Anda di halaman 1dari 13

PT.

WIRATADAYA BANGUN PERSADA


Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : I - #DIV/0!

Jumlah Janjang Diperiksa


BJR
Tahun Luas Pokok Kg Minyak
Blok Jml Jjg Per Blok Timbang Total Kg Kg./Ha
Tanam (Ha) Produktif Per Blok
Jml Pkk Jml Jjg Rata2 Jjg Lapangan

1 3 5 6 7 8 9 10 11 12 13

2006 AY 5 4 445 - - - -
2006 AY 6 4 591 - - - -
2006 AY 7 12 1,598 - - - -
2006 AX 3 24 2,678 - - - -
2006 AX 4 30 3,498 - - - -
2006 AX 5 31 4,158 - - - -
2006 AX 6 31 4,439 - - - -
2006 AX 7 32 4,329 - - - -
2006 AW 2 30 3,930 - - - -
2006 AW 3 42 5,623 - - - -
2006 AW 4 31 3,886 - - - -
2006 AW 5 27 3,639 - - - -
2006 AW 6 21 1,918 - - - -
2006 AW 7 18 2,275 - - - -
2006 AW 8 12 1,821 - - - -
2006 AW 9 8 1,224 - - - -
2006 H 39 43 5,885 - - - -
2006 H 40 12 1,557 - - - -
2006 H 41 7 1,035 - - - -
2007 AX 0 10 1,380 - - - -
2007 AX 1 18 2,186 - - - -
2007 AX 2 23 2,349 - - - -
2007 AW 0 6 787 - - - -
2007 AW 1 6 817 - - - -
2007 H 36 9 1,165 - - - -
2007 H 37 25 3,485 - - - -
2007 H 38 29 3,578 - - - -
2006 419 54,529 - - - - - - -
2007 126 15,747 - - - - - - -
TOTAL 545 70,276 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN Surya Kasdela Muhamad Yunus Tambun


Estate Manager Senior Asisten Asisten Divisi I
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : II - #DIV/0!

Jumlah Janjang Diperiksa


BJR Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok Timbang Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Lapangan Per Blok

1 3 5 6 7 8 9 10 11 12 13

1999 K 40 29 3,670 - - - -
1999 K 41 26 3,765 - - - -
1999 K 42 24 2,850 - - - -
1999 K 43 36 4,175 - - - -
1999 J 36 30 4,075 - - - -
1999 J 37 29 3,630 - - - -
1999 J 38 31 3,685 - - - -
1999 J 39 31 3,794 - - - -
1999 J 41 31 3,877 - - - -
2000 K 44 13 1,255 - - - -
2000 K 45 5 710 - - - -
2000 K 46 1 125 - - - -
2000 J 40 26 3,055 - - - -
2000 J 42 25 3,197 - - - -
2000 J 43 37 4,388 - - - -
2000 I 40 12 1,250 - - - -
2000 I 41 22 2,655 - - - -
2000 I 42 8 801 - - - -
2004 J 44 31 4,312 - - - -
2006 K 45 26 3,010 - - - -
2006 AW 10 7 742 - - - -
2006 AW 11 3 421 - - - -
2006 I 39 38 5,112 - - - -
2006 I 40 9 1,075 - - - -
2006 I 41 16 2,170 - - - -
2007 J 45 18 2,172 - - - -
2007 K 44 14 1,810 - - - -
2007 K 46 17 1,650 - - - -
2007 I 36 26 3,356 - - - -
2007 I 37 27 3,621 - - - -
2007 I 38 31 4,359 - - - -
1999 267 33,521 - - - - - - -
2000 149 17,436 - - - - - - -
2004 31 4,312 - - - - - - -
2006 99 12,530 - - - - - - -
2007 133 16,968 - - - - - - -
TOTAL 679 84,767 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN S Kasdela Parihin
Estate Manager Senior Asisten Asisten Divisi II
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : III - #DIV/0!

