316.0
315.0 315.0
314.0 314.0
313.0 313.0
312.0 312.0
311.0 311.0
310.0 310.0
309.0 309.0
308.0 308.0
307.0 307.0
306.0 306.0
305.0 305.0
304.0 304.0
303.0 303.0
302.0 302.0
301.0 301.0
300.0
.8 8% 300.0
299.0
14 299.0
298.0 298.0
297.0 297.0
296.0 296.0
295.0 295.0
294.0 294.0
293.0 293.0
292.0 292.0
291.0 291.0
290.0 290.0
289.0 289.0
288.0 288.0
287.0 287.0
286.0 286.0
285.0 285.0
284.0 284.0
5.30%
283.0 283.0
282.0 282.0
281.0 281.0
280.0 280.0
279.0 32% 279.0
10.
278.0 278.0
277.0 277.0
276.0 276.0
PERKERASAN EKSISTING : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb)
275.0 + 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb) 275.0
274.0
PERKERASAN PELEBARAN : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb) 274.0
+ 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb)
273.0 + 30.0 cm Lapis Fondasi Aggregat Kelas A 273.0
272.0 272.0
275.953

278.289

280.882

282.863

284.187

285.577

287.696

290.944

294.593

297.952

301.667
301.671

305.219

308.612

312.430

316.518
Elevasi
Rencana
275.77

278.11

280.70

282.68

284.01

285.40

287.52

290.76

294.41

297.77

301.49

305.04

308.43

312.25

316.34
Elevasi
Eksisting

STA. 17+600 17+650 17+700 17+750 17+800 17+850 17+900 17+950


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 10
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 17+950 - 18+300
17
+ 85
0
TC X = 258,004.722
= 00
380.0

