PERKIRAAN HARGA SATUAN DASAR KOTA BESAR DI INDONESIA


JURNAL DATABASE HARGA SATUAN (BIDANG IV CIPTA KARYA)
20/03/2023 13:32:31

Provinsi : Ibukota : UMP:


13 Jawa Barat Bandung Rp 3,181,013

DATABASE BIDANG CIPTA KARYA (STD IV)

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
DAFTAR HARGA DASAR UPAH KERJA
1 Pekerja L.4.001 oh 103,000
2 Pekerja penganyam L.4.002 oh 103,000
3 Pekerja pengisi batu L.4.003 oh 103,000
4 Teknisi sampling kualitas air L.4.004 oh 130,000
5 Buruh Kasar L.4.005 oh 96,600
6 Tukang Atap L.4.006 oh 155,800
7 Tukang batu L.4.007 oh 154,500
8 Tukang Besi L.4.008 oh 155,800
9 Tukang Besi Konstruksi L.4.009 oh 154,500
10 Tukang cat L.4.010 oh 141,600
11 Tukang ereksi L.4.011 oh 141,600
12 Tukang Pancang L.4.012 oh 141,600
13 Tukang Kayu/Bekisting L.4.013 oh 141,600
14 Tukang gambar L.4.014 oh 180,200
15 Tukang Interior L.4.015 oh 180,200
16 Tukang Kayu L.4.016 oh 154,500
17 Tukang Las L.4.017 oh 141,600
18 Tukang Las Konstruksi L.4.018 oh 141,600
19 Tukang Listrik L.4.019 oh 167,400
20 Tukang Pipa L.4.020 oh 141,600
21 Tukang Plafon L.4.021 oh 141,600
22 Tukang Prodo L.4.022 oh 167,400
23 Tukang Ukir L.4.023 oh 141,600
24 Tukang vibrator L.4.024 oh 141,600
25 Tukang Bor L.4.025 oh 141,600
26 Tukang cat dan tulis *) L.4.026 oh 141,600
27 Tukang Jahit L.4.027 oh 141,600
28 Tukang Las biasa L.4.028 oh 141,600
29 Tukang Las Listrik L.4.029 oh 141,600
30 Tukang penganyam L.4.030 oh 141,600
31 Tukang Gali L.4.031 oh 131,300
32 Tukang gali sumur L.4.032 oh 132,600
33 Direktur Kontraktor (Pemberi Tugas) L.4.033 oh 309,000
34 Supervisor (Staf Kontraktor) L.4.034 oh 257,500
35 Mandor L.4.035 oh 231,700
36 Kepala Tukang L.4.036 oh 193,100
37 Operator alat berat L.4.037 oh 141,600
38 Operator Alat Pipa L.4.038 oh 141,600
39 Operator crane L.4.039 oh 141,600
40 Supir truck L.4.040 oh 141,600
41 Supir kendaraan < 2 ton (termasuk sedan) L.4.041 oh 141,600
42 Kenek L.4.042 oh 128,800
43 Pembantu operator crane L.4.043 oh 128,800
44 Operator Alat Pipa Ahli L.4.044 oh 128,800
45 Pembantu Operator Alat Pipa L.4.045 oh 128,800

www.mitra-arsitek.com Price CK 1/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
46 Operator Alat Elektronik L.4.046 oh 135,200
47 Operator Pompa L.4.047 oh 135,200
48 Operator printer L.4.048 oh 135,200
49 Operator Tripod/Crane *) L.4.049 oh 135,200
50 Operator, driver speedboat L.4.050 oh 135,200
51 Ahli madya (sipil/hidrologi) L.4.051 oh 231,700
52 Ahli madya geologist L.4.052 oh 231,700
53 Engineer (sipil/geologi)/ahli madya L.4.053 oh 231,700
54 Ahli Alat Berat L.4.054 oh 231,700
55 Ahli K3 L.4.055 oh 231,700
56 Dokter L.4.056 oh 231,700
57 Perawat L.4.057 oh 231,700
58 Juru Ukur L.4.058 oh 231,700
59 Asisten Ahli Ukur L.4.059 oh 193,100
60 Penjaga malam/Satpam L.4.060 oh 128,800
61 Tukang gambar Drafter L.4.061 oh 193,100
62 Desain Engineer L.4.062 oh 257,500
63 Operator komputer/printer/ploter L.4.063 oh 128,800

DAFTAR HARGA DASAR PERALATAN


64 Alat Bantu/Perlengkapan Umum T.4.001 Ls 275,400
65 Alat Rangka Atap Baja Canai Dingin T.4.002 Ls 445,500
66 Assesoris (perkuatan, las dll) T.4.003 Ls 156,500
67 Bahan Kerja Paving Blok T.4.004 Ls 216,300
68 Bahan Pasang Dinding Bata Ringan T.4.005 Ls 218,400
69 Bahan potong pipa T1/manual (gergaji) /saw T.4.006 hari 252,000
70 Bahan potong pipa T2/mekanik / cilinder T.4.007 hari 695,500
71 Mobile crane =< 3 ton T.4.008 hari 1,092,000
72 Penjaga jarak bekisting / spacer T.4.009 bh 4,800
73 Peralatan Pasang Dinding Bata Ringan T.4.010 Ls 247,500
74 Perancah kayu T.4.011 m3 1,417,500
75 Perlengkapan T.4.012 Ls 260,000
76 Perlengkapan Badkip T.4.013 Ls 151,500
77 Perlengkapan Bak T.4.014 Ls 144,000
78 Perlengkapan Kloset T.4.015 Ls 144,000
79 Perlengkapan Pipa T.4.016 Ls 163,500
80 Perlengkapan Urinoir T.4.017 Ls 150,000
81 Perlengkapan Wastafel T.4.018 Ls 159,000
82 Scafolding T.4.019 sewa-unit 24,000
83 Sewa alat las T.4.020 Jam 159,000
84 Sewa alat perakitan baja T.4.021 Jam 63,700
85 Sewa alat Perakitan Baja IWF T.4.022 Jam 63,100
86 Sewa alat ukur T.4.023 hr 64,400
87 Sewa crane T.4.024 unit hari 1,330,600
88 Sewa excavator type 225 kap 0,5 -1,0 m3 T.4.025 hari 1,687,600
89 Sewa Genset 1500 watt T.4.026 hari 340,200
90 Sewa pipe support T.4.027 Buah hari 348,800
91 Sewa Pompa Submersible 3m3/h T.4.028 hari 307,100
92 Sewa Tripot/Tackel & handle crane 2 T T.4.029 hari 500,900
93 Sewa Perlengkapan Gerinda T.4.030 jam 43,700
94 Sewa mesin gerinda potong T.4.031 hari 125,000
95 Rol Cat T.4.032 hari 26,000

DAFTAR HARGA DASAR MATERIAL


96 Air M.4.001 Ltr 700
97 Air test (air bersih) M.4.002 m3 50,000
98 Alang-alang M.4.003 Ikat 600
99 Alkasit M.4.004 kg 49,100

www.mitra-arsitek.com Price CK 2/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
100 Bata ringan tebal 7,5 cm M.4.005 m3 2,836,700
101 Bata berongga M.4.006 bh 1,800
102 Bata merah M.4.007 Bh 1,000
103 Bata pelapis Dinding 3cm x 7cm x 24cm M.4.008 Bh 900
104 Bata rooster M.4.009 bh 900
105 Batako M.4.010 bh 4,500
106 Batu alam / tempel M.4.011 m2 299,300
107 Batu apung M.4.012 kg 30,300
108 Batu belah M.4.013 m3 299,800
109 Batu granit M.4.014 Kg 16,400
110 Batu paras M.4.015 m2 86,400
111 Serbuk Batu M.4.016 kg 4,700
112 Batu pecah 2/3 M.4.017 m3 349,500
113 Batu teraso M.4.018 Kg 2,400
114 Ijuk M.4.019 m3 205,800
115 Kapur M.4.020 m3 357,100
116 Kapur padam M.4.021 m3 80,700
117 Kapur Pasang M.4.022 m3 475,300
118 Kapur sirih M.4.023 Kg 12,700
119 Kerikil M.4.024 m3 242,100
120 Kerikil (kg) M.4.025 kg 200
121 Koral beton M.4.026 m3 227,400
122 Mortar siap pakai M.4.027 Kg 10,800
123 Pasir beton M.4.028 m3 294,800
124 Pasir Beton (kg) M.4.029 kg 300
125 Pasir pasang M.4.030 m3 222,600
126 Pasir Silika M.4.031 Kg 2,300
127 Pasir urug M.4.032 M3 251,300
128 Semen M.4.033 Kg 1,900
129 Semen grout M.4.034 Kg 1,800
130 Semen nat M.4.035 Kg 9,700
131 Semen Warna M.4.036 Kg 2,500
132 Sirtu M.4.037 m3 258,200
133 Tanah Liat M.4.038 m3 146,100
134 Tanah urug M.4.039 m3 196,100
135 Tepung gypsum M.4.040 kg 4,000
136 Bambu Ø 6 - 8 / 600 cm M.4.041 btg 27,000
137 Dolken kayu Ø 8-10/400 cm M.4.042 btg 26,800
138 List kayu 2/4 M.4.043 m3 5,940,000
139 List kayu profil M.4.044 m 2,900
140 Plepet kayu M.4.045 m1 2,100
141 Kayu cetakan M.4.046 m2 160,500
142 Reng 2 x 3 cm Kayu Kelas II M.4.047 m3 3,072,000
143 Reng bengkirai 2/3 M.4.048 m1 4,700
144 Reng bengkirai 3/4 M.4.049 m1 9,000
145 Reng jati (lokal) 2/3 M.4.050 m1 6,400
146 Reng jati (lokal) 3/4 M.4.051 m1 11,600
147 Reng jati 3/4 (klas 1) M.4.052 m1 15,200
148 Reng kamper 2/3 M.4.053 m1 4,400
149 Reng kamper 3/4 M.4.054 m1 8,700
150 Reng kruing 2/3 M.4.055 m1 3,400
151 Reng kruing 3/4 M.4.056 m1 6,800
152 Kaso 5/7 Kelas II M.4.057 m3 3,815,000
153 Kaso 5/7 ( albasiah/meranti ) M.4.058 m3 3,640,000
154 Kaso-kaso (5 x 7) cm bengkirai M.4.059 m3 6,375,000
155 Kaso-kaso (5 x 7) cm jati lokal M.4.060 m3 10,989,000
156 Kaso-kaso (5 x 7) cm kamper M.4.061 m3 6,474,000
157 Kaso-kaso (5 x 7) cm kruing M.4.062 m3 4,545,000

www.mitra-arsitek.com Price CK 3/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
158 Kayu Kaso 5 / 7 (borneo) M.4.063 btg 70,200
159 Kayu Kaso 5 / 7 (borneo/meranti) M.4.064 m3 3,570,000
160 Kayu kruing 5/7 M.4.065 m3 4,320,000
161 Usuk kayu bengkirai 5/7 M.4.066 m1 24,200
162 Usuk kayu jati (lokal) 5/7 M.4.067 m1 32,000
163 Usuk kayu jati 5/7 (klas 1) M.4.068 m1 39,100
164 Usuk kayu kamper 5/7 M.4.069 m1 24,200
165 Usuk kayu kruing 5/7 M.4.070 m1 16,700
166 Usuk Kayu meranti 5/7 Kelas III M.4.071 m3 2,575,000
167 Balok kayu 8/15 Kelas I M.4.072 m3 8,100,000
168 Balok kayu bengkirai M.4.073 m3 6,437,500
169 Balok Kayu Borneo M.4.074 m3 3,605,000
170 Balok kayu jati (klas plitur) M.4.075 m3 10,656,000
171 Balok kayu jati (lokal) M.4.076 m3 9,100,000
172 Balok kayu kamper M.4.077 m3 6,411,800
173 Balok kayu kelas II M.4.078 m3 3,465,000
174 Balok kayu kruing M.4.079 m3 4,410,000
175 Balok kayu papan (klas plitur) M.4.080 m3 6,370,000
176 Balok kayu, 6 x 12 M.4.081 m3 4,500,000
177 Kayu balok 5/7 Kelas II M.4.082 m3 2,415,000
178 Kayu balok 5/7 kelas III M.4.083 m3 2,016,000
179 Kayu balok borneo M.4.084 M3 3,710,000
180 Kayu bengkirai balok M.4.085 m3 6,812,500
181 Kayu glugu balok M.4.086 m3 1,632,000
182 Kayu jati (klas plitur) balok M.4.087 m3 9,405,000
183 Kayu jati (lokal) balok M.4.088 m3 7,575,000
184 Kayu kamper balok M.4.089 m3 6,100,500
185 Kayu kelas II balok M.4.090 M3 3,150,000
186 Kayu kruing balok M.4.091 m3 4,680,000
187 Kayu bengkirai papan M.4.092 m3 6,125,000
188 Kayu jati (lokal) papan M.4.093 m3 10,355,000
189 Kayu jati papan M.4.094 m3 9,310,000
190 Kayu jati papan (klas 1) M.4.095 m3 11,100,000
191 Kayu kamper papan M.4.096 m3 6,536,300
192 Kayu kelas III (papan) M.4.097 m3 2,675,000
193 Kayu kruing papan M.4.098 m3 4,545,000
194 Kayu Papan 3 / 20 borneo/meranti M.4.099 m3 3,465,000
195 Kayu papan 3/20 M.4.100 m3 3,605,000
196 Kayu Papan kelas I M.4.101 M3 6,598,500
197 Kayu Papan kelas II M.4.102 m3 3,570,000
198 Kayu papan kelas III M.4.103 m3 2,725,000
199 Papan cetakan M.4.104 m3 1,648,000
200 Papan kayu 3/20 Kelas II M.4.105 m3 3,152,500
201 Papan kayu 3/20 Kelas III M.4.106 m3 1,908,000
202 Papan kayu bengkirai M.4.107 m3 6,812,500
203 Papan Kayu Borneo tebal 3cm M.4.108 m3 3,745,000
204 Papan kayu jati (klas plitur) M.4.109 m3 9,690,000
205 Papan kayu jati (lokal) M.4.110 m3 9,690,000
206 Papan kayu kamper M.4.111 m3 6,100,500
207 Papan kayu kelas II M.4.112 m3 3,500,000
208 Papan kayu kruing M.4.113 m3 4,500,000
209 Ram kayu bengkirai M.4.114 m3 5,722,500
210 Ram kayu jati (lokal) M.4.115 m3 8,100,000
211 Ram kayu kamper M.4.116 m3 5,434,000
212 Ram kayu kruing M.4.117 m3 3,535,000
213 Alluminium B M.4.118 Kg 25,000
214 Alluminium C M.4.119 Kg 26,400
215 Aluminium Composite Panel M.4.120 Lbr 297,000

www.mitra-arsitek.com Price CK 4/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
216 Aluminium foil M.4.121 M2 28,800
217 Aluminium strip M.4.122 m 26,700
218 Alumunium gel tbl 0,55 M.4.123 Lbr 139,200
219 Baja Ringan- Reng Truss M.4.124 M' 11,300
220 Baja Ringan-C Truss M.4.125 m1 20,800
221 Baja Siku M.4.126 Kg 15,400
222 Baja WF M.4.127 Kg 18,600
223 Baja strip (0,2 x 2) cm M.4.128 Kg 13,400
224 Baut (Srew driver) M.4.129 bh 500
225 Baut Ramset / Dina Bolt M.4.130 bh 4,800
226 Besi angkur Ø=8 mm M.4.131 Kg 14,000
227 Besi beton M.4.132 Kg 14,100
228 Besi hollow 50.50.3 M.4.133 Kg 21,300
229 Besi IWF M.4.134 Kg 10,100
230 Besi lis kaca (1 x 1) cm M.4.135 m 46,400
231 Besi plat baja M.4.136 Kg 10,500
232 Besi Profil M.4.137 Kg 17,100
233 Besi rangka M.4.138 kg 1,700
234 Besi siku L 30.30.3 M.4.139 Kg 13,700
235 Besi square tube M.4.140 m 27,100
236 Hollow 4/4 M.4.141 M1 12,600
237 Kait angin M.4.142 Bh 5,700
238 Kawat beton M.4.143 Kg 28,800
239 Kawat burung M.4.144 m2 16,200
240 Kawat dia 4 mm M.4.145 kg 36,300
241 Kawat duri M.4.146 M’ 21,200
242 Kawat harmonika M.4.147 m2 41,200
243 Kawat jaring M.4.148 Lbr 115,500
244 Kawat kassa M.4.149 m2 11,900
245 Kawat las listrik M.4.150 Kg 45,900
246 Kawat las gas M.4.151 Kg 46,400
247 Kawat nyamuk M.4.152 m2 11,800
248 Kawat penggantung M.4.153 m1 500
249 Pagar kawat jaring M.4.154 lbr 37,500
250 Paku 5 - 10 cm M.4.155 kg 25,400
251 Paku anti karat M.4.156 kg 19,900
252 Paku Biasa ½" - 1" M.4.157 Kg 24,300
253 Paku Biasa 2" - 5" M.4.158 Kg 27,300
254 Paku eternit M.4.159 kg 20,700
255 Paku gypsum M.4.160 kg 17,200
256 Paku Hak Panjang 15cm M.4.161 Kg 10,800
257 Paku Pancing 60 x 230 M.4.162 Kg 12,200
258 Paku plepet M.4.163 kg 16,500
259 Paku reng M.4.164 kg 17,000
260 Paku sekrup M.4.165 bh 800
261 Paku sekrup 3,5" M.4.166 Kg 13,100
262 Paku skrup 1 cm – 2,5 cm M.4.167 bh 600
263 Paku skrup 10 cm M.4.168 kg 13,900
264 Paku skrup 5 cm M.4.169 kg 16,700
265 Paku sumbat M.4.170 bh 400
266 Paku tripleks M.4.171 kg 17,300
267 Paku usuk M.4.172 kg 15,900
268 Paku/skrup atap anti karat M.4.173 bh 1,100
269 Pintu alluminium M.4.174 m 445,500
270 Pintu alumunium M.4.175 m2 218,200
271 Pintu gulung besi M.4.176 m2 544,500
272 Profil Alluminium "T" M.4.177 m 12,600
273 Profil kusen alluminium M.4.178 m1 123,600

www.mitra-arsitek.com Price CK 5/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
274 Rel pintu dorong M.4.179 Set 200,000
275 Rolling door alluminium M.4.180 m2 514,800
276 Screening M.4.181 Kg 2,600
277 Screw M.4.182 bh 500
278 Sekrup fixer M.4.183 bh 300
279 Sunscreen alumunium M.4.184 m2 265,000
280 Bak cuci piring M.4.185 Unit 464,400
281 Bak fiberglass M.4.186 Unit 339,200
282 Bak mandi teraso M.4.187 bh 184,200
283 Bathcuip M.4.188 Unit 2,722,500
284 Floor drain M.4.189 Unit 61,800
285 Klem Pipa M.4.190 bh 1,500
286 Kloset duduk / monoblock M.4.191 Unit 2,700,000
287 Kloset jongkok porselen M.4.192 bh 160,500
288 Kloset jongkok teraso M.4.193 Unit 257,500
289 Kran air M.4.194 M 26,800
290 L.Bow M.4.195 bh 10,600
291 Pipa Beton M.4.196 Bh 53,400
292 Pipa Conduit M.4.197 M' 5,100
293 Pipa tanah M.4.198 Bh 47,900
294 Socket Pipa M.4.199 bh 14,000
295 Urinoir M.4.200 Unit 1,526,000
296 Wastafel M.4.201 Unit 1,464,500
297 Waterdrain M.4.202 Bh 73,000
298 Pipa PVC 1/2" M.4.203 M 4,400
299 Pipa PVC 3/4" M.4.204 M 5,400
300 Pipa PVC 1” M.4.205 M 6,300
301 Pipa PVC 11/2” M.4.206 M 6,900
302 Pipa PVC 2” M.4.207 M 7,300
303 Pipa PVC 21/2” M.4.208 M 7,500
304 Pipa PVC 3" M.4.209 m1 7,700
305 Pipa PVC 3” M.4.210 M 8,500
306 Pipa PVC 4" M.4.211 M 9,700
307 Pipa galvanis ½” M.4.212 M 20,400
308 Pipa galvanis 3/4” M.4.213 M 26,000
309 Pipa galvanis 1” M.4.214 M 42,800
310 Pipa galvanis 11/2” M.4.215 M 74,500
311 Pipa galvanis 3” M.4.216 M 101,000
312 Pipa galvanis 4” M.4.217 M 143,400
313 Pipa Baja Ø 63 mm M.4.218 m 218,800
314 Pipa Baja Ø 100 mm M.4.219 m 375,000
315 Pipa Baja Ø 125 mm M.4.220 m 200,000
316 Pipa Baja Ø 150 mm M.4.221 m 135,200
317 Pipa Baja Ø 200 mm M.4.222 m 218,300
318 Pipa Baja Ø 250 mm M.4.223 m 275,100
319 Pipa Baja Ø 300 mm M.4.224 m 321,300
320 Pipa Baja Ø 400 mm M.4.225 m 415,800
321 Pipa Baja Ø 450 mm M.4.226 m 505,100
322 Pipa Baja Ø 500 mm M.4.227 m 540,800
323 Pipa Baja Ø 600 mm M.4.228 m 666,800
324 Pipa Baja Ø 800 mm M.4.229 m 898,800
325 Pipa Baja Ø 900 mm M.4.230 m 907,200
326 Pipa Baja Ø 1000 mm M.4.231 m 1,272,000
327 Pipa Baja Ø 1100 mm M.4.232 m 1,287,500
328 Pipa Baja Ø 1200 mm M.4.233 m 1,287,000
329 Pipa DCI Ø 100 mm M.4.234 m 141,200
330 Pipa DCI Ø 125 mm M.4.235 m 192,000
331 Pipa DCI Ø 150 mm M.4.236 m 318,300

www.mitra-arsitek.com Price CK 6/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
332 Pipa DCI Ø 200 mm M.4.237 M 539,000
333 Pipa DCI Ø 250 mm M.4.238 M 836,000
334 Pipa DCI Ø 300 mm M.4.239 m 1,071,000
335 Pipa DCI Ø 400 mm M.4.240 m 2,592,000
336 Pipa DCI Ø 450 mm M.4.241 m 2,744,000
337 Pipa DCI Ø 500 mm M.4.242 m 3,136,000
338 Pipa DCI Ø 600 mm M.4.243 m 3,492,000
339 Pipa DCI Ø 800 mm M.4.244 m 4,848,000
340 Pipa DCI Ø 900 mm M.4.245 m 4,896,000
341 Pipa DCI Ø 1000 mm M.4.246 m 6,000,000
342 Pipa DCI Ø 1100 mm M.4.247 m 6,370,000
343 Pipa DCI Ø 1200 mm M.4.248 m 7,446,000
344 Pipa GIP Ø 63 mm M.4.249 m 150,000
345 Pipa GIP Ø 100 mm M.4.250 m 219,000
346 Pipa GIP Ø 125 mm M.4.251 m 297,700
347 Pipa GIP Ø 150 mm M.4.252 m 360,600
348 Pipa GIP Ø 200 mm M.4.253 m 458,700
349 Pipa GIP Ø 250 mm M.4.254 m 589,900
350 Pipa GIP Ø 300 mm M.4.255 m 714,500
351 Pipa GIP Ø 400 mm M.4.256 m 890,900
352 Pipa GIP Ø 450 mm M.4.257 m 1,022,100
353 Pipa GIP Ø 500 mm M.4.258 m 1,201,800
354 Pipa GIP Ø 600 mm M.4.259 m 1,389,200
355 Pipa GIP Ø 800 mm M.4.260 m 1,728,800
356 Pipa GIP Ø 900 mm M.4.261 m 1,984,500
357 Pipa GIP Ø 1000 mm M.4.262 m 2,160,900
358 Pipa GIP Ø 1100 mm M.4.263 m 2,377,000
359 Pipa GIP Ø 1200 mm M.4.264 m 2,804,800
360 Pipa HDPE Ø 63 mm M.4.265 m 53,400
361 Pipa HDPE Ø 100 mm M.4.266 m 125,300
362 Pipa HDPE Ø 125 mm M.4.267 m 230,900
363 Pipa HDPE Ø 150 mm M.4.268 m 307,900
364 Pipa HDPE Ø 200 mm M.4.269 m 619,200
365 Pipa HDPE Ø 250 mm M.4.270 m 974,400
366 Pipa HDPE Ø 300 mm M.4.271 m 1,656,800
367 Pipa HDPE Ø 400 mm M.4.272 m 2,538,900
368 Pipa HDPE Ø 450 mm M.4.273 m 3,093,700
369 Pipa HDPE Ø 500 mm M.4.274 m 3,552,000
370 Pipa HDPE Ø 600 mm M.4.275 bh 6,240,000
371 Pipa HDPE Ø 800 mm M.4.276 m 9,048,000
372 Pipa HDPE Ø 900 mm M.4.277 m 9,996,000
373 Pipa HDPE Ø 1000 M.4.278 bh 11,025,000
374 Pipa HDPE Ø 1000 mm M.4.279 m 11,845,000
375 Pipa HDPE Ø 1100 M.4.280 bh 11,025,000
376 Pipa HDPE Ø 1100 mm M.4.281 m 12,305,000
377 Pipa HDPE Ø 1200 mm M.4.282 m 13,500,000
378 Pipa Ø 80 mm M.4.283 bh 59,800
379 Pipa Ø 100 mm M.4.284 bh 85,500
380 Pipa Ø 150 mm M.4.285 bh 94,100
381 Pipa Ø 200 mm M.4.286 bh 178,000
382 Pipa Ø 250 mm M.4.287 bh 233,200
383 Pipa Ø 300 mm M.4.288 bh 273,400
384 Pipa Ø 400 mm M.4.289 bh 378,500
385 Pipa Ø 450 mm M.4.290 bh 449,900
386 Pipa Ø 500 mm M.4.291 bh 495,600
387 Pipa Ø 600 mm M.4.292 bh 605,700
388 Pipa Ø 700 mm M.4.293 bh 764,000
389 Pipa Ø 800 mm M.4.294 bh 779,200

www.mitra-arsitek.com Price CK 7/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
390 Pipa PVC Ø 63 mm M.4.295 m 86,400
391 Pipa PVC Ø 90 mm M.4.296 m 110,200
392 Pipa PVC Ø 110 mm M.4.297 m 134,700
393 Pipa PVC Ø 150 mm M.4.298 m 168,300
394 Pipa PVC Ø 200 mm M.4.299 m 315,300
395 Pipa PVC Ø 250 mm M.4.300 m 472,000
396 Pipa PVC Ø 300 mm M.4.301 m 793,800
397 Pipa PVC Ø 400 mm M.4.302 m 1,392,600
398 Pipa PVC Ø 450 mm M.4.303 m 1,744,000
399 Pipa PVC Ø 500 mm M.4.304 m 2,461,000
400 Pipa PVC Ø 600 mm M.4.305 m 3,600,000
401 Pipa PVC Ø 800 mm M.4.306 m 5,292,000
402 Pipa PVC Ø 900 mm M.4.307 m 6,138,000
403 Pipa PVC Ø 1000 mm M.4.308 m 7,650,000
404 Pipa PVC Ø 1100 mm M.4.309 m 8,448,000
405 Pipa PVC Ø 1200 mm M.4.310 m 9,696,000
406 Tee Ø 150 mm M.4.311 bh 145,500
407 Tee Ø 200 mm M.4.312 bh 204,000
408 Tee Ø 250 mm M.4.313 bh 240,000
409 Tee Ø 300 mm M.4.314 bh 300,000
410 Tee Ø 400 mm M.4.315 bh 374,500
411 Tee Ø 450 mm M.4.316 bh 420,000
412 Tee Ø 500 mm M.4.317 bh 481,500
413 Tee Ø 600 mm M.4.318 bh 500,000
414 Tee Ø 700 mm M.4.319 bh 544,500
415 Tee Ø 800 mm M.4.320 bh 636,000
416 Tee Ø 900 mm M.4.321 bh 643,500
417 Tee Ø 1000 mm M.4.322 bh 763,000
418 Tee Ø 1100 mm M.4.323 bh 817,500
419 Tee Ø 1200 mm M.4.324 bh 824,000
420 Valve Ø 150 mm M.4.325 bh 5,432,000
421 Valve Ø 200 mm M.4.326 bh 7,236,000
422 Valve Ø 250 mm M.4.327 bh 10,355,000
423 Valve Ø 300 mm M.4.328 bh 12,915,000
424 Valve Ø 400 mm M.4.329 bh 15,402,000
425 Valve Ø 450 mm M.4.330 bh 17,542,000
426 Valve Ø 500 mm M.4.331 bh 22,149,000
427 Valve Ø 600 mm M.4.332 bh 25,380,000
428 Valve Ø 700 mm M.4.333 bh 25,511,000
429 Valve Ø 800 mm M.4.334 bh 31,719,000
430 Valve Ø 900 mm M.4.335 bh 31,262,000
431 Valve Ø 1000 mm M.4.336 bh 36,088,000
432 Valve Ø 1100 mm M.4.337 bh 40,875,000
433 Valve Ø 1200 mm M.4.338 bh 43,121,000
434 Akustik Uk. 60 cm x 120 cm M.4.339 Lbr 130,600
435 Akustik ukuran 30 x 30 cm M.4.340 Lbr 35,400
436 Akustik ukuran 30 x 60 cm M.4.341 Lbr 57,800
437 Asbes semen M.4.342 m2 83,200
438 Asbes 1,00 x 1,00 m M.4.343 lbr 26,000
439 Asbes Gelombang M.4.344 lbr 107,800
440 Asbes gelombang 92x250 M.4.345 Lbr 108,100
441 Asbes plat M.4.346 m2 33,000
442 Asbes semen tebal 4 mm M.4.347 m2 19,500
443 Asbes semen tebal 5 mm M.4.348 m2 22,300
444 Asbes semen tebal 6 mm M.4.349 m2 24,000
445 Bilik bambu M.4.350 m2 77,300
446 Formika M.4.351 Lbr 93,600
447 Gymfloor M.4.352 m2 143,900

www.mitra-arsitek.com Price CK 8/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
448 Gypsum board 9 mm M.4.353 lbr 85,300
449 Kalsiboard 3.5 mm M.4.354 lbr 67,000
450 Karpet M.4.355 m2 70,100
451 List profil cornees gypsum M.4.356 m1 26,800
452 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) M.4.357 M' 35,700
453 Multiplek M.4.358 lbr 81,600
454 Parquet kayu M.4.359 m2 13,900
455 Parquet kayu gymfloor M.4.360 m2 298,700
456 Phel film 12mm M.4.361 Lbr 150,800
457 Plafond PVC M.4.362 m2 115,600
458 Plastic aerator M.4.363 Bh 36,800
459 Polycarbonat M.4.364 m2 147,000
460 Plywood 120x240 tbl. 4 mm M.4.365 Lbr 78,500
461 Plywood 120x240 tbl. 6 mm M.4.366 Lbr 76,800
462 Plywood 120x240 tbl. 9 mm M.4.367 Lbr 115,200
463 Seng Gelombang 3" x 6" BJLS 28 M.4.368 Lbr 51,000
464 Seng Gelombang BJLS 32 M.4.369 lbr 112,700
465 Teakwood 4 mm 90 x 220 cm M.4.370 Lbr 61,500
466 Teakwood 4 mm, 120 x 240 M.4.371 Lbr 76,300
467 Tripleks M.4.372 Lbr 40,000
468 underlayer (pelapis bawah karpet) M.4.373 m2 29,100
469 Wallpaper M.4.374 m 34,000
470 Cat alkali resisting primer M.4.375 kg 33,000
471 Cat antara M.4.376 Kg 49,100
472 Cat Besi M.4.377 Kg 53,500
473 Cat dasar M.4.378 kg 27,500
474 Cat dasar Besi M.4.379 Kg 30,400
475 Cat dasar Kayu M.4.380 Kg 30,700
476 Cat dasar Tembok M.4.381 Kg 65,000
477 Cat duco M.4.382 kg 65,000
478 Cat emco M.4.383 kg 43,300
479 Cat ICI Weathershield M.4.384 kg 57,600
480 Cat kayu M.4.385 kg 49,000
481 Cat meni M.4.386 Kg 16,300
482 Cat Penutup Tembok M.4.387 Kg 37,800
483 Dempul M.4.388 Kg 40,000
484 Flincoat M.4.389 kg 35,900
485 Kuas M.4.390 Bh 18,100
486 Meni ( Read Lead ) A M.4.391 Kg 34,400
487 Meni ( Read Lead ) B M.4.392 Kg 37,500
488 Meni besi M.4.393 Ltr 31,800
489 Menie A M.4.394 Kg 33,700
490 Menie B M.4.395 Kg 36,800
491 Menie besi M.4.396 Kg 28,400
492 Minyak cat M.4.397 kg 35,000
493 Pengencer M.4.398 Kg 36,800
494 Plamir M.4.399 Kg 56,300
495 Politur M.4.400 L 37,500
496 Teak oil M.4.401 L 16,500
497 Tinner M.4.402 ltr 36,500
498 Vernis M.4.403 L 110,400
499 Vinyl M.4.404 Bh 18,400
500 Hospital plint M.4.405 bh 12,300
501 keramik artistik 10cm x 10cm atau 5cm x 20cm M.4.406 Bh 2,500
502 keramik artistik 10cm x 20cm M.4.407 m2 75,000
503 keramik Dinding 10cm x 20cm M.4.408 m2 85,900
504 keramik Dinding 20cm x 20cm M.4.409 m2 68,200
505 Keramik Dinding artistik M.4.410 m2 72,000

www.mitra-arsitek.com Price CK 9/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
506 Keramik mozaik ukuran 30cm x 30cm M.4.411 Bh 13,100
507 Keramik ukuran 20cm x 20cm M.4.412 Bh 5,000
508 keramik ukuran 30cm x 30cm M.4.413 Bh 6,000
509 keramik ukuran 33cm x 33cm M.4.414 Bh 7,500
510 List keramik dinding motif M.4.415 bh 11,800
511 Marmer M.4.416 m2 450,000
512 marmer ukuran 100cm x 100cm M.4.417 Bh 62,100
513 Mosaik M.4.418 m2 218,400
514 Plint internal cove artistik 5cm x 5cm x 20cm M.4.419 Bh 4,800
515 Plint keramik artistik M.4.420 bh 10,600
516 Plint keramik ukuran 10cm x 10cm M.4.421 Bh 5,500
517 Plint keramik ukuran 10cm x 20cm M.4.422 Bh 6,600
518 Plint keramik ukuran 5cm x 20cm M.4.423 Bh 4,400
519 Plint Ubin M.4.424 bh 3,400
520 Plint ubin granit M.4.425 bh 12,200
521 Plint ubin granit ukuran 10cm x 30cm M.4.426 Bh 14,000
522 Plint ubin granit ukuran 10cm x 40cm M.4.427 Bh 14,200
523 Plint ubin keramik 10 x 30 cm M.4.428 bh 4,700
524 Plint ubin keramik 10 x 40 cm M.4.429 bh 5,900
525 Plint ubin Pc abu-abu ukuran 10cm x 30cm M.4.430 Bh 5,300
526 Plint ubin Pc abu-abu ukuran 10cm x 40cm M.4.431 Bh 6,100
527 Plint ubin Pc abu-abu ukuran 15cm x 20cm M.4.432 Bh 6,500
528 Plint ubin PC warna M.4.433 bh 5,600
529 Plint ubin teralux kerang M.4.434 bh 6,500
530 Plint ubin teralux kerang ukuran 10cm x 30cm M.4.435 Bh 6,300
531 Plint ubin teralux kerang ukuran 10cm x 40cm M.4.436 Bh 7,300
532 Plint ubin teralux marmer M.4.437 bh 13,000
533 Plint ubin teralux marmer ukuran 10cm x 30cm M.4.438 Bh 13,800
534 Plint ubin teralux marmer ukuran 10cm x 40cm M.4.439 Bh 14,600
535 plint ubin teralux marmer ukuran 10cm x 60cm M.4.440 Bh 16,400
536 Plint ubin teraso M.4.441 bh 4,800
537 Plint ubin teraso ukuran 10cm x 30cm M.4.442 Bh 5,500
538 Plint ubin teraso ukuran 10cm x 40cm M.4.443 Bh 7,600
539 Plint ubin warna ukuran 10cm x 20cm M.4.444 Bh 4,800
540 Plint ubin warna ukuran 10cm x 30cm M.4.445 Bh 5,000
541 Plint ubin warna ukuran 10cm x 40cm M.4.446 Bh 6,500
542 plint vynil 15cm x 30cm M.4.447 Bh 24,000
543 Porselen M.4.448 m2 143,100
544 Porselen (11 x 11) cm M.4.449 Bh 6,700
545 Porselen Dinding 10x20 M.4.450 Bh 5,000
546 Porselen Dinding 20x20 M.4.451 Bh 7,000
547 Print outdoor flexi M.4.452 m2 54,600
548 Stepnosing granito M.4.453 bh 11,200
549 Ubin abu-abu M.4.454 m2 35,700
550 Ubin granit M.4.455 m2 282,200
551 ubin granit ukuran 30cm x30cm M.4.456 Bh 15,700
552 ubin granit ukuran 40cm x40cm M.4.457 Bh 20,600
553 Ubin keramik M.4.458 Bh 9,600
554 Ubin keramik artistik M.4.459 m2 61,100
555 ubin PC abu-abu ukuran 20cm x20 cm M.4.460 Bh 3,200
556 ubin PC abu-abu ukuran 30cm x30 cm M.4.461 Bh 4,400
557 ubin PC abu-abu ukuran 40cm x40cm M.4.462 Bh 6,500
558 Ubin porselen M.4.463 Bh 6,600
559 ubin teralux marmer ukuran 40cm x40cm M.4.464 Bh 11,700
560 ubin teralux ukuran 30cm x30cm M.4.465 Bh 14,700
561 Ubin teralux kerang M.4.466 m2 76,500
562 Ubin teralux marmer M.4.467 m2 303,500
563 ubin teralux marmer ukuran 30cm x30cm M.4.468 Bh 33,000

www.mitra-arsitek.com Price CK 10/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
564 ubin teralux marmer ukuran 40cm x40cm M.4.469 Bh 39,300
565 ubin teralux marmer ukuran 60cm x60cm M.4.470 Bh 44,100
566 Ubin teraso M.4.471 m2 143,600
567 ubin teraso ukuran 30cm x30cm M.4.472 Bh 13,400
568 ubin teraso ukuran 40cm x40cm M.4.473 Bh 15,400
569 Ubin warna M.4.474 m2 107,800
570 ubin warna ukuran 20cm x20cm M.4.475 Bh 11,800
571 ubin warna ukuran 30cm x30cm M.4.476 Bh 12,000
572 ubin warna ukuran 40cm x40 cm M.4.477 Bh 14,700
573 Atap Alluminium Gelombang tebal 0.55 M.4.478 m2 161,700
574 Atap metal gelombang t 0.35 mm M.4.479 m2 64,900
575 Bubung stel gel. M.4.480 Lbr 16,400
576 Bubungan gent.krmk KIA natural M.4.481 bh 29,700
577 Bubungan genteng beton warna M.4.482 bh 23,100
578 Bubungan genteng paris M.4.483 bh 22,100
579 Genteng aspal M.4.484 Bh 3,100
580 Genteng beton M.4.485 Bh 2,900
581 Genteng beton natural M.4.486 bh 2,800
582 Genteng beton Warna M.4.487 bh 2,900
583 Genteng bubung M.4.488 Bh 5,000
584 Genteng Bubung Kodok M.4.489 bh 1,500
585 Genteng Bubung Palentong M.4.490 bh 2,000
586 Genteng keramik KIA natural M.4.491 bh 6,900
587 Genteng kodok M.4.492 Bh 1,700
588 Genteng metal M.4.493 Bh 35,400
589 Genteng palentong M.4.494 Bh 2,500
590 Genteng Palentong Super M.4.495 bh 3,700
591 Genteng paris M.4.496 bh 900
592 Genteng Sirap M.4.497 lbr 4,000
593 nok genteng aspal M.4.498 Bh 25,000
594 nok genteng beton M.4.499 Bh 15,600
595 Nok Genteng Decra Bond M.4.500 lbr 71,000
596 nok genteng metal M.4.501 Bh 88,000
597 Nok metal M.4.502 bh 77,000
598 Nok Paten M.4.503 Lbr 40,700
599 Nok standar 40 cm 18, swg 22 M.4.504 m2 80,200
600 Nok standar 40x18 M.4.505 Bh 6,400
601 Nok Stel Gelombang M.4.506 lbr 71,800
602 Nok Stel rata M.4.507 lbr 59,400
603 Roof Light Fiberglass M.4.508 lbr 133,900
604 Rooflight 90x180 M.4.509 Lbr 120,000
605 Sirap kayu M.4.510 Bh 2,500
606 Talang / Jurai Canai Dingin M.4.511 M' 45,900
607 Fitting Lampu M.4.512 bh 25,500
608 Kabel NYM 3x2,5 mm2 M.4.513 m 20,700
609 Klem Pipa Listrik M.4.514 bh 800
610 Las Dop M.4.515 bh 1,100
611 Mongkok (Listrik) M.4.516 bh 1,500
612 Saklar (standar) M.4.517 bh 38,200
613 Tee Doos M.4.518 bh 1,600
614 Pipa listrik 5/8” M.4.519 btg 13,400
615 Kaca buram 12 mm M.4.520 m2 162,000
616 Kaca cermin 5 mm M.4.521 m2 162,600
617 Kaca cermin 8 mm M.4.522 m2 237,400
618 Kaca patri 5mm M.4.523 m2 91,000
619 Kaca polos M.4.524 m2 112,200
620 Kaca tebal 3mm M.4.525 m2 91,800
621 Kaca tebal 5 mm M.4.526 m2 116,400

www.mitra-arsitek.com Price CK 11/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
622 Kaca tebal 8 mm M.4.527 m2 187,200
623 Kaca wire glass M.4.528 m2 251,500
624 Profil kaca M.4.529 m 64,400
625 Bahan teraso cor M.4.530 m3 1,068,200
626 Beton 1:2:3 M.4.531 M3 1,248,000
627 Beton kedap air M.4.532 m3 292,100
628 Buis beton D. 80 cm M.4.533 bh 63,300
629 Conblock M.4.534 m2 6,400
630 Hollow Block 10 M.4.535 bh 6,900
631 Hollow Block 15 M.4.536 bh 7,400
632 Hollow Block 20 M.4.537 bh 10,700
633 Kasa gypsum M.4.538 roll 474,900
634 Kolom beton pracetak M.4.539 btg 201,600
635 Panel Beton Pracetak M.4.540 Lbr 153,000
636 Paving block 8 cm berwarna M.4.541 M2 115,500
637 Paving block 6 cm M.4.542 M2 141,800
638 Paving block 6cm berwarna M.4.543 M2 137,800
639 Paving block 8 cm natural M.4.544 M2 3,700
640 Roster 25/25 cm M.4.545 bh 15,800
641 Teraso cor di tempat, tebal 3cm M.4.546 M3 4,800
642 Terawang (roster) M.4.547 bh 8,900
643 Amplas M.4.548 Lbr 6,500
644 Bahan Bakar M.4.549 Ltr 10,500
645 Bahan Kimia M.4.550 Ltr 47,700
646 Batu Gerinda M.4.551 bh 75,000
647 Lem M.4.552 kg 14,600
648 Lem kayu M.4.553 Kg 13,200
649 Lem Putih M.4.554 Kg 15,200
650 Lem vinyl M.4.555 kg 20,800
651 Minyak bekisting M.4.556 Ltr 5,700
652 Minyak pelumas M.4.557 Ltr 34,700
653 Oli M.4.558 Ltr 35,400
654 Perekat M.4.559 Kg 43,700
655 Residu M.4.560 Ltr 8,700
656 Sabun M.4.561 Kg 11,400
657 Soda api M.4.562 Kg 47,700
658 Solar M.4.563 L 8,800
659 Gas Oxigen M.4.564 Tbg 1,589,700
660 Gas Aceteline M.4.565 Tbg 2,016,500
661 Kawat Solder (Timah) M.4.566 kg 945,000
662 Kawat Brazing (Kuningan) M.4.567 kg 1,035,500
663 Door closer M.4.568 set 255,000
664 Door holder M.4.569 Bh 101,900
665 Door stop M.4.570 Bh 94,100
666 Engsel angin M.4.571 Bh 7,900
667 Engsel jendela M.4.572 bh 8,700
668 Engsel kupu-kupu M.4.573 Bh 19,600
669 Engsel pintu M.4.574 Bh 17,400
670 Jendela besi M.4.575 m2 792,000
671 Jendela naco M.4.576 Bh 26,500
672 Jendela nako (rangka + kaca 5 mm) M.4.577 m2 60,000
673 Serat Semen M.4.578 lbr 81,600
674 Kunci lemari M.4.579 Set 12,600
675 Kunci silinder M.4.580 Bh 79,500
676 Kunci slot M.4.581 Bh 49,000
677 Kunci tanam antik M.4.582 Bh 272,500
678 Kunci tanam biasa M.4.583 Bh 141,700
679 Kunci tanam KM M.4.584 Bh 49,500

www.mitra-arsitek.com Price CK 12/275


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:55 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
680 Pintu lipat M.4.585 m2 500,000
681 Badkip M.4.586 bh 16,400
682 Floor hardener M.4.587 Kg 4,100
683 Grassblock M.4.588 m2 48,600
684 Gebalan Rumput M.4.589 m2 30,900
685 Internal cove M.4.590 bh 7,500
686 Jaring kawat baja dilas M.4.591 kg 12,300
687 Kalkarium M.4.592 Kg 5,200
688 Kerta karbon M.4.593 lbr 3,800
689 Kertas 100 x 100 cm M.4.594 lb 5,600
690 Lantai kerja tebal 10cm M.4.595 m3 757,500
691 Pengelasan M.4.596 cm 4,500
692 Prodo M.4.597 m2 3,210,000
693 Sealant M.4.598 Tube 226,800
694 Sealtape M.4.599 bh 3,600
695 Spring knip M.4.600 Bh 8,200
696 Strorox - 100 M.4.601 kg 43,400
697 Tali ijuk M.4.602 Kg 24,200
698 Underlayer irubber corrugated M.4.603 m2 100,100
699 Venetions blinds dan vertical blinds (tirai) M.4.604 m2 79,500
700 Waterstop lebar 150 mm M.4.605 m 78,000
701 Waterstop lebar 200 mm M.4.606 m 83,200
702 Waterstop lebar 230 mm - 320 mm M.4.607 m 102,600
703 Upah Kerja Mobiliasasi/Demobilisasi M.4.608 Ls 891,000
704 Alat Kerja Mobilisasi/Demobilisasi M.4.609 Ls 432,000
705 Bahan Kerja Mobilisasi/Demobilisasi M.4.610 Ls 252,500
706 Upah Kerja Pembuatan Septik Tank M.4.611 Ls 1,530,000
707 Alat Kerja Pembuatan Septik Tank M.4.612 Ls 477,000
708 Bahan Kerja Pembuatan Septik Tank M.4.613 Ls 6,630,000
709 Upah Kerja Pembuatan Sumur Resapan Limbah M.4.614 Ls 1,078,000
710 Alat Kerja Pembuatan Sumur Resapan Limbah M.4.615 Ls 381,500
711 Bahan Kerja Pembuatan Sumur Resapan Limbah M.4.616 Ls 4,770,000
712 Biaya Pengurusan Daya Listrik PLN M.4.617 Ls 5,335,000
713 Biaya Pengurusan Instalasai PDAM M.4.618 Ls 2,600,000
714 Shower Mandi M.4.619 Unit 135,000
715 Tangki Air M.4.620 Unit 1,300,000
716 Pompa Air M.4.621 Unit 654,000
717 Pintu Utama (Kusen+Panel) Type P1 M.4.622 set 2,289,000
718 Pintu Utama (Kusen+Panel) Type P2 M.4.623 set 1,680,000
719 Pintu Utama (Kusen+Panel) Type P3 M.4.624 set 1,177,000
720 Jendela Type J1 M.4.625 set 940,800
721 Jendela Type J2 M.4.626 set 600,000
722 Jendela Type J3 M.4.627 set 2,400,000
723 Lubang Angin M.4.628 Unit 24,500
724 MCB + Box M.4.629 Unit 357,000
725 Tembaga dia.1/2"-1.5m M.4.630 btg 643,500
726 Kabel NYM 3x2,5 mm2-SNI M.4.631 m1 12,300
727 Kabel NYM 2x1,5 mm2-SNI M.4.632 m1 10,000
728 Saklar Listrik M.4.633 unit 24,800
729 Lampu 5W M.4.634 unit 24,800
730 Lampu 15W M.4.635 unit 35,700
731 Lampu 20W M.4.636 unit 45,900
732 Receiptackle M.4.637 unit 30,000
733 Air Conditioner M.4.638 unit 3,424,000
734 Exhaust Fan M.4.639 unit 735,000
735 Cat Anti Bocor+Waterproofing M.4.640 kg 17,000
736 Pohon Perdu M.4.641 unit 540,000

www.mitra-arsitek.com Price CK 13/275


Aplikasi DataPro Premium v23.0 (Full).xlsx

DAFTAR ANALISA UTAMA


Analisa Harga Satuan Pekerjaan Sesuai Acuan PUPERA Tahun 2016 Bidang IV CIPTA KARYA
PERMEN PUPERA NO 28 Tahun 2016 Bidang Cipta Karya
20/03/2023 13:32:31
STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.2.2.1.1. P-001 1.00 m2 (K3) Pembuatan pagar sementara dari kayu tinggi 2 meter 306,115 0.64 . 80,596 - 225,519
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
5.00 Kg Semen 9,500 M.4.033 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral beton 2,047 M.4.026 . . .
0.07 m3 Kayu balok 5/7 Kelas II 173,880 M.4.082 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
0.40 Ltr Residu 3,480 M.4.560 . . .
A.2.2.1.2 P-002 1.00 m2 (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
383,695 0.64 . 90,896 - 292,799
0.20 OH Pekerja 20,600 L.4.001 . . .
0.40 OH Tukang Kayu 61,800 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
2.50 Kg Semen 4,750 M.4.033 . . .
1.20 Lbr Seng Gelombang 3" x 6" BJLS 28 61,200 M.4.368 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral beton 2,047 M.4.026 . . .
0.07 m3 Kayu balok 5/7 Kelas II 173,880 M.4.082 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
0.45 Ltr Meni besi 14,310 M.4.393 . . .
A.2.2.1.3. P-003 1.00 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter 641,205 0.54 . 75,446 - 565,759
0.20 OH Pekerja 20,600 L.4.001 . . .
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
1.00 btg Dolken kayu Ø 8-10/400 cm 26,800 M.4.042 . . .
2.00 Kg Semen 3,800 M.4.033 . . .
25.00 M’ Kawat duri 530,000 M.4.146 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral beton 2,047 M.4.026 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
A.2.2.1.4. P-004 1.00 m1 Pengukuran dan pemasangan Bouwplank 83,601 0.22 . 28,840 - 54,761
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 28,980 M.4.082 . . .
0.02 Kg Paku Biasa 2" - 5" 546 M.4.158 . . .

www.mitra-arsitek.com 14/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu papan 3/20 25,235 M.4.100 . . .
A.2.2.1.5. P-005 1.00 m2 (K3) Pembuatan kantor sementara lantai plesteran 1,470,610 5.35 . 739,015 - 731,595
2.00 OH Pekerja 206,000 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
1.00 OH Tukang batu 154,500 L.4.007 . . .
0.30 OH Kepala Tukang 57,930 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
0.18 m3 Kayu balok 5/7 Kelas II 434,700 M.4.082 . . .
0.08 Kg Paku Biasa 2" - 5" 2,184 M.4.158 . . .
1.10 Kg Baja strip (0,2 x 2) cm 14,740 M.4.128 . . .
35.00 Kg Semen 66,500 M.4.033 . . .
0.15 m3 Pasir pasang 33,390 M.4.030 . . .
0.10 m3 Pasir beton 29,480 M.4.028 . . .
0.15 m3 Koral beton 34,110 M.4.026 . . .
30.00 Bh Bata merah 30,000 M.4.007 . . .
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 12,750 M.4.368 . . .
0.20 Bh Jendela naco 5,300 M.4.576 . . .
0.08 m2 Kaca polos 8,976 M.4.524 . . .
0.15 Bh Kunci tanam biasa 21,255 M.4.583 . . .
0.06 Lbr Plywood 120x240 tbl. 4 mm 4,710 M.4.365 . . .
A.2.2.1.6. P-006 1.00 m2 (K3) Pembuatan rumah jaga (konstruksi kayu ) 1,421,400 2.70 . 375,300 - 1,046,100
1.00 OH Pekerja 103,000 L.4.001 . . .
1.50 OH Tukang Kayu 231,750 L.4.016 . . .
0.15 OH Kepala tukang 28,965 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
3.00 btg Dolken kayu Ø 8-10/400 cm 80,400 M.4.042 . . .
0.28 m3 Papan kayu 3/20 Kelas II 870,090 M.4.105 . . .
0.70 Kg Paku Biasa 2" - 5" 19,110 M.4.158 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 76,500 M.4.368 . . .
A.2.2.1.7. P-007 1.00 m2 (K3) Pembuatan gudang semen dan bahan 1,307,394 3.25 . 462,205 - 845,189
1.00 OH Pekerja 103,000 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
0.20 OH Kepala Tukang 38,620 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.70 btg Dolken kayu Ø 8-10/400 cm 45,560 M.4.042 . . .
0.21 m3 Papan kayu 3/20 Kelas II 662,025 M.4.105 . . .
0.30 Kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
10.50 Kg Semen 19,950 M.4.033 . . .
0.03 m3 Pasir beton 8,844 M.4.028 . . .
0.05 m3 Koral beton 11,370 M.4.026 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 76,500 M.4.368 . . .
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 12,750 M.4.368 . . .
A.2.2.1.8. P-008 1.00 m2 (K3) Pembuatan bedeng pekerja 1,327,149 3.25 . 462,205 - 864,944
1.00 OH Pekerja 103,000 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
0.20 OH Kepala Tukang 38,620 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
0.19 m3 Papan kayu 3/20 Kelas II 586,365 M.4.105 . . .

www.mitra-arsitek.com 15/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 Kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
18.00 Kg Semen 34,200 M.4.033 . . .
0.03 m3 Pasir beton 8,844 M.4.028 . . .
0.05 m3 Koral beton 11,370 M.4.026 . . .
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 76,500 M.4.368 . . .
1.35 Lbr Plywood 120x240 tbl. 4 mm 105,975 M.4.365 . . .
A.2.2.1.9. P-009 1.00 m2 (K3) Pembersihan lapangan dan perataan 21,885 0.15 . 21,885 - -
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
A.2.2.1.10. P-010 1.00 m2 (K3) Pembuatan steger/perancah dari bambu 500,456 3.25 . 462,205 - 38,251
1.00 OH Pekerja 103,000 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
0.20 OH Kepala Tukang 38,620 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.25 btg Bambu Ø 6 - 8 / 600 cm 33,750 M.4.041 . . .
0.19 Kg Tali ijuk 4,501 M.4.602 . . .
A.2.2.1.11. P-011 1.00 m2 Pembuatan kotak adukan ukuran 40cm x50cm x25cm 194,763 0.33 . 52,143 - 142,620
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.03 OH Kepala Tukang 5,793 L.4.036 . . .
0.04 m3 Kayu papan kelas III 98,100 M.4.103 . . .
0.02 m3 Kayu balok 5/7 kelas III 42,336 M.4.083 . . .
0.08 kg Paku Biasa 2" - 5" 2,184 M.4.158 . . .
A.2.2.1.12. P-012 1.00 m2 Pembuatan jalan sementara 182,810 1.01 . 104,159 - 78,651
1.00 OH Pekerja 103,000 L.4.001 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.15 m3 Batu belah 44,970 M.4.013 . . .
0.09 m3 Batu pecah 2/3 31,455 M.4.017 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
A.2.2.1.13. P-013 1.00 m2 Pembongkaran beton bertulang 291,652 2.00 . 291,652 - -
1.33 OH Pekerja 137,340 L.4.001 . . .
0.67 OH Mandor 154,312 L.4.035 . . .
A.2.2.1.14. P-014 1.00 m3 Pembongkaran dinding tembok bata 145,826 1.00 . 145,826 - -
0.67 OH Pekerja 68,670 L.4.001 . . .
0.33 OH Mandor 77,156 L.4.035 . . .
A.2.2.1.15. P-015 1.00 m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm 31,630 0.09 . 15,067 - 16,563
0.04 OH Pekerja 4,326 L.4.001 . . .
0.00 OH Tukang Besi 623 L.4.008 . . .
0.00 OH Kepala Tukang 386 L.4.036 . . .
0.04 OH Mandor 9,731 L.4.035 . . .
0.14 Lbr Kawat jaring 16,563 M.4.148 . . .
A.2.2.1.16. P-016 1.00 m2 Pemasangan panel beton pracetak 5x50x240 cm 461,871 0.53 . 64,657 - 397,214
0.38 OH Pekerja 38,625 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,402 L.4.035 . . .
0.99 Lbr Panel Beton Pracetak 150,858 M.4.540 . . .
0.53 btg Kolom beton pracetak 105,840 M.4.539 . . .
45.00 Kg Semen 85,500 M.4.033 . . .
0.07 m3 Pasir beton 21,815 M.4.028 . . .
0.15 m3 Koral beton 33,200 M.4.026 . . .

www.mitra-arsitek.com 16/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.2.3.1.1. P-017 1.00 m3 Penggalian tanah biasa sedalam 1 m 83,043 0.78 . 83,043 - -
0.75 OH Pekerja 77,250 L.4.001 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
A.2.3.1.2. P-018 1.00 m3 Penggalian tanah biasa sedalam 2 m 103,127 0.95 . 103,127 - -
0.90 OH Pekerja 92,700 L.4.001 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
A.2.3.1.3. P-019 1.00 m3 Menggali tanah biasa sedalam 3 m 123,674 1.12 . 123,674 - -
1.05 OH Pekerja 108,150 L.4.001 . . .
0.07 OH Mandor 15,524 L.4.035 . . .
A.2.3.1.4. P-020 1.00 m3 Menggali tanah keras sedalam 1 m 110,414 1.03 . 110,414 - -
1.00 OH Pekerja 103,000 L.4.001 . . .
0.03 OH Mandor 7,414 L.4.035 . . .
A.2.3.1.5. P-021 1.00 m3 Menggali tanah cadas sedalam 1 m 168,402 1.56 . 168,402 - -
1.50 OH Pekerja 154,500 L.4.001 . . .
0.06 OH Mandor 13,902 L.4.035 . . .
A.2.3.1.6. P-022 1.00 m3 Menggali tanah lumpur sedalam 1 m 134,027 1.25 . 134,027 - -
1.20 OH Pekerja 123,600 L.4.001 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
A.2.3.1.7. P-023 1.00 m2 Pengerjaan stripping tanah tebing setinggi 1 meter 6,309 0.06 . 6,309 - -
0.05 OH Pekerja 5,150 L.4.001 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.2.3.1.8. P-024 1.00 m3 (K3) Pembuangan tanah sejauh 30 meter 36,307 0.34 . 36,307 - -
0.33 OH Pekerja 33,990 L.4.001 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
A.2.3.1.9. P-025 1.00 m3 Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M 31,543 0.28 . 31,543 - -
0.25 OH Pekerja 25,750 L.4.001 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
A.2.3.1.10. P-026 1.00 m3 (K3) Pemadatan tanah tanah ( per 20 cm) 63,085 0.55 . 63,085 - -
0.50 OH Pekerja 51,500 L.4.001 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
A.2.3.1.11. P-027 1.00 m3 Pengurugan dengan pasir urug 334,777 0.31 . 33,217 - 301,560
0.30 OH Pekerja 30,900 L.4.001 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
1.20 M3 Pasir urug 301,560 M.4.032 . . .
A.2.3.1.12. P-028 1.00 m3 Pemasangan lapisan pudel campuran 1KP:3PP:7TL 446,211 1.32 . 170,460 - 275,751
0.80 OH Pekerja 82,400 L.4.001 . . .
0.40 OH Tukang Batu 61,800 L.4.007 . . .
0.04 OH Kepala Tukang 7,724 L.4.036 . . .
0.08 OH Mandor 18,536 L.4.035 . . .
0.14 m3 Kapur 48,209 M.4.020 . . .
0.40 m3 Pasir Pasang 89,040 M.4.030 . . .
0.95 m3 Tanah Liat 138,503 M.4.038 . . .
A.2.3.1.13. P-029 1.00 m3 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 1,253,726 0.17 . 18,926 - 1,234,800
0.15 OH Pekerja 15,450 L.4.001 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
6.00 m3 Ijuk 1,234,800 M.4.019 . . .
A.2.3.1.14. P-030 1.00 m3 Pengurugan sirtu padat 341,383 0.28 . 31,543 - 309,840
0.25 OH Pekerja 25,750 L.4.001 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
1.20 m3 Sirtu 309,840 M.4.037 . . .

www.mitra-arsitek.com 17/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.3.2.1.1. P-031 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 1,153,756 2.40 . 302,235 - 851,521
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
202.00 Kg Semen 383,800 M.4.033 . . .
0.49 m3 Pasir Pasang 107,961 M.4.030 . . .
A.3.2.1.2. P-032 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 4PP 1,087,447 2.40 . 302,235 - 785,212
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
163.00 Kg Semen 309,700 M.4.033 . . .
0.52 m3 Pasir Pasang 115,752 M.4.030 . . .
A.3.2.1.3. P-033 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 1,041,489 2.40 . 302,235 - 739,254
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
136.00 Kg Semen 258,400 M.4.033 . . .
0.54 m3 Pasir Pasang 121,094 M.4.030 . . .
A.3.2.1.4. P-034 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 6PP 1,009,174 2.40 . 302,235 - 706,939
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
117.00 Kg Semen 222,300 M.4.033 . . .
0.56 m3 Pasir Pasang 124,879 M.4.030 . . .
A.3.2.1.5. P-035 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 8PP 964,893 2.40 . 302,235 - 662,658
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
91.00 Kg Semen 172,900 M.4.033 . . .
0.58 m3 Pasir Pasang 129,998 M.4.030 . . .
A.3.2.1.6. P-036 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP 1,121,386 2.40 . 302,235 - 819,151
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
0.17 m3 Kapur 60,707 M.4.020 . . .
170.00 Kg Semen 323,000 M.4.033 . . .
0.34 m3 Pasir Pasang 75,684 M.4.030 . . .
A.3.2.1.7. P-037 1.00 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP 939,908 2.40 . 302,235 - 637,673

www.mitra-arsitek.com 18/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
61.00 Kg Semen 115,900 M.4.033 . . .
0.15 m3 Kapur 52,494 M.4.020 . . .
0.49 m3 Pasir Pasang 109,519 M.4.030 . . .
A.3.2.1.8. P-038 1.00 m3 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP 903,095 2.40 . 302,235 - 600,860
1.50 OH Pekerja 154,500 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
41.00 Kg Semen 77,900 M.4.033 . . .
0.13 m3 Kapur 46,780 M.4.020 . . .
0.52 m3 Pasir Pasang 116,420 M.4.030 . . .
A.3.2.1.9. P-039 1.00 m3 Pemasangan batu kosong (anstamping) 625,484 1.25 . 157,162 - 468,322
0.78 OH Pekerja 80,340 L.4.001 . . .
0.39 OH Tukang Batu 60,255 L.4.007 . . .
0.04 OH Kepala Tukang 7,531 L.4.036 . . .
0.04 OH Mandor 9,036 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
0.43 m3 Pasir urug 108,562 M.4.032 . . .
A.3.2.1.10. P-040 1.00 m3 (K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB
3,083,552
: 3 Kr dan 40%
4.51batu belah
. 537,328 - 2,546,224
3.40 OH Pekerja 350,200 L.4.001 . . .
0.85 OH Tukang Batu 131,325 L.4.007 . . .
0.09 OH Kepala Tukang 16,414 L.4.036 . . .
0.17 OH Mandor 39,389 L.4.035 . . .
0.48 m3 Batu belah 143,904 M.4.013 . . .
194.00 Kg Semen 368,600 M.4.033 . . .
0.31 m3 Pasir Beton 91,978 M.4.028 . . .
0.47 m3 Kerikil 113,303 M.4.024 . . .
126.00 Kg Besi beton 1,776,600 M.4.132 . . .
1.80 Kg Kawat beton 51,840 M.4.143 . . .
A.3.2.1.11. P-041 1.00 m3 Pemasangan pondasi sumuran, diameter 100 cm 1,122,611 3.40 . 413,820 - 708,790
2.40 OH Pekerja 247,200 L.4.001 . . .
0.80 OH Tukang Batu 123,600 L.4.007 . . .
0.08 OH Kepala Tukang 15,448 L.4.036 . . .
0.12 OH Mandor 27,572 L.4.035 . . .
0.45 m3 Batu belah 134,910 M.4.013 . . .
194.00 Kg Semen 368,600 M.4.033 . . .
0.31 m3 Pasir Beton 91,978 M.4.028 . . .
0.47 m3 Kerikil 113,303 M.4.024 . . .
A.4.1.1.1 P-042 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 1,317,375 2.04 . 237,075 - 1,080,300
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
247.00 kg Semen 469,300 M.4.033 . . .

www.mitra-arsitek.com 19/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
869.00 kg Pasir Beton (kg) 260,700 M.4.029 . . .
999.00 kg Kerikil (kg) 199,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.2 P-043 1.00 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 1,362,775 2.04 . 237,075 - 1,125,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
276.00 kg Semen 524,400 M.4.033 . . .
828.00 kg Pasir Beton (kg) 248,400 M.4.029 . . .
1,012.00 kg Kerikil (kg) 202,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.3 P-044 1.00 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 1,398,775 2.04 . 237,075 - 1,161,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
299.00 kg Semen 568,100 M.4.033 . . .
799.00 kg Pasir Beton (kg) 239,700 M.4.029 . . .
1,017.00 kg Kerikil (kg) 203,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.4 P-045 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
1,222,564 1.48 . 172,264 - 1,050,300
1.20 OH Pekerja 123,600 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.06 OH Mandor 13,902 L.4.035 . . .
230.00 kg Semen 437,000 M.4.033 . . .
893.00 kg Pasir Beton (kg) 267,900 M.4.029 . . .
1,027.00 kg Kerikil (kg) 205,400 M.4.025 . . .
200.00 Ltr Air 140,000 M.4.001 . . .
A.4.1.1.5. P-046 1.00 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c1,440,775
= 0,66 2.04 . 237,075 - 1,203,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
326.00 kg Semen 619,400 M.4.033 . . .
760.00 kg Pasir Beton (kg) 228,000 M.4.029 . . .
1,029.00 kg Kerikil (kg) 205,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.6 P-047 1.00 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, 1,481,875
w/c = 0,61 2.04 . 237,075 - 1,244,800
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
352.00 kg Semen 668,800 M.4.033 . . .
731.00 kg Pasir Beton (kg) 219,300 M.4.029 . . .
1,031.00 kg Kerikil (kg) 206,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.7. P-048 1.00 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm,1,511,275
w/c = 0,58 2.04 . 237,075 - 1,274,200
1.65 OH Pekerja 169,950 L.4.001 . . .

www.mitra-arsitek.com 20/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
371.00 kg Semen 704,900 M.4.033 . . .
698.00 kg Pasir Beton (kg) 209,400 M.4.029 . . .
1,047.00 kg Kerikil (kg) 209,400 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.8. P-049 1.00 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, 1,532,575
w/c = 0,56 2.04 . 237,075 - 1,295,500
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
384.00 kg Semen 729,600 M.4.033 . . .
692.00 kg Pasir Beton (kg) 207,600 M.4.029 . . .
1,039.00 kg Kerikil (kg) 207,800 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.9. P-050 1.00 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm,1,569,375
w/c = 0,53 2.04 . 237,075 - 1,332,300
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
406.00 kg Semen 771,400 M.4.033 . . .
684.00 kg Pasir Beton (kg) 205,200 M.4.029 . . .
1,026.00 kg Kerikil (kg) 205,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.10. P-051 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm,1,580,775
w/c = 0,52 2.04 . 237,075 - 1,343,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
413.00 kg Semen 784,700 M.4.033 . . .
681.00 kg Pasir Beton (kg) 204,300 M.4.029 . . .
1,021.00 kg Kerikil (kg) 204,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.11. P-052 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm,1,688,262
w/c = 0,49 2.59 . 301,462 - 1,386,800
2.10 OH Pekerja 216,300 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.11 OH Mandor 24,329 L.4.035 . . .
439.00 kg Semen 834,100 M.4.033 . . .
670.00 kg Pasir Beton (kg) 201,000 M.4.029 . . .
1,006.00 kg Kerikil (kg) 201,200 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.12. P-053 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm,1,703,262
w/c = 0,48 2.59 . 301,462 - 1,401,800
2.10 OH Pekerja 216,300 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.11 OH Mandor 24,329 L.4.035 . . .
448.00 kg Semen 851,200 M.4.033 . . .
667.00 kg Pasir Beton (kg) 200,100 M.4.029 . . .

www.mitra-arsitek.com 21/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1,000.00 kg Kerikil (kg) 200,000 M.4.025 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.12. P-053a 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), campuran bahan kimia
1,917,912 2.59 . 301,462 - 1,616,450
2.10 OH Pekerja 216,300 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.11 OH Mandor 24,329 L.4.035 . . .
448.00 kg Semen 851,200 M.4.033 . . .
667.00 kg Pasir Beton (kg) 200,100 M.4.029 . . .
1,000.00 kg Kerikil (kg) 200,000 M.4.025 . . .
4.50 Ltr Bahan Kimia 214,650 M.4.550 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
A.4.1.1.13 P-054 1.00 m3 Membuat beton kedap air dengan strorox - 100 1,448,726 2.59 . 301,462 - 1,147,264
2.10 OH Pekerja 216,300 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.11 OH Mandor 24,329 L.4.035 . . .
400.00 kg Semen 760,000 M.4.033 . . .
0.48 m3 Pasir Beton 141,504 M.4.028 . . .
0.80 m3 Kerikil 193,680 M.4.024 . . .
1.20 kg Strorox - 100 52,080 M.4.601 . . .
A.4.1.1.14 P-055 1.00 m1 Pemasangan PVC Waterstop lebar 150 mm 93,602 0.10 . 11,702 - 81,900
0.06 OH Pekerja 6,180 L.4.001 . . .
0.03 OH Tukang Pipa 4,248 L.4.020 . . .
0.00 OH Kepala Tukang 579 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.05 m Waterstop lebar 150 mm 81,900 M.4.605 . . .
A.4.1.1.15 P-056 1.00 m1 Pemasangan PVC Waterstop lebar 200 mm 101,920 0.12 . 14,560 - 87,360
0.07 OH Pekerja 7,210 L.4.001 . . .
0.04 OH Tukang Pipa 4,956 L.4.020 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.05 m Waterstop lebar 200 mm 87,360 M.4.606 . . .
A.4.1.1.16 P-057 1.00 m1 Membuat PVC Waterstop lebar 230 mm - 320 mm 123,849 0.13 . 16,119 - 107,730
0.08 OH Pekerja 8,240 L.4.001 . . .
0.04 OH Tukang Batu 6,180 L.4.007 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.05 m Waterstop lebar 230 mm - 320 mm 107,730 M.4.607 . . .
A.4.1.1.17 P-058 1.00 kg Pembesian dengan besi polos atau besi ulir 17,276 0.02 . 2,039 - 15,237
0.01 OH Pekerja 721 L.4.001 . . .
0.01 OH Tukang Besi 1,091 L.4.008 . . .
0.00 OH Kepala Tukang 135 L.4.036 . . .
0.00 OH Mandor 93 L.4.035 . . .
1.05 kg Besi beton 14,805 M.4.132 . . .
0.02 kg Kawat beton 432 M.4.143 . . .
A.4.1.1.18 P-059 1.00 kg Pemasangan kabel presstressed polos/strands 16,553 0.01 . 1,460 - 15,093
0.01 OH Pekerja 515 L.4.001 . . .
0.01 OH Tukang Besi 779 L.4.008 . . .
0.00 OH Kepala Tukang 97 L.4.036 . . .

www.mitra-arsitek.com 22/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 70 L.4.035 . . .
1.05 kg Besi beton 14,805 M.4.132 . . .
0.01 kg Kawat beton 288 M.4.143 . . .
A.4.1.1.19 P-060 1.00 kg Pemasangan jaring kawat baja (wiremesh) 13,843 0.01 . 1,153 - 12,690
0.00 OH Pekerja 258 L.4.001 . . .
0.00 OH Tukang Besi 390 L.4.008 . . .
0.00 OH Kepala Tukang 483 L.4.036 . . .
0.00 OH Mandor 23 L.4.035 . . .
1.02 kg Jaring kawat baja dilas 12,546 M.4.591 . . .
0.01 kg Kawat beton 144 M.4.143 . . .
A.4.1.1.20 P-061 1.00 m2 (K3) Pemasangan bekisting untuk pondasi 189,285 0.83 . 104,775 - 84,510
0.52 OH Pekerja 53,560 L.4.001 . . .
0.26 OH Tukang Kayu 40,170 L.4.016 . . .
0.03 OH Kepala Tukang 5,021 L.4.036 . . .
0.03 OH Mandor 6,024 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.30 kg Paku 5 - 10 cm 7,620 M.4.155 . . .
0.10 Ltr Minyak bekisting 570 M.4.556 . . .
A.4.1.1.21 P-062 1.00 m2 (K3) Pemasangan bekisting untuk sloof 198,825 0.83 . 104,775 - 94,050
0.52 OH Pekerja 53,560 L.4.001 . . .
0.26 OH Tukang Kayu 40,170 L.4.016 . . .
0.03 OH Kepala Tukang 5,021 L.4.036 . . .
0.03 OH Mandor 6,024 L.4.035 . . .
0.05 m3 Papan kayu 3/20 Kelas III 85,860 M.4.106 . . .
0.30 kg Paku 5 - 10 cm 7,620 M.4.155 . . .
0.10 Ltr Minyak bekisting 570 M.4.556 . . .
A.4.1.1.22 P-063 1.00 m2 (K3) Pemasangan bekisting untuk kolom 367,258 1.06 . 132,983 - 234,275
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.23 P-064 1.00 m2 (K3) Pemasangan bekisting untuk balok 377,653 1.06 . 132,983 - 244,670
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 62,370 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.24 P-065 1.00 m2 (K3) Pemasangan bekisting untuk lantai 474,458 1.06 . 132,983 - 341,475
0.66 OH Pekerja 67,980 L.4.001 . . .