Jumlah Janjang Diperiksa


Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok BJR Timbang Lapangan Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Per Blok

1 3 5 6 7 8 9 10 11 12 13

1999 L 35 27 3,885 255 751 2.9 11,442 15.66 179,177 6,636


1999 L 36 25 2,985 239 766 3.2 9,567 15.25 145,897 5,836
1999 L 37 23 2,525 282 817 2.9 7,315 16.20 118,508 5,153
1999 L 38 21 2,735 254 825 3.2 8,883 15.88 141,068 6,718
1999 L 39 27 3,670 257 847 3.3 12,095 16.15 195,339 7,235
1999 L 40 31 4,298 278 849 3.1 13,126 16.27 213,558 6,889
1999 L 41 25 3,255 274 723 2.6 8,589 16.27 139,742 5,590
1999 L 42 16 2,190 331 1,060 3.2 7,013 15.28 107,163 6,698
1999 L 43 25 3,203 257 782 3.0 9,746 15.10 147,166 5,887
1999 L 44 10 1,130 220 562 2.6 2,887 16.22 46,821 4,682
1999 L 45 20 2,154 256 1,085 4.2 9,129 15.26 139,312 6,966
1999 L 46 9 1,099 137 436 3.2 3,498 16.11 56,345 6,261
1999 L 47 8 1,139 115 386 3.4 3,823 15.88 60,710 7,589
1999 M 34 6 729 80 208 2.6 1,895 15.10 28,621 4,770
1999 M 35 21 2,274 384 1,130 2.9 6,692 15.24 101,982 4,856
1999 M 36 17 2,029 320 1,010 3.2 6,404 15.33 98,174 5,775
1999 M 37 18 2,469 375 1,100 2.9 7,242 15.64 113,271 6,293
1999 M 38 10 1,404 157 420 2.7 3,756 15.21 57,128 5,713
1999 M 39 14 1,762 232 650 2.8 4,937 15.10 74,543 5,325
1999 M 40 19 2,710 364 1,058 2.9 7,877 15.20 119,728 6,301
1999 M 41 3 437 88 320 3.6 1,589 15.00 23,836 7,945
1999 K 36 23 3,080 256 628 2.5 7,556 15.72 118,774 5,164
1999 K 37 26 3,215 258 677 2.6 8,436 15.80 133,293 5,127
1999 K 38 26 3,387 257 684 2.7 9,014 15.70 141,527 5,443
1999 K 39 26 3,312 247 635 2.6 8,515 16.20 137,937 5,305
2005 L 36 5 557 103 475 4.6 2,569 14.10 36,219 7,244
2005 L 37 9 1,011 115 488 4.2 4,290 14.30 61,349 6,817
2005 L 38 9 1,204 122 560 4.6 5,527 14.20 78,477 8,720
2005 M 35 8 905 86 380 4.4 3,999 14.00 55,984 6,998
2005 M 36 6 574 74 356 4.8 2,761 14.20 39,212 6,535
2005 M 37 9 1,240 146 657 4.5 5,580 14.20 79,236 8,804
2005 M 38 19 1,550 290 1,375 4.7 7,349 14.30 105,093 5,531
2005 M 39 12 970 162 735 4.5 4,401 14.00 61,613 5,134
2005 M 40 12 1,720 181 780 4.3 7,412 14.10 104,511 8,709
2007 L 44 17 1,845 250 1,321 5.3 9,749 12.80 124,787 7,340
2007 L 45 13 1,515 256 1,295 5.1 7,664 12.38 94,877 7,298
2008 L 41 3 242 55 278 5.1 1,223 11.00 13,455 4,485
2008 L 42 7 811 82 442 5.4 4,371 11.66 50,972 7,282
2008 L 43 6 815 173 784 4.5 3,693 11.32 41,809 6,968
2008 L 46 19 1,246 251 1,275 5.1 6,329 11.84 74,939 3,944
2008 M 36 6 760 68 372 5.5 4,158 10.19 42,366 7,061
2008 M 41 13 1,595 232 1,254 5.4 8,621 10.00 86,213 6,632
2008 M 42 10 1,345 193 1,086 5.6 7,568 10.28 77,801 7,780
2008 M 43 10 1,116 197 1,101 5.6 6,237 10.66 66,488 6,649
2016 M 41 15 580 185 1,245 6.7 3,903 9.20 35,910 2,394
2016 M 42 17 305 138 897 6.5 1,983 9.50 18,834 1,108
2016 M 43 23 430 182 1,187 6.5 2,804 9.00 25,240 1,097
1999 476 61,076 6,173 18,409 3.0 181,026 15.69 2,839,622 5,966
2005 89 9,731 1,279 5,806 4.5 43,888 14.17 621,694 6,985
2007 30 3,360 506 2,616 5.2 17,413 12.62 219,664 7,322
2008 74 7,930 1,251 6,592 5.3 42,202 10.76 454,043 6,136
2016 55 1,315 505 3,329 6.6 8,690 9.20 79,984 1,454
TOTAL 724 83,412 9,714 36,752 3.8 293,219 14.37 4,215,007 5,822
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN S Kasdela M. Bagus Maulana