N
17
+8
2.1 7 00
376.0
42
00
372.0

CT
30

=
8.0
00

17
00

Y = 52,802.656
368.0
31

+
2.
00

17

9
0

05
+9 364
.000
00 .15
31

Y = 52,602.656
6.
00

X = 257,954.722 360.000
0
32
0.
00
0

0
.00

00
360
X = 257,954.722

.0
4
36

0
00
0.
36
00
35 364.0
TC

34 2.
ME

324 0 00

300
8.
95
.00 34 00 0
=

0 4. 0
34 00
+
PA

00
0.
17
TC 0
17

00

8+
6.
33 0
. 6.0

35
NG

=
ta
00
+

1
328.000

0
tS
17
9

00
332
.00

2.
A
21

pi

ta.
+9 0 0

35
32
25 CT = 18+364.635

8.0
LAM
.02

Im
64

it S
+
Y = 52,852.656

00
ris 18
332.000 .65
BU
9

CT
Ga NU

mp
9

TC
00

CT
=

Y = 52,752.656

2.0

00

CT

is I
17

.0
35
336.000

=1
356

=
+

=1

Gar
95 372.0

18+
8+
0.3 00
X = 257,904.722

8+
340.00 45
0 376.0

266 40
00

3
262

01.
CT

.65
X = 257,904.722

267
344.00

.2
380.000

=1
0
18

1
+0

8
00

+0
384.000
34

1
8.0

6.2
00

TC = 18+21

05
388.000
5.887
392.00
0

18+200
332
.000
18 396
Y = 52,852.656

+0 .000
50
336
.00
0 400

Y = 52,702.656

.000
.00
0

400
X = 257,854.722
CT = 18+18
34
1.280
0.0
00
X = 257,854.722
TC
=1

CTTC X = 257,854.722
8+

== 1
TC

18
344
.00
0

+1
0

188+ =
62

18 +11

00
4478.
.17

+1
.794
15
4

50
17 . 873

+1
348.000 5

18
CT
0
=
.00
352
18
+1
04
00
55 .
6.0
35 6

00
0.0
36
X = 257,804.722

0
0

.00
8.0
Y = 52,702.656

0
0
34

00
352

6.0

00
0.0
35

0
4.0
36

.00

00
36

368

2.0
00

37
6.0
37 00
0.0
38
275.953

278.289

280.882

282.863

284.187

285.577

287.696

290.944

294.593

297.952

301.667
301.671

305.219

308.612

312.430

316.518
Elevasi
Rencana
275.77

278.11

280.70

282.68

284.01

285.40

287.52

290.76

294.41

297.77

301.49

305.04

308.43

312.25

316.34
Elevasi
Eksisting

STA. 17+950 18+000 18+050 18+100 18+150 18+200 18+250 18+300


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 11
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
POTONGAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 17+950 - 18+300
362.0 362.0
361.0 361.0
360.0 360.0
359.0 359.0
5%
358.0 358.0
14.5
357.0 357.0
356.0 356.0
355.0 355.0
354.0 354.0
353.0 353.0
352.0 352.0
351.0 351.0
350.0 350.0
349.0 349.0
348.0 348.0
347.0 347.0
346.0 346.0
345.0 345.0
344.0 344.0
343.0 343.0
342.0 342.0
341.0 341.0
340.0 340.0
339.0 339.0
338.0 338.0
337.0 337.0
336.0 336.0
335.0 335.0
334.0 9% 334.0
1 5.5
333.0 333.0
332.0 332.0
331.0 331.0
330.0 330.0
329.0 329.0
328.0 328.0
327.0 327.0
326.0 326.0
325.0 325.0
324.0 324.0
323.0 323.0
322.0 322.0
321.0 321.0
320.0 320.0
319.0 319.0
.34% PERKERASAN EKSISTING : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb)
318.0 16 + 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb) 318.0
317.0
PERKERASAN PELEBARAN : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb) 317.0
+ 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb)
316.0 + 30.0 cm Lapis Fondasi Aggregat Kelas A 316.0
315.0 315.0
316.518

320.602

324.609

328.337

332.062

335.960

339.715

342.967

346.275

349.633

352.884

356.226

359.865

364.020

367.717
Elevasi
Rencana
316.34

320.42

324.43

328.16

331.88

335.78

339.53

342.79

346.09

349.45

352.70

356.05

359.68

363.84

367.54
Elevasi
Eksisting

STA. 17+950 18+000 18+050 18+100 18+150 18+200 18+250 18+300


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 12
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 18+300 - 18+650