www.mitra-arsitek.com 23/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
6.00 btg Dolken kayu Ø 8-10/400 cm 160,800 M.4.042 . . .
A.4.1.1.25 P-066 1.00 m2 (K3) Pemasangan bekisting untuk dinding 411,503 1.06 . 132,983 19,200 259,320
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.03 m3 Papan kayu 3/20 Kelas III 57,240 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Ltr Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 69,300 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
3.00 btg Dolken kayu Ø 8-10/400 cm 80,400 M.4.042 . . .
4.00 bh Penjaga jarak bekisting / spacer 19,200 T.4.009 . . .
A.4.1.1.26 P-067 1.00 m2 (K3) Pemasangan bekisting untuk tangga 347,893 1.06 . 132,983 - 214,910
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.03 m3 Papan kayu 3/20 Kelas III 57,240 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.15 Ltr Minyak bekisting 855 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 btg Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.27 P-068 1.00 m2 Pemasangan jembatan untuk pengecoran beton 126,394 0.21 . 25,994 - 100,400
0.15 OH Pekerja 15,450 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 70,620 M.4.097 . . .
0.60 kg Paku Biasa 2" - 5" 16,380 M.4.158 . . .
0.50 btg Dolken kayu Ø 8-10/400 cm 13,400 M.4.042 . . .
A.4.1.1.28 P-069 1.00 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting) 4,768,893 8.45 . 1,064,820 - 3,704,073
5.30 OH Pekerja 545,900 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.30 OH Tukang kayu 200,850 L.4.016 . . .
1.05 OH Tukang besi 163,590 L.4.008 . . .
0.26 OH Kepala tukang 50,592 L.4.036 . . .
0.27 OH Mandor 61,401 L.4.035 . . .
0.20 m3 Papan kayu 3/20 Kelas III 381,600 M.4.106 . . .
1.50 kg Paku Biasa 2" - 5" 40,950 M.4.158 . . .
0.40 Ltr Minyak bekisting 2,280 M.4.556 . . .

www.mitra-arsitek.com 24/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
157.50 kg Besi beton 2,220,750 M.4.132 . . .
2.25 kg Kawat beton 64,800 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
A.4.1.1.29 P-070 1.00 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) 5,825,793 9.49 . 1,211,520 - 4,614,273
5.65 OH Pekerja 581,950 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.56 OH Tukang kayu 241,020 L.4.016 . . .
1.40 OH Tukang besi 218,120 L.4.008 . . .
0.32 OH Kepala tukang 62,371 L.4.036 . . .
0.28 OH Mandor 65,571 L.4.035 . . .
0.27 m3 Papan kayu 3/20 Kelas III 515,160 M.4.106 . . .
2.00 kg Paku Biasa 2" - 5" 54,600 M.4.158 . . .
0.60 Ltr Minyak bekisting 3,420 M.4.556 . . .
210.00 kg Besi beton 2,961,000 M.4.132 . . .
3.00 kg Kawat beton 86,400 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
A.4.1.1.30 P-071 1.00 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) 9,370,645 11.83 . 1,510,352 - 7,860,293
7.05 OH Pekerja 726,150 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.65 OH Tukang kayu 254,925 L.4.016 . . .
2.10 OH Tukang besi 327,180 L.4.008 . . .
0.40 OH Kepala tukang 77,819 L.4.036 . . .
0.35 OH Mandor 81,790 L.4.035 . . .
0.40 m3 Papan kayu 3/20 Kelas III 763,200 M.4.106 . . .
4.00 kg Paku Biasa 2" - 5" 109,200 M.4.158 . . .
2.00 Ltr Minyak bekisting 11,400 M.4.556 . . .
315.00 kg Besi beton 4,441,500 M.4.132 . . .
4.50 kg Kawat beton 129,600 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
0.15 M3 Kayu kelas II balok 472,500 M.4.090 . . .
3.50 Lbr Plywood 120x240 tbl. 9 mm 403,200 M.4.367 . . .
20.00 btg Dolken kayu Ø 8-10/400 cm 536,000 M.4.042 . . .
A.4.1.1.31 P-072 1.00 m3 Membuat balok beton bertulang (200 kg besi + bekisting) 7,248,058 10.33 . 1,307,565 - 5,940,493
6.35 OH Pekerja 654,050 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.65 OH Tukang kayu 254,925 L.4.016 . . .
1.40 OH Tukang besi 218,120 L.4.008 . . .
0.33 OH Kepala tukang 64,302 L.4.036 . . .
0.32 OH Mandor 73,681 L.4.035 . . .
0.32 m3 Papan kayu 3/20 Kelas III 610,560 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 87,360 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,120 M.4.556 . . .
210.00 kg Besi beton 2,961,000 M.4.132 . . .
3.00 kg Kawat beton 86,400 M.4.143 . . .

www.mitra-arsitek.com 25/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
0.14 m3 Kayu kelas II balok 441,000 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 322,560 M.4.367 . . .
16.00 btg Dolken kayu Ø 8-10/400 cm 428,800 M.4.042 . . .
A.4.1.1.32 P-073 1.00 m3 Membuat kolom beton bertulang (150 kg besi + bekisting) 6,609,843 8.46 . 1,065,400 - 5,544,443
5.30 OH Pekerja 545,900 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.30 OH Tukang kayu 200,850 L.4.016 . . .
1.05 OH Tukang besi 163,590 L.4.008 . . .
0.27 OH Kepala tukang 51,172 L.4.036 . . .
0.27 OH Mandor 61,401 L.4.035 . . .
0.32 m3 Papan kayu 3/20 Kelas III 610,560 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 87,360 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,120 M.4.556 . . .
157.50 kg Besi beton 2,220,750 M.4.132 . . .
2.25 kg Kawat beton 64,800 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
0.12 m3 Kayu kelas II balok 378,000 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 322,560 M.4.367 . . .
32.00 btg Dolken kayu Ø 8-10/400 cm 857,600 M.4.042 . . .
A.4.1.1.33 P-074 1.00 m3 Membuat dinding beton bertulang (150 kg besi + bekisting) 5,876,913 3.68 . 573,510 - 5,303,403
0.53 OH Pekerja 54,590 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.30 OH Tukang kayu 200,850 L.4.016 . . .
1.05 OH Tukang besi 163,590 L.4.008 . . .
0.26 OH Kepala tukang 50,592 L.4.036 . . .
0.27 OH Mandor 61,401 L.4.035 . . .
0.24 m3 Papan kayu 3/20 Kelas III 457,920 M.4.106 . . .
3.20 kg Paku Biasa 2" - 5" 87,360 M.4.158 . . .
1.60 Ltr Minyak bekisting 9,120 M.4.556 . . .
157.50 kg Besi beton 2,220,750 M.4.132 . . .
2.25 kg Kawat beton 64,800 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
0.16 m3 Kayu kelas II balok 504,000 M.4.090 . . .
2.80 Lbr Plywood 120x240 tbl. 9 mm 322,560 M.4.367 . . .
24.00 btg Dolken kayu Ø 8-10/400 cm 643,200 M.4.042 . . .
A.4.1.1.34 P-075 1.00 m3 Membuat dinding beton bertulang (200 kg besi + bekisting) 6,812,303 9.49 . 1,211,520 - 5,600,783
5.65 OH Pekerja 581,950 L.4.001 . . .
0.28 OH Tukang batu 42,488 L.4.007 . . .
1.56 OH Tukang kayu 241,020 L.4.016 . . .
1.40 OH Tukang besi 218,120 L.4.008 . . .
0.32 OH Kepala tukang 62,371 L.4.036 . . .
0.28 OH Mandor 65,571 L.4.035 . . .
0.25 m3 Papan kayu 3/20 Kelas III 477,000 M.4.106 . . .

www.mitra-arsitek.com 26/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.00 kg Paku Biasa 2" - 5" 81,900 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,840 M.4.556 . . .
210.00 kg Besi beton 2,961,000 M.4.132 . . .
3.00 kg Kawat beton 86,400 M.4.143 . . .
336.00 kg Semen 638,400 M.4.033 . . .
0.54 m3 Pasir Beton 159,192 M.4.028 . . .
0.81 m3 Kerikil 196,101 M.4.024 . . .
0.11 m3 Kayu kelas II balok 330,750 M.4.090 . . .
2.50 Lbr Plywood 120x240 tbl. 9 mm 288,000 M.4.367 . . .
14.00 btg Dolken kayu Ø 8-10/400 cm 375,200 M.4.042 . . .
A.4.1.1.35 P-076 1.00 m1 Membuat kolom praktis beton bertulang (11 x 11) cm 108,817 0.26 . 31,080 - 77,737
0.18 OH Pekerja 18,540 L.4.001 . . .
0.02 OH Tukang batu 3,090 L.4.007 . . .
0.02 OH Tukang kayu 3,090 L.4.016 . . .
0.02 OH Tukang besi 3,116 L.4.008 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
0.00 m3 Papan kayu 3/20 Kelas III 3,816 M.4.106 . . .
0.01 kg Paku Biasa 2" - 5" 273 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,840 M.4.556 . . .
3.00 kg Besi beton 42,300 M.4.132 . . .
0.45 kg Kawat beton 12,960 M.4.143 . . .
4.00 kg Semen 7,600 M.4.033 . . .
0.01 m3 Pasir Beton 1,769 M.4.028 . . .
0.01 m3 Kerikil 2,179 M.4.024 . . .
A.4.1.1.36 P-077 1.00 m1 Membuat ring balok beton bertulang (10 x 15) cm 133,381 0.42 . 51,336 - 82,045
0.30 OH Pekerja 30,591 L.4.001 . . .
0.03 OH Tukang batu 5,099 L.4.007 . . .
0.03 OH Tukang kayu 5,099 L.4.016 . . .
0.03 OH Tukang besi 5,141 L.4.008 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
0.00 m3 Papan kayu 3/20 Kelas III 5,724 M.4.106 . . .
0.02 kg Paku Biasa 2" - 5" 546 M.4.158 . . .
1.20 Ltr Minyak bekisting 6,840 M.4.556 . . .
3.60 kg Besi beton 50,760 M.4.132 . . .
0.05 kg Kawat beton 1,440 M.4.143 . . .
5.50 kg Semen 10,450 M.4.033 . . .
0.01 m3 Pasir Beton 2,653 M.4.028 . . .
0.02 m3 Kerikil 3,632 M.4.024 . . .
A.4.1.2.1. P-078 1.00 m2 (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (1200.16
115,299 ± 20) mm . 19,003 - 96,296
0.13 OH Pekerja 13,596 L.4.001 . . .
0.02 OH Tukang batu 3,399 L.4.007 . . .
0.00 OH Kepala tukang 386 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
26.08 Kg Semen 49,552 M.4.033 . . .
60.80 Kg Pasir Beton (kg) 18,240 M.4.029 . . .
82.32 Kg Kerikil (kg) 16,464 M.4.025 . . .
17.20 L Air 12,040 M.4.001 . . .
A.4.1.2.2. P-079 1.00 m2 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120
144,124 0.20± 20) mm . 23,754 - 120,370

www.mitra-arsitek.com 27/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.17 OH Pekerja 16,995 L.4.001 . . .
0.03 OH Tukang batu 4,326 L.4.007 . . .
0.00 OH Kepala tukang 579 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
32.60 Kg Semen 61,940 M.4.033 . . .
76.00 Kg Pasir Beton (kg) 22,800 M.4.029 . . .
102.90 Kg Kerikil (kg) 20,580 M.4.025 . . .
21.50 L Air 15,050 M.4.001 . . .
A.4.1.2.3. P-080 1.00 m2 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120
159,533 ± 20) mm .
0.24 28,389 - 131,144
0.20 OH Pekerja 20,394 L.4.001 . . .
0.03 OH Tukang batu 5,099 L.4.007 . . .
0.00 OH Kepala tukang 579 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
32.12 Kg Semen 61,028 M.4.033 . . .
91.20 Kg Pasir Beton (kg) 27,360 M.4.029 . . .
123.48 Kg Kerikil (kg) 24,696 M.4.025 . . .
25.80 L Air 18,060 M.4.001 . . .
A.4.1.2.4. P-081 1.00 m2 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120
216,218 ± 20) mm .
0.31 35,663 - 180,555
0.25 OH Pekerja 25,544 L.4.001 . . .
0.04 OH Tukang batu 6,335 L.4.007 . . .
0.00 OH Kepala tukang 772 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
48.90 Kg Semen 92,910 M.4.033 . . .
114.00 Kg Pasir Beton (kg) 34,200 M.4.029 . . .
154.35 Kg Kerikil (kg) 30,870 M.4.025 . . .
32.25 L Air 22,575 M.4.001 . . .
A.4.1.2.5. P-082 1.00 m2 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) 325,844 0.09 . 14,240 - 311,605
0.01 OH Pekerja 721 L.4.001 . . .
0.08 OH Tukang batu 11,742 L.4.007 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.08 m3 Lantai kerja tebal 10cm 60,600 M.4.595 . . .
9.39 Kg Besi hollow 50.50.3 200,092 M.4.133 . . .
0.01 m3 Kaso 5/7 Kelas II 19,075 M.4.057 . . .
0.08 Lbr Phel film 12mm 12,064 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
3.88 Bh Baut Ramset / Dina Bolt 18,634 M.4.130 . . .
A.4.1.2.6. P-083 1.00 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) 37,313 0.05 . 7,287 - 30,026
0.00 OH Pekerja 412 L.4.001 . . .
0.04 OH Tukang batu 5,871 L.4.007 . . .
0.00 OH Kepala tukang 772 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 19,075 M.4.057 . . .
0.04 Lbr Phel film 12mm 6,484 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
0.69 Bh Baut Ramset / Dina Bolt 3,326 M.4.130 . . .
A.4.1.2.7. P-084 1.00 m2 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) 35,508 0.05 . 7,287 - 28,221
0.00 OH Pekerja 412 L.4.001 . . .
0.04 OH Tukang batu 5,871 L.4.007 . . .
0.00 OH Kepala tukang 772 L.4.036 . . .

www.mitra-arsitek.com 28/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 232 L.4.035 . . .
0.00 m3 Kaso 5/7 Kelas II 15,260 M.4.057 . . .
0.05 Lbr Phel film 12mm 7,238 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
0.05 Kg Paku Biasa 2" - 5" 1,256 M.4.158 . . .
0.69 Bh Baut Ramset / Dina Bolt 3,326 M.4.130 . . .
A.4.1.2.8. P-085 1.00 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 9,399 0.08 . 9,399 - -
0.05 OH Pekerja 5,459 L.4.001 . . .
0.02 OH Tukang kayu 2,781 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.9. P-086 1.00 bh Pemasangan dan membuka bekisting komponen balok beton pracetak14,961 0.12 . 14,961 - -
0.09 OH Pekerja 9,167 L.4.001 . . .
0.03 OH Tukang kayu 4,635 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.10. P-087 1.00 bh Pemasangan dan membuka bekisting komponen Kolom beton pracetak12,180 0.10 . 12,180 - -
0.07 OH Pekerja 7,313 L.4.001 . . .
0.02 OH Tukang kayu 3,708 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.11. P-088 1.00 bh Penuangan/menebar beton untuk komponen plat pracetak 85,894 0.54 . 85,894 - -
0.06 OH Pekerja 6,592 L.4.001 . . .
0.24 OH Tukang batu 37,698 L.4.007 . . .
0.13 OH Tukang vibrator 18,125 L.4.024 . . .
0.03 OH Kepala Tukang 6,565 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.12. P-089 1.00 bh Penuangan/menebar beton untuk komponen balok pracetak 88,096 0.56 . 88,096 - -
0.07 OH Pekerja 7,107 L.4.001 . . .
0.24 OH Tukang batu 37,389 L.4.007 . . .
0.14 OH Tukang vibrator 19,541 L.4.024 . . .
0.04 OH Kepala Tukang 7,145 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.13. P-090 1.00 bh Penuangan/menebar beton untuk komponen kolom pracetak 79,753 0.50 . 79,753 - -
0.06 OH Pekerja 6,283 L.4.001 . . .
0.21 OH Tukang batu 32,909 L.4.007 . . .
0.12 OH Tukang vibrator 17,275 L.4.024 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.14. P-091 1.00 bh Ereksi komponen untuk pelat pracetak 614,384 0.54 . 82,805 472,830 58,749
0.07 OH Operator crane 9,487 L.4.039 . . .
0.07 OH Pembantu operator crane 8,630 L.4.043 . . .
0.07 OH Pekerja 6,901 L.4.001 . . .
0.07 OH Tukang batu 10,352 L.4.007 . . .
0.13 OH Tukang ereksi 18,974 L.4.011 . . .
0.07 OH Kepala tukang 12,938 L.4.036 . . .
0.07 OH Mandor 15,524 L.4.035 . . .
6.68 L Solar 58,749 M.4.563 . . .
0.07 unit hari Sewa crane 89,150 T.4.024 . . .
1.10 Buah hari Sewa pipe support 383,680 T.4.027 . . .
A.4.1.2.15. P-092 1.00 bh Ereksi komponen untuk balok pracetak 594,005 0.49 . 75,390 464,847 53,768
0.06 OH Operator crane 8,638 L.4.039 . . .
0.06 OH Pembantu operator crane 7,857 L.4.043 . . .

www.mitra-arsitek.com 29/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.06 OH Pekerja 6,283 L.4.001 . . .
0.06 OH Tukang batu 9,425 L.4.007 . . .
0.12 OH Tukang ereksi 17,275 L.4.011 . . .
0.06 OH Kepala tukang 11,779 L.4.036 . . .
0.06 OH Mandor 14,134 L.4.035 . . .
6.11 L Solar 53,768 M.4.563 . . .
0.06 unit hari Sewa crane 81,167 T.4.024 . . .
1.10 Buah hari Sewa pipe support 383,680 T.4.027 . . .
A.4.1.2.16. P-093 1.00 bh Ereksi komponen untuk Kolom pracetak 1,053,217 0.66 . 102,580 877,800 72,838
0.08 OH Operator crane 11,753 L.4.039 . . .
0.08 OH Pembantu operator crane 10,690 L.4.043 . . .
0.08 OH Pekerja 8,549 L.4.001 . . .
0.08 OH Tukang batu 12,824 L.4.007 . . .
0.17 OH Tukang ereksi 23,506 L.4.011 . . .
0.08 OH Kepala tukang 16,027 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
8.28 L Solar 72,838 M.4.563 . . .
0.08 unit hari Sewa crane 110,440 T.4.024 . . .
2.20 Buah hari Sewa pipe support 767,360 T.4.027 . . .
A.4.1.2.17. P-094 1.00 bh Melangsir komponen plat pracetak ( ± 20 m) 54,941 0.10 . 12,966 25,281 16,694
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang batu 5,871 L.4.007 . . .
0.02 OH Operator crane 2,690 L.4.039 . . .
0.02 OH Pembantu operator crane 2,447 L.4.043 . . .
1.90 L Solar 16,694 M.4.563 . . .
0.02 UH Sewa crane 25,281 T.4.024 . . .
A.4.1.2.18. P-095 1.00 bh Melangsir komponen balok pracetak ( ± 20 m) 54,941 0.10 . 12,966 25,281 16,694
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang batu 5,871 L.4.007 . . .
0.02 OH Operator crane 2,690 L.4.039 . . .
0.02 OH Pembantu operator crane 2,447 L.4.043 . . .
1.90 L Solar 16,694 M.4.563 . . .
0.02 UH Sewa crane 25,281 T.4.024 . . .
A.4.1.2.19. P-096 1.00 bh Melangsir komponen kolom pracetak ( ± 20 m) 54,941 0.10 . 12,966 25,281 16,694
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang batu 5,871 L.4.007 . . .
0.02 OH Operator crane 2,690 L.4.039 . . .
0.02 OH Pembantu operator crane 2,447 L.4.043 . . .
1.90 L Solar 16,694 M.4.563 . . .
0.02 UH Sewa crane 25,281 T.4.024 . . .
A.4.1.2.20. P-097 1.00 m3 Grouting campuran 4,095,000 - . - - 4,095,000
1,200.00 Kg Semen grout 2,160,000 M.4.034 . . .
650.00 Kg Screening 1,690,000 M.4.181 . . .
350.00 L Air 245,000 M.4.001 . . .
A.4.1.2.21. P-098 1.00 m3 Grouting tidak campuran 3,610,000 - . - - 3,610,000
1,850.00 Kg Semen grout 3,330,000 M.4.034 . . .
400.00 L Air 280,000 M.4.001 . . .
A.4.1.2.22. P-099 1.00 titik Upah melakukan grouting pada join pracetak 79,564 0.48 . 79,564 - -
0.37 OH Tukang batu 56,702 L.4.007 . . .
0.07 OH Kepala tukang 14,289 L.4.036 . . .

www.mitra-arsitek.com 30/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 OH Mandor 8,573 L.4.035 . . .
A.4.1.2.23. P-100 1.00 titik Pemasangan Bekisting join pracetak 105,795 0.31 . 41,908 - 63,887
0.15 OH Pekerja 15,141 L.4.001 . . .
0.15 OH Tukang kayu 22,712 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 45,780 M.4.057 . . .
0.00 m3 Kayu papan kelas III 10,900 M.4.103 . . .
0.26 Kg Paku Biasa 2" - 5" 7,207 M.4.158 . . .
A.4.1.2.24. P-101 1.00 titik Upah Join dengan Sling 93,475 0.67 . 93,475 - -
0.22 OH Pekerja 22,660 L.4.001 . . .
0.22 OH Tukang kayu 33,990 L.4.016 . . .
0.22 OH Tukang besi 34,276 L.4.008 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
A.4.2.1.1. P-102 1.00 titik Pemasangan besi profil 36,195 0.13 . 16,530 - 19,665
0.06 OH Pekerja 6,180 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,496 L.4.018 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.15 Kg Besi Profil 19,665 M.4.137 . . .
A.4.2.1.2. P-103 1.00 kg Pemasangan rangka kuda-kuda baja IWF 28,145 0.13 . 16,530 - 11,615
0.06 OH Pekerja 6,180 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,496 L.4.018 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.15 Kg Besi IWF 11,615 M.4.134 . . .
A.4.2.1.3. P-104 1.00 kg Pengerjaan pekerjaan perakitan 899 0.00 . 271 505 123
0.00 OH Pekerja 103 L.4.001 . . .
0.00 OH Tukang Besi Konstruksi 155 L.4.009 . . .
0.00 OH Kepala tukang 2 L.4.036 . . .
0.00 OH Mandor 12 L.4.035 . . .
0.01 Ltr Solar 88 M.4.563 . . .
0.00 Ltr Minyak pelumas 35 M.4.557 . . .
0.01 Jam Sewa alat Perakitan Baja IWF 505 T.4.022 . . .
A.4.2.1.4. P-105 1.00 m2 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
841,349 2.26 . 289,154 - 552,195
1.05 OH Pekerja 108,150 L.4.001 . . .
1.05 OH Tukang Las 148,680 L.4.017 . . .
0.11 OH Kepala tukang 20,276 L.4.036 . . .
0.05 OH Mandor 12,048 L.4.035 . . .
15.00 Kg Besi siku L 30.30.3 205,500 M.4.139 . . .
32.80 Kg Besi plat baja 344,400 M.4.136 . . .
0.05 Kg Kawat las listrik 2,295 M.4.150 . . .
A.4.2.1.5. P-106 1.00 m1 Pengerjaan pengelasan dengan las listrik 574,776 0.64 . 80,596 270,300 223,880
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Besi Konstruksi 30,900 L.4.009 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
4.00 Kg Kawat las listrik 183,600 M.4.150 . . .
3.00 Ltr Solar 26,400 M.4.563 . . .
0.40 Ltr Minyak pelumas 13,880 M.4.557 . . .

www.mitra-arsitek.com 31/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.70 Jam Sewa alat las 270,300 T.4.020 . . .
A.4.2.1.6. P-107 1.00 m2 Pembuatan rangka jendela besi scuare tube (25 x 5) cm 607,773 1.40 . 178,956 - 428,817
0.65 OH Pekerja 66,950 L.4.001 . . .
0.65 OH Tukang Las 92,040 L.4.017 . . .
0.07 OH Kepala tukang 12,552 L.4.036 . . .
0.03 OH Mandor 7,414 L.4.035 . . .
4.76 m Besi square tube 128,996 M.4.140 . . .
4.52 m Besi lis kaca (1 x 1) cm 209,821 M.4.135 . . .
20.00 cm Pengelasan 90,000 M.4.596 . . .
A.4.2.1.7. P-108 1.00 m2 Pemasangan pintu rolling door besi 862,582 2.53 . 318,082 - 544,500
1.20 OH Pekerja 123,600 L.4.001 . . .
1.20 OH Tukang Las 169,920 L.4.017 . . .
0.12 OH Kepala tukang 23,172 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.00 m2 Pintu gulung besi 544,500 M.4.176 . . .
A.4.2.1.8. P-109 1.00 m2 Pemasangan pintu lipat (folding door) plastik/PVC 626,894 0.95 . 126,894 - 500,000
0.44 OH Pekerja 45,320 L.4.001 . . .
0.44 OH Tukang kayu 67,980 L.4.016 . . .
0.04 OH Kepala tukang 8,496 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
1.00 m2 Pintu lipat 500,000 M.4.585 . . .
A.4.2.1.9. P-110 1.00 m2 Pemasangan sunscreen alluminium 414,255 0.96 . 149,255 - 265,000
0.08 OH Pekerja 8,240 L.4.001 . . .
0.80 OH Tukang Besi 124,640 L.4.008 . . .
0.08 OH Kepala tukang 15,448 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.00 m2 Sunscreen alumunium 265,000 M.4.184 . . .
A.4.2.1.10. P-111 1.00 m2 Pemasangan rolling door alluminium 804,495 2.15 . 289,695 - 514,800
1.00 OH Pekerja 103,000 L.4.001 . . .
1.00 OH Tukang Besi 155,800 L.4.008 . . .
0.10 OH Kepala tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 m2 Rolling door alluminium 514,800 M.4.180 . . .
A.4.2.1.11. P-112 1.00 m1 Pemasangan kusen pintu alluminium 40,513 0.09 . 12,445 - 28,068
0.04 OH Pekerja 4,429 L.4.001 . . .
0.04 OH Tukang Besi 6,699 L.4.008 . . .
0.00 OH Kepala tukang 830 L.4.036 . . .
0.00 OH Mandor 487 L.4.035 . . .
1.10 m Profil Alluminium "T" 13,860 M.4.177 . . .
2.00 bh Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 13,608 M.4.598 . . .
A.4.2.1.12. P-113 1.00 m2 Pemasangan pintu alluminium strip lebar 8 cm 469,872 0.18 . 24,612 - 445,260
0.09 OH Pekerja 8,755 L.4.001 . . .
0.09 OH Tukang Besi 13,243 L.4.008 . . .
0.01 OH Kepala tukang 1,641 L.4.036 . . .
0.00 OH Mandor 973 L.4.035 . . .
4.40 m Profil Alluminium "T" 55,440 M.4.177 . . .
14.60 m Aluminium strip 389,820 M.4.122 . . .
A.4.2.1.13. P-114 1.00 m2 Pemasangan pintu kaca rangka alluminium 2,336,130 0.18 . 24,894 - 2,311,236
0.09 OH Pekerja 8,755 L.4.001 . . .

www.mitra-arsitek.com 32/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Besi 13,243 L.4.008 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
4.40 m Pintu alluminium 1,960,200 M.4.174 . . .
4.50 m Profil kaca 289,800 M.4.529 . . .
0.27 Tube Sealant 61,236 M.4.598 . . .
A.4.2.1.14. P-115 1.00 m2 Pemasangan venetions blinds dan Vertical blinds 189,549 0.75 . 110,049 - 79,500
0.35 OH Pekerja 36,050 L.4.001 . . .
0.35 OH Tukang Interior 63,070 L.4.015 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
1.00 m2 Venetions blinds dan vertical blinds (tirai) 79,500 M.4.604 . . .
A.4.2.1.15. P-116 1.00 m2 Pemasangan terali besi strip (2 x 3) mm 664,593 3.59 . 459,961 - 204,632
1.67 OH Pekerja 172,010 L.4.001 . . .
1.67 OH Tukang Las 236,472 L.4.017 . . .
0.17 OH Kepala tukang 32,248 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
6.18 kg Baja strip (0,2 x 2) cm 82,772 M.4.128 . . .
27.08 cm Pengelasan 121,860 M.4.596 . . .
A.4.2.1.16. P-117 1.00 m2 Pemasangan kawat nyamuk 114,809 0.22 . 28,840 - 85,969
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.10 m2 Kawat nyamuk 12,980 M.4.152 . . .
11.11 cm Pengelasan 49,995 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 22,994 M.4.128 . . .
A.4.2.1.17. P-118 1.00 m2 Pemasangan jendela nako & tralis 223,394 0.42 . 55,594 - 167,800
0.20 OH Pekerja 20,600 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.10 m2 Jendela nako (rangka + kaca 5 mm) 66,000 M.4.577 . . .
10.00 bh Paku sekrup 8,000 M.4.165 . . .
7.00 m Baja strip (0,2 x 2) cm 93,800 M.4.128 . . .
A.4.2.1.18. P-119 1.00 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 177,643 0.42 . 55,854 - 121,790
0.20 OH Pekerja 20,600 L.4.001 . . .
0.20 OH Tukang Atap 31,160 L.4.006 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 53,550 M.4.368 . . .
0.02 kg Paku Biasa 2" - 5" 410 M.4.158 . . .
0.02 m3 Kayu Papan kelas II 67,830 M.4.102 . . .
A.4.2.1.19 P-120 1.00 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 130,360
cm 0.49 . 69,837 - 60,523
0.15 OH Pekerja 15,450 L.4.001 . . .
0.30 OH Tukang Atap 46,740 L.4.006 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 53,550 M.4.368 . . .
0.01 kg Paku Biasa 2" - 5" 273 M.4.158 . . .

www.mitra-arsitek.com 33/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 kg Baja strip (0,2 x 2) cm 6,700 M.4.128 . . .
A.4.2.1.20. P-121 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding
273,140partisi0.54 . 72,540 156,500 44,100
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Besi 38,950 L.4.008 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
3.50 M1 Hollow 4/4 44,100 M.4.141 . . .
1.00 Ls Assesoris (perkuatan, las dll) 156,500 T.4.003 . . .
A.4.2.1.21. P-122 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
308,409 0.75 . 101,509 156,500 50,400
0.35 OH Pekerja 36,050 L.4.001 . . .
0.35 OH Tukang Besi 54,530 L.4.008 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
4.00 M1 Hollow 4/4 50,400 M.4.141 . . .
1.00 Ls Assesoris (perkuatan, las dll) 156,500 T.4.003 . . .
A.4.2.1.22. P-123 1.00 m2 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75
349,062 1.63 . 220,272 44,550 84,240
0.76 OH Pekerja 78,321 L.4.001 . . .
0.76 OH Tukang Besi 118,470 L.4.008 . . .
0.08 OH Kepala Tukang 14,676 L.4.036 . . .
0.04 OH Mandor 8,805 L.4.035 . . .
4.05 m1 Baja Ringan-C Truss 84,240 M.4.125 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 44,550 T.4.002 . . .
A.4.2.1.23. P-124 1.00 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75
341,418 1.58 . 212,628 44,550 84,240
0.73 OH Pekerja 75,602 L.4.001 . . .
0.73 OH Tukang Besi 114,357 L.4.008 . . .
0.07 OH Kepala Tukang 14,096 L.4.036 . . .
0.04 OH Mandor 8,573 L.4.035 . . .
4.05 m1 Baja Ringan-C Truss 84,240 M.4.125 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 44,550 T.4.002 . . .
A.4.2.1.24. P-125 1.00 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK 316,464
ATAP GENTENG
0.71 BIASA/METAL
. 104,226 44,550 167,688
0.20 OH Pekerja 20,600 L.4.001 . . .
0.45 OH Tukang Besi 70,110 L.4.008 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
3.72 M' Baja Ringan-C Truss 77,376 M.4.125 . . .
28.00 bh Baut (Srew driver) 14,000 M.4.129 . . .
2.00 bh Baut Ramset / Dina Bolt 9,600 M.4.130 . . .
5.40 M' Baja Ringan- Reng Truss 61,020 M.4.124 . . .
0.12 M' Talang / Jurai Canai Dingin 5,692 M.4.511 . . .
0.10 Ls Alat Rangka Atap Baja Canai Dingin 44,550 T.4.002 . . .
A.4.4.1.1. P-126 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 343,971
1 SP : 2 PP
0.85 . 103,513 - 240,458
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
43.50 Kg Semen 82,650 M.4.033 . . .
0.08 m3 Pasir Pasang 17,808 M.4.030 . . .
A.4.4.1.2. P-127 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 326,375
1 SP : 3 PP
0.85 . 103,513 - 222,862
0.60 OH Pekerja 61,800 L.4.001 . . .

www.mitra-arsitek.com 34/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
32.95 Kg Semen 62,605 M.4.033 . . .
0.09 m3 Pasir Pasang 20,257 M.4.030 . . .
A.4.4.1.3. P-128 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
314,660
1 SP : 4 PP0.85 . 103,513 - 211,147
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
26.55 Kg Semen 50,445 M.4.033 . . .
0.09 m3 Pasir Pasang 20,702 M.4.030 . . .
A.4.4.1.4. P-129 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
308,398
1 SP : 5 PP0.85 . 103,513 - 204,885
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
22.20 Kg Semen 42,180 M.4.033 . . .
0.10 m3 Pasir Pasang 22,705 M.4.030 . . .
A.4.4.1.5. P-130 1.00 m2 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran
305,820
1 SP : 6 PP
0.85 . 103,513 - 202,307
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
18.50 Kg Semen 35,150 M.4.033 . . .
0.12 m3 Pasir Pasang 27,157 M.4.030 . . .
A.4.4.1.6 P-131 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran
293,076
1SP : 3KP0.85
: 10PP . 103,513 - 189,563
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 bh Bata merah 140,000 M.4.007 . . .
10.08 Kg Semen 19,152 M.4.033 . . .
0.03 m3 Kapur 9,820 M.4.020 . . .
0.09 m3 Pasir Pasang 20,591 M.4.030 . . .
A.4.4.1.7 P-132 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
166,220
1SP : 2PP0.43 . 51,757 - 114,464
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
18.95 Kg Semen 36,005 M.4.033 . . .
0.04 m3 Pasir Pasang 8,459 M.4.030 . . .
A.4.4.1.8 P-133 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
157,964
1SP : 3PP0.43 . 51,757 - 106,207
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .

www.mitra-arsitek.com 35/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
14.37 Kg Semen 27,303 M.4.033 . . .
0.04 m3 Pasir Pasang 8,904 M.4.030 . . .
A.4.4.1.9 P-134 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
153,178
1SP :4PP 0.43 . 51,757 - 101,422
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 m3 Bata merah 70,000 M.4.007 . . .
11.50 Kg Semen 21,850 M.4.033 . . .
0.04 m3 Pasir Pasang 9,572 M.4.030 . . .
A.4.4.1.10 P-135 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
150,166
1 SP : 5 PP0.43 . 51,757 - 98,409
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
9.68 Kg Semen 18,392 M.4.033 . . .
0.05 m3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.1.11 P-136 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
148,472
1 SP : 6 PP0.43 . 51,757 - 96,715
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
8.32 Kg Semen 15,808 M.4.033 . . .
0.05 m3 Pasir Pasang 10,907 M.4.030 . . .
A.4.4.1.12 P-137 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
145,237
1SP : 8 PP0.43 . 51,757 - 93,480
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
6.50 Kg Semen 12,350 M.4.033 . . .
0.05 m3 Pasir Pasang 11,130 M.4.030 . . .
A.4.4.1.13 P-138 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
146,793
1SP : 3KP 0.43
:10PP . 51,757 - 95,037
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
4.50 Kg Semen 8,550 M.4.033 . . .
0.02 m3 Kapur 5,357 M.4.020 . . .
0.05 m3 Pasir Pasang 11,130 M.4.030 . . .
A.4.4.1.14 P-139 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran
132,236
1SM : 1KP0.43:1PP . 51,757 - 80,480
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .

www.mitra-arsitek.com 36/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
0.02 Kg Semen Warna 45 M.4.036 . . .
0.02 m3 Kapur 6,428 M.4.020 . . .
0.02 m3 Pasir Pasang 4,007 M.4.030 . . .
A.4.4.1.15 P-140 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran
133,024
1SM : 1KP
0.43
:2PP . 51,757 - 81,267
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
0.01 Kg Semen Warna 35 M.4.036 . . .
0.01 m3 Kapur 4,999 M.4.020 . . .
0.03 m3 Pasir Pasang 6,233 M.4.030 . . .
A.4.4.1.16 P-141 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP : 3PP 423,623 0.53 . 66,292 - 357,331
0.35 OH Pekerja 36,050 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
30.32 Kg Semen 57,608 M.4.033 . . .
0.73 m3 Pasir Pasang 162,053 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.17 P-142 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP:4PP 421,903 0.53 . 66,292 - 355,611
0.35 OH Pekerja 36,050 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
12.50 m3 Hollow Block 20 133,750 M.4.537 . . .
24.26 Kg Semen 46,094 M.4.033 . . .
0.77 m3 Pasir Pasang 171,847 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.8 P-143 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :3PP 319,580 0.47 . 57,524 - 262,056
0.32 OH Pekerja 32,960 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
12.50 bh Hollow Block 15 92,500 M.4.536 . . .
22.74 Kg Semen 43,206 M.4.033 . . .
0.55 m3 Pasir Pasang 122,430 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.19 P-144 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :4PP 318,078 0.47 . 57,524 - 260,553
0.32 OH Pekerja 32,960 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
12.50 m3 Hollow Block 15 92,500 M.4.536 . . .
18.20 Kg Semen 34,580 M.4.033 . . .
0.58 m3 Pasir Pasang 129,553 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .

www.mitra-arsitek.com 37/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.20 P-145 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :3PP 251,757 0.43 . 51,757 - 200,000
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
12.50 bh Hollow Block 10 86,250 M.4.535 . . .
15.16 Kg Semen 28,804 M.4.033 . . .
0.36 m3 Pasir Pasang 81,026 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.21 P-146 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :4PP 251,342 0.43 . 51,757 - 199,586
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
12.50 bh Hollow Block 10 86,250 M.4.535 . . .
12.13 Kg Semen 23,047 M.4.033 . . .
0.39 m3 Pasir Pasang 86,369 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.22 P-147 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 107,448 0.43 . 51,757 - 55,691
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
30.00 bh Bata rooster 27,000 M.4.009 . . .
11.00 Kg Semen 20,900 M.4.033 . . .
0.04 m3 Pasir Pasang 7,791 M.4.030 . . .
A.4.4.1.23 P-148 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 134,448 0.43 . 51,757 - 82,691
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
30.00 bh Bata berongga 54,000 M.4.006 . . .
11.00 Kg Semen 20,900 M.4.033 . . .
0.04 m3 Pasir Pasang 7,791 M.4.030 . . .
A.4.4.1.24 P-149 1.00 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 SP 157,170
: 3 PP 0.48 . 60,447 - 96,723
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 m3 Bata rooster 63,000 M.4.009 . . .
14.00 Kg Semen 26,600 M.4.033 . . .
0.03 m3 Pasir Pasang 7,123 M.4.030 . . .
A.4.4.1.25 P-150 1.00 m2 Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
323,871
B. 0.50 . 59,340 21,840 242,690
0.35 OH Pekerja 36,050 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.08 m3 Bata ringan tebal 7,5 cm 212,753 M.4.005 . . .
2.77 Kg Mortar siap pakai 29,938 M.4.027 . . .
0.10 Ls Bahan Pasang Dinding Bata Ringan 21,840 T.4.005 . . .

www.mitra-arsitek.com 38/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.26 P-151 1.00 m2 Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai
415,280 0.50 . 59,340 24,750 331,190
0.35 OH Pekerja 36,050 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.10 m3 Bata ringan tebal 7,5 cm 283,670 M.4.005 . . .
4.40 Kg Mortar siap pakai 47,520 M.4.027 . . .
0.10 Ls Peralatan Pasang Dinding Bata Ringan 24,750 T.4.010 . . .
A.4.4.2.1. P-152 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 15 mm. 93,466 0.48 . 60,447 - 33,019
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
15.50 Kg Semen 29,458 M.4.033 . . .
0.02 m3 Pasir Pasang 3,562 M.4.030 . . .
A.4.4.2.2. P-153 1.00 m2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. 84,325 0.48 . 60,447 - 23,878
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
10.22 Kg Semen 19,426 M.4.033 . . .
0.02 m3 Pasir Pasang 4,452 M.4.030 . . .
A.4.4.2.3. P-154 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 80,341 0.48 . 60,447 - 19,894
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
7.78 Kg Semen 14,774 M.4.033 . . .
0.02 m3 Pasir Pasang 5,120 M.4.030 . . .
A.4.4.2.4. P-155 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 15 mm 77,645 0.48 . 60,447 - 17,198
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
6.24 Kg Semen 11,856 M.4.033 . . .
0.02 m3 Pasir Pasang 5,342 M.4.030 . . .
A.4.4.2.5. P-156 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 76,084 0.48 . 60,447 - 15,637
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
5.18 Kg Semen 9,850 M.4.033 . . .
0.03 m3 Pasir Pasang 5,788 M.4.030 . . .
A.4.4.2.6. P-157 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 15 mm. 74,848 0.48 . 60,447 - 14,401
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
4.42 Kg Semen 8,390 M.4.033 . . .
0.03 m3 Pasir Pasang 6,010 M.4.030 . . .

www.mitra-arsitek.com 39/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.2.7. P-158 1.00 m2 Pemasangan plesteran 1SP : 7PP tebal 15 mm 74,158 0.48 . 60,447 - 13,711
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
3.94 Kg Semen 7,478 M.4.033 . . .
0.03 m3 Pasir Pasang 6,233 M.4.030 . . .
A.4.4.2.8. P-159 1.00 m2 Pemasangan plesteran 1SP : 8PP tebal 15 mm 73,469 0.48 . 60,447 - 13,022
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
3.46 Kg Semen 6,566 M.4.033 . . .
0.03 m3 Pasir Pasang 6,455 M.4.030 . . .
A.4.4.2.9. P-160 1.00 m2 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm 77,372 0.51 . 62,108 - 15,264
0.36 OH Pekerja 37,080 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
5.76 Kg Semen 10,944 M.4.033 . . .
0.00 m3 Kapur Pasang 1,426 M.4.022 . . .
0.01 m3 Pasir Pasang 2,894 M.4.030 . . .
A.4.4.2.10. P-161 1.00 m2 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm 74,636 0.51 . 62,108 - 12,529
0.36 OH Pekerja 37,080 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
3.00 Kg Semen 5,700 M.4.033 . . .
0.01 m3 Kapur Pasang 2,377 M.4.022 . . .
0.02 m3 Pasir Pasang 4,452 M.4.030 . . .
A.4.4.2.11. P-162 1.00 m2 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm 68,406 0.51 . 62,108 - 6,298
0.36 OH Pekerja 37,080 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.01 m3 Semen 17 M.4.033 . . .
0.01 m3 Kapur Pasang 4,278 M.4.022 . . .
0.01 m3 Pasir Pasang 2,003 M.4.030 . . .
A.4.4.2.12. P-163 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm 68,787 0.51 . 62,108 - 6,679
0.36 OH Pekerja 37,080 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.01 m3 Semen 13 M.4.033 . . .
0.01 m3 Kapur Pasang 3,327 M.4.022 . . .
0.02 m3 Pasir Pasang 3,339 M.4.030 . . .
A.4.4.2.13. P-164 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 20 mm 112,970 0.64 . 81,059 - 31,911
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .

www.mitra-arsitek.com 40/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Mandor 5,097 L.4.035 . . .
13.63 Kg Semen 25,901 M.4.033 . . .
0.03 m3 Pasir Pasang 6,010 M.4.030 . . .
A.4.4.2.14. P-165 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 20 mm 91,154 0.49 . 64,554 - 26,600
0.26 OH Pekerja 26,780 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
10.37 Kg Semen 19,699 M.4.033 . . .
0.03 m3 Pasir Pasang 6,901 M.4.030 . . .
A.4.4.2.15. P-166 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 20 mm. 103,991 0.64 . 81,059 - 22,931
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
8.32 Kg Semen 15,808 M.4.033 . . .
0.03 m3 Pasir Pasang 7,123 M.4.030 . . .
A.4.4.2.16. P-167 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 20 mm 101,983 0.64 . 81,059 - 20,924
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
6.91 Kg Semen 13,133 M.4.033 . . .
0.04 m3 Pasir Pasang 7,791 M.4.030 . . .
A.4.4.2.17. P-168 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 20 mm 100,260 0.64 . 81,059 - 19,201
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
5.89 Kg Semen 11,187 M.4.033 . . .
0.04 m3 Pasir Pasang 8,014 M.4.030 . . .
A.4.4.2.18. P-169 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm 96,957 0.70 . 88,656 - 8,302
0.44 OH Pekerja 45,320 L.4.001 . . .
0.22 OH Tukang Batu 33,990 L.4.007 . . .
0.02 OH Kepala Tukang 4,248 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
0.01 m3 Semen 17 M.4.033 . . .
0.01 m3 Kapur Pasang 4,278 M.4.022 . . .
0.02 m3 Pasir Pasang 4,007 M.4.030 . . .
A.4.4.2.19. P-170 1.00 m2 Pemasangan berapen 1SP : 5PP tebal 15 mm 46,073 0.24 . 30,436 - 15,637
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Batu 11,588 L.4.007 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
5.18 Kg Semen 9,850 M.4.033 . . .
0.03 m3 Pasir Pasang 5,788 M.4.030 . . .
A.4.4.2.20. P-171 1.00 m1 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm 82,535 0.52 . 78,691 - 3,844
0.08 OH Pekerja 8,240 L.4.001 . . .
0.40 OH Tukang Batu 61,800 L.4.007 . . .
0.04 OH Kepala Tukang 7,724 L.4.036 . . .

www.mitra-arsitek.com 41/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 927 L.4.035 . . .
0.50 Kg Semen 950 M.4.033 . . .
0.01 m3 Pasir Pasang 2,894 M.4.030 . . .
A.4.4.2.21. P-172 1.00 m2 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm 355,883 0.72 . 90,883 - 265,000
0.45 OH Pekerja 46,350 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.02 OH Mandor 5,329 L.4.035 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
15.00 Kg Batu granit 246,000 M.4.014 . . .
A.4.4.2.22. P-173 1.00 m2 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm 145,883 0.72 . 90,883 - 55,000
0.45 OH Pekerja 46,350 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.02 OH Mandor 5,329 L.4.035 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
15.00 Kg Batu teraso 36,000 M.4.018 . . .
A.4.4.2.23. P-174 1.00 m2 Pemasangan plesteran ciprat 1SP : 2PP 61,300 0.43 . 51,757 - 9,544
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
4.32 Kg Semen 8,208 M.4.033 . . .
0.01 m3 Pasir Pasang 1,336 M.4.030 . . .
A.4.4.2.24 P-175 1.00 m2 Pemasangan finishing siar pasangan bata merah 36,341 0.24 . 30,436 - 5,905
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Batu 11,588 L.4.007 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
3.11 Kg Semen 5,905 M.4.033 . . .
A.4.4.2.25. P-176 1.00 m2 Pemasangan Finishing siar pasangan conblock ekspose 17,357 0.11 . 14,317 - 3,040
0.07 OH Pekerja 7,210 L.4.001 . . .
0.04 OH Tukang Batu 5,408 L.4.007 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.60 Kg Semen 3,040 M.4.033 . . .
A.4.4.2.26. P-177 1.00 m2 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. 75,164 0.48 . 60,447 - 14,717
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
6.34 Kg Semen 12,046 M.4.033 . . .
0.01 m3 Pasir Pasang 2,671 M.4.030 . . .
A.4.4.2.27. P-178 1.00 m2 Pemasangan acian. 46,473 0.32 . 40,298 - 6,175
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
3.25 Kg Semen 6,175 M.4.033 . . .
A.4.4.2.28. P-179 1.00 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) 90,847 0.48 . 60,447 - 30,400

www.mitra-arsitek.com 42/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
16.00 Kg Semen 30,400 M.4.033 . . .
A.4.4.2.29. P-180 1.00 m2 Pemasangan Acian dengan mortar siap pakai (MSP) 47,138 0.32 . 40,298 - 6,840
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
3.60 Kg Semen 6,840 M.4.033 . . .
A.4.4.3.1. P-181 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm 122,317 0.40 . 50,585 - 71,732
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin PC abu-abu ukuran 40cm x40cm 43,095 M.4.462 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.2. P-182 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm 131,830 0.40 . 50,585 - 81,245
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin PC abu-abu ukuran 30cm x30 cm 52,228 M.4.461 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.3. P-183 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm 169,192 0.43 . 54,615 - 114,577
0.27 OH Pekerja 27,810 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala tukang 2,703 L.4.036 . . .
0.01 OH Mandor 3,244 L.4.035 . . .
26.50 Bh ubin PC abu-abu ukuran 20cm x20 cm 84,800 M.4.460 . . .
10.40 kg Semen 19,760 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.4. P-184 1.00 m2 Pemasangan lantai ubin warna ukuran 40cm x40 cm 179,933 0.40 . 50,585 - 129,348
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin warna ukuran 40cm x40 cm 97,461 M.4.477 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.5. P-185 1.00 m2 Pemasangan lantai ubin warna ukuran 30cm x30cm 227,594 0.42 . 52,387 - 175,207
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin warna ukuran 30cm x30cm 142,440 M.4.476 . . .

www.mitra-arsitek.com 43/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.6. P-186 1.00 m2 Pemasangan lantai ubin warna ukuran 20cm x20cm 401,142 0.43 . 54,615 - 346,527
0.27 OH Pekerja 27,810 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala tukang 2,703 L.4.036 . . .
0.01 OH Mandor 3,244 L.4.035 . . .
26.50 Bh ubin warna ukuran 20cm x20cm 312,700 M.4.475 . . .
10.40 kg Semen 19,760 M.4.033 . . .
1.62 Kg Semen Warna 4,050 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.7. P-187 1.00 m2 Pemasangan lantai ubin teraso ukuran 40cm x40cm 184,574 0.40 . 50,585 - 133,989
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin teraso ukuran 40cm x40cm 102,102 M.4.473 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.8. P-188 1.00 m2 Pemasangan lantai ubin teraso ukuran 30cm x30cm 244,212 0.42 . 52,387 - 191,825
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin teraso ukuran 30cm x30cm 159,058 M.4.472 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.9. P-189 1.00 m2 Pemasangan lantai ubin granit ukuran 40cm x40cm 219,050 0.40 . 50,585 - 168,465
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin granit ukuran 40cm x40cm 136,578 M.4.457 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.10. P-190 1.00 m2 Pemasangan lantai ubin granit ukuran 30cm x30cm 271,513 0.42 . 52,387 - 219,126
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin granit ukuran 30cm x30cm 186,359 M.4.456 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.11. P-191 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 160,043 0.40 . 50,585 - 109,458
0.25 OH Pekerja 25,750 L.4.001 . . .

www.mitra-arsitek.com 44/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 77,571 M.4.464 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.12. P-192 1.00 m2 Pemasangan lantai ubin teralux ukuran 30cm x30cm 259,643 0.42 . 52,387 - 207,256
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin teralux ukuran 30cm x30cm 174,489 M.4.465 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.13. P-193 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm 217,075 0.38 . 48,358 - 168,717
0.24 OH Pekerja 24,720 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 2,780 L.4.035 . . .
3.10 Bh ubin teralux marmer ukuran 60cm x60cm 136,710 M.4.470 . . .
9.60 kg Semen 18,240 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.14. P-194 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 343,031 0.40 . 50,585 - 292,446
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 260,559 M.4.469 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.15. P-195 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm 476,864 0.42 . 52,387 - 424,477
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin teralux marmer ukuran 30cm x30cm 391,710 M.4.468 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
A.4.4.3.16. P-196 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm 64,547 0.19 . 26,071 - 38,475
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
5.30 Bh Plint ubin Pc abu-abu ukuran 15cm x 20cm 34,450 M.4.432 . . .
1.65 kg Semen 3,135 M.4.033 . . .

www.mitra-arsitek.com 45/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 M3 Pasir Pasang 890 M.4.030 . . .
A.4.4.3.17. P-197 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm 47,804 0.19 . 26,071 - 21,733
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin Pc abu-abu ukuran 10cm x 30cm 18,709 M.4.430 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.18. P-198 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm 45,260 0.19 . 26,071 - 19,189
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin Pc abu-abu ukuran 10cm x 40cm 16,165 M.4.431 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 M3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.19. P-199 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 20cm 41,875 0.19 . 26,071 - 15,804
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin warna ukuran 10cm x 20cm 12,720 M.4.444 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.20. P-200 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 30cm 46,805 0.19 . 26,071 - 20,734
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin warna ukuran 10cm x 30cm 17,650 M.4.445 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.21. P-201 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 40cm 46,380 0.19 . 26,071 - 20,309
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin warna ukuran 10cm x 40cm 17,225 M.4.446 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.22. P-202 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 30cm 48,570 0.19 . 26,071 - 22,499
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin teraso ukuran 10cm x 30cm 19,415 M.4.442 . . .

www.mitra-arsitek.com 46/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.23. P-203 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 40cm 49,295 0.19 . 26,071 - 23,224
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin teraso ukuran 10cm x 40cm 20,140 M.4.443 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.24. P-204 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 40cm 66,785 0.19 . 26,071 - 40,714
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin granit ukuran 10cm x 40cm 37,630 M.4.427 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.25. P-205 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 30cm 78,575 0.19 . 26,071 - 52,504
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin granit ukuran 10cm x 30cm 49,420 M.4.426 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.26. P-206 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm 48,354 0.19 . 26,071 - 22,283
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.63 Bh Plint ubin teralux kerang ukuran 10cm x 40cm 19,199 M.4.436 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.27. P-207 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm 51,394 0.19 . 26,071 - 25,323
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin teralux kerang ukuran 10cm x 30cm 22,239 M.4.435 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.28. P-208 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm 57,035 0.19 . 26,071 - 30,964
0.09 OH Pekerja 9,270 L.4.001 . . .

www.mitra-arsitek.com 47/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.70 Bh plint ubin teralux marmer ukuran 10cm x 60cm 27,880 M.4.440 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.29. P-209 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm 67,845 0.19 . 26,071 - 41,774
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin teralux marmer ukuran 10cm x 40cm 38,690 M.4.439 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.30. P-210 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm 77,869 0.19 . 26,071 - 51,798
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin teralux marmer ukuran 10cm x 30cm 48,714 M.4.438 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
A.4.4.3.31. P-211 1.00 m2 Pemasangan lantai teraso cor di tempat, tebal 3cm 72,959 0.58 . 72,536 - 423
0.36 OH Pekerja 37,080 L.4.001 . . .
0.18 OH Tukang Batu 27,810 L.4.007 . . .
0.02 OH Kepala tukang 3,476 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 M3 Teraso cor di tempat, tebal 3cm 173 M.4.546 . . .
0.10 Kg Semen warna 250 M.4.036 . . .
A.4.4.3.32. P-212 1.00 m2 Pemasangan lantai keramik artistik 10cm x 20cm 252,246 1.12 . 141,043 - 111,203
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 m2 keramik artistik 10cm x 20cm 78,750 M.4.407 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 M3 Pasir pasang 10,017 M.4.030 . . .
2.75 Kg Semen warna 6,875 M.4.036 . . .
A.4.4.3.33. P-213 1.00 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 439,621 1.12 . 141,043 - 298,578
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
106.00 Bh keramik artistik 10cm x 10cm atau 5cm x 20cm 265,000 M.4.406 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
3.20 Kg Semen Warna 8,000 M.4.036 . . .

www.mitra-arsitek.com 48/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.34. P-214 1.00 m2 Pemasangan lantai keramik ukuran 33cm x 33cm 245,671 1.12 . 141,043 - 104,628
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
10.00 Bh keramik ukuran 33cm x 33cm 75,000 M.4.414 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
1.62 Kg Semen Warna 4,050 M.4.036 . . .
A.4.4.3.35. P-215 1.00 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 245,030 1.12 . 141,043 - 103,987
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
11.87 Bh keramik ukuran 30cm x 30cm 71,220 M.4.413 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
A.4.4.3.36. P-216 1.00 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 307,370 1.12 . 141,043 - 166,327
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
26.50 Bh Keramik ukuran 20cm x 20cm 132,500 M.4.412 . . .
10.40 Kg Semen 19,760 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
1.62 Kg Semen Warna 4,050 M.4.036 . . .
A.4.4.3.37. P-217 1.00 m2 keramik ukuran 10cm x 33cm untuk variasi/border 568,139 1.68 . 211,777 - 356,362
1.05 OH Pekerja 108,150 L.4.001 . . .
0.53 OH Tukang Batu 81,113 L.4.007 . . .
0.05 OH Kepala tukang 10,234 L.4.036 . . .
0.05 OH Mandor 12,280 L.4.035 . . .
33.00 Bh Ubin keramik 316,800 M.4.458 . . .
9.80 Kg Semen 18,620 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
4.37 Kg Semen Warna 10,925 M.4.036 . . .
A.4.4.3.38. P-218 1.00 m2 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm 337,106 1.12 . 141,043 - 196,063
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
11.87 Bh Keramik mozaik ukuran 30cm x 30cm 155,497 M.4.411 . . .
14.15 Kg Semen 26,885 M.4.033 . . .
0.04 M3 Pasir Pasang 8,681 M.4.030 . . .
2.00 Kg Semen Warna 5,000 M.4.036 . . .
A.4.4.3.39. P-219 1.00 m1 Pemasangan plint keramik ukuran 10cm x 20cm 68,968 0.22 . 31,092 - 37,876
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .

www.mitra-arsitek.com 49/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
5.30 Bh Plint keramik ukuran 10cm x 20cm 34,980 M.4.422 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
0.03 Kg Semen Warna 63 M.4.036 . . .
A.4.4.3.40. P-220 1.00 m1 Pemasangan plint keramik ukuran 10cm x 10cm 92,351 0.22 . 31,092 - 61,259
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
10.60 Bh Plint keramik ukuran 10cm x 10cm 58,300 M.4.421 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
0.05 Kg Semen Warna 125 M.4.036 . . .
A.4.4.3.41. P-221 1.00 m1 Pemasangan plint keramik ukuran 5cm x 20cm 55,861 0.22 . 31,092 - 24,769
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
5.30 Bh Plint keramik ukuran 5cm x 20cm 23,320 M.4.423 . . .
0.57 Kg Semen 1,083 M.4.033 . . .
0.00 M3 Pasir Pasang 334 M.4.030 . . .
0.01 Kg Semen Warna 33 M.4.036 . . .
A.4.4.3.42. P-222 1.00 m1 Pemasangan plint internal cove artistik 5cm x 5cm x 20cm 244,936 1.61 . 216,412 - 28,524
0.75 OH Pekerja 77,250 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala tukang 14,483 L.4.036 . . .
0.04 OH Mandor 8,805 L.4.035 . . .
5.30 Bh Plint internal cove artistik 5cm x 5cm x 20cm 25,440 M.4.419 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 M3 Pasir Pasang 668 M.4.030 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
A.4.4.3.43. P-223 1.00 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 234,072 1.12 . 141,043 - 93,029
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.06 Bh marmer ukuran 100cm x 100cm 65,826 M.4.417 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 M3 Pasir Pasang 10,017 M.4.030 . . .
0.65 Kg Semen Warna 1,625 M.4.036 . . .
A.4.4.3.44. P-224 1.00 m2 Pemasangan lantai karpet 127,368 0.37 . 49,143 - 78,225
0.17 OH Pekerja 17,510 L.4.001 . . .
0.17 OH Tukang Kayu 26,265 L.4.016 . . .
0.02 OH Kepala tukang 3,283 L.4.036 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.05 m2 Karpet 73,605 M.4.355 . . .
0.35 Kg Lem kayu 4,620 M.4.553 . . .
A.4.4.3.45. P-225 1.00 m2 Pemasangan underlayer (pelapis bawah karpet) 69,782 0.26 . 34,607 - 35,175
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Kayu 18,540 L.4.016 . . .

www.mitra-arsitek.com 50/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.05 m2 underlayer (pelapis bawah karpet) 30,555 M.4.373 . . .
0.35 Kg Lem kayu 4,620 M.4.553 . . .
A.4.4.3.46. P-226 1.00 m2 Pemasangan lantai parquet kayu 163,558 1.12 . 141,043 - 22,515
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Kayu 54,075 L.4.016 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 m2 Parquet kayu 14,595 M.4.359 . . .
0.60 Kg Lem kayu 7,920 M.4.553 . . .
A.4.4.3.47. P-227 1.00 m2 Pemasangan lantai kayu gymfloor 462,598 1.12 . 141,043 - 321,555
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Kayu 54,075 L.4.016 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 m2 Parquet kayu gymfloor 313,635 M.4.360 . . .
0.60 Kg Lem kayu 7,920 M.4.553 . . .
A.4.4.3.48. P-228 1.00 m2 Pemasangan dinding porslen 11cm x 11cm 803,117 1.60 . 201,490 - 601,627
1.00 OH Pekerja 103,000 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
86.00 Bh Porselen (11 x 11) cm 576,200 M.4.449 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
A.4.4.3.49. P-229 1.00 m2 Pemasangan dinding porslen 10cm x 20cm 474,893 1.44 . 181,341 - 293,552
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
53.00 Bh Porselen Dinding 10x20 265,000 M.4.450 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.50. P-230 1.00 m2 Pemasangan dinding porslen 20cm x 20cm 389,868 1.44 . 181,341 - 208,527
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
26.00 Bh Porselen Dinding 20x20 182,000 M.4.451 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
1.94 Kg Semen Warna 4,850 M.4.036 . . .
A.4.4.3.51. P-231 1.00 m2 Pemasangan dinding keramik artistik 10cm x 20cm 289,093 1.44 . 181,341 - 107,752
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .

www.mitra-arsitek.com 51/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 m2 Keramik Dinding artistik 79,200 M.4.410 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.52. P-232 1.00 m2 Pemasangan dinding keramik artistik 5cm x 20cm 285,868 1.44 . 181,341 - 104,527
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.05 m2 Keramik Dinding artistik 75,600 M.4.410 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
2.90 Kg Semen Warna 7,250 M.4.036 . . .
A.4.4.3.53. P-233 1.00 m2 Pemasangan dinding keramik 10cm x 20cm 300,088 1.44 . 181,341 - 118,747
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.05 m2 keramik Dinding 10cm x 20cm 90,195 M.4.408 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.54. P-234 1.00 m2 Pemasangan dinding keramik 20cm x 20cm 282,888 1.44 . 181,341 - 101,547
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.10 m2 keramik Dinding 20cm x 20cm 75,020 M.4.409 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 M3 Pasir Pasang 4,007 M.4.030 . . .
1.94 Kg Semen Warna 4,850 M.4.036 . . .
A.4.4.3.55. P-235 1.00 m2 Pemasangan dinding marmer 100cm x 100cm 503,712 2.08 . 261,937 - 241,775
1.30 OH Pekerja 133,900 L.4.001 . . .
0.65 OH Tukang Batu 100,425 L.4.007 . . .
0.07 OH Kepala tukang 12,552 L.4.036 . . .
0.07 OH Mandor 15,061 L.4.035 . . .
1.06 Bh marmer ukuran 100cm x 100cm 65,826 M.4.417 . . .
12.44 Kg Semen 23,636 M.4.033 . . .
0.03 M3 Semen 48 M.4.033 . . .
0.65 Kg Pasir Pasang 144,690 M.4.030 . . .
3.03 Bh Semen Warna 7,575 M.4.036 . . .
A.4.4.3.56. P-236 1.00 m2 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm 294,266 1.60 . 201,490 - 92,776
1.00 OH Pekerja 103,000 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
63.00 Bh Bata pelapis Dinding 3cm x 7cm x 24cm 56,700 M.4.008 . . .
12.44 Kg Semen 23,636 M.4.033 . . .
0.03 M3 Pasir Pasang 5,565 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .

www.mitra-arsitek.com 52/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.57. P-237 1.00 m2 Pemasangan dinding batu paras 266,199 1.12 . 141,043 - 125,156
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.10 m2 Batu paras 95,040 M.4.015 . . .
11.75 Kg Semen 22,325 M.4.033 . . .
0.04 M3 Pasir Pasang 7,791 M.4.030 . . .
A.4.4.3.58. P-238 1.00 m2 Pemasangan dinding batu tempel hitam 500,389 1.12 . 141,043 - 359,346
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.10 m2 Batu alam / tempel 329,230 M.4.011 . . .
11.75 Kg Semen 22,325 M.4.033 . . .
0.04 M3 Pasir Pasang 7,791 M.4.030 . . .
A.4.4.3.59. P-239 1.00 m2 Pemasangan lantai vynil ukuran 30cm x 30cm 266,403 0.32 . 43,375 - 223,028
0.15 OH Pekerja 15,450 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
11.87 Bh Vinyl 218,408 M.4.404 . . .
0.35 Kg Lem kayu 4,620 M.4.553 . . .
A.4.4.3.60. P-240 1.00 m2 Pemasangan wallpaper lebar 50 cm 145,434 0.54 . 66,834 - 78,600
0.35 OH Pekerja 36,050 L.4.001 . . .
0.18 OH Tukang Batu 27,038 L.4.007 . . .
0.02 OH Kepala tukang 3,283 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
2.20 m Wallpaper 74,800 M.4.374 . . .
0.25 Kg Lem Putih 3,800 M.4.554 . . .
A.4.4.3.61. P-241 1.00 m2 Pemasangan floor harderner 55,107 0.26 . 34,607 - 20,500
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
5.00 Kg Floor hardener 20,500 M.4.587 . . .
A.4.4.3.62. P-242 1.00 m1 Pemasangan plint vynil 15cm x 30cm 66,368 0.17 . 23,072 - 43,296
0.08 OH Pekerja 8,240 L.4.001 . . .
0.08 OH Tukang Batu 12,360 L.4.007 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.76 Bh plint vynil 15cm x 30cm 42,240 M.4.447 . . .
0.08 Kg Lem kayu 1,056 M.4.553 . . .
A.4.4.3.63. P-243 1.00 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 54,443 0.26 . 34,607 - 19,836
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.00 M3 Kayu Papan kelas I 19,796 M.4.101 . . .
0.05 Kg Paku sekrup 40 M.4.165 . . .

www.mitra-arsitek.com 53/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.64. P-244 1.00 m2 Pemasangan paving block natural tebal 6 cm 249,370 0.53 . 69,782 21,630 157,958
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
1.01 M2 Paving block 6 cm 143,218 M.4.542 . . .
0.05 M3 Pasir beton 14,740 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,630 T.4.004 . . .
A.4.4.3.65. P-245 1.00 m2 Pemasangan paving block natural tebal 8 cm 115,785 0.53 . 69,782 21,630 24,373
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
1.01 M2 Paving block 8 cm natural 3,737 M.4.544 . . .
0.07 M3 Pasir beton 20,636 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,630 T.4.004 . . .
A.4.4.3.66. P-246 1.00 m2 Pemasangan paving block berwarna tebal 6 cm 245,330 0.53 . 69,782 21,630 153,918
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
1.01 M2 Paving block 6cm berwarna 139,178 M.4.543 . . .
0.05 M3 Pasir beton 14,740 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,630 T.4.004 . . .
A.4.4.3.67. P-247 1.00 m2 Pemasangan paving block berwarna tebal 8 cm 228,703 0.53 . 69,782 21,630 137,291
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
1.01 M2 Paving block 8 cm berwarna 116,655 M.4.541 . . .
0.07 M3 Pasir beton 20,636 M.4.028 . . .
0.10 % Bahan Kerja Paving Blok 21,630 T.4.004 . . .
A.4.4.3.68. P-248 1.00 m2 Pemasangan Aluminium Composite Panel 148,938 0.24 . 30,533 - 118,405
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Besi 11,685 L.4.008 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.37 Lbr Aluminium Composite Panel 108,405 M.4.120 . . .
20.00 bh Screw 10,000 M.4.182 . . .
A.4.5.1.1. P-249 1.00 m2 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm107,877 0.11 . 16,184 - 91,693
0.03 OH Pekerja 3,090 L.4.001 . . .
0.07 OH Tukang kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 m2 Asbes semen 91,520 M.4.342 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
A.4.5.1.2. P-250 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 30) cm 460,272 0.26 . 34,607 - 425,665
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang kayu 18,540 L.4.016 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .

www.mitra-arsitek.com 54/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 1,390 L.4.035 . . .
12.00 Lbr Akustik ukuran 30 x 30 cm 424,800 M.4.340 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .
A.4.5.1.3. P-251 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 60) cm 370,712 0.26 . 34,607 - 336,105
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang kayu 18,540 L.4.016 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
5.80 Lbr Akustik ukuran 30 x 60 cm 335,240 M.4.341 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .
A.4.5.1.4. P-252 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm 225,605 0.22 . 28,840 - 196,765
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.50 Lbr Akustik Uk. 60 cm x 120 cm 195,900 M.4.339 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .
A.4.5.1.5. P-253 1.00 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm,44,359
4 mm & 6 0.22 . 28,840 - 15,519
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.38 Lbr Tripleks 15,000 M.4.372 . . .
0.03 kg Paku tripleks 519 M.4.171 . . .
A.4.5.1.6. P-254 1.00 m2 Pemasangan langit-langit lambrisering kayu, tebal 9 mm 284,964 1.72 . 230,716 - 54,248
0.80 OH Pekerja 82,400 L.4.001 . . .
0.80 OH Tukang kayu 123,600 L.4.016 . . .
0.08 OH Kepala tukang 15,448 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.02 m3 Kayu Papan 3/20 54,075 M.4.100 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
A.4.5.1.7. P-255 1.00 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 51,286
9 mm 0.16 . 20,149 - 31,137
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Tukang kayu 7,725 L.4.016 . . .
0.01 OH Kepala tukang 966 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.36 Lbr Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 88 M.4.165 . . .
A.4.5.1.8. P-256 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut 395,943
rangka alluminium
1.08 . 144,198 - 251,745
0.50 OH Pekerja 51,500 L.4.001 . . .
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
3.60 m Profil Alluminium "T" 45,360 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,445 M.4.145 . . .
1.05 bh Baut Ramset / Dina Bolt 5,040 M.4.130 . . .
1.50 Lbr Akustik Uk. 60 cm x 120 cm 195,900 M.4.339 . . .
A.4.5.1.9. P-257 1.00 m1 Pemasangan list langit-langit kayu profil 17,854 0.11 . 14,536 - 3,318
0.05 OH Pekerja 5,150 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .

www.mitra-arsitek.com 55/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala tukang 966 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.05 m List kayu profil 3,045 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 273 M.4.158 . . .
A.4.5.1.10. P-258 1.00 m2 Pemasangan Plafond PVC 206,660 0.50 . 76,280 - 130,380
0.15 OH Pekerja 15,450 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
1.05 m2 Plafond PVC 121,380 M.4.362 . . .
18.00 bh Screw 9,000 M.4.182 . . .
A.4.5.1.10. P-259 1.00 m2 Pemasangan List Plafond PVC 60,634 0.16 . 20,149 - 40,485
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala tukang 966 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.05 M' List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) 37,485 M.4.357 . . .
6.00 bh Screw 3,000 M.4.182 . . .
A.4.5.2.1. P-260 1.00 m2 Pemasangan atap genteng palentong kecil 92,839 0.24 . 30,339 - 62,500
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,448 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
25.00 Bh Genteng palentong 62,500 M.4.494 . . .
A.4.5.2.2. P-261 1.00 m2 Pemasangan atap genteng kodok glazuur 72,936 0.24 . 30,436 - 42,500
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
25.00 Bh Genteng kodok 42,500 M.4.492 . . .
A.4.5.2.3. P-262 1.00 m2 Pemasangan atap genteng palentong besar/super 50,836 0.24 . 30,436 - 20,400
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
12.00 Bh Genteng kodok 20,400 M.4.492 . . .
A.4.5.2.4. P-263 1.00 m1 Pemasangan bubung genteng palentong 123,749 0.62 . 76,425 - 47,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
5.00 Bh Genteng bubung 25,000 M.4.488 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 M3 Pasir Pasang 7,123 M.4.030 . . .
A.4.5.2.5. P-264 1.00 m1 Pemasangan bubung genteng kodok glazuur 123,749 0.62 . 76,425 - 47,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
5.00 Bh Genteng bubung 25,000 M.4.488 . . .