Estate Manager Senior Asisten Asisten Divisi III
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : IV - #DIV/0!

Jumlah Janjang Diperiksa


BJR Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok Timbang Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Lapangan Per Blok

1 3 5 6 7 8 9 10 11 12 13

2005 N 34 23 2,576 - - - -
2005 N 35 30 4,025 - - - -
2005 N 36 26 3,750 - - - -
2005 N 37 32 4,346 - - - -
2005 N 38 30 4,320 - - - -
2005 N 39 26 3,490 - - - -
2005 N 40 21 3,450 - - - -
2005 N41 10 1,130 - - - -
2006 AV 28/Av 27 13 1,800 - - - -
2006 AV 29 16 2,260 - - - -
2006 AV 30 6 840 - - - -
2006 AW 26 22 3,290 - - - -
2006 AW 27 27 3,368 - - - -
2006 AW 28 27 3,800 - - - -
2006 AW 29 30 3,890 - - - -
2006 AW 30 33 4,468 - - - -
2007 O 38/O 39 11 1,450 - - - -
2005 198 27,087 - - - - - - -
2006 174 23,716 - - - - - - -
2007 11 1,450 - - - - - - -
TOTAL 383 52,253 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN SP Girsang Wando Wijaya Sianturi


Estate Manager Senior Asisten Asisten Divisi IV
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : V - #DIV/0!

Jumlah Janjang Diperiksa


BJR Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok Timbang Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Lapangan Per Blok

1 3 5 6 7 8 9 10 11 12 13

2006 AW 25 9 1,038 - - - -
2006 AX 21 8 1,100 - - - -
2006 AX 22 13 1,475 - - - -
2006 AX 23 18 2,005 - - - -
2006 AX 24 27 3,405 - - - -
2006 AX 25 27 3,372 - - - -
2006 AX 26 24 2,860 - - - -
2006 AX 27 15 1,790 - - - -
2006 AX 28 7 851 - - - -
2006 AX 29 7 850 - - - -
2006 AY 22 30 3,620 - - - -
2006 AY 24 23 2,940 - - - -
2006 AZ 26 28 3,585 - - - -
2006 AZ 27 10 1,290 - - - -
2006 AZ 21 30 3,760 - - - -
2007 AW 24 25 3,265 - - - -
2007 AW 25 17 1,960 - - - -
2007 AY 21 25 3,060 - - - -
2007 AY 23 21 2,965 - - - -
2007 AZ 22 28 3,650 - - - -
2007 AZ 23 27 3,410 - - - -
2007 AZ 25 30 4,080 - - - -
2008 M 44 11 1,410 - - - -
2008 M 45 12 1,035 - - - -
2008 AY 25 10 1,291 - - - -
2008 AZ 24 27 3,384 - - - -
2016 M 44 13 1,260 - - - -
2006 276 33,941 - - - - - - -
2007 173 22,390 - - - - - - -
2008 60 7,120 - - - - - - -
2016 13 1,260 - - - - - - -
TOTAL 522 64,711 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN SP Girsang Sugiarto
Estate Manager Senior Asisten Asisten Divisi V
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : VI - #DIV/0!

