PALMA SATU
KEBUN PALMA A
Divisi II (Dua) RENCANA KERJA ASISTEN BULAN JANUARI 2023 Hari Kerja Efektif = 26 Hari
UMUM
1 Mdr / Krani 269 - 269
2 Pamongan/Mudim/Operator genset 49 49 98
Sub total 318 49 367 - - - - -
PANEN
1 Panen - - -
- Produksi (Ton) 18,312 1,457 1,457 - 1,457 1,457 2016/2017/2018
M40-44,N40-45,O39-45,P37-45,Q37-45/O38,P36,Q34-36/O34
4 926 0.24 873 - 873
2 Pemuat Dump Truck (Ton) 18,312 1,457 1,457 - 1,457 1,4572016/2017/2018
M40-44,N40-45,O39-45,P37-45,Q37-45/O38,P36,Q34-36/O34
4 926 0.03 117 - 117
3 Pemuat Kubota (Langsir) Ton 8,240 655 655 - 655 6552016/2017/2018
M40-44,N40-45,O39-45,P37-45,Q37-45/O38,P36,Q34-36/O34
4 926 0.02 57 - 57
4 Pemuat Quick (Langsir) Ton - - - - - - 1 926 - - - -
5 Pemuat Badang (Langsir) Ton - - - - - - 1 926 - - - -
6 Kutib Brondolan - - - - - - -
7 Sensus Produksi 1,851 - - - - - 1 - - - - -
8 Timbang BJR 1,851 - - - - - 1 - - - - -
Sub Total 1,046 - 1,046
PERAWATAN TM
1 Wiping Lalang 5,804 490 490 - 490 4902016/2017/2018
M40-44,N40-45-O39-45,P37/O38,P36/O34
1 490 0.05 - 25 25 Glifosat Ltr 0.02 9.81
2 Piringan Manual 484 40 40 - 40 40 2,016 M40-41 1 40 2.00 - 79 79
3 Piringan Chemis 2,902 409 409 - 409 409 2,016 M40-44,N40-45,O39-45
1 409 0.33 - 135 135
a. Rumput dan Daun Lebar (Glifosat) Glifosat Ltr 0.40 163.72
Floroksipir Ltr 0.01 4.09
b. Pakis-Pakisan (Paraquat) Paraquat Ltr 0.40 163.72
Metil Metsulfuron
Ltr 0.02 8.19
4 Gawangan Manual/Babat Rendahan 725 74 74 - 74 74 2,016 M40-44 1 74 2.00 - 149 149
5 Gawangan Chemis 1,935 - - - - - 1 - - - - - `
a. Semprot Rendahan - - - Paraquat Ltr 0.60 -
Metil Metsulfuron
Ltr 0.03 -
b. Semprot Anak Kayu - - - Triklopir Ltr - -
c. Oles Anak Kayu 484 76 76 - 76 76 2,016 M40-44,N40-41,43
1 76 2.00 152 - 152
Triklopir Ltr 0.02 1.52
Solar Ltr 0.38 28.94
6 Tunas Pokok 1,257 116 116 - 116 116 2,016 P40-44 1 116 2.37 275 - 275
7 Tunas Pokok Borongan - - - - - - 1 - - - - -
8 Sensus LSU 967 - - - - - 1 - - - - -
Divisi II (Dua) RENCANA KERJA ASISTEN BULAN JANUARI 2023 Hari Kerja Efektif = 26 Hari
1 PEMUPUKAN
a. NPK 13-6-27-4-0,65 2,902 242 242 - 242 242 2016/2018 M40-44-N40-45/O38
1 242 0.50 121 - 121 Kg 385.94 93,509
b. ROCK PHOSPATE - - - - - - 1 - - - - - Kg
c. DOLOMITE - - - - - - 1 - - - - - Kg - -
d. UREA - - - - - - 1 - - - - - Kg
e. MOP - - - - - - 1 - - - - - Kg
f. KAPTAN 967 74 74 - 74 74 2,016 M40-44 1 74 0.50 37 - 37 Kg 237.71 17,662
g. NPK 12.12.17.2 - - - - - - 1 - - - - -
h. NPK 15.15.6.4 - - - - - - 1 - - - - -
i. UTAH 967 74 74 - 74 74 2,016 M40-44 1 74 0.20 15 - 15 Kg 19.43 1,444
j. BORATE - - - - - - 1 - - - - - Kg
k. Until Pupuk 4,837 406 406 - 406 406 2016/2017/2018
M40-44,N40-45,O39-44/O38/O34
1 406 0.27 110 - 110
l. Muat Pupuk - - - -
m. Aplikasi JJK - - - -
Sub Total 283 - 283 112,615
Kebutuhan HK Efektif 2,162 565 2,726 TRUE
HK Non Efektif 136 36 172
Total Keb Tenaga 2,298 600 2,898
Total Keb Tenaga/Hari 88 23 111 TRUE
Tenaga Tersedia 75 29 104 TRUE
+/- Tenaga Kerja (13) 6 (7)
Areal Statement
TM 2005 - Ha Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,
2006 - Ha
2016 887 Ha
2017 66 Ha
2018 14 Ha
2019 - Ha
Subtotal 967 Ha
TBM-II 2021 - Ha Novendra Agus Job Ginting Fachrizal Lubis
Jln,Parit,Emplasment 41 Ha Est. Manager Senior Asisten Asisten Divisi II
Okupasi 192 Ha
Grand Total 1,200 Ha