www.mitra-arsitek.com 56/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 M3 Pasir Pasang 7,123 M.4.030 . . .
A.4.5.2.6. P-265 1.00 m1 Pemasangan bubung genteng palentong besar 118,749 0.62 . 76,425 - 42,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
4.00 Bh Genteng bubung 20,000 M.4.488 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 M3 Pasir Pasang 7,123 M.4.030 . . .
A.4.5.2.7. P-266 1.00 m2 Pemasangan roof light fibreglass 90x180 101,110 0.22 . 27,745 - 73,365
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,352 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.60 Lbr Rooflight 90x180 72,000 M.4.509 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.5.2.8. P-267 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm 84,920 0.23 . 29,406 - 55,514
0.14 OH Pekerja 14,420 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.50 Lbr Asbes gelombang 92x250 54,050 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.9. P-268 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm 95,730 0.23 . 29,406 - 66,324
0.14 OH Pekerja 14,420 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.60 Lbr Asbes gelombang 92x250 64,860 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.10. P-269 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm 94,533 0.22 . 28,209 - 66,324
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.60 Lbr Asbes gelombang 92x250 64,860 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.11. P-270 1.00 m2 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm 110,748 0.22 . 28,209 - 82,539
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.75 Lbr Asbes gelombang 92x250 81,075 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.12. P-271 1.00 m2 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm 67,508 0.22 . 28,209 - 39,299
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .

www.mitra-arsitek.com 57/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 Lbr Asbes gelombang 92x250 37,835 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.13. P-272 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm 75,075 0.22 . 28,209 - 46,866
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.42 Lbr Asbes gelombang 92x250 45,402 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.14. P-273 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm 77,237 0.22 . 28,209 - 49,028
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.44 Lbr Asbes gelombang 92x250 47,564 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.15. P-274 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm 84,804 0.22 . 28,209 - 56,595
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.51 Lbr Asbes gelombang 92x250 55,131 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.16. P-275 1.00 m2 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm 116,153 0.22 . 28,209 - 87,944
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.80 Lbr Asbes gelombang 92x250 86,480 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.17. P-276 1.00 m2 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm 69,670 0.22 . 28,209 - 41,461
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.37 Lbr Asbes gelombang 92x250 39,997 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.18. P-277 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm 70,751 0.22 . 28,209 - 42,542
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.38 Lbr Asbes gelombang 92x250 41,078 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.19. P-278 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm 79,399 0.22 . 28,209 - 51,190
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.46 Lbr Asbes gelombang 92x250 49,726 M.4.345 . . .

www.mitra-arsitek.com 58/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.20. P-279 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm 82,642 0.22 . 28,209 - 54,433
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.49 Lbr Asbes gelombang 92x250 52,969 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.21. P-280 1.00 m2 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm 91,290 0.22 . 28,209 - 63,081
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.57 Lbr Asbes gelombang 92x250 61,617 M.4.345 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.22. P-281 1.00 m1 Pemasangan bubung stel gelombang 0,92m 75,562 0.23 . 31,402 - 44,160
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.40 Lbr Bubung stel gel. 39,360 M.4.480 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.23. P-282 1.00 m1 Pemasangan bubung stel gelombang 1,05m 70,642 0.23 . 31,402 - 39,240
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.10 Lbr Bubung stel gel. 34,440 M.4.480 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.24. P-283 1.00 m1 Pemasangan bubung stel gelombang 1,08m 69,822 0.23 . 31,402 - 38,420
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.05 Lbr Bubung stel gel. 33,620 M.4.480 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.25. P-284 1.00 m1 Pemasangan Nok paten 0,92m 85,042 0.23 . 31,402 - 53,640
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 Lbr Nok Paten 48,840 M.4.503 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.26. P-285 1.00 m1 Pemasangan Nok paten 1,05m 85,042 0.23 . 31,402 - 53,640
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 Lbr Nok Paten 48,840 M.4.503 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .

www.mitra-arsitek.com 59/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.2.27. P-286 1.00 m1 Pemasangan Nok paten 1,08m 85,042 0.23 . 31,402 - 53,640
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 Lbr Nok Paten 48,840 M.4.503 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.28. P-287 1.00 m1 Pemasangan nok stel rata 0,92m 86,482 0.27 . 36,912 - 49,570
0.10 OH Pekerja 10,300 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 Lbr Nok Paten 44,770 M.4.503 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.29. P-288 1.00 m1 Pemasangan nok stel rata 1,05m 80,972 0.23 . 31,402 - 49,570
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 Lbr Nok Paten 44,770 M.4.503 . . .
6.00 Bh Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.30. P-289 1.00 m2 Pemasangan genteng beton 73,017 0.32 . 40,298 - 32,719
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
11.00 Bh Genteng beton 31,900 M.4.485 . . .
0.03 Kg Paku Biasa 2" - 5" 819 M.4.158 . . .
A.4.5.2.31. P-290 1.00 m2 Pemasangan genteng aspal 137,335 0.51 . 69,846 - 67,489
0.20 OH Pekerja 20,600 L.4.001 . . .
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.00 OH Kepala tukang 579 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
6.90 Bh Genteng aspal 21,390 M.4.484 . . .
0.35 Lbr Plywood 120x240 tbl. 6 mm 26,880 M.4.366 . . .
0.03 Kg Paku Biasa 2" - 5" 819 M.4.158 . . .
0.50 Bh Plastic aerator 18,400 M.4.363 . . .
A.4.5.2.32. P-291 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 89,093 0.31 . 38,213 - 50,880
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.30 Bh Genteng metal 46,020 M.4.493 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.33. P-292 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai 113,873 0.31 . 38,213 - 75,660
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
2.00 Bh Genteng metal 70,800 M.4.493 . . .

www.mitra-arsitek.com 60/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.34. P-293 1.00 m2 Pemasangan atap sirap kayu 142,864 0.45 . 62,404 - 80,460
0.17 OH Pekerja 17,098 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
30.00 Bh Sirap kayu 75,000 M.4.510 . . .
0.20 Kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
A.4.5.2.35. P-294 1.00 m1 Pemasangan nok genteng beton 166,704 0.64 . 80,596 - 86,108
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
3.50 Bh nok genteng beton 54,600 M.4.499 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
10.80 Kg Semen 20,520 M.4.033 . . .
0.03 M3 Pasir Pasang 7,123 M.4.030 . . .
1.00 Kg Semen warna 2,500 M.4.036 . . .
A.4.5.2.36. P-295 1.00 m1 Pemasangan Nok genteng aspal 122,068 0.41 . 57,718 - 64,350
0.13 OH Pekerja 12,875 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
2.00 Bh nok genteng aspal 50,000 M.4.498 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.00 M3 Kayu balok borneo 12,985 M.4.084 . . .
A.4.5.2.37. P-296 1.00 m1 Pemasangan nok genteng metal 152,999 0.43 . 54,834 - 98,165
0.25 OH Pekerja 25,750 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
1.10 Bh nok genteng metal 96,800 M.4.501 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.5.2.38. P-297 1.00 m1 Pemasangan Nok sirap 80,848 0.41 . 57,718 - 23,130
0.13 OH Pekerja 12,875 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 20,400 M.4.368 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.5.2.39. P-298 1.00 m2 Pemasangan atap seng gelombang 60,425 0.19 . 24,179 - 36,246
0.12 OH Pekerja 12,360 L.4.001 . . .
0.06 OH Tukang Kayu 9,270 L.4.016 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 35,700 M.4.368 . . .
0.02 Kg Paku Biasa 2" - 5" 546 M.4.158 . . .
A.4.5.2.40. P-299 1.00 m1 Pemasangan nok atap seng 45,399 0.23 . 29,007 - 16,392
0.15 OH Pekerja 15,450 L.4.001 . . .

www.mitra-arsitek.com 61/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.30 Lbr Seng Gelombang 3" x 6" BJLS 28 15,300 M.4.368 . . .
0.04 Kg Paku Biasa 2" - 5" 1,092 M.4.158 . . .
A.4.5.2.41. P-300 1.00 m2 Pemasangan atap alumunium 294,539 0.99 . 148,163 - 146,376
0.15 OH Pekerja 15,450 L.4.001 . . .
0.75 OH Tukang Kayu 115,875 L.4.016 . . .
0.08 OH Kepala tukang 15,448 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.05 Lbr Alumunium gel tbl 0,55 146,160 M.4.123 . . .
0.02 Kg Paku Hak Panjang 15cm 216 M.4.161 . . .
A.4.5.2.42. P-301 1.00 m1 Pemasangan Nok alumunium 203,807 1.25 . 195,695 - 8,112
0.10 OH Pekerja 10,300 L.4.001 . . .
1.00 OH Tukang Kayu 154,500 L.4.016 . . .
0.10 OH Kepala tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.20 Bh Nok standar 40x18 7,680 M.4.505 . . .
0.04 Kg Paku Hak Panjang 15cm 432 M.4.161 . . .
A.4.5.2.43. P-302 1.00 m2 Pemasangan alumunium foil/sisalation 56,234 0.21 . 25,994 - 30,240
0.15 OH Pekerja 15,450 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala tukang 966 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.05 M2 Aluminium foil 30,240 M.4.121 . . .
A.4.6.1.1. P-303 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu13,409,430
kelas I 30.45 . 4,452,105 - 8,957,325
7.00 OH Pekerja 721,000 L.4.001 . . .
21.00 OH Tukang kayu 3,244,500 L.4.016 . . .
2.10 OH Kepala tukang 405,510 L.4.036 . . .
0.35 OH Mandor 81,095 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,910,000 M.4.072 . . .
1.25 Kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 Kg Lem kayu 13,200 M.4.553 . . .
A.4.6.1.2. P-304 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu13,583,415
kelas II atau 26.10
III . 3,816,090 - 9,767,325
6.00 OH Pekerja 618,000 L.4.001 . . .
18.00 OH Tukang kayu 2,781,000 L.4.016 . . .
1.80 OH Kepala tukang 347,580 L.4.036 . . .
0.30 OH Mandor 69,510 L.4.035 . . .
1.20 m3 Balok kayu 8/15 Kelas I 9,720,000 M.4.072 . . .
1.25 Kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 Kg Lem kayu 13,200 M.4.553 . . .
A.4.6.1.3. P-305 1.00 m2 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II 368,286 1.52 . 222,721 - 145,565
0.35 OH Pekerja 36,050 L.4.001 . . .
1.05 OH Tukang kayu 162,225 L.4.016 . . .
0.11 OH Kepala tukang 20,276 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 144,200 M.4.100 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.4. P-306 1.00 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III 368,286 1.52 . 222,721 - 145,565
0.35 OH Pekerja 36,050 L.4.001 . . .

www.mitra-arsitek.com 62/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.05 OH Tukang kayu 162,225 L.4.016 . . .
0.11 OH Kepala tukang 20,276 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 144,200 M.4.100 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.5. P-307 1.00 m2 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II 786,815 4.35 . 636,015 - 150,800
1.00 OH Pekerja 103,000 L.4.001 . . .
3.00 OH Tukang kayu 463,500 L.4.016 . . .
0.30 OH Kepala tukang 57,930 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
0.04 m3 Kayu Papan 3/20 144,200 M.4.100 . . .
0.50 Kg Lem kayu 6,600 M.4.553 . . .
A.4.6.1.6. P-308 1.00 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau
599,292
II 3.48 . 508,812 - 90,480
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang kayu 370,800 L.4.016 . . .
0.24 OH Kepala tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.02 m3 Kayu Papan 3/20 86,520 M.4.100 . . .
0.30 Kg Lem kayu 3,960 M.4.553 . . .
A.4.6.1.7. P-309 1.00 m2 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau
873,335
II 4.35 . 636,015 - 237,320
1.00 OH Pekerja 103,000 L.4.001 . . .
3.00 OH Tukang kayu 463,500 L.4.016 . . .
0.30 OH Kepala tukang 57,930 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
0.06 m3 Kayu Papan 3/20 230,720 M.4.100 . . .
0.50 Kg Lem kayu 6,600 M.4.553 . . .
A.4.6.1.8. P-310 1.00 m2 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup
621,255 3.05 . 445,211 - 176,044
0.70 OH Pekerja 72,100 L.4.001 . . .
2.10 OH Tukang kayu 324,450 L.4.016 . . .
0.21 OH Kepala tukang 40,551 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 90,125 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 819 M.4.158 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 Lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
A.4.6.1.9. P-311 1.00 m2 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau 687,019
II 3.48 . 508,812 - 178,207
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang kayu 370,800 L.4.016 . . .
0.24 OH Kepala tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 92,288 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 819 M.4.158 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 Lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
A.4.6.1.10. P-312 1.00 m2 Pemasangan jalusi kusen, kayu kelas I atau II 714,645 3.21 . 494,250 - 220,395
0.67 OH Pekerja 69,010 L.4.001 . . .
2.00 OH Tukang kayu 309,000 L.4.016 . . .
0.20 OH Kepala tukang 38,620 L.4.036 . . .
0.34 OH Mandor 77,620 L.4.035 . . .
0.06 m3 Kayu Papan 3/20 216,300 M.4.100 . . .

www.mitra-arsitek.com 63/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
A.4.6.1.11. P-313 1.00 m2 Pemasangan teakwood rangkap, rangka expose kayu kelas I 665,216 3.48 . 508,812 - 156,404
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang kayu 370,800 L.4.016 . . .
0.24 OH Kepala tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 90,125 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 819 M.4.158 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 Lbr Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
A.4.6.1.12. P-314 1.00 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas
750,533
II 3.70 . 540,729 - 209,804
0.85 OH Pekerja 87,550 L.4.001 . . .
2.55 OH Tukang kayu 393,975 L.4.016 . . .
0.26 OH Kepala tukang 49,241 L.4.036 . . .
0.04 OH Mandor 9,963 L.4.035 . . .
0.03 m3 Kayu Papan 3/20 90,125 M.4.100 . . .
0.03 kg Paku Biasa 2" - 5" 819 M.4.158 . . .
0.80 kg Lem kayu 10,560 M.4.553 . . .
1.00 Lbr Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
0.50 Lbr Formika 46,800 M.4.351 . . .
A.4.6.1.13. P-315 1.00 m3 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II11,807,940
dan III bentang
17.40
6 meter . 2,544,060 - 9,263,880
4.00 OH Pekerja 412,000 L.4.001 . . .
12.00 OH Tukang kayu 1,854,000 L.4.016 . . .
1.20 OH Kepala tukang 231,720 L.4.036 . . .
0.20 OH Mandor 46,340 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,910,000 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 152,880 M.4.158 . . .
A.4.6.1.14. P-316 1.00 m3 Pemasangan konstruksi kuda-kuda expose, kayu kelas I 14,335,181 29.15 . 4,261,301 - 10,073,880
6.70 OH Pekerja 690,100 L.4.001 . . .
20.10 OH Tukang kayu 3,105,450 L.4.016 . . .
2.01 OH Kepala tukang 388,131 L.4.036 . . .
0.34 OH Mandor 77,620 L.4.035 . . .
1.20 m3 Balok kayu 8/15 Kelas I 9,720,000 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 152,880 M.4.158 . . .
A.4.6.1.15. P-317 1.00 m3 Pemasangan konstruksi gordeng, kayu kelas II 13,454,201 29.15 . 4,261,301 - 9,192,900
6.70 OH Pekerja 690,100 L.4.001 . . .
20.10 OH Tukang kayu 3,105,450 L.4.016 . . .
2.01 OH Kepala tukang 388,131 L.4.036 . . .
0.34 OH Mandor 77,620 L.4.035 . . .
1.10 m3 Balok kayu 8/15 Kelas I 8,910,000 M.4.072 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku Biasa 2" - 5" 81,900 M.4.158 . . .
A.4.6.1.16. P-318 1.00 m2 Pemasangan rangka atap genteng keramik, kayu kelas II 180,067 0.22 . 28,840 - 151,227
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 33,810 M.4.082 . . .

www.mitra-arsitek.com 64/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 m3 Reng 2 x 3 cm Kayu Kelas II 110,592 M.4.047 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.17. P-319 1.00 m2 Pemasangan rangka atap genteng beton, kayu kelas II 244,579 0.22 . 28,840 - 215,739
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 33,810 M.4.082 . . .
0.06 m3 Reng 2 x 3 cm Kayu Kelas II 175,104 M.4.047 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.18. P-320 1.00 m2 Pemasangan rangka atap sirap, kayu kelas II 69,974 0.26 . 34,607 - 35,366
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang kayu 18,540 L.4.016 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.01 m3 Kayu balok 5/7 Kelas II 33,810 M.4.082 . . .
0.06 m3 Paku Biasa 2" - 5" 1,556 M.4.158 . . .
A.4.6.1.19. P-321 1.00 m2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau 127,622
III 0.56 . 84,971 - 42,651
0.15 OH Pekerja 15,450 L.4.001 . . .
0.30 OH Tukang kayu 46,350 L.4.016 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
0.02 m3 Kayu balok 5/7 Kelas II 37,191 M.4.082 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
A.4.6.1.20. P-322 1.00 m2 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III
121,250 0.54 . 75,060 - 46,190
0.20 OH Pekerja 20,600 L.4.001 . . .
0.30 OH Tukang kayu 46,350 L.4.016 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
0.02 m3 Kayu balok 5/7 Kelas II 39,365 M.4.082 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.21. P-323 1.00 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 87,885 0.33 . 46,221 - 41,664
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 38,934 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
A.4.6.1.22. P-324 1.00 m1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 87,241 0.33 . 46,221 - 41,020
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 39,655 M.4.100 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.23. P-325 1.00 m2 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau 326,413
III 0.65 . 95,518 - 230,895
0.15 OH Pekerja 15,450 L.4.001 . . .
0.45 OH Tukang kayu 69,525 L.4.016 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .

www.mitra-arsitek.com 65/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 m3 Balok kayu 8/15 Kelas I 226,800 M.4.072 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
A.4.6.1.24. P-326 1.00 m2 Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas298,623
II 0.65 . 95,518 - 203,105
0.15 OH Pekerja 15,450 L.4.001 . . .
0.45 OH Tukang kayu 69,525 L.4.016 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 126,000 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 Lbr Teakwood 4 mm, 120 x 240 65,618 M.4.371 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
A.4.6.1.25. P-327 1.00 m2 Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas 332,200
II 0.87 . 127,203 - 204,997
0.20 OH Pekerja 20,600 L.4.001 . . .
0.60 OH Tukang kayu 92,700 L.4.016 . . .
0.06 OH Kepala tukang 11,586 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 126,000 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 Lbr Plywood 120x240 tbl. 4 mm 67,510 M.4.365 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
A.4.6.1.26. P-328 1.00 m2 Pemasangan dinding lambrisering dari Kayu Papan kelas I 409,694 2.61 . 381,609 - 28,085
0.60 OH Pekerja 61,800 L.4.001 . . .
1.80 OH Tukang kayu 278,100 L.4.016 . . .
0.18 OH Kepala tukang 34,758 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
0.01 m3 Kayu Papan 3/20 25,235 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku sekrup 120 M.4.165 . . .
A.4.6.1.27. P-329 1.00 m2 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm
48,704 0.11 . 15,939 - 32,765
0.03 OH Pekerja 2,575 L.4.001 . . .
0.08 OH Tukang kayu 11,588 L.4.016 . . .
0.01 OH Kepala tukang 1,545 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.40 m3 Plywood 120x240 tbl. 4 mm 31,400 M.4.365 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.28. P-330 1.00 m2 Pemasangan dinding bilik, rangka kayu kelas III atau IV 188,057 0.16 . 20,149 - 167,908
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Tukang kayu 7,725 L.4.016 . . .
0.01 OH Kepala tukang 966 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.50 m2 Bilik bambu 115,950 M.4.350 . . .
0.01 m3 Kayu balok 5/7 Kelas II 33,810 M.4.082 . . .
0.01 kg Paku Biasa 2" - 5" 328 M.4.158 . . .
0.00 m3 List kayu 2/4 17,820 M.4.043 . . .
A.4.6.2.1. P-331 1.00 bh Pemasangan kunci tanam antik 383,661 0.72 . 111,161 - 272,500
0.06 OH Pekerja 6,180 L.4.001 . . .
0.60 OH Tukang kayu 92,700 L.4.016 . . .
0.06 OH Kepala tukang 11,586 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Bh Kunci tanam antik 272,500 M.4.582 . . .

www.mitra-arsitek.com 66/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.6.2.2. P-332 1.00 bh Pemasangan kunci tanam biasa 230,794 0.57 . 89,094 - 141,700
0.01 OH Pekerja 1,030 L.4.001 . . .
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 Bh Kunci tanam biasa 141,700 M.4.583 . . .
A.4.6.2.3. P-333 1.00 bh Pemasangan kunci kamar mandi 137,615 0.56 . 88,115 - 49,500
0.01 OH Pekerja 515 L.4.001 . . .
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Bh Kunci tanam KM 49,500 M.4.584 . . .
A.4.6.2.4. P-334 1.00 bh Pemasangan kunci silinder 167,615 0.56 . 88,115 - 79,500
0.01 OH Pekerja 515 L.4.001 . . .
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Bh Kunci silinder 79,500 M.4.580 . . .
A.4.6.2.5. P-335 1.00 bh Pemasangan engsel pintu 45,202 0.18 . 27,802 - 17,400
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.00 Bh Engsel pintu 17,400 M.4.574 . . .
A.4.6.2.6. P-336 1.00 bh Pemasangan engsel jendela kupu-kupu 38,127 0.12 . 18,527 - 19,600
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.00 OH Mandor 116 L.4.035 . . .
1.00 Bh Engsel kupu-kupu 19,600 M.4.573 . . .
A.4.6.2.7. P-337 1.00 bh Pemasangan engsel angin 53,078 0.32 . 45,178 - 7,900
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 116 L.4.035 . . .
1.00 Bh Engsel angin 7,900 M.4.571 . . .
A.4.6.2.8. P-338 1.00 bh Pemasangan spring knip 37,670 0.19 . 29,470 - 8,200
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 Bh Spring knip 8,200 M.4.600 . . .
A.4.6.2.9. P-339 1.00 bh Pemasangan kait angin 35,170 0.19 . 29,470 - 5,700
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 Bh Kait angin 5,700 M.4.142 . . .
A.4.6.2.10. P-340 1.00 bh Pemasangan door closer 347,750 0.60 . 92,750 - 255,000
0.05 OH Pekerja 5,150 L.4.001 . . .

www.mitra-arsitek.com 67/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 set Door closer 255,000 M.4.568 . . .
A.4.6.2.11. P-341 1.00 bh Pemasangan kunci slot 86,054 0.24 . 37,054 - 49,000
0.02 OH Pekerja 2,060 L.4.001 . . .
0.20 OH Tukang kayu 30,900 L.4.016 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.00 Bh Kunci slot 49,000 M.4.581 . . .
A.4.6.2.12. P-342 1.00 bh Pemasangan Door holder 194,650 0.60 . 92,750 - 101,900
0.05 OH Pekerja 5,150 L.4.001 . . .
0.50 OH Tukang kayu 77,250 L.4.016 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Bh Door holder 101,900 M.4.569 . . .
A.4.6.2.13. P-343 1.00 bh Pemasangan door stop 113,670 0.13 . 19,570 - 94,100
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang kayu 15,450 L.4.016 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 Bh Door stop 94,100 M.4.570 . . .
A.4.6.2.14. P-344 1.00 bh Pemasangan Rrel pintu sorong 311,161 0.72 . 111,161 - 200,000
0.06 OH Pekerja 6,180 L.4.001 . . .
0.60 OH Tukang kayu 92,700 L.4.016 . . .
0.06 OH Kepala tukang 11,586 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Set Rel pintu dorong 200,000 M.4.179 . . .
A.4.6.2.15. P-345 1.00 bh Pemasangan kunci lemari 58,929 0.30 . 46,329 - 12,600
0.03 OH Pekerja 2,575 L.4.001 . . .
0.25 OH Tukang kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.00 Set Kunci lemari 12,600 M.4.579 . . .
A.4.6.2.16. P-346 1.00 m2 Pemasangan kaca tebal 3 mm 140,122 0.18 . 27,802 - 112,320
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.10 m2 Kaca tebal 3mm 100,980 M.4.525 . . .
0.05 Kg SEalant 11,340 M.4.598 . . .
A.4.6.2.17. P-347 1.00 m2 Pemasangan kaca tebal 5 mm 167,182 0.18 . 27,802 - 139,380
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.10 m2 Kaca tebal 5 mm 128,040 M.4.526 . . .
0.05 Kg SEalant 11,340 M.4.598 . . .
A.4.6.2.18. P-348 1.00 m2 Pemasangan kaca tebal 8 mm 253,303 0.20 . 31,507 - 221,796
0.02 OH Pekerja 1,751 L.4.001 . . .

www.mitra-arsitek.com 68/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.17 OH Tukang kayu 26,265 L.4.016 . . .
0.02 OH Kepala tukang 3,283 L.4.036 . . .
0.00 OH Mandor 209 L.4.035 . . .
1.10 m2 Kaca tebal 8 mm 205,920 M.4.527 . . .
0.07 Kg SEalant 15,876 M.4.598 . . .
A.4.6.2.19. P-349 1.00 m2 Pemasangan kaca buram tebal 12 mm 240,405 0.30 . 46,329 - 194,076
0.03 OH Pekerja 2,575 L.4.001 . . .
0.25 OH Tukang kayu 38,625 L.4.016 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.10 m2 Kaca buram 12 mm 178,200 M.4.520 . . .
0.07 Kg SEalant 15,876 M.4.598 . . .
A.4.6.2.20. P-350 1.00 m2 Pemasangan kaca cermin tebal 5 mm 208,330 0.19 . 29,470 - 178,860
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.10 m2 Kaca cermin 5 mm 178,860 M.4.521 . . .
A.4.6.2.21. P-351 1.00 m2 Pemasangan kaca cermin tebal 8 mm 294,524 0.21 . 33,384 - 261,140
0.02 OH Pekerja 1,751 L.4.001 . . .
0.17 OH Tukang kayu 26,265 L.4.016 . . .
0.02 OH Kepala tukang 3,283 L.4.036 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.10 m2 Kaca cermin 8 mm 261,140 M.4.522 . . .
A.4.6.2.22. P-352 1.00 m2 Pemasangan kaca wireglassed tebal 5 mm 306,120 0.19 . 29,470 - 276,650
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.10 m2 Kaca wire glass 276,650 M.4.528 . . .
A.4.6.2.23. P-353 1.00 m2 Pemasangan kaca patri tebal 5 mm 146,163 0.24 . 34,723 - 111,440
0.08 OH Pekerja 7,725 L.4.001 . . .
0.15 OH Tukang kayu 23,175 L.4.016 . . .
0.02 OH Kepala tukang 2,897 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 m2 Kaca patri 5mm 100,100 M.4.523 . . .
0.05 Kg Sealant 11,340 M.4.598 . . .
A.4.7.1.1. P-354 1.00 m2 Pengikisan/pengerokan permukaan cat lama 18,530 0.15 . 16,145 - 2,385
0.15 OH Pekerja 15,450 L.4.001 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.05 Kg Soda api 2,385 M.4.562 . . .
A.4.7.1.2. P-355 1.00 m2 Pencucian bidang permukaan tembok yang pernah dicat 16,715 0.15 . 16,145 - 570
0.15 OH Pekerja 15,450 L.4.001 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.05 Kg Sabun 570 M.4.561 . . .
A.4.7.1.3. P-356 1.00 m2 Pengerokan karat pada permukaan baja cara manual 17,874 0.16 . 17,304 - 570
0.15 OH Pekerja 15,450 L.4.001 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.05 Kg Sabun 570 M.4.561 . . .
A.4.7.1.4. P-357 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
42,587
cat penutup)
0.09 . 10,338 - 32,249

www.mitra-arsitek.com 69/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Pekerja 7,210 L.4.001 . . .
0.01 OH Tukang cat 1,274 L.4.010 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.20 Kg Cat meni 3,260 M.4.386 . . .
0.15 Kg Plamir 8,445 M.4.399 . . .
0.17 Kg Cat dasar Kayu 5,219 M.4.380 . . .
0.26 Kg Cat kayu 12,740 M.4.385 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.03 Kg Pengencer 1,104 M.4.398 . . .
0.20 Lbr Amplas 1,300 M.4.548 . . .
A.4.7.1.5. P-358 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis
60,205
cat Penutup)
0.18 . 23,546 - 36,659
0.07 OH Pekerja 7,210 L.4.001 . . .
0.11 OH Tukang cat 14,868 L.4.010 . . .
0.00 OH Kepala tukang 772 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.20 Kg Cat meni 3,260 M.4.386 . . .
0.15 Kg Plamir 8,445 M.4.399 . . .
0.17 Kg Cat dasar Kayu 5,219 M.4.380 . . .
0.35 Kg Cat kayu 17,150 M.4.385 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.03 Kg Pengencer 1,104 M.4.398 . . .
0.20 Lbr Amplas 1,300 M.4.548 . . .
A.4.7.1.6. P-359 1.00 m2 Pelaburan bidang kayu dengan teak oil 31,841 0.17 . 25,901 - 5,940
0.04 OH Pekerja 4,120 L.4.001 . . .
0.06 OH Tukang cat 8,921 L.4.010 . . .
0.06 OH Kepala tukang 12,165 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.36 L Teak oil 5,940 M.4.401 . . .
A.4.7.1.7. P-360 1.00 m2 Pelaburan bidang kayu dengan politur 48,976 0.12 . 16,401 - 32,575
0.04 OH Pekerja 4,120 L.4.001 . . .
0.06 OH Tukang cat 8,496 L.4.010 . . .
0.02 OH Kepala tukang 3,090 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.15 L Politur 5,625 M.4.400 . . .
0.37 L Politur 13,950 M.4.400 . . .
2.00 Lbr Amplas 13,000 M.4.548 . . .
A.4.7.1.8. P-361 1.00 m2 Pelaburan bidang kayu dengan cat residu dan ter 14,735 0.11 . 11,690 - 3,045
0.10 OH Pekerja 10,300 L.4.001 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.35 L Residu 3,045 M.4.560 . . .
A.4.7.1.9. P-362 1.00 m2 Pelaburan bidang kayu dengan vernis 62,131 0.34 . 42,921 - 19,210
0.16 OH Pekerja 16,480 L.4.001 . . .
0.16 OH Tukang cat 22,656 L.4.010 . . .
0.02 OH Kepala tukang 3,090 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.15 L Vernis 16,560 M.4.403 . . .
0.05 Kg Dempul 2,000 M.4.388 . . .
0.10 Lbr Amplas 650 M.4.548 . . .
A.4.7.1.10. P-363 1.00 m2 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat
34,850
penutup)0.09 . 12,892 - 21,958

www.mitra-arsitek.com 70/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Pekerja 2,060 L.4.001 . . .
0.06 OH Tukang cat 8,921 L.4.010 . . .
0.01 OH Kepala tukang 1,217 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.10 Kg Plamir 5,630 M.4.399 . . .
0.10 Kg Cat dasar Tembok 6,500 M.4.381 . . .
0.26 Kg Cat Penutup Tembok 9,828 M.4.387 . . .
A.4.7.1.11. P-364 1.00 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 24,941 0.08 . 10,337 - 14,604
0.03 OH Pekerja 2,884 L.4.001 . . .
0.04 OH Tukang cat 5,947 L.4.010 . . .
0.00 OH Kepala tukang 811 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.12 Kg Cat dasar Tembok 7,800 M.4.381 . . .
0.18 Kg Cat Penutup Tembok 6,804 M.4.387 . . .
A.4.7.1.12. P-365 1.00 m2 Pelaburan tembok dengan kalkarium 10,857 0.08 . 10,337 - 520
0.03 OH Pekerja 2,884 L.4.001 . . .
0.04 OH Tukang cat 5,947 L.4.010 . . .
0.00 OH Kepala tukang 811 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.10 Kg Kalkarium 520 M.4.592 . . .
A.4.7.1.13. P-366 1.00 m2 Pelaburan tembok dengan kapur sirih 18,895 0.15 . 16,190 - 2,705
0.15 OH Pekerja 15,450 L.4.001 . . .
0.00 OH Tukang cat 142 L.4.010 . . .
0.00 OH Kepala tukang 19 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
0.15 Kg Kapur sirih 1,905 M.4.023 . . .
0.10 Lbr Amplas 650 M.4.548 . . .
0.25 Ikat Alang-alang 150 M.4.003 . . .
A.4.7.1.14. P-367 1.00 m2 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) 10,764 0.05 . 5,504 - 5,260
0.04 OH Pekerja 4,120 L.4.001 . . .
0.01 OH Tukang cat 708 L.4.010 . . .
0.00 OH Kepala tukang 97 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
0.30 Kg Kapur sirih 3,810 M.4.023 . . .
0.20 Lbr Amplas 1,300 M.4.548 . . .
0.25 Ikat Alang-alang 150 M.4.003 . . .
A.4.7.1.15. P-368 1.00 m2 Pemasangan wallpaper 78,261 0.24 . 34,821 - 43,440
0.02 OH Pekerja 2,060 L.4.001 . . .
0.20 OH Tukang cat 28,320 L.4.010 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
1.20 m2 Wallpaper 40,800 M.4.374 . . .
0.20 Kg Lem kayu 2,640 M.4.553 . . .
A.4.7.1.16. P-369 1.00 m2 Pengecatan permukaan baja dengan menie besi 37,842 0.24 . 34,821 - 3,021
0.02 OH Pekerja 2,060 L.4.001 . . .
0.20 OH Tukang cat 28,320 L.4.010 . . .
0.02 OH Kepala tukang 3,862 L.4.036 . . .
0.00 OH Mandor 579 L.4.035 . . .
0.10 Kg Menie besi 2,840 M.4.396 . . .
0.01 Bh Kuas 181 M.4.390 . . .

www.mitra-arsitek.com 71/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.7.1.17. P-370 1.00 m2 Pengecatan permukaan baja dengan menie besi dengan perancah 69,917 0.51 . 63,693 2,835 3,389
0.25 OH Pekerja 25,750 L.4.001 . . .
0.23 OH Tukang cat 31,860 L.4.010 . . .
0.02 OH Kepala tukang 4,345 L.4.036 . . .
0.01 OH Mandor 1,738 L.4.035 . . .
0.10 Kg Menie besi 2,840 M.4.396 . . .
0.01 L Pengencer 368 M.4.398 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.00 m3 Perancah kayu 2,835 T.4.011 . . .
A.4.7.1.18. P-371 1.00 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis 78,158 0.53 . 66,279 - 11,879
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang cat 35,400 L.4.010 . . .
0.03 OH Kepala tukang 4,828 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
0.10 Kg Menie A 3,370 M.4.394 . . .
0.10 Kg Menie B 3,680 M.4.395 . . .
0.08 Kg Cat Besi 4,280 M.4.377 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.01 L Pengencer 368 M.4.398 . . .
A.4.7.1.19. P-372 1.00 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat
34,287
mutakhir 0.14 . 17,688 - 16,599
0.06 OH Pekerja 6,180 L.4.001 . . .
0.06 OH Tukang cat 8,496 L.4.010 . . .
0.01 OH Kepala tukang 2,317 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.30 Kg Cat Besi 16,050 M.4.377 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.01 L Pengencer 368 M.4.398 . . .
A.4.7.1.20. P-373 1.00 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 191,082 1.30 . 174,562 - 16,520
0.40 OH Pekerja 41,200 L.4.001 . . .
0.80 OH Tukang cat 113,280 L.4.010 . . .
0.08 OH Kepala tukang 15,448 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
0.11 Kg Cat dasar Besi 3,344 M.4.379 . . .
0.17 Kg Cat antara 8,347 M.4.376 . . .
0.08 Kg Cat Besi 4,280 M.4.377 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.01 L Pengencer 368 M.4.398 . . .
A.4.7.1.21. P-374 1.00 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat
174,889
mutakhir1.19 . 158,471 - 16,418
0.40 OH Pekerja 41,200 L.4.001 . . .
0.70 OH Tukang cat 99,120 L.4.010 . . .
0.07 OH Kepala tukang 13,517 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
0.30 Kg Cat Besi 16,050 M.4.377 . . .
0.01 L Pengencer 368 M.4.398 . . .
A.4.7.1.22. P-375 1.00 m2 Plituran dengan plitur melamic 16,805 0.12 . 15,847 - 958
0.04 OH Pekerja 4,120 L.4.001 . . .
0.07 OH Tukang cat 9,912 L.4.010 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
0.03 Kg Cat Dasar Kayu 921 M.4.380 . . .

www.mitra-arsitek.com 72/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 L Pengencer 37 M.4.398 . . .
A.5.1.1.1. P-376 1.00 bh (K3) Pemasangan closet duduk/moblock 3,264,453 4.57 . 548,853 15,600 2,700,000
3.30 OH Pekerja 339,900 L.4.001 . . .
1.10 OH Tukang batu 169,950 L.4.007 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.16 OH Mandor 37,072 L.4.035 . . .
1.00 Unit Kloset duduk / monoblock 2,700,000 M.4.191 . . .
0.06 % Perlengkapan 15,600 T.4.012 . . .
A.5.1.1 2. P-377 1.00 bh Pemasangan closet jongkok porslen 671,913 2.81 . 400,787 - 271,126
1.00 OH Pekerja 103,000 L.4.001 . . .
1.50 OH Tukang batu 231,750 L.4.007 . . .
0.15 OH Kepala tukang 28,965 L.4.036 . . .
0.16 OH Mandor 37,072 L.4.035 . . .
1.00 Unit Kloset jongkok teraso 257,500 M.4.193 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 M3 Pasir pasang 2,226 M.4.030 . . .
A.5.1.1 3. P-378 1.00 bh Pemasangan closet jongkok teraso 653,426 2.70 . 375,300 - 278,126
1.00 OH Pekerja 103,000 L.4.001 . . .
1.50 OH Tukang batu 231,750 L.4.007 . . .
0.15 OH Kepala tukang 28,965 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 Unit Kloset jongkok teraso 257,500 M.4.193 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 M3 Pasir pasang 2,226 M.4.030 . . .
7.00 Bh Bata merah 7,000 M.4.007 . . .
A.5.1.1 4. P-379 1.00 bh (K3) Pemasangan uriir 1,906,021 2.15 . 288,395 78,000 1,539,626
1.00 OH Pekerja 103,000 L.4.001 . . .
1.00 OH Tukang batu 154,500 L.4.007 . . .
0.10 OH Kepala tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 Unit Urinoir 1,526,000 M.4.200 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 M3 Pasir pasang 2,226 M.4.030 . . .
0.30 % Perlengkapan 78,000 T.4.012 . . .
A.5.1.1 5. P-380 1.00 bh (K3) Pemasangan wastafel 2,192,718 2.86 . 390,492 31,200 1,771,026
1.20 OH Pekerja 123,600 L.4.001 . . .
1.45 OH Tukang batu 224,025 L.4.007 . . .
0.15 OH Kepala tukang 28,965 L.4.036 . . .
0.06 OH Mandor 13,902 L.4.035 . . .
1.20 Unit Wastafel 1,757,400 M.4.201 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 M3 Pasir pasang 2,226 M.4.030 . . .
0.12 % Perlengkapan 31,200 T.4.012 . . .
A.5.1.1 6. P-381 1.00 bh (K3) Pemasangan bathcuip porselen 2,913,278 0.90 . 138,778 52,000 2,722,500
0.08 OH Pekerja 7,725 L.4.001 . . .
0.75 OH Tukang batu 115,875 L.4.007 . . .
0.08 OH Kepala tukang 14,483 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Unit Bathcuip 2,722,500 M.4.188 . . .
0.20 % Perlengkapan 52,000 T.4.012 . . .

www.mitra-arsitek.com 73/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.5.1.1 7. P-382 1.00 bh (K3) Pemasangan bak fibreglass vol 1 m3 1,592,835 8.45 . 1,222,435 31,200 339,200
3.00 OH Pekerja 309,000 L.4.001 . . .
4.50 OH Tukang batu 695,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.90 OH Mandor 208,530 L.4.035 . . .
1.00 Unit Bak fiberglass 339,200 M.4.186 . . .
0.12 % Perlengkapan 31,200 T.4.012 . . .
A.5.1.1 8. P-383 1.00 bh (K3) Pemasangan bak mandi batu bata vol 0,30 m3 4,018,161 9.33 . 1,146,381 - 2,871,780
6.00 OH Pekerja 618,000 L.4.001 . . .
3.00 OH Tukang batu 463,500 L.4.007 . . .
0.30 OH Kepala tukang 57,930 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
150.00 M3 Bata merah 150,000 M.4.007 . . .
120.00 Kg Semen 228,000 M.4.033 . . .
0.30 M3 Pasir pasang 66,780 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,412,000 M.4.449 . . .
6.00 Kg Semen warna 15,000 M.4.036 . . .
A.5.1.1 9. P-384 1.00 bh Pemasangan bak mandi teraso vol 0,30 m3 1,592,835 8.45 . 1,222,435 31,200 339,200
3.00 OH Pekerja 309,000 L.4.001 . . .
4.50 OH Tukang batu 695,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.90 OH Mandor 208,530 L.4.035 . . .
1.00 Unit Bak fiberglass 339,200 M.4.186 . . .
0.12 % Perlengkapan 31,200 T.4.012 . . .
A.5.1.1 10. P-385 1.00 bh Pemasangan bak air fibreglass vol 1 m3 482,990 0.81 . 112,590 31,200 339,200
0.30 OH Pekerja 30,900 L.4.001 . . .
0.45 OH Tukang batu 69,525 L.4.007 . . .
0.05 OH Kepala tukang 8,690 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
1.00 Unit Bak fiberglass 339,200 M.4.186 . . .
0.12 % Perlengkapan 31,200 T.4.012 . . .
A.5.1.1 11. P-386 1.00 bh Pemasangan bak beton volume 1 m3 9,340,776 8.07 . 1,069,576 26,000 8,245,200
3.50 OH Pekerja 360,500 L.4.001 . . .
4.50 OH Tukang batu 695,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.90 M3 Beton 1:2:3 1,123,200 M.4.531 . . .
180.00 Kg Besi beton 2,538,000 M.4.132 . . .
8.00 M2 Kayu cetakan 1,284,000 M.4.046 . . .
500.00 Bh Ubin porselen 3,300,000 M.4.463 . . .
0.10 % Perlengkapan 26,000 T.4.012 . . .
A.5.1.1 12. P-387 1.00 bh Pemasangan bak cuci piring stainlessteel 596,109 0.38 . 58,709 - 537,400
0.03 OH Pekerja 3,090 L.4.001 . . .
0.30 OH Tukang batu 46,350 L.4.007 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
1.00 Unit Bak cuci piring 464,400 M.4.185 . . .
1.00 Bh Waterdrain 73,000 M.4.202 . . .
A.5.1.1 13. P-388 1.00 bh Pemasangan bak cuci piring teraso 684,378 0.63 . 97,848 - 586,530
0.05 OH Pekerja 5,150 L.4.001 . . .

www.mitra-arsitek.com 74/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 OH Tukang batu 77,250 L.4.007 . . .
0.05 OH Kepala tukang 9,655 L.4.036 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
1.00 Unit Bak cuci piring 464,400 M.4.185 . . .
1.00 Bh Waterdrain 73,000 M.4.202 . . .
20.00 Kg Semen 38,000 M.4.033 . . .
0.05 M3 Pasir pasang 11,130 M.4.030 . . .
A.5.1.1 14. P-389 1.00 bh Pemasangan floor drain 81,370 0.13 . 19,570 - 61,800
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang batu 15,450 L.4.007 . . .
0.01 OH Kepala tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 Unit Floor drain 61,800 M.4.189 . . .
A.5.1.1 15. P-390 1.00 bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm 546,549 2.96 . 350,172 - 196,377
2.16 OH Pekerja 222,480 L.4.001 . . .
0.72 OH Tukang batu 111,240 L.4.007 . . .
0.07 OH Kepala tukang 13,903 L.4.036 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
40.00 bh Bata merah 40,000 M.4.007 . . .
44.00 Kg Semen 83,600 M.4.033 . . .
0.07 M3 Pasir pasang 15,582 M.4.030 . . .
0.06 M3 Pasir beton 17,688 M.4.028 . . .
0.07 M3 Kerikil 16,947 M.4.024 . . .
1.60 Kg Besi beton 22,560 M.4.132 . . .
A.5.1.1 16. P-391 1.00 bh Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 826,378 4.38 . 513,106 - 313,272
3.20 OH Pekerja 329,600 L.4.001 . . .
1.15 OH Tukang batu 177,675 L.4.007 . . .
0.01 OH Kepala tukang 2,124 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
70.00 bh Bata merah 70,000 M.4.007 . . .
77.00 Kg Semen 146,300 M.4.033 . . .
0.13 M3 Pasir pasang 28,938 M.4.030 . . .
0.09 M3 Pasir beton 26,532 M.4.028 . . .
0.02 M3 Kerikil 4,842 M.4.024 . . .
2.60 Kg Besi beton 36,660 M.4.132 . . .
A.5.1.1 17. P-392 1.00 bh Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm1,005,415 4.38 . 513,106 - 492,309
3.20 OH Pekerja 329,600 L.4.001 . . .
1.15 OH Tukang batu 177,675 L.4.007 . . .
0.01 OH Kepala tukang 2,124 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
123.00 bh Bata merah 123,000 M.4.007 . . .
114.00 Kg Semen 216,600 M.4.033 . . .
0.18 M3 Pasir pasang 40,958 M.4.030 . . .
0.12 M3 Pasir beton 35,376 M.4.028 . . .
0.03 M3 Kerikil 7,989 M.4.024 . . .
4.85 Kg Besi beton 68,385 M.4.132 . . .
A.5.1.1 18. P-393 1.00 m1 Pemasangan pipa galvanis diameter ½” 142,941 0.18 . 27,461 91,000 24,480
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .

www.mitra-arsitek.com 75/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 M Pipa galvanis ½” 24,480 M.4.212 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 19. P-394 1.00 bh Pemasangan kran diameter ½” atau 3/4” 98,603 0.46 . 71,713 - 26,890
0.01 OH Pekerja 1,030 L.4.001 . . .
0.40 OH Tukang batu 61,800 L.4.007 . . .
0.04 OH Kepala tukang 7,724 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 M Kran air 26,800 M.4.194 . . .
0.03 bh Sealtape 90 M.4.599 . . .
A.5.1.1 20. P-395 1.00 m1 Pemasangan pipa galvanis diameter 3/4” 149,661 0.18 . 27,461 91,000 31,200
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 M Pipa galvanis 3/4” 31,200 M.4.213 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 21. P-396 1.00 m1 Pemasangan pipa galvanis diameter 1” 169,821 0.18 . 27,461 91,000 51,360
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 M Pipa galvanis 1” 51,360 M.4.214 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 22. P-397 1.00 m1 Pemasangan pipa galvanis diameter 1 ½” 223,968 0.31 . 43,568 91,000 89,400
0.11 OH Pekerja 11,124 L.4.001 . . .
0.18 OH Tukang batu 27,810 L.4.007 . . .
0.02 OH Kepala tukang 3,476 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.20 M Pipa galvanis 11/2” 89,400 M.4.215 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 23. P-398 1.00 m1 Pemasangan pipa galvanis diameter 3” 266,931 0.39 . 54,731 91,000 121,200
0.14 OH Pekerja 13,905 L.4.001 . . .
0.23 OH Tukang batu 34,763 L.4.007 . . .
0.02 OH Kepala tukang 4,441 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 M Pipa galvanis 3” 121,200 M.4.216 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 24. P-399 1.00 m1 Pemasangan pipa galvanis diameter 4” 317,811 0.39 . 54,731 91,000 172,080
0.14 OH Pekerja 13,905 L.4.001 . . .
0.23 OH Tukang batu 34,763 L.4.007 . . .
0.02 OH Kepala tukang 4,441 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 M Pipa galvanis 4” 172,080 M.4.217 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 25. P-400 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 110,880 0.10 . 14,600 91,000 5,280
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang batu 9,270 L.4.007 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .

www.mitra-arsitek.com 76/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.20 M Pipa PVC 1/2" 5,280 M.4.203 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 26. P-401 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 112,080 0.10 . 14,600 91,000 6,480
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang batu 9,270 L.4.007 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.20 M Pipa PVC 3/4" 6,480 M.4.204 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 27. P-402 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1” 113,160 0.10 . 14,600 91,000 7,560
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang batu 9,270 L.4.007 . . .
0.01 OH Kepala tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.20 M Pipa PVC 1” 7,560 M.4.205 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 28. P-403 1.00 m1 Pemasangan pipa PVC tipe AW diameter 11/2” 121,180 0.16 . 21,900 91,000 8,280
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.20 M Pipa PVC 11/2” 8,280 M.4.206 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 29. P-404 1.00 m1 Pemasangan pipa PVC tipe AW diameter 2” 121,660 0.16 . 21,900 91,000 8,760
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang batu 13,905 L.4.007 . . .
0.01 OH Kepala tukang 1,738 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.20 M Pipa PVC 2” 8,760 M.4.207 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 30. P-405 1.00 m1 Pemasangan pipa PVC tipe AW diameter 21/2” 132,734 0.23 . 32,734 91,000 9,000
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang batu 20,858 L.4.007 . . .
0.01 OH Kepala tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 M Pipa PVC 21/2” 9,000 M.4.208 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 31. P-406 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” 133,934 0.23 . 32,734 91,000 10,200
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang batu 20,858 L.4.007 . . .
0.01 OH Kepala tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 M Pipa PVC 3” 10,200 M.4.210 . . .
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 32. P-407 1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” 135,374 0.23 . 32,734 91,000 11,640
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang batu 20,858 L.4.007 . . .
0.01 OH Kepala tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 M Pipa PVC 4" 11,640 M.4.211 . . .

www.mitra-arsitek.com 77/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 % Perlengkapan 91,000 T.4.012 . . .
A.5.1.1 33. P-408 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah 165,894 0.13 . 16,119 - 149,775
0.08 OH Pekerja 8,240 L.4.001 . . .
0.04 OH Tukang batu 6,180 L.4.007 . . .
0.00 OH Kepala tukang 772 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.60 m Pipa tanah 76,640 M.4.198 . . .
35.00 Kg Semen 66,500 M.4.033 . . .
0.01 M3 Pasir pasang 3,116 M.4.030 . . .
0.01 M3 Pasir urug 3,518 M.4.032 . . .
A.5.1.1 34. P-409 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm 95,680 0.10 . 12,089 - 83,590
0.06 OH Pekerja 6,180 L.4.001 . . .
0.03 OH Tukang batu 4,635 L.4.007 . . .
0.00 OH Kepala tukang 579 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.60 Bh Pipa tanah 76,640 M.4.198 . . .
0.68 Kg Semen 1,292 M.4.033 . . .
0.01 M3 Pasir pasang 2,894 M.4.030 . . .
0.01 M3 Pasir urug 2,764 M.4.032 . . .
A.5.1.1 35. P-410 1.00 m1 Pemasangan pipa beton diameter 15 - 20 cm 112,920 0.22 . 28,209 - 84,712
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang batu 10,815 L.4.007 . . .
0.01 OH Kepala tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.10 Bh Pipa Beton 58,740 M.4.196 . . .
0.03 M3 Bata merah 27 M.4.007 . . .
3.92 Kg Semen 7,448 M.4.033 . . .
0.06 M3 Pasir pasang 12,466 M.4.030 . . .
0.02 M3 Pasir urug 6,031 M.4.032 . . .
A.5.1.1.36. P-411 1.00 m1 Pemasangan pipa beton diameter 30 - 100 cm 186,345 0.61 . 76,566 - 109,778
0.38 OH Pekerja 39,140 L.4.001 . . .
0.19 OH Tukang batu 29,355 L.4.007 . . .
0.02 OH Kepala tukang 3,669 L.4.036 . . .
0.02 OH Mandor 4,402 L.4.035 . . .
1.10 Bh Pipa Beton 58,740 M.4.196 . . .
0.55 M3 Bata merah 550 M.4.007 . . .
10.30 Kg Semen 19,570 M.4.033 . . .
0.06 M3 Pasir pasang 13,579 M.4.030 . . .
0.07 M3 Pasir urug 17,340 M.4.032 . . .
A.8.4.1.1 P-412 1.00 m1 (K3) Pemasangan pipa PVC Ø 63 mm 105,408 0.13 . 16,002 3,005 86,400
0.08 OH Pekerja 8,343 L.4.001 . . .
0.04 OH Tukang pipa 5,806 L.4.020 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 m Pipa PVC Ø 63 mm 86,400 M.4.295 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 3,005 T.4.029 . . .
A.8.4.1.2 P-413 1.00 m1 (K3) Pemasangan pipa PVC Ø 90 mm 132,630 0.15 . 18,423 4,007 110,200
0.09 OH Pekerja 9,682 L.4.001 . . .
0.05 OH Tukang pipa 6,655 L.4.020 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.00 m Pipa PVC Ø 90 mm 110,200 M.4.296 . . .

www.mitra-arsitek.com 78/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 4,007 T.4.029 . . .
A.8.4.1.3 P-414 1.00 m1 (K3) Pemasangan pipa PVC Ø 110 mm 160,578 0.17 . 20,869 5,009 134,700
0.11 OH Pekerja 10,815 L.4.001 . . .
0.05 OH Tukang pipa 7,505 L.4.020 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
1.00 m Pipa PVC Ø 110 mm 134,700 M.4.297 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 5,009 T.4.029 . . .
A.8.4.1.4 P-415 1.00 m1 (K3) Pemasangan pipa PVC Ø 150 mm 197,600 0.19 . 23,289 6,011 168,300
0.12 OH Pekerja 12,154 L.4.001 . . .
0.06 OH Tukang pipa 8,354 L.4.020 . . .
0.01 OH Mandor 2,780 L.4.035 . . .
1.00 m Pipa PVC Ø 150 mm 168,300 M.4.298 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 6,011 T.4.029 . . .
A.8.4.1.5 P-416 1.00 m1 (K3) Pemasngan pipa PVC Ø 200 mm 364,643 0.30 . 37,321 12,022 315,300
0.19 OH Pekerja 19,467 L.4.001 . . .
0.10 OH Tukang pipa 13,452 L.4.020 . . .
0.02 OH Mandor 4,402 L.4.035 . . .
1.00 m Pipa PVC Ø 200 mm 315,300 M.4.299 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 12,022 T.4.029 . . .
A.8.4.1.6 P-417 1.00 m1 (K3) Pemasangan pipa PVC Ø 250 mm 539,548 0.41 . 50,517 17,031 472,000
0.26 OH Pekerja 26,368 L.4.001 . . .
0.13 OH Tukang pipa 18,125 L.4.020 . . .
0.03 OH Mandor 6,024 L.4.035 . . .
1.00 m Pipa PVC Ø 250 mm 472,000 M.4.300 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 17,031 T.4.029 . . .
A.8.4.1.7 P-418 1.00 m1 (K3) Pemasangan pipa PVC Ø 300 mm 871,653 0.47 . 57,817 20,036 793,800
0.29 OH Pekerja 30,282 L.4.001 . . .
0.15 OH Tukang pipa 20,815 L.4.020 . . .
0.03 OH Mandor 6,719 L.4.035 . . .
1.00 m Pipa PVC Ø 300 mm 793,800 M.4.301 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 20,036 T.4.029 . . .
A.8.4.1.8 P-419 1.00 m1 (K3) Pemasangan pipa PVC Ø 400 mm 1,539,731 0.87 . 107,059 40,072 1,392,600
0.54 OH Pekerja 56,032 L.4.001 . . .
0.27 OH Tukang pipa 38,515 L.4.020 . . .
0.05 OH Mandor 12,512 L.4.035 . . .
1.00 m Pipa PVC Ø 400 mm 1,392,600 M.4.302 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 40,072 T.4.029 . . .
A.8.4.1.9 P-420 1.00 m1 (K3) Pemasangan pipa PVC Ø 450 mm 1,925,957 1.07 . 131,867 50,090 1,744,000
0.67 OH Pekerja 68,907 L.4.001 . . .
0.34 OH Tukang pipa 47,436 L.4.020 . . .
0.07 OH Mandor 15,524 L.4.035 . . .
1.00 m Pipa PVC Ø 450 mm 1,744,000 M.4.303 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 50,090 T.4.029 . . .
A.8.4.1.10 P-421 1.00 m1 (K3) Pemasangan pipa PVC Ø 500 mm 2,681,553 1.30 . 159,443 61,110 2,461,000
0.81 OH Pekerja 83,327 L.4.001 . . .
0.41 OH Tukang pipa 57,348 L.4.020 . . .
0.08 OH Mandor 18,768 L.4.035 . . .
1.00 m Pipa PVC Ø 500 mm 2,461,000 M.4.304 . . .
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 61,110 T.4.029 . . .
A.8.4.1.11 P-422 1.00 m1 (K3) Pemasangan pipa PVC Ø 600 mm 3,861,271 1.53 . 188,641 72,631 3,600,000

www.mitra-arsitek.com 79/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.96 OH Pekerja 98,571 L.4.001 . . .
0.48 OH Tukang pipa 67,826 L.4.020 . . .
0.10 OH Mandor 22,243 L.4.035 . . .
1.00 m Pipa PVC Ø 600 mm 3,600,000 M.4.305 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 72,631 T.4.029 . . .
A.8.4.1.12 P-423 1.00 m1 (K3) Pemasangan pipa PVC Ø 800 mm 5,735,969 2.59 . 318,744 125,225 5,292,000
1.62 OH Pekerja 166,654 L.4.001 . . .
0.81 OH Tukang pipa 114,554 L.4.020 . . .
0.16 OH Mandor 37,535 L.4.035 . . .
1.00 m Pipa PVC Ø 800 mm 5,292,000 M.4.306 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 125,225 T.4.029 . . .
A.8.4.1.13 P-424 1.00 m1 (K3) Pemasangan pipa PVC Ø 900 mm 6,602,360 2.71 . 333,124 131,236 6,138,000
1.69 OH Pekerja 174,173 L.4.001 . . .
0.85 OH Tukang pipa 119,794 L.4.020 . . .
0.17 OH Mandor 39,157 L.4.035 . . .
1.00 m Pipa PVC Ø 900 mm 6,138,000 M.4.307 . . .
0.26 hari Sewa Tripot/Tackel & handle crane 2 T 131,236 T.4.029 . . .
A.8.4.1.14 P-425 1.00 m1 (K3) Pemasangan pipa PVC Ø 1000 mm 8,170,709 3.03 . 373,445 147,265 7,650,000
1.90 OH Pekerja 195,185 L.4.001 . . .
0.95 OH Tukang pipa 134,237 L.4.020 . . .
0.19 OH Mandor 44,023 L.4.035 . . .
1.00 m Pipa PVC Ø 1000 mm 7,650,000 M.4.308 . . .
0.29 hari Sewa Tripot/Tackel & handle crane 2 T 147,265 T.4.029 . . .
A.8.4.1.15 P-426 1.00 m1 (K3) Pemasangan pipa PVC Ø 1100 mm 9,025,328 3.36 . 413,534 163,794 8,448,000
2.10 OH Pekerja 216,197 L.4.001 . . .
1.05 OH Tukang pipa 148,680 L.4.020 . . .
0.21 OH Mandor 48,657 L.4.035 . . .
1.00 m Pipa PVC Ø 1100 mm 8,448,000 M.4.309 . . .
0.33 hari Sewa Tripot/Tackel & handle crane 2 T 163,794 T.4.029 . . .
A.8.4.1.16 P-427 1.00 m1 (K3) Pemasangan pipa PVC Ø 1200 mm 10,329,446 3.69 . 453,623 179,823 9,696,000
2.30 OH Pekerja 237,209 L.4.001 . . .
1.15 OH Tukang pipa 163,123 L.4.020 . . .
0.23 OH Mandor 53,291 L.4.035 . . .
1.00 m Pipa PVC Ø 1200 mm 9,696,000 M.4.310 . . .
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 179,823 T.4.029 . . .
A.8.4.1.17 P-428 1.00 m1 (K3) Pemasangan pipa HDPE Ø 63 mm 69,624 0.06 . 6,707 9,517 53,400
0.04 OH Pekerja 3,605 L.4.001 . . .
0.02 OH Tukang pipa 2,407 L.4.020 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 m Pipa HDPE Ø 63 mm 53,400 M.4.265 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,517 T.4.029 . . .
A.8.4.1.18 P-429 1.00 m1 (K3) Pemasangan pipa HDPE Ø 100 mm 142,696 0.06 . 7,879 9,517 125,300
0.04 OH Pekerja 4,120 L.4.001 . . .
0.02 OH Tukang pipa 2,832 L.4.020 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.00 m Pipa HDPE Ø 100 mm 125,300 M.4.266 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,517 T.4.029 . . .
A.8.4.1.19 P-430 1.00 m1 (K3) Pemasangan pipa HDPE Ø 125 mm 249,467 0.07 . 9,050 9,517 230,900
0.05 OH Pekerja 4,635 L.4.001 . . .
0.02 OH Tukang pipa 3,257 L.4.020 . . .

www.mitra-arsitek.com 80/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 m Pipa HDPE Ø 125 mm 230,900 M.4.267 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,517 T.4.029 . . .
A.8.4.1.20 P-431 1.00 m1 (K3) Pemasangan pipa HDPE Ø 150 mm 329,583 0.10 . 12,166 9,517 307,900
0.06 OH Pekerja 6,386 L.4.001 . . .
0.03 OH Tukang pipa 4,390 L.4.020 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.00 m Pipa HDPE Ø 150 mm 307,900 M.4.268 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,517 T.4.029 . . .
A.8.4.1.21 P-432 1.00 m1 (K3) Pemasangan pipa HDPE Ø 200 mm 648,762 0.16 . 20,045 9,517 619,200
0.10 OH Pekerja 10,506 L.4.001 . . .
0.05 OH Tukang pipa 7,222 L.4.020 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
1.00 m Pipa HDPE Ø 200 mm 619,200 M.4.269 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,517 T.4.029 . . .
A.8.4.1.22 P-433 1.00 m1 (K3) Pemasangan pipa HDPE Ø 250 mm 1,021,636 0.21 . 26,198 21,038 974,400
0.13 OH Pekerja 13,699 L.4.001 . . .
0.07 OH Tukang pipa 9,487 L.4.020 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
1.00 m Pipa HDPE Ø 250 mm 974,400 M.4.270 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 21,038 T.4.029 . . .
A.8.4.1.23 P-434 1.00 m1 (K3) Pemasangan pipa HDPE Ø 300 mm 1,722,843 0.27 . 33,485 32,559 1,656,800
0.17 OH Pekerja 17,510 L.4.001 . . .
0.09 OH Tukang pipa 12,036 L.4.020 . . .
0.02 OH Mandor 3,939 L.4.035 . . .
1.00 m Pipa HDPE Ø 300 mm 1,656,800 M.4.271 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 32,559 T.4.029 . . .
A.8.4.1.24 P-435 1.00 m1 (K3) Pemasangan pipa HDPE Ø 400 mm 2,672,158 0.46 . 57,121 76,137 2,538,900
0.29 OH Pekerja 29,870 L.4.001 . . .
0.15 OH Tukang pipa 20,532 L.4.020 . . .
0.03 OH Mandor 6,719 L.4.035 . . .
1.00 m Pipa HDPE Ø 400 mm 2,538,900 M.4.272 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 76,137 T.4.029 . . .
A.8.4.1.25 P-436 1.00 m1 (K3) Pemasangan pipa HDPE Ø 450 mm 3,264,686 0.58 . 70,806 100,180 3,093,700
0.36 OH Pekerja 36,977 L.4.001 . . .
0.18 OH Tukang pipa 25,488 L.4.020 . . .
0.04 OH Mandor 8,341 L.4.035 . . .
1.00 m Pipa HDPE Ø 450 mm 3,093,700 M.4.273 . . .
0.20 hari Sewa Tripot/Tackel & handle crane 2 T 100,180 T.4.029 . . .
A.8.4.1.26 P-437 1.00 m1 (K3) Pemasangan pipa HDPE Ø 500 mm 3,762,874 0.69 . 85,148 125,726 3,552,000
0.43 OH Pekerja 44,599 L.4.001 . . .
0.22 OH Tukang pipa 30,586 L.4.020 . . .
0.04 OH Mandor 9,963 L.4.035 . . .
1.00 m Pipa HDPE Ø 500 mm 3,552,000 M.4.274 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 125,726 T.4.029 . . .
A.8.4.1.27 P-438 1.00 m1 (K3) Pemasangan pipa HDPE Ø 600 mm 3,806,579 0.82 . 100,802 153,776 3,552,000
0.51 OH Pekerja 52,736 L.4.001 . . .
0.26 OH Tukang pipa 36,250 L.4.020 . . .
0.05 OH Mandor 11,817 L.4.035 . . .
1.00 m Pipa HDPE Ø 500 mm 3,552,000 M.4.274 . . .

www.mitra-arsitek.com 81/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.31 hari Sewa Tripot/Tackel & handle crane 2 T 153,776 T.4.029 . . .
A.8.4.1.28 P-439 1.00 m1 (K3) Pemasangan pipa HDPE Ø 800 mm 9,510,770 1.43 . 175,754 287,016 9,048,000
0.89 OH Pekerja 91,979 L.4.001 . . .
0.45 OH Tukang pipa 63,154 L.4.020 . . .
0.09 OH Mandor 20,621 L.4.035 . . .
1.00 m Pipa HDPE Ø 800 mm 9,048,000 M.4.276 . . .
0.57 hari Sewa Tripot/Tackel & handle crane 2 T 287,016 T.4.029 . . .
A.8.4.1.29 P-440 1.00 m1 (K3) Pemasangan pipa HDPE Ø 900 mm 10,704,796 2.17 . 266,502 442,295 9,996,000
1.35 OH Pekerja 139,359 L.4.001 . . .
0.68 OH Tukang pipa 95,863 L.4.020 . . .
0.14 OH Mandor 31,280 L.4.035 . . .
1.00 m Pipa HDPE Ø 900 mm 9,996,000 M.4.277 . . .
0.88 hari Sewa Tripot/Tackel & handle crane 2 T 442,295 T.4.029 . . .
A.8.4.1.30 P-441 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1000 mm 12,719,351 2.66 . 326,867 547,484 11,845,000
1.66 OH Pekerja 170,877 L.4.001 . . .
0.83 OH Tukang pipa 117,528 L.4.020 . . .
0.17 OH Mandor 38,462 L.4.035 . . .
1.00 m Pipa HDPE Ø 1000 mm 11,845,000 M.4.279 . . .
1.09 hari Sewa Tripot/Tackel & handle crane 2 T 547,484 T.4.029 . . .
A.8.4.1.31 P-442 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1100 mm 13,266,722 2.91 . 358,138 603,585 12,305,000
1.82 OH Pekerja 187,254 L.4.001 . . .
0.91 OH Tukang pipa 128,714 L.4.020 . . .
0.18 OH Mandor 42,169 L.4.035 . . .
1.00 m Pipa HDPE Ø 1100 mm 12,305,000 M.4.281 . . .
1.21 hari Sewa Tripot/Tackel & handle crane 2 T 603,585 T.4.029 . . .
A.8.4.1.32 P-443 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1200 mm 14,760,245 3.79 . 466,819 793,426 13,500,000
2.37 OH Pekerja 244,110 L.4.001 . . .
1.19 OH Tukang pipa 167,796 L.4.020 . . .
0.24 OH Mandor 54,913 L.4.035 . . .
1.00 m Pipa HDPE Ø 1200 mm 13,500,000 M.4.282 . . .
1.58 hari Sewa Tripot/Tackel & handle crane 2 T 793,426 T.4.029 . . .
A.8.4.1.33 P-444 1.00 m1 (K3) Pemasangan pipa GIP Ø 63 mm 236,802 0.55 . 67,768 19,034 150,000
0.35 OH Pekerja 35,535 L.4.001 . . .
0.17 OH Tukang pipa 24,355 L.4.020 . . .
0.03 OH Mandor 7,878 L.4.035 . . .
1.00 m Pipa GIP Ø 63 mm 150,000 M.4.249 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,034 T.4.029 . . .
A.8.4.1.34 P-445 1.00 m1 (K3) Pemasangan pipa GIP Ø 100 mm 316,822 0.64 . 78,788 19,034 219,000
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang pipa 28,320 L.4.020 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
1.00 m Pipa GIP Ø 100 mm 219,000 M.4.250 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,034 T.4.029 . . .
A.8.4.1.35 P-446 1.00 m1 (K3) Pemasangan pipa GIP Ø 125 mm 405,023 0.72 . 88,289 19,034 297,700
0.45 OH Pekerja 46,144 L.4.001 . . .
0.22 OH Tukang pipa 31,718 L.4.020 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.00 m Pipa GIP Ø 125 mm 297,700 M.4.251 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,034 T.4.029 . . .
A.8.4.1.36 P-447 1.00 m1 (K3) Pemasangan pipa GIP Ø 150 mm 481,397 0.81 . 99,760 21,038 360,600

www.mitra-arsitek.com 82/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.51 OH Pekerja 52,118 L.4.001 . . .
0.25 OH Tukang pipa 35,825 L.4.020 . . .
0.05 OH Mandor 11,817 L.4.035 . . .
1.00 m Pipa GIP Ø 150 mm 360,600 M.4.252 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 21,038 T.4.029 . . .
A.8.4.1.37 P-448 1.00 m1 (K3) Pemasangan pipa GIP Ø 200 mm 636,619 1.27 . 156,881 21,038 458,700
0.80 OH Pekerja 81,988 L.4.001 . . .
0.40 OH Tukang pipa 56,357 L.4.020 . . .
0.08 OH Mandor 18,536 L.4.035 . . .
1.00 m Pipa GIP Ø 200 mm 458,700 M.4.253 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 21,038 T.4.029 . . .
A.8.4.1.38 P-449 1.00 m1 (K3) Pemasangan pipa GIP Ø 250 mm 797,956 1.52 . 187,019 21,038 589,900
0.95 OH Pekerja 97,747 L.4.001 . . .
0.48 OH Tukang pipa 67,260 L.4.020 . . .
0.10 OH Mandor 22,012 L.4.035 . . .
1.00 m Pipa GIP Ø 250 mm 589,900 M.4.254 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 21,038 T.4.029 . . .
A.8.4.1.39 P-450 1.00 m1 (K3) Pemasangan pipa GIP Ø 300 mm 924,281 1.53 . 188,744 21,038 714,500
0.96 OH Pekerja 98,674 L.4.001 . . .
0.48 OH Tukang pipa 67,826 L.4.020 . . .
0.10 OH Mandor 22,243 L.4.035 . . .
1.00 m Pipa GIP Ø 300 mm 714,500 M.4.255 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 21,038 T.4.029 . . .
A.8.4.1.40 P-451 1.00 m1 (K3) Pemasangan pipa GIP Ø 400 mm 1,158,383 1.94 . 238,681 28,802 890,900
1.21 OH Pekerja 124,836 L.4.001 . . .
0.61 OH Tukang pipa 85,810 L.4.020 . . .
0.12 OH Mandor 28,036 L.4.035 . . .
1.00 m Pipa GIP Ø 400 mm 890,900 M.4.256 . . .
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 28,802 T.4.029 . . .
A.8.4.1.41 P-452 1.00 m1 (K3) Pemasangan pipa GIP Ø 450 mm 1,317,262 2.16 . 266,360 28,802 1,022,100
1.35 OH Pekerja 139,359 L.4.001 . . .
0.68 OH Tukang pipa 95,722 L.4.020 . . .
0.14 OH Mandor 31,280 L.4.035 . . .
1.00 m Pipa GIP Ø 450 mm 1,022,100 M.4.257 . . .
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 28,802 T.4.029 . . .
A.8.4.1.42 P-453 1.00 m1 (K3) Pemasangan pipa GIP Ø 500 mm 1,529,645 2.35 . 289,443 38,402 1,201,800
1.47 OH Pekerja 151,307 L.4.001 . . .
0.74 OH Tukang pipa 104,076 L.4.020 . . .
0.15 OH Mandor 34,060 L.4.035 . . .
1.00 m Pipa GIP Ø 500 mm 1,201,800 M.4.258 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 38,402 T.4.029 . . .
A.8.4.1.43 P-454 1.00 m1 (K3) Pemasangan pipa GIP Ø 600 mm 1,689,122 2.12 . 261,520 38,402 1,389,200
1.33 OH Pekerja 136,681 L.4.001 . . .
0.66 OH Tukang pipa 94,022 L.4.020 . . .
0.13 OH Mandor 30,816 L.4.035 . . .
1.00 m Pipa GIP Ø 600 mm 1,389,200 M.4.259 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 38,402 T.4.029 . . .
A.8.4.1.44 P-455 1.00 m1 (K3) Pemasangan pipa GIP Ø 800 mm 2,230,351 3.72 . 458,348 43,203 1,728,800
2.33 OH Pekerja 239,681 L.4.001 . . .
1.16 OH Tukang pipa 164,681 L.4.020 . . .