Jumlah Janjang Diperiksa


BJR Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok Timbang Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Lapangan Per Blok

1 3 5 6 7 8 9 10 11 12 13

2006 J 46 35 4,129 - - - -
2006 AX 8 30 4,071 - - - -
2006 AX 9 32 4,216 - - - -
2006 AX 10 29 3,557 - - - -
2006 AX 11 14 1,580 - - - -
2006 AY 8 18 2,531 - - - -
2006 AY 9 22 2,616 - - - -
2006 AY 10 15 1,759 - - - -
2006 AY 11 13 1,624 - - - -
2006 AY 15 20 2,501 - - - -
2006 AY 16 30 3,658 - - - -
2006 AY 17 28 3,625 - - - -
2006 AY 18 18 2,294 - - - -
2006 AY 19 21 2,616 - - - -
2006 AZ 12 2 273 - - - -
2006 AZ 13 6 694 - - - -
2006 AZ 14 9 1,136 - - - -
2006 AZ 15 9 1,126 - - - -
2006 AZ 16 12 1,577 - - - -
2006 AZ 17 21 2,592 - - - -
2006 AZ 18 32 3,860 - - - -
2006 AZ 19 30 3,898 - - - -
2006 AZ 20 28 3,532 - - - -
2007 AY 12 11 1,240 - - - -
2007 AY 13 24 3,149 - - - -
2007 AY 20 24 3,075 - - - -
2006 495 62,420 - - - - - - -
2007 59 7,464 - - - - - - -
2008 - - - - - - - - -
TOTAL 554 69,884 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN SP Girsang Hary Rizkiawan Nasution


Estate Manager Senior Asisten Asisten Divisi VI
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2024

Divisi : VII - #DIV/0!

Jumlah Janjang Diperiksa


BJR Kg
Tahun Luas Pokok
Blok Jml Jjg Per Blok Timbang Total Kg Minyak Kg./Ha
Tanam (Ha) Produktif
Jml Pkk Jml Jjg Rata2 Jjg Lapangan Per Blok

1 3 5 6 7 8 9 10 11 12 13

2006 A 18 28 3,433 - - - -
2006 A 19 27 3,606 - - - -
2006 A 20 32 4,048 - - - -
2006 A 21 26 3,461 - - - -
2006 A 22 30 4,034 - - - -
2006 A 23 29 4,006 - - - -
2006 A 24 30 4,082 - - - -
2006 A 25 29 3,873 - - - -
2006 A 26 29 4,117 - - - -
2006 A 27 29 4,052 - - - -
2006 B 21 29 3,934 - - - -
2006 B 22 30 3,989 - - - -
2006 B 23 25 3,550 - - - -
2006 B 24 25 3,547 - - - -
2006 B 26 10 1,243 - - - -
2006 B 27 4 444 - - - -
2006 C 20 5 628 - - - -
2006 C 21 9 1,212 - - - -
2006 C 22 3 422 - - - -
2006 C 23 2 263 - - - -
2007 B 19 17 1,975 - - - -
2007 B 25 21 2,552 - - - -
2008 A 17 28 3,156 - - - -
2008 B 17 5 583 - - - -
2008 B 18 7 867 - - - -
2008 B 20 31 3,308 - - - -
2006 431 57,944 - - - - - - -
2007 38 4,527 - - - - - - -
2008 71 7,914 - - - - - - -
TOTAL 540 70,385 - - - - - - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

NN SP Girsang Yanto
Estate Manager Senior Asisten Asisten Divisi VII
PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2018

Divisi : VIII
Jumlah Janjang Diperiksa
Kg
Tahun Pokok
Blok Luas (Ha) Jml Jjg Per Blok BJR Total Kg Minyak Kg./Ha
Tanam Produktif
Jml Pkk Jml Jjg Rata2 Jjg Per Blok

1 3 5 6 7 8 9 10 11 12 13

- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
1999 - - - - - - 0.0 - -
2000 - - - - - - 0.0 - -
2001 - - - - - - 0.0 - -
2004 - - - - - - 0.0 - -
2005 - - - - - - 0.0 - -
2006 - - - - - - 0.0 - -
2007 - - - - - - 0.0 - -
2008 - - - - - - 0.0 - -
2009 - - - - - - 0.0 - -
2010 - - - - - - 0.0 - -
2011 - - - - - - 0.0 - -
2012 - - - - - - 0.0 - -
2013 - - - - - - 0.0 - -
2014 - - - - - - 0.0 - -
2015 - - - - - - 0.0 - -
TOTAL - - - - - - 0.0 - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