56
2.6
2,50
5
364.000 Y=

22
4.7
,20
360.000

8
25
=
X
356.000

384

388
.00

2
.72
352.000

.00
0

54
0

8,1
380

25
.00
0

=
0

X
.00
39 2
56

0
.6

.00
384
.000
02

396
38 52,5
0.0
00 Y=
37
6.0
00
18+
352.00
0
37
550
2.0
00

400.000
00 36
356.0 18+250 8.0
00

0
.00
0
00
36

384
4.0

0.
CT

38
00

00
36 36
0.0 0
=
22

0 .0

+5
0 00
N 18
4.7

18
+4 TC

TC
6
5

C
.65
7,9

00

T=
02 83 = .0

T
CT =
25

6 00

=
, 4

C
52 6.0 .8 18 40
=

37
1

18
22
36

=
18+
Y= 1 +5
X

4.0

4.7
00 00

18
+
18
CT

08 .0

18+6
6

55
,00
8
TC

TC

5 +6 40

+
462
2.6 .2

58
=1

6
9
,55 66 00
MEPA

0
0
.83
=

2
=

52

8+65
8.8
=

.990
18

3
Y=

9
1

X
+

64

8.621
8+
+2

262 51

6
0 .65

ta. 1
N
266

8+30 0
15

45 02
NU
ta. 1 18+ ,5
GA
.24

BU
.88

t S 52
i LAM
.6

s Imp Y=

pit S
0

Gari
7

2
AKHIR PEKERJAAN

.72

Im
CT =

54
18+3 00
X = 258040.60

8,0
01.26 412.0

Garis
2
KORDINAT

25

2
7 416.000
Y = 52519.39

4.7
00

=
2.0
6

5
00
.65

8,1
39

6.0
408.000
0 2

00
0 ,40

25
39
+4

0.0

00
52
372

00

40
18

=
4.0
2.0

00
41
Y=
.00

X
40

8.0

0
376

.00
0

40
CT

00
2
.00

41
CT

6.0
0

0
=

.000

41

.00
416
38

=1

420
18
0.
00

+3

TC =
0

8+4

18+3
64
38

37.50 0
4.0

.00
.63

420
2
18+
00

17.0
TC

350
5
38

=
8.0

15
0

18
0

+
39

38
2.0
00

7.2

0
00
4.
38

42
396
.000

.000
400
400.0
00
2
.72
54

56
,8

.6
52
57

2,5
2

5
=

2
.72
Y=
X

04
6
.65

BM ,1
58
,3 52

2
. 05 Z= 41
52

=
Y=

X
X = 52322 2
Y = 5.56
258 .55
N

115.
97
367.717

371.328

374.952

377.851

380.555

383.441

386.125

388.815

391.998

Elevasi
Rencana
367.54

371.15

374.77

377.67

380.37

383.26

385.94

388.63

391.82

395.37

398.53

401.05

403.48

406.06

408.50
Elevasi
Eksisting

STA. 18+300 18+350 18+400 18+450 18+500 18+550 18+600 18+650


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 13
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
POTONGAN MEMANJANG
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 18+300 - 18+650
411.0 411.0
410.0 410.0
409.0 409.0
408.0 408.0
407.0 407.0
406.0 406.0
405.0 405.0
404.0 404.0
403.0 403.0
5%
402.0 9.7 402.0
401.0 401.0
400.0 400.0
399.0 399.0
398.0 398.0
397.0 397.0
396.0 396.0
395.0 395.0
1%
394.0 394.0
14.2
393.0 393.0
392.0 392.0
391.0 391.0
390.0 390.0
389.0 389.0
388.0 388.0
387.0 387.0
386.0 386.0
385.0 385.0
384.0 384.0
383.0 383.0
%
382.0 .54 382.0
11
381.0 381.0
380.0 380.0
379.0 379.0
378.0 378.0
377.0 377.0
376.0 376.0
375.0 375.0
374.0 374.0
0%
373.0
14.5 373.0
372.0 372.0
371.0 371.0
370.0 370.0
369.0 369.0
368.0 368.0
PERKERASAN EKSISTING : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb)
367.0 + 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb) 367.0
366.0
PERKERASAN PELEBARAN : 4.0 cm Laston Lapis Aus Asbuton (AC-WC Asb) 366.0
+ 12.5 cm Laston Lapis Antara Asbuton (AC-WC Asb)
365.0 + 30.0 cm Lapis Fondasi Aggregat Kelas A 365.0
364.0 364.0
367.717

371.328

374.952

377.851

380.555

383.441

386.125

388.815

391.998

Elevasi
Rencana
367.54

371.15

374.77

377.67

380.37

383.26

385.94

388.63

391.82

395.37

398.53

401.05

403.48

406.06

408.50
Elevasi
Eksisting

STA. 18+300 18+350 18+400 18+450 18+500 18+550 18+600 18+650


PAKET PEKERJAAN :NO. PAKET KONSULTAN PERENCANA Judul Gambar :
REPUBLIK INDONESIA Digambar Direncanakan Diperiksa : 14
No. Lembar
NO. RUAS JALAN
52.022
KEMENTERIANPEKERJAANUMUMDANPERUMAHANRAKYAT PR-02, PERENCANAAN TEKNIS
JALAN DAN JEMBATAN
SITUASI DAN POTONGAN
DIREKTORAT JENDERAL BINA MARGA WILAYAH II
NAMA RUAS LAMBUNU-MEPANGA MEMANJANG JALAN
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGAH
Adum, ST. Hasri Rahim, ST. Jml. Lembar
: 14
S
A
TU
AK
N
E
RP
A
JE
RE
NC
AN
A
DA
A
N
P
NE
NG
AWA
S
AA
JN
L
A
NA
O
SIN
P
A
RLO
S
N
U
VS
IL
A
IW
TE
N
SIG
AH PROVINSI SULAWESI TENGAH PROVINSI SULAWESI TENGAH
Juru Gambar Ahli Jalan
Ir.Abdul Rahim Nurdin, MT.
Ketua Tim
STA. 18+650 - 18+800
X=2
58,20
4.722