www.mitra-arsitek.com 83/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.23 OH Mandor 53,986 L.4.035 . . .
1.00 m Pipa GIP Ø 800 mm 1,728,800 M.4.260 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 43,203 T.4.029 . . .
A.8.4.1.45 P-456 1.00 m1 (K3) Pemasangan pipa GIP Ø 900 mm 2,544,356 4.20 . 516,654 43,203 1,984,500
2.62 OH Pekerja 270,169 L.4.001 . . .
1.31 OH Tukang pipa 185,779 L.4.020 . . .
0.26 OH Mandor 60,705 L.4.035 . . .
1.00 m Pipa GIP Ø 900 mm 1,984,500 M.4.261 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 43,203 T.4.029 . . .
A.8.4.1.46 P-457 1.00 m1 (K3) Pemasangan pipa GIP Ø 1000 mm 2,777,530 4.66 . 573,427 43,203 2,160,900
2.91 OH Pekerja 299,833 L.4.001 . . .
1.46 OH Tukang pipa 206,170 L.4.020 . . .
0.29 OH Mandor 67,425 L.4.035 . . .
1.00 m Pipa GIP Ø 1000 mm 2,160,900 M.4.262 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 43,203 T.4.029 . . .
A.8.4.1.47 P-458 1.00 m1 (K3) Pemasangan pipa GIP Ø 1100 mm 3,050,507 5.12 . 630,304 43,203 2,377,000
3.20 OH Pekerja 329,600 L.4.001 . . .
1.60 OH Tukang pipa 226,560 L.4.020 . . .
0.32 OH Mandor 74,144 L.4.035 . . .
1.00 m Pipa GIP Ø 1100 mm 2,377,000 M.4.263 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 43,203 T.4.029 . . .
A.8.4.1.48 P-459 1.00 m1 (K3) Pemasangan pipa GIP Ø 1200 mm 3,211,743 2.44 . 363,740 43,203 2,804,800
0.35 OH Pekerja 35,926 L.4.001 . . .
1.74 OH Tukang pipa 246,950 L.4.020 . . .
0.35 OH Mandor 80,863 L.4.035 . . .
1.00 m Pipa GIP Ø 1200 mm 2,804,800 M.4.264 . . .
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 43,203 T.4.029 . . .
A.8.4.1.49 P-460 1.00 m1 (K3) Pemasangan pipa DCI Ø 100 mm 407,139 0.64 . 75,597 190,342 141,200
0.49 OH Pekerja 50,367 L.4.001 . . .
0.10 OH Tukang pipa 13,877 L.4.020 . . .
0.05 OH Mandor 11,353 L.4.035 . . .
1.00 m Pipa DCI Ø 100 mm 141,200 M.4.234 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 190,342 T.4.029 . . .
A.8.4.1.50 P-461 1.00 m1 (K3) Pemasangan pipa DCI Ø 125 mm 466,861 0.71 . 84,519 190,342 192,000
0.55 OH Pekerja 56,341 L.4.001 . . .
0.11 OH Tukang pipa 15,434 L.4.020 . . .
0.06 OH Mandor 12,744 L.4.035 . . .
1.00 m Pipa DCI Ø 125 mm 192,000 M.4.235 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 190,342 T.4.029 . . .
A.8.4.1.51 P-462 1.00 m1 (K3) Pemasangan pipa DCI Ø 150 mm 603,332 0.80 . 94,690 190,342 318,300
0.61 OH Pekerja 63,139 L.4.001 . . .
0.12 OH Tukang pipa 17,417 L.4.020 . . .
0.06 OH Mandor 14,134 L.4.035 . . .
1.00 m Pipa DCI Ø 150 mm 318,300 M.4.236 . . .
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 190,342 T.4.029 . . .
A.8.4.1.52 P-463 1.00 m1 (K3) Pemasangan pipa DCI Ø 200 mm 861,315 1.11 . 131,973 190,342 539,000
0.86 OH Pekerja 88,065 L.4.001 . . .
0.17 OH Tukang pipa 24,214 L.4.020 . . .
0.09 OH Mandor 19,695 L.4.035 . . .
1.00 M Pipa DCI Ø 200 mm 539,000 M.4.237 . . .

www.mitra-arsitek.com 84/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 190,342 T.4.029 . . .
A.8.4.1.53 P-464 1.00 m1 (K3) Pemasangan pipa DCI Ø 250 mm 1,007,914 1.24 . 146,869 25,045 836,000
0.95 OH Pekerja 97,953 L.4.001 . . .
0.19 OH Tukang pipa 26,904 L.4.020 . . .
0.10 OH Mandor 22,012 L.4.035 . . .
1.00 M Pipa DCI Ø 250 mm 836,000 M.4.238 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 25,045 T.4.029 . . .
A.8.4.1.54 P-465 1.00 m1 (K3) Pemasangan pipa DCI Ø 300 mm 1,256,870 1.27 . 150,306 35,564 1,071,000
0.97 OH Pekerja 100,219 L.4.001 . . .
0.20 OH Tukang pipa 27,612 L.4.020 . . .
0.10 OH Mandor 22,475 L.4.035 . . .
1.00 m Pipa DCI Ø 300 mm 1,071,000 M.4.239 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 35,564 T.4.029 . . .
A.8.4.1.55 P-466 1.00 m1 (K3) Pemasangan pipa DCI Ø 400 mm 2,898,083 2.10 . 251,740 54,343 2,592,000
1.55 OH Pekerja 159,135 L.4.001 . . .
0.31 OH Tukang pipa 43,754 L.4.020 . . .
0.09 OH Operator alat berat 13,169 L.4.037 . . .
0.15 OH Mandor 35,682 L.4.035 . . .
1.00 m Pipa DCI Ø 400 mm 2,592,000 M.4.240 . . .
0.02 hari Sewa excavator type 225 kap 0,5 -1,0 m3 38,815 T.4.025 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 15,528 T.4.029 . . .
A.8.4.1.56 P-467 1.00 m1 (K3) Pemasangan pipa DCI Ø 450 mm 3,112,802 2.50 . 300,326 68,476 2,744,000
1.81 OH Pekerja 186,739 L.4.001 . . .
0.36 OH Tukang pipa 51,401 L.4.020 . . .
0.14 OH Operator alat berat 20,249 L.4.037 . . .
0.18 OH Mandor 41,938 L.4.035 . . .
1.00 m Pipa DCI Ø 450 mm 2,744,000 M.4.241 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 48,940 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,535 T.4.029 . . .
A.8.4.1.57 P-468 1.00 m1 (K3) Pemasangan pipa DCI Ø 500 mm 3,559,502 2.85 . 343,583 79,919 3,136,000
2.05 OH Pekerja 210,841 L.4.001 . . .
0.41 OH Tukang pipa 57,914 L.4.020 . . .
0.19 OH Operator alat berat 27,329 L.4.037 . . .
0.21 OH Mandor 47,499 L.4.035 . . .
1.00 m Pipa DCI Ø 500 mm 3,136,000 M.4.242 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 57,378 T.4.025 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 22,541 T.4.029 . . .
A.8.4.1.58 P-469 1.00 m1 (K3) Pemasangan pipa DCI Ø 600 mm 3,980,567 2.91 . 352,117 136,450 3,492,000
2.01 OH Pekerja 207,133 L.4.001 . . .
0.40 OH Tukang pipa 56,923 L.4.020 . . .
0.29 OH Operator alat berat 41,489 L.4.037 . . .
0.20 OH Mandor 46,572 L.4.035 . . .
1.00 m Pipa DCI Ø 600 mm 3,492,000 M.4.243 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 97,881 T.4.025 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 38,569 T.4.029 . . .
A.8.4.1.59 P-470 1.00 m1 (K3) Pemasangan pipa DCI Ø800 mm 5,768,498 5.51 . 666,037 254,461 4,848,000
3.86 OH Pekerja 397,477 L.4.001 . . .
0.77 OH Tukang pipa 109,315 L.4.020 . . .
0.49 OH Operator alat berat 69,809 L.4.037 . . .
0.39 OH Mandor 89,436 L.4.035 . . .

www.mitra-arsitek.com 85/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 m Pipa DCI Ø 800 mm 4,848,000 M.4.244 . . .
0.08 hari Sewa excavator type 225 kap 0,5 -1,0 m3 141,758 T.4.025 . . .
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 112,703 T.4.029 . . .
A.8.4.1.60 P-471 1.00 m1 (K3) Pemasangan pipa DCI Ø900 mm 6,032,701 7.09 . 855,531 281,170 4,896,000
5.00 OH Pekerja 514,485 L.4.001 . . .
1.00 OH Tukang pipa 141,458 L.4.020 . . .
0.59 OH Operator alat berat 83,969 L.4.037 . . .
0.50 OH Mandor 115,618 L.4.035 . . .
1.00 m Pipa DCI Ø 900 mm 4,896,000 M.4.245 . . .
0.09 hari Sewa excavator type 225 kap 0,5 -1,0 m3 156,947 T.4.025 . . .
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 124,223 T.4.029 . . .
A.8.4.1.61 P-472 1.00 m1 (K3) Pemasangan pipa DCI Ø1000 mm 7,389,967 8.60 . 1,051,688 338,279 6,000,000
5.93 OH Pekerja 610,893 L.4.001 . . .
1.19 OH Tukang pipa 167,938 L.4.020 . . .
0.79 OH Operator alat berat 112,289 L.4.037 . . .
0.69 OH Mandor 160,568 L.4.035 . . .
1.00 m Pipa DCI Ø 1000 mm 6,000,000 M.4.246 . . .
0.11 hari Sewa excavator type 225 kap 0,5 -1,0 m3 189,011 T.4.025 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 149,268 T.4.029 . . .
A.8.4.1.62 P-473 1.00 m1 (K3) Pemasangan pipa DCI Ø1100 mm 7,964,680 9.83 . 1,185,891 408,789 6,370,000
6.95 OH Pekerja 715,747 L.4.001 . . .
1.39 OH Tukang pipa 196,824 L.4.020 . . .
0.79 OH Operator alat berat 112,289 L.4.037 . . .
0.70 OH Mandor 161,032 L.4.035 . . .
1.00 m Pipa DCI Ø 1100 mm 6,370,000 M.4.247 . . .
0.15 hari Sewa excavator type 225 kap 0,5 -1,0 m3 256,515 T.4.025 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 152,274 T.4.029 . . .
A.8.4.1.63 P-474 1.00 m1 (K3) Pemasangan pipa DCI Ø1200 mm 9,301,177 11.37 . 1,371,085 484,092 7,446,000
8.06 OH Pekerja 829,768 L.4.001 . . .
1.61 OH Tukang pipa 228,118 L.4.020 . . .
0.89 OH Operator alat berat 126,449 L.4.037 . . .
0.81 OH Mandor 186,750 L.4.035 . . .
1.00 m Pipa DCI Ø 1200 mm 7,446,000 M.4.248 . . .
0.18 hari Sewa excavator type 225 kap 0,5 -1,0 m3 303,768 T.4.025 . . .
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 180,324 T.4.029 . . .
A.8.4.1.64 P-475 1.00 m1 (K3) Pemasangan pipa baja Ø 63 mm 297,946 0.65 . 77,142 2,004 218,800
0.50 OH Pekerja 51,397 L.4.001 . . .
0.10 OH Tukang pipa 14,160 L.4.020 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 m Pipa Baja Ø 63 mm 218,800 M.4.218 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.65 P-476 1.00 m1 (K3) Pemasangan pipa baja Ø 100 mm 466,505 0.75 . 89,501 2,004 375,000
0.58 OH Pekerja 59,637 L.4.001 . . .
0.12 OH Tukang pipa 16,426 L.4.020 . . .
0.06 OH Mandor 13,439 L.4.035 . . .
1.00 m Pipa Baja Ø 100 mm 375,000 M.4.219 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.66 P-477 1.00 m1 (K3) Pemasangan pipa baja Ø 125 mm 302,216 0.84 . 100,213 2,004 200,000
0.65 OH Pekerja 66,744 L.4.001 . . .
0.13 OH Tukang pipa 18,408 L.4.020 . . .

www.mitra-arsitek.com 86/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Mandor 15,061 L.4.035 . . .
1.00 m Pipa Baja Ø 125 mm 200,000 M.4.220 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.67 P-478 1.00 m1 (K3) Pemasangan pipa baja Ø 150 mm 246,686 0.92 . 109,482 2,004 135,200
0.71 OH Pekerja 72,924 L.4.001 . . .
0.14 OH Tukang pipa 20,107 L.4.020 . . .
0.07 OH Mandor 16,451 L.4.035 . . .
1.00 m Pipa Baja Ø 150 mm 135,200 M.4.221 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.68 P-479 1.00 m1 (K3) Pemasangan pipa baja Ø 200 mm 392,238 1.45 . 171,935 2,004 218,300
1.11 OH Pekerja 114,639 L.4.001 . . .
0.22 OH Tukang pipa 31,577 L.4.020 . . .
0.11 OH Mandor 25,719 L.4.035 . . .
1.00 m Pipa Baja Ø 200 mm 218,300 M.4.222 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.69 P-480 1.00 m1 (K3) Pemasangan pipa baja Ø 250 mm 481,919 1.72 . 204,815 2,004 275,100
1.33 OH Pekerja 136,475 L.4.001 . . .
0.27 OH Tukang pipa 37,524 L.4.020 . . .
0.13 OH Mandor 30,816 L.4.035 . . .
1.00 m Pipa Baja Ø 250 mm 275,100 M.4.223 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.70 P-481 1.00 m1 (K3) Pemasangan pipa baja Ø 300 mm 541,791 1.84 . 218,488 2,004 321,300
1.42 OH Pekerja 145,745 L.4.001 . . .
0.28 OH Tukang pipa 40,073 L.4.020 . . .
0.14 OH Mandor 32,670 L.4.035 . . .
1.00 m Pipa Baja Ø 300 mm 321,300 M.4.224 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 2,004 T.4.029 . . .
A.8.4.1.71 P-482 1.00 m1 (K3) Pemasangan pipa baja Ø 400 mm 846,488 3.08 . 365,588 65,100 415,800
2.37 OH Pekerja 243,698 L.4.001 . . .
0.47 OH Tukang pipa 66,977 L.4.020 . . .
0.24 OH Mandor 54,913 L.4.035 . . .
1.00 m Pipa Baja Ø 400 mm 415,800 M.4.225 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 45,565 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,535 T.4.029 . . .
A.8.4.1.72 P-483 1.00 m1 (K3) Pemasangan pipa baja Ø 450 mm 912,127 2.90 . 344,616 62,411 505,100
2.23 OH Pekerja 229,793 L.4.001 . . .
0.45 OH Tukang pipa 63,154 L.4.020 . . .
0.22 OH Mandor 51,669 L.4.035 . . .
1.00 m Pipa Baja Ø 450 mm 505,100 M.4.226 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 43,878 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,533 T.4.029 . . .
A.8.4.1.73 P-484 1.00 m1 (K3) Pemasangan pipa baja Ø 500 mm 987,898 3.16 . 375,617 71,481 540,800
2.43 OH Pekerja 250,496 L.4.001 . . .
0.49 OH Tukang pipa 68,818 L.4.020 . . .
0.24 OH Mandor 56,303 L.4.035 . . .
1.00 m Pipa Baja Ø 500 mm 540,800 M.4.227 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 48,940 T.4.025 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 22,541 T.4.029 . . .
A.8.4.1.74 P-485 1.00 m1 (K3) Pemasangan pipa baja Ø 600 mm 1,073,117 2.87 . 341,217 65,100 666,800
2.21 OH Pekerja 227,424 L.4.001 . . .

www.mitra-arsitek.com 87/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.44 OH Tukang pipa 62,587 L.4.020 . . .
0.22 OH Mandor 51,206 L.4.035 . . .
1.00 m Pipa Baja Ø 600 mm 666,800 M.4.228 . . .
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 45,565 T.4.025 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,535 T.4.029 . . .
A.8.4.1.75 P-486 1.00 m1 (K3) Pemasangan pipa baja Ø 800 mm 1,627,578 5.07 . 602,060 126,718 898,800
3.90 OH Pekerja 401,391 L.4.001 . . .
0.78 OH Tukang pipa 110,306 L.4.020 . . .
0.39 OH Mandor 90,363 L.4.035 . . .
1.00 m Pipa Baja Ø 800 mm 898,800 M.4.229 . . .
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 77,630 T.4.025 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 49,088 T.4.029 . . .
A.8.4.1.76 P-487 1.00 m1 (K3) Pemasangan pipa baja Ø 900 mm 1,619,485 4.92 . 566,927 145,359 907,200
4.40 OH Pekerja 453,509 L.4.001 . . .
0.08 OH Tukang pipa 11,470 L.4.020 . . .
0.44 OH Mandor 101,948 L.4.035 . . .
1.00 m Pipa Baja Ø 900 mm 907,200 M.4.230 . . .
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 87,755 T.4.025 . . .
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 57,604 T.4.029 . . .
A.8.4.1.77 P-488 1.00 m1 (K3) Pemasangan pipa baja Ø 1000 mm 2,192,613 6.36 . 756,113 164,501 1,272,000
4.90 OH Pekerja 504,185 L.4.001 . . .
0.98 OH Tukang pipa 138,626 L.4.020 . . .
0.49 OH Mandor 113,301 L.4.035 . . .
1.00 m Pipa Baja Ø 1000 mm 1,272,000 M.4.231 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 97,881 T.4.025 . . .
0.13 hari Sewa Tripot/Tackel & handle crane 2 T 66,620 T.4.029 . . .
A.8.4.1.78 P-489 1.00 m1 (K3) Pemasangan pipa baja Ø 1100 mm 2,302,892 7.00 . 832,251 183,141 1,287,500
5.39 OH Pekerja 554,861 L.4.001 . . .
1.08 OH Tukang pipa 152,503 L.4.020 . . .
0.54 OH Mandor 124,886 L.4.035 . . .
1.00 m Pipa Baja Ø 1100 mm 1,287,500 M.4.232 . . .
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 108,006 T.4.025 . . .
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 75,135 T.4.029 . . .
A.8.4.1.79 P-490 1.00 m1 (K3) Pemasangan pipa baja Ø 1200 mm 2,398,935 7.66 . 910,152 201,782 1,287,000
5.90 OH Pekerja 607,391 L.4.001 . . .
1.18 OH Tukang pipa 166,522 L.4.020 . . .
0.59 OH Mandor 136,240 L.4.035 . . .
1.00 m Pipa Baja Ø 1200 mm 1,287,000 M.4.233 . . .
0.07 hari Sewa excavator type 225 kap 0,5 -1,0 m3 118,132 T.4.025 . . .
0.17 hari Sewa Tripot/Tackel & handle crane 2 T 83,650 T.4.029 . . .
A.8.4.2.1 P-491 1.00 m1 (K3) Pemotongan pipa PVC Ø 63 mm 88,070 0.01 . 914 756 86,400
0.01 OH Pekerja 515 L.4.001 . . .
0.00 OH Tukang pipa 283 L.4.020 . . .
0.00 OH Mandor 116 L.4.035 . . .
1.00 bh Pipa PVC Ø 63 mm 86,400 M.4.295 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 756 T.4.006 . . .
A.8.4.2.2 P-492 1.00 m1 (K3) Pemotongan pipa PVC Ø 90 mm 113,621 0.02 . 2,665 756 110,200
0.01 OH Pekerja 1,442 L.4.001 . . .
0.01 OH Tukang pipa 991 L.4.020 . . .
0.00 OH Mandor 232 L.4.035 . . .

www.mitra-arsitek.com 88/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa PVC Ø 90 mm 110,200 M.4.296 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 756 T.4.006 . . .
A.8.4.2.3 P-493 1.00 bh (K3) Pemotongan pipa PVC Ø 110 mm 139,743 0.04 . 4,287 756 134,700
0.02 OH Pekerja 2,266 L.4.001 . . .
0.01 OH Tukang pipa 1,558 L.4.020 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.00 bh Pipa PVC Ø 110 mm 134,700 M.4.297 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 756 T.4.006 . . .
A.8.4.2.4 P-494 1.00 bh (K3) Pemotongan pipa PVC Ø 150 mm 175,068 0.05 . 6,012 756 168,300
0.03 OH Pekerja 3,193 L.4.001 . . .
0.02 OH Tukang pipa 2,124 L.4.020 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 bh Pipa PVC Ø 150 mm 168,300 M.4.298 . . .
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 756 T.4.006 . . .
A.8.4.2.5 P-495 1.00 bh (K3) Pemotongan pipa PVC Ø 200 mm 335,445 0.13 . 15,861 4,284 315,300
0.08 OH Pekerja 8,343 L.4.001 . . .
0.04 OH Tukang pipa 5,664 L.4.020 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 bh Pipa PVC Ø 200 mm 315,300 M.4.299 . . .
0.02 hari Bahan potong pipa T1/manual (gergaji) /saw 4,284 T.4.006 . . .
A.8.4.2.6 P-496 1.00 bh (K3) Pemotongan pipa PVC Ø 250 mm 504,819 0.21 . 25,259 7,560 472,000
0.13 OH Pekerja 13,184 L.4.001 . . .
0.06 OH Tukang pipa 9,062 L.4.020 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
1.00 bh Pipa PVC Ø 250 mm 472,000 M.4.300 . . .
0.03 hari Bahan potong pipa T1/manual (gergaji) /saw 7,560 T.4.006 . . .
A.8.4.2.7 P-497 1.00 bh (K3) Pemotongan pipa PVC Ø 300 mm 833,468 0.25 . 30,344 9,324 793,800
0.16 OH Pekerja 15,965 L.4.001 . . .
0.08 OH Tukang pipa 10,903 L.4.020 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
1.00 bh Pipa PVC Ø 300 mm 793,800 M.4.301 . . .
0.04 hari Bahan potong pipa T1/manual (gergaji) /saw 9,324 T.4.006 . . .
A.8.4.2.8 P-498 1.00 bh (K3) Pemotongan pipa PVC Ø 400 mm 1,479,517 0.53 . 65,245 21,672 1,392,600
0.33 OH Pekerja 34,093 L.4.001 . . .
0.17 OH Tukang pipa 23,506 L.4.020 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
1.00 bh Pipa PVC Ø 400 mm 1,392,600 M.4.302 . . .
0.09 hari Bahan potong pipa T1/manual (gergaji) /saw 21,672 T.4.006 . . .
A.8.4.2.9 P-499 1.00 bh (K3) Pemotongan pipa PVC Ø 450 mm 1,864,284 0.67 . 82,727 37,557 1,744,000
0.42 OH Pekerja 43,260 L.4.001 . . .
0.21 OH Tukang pipa 29,736 L.4.020 . . .
0.04 OH Mandor 9,731 L.4.035 . . .
1.00 bh Pipa PVC Ø 450 mm 1,744,000 M.4.303 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 37,557 T.4.007 . . .
A.8.4.2.10 P-500 1.00 bh (K3) Pemotongan pipa PVC Ø 500 mm 2,611,066 0.83 . 102,077 47,990 2,461,000
0.52 OH Pekerja 53,354 L.4.001 . . .
0.26 OH Tukang pipa 36,674 L.4.020 . . .
0.05 OH Mandor 12,048 L.4.035 . . .
1.00 bh Pipa PVC Ø 500 mm 2,461,000 M.4.304 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 47,990 T.4.007 . . .

www.mitra-arsitek.com 89/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.11 P-501 1.00 bh (K3) Pemotongan pipa PVC Ø 600 mm 3,782,385 1.00 . 122,572 59,813 3,600,000
0.62 OH Pekerja 64,169 L.4.001 . . .
0.31 OH Tukang pipa 44,038 L.4.020 . . .
0.06 OH Mandor 14,365 L.4.035 . . .
1.00 bh Pipa PVC Ø 600 mm 3,600,000 M.4.305 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 59,813 T.4.007 . . .
A.8.4.2.12 P-502 1.00 bh (K3) Pemotongan pipa PVC Ø 800 mm 5,617,874 1.74 . 214,594 111,280 5,292,000
1.09 OH Pekerja 112,167 L.4.001 . . .
0.55 OH Tukang pipa 77,172 L.4.020 . . .
0.11 OH Mandor 25,255 L.4.035 . . .
1.00 bh Pipa PVC Ø 800 mm 5,292,000 M.4.306 . . .
0.16 hari Bahan potong pipa T2/mekanik / cilinder 111,280 T.4.007 . . .
A.8.4.2.13 P-503 1.00 bh (K3) Pemotongan pipa PVC Ø 900 mm 6,479,634 1.83 . 224,790 116,844 6,138,000
1.14 OH Pekerja 117,523 L.4.001 . . .
0.57 OH Tukang pipa 80,854 L.4.020 . . .
0.11 OH Mandor 26,414 L.4.035 . . .
1.00 bh Pipa PVC Ø 900 mm 6,138,000 M.4.307 . . .
0.17 hari Bahan potong pipa T2/mekanik / cilinder 116,844 T.4.007 . . .
A.8.4.2.14 P-504 1.00 bh (K3) Pemotongan pipa PVC Ø 1000 mm 8,036,134 2.06 . 253,293 132,841 7,650,000
1.29 OH Pekerja 132,355 L.4.001 . . .
0.64 OH Tukang pipa 91,049 L.4.020 . . .
0.13 OH Mandor 29,889 L.4.035 . . .
1.00 bh Pipa PVC Ø 1000 mm 7,650,000 M.4.308 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 132,841 T.4.007 . . .
A.8.4.2.15 P-505 1.00 bh (K3) Pemotongan pipa PVC Ø 1100 mm 8,877,706 2.29 . 281,564 148,142 8,448,000
1.43 OH Pekerja 147,187 L.4.001 . . .
0.72 OH Tukang pipa 101,244 L.4.020 . . .
0.14 OH Mandor 33,133 L.4.035 . . .
1.00 bh Pipa PVC Ø 1100 mm 8,448,000 M.4.309 . . .
0.21 hari Bahan potong pipa T2/mekanik / cilinder 148,142 T.4.007 . . .
A.8.4.2.16 P-506 1.00 bh (K3) Pemotongan pipa PVC Ø 1200 mm 10,169,973 2.52 . 309,835 164,138 9,696,000
1.57 OH Pekerja 162,019 L.4.001 . . .
0.79 OH Tukang pipa 111,439 L.4.020 . . .
0.16 OH Mandor 36,377 L.4.035 . . .
1.00 bh Pipa PVC Ø 1200 mm 9,696,000 M.4.310 . . .
0.24 hari Bahan potong pipa T2/mekanik / cilinder 164,138 T.4.007 . . .
A.8.4.2.17 P-507 1.00 bh (K3) Pemotongan pipa HDPE Ø 63 mm 61,390 0.04 . 5,208 2,782 53,400
0.00 OH Pekerja 206 L.4.001 . . .
0.00 OH Tukang pipa 142 L.4.020 . . .
0.00 OH Mandor 46 L.4.035 . . .
0.03 OH Operator Alat Pipa 4,814 L.4.038 . . .
1.00 bh Pipa HDPE Ø 63 mm 53,400 M.4.265 . . .
0.00 hari Bahan potong pipa T2/mekanik / cilinder 2,782 T.4.007 . . .
A.8.4.2.18 P-508 1.00 bh (K3) Pemotongan pipa HDPE Ø 100 mm 140,106 0.08 . 11,328 3,478 125,300
0.01 OH Pekerja 618 L.4.001 . . .
0.00 OH Tukang pipa 425 L.4.020 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.07 OH Operator Alat Pipa 10,054 L.4.038 . . .
1.00 bh Pipa HDPE Ø 100 mm 125,300 M.4.266 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 3,478 T.4.007 . . .

www.mitra-arsitek.com 90/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.19 P-509 1.00 bh (K3) Pemotongan pipa HDPE Ø 125 mm 250,533 0.11 . 15,460 4,173 230,900
0.01 OH Pekerja 927 L.4.001 . . .
0.01 OH Tukang pipa 708 L.4.020 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.10 OH Operator Alat Pipa 13,594 L.4.038 . . .
1.00 bh Pipa HDPE Ø 125 mm 230,900 M.4.267 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 4,173 T.4.007 . . .
A.8.4.2.20 P-510 1.00 bh (K3) Pemotongan pipa HDPE Ø 150 mm 334,537 0.15 . 20,378 6,260 307,900
0.02 OH Pekerja 1,648 L.4.001 . . .
0.01 OH Tukang pipa 1,133 L.4.020 . . .
0.00 OH Mandor 463 L.4.035 . . .
0.12 OH Operator Alat Pipa 17,134 L.4.038 . . .
1.00 bh Pipa HDPE Ø 150 mm 307,900 M.4.268 . . .
0.01 hari Bahan potong pipa T2/mekanik / cilinder 6,260 T.4.007 . . .
A.8.4.2.21 P-511 1.00 bh (K3) Pemotongan pipa HDPE Ø 200 mm 663,811 0.24 . 32,788 11,824 619,200
0.04 OH Pekerja 4,532 L.4.001 . . .
0.02 OH Tukang pipa 3,115 L.4.020 . . .
0.00 OH Mandor 927 L.4.035 . . .
0.17 OH Operator Alat Pipa 24,214 L.4.038 . . .
1.00 bh Pipa HDPE Ø 200 mm 619,200 M.4.269 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,824 T.4.007 . . .
A.8.4.2.22 P-512 1.00 bh (K3) Pemotongan pipaHDPE Ø 250 mm 1,034,886 0.33 . 44,489 15,997 974,400
0.07 OH Pekerja 6,901 L.4.001 . . .
0.03 OH Tukang pipa 4,673 L.4.020 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.22 OH Operator Alat Pipa 31,294 L.4.038 . . .
1.00 bh Pipa HDPE Ø 250 mm 974,400 M.4.270 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 15,997 T.4.007 . . .
A.8.4.2.23 P-513 1.00 bh (K3) Pemotongan pipa HDPE Ø 300 mm 1,733,766 0.42 . 56,101 20,865 1,656,800
0.09 OH Pekerja 9,270 L.4.001 . . .
0.05 OH Tukang pipa 6,372 L.4.020 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
0.27 OH Operator Alat Pipa 38,374 L.4.038 . . .
1.00 bh Pipa HDPE Ø 300 mm 1,656,800 M.4.271 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 20,865 T.4.007 . . .
A.8.4.2.24 P-514 1.00 bh (K3) Pemotongan pipa HDPE Ø 400 mm 2,664,549 0.65 . 87,396 38,253 2,538,900
0.18 OH Pekerja 18,231 L.4.001 . . .
0.09 OH Tukang pipa 12,461 L.4.020 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.37 OH Operator Alat Pipa 52,534 L.4.038 . . .
1.00 bh Pipa HDPE Ø 400 mm 2,538,900 M.4.272 . . .
0.06 hari Bahan potong pipa T2/mekanik / cilinder 38,253 T.4.007 . . .
A.8.4.2.25 P-515 1.00 bh (K3) Pemotongan pipa HDPE Ø 450 mm 3,246,504 0.78 . 104,119 48,685 3,093,700
0.23 OH Pekerja 23,175 L.4.001 . . .
0.11 OH Tukang pipa 16,001 L.4.020 . . .
0.02 OH Mandor 5,329 L.4.035 . . .
0.42 OH Operator Alat Pipa 59,614 L.4.038 . . .
1.00 bh Pipa HDPE Ø 450 mm 3,093,700 M.4.273 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 48,685 T.4.007 . . .
A.8.4.2.26 P-516 1.00 bh (K3) Pemotongan pipa HDPE Ø 500 mm 3,732,512 0.92 . 121,395 59,118 3,552,000

www.mitra-arsitek.com 91/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 OH Pekerja 28,531 L.4.001 . . .
0.14 OH Tukang pipa 19,682 L.4.020 . . .
0.03 OH Mandor 6,488 L.4.035 . . .
0.47 OH Operator Alat Pipa 66,694 L.4.038 . . .
1.00 bh Pipa HDPE Ø 500 mm 3,552,000 M.4.274 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 59,118 T.4.007 . . .
A.8.4.2.27 P-517 1.00 bh (K3) Pemotongan pipa HDPE Ø 600 mm 6,456,691 1.10 . 146,446 70,246 6,240,000
0.33 OH Pekerja 34,299 L.4.001 . . .
0.17 OH Tukang pipa 23,647 L.4.020 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.57 OH Operator Alat Pipa 80,854 L.4.038 . . .
1.00 bh Pipa HDPE Ø 600 mm 6,240,000 M.4.275 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 70,246 T.4.007 . . .
A.8.4.2.28 P-518 1.00 bh (K3) Pemotongan pipa HDPE Ø 800 mm 9,400,095 1.73 . 227,600 124,495 9,048,000
0.60 OH Pekerja 61,903 L.4.001 . . .
0.30 OH Tukang pipa 42,622 L.4.020 . . .
0.06 OH Mandor 13,902 L.4.035 . . .
0.77 OH Operator Alat Pipa 109,174 L.4.038 . . .
1.00 bh Pipa HDPE Ø 800 mm 9,048,000 M.4.276 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 124,495 T.4.007 . . .
A.8.4.2.29 P-519 1.00 bh (K3) Pemotongan pipa HDPE Ø 900 mm 10,486,812 2.33 . 303,027 187,785 9,996,000
0.91 OH Pekerja 94,039 L.4.001 . . .
0.46 OH Tukang pipa 64,570 L.4.020 . . .
0.09 OH Mandor 21,085 L.4.035 . . .
0.87 OH Operator Alat Pipa 123,334 L.4.038 . . .
1.00 bh Pipa HDPE Ø 900 mm 9,996,000 M.4.277 . . .
0.27 hari Bahan potong pipa T2/mekanik / cilinder 187,785 T.4.007 . . .
A.8.4.2.30 P-520 1.00 bh (K3) Pemotongan pipa HDPE Ø 1000 mm 11,614,804 2.77 . 358,898 230,906 11,025,000
1.13 OH Pekerja 115,875 L.4.001 . . .
0.56 OH Tukang pipa 79,579 L.4.020 . . .
0.11 OH Mandor 25,950 L.4.035 . . .
0.97 OH Operator Alat Pipa 137,494 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1000 11,025,000 M.4.278 . . .
0.33 hari Bahan potong pipa T2/mekanik / cilinder 230,906 T.4.007 . . .
A.8.4.2.31 P-521 1.00 bh (K3) Pemotongan pipa HDPE Ø 1100 mm 11,674,406 3.05 . 395,549 253,858 11,025,000
1.24 OH Pekerja 127,514 L.4.001 . . .
0.62 OH Tukang pipa 87,650 L.4.020 . . .
0.12 OH Mandor 28,731 L.4.035 . . .
1.07 OH Operator Alat Pipa 151,654 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1100 11,025,000 M.4.280 . . .
0.37 hari Bahan potong pipa T2/mekanik / cilinder 253,858 T.4.007 . . .
A.8.4.2.32 P-522 1.00 bh (K3) Pemotongan pipa HDPE Ø 1200 mm 14,316,414 3.76 . 484,660 331,754 13,500,000
1.62 OH Pekerja 166,757 L.4.001 . . .
0.81 OH Tukang pipa 114,554 L.4.020 . . .
0.16 OH Mandor 37,535 L.4.035 . . .
1.17 OH Operator Alat Pipa 165,814 L.4.038 . . .
1.00 bh Pipa HDPE Ø 1200 mm 13,500,000 M.4.282 . . .
0.48 hari Bahan potong pipa T2/mekanik / cilinder 331,754 T.4.007 . . .
A.8.4.2.33 P-523 1.00 bh (K3) Pemotongan pipa GIP Ø 63 mm 165,660 0.03 . 3,836 11,824 150,000
0.02 OH Pekerja 1,957 L.4.001 . . .

www.mitra-arsitek.com 92/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Tukang pipa 1,416 L.4.020 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.00 bh Pipa GIP Ø 63 mm 150,000 M.4.249 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,824 T.4.007 . . .
A.8.4.2.34 P-524 1.00 bh (K3) Pemotongan pipa GIP Ø 100 mm 242,294 0.09 . 11,471 11,824 219,000
0.06 OH Pekerja 5,974 L.4.001 . . .
0.03 OH Tukang pipa 4,106 L.4.020 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.00 bh Pipa GIP Ø 100 mm 219,000 M.4.250 . . .
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,824 T.4.007 . . .
A.8.4.2.35 P-525 1.00 bh (K3) Pemotongan pipa GIP Ø 125 mm 339,422 0.15 . 18,075 23,647 297,700
0.09 OH Pekerja 9,476 L.4.001 . . .
0.05 OH Tukang pipa 6,514 L.4.020 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.00 bh Pipa GIP Ø 125 mm 297,700 M.4.251 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 23,647 T.4.007 . . .
A.8.4.2.36 P-526 1.00 bh (K3) Pemotongan pipa GIP Ø 150 mm 410,098 0.21 . 25,851 23,647 360,600
0.13 OH Pekerja 13,493 L.4.001 . . .
0.07 OH Tukang pipa 9,346 L.4.020 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
1.00 bh Pipa GIP Ø 150 mm 360,600 M.4.252 . . .
0.03 hari Bahan potong pipa T2/mekanik / cilinder 23,647 T.4.007 . . .
A.8.4.2.37 P-527 1.00 bh (K3) Pemotongan pipa GIP Ø 200 mm 561,140 0.54 . 66,970 35,471 458,700
0.34 OH Pekerja 35,020 L.4.001 . . .
0.17 OH Tukang pipa 24,072 L.4.020 . . .
0.03 OH Mandor 7,878 L.4.035 . . .
1.00 bh Pipa GIP Ø 200 mm 458,700 M.4.253 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 35,471 T.4.007 . . .
A.8.4.2.38 P-528 1.00 bh (K3) Pemotongan pipa GIP Ø 250 mm 718,745 0.76 . 93,374 35,471 589,900
0.48 OH Pekerja 48,925 L.4.001 . . .
0.24 OH Tukang pipa 33,559 L.4.020 . . .
0.05 OH Mandor 10,890 L.4.035 . . .
1.00 bh Pipa GIP Ø 250 mm 589,900 M.4.254 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 35,471 T.4.007 . . .
A.8.4.2.39 P-529 1.00 bh (K3) Pemotongan pipa GIP Ø 300 mm 849,151 0.81 . 99,180 35,471 714,500
0.50 OH Pekerja 51,912 L.4.001 . . .
0.25 OH Tukang pipa 35,683 L.4.020 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 bh Pipa GIP Ø 300 mm 714,500 M.4.255 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 35,471 T.4.007 . . .
A.8.4.2.40 P-530 1.00 bh (K3) Pemotongan pipa GIP Ø 400 mm 1,083,604 1.18 . 145,410 47,294 890,900
0.74 OH Pekerja 76,014 L.4.001 . . .
0.37 OH Tukang pipa 52,250 L.4.020 . . .
0.07 OH Mandor 17,146 L.4.035 . . .
1.00 bh Pipa GIP Ø 400 mm 890,900 M.4.256 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 47,294 T.4.007 . . .
A.8.4.2.41 P-531 1.00 bh (K3) Pemotongan pipa GIP Ø 450 mm 1,236,471 1.36 . 167,077 47,294 1,022,100
0.85 OH Pekerja 87,344 L.4.001 . . .
0.42 OH Tukang pipa 60,038 L.4.020 . . .
0.09 OH Mandor 19,695 L.4.035 . . .

www.mitra-arsitek.com 93/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa GIP Ø 450 mm 1,022,100 M.4.257 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 47,294 T.4.007 . . .
A.8.4.2.42 P-532 1.00 bh (K3) Pemotongan pipa GIP Ø 500 mm 1,434,490 1.51 . 185,396 47,294 1,201,800
0.94 OH Pekerja 96,923 L.4.001 . . .
0.47 OH Tukang pipa 66,694 L.4.020 . . .
0.09 OH Mandor 21,780 L.4.035 . . .
1.00 bh Pipa GIP Ø 500 mm 1,201,800 M.4.258 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 47,294 T.4.007 . . .
A.8.4.2.43 P-533 1.00 bh (K3) Pemotongan pipa GIP Ø 600 mm 1,618,407 1.38 . 170,089 59,118 1,389,200
0.86 OH Pekerja 88,992 L.4.001 . . .
0.43 OH Tukang pipa 61,171 L.4.020 . . .
0.09 OH Mandor 19,926 L.4.035 . . .
1.00 bh Pipa GIP Ø 600 mm 1,389,200 M.4.259 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 59,118 T.4.007 . . .
A.8.4.2.44 P-534 1.00 bh (K3) Pemotongan pipa GIP Ø 800 mm 2,096,568 2.51 . 308,651 59,118 1,728,800
1.57 OH Pekerja 161,401 L.4.001 . . .
0.78 OH Tukang pipa 110,873 L.4.020 . . .
0.16 OH Mandor 36,377 L.4.035 . . .
1.00 bh Pipa GIP Ø 800 mm 1,728,800 M.4.260 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 59,118 T.4.007 . . .
A.8.4.2.45 P-535 1.00 bh (K3) Pemotongan pipa GIP Ø 900 mm 2,392,254 2.83 . 348,637 59,118 1,984,500
1.77 OH Pekerja 182,310 L.4.001 . . .
0.89 OH Tukang pipa 125,316 L.4.020 . . .
0.18 OH Mandor 41,011 L.4.035 . . .
1.00 bh Pipa GIP Ø 900 mm 1,984,500 M.4.261 . . .
0.09 hari Bahan potong pipa T2/mekanik / cilinder 59,118 T.4.007 . . .
A.8.4.2.46 P-536 1.00 bh (K3) Pemotongan pipa GIP Ø 1000 mm 2,620,567 3.16 . 388,726 70,941 2,160,900
1.97 OH Pekerja 203,322 L.4.001 . . .
0.99 OH Tukang pipa 139,759 L.4.020 . . .
0.20 OH Mandor 45,645 L.4.035 . . .
1.00 bh Pipa GIP Ø 1000 mm 2,160,900 M.4.262 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 70,941 T.4.007 . . .
A.8.4.2.47 P-537 1.00 bh (K3) Pemotongan pipa GIP Ø 1100 mm 2,876,988 3.49 . 429,047 70,941 2,377,000
2.18 OH Pekerja 224,334 L.4.001 . . .
1.09 OH Tukang pipa 154,202 L.4.020 . . .
0.22 OH Mandor 50,511 L.4.035 . . .
1.00 bh Pipa GIP Ø 1100 mm 2,377,000 M.4.263 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 70,941 T.4.007 . . .
A.8.4.2.48 P-538 1.00 bh (K3) Pemotongan pipa GIP Ø 1200 mm 3,344,877 3.81 . 469,136 70,941 2,804,800
2.38 OH Pekerja 245,346 L.4.001 . . .
1.19 OH Tukang pipa 168,646 L.4.020 . . .
0.24 OH Mandor 55,145 L.4.035 . . .
1.00 bh Pipa GIP Ø 1200 mm 2,804,800 M.4.264 . . .
0.10 hari Bahan potong pipa T2/mekanik / cilinder 70,941 T.4.007 . . .
A.8.4.2.49 P-539 1.00 bh (K3) Pemotongan pipa DCI Ø 100 mm 153,620 0.09 . 10,917 1,503 141,200
0.07 OH Pekerja 7,313 L.4.001 . . .
0.01 OH Tukang pipa 1,982 L.4.020 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.00 bh Pipa DCI Ø 100 mm 141,200 M.4.234 . . .
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,503 T.4.029 . . .

www.mitra-arsitek.com 94/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.50 P-540 1.00 bh (K3) Pemotongan pipa DCI Ø 125 mm 214,209 0.15 . 17,200 5,009 192,000
0.11 OH Pekerja 11,536 L.4.001 . . .
0.02 OH Tukang pipa 3,115 L.4.020 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
1.00 bh Pipa DCI Ø 125 mm 192,000 M.4.235 . . .
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 5,009 T.4.029 . . .
A.8.4.2.51 P-541 1.00 bh (K3) Pemotongan pipa DCI Ø 150 mm 351,932 0.21 . 24,615 9,016 318,300
0.16 OH Pekerja 16,377 L.4.001 . . .
0.03 OH Tukang pipa 4,531 L.4.020 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
1.00 bh Pipa DCI Ø 150 mm 318,300 M.4.236 . . .
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 9,016 T.4.029 . . .
A.8.4.2.52 P-542 1.00 bh (K3) Pemotongan pipa DCI Ø 200 mm 622,656 0.48 . 56,608 27,049 539,000
0.37 OH Pekerja 37,698 L.4.001 . . .
0.07 OH Tukang pipa 10,337 L.4.020 . . .
0.04 OH Mandor 8,573 L.4.035 . . .
1.00 bh Pipa DCI Ø 200 mm 539,000 M.4.237 . . .
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 27,049 T.4.029 . . .
A.8.4.2.53 P-543 1.00 bh (K3) Pemotongan pipa DCI Ø 250 mm 946,167 0.62 . 73,602 36,566 836,000
0.48 OH Pekerja 49,028 L.4.001 . . .
0.10 OH Tukang pipa 13,452 L.4.020 . . .
0.05 OH Mandor 11,122 L.4.035 . . .
1.00 bh Pipa DCI Ø 250 mm 836,000 M.4.238 . . .
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 36,566 T.4.029 . . .
A.8.4.2.54 P-544 1.00 bh (K3) Pemotongan pipa DCI Ø 300 mm 1,189,567 0.67 . 78,996 39,571 1,071,000
0.51 OH Pekerja 52,736 L.4.001 . . .
0.10 OH Tukang pipa 14,443 L.4.020 . . .
0.05 OH Mandor 11,817 L.4.035 . . .
1.00 bh Pipa DCI Ø 300 mm 1,071,000 M.4.239 . . .
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 39,571 T.4.029 . . .
A.8.4.2.55 P-545 1.00 bh (K3) Pemotongan pipa DCI Ø 400 mm 2,847,213 1.22 . 145,324 109,889 2,592,000
0.94 OH Pekerja 96,923 L.4.001 . . .
0.19 OH Tukang pipa 26,621 L.4.020 . . .
0.09 OH Mandor 21,780 L.4.035 . . .
1.00 bh Pipa DCI Ø 400 mm 2,592,000 M.4.240 . . .
0.16 hari Bahan potong pipa T2/mekanik / cilinder 109,889 T.4.007 . . .
A.8.4.2.56 P-546 1.00 bh (K3) Pemotongan pipa DCI Ø 450 mm 3,042,076 1.48 . 175,668 122,408 2,744,000
1.14 OH Pekerja 117,111 L.4.001 . . .
0.23 OH Tukang pipa 32,143 L.4.020 . . .
0.11 OH Mandor 26,414 L.4.035 . . .
1.00 bh Pipa DCI Ø 450 mm 2,744,000 M.4.241 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 122,408 T.4.007 . . .
A.8.4.2.57 P-547 1.00 bh (K3) Pemotongan pipa DCI Ø 500 mm 3,472,124 1.71 . 202,588 133,536 3,136,000
1.31 OH Pekerja 135,136 L.4.001 . . .
0.26 OH Tukang pipa 37,099 L.4.020 . . .
0.13 OH Mandor 30,353 L.4.035 . . .
1.00 bh Pipa DCI Ø 500 mm 3,136,000 M.4.242 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 133,536 T.4.007 . . .
A.8.4.2.58 P-548 1.00 bh (K3) Pemotongan pipa DCI Ø 600 mm 3,827,815 1.70 . 202,279 133,536 3,492,000
1.31 OH Pekerja 134,827 L.4.001 . . .

www.mitra-arsitek.com 95/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.26 OH Tukang pipa 37,099 L.4.020 . . .
0.13 OH Mandor 30,353 L.4.035 . . .
1.00 bh Pipa DCI Ø 600 mm 3,492,000 M.4.243 . . .
0.19 hari Bahan potong pipa T2/mekanik / cilinder 133,536 T.4.007 . . .
A.8.4.2.59 P-549 1.00 bh (K3) Pemotongan pipa DCI Ø 800 mm 5,465,073 3.38 . 401,468 215,605 4,848,000
2.60 OH Pekerja 267,594 L.4.001 . . .
0.52 OH Tukang pipa 73,632 L.4.020 . . .
0.26 OH Mandor 60,242 L.4.035 . . .
1.00 bh Pipa DCI Ø 800 mm 4,848,000 M.4.244 . . .
0.31 hari Bahan potong pipa T2/mekanik / cilinder 215,605 T.4.007 . . .
A.8.4.2.60 P-550 1.00 bh (K3) Pemotongan pipa DCI Ø 900 mm 5,681,617 4.38 . 520,631 264,986 4,896,000
3.37 OH Pekerja 347,110 L.4.001 . . .
0.67 OH Tukang pipa 95,438 L.4.020 . . .
0.34 OH Mandor 78,083 L.4.035 . . .
1.00 bh Pipa DCI Ø 900 mm 4,896,000 M.4.245 . . .
0.38 hari Bahan potong pipa T2/mekanik / cilinder 264,986 T.4.007 . . .
A.8.4.2.61 P-551 1.00 bh (K3) Pemotongan pipa DCI Ø 1000 mm 6,927,868 5.23 . 621,153 306,716 6,000,000
4.02 OH Pekerja 414,163 L.4.001 . . .
0.80 OH Tukang pipa 113,846 L.4.020 . . .
0.40 OH Mandor 93,143 L.4.035 . . .
1.00 bh Pipa DCI Ø 1000 mm 6,000,000 M.4.246 . . .
0.44 hari Bahan potong pipa T2/mekanik / cilinder 306,716 T.4.007 . . .
A.8.4.2.62 P-552 1.00 bh (K3) Pemotongan pipa DCI Ø 1100 mm 7,452,764 6.15 . 730,841 351,923 6,370,000
4.73 OH Pekerja 487,293 L.4.001 . . .
0.95 OH Tukang pipa 133,954 L.4.020 . . .
0.47 OH Mandor 109,594 L.4.035 . . .
1.00 bh Pipa DCI Ø 1100 mm 6,370,000 M.4.247 . . .
0.51 hari Bahan potong pipa T2/mekanik / cilinder 351,923 T.4.007 . . .
A.8.4.2.63 P-553 1.00 bh (K3) Pemotongan pipa DCI Ø 1200 mm 8,696,509 7.15 . 849,901 400,608 7,446,000
5.50 OH Pekerja 566,706 L.4.001 . . .
1.10 OH Tukang pipa 155,760 L.4.020 . . .
0.55 OH Mandor 127,435 L.4.035 . . .
1.00 bh Pipa DCI Ø 1200 mm 7,446,000 M.4.248 . . .
0.58 hari Bahan potong pipa T2/mekanik / cilinder 400,608 T.4.007 . . .
A.8.4.2.64 P-554 1.00 bh (K3) Pemotongan pipa baja Ø 63 mm 248,962 0.04 . 4,429 25,734 218,800
0.03 OH Pekerja 2,884 L.4.001 . . .
0.01 OH Tukang pipa 850 L.4.020 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 bh Pipa Baja Ø 63 mm 218,800 M.4.218 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 25,734 T.4.007 . . .
A.8.4.2.65 P-555 1.00 bh (K3) Pemotongan pipa baja Ø 100 mm 415,836 0.11 . 13,016 27,820 375,000
0.09 OH Pekerja 8,755 L.4.001 . . .
0.02 OH Tukang pipa 2,407 L.4.020 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 bh Pipa Baja Ø 100 mm 375,000 M.4.219 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 27,820 T.4.007 . . .
A.8.4.2.66 P-556 1.00 bh (K3) Pemotongan pipa baja Ø 125 mm 249,745 0.17 . 20,534 29,211 200,000
0.13 OH Pekerja 13,699 L.4.001 . . .
0.03 OH Tukang pipa 3,823 L.4.020 . . .
0.01 OH Mandor 3,012 L.4.035 . . .

www.mitra-arsitek.com 96/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Pipa Baja Ø 125 mm 200,000 M.4.220 . . .
0.04 hari Bahan potong pipa T2/mekanik / cilinder 29,211 T.4.007 . . .
A.8.4.2.67 P-557 1.00 bh (K3) Pemotongan pipa baja Ø 150 mm 194,859 0.24 . 28,362 31,298 135,200
0.18 OH Pekerja 18,952 L.4.001 . . .
0.04 OH Tukang pipa 5,239 L.4.020 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
1.00 bh Pipa Baja Ø 150 mm 135,200 M.4.221 . . .
0.05 hari Bahan potong pipa T2/mekanik / cilinder 31,298 T.4.007 . . .
A.8.4.2.68 P-558 1.00 bh (K3) Pemotongan pipa baja Ø 200 mm 333,632 0.62 . 73,602 41,730 218,300
0.48 OH Pekerja 49,028 L.4.001 . . .
0.10 OH Tukang pipa 13,452 L.4.020 . . .
0.05 OH Mandor 11,122 L.4.035 . . .
1.00 bh Pipa Baja Ø 200 mm 218,300 M.4.222 . . .
0.06 hari Bahan potong pipa T2/mekanik / cilinder 41,730 T.4.007 . . .
A.8.4.2.69 P-559 1.00 bh (K3) Pemotongan pipa baja Ø 250 mm 424,808 0.86 . 102,414 47,294 275,100
0.66 OH Pekerja 68,289 L.4.001 . . .
0.13 OH Tukang pipa 18,833 L.4.020 . . .
0.07 OH Mandor 15,292 L.4.035 . . .
1.00 bh Pipa Baja Ø 250 mm 275,100 M.4.223 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 47,294 T.4.007 . . .
A.8.4.2.70 P-560 1.00 bh (K3) Pemotongan pipa baja Ø 300 mm 486,355 0.97 . 114,979 50,076 321,300
0.75 OH Pekerja 76,735 L.4.001 . . .
0.15 OH Tukang pipa 21,098 L.4.020 . . .
0.07 OH Mandor 17,146 L.4.035 . . .
1.00 bh Pipa Baja Ø 300 mm 321,300 M.4.224 . . .
0.07 hari Bahan potong pipa T2/mekanik / cilinder 50,076 T.4.007 . . .
A.8.4.2.71 P-561 1.00 bh (K3) Pemotongan pipa baja Ø 400 mm 711,293 1.87 . 222,466 73,028 415,800
1.44 OH Pekerja 148,320 L.4.001 . . .
0.29 OH Tukang pipa 40,781 L.4.020 . . .
0.14 OH Mandor 33,365 L.4.035 . . .
1.00 bh Pipa Baja Ø 400 mm 415,800 M.4.225 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 73,028 T.4.007 . . .
A.8.4.2.72 P-562 1.00 bh (K3) Pemotongan pipa baja Ø 450 mm 795,702 1.82 . 216,183 74,419 505,100
1.40 OH Pekerja 144,097 L.4.001 . . .
0.28 OH Tukang pipa 39,648 L.4.020 . . .
0.14 OH Mandor 32,438 L.4.035 . . .
1.00 bh Pipa Baja Ø 450 mm 505,100 M.4.226 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 74,419 T.4.007 . . .
A.8.4.2.73 P-563 1.00 bh (K3) Pemotongan pipa baja Ø 500 mm 856,017 2.03 . 240,798 74,419 540,800
1.56 OH Pekerja 160,474 L.4.001 . . .
0.31 OH Tukang pipa 44,179 L.4.020 . . .
0.16 OH Mandor 36,145 L.4.035 . . .
1.00 bh Pipa Baja Ø 500 mm 540,800 M.4.227 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 74,419 T.4.007 . . .
A.8.4.2.74 P-564 1.00 bh (K3) Pemotongan pipa baja Ø 600 mm 967,407 1.87 . 222,015 78,592 666,800
1.44 OH Pekerja 148,011 L.4.001 . . .
0.29 OH Tukang pipa 40,639 L.4.020 . . .
0.14 OH Mandor 33,365 L.4.035 . . .
1.00 bh Pipa Baja Ø 600 mm 666,800 M.4.228 . . .
0.11 hari Bahan potong pipa T2/mekanik / cilinder 78,592 T.4.007 . . .

www.mitra-arsitek.com 97/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.2.75 P-565 1.00 bh (K3) Pemotongan pipa baja Ø 800 mm 1,419,570 3.41 . 405,317 115,453 898,800
2.62 OH Pekerja 270,272 L.4.001 . . .
0.53 OH Tukang pipa 74,340 L.4.020 . . .
0.26 OH Mandor 60,705 L.4.035 . . .
1.00 bh Pipa Baja Ø 800 mm 898,800 M.4.229 . . .
0.17 hari Bahan potong pipa T2/mekanik / cilinder 115,453 T.4.007 . . .
A.8.4.2.76 P-566 1.00 bh (K3) Pemotongan pipa baja Ø 900 mm 1,493,415 3.86 . 458,938 127,277 907,200
2.97 OH Pekerja 306,013 L.4.001 . . .
0.59 OH Tukang pipa 84,110 L.4.020 . . .
0.30 OH Mandor 68,815 L.4.035 . . .
1.00 bh Pipa Baja Ø 900 mm 907,200 M.4.230 . . .
0.18 hari Bahan potong pipa T2/mekanik / cilinder 127,277 T.4.007 . . .
A.8.4.2.77 P-567 1.00 bh (K3) Pemotongan pipa baja Ø 1000 mm 1,924,599 4.32 . 512,804 139,796 1,272,000
3.32 OH Pekerja 341,857 L.4.001 . . .
0.66 OH Tukang pipa 94,022 L.4.020 . . .
0.33 OH Mandor 76,924 L.4.035 . . .
1.00 bh Pipa Baja Ø 1000 mm 1,272,000 M.4.231 . . .
0.20 hari Bahan potong pipa T2/mekanik / cilinder 139,796 T.4.007 . . .
A.8.4.2.78 P-568 1.00 bh (K3) Pemotongan pipa baja Ø 1100 mm 2,005,647 4.77 . 566,528 151,619 1,287,500
3.67 OH Pekerja 377,701 L.4.001 . . .
0.73 OH Tukang pipa 103,793 L.4.020 . . .
0.37 OH Mandor 85,034 L.4.035 . . .
1.00 bh Pipa Baja Ø 1100 mm 1,287,500 M.4.232 . . .
0.22 hari Bahan potong pipa T2/mekanik / cilinder 151,619 T.4.007 . . .
A.8.4.2.79 P-569 1.00 bh (K3) Pemotongan pipa baja Ø 1200 mm 2,072,031 5.22 . 620,393 164,138 1,287,500
4.02 OH Pekerja 413,545 L.4.001 . . .
0.80 OH Tukang pipa 113,705 L.4.020 . . .
0.40 OH Mandor 93,143 L.4.035 . . .
1.00 bh Pipa Baja Ø 1100 mm 1,287,500 M.4.232 . . .
0.24 hari Bahan potong pipa T2/mekanik / cilinder 164,138 T.4.007 . . .
A.8.4.3.1 P-570 1.00 bh (K3) Pemasangan Valve Ø 150 mm 5,763,654 2.29 . 281,564 50,090 5,432,000
1.43 OH Pekerja 147,187 L.4.001 . . .
0.72 OH Tukang pipa 101,244 L.4.020 . . .
0.14 OH Mandor 33,133 L.4.035 . . .
1.00 bh Valve Ø 150 mm 5,432,000 M.4.325 . . .
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 50,090 T.4.029 . . .
A.8.4.3.2 P-571 1.00 bh (K3) Pemasangan Valve Ø 200 mm 7,723,784 2.74 . 337,514 150,270 7,236,000
1.71 OH Pekerja 176,542 L.4.001 . . .
0.86 OH Tukang pipa 121,351 L.4.020 . . .
0.17 OH Mandor 39,621 L.4.035 . . .
1.00 bh Valve Ø 200 mm 7,236,000 M.4.326 . . .
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 150,270 T.4.029 . . .
A.8.4.3.3 P-572 1.00 bh (K3) Pemasangan Valve Ø 250 mm 10,892,874 2.74 . 337,514 200,360 10,355,000
1.71 OH Pekerja 176,542 L.4.001 . . .
0.86 OH Tukang pipa 121,351 L.4.020 . . .
0.17 OH Mandor 39,621 L.4.035 . . .
1.00 bh Valve Ø 250 mm 10,355,000 M.4.327 . . .
0.40 hari Sewa Tripot/Tackel & handle crane 2 T 200,360 T.4.029 . . .
A.8.4.3.4 P-573 1.00 bh (K3) Pemasangan Valve Ø 300 mm 13,559,390 3.20 . 393,940 250,450 12,915,000
2.00 OH Pekerja 206,000 L.4.001 . . .

www.mitra-arsitek.com 98/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 OH Tukang pipa 141,600 L.4.020 . . .
0.20 OH Mandor 46,340 L.4.035 . . .
1.00 bh Valve Ø 300 mm 12,915,000 M.4.328 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
A.8.4.3.5 P-574 1.00 bh (K3) Pemasangan Valve Ø 400 mm 16,578,404 5.49 . 675,504 500,900 15,402,000
3.43 OH Pekerja 353,187 L.4.001 . . .
1.72 OH Tukang pipa 242,844 L.4.020 . . .
0.34 OH Mandor 79,473 L.4.035 . . .
1.00 bh Valve Ø 400 mm 15,402,000 M.4.329 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
A.8.4.3.6 P-575 1.00 bh (K3) Pemasangan Valve Ø 450 mm 18,718,404 5.49 . 675,504 500,900 17,542,000
3.43 OH Pekerja 353,187 L.4.001 . . .
1.72 OH Tukang pipa 242,844 L.4.020 . . .
0.34 OH Mandor 79,473 L.4.035 . . .
1.00 bh Valve Ø 450 mm 17,542,000 M.4.330 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
A.8.4.3.7 P-576 1.00 bh (K3) Pemasangan Valve Ø 500 mm 23,437,780 6.40 . 787,880 500,900 22,149,000
4.00 OH Pekerja 412,000 L.4.001 . . .
2.00 OH Tukang pipa 283,200 L.4.020 . . .
0.40 OH Mandor 92,680 L.4.035 . . .
1.00 bh Valve Ø 500 mm 22,149,000 M.4.331 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
A.8.4.3.8 P-577 1.00 bh (K3) Pemasangan Valve Ø 600 mm 26,288,082 2.27 . 279,942 628,140 25,380,000
1.42 OH Pekerja 146,363 L.4.001 . . .
0.71 OH Tukang pipa 100,678 L.4.020 . . .
0.14 OH Mandor 32,901 L.4.035 . . .
1.00 bh Valve Ø 600 mm 25,380,000 M.4.332 . . .
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 300,540 T.4.029 . . .
0.30 hari Mobile crane =< 3 ton 327,600 T.4.008 . . .
A.8.4.3.9 P-578 1.00 bh (K3) Pemasangan Valve Ø 700 mm 26,589,014 2.29 . 281,564 796,450 25,511,000
1.43 OH Pekerja 147,187 L.4.001 . . .
0.72 OH Tukang pipa 101,244 L.4.020 . . .
0.14 OH Mandor 33,133 L.4.035 . . .
1.00 bh Valve Ø 700 mm 25,511,000 M.4.333 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
0.50 hari Mobile crane =< 3 ton 546,000 T.4.008 . . .
A.8.4.3.10 P-579 1.00 bh (K3) Pemasangan Valve Ø 800 mm 32,867,331 2.86 . 351,881 796,450 31,719,000
1.79 OH Pekerja 183,958 L.4.001 . . .
0.89 OH Tukang pipa 126,449 L.4.020 . . .
0.18 OH Mandor 41,474 L.4.035 . . .
1.00 bh Valve Ø 800 mm 31,719,000 M.4.334 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
0.50 hari Mobile crane =< 3 ton 546,000 T.4.008 . . .
A.8.4.3.11 P-580 1.00 bh (K3) Pemasangan Valve Ø 900 mm 32,794,189 2.74 . 337,514 1,194,675 31,262,000
1.71 OH Pekerja 176,542 L.4.001 . . .
0.86 OH Tukang pipa 121,351 L.4.020 . . .
0.17 OH Mandor 39,621 L.4.035 . . .
1.00 bh Valve Ø 900 mm 31,262,000 M.4.335 . . .
0.75 hari Sewa Tripot/Tackel & handle crane 2 T 375,675 T.4.029 . . .
0.75 hari Mobile crane =< 3 ton 819,000 T.4.008 . . .

www.mitra-arsitek.com 99/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.3.12 P-581 1.00 bh (K3) Pemasangan Valve Ø 1000 mm 38,187,358 4.11 . 506,458 1,592,900 36,088,000
2.57 OH Pekerja 264,813 L.4.001 . . .
1.29 OH Tukang pipa 182,098 L.4.020 . . .
0.26 OH Mandor 59,547 L.4.035 . . .
1.00 bh Valve Ø 1000 mm 36,088,000 M.4.336 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,092,000 T.4.008 . . .
A.8.4.3.13 P-582 1.00 bh (K3) Pemasangan Valve Ø 1100 mm 43,058,810 4.80 . 590,910 1,592,900 40,875,000
3.00 OH Pekerja 309,000 L.4.001 . . .
1.50 OH Tukang pipa 212,400 L.4.020 . . .
0.30 OH Mandor 69,510 L.4.035 . . .
1.00 bh Valve Ø 1100 mm 40,875,000 M.4.337 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,092,000 T.4.008 . . .
A.8.4.3.14 P-583 1.00 bh (K3) Pemasangan Valve Ø 1200 mm 45,304,810 4.80 . 590,910 1,592,900 43,121,000
3.00 OH Pekerja 309,000 L.4.001 . . .
1.50 OH Tukang pipa 212,400 L.4.020 . . .
0.30 OH Mandor 69,510 L.4.035 . . .
1.00 bh Valve Ø 1200 mm 43,121,000 M.4.338 . . .
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 500,900 T.4.029 . . .
1.00 hari Mobile crane =< 3 ton 1,092,000 T.4.008 . . .
A.8.4.3.15 P-584 1.00 bh (K3) Pemasangan Tee Ø 150 mm 180,497 0.17 . 20,972 14,025 145,500
0.11 OH Pekerja 10,918 L.4.001 . . .
0.05 OH Tukang pipa 7,505 L.4.020 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
1.00 bh Tee Ø 150 mm 145,500 M.4.311 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 14,025 T.4.029 . . .
A.8.4.3.16 P-585 1.00 bh (K3) Pemasangan Tee Ø 200 mm 261,164 0.35 . 42,638 14,526 204,000
0.22 OH Pekerja 22,248 L.4.001 . . .
0.11 OH Tukang pipa 15,293 L.4.020 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
1.00 bh Tee Ø 200 mm 204,000 M.4.312 . . .
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 14,526 T.4.029 . . .
A.8.4.3.17 P-586 1.00 bh (K3) Pemasangan 1 buah Tee Ø 250 mm 323,840 0.52 . 64,305 19,535 240,000
0.33 OH Pekerja 33,578 L.4.001 . . .
0.16 OH Tukang pipa 23,081 L.4.020 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
1.00 bh Tee Ø 250 mm 240,000 M.4.313 . . .
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,535 T.4.029 . . .
A.8.4.3.18 P-587 1.00 bh (K3) Pemasangan Tee Ø 300 mm 636,422 0.70 . 85,972 250,450 300,000
0.44 OH Pekerja 44,908 L.4.001 . . .
0.22 OH Tukang pipa 30,869 L.4.020 . . .
0.04 OH Mandor 10,195 L.4.035 . . .
1.00 bh Tee Ø 300 mm 300,000 M.4.314 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
A.8.4.3.19 P-588 1.00 bh (K3) Pemasangan Tee Ø 400 mm 754,255 1.05 . 129,305 250,450 374,500
0.66 OH Pekerja 67,568 L.4.001 . . .
0.33 OH Tukang pipa 46,445 L.4.020 . . .
0.07 OH Mandor 15,292 L.4.035 . . .
1.00 bh Tee Ø 400 mm 374,500 M.4.315 . . .

www.mitra-arsitek.com 100/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
A.8.4.3.20 P-589 1.00 bh (K3) Pemasangan Tee Ø 450 mm 821,422 1.23 . 150,972 250,450 420,000
0.77 OH Pekerja 78,898 L.4.001 . . .
0.38 OH Tukang pipa 54,233 L.4.020 . . .
0.08 OH Mandor 17,841 L.4.035 . . .
1.00 bh Tee Ø 450 mm 420,000 M.4.316 . . .
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 250,450 T.4.029 . . .
A.8.4.3.21 P-590 1.00 bh (K3) Pemasangan Tee Ø 500 mm 954,678 1.40 . 172,638 300,540 481,500
0.88 OH Pekerja 90,228 L.4.001 . . .
0.44 OH Tukang pipa 62,021 L.4.020 . . .
0.09 OH Mandor 20,390 L.4.035 . . .
1.00 bh Tee Ø 500 mm 481,500 M.4.317 . . .
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 300,540 T.4.029 . . .
A.8.4.3.22 P-591 1.00 bh (K3) Pemasangan Tee Ø 600 mm 917,478 1.75 . 215,972 201,506 500,000
1.10 OH Pekerja 112,888 L.4.001 . . .
0.55 OH Tukang pipa 77,597 L.4.020 . . .
0.11 OH Mandor 25,487 L.4.035 . . .
1.00 bh Tee Ø 600 mm 500,000 M.4.318 . . .
0.19 hari Sewa Tripot/Tackel & handle crane 2 T 96,674 T.4.029 . . .
0.10 hari Mobile crane =< 3 ton 104,832 T.4.008 . . .
A.8.4.3.23 P-592 1.00 bh (K3) Pemasangan Tee Ø 700 mm 1,039,904 2.11 . 259,305 236,099 544,500
1.32 OH Pekerja 135,548 L.4.001 . . .
0.66 OH Tukang pipa 93,173 L.4.020 . . .
0.13 OH Mandor 30,584 L.4.035 . . .
1.00 bh Tee Ø 700 mm 544,500 M.4.319 . . .
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 112,703 T.4.029 . . .
0.11 hari Mobile crane =< 3 ton 123,396 T.4.008 . . .
A.8.4.3.24 P-593 1.00 bh (K3) Pemasangan Tee Ø 800 mm 1,208,238 2.46 . 302,639 269,599 636,000
1.54 OH Pekerja 158,208 L.4.001 . . .
0.77 OH Tukang pipa 108,749 L.4.020 . . .
0.15 OH Mandor 35,682 L.4.035 . . .
1.00 bh Tee Ø 800 mm 636,000 M.4.320 . . .
0.26 hari Sewa Tripot/Tackel & handle crane 2 T 128,731 T.4.029 . . .
0.13 hari Mobile crane =< 3 ton 140,868 T.4.008 . . .
A.8.4.3.25 P-594 1.00 bh (K3) Pemasangan Tee Ø 900 mm 1,326,073 2.81 . 345,972 336,601 643,500
1.76 OH Pekerja 180,868 L.4.001 . . .
0.88 OH Tukang pipa 124,325 L.4.020 . . .
0.18 OH Mandor 40,779 L.4.035 . . .
1.00 bh Tee Ø 900 mm 643,500 M.4.321 . . .
0.32 hari Sewa Tripot/Tackel & handle crane 2 T 160,789 T.4.029 . . .
0.16 hari Mobile crane =< 3 ton 175,812 T.4.008 . . .
A.8.4.3.26 P-595 1.00 bh (K3) Pemasangan Tee Ø 1000 mm 1,535,471 3.16 . 389,305 383,165 763,000
1.98 OH Pekerja 203,528 L.4.001 . . .
0.99 OH Tukang pipa 139,901 L.4.020 . . .
0.20 OH Mandor 45,877 L.4.035 . . .
1.00 bh Tee Ø 1000 mm 763,000 M.4.322 . . .
0.37 hari Sewa Tripot/Tackel & handle crane 2 T 183,329 T.4.029 . . .
0.18 hari Mobile crane =< 3 ton 199,836 T.4.008 . . .
A.8.4.3.27 P-596 1.00 bh (K3) Pemasangan Tee Ø 1100 mm 1,654,242 3.51 . 432,639 404,103 817,500
2.20 OH Pekerja 226,188 L.4.001 . . .

www.mitra-arsitek.com 101/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 OH Tukang pipa 155,477 L.4.020 . . .
0.22 OH Mandor 50,974 L.4.035 . . .
1.00 bh Tee Ø 1100 mm 817,500 M.4.323 . . .
0.39 hari Sewa Tripot/Tackel & handle crane 2 T 193,347 T.4.029 . . .
0.19 hari Mobile crane =< 3 ton 210,756 T.4.008 . . .
A.8.4.3.28 P-597 1.00 bh (K3) Pemasangan Tee Ø 1200 mm 1,771,077 3.87 . 475,972 471,105 824,000
2.42 OH Pekerja 248,848 L.4.001 . . .
1.21 OH Tukang pipa 171,053 L.4.020 . . .
0.24 OH Mandor 56,071 L.4.035 . . .
1.00 bh Tee Ø 1200 mm 824,000 M.4.324 . . .
0.45 hari Sewa Tripot/Tackel & handle crane 2 T 225,405 T.4.029 . . .
0.23 hari Mobile crane =< 3 ton 245,700 T.4.008 . . .
A.8.4.4.1 P-598 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm 1,526,190 2.35 . 288,851 1,177,539 59,800
1.47 OH Pekerja 150,998 L.4.001 . . .
0.73 OH Tukang pipa 103,793 L.4.020 . . .
0.15 OH Mandor 34,060 L.4.035 . . .
1.00 bh Pipa Ø 80 mm 59,800 M.4.283 . . .
0.61 hari Bahan potong pipa T2/mekanik / cilinder 421,473 T.4.007 . . .
0.08 hari Sewa Genset 1500 watt 25,515 T.4.026 . . .
0.97 hari Sewa Pompa Submersible 3m3/h 297,273 T.4.028 . . .
0.87 hari Sewa Tripot/Tackel & handle crane 2 T 433,279 T.4.029 . . .
A.8.4.4.2 P-599 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm 1,703,346 2.63 . 324,305 1,293,541 85,500
1.65 OH Pekerja 169,538 L.4.001 . . .
0.82 OH Tukang pipa 116,537 L.4.020 . . .
0.17 OH Mandor 38,231 L.4.035 . . .
1.00 bh Pipa Ø 100 mm 85,500 M.4.284 . . .
0.65 hari Bahan potong pipa T2/mekanik / cilinder 452,075 T.4.007 . . .
0.16 hari Sewa Genset 1500 watt 54,092 T.4.026 . . .
1.08 hari Sewa Pompa Submersible 3m3/h 331,054 T.4.028 . . .
0.91 hari Sewa Tripot/Tackel & handle crane 2 T 456,320 T.4.029 . . .
A.8.4.4.3 P-600 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm 2,090,585 3.35 . 412,942 1,583,544 94,100
2.10 OH Pekerja 215,888 L.4.001 . . .
1.05 OH Tukang pipa 148,397 L.4.020 . . .
0.21 OH Mandor 48,657 L.4.035 . . .
1.00 bh Pipa Ø 150 mm 94,100 M.4.285 . . .
0.76 hari Bahan potong pipa T2/mekanik / cilinder 528,580 T.4.007 . . .
0.37 hari Sewa Genset 1500 watt 125,534 T.4.026 . . .
1.35 hari Sewa Pompa Submersible 3m3/h 415,506 T.4.028 . . .
1.03 hari Sewa Tripot/Tackel & handle crane 2 T 513,923 T.4.029 . . .
A.8.4.4.4 P-601 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm 2,553,125 4.07 . 501,578 1,873,547 178,000
2.55 OH Pekerja 262,238 L.4.001 . . .
1.27 OH Tukang pipa 180,257 L.4.020 . . .
0.26 OH Mandor 59,084 L.4.035 . . .
1.00 bh Pipa Ø 200 mm 178,000 M.4.286 . . .
0.87 hari Bahan potong pipa T2/mekanik / cilinder 605,085 T.4.007 . . .
0.58 hari Sewa Genset 1500 watt 196,976 T.4.026 . . .
1.63 hari Sewa Pompa Submersible 3m3/h 499,959 T.4.028 . . .
1.14 hari Sewa Tripot/Tackel & handle crane 2 T 571,527 T.4.029 . . .
A.8.4.4.5 P-602 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm 2,986,964 4.79 . 590,215 2,163,550 233,200
3.00 OH Pekerja 308,588 L.4.001 . . .