Estate Manager Askep Asisten Divisi VIII


PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III

SENSUS PRODUKSI SEMESTER I 2018

Divisi : IX
Jumlah Janjang Diperiksa
Kg
Tahun Pokok
Blok Luas (Ha) Jml Jjg Per Blok BJR Total Kg Minyak Kg./Ha
Tanam Produktif
Jml Pkk Jml Jjg Rata2 Jjg Per Blok

1 3 5 6 7 8 9 10 11 12 13

- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- - 0.0 - -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
- 0.0 -
1999 - - - - - - 0.0 - -
2000 - - - - - - 0.0 - -
2001 - - - - - - 0.0 - -
2004 - - - - - - 0.0 - -
2005 - - - - - - 0.0 - -
2006 - - - - - - 0.0 - -
2007 - - - - - - 0.0 - -
2008 - - - - - - 0.0 - -
2009 - - - - - - 0.0 - -
2010 - - - - - - 0.0 - -
2011 - - - - - - 0.0 - -
2012 - - - - - - 0.0 - -
2013 - - - - - - 0.0 - -
2014 - - - - - - 0.0 - -
2015 - - - - - - 0.0 - -
TOTAL - - - - - - 0.0 - -
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

Estate Manager Askep Asisten Divisi IX


PT.WIRATADAYA BANGUN PERSADA
Kebun Wirata III
REKAPITULASI SENSUS PRODUKSI WRE3 SEMESTER I 2024 #DIV/0!

Budget Jumlah Janjang Diperiksa


Kg % Penca
Pokok
DIVISI T.T Luas (Ha) Jumlah Pokok Jml Jjg BJR Total Kg Minyak Kg/Ha
Produktif
Per Blok
Semester I (Kg) Jml Pkk Jml Jjg Jjg/Pkk pain

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1999 476 61,429 61,076 - 6,173 18,409 3.0 181,026 15.7 2,839,622 5,966 #DIV/0!
2005 89 9,802 9,731 - 1,279 5,806 4.5 43,888 14.2 621,694 6,985 #DIV/0!
III 2007 30 3,392 3,360 - 506 2,616 5.2 17,413 12.6 219,664 7,322 #DIV/0!
2008 74 7,952 7,930 - 1,251 6,592 5.3 42,202 10.8 454,043 6,136 #DIV/0!
2016 55 1,315 1,315 - 505 3,329 6.6 8,690 9.2 79,984 1,454 #DIV/0!
TOTAL 724 83,890 83,412 - 9,714 36,752 3.8 293,219 14.4 4,215,007 5,822 #DIV/0!
1999 743 95,178 94,597 - 6,173 18,409 3.0 181,026 15.7 2,839,622 3,822 #DIV/0!
2000 149 17,633 17,436 - - - - - - - - #DIV/0!
2004 31 4,330 4,312 - - - - - - - - #DIV/0!
2005 287 37,094 36,818 - 1,279 5,806 4.5 43,888 14.2 621,694 2,166 #DIV/0!
TOTAL 2006 1,894 248,523 245,080 - - - - - - - - #DIV/0!
2007 570 73,421 71,906 - 506 2,616 5.2 17,413 12.6 219,664 385 #DIV/0!
2008 205 23,114 22,964 - 1,251 6,592 5.3 42,202 10.8 454,043 2,215 #DIV/0!
2016 68 2,635 2,575 - 505 3,329 6.6 8,690 9.2 79,984 1,176 #DIV/0!
GRAND TOTAL 3,947 501,928 495,688 - 9,714 36,752 3.8 293,219 14.4 4,215,007 1,068 #DIV/0!
AS 501,928 495,688 - 4,215,007 Perk Wirata III, 10 Januari 2024
Disetujui Oleh, Diperiksa Oleh, Direkapitulasi Oleh,

NN Surya Kasdela S.P Girsang NN


Estate Manager Senior Asisten Senior Asisten KTU
###

SENSUS PRODUKSI SM 1
PT.WIRATADAYA BANGUN PERSADA

2024
Kebun Wirata III A

Anda mungkin juga menyukai