DATA UMUM
WAKTU
90 (Sembilan Puluh Hari) Hari Kalender
PELAKSANAAN
DATA UMUM
Iman Kusmana, ST
General Superintendent
Danang Mahendra, SST
Ahli K3 Konstruksi
Bambang Slamet
Deputy General Superintendent
JUDUL DATA UMUM JADWAL METODE SMK3 PENUTUP
MINGGU KE-
1 2 3 4 5 6 7 8 9 10 11 12 13
NO URAIAN PEKERJAAN BOBOT (%) DURASI (mg) 20/09/2021 27/09/2021 04/10/2021 11/10/2021 18/10/2021 25/10/2021 01/11/2021 08/11/2021 15/11/2021 22/11/2021 29/11/2021 06/12/2021 13/12/2021
KURVA-S s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
26/09/2021 03/10/2021 10/10/2021 17/10/2021 24/10/2021 31/10/2021 07/11/2021 14/11/2021 21/11/2021 28/11/2021 05/12/2021 12/12/2021 18/12/2021
BAB 1 UMUM
1.19 Pemeliharaan dan Perlindungan Lalu Lintas 2,387 13 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184 0,184
1.20 Mobilisasi dan Demobilisasi 1,956 6 0,326 0,326 0,326 0,326 0,326 0,326
BAB 2 PEMBERSIHAN TEMPAT KERJA
2.01(1) Pembersihan Tempat Kerja 2,012 6 0,335 0,335 0,335 0,335 0,335 0,335
BAB 3 PEMBONGKARAN
4.05(1) Borrow Material untuk Timbunan Biasa 0,995 4 0,249 0,249 0,249 0,249
BAB 5 GALIAN STRUKTUR
6.06(1c) Saluran U Pracetak Beton Ukuran 100x120 26,591 7 3,799 3,799 3,799 3,799 3,799 3,799 3,799
6.06(1d) Saluran U Pracetak Beton Ukuran 150x150 19,078 8 2,385 2,385 2,385 2,385 2,385 2,385 2,385 2,385
10.01(10) Beton Kelas C - 1 - 1 (wing wall) 13,631 5 2,726 2,726 2,726 2,726 2,726
10.02 (3) Batang Baja Tulangan Ulir 14,784 5 2,957 2,957 2,957 2,957 2,957
BAB 12 PEKERJAAN LAIN-LAIN
12.02 (3) Pasangan Batu Kali 1,915 5 0,383 0,383 0,383 0,383 0,383
BAB 15 PENGALIHAN DAN PERLINDUNGAN LALU LINTAS YANG ADA
15,1 Pengalihan dan Perlindungan Utilitas Yang Ada 12,568 4 3,142 3,142 3,142 3,142
JUMLAH HARGA TOTAL 100,00
BOBOT RENCANA (%) 0,519 0,845 1,347 1,347 3,578 6,367 15,577 15,960 13,067 16,159 16,656 7,696 0,881
KOMULATIF (%) - 0,519 1,364 2,711 4,059 7,636 14,003 29,580 45,540 58,607 74,766 91,422 99,119 100,000
JUDUL DATA UMUM TAHAPAN METODE SMK3 PENUTUP
START
FLOW CHART
KONTRAK KERJA
ALAT JOB MIX DESIGN & TRIAL MIX SURVEY PENGUKURAN PEKERJAAN PERSIAPAN
CIKAMPEK KM 47
PELAKSANAAN
PENGECORAN
WING WALL PENGADAAN UDITCH
DAN BAK KONTROL
PEK KISDAM ZONA 1 PEK KISDAM ZONA 2 PEK KISDAM ZONA 1 PEK KISDAM ZONA 2
PENGADAAN UDITCH
DAN BAK KONTROL
PEMASANGAN UDITCH
PEK DINDING SUNGAI
PEMASANGAN UDITCH
BATU KALI
PEK TIMBUNAN
PEK TIMBUNAN
FLOW CHART
ALAT
FLOW CHART
ALAT
ILUSTRASI
PELAKSANAAN
PENGECORAN
WING WALL
JUDUL DATA UMUM TAHAPAN METODE SMK3 PENUTUP
FLOW CHART
WINGWALL
ZONA 1 SANDBAG
ALAT
ILUSTRASI
PELAKSANAAN
PENGECORAN WINGWALL
WING WALL
ZONA 1
JALUR B JALUR A
JUDUL DATA UMUM TAHAPAN METODE SMK3 PENUTUP
FLOW CHART
SANDBAG
WIN
GW
ZON ALL
A
ALAT (JALU 2
R B)
ILUSTRASI
PELAKSANAAN
PENGECORAN
WINGWALL
WING WALL ZONA 2
(JALUR A)
JALUR B JALUR A
JUDUL DATA UMUM TAHAPAN DATA TEKNIS SMK3 PENUTUP
RAMBU-RAMBU
ILUSTRASI
PENGATURAN LALU-
LINTAS
RAMBU-RAMBU
ILUSTRASI
PENGATURAN LALU-
LOKASI
LINTAS PEKERJAAN
PROGRAM
PEKERJAAN
JARAK RUMAH LOKASI
SAKIT TERDEKAT
JUDUL DATA UMUM TAHAPAN DATA TEKNIS SMK3 PENUTUP
ILUSTRASI
PENGATURAN LALU- 2 Pertemuan pagi hari ( Safety Morning) K3 Setiap Hari (08:00 sd selesai)
LINTAS
3 Pertemuan kelompok Kerja ( Toolbox Meeting) K3, Pelaksana Setiap Hari (08:00 sd selesai)
PROGRAM
4 Rapat Keselamatan Kontruksi K3 1 Minggu sekali ( setiap hari kamis pukul 16:00 sd selesai)
JARAK RUMAH
SAKIT TERDEKAT 5 Jumat bersih K3, pelaksana 1 Minggu sekali ( setiap hari Jumat pukul 16:00 sd selesai)
JUDUL DATA UMUM TAHAPAN DATA TEKNIS SMK3 PENUTUP
RAMBU-RAMBU
ILUSTRASI
PENGATURAN LALU-
LINTAS
PROGRAM
JARAK RUMAH
SAKIT TERDEKAT
JUDUL PD IL METODE SMK3 PENUTUP
S ELESAI