www.mitra-arsitek.com 102/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 OH Tukang pipa 212,117 L.4.020 . . .
0.30 OH Mandor 69,510 L.4.035 . . .
1.00 bh Pipa Ø 250 mm 233,200 M.4.287 . . .
0.98 hari Bahan potong pipa T2/mekanik / cilinder 681,590 T.4.007 . . .
0.79 hari Sewa Genset 1500 watt 268,418 T.4.026 . . .
1.90 hari Sewa Pompa Submersible 3m3/h 584,411 T.4.028 . . .
1.26 hari Sewa Tripot/Tackel & handle crane 2 T 629,130 T.4.029 . . .
A.8.4.4.6 P-603 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm 3,405,804 5.51 . 678,851 2,453,553 273,400
3.45 OH Pekerja 354,938 L.4.001 . . .
1.72 OH Tukang pipa 243,977 L.4.020 . . .
0.35 OH Mandor 79,937 L.4.035 . . .
1.00 bh Pipa Ø 300 mm 273,400 M.4.288 . . .
1.09 hari Bahan potong pipa T2/mekanik / cilinder 758,095 T.4.007 . . .
1.00 hari Sewa Genset 1500 watt 339,860 T.4.026 . . .
2.18 hari Sewa Pompa Submersible 3m3/h 668,864 T.4.028 . . .
1.37 hari Sewa Tripot/Tackel & handle crane 2 T 686,734 T.4.029 . . .
A.8.4.4.7 P-604 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm 4,268,183 6.95 . 856,124 3,033,559 378,500
4.35 OH Pekerja 447,638 L.4.001 . . .
2.17 OH Tukang pipa 307,697 L.4.020 . . .
0.44 OH Mandor 100,790 L.4.035 . . .
1.00 bh Pipa Ø 400 mm 378,500 M.4.289 . . .
1.31 hari Bahan potong pipa T2/mekanik / cilinder 911,105 T.4.007 . . .
1.42 hari Sewa Genset 1500 watt 482,744 T.4.026 . . .
2.73 hari Sewa Pompa Submersible 3m3/h 837,769 T.4.028 . . .
1.60 hari Sewa Tripot/Tackel & handle crane 2 T 801,941 T.4.029 . . .
A.8.4.4.8 P-605 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm 4,718,222 7.67 . 944,761 3,323,562 449,900
4.80 OH Pekerja 493,988 L.4.001 . . .
2.40 OH Tukang pipa 339,557 L.4.020 . . .
0.48 OH Mandor 111,216 L.4.035 . . .
1.00 bh Pipa Ø 450 mm 449,900 M.4.290 . . .
1.42 hari Bahan potong pipa T2/mekanik / cilinder 987,610 T.4.007 . . .
1.63 hari Sewa Genset 1500 watt 554,186 T.4.026 . . .
3.00 hari Sewa Pompa Submersible 3m3/h 922,221 T.4.028 . . .
1.72 hari Sewa Tripot/Tackel & handle crane 2 T 859,544 T.4.029 . . .
A.8.4.4.9 P-606 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm 5,142,562 8.39 . 1,033,397 3,613,565 495,600
5.25 OH Pekerja 540,338 L.4.001 . . .
2.62 OH Tukang pipa 371,417 L.4.020 . . .
0.53 OH Mandor 121,643 L.4.035 . . .
1.00 bh Pipa Ø 500 mm 495,600 M.4.291 . . .
1.53 hari Bahan potong pipa T2/mekanik / cilinder 1,064,115 T.4.007 . . .
1.84 hari Sewa Genset 1500 watt 625,628 T.4.026 . . .
3.28 hari Sewa Pompa Submersible 3m3/h 1,006,674 T.4.028 . . .
1.83 hari Sewa Tripot/Tackel & handle crane 2 T 917,148 T.4.029 . . .
A.8.4.4.10 P-607 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm 6,009,941 9.83 . 1,210,670 4,193,571 605,700
6.15 OH Pekerja 633,038 L.4.001 . . .
3.07 OH Tukang pipa 435,137 L.4.020 . . .
0.62 OH Mandor 142,496 L.4.035 . . .
1.00 bh Pipa Ø 600 mm 605,700 M.4.292 . . .
1.75 hari Bahan potong pipa T2/mekanik / cilinder 1,217,125 T.4.007 . . .
2.26 hari Sewa Genset 1500 watt 768,512 T.4.026 . . .

www.mitra-arsitek.com 103/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.83 hari Sewa Pompa Submersible 3m3/h 1,175,579 T.4.028 . . .
2.06 hari Sewa Tripot/Tackel & handle crane 2 T 1,032,355 T.4.029 . . .
A.8.4.4.11 P-608 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm 6,925,520 11.27 . 1,387,943 4,773,577 764,000
7.05 OH Pekerja 725,738 L.4.001 . . .
3.52 OH Tukang pipa 498,857 L.4.020 . . .
0.71 OH Mandor 163,349 L.4.035 . . .
1.00 bh Pipa Ø 700 mm 764,000 M.4.293 . . .
1.97 hari Bahan potong pipa T2/mekanik / cilinder 1,370,135 T.4.007 . . .
2.68 hari Sewa Genset 1500 watt 911,396 T.4.026 . . .
4.38 hari Sewa Pompa Submersible 3m3/h 1,344,484 T.4.028 . . .
2.29 hari Sewa Tripot/Tackel & handle crane 2 T 1,147,562 T.4.029 . . .
A.8.4.4.12 P-609 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm 7,697,999 12.71 . 1,565,216 5,353,583 779,200
7.95 OH Pekerja 818,438 L.4.001 . . .
3.97 OH Tukang pipa 562,577 L.4.020 . . .
0.80 OH Mandor 184,202 L.4.035 . . .
1.00 bh Pipa Ø 800 mm 779,200 M.4.294 . . .
2.19 hari Bahan potong pipa T2/mekanik / cilinder 1,523,145 T.4.007 . . .
3.10 hari Sewa Genset 1500 watt 1,054,280 T.4.026 . . .
4.93 hari Sewa Pompa Submersible 3m3/h 1,513,389 T.4.028 . . .
2.52 hari Sewa Tripot/Tackel & handle crane 2 T 1,262,769 T.4.029 . . .
A.8.4.5.1 P-610 1.00 bh (K3) Pengetesan pipa Ø 50 mm 1,810 0.01 . 1,009 - 801
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.00 m3 Air test (air bersih) 100 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.2 P-611 1.00 m1 (K3) Pengetesan pipa Ø 75 mm 1,910 0.01 . 1,009 - 901
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.00 m3 Air test (air bersih) 200 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.3 P-612 1.00 m1 (K3) Pengetesan pipa Ø 100 mm 2,110 0.01 . 1,009 - 1,101
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.01 m3 Air test (air bersih) 400 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.4 P-613 1.00 m1 (K3) Pengetesan pipa Ø 150 mm 2,610 0.01 . 1,009 - 1,601
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.02 m3 Air test (air bersih) 900 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.5 P-614 1.00 m1 (K3) Pengetesan 1 m pipa Ø 200 mm 3,260 0.01 . 1,009 - 2,251
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.03 m3 Air test (air bersih) 1,550 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .

www.mitra-arsitek.com 104/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.8.4.5.6 P-615 1.00 m1 (K3) Pengetesan pipa Ø 250 mm 4,160 0.01 . 1,009 - 3,151
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.05 m3 Air test (air bersih) 2,450 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.7 P-616 1.00 m1 (K3) Pengetesan 1 m pipa Ø 300 mm 5,260 0.01 . 1,009 - 4,251
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.07 m3 Air test (air bersih) 3,550 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.8 P-617 1.00 m1 (K3) Pengetesan pipa Ø 400 mm 8,010 0.01 . 1,009 - 7,001
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.13 m3 Air test (air bersih) 6,300 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.9 P-618 1.00 m1 (K3) Pengetesan 1 m pipa Ø 500 mm 9,610 0.01 . 1,009 - 8,601
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.16 m3 Air test (air bersih) 7,900 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.5.10 P-619 1.00 m1 (K3) Pengetesan pipa Ø 600 mm 15,860 0.01 . 1,009 - 14,851
0.01 OH Pekerja 824 L.4.001 . . .
0.00 OH Mandor 185 L.4.035 . . .
0.28 m3 Air test (air bersih) 14,150 M.4.002 . . .
0.06 Ltr Bahan Bakar 630 M.4.549 . . .
0.00 Ltr Oli 71 M.4.558 . . .
A.8.4.6.1 P-620 1.00 titik (K3) Pemasangan titik lampu 686,861 0.36 . 51,369 - 635,492
0.15 OH Pekerja 15,450 L.4.001 . . .
0.15 OH Tukang batu 23,175 L.4.007 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
0.28 btg Pipa listrik 5/8” 3,792 M.4.519 . . .
24.00 m Kabel NYM 3x2,5 mm2 496,800 M.4.513 . . .
3.00 bh Tee Doos 4,800 M.4.518 . . .
4.00 bh L.Bow 42,400 M.4.195 . . .
3.00 bh Las Dop 3,300 M.4.515 . . .
24.00 bh Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 bh Mongkok (Listrik) 1,500 M.4.516 . . .
1.00 bh Saklar (standar) 38,200 M.4.517 . . .
1.00 bh Fitting Lampu 25,500 M.4.512 . . .
A.8.4.6.2 P-621 1.00 titik Memasang Instalasi Penerangan 361,769 0.36 . 51,369 - 310,400
0.15 OH Pekerja 15,450 L.4.001 . . .
0.15 OH Tukang batu 23,175 L.4.007 . . .
0.03 OH Kepala tukang 5,793 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
11.00 M' Kabel NYM 3x2,5 mm2 227,700 M.4.513 . . .

www.mitra-arsitek.com 105/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
11.00 M' Pipa Conduit 56,100 M.4.197 . . .
1.00 bh Socket Pipa 14,000 M.4.199 . . .
2.00 bh Tee Doos 3,200 M.4.518 . . .
3.00 bh Klem Pipa 4,500 M.4.190 . . .
6.00 bh Sekrup fixer 1,800 M.4.183 . . .
2.00 bh Las Dop 2,200 M.4.515 . . .
0.25 bh Sealtape 900 M.4.599 . . .
. . . .
. . . .
DAFTAR ANALISA SNI . . . .
Analisa Harga Satuan Pekerjaan SNI . . . .
. . . .
. . . .
. . . .
STANDAR ID Koef. Unit Uraian - - . - - -
. . . .
SNI-2002 S-001 1.00 m1 Pek. Pengukuran & Pemasangan Bowplank 96,481 0.22 . 28,840 - 67,641
0.01 m3 Kayu Kaso 5 / 7 (borneo/meranti) 42,840 M.4.064 . . .
0.01 m3 Kayu Papan 3 / 20 borneo/meranti 24,255 M.4.099 . . .
0.02 kg Paku Biasa 2" - 5" 546 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI 2008 S-002 1.00 m2 Pekerjaan Pengukuran Gedung 18,539 0.13 . 17,895 644 -
0.08 oh Pekerja 8,240 L.4.001 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
0.02 oh Asisten Ahli Ukur 3,862 L.4.059 . . .
0.01 hr Sewa alat ukur 644 T.4.023 . . .
SNI-2002 S-003 1.00 m2 Membersihkan Lapangan dan Perataan 21,885 0.15 . 21,885 - -
0.10 oh Pekerja 10,300 L.4.001 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
AK-SNI 2008 S-004 1.00 m2 Pembuatan jalan sementara, tebal 25 cm 228,443 1.10 . 126,170 - 102,273
0.28 m3 Batu belah 82,445 M.4.013 . . .
0.03 m3 Kerikil 7,263 M.4.024 . . .
0.05 m3 Pasir Urug 12,565 M.4.032 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.10 oh Mandor 23,170 L.4.035 . . .
SNI-2002 S-005 1.00 m2 Pembuatan Jalan Sementara 188,763 1.05 . 114,585 - 74,178
0.15 m3 Batu belah 44,970 M.4.013 . . .
0.09 m3 Batu belah 26,982 M.4.013 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-006 1.00 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran 1,749,431 5.35 . 739,015 - 1,010,416
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
0.18 m3 Kayu balok borneo 667,800 M.4.084 . . .
0.85 kg Paku Biasa 2" - 5" 23,205 M.4.158 . . .
1.10 kg Baja strip (0,2 x 2) cm 14,740 M.4.128 . . .

www.mitra-arsitek.com 106/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
35.00 kg Semen 66,500 M.4.033 . . .
0.15 m3 Pasir pasang 33,390 M.4.030 . . .
0.10 m3 Pasir beton 29,480 M.4.028 . . .
0.15 m3 Koral Beton 34,110 M.4.026 . . .
30.00 bh Bata merah 30,000 M.4.007 . . .
0.25 lbr Seng Gelombang 3" x 6" BJLS 28 12,750 M.4.368 . . .
0.50 bh Jendela nako (rangka + kaca 5 mm) 30,000 M.4.577 . . .
0.08 m2 Kaca Polos 8,976 M.4.524 . . .
0.15 bh Kunci tanam biasa 21,255 M.4.583 . . .
0.06 lbr Plywood 120x240 tbl. 4 mm 4,710 M.4.365 . . .
2.00 oh Pekerja 206,000 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
1.00 oh Tukang batu 154,500 L.4.007 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-007 1.00 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m 461,595 0.64 . 80,596 - 380,999
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
2.50 Kg Semen 4,750 M.4.033 . . .
1.20 lbr Seng Gelombang 3" x 6" BJLS 28 61,200 M.4.368 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral Beton 2,047 M.4.026 . . .
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 262,080 M.4.058 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
0.45 Lt Meni Besi 14,310 M.4.393 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
SNI-2002 S-008 1.00 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m 636,055 0.54 . 70,296 - 565,759
1.00 btg Dolken kayu Ø 8-10/400 cm 26,800 M.4.042 . . .
2.00 Kg Semen 3,800 M.4.033 . . .
25.00 Kg Kawat Duri 530,000 M.4.146 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral Beton 2,047 M.4.026 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
SNI-2002 S-009 1.00 m1 Pagar Sementara dari Kayu tinggi 2 m 389,565 0.64 . 80,596 - 308,969
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
2.50 Kg Semen 4,750 M.4.033 . . .
0.01 m3 Pasir beton 1,474 M.4.028 . . .
0.01 m3 Koral Beton 2,047 M.4.026 . . .
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 262,080 M.4.058 . . .
0.06 Kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
0.40 Lt Residu 3,480 M.4.560 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .

www.mitra-arsitek.com 107/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 4,634 L.4.035 . . .
SNI-2002 S-010 1.00 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m 28,380 0.09 . 12,105 - 16,275
0.43 lbr Pagar kawat jaring 16,275 M.4.154 . . .
0.04 oh Pekerja 4,326 L.4.001 . . .
0.04 oh Tukang besi 6,544 L.4.008 . . .
0.00 oh Kepala Tukang 772 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
SNI-2002 S-011 1.00 m2 Pembuatan Gudang Semen dan Alat - alat 1,504,269 3.25 . 462,205 - 1,042,064
1.70 btg Dolken kayu Ø 8-10/400 cm 45,560 M.4.042 . . .
0.21 m3 Kayu balok borneo 779,100 M.4.084 . . .
0.30 Kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
10.50 Kg Semen 19,950 M.4.033 . . .
0.03 m3 Pasir beton 8,844 M.4.028 . . .
0.05 m3 Koral Beton 11,370 M.4.026 . . .
1.50 lbr Seng Gelombang BJLS 32 169,050 M.4.369 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-012 1.00 m2 Pembuatan Rumah Jaga / Konstruksi Kayu 1,667,820 2.70 . 375,300 - 1,292,520
3.00 btg Dolken kayu Ø 8-10/400 cm 80,400 M.4.042 . . .
0.28 m3 Kayu balok borneo 1,023,960 M.4.084 . . .
0.70 Kg Paku Biasa 2" - 5" 19,110 M.4.158 . . .
1.50 lbr Seng Gelombang BJLS 32 169,050 M.4.369 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
1.50 oh Tukang kayu 231,750 L.4.016 . . .
0.15 oh Kepala tukang 28,965 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-013 1.00 m2 Pembuatan Bedeng Buruh 1,523,394 3.25 . 462,205 - 1,061,189
1.25 btg Dolken kayu Ø 8-10/400 cm 33,500 M.4.042 . . .
0.19 m3 Kayu balok borneo 690,060 M.4.084 . . .
0.30 Kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
18.00 Kg Semen 34,200 M.4.033 . . .
0.03 m3 Pasir beton 8,844 M.4.028 . . .
0.05 m3 Koral Beton 11,370 M.4.026 . . .
1.50 lbr Seng Gelombang BJLS 32 169,050 M.4.369 . . .
1.35 lbr Plywood 120x240 tbl. 4 mm 105,975 M.4.365 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-014 1.00 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 190,857 0.03 . 4,983 - 185,874
0.04 m3 Papan kayu 3/20 Kelas II 113,490 M.4.105 . . .
0.08 Kg Paku Biasa 2" - 5" 2,184 M.4.158 . . .
1.00 btg Kayu Kaso 5 / 7 (borneo) 70,200 M.4.063 . . .
0.03 oh Tukang kayu 4,635 L.4.016 . . .
0.00 oh Mandor 348 L.4.035 . . .
SNI-2002 S-015 1.00 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 87,054 0.28 . 54,004 - 33,050
1.00 btg Bambu Ø 6 - 8 / 600 cm 27,000 M.4.041 . . .
0.25 Kg Tali ijuk 6,050 M.4.602 . . .

www.mitra-arsitek.com 108/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Pekerja 206 L.4.001 . . .
0.02 oh Tukang kayu 2,627 L.4.016 . . .
0.25 oh Kepala tukang 48,275 L.4.036 . . .
0.01 oh Mandor 2,896 L.4.035 . . .
SNI-2002 S-016 1.00 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 479,697 0.53 . 64,657 - 415,040
0.99 lbr Panel beton pracetak 150,858 M.4.540 . . .
0.53 btg Kolom beton pracetak 105,840 M.4.539 . . .
0.07 m3 Pasir beton 21,815 M.4.028 . . .
0.15 m3 Batu pecah 2/3 51,027 M.4.017 . . .
45.00 kg Semen 85,500 M.4.033 . . .
0.38 oh Pekerja 38,625 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,402 L.4.035 . . .
AK-SNI 2008 S-017 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng) 1,069,264 5.12 . 747,962 - 321,302
0.04 m3 Papan kayu 3/20 Kelas II 110,338 M.4.105 . . .
1.40 m1 Seng Gelombang 3" x 6" BJLS 28 71,400 M.4.368 . . .
0.60 kg Paku Biasa 2" - 5" 16,380 M.4.158 . . .
1.50 kg Cat kayu 73,500 M.4.385 . . .
16.80 kg Semen 31,920 M.4.033 . . .
0.03 m3 Pasir beton 7,960 M.4.028 . . .
0.04 m3 Kerikil 9,805 M.4.024 . . .
2.10 oh Pekerja 216,300 L.4.001 . . .
0.02 oh Tukang batu 2,704 L.4.007 . . .
1.00 oh Tukang kayu 154,500 L.4.016 . . .
1.00 oh Tukang cat 141,600 L.4.010 . . .
1.01 oh Mandor 232,859 L.4.035 . . .
AK-SNI 2008 S-018 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 729,476 3.12 . 424,974 - 304,502
0.04 m3 Papan kayu 3/20 Kelas II 110,338 M.4.105 . . .
1.00 m2 Print outdoor flexi 54,600 M.4.452 . . .
0.60 kg Paku Biasa 2" - 5" 16,380 M.4.158 . . .
1.50 kg Cat kayu 73,500 M.4.385 . . .
16.80 kg Semen 31,920 M.4.033 . . .
0.03 m3 Pasir beton 7,960 M.4.028 . . .
0.04 m3 Kerikil 9,805 M.4.024 . . .
0.02 oh Tukang batu 2,704 L.4.007 . . .
1.00 oh Tukang kayu 154,500 L.4.016 . . .
1.00 oh Tukang cat 141,600 L.4.010 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.10 oh Mandor 23,170 L.4.035 . . .
AK-SNI 2008 S-019 1.00 m3 Membongkar pasangan batu kali 659,200 4.40 . 659,200 - -
4.00 oh Tukang batu 618,000 L.4.007 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
AK-SNI 2008 S-020 1.00 m3 Membongkar pasangan batu merah dan membersihkan 319,300 2.10 . 319,300 - -
2.00 oh Tukang batu 309,000 L.4.007 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
AK-SNI 2008 S-021 1.00 m3 Membongkar beton bertulang dan membersihkan 878,070 8.30 . 878,070 - -
0.20 oh Tukang batu 30,900 L.4.007 . . .
8.00 oh Pekerja 824,000 L.4.001 . . .
0.10 oh Mandor 23,170 L.4.035 . . .

www.mitra-arsitek.com 109/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-022 1.00 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 22,917 0.21 . 22,917 - -
0.20 oh Pekerja 20,600 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-023 1.00 m2 Mengupas plesteran lama 15,771 0.14 . 15,771 - -
0.13 oh Pekerja 12,875 L.4.001 . . .
0.01 oh Mandor 2,896 L.4.035 . . .
AK-SNI 2008 S-024 1.00 m2 Membongkar genteng / sirap untuk dipergunakan lagi 22,917 0.21 . 22,917 - -
0.20 oh Pekerja 20,600 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-025 1.00 m2 Membongkar atap seng 18,090 0.15 . 18,090 - -
0.05 oh Tukang besi 7,790 L.4.008 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
AK-SNI 2008 S-026 1.00 m2 Membongkar usuk / reng dipakai lagi 33,346 0.28 . 33,346 - -
0.06 oh Tukang kayu 9,270 L.4.016 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-027 1.00 m2 Membongkar usuk / reng tidak dipakai lagi 22,917 0.21 . 22,917 - -
0.20 oh Pekerja 20,600 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-028 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk
1,501,200
digunakan
10.80
lagi . 1,501,200 - -
6.00 oh Tukang kayu 927,000 L.4.016 . . .
0.60 oh Kepala Tukang 115,860 L.4.036 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
AK-SNI 2008 S-029 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak149,340
digunakan 1.20
lagi . 149,340 - -
1.00 oh Pekerja 103,000 L.4.001 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
AK-SNI 2008 S-030 1.00 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar 2,544,060 17.40 . 2,544,060 - -
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala Tukang 231,720 L.4.036 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-031 1.00 m3 Menggali tanah biasa sedalam 1 meter 83,043 0.78 . 83,043 - -
0.75 oh Pekerja 77,250 L.4.001 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
SNI-2007 S-032 1.00 m3 Menggali tanah biasa sedalam 2 meter 103,127 0.95 . 103,127 - -
0.90 oh Pekerja 92,700 L.4.001 . . .
0.05 oh Mandor 10,427 L.4.035 . . .
SNI-2007 S-033 1.00 m3 Menggali tanah biasa sedalam 3 meter 123,674 1.12 . 123,674 - -
1.05 oh Pekerja 108,150 L.4.001 . . .
0.07 oh Mandor 15,524 L.4.035 . . .
SNI-2007 S-034 1.00 m3 Menggali tanah keras sedalam 1 meter 110,414 1.03 . 110,414 - -
1.00 oh Pekerja 103,000 L.4.001 . . .
0.03 oh Mandor 7,414 L.4.035 . . .
SNI-2007 S-035 1.00 m3 Menggali tanah cadas sedalam 1 meter 168,402 1.56 . 168,402 - -
1.50 oh Pekerja 154,500 L.4.001 . . .
0.06 oh Mandor 13,902 L.4.035 . . .
SNI-2007 S-036 1.00 m3 Menggali tanah lumpur sedalam 1 meter 134,027 1.25 . 134,027 - -
1.20 oh Pekerja 123,600 L.4.001 . . .

www.mitra-arsitek.com 110/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 oh Mandor 10,427 L.4.035 . . .
SNI-2007 S-037 1.00 m2 Mengerjakan stripping tebing setinggi 1 meter 6,309 0.06 . 6,309 - -
0.05 oh Pekerja 5,150 L.4.001 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-038 1.00 m3 Urug kembali bekas galian 24,178 0.21 . 24,178 - -
0.19 oh Pekerja 19,776 L.4.001 . . .
0.02 oh Mandor 4,402 L.4.035 . . .
SNI-2007 S-039 1.00 m3 Membuang tanah sejauh 30 meter 36,307 0.34 . 36,307 - -
0.33 oh Pekerja 33,990 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-040 1.00 m3 Membuang tanah sejauh 150 meter 64,733 0.57 . 64,733 - -
0.52 oh Pekerja 53,148 L.4.001 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-041 1.00 m3 Memadatkan tanah (per 20 cm) 63,085 0.55 . 63,085 - -
0.50 oh Pekerja 51,500 L.4.001 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
AK-SNI 2008 S-042 1.00 m2 Meratakan tanah ditumbuk halus 28,067 0.26 . 28,067 - -
0.25 oh Pekerja 25,750 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-043 1.00 m3 Mengurug pasir urug 334,777 0.31 . 33,217 - 301,560
1.20 m3 Pasir urug 301,560 M.4.032 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-044 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL 408,897 1.32 . 170,460 - 238,437
0.14 m3 Kapur padam 10,895 M.4.021 . . .
0.40 m3 Pasir pasang 89,040 M.4.030 . . .
0.95 m3 Tanah Liat 138,503 M.4.038 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
0.40 oh Tukang batu 61,800 L.4.007 . . .
0.04 oh Kepala tukang 7,724 L.4.036 . . .
0.08 oh Mandor 18,536 L.4.035 . . .
SNI-2007 S-045 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 5 TL 371,638 1.32 . 170,460 - 201,178
0.25 m3 Kapur padam 20,014 M.4.021 . . .
1.24 m3 Tanah Liat 181,164 M.4.038 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
0.40 oh Tukang batu 61,800 L.4.007 . . .
0.04 oh Kepala tukang 7,724 L.4.036 . . .
0.08 oh Mandor 18,536 L.4.035 . . .
SNI-2007 S-046 1.00 m3 Memasang lapisan ijuk tebal 10 cm 327,626 0.17 . 18,926 - 308,700
1.50 m3 Ijuk 308,700 M.4.019 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2002 S-047 1.00 m3 Pemasangan lapisan ijuk 265,886 0.17 . 18,926 - 246,960
1.20 m3 Ijuk 246,960 M.4.019 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-048 1.00 m3 Mengurug sirtu padat untuk peninggian lantai bangunan 341,383 0.28 . 31,543 - 309,840
1.20 m3 Sirtu 309,840 M.4.037 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.03 oh Mandor 5,793 L.4.035 . . .

www.mitra-arsitek.com 111/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-049 1.00 m3 Urug tanah mendatangkan 268,537 0.31 . 33,217 - 235,320
1.20 m3 Tanah urug 235,320 M.4.039 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-050 1.00 m3 Membuang tanah dengan menghampar 28,067 0.26 . 28,067 - -
0.25 oh Pekerja 25,750 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-051 1.00 m1 Pekerjaan Membuat sumur 351,935 1.81 . 225,335 - 126,600
2.00 bh Buis beton D. 80 cm 126,600 M.4.533 . . .
1.00 oh Tukang gali sumur 132,600 L.4.032 . . .
0.74 oh Pekerja 75,705 L.4.001 . . .
0.07 oh Mandor 17,030 L.4.035 . . .
AK-SNI 2008 S-052 1.00 m2 Pekerjaan Gebalan rumput 93,593 0.53 . 57,293 - 36,300
0.20 btg Bambu Ø 6 - 8 / 600 cm 5,400 M.4.041 . . .
1.00 m2 Gebalan rumput 30,900 M.4.589 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
SNI-2002 S-053 1.00 m3 Pasangan pondasi 1 Pc : 1 Ps 1,446,711 2.40 . 302,235 - 1,144,476
1.10 m3 Batu belah 329,780 M.4.013 . . .
392.00 kg Semen 744,800 M.4.033 . . .
0.31 m3 Pasir pasang 69,896 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala Tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2002 S-054 1.00 m3 Pasangan pondasi 1 Pc : 2 Ps 1,234,365 2.40 . 302,235 - 932,130
1.10 m3 Batu belah 329,780 M.4.013 . . .
267.00 kg Semen 507,300 M.4.033 . . .
0.43 m3 Pasir pasang 95,050 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala Tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-055 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP 1,153,756 2.40 . 302,235 - 851,521
1.20 m3 Batu belah 359,760 M.4.013 . . .
202.00 kg Semen 383,800 M.4.033 . . .
0.49 m3 Pasir pasang 107,961 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-056 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP 1,087,447 2.40 . 302,235 - 785,212
1.20 m3 Batu belah 359,760 M.4.013 . . .
163.00 kg Semen 309,700 M.4.033 . . .
0.52 m3 Pasir pasang 115,752 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-057 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP 1,041,489 2.40 . 302,235 - 739,254

www.mitra-arsitek.com 112/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.20 m3 Batu belah 359,760 M.4.013 . . .
136.00 kg Semen 258,400 M.4.033 . . .
0.54 m3 Pasir pasang 121,094 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-058 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP 1,009,174 2.40 . 302,235 - 706,939
1.20 m3 Batu belah 359,760 M.4.013 . . .
117.00 kg Semen 222,300 M.4.033 . . .
0.56 m3 Pasir pasang 124,879 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-059 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP 964,893 2.40 . 302,235 - 662,658
1.20 m3 Batu belah 359,760 M.4.013 . . .
91.00 kg Semen 172,900 M.4.033 . . .
0.58 m3 Pasir pasang 129,998 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2002 S-060 1.00 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 862,526 2.40 . 302,235 - 560,291
1.10 m3 Batu belah 329,780 M.4.013 . . .
0.23 m3 Kapur Pasang 108,844 M.4.022 . . .
0.23 m3 Semen Warna 573 M.4.036 . . .
0.54 m3 Pasir pasang 121,094 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala Tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-061 1.00 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP 818,905 2.40 . 302,235 - 516,670
1.20 m3 Batu belah 359,760 M.4.013 . . .
0.17 m3 Kapur Pasang 80,801 M.4.022 . . .
0.17 m3 Semen Warna 425 M.4.036 . . .
0.34 m3 Pasir pasang 75,684 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
AK-SNI 2008 S-062 1.00 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 1,037,170 2.40 . 302,235 - 734,935
1.20 m3 Batu belah 359,760 M.4.013 . . .
95.42 kg Semen 181,298 M.4.033 . . .
0.23 m3 Kapur Pasang 108,844 M.4.022 . . .
0.38 m3 Pasir pasang 85,033 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala Tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .

www.mitra-arsitek.com 113/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-063 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP 957,283 2.40 . 302,235 - 655,048
1.20 m3 Batu belah 359,760 M.4.013 . . .
61.00 kg Semen 115,900 M.4.033 . . .
0.15 m3 Kapur Pasang 69,869 M.4.022 . . .
0.49 m3 Pasir pasang 109,519 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-064 1.00 m3 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP 918,579 2.40 . 302,235 - 616,344
1.20 m3 Batu belah 359,760 M.4.013 . . .
41.00 kg Semen 77,900 M.4.033 . . .
0.13 m3 Kapur Pasang 62,264 M.4.022 . . .
0.52 m3 Pasir pasang 116,420 M.4.030 . . .
1.50 oh Pekerja 154,500 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.08 oh Kepala tukang 14,483 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-065 1.00 m3 Memasang batu kosong (aanstamping) 625,484 1.25 . 157,162 - 468,322
1.20 m3 Batu belah 359,760 M.4.013 . . .
0.43 m3 Pasir urug 108,562 M.4.032 . . .
0.78 oh Pekerja 80,340 L.4.001 . . .
0.39 oh Tukang batu 60,255 L.4.007 . . .
0.04 oh Kepala tukang 7,531 L.4.036 . . .
0.04 oh Mandor 9,036 L.4.035 . . .
SNI-2007 S-066 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan
3,076,672
40% batu belah
4.51 . 537,328 - 2,539,345
0.48 m3 Batu belah 143,904 M.4.013 . . .
194.00 kg Semen 368,600 M.4.033 . . .
0.31 m3 Pasir beton 91,978 M.4.028 . . .
0.47 m3 Koral Beton 106,423 M.4.026 . . .
126.00 kg Besi beton 1,776,600 M.4.132 . . .
1.80 kg Kawat beton 51,840 M.4.143 . . .
3.40 oh Pekerja 350,200 L.4.001 . . .
0.85 oh Tukang batu 131,325 L.4.007 . . .
0.09 oh Kepala tukang 16,414 L.4.036 . . .
0.17 oh Mandor 39,389 L.4.035 . . .
SNI-2007 S-067 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan
1,248,232
40% batu belah
4.51 tanpa besi
. 537,328 - 710,905
0.48 m3 Batu belah 143,904 M.4.013 . . .
194.00 kg Semen 368,600 M.4.033 . . .
0.31 m3 Pasir beton 91,978 M.4.028 . . .
0.47 m3 Koral Beton 106,423 M.4.026 . . .
3.40 oh Pekerja 350,200 L.4.001 . . .
0.85 oh Tukang batu 131,325 L.4.007 . . .
0.09 oh Kepala tukang 16,414 L.4.036 . . .
0.17 oh Mandor 39,389 L.4.035 . . .
SNI-2007 S-068 1.00 m3 Memasang pondasi sumuran, diameter 100 cm 1,115,731 3.40 . 413,820 - 701,911
0.45 m3 Batu belah 134,910 M.4.013 . . .
194.00 kg Semen 368,600 M.4.033 . . .
0.31 m3 Pasir beton 91,978 M.4.028 . . .
0.47 m3 Koral Beton 106,423 M.4.026 . . .

www.mitra-arsitek.com 114/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.40 oh Pekerja 247,200 L.4.001 . . .
0.80 oh Tukang batu 123,600 L.4.007 . . .
0.08 oh Kepala tukang 15,448 L.4.036 . . .
0.12 oh Mandor 27,572 L.4.035 . . .
SNI-2007 S-069 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 343,971
campuran spesi
0.851 PC : 2 PP
. 103,513 - 240,458
140.00 bh Bata merah 140,000 M.4.007 . . .
43.50 kg Semen 82,650 M.4.033 . . .
0.08 m3 Pasir pasang 17,808 M.4.030 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-070 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 326,375
campuran spesi
0.851 PC : 3 PP
. 103,513 - 222,862
140.00 bh Bata merah 140,000 M.4.007 . . .
32.95 kg Semen 62,605 M.4.033 . . .
0.09 m3 Pasir pasang 20,257 M.4.030 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-071 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 314,660
campuran spesi
0.851 PC : 4 PP
. 103,513 - 211,147
140.00 bh Bata merah 140,000 M.4.007 . . .
26.55 kg Semen 50,445 M.4.033 . . .
0.09 m3 Pasir pasang 20,702 M.4.030 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-072 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 308,398
campuran spesi
0.851 PC : 5 PP
. 103,513 - 204,885
140.00 bh Bata merah 140,000 M.4.007 . . .
22.20 kg Semen 42,180 M.4.033 . . .
0.10 m3 Pasir pasang 22,705 M.4.030 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-073 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 305,820
campuran spesi
0.851 PC : 6 PP
. 103,513 - 202,307
140.00 bh Bata merah 140,000 M.4.007 . . .
18.50 kg Semen 35,150 M.4.033 . . .
0.12 m3 Pasir pasang 27,157 M.4.030 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-074 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 285,475
campuran spesi
0.851 PC : 3 KP
. : 10 PP 103,513 - 181,962
140.00 bh Bata merah 140,000 M.4.007 . . .
10.08 kg Semen 19,152 M.4.033 . . .
0.09 m3 Pasir pasang 20,591 M.4.030 . . .
0.03 m3 Kapur padam 2,219 M.4.021 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .

www.mitra-arsitek.com 115/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-075 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
166,220
campuran 0.43
spesi 1 PC : 2. PP 51,757 - 114,464
70.00 bh Bata merah 70,000 M.4.007 . . .
18.95 kg Semen 36,005 M.4.033 . . .
0.04 m3 Pasir pasang 8,459 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-076 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
157,964
campuran 0.43
spesi 1 PC : 3. PP 51,757 - 106,207
70.00 bh Bata merah 70,000 M.4.007 . . .
14.37 kg Semen 27,303 M.4.033 . . .
0.04 m3 Pasir pasang 8,904 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-077 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
153,178
campuran 0.43
spesi 1 PC : 4. PP 51,757 - 101,422
70.00 bh Bata merah 70,000 M.4.007 . . .
11.50 kg Semen 21,850 M.4.033 . . .
0.04 m3 Pasir pasang 9,572 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-078 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
150,166
campuran 0.43
spesi 1 PC : 5. PP 51,757 - 98,409
70.00 bh Bata merah 70,000 M.4.007 . . .
9.68 kg Semen 18,392 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-079 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
148,472
campuran 0.43
spesi 1 PC : 6. PP 51,757 - 96,715
70.00 bh Bata merah 70,000 M.4.007 . . .
8.32 kg Semen 15,808 M.4.033 . . .
0.05 m3 Pasir pasang 10,907 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-080 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran
145,237 spesi
0.43
1 PC : 8 PP. 51,757 - 93,480
70.00 bh Bata merah 70,000 M.4.007 . . .
6.50 kg Semen 12,350 M.4.033 . . .
0.05 m3 Pasir pasang 11,130 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .

www.mitra-arsitek.com 116/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-081 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
142,647
campuran 0.43
spesi 1 PC : 3. KP : 10 PP 51,757 - 90,891
70.00 bh Bata merah 70,000 M.4.007 . . .
4.50 kg Semen 8,550 M.4.033 . . .
0.05 m3 Pasir pasang 11,130 M.4.030 . . .
0.02 m3 Kapur padam 1,211 M.4.021 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-082 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
127,261
campuran0.43
spesi 1 KP : .1 SM : 1 PP 51,757 - 75,504
70.00 bh Bata merah 70,000 M.4.007 . . .
0.02 m3 Semen Warna 45 M.4.036 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
0.02 m3 Kapur padam 1,453 M.4.021 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-083 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
129,154
campuran 0.43
spesi 1 KP : 1. SM : 2 PP 51,757 - 77,398
70.00 bh Bata merah 70,000 M.4.007 . . .
0.01 m3 Semen Warna 35 M.4.036 . . .
0.03 m3 Pasir pasang 6,233 M.4.030 . . .
0.01 m3 Kapur padam 1,130 M.4.021 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-084 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 417,778 0.48 . 60,447 - 357,331
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
30.32 kg Semen 57,608 M.4.033 . . .
0.73 m3 Pasir pasang 162,053 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-085 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 416,058 0.48 . 60,447 - 355,611
12.50 bh Hollow Block 20 133,750 M.4.537 . . .
24.26 kg Semen 46,094 M.4.033 . . .
0.77 m3 Pasir pasang 171,847 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-086 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 324,164 0.51 . 62,108 - 262,056
12.50 bh Hollow Block 15 92,500 M.4.536 . . .
22.74 kg Semen 43,206 M.4.033 . . .
0.55 m3 Pasir pasang 122,430 M.4.030 . . .

www.mitra-arsitek.com 117/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-087 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 322,661 0.51 . 62,108 - 260,553
12.50 bh Hollow Block 15 92,500 M.4.536 . . .
18.20 kg Semen 34,580 M.4.033 . . .
0.58 m3 Pasir pasang 129,553 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-088 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 251,757 0.43 . 51,757 - 200,000
12.50 bh Hollow Block 10 86,250 M.4.535 . . .
15.16 kg Semen 28,804 M.4.033 . . .
0.36 m3 Pasir pasang 81,026 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-089 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 251,342 0.43 . 51,757 - 199,586
12.50 bh Hollow Block 10 86,250 M.4.535 . . .
12.13 kg Semen 23,047 M.4.033 . . .
0.39 m3 Pasir pasang 86,369 M.4.030 . . .
0.28 kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-090 1.00 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran 338,280
spesi 1 PC : 30.43
PP . 51,757 - 286,523
16.00 bh Roster 25/25 cm 252,800 M.4.545 . . .
14.00 kg Semen 26,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-091 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
352,480spesi 10.43
PC : 3 PP . 51,757 - 300,723
30.00 bh Terawang (roster) 267,000 M.4.547 . . .
14.00 kg Semen 26,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-092 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
347,448spesi 10.43
PC : 4 PP . 51,757 - 295,691
30.00 bh Terawang (roster) 267,000 M.4.547 . . .

www.mitra-arsitek.com 118/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
11.00 kg Semen 20,900 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-093 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran
220,170 spesi
0.48
1 PC : 3 PP
. 60,447 - 159,723
70.00 bh Bata berongga 126,000 M.4.006 . . .
14.00 kg Semen 26,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2002 S-094 1.00 m2 Pasangan dinding batako 163,578 0.64 . 74,674 - 88,904
12.50 bh Batako 56,250 M.4.010 . . .
12.50 kg Semen 23,750 M.4.033 . . .
0.04 m3 Pasir pasang 8,904 M.4.030 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
SNI-2002 S-095 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 44,967 0.13 . 15,527 - 29,440
17.00 bh Bata merah 17,000 M.4.007 . . .
4.94 kg Semen 9,391 M.4.033 . . .
0.01 m3 Pasir pasang 3,050 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.03 oh Tukang batu 4,635 L.4.007 . . .
0.00 oh Kepala tukang 579 L.4.036 . . .
0.00 oh Mandor 1,043 L.4.035 . . .
SNI-2007 S-096 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c1,208,134
= 0,87 2.04 . 237,075 - 971,058
247.00 kg Semen 469,300 M.4.033 . . .
0.62 m3 Pasir beton 182,982 M.4.028 . . .
0.74 m3 Koral beton 168,276 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-097 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 2.04
1,256,779 . 237,075 - 1,019,704
276.00 kg Semen 524,400 M.4.033 . . .
0.59 m3 Pasir beton 174,345 M.4.028 . . .
0.75 m3 Koral beton 170,459 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-098 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
1,295,218 2.04 . 237,075 - 1,058,143
299.00 kg Semen 568,100 M.4.033 . . .

www.mitra-arsitek.com 119/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.57 m3 Pasir beton 168,242 M.4.028 . . .
0.75 m3 Koral beton 171,300 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-099 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
1,110,300 1.48 . 172,264 - 938,036
230.00 kg Semen 437,000 M.4.033 . . .
0.64 m3 Pasir beton 188,053 M.4.028 . . .
0.76 m3 Koral beton 172,983 M.4.026 . . .
200.00 Ltr Air 140,000 M.4.001 . . .
1.20 oh Pekerja 123,600 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.06 oh Mandor 13,902 L.4.035 . . .
SNI-2007 S-100 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
1,340,347 2.04 . 237,075 - 1,103,271
326.00 kg Semen 619,400 M.4.033 . . .
0.54 m3 Pasir beton 160,047 M.4.028 . . .
0.76 m3 Koral beton 173,324 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-101 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
1,383,956 2.04 . 237,075 - 1,146,880
352.00 kg Semen 668,800 M.4.033 . . .
0.52 m3 Pasir beton 153,915 M.4.028 . . .
0.76 m3 Koral beton 173,665 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-102 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
1,415,834 2.04 . 237,075 - 1,178,759
371.00 kg Semen 704,900 M.4.033 . . .
0.50 m3 Pasir beton 146,987 M.4.028 . . .
0.78 m3 Koral beton 176,371 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-103 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
1,437,902 2.04 . 237,075 - 1,200,827
384.00 kg Semen 729,600 M.4.033 . . .
0.49 m3 Pasir beton 145,720 M.4.028 . . .
0.77 m3 Koral beton 175,007 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .

www.mitra-arsitek.com 120/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-104 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
1,475,839 2.04 . 237,075 - 1,238,763
406.00 kg Semen 771,400 M.4.033 . . .
0.49 m3 Pasir beton 144,039 M.4.028 . . .
0.76 m3 Koral beton 172,824 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-105 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
1,487,649 2.04 . 237,075 - 1,250,573
413.00 kg Semen 784,700 M.4.033 . . .
0.49 m3 Pasir beton 143,391 M.4.028 . . .
0.76 m3 Koral beton 171,983 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
1.65 oh Pekerja 169,950 L.4.001 . . .
0.28 oh Tukang batu 42,488 L.4.007 . . .
0.03 oh Kepala tukang 5,407 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-106 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
1,596,612 2.59 . 301,462 - 1,295,150
439.00 kg Semen 834,100 M.4.033 . . .
0.48 m3 Pasir beton 141,091 M.4.028 . . .
0.75 m3 Koral beton 169,458 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
2.10 oh Pekerja 216,300 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.11 oh Mandor 24,329 L.4.035 . . .
SNI-2007 S-107 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
1,612,040 2.59 . 301,462 - 1,310,578
448.00 kg Semen 851,200 M.4.033 . . .
0.48 m3 Pasir beton 140,443 M.4.028 . . .
0.74 m3 Koral beton 168,435 M.4.026 . . .
215.00 Ltr Air 150,500 M.4.001 . . .
2.10 oh Pekerja 216,300 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.11 oh Mandor 24,329 L.4.035 . . .
SNI-2007 S-108 1.00 m3 Membuat beton kedap air dengan strorox – 100 1,436,966 2.59 . 301,462 - 1,135,504
400.00 kg Semen 760,000 M.4.033 . . .
0.48 m3 Pasir beton 141,504 M.4.028 . . .
0.80 m3 Koral Beton 181,920 M.4.026 . . .
1.20 kg Strorox - 100 52,080 M.4.601 . . .
2.10 oh Pekerja 216,300 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.11 oh Mandor 24,329 L.4.035 . . .
SNI-2007 S-109 1.00 kg Pembesian dengan besi ulir 17,276 0.02 . 2,039 - 15,237
1.05 kg Besi beton 14,805 M.4.132 . . .
0.02 kg Kawat beton 432 M.4.143 . . .

www.mitra-arsitek.com 121/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Pekerja 721 L.4.001 . . .
0.01 oh Tukang besi 1,091 L.4.008 . . .
0.00 oh Kepala tukang 135 L.4.036 . . .
0.00 oh Mandor 93 L.4.035 . . .
SNI-2007 S-110 1.00 kg Pembesian dengan besi polos 17,276 0.02 . 2,039 - 15,237
1.05 kg Besi beton 14,805 M.4.132 . . .
0.02 kg Kawat beton 432 M.4.143 . . .
0.01 oh Pekerja 721 L.4.001 . . .
0.01 oh Tukang besi 1,091 L.4.008 . . .
0.00 oh Kepala tukang 135 L.4.036 . . .
0.00 oh Mandor 93 L.4.035 . . .
SNI-2007 S-111 1.00 kg Memasang kabel presstressed polos/strands 16,553 0.01 . 1,460 - 15,093
1.05 kg Besi beton 14,805 M.4.132 . . .
0.01 kg Kawat beton 288 M.4.143 . . .
0.01 oh Pekerja 515 L.4.001 . . .
0.01 oh Tukang besi 779 L.4.008 . . .
0.00 oh Kepala tukang 97 L.4.036 . . .
0.00 oh Mandor 70 L.4.035 . . .
SNI-2007 S-112 10.00 kg Memasang jaring kawat baja/wire mesh 13,843 0.01 . 1,153 - 12,690
1.02 kg Jaring kawat baja dilas 12,546 M.4.591 . . .
0.01 kg Kawat beton 144 M.4.143 . . .
0.00 oh Pekerja 258 L.4.001 . . .
0.00 oh Tukang besi 390 L.4.008 . . .
0.00 oh Kepala tukang 483 L.4.036 . . .
0.00 oh Mandor 23 L.4.035 . . .
AK-SNI 2008 S-113 1.00 m2 Cetakan beton / begisting memakai papan 204,069 0.76 . 109,822 - 94,247
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 43,775 M.4.071 . . .
0.02 m3 Papan cetakan 39,552 M.4.104 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.05 oh Kepala Tukang 9,655 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-114 1.00 m2 Cetakan beton / begisting memakai multiplek 192,832 0.76 . 109,822 - 83,010
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 43,775 M.4.071 . . .
0.35 lbr Multiplek 28,315 M.4.358 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.05 oh Kepala Tukang 9,655 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-115 1.00 m3 Membongkar cetakan 5,261,042 25.40 . 3,500,792 1,760,250 -
4.00 oh Pekerja 412,000 L.4.001 . . .
0.70 m3 Perancah kayu 992,250 T.4.011 . . .
3.50 oh Pekerja 360,500 L.4.001 . . .
10.50 oh Tukang kayu 1,622,250 L.4.016 . . .
1.05 oh Kepala Tukang 202,755 L.4.036 . . .
0.18 oh Mandor 40,548 L.4.035 . . .
32.00 sewa-unit Scafolding 768,000 T.4.019 . . .
2.20 oh Pekerja 226,600 L.4.001 . . .

www.mitra-arsitek.com 122/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
3.50 oh Tukang kayu 540,750 L.4.016 . . .
0.35 oh Kepala Tukang 67,585 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
SNI-2002 S-116 1.00 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 1,245,624 1.79 . 231,038 - 1,014,586
0.02 m3 Pasir urug 4,775 M.4.032 . . .
0.09 m3 Pasir beton 27,711 M.4.028 . . .
0.15 m3 Batu pecah 2/3 52,425 M.4.017 . . .
60.50 kg Semen 114,950 M.4.033 . . .
45.00 kg Besi beton 634,500 M.4.132 . . .
0.90 kg Kawat beton 25,920 M.4.143 . . .
0.03 m3 Kayu kruing 5/7 138,240 M.4.065 . . .
0.12 kg Paku reng 2,040 M.4.164 . . .
0.09 ltr Minyak bekisting 513 M.4.556 . . .
0.24 kg Plamir 13,512 M.4.399 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.67 oh Tukang batu 103,515 L.4.007 . . .
0.07 oh Kepala Tukang 12,938 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2002 S-117 1.00 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 981,264 1.39 . 178,573 - 802,691
0.02 m3 Pasir urug 4,021 M.4.032 . . .
0.08 m3 Pasir beton 23,584 M.4.028 . . .
0.13 m3 Batu pecah 2/3 43,688 M.4.017 . . .
49.00 kg Semen 93,100 M.4.033 . . .
34.50 kg Besi beton 486,450 M.4.132 . . .
0.70 kg Kawat beton 20,160 M.4.143 . . .
0.03 m3 Kayu kruing 5/7 116,640 M.4.065 . . .
0.12 kg Paku Biasa 2" - 5" 3,276 M.4.158 . . .
0.09 ltr Minyak bekisting 513 M.4.556 . . .
0.20 kg Plamir 11,260 M.4.399 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
0.50 oh Tukang batu 77,250 L.4.007 . . .
0.05 oh Kepala Tukang 9,655 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-118 1.00 m1 Memasang 1 m’ PVC Waterstop lebar 150 mm 93,989 0.10 . 12,089 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.06 oh Pekerja 6,180 L.4.001 . . .
0.03 oh Tukang batu 4,635 L.4.007 . . .
0.00 oh Kepala tukang 579 L.4.036 . . .
0.00 oh Mandor 695 L.4.035 . . .
SNI-2007 S-119 1.00 m1 Memasang PVC Waterstop lebar 200 mm 96,912 0.12 . 15,012 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.04 oh Tukang batu 5,408 L.4.007 . . .
0.00 oh Kepala tukang 772 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2007 S-120 1.00 m1 Membuat PVC Waterstop lebar 230 mm – 320 mm 98,019 0.13 . 16,119 - 81,900
1.05 m1 Waterstop lebar 150 mm 81,900 M.4.605 . . .
0.08 oh Pekerja 8,240 L.4.001 . . .
0.04 oh Tukang batu 6,180 L.4.007 . . .
0.00 oh Kepala tukang 772 L.4.036 . . .

www.mitra-arsitek.com 123/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 927 L.4.035 . . .
AK-SNI 2008 S-121 1.00 m1 Cor beton kerb ( 15 x 30 ) cm 72,876 0.20 . 24,272 - 48,605
15.30 kg Semen 29,070 M.4.033 . . .
0.02 m3 Pasir pasang 5,409 M.4.030 . . .
0.04 m3 Kerikil 8,933 M.4.024 . . .
0.00 m3 Papan cetakan 4,450 M.4.104 . . .
0.03 kg Paku Biasa 2" - 5" 743 M.4.158 . . .
0.03 oh Tukang kayu 5,253 L.4.016 . . .
0.02 oh Tukang batu 2,441 L.4.007 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.14 oh Pekerja 14,152 L.4.001 . . .
0.01 oh Mandor 1,460 L.4.035 . . .
AK-SNI 2008 S-122 1.00 m1 Cor beton Devider ( 30 x 30 ) cm 131,839 0.33 . 39,822 - 92,018
30.60 kg Semen 58,140 M.4.033 . . .
0.05 m3 Pasir pasang 10,818 M.4.030 . . .
0.07 m3 Kerikil 17,867 M.4.024 . . .
0.00 m3 Papan cetakan 4,450 M.4.104 . . .
0.03 kg Paku Biasa 2" - 5" 743 M.4.158 . . .
0.03 oh Tukang kayu 5,253 L.4.016 . . .
0.03 oh Tukang batu 4,867 L.4.007 . . .
0.01 oh Kepala tukang 1,274 L.4.036 . . .
0.25 oh Pekerja 25,740 L.4.001 . . .
0.01 oh Mandor 2,688 L.4.035 . . .
SNI-2007 S-123 1.00 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm 93,466 0.48 . 60,447 - 33,019
15.50 kg Semen 29,458 M.4.033 . . .
0.02 m3 Pasir pasang 3,562 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-124 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm 84,325 0.48 . 60,447 - 23,878
10.22 kg Semen 19,426 M.4.033 . . .
0.02 m3 Pasir pasang 4,452 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-125 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 80,341 0.48 . 60,447 - 19,894
7.78 kg Semen 14,774 M.4.033 . . .
0.02 m3 Pasir pasang 5,120 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-126 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm 77,645 0.48 . 60,447 - 17,198
6.24 kg Semen 11,856 M.4.033 . . .
0.02 m3 Pasir pasang 5,342 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .

www.mitra-arsitek.com 124/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-127 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 76,084 0.48 . 60,447 - 15,637
5.18 kg Semen 9,850 M.4.033 . . .
0.03 m3 Pasir pasang 5,788 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-128 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm 74,848 0.48 . 60,447 - 14,401
4.42 kg Semen 8,390 M.4.033 . . .
0.03 m3 Pasir pasang 6,010 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-129 1.00 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm 74,158 0.48 . 60,447 - 13,711
3.94 kg Semen 7,478 M.4.033 . . .
0.03 m3 Pasir pasang 6,233 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-130 1.00 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 73,469 0.48 . 60,447 - 13,022
3.46 kg Semen 6,566 M.4.033 . . .
0.03 m3 Pasir pasang 6,455 M.4.030 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.15 oh Tukang batu 23,175 L.4.007 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-131 1.00 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 76,188 0.51 . 62,108 - 14,080
5.76 kg Semen 10,944 M.4.033 . . .
0.00 m3 Kapur padam 242 M.4.021 . . .
0.01 m3 Pasir pasang 2,894 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-132 1.00 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 72,663 0.51 . 62,108 - 10,556
3.00 kg Semen 5,700 M.4.033 . . .
0.01 m3 Kapur padam 404 M.4.021 . . .
0.02 m3 Pasir pasang 4,452 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-133 1.00 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 64,860 0.51 . 62,108 - 2,752
0.01 m3 Semen Warna 23 M.4.036 . . .
0.01 m3 Kapur padam 726 M.4.021 . . .
0.01 m3 Pasir pasang 2,003 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .

www.mitra-arsitek.com 125/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-134 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 66,029 0.51 . 62,108 - 3,921
0.01 m3 Semen Warna 18 M.4.036 . . .
0.01 m3 Kapur padam 565 M.4.021 . . .
0.02 m3 Pasir pasang 3,339 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2002 S-135 1.00 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 71,572 0.51 . 62,108 - 9,464
1.84 kg Semen 3,496 M.4.033 . . .
0.01 m3 Kapur Pasang 2,852 M.4.022 . . .
0.01 m3 Pasir pasang 3,116 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala Tukang 2,317 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-136 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm 112,970 0.64 . 81,059 - 31,911
13.63 kg Semen 25,901 M.4.033 . . .
0.03 m3 Pasir pasang 6,010 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-137 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm 91,154 0.49 . 64,554 - 26,600
10.37 kg Semen 19,699 M.4.033 . . .
0.03 m3 Pasir pasang 6,901 M.4.030 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-138 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm 103,991 0.64 . 81,059 - 22,931
8.32 kg Semen 15,808 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-139 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm 101,983 0.64 . 81,059 - 20,924
6.91 kg Semen 13,133 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-140 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm 100,260 0.64 . 81,059 - 19,201
5.89 kg Semen 11,187 M.4.033 . . .
0.04 m3 Pasir pasang 8,014 M.4.030 . . .

www.mitra-arsitek.com 126/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-141 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 93,411 0.70 . 88,656 - 4,756
0.01 m3 Semen Warna 23 M.4.036 . . .
0.01 m3 Kapur padam 726 M.4.021 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
0.44 oh Pekerja 45,320 L.4.001 . . .
0.22 oh Tukang batu 33,990 L.4.007 . . .
0.02 oh Kepala tukang 4,248 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-142 1.00 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm 46,073 0.24 . 30,436 - 15,637
5.18 kg Semen 9,850 M.4.033 . . .
0.03 m3 Pasir pasang 5,788 M.4.030 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.08 oh Tukang batu 11,588 L.4.007 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-143 1.00 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 20,938 0.14 . 19,543 - 1,395
0.50 kg Semen 950 M.4.033 . . .
0.00 m3 Pasir pasang 445 M.4.030 . . .
0.06 oh Pekerja 5,871 L.4.001 . . .
0.04 oh Tukang batu 5,871 L.4.007 . . .
0.04 oh Kepala Tukang 7,338 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
AK-SNI 2008 S-144 1.00 m1 Sponengan (untuk saluran dan sejenisnya) 16,402 0.13 . 15,527 - 875
0.36 kg Semen 684 M.4.033 . . .
0.00 m3 Pasir pasang 191 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.03 oh Tukang batu 4,635 L.4.007 . . .
0.00 oh Kepala Tukang 579 L.4.036 . . .
0.00 oh Mandor 1,043 L.4.035 . . .
SNI-2007 S-145 1.00 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm 355,883 0.72 . 90,883 - 265,000
10.00 kg Semen 19,000 M.4.033 . . .
15.00 kg Batu granit 246,000 M.4.014 . . .
0.45 oh Pekerja 46,350 L.4.001 . . .
0.23 oh Tukang batu 34,763 L.4.007 . . .
0.02 oh Kepala tukang 4,441 L.4.036 . . .
0.02 oh Mandor 5,329 L.4.035 . . .
SNI-2007 S-146 1.00 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm 145,883 0.72 . 90,883 - 55,000
10.00 kg Semen 19,000 M.4.033 . . .
15.00 kg Batu teraso 36,000 M.4.018 . . .
0.45 oh Pekerja 46,350 L.4.001 . . .
0.23 oh Tukang batu 34,763 L.4.007 . . .
0.02 oh Kepala tukang 4,441 L.4.036 . . .
0.02 oh Mandor 5,329 L.4.035 . . .
SNI-2007 S-147 1.00 m2 Memasang Plesteran Ciprat 1 PC : 2 PP 61,300 0.43 . 51,757 - 9,544
4.32 kg Semen 8,208 M.4.033 . . .
0.01 m3 Pasir pasang 1,336 M.4.030 . . .

www.mitra-arsitek.com 127/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
SNI-2007 S-148 1.00 m2 Memasang finishing siar pasangan dinding bata merah (=20 m’) 36,341 0.24 . 30,436 - 5,905
3.11 kg Semen 5,905 M.4.033 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.08 oh Tukang batu 11,588 L.4.007 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-149 1.00 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) 17,357 0.11 . 14,317 - 3,040
1.60 kg Semen 3,040 M.4.033 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.04 oh Tukang batu 5,408 L.4.007 . . .
0.00 oh Kepala tukang 772 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-150 1.00 m2 Plesteran siar adukan 1 Pc : 2 Ps 41,240 0.24 . 29,470 - 11,770
4.32 kg Semen 8,208 M.4.033 . . .
0.02 m3 Pasir pasang 3,562 M.4.030 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.07 oh Tukang batu 10,815 L.4.007 . . .
0.01 oh Kepala Tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-151 1.00 m2 Memasang acian 46,473 0.32 . 40,298 - 6,175
3.25 kg Semen 6,175 M.4.033 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-152 1.00 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 82,662 0.49 . 64,554 - 18,108
7.07 kg Semen 13,433 M.4.033 . . .
0.02 m3 Pasir pasang 4,675 M.4.030 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
AK-SNI 2008 S-153 1.00 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 93,979 0.64 . 80,596 - 13,383
5.10 kg Semen 9,690 M.4.033 . . .
0.00 m3 Kapur pasang 665 M.4.022 . . .
0.01 m3 Pasir pasang 3,027 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-154 1.00 m2 Plesteran batu kali 1pc:3ps 100,418 0.64 . 80,596 - 19,822
8.16 kg Semen 15,504 M.4.033 . . .
0.02 m3 Pasir pasang 4,318 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .

www.mitra-arsitek.com 128/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-155 1.00 m2 Plesteran batu kali 1pc:4ps 97,619 0.64 . 80,596 - 17,023
6.51 kg Semen 12,371 M.4.033 . . .
0.02 m3 Pasir pasang 4,652 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-156 1.00 m2 Plesteran K- 50, tebal 20 mm 100,342 0.58 . 72,536 - 27,806
11.12 kg Semen 21,128 M.4.033 . . .
0.03 m3 Pasir pasang 6,678 M.4.030 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.18 oh Tukang batu 27,810 L.4.007 . . .
0.02 oh Kepala Tukang 3,476 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-157 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm 117,092 0.40 . 50,585 - 66,508
1.06 m2 Ubin abu-abu 37,871 M.4.454 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-158 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm 119,543 0.42 . 52,387 - 67,155
1.07 m2 Ubin abu-abu 38,138 M.4.454 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-159 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm 122,234 0.43 . 54,615 - 67,619
1.06 m2 Ubin abu-abu 37,842 M.4.454 . . .
10.40 kg Semen 19,760 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.27 oh Pekerja 27,810 L.4.001 . . .
0.14 oh Tukang batu 20,858 L.4.007 . . .
0.01 oh Kepala tukang 2,703 L.4.036 . . .
0.01 oh Mandor 3,244 L.4.035 . . .
SNI-2007 S-160 1.00 m2 Memasang lantai ubin warna ukuran (40 x 40) cm 196,826 0.40 . 50,585 - 146,241
1.06 m2 Ubin warna 114,354 M.4.474 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.30 kg Semen warna 3,250 M.4.036 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-161 1.00 m2 Memasang lantai ubin warna ukuran (30 x 30) cm 200,317 0.42 . 52,387 - 147,930
1.07 m2 Ubin warna 115,163 M.4.474 . . .

www.mitra-arsitek.com 129/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-162 1.00 m2 Memasang lantai ubin warna ukuran (20 x 20) cm 202,710 0.43 . 54,615 - 148,095
1.06 m2 Ubin warna 114,268 M.4.474 . . .
10.40 kg Semen 19,760 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.62 kg Semen warna 4,050 M.4.036 . . .
0.27 oh Pekerja 27,810 L.4.001 . . .
0.14 oh Tukang batu 20,858 L.4.007 . . .
0.01 oh Kepala tukang 2,703 L.4.036 . . .
0.01 oh Mandor 3,244 L.4.035 . . .
SNI-2007 S-163 1.00 m2 Memasang lantai ubin teraso ukuran (40 x 40) cm 234,803 0.40 . 50,585 - 184,218
1.06 m2 Ubin teraso 152,331 M.4.471 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.30 kg Semen warna 3,250 M.4.036 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-164 1.00 m2 Memasang lantai ubin teraso ukuran (30 x 30) cm 238,562 0.42 . 52,387 - 186,175
1.07 m2 Ubin teraso 153,408 M.4.471 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-165 1.00 m2 Memasang lantai ubin granit ukuran (40 x 40) cm 381,830 0.40 . 50,585 - 331,245
1.06 m2 Ubin granit 299,358 M.4.455 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.30 kg Semen warna 3,250 M.4.036 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-166 1.00 m2 Memasang lantai ubin granit ukuran (30 x 30) cm 386,629 0.42 . 52,387 - 334,241
1.07 m2 Ubin granit 301,474 M.4.455 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .

www.mitra-arsitek.com 130/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-167 1.00 m2 Memasang lantai ubin teralux ukuran (40 x 40) cm 163,623 0.40 . 50,585 - 113,038
1.06 m2 Ubin teralux kerang 81,151 M.4.466 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.30 kg Semen warna 3,250 M.4.036 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-168 1.00 m2 Memasang lantai ubin teralux ukuran (30 x 30) cm 166,879 0.42 . 52,387 - 114,492
1.07 m2 Ubin teralux kerang 81,725 M.4.466 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-169 1.00 m2 Memasang lantai ubin teralux marmer ukuran (60 x 60) cm 419,071 0.38 . 48,358 - 370,713
1.12 m2 Ubin teralux marmer 338,706 M.4.467 . . .
9.60 kg Semen 18,240 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.12 oh Tukang batu 18,540 L.4.007 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
SNI-2007 S-170 1.00 m2 Memasang lantai ubin teralux marmer ukuran (40 x 40) cm 404,425 0.40 . 50,585 - 353,840
1.06 m2 Ubin teralux marmer 321,953 M.4.467 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.30 kg Semen warna 3,250 M.4.036 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.13 oh Tukang batu 19,313 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-171 1.00 m2 Memasang lantai ubin teralux marmer ukuran (30 x 30) cm 409,383 0.42 . 52,387 - 356,996
1.07 m2 Ubin teralux marmer 324,229 M.4.467 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.26 oh Pekerja 26,780 L.4.001 . . .
0.13 oh Tukang batu 20,085 L.4.007 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2007 S-172 1.00 m1 Memasang plint ubin PC abu-abu ukuran (15 x 20) cm 48,117 0.19 . 26,071 - 22,045
5.30 bh Plint Ubin 18,020 M.4.424 . . .
1.65 kg Semen 3,135 M.4.033 . . .

www.mitra-arsitek.com 131/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 m3 Pasir pasang 890 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-173 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 30) cm 41,097 0.19 . 26,071 - 15,026
3.53 bh Plint Ubin 12,002 M.4.424 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-174 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 40) cm 38,105 0.19 . 26,071 - 12,034
2.65 bh Plint Ubin 9,010 M.4.424 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-175 1.00 m1 Pasang plint ubin PC abu-abu ukuran 10 x 20 cm 58,853 0.19 . 26,071 - 32,782
5.30 bh Plint keramik ukuran 10cm x 10cm 29,150 M.4.421 . . .
1.56 kg Semen 2,964 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-176 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 20) cm 58,835 0.19 . 26,071 - 32,764
5.30 bh Plint ubin PC warna 29,680 M.4.433 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-177 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 30) cm 48,923 0.19 . 26,071 - 22,852
3.53 bh Plint ubin PC warna 19,768 M.4.433 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-178 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 40) cm 43,995 0.19 . 26,071 - 17,924
2.65 bh Plint ubin PC warna 14,840 M.4.433 . . .
1.14 kg Semen 2,166 M.4.033 . . .

www.mitra-arsitek.com 132/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-179 1.00 m1 Memasang plint ubin teraso ukuran (10 x 30) cm 46,099 0.19 . 26,071 - 20,028
3.53 bh Plint ubin teraso 16,944 M.4.441 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-180 1.00 m1 Memasang plint ubin teraso ukuran (10 x 40) cm 41,875 0.19 . 26,071 - 15,804
2.65 bh Plint ubin teraso 12,720 M.4.441 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-181 1.00 m1 Memasang plint ubin granit ukuran (10 x 40) cm 61,485 0.19 . 26,071 - 35,414
2.65 bh Plint ubin granit 32,330 M.4.425 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-182 1.00 m1 Memasang plint ubin granit ukuran (10 x 30) cm 72,221 0.19 . 26,071 - 46,150
3.53 bh Plint ubin granit 43,066 M.4.425 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-183 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 40) cm 46,380 0.19 . 26,071 - 20,309
2.65 bh Plint ubin teralux kerang 17,225 M.4.434 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .

www.mitra-arsitek.com 133/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-184 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 30) cm 52,100 0.19 . 26,071 - 26,029
3.53 bh Plint ubin teralux kerang 22,945 M.4.434 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-185 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 60) cm 51,255 0.19 . 26,071 - 25,184
1.70 bh Plint ubin teralux marmer 22,100 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-186 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 40) cm 63,605 0.19 . 26,071 - 37,534
2.65 bh Plint ubin teralux marmer 34,450 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-187 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 30) cm 75,045 0.19 . 26,071 - 48,974
3.53 bh Plint ubin teralux marmer 45,890 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-188 1.00 m2 Memasang lantai teraso cor ditempat, tebal 3 cm 110,992 0.58 . 72,536 - 38,455
0.04 m3 Bahan teraso cor 38,455 M.4.530 . . .
0.36 oh Pekerja 37,080 L.4.001 . . .
0.18 oh Tukang batu 27,810 L.4.007 . . .
0.02 oh Kepala tukang 3,476 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-189 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 20) cm 238,262 1.12 . 141,043 - 97,219
1.06 m2 Ubin keramik artistik 64,766 M.4.459 . . .
8.19 kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
2.75 kg Semen warna 6,875 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .

www.mitra-arsitek.com 134/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-190 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) 239,387
cm 1.12 . 141,043 - 98,344
1.06 m2 Ubin keramik artistik 64,766 M.4.459 . . .
8.19 kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
3.20 kg Semen warna 8,000 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-191 1.00 m2 Memasang lantai keramik ukuran (33 x 33) cm 181,125 1.12 . 141,043 - 40,082
1.09 m2 Ubin keramik 10,454 M.4.458 . . .
8.19 kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.62 kg Semen warna 4,050 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-192 1.00 m2 Memasang lantai keramik ukuran (30 x 30) cm 184,063 1.12 . 141,043 - 43,020
1.07 m2 Ubin keramik 10,253 M.4.458 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-193 1.00 m2 Memasang lantai keramik ukuran (20 x 20) cm 185,046 1.12 . 141,043 - 44,003
1.06 m2 Ubin keramik 10,176 M.4.458 . . .
10.40 kg Semen 19,760 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
1.62 kg Semen warna 4,050 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-194 1.00 m2 Memasang lantai keramik ukuran (10 x 33) cm, variasi/border 261,793 1.68 . 211,777 - 50,016
1.09 m2 Ubin keramik 10,454 M.4.458 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
4.37 kg Semen warna 10,925 M.4.036 . . .
1.05 oh Pekerja 108,150 L.4.001 . . .
0.53 oh Tukang batu 81,113 L.4.007 . . .
0.05 oh Kepala tukang 10,234 L.4.036 . . .
0.05 oh Mandor 12,280 L.4.035 . . .
SNI-2007 S-195 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC 414,926
: 3 PP 1.12 . 141,043 - 273,883
1.07 m2 Mosaik 233,317 M.4.418 . . .
14.15 kg Semen 26,885 M.4.033 . . .

www.mitra-arsitek.com 135/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 m3 Pasir pasang 8,681 M.4.030 . . .
2.00 kg Semen warna 5,000 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-196 1.00 m1 Memasang plint keramik artisitk ukuran (10 x 20) cm 85,148 0.19 . 26,071 - 59,076
5.30 bh Plint keramik artistik 56,180 M.4.420 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.03 kg Semen warna 63 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-197 1.00 m1 Memasang plint keramik artisitik ukuran (10 x 10) cm 141,390 0.19 . 26,071 - 115,319
10.60 bh Plint keramik artistik 112,360 M.4.420 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.05 kg Semen warna 125 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-198 1.00 m1 Memasang plint keramik ukuran (5 x 20) cm 83,701 0.19 . 26,071 - 57,629
5.30 bh Plint keramik artistik 56,180 M.4.420 . . .
0.57 kg Semen 1,083 M.4.033 . . .
0.00 m3 Pasir pasang 334 M.4.030 . . .
0.01 kg Semen warna 33 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-199 1.00 m1 Pasang plint keramik ukuran 10 x 40 cm 44,904 0.19 . 26,071 - 18,833
2.65 bh Plint ubin keramik 10 x 40 cm 15,635 M.4.429 . . .
1.20 kg Semen 2,280 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-200 1.00 m1 Pasang plint keramik ukuran 10 x 30 cm 46,760 0.19 . 26,071 - 20,688
3.53 bh Plint ubin keramik 10 x 30 cm 16,591 M.4.428 . . .
1.65 kg Semen 3,135 M.4.033 . . .
0.00 m3 Pasir pasang 712 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .

www.mitra-arsitek.com 136/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-201 1.00 m1 Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm 68,905 0.19 . 26,071 - 42,834
5.30 bh Internal cove 39,750 M.4.590 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 kg Semen warna 250 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-202 1.00 m2 Memasang lantai marmer ukuran (100 x 100) cm 645,246 1.12 . 141,043 - 504,203
1.06 m2 Marmer 477,000 M.4.416 . . .
8.19 kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.65 kg Semen warna 1,625 M.4.036 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-203 1.00 m2 Memasang lantai karpet 127,858 0.37 . 49,143 - 78,715
1.05 m2 Karpet 73,605 M.4.355 . . .
0.35 kg Lem 5,110 M.4.552 . . .
0.17 oh Pekerja 17,510 L.4.001 . . .
0.17 oh Tukang kayu 26,265 L.4.016 . . .
0.02 oh Kepala tukang 3,283 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
SNI-2007 S-204 1.00 m2 Memasang underlayer 144,822 0.26 . 34,607 - 110,215
1.05 m2 Underlayer irubber corrugated 105,105 M.4.603 . . .
0.35 kg Lem 5,110 M.4.552 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-205 1.00 m2 Memasang lantai parquet 164,398 1.12 . 141,043 - 23,355
1.05 m2 Parquet kayu 14,595 M.4.359 . . .
0.60 kg Lem 8,760 M.4.552 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang kayu 54,075 L.4.016 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-206 1.00 m2 Memasang lantai kayu (gym floor) 300,898 1.12 . 141,043 - 159,855
1.05 m2 Gymfloor 151,095 M.4.352 . . .
0.60 kg Lem 8,760 M.4.552 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang kayu 54,075 L.4.016 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-207 1.00 m2 Memasang dinding porselen ukuran (11 x 11) cm 376,599 1.60 . 201,490 - 175,109
1.05 m2 Porselen 149,683 M.4.448 . . .
9.30 kg Semen 17,670 M.4.033 . . .

www.mitra-arsitek.com 137/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
1.50 kg Semen warna 3,750 M.4.036 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.50 oh Tukang batu 77,250 L.4.007 . . .
0.05 oh Kepala tukang 9,655 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-208 1.00 m2 Memasang dinding porselin ukuran (10 x 20) cm 361,579 1.44 . 181,341 - 180,238
1.06 m2 Porselen 151,686 M.4.448 . . .
9.30 kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.75 kg Semen warna 6,875 M.4.036 . . .
0.90 oh Pekerja 92,700 L.4.001 . . .
0.45 oh Tukang batu 69,525 L.4.007 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.05 oh Mandor 10,427 L.4.035 . . .
SNI-2007 S-209 1.00 m2 Memasang dinding porselin ukuran (20 x 20) cm 359,554 1.44 . 181,341 - 178,213
1.06 m2 Porselen 151,686 M.4.448 . . .
9.30 kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
1.94 kg Semen warna 4,850 M.4.036 . . .
0.90 oh Pekerja 92,700 L.4.001 . . .
0.45 oh Tukang batu 69,525 L.4.007 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.05 oh Mandor 10,427 L.4.035 . . .
SNI-2007 S-210 1.00 m2 Memasang dinding keramik ukuran (10 x 20) cm 289,393 1.44 . 181,341 - 108,052
1.06 m2 keramik artistik 10cm x 20cm 79,500 M.4.407 . . .
9.30 kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.75 kg Semen warna 6,875 M.4.036 . . .
0.90 oh Pekerja 92,700 L.4.001 . . .
0.45 oh Tukang batu 69,525 L.4.007 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.05 oh Mandor 10,427 L.4.035 . . .
SNI-2007 S-211 1.00 m2 Memasang dinding marmer ukuran (100 x 100) cm 851,745 2.08 . 261,937 - 589,808
1.06 m2 Marmer 477,000 M.4.416 . . .
3.00 bh Paku Biasa 2" - 5" 81,982 M.4.158 . . .
12.44 kg Semen 23,636 M.4.033 . . .
0.03 m3 Pasir pasang 5,565 M.4.030 . . .
0.65 kg Semen warna 1,625 M.4.036 . . .
1.30 oh Pekerja 133,900 L.4.001 . . .
0.65 oh Tukang batu 100,425 L.4.007 . . .
0.07 oh Kepala tukang 12,552 L.4.036 . . .
0.07 oh Mandor 15,061 L.4.035 . . .
SNI-2007 S-212 1.00 m2 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm 300,566 1.60 . 201,490 - 99,076
63.00 bh Bata merah 63,000 M.4.007 . . .
12.44 kg Semen 23,636 M.4.033 . . .
0.03 m3 Pasir pasang 5,565 M.4.030 . . .
2.75 kg Semen warna 6,875 M.4.036 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.50 oh Tukang batu 77,250 L.4.007 . . .

www.mitra-arsitek.com 138/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 oh Kepala tukang 9,655 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-213 1.00 m2 Memasang dinding batu paras 266,199 1.12 . 141,043 - 125,156
1.10 m2 Batu paras 95,040 M.4.015 . . .
11.75 kg Semen 22,325 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-214 1.00 m2 Memasang dinding batu tempel hitam 500,389 1.12 . 141,043 - 359,346
1.10 m2 Batu alam / tempel 329,230 M.4.011 . . .
11.75 kg Semen 22,325 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
0.35 oh Tukang batu 54,075 L.4.007 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-215 1.00 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I 269,063 0.32 . 43,375 - 225,688
11.87 m2 Vinyl 218,408 M.4.404 . . .
0.35 kg Lem vinyl 7,280 M.4.555 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-216 1.00 m2 Memasang wall paper, lebar 50 cm 149,781 0.54 . 71,331 - 78,450
2.20 m1 Wallpaper 74,800 M.4.374 . . .
0.25 kg Lem 3,650 M.4.552 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
0.18 oh Tukang Interior 31,535 L.4.015 . . .
0.02 oh Kepala tukang 3,283 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
SNI-2007 S-217 1.00 m2 Memasang floor hardener 55,107 0.26 . 34,607 - 20,500
5.00 kg Floor hardener 20,500 M.4.587 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-218 1.00 m1 Memasang plint kayu kelas II ukuran (2 x 10) cm 45,942 0.26 . 34,607 - 11,335
0.00 m3 Papan kayu kelas II 10,500 M.4.112 . . .
0.05 kg Paku skrup 5 cm 835 M.4.169 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
AK-SNI 2008 S-219 1.00 m1 Pasang keramik stepnosing granito 7/30 64,556 0.16 . 23,110 - 41,446
3.60 bh Stepnosing granito 40,320 M.4.453 . . .
0.41 kg Semen 775 M.4.033 . . .
0.00 m3 Pasir Pasang 200 M.4.030 . . .
0.06 kg Semen Warna 150 M.4.036 . . .

www.mitra-arsitek.com 139/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
AK-SNI 2008 S-220 1.00 m1 Pasang list keramik dinding 5/20 83,236 0.16 . 23,110 - 60,126
5.00 bh List keramik dinding motif 59,000 M.4.415 . . .
0.41 kg Semen 775 M.4.033 . . .
0.00 m3 Pasir pasang 200 M.4.030 . . .
0.06 kg Semen Warna 150 M.4.036 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
AK-SNI 2008 S-221 1.00 m1 Memasang hospital plint panjang 20 cm 94,158 0.19 . 26,071 - 68,086
5.30 bh Hospital plint 65,190 M.4.405 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.03 kg Semen warna 63 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-222 1.00 m1 Memasang hospital plint panjang 30 cm 45,559 0.19 . 26,071 - 19,487
3.53 bh Plint ubin keramik 10 x 30 cm 16,591 M.4.428 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.03 kg Semen warna 63 M.4.036 . . .
0.09 oh Pekerja 9,270 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-223 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-224 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-225 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .

www.mitra-arsitek.com 140/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-226 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-227 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-228 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-229 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-230 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-231 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-232 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .

www.mitra-arsitek.com 141/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-233 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-234 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 119,710 0.80 . 100,745 - 18,965
1.00 m2 Conblock 6,400 M.4.534 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-235 1.00 m2 Pasang grassblock bulat tebal 10 cm 161,910 0.80 . 100,745 - 61,165
1.00 m2 Grassblock 48,600 M.4.588 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
AK-SNI 2008 S-236 1.00 m2 Pasang grassblock tebal 10 cm 161,910 0.80 . 100,745 - 61,165
1.00 m2 Grassblock 48,600 M.4.588 . . .
0.05 m3 Pasir urug 12,565 M.4.032 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.25 oh Tukang batu 38,625 L.4.007 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
SNI-2007 S-237 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati16,221,030
(klas plitur) 30.45 . 4,452,105 - 11,768,925
1.10 m3 Balok kayu jati (klas plitur) 11,721,600 M.4.075 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
7.00 oh Pekerja 721,000 L.4.001 . . .
21.00 oh Tukang kayu 3,244,500 L.4.016 . . .
2.10 oh Kepala tukang 405,510 L.4.036 . . .
0.35 oh Mandor 81,095 L.4.035 . . .
SNI-2007 S-238 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati14,509,430
lokal 30.45 . 4,452,105 - 10,057,325
1.10 m3 Balok kayu jati (lokal) 10,010,000 M.4.076 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
7.00 oh Pekerja 721,000 L.4.001 . . .
21.00 oh Tukang kayu 3,244,500 L.4.016 . . .
2.10 oh Kepala tukang 405,510 L.4.036 . . .
0.35 oh Mandor 81,095 L.4.035 . . .
SNI-2007 S-239 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
11,557,575 26.10 . 3,816,090 - 7,741,485
1.20 m3 Balok kayu kamper 7,694,160 M.4.077 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
6.00 oh Pekerja 618,000 L.4.001 . . .

www.mitra-arsitek.com 142/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
18.00 oh Tukang kayu 2,781,000 L.4.016 . . .
1.80 oh Kepala tukang 347,580 L.4.036 . . .
0.30 oh Mandor 69,510 L.4.035 . . .
SNI-2007 S-240 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai
11,588,415 26.10 . 3,816,090 - 7,772,325
1.20 m3 Balok kayu bengkirai 7,725,000 M.4.073 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
6.00 oh Pekerja 618,000 L.4.001 . . .
18.00 oh Tukang kayu 2,781,000 L.4.016 . . .
1.80 oh Kepala tukang 347,580 L.4.036 . . .
0.30 oh Mandor 69,510 L.4.035 . . .
SNI-2007 S-241 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing
9,155,415 26.10 . 3,816,090 - 5,339,325
1.20 m3 Balok kayu kruing 5,292,000 M.4.079 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
6.00 oh Pekerja 618,000 L.4.001 . . .
18.00 oh Tukang kayu 2,781,000 L.4.016 . . .
1.80 oh Kepala tukang 347,580 L.4.036 . . .
0.30 oh Mandor 69,510 L.4.035 . . .
SNI-2007 S-242 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur) 611,686 1.52 . 222,721 - 388,965
0.04 m3 Papan kayu jati (klas plitur) 387,600 M.4.109 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
1.05 oh Tukang kayu 162,225 L.4.016 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-243 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (lokal) 611,686 1.52 . 222,721 - 388,965
0.04 m3 Papan kayu jati (lokal) 387,600 M.4.110 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
1.05 oh Tukang kayu 162,225 L.4.016 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-244 1.00 m2 Membuat dan memasang pintu klamp, kayu kamper 468,106 1.52 . 222,721 - 245,385
0.04 m3 Papan kayu kamper 244,020 M.4.111 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
1.05 oh Tukang kayu 162,225 L.4.016 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-245 1.00 m2 Membuat dan memasang pintu klamp, kayu bengkirai 496,586 1.52 . 222,721 - 273,865
0.04 m3 Papan kayu bengkirai 272,500 M.4.107 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
1.05 oh Tukang kayu 162,225 L.4.016 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-246 1.00 m2 Membuat dan memasang pintu klamp, kayu kruing 404,086 1.52 . 222,721 - 181,365
0.04 m3 Papan kayu kruing 180,000 M.4.113 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .

www.mitra-arsitek.com 143/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 oh Pekerja 36,050 L.4.001 . . .
1.05 oh Tukang kayu 162,225 L.4.016 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-247 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur) 1,030,215 4.35 . 636,015 - 394,200
0.04 m3 Papan kayu jati (klas plitur) 387,600 M.4.109 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-248 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal) 1,030,215 4.35 . 636,015 - 394,200
0.04 m3 Papan kayu jati (lokal) 387,600 M.4.110 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-249 1.00 m2 Membuat dan memasang daun pintu panel, kayu kamper 886,635 4.35 . 636,015 - 250,620
0.04 m3 Papan kayu kamper 244,020 M.4.111 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-250 1.00 m2 Membuat dan memasang daun pintu panel, kayu bengkirai 915,115 4.35 . 636,015 - 279,100
0.04 m3 Papan kayu bengkirai 272,500 M.4.107 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-251 1.00 m2 Membuat dan memasang daun pintu panel, kayu kruing 822,615 4.35 . 636,015 - 186,600
0.04 m3 Papan kayu kruing 180,000 M.4.113 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-252 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur)
745,332 3.48 . 508,812 - 236,520
0.02 m3 Papan kayu jati (klas plitur) 232,560 M.4.109 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
2.40 oh Tukang kayu 370,800 L.4.016 . . .
0.24 oh Kepala tukang 46,344 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-253 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal) 745,332 3.48 . 508,812 - 236,520
0.02 m3 Papan kayu jati (lokal) 232,560 M.4.110 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .

www.mitra-arsitek.com 144/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.40 oh Tukang kayu 370,800 L.4.016 . . .
0.24 oh Kepala tukang 46,344 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-254 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper 659,184 3.48 . 508,812 - 150,372
0.02 m3 Papan kayu kamper 146,412 M.4.111 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
2.40 oh Tukang kayu 370,800 L.4.016 . . .
0.24 oh Kepala tukang 46,344 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-255 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai 676,272 3.48 . 508,812 - 167,460
0.02 m3 Papan kayu bengkirai 163,500 M.4.107 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
2.40 oh Tukang kayu 370,800 L.4.016 . . .
0.24 oh Kepala tukang 46,344 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-256 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing 620,772 3.48 . 508,812 - 111,960
0.02 m3 Papan kayu kruing 108,000 M.4.113 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
2.40 oh Tukang kayu 370,800 L.4.016 . . .
0.24 oh Kepala tukang 46,344 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-257 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
1,262,775 4.35 . 636,015 - 626,760
0.06 m3 Papan kayu jati (klas plitur) 620,160 M.4.109 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-258 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) 1,262,775 4.35 . 636,015 - 626,760
0.06 m3 Papan kayu jati (lokal) 620,160 M.4.110 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-259 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper 1,033,047 4.35 . 636,015 - 397,032
0.06 m3 Papan kayu kamper 390,432 M.4.111 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-260 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai 1,078,615 4.35 . 636,015 - 442,600
0.06 m3 Papan kayu bengkirai 436,000 M.4.107 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .

www.mitra-arsitek.com 145/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-261 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing 930,615 4.35 . 636,015 - 294,600
0.06 m3 Papan kayu kruing 288,000 M.4.113 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-262 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup773,290
kayu jati lokal
3.05(lebar sampai
. 90 cm) 445,211 - 328,079
0.03 m3 Papan kayu jati (lokal) 242,250 M.4.110 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
2.10 oh Tukang kayu 324,450 L.4.016 . . .
0.21 oh Kepala tukang 40,551 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-263 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup683,552
kayu kamper 3.05
(lebar sampai
. 90 cm) 445,211 - 238,342
0.03 m3 Papan kayu kamper 152,513 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
2.10 oh Tukang kayu 324,450 L.4.016 . . .
0.21 oh Kepala tukang 40,551 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-264 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup701,352
kayu bengkirai
3.05(lebar sampai
. 90 cm) 445,211 - 256,142
0.03 m3 Papan kayu bengkirai 170,313 M.4.107 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
2.10 oh Tukang kayu 324,450 L.4.016 . . .
0.21 oh Kepala tukang 40,551 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-265 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup643,540
kayu kruing3.05
(lebar sampai. 90 cm) 445,211 - 198,329
0.03 m3 Papan kayu kruing 112,500 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 lbr Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
0.70 oh Pekerja 72,100 L.4.001 . . .
2.10 oh Tukang kayu 324,450 L.4.016 . . .
0.21 oh Kepala tukang 40,551 L.4.036 . . .
0.04 oh Mandor 8,110 L.4.035 . . .
SNI-2007 S-266 1.00 m2 Memasang jalusi kusen, kayu jati (klas plitur) 1,079,295 3.21 . 494,250 - 585,045
0.06 m3 Papan kayu jati (klas plitur) 581,400 M.4.109 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 69,010 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .

www.mitra-arsitek.com 146/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-267 1.00 m2 Memasang jalusi kusen, kayu jati (lokal) 1,079,295 3.21 . 494,250 - 585,045
0.06 m3 Papan kayu jati (lokal) 581,400 M.4.110 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 69,010 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-268 1.00 m2 Memasang jalusi kusen, kayu kamper 863,925 3.21 . 494,250 - 369,675
0.06 m3 Papan kayu kamper 366,030 M.4.111 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 69,010 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-269 1.00 m2 Memasang jalusi kusen, kayu bengkirai 906,645 3.21 . 494,250 - 412,395
0.06 m3 Papan kayu bengkirai 408,750 M.4.107 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 69,010 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-270 1.00 m2 Memasang jalusi kusen, kayu kruing 767,895 3.21 . 494,250 - 273,645
0.06 m3 Papan kayu kruing 270,000 M.4.113 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
0.67 oh Pekerja 69,010 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2002 S-271 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 687,284 2.83 . 416,371 - 270,913
0.02 m3 Papan kayu jati (lokal) 189,924 M.4.110 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 76,300 M.4.371 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala Tukang 38,620 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2002 S-272 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 616,930 2.83 . 416,371 - 200,559
0.02 m3 Papan kayu kamper 119,570 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 76,300 M.4.371 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala Tukang 38,620 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2002 S-273 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 630,885 2.83 . 416,371 - 214,514
0.02 m3 Papan kayu bengkirai 133,525 M.4.107 . . .

www.mitra-arsitek.com 147/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 76,300 M.4.371 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala Tukang 38,620 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2002 S-274 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 585,560 2.83 . 416,371 - 169,189
0.02 m3 Papan kayu kruing 88,200 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 lbr Teakwood 4 mm, 120 x 240 76,300 M.4.371 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
2.00 oh Tukang kayu 309,000 L.4.016 . . .
0.20 oh Kepala Tukang 38,620 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-275 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
812,830 3.70 . 540,729 - 272,102
0.03 m3 Papan kayu kamper 152,513 M.4.111 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,560 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
0.50 lbr Formika 46,800 M.4.351 . . .
0.85 oh Pekerja 87,550 L.4.001 . . .
2.55 oh Tukang kayu 393,975 L.4.016 . . .
0.26 oh Kepala tukang 49,241 L.4.036 . . .
0.04 oh Mandor 9,963 L.4.035 . . .
SNI-2007 S-276 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
830,630 3.70 . 540,729 - 289,902
0.03 m3 Papan kayu bengkirai 170,313 M.4.107 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,560 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
0.50 lbr Formika 46,800 M.4.351 . . .
0.85 oh Pekerja 87,550 L.4.001 . . .
2.55 oh Tukang kayu 393,975 L.4.016 . . .
0.26 oh Kepala tukang 49,241 L.4.036 . . .
0.04 oh Mandor 9,963 L.4.035 . . .
SNI-2007 S-277 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
772,818 3.70 . 540,729 - 232,089
0.03 m3 Papan kayu kruing 112,500 M.4.113 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,560 M.4.553 . . .
1.00 lbr Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
0.50 lbr Formika 46,800 M.4.351 . . .
0.85 oh Pekerja 87,550 L.4.001 . . .
2.55 oh Tukang kayu 393,975 L.4.016 . . .
0.26 oh Kepala tukang 49,241 L.4.036 . . .
0.04 oh Mandor 9,963 L.4.035 . . .
SNI-2007 S-278 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur)
13,243,440
bentang 617.40
meter . 2,544,060 - 10,699,380
1.10 m3 Kayu jati (klas plitur) balok 10,345,500 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .

www.mitra-arsitek.com 148/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-279 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang
11,230,440
6 meter
17.40 . 2,544,060 - 8,686,380
1.10 m3 Kayu jati (lokal) balok 8,332,500 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-280 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang9,608,490
6 meter 17.40 . 2,544,060 - 7,064,430
1.10 m3 Kayu kamper balok 6,710,550 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-281 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang
10,391,690
6 meter17.40 . 2,544,060 - 7,847,630
1.10 m3 Kayu bengkirai balok 7,493,750 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-282 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang8,045,940
6 meter 17.40 . 2,544,060 - 5,501,880
1.10 m3 Kayu kruing balok 5,148,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-283 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 4,693,140
6 meter 17.40 . 2,544,060 - 2,149,080
1.10 m3 Kayu glugu balok 1,795,200 M.4.086 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
4.00 oh Pekerja 412,000 L.4.001 . . .
12.00 oh Tukang kayu 1,854,000 L.4.016 . . .
1.20 oh Kepala tukang 231,720 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2007 S-284 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur) 15,901,181 29.15 . 4,261,301 - 11,639,880
1.20 m3 Kayu jati (klas plitur) balok 11,286,000 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
6.70 oh Pekerja 690,100 L.4.001 . . .
20.10 oh Tukang kayu 3,105,450 L.4.016 . . .

www.mitra-arsitek.com 149/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.01 oh Kepala tukang 388,131 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-285 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal 13,705,181 29.15 . 4,261,301 - 9,443,880
1.20 m3 Kayu jati (lokal) balok 9,090,000 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
6.70 oh Pekerja 690,100 L.4.001 . . .
20.10 oh Tukang kayu 3,105,450 L.4.016 . . .
2.01 oh Kepala tukang 388,131 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-286 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kamper 11,935,781 29.15 . 4,261,301 - 7,674,480
1.20 m3 Kayu kamper balok 7,320,600 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
6.70 oh Pekerja 690,100 L.4.001 . . .
20.10 oh Tukang kayu 3,105,450 L.4.016 . . .
2.01 oh Kepala tukang 388,131 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-287 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kruing 10,231,181 29.15 . 4,261,301 - 5,969,880
1.20 m3 Kayu kruing balok 5,616,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
6.70 oh Pekerja 690,100 L.4.001 . . .
20.10 oh Tukang kayu 3,105,450 L.4.016 . . .
2.01 oh Kepala tukang 388,131 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-288 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai 12,790,181 29.15 . 4,261,301 - 8,528,880
1.20 m3 Kayu bengkirai balok 8,175,000 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku biasa 2" - 5" 152,880 M.4.158 . . .
6.70 oh Pekerja 690,100 L.4.001 . . .
20.10 oh Tukang kayu 3,105,450 L.4.016 . . .
2.01 oh Kepala tukang 388,131 L.4.036 . . .
0.34 oh Mandor 77,620 L.4.035 . . .
SNI-2007 S-289 1.00 m3 Memasang konstruksi gordeng, kayu jati (klas plitur) 12,154,836 10.44 . 1,526,436 - 10,628,400
1.10 m3 Kayu jati (klas plitur) balok 10,345,500 M.4.087 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
SNI-2007 S-290 1.00 m3 Memasang konstruksi gordeng, kayu jati lokal 10,141,836 10.44 . 1,526,436 - 8,615,400
1.10 m3 Kayu jati (lokal) balok 8,332,500 M.4.088 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .

www.mitra-arsitek.com 150/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-291 1.00 m3 Memasang konstruksi gordeng, kayu kamper 8,519,886 10.44 . 1,526,436 - 6,993,450
1.10 m3 Kayu kamper balok 6,710,550 M.4.089 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
SNI-2007 S-292 1.00 m3 Memasang konstruksi gordeng, kayu bengkirai 9,303,086 10.44 . 1,526,436 - 7,776,650
1.10 m3 Kayu bengkirai balok 7,493,750 M.4.085 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
SNI-2007 S-293 1.00 m3 Memasang konstruksi gordeng, kayu kruing 6,957,336 10.44 . 1,526,436 - 5,430,900
1.10 m3 Kayu kruing balok 5,148,000 M.4.091 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
SNI-2007 S-294 1.00 m3 Memasang konstruksi gordeng, kayu glugu 3,604,536 10.44 . 1,526,436 - 2,078,100
1.10 m3 Kayu glugu balok 1,795,200 M.4.086 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku biasa 2" - 5" 81,900 M.4.158 . . .
2.40 oh Pekerja 247,200 L.4.001 . . .
7.20 oh Tukang kayu 1,112,400 L.4.016 . . .
0.72 oh Kepala tukang 139,032 L.4.036 . . .
0.12 oh Mandor 27,804 L.4.035 . . .
AK-SNI 2008 S-295 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 135,325 0.22 . 28,840 - 106,485
2.20 m1 Usuk kayu jati (lokal) 5/7 70,400 M.4.067 . . .
5.00 m1 Reng jati (lokal) 2/3 32,000 M.4.050 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-296 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 118,165 0.22 . 28,840 - 89,325
2.20 m1 Usuk kayu kamper 5/7 53,240 M.4.069 . . .
5.00 m1 Reng jati (lokal) 2/3 32,000 M.4.050 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .

www.mitra-arsitek.com 151/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-297 1.00 m2 Memasang usuk kamper 5/7, reng kamper 2/3 108,165 0.22 . 28,840 - 79,325
2.20 m1 Usuk kayu kamper 5/7 53,240 M.4.069 . . .
5.00 m1 Reng kamper 2/3 22,000 M.4.053 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-298 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 118,165 0.22 . 28,840 - 89,325
2.20 m1 Usuk kayu bengkirai 5/7 53,240 M.4.066 . . .
5.00 m1 Reng jati (lokal) 2/3 32,000 M.4.050 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-299 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 109,665 0.22 . 28,840 - 80,825
2.20 m1 Usuk kayu bengkirai 5/7 53,240 M.4.066 . . .
5.00 m1 Reng bengkirai 2/3 23,500 M.4.048 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-300 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 101,665 0.22 . 28,840 - 72,825
2.20 m1 Usuk kayu kruing 5/7 36,740 M.4.070 . . .
5.00 m1 Reng jati (lokal) 2/3 32,000 M.4.050 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-301 1.00 m2 Memasang usuk kruing 5/7, reng kruing 2/3 86,665 0.22 . 28,840 - 57,825
2.20 m1 Usuk kayu kruing 5/7 36,740 M.4.070 . . .
5.00 m1 Reng kruing 2/3 17,000 M.4.055 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-302 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) 194,945 0.22 . 28,840 - 166,105
2.20 m1 Usuk kayu jati 5/7 (klas 1) 86,020 M.4.068 . . .
5.00 m1 Reng jati 3/4 (klas 1) 76,000 M.4.052 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .

www.mitra-arsitek.com 152/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-303 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4 144,165 0.22 . 28,840 - 115,325
2.20 m1 Usuk kayu kamper 5/7 53,240 M.4.069 . . .
5.00 m1 Reng jati (lokal) 3/4 58,000 M.4.051 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-304 1.00 m2 Memasang usuk kamper 5/7, reng kamper 3/4 129,665 0.22 . 28,840 - 100,825
2.20 m1 Usuk kayu kamper 5/7 53,240 M.4.069 . . .
5.00 m1 Reng kamper 3/4 43,500 M.4.054 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-305 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 144,165 0.22 . 28,840 - 115,325
2.20 m1 Usuk kayu bengkirai 5/7 53,240 M.4.066 . . .
5.00 m1 Reng jati (lokal) 3/4 58,000 M.4.051 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-306 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 131,165 0.22 . 28,840 - 102,325
2.20 m1 Usuk kayu bengkirai 5/7 53,240 M.4.066 . . .
5.00 m1 Reng bengkirai 3/4 45,000 M.4.049 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-307 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 127,665 0.22 . 28,840 - 98,825
2.20 m1 Usuk kayu kruing 5/7 36,740 M.4.070 . . .
5.00 m1 Reng jati (lokal) 3/4 58,000 M.4.051 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-308 1.00 m2 Memasang usuk kruing 5/7, reng kruing 3/4 103,665 0.22 . 28,840 - 74,825

www.mitra-arsitek.com 153/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
2.20 m1 Usuk kayu kruing 5/7 36,740 M.4.070 . . .
5.00 m1 Reng kruing 3/4 34,000 M.4.056 . . .
0.15 kg Paku usuk 2,385 M.4.172 . . .
0.10 kg Paku reng 1,700 M.4.164 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-309 1.00 m2 Memasang rangka atap sirap, kayu jati (lokal) 1,289,942 0.26 . 34,607 - 1,255,335
0.17 m3 Kayu jati (lokal) balok 1,249,875 M.4.088 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-310 1.00 m2 Memasang rangka atap sirap, kayu kamper 1,046,650 0.26 . 34,607 - 1,012,043
0.17 m3 Kayu kamper balok 1,006,583 M.4.089 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-311 1.00 m2 Memasang rangka atap sirap, kayu bengkirai 1,164,130 0.26 . 34,607 - 1,129,523
0.17 m3 Kayu bengkirai balok 1,124,063 M.4.085 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-312 1.00 m2 Memasang rangka atap sirap, kayu kruing 812,267 0.26 . 34,607 - 777,660
0.17 m3 Kayu kruing balok 772,200 M.4.091 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-313 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) 259,661 0.56 . 84,971 - 174,691
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 169,231 M.4.060 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-314 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kamper 190,130 0.56 . 84,971 - 105,160
0.02 m3 Kaso-kaso (5 x 7) cm kamper 99,700 M.4.061 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .

www.mitra-arsitek.com 154/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2007 S-315 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai 188,606 0.56 . 84,971 - 103,635
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 98,175 M.4.059 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-316 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kruing 160,424 0.56 . 84,971 - 75,453
0.02 m3 Kaso-kaso (5 x 7) cm kruing 69,993 M.4.062 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.08 oh Mandor 17,378 L.4.035 . . .
SNI-2007 S-317 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) 261,006 0.54 . 75,060 - 185,946
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 179,121 M.4.060 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-318 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kamper 187,411 0.54 . 75,060 - 112,351
0.02 m3 Kaso-kaso (5 x 7) cm kamper 105,526 M.4.061 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-319 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai 185,798 0.54 . 75,060 - 110,738
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 103,913 M.4.059 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-320 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kruing 155,969 0.54 . 75,060 - 80,909
0.02 m3 Kaso-kaso (5 x 7) cm kruing 74,084 M.4.062 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-321 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) 168,159 0.48 . 66,408 - 101,751
0.01 m3 Kayu jati (lokal) balok 98,475 M.4.088 . . .
0.12 kg Paku Biasa 2" - 5" 3,276 M.4.158 . . .
0.17 oh Pekerja 17,510 L.4.001 . . .
0.27 oh Tukang kayu 41,715 L.4.016 . . .
0.03 oh Kepala Tukang 5,214 L.4.036 . . .
0.01 oh Mandor 1,969 L.4.035 . . .
AK-SNI 2008 S-322 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kamper 148,991 0.48 . 66,408 - 82,583

www.mitra-arsitek.com 155/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu kamper balok 79,307 M.4.089 . . .
0.12 kg Paku Biasa 2" - 5" 3,276 M.4.158 . . .
0.17 oh Pekerja 17,510 L.4.001 . . .
0.27 oh Tukang kayu 41,715 L.4.016 . . .
0.03 oh Kepala Tukang 5,214 L.4.036 . . .
0.01 oh Mandor 1,969 L.4.035 . . .
AK-SNI 2008 S-323 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai 158,247 0.48 . 66,408 - 91,839
0.01 m3 Kayu bengkirai balok 88,563 M.4.085 . . .
0.12 kg Paku Biasa 2" - 5" 3,276 M.4.158 . . .
0.17 oh Pekerja 17,510 L.4.001 . . .
0.27 oh Tukang kayu 41,715 L.4.016 . . .
0.03 oh Kepala Tukang 5,214 L.4.036 . . .
0.01 oh Mandor 1,969 L.4.035 . . .
AK-SNI 2008 S-324 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kruing 130,524 0.48 . 66,408 - 64,116
0.01 m3 Kayu kruing balok 60,840 M.4.091 . . .
0.12 kg Paku Biasa 2" - 5" 3,276 M.4.158 . . .
0.17 oh Pekerja 17,510 L.4.001 . . .
0.27 oh Tukang kayu 41,715 L.4.016 . . .
0.03 oh Kepala Tukang 5,214 L.4.036 . . .
0.01 oh Mandor 1,969 L.4.035 . . .
SNI-2002 S-325 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) 154,270 0.43 . 60,640 - 93,630
0.01 m3 Kayu jati (lokal) balok 90,900 M.4.088 . . .
0.10 kg Paku biasa 2" - 5" 2,730 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-326 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 136,576 0.43 . 60,640 - 75,936
0.01 m3 Kayu kamper balok 73,206 M.4.089 . . .
0.10 kg Paku biasa 2" - 5" 2,730 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-327 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 145,120 0.43 . 60,640 - 84,480
0.01 m3 Kayu bengkirai balok 81,750 M.4.085 . . .
0.10 kg Paku biasa 2" - 5" 2,730 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-328 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 119,530 0.43 . 60,640 - 58,890
0.01 m3 Kayu kruing balok 56,160 M.4.091 . . .
0.10 kg Paku biasa 2" - 5" 2,730 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-329 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) 118,319 0.33 . 47,186 - 71,133
0.01 m3 Papan kayu jati (klas plitur) 69,768 M.4.109 . . .

www.mitra-arsitek.com 156/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-330 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) 118,319 0.33 . 47,186 - 71,133
0.01 m3 Papan kayu jati (lokal) 69,768 M.4.110 . . .
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-331 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kamper 92,475 0.33 . 47,186 - 45,289
0.01 m3 Papan kayu kamper 43,924 M.4.111 . . .
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-332 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai 97,601 0.33 . 47,186 - 50,415
0.01 m3 Papan kayu bengkirai 49,050 M.4.107 . . .
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-333 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kruing 80,951 0.33 . 47,186 - 33,765
0.01 m3 Papan kayu kruing 32,400 M.4.113 . . .
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-334 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) 154,176 0.33 . 46,221 - 107,955
0.01 m3 Papan kayu jati (klas plitur) 106,590 M.4.109 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-335 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 154,176 0.33 . 46,221 - 107,955
0.01 m3 Papan kayu jati (lokal) 106,590 M.4.110 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-336 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 114,691 0.33 . 46,221 - 68,471
0.01 m3 Papan kayu kamper 67,106 M.4.111 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .

www.mitra-arsitek.com 157/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-337 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai 122,523 0.33 . 46,221 - 76,303
0.01 m3 Papan kayu bengkirai 74,938 M.4.107 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-338 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 97,086 0.33 . 46,221 - 50,865
0.01 m3 Papan kayu kruing 49,500 M.4.113 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-339 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur) 202,783 0.43 . 60,640 - 142,143
0.01 m3 Papan kayu jati (klas plitur) 140,505 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-340 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) 202,783 0.43 . 60,640 - 142,143
0.01 m3 Papan kayu jati (lokal) 140,505 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-341 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 150,736 0.43 . 60,640 - 90,095
0.01 m3 Papan kayu kamper 88,457 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-342 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 161,060 0.43 . 60,640 - 100,419
0.01 m3 Papan kayu bengkirai 98,781 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-343 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 127,528 0.43 . 60,640 - 66,888
0.01 m3 Papan kayu kruing 65,250 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .

www.mitra-arsitek.com 158/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-344 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur) 113,812 0.22 . 28,840 - 84,972
0.01 m3 Papan kayu jati (klas plitur) 83,334 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-345 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal) 113,812 0.22 . 28,840 - 84,972
0.01 m3 Papan kayu jati (lokal) 83,334 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-346 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 82,942 0.22 . 28,840 - 54,102
0.01 m3 Papan kayu kamper 52,464 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-347 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 89,065 0.22 . 28,840 - 60,226
0.01 m3 Papan kayu bengkirai 58,588 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-348 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 69,178 0.22 . 28,840 - 40,338
0.01 m3 Papan kayu kruing 38,700 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-349 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur) 88,618 0.22 . 28,840 - 59,778
0.01 m3 Papan kayu jati (klas plitur) 58,140 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-350 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal 88,618 0.22 . 28,840 - 59,778
0.01 m3 Papan kayu jati (lokal) 58,140 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .

www.mitra-arsitek.com 159/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-351 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper 67,081 0.22 . 28,840 - 38,241
0.01 m3 Papan kayu kamper 36,603 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-352 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai 71,353 0.22 . 28,840 - 42,513
0.01 m3 Papan kayu bengkirai 40,875 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-353 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing 57,478 0.22 . 28,840 - 28,638
0.01 m3 Papan kayu kruing 27,000 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-354 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) 76,990 0.22 . 28,840 - 48,150
0.00 m3 Papan kayu jati (klas plitur) 46,512 M.4.109 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-355 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) 76,990 0.22 . 28,840 - 48,150
0.00 m3 Papan kayu jati (lokal) 46,512 M.4.110 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-356 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper 59,760 0.22 . 28,840 - 30,920
0.00 m3 Papan kayu kamper 29,282 M.4.111 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-357 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai 63,178 0.22 . 28,840 - 34,338
0.00 m3 Papan kayu bengkirai 32,700 M.4.107 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .

www.mitra-arsitek.com 160/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-358 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing 52,078 0.22 . 28,840 - 23,238
0.00 m3 Papan kayu kruing 21,600 M.4.113 . . .
0.06 kg Paku biasa 2" - 5" 1,638 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-359 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal) 622,209 2.61 . 381,609 - 240,600
0.03 m3 Ram kayu jati (lokal) 202,500 M.4.115 . . .
1.00 m2 Asbes plat 33,000 M.4.346 . . .
0.30 kg Paku reng 5,100 M.4.164 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala Tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
AK-SNI 2008 S-360 1.00 m2 Membuat listplank asbes plat ram kayu kamper 555,559 2.61 . 381,609 - 173,950
0.03 m3 Ram kayu kamper 135,850 M.4.116 . . .
1.00 m2 Asbes plat 33,000 M.4.346 . . .
0.30 kg Paku reng 5,100 M.4.164 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala Tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
AK-SNI 2008 S-361 1.00 m2 Membuat listplank asbes plat ram kayu bengkirai 624,572 3.21 . 443,409 - 181,163
0.03 m3 Ram kayu bengkirai 143,063 M.4.114 . . .
1.00 m2 Asbes plat 33,000 M.4.346 . . .
0.30 kg Paku reng 5,100 M.4.164 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala Tukang 34,758 L.4.036 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
AK-SNI 2008 S-362 1.00 m2 Membuat listplank asbes plat ram kayu kruing 508,084 2.61 . 381,609 - 126,475
0.03 m3 Ram kayu kruing 88,375 M.4.117 . . .
1.00 m2 Asbes plat 33,000 M.4.346 . . .
0.30 kg Paku reng 5,100 M.4.164 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala Tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-363 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal) 354,413 0.65 . 95,518 - 258,895
0.03 m3 Balok kayu jati (lokal) 254,800 M.4.076 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-364 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper 279,144 0.65 . 95,518 - 183,625
0.03 m3 Balok kayu kamper 179,530 M.4.077 . . .

www.mitra-arsitek.com 161/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-365 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai 279,863 0.65 . 95,518 - 184,345
0.03 m3 Balok kayu bengkirai 180,250 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-366 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing 223,093 0.65 . 95,518 - 127,575
0.03 m3 Balok kayu kruing 123,480 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-367 1.00 m2 Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal)
427,423 0.65 . 95,518 - 331,905
0.03 m3 Balok kayu jati (lokal) 254,800 M.4.076 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 65,618 M.4.371 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-368 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper 352,154 0.65 . 95,518 - 256,635
0.03 m3 Balok kayu kamper 179,530 M.4.077 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 65,618 M.4.371 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-369 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
352,873 0.65 . 95,518 - 257,355
0.03 m3 Balok kayu bengkirai 180,250 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 65,618 M.4.371 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-370 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing296,103 0.65 . 95,518 - 200,585
0.03 m3 Balok kayu kruing 123,480 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Teakwood 4 mm, 120 x 240 65,618 M.4.371 . . .

www.mitra-arsitek.com 162/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.45 oh Tukang kayu 69,525 L.4.016 . . .
0.05 oh Kepala tukang 8,690 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2007 S-371 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper385,730 0.87 . 127,203 - 258,527
0.03 m3 Balok kayu kamper 179,530 M.4.077 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 67,510 M.4.365 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.60 oh Tukang kayu 92,700 L.4.016 . . .
0.06 oh Kepala tukang 11,586 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-372 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai 386,450 0.87 . 127,203 - 259,247
0.03 m3 Balok kayu bengkirai 180,250 M.4.073 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 67,510 M.4.365 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.60 oh Tukang kayu 92,700 L.4.016 . . .
0.06 oh Kepala tukang 11,586 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-373 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing 329,680 0.87 . 127,203 - 202,477
0.03 m3 Balok kayu kruing 123,480 M.4.079 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 lbr Plywood 120x240 tbl. 4 mm 67,510 M.4.365 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.60 oh Tukang kayu 92,700 L.4.016 . . .
0.06 oh Kepala tukang 11,586 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2007 S-374 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur) 454,254 2.61 . 381,609 - 72,645
0.01 m3 Papan kayu jati (klas plitur) 67,830 M.4.109 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-375 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal) 454,254 2.61 . 381,609 - 72,645
0.01 m3 Papan kayu jati (lokal) 67,830 M.4.110 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-376 1.00 m2 Memasang dinding lambriziring dari papan kayu kamper 429,128 2.61 . 381,609 - 47,519
0.01 m3 Papan kayu kamper 42,704 M.4.111 . . .

www.mitra-arsitek.com 163/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-377 1.00 m2 Memasang dinding lambriziring dari papan kayu bengkirai 434,112 2.61 . 381,609 - 52,503
0.01 m3 Papan kayu bengkirai 47,688 M.4.107 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-378 1.00 m2 Memasang dinding lambriziring dari papan kayu kruing 417,924 2.61 . 381,609 - 36,315
0.01 m3 Papan kayu kruing 31,500 M.4.113 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
0.60 oh Pekerja 61,800 L.4.001 . . .
1.80 oh Tukang kayu 278,100 L.4.016 . . .
0.18 oh Kepala tukang 34,758 L.4.036 . . .
0.03 oh Mandor 6,951 L.4.035 . . .
SNI-2007 S-379 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm 48,554 0.11 . 15,939 - 32,615
0.40 lbr Plywood 120x240 tbl. 4 mm 31,400 M.4.365 . . .
0.05 kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.03 oh Pekerja 2,575 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.00 oh Mandor 232 L.4.035 . . .
SNI-2007 S-380 1.00 m2 Memasang dinding bilik, rangka kayu kruing 217,877 0.16 . 20,149 - 197,728
1.50 m2 Bilik bambu 115,950 M.4.350 . . .
0.01 m3 Kaso-kaso (5 x 7) cm kruing 63,630 M.4.062 . . .
0.00 m3 List kayu 2/4 17,820 M.4.043 . . .
0.01 kg Paku Biasa 2" - 5" 328 M.4.158 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.05 oh Tukang kayu 7,725 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-381 1.00 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 56,419 0.12 . 17,113 - 39,306
0.00 m3 Papan kayu jati (lokal) 38,760 M.4.110 . . .
0.02 kg Paku biasa 2" - 5" 546 M.4.158 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.08 oh Tukang kayu 12,360 L.4.016 . . .
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.00 oh Mandor 324 L.4.035 . . .
AK-SNI 2008 S-382 1.00 m1 Mengerjakan papan ruiter kayu kamper 2/20 42,061 0.12 . 17,113 - 24,948
0.00 m3 Papan kayu kamper 24,402 M.4.111 . . .
0.02 kg Paku biasa 2" - 5" 546 M.4.158 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.08 oh Tukang kayu 12,360 L.4.016 . . .

www.mitra-arsitek.com 164/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.00 oh Mandor 324 L.4.035 . . .
AK-SNI 2008 S-383 1.00 m1 Mengerjakan papan ruiter kayu bengkirai 2/20 44,909 0.12 . 17,113 - 27,796
0.00 m3 Papan kayu bengkirai 27,250 M.4.107 . . .
0.02 kg Paku biasa 2" - 5" 546 M.4.158 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.08 oh Tukang kayu 12,360 L.4.016 . . .
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.00 oh Mandor 324 L.4.035 . . .
AK-SNI 2008 S-384 1.00 m1 Mengerjakan papan ruiter kayu kruing 2/20 35,659 0.12 . 17,113 - 18,546
0.00 m3 Papan kayu kruing 18,000 M.4.113 . . .
0.02 kg Paku biasa 2" - 5" 546 M.4.158 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.08 oh Tukang kayu 12,360 L.4.016 . . .
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.00 oh Mandor 324 L.4.035 . . .
SNI-2002 S-385 1.00 m2 Pasang plywood tebal 4 mm, untuk dinding 48,677 0.11 . 15,912 - 32,765
0.40 lbr Plywood 120x240 tbl. 4 mm 31,400 M.4.365 . . .
0.05 kg Paku biasa 2" - 5" 1,365 M.4.158 . . .
0.03 oh Pekerja 2,575 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala Tukang 1,448 L.4.036 . . .
0.00 oh Mandor 301 L.4.035 . . .
AK-SNI 2008 S-386 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) tanpa plepet
197,383 0.54 . 76,245 - 121,138
0.01 m3 Kayu jati (lokal) balok 90,900 M.4.088 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-387 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet179,689 0.54 . 76,245 - 103,444
0.01 m3 Kayu kamper balok 73,206 M.4.089 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-388 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet
188,233 0.54 . 76,245 - 111,988
0.01 m3 Kayu bengkirai balok 81,750 M.4.085 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-389 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet162,643 0.54 . 76,245 - 86,398
0.01 m3 Kayu kruing balok 56,160 M.4.091 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .

www.mitra-arsitek.com 165/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-390 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai203,215
plepet 0.54 . 76,245 - 126,970
0.01 m3 Kayu jati (lokal) balok 90,900 M.4.088 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
2.60 m1 Plepet kayu 5,460 M.4.045 . . .
0.01 kg Paku eternit 207 M.4.159 . . .
0.01 kg Paku plepet 165 M.4.163 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-391 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
185,521 0.54 . 76,245 - 109,276
0.01 m3 Kayu kamper balok 73,206 M.4.089 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
2.60 m1 Plepet kayu 5,460 M.4.045 . . .
0.01 kg Paku eternit 207 M.4.159 . . .
0.01 kg Paku plepet 165 M.4.163 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-392 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai 194,065
plepet 0.54 . 76,245 - 117,820
0.01 m3 Kayu bengkirai balok 81,750 M.4.085 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
2.60 m1 Plepet kayu 5,460 M.4.045 . . .
0.01 kg Paku eternit 207 M.4.159 . . .
0.01 kg Paku plepet 165 M.4.163 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-393 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
168,475 0.54 . 76,245 - 92,230
0.01 m3 Kayu kruing balok 56,160 M.4.091 . . .
0.06 kg Paku Biasa 2" - 5" 1,638 M.4.158 . . .
1.10 lbr Asbes 1,00 x 1,00 m 28,600 M.4.343 . . .
2.60 m1 Plepet kayu 5,460 M.4.045 . . .
0.01 kg Paku eternit 207 M.4.159 . . .
0.01 kg Paku plepet 165 M.4.163 . . .
0.18 oh Pekerja 18,540 L.4.001 . . .
0.32 oh Tukang kayu 49,440 L.4.016 . . .
0.03 oh Kepala Tukang 6,179 L.4.036 . . .
0.01 oh Mandor 2,085 L.4.035 . . .
AK-SNI 2008 S-394 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal)
249,453 0.66 . 91,810 - 157,643

www.mitra-arsitek.com 166/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Kayu jati (lokal) balok 98,475 M.4.088 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-395 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
230,285 0.66 . 91,810 - 138,475
0.01 m3 Kayu kamper balok 79,307 M.4.089 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-396 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
239,541 0.66 . 91,810 - 147,731
0.01 m3 Kayu bengkirai balok 88,563 M.4.085 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-397 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
211,818 0.66 . 91,810 - 120,008
0.01 m3 Kayu kruing balok 60,840 M.4.091 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-398 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow 207,530 0.66 . 91,810 - 115,720
4.50 m1 Hollow 4/4 56,700 M.4.141 . . .
0.36 lbr Gypsum board 9 mm 30,708 M.4.353 . . .

www.mitra-arsitek.com 167/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.15 kg Paku sekrup 120 M.4.165 . . .
5.00 m1 Kawat penggantung 2,500 M.4.153 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-399 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal)
242,865 0.66 . 91,810 - 151,055
0.01 m3 Kayu jati (lokal) balok 98,475 M.4.088 . . .
0.36 lbr Kalsiboard 3.5 mm 24,120 M.4.354 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-400 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper223,697 0.66 . 91,810 - 131,887
0.01 m3 Kayu kamper balok 79,307 M.4.089 . . .
0.36 lbr Kalsiboard 3.5 mm 24,120 M.4.354 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-401 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai232,953 0.66 . 91,810 - 141,143
0.01 m3 Kayu bengkirai balok 88,563 M.4.085 . . .
0.36 lbr Kalsiboard 3.5 mm 24,120 M.4.354 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-402 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 205,230 0.66 . 91,810 - 113,420
0.01 m3 Kayu kruing balok 60,840 M.4.091 . . .
0.36 lbr Kalsiboard 3.5 mm 24,120 M.4.354 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .

www.mitra-arsitek.com 168/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 kg Alkasit 147 M.4.004 . . .
0.05 kg Paku gypsum 860 M.4.160 . . .
0.12 kg Paku usuk 1,908 M.4.172 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
AK-SNI 2008 S-403 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 200,942 0.66 . 91,810 - 109,132
4.50 m1 Hollow 4/4 56,700 M.4.141 . . .
0.36 lbr Kalsiboard 3.5 mm 24,120 M.4.354 . . .
0.05 roll Kasa gypsum 23,745 M.4.538 . . .
0.45 kg Tepung gypsum 1,800 M.4.040 . . .
0.00 kg Alkasit 147 M.4.004 . . .
0.15 kg Paku sekrup 120 M.4.165 . . .
5.00 m1 Kawat penggantung 2,500 M.4.153 . . .
0.24 oh Pekerja 24,720 L.4.001 . . .
0.37 oh Tukang kayu 57,165 L.4.016 . . .
0.04 oh Kepala Tukang 7,145 L.4.036 . . .
0.01 oh Mandor 2,780 L.4.035 . . .
SNI-2007 S-404 1.00 m2 Memasang langit-langit asbes semen, tebal 4 mm 37,807 0.11 . 16,184 - 21,623
1.10 m2 Asbes semen tebal 4 mm 21,450 M.4.347 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
0.03 oh Pekerja 3,090 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2007 S-405 1.00 m2 Memasang langit-langit asbes semen, tebal 5 mm 40,887 0.11 . 16,184 - 24,703
1.10 m2 Asbes semen tebal 5 mm 24,530 M.4.348 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
0.03 oh Pekerja 3,090 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2007 S-406 1.00 m2 Memasang langit-langit asbes semen, tebal 6 mm 42,757 0.11 . 16,184 - 26,573
1.10 m2 Asbes semen tebal 6 mm 26,400 M.4.349 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
0.03 oh Pekerja 3,090 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2007 S-407 1.00 m2 Memasang langit-langit akustik ukuran (30 x 30) cm 460,272 0.26 . 34,607 - 425,665
12.00 lbr Akustik ukuran 30 x 30 cm 424,800 M.4.340 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.12 oh Tukang kayu 18,540 L.4.016 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-408 1.00 m2 Memasang langit-langit akustik ukuran (30 x 60) cm 364,945 0.22 . 28,840 - 336,105
5.80 lbr Akustik ukuran 30 x 60 cm 335,240 M.4.341 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .

www.mitra-arsitek.com 169/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-409 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm 225,605 0.22 . 28,840 - 196,765
1.50 lbr Akustik Uk. 60 cm x 120 cm 195,900 M.4.339 . . .
0.05 kg Paku tripleks 865 M.4.171 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-410 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm 44,359 0.22 . 28,840 - 15,519
0.38 lbr Tripleks 15,000 M.4.372 . . .
0.03 kg Paku tripleks 519 M.4.171 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-411 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm 44,359 0.22 . 28,840 - 15,519
0.38 lbr Tripleks 15,000 M.4.372 . . .
0.03 kg Paku tripleks 519 M.4.171 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-412 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm 44,359 0.22 . 28,840 - 15,519
0.38 lbr Tripleks 15,000 M.4.372 . . .
0.03 kg Paku tripleks 519 M.4.171 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-413 1.00 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm 284,964 1.72 . 230,716 - 54,248
0.02 m3 Kayu Papan 3/20 54,075 M.4.100 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
0.80 oh Pekerja 82,400 L.4.001 . . .
0.80 oh Tukang kayu 123,600 L.4.016 . . .
0.08 oh Kepala tukang 15,448 L.4.036 . . .
0.04 oh Mandor 9,268 L.4.035 . . .
SNI-2007 S-414 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal51,286
9 mm 0.16 . 20,149 - 31,137
0.36 lbr Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 88 M.4.165 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.05 oh Tukang kayu 7,725 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-415 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
395,943 1.08 . 144,198 - 251,745
3.60 m’ Profil Alluminium "T" 45,360 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,445 M.4.145 . . .
1.05 bh Baut Ramset / Dina Bolt 5,040 M.4.130 . . .

www.mitra-arsitek.com 170/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.50 lbr Akustik Uk. 60 cm x 120 cm 195,900 M.4.339 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.05 oh Kepala tukang 9,655 L.4.036 . . .
0.03 oh Mandor 5,793 L.4.035 . . .
SNI-2007 S-416 1.00 m1 Memasang ist langit-langit kayu profil 17,854 0.11 . 14,536 - 3,318
1.05 m1 List kayu profil 3,045 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 273 M.4.158 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.05 oh Tukang kayu 7,725 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.00 oh Mandor 695 L.4.035 . . .
AK-SNI 2008 S-417 1.00 m1 Pasang list profil cornees gypsum lebar sampai 5 cm 52,054 0.16 . 19,602 - 32,452
1.10 m1 List profil cornees gypsum 29,480 M.4.356 . . .
0.70 kg Tepung gypsum 2,800 M.4.040 . . .
0.00 kg Alkasit 172 M.4.004 . . .
0.11 oh Pekerja 11,588 L.4.001 . . .
0.04 oh Tukang kayu 5,794 L.4.016 . . .
0.00 oh Kepala Tukang 714 L.4.036 . . .
0.01 oh Mandor 1,506 L.4.035 . . .
AK-SNI 2008 S-418 1.00 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm 52,798 0.16 . 19,602 - 33,196
1.10 m1 List profil cornees gypsum 29,480 M.4.356 . . .
0.88 kg Tepung gypsum 3,500 M.4.040 . . .
0.00 kg Alkasit 216 M.4.004 . . .
0.11 oh Pekerja 11,588 L.4.001 . . .
0.04 oh Tukang kayu 5,794 L.4.016 . . .
0.00 oh Kepala Tukang 714 L.4.036 . . .
0.01 oh Mandor 1,506 L.4.035 . . .
AK-SNI 2008 S-419 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 53,986 0.16 . 20,046 - 33,940
1.10 m1 List profil cornees gypsum 29,480 M.4.356 . . .
1.05 kg Tepung gypsum 4,200 M.4.040 . . .
0.01 kg Alkasit 260 M.4.004 . . .
0.11 oh Pekerja 11,588 L.4.001 . . .
0.04 oh Tukang kayu 6,180 L.4.016 . . .
0.00 oh Kepala Tukang 772 L.4.036 . . .
0.01 oh Mandor 1,506 L.4.035 . . .
AK-SNI 2008 S-420 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak
3,478,400
berlubang
22.00 . 3,282,600 - 195,800
1.00 lb Kertas 100 x 100 cm 5,600 M.4.594 . . .
15.00 lbr Kerta karbon 57,000 M.4.593 . . .
2.00 oh Tukang gambar 360,400 L.4.014 . . .
16.00 oh Tukang Ukir 2,265,600 L.4.023 . . .
1.00 oh Kepala Tukang 193,100 L.4.036 . . .
20.00 lbr Amplas 130,000 M.4.548 . . .
0.08 kg Dempul 3,200 M.4.388 . . .
3.00 oh Tukang kayu 463,500 L.4.016 . . .
AK-SNI 2008 S-421 1.00 m3 Memasang usuk peniung, kayu jati (klas plitur) 12,143,430 30.45 . 4,452,105 - 7,691,325
1.20 m3 Balok kayu papan (klas plitur) 7,644,000 M.4.080 . . .
1.25 kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 kg Lem kayu 13,200 M.4.553 . . .
7.00 oh Pekerja 721,000 L.4.001 . . .

www.mitra-arsitek.com 171/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
21.00 oh Tukang kayu 3,244,500 L.4.016 . . .
2.10 oh Kepala tukang 405,510 L.4.036 . . .
0.35 oh Mandor 81,095 L.4.035 . . .
SNI-2002 S-422 1.00 m2 Pasang Atap Genteng Palentong Kecil 92,936 0.24 . 30,436 - 62,500
25.00 bh Genteng palentong 62,500 M.4.494 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
AK-SNI 2008 S-423 1.00 m2 Pasang genteng paris 62,798 0.32 . 40,298 - 22,500
25.00 bh Genteng paris 22,500 M.4.496 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-424 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 65,498 0.32 . 40,298 - 25,200
9.00 bh Genteng beton natural 25,200 M.4.486 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-425 1.00 m1 Pasang Genteng Bubung Palentong 108,749 0.62 . 76,425 - 32,323
5.00 bh Genteng Bubung Palentong 10,000 M.4.490 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
SNI-2002 S-426 1.00 m1 Pasang Nok Genteng Beton 122,254 0.64 . 80,596 - 41,658
3.50 lbr Genteng Beton 10,150 M.4.485 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
10.80 Kg Semen 20,520 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
1.00 Kg Semen Warna 2,500 M.4.036 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-427 1.00 m1 Pasang bubungan genteng paris 204,600 0.64 . 80,596 - 124,004
5.00 bh Bubungan genteng paris 110,500 M.4.483 . . .
0.02 m3 Kapur pasang 7,225 M.4.022 . . .
0.02 m3 Pasir pasang 3,384 M.4.030 . . .
1.52 kg Semen 2,896 M.4.033 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
SNI-2002 S-428 1.00 m2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 84,770 0.23 . 29,406 - 55,364
0.50 lbr Asbes Gelombang 53,900 M.4.344 . . .

www.mitra-arsitek.com 172/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-429 1.00 m2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 95,550 0.23 . 29,406 - 66,144
0.60 lbr Asbes Gelombang 64,680 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-430 1.00 m2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 94,353 0.22 . 28,209 - 66,144
0.60 lbr Asbes Gelombang 64,680 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-431 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 110,523 0.22 . 28,209 - 82,314
0.75 lbr Asbes Gelombang 80,850 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-432 1.00 m2 Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 67,403 0.22 . 28,209 - 39,194
0.35 lbr Asbes Gelombang 37,730 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-433 1.00 m2 Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 74,949 0.22 . 28,209 - 46,740
0.42 lbr Asbes Gelombang 45,276 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-434 1.00 m2 Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 76,641 0.22 . 27,745 - 48,896
0.44 lbr Asbes Gelombang 47,432 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-435 1.00 m2 Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 84,187 0.22 . 27,745 - 56,442
0.51 lbr Asbes Gelombang 54,978 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .

www.mitra-arsitek.com 173/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-436 1.00 m2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 115,449 0.22 . 27,745 - 87,704
0.80 lbr Asbes Gelombang 86,240 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-437 1.00 m2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 69,095 0.22 . 27,745 - 41,350
0.37 lbr Asbes Gelombang 39,886 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-438 1.00 m2 Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 70,173 0.22 . 27,745 - 42,428
0.38 lbr Asbes Gelombang 40,964 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-439 1.00 m2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 78,797 0.22 . 27,745 - 51,052
0.46 lbr Asbes Gelombang 49,588 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-440 1.00 m2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 82,031 0.22 . 27,745 - 54,286
0.49 lbr Asbes Gelombang 52,822 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-441 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 90,655 0.22 . 27,745 - 62,910
0.57 lbr Asbes Gelombang 61,446 M.4.344 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-442 1.00 m1 Pasang Nok Stel Gelombang 0.92m 276,922 0.23 . 31,402 - 245,520
2.40 lbr Nok Stel Gelombang 172,320 M.4.506 . . .
6.00 Kg Paku Pancing 60 x 230 73,200 M.4.162 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .

www.mitra-arsitek.com 174/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-443 1.00 m1 Pasang Nok Stel Gelombang 1.05m 260,782 0.23 . 31,402 - 229,380
2.10 lbr Nok Stel Gelombang 150,780 M.4.506 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-444 1.00 m1 Pasang Nok Stel Gelombang 1.08m 257,192 0.23 . 31,402 - 225,790
2.05 lbr Nok Stel Gelombang 147,190 M.4.506 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-445 1.00 m1 Pasang Nok Paten 0.92m 158,842 0.23 . 31,402 - 127,440
1.20 lbr Nok Paten 48,840 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-446 1.00 m1 Pasang Nok Paten 1.05m 158,842 0.23 . 31,402 - 127,440
1.20 lbr Nok Paten 48,840 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-447 1.00 m1 Pasang Nok Paten 1.08m 158,842 0.23 . 31,402 - 127,440
1.20 lbr Nok paten 48,840 M.4.503 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .
0.01 oh Kepala Tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-448 1.00 m1 Pasang Nok Stel rata 0.92m 180,852 0.27 . 36,912 - 143,940
1.10 lbr Nok Stel rata 65,340 M.4.507 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-449 1.00 m1 Pasang Nok Stel rata 1.05m 175,342 0.23 . 31,402 - 143,940
1.10 lbr Nok Stel rata 65,340 M.4.507 . . .
6.00 Kg Paku sekrup 3,5" 78,600 M.4.166 . . .
0.08 oh Pekerja 8,652 L.4.001 . . .
0.13 oh Tukang kayu 19,313 L.4.016 . . .

www.mitra-arsitek.com 175/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Kepala tukang 2,510 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2002 S-450 1.00 m2 Pasang Nok Atap Seng 31,567 0.10 . 15,295 - 16,272
0.30 lbr Seng Gelombang 3" x 6" BJLS 28 15,300 M.4.368 . . .
0.04 Kg Paku Biasa ½" - 1" 972 M.4.157 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.07 oh Tukang kayu 10,815 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-451 1.00 m2 Pasang Atap Alluminium 186,069 0.10 . 16,068 - 170,001
1.05 m2 Atap Alluminium Gelombang tebal 0.55 169,785 M.4.478 . . .
0.02 Kg Paku Hak Panjang 15cm 216 M.4.161 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-452 1.00 m2 Pasang Nok Alluminium 265,720 1.12 . 169,048 - 96,672
1.20 m2 Nok standar 40 cm 18, swg 22 96,240 M.4.504 . . .
0.04 Kg Paku Hak Panjang 15cm 432 M.4.161 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
1.00 oh Tukang kayu 154,500 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-453 1.00 m2 Pasang Alluminium Foil / Sisalation 56,234 0.21 . 25,994 - 30,240
1.05 m2 Aluminium foil 30,240 M.4.121 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.05 oh Tukang kayu 7,725 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-454 1.00 m2 Pasang Atap Genteng Aspal 137,840 0.51 . 69,846 - 67,994
6.90 lbr Genteng Aspal 21,390 M.4.484 . . .
0.35 lbr Plywood 120x240 tbl. 4 mm 27,475 M.4.365 . . .
0.03 Kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 Bh Plastic Aerator 18,400 M.4.363 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang kayu 46,350 L.4.016 . . .
0.00 oh Kepala tukang 579 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-455 1.00 m2 Pasang Atap Genteng Metal 79,781 0.31 . 38,213 - 41,568
1.02 lbr Genteng Metal 36,108 M.4.493 . . .
0.20 Kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.00 oh Mandor 232 L.4.035 . . .
SNI-2002 S-456 1.00 m2 Pasang Atap Genteng Kodok / Glazzur 72,936 0.24 . 30,436 - 42,500
25.00 bh Genteng Kodok 42,500 M.4.492 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.08 oh Tukang kayu 11,588 L.4.016 . . .
0.01 oh Kepala tukang 1,545 L.4.036 . . .

www.mitra-arsitek.com 176/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-457 1.00 m2 Pasang Atap Genteng Palentong Super / Besar 72,132 0.22 . 27,732 - 44,400
12.00 bh Genteng Palentong Super 44,400 M.4.495 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.06 oh Tukang kayu 9,270 L.4.016 . . .
0.01 oh Kepala tukang 1,159 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-458 1.00 m2 Pasang Atap Sirap 307,264 0.45 . 62,404 - 244,860
60.00 lbr Genteng Sirap 240,000 M.4.497 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
0.17 oh Pekerja 17,098 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-459 1.00 m1 Pasang Genteng Bubung Kodok Glazzur 106,249 0.62 . 76,425 - 29,823
5.00 bh Genteng Bubung Kodok 7,500 M.4.489 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
SNI-2002 S-460 1.00 m1 Pasang Genteng Bubung Palentong Besar 106,749 0.62 . 76,425 - 30,323
4.00 bh Genteng Bubung Palentong 8,000 M.4.490 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
SNI-2002 S-461 1.00 m1 Pasang Rooflight Fiberglass ( 180 x 90 ) cm 109,450 0.22 . 27,745 - 81,705
0.60 lbr Roof Light Fiberglass 80,340 M.4.508 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang kayu 10,352 L.4.016 . . .
0.01 oh Kepala tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-462 1.00 m1 Pasang Nok Genteng Aspal 121,550 0.41 . 57,718 - 63,833
2.00 lbr Nok Genteng Aspal 50,000 M.4.498 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.00 m3 Balok Kayu Borneo 12,618 M.4.074 . . .
0.13 oh Pekerja 12,875 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-463 1.00 m1 Pasang Nok Genteng Metal 134,149 0.43 . 54,834 - 79,315
1.10 lbr Nok Genteng Decra Bond 78,100 M.4.500 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .

www.mitra-arsitek.com 177/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
SNI-2002 S-464 1.00 m1 Pasang Nok Sirap 95,921 0.41 . 57,718 - 38,203
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 20,400 M.4.368 . . .
0.06 Kg Paku Biasa ½" - 1" 1,458 M.4.157 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
0.00 m3 Papan Kayu Borneo tebal 3cm 14,980 M.4.108 . . .
0.13 oh Pekerja 12,875 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala tukang 4,828 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-465 1.00 m2 Pasang Atap Seng Gelombang 60,365 0.19 . 24,179 - 36,186
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 35,700 M.4.368 . . .
0.02 Kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.12 oh Pekerja 12,360 L.4.001 . . .
0.06 oh Tukang kayu 9,270 L.4.016 . . .
0.01 oh Kepala tukang 1,159 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
AK-SNI 2008 S-466 1.00 m2 Pasang genteng paris untuk rumah tingkat 74,257 0.43 . 51,757 - 22,500
25.00 bh Genteng paris 22,500 M.4.496 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
AK-SNI 2008 S-467 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat76,957 0.43 . 51,757 - 25,200
9.00 bh Genteng beton natural 25,200 M.4.486 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
AK-SNI 2008 S-468 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 66,398 0.32 . 40,298 - 26,100
9.00 bh Genteng beton Warna 26,100 M.4.487 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-469 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat77,857 0.43 . 51,757 - 26,100
9.00 bh Genteng beton Warna 26,100 M.4.487 . . .
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
AK-SNI 2008 S-470 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 140,348 0.32 . 40,298 - 100,050
14.50 bh Genteng keramik KIA natural 100,050 M.4.491 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-471 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah 92,357
tingkat 0.43 . 51,757 - 40,600
14.50 bh Genteng beton natural 40,600 M.4.486 . . .

www.mitra-arsitek.com 178/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 oh Pekerja 30,900 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.02 oh Mandor 3,476 L.4.035 . . .
AK-SNI 2008 S-472 1.00 m2 Pasang bubungan genteng beton Warna 186,500 0.64 . 80,596 - 105,904
4.00 bh Bubungan genteng beton warna 92,400 M.4.482 . . .
0.02 m3 Kapur pasang 7,225 M.4.022 . . .
0.02 m3 Pasir pasang 3,384 M.4.030 . . .
1.52 kg Semen 2,896 M.4.033 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-473 1.00 m2 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural212,900 0.64 . 80,596 - 132,304
4.00 bh Bubungan gent.krmk KIA natural 118,800 M.4.481 . . .
0.02 m3 Kapur pasang 7,225 M.4.022 . . .
0.02 m3 Pasir pasang 3,384 M.4.030 . . .
1.52 kg Semen 2,896 M.4.033 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.20 oh Tukang batu 30,900 L.4.007 . . .
0.02 oh Kepala Tukang 3,862 L.4.036 . . .
0.02 oh Mandor 4,634 L.4.035 . . .
AK-SNI 2008 S-474 1.00 m2 Pasang atap metal gelombang 108,811 0.31 . 38,213 - 70,598
1.02 m2 Atap metal gelombang t 0.35 mm 66,198 M.4.479 . . .
4.00 bh Paku/skrup atap anti karat 4,400 M.4.173 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.00 oh Mandor 232 L.4.035 . . .
AK-SNI 2008 S-475 1.00 m1 Pasang nok genteng metal U type prima roof 140,529 0.43 . 54,834 - 85,695
1.10 bh Nok metal 84,700 M.4.502 . . .
0.05 kg Paku anti karat 995 M.4.156 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala Tukang 2,897 L.4.036 . . .
0.01 oh Mandor 3,012 L.4.035 . . .
AK-SNI 2008 S-476 1.00 m2 Pasang atap polikarbonat 313,084 1.05 . 139,634 - 173,450
1.05 m2 Polycarbonat 154,350 M.4.364 . . .
7.00 kg Besi rangka 11,900 M.4.138 . . .
9.00 bh Paku sekrup 7,200 M.4.165 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.50 oh Tukang besi 77,900 L.4.008 . . .
0.05 oh Kepala Tukang 9,655 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-477 1.00 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 18,414 0.15 . 16,029 - 2,385
0.05 kg Soda api 2,385 M.4.562 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-478 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 16,599 0.15 . 16,029 - 570
0.05 kg Sabun 570 M.4.561 . . .

www.mitra-arsitek.com 179/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.15 oh Pekerja 15,450 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-479 1.00 m2 Mendempul dan Menggosok Kayu 15,339 0.09 . 11,136 - 4,203
0.08 kg Dempul 3,200 M.4.388 . . .
0.02 kg Minyak cat 700 M.4.397 . . .
0.01 kg Batu apung 303 M.4.012 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.04 oh Tukang Cat 5,664 L.4.010 . . .
0.00 oh Kepala tukang 772 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-480 1.00 m2 Pengecatan Bidang Kayu Lama 41,308 0.16 . 19,858 - 21,450
0.15 kg Plamir 8,445 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.17 kg Cat kayu 8,330 M.4.385 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.08 oh Tukang Cat 10,620 L.4.010 . . .
0.01 oh Kepala tukang 1,448 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-481 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 239,342
Lapis Cat 0.09
Penutup . 10,222 - 29,120
0.20 kg Cat meni 3,260 M.4.386 . . .
0.15 kg Plamir 8,445 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.26 kg Cat kayu 12,740 M.4.385 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.01 oh Tukang Cat 1,274 L.4.010 . . .
0.01 oh Kepala tukang 1,159 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-482 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 356,960
Lapis Cat 0.18
Penutup . 23,430 - 33,530
0.20 kg Cat meni 3,260 M.4.386 . . .
0.15 kg Plamir 8,445 M.4.399 . . .
0.17 kg Cat dasar 4,675 M.4.378 . . .
0.35 kg Cat kayu 17,150 M.4.385 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.11 oh Tukang Cat 14,868 L.4.010 . . .
0.00 oh Kepala tukang 772 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-483 1.00 m2 Pelaburan Bidang Kayu dengan Teak Oil 31,725 0.17 . 25,785 - 5,940
0.36 ltr Teak oil 5,940 M.4.401 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.06 oh Tukang Cat 8,921 L.4.010 . . .
0.06 oh Kepala tukang 12,165 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-484 1.00 m2 Pelaburan Bidang Kayu dengan Pelitur 44,740 0.08 . 12,165 - 32,575
0.15 ltr Politur 5,625 M.4.400 . . .
0.37 ltr Politur 13,950 M.4.400 . . .
2.00 lbr Amplas 13,000 M.4.548 . . .
0.06 oh Tukang cat 8,496 L.4.010 . . .
0.02 oh Kepala Tukang 3,090 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-485 1.00 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 14,735 0.11 . 11,690 - 3,045

www.mitra-arsitek.com 180/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 ltr Residu 3,045 M.4.560 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-486 1.00 m2 Pelaburan Bidang Kayu dengan Vernis 62,196 0.34 . 42,805 - 19,391
0.15 Ltr Vernis 16,560 M.4.403 . . .
0.05 Kg Dempul 2,000 M.4.388 . . .
0.10 Lbr Amplas 650 M.4.548 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.16 oh Pekerja 16,480 L.4.001 . . .
0.16 oh Tukang Cat 22,656 L.4.010 . . .
0.02 oh Kepala tukang 3,090 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-487 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
30,985 ) 0.09 . 12,777 - 18,208
0.10 Kg Plamir 5,630 M.4.399 . . .
0.10 Kg Cat dasar 2,750 M.4.378 . . .
0.26 Kg Cat Penutup Tembok 9,828 M.4.387 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.06 oh Tukang Cat 8,921 L.4.010 . . .
0.01 oh Kepala tukang 1,217 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-488 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,325 0.08 . 10,221 - 10,104
0.12 kg Cat dasar 3,300 M.4.378 . . .
0.18 lbr Cat Penutup Tembok 6,804 M.4.387 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.04 oh Tukang Cat 5,947 L.4.010 . . .
0.00 oh Kepala tukang 811 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-489 1.00 m2 Melabur tembok dengan kalkarium 10,741 0.08 . 10,221 - 520
0.10 kg Kalkarium 520 M.4.592 . . .
0.03 oh Pekerja 2,884 L.4.001 . . .
0.04 oh Tukang Cat 5,947 L.4.010 . . .
0.00 oh Kepala tukang 811 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-490 1.00 m2 Melabur Tembok dengan Kapur Sirih 21,730 0.15 . 16,190 2,835 2,705
0.10 Lbr Amplas 650 M.4.548 . . .
0.25 ikat Alang-alang 150 M.4.003 . . .
0.00 m3 Perancah Kayu 2,835 T.4.011 . . .
0.15 Kg Kapur Sirih 1,905 M.4.023 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.00 oh Tukang Cat 142 L.4.010 . . .
0.00 oh Kepala tukang 19 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-491 1.00 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 12,149 0.05 . 5,504 2,835 3,810
0.00 m3 Perancah Kayu 2,835 T.4.011 . . .
0.30 Kg Kapur Sirih 3,810 M.4.023 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.01 oh Tukang Cat 708 L.4.010 . . .
0.00 oh Kepala tukang 97 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-492 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi 39,920 0.25 . 36,559 - 3,361

www.mitra-arsitek.com 181/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 Kg Meni besi 3,180 M.4.393 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.20 oh Tukang Cat 28,320 L.4.010 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-493 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 69,889 0.51 . 63,693 2,835 3,361
0.10 Kg Meni besi 3,180 M.4.393 . . .
0.01 Bh Kuas 181 M.4.390 . . .
0.00 m3 Perancah kayu 2,835 T.4.011 . . .
0.25 oh Pekerja 25,750 L.4.001 . . .
0.23 oh Tukang Cat 31,860 L.4.010 . . .
0.02 oh Kepala tukang 4,345 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-494 1.00 m2 Pemasangan Wall Paper 80,885 0.22 . 31,345 - 49,540
1.20 m3 Wallpaper 40,800 M.4.374 . . .
0.20 Kg Perekat 8,740 M.4.559 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.20 oh Tukang Cat 28,320 L.4.010 . . .
0.00 oh Kepala tukang 386 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-495 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
19,9994 Lapis
0.04
Cat Konvensional,
. tebal 2007,550
um 2,835 9,614
0.10 Kg Meni ( Read Lead ) A 3,440 M.4.391 . . .
0.10 Kg Meni ( Read Lead ) B 3,750 M.4.392 . . .
0.04 Kg Alluminium C 1,056 M.4.119 . . .
0.04 Kg Alluminium B 1,000 M.4.118 . . .
0.01 Ltr Pengencer 368 M.4.398 . . .
0.00 m3 Perancah Kayu 2,835 T.4.011 . . .
0.01 oh Pekerja 618 L.4.001 . . .
0.01 oh Tukang Cat 850 L.4.010 . . .
0.02 oh Kepala tukang 4,345 L.4.036 . . .
0.01 oh Mandor 1,738 L.4.035 . . .
SNI-2002 S-496 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
22,3611 Lapis
0.08
Cat Mutakhir,
. tebal 200 um
12,821 - 9,540
0.30 Kg Meni Besi 9,540 M.4.393 . . .
0.01 oh Pekerja 618 L.4.001 . . .
0.06 oh Tukang Cat 8,496 L.4.010 . . .
0.01 oh Kepala tukang 2,317 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-497 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem
284,7023 Lapis
1.80
Cat Konvensional,
. tebal269,050
200 um - 15,652
0.11 Kg Cat Dasar 3,025 M.4.378 . . .
0.17 Kg Cat Antara 8,347 M.4.376 . . .
0.08 Kg Cat Besi 4,280 M.4.377 . . .
0.50 oh Pekerja 51,500 L.4.001 . . .
0.80 oh Tukang Cat 113,280 L.4.010 . . .
0.30 oh Kepala tukang 57,930 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2002 S-498 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot 233,530
( Airless Spray
1.50
) dgn Sistem
. 1 Lapis Cat
225,280
Mutakhir, tebal -200 um 8,250
0.30 Kg Cat Dasar 8,250 M.4.378 . . .
0.40 oh Pekerja 41,200 L.4.001 . . .
0.70 oh Tukang Cat 99,120 L.4.010 . . .

www.mitra-arsitek.com 182/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 oh Kepala tukang 38,620 L.4.036 . . .
0.20 oh Mandor 46,340 L.4.035 . . .
SNI-2002 S-499 1.00 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 16,599 0.15 . 16,029 - 570
0.05 Kg Sabun 570 M.4.561 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-500 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir 858,690
( Sanblasting4.50
) dgn Tingkat
. Kebersihan
661,690
Sa 2½. - 197,000
40.00 Kg Pasir Silika 92,000 M.4.031 . . .
10.00 Ltr Bahan Bakar 105,000 M.4.549 . . .
1.60 oh Pekerja 164,800 L.4.001 . . .
1.60 oh Tukang Cat 226,560 L.4.010 . . .
0.80 oh Kepala tukang 154,480 L.4.036 . . .
0.50 oh Mandor 115,850 L.4.035 . . .
SNI-2002 S-501 1.00 m2 Menyabun Permukaan Tembok Lama 16,599 0.15 . 16,029 - 570
0.05 Kg Sabun 570 M.4.561 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
AK-SNI 2008 S-502 1.00 m2 Pengecatan tembok tidak terlindung dari panas dan hujan 36,813 0.09 . 12,777 - 24,036
0.10 kg Cat alkali resisting primer 3,300 M.4.375 . . .
0.36 kg Cat ICI Weathershield 20,736 M.4.384 . . .
0.06 oh Tukang cat 8,921 L.4.010 . . .
0.01 oh Kepala Tukang 1,217 L.4.036 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.00 oh Mandor 579 L.4.035 . . .
AK-SNI 2008 S-503 1.00 m2 Pengecatan bidang besi ( 3 x ) 42,327 0.18 . 23,430 - 18,897
0.17 kg Cat meni 2,722 M.4.386 . . .
0.20 kg Cat besi 10,700 M.4.377 . . .
0.15 ltr Tinner 5,475 M.4.402 . . .
0.07 oh Pekerja 7,210 L.4.001 . . .
0.11 oh Tukang cat 14,868 L.4.010 . . .
0.00 oh Kepala Tukang 772 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
AK-SNI 2008 S-504 1.00 m2 Pengetiran kayu ( 2 x ) 14,504 0.11 . 11,459 - 3,045
0.35 kg Residu 3,045 M.4.560 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
AK-SNI 2008 S-505 1.00 m2 Pekerjaan cat duco 3 x 101,546 0.54 . 71,190 - 30,356
0.43 kg Cat duco 27,625 M.4.382 . . .
0.06 ltr Tinner 2,081 M.4.402 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.10 lbr Amplas 650 M.4.548 . . .
0.30 oh Tukang cat 42,480 L.4.010 . . .
0.03 oh Kepala Tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-506 1.00 m2 Mengecat genteng 33,513 0.09 . 12,777 - 20,736
0.36 kg Cat ICI Weathershield 20,736 M.4.384 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.06 oh Tukang cat 8,921 L.4.010 . . .
0.01 oh Kepala Tukang 1,217 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .

www.mitra-arsitek.com 183/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-SNI 2008 S-507 1.00 m2 Mengecat kerb 3 kali 91,588 0.54 . 71,190 - 20,398
0.43 kg Cat emco 18,403 M.4.383 . . .
0.06 ltr Minyak cat 1,995 M.4.397 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang cat 42,480 L.4.010 . . .
0.03 oh Kepala Tukang 5,793 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-SNI 2008 S-508 1.00 m2 Memasang Prodo Mas 24 karat 5,404,340 9.10 . 1,546,460 - 3,857,880
1.20 m2 Prodo 3,852,000 M.4.597 . . .
0.12 kg Cat kayu 5,880 M.4.385 . . .
0.10 oh Tukang cat 14,160 L.4.010 . . .
8.00 oh Tukang Prodo 1,339,200 L.4.022 . . .
1.00 oh Kepala tukang 193,100 L.4.036 . . .
AK-SNI 2008 S-509 1.00 m2 Mengerjakan Cat Sungging 867,819 5.82 . 841,538 - 26,281
0.12 kg Cat meni 1,956 M.4.386 . . .
0.04 oh Tukang cat 5,664 L.4.010 . . .
0.00 oh Kepala Tukang 772 L.4.036 . . .
0.07 oh Pekerja 6,870 L.4.001 . . .
0.00 oh Mandor 765 L.4.035 . . .
0.43 kg Cat kayu 20,825 M.4.385 . . .
0.10 ltr Minyak cat 3,500 M.4.397 . . .
5.00 oh Tukang cat 708,000 L.4.010 . . .
0.50 oh Kepala Tukang 96,550 L.4.036 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-510 1.00 bh Memasang Kloset Duduk / Monoblok 3,255,755 4.56 . 547,115 8,640 2,700,000
1.00 bh Kloset duduk / monoblock 2,700,000 M.4.191 . . .
0.06 Ls Perlengkapan Kloset 8,640 T.4.015 . . .
3.30 oh Pekerja 339,900 L.4.001 . . .
1.10 oh Tukang batu 169,950 L.4.007 . . .
0.00 oh Kepala Tukang 193 L.4.036 . . .
0.16 oh Mandor 37,072 L.4.035 . . .
SNI-2002 S-511 1.00 bh Memasang 1Kloset Jongkok Porselen 835,598 4.16 . 661,472 - 174,126
1.00 bh Kloset jongkok porselen 160,500 M.4.192 . . .
6.00 kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
1.50 oh Tukang batu 231,750 L.4.007 . . .
1.50 oh Kepala Tukang 289,650 L.4.036 . . .
0.16 oh Mandor 37,072 L.4.035 . . .
SNI-2002 S-512 1.00 bh Memasang Kloset Jongkok Teraso 696,293 2.91 . 418,167 - 278,126
1.00 bh Kloset jongkok teraso 257,500 M.4.193 . . .
7.00 bh Bata merah 7,000 M.4.007 . . .
6.00 kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
1.50 oh Tukang batu 231,750 L.4.007 . . .
0.30 oh Kepala Tukang 57,930 L.4.036 . . .
0.11 oh Mandor 25,487 L.4.035 . . .
SNI-2002 S-513 1.00 bh Memasang Urinoir 1,884,606 2.20 . 299,980 45,000 1,539,626

www.mitra-arsitek.com 184/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 bh Urinoir 1,526,000 M.4.200 . . .
0.30 Ls Perlengkapan Urinoir 45,000 T.4.017 . . .
6.00 kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
1.00 oh Tukang batu 154,500 L.4.007 . . .
0.10 oh Kepala Tukang 19,310 L.4.036 . . .
0.10 oh Mandor 23,170 L.4.035 . . .
SNI-2002 S-514 1.00 bh Memasang Wastafel 1,896,966 2.90 . 399,760 19,080 1,478,126
1.00 bh Wastafel 1,464,500 M.4.201 . . .
0.12 Ls Perlengkapan Wastafel 19,080 T.4.018 . . .
6.00 kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
1.20 oh Pekerja 123,600 L.4.001 . . .
1.45 oh Tukang batu 224,025 L.4.007 . . .
0.15 oh Kepala Tukang 28,965 L.4.036 . . .
0.10 oh Mandor 23,170 L.4.035 . . .
SNI-2002 S-515 1.00 bh Memasang Bak Mandi Fiberglass, volume 0.30 m³ 1,097,431 5.15 . 732,311 25,920 339,200
1.00 bh Bak fiberglass 339,200 M.4.186 . . .
0.18 Ls Perlengkapan Bak 25,920 T.4.014 . . .
1.80 oh Pekerja 185,400 L.4.001 . . .
2.70 oh Tukang batu 417,150 L.4.007 . . .
0.54 oh Kepala Tukang 104,274 L.4.036 . . .
0.11 oh Mandor 25,487 L.4.035 . . .
SNI-2002 S-516 1.00 bh Memasang Badkip Porselen 364,038 2.08 . 317,338 30,300 16,400
1.00 bh Badkip 16,400 M.4.586 . . .
0.20 Ls Perlengkapan Badkip 30,300 T.4.013 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
0.08 oh Tukang batu 11,588 L.4.007 . . .
0.75 oh Kepala Tukang 144,825 L.4.036 . . .
0.25 oh Mandor 57,925 L.4.035 . . .
SNI-2002 S-517 1.00 bh Memasang Bak Fiberglass volume 1 m³ air 1,743,050 9.30 . 1,386,570 17,280 339,200
1.00 bh Bak fiberglass 339,200 M.4.186 . . .
0.12 Ls Perlengkapan Bak 17,280 T.4.014 . . .
3.00 oh Pekerja 309,000 L.4.001 . . .
4.50 oh Tukang batu 695,250 L.4.007 . . .
0.90 oh Kepala Tukang 173,790 L.4.036 . . .
0.90 oh Mandor 208,530 L.4.035 . . .
SNI-2002 S-518 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 95,564 0.10 . 11,974 - 83,590
1.60 bh Pipa tanah 76,640 M.4.198 . . .
0.68 kg Semen 1,292 M.4.033 . . .
0.01 m3 Pasir pasang 2,894 M.4.030 . . .
0.01 m3 Pasir urug 2,764 M.4.032 . . .
0.06 oh Pekerja 6,180 L.4.001 . . .
0.03 oh Tukang batu 4,635 L.4.007 . . .
0.00 oh Kepala Tukang 579 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-519 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 101,742 0.13 . 16,814 - 84,928
1.60 bh Pipa tanah 76,640 M.4.198 . . .
0.87 Kg Semen 1,653 M.4.033 . . .

www.mitra-arsitek.com 185/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 m3 Pasir pasang 3,116 M.4.030 . . .
0.01 m3 Pasir urug 3,518 M.4.032 . . .
0.08 oh Pekerja 8,240 L.4.001 . . .
0.04 oh Tukang batu 6,180 L.4.007 . . .
0.00 oh Kepala Tukang 772 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-520 1.00 m1 Memasang Pipa Beton Ø 5 cm - 20 cm 128,893 0.22 . 28,209 - 100,685
1.10 bh Pipa beton 58,740 M.4.196 . . .
16.00 bh Bata merah 16,000 M.4.007 . . .
3.92 kg Semen 7,448 M.4.033 . . .
0.06 m3 Pasir pasang 12,466 M.4.030 . . .
0.02 m3 Pasir urug 6,031 M.4.032 . . .
0.14 oh Pekerja 14,420 L.4.001 . . .
0.07 oh Tukang batu 10,815 L.4.007 . . .
0.01 oh Kepala Tukang 1,352 L.4.036 . . .
0.01 oh Mandor 1,622 L.4.035 . . .
SNI-2002 S-521 1.00 m1 Memasang Pipa Beton Ø 30 cm - 100 cm 515,795 0.61 . 76,566 - 439,228
1.10 bh Pipa beton 58,740 M.4.196 . . .
330.00 bh Bata merah 330,000 M.4.007 . . .
10.30 kg Semen 19,570 M.4.033 . . .
0.06 m3 Pasir pasang 13,579 M.4.030 . . .
0.07 m3 Pasir urug 17,340 M.4.032 . . .
0.38 oh Pekerja 39,140 L.4.001 . . .
0.19 oh Tukang batu 29,355 L.4.007 . . .
0.02 oh Kepala Tukang 3,669 L.4.036 . . .
0.02 oh Mandor 4,402 L.4.035 . . .
SNI-2002 S-522 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t =733,791
35 cm 4.23 . 490,414 - 243,377
87.00 bh Bata merah 87,000 M.4.007 . . .
44.00 kg Semen 83,600 M.4.033 . . .
0.07 m3 Pasir pasang 15,582 M.4.030 . . .
0.07 m3 Kerikil 16,947 M.4.024 . . .
1.60 kg Besi beton 22,560 M.4.132 . . .
0.06 m3 Pasir beton 17,688 M.4.028 . . .
3.20 oh Pekerja 329,600 L.4.001 . . .
1.02 oh Tukang batu 156,818 L.4.007 . . .
0.00 oh Kepala Tukang 290 L.4.036 . . .
0.02 oh Mandor 3,707 L.4.035 . . .
SNI-2002 S-523 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t =638,137
50 cm 2.01 . 244,865 - 393,272
150.00 bh Bata merah 150,000 M.4.007 . . .
77.00 kg Semen 146,300 M.4.033 . . .
0.13 m3 Pasir pasang 28,938 M.4.030 . . .
0.02 m3 Kerikil 4,842 M.4.024 . . .
2.60 kg Besi beton 36,660 M.4.132 . . .
0.09 m3 Pasir beton 26,532 M.4.028 . . .
1.42 oh Pekerja 146,260 L.4.001 . . .
0.47 oh Tukang batu 73,079 L.4.007 . . .
0.05 oh Kepala Tukang 9,076 L.4.036 . . .
0.07 oh Mandor 16,451 L.4.035 . . .
SNI-2002 S-524 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t =977,086
65 cm 3.16 . 385,777 - 591,309
222.00 bh Bata merah 222,000 M.4.007 . . .

www.mitra-arsitek.com 186/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
114.00 kg Semen 216,600 M.4.033 . . .
0.18 m3 Pasir pasang 40,958 M.4.030 . . .
0.03 m3 Kerikil 7,989 M.4.024 . . .
4.85 kg Besi beton 68,385 M.4.132 . . .
0.12 m3 Pasir beton 35,376 M.4.028 . . .
2.16 oh Pekerja 222,480 L.4.001 . . .
0.72 oh Tukang batu 111,240 L.4.007 . . .
0.07 oh Kepala Tukang 13,903 L.4.036 . . .
0.11 oh Mandor 25,024 L.4.035 . . .
0.10 oh Tukang Gali 13,130 L.4.031 . . .
SNI-2002 S-525 1.00 m1 Memasang Pipa Galvanis Ø ½" 109,166 0.18 . 27,461 57,225 24,480
1.20 m1 Pipa galvanis ½” 24,480 M.4.212 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.05 oh Pekerja 5,562 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.03 oh Mandor 6,256 L.4.035 . . .
SNI-2002 S-526 1.00 m1 Memasang Pipa Galvanis Ø ¾" 115,886 0.18 . 27,461 57,225 31,200
1.20 m1 Pipa galvanis 3/4” 31,200 M.4.213 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.05 oh Pekerja 5,562 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.03 oh Mandor 6,256 L.4.035 . . .
SNI-2002 S-527 1.00 m1 Memasang Pipa Galvanis Ø 1" 136,046 0.18 . 27,461 57,225 51,360
1.20 m1 Pipa galvanis 1” 51,360 M.4.214 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.05 oh Pekerja 5,562 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.03 oh Mandor 6,256 L.4.035 . . .
SNI-2002 S-528 1.00 m1 Memasang Pipa Galvanis Ø 1½" 190,286 0.31 . 43,661 57,225 89,400
1.20 m1 Pipa galvanis 11/2” 89,400 M.4.215 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.11 oh Pekerja 11,124 L.4.001 . . .
0.18 oh Tukang batu 27,810 L.4.007 . . .
0.02 oh Kepala Tukang 3,476 L.4.036 . . .
0.01 oh Mandor 1,251 L.4.035 . . .
SNI-2002 S-529 1.00 m1 Memasang Pipa Galvanis Ø 3" 222,086 0.31 . 43,661 57,225 121,200
1.20 m1 Pipa galvanis 3” 121,200 M.4.216 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.11 oh Pekerja 11,124 L.4.001 . . .
0.18 oh Tukang batu 27,810 L.4.007 . . .
0.02 oh Kepala Tukang 3,476 L.4.036 . . .
0.01 oh Mandor 1,251 L.4.035 . . .
SNI-2002 S-530 1.00 m1 Memasang Pipa Galvanis Ø 4" 283,893 0.39 . 54,588 57,225 172,080
1.20 m1 Pipa galvanis 4” 172,080 M.4.217 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.14 oh Pekerja 13,905 L.4.001 . . .
0.23 oh Tukang batu 34,763 L.4.007 . . .

www.mitra-arsitek.com 187/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 oh Kepala Tukang 4,345 L.4.036 . . .
0.01 oh Mandor 1,576 L.4.035 . . .
SNI-2002 S-531 1.00 m1 Memasang Pipa PVC tipe AW Ø ½" 77,059 0.10 . 14,554 57,225 5,280
1.20 m1 Pipa PVC 1/2" 5,280 M.4.203 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.04 oh Pekerja 3,708 L.4.001 . . .
0.06 oh Tukang batu 9,270 L.4.007 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.00 oh Mandor 417 L.4.035 . . .
SNI-2002 S-532 1.00 m1 Memasang Pipa PVC tipe AW Ø ¾" 78,259 0.10 . 14,554 57,225 6,480
1.20 m1 Pipa PVC 3/4" 6,480 M.4.204 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.04 oh Pekerja 3,708 L.4.001 . . .
0.06 oh Tukang batu 9,270 L.4.007 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.00 oh Mandor 417 L.4.035 . . .
SNI-2002 S-533 1.00 m1 Memasang Pipa PVC tipe AW Ø 1" 79,339 0.10 . 14,554 57,225 7,560
1.20 m1 Pipa PVC 1” 7,560 M.4.205 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.04 oh Pekerja 3,708 L.4.001 . . .
0.06 oh Tukang batu 9,270 L.4.007 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.00 oh Mandor 417 L.4.035 . . .
SNI-2002 S-534 1.00 m1 Memasang Pipa PVC tipe AW Ø 1½" 80,059 0.10 . 14,554 57,225 8,280
1.20 m1 Pipa PVC 11/2” 8,280 M.4.206 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.04 oh Pekerja 3,708 L.4.001 . . .
0.06 oh Tukang batu 9,270 L.4.007 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.00 oh Mandor 417 L.4.035 . . .
SNI-2002 S-535 1.00 m1 Memasang Pipa PVC tipe AW Ø 2" 87,857 0.16 . 21,872 57,225 8,760
1.20 m1 Pipa PVC 2” 8,760 M.4.207 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.05 oh Pekerja 5,603 L.4.001 . . .
0.09 oh Tukang batu 13,905 L.4.007 . . .
0.01 oh Kepala Tukang 1,738 L.4.036 . . .
0.00 oh Mandor 626 L.4.035 . . .
SNI-2002 S-536 1.00 m1 Memasang Pipa PVC tipe AW Ø 2½" 80,779 0.10 . 14,554 57,225 9,000
1.20 m1 Pipa PVC 21/2” 9,000 M.4.208 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.04 oh Pekerja 3,708 L.4.001 . . .
0.06 oh Tukang batu 9,270 L.4.007 . . .
0.01 oh Kepala Tukang 1,159 L.4.036 . . .
0.00 oh Mandor 417 L.4.035 . . .
SNI-2002 S-537 1.00 m1 Memasang Pipa PVC tipe AW Ø 3" 99,222 0.23 . 32,757 57,225 9,240
1.20 m1 Pipa PVC 3" 9,240 M.4.209 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.08 oh Pekerja 8,343 L.4.001 . . .
0.14 oh Tukang batu 20,858 L.4.007 . . .
0.01 oh Kepala Tukang 2,607 L.4.036 . . .

www.mitra-arsitek.com 188/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 950 L.4.035 . . .
SNI-2002 S-538 1.00 m1 Memasang Pipa PVC tipe AW Ø 4" 106,312 0.23 . 37,447 57,225 11,640
1.20 m1 Pipa PVC 4" 11,640 M.4.211 . . .
0.35 Ls Perlengkapan Pipa 57,225 T.4.016 . . .
0.08 oh Pekerja 8,343 L.4.001 . . .
0.14 oh Kepala Tukang 26,069 L.4.036 . . .
0.01 oh Tukang batu 2,086 L.4.007 . . .
0.00 oh Mandor 950 L.4.035 . . .
SNI-2002 S-539 1.00 bh Memasang Bak Cuci Piring Stainles Steel 592,981 0.36 . 55,581 - 537,400
1.00 bh Bak cuci piring 464,400 M.4.185 . . .
1.00 set Waterdrain 73,000 M.4.202 . . .
0.03 oh Pekerja 3,090 L.4.001 . . .
0.30 oh Tukang batu 46,350 L.4.007 . . .
0.03 oh Kepala Tukang 5,793 L.4.036 . . .
0.00 oh Mandor 348 L.4.035 . . .
SNI-2002 S-540 1.00 bh Memasang Bak Cuci Piring Teraso 679,164 0.60 . 92,634 - 586,530
1.00 bh Bak cuci piring 464,400 M.4.185 . . .
1.00 set Waterdrain 73,000 M.4.202 . . .
20.00 kg Semen 38,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,130 M.4.030 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.50 oh Tukang batu 77,250 L.4.007 . . .
0.05 oh Kepala Tukang 9,655 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-541 1.00 bh Memasang Kran Ø ¾" atau ½" 46,460 0.13 . 19,570 - 26,890
1.00 bh Kran air 26,800 M.4.194 . . .
0.03 bh Sealtape 90 M.4.599 . . .
0.01 oh Pekerja 1,030 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-542 1.00 bh Memasang Floor Drain 81,370 0.13 . 19,570 - 61,800
1.00 bh Floor drain 61,800 M.4.189 . . .
0.01 oh Pekerja 1,030 L.4.001 . . .
0.10 oh Tukang batu 15,450 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-543 1.00 bh Memasang Bak Mandi Teraso, volume 0.30 m3 569,005 3.03 . 371,179 - 197,826
1.00 bh Bak mandi teraso 184,200 M.4.187 . . .
6.00 kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
2.10 oh Pekerja 216,300 L.4.001 . . .
0.75 oh Tukang batu 115,875 L.4.007 . . .
0.07 oh Kepala Tukang 13,517 L.4.036 . . .
0.11 oh Mandor 25,487 L.4.035 . . .
SNI-2002 S-544 1.00 bh Memasang bak mandi batu bata volume 0,30 m3 4,213,920 9.60 . 1,208,940 - 3,004,980
240.00 bh Bata merah 240,000 M.4.007 . . .
120.00 Kg Semen 228,000 M.4.033 . . .
0.30 m3 Pasir pasang 66,780 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,412,000 M.4.449 . . .

www.mitra-arsitek.com 189/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
6.00 Kg Semen nat 58,200 M.4.035 . . .
6.00 oh Pekerja 618,000 L.4.001 . . .
3.00 oh Tukang batu 463,500 L.4.007 . . .
0.30 oh Kepala Tukang 57,930 L.4.036 . . .
0.30 oh Mandor 69,510 L.4.035 . . .
SNI-2002 S-545 1.00 bh Membuat bak beton volume 1 m3 air 5,583,500 9.80 . 1,438,070 27,540 4,117,890
0.90 m3 Beton kedap air 262,890 M.4.532 . . .
180.00 kg Besi beton 2,538,000 M.4.132 . . .
8.00 m2 Kayu cetakan 1,284,000 M.4.046 . . .
5.00 m2 Ubin porselen 33,000 M.4.463 . . .
0.10 Ls Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
3.50 oh Pekerja 360,500 L.4.001 . . .
4.50 oh Tukang batu 695,250 L.4.007 . . .
0.90 oh Kepala Tukang 173,790 L.4.036 . . .
0.90 oh Mandor 208,530 L.4.035 . . .
SNI-2007 S-546 1.00 kg Memasang besi profil 36,195 0.13 . 16,530 - 19,665
1.15 kg Besi profil 19,665 M.4.137 . . .
0.06 oh Pekerja 6,180 L.4.001 . . .
0.06 oh Tukang las 8,496 L.4.017 . . .
0.01 oh Kepala tukang 1,159 L.4.036 . . .
0.00 oh Mandor 695 L.4.035 . . .
SNI-2007 S-547 100.00 kg Mengerjakan pekerjaan perakitan 90,462 0.21 . 27,232 50,960 12,270
1.00 lte Solar 8,800 M.4.563 . . .
0.10 ltr Minyak pelumas 3,470 M.4.557 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang besi 15,580 L.4.008 . . .
0.00 oh Kepala tukang 193 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
0.80 Jam Sewa alat perakitan baja 50,960 T.4.021 . . .
SNI-2007 S-548 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja856,259
siku 2.26 . 304,064 - 552,195
15.00 kg Besi siku L 30.30.3 205,500 M.4.139 . . .
32.80 kg Besi plat baja 344,400 M.4.136 . . .
0.05 kg Kawat las listrik 2,295 M.4.150 . . .
1.05 oh Pekerja 108,150 L.4.001 . . .
1.05 oh Tukang besi 163,590 L.4.008 . . .
0.11 oh Kepala tukang 20,276 L.4.036 . . .
0.05 oh Mandor 12,048 L.4.035 . . .
SNI-2007 S-549 10.00 cm Mengerjakan pengelasan dengan las listrik 57,504 0.06 . 8,086 27,030 22,388
0.40 kg Kawat las listrik 18,360 M.4.150 . . .
0.30 ltr Solar 2,640 M.4.563 . . .
0.04 ltr Minyak pelumas 1,388 M.4.557 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.02 oh Tukang besi 3,116 L.4.008 . . .
0.00 oh Kepala tukang 386 L.4.036 . . .
0.00 oh Mandor 463 L.4.035 . . .
0.17 Jam Sewa alat las 27,030 T.4.020 . . .
SNI-2007 S-550 1.00 m2 Membuat rangka jendela besi square tube (25 x 5) cm 617,003 1.40 . 188,186 - 428,817
4.76 m1 Besi square tube 128,996 M.4.140 . . .
4.52 m1 Besi lis kaca (1 x 1) cm 209,821 M.4.135 . . .
20.00 cm Pengelasan 90,000 M.4.596 . . .

www.mitra-arsitek.com 190/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.65 oh Pekerja 66,950 L.4.001 . . .
0.65 oh Tukang besi 101,270 L.4.008 . . .
0.07 oh Kepala tukang 12,552 L.4.036 . . .
0.03 oh Mandor 7,414 L.4.035 . . .
SNI-2007 S-551 1.00 m2 Memasang pintu rolling door besi 879,622 2.53 . 335,122 - 544,500
1.00 m2 Pintu gulung besi 544,500 M.4.176 . . .
1.20 oh Pekerja 123,600 L.4.001 . . .
1.20 oh Tukang besi 186,960 L.4.008 . . .
0.12 oh Kepala tukang 23,172 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2007 S-552 1.00 m2 Memasang pintu lipat (Folding door) 627,466 0.95 . 127,466 - 500,000
1.00 m2 Pintu lipat 500,000 M.4.585 . . .
0.44 oh Pekerja 45,320 L.4.001 . . .
0.44 oh Tukang besi 68,552 L.4.008 . . .
0.04 oh Kepala tukang 8,496 L.4.036 . . .
0.02 oh Mandor 5,097 L.4.035 . . .
SNI-2007 S-553 1.00 m2 Memasang sunscreen alluminium 414,255 0.96 . 149,255 - 265,000
1.00 m2 Sunscreen alumunium 265,000 M.4.184 . . .
0.08 oh Pekerja 8,240 L.4.001 . . .
0.80 oh Tukang besi 124,640 L.4.008 . . .
0.08 oh Kepala tukang 15,448 L.4.036 . . .
0.00 oh Mandor 927 L.4.035 . . .
SNI-2007 S-554 1.00 m2 Memasang rolling door alluminium 804,495 2.15 . 289,695 - 514,800
1.00 m2 Rolling door alluminium 514,800 M.4.180 . . .
1.00 oh Pekerja 103,000 L.4.001 . . .
1.00 oh Tukang besi 155,800 L.4.008 . . .
0.10 oh Kepala tukang 19,310 L.4.036 . . .
0.05 oh Mandor 11,585 L.4.035 . . .
SNI-2007 S-555 1.00 m1 Memasang kusen pintu alluminium 162,557 0.09 . 12,389 - 150,168
1.10 m1 Profil kusen alluminium 135,960 M.4.178 . . .
2.00 bh Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 13,608 M.4.598 . . .
0.04 oh Pekerja 4,429 L.4.001 . . .
0.04 oh Tukang besi konstruksi 6,644 L.4.009 . . .
0.00 oh Kepala tukang 830 L.4.036 . . .
0.00 oh Mandor 487 L.4.035 . . .
SNI-2007 S-556 1.00 m2 Memasang pintu alluminium strip lebar 8 cm 958,162 0.18 . 24,502 - 933,660
4.40 m1 Profil kusen alluminium 543,840 M.4.178 . . .
14.60 m1 Aluminium strip 389,820 M.4.122 . . .
0.09 oh Pekerja 8,755 L.4.001 . . .
0.09 oh Tukang besi konstruksi 13,133 L.4.009 . . .
0.01 oh Kepala tukang 1,641 L.4.036 . . .
0.00 oh Mandor 973 L.4.035 . . .
SNI-2007 S-557 1.00 m2 Memasang pintu kaca rangka alluminium 2,336,130 0.18 . 24,894 - 2,311,236
4.40 m1 Pintu alluminium 1,960,200 M.4.174 . . .
4.50 m1 Profil kaca 289,800 M.4.529 . . .
0.27 tube Sealant 61,236 M.4.598 . . .
0.09 oh Pekerja 8,755 L.4.001 . . .
0.09 oh Tukang besi 13,243 L.4.008 . . .
0.01 oh Kepala tukang 1,738 L.4.036 . . .

www.mitra-arsitek.com 191/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2007 S-558 1.00 m2 Memasang venetions blinds dan Vertical blinds 181,009 0.75 . 101,509 - 79,500
1.00 m2 Venetions blinds dan vertical blinds (tirai) 79,500 M.4.604 . . .
0.35 oh Pekerja 36,050 L.4.001 . . .
0.35 oh Tukang besi 54,530 L.4.008 . . .
0.04 oh Kepala tukang 6,759 L.4.036 . . .
0.02 oh Mandor 4,171 L.4.035 . . .
SNI-2007 S-559 1.00 m2 Memasang terali besi strip (2 x 3) mm 688,307 3.59 . 483,675 - 204,632
6.18 kg Baja strip (0,2 x 2) cm 82,772 M.4.128 . . .
27.08 cm Pengelasan 121,860 M.4.596 . . .
1.67 oh Pekerja 172,010 L.4.001 . . .
1.67 oh Tukang besi 260,186 L.4.008 . . .
0.17 oh Kepala tukang 32,248 L.4.036 . . .
0.08 oh Mandor 19,231 L.4.035 . . .
SNI-2007 S-560 1.00 m2 Memasang kawat nyamuk dengan plepet baja strip 114,939 0.22 . 28,970 - 85,969
1.10 m2 Kawat nyamuk 12,980 M.4.152 . . .
11.11 cm Pengelasan 49,995 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 22,994 M.4.128 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang besi 15,580 L.4.008 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-561 1.00 m2 Pasang kawat nyamuk dengan plepet kayu 53,028 0.21 . 27,797 - 25,231
1.10 m2 Kawat nyamuk 12,980 M.4.152 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,765 M.4.096 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2007 S-562 1.00 m2 Memasang jendela nako & tralis 221,654 0.42 . 55,854 - 165,800
1.10 m2 Jendela nako (rangka + kaca 5 mm) 66,000 M.4.577 . . .
10.00 bh Paku skrup 1 cm – 2,5 cm 6,000 M.4.167 . . .
7.00 m1 Baja strip (0,2 x 2) cm 93,800 M.4.128 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.20 oh Tukang besi 31,160 L.4.008 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.00 oh Mandor 232 L.4.035 . . .
SNI-2007 S-563 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
130,330 0.49 . 69,837 - 60,493
1.05 m Seng Gelombang 3" x 6" BJLS 28 53,550 M.4.368 . . .
0.01 kg Paku Biasa ½" - 1" 243 M.4.157 . . .
0.50 kg Baja strip (0,2 x 2) cm 6,700 M.4.128 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.30 oh Tukang besi 46,740 L.4.008 . . .
0.03 oh Kepala tukang 5,793 L.4.036 . . .
0.01 oh Mandor 1,854 L.4.035 . . .
SNI-2002 S-564 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati 206,583 0.58 . 82,367 - 124,216
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu jati papan 89,376 M.4.094 . . .

www.mitra-arsitek.com 192/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.25 kg Flincoat 8,975 M.4.389 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-565 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal) 216,615 0.58 . 82,367 - 134,248
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu jati (lokal) papan 99,408 M.4.093 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-566 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper 179,955 0.58 . 82,367 - 97,588
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu kamper papan 62,748 M.4.096 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-567 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing 160,839 0.58 . 82,367 - 78,472
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu kruing papan 43,632 M.4.098 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-568 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 176,007 0.58 . 82,367 - 93,640
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.01 m3 Kayu bengkirai papan 58,800 M.4.092 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.15 oh Pekerja 15,450 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-569 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1) 318,572 0.47 . 71,037 - 247,535
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu jati papan (klas 1) 210,900 M.4.095 . . .
0.30 kg Flincoat 10,770 M.4.389 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .

www.mitra-arsitek.com 193/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
SNI-2002 S-570 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal) 302,622 0.47 . 71,037 - 231,585
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu jati (lokal) papan 196,745 M.4.093 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-571 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper 230,066 0.47 . 71,037 - 159,029
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu kamper papan 124,190 M.4.096 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-572 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing 192,232 0.47 . 71,037 - 121,195
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu kruing papan 86,355 M.4.098 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-573 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 222,252 0.47 . 71,037 - 151,215
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 25,500 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu bengkirai papan 116,375 M.4.092 . . .
0.25 kg Flincoat 8,975 M.4.389 . . .
0.04 oh Pekerja 4,120 L.4.001 . . .
0.40 oh Tukang kayu 61,800 L.4.016 . . .
0.03 oh Kepala Tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
AK-SNI 2008 S-574 1.00 m1 Pasang talang torong 1,513,900 6.49 . 913,900 - 600,000
10.00 m1 Seng Gelombang 3" x 6" BJLS 28 510,000 M.4.368 . . .
225.00 bh Paku sumbat 90,000 M.4.170 . . .
2.25 oh Pekerja 231,750 L.4.001 . . .
3.75 oh Tukang besi 584,250 L.4.008 . . .
0.38 oh Kepala Tukang 72,413 L.4.036 . . .
0.11 oh Mandor 25,487 L.4.035 . . .
SNI-2002 S-575 1.00 m2 Pasang jendela besi 1,083,867 2.21 . 291,867 - 792,000
1.00 m2 Jendela besi 792,000 M.4.575 . . .
1.05 oh Pekerja 108,150 L.4.001 . . .
1.05 oh Tukang besi konstruksi 162,225 L.4.009 . . .
0.11 oh Kepala Tukang 20,276 L.4.036 . . .
0.01 oh Mandor 1,216 L.4.035 . . .
SNI-2002 S-576 1.00 m2 Pasang jendela besi tahan api 1,107,228 2.35 . 315,228 - 792,000

www.mitra-arsitek.com 194/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 m2 Jendela besi 792,000 M.4.575 . . .
1.02 oh Pekerja 105,266 L.4.001 . . .
1.20 oh Tukang besi konstruksi 185,400 L.4.009 . . .
0.12 oh Kepala Tukang 23,172 L.4.036 . . .
0.01 oh Mandor 1,390 L.4.035 . . .
SNI-2002 S-577 1.00 m2 Pasang pintu alumunium 510,055 2.21 . 291,855 - 218,200
1.00 m2 Pintu alumunium 218,200 M.4.175 . . .
1.05 oh Pekerja 108,150 L.4.001 . . .
1.05 oh Tukang besi konstruksi 162,225 L.4.009 . . .
0.11 oh Kepala Tukang 20,276 L.4.036 . . .
0.01 oh Mandor 1,205 L.4.035 . . .
SNI-2002 S-578 1.00 m2 Pasang kawat harmonika 85,368 0.21 . 27,797 - 57,571
1.10 m2 Kawat harmonika 45,320 M.4.147 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,765 M.4.096 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2002 S-579 1.00 m2 Pasang kawat kassa 53,138 0.21 . 27,797 - 25,341
1.10 m2 Kawat kassa 13,090 M.4.149 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,765 M.4.096 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2002 S-580 1.00 m2 Pasang kawat burung 57,868 0.21 . 27,797 - 30,071
1.10 m2 Kawat burung 17,820 M.4.144 . . .
0.02 kg Paku Biasa ½" - 1" 486 M.4.157 . . .
0.00 m3 Kayu kamper papan 11,765 M.4.096 . . .
0.10 oh Pekerja 10,300 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2002 S-581 1.00 bh Pasang kunci Tanam Antik 383,661 0.72 . 111,161 - 272,500
1.00 bh kunci Tanam Antik 272,500 M.4.582 . . .
0.06 oh Pekerja 6,180 L.4.001 . . .
0.60 oh Tukang kayu 92,700 L.4.016 . . .
0.06 oh Kepala tukang 11,586 L.4.036 . . .
0.00 oh Mandor 695 L.4.035 . . .
SNI-2002 S-582 1.00 bh Pasang kunci Tanam Biasa 223,070 0.53 . 81,370 - 141,700
1.00 bh Kunci tanam biasa 141,700 M.4.583 . . .
0.01 oh Pekerja 1,030 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.01 oh Mandor 1,159 L.4.035 . . .
SNI-2002 S-583 1.00 bh Pasang kunci Tanam Kamar Mandi 128,810 0.51 . 79,310 - 49,500
1.00 bh Kunci tanam KM 49,500 M.4.584 . . .
0.01 oh Pekerja 515 L.4.001 . . .

www.mitra-arsitek.com 195/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-584 1.00 bh Pasang kunci Silinder 158,288 0.51 . 78,788 - 79,500
1.00 bh Kunci silinder 79,500 M.4.580 . . .
0.01 oh Pekerja 515 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.01 oh Kepala tukang 966 L.4.036 . . .
0.00 oh Mandor 58 L.4.035 . . .
SNI-2002 S-585 1.00 bh Pasang Engsel Pintu 45,190 0.18 . 27,790 - 17,400
1.00 bh Engsel pintu 17,400 M.4.574 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-586 1.00 bh Pasang Engsel Jendela Kupu - kupu 27,227 0.12 . 18,527 - 8,700
1.00 bh Engsel jendela 8,700 M.4.572 . . .
0.01 oh Pekerja 1,030 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2002 S-587 1.00 bh Buah Pasang Engsel Angin 47,039 0.25 . 39,139 - 7,900
1.00 bh Engsel angin 7,900 M.4.571 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
SNI-2002 S-588 1.00 bh Pasang Spring Knip 35,990 0.18 . 27,790 - 8,200
1.00 bh Spring knip 8,200 M.4.600 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-589 1.00 bh Pasang Kait angin 33,490 0.18 . 27,790 - 5,700
1.00 bh Kait angin 5,700 M.4.142 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-590 1.00 bh Pasang Door Closer 347,634 0.60 . 92,634 - 255,000
1.00 bh Door closer 255,000 M.4.568 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.05 oh Kepala tukang 9,655 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-591 1.00 bh Pasang kunci selot 86,054 0.24 . 37,054 - 49,000
1.00 bh Kunci slot 49,000 M.4.581 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.20 oh Tukang kayu 30,900 L.4.016 . . .
0.02 oh Kepala tukang 3,862 L.4.036 . . .

www.mitra-arsitek.com 196/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 oh Mandor 232 L.4.035 . . .
SNI-2002 S-592 1.00 bh Pasang pegangan pintu / door holder 194,534 0.60 . 92,634 - 101,900
1.00 bh Door holder 101,900 M.4.569 . . .
0.05 oh Pekerja 5,150 L.4.001 . . .
0.50 oh Tukang kayu 77,250 L.4.016 . . .
0.05 oh Kepala tukang 9,655 L.4.036 . . .
0.00 oh Mandor 579 L.4.035 . . .
SNI-2002 S-593 1.00 bh Pasang door stop 112,627 0.12 . 18,527 - 94,100
1.00 bh Door stop 94,100 M.4.570 . . .
0.01 oh Pekerja 1,030 L.4.001 . . .
0.10 oh Tukang kayu 15,450 L.4.016 . . .
0.01 oh Kepala tukang 1,931 L.4.036 . . .
0.00 oh Mandor 116 L.4.035 . . .
SNI-2002 S-594 1.00 bh Pasang rel pintu dorong 311,161 0.72 . 111,161 - 200,000
1.00 bh Rel pintu dorong 200,000 M.4.179 . . .
0.06 oh Pekerja 6,180 L.4.001 . . .
0.60 oh Tukang kayu 92,700 L.4.016 . . .
0.06 oh Kepala tukang 11,586 L.4.036 . . .
0.00 oh Mandor 695 L.4.035 . . .
SNI-2002 S-595 1.00 bh Pasang kunci lemari 58,917 0.30 . 46,317 - 12,600
1.00 bh Kunci lemari 12,600 M.4.579 . . .
0.03 oh Pekerja 2,575 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-596 1.00 m2 Pasang kaca, tebal 3 mm 151,210 0.18 . 27,790 - 123,420
1.10 m2 Kaca polos 123,420 M.4.524 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-597 1.00 m2 Pasang kaca, tebal 5 mm 151,210 0.18 . 27,790 - 123,420
1.10 m2 Kaca polos 123,420 M.4.524 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-598 1.00 m2 Pasang kaca, tebal 8 mm 153,984 0.20 . 30,564 - 123,420
1.10 m2 Kaca polos 123,420 M.4.524 . . .
0.02 oh Pekerja 1,700 L.4.001 . . .
0.17 oh Tukang kayu 25,493 L.4.016 . . .
0.02 oh Kepala tukang 3,186 L.4.036 . . .
0.00 oh Mandor 185 L.4.035 . . .
SNI-2002 S-599 1.00 m2 Pasang kaca buram, tebal 12 mm 224,517 0.30 . 46,317 - 178,200
1.10 m2 Kaca buram 12 mm 178,200 M.4.520 . . .
0.03 oh Pekerja 2,575 L.4.001 . . .
0.25 oh Tukang kayu 38,625 L.4.016 . . .
0.03 oh Kepala tukang 4,828 L.4.036 . . .
0.00 oh Mandor 290 L.4.035 . . .
SNI-2002 S-600 1.00 m2 Pasang kaca cermin, tebal 5 mm 206,650 0.18 . 27,790 - 178,860

www.mitra-arsitek.com 197/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.10 m2 Kaca cermin 5 mm 178,860 M.4.521 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-601 1.00 m2 Pasang kaca cermin, tebal 6 mm 27,790 0.18 . 27,790 - -
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-602 1.00 m2 Pasang kaca cermin, tebal 8 mm 209,424 0.20 . 30,564 - 178,860
1.10 m2 Kaca cermin 5 mm 178,860 M.4.521 . . .
0.02 oh Pekerja 1,700 L.4.001 . . .
0.17 oh Tukang kayu 25,493 L.4.016 . . .
0.02 oh Kepala tukang 3,186 L.4.036 . . .
0.00 oh Mandor 185 L.4.035 . . .
SNI-2002 S-603 1.00 m2 Pasang kaca "wireglass", tebal 5 mm 304,440 0.18 . 27,790 - 276,650
1.10 m2 Kaca wire glass 276,650 M.4.528 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
SNI-2002 S-604 1.00 m2 Pasang kaca patri, tebal 5 mm 127,890 0.18 . 27,790 - 100,100
1.10 m2 Kaca patri 5mm 100,100 M.4.523 . . .
0.02 oh Pekerja 1,545 L.4.001 . . .
0.15 oh Tukang kayu 23,175 L.4.016 . . .
0.02 oh Kepala tukang 2,897 L.4.036 . . .
0.00 oh Mandor 174 L.4.035 . . .
. . . .
. . . .
DAFTAR ANALISA TAMBAHAN . . . .
Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Data Empiris/Data Pelaksanaan Di Lapangan . . . .
. . . .
. . . .
. . . .
STANDAR ID Koef. Unit Uraian - - . - - -
. . . .
AK-I.2016.(1) A-001 1.00 Ls Pekerjaan Mobilisasi dan demobilisasi 3,151,000 - . - - 3,151,000
2.00 Ls Upah Kerja Mobiliasasi/Demobilisasi 1,782,000 M.4.608 . . .
2.00 Ls Alat Kerja Mobilisasi/Demobilisasi 864,000 M.4.609 . . .
2.00 Ls Bahan Kerja Mobilisasi/Demobilisasi 505,000 M.4.610 . . .
AK-I.2016.(2) A-002 1.00 unit Pekerjaan Pasangan Pintu utama type P1 2,591,270 1.40 . 198,270 104,000 2,289,000
1.00 set Pintu Utama (Kusen+Panel) Type P1 2,289,000 M.4.622 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.50 Oh Pekerja 51,500 L.4.001 . . .
0.80 Oh Tukang Kayu 123,600 L.4.016 . . .
0.10 Oh Mandor 23,170 L.4.035 . . .
AK-I.2016.(3) A-003 1.00 unit Pekerjaan Pasangan Pintu Ruangan type P2 1,982,270 1.40 . 198,270 104,000 1,680,000
1.00 set Pintu Utama (Kusen+Panel) Type P2 1,680,000 M.4.623 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .

www.mitra-arsitek.com 198/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 Oh Pekerja 51,500 L.4.001 . . .
0.80 Oh Tukang Kayu 123,600 L.4.016 . . .
0.10 Oh Mandor 23,170 L.4.035 . . .
AK-I.2016.(4) A-004 1.00 unit Pekerjaan Pasangan Pintu WC type P3 1,479,270 1.40 . 198,270 104,000 1,177,000
1.00 set Pintu Utama (Kusen+Panel) Type P3 1,177,000 M.4.624 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.50 Oh Pekerja 51,500 L.4.001 . . .
0.80 Oh Tukang Kayu 123,600 L.4.016 . . .
0.10 Oh Mandor 23,170 L.4.035 . . .
AK-I.2016.(5) A-005 unit Pekerjaan Pasangan Jendela type J1 1,127,985 0.95 . 135,185 52,000 940,800
1.00 set Jendela Type J1 940,800 M.4.625 . . .
0.20 Ls Perlengkapan 52,000 T.4.012 . . .
0.30 Oh Pekerja 30,900 L.4.001 . . .
0.60 Oh Tukang Kayu 92,700 L.4.016 . . .
0.05 Oh Mandor 11,585 L.4.035 . . .
AK-I.2016.(6) A-006 unit Pekerjaan Pasangan Jendela type J2 895,319 1.37 . 191,319 104,000 600,000
1.00 set Jendela Type J2 600,000 M.4.626 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.50 Oh Pekerja 51,500 L.4.001 . . .
0.80 Oh Tukang Kayu 123,600 L.4.016 . . .
0.07 Oh Mandor 16,219 L.4.035 . . .
AK-I.2016.(7) A-007 1.00 unit Pekerjaan Pasangan Jendela type J3 2,842,320 1.70 . 234,320 208,000 2,400,000
1.00 set Jendela Type J3 2,400,000 M.4.627 . . .
0.80 Ls Perlengkapan 208,000 T.4.012 . . .
0.70 Oh Pekerja 72,100 L.4.001 . . .
0.90 Oh Tukang Kayu 139,050 L.4.016 . . .
0.10 Oh Mandor 23,170 L.4.035 . . .
AK-I.2016.(8) A-008 1.00 unit Pekerjaan Pasangan Lubang Angin/Roster 38,172 0.07 . 11,072 2,600 24,500
1.00 Unit Lubang Angin 24,500 M.4.628 . . .
0.01 Ls Perlengkapan 2,600 T.4.012 . . .
0.01 Oh Pekerja 1,030 L.4.001 . . .
0.05 Oh Tukang Batu 7,725 L.4.007 . . .
0.01 Oh Mandor 2,317 L.4.035 . . .
AK-I.2016.(9) A-009 unit Pekerjaan Pasangan Shower Mandi 201,553 0.33 . 40,553 26,000 135,000
1.00 Unit Shower Mandi 135,000 M.4.619 . . .
0.10 Ls Perlengkapan 26,000 T.4.012 . . .
0.20 Oh Pekerja 20,600 L.4.001 . . .
0.10 Oh Tukang Pipa 14,160 L.4.020 . . .
0.03 Oh Mandor 5,793 L.4.035 . . .
AK-I.2016.(10) A-010 unit Pekerjaan Pasangan Tangki Air 1,548,693 0.78 . 92,693 156,000 1,300,000
1.00 Unit Tangki Air 1,300,000 M.4.620 . . .
0.60 Ls Perlengkapan 156,000 T.4.012 . . .
0.50 Oh Pekerja 51,500 L.4.001 . . .
0.25 Oh Tukang Pipa 35,400 L.4.020 . . .
0.03 Oh Mandor 5,793 L.4.035 . . .
AK-I.2016.(11) A-011 unit Pekerjaan Pasangan Pompa Air 832,154 0.62 . 74,154 104,000 654,000
1.00 Unit Pompa Air 654,000 M.4.621 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.40 Oh Pekerja 41,200 L.4.001 . . .
0.20 Oh Tukang Pipa 28,320 L.4.020 . . .

www.mitra-arsitek.com 199/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 Oh Mandor 4,634 L.4.035 . . .
AK-I.2016.(12) A-012 m3 Pekerjaan Septik Tank Volume 1 m3 8,637,000 1.00 . - - 8,637,000
1.00 oh/m3 Upah Kerja Pembuatan Septik Tank 1,530,000 M.4.611 . . .
1.00 Ls Alat Kerja Pembuatan Septik Tank 477,000 M.4.612 . . .
1.00 Ls Bahan Kerja Pembuatan Septik Tank 6,630,000 M.4.613 . . .
AK-I.2016.(13) A-013 m3 Pekerjaan Sumur Resapan Air Hujan/Limbah Volume 1 m3 6,229,500 1.00 . - - 6,229,500
1.00 oh/m3 Upah Kerja Pembuatan Sumur Resapan Limbah 1,078,000 M.4.614 . . .
1.00 Ls Alat Kerja Pembuatan Sumur Resapan Limbah 381,500 M.4.615 . . .
1.00 Ls Bahan Kerja Pembuatan Sumur Resapan Limbah 4,770,000 M.4.616 . . .
AK-I.2016.(14) A-014 Unit Pekerjaan Pasangan Box MCB 540,314 0.62 . 79,314 104,000 357,000
1.00 Unit MCB + Box 357,000 M.4.629 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.40 Oh Pekerja 41,200 L.4.001 . . .
0.20 Oh Tukang Listrik 33,480 L.4.019 . . .
0.02 Oh Mandor 4,634 L.4.035 . . .
AK-I.2016.(15) A-015 btg Pekerjaan Pasangan Pembumian (Grounding) 826,814 0.62 . 79,314 104,000 643,500
1.00 btg Tembaga dia.1/2"-1.5m 643,500 M.4.630 . . .
0.40 Ls Perlengkapan 104,000 T.4.012 . . .
0.40 Oh Pekerja 41,200 L.4.001 . . .
0.20 Oh Tukang Listrik 33,480 L.4.019 . . .
0.02 Oh Mandor 4,634 L.4.035 . . .
AK-I.2016.(16) A-016 m1 Pekerjaan Instalasi Kabel NYM-3x2.5m2 21,627 0.03 . 4,197 3,900 13,530
1.10 m1 Kabel NYM 3x2,5 mm2-SNI 13,530 M.4.631 . . .
0.02 Ls Perlengkapan 3,900 T.4.012 . . .
0.02 Oh Pekerja 2,060 L.4.001 . . .
0.01 Oh Tukang Listrik 1,674 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(17) A-017 m1 Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 17,797 0.03 . 4,197 2,600 11,000
1.10 m1 Kabel NYM 2x1,5 mm2-SNI 11,000 M.4.632 . . .
0.01 Ls Perlengkapan 2,600 T.4.012 . . .
0.02 Oh Pekerja 2,060 L.4.001 . . .
0.01 Oh Tukang Listrik 1,674 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(18) A-018 Unit Pekerjaan Pasangan Fitting Lampu 38,631 0.06 . 7,931 5,200 25,500
1.00 unit Fitting Lampu 25,500 M.4.512 . . .
0.02 Ls Perlengkapan 5,200 T.4.012 . . .
0.04 Oh Pekerja 4,120 L.4.001 . . .
0.02 Oh Tukang Listrik 3,348 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(19) A-019 unit Pekerjaan Pasangan Saklar Lampu 38,971 0.06 . 7,931 6,240 24,800
1.00 unit Saklar Listrik 24,800 M.4.633 . . .
0.02 Ls Perlengkapan 6,240 T.4.012 . . .
0.04 Oh Pekerja 4,120 L.4.001 . . .
0.02 Oh Tukang Listrik 3,348 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(20) A-020 unit Pekerjaan Pasangan Lampu 5 W 33,426 0.05 . 6,026 2,600 24,800
1.00 unit Lampu 5W 24,800 M.4.634 . . .
0.01 Ls Perlengkapan 2,600 T.4.012 . . .
0.04 Oh Pekerja 4,120 L.4.001 . . .
0.01 Oh Tukang Listrik 1,674 L.4.019 . . .

www.mitra-arsitek.com 200/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 Oh Mandor 232 L.4.035 . . .
AK-I.2016.(21) A-021 unit Pekerjaan Pasangan Lampu 15 W 44,326 0.05 . 6,026 2,600 35,700
1.00 unit Lampu 15W 35,700 M.4.635 . . .
0.01 Ls Perlengkapan 2,600 T.4.012 . . .
0.04 Oh Pekerja 4,120 L.4.001 . . .
0.01 Oh Tukang Listrik 1,674 L.4.019 . . .
0.00 Oh Mandor 232 L.4.035 . . .
AK-I.2016.(22) A-022 unit Pekerjaan Pasangan Lampu 20 W 54,526 0.05 . 6,026 2,600 45,900
1.00 unit Lampu 20W 45,900 M.4.636 . . .
0.01 Ls Perlengkapan 2,600 T.4.012 . . .
0.04 Oh Pekerja 4,120 L.4.001 . . .
0.01 Oh Tukang Listrik 1,674 L.4.019 . . .
0.00 Oh Mandor 232 L.4.035 . . .
AK-I.2016.(23) A-023 unit Pekerjaan Pasangan Colokan Listrik (Receiptackle) 44,637 0.06 . 8,137 6,500 30,000
1.00 unit Receiptackle 30,000 M.4.637 . . .
0.03 Ls Perlengkapan 6,500 T.4.012 . . .
0.04 Oh Pekerja 4,326 L.4.001 . . .
0.02 Oh Tukang Listrik 3,348 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(24) A-024 unit Pekerjaan Pasangan Air Conditioner 3,438,637 0.06 . 8,137 6,500 3,424,000
1.00 unit Air Conditioner 3,424,000 M.4.638 . . .
0.03 Ls Perlengkapan 6,500 T.4.012 . . .
0.04 Oh Pekerja 4,326 L.4.001 . . .
0.02 Oh Tukang Listrik 3,348 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(25) A-025 unit Pekerjaan Pasangan Exhaust Fan 749,637 0.06 . 8,137 6,500 735,000
1.00 unit Exhaust Fan 735,000 M.4.639 . . .
0.03 Ls Perlengkapan 6,500 T.4.012 . . .
0.04 Oh Pekerja 4,326 L.4.001 . . .
0.02 Oh Tukang Listrik 3,348 L.4.019 . . .
0.00 Oh Mandor 463 L.4.035 . . .
AK-I.2016.(26) A-026 Ls Penyambungan Instalasi Listrik PLN 5,335,000 - . - - 5,335,000
1.00 Ls Biaya Pengurusan Daya Listrik PLN 5,335,000 M.4.617 . . .
AK-I.2016.(27) A-027 Ls Penyambungan Instalasi Air PDAM 2,600,000 - . - - 2,600,000
1.00 Ls Biaya Pengurusan Instalasai PDAM 2,600,000 M.4.618 . . .
AK-I.2016.(28) A-028 m2 Pekerjaan Pekerjaan Plamir (1 Lapis) 25,100 0.11 . 16,220 - 8,880
0.10 kg Plamir 5,630 M.4.399 . . .
0.50 Lbr Amplas 3,250 M.4.548 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.07 oh Tukang Cat 9,912 L.4.010 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
AK-I.2016.(29) A-029 m2 Pekerjaan Cat Anti Lumut dan Waterproofing 21,430 0.11 . 16,220 260 4,950
0.10 kg Cat Anti Bocor+Waterproofing 1,700 M.4.640 . . .
0.50 Lbr Amplas 3,250 M.4.548 . . .
0.01 ea Rol Cat 260 T.4.032 . . .
0.02 oh Pekerja 2,060 L.4.001 . . .
0.07 oh Tukang Cat 9,912 L.4.010 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .

www.mitra-arsitek.com 201/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
AK-I.2016.(30) A-030 pohon Pekerjaan Menanam Pohon Perdu 621,598 0.52 . 71,198 10,400 540,000
1.00 unit Pohon Perdu 540,000 M.4.641 . . .
0.04 Ls Perlengkapan 10,400 T.4.012 . . .
0.20 oh Pekerja 20,600 L.4.001 . . .
0.30 oh Tukang Batu 46,350 L.4.007 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.01 oh Mandor 2,317 L.4.035 . . .
A.2.2.1.9.a A-031 1.00 m2 Pembersihan Area Kerja Pasca Konstruksi 16,479 0.13 . 16,479 - -
0.10 OH Pekerja 10,300 L.4.001 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
. . . .
. . . .
ANALISA SATUAN PEKERJAAN BAJA . . . .
A.4.2.1.1.(a) A-032 1.00 kg Pekerjaan perakitan baja siku 32,128 0.11 . 13,865 239 18,024
1.03 kg Baja Siku 15,785 M.4.126 . . .
0.04 kg Kawat las listrik 1,836 M.4.150 . . .
0.03 ltr solar 264 M.4.563 . . .
0.00 ltr Minyak pelumas 139 M.4.557 . . .
0.00 unit Sewa alat las 239 T.4.020 . . .
0.03 oh tukang las 4,248 L.4.017 . . .
0.01 oh Kepala Tukang 1,545 L.4.036 . . .
0.08 oh pekerja 7,725 L.4.001 . . .
0.00 oh mandor 348 L.4.035 . . .
A.4.2.1.1.(b) A-033 1.00 kg Pekerjaan Perakitan baja WF 32,743 0.10 . 11,870 398 20,475
1.03 kg Baja WF 19,065 M.4.127 . . .
0.03 kg Kawat las listrik 1,148 M.4.150 . . .
0.02 ltr solar 176 M.4.563 . . .
0.00 ltr Minyak pelumas 87 M.4.557 . . .
0.00 unit Sewa alat las 398 T.4.020 . . .
0.02 oh Tukang las 2,832 L.4.017 . . .
0.01 oh Kepala Tukang 966 L.4.036 . . .
0.08 oh pekerja 7,725 L.4.001 . . .
0.00 oh mandor 348 L.4.035 . . .
A.4.2.1.1.(c) A-034 1.00 cm Pemotongan Baja dengan Las Oxy Acetilene 15,205 0.01 . 780 1,590 12,835
0.003 Cyl Gas Oxigen 4,769 M.4.564 . . .
0.004 Cyl Gas Aceteline 8,066 M.4.565 . . .
0.01 jam Sewa alat las 1,590 T.4.020 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.002 oh Tukang Las 283 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 46 L.4.035 . . .
A.4.2.1.1.(d) A-035 1.00 cm Pemotongan Baja dengan Mesin Gerinda Potong 2,905 0.01 . 780 2,125 -
0.017 jam Sewa mesin gerinda potong 2,125 T.4.031 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.002 oh Tukang Las 283 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 46 L.4.035 . . .
A.4.2.1.1.(e) A-036 1.00 cm Penyambungan Pengelasan Busur Las Listrik (Arc Welding) 5,722 0.01 . 780 2,703 2,239
0.04 kg Kawat las listrik 1,836 M.4.150 . . .

www.mitra-arsitek.com 202/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 ltr Solar 264 M.4.563 . . .
0.004 ltr Minyak pelumas 139 M.4.557 . . .
0.017 jam Sewa alat las 2,703 T.4.020 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.002 oh Tukang Las 283 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 46 L.4.035 . . .
A.4.2.1.1.(f) A-037 1.00 cm Penyambungan Pengelasan Las Gas (Gas Welding) 10,962 0.01 . 780 2,703 7,479
0.04 kg Kawat las gas 1,856 M.4.151 . . .
0.001 Cyl Gas Oxigen 1,590 M.4.564 . . .
0.002 Cyl Gas Aceteline 4,033 M.4.565 . . .
0.017 jam Sewa alat las 2,703 T.4.020 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.002 oh Tukang Las 283 L.4.017 . . .
0.0002 oh Kepala Tukang 39 L.4.036 . . .
0.0002 oh Mandor 46 L.4.035 . . .
A.4.2.1.1.(g) A-038 1.00 cm Pekerjaan Sambungan Dengan Solder (Pateri Lunak) 18,064 0.01 . 1,828 1,590 14,646
0.01 kg Kawat Solder (Timah) 9,450 M.4.566 . . .
0.002 Cyl Gas Oxigen 3,179 M.4.564 . . .
0.001 Cyl Gas Aceteline 2,017 M.4.565 . . .
0.01 jam Sewa alat las 1,590 T.4.020 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.007 oh Tukang Las 991 L.4.017 . . .
0.001 oh Kepala Tukang 193 L.4.036 . . .
0.001 oh Mandor 232 L.4.035 . . .
A.4.2.1.1.(h) A-039 1.00 cm Pekerjaan Sambungan Dengan Brazing (Pateri Keras) 36,146 0.01 . 1,828 1,590 32,728
0.01 kg Kawat Brazing (Kuningan) 10,355 M.4.567 . . .
0.009 Cyl Gas Oxigen 14,307 M.4.564 . . .
0.004 Cyl Gas Aceteline 8,066 M.4.565 . . .
0.01 jam Sewa alat las 1,590 T.4.020 . . .
0.004 oh Pekerja 412 L.4.001 . . .
0.007 oh Tukang Las 991 L.4.017 . . .
0.001 oh Kepala Tukang 193 L.4.036 . . .
0.001 oh Mandor 232 L.4.035 . . .
A.4.2.1.1.(i) A-040 1.00 m2 Meratakan Permukaan Baja dengan Gerinda 105,120 0.27 . 30,770 21,850 52,500
0.7 bh Batu Gerinda 52,500 M.4.551 . . .
0.5 jam Sewa Perlengkapan Gerinda 21,850 T.4.030 . . .
0.2 oh Pekerja 20,600 L.4.001 . . .
0.05 oh Tukang Las 7,080 L.4.017 . . .
0.01 oh Kepala Tukang 1,931 L.4.036 . . .
0.005 oh Mandor 1,159 L.4.035 . . .