N
.656
.656

2,202
2,352
0
70

Y=5
Y=5
+
18 X=2
18
58,154
.722
+7
5 0

.656

CT
2,502

=1
Y=5

8
X=2

+7
58,20
4.722 TC = 18
+681.04

3
9

0.0
52

TC
6
408.0

18
.65
404

=
420.000

+8
2,402
.000

00

00

18

00
0
0
416.0

.00
412.00

+
424
Y=5

77
3.0
X=2

5
58,154

7
50 .722
8+6 CT
it Sta. 1

42
A

4.
p
Garis Im

00
MEPANG
=

0
18
CT = 18

LA
+638.62 80 +
1

M
400
.00

TC
0
4.8

BU
97

42
424

NU
=1

0.
.00

00
0

0
8+
X=2

60

.656
58,154
.656

.722

416.000

2,352
.86

424.0
2,502
39

412.000

420.000
6 .0

0
.000

.00
0

00
420

Y=5
0

0
Y=5

408
+6 X = 258115.97
18 BM. 05 Y = 52322.55
58,104
X=2
.722
Z= 415.562 .000
416
39
2.
00
0

.656
0
412.00

2,252
0

Y=5
+ 55 408.000

18
388.000
X=2
58,05
22 4.7
CT

404.000
=1

427.0 427.0
8+

426.0 426.0
55
9

425.0 425.0
.83
9

424.0 424.0
423.0 423.0
422.0 422.0
421.0 421.0
420.0 420.0
419.0 419.0
418.0 418.0
417.0 417.0
416.0 3.59% 416.0
415.0 415.0
414.0 414.0
413.0 413.0
412.0 412.0
411.0 411.0
410.0
.7 1% 410.0
10
409.0 409.0
408.0 408.0
407.0 407.0
Elevasi
Rencana
408.50

411.18

413.38

414.68

415.52

416.40

416.64

Elevasi
Eksisting

STA. 18+650 18+700 18+750 18+800


(KSO)
(KSO)
(KSO)
(KSO)
25+000

25+100

25+200

25+300

25+400

25+500

25+600

25+700

25+800

25+900

STATION
IRI Normal SEMESTER-1 TAHUN 2023 9.10 12.10 9.30 8.60 12.10 7.60 6.30 6.20 6.80 7.00
IRI Oposite SEMESTER-1 TAHUN 2023 9.50 9.60 9.80 9.20 11.80 6.00 6.00 6.70 6.50 6.70
IRI RATA-RATA SEMESTER-1 TAHUN 2023 9.3 10.9 9.6 8.9 12.0 6.8 6.2 6.5 6.7 6.9
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
53+400

53+500

53+600

53+700

53+800

53+900

54+000

54+100

54+200

54+300

STATION
IRI Normal SEMESTER-1 TAHUN 2023 8.90 8.00 8.40 8.20 4.00 6.90 4.00 5.60 5.70 4.60
IRI Oposite SEMESTER-1 TAHUN 2023 8.00 8.30 7.90 8.00 5.70 6.80 4.30 4.10 5.10 4.70
IRI RATA-RATA SEMESTER-1 TAHUN 2023 8.5 8.2 8.2 8.1 4.9 6.9 4.2 4.9 5.4 4.7
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
6+000

6+100

6+200

6+300

6+400

6+500

6+600

6+700

6+800

6+900

STATION
IRI Normal SEMESTER-1 TAHUN 2023 3.70 6.10 5.20 4.90 3.50 7.20 8.40 10.50 8.10 7.90
IRI Oposite SEMESTER-1 TAHUN 2023 4.00 5.40 5.00 6.70 4.00 6.40 8.20 9.80 8.30 7.80
IRI RATA-RATA SEMESTER-1 TAHUN 2023 3.9 5.8 5.1 5.8 3.8 6.8 8.3 10.2 8.2 7.9
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)
(KSO)

Anda mungkin juga menyukai