AHSP PUPR 2022 (Permen PUPR No.1 th 2022)


A.1.1.1.11 K-001 1.00 m2 Pembuatan1 m2 Steger/Perancah dari Bambu sd Tinggi 6 meter 500,456 3.25 . 462,205 - 38,251
1.00 OH Pekerja 103,000 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
0.20 OH Kepala Tukang 38,620 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.25 Batang Bambu Ø 6 - 8 / 600 cm 33,750 M.4.041 . . .

www.mitra-arsitek.com 203/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.19 m3 Tali ijuk 4,501 M.4.602 . . .
A.1.1.1.15 K-002 1.00 m2 Pemasangan 1m2 Pagar BRC Galvanis 31,624 0.09 . 15,062 - 16,563
0.04 OH Pekerja 4,326 L.4.001 . . .
0.00 OH Tukang Kayu 618 L.4.016 . . .
0.00 OH Kepala Tukang 386 L.4.036 . . .
0.04 OH Mandor 9,731 L.4.035 . . .
0.14 Lbr Kawat jaring 16,563 M.4.148 . . .
A.1.1.1.16 K-003 1.00 m2 Pemasangan 1 m2 Panel Beton Pracetak 50x50x240cm untuk Pagar 464,017 0.53 . 64,657 - 399,360
0.38 OH Pekerja 38,625 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 4,402 L.4.035 . . .
0.99 Lbr Panel Beton Pracetak 150,858 M.4.540 . . .
0.53 Batang Kolom Beton Pracetak 105,840 M.4.539 . . .
45.00 Kg Semen 85,500 M.4.033 . . .
0.07 m3 Pasir beton 21,815 M.4.028 . . .
0.15 m3 Kerikil 35,347 M.4.024 . . .
A.1.5.1.13 K-004 1.00 m2 Pemasangan 1 m2 Lapisan Ijuk Tebal 10cm untuk Bidang Resapan1,253,726 0.17 . 18,926 - 1,234,800
0.15 OH Pekerja 15,450 L.4.001 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
6.00 kg Ijuk 1,234,800 M.4.019 . . .
A.3.2.1.9 K-005 1.00 m3 Pemasangan 1 m3 Batu Kosong (Aanstamping) untuk Pondasi Gedung625,484 1.25 . 157,162 - 468,322
0.78 OH Pekerja 80,340 L.4.001 . . .
0.39 OH Tukang Batu 60,255 L.4.007 . . .
0.04 OH Kepala Tukang 7,531 L.4.036 . . .
0.04 OH Mandor 9,036 L.4.035 . . .
1.20 m3 Batu belah 359,760 M.4.013 . . .
0.43 m3 Pasir urug 108,562 M.4.032 . . .
A.4.1.1.1 K-006 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 7.4 Mpa (K100) 1,317,375 2.04 . 237,075 - 1,080,300
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
247.00 kg Semen 469,300 M.4.033 . . .
869.00 kg Pasir Beton (kg) 260,700 M.4.029 . . .
999.00 kg Kerikil (kg) 199,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.2 K-007 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 9.8 Mpa (K125) 1,362,775 2.04 . 237,075 - 1,125,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
276.00 kg Semen 524,400 M.4.033 . . .
828.00 kg Pasir Beton (kg) 248,400 M.4.029 . . .
1012 kg Kerikil (kg) 202,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.3 K-008 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 12.2 Mpa (K150) 1,398,775 2.04 . 237,075 - 1,161,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .

www.mitra-arsitek.com 204/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Mandor 19,231 L.4.035 . . .
299.00 kg Semen 568,100 M.4.033 . . .
799.00 kg Pasir Beton (kg) 239,700 M.4.029 . . .
1017 kg Kerikil (kg) 203,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.5 K-009 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 14.5 Mpa (K175) 1,440,775 2.04 . 237,075 - 1,203,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
326.00 kg Semen 619,400 M.4.033 . . .
760.00 kg Pasir Beton (kg) 228,000 M.4.029 . . .
1029 kg Kerikil (kg) 205,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.6. K-010 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 16.9 Mpa (K200) 1,481,875 2.04 . 237,075 - 1,244,800
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
352.00 kg Semen 668,800 M.4.033 . . .
731.00 kg Pasir Beton (kg) 219,300 M.4.029 . . .
1031 kg Kerikil (kg) 206,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.7. K-011 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 19.3 Mpa (K225) 1,511,275 2.04 . 237,075 - 1,274,200
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
371.00 kg Semen 704,900 M.4.033 . . .
698.00 kg Pasir Beton (kg) 209,400 M.4.029 . . .
1047 kg Kerikil (kg) 209,400 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.8. K-012 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 21.7 Mpa (K250) 1,532,575 2.04 . 237,075 - 1,295,500
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
384.00 kg Semen 729,600 M.4.033 . . .
692.00 kg Pasir Beton (kg) 207,600 M.4.029 . . .
1039 kg Kerikil (kg) 207,800 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.9. K-013 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 24.0 Mpa (K275) 1,569,375 2.04 . 237,075 - 1,332,300
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
406.00 kg Semen 771,400 M.4.033 . . .
684.00 kg Pasir Beton (kg) 205,200 M.4.029 . . .
1,026.00 kg Kerikil (kg) 205,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .

www.mitra-arsitek.com 205/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.1.1.10. K-014 1.00 m3 Pembuatan 1 m3 Beton Mutu f’c = 26.4 Mpa (K300) 1,580,775 2.04 . 237,075 - 1,343,700
1.65 OH Pekerja 169,950 L.4.001 . . .
0.28 OH Tukang Batu 42,488 L.4.007 . . .
0.03 OH Kepala Tukang 5,407 L.4.036 . . .
0.08 OH Mandor 19,231 L.4.035 . . .
413.00 kg Semen 784,700 M.4.033 . . .
681.00 kg Pasir Beton (kg) 204,300 M.4.029 . . .
1021 kg Kerikil (kg) 204,200 M.4.025 . . .
215.00 Liter Air 150,500 M.4.001 . . .
A.4.1.1.13. K-015 1.00 m3 Pembuatan 1 m3 Beton Kedap Air dengan Aditif Kedap Air 1,595,726 2.59 . 301,462 - 1,294,264
2.10 OH Pekerja 216,300 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.11 OH Mandor 24,329 L.4.035 . . .
400.00 kg Semen 760,000 M.4.033 . . .
0.48 m3 Pasir beton 141,504 M.4.028 . . .
0.80 m3 Kerikil 193,680 M.4.024 . . .
1.20 kg Strorox - 100 52,080 M.4.601 . . .
210.00 Liter Air 147,000 M.4.001 . . .
A.4.1.1.17. K-016 1.00 kg Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- 13,820
M8 0.01 . 1,130 - 12,690
0.00 OH Pekerja 258 L.4.001 . . .
0.00 OH Tukang Besi 390 L.4.008 . . .
0.00 OH Kepala Tukang 483 L.4.036 . . .
1.02 kg Jaring kawat baja dilas 12,546 M.4.591 . . .
0.01 kg Kawat beton 144 M.4.143 . . .
A.4.1.1.18. K-017 … m2 Pemasangan 1 m2 Bekisting untuk Pondasi Telapak Beton BangunanGedung
189,855 0.83 . 104,775 - 85,080
0.52 OH Pekerja 53,560 L.4.001 . . .
0.26 OH Tukang Kayu 40,170 L.4.016 . . .
0.03 OH Kepala Tukang 5,021 L.4.036 . . .
0.03 OH Mandor 6,024 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.30 kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
0.10 Liter Minyak bekisting 570 M.4.556 . . .
A.4.1.1.19. K-018 … m2 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung 199,395 0.83 . 104,775 - 94,620
0.52 OH Pekerja 53,560 L.4.001 . . .
0.26 OH Tukang Kayu 40,170 L.4.016 . . .
0.03 OH Kepala Tukang 5,021 L.4.036 . . .
0.03 OH Mandor 6,024 L.4.035 . . .
0.05 m3 Papan kayu 3/20 Kelas III 85,860 M.4.106 . . .
0.30 kg Paku Biasa 2" - 5" 8,190 M.4.158 . . .
0.10 Liter Minyak bekisting 570 M.4.556 . . .
A.4.1.1.20. K-019 … m2 Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung 367,258 1.06 . 132,983 - 234,275
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Papan kayu 3/20 Kelas III 76,320 M.4.106 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Liter Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .

www.mitra-arsitek.com 206/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.21. K-020 … m2 Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung 381,973 1.06 . 132,983 - 248,990
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Kayu balok 5/7 kelas III 80,640 M.4.083 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Liter Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 62,370 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.22. K-021 … m2 Pemasangan 1 m2 Bekisting untuk Plat lantai Beton Bangunan Gedung
505,138 1.06 . 132,983 - 372,155
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.04 m3 Kayu kelas III (papan) 107,000 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Liter Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
6.00 Batang Dolken kayu Ø 8-10/400 cm 160,800 M.4.042 . . .
A.4.1.1.23. K-022 … m2 Pemasangan 1 m2 Bekisting untuk Dinding Sheerwall 434,513 1.06 . 132,983 19,200 282,330
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 80,250 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.20 Liter Minyak bekisting 1,140 M.4.556 . . .
0.02 m3 Balok kayu kelas II 69,300 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
3.00 Batang Dolken kayu Ø 8-10/400 cm 80,400 M.4.042 . . .
4.00 Buah Penjaga jarak bekisting / spacer 19,200 T.4.009 . . .
A.4.1.1.25. K-023 … m2 Pemasangan 1 m2 Bekisting untuk Tangga Beton Bangunan Gedung370,903 1.06 . 132,983 - 237,920
0.66 OH Pekerja 67,980 L.4.001 . . .
0.33 OH Tukang Kayu 50,985 L.4.016 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.03 OH Mandor 7,646 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 80,250 M.4.097 . . .
0.40 kg Paku Biasa 2" - 5" 10,920 M.4.158 . . .
0.15 Liter Minyak bekisting 855 M.4.556 . . .
0.02 m3 Balok kayu kelas II 51,975 M.4.078 . . .
0.35 Lbr Plywood 120x240 tbl. 9 mm 40,320 M.4.367 . . .
2.00 Batang Dolken kayu Ø 8-10/400 cm 53,600 M.4.042 . . .
A.4.1.1.28 K-024 … m2 Pemasangan bekisting 1 m2 Jembatan untuk Pengecoran Beton 126,394 0.21 . 25,994 - 100,400
0.15 OH Pekerja 15,450 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .

www.mitra-arsitek.com 207/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.03 m3 Kayu kelas III (papan) 70,620 M.4.097 . . .
0.60 kg Paku Biasa 2" - 5" 16,380 M.4.158 . . .
0.50 Batang Dolken kayu Ø 8-10/400 cm 13,400 M.4.042 . . .
A.4.1.2.5. K-025 … m2 Pembuatan 1 m2 Bekisting untuk Pelat Beton Pracetak Komponen Modular
271,304 Bangunan
0.09 Gedung
. (5 kali pakai)
14,240 - 257,065
0.01 OH Pekerja 721 L.4.001 . . .
0.08 OH Tukang Kayu 11,742 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.01 m3 Lantai kerja tebal 10cm 6,060 M.4.595 . . .
9.39 Kg Besi hollow 50.50.3 200,092 M.4.133 . . .
0.01 m3 Kaso 5/7 Kelas II 19,075 M.4.057 . . .
0.08 Lbr Phel film 12mm 12,064 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
3.88 buah Baut Ramset / Dina Bolt 18,634 M.4.130 . . .
A.4.1.2.6. K-026 … m2 Pembuatan 1 m2 Bekisting untuk Balok Beton Pracetak (10-12 kali pakai)
38,569 0.05 . 7,287 - 31,282
0.00 OH Pekerja 412 L.4.001 . . .
0.04 OH Tukang Kayu 5,871 L.4.016 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 19,075 M.4.057 . . .
0.04 Lbr Phel film 12mm 6,484 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
0.05 kg Paku Biasa 2" - 5" 1,256 M.4.158 . . .
0.69 buah Baut Ramset / Dina Bolt 3,326 M.4.130 . . .
A.4.1.2.7. K-027 … m2 Pembuatan 1 m2 Bekisting untuk Kolom Beton Pracetak (10-12 Kali 35,508
Pakai) 0.05 . 7,287 - 28,221
0.00 OH Pekerja 412 L.4.001 . . .
0.04 OH Tukang Kayu 5,871 L.4.016 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
0.00 m3 Kaso 5/7 Kelas II 15,260 M.4.057 . . .
0.05 Lbr Phel film 12mm 7,238 M.4.361 . . .
0.20 L Minyak bekisting 1,140 M.4.556 . . .
0.05 Kg Paku Biasa 2" - 5" 1,256 M.4.158 . . .
0.69 buah Baut Ramset / Dina Bolt 3,326 M.4.130 . . .
A.4.1.2.8. K-028 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Pelat Beton Pracetak9,399 0.08 . 9,399 - -
0.05 OH Pekerja 5,459 L.4.001 . . .
0.02 OH Tukang Kayu 2,781 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.9. K-029 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Balok Beton14,961 Pracetak 0.12 . 14,961 - -
0.09 OH Pekerja 9,167 L.4.001 . . .
0.03 OH Tukang Kayu 4,635 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.10. K-030 … bh Pemasangan dan Membuka Cetakan 1 Buah Komponen Kolom Beton12,180 Pracetak 0.10 . 12,180 - -
0.07 OH Pekerja 7,313 L.4.001 . . .
0.02 OH Tukang Kayu 3,708 L.4.016 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
A.4.1.2.11. K-031 … m3 Penuangan/Menebar Beton 1 m3 untuk Pelat Beton Pracetak 85,894 0.54 . 85,894 - -
0.06 OH Pekerja 6,592 L.4.001 . . .

www.mitra-arsitek.com 208/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.24 OH Tukang Batu 37,698 L.4.007 . . .
0.13 OH Tukang vibrator 18,125 L.4.024 . . .
0.03 OH Kepala Tukang 6,565 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.12. K-032 … m3 Penuangan/Menebar Beton 1 m3 untuk Balok Beton Pracetak 88,096 0.56 . 88,096 - -
0.07 OH Pekerja 7,107 L.4.001 . . .
0.24 OH Tukang Batu 37,389 L.4.007 . . .
0.14 OH Tukang vibrator 19,541 L.4.024 . . .
0.04 OH Kepala Tukang 7,145 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.13. K-033 … m3 Penuangan/Menebar Beton 1 m3 untuk Kolom Beton Pracetak 79,753 0.50 . 79,753 - -
0.06 OH Pekerja 6,283 L.4.001 . . .
0.21 OH Tukang Batu 32,909 L.4.007 . . .
0.12 OH Tukang vibrator 17,275 L.4.024 . . .
0.03 OH Kepala Tukang 6,372 L.4.036 . . .
0.07 OH Mandor 16,914 L.4.035 . . .
A.4.1.2.14. K-034 … bh Pemasangan 1 buah Komponen untuk Pelat Beton Pracetak Beserta 555,636
Indeks Kenaikan
0.54 Lantai
. Ereksi Pelat Hingga
82,80524 Lantai
472,830 -
0.07 OH Operator crane 9,487 L.4.039 . . .
0.07 OH Pembantu operator crane 8,630 L.4.043 . . .
0.07 OH Pekerja 6,901 L.4.001 . . .
0.07 OH Tukang Batu 10,352 L.4.007 . . .
0.13 OH Tukang ereksi 18,974 L.4.011 . . .
0.07 OH Kepala Tukang 12,938 L.4.036 . . .
0.07 OH Mandor 15,524 L.4.035 . . .
0.07 unit hari Sewa Crane 89,150 T.4.024 . . .
1.10 buah hari Sewa pipe support 383,680 T.4.027 . . .
A.4.1.2.15. K-035 … bh Pemasangan 1 buah Komponen Balok Pracetak Beserta Indeks Kenaikan
182,957
Lantai 0.49
Ereksi. Balok Hingga 24 Lantai
75,390 107,567 -
0.06 OH Operator crane 8,638 L.4.039 . . .
0.06 OH Pembantu operator crane 7,857 L.4.043 . . .
0.06 OH Pekerja 6,283 L.4.001 . . .
0.06 OH Tukang Batu 9,425 L.4.007 . . .
0.12 OH Tukang ereksi 17,275 L.4.011 . . .
0.06 OH Kepala Tukang 11,779 L.4.036 . . .
0.06 OH Mandor 14,134 L.4.035 . . .
0.06 unit hari Sewa crane 81,167 T.4.024 . . .
1.10 unit hari Scafolding 26,400 T.4.019 . . .
A.4.1.2.17. K-036 … bh Pemindahan 1 buah Komponen untuk Pelat Pracetak (± 20 m) 33,109 0.06 . 7,828 25,281 -
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang Batu 5,871 L.4.007 . . .
0.02 unit hari Sewa crane 25,281 T.4.024 . . .
A.4.1.2.18. K-037 … bh Pemindahan 1 buah Komponen untuk Balok Pracetak ( ± 20 m) 33,109 0.06 . 7,828 25,281 -
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang Batu 5,871 L.4.007 . . .
0.02 unit hari Sewa crane 25,281 T.4.024 . . .
A.4.1.2.19. K-038 … bh Pemindahan 1 buah Komponen untuk Kolom Pracetak ( ± 20 m) 33,109 0.06 . 7,828 25,281 -
0.02 OH Pekerja 1,957 L.4.001 . . .
0.04 OH Tukang Batu 5,871 L.4.007 . . .
0.02 unit hari Sewa crane 25,281 T.4.024 . . .
A.4.1.2.22. K-039 … bh Upah 1 titik Pekerjaan Grout pada Joint Beton Pracetak 79,564 0.48 . 79,564 - -
0.37 OH Tukang Batu 56,702 L.4.007 . . .

www.mitra-arsitek.com 209/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 OH Kepala Tukang 14,289 L.4.036 . . .
0.04 OH Mandor 8,573 L.4.035 . . .
A.4.1.2.23. K-040 … titik Pemasangan 1 titik Bekisting Joint Pracetak 105,795 0.31 . 41,908 - 63,887
0.15 OH Pekerja 15,141 L.4.001 . . .
0.15 OH Tukang Kayu 22,712 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kaso 5/7 Kelas II 45,780 M.4.057 . . .
0.00 m3 Kayu papan kelas III 10,900 M.4.103 . . .
0.26 Kg Paku Biasa 2" - 5" 7,207 M.4.158 . . .
A.4.1.2.24. K-041 … titik Upah 1 titik Joint dengan Sling 62,884 0.47 . 62,884 - -
0.22 OH Pekerja 22,660 L.4.001 . . .
0.02 OH Tukang Kayu 3,399 L.4.016 . . .
0.22 OH Tukang Besi 34,276 L.4.008 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
A.4.2.1.1. K-042 … kg Pembuatan 1 kg Baja Profil 44,100 0.19 . 22,710 - 21,390
0.06 OH Pekerja 6,180 L.4.001 . . .
0.06 OH Tukang Las Konstruksi 8,496 L.4.018 . . .
0.01 OH Kepala Tukang 1,159 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.06 OH Pekerja 6,180 L.4.001 . . .
1.15 Kg Baja WF 21,390 M.4.127 . . .
A.4.2.1.7. K-043 … m2 Pemasangan 1 m2 Pintu Rolling Door Besi 862,582 2.53 . 318,082 - 544,500
1.20 OH Pekerja 123,600 L.4.001 . . .
1.20 OH Tukang Las 169,920 L.4.017 . . .
0.12 OH Kepala Tukang 23,172 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.00 m2 Pintu gulung besi 544,500 M.4.176 . . .
A.4.2.1.9. K-044 … m2 Pemasangan 1 m2 Rolling door Aluminium 804,495 2.15 . 289,695 - 514,800
1.00 OH Pekerja 103,000 L.4.001 . . .
1.00 OH Tukang Besi 155,800 L.4.008 . . .
0.10 OH Kepala Tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 m2 Rolling door alluminium 514,800 M.4.180 . . .
A.4.2.1.8. K-045 … m2 Pemasangan 1 m2 Pintu Lipat (Folding Door) BAHAN Plastik/PVC 626,894 0.95 . 126,894 - 500,000
0.44 OH Pekerja 45,320 L.4.001 . . .
0.44 OH Tukang Kayu 67,980 L.4.016 . . .
0.04 OH Kepala Tukang 8,496 L.4.036 . . .
0.02 OH Mandor 5,097 L.4.035 . . .
1.00 m2 Pintu lipat 500,000 M.4.585 . . .
A.4.2.1.9. K-046 … m2 Pemasangan 1 m2 Sunscreen Aluminium 414,255 0.96 . 149,255 - 265,000
0.08 OH Pekerja 8,240 L.4.001 . . .
0.80 OH Tukang Besi 124,640 L.4.008 . . .
0.08 OH Kepala Tukang 15,448 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.00 m2 Sunscreen alumunium 265,000 M.4.184 . . .
A.4.2.1.15. K-047 … m2 Pemasangan 1 m2 Teralis Besi strip (20 x 3) mm 664,593 3.59 . 459,961 - 204,632
1.67 OH Pekerja 172,010 L.4.001 . . .
1.67 OH Tukang Las 236,472 L.4.017 . . .
0.17 OH Kepala Tukang 32,248 L.4.036 . . .

www.mitra-arsitek.com 210/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Mandor 19,231 L.4.035 . . .
6.18 kg Baja strip (0,2 x 2) cm 82,772 M.4.128 . . .
27.08 cm Pengelasan 121,860 M.4.596 . . .
A.4.2.1.16. K-048 … m2 Pemasangan 1 m2 Kawat Nyamuk 114,939 0.22 . 28,970 - 85,969
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Besi 15,580 L.4.008 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.10 m2 Kawat nyamuk 12,980 M.4.152 . . .
11.11 cm Pengelasan 49,995 M.4.596 . . .
1.72 kg Baja strip (0,2 x 2) cm 22,994 M.4.128 . . .
A.4.2.1.17. K-049 … m2 Pemasangan 1 m2 Jendela Nako dan Tralis 154,654 0.42 . 55,854 - 98,800
0.20 OH Pekerja 20,600 L.4.001 . . .
0.20 OH Tukang Besi 31,160 L.4.008 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.10 m2 Jendela nako (rangka + kaca 5 mm) 66,000 M.4.577 . . .
10.00 buah Paku skrup 1 cm – 2,5 cm 6,000 M.4.167 . . .
2.00 kg Baja strip (0,2 x 2) cm 26,800 M.4.128 . . .
A.4.2.1.18. K-050 … m1 Pemasangan 1 m’ Talang Datar/Jurai Seng bjls 28 Lebar 90cm 161,543 0.42 . 55,854 - 105,690
0.20 OH Pekerja 20,600 L.4.001 . . .
0.20 OH Tukang Atap 31,160 L.4.006 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 53,550 M.4.368 . . .
0.02 kg Paku Biasa ½" - 1" 365 M.4.157 . . .
0.02 m3 Kayu papan kelas III 51,775 M.4.103 . . .
A.4.2.1.19. K-051 … m1 Pemasangan 1 m Talang ½ Lingkaran D-15cm. Seng Pelat bjls 30 130,330 0.49 . 69,837 - 60,493
0.15 OH Pekerja 15,450 L.4.001 . . .
0.30 OH Tukang Atap 46,740 L.4.006 . . .
0.03 OH Kepala Tukang 5,793 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.05 m Seng Gelombang 3" x 6" BJLS 28 53,550 M.4.368 . . .
0.01 kg Paku Biasa ½" - 1" 243 M.4.157 . . .
0.50 kg Baja strip (0,2 x 2) cm 6,700 M.4.128 . . .
A.4.2.1.20. K-052 … m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x120cm.
392,040 untuk 0.54Partisi
. 72,540 275,400 44,100
0.25 OH Pekerja 25,750 L.4.001 . . .
0.25 OH Tukang Besi 38,950 L.4.008 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
3.50 m’ Hollow 4/4 44,100 M.4.141 . . .
1.00 Ls Alat Bantu/Perlengkapan Umum 275,400 T.4.001 . . .
A.4.2.1.21. K-053 … m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60x60cm.
427,309 untuk 0.75
Plafond
. 101,509 275,400 50,400
0.35 OH Pekerja 36,050 L.4.001 . . .
0.35 OH Tukang Besi 54,530 L.4.008 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
4.00 m’ Hollow 4/4 50,400 M.4.141 . . .
1.00 Ls Alat Bantu/Perlengkapan Umum 275,400 T.4.001 . . .
A.4.2.1.22. K-054 … m2 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin)
427,738
Profil C75
1.58 . 212,628 44,550 170,560

www.mitra-arsitek.com 211/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.73 OH Pekerja 75,602 L.4.001 . . .
0.73 OH Tukang Besi 114,357 L.4.008 . . .
0.07 OH Kepala Tukang 14,096 L.4.036 . . .
0.04 OH Mandor 8,573 L.4.035 . . .
8.20 m Baja Ringan-C Truss 170,560 M.4.125 . . .
0.10 % Alat Rangka Atap Baja Canai Dingin 44,550 T.4.002 . . .
A.4.2.1.23. K-055 … m2 Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai
433,302
Dingin)1.63
Profil .C75 220,272 44,550 168,480
0.76 OH Pekerja 78,321 L.4.001 . . .
0.76 OH Tukang Besi 118,470 L.4.008 . . .
0.08 OH Kepala Tukang 14,676 L.4.036 . . .
0.04 OH Mandor 8,805 L.4.035 . . .
8.10 m Baja Ringan-C Truss 168,480 M.4.125 . . .
0.10 % Alat Rangka Atap Baja Canai Dingin 44,550 T.4.002 . . .
A.4.2.1.24. K-056 … m1 Pemasangan 1 m Kusen Aluminium 40,513 0.09 . 12,445 - 28,068
0.04 OH Pekerja 4,429 L.4.001 . . .
0.04 OH Tukang Besi 6,699 L.4.008 . . .
0.00 OH Kepala Tukang 830 L.4.036 . . .
0.00 OH Mandor 487 L.4.035 . . .
1.10 m Profil Alluminium "T" 13,860 M.4.177 . . .
2.00 buah Sekrup fixer 600 M.4.183 . . .
0.06 Tube Sealant 13,608 M.4.598 . . .
A.4.2.1.25. K-057 … m2 Pemasangan 1 m2 Pintu Aluminium Strip Lebar 8 cm 469,872 0.18 . 24,612 - 445,260
0.09 OH Pekerja 8,755 L.4.001 . . .
0.09 OH Tukang Besi 13,243 L.4.008 . . .
0.01 OH Kepala Tukang 1,641 L.4.036 . . .
0.00 OH Mandor 973 L.4.035 . . .
4.40 m Profil Alluminium "T" 55,440 M.4.177 . . .
14.60 m Aluminium strip 389,820 M.4.122 . . .
A.4.2.1.26. K-058 … m2 Pemasangan 1 m2 Pintu kaca Rangka Aluminium 2,336,130 0.18 . 24,894 - 2,311,236
0.09 OH Pekerja 8,755 L.4.001 . . .
0.09 OH Tukang Besi 13,243 L.4.008 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
4.40 m Pintu alluminium 1,960,200 M.4.174 . . .
4.50 m Profil kaca 289,800 M.4.529 . . .
0.27 Tube Sealant 61,236 M.4.598 . . .
A.4.2.1.27. K-059 … m2 Pemasangan 1 m2 Venetions Blinds dan Vertical Blinds 189,549 0.75 . 110,049 - 79,500
0.35 OH Pekerja 36,050 L.4.001 . . .
0.35 OH Tukang Interior 63,070 L.4.015 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
1.00 m2 Venetions blinds dan vertical blinds (tirai) 79,500 M.4.604 . . .
A.4.4.1.1. K-060 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu dengan Mortar0.85
343,971 tipe M.fc’
. 17. 2 Mpa ( Setara Campuran 1SP
103,513 - : 2PP). 240,458
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
43.50 Kg Semen 82,650 M.4.033 . . .
0.08 m3 Pasir pasang 17,808 M.4.030 . . .

www.mitra-arsitek.com 212/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.1.2. K-061 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batudengan Mortar 0.85
326,375 tipe S.fc’
. 12. 5 Mpa ( Setara Campuran 1SP -: 3PP)
103,513 222,862
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
32.95 Kg Semen 62,605 M.4.033 . . .
0.09 m3 Pasir pasang 20,257 M.4.030 . . .
A.4.4.1.3. K-062 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe
314,660 0.85 N.fc’
. 5.2 Mpa ( Setara103,513
Campuran 1SP : 4PP)
- 211,147
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
26.55 Kg Semen 50,445 M.4.033 . . .
0.09 m3 Pasir pasang 20,702 M.4.030 . . .
A.4.4.1.4. K-063 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe
308,398 0.85 O.. fc’ 2.4 Mpa ( Setara Campuran 1SP : -5PP)
103,513 204,885
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
22.20 Kg Semen 42,180 M.4.033 . . .
0.10 m3 Pasir pasang 22,705 M.4.030 . . .
A.4.4.1.5 K-064 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batuCampuran
305,820 1SP :0.85
6PP . 103,513 - 202,307
0.60 OH Pekerja 61,800 L.4.001 . . .
0.20 OH Tukang Batu 30,900 L.4.007 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
140.00 buah Bata merah 140,000 M.4.007 . . .
18.50 Kg Semen 35,150 M.4.033 . . .
0.12 m3 Pasir pasang 27,157 M.4.030 . . .
A.4.4.1.7 K-065 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan Mortar0.43
166,220 tipe M.fc’
. 17. 7 Mpa ( Setara Campuran 1SP
51,757 - : 2PP). 114,464
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
18.95 Kg Semen 36,005 M.4.033 . . .
0.04 m3 Pasir pasang 8,459 M.4.030 . . .
A.4.4.1.8 K-066 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan Mortar0.43
157,964 tipe S.. fc’ 12. 5 Mpa ( Setara Campuran 1SP- : 3PP).
51,757 106,207
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
14.37 Kg Semen 27,303 M.4.033 . . .
0.04 m3 Pasir pasang 8,904 M.4.030 . . .
A.4.4.1.9 K-067 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan Mortar0.43
153,178 tipe N.fc’
. 5.2 Mpa ( Setara51,757
Campuran 1SP :- 4PP) 101,422
0.30 OH Pekerja 30,900 L.4.001 . . .

www.mitra-arsitek.com 213/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
11.50 Kg Semen 21,850 M.4.033 . . .
0.04 m3 Pasir pasang 9,572 M.4.030 . . .
A.4.4.1.10 K-068 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm Tebal ½ Batu dengan
150,166Mortar 0.43
tipe O.. fc’ 2.4 Mpa ( Setara51,757
Campuran 1SP :- 5PP) 98,409
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
9.68 Kg Semen 18,392 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.1.11 K-069 … m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm tebal ½ BatuCampuran
148,472 1SP :0.43
6PP . 51,757 - 96,715
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
8.32 Kg Semen 15,808 M.4.033 . . .
0.05 m3 Pasir pasang 10,907 M.4.030 . . .
A.4.4.1.16. K-070 … m2 Pemasangan 1m2 Dinding Conblock HB20 dengan Mortar Tipe S.fc’423,623
12.5 Mpa ( Setara
0.53 Campuran
. 1SP : 3PP)66,292 - 357,331
0.35 OH Pekerja 36,050 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
12.50 buah Hollow Block 20 133,750 M.4.537 . . .
30.32 Kg Semen 57,608 M.4.033 . . .
0.73 m3 Pasir pasang 162,053 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.17. K-071 … m2 Pemasangan 1m2 Dinding Conblock HB20 Campuran1SP :4PP dengan Mortar Tipe
421,903 N.fc’. 5.2 Mpa ( Setara Campuran
0.53 66,292 1SP : 4PP)
- 355,611
0.35 OH Pekerja 36,050 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
12.50 buah Hollow Block 20 133,750 M.4.537 . . .
24.26 Kg Semen 46,094 M.4.033 . . .
0.77 m3 Pasir pasang 171,847 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.18. K-072 … m2 Pemasangan 1m2 Dinding Conblock HB15 dengan Mortar Tipe S. fc’319,580
12.5 Mpa ( Setara
0.47 .Campuran 1SP : 3PP) 57,524 - 262,056
0.32 OH Pekerja 32,960 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
12.50 buah Hollow Block 15 92,500 M.4.536 . . .
22.74 Kg Semen 43,206 M.4.033 . . .
0.55 m3 Pasir pasang 122,430 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.19. K-073 … m2 Pemasangan 1 m2 Dinding Conblock HB15 dengan Mortar Tipe N. fc’ 5.2 Mpa ( 0.47
318,078 Setara. Campuran 1SP : 4PP) 57,524 - 260,553

www.mitra-arsitek.com 214/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.32 OH Pekerja 32,960 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
12.50 buah Hollow Block 15 92,500 M.4.536 . . .
18.20 Kg Semen 34,580 M.4.033 . . .
0.58 m3 Pasir pasang 129,553 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.20. K-074 … m2 Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe S. fc’ 12.5 Mpa (Setara
251,757 0.43 .Campuran 1SP : 3PP) 51,757 - 200,000
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
12.50 buah Hollow Block 10 86,250 M.4.535 . . .
15.16 Kg Semen 28,804 M.4.033 . . .
0.36 m3 Pasir pasang 81,026 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.21. K-075 … m2 Pemasangan 1 m2 Dinding Conblock HB10 dengan Mortar Tipe N. fc’ 5.2 Mpa (Setara
251,342 0.43 Campuran
. 1SP : 4PP)51,757 - 199,586
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
12.50 buah Hollow Block 10 86,250 M.4.535 . . .
12.13 Kg Semen 23,047 M.4.033 . . .
0.39 m3 Pasir pasang 86,369 M.4.030 . . .
0.28 Kg Besi angkur Ø=8 mm 3,920 M.4.131 . . .
A.4.4.1.22. K-076 … m2 Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 denganMortar Tipe S.fc’0.43
107,448 12. 5 Mpa
. ( Setara Campuran
51,7571SP : 3PP) - 55,691
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
30.00 buah Bata rooster 27,000 M.4.009 . . .
11.00 Kg Semen 20,900 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
A.4.4.1.23. K-077 … m2 Pemasangan 1 m2 Dinding Terawang (rooster) 12x11x24 dengan Mortar Tipe N.fc’0.43
347,448 5.2 Mpa
. ( Setara Campuran 1SP : 4PP)
51,757 - 295,691
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
30.00 buah Terawang (roster) 267,000 M.4.547 . . .
11.00 Kg Semen 20,900 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
A.4.4.1.24. K-078 … m2 Pemasangan 1 m2 Dinding bata Berongga Ekspose 12x11x24 dengan220,170
Mortar Tipe 0.48
S.fc’ 12.
. 5 Mpa ( Setara Campuran
60,447 1SP : 3PP)- 159,723
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
70.00 buah Bata Berongga 126,000 M.4.006 . . .
14.00 Kg Semen 26,600 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .

www.mitra-arsitek.com 215/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A. 4.4.1.25. K-079 … m2 Pemasangan 1 m2 Dinding Bata Ringan Tebal 7.5cm dengan Mortar266,784
Siap Pakai 0.82 . 92,300 27,540 146,943
0.67 OH Pekerja 69,010 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.05 m3 Bata ringan tebal 7,5 cm 141,835 M.4.005 . . .
0.47 Kg Mortar siap pakai 5,108 M.4.027 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.4.1.26. K-080 … m2 Pemasangan 1m2 Dinding Bata Ringan Tebal 10cm dengan Mortar Siap
290,826
Pakai 0.82 . 92,403 27,540 170,882
0.67 OH Pekerja 69,113 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
0.06 m3 Bata ringan tebal 7,5 cm 170,202 M.4.005 . . .
0.06 Kg Mortar siap pakai 680 M.4.027 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.4.2.19. K-081 … m2 Pemasangan 1 m2 Berapen 1SP : 5PP Tebal 15 mm 46,073 0.24 . 30,436 - 15,637
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Batu 11,588 L.4.007 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
5.18 Kg Semen 9,850 M.4.033 . . .
0.03 m3 Pasir pasang 5,788 M.4.030 . . .
A.4.4.2.20. K-082 … m2 Pemasangan 1 m’ Plesteran Skoning 1SP : 3PP Lebar 10 cm 82,535 0.52 . 78,691 - 3,844
0.08 OH Pekerja 8,240 L.4.001 . . .
0.40 OH Tukang Batu 61,800 L.4.007 . . .
0.04 OH Kepala Tukang 7,724 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
0.50 Kg Semen 950 M.4.033 . . .
0.01 m3 Pasir pasang 2,894 M.4.030 . . .
A.4.4.2.21. K-083 … m2 Pemasangan1 m2 Plesteran Granit 1SP : 2 granit Tebal 10 mm 180,383 0.72 . 90,883 - 89,500
0.45 OH Pekerja 46,350 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.02 OH Mandor 5,329 L.4.035 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
15.00 Kg Serbuk Batu 70,500 M.4.016 . . .
A.4.4.2.22. K-084 … m2 Pemasangan1 m2 Plesteran Traso 1SP : 2 Traso Tebal 10 mm 180,383 0.72 . 90,883 - 89,500
0.45 OH Pekerja 46,350 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.02 OH Mandor 5,329 L.4.035 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
15.00 Kg Serbuk Batu 70,500 M.4.016 . . .
A.4.4.2.23. K-085 … m2 Pemasangan1 m2 Plesteran Ciprat (Kamprotan)1SP : 2PP 61,300 0.43 . 51,757 - 9,544
0.30 OH Pekerja 30,900 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
4.32 Kg Semen 8,208 M.4.033 . . .

www.mitra-arsitek.com 216/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 Kg Pasir pasang 1,336 M.4.030 . . .
A.4.4.2.24. K-086 … m2 Pemasangan Finishing 1 m2 Dinding Siar Pasangan Bata Merah 36,341 0.24 . 30,436 - 5,905
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Batu 11,588 L.4.007 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
3.11 Kg Semen 5,905 M.4.033 . . .
A.4.4.2.25. K-087 … m2 Pemasangan Finishing 1m2 Dinding Siar Pasangan Conblock Ekspose17,357 0.11 . 14,317 - 3,040
0.07 OH Pekerja 7,210 L.4.001 . . .
0.04 OH Tukang Batu 5,408 L.4.007 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.60 Kg Semen 3,040 M.4.033 . . .
A.4.4.2.26. K-088 … m2 Pemasangan 1m2 Finishing Siar Pasangan Batu Kali. Campuran1SP :75,164
2PP 0.48 . 60,447 - 14,717
0.30 OH Pekerja 30,900 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
6.34 Kg Semen 12,046 M.4.033 . . .
0.01 m3 Pasir pasang 2,671 M.4.030 . . .
A.4.4.3.1. K-089 … m2 Pemasangan 1m2 lantai ubin PC Abu-abu Ukuran 40cm x40cm 315,913 0.40 . 50,585 - 265,328
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 buah Ubin Abu-abu 236,691 M.4.454 . . .
9.80 kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.2. K-090 … m2 Pemasangan 1m2 Lantai Ubin PC Abu-abu Ukuran 30cm x 30 cm 503,361 0.40 . 50,585 - 452,776
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh Ubin Abu-abu 423,759 M.4.454 . . .
10.00 kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.3. K-091 … m2 Pemasangan 1m2 Lantai ubin PC Abu-abu Ukuran 20cm x 20 cm 1,030,442 0.43 . 54,615 - 975,827
0.27 OH Pekerja 27,810 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala Tukang 2,703 L.4.036 . . .
0.01 OH Mandor 3,244 L.4.035 . . .
26.50 buah Ubin Abu-abu 946,050 M.4.454 . . .
10.40 kg Semen 19,760 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.5. K-092 … m2 Pemasangan 1m2 Lantai ubin Warna Ukuran 30cm x 30cm 1,362,490 0.42 . 52,387 - 1,310,103
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh Ubin Warna 1,279,586 M.4.474 . . .

www.mitra-arsitek.com 217/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
10.00 kg Semen 19,000 M.4.033 . . .
0.60 Kg Semen Warna 1,500 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.6. K-093 … m2 Pemasangan 1m2 Lantai ubin Warna Ukuran 20cm x 20cm 2,943,592 0.43 . 54,615 - 2,888,977
0.27 OH Pekerja 27,810 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala Tukang 2,703 L.4.036 . . .
0.01 OH Mandor 3,244 L.4.035 . . .
26.50 Bh Ubin Warna 2,856,700 M.4.474 . . .
10.40 kg Semen 19,760 M.4.033 . . .
1.00 Kg Semen Warna 2,500 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.7. K-094 … m2 Pemasangan 1m2 Lantai Ubin Teraso Ukuran 40cm x 40cm 1,034,540 0.40 . 50,585 - 983,955
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh Ubin Teraso 952,068 M.4.471 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.8. K-095 … m2 Pemasangan 1m2 Lantai Ubin Teraso Ukuran 30cm x 30cm 1,789,686 0.42 . 52,387 - 1,737,299
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh Ubin teraso 1,704,532 M.4.471 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.9. K-096 … m2 Pemasangan 1m2 Lantai Ubin Granit Ukuran 40cm x 40cm 1,953,458 0.40 . 50,585 - 1,902,873
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh Ubin granit 1,870,986 M.4.455 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.10. K-097 … m2 Pemasangan 1m2 Lantai Ubin Granit Ukuran 30cm x 30cm 3,434,868 0.42 . 52,387 - 3,382,481
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh Ubin Granit 3,349,714 M.4.455 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.12. K-098 … m2 Pemasangan 1m2 Lantai Ubin Teralux Ukuran 30cm x30cm 162,309 0.42 . 52,387 - 109,922
0.26 OH Pekerja 26,780 L.4.001 . . .

www.mitra-arsitek.com 218/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh Plint ubin teralux kerang 77,155 M.4.434 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.13. K-099 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm217,075 0.38 . 48,358 - 168,717
0.24 OH Pekerja 24,720 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 2,780 L.4.035 . . .
3.10 Bh ubin teralux marmer ukuran 60cm x60cm 136,710 M.4.470 . . .
9.60 kg Semen 18,240 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.14. K-100 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 40cm x40cm343,031 0.40 . 50,585 - 292,446
0.25 OH Pekerja 25,750 L.4.001 . . .
0.13 OH Tukang Batu 19,313 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 260,559 M.4.469 . . .
9.80 kg Semen 18,620 M.4.033 . . .
1.30 Kg Semen Warna 3,250 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.15. K-101 … m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm476,864 0.42 . 52,387 - 424,477
0.26 OH Pekerja 26,780 L.4.001 . . .
0.13 OH Tukang Batu 20,085 L.4.007 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.01 OH Mandor 3,012 L.4.035 . . .
11.87 Bh ubin teralux marmer ukuran 30cm x30cm 391,710 M.4.468 . . .
10.00 kg Semen 19,000 M.4.033 . . .
1.50 Kg Semen Warna 3,750 M.4.036 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
A.4.4.3.16. K-102 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 20 s.d. <30 cm 48,117 0.19 . 26,071 - 22,045
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
5.30 Bh Plint Ubin 18,020 M.4.424 . . .
1.65 kg Semen 3,135 M.4.033 . . .
0.00 m3 Pasir pasang 890 M.4.030 . . .
A.4.4.3.17. K-103 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 30 s.d. <40 cm 41,097 0.19 . 26,071 - 15,026
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint Ubin 12,002 M.4.424 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .

www.mitra-arsitek.com 219/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.18. K-104 … m1 Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 40 s.d. <50 cm 38,105 0.19 . 26,071 - 12,034
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint Ubin 9,010 M.4.424 . . .
1.24 kg Semen 2,356 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.19. K-105 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 20 s.d. <30cm 47,175 0.19 . 26,071 - 21,104
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
5.30 Bh Plint Ubin 18,020 M.4.424 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.20. K-106 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 30 s.d. <40cm 41,157 0.19 . 26,071 - 15,086
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint Ubin 12,002 M.4.424 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.21. K-107 … m1 Pemasangan 1 m’ Plint Ubin Warna Ukuran 40 s.d. <50 cm 38,165 0.19 . 26,071 - 12,094
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint Ubin 9,010 M.4.424 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.22. K-108 … m1 Pemasangan 1 m’ Plint Ubin Teraso Ukuran 30 s.d. <40cm 46,099 0.19 . 26,071 - 20,028
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint Ubin teraso 16,944 M.4.441 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.23. K-109 … m1 Pemasangan 1 m’ Plint Ubin Teraso Ukuran 40 s.d. <50 cm 41,875 0.19 . 26,071 - 15,804
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint Ubin teraso 12,720 M.4.441 . . .

www.mitra-arsitek.com 220/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.24. K-110 … m1 Pemasangan 1 m’ Plint Ubin Granit Ukuran 30 s.d. <40 cm 72,221 0.19 . 26,071 - 46,150
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint Ubin granit 43,066 M.4.425 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.25. K-111 … m1 Pemasangan 1 m’ Plint Ubin Granit Ukuran 40 s.d. <50cm 61,485 0.19 . 26,071 - 35,414
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint Ubin granit 32,330 M.4.425 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.26. K-112 … m1 Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 30 s.d. <40cm 52,100 0.19 . 26,071 - 26,029
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin teralux kerang 22,945 M.4.434 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.27. K-113 … m1 Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 40 s.d. <50cm 46,250 0.19 . 26,071 - 20,179
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.63 Bh Plint ubin teralux kerang 17,095 M.4.434 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.28. K-114 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 30 s.d. <40cm 75,045 0.19 . 26,071 - 48,974
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
3.53 Bh Plint ubin teralux marmer 45,890 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.29. K-115 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 40 s.d. <50cm 63,605 0.19 . 26,071 - 37,534
0.09 OH Pekerja 9,270 L.4.001 . . .

www.mitra-arsitek.com 221/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
2.65 Bh Plint ubin teralux marmer 34,450 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.30. K-116 … m1 Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm 51,255 0.19 . 26,071 - 25,184
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.70 Bh Plint ubin teralux marmer 22,100 M.4.437 . . .
1.14 kg Semen 2,166 M.4.033 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
A.4.4.3.31. K-117 … m2 Pemasangan 1m2 Lantai Teraso Cor di Tempat. Tebal 3cm 111,242 0.58 . 72,536 - 38,705
0.36 OH Pekerja 37,080 L.4.001 . . .
0.18 OH Tukang Batu 27,810 L.4.007 . . .
0.02 OH Kepala Tukang 3,476 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 m3 Bahan teraso cor 38,455 M.4.530 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
A.4.4.3.32. K-118 … m2 Pemasangan 1m2 Lantai Keramik Artistik 10 s.d. <20cm 276,381 1.12 . 141,043 - 135,338
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
10.60 Bh Ubin Keramik 101,760 M.4.458 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
3.20 Kg Semen Warna 8,000 M.4.036 . . .
A.4.4.3.33. K-119 … m2 Pemasangan 1m2 Lantai Keramik Artistik Ukuran 20 s.d. <30 cm 682,296 1.12 . 141,043 - 541,253
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
53.00 Bh Ubin Keramik 508,800 M.4.458 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.35. K-120 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 20 s.d. <30cm 182,150 1.12 . 141,043 - 41,107
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 Dus Ubin Keramik 10,080 M.4.458 . . .
10.40 Kg Semen 19,760 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.50 Kg Semen Warna 1,250 M.4.036 . . .

www.mitra-arsitek.com 222/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.36. K-121 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm 181,390 1.12 . 141,043 - 40,347
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 Dus Ubin Keramik 10,080 M.4.458 . . .
10.00 Kg Semen 19,000 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.50 Kg Semen Warna 1,250 M.4.036 . . .
A.4.4.3.37. K-122 … m2 Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40 cm untukVariasi/border
568,139 1.68 . 211,777 - 356,362
1.05 OH Pekerja 108,150 L.4.001 . . .
0.53 OH Tukang Batu 81,113 L.4.007 . . .
0.05 OH Kepala Tukang 10,234 L.4.036 . . .
0.05 OH Mandor 12,280 L.4.035 . . .
33.00 Bh Ubin Keramik 316,800 M.4.458 . . .
9.80 Kg Semen 18,620 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
4.37 Kg Semen Warna 10,925 M.4.036 . . .
A.4.4.3.39. K-123 … m1 Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <20cm 104,011 0.22 . 31,092 - 72,919
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
10.60 Bh Plint keramik ukuran 10cm x 20cm 69,960 M.4.422 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.05 Kg Semen Warna 125 M.4.036 . . .
A.4.4.3.40. K-124 … m1 Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <30 cm 62,078 0.22 . 31,092 - 30,986
0.09 OH Pekerja 9,270 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
5.30 Bh Plint ubin Pc abu-abu ukuran 10cm x 30cm 28,090 M.4.430 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.03 Kg Semen Warna 63 M.4.036 . . .
A.4.4.3.41. K-125 … m1 Pemasangan 1 m’ Plint Internal Cove Artistik 5cm x 5cm x 20cm 259,246 1.61 . 216,412 - 42,834
0.75 OH Pekerja 77,250 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.04 OH Mandor 8,805 L.4.035 . . .
5.30 Bh Internal Cove 39,750 M.4.590 . . .
1.14 Kg Semen 2,166 M.4.033 . . .
0.00 m3 Pasir pasang 668 M.4.030 . . .
0.10 Kg Semen Warna 250 M.4.036 . . .
A.4.4.3.42. K-126 … m2 Pemasangan 1 m2 Lantai Marmer Ukuran 100cm x 100cm 643,956 1.12 . 141,043 - 502,913
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .

www.mitra-arsitek.com 223/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.06 buah Marmer 477,000 M.4.416 . . .
8.19 Kg Semen 15,561 M.4.033 . . .
0.05 m3 Pasir pasang 10,017 M.4.030 . . .
0.13 Kg Semen Warna 335 M.4.036 . . .
A.4.4.3.43. K-127 … m2 Pemasangan 1 m2 Lantai Karpet 127,858 0.37 . 49,143 - 78,715
0.17 OH Pekerja 17,510 L.4.001 . . .
0.17 OH Tukang Kayu 26,265 L.4.016 . . .
0.02 OH Kepala Tukang 3,283 L.4.036 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.05 m2 Karpet 73,605 M.4.355 . . .
0.35 Kg Lem 5,110 M.4.552 . . .
A.4.4.3.44. K-128 … m2 Pemasangan 1 m2 Underlayer (Pelapis Bawah Karpet) 70,272 0.26 . 34,607 - 35,665
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Kayu 18,540 L.4.016 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
1.05 m2 underlayer (pelapis bawah karpet) 30,555 M.4.373 . . .
0.35 Kg Lem 5,110 M.4.552 . . .
A.4.4.3.45. K-129 … m2 Pemasangan 1 m2 Lantai Parquet Kayu Solid 163,558 1.12 . 141,043 - 22,515
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Kayu 54,075 L.4.016 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 m2 Parquet kayu 14,595 M.4.359 . . .
0.60 Kg Lem kayu 7,920 M.4.553 . . .
A.4.4.3.46. K-130 … m2 Pemasangan 1 m2 Lantai Kayu Gymfloor 462,598 1.12 . 141,043 - 321,555
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Kayu 54,075 L.4.016 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.05 m2 Parquet kayu gymfloor 313,635 M.4.360 . . .
0.60 Kg Lem Kayu 7,920 M.4.553 . . .
A.4.4.3.47. K-131 … m2 Pemasangan 1 m2 Dinding Porselen 11cm x 11cm 231,452 1.60 . 201,490 - 29,962
1.00 OH Pekerja 103,000 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.05 buah Porselen (11 x 11) cm 7,035 M.4.449 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
0.50 Kg Semen Warna 1,250 M.4.036 . . .
A.4.4.3.48. K-132 … m2 Pemasangan 1 m2 Dinding Porselen 10cm x 20cm 474,893 1.44 . 181,341 - 293,552
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
53.00 buah Porselen Dinding 10x20 265,000 M.4.450 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .

www.mitra-arsitek.com 224/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.49. K-133 … m2 Pemasangan 1 m2 Dinding Porselen 20cm x 20cm 389,868 1.44 . 181,341 - 208,527
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
26.00 buah Porselen Dinding 20x20 182,000 M.4.451 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
1.94 Kg Semen Warna 4,850 M.4.036 . . .
A.4.4.3.50. K-134 … m2 Pemasangan 1 m2 Dinding Keramik Artistik 10cm x 20cm 339,893 1.44 . 181,341 - 158,552
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
52.00 buah keramik artistik 10cm x 10cm atau 5cm x 20cm 130,000 M.4.406 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.51. K-135 … m2 Pemasangan 1 m2 Dinding Keramik Artistik 5cm x 20cm 289,468 1.44 . 181,341 - 108,127
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.10 m2 Keramik Dinding artistik 79,200 M.4.410 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.90 Kg Semen Warna 7,250 M.4.036 . . .
A.4.4.3.52. K-136 … m2 Pemasangan 1 m2 Dinding Keramik 10cm x 20cm 292,393 1.44 . 181,341 - 111,052
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.10 m2 keramik artistik 10cm x 20cm 82,500 M.4.407 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.53. K-137 … m2 Pemasangan 1 m2 Dinding Keramik 20cm x 20cm 282,888 1.44 . 181,341 - 101,547
0.90 OH Pekerja 92,700 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.05 OH Mandor 10,427 L.4.035 . . .
1.10 m2 keramik Dinding 20cm x 20cm 75,020 M.4.409 . . .
9.30 Kg Semen 17,670 M.4.033 . . .
0.02 m3 Pasir pasang 4,007 M.4.030 . . .
1.94 Kg Semen Warna 4,850 M.4.036 . . .
A.4.4.3.54. K-138 … m2 Pemasangan 1 m2 Dinding Marmer 100cm x 100cm 852,482 2.08 . 261,937 - 590,545
1.30 OH Pekerja 133,900 L.4.001 . . .
0.65 OH Tukang Batu 100,425 L.4.007 . . .
0.07 OH Kepala Tukang 12,552 L.4.036 . . .
0.07 OH Mandor 15,061 L.4.035 . . .

www.mitra-arsitek.com 225/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.06 buah Marmer 477,000 M.4.416 . . .
12.44 Kg Semen 23,636 M.4.033 . . .
0.03 m3 Pasir pasang 5,565 M.4.030 . . .
0.65 Kg Semen Warna 1,625 M.4.036 . . .
3.03 buah Paku Biasa 2" - 5" 82,719 M.4.158 . . .
A.4.4.3.55. K-139 … m2 Pemasangan 1 m2 Dinding Bata Pelapis (Super) 3cm x 7cm x 24cm 294,266 1.60 . 201,490 - 92,776
1.00 OH Pekerja 103,000 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
63.00 buah Bata pelapis Dinding 3cm x 7cm x 24cm 56,700 M.4.008 . . .
12.44 Kg Semen 23,636 M.4.033 . . .
0.03 m3 Pasir pasang 5,565 M.4.030 . . .
2.75 Kg Semen Warna 6,875 M.4.036 . . .
A.4.4.3.56. K-140 … m2 Pemasangan 1 m2 Dinding Batu Paras 266,199 1.12 . 141,043 - 125,156
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.10 Buah Batu paras 95,040 M.4.015 . . .
11.75 Kg Semen 22,325 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
A.4.4.3.57. K-141 … m2 Pemasangan 1 m2 Dinding Batu Tempel Hitam 500,389 1.12 . 141,043 - 359,346
0.70 OH Pekerja 72,100 L.4.001 . . .
0.35 OH Tukang Batu 54,075 L.4.007 . . .
0.04 OH Kepala Tukang 6,759 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
1.10 Buah Batu alam / tempel 329,230 M.4.011 . . .
11.75 Kg Semen 22,325 M.4.033 . . .
0.04 m3 Pasir pasang 7,791 M.4.030 . . .
A.4.4.3.58. K-142 … m2 Pemasangan 1 m2 Lantai Vynil Ukuran 30cm x 30cm 333,365 0.32 . 43,375 - 289,990
0.15 OH Pekerja 15,450 L.4.001 . . .
0.15 OH Tukang Batu 23,175 L.4.007 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
11.87 buah plint vynil 15cm x 30cm 284,880 M.4.447 . . .
0.35 Kg Lem 5,110 M.4.552 . . .
A.4.4.3.59. K-143 … m2 Pemasangan 1 m2 Wallpaper lebar 50 cm 145,284 0.54 . 66,834 - 78,450
0.35 OH Pekerja 36,050 L.4.001 . . .
0.18 OH Tukang Batu 27,038 L.4.007 . . .
0.02 OH Kepala Tukang 3,283 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
2.20 m’ Wallpaper 74,800 M.4.374 . . .
0.25 Kg Lem 3,650 M.4.552 . . .
A.4.4.3.60. K-144 … m2 Pemasangan 1m2 Floor Harderner 55,107 0.26 . 34,607 - 20,500
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
5.00 Kg Floor hardener 20,500 M.4.587 . . .

www.mitra-arsitek.com 226/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.4.3.61. K-145 … m1 Pemasangan 1 m’ Plint Vynil 15cm x 30cm 98,640 0.17 . 23,072 - 75,568
0.08 OH Pekerja 8,240 L.4.001 . . .
0.08 OH Tukang Batu 12,360 L.4.007 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
3.10 buah plint vynil 15cm x 30cm 74,400 M.4.447 . . .
0.08 Kg Lem 1,168 M.4.552 . . .
A.4.4.3.62. K-146 … m1 Pemasangan 1 m’ Plint Kayu Tebal 2 cm Lebar 10cm 55,238 0.26 . 34,607 - 20,631
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Batu 18,540 L.4.007 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.00 m3 Kayu Papan kelas I 19,796 M.4.101 . . .
0.05 Kg Paku skrup 5 cm 835 M.4.169 . . .
A.4.4.3.63. K-147 … m2 Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm 298,454 0.80 . 112,956 27,540 157,958
0.25 OH Pekerja 25,750 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.01 m2 Paving block 6 cm 143,218 M.4.542 . . .
0.05 m3 Pasir beton 14,740 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.4.3.64. K-148 … m2 Pemasangan 1 m2 Pavingblock (Blok Beton) Natural tebal 8cm 193,567 1.05 . 138,706 27,540 27,321
0.50 OH Pekerja 51,500 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.01 m2 Paving block 8 cm natural 3,737 M.4.544 . . .
0.08 m3 Pasir beton 23,584 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.4.3.65. K-149 … m2 Pemasangan 1 m2 Paving Block ( Blok Beton) Berwarna Tebal 6cm 294,414 0.80 . 112,956 27,540 153,918
0.25 OH Pekerja 25,750 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.01 m2 Paving block 6cm berwarna 139,178 M.4.543 . . .
0.05 m3 Pasir beton 14,740 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.4.3.66. K-150 … m2 Pemasangan 1 m2 Pavingblock (Blok Beton) Berwarna Tebal 8cm 306,485 1.05 . 138,706 27,540 140,239
0.50 OH Pekerja 51,500 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.01 m2 Paving block 8 cm berwarna 116,655 M.4.541 . . .
0.08 m3 Pasir beton 23,584 M.4.028 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.5.1.1. K-151 … m2 Pemasangan1 m2 Langit-Langit Serat Semen. Tebal 4 mm. 5 mm. dan
133,657
6 mm 0.11 . 16,184 27,540 89,933
0.03 OH Pekerja 3,090 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .

www.mitra-arsitek.com 227/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 927 L.4.035 . . .
1.10 m2 Serat semen 89,760 M.4.578 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
0.10 % Alat Bantu/Perlengkapan Umum 27,540 T.4.001 . . .
A.4.5.1.2. K-152 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 30 cm 459,407 0.26 . 34,607 - 424,800
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Kayu 18,540 L.4.016 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
12.00 Lembar Akustik ukuran 30 x 30 cm 424,800 M.4.340 . . .
A.4.5.1.3. K-153 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 30 x 60 cm 239,927 0.26 . 34,607 - 205,320
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Kayu 18,540 L.4.016 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
5.80 Lembar Akustik ukuran 30 x 30 cm 205,320 M.4.340 . . .
A.4.5.1.4. K-154 … m2 Pemasangan 1 m2 Langit-Langit Akustik Ukuran 60 x 120 cm 81,940 0.22 . 28,840 - 53,100
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.50 Lembar Akustik ukuran 30 x 30 cm 53,100 M.4.340 . . .
A.4.5.1.5. K-155 … m2 Pemasangan 1 m2 Langit-Langit Kayu Lapis. Tebal 3 mm. 4 mm dan 6mm
59,959 0.22 . 28,840 - 31,119
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.38 Lembar Multiplek 30,600 M.4.358 . . .
0.03 kg Paku tripleks 519 M.4.171 . . .
A.4.5.1.6. K-156 … m2 Pemasangan 1 m2 Langit-Langit Lambrisering Kayu. tebal 9 mm 397,389 1.72 . 230,716 - 166,673
0.80 OH Pekerja 82,400 L.4.001 . . .
0.80 OH Tukang Kayu 123,600 L.4.016 . . .
0.08 OH Kepala Tukang 15,448 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.02 m3 Kayu jati papan (klas 1) 166,500 M.4.095 . . .
0.01 kg Paku tripleks 173 M.4.171 . . .
A.4.5.1.7. K-157 … m2 Pemasangan 1 m2 Langit-Langit Papan Gipsum. Tebal 9 mm 51,286 0.16 . 20,149 - 31,137
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.36 Lembar Gypsum board 9 mm 31,049 M.4.353 . . .
0.11 kg Paku sekrup 88 M.4.165 . . .
A.4.5.1.10. K-158 … m1 Pemasangan 1 m’ List Langit-Langit Kayu profil 17,854 0.11 . 14,536 - 3,318
0.05 OH Pekerja 5,150 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.05 m List Kayu profil 3,045 M.4.044 . . .
0.01 kg Paku Biasa 2" - 5" 273 M.4.158 . . .

www.mitra-arsitek.com 228/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.1.12. K-159 … m2 Pemasangan 1 m2 Langit-langit Akustik Uk. 60x120cm Berikut Rangka
396,593
Aluminium
1.08 . 144,848 - 251,745
0.50 OH Pekerja 51,500 L.4.001 . . .
0.50 OH Tukang Besi 77,900 L.4.008 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
3.60 m Profil Alluminium "T" 45,360 M.4.177 . . .
0.15 kg Kawat dia 4 mm 5,445 M.4.145 . . .
1.05 Buah Baut Ramset / Dina Bolt 5,040 M.4.130 . . .
1.50 Lembar Akustik Uk. 60 cm x 120 cm 195,900 M.4.339 . . .
A.4.5.2.1. K-160 … m2 Pemasangan 1 m2 Atap genteng Palentong Kecil 92,839 0.24 . 30,339 - 62,500
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,448 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
25.00 buah Genteng palentong 62,500 M.4.494 . . .
A.4.5.2.2. K-161 … m2 Pemasangan1 m2 Atap Genteng Kodok Glazuur 72,936 0.24 . 30,436 - 42,500
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
25.00 buah Genteng kodok 42,500 M.4.492 . . .
A.4.5.2.3. K-162 … m2 Pemasangan1 m2 Atap Genteng Palentong Besar/Morando 60,436 0.24 . 30,436 - 30,000
0.15 OH Pekerja 15,450 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
12.00 buah Genteng palentong 30,000 M.4.494 . . .
A.4.5.2.4. K-163 … m1 Pemasangan 1 m’ Bubung Genteng Palentong Kecil 123,749 0.62 . 76,425 - 47,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
5.00 Buah Genteng Bubung 25,000 M.4.488 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
A.4.5.2.5. K-164 … m1 Pemasangan 1 m’ Bubung Genteng Kodok Glazuur 123,749 0.62 . 76,425 - 47,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
5.00 buah Genteng Bubung 25,000 M.4.488 . . .
8.00 Kg Semen 15,200 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
A.4.5.2.6. K-165 … m1 Pemasangan 1 m’ Bubung Genteng Palentong Besar 118,749 0.62 . 76,425 - 42,323
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
4.00 buah Genteng Bubung 20,000 M.4.488 . . .
8.00 Kg Semen 15,200 M.4.033 . . .

www.mitra-arsitek.com 229/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
A.4.5.2.7. K-166 … m2 Pemasangan 1 m2 Roof Light Fibreglass 90cm x180cm 100,960 0.22 . 27,745 - 73,215
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,352 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
0.60 Lbr Rooflight 90x180 72,000 M.4.509 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.8. K-167 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 250cm x 5mm
128,790 0.23 . 29,406 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.9. K-168 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 92cm x 225cm x 5mm
128,790 0.23 . 29,406 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.10. K-169 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 200cm x 5mm127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.11. K-170 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 92cm x 180cm x 5mm127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.12. K-171 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 300cm x 5 mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.15. K-172 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 240cm x 5mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .

www.mitra-arsitek.com 230/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.5.2.17. K-173 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 210cm x 5mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.18. K-174 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 105cm x 150cm x 5mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.19. K-175 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 300cm x 6mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.20. K-176 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 270cm x 6mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.21. K-177 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 240cm x 6mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.22. K-178 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 210cm x 6mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.23. K-179 … m2 Pemasangan 1 m2 Atap Serat Semen Gelombang 108cm x 180cm x 6mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.5.2.24. K-180 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 92 cm 75,562 0.23 . 31,402 - 44,160

www.mitra-arsitek.com 231/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.40 Lbr Bubung stel gel. 39,360 M.4.480 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.25. K-181 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 105 cm 70,642 0.23 . 31,402 - 39,240
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.10 Lbr Bubung stel gel. 34,440 M.4.480 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.26. K-182 … m1 Pemasangan 1 m’ Nok/Bubung Setel Gelombang 108 cm 69,002 0.23 . 31,402 - 37,600
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
2.00 Lbr Bubung stel gel. 32,800 M.4.480 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.27. K-183 … m1 Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 92 cm 80,972 0.23 . 31,402 - 49,570
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 Lbr Nok Paten 44,770 M.4.503 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.28. K-184 … m1 Pemasangan 1 m’ Nok/Bubung Paten (Permanen) 105cm 85,042 0.23 . 31,402 - 53,640
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 Lbr Nok Paten 48,840 M.4.503 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.29. K-185 … m1 Pemasangan 1 m’ Nok/Bubung Paten(Permanen) 108 cm 85,042 0.23 . 31,402 - 53,640
0.08 OH Pekerja 8,652 L.4.001 . . .
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 Lbr Nok Paten 48,840 M.4.503 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.30. K-186 … m1 Pemasangan 1 m’ Nok/Bubung Setel Rata 92cm 126,412 0.27 . 36,912 - 89,500
0.10 OH Pekerja 10,300 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 Lbr Nok metal 84,700 M.4.502 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.31. K-187 … m1 Pemasangan 1 m’ Nok/Bubung Setel Rata 105 cm 120,902 0.23 . 31,402 - 89,500
0.08 OH Pekerja 8,652 L.4.001 . . .

www.mitra-arsitek.com 232/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.13 OH Tukang Kayu 19,313 L.4.016 . . .
0.01 OH Kepala Tukang 2,510 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 Lbr Nok metal 84,700 M.4.502 . . .
6.00 buah Paku sekrup 4,800 M.4.165 . . .
A.4.5.2.32. K-188 … m2 Pemasangan 1 m2 Genteng Beton 73,017 0.32 . 40,298 - 32,719
0.20 OH Pekerja 20,600 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
11.00 buah Genteng Beton 31,900 M.4.485 . . .
0.03 Kg Paku Biasa 2" - 5" 819 M.4.158 . . .
A.4.5.2.33. K-189 … m2 Pemasangan 1 m2 Genteng Aspal 80x100cm 120,505 0.51 . 69,846 - 50,659
0.20 OH Pekerja 20,600 L.4.001 . . .
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.00 OH Kepala Tukang 579 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
1.50 Buah Genteng aspal 4,650 M.4.484 . . .
0.35 Lbr Plywood 120x240 tbl. 6 mm 26,880 M.4.366 . . .
0.03 Kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 buah Plastic aerator 18,400 M.4.363 . . .
A.4.5.2.35. K-190 … m2 Pemasangan 1 m2 Atap Sirap Kayu 142,264 0.45 . 62,404 - 79,860
0.17 OH Pekerja 17,098 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
30.00 buah Sirap kayu 75,000 M.4.510 . . .
0.20 Kg Paku Biasa ½" - 1" 4,860 M.4.157 . . .
A.4.5.2.36. K-191 … m2 Pemasangan 1 m’ Nok/Bubung Genteng Beton 166,554 0.64 . 80,596 - 85,958
0.40 OH Pekerja 41,200 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
3.50 buah Nok Genteng beton 54,600 M.4.499 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
10.80 Kg Semen 20,520 M.4.033 . . .
0.03 m3 Pasir pasang 7,123 M.4.030 . . .
1.00 Kg Semen Warna 2,500 M.4.036 . . .
A.4.5.2.37. K-192 … m1 Pemasangan 1 m’ Nok/Bubung Genteng Aspal 121,918 0.41 . 57,718 - 64,200
0.13 OH Pekerja 12,875 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
2.00 buah Nok genteng aspal 50,000 M.4.498 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
0.00 m3 Kayu balok borneo 12,985 M.4.084 . . .
A.4.5.2.38. K-193 … m1 Pemasangan 1 m’ Nok/Bubung Genteng Metal 152,849 0.43 . 54,834 - 98,015
0.25 OH Pekerja 25,750 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .

www.mitra-arsitek.com 233/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Mandor 3,012 L.4.035 . . .
1.10 buah nok genteng metal 96,800 M.4.501 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.39. K-194 … m1 Pemasangan 1 m’ Nok/Bubung Atap Sirap 79,333 0.41 . 57,718 - 21,615
0.13 OH Pekerja 12,875 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 20,400 M.4.368 . . .
0.05 Kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.5.2.40. K-195 … m2 Pemasangan 1 m2 Atap Seng Gelombang 105cm x180cm 60,365 0.19 . 24,179 - 36,186
0.12 OH Pekerja 12,360 L.4.001 . . .
0.06 OH Tukang Kayu 9,270 L.4.016 . . .
0.01 OH Kepala Tukang 1,159 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 35,700 M.4.368 . . .
0.02 Kg Paku Biasa ½" - 1" 486 M.4.157 . . .
A.4.5.2.41. K-196 … m1 Pemasangan 1 m’ Nok/Bubung Atap Seng 45,279 0.23 . 29,007 - 16,272
0.15 OH Pekerja 15,450 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.30 Lbr Seng Gelombang 3" x 6" BJLS 28 15,300 M.4.368 . . .
0.04 Kg Paku Biasa ½" - 1" 972 M.4.157 . . .
A.4.5.2.42. K-197 … m2 Pemasangan 1 m2 Atap Aluminium Gelombang 95cm x 180cm 269,682 0.99 . 148,163 - 121,519
0.15 OH Pekerja 15,450 L.4.001 . . .
0.75 OH Tukang Kayu 115,875 L.4.016 . . .
0.08 OH Kepala Tukang 15,448 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.75 Lbr Atap Alluminium Gelombang tebal 0.55 121,275 M.4.478 . . .
0.02 Kg Paku Pancing 60 x 230 244 M.4.162 . . .
A.4.5.2.43. K-198 … m1 Pemasangan 1 m’ Nok/Bubung Atap Aluminium Gelombang 288,339 1.25 . 195,695 - 92,644
0.10 OH Pekerja 10,300 L.4.001 . . .
1.00 OH Tukang Kayu 154,500 L.4.016 . . .
0.10 OH Kepala Tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.20 buah Nok metal 92,400 M.4.502 . . .
0.02 Kg Paku Pancing 60 x 230 244 M.4.162 . . .
A.4.5.2.44. K-199 … m2 Pemasangan 1 m2 Lapisan Aluminium Foil 56,234 0.21 . 25,994 - 30,240
0.15 OH Pekerja 15,450 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.05 m2 Aluminium foil 30,240 M.4.121 . . .
A.4.5.2.45. K-200 … m2 Pemasangan1 m2 Atap Serat Semen Gelombang 105cm x 270cm x 4mm
127,593 0.22 . 28,209 - 99,384
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Kayu 10,815 L.4.016 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m2 Serat Semen 97,920 M.4.578 . . .

www.mitra-arsitek.com 234/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.12 Kg Paku Pancing 60 x 230 1,464 M.4.162 . . .
A.4.6.1.1. K-201 … m3 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela. 8,310,930
Kayu Kelas30.45
I . 4,452,105 - 3,858,825
7.00 OH Pekerja 721,000 L.4.001 . . .
21.00 OH Tukang Kayu 3,244,500 L.4.016 . . .
2.10 OH Kepala Tukang 405,510 L.4.036 . . .
0.35 OH Mandor 81,095 L.4.035 . . .
1.10 m3 Balok kayu kelas II 3,811,500 M.4.078 . . .
1.25 Kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 Kg Lem kayu 13,200 M.4.553 . . .
A.4.6.1.2. K-202 … m3 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela8,021,415
Kayu Kelas II
26.10
atau III
. 3,816,090 - 4,205,325
6.00 OH Pekerja 618,000 L.4.001 . . .
18.00 OH Tukang Kayu 2,781,000 L.4.016 . . .
1.80 OH Kepala Tukang 347,580 L.4.036 . . .
0.30 OH Mandor 69,510 L.4.035 . . .
1.20 m3 Balok kayu kelas II 4,158,000 M.4.078 . . .
1.25 Kg Paku Biasa 2" - 5" 34,125 M.4.158 . . .
1.00 Kg Lem kayu 13,200 M.4.553 . . .
A.4.6.1.3. K-203 … m2 Pembuatan dan Pemasangan 1 m2 Pintu Klamp Standar Kayu Kelas366,886
II 1.52 . 222,721 - 144,165
0.35 OH Pekerja 36,050 L.4.001 . . .
1.05 OH Tukang Kayu 162,225 L.4.016 . . .
0.11 OH Kepala Tukang 20,276 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 m3 Kayu Papan kelas II 142,800 M.4.102 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.4. K-204 … m2 Pembuatan dan Pemasangan 1 m2 Pintu Klamp Sederhana Kayu Kelas 366,886
III 1.52 . 222,721 - 144,165
0.35 OH Pekerja 36,050 L.4.001 . . .
1.05 OH Tukang Kayu 162,225 L.4.016 . . .
0.11 OH Kepala Tukang 20,276 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.04 m3 Kayu Papan kelas II 142,800 M.4.102 . . .
0.05 Kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.5. K-205 … m2 Pembuatan 1 m2 Daun Pintu Panel. Kayu Kelas I atau II 786,815 4.35 . 636,015 - 150,800
1.00 OH Pekerja 103,000 L.4.001 . . .
3.00 OH Tukang Kayu 463,500 L.4.016 . . .
0.30 OH Kepala Tukang 57,930 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
0.04 m3 Kayu papan 3/20 144,200 M.4.100 . . .
0.50 Kg Lem kayu 6,600 M.4.553 . . .
A.4.6.1.6. K-206 … m2 Pembuatan 1 m2 Pintu dan Jendela Kaca. Kayu Kelas I atau II 599,292 3.48 . 508,812 - 90,480
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang Kayu 370,800 L.4.016 . . .
0.24 OH Kepala Tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.02 m3 Kayu papan 3/20 86,520 M.4.100 . . .
0.30 Kg Lem kayu 3,960 M.4.553 . . .
A.4.6.1.7. K-207 … m2 Pembuatan 1 m2 Pintu dan Jendela Jalusi Kayu Kelas I atau II 873,335 4.35 . 636,015 - 237,320
1.00 OH Pekerja 103,000 L.4.001 . . .
3.00 OH Tukang Kayu 463,500 L.4.016 . . .
0.30 OH Kepala Tukang 57,930 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .

www.mitra-arsitek.com 235/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.06 m3 Kayu papan 3/20 230,720 M.4.100 . . .
0.50 Kg Lem kayu 6,600 M.4.553 . . .
A.4.6.1.8. K-208 … m2 Pembuatan 1 m2 Daun pintu Plywood Rangkap. Rangka Kayu Kelas620,290
II Tertutup 3.05
(Lebar. Sampai 90cm) 445,211 - 175,079
0.70 OH Pekerja 72,100 L.4.001 . . .
2.10 OH Tukang Kayu 324,450 L.4.016 . . .
0.21 OH Kepala Tukang 40,551 L.4.036 . . .
0.04 OH Mandor 8,110 L.4.035 . . .
0.03 m3 Kayu Papan kelas II 89,250 M.4.102 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 Lembar Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
A.4.6.1.9. K-209 … m2 Pembuatan 1m2 Pintu Plywood Rangkap. Rangka Expose Kayu Kelas 686,929
I atau II 3.48 . 508,812 - 178,117
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang Kayu 370,800 L.4.016 . . .
0.24 OH Kepala Tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.03 m3 Kayu papan 3/20 92,288 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.50 kg Lem kayu 6,600 M.4.553 . . .
1.00 Lembar Plywood 120x240 tbl. 4 mm 78,500 M.4.365 . . .
A.4.6.1.10. K-210 … m2 Pembuatan dan Pemasangan 1 m2 Jalusi Kusen Kayu Kelas I atau II714,195 3.21 . 494,250 - 219,945
0.67 OH Pekerja 69,010 L.4.001 . . .
2.00 OH Tukang Kayu 309,000 L.4.016 . . .
0.20 OH Kepala Tukang 38,620 L.4.036 . . .
0.34 OH Mandor 77,620 L.4.035 . . .
0.06 m3 Kayu papan 3/20 216,300 M.4.100 . . .
0.15 kg Paku Biasa ½" - 1" 3,645 M.4.157 . . .
A.4.6.1.11. K-211 … m2 Pembuatan 1 m2 Teakwood Rangkap. Rangka Expose Kayu Kelas I 665,126 3.48 . 508,812 - 156,314
0.80 OH Pekerja 82,400 L.4.001 . . .
2.40 OH Tukang Kayu 370,800 L.4.016 . . .
0.24 OH Kepala Tukang 46,344 L.4.036 . . .
0.04 OH Mandor 9,268 L.4.035 . . .
0.03 m3 Kayu papan 3/20 90,125 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.30 kg Lem kayu 3,960 M.4.553 . . .
1.00 Lembar Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
A.4.6.1.12. K-212 … m2 Pembuatan 1 m2 Teakwood Rangkap Lapis Formika. Rangka Expose 750,443
Kayu Kelas3.70
II . 540,729 - 209,714
0.85 OH Pekerja 87,550 L.4.001 . . .
2.55 OH Tukang Kayu 393,975 L.4.016 . . .
0.26 OH Kepala Tukang 49,241 L.4.036 . . .
0.04 OH Mandor 9,963 L.4.035 . . .
0.03 m3 Kayu papan 3/20 90,125 M.4.100 . . .
0.03 kg Paku Biasa ½" - 1" 729 M.4.157 . . .
0.80 kg Lem kayu 10,560 M.4.553 . . .
1.00 Lembar Teakwood 4 mm 90 x 220 cm 61,500 M.4.370 . . .
0.50 Lembar Formika 46,800 M.4.351 . . .
A.4.6.1.13. K-213 … m3 Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional. Kayu Kelas
6,709,440
I.II dan III17.40
Bentang
. Sampai Dengan2,544,060
6 Meter - 4,165,380
4.00 OH Pekerja 412,000 L.4.001 . . .
12.00 OH Tukang Kayu 1,854,000 L.4.016 . . .
1.20 OH Kepala Tukang 231,720 L.4.036 . . .

www.mitra-arsitek.com 236/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.20 OH Mandor 46,340 L.4.035 . . .
1.10 m3 Balok kayu kelas II 3,811,500 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 152,880 M.4.158 . . .
A.4.6.1.14. K-214 … m3 Pemasangan 1 m3 Konstruksi Kuda-kuda Expose. Kayu Kelas I 8,773,181 29.15 . 4,261,301 - 4,511,880
6.70 OH Pekerja 690,100 L.4.001 . . .
20.10 OH Tukang Kayu 3,105,450 L.4.016 . . .
2.01 OH Kepala Tukang 388,131 L.4.036 . . .
0.34 OH Mandor 77,620 L.4.035 . . .
1.20 m3 Balok kayu kelas II 4,158,000 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
5.60 kg Paku Biasa 2" - 5" 152,880 M.4.158 . . .
A.4.6.1.15. K-215 … m3 Pemasangan 1 m3 Konstruksi Gordeng. Kayu kelas II 5,620,836 10.44 . 1,526,436 - 4,094,400
2.40 OH Pekerja 247,200 L.4.001 . . .
7.20 OH Tukang Kayu 1,112,400 L.4.016 . . .
0.72 OH Kepala Tukang 139,032 L.4.036 . . .
0.12 OH Mandor 27,804 L.4.035 . . .
1.10 m3 Balok kayu kelas II 3,811,500 M.4.078 . . .
15.00 kg Baja strip (0,2 x 2) cm 201,000 M.4.128 . . .
3.00 kg Paku Biasa 2" - 5" 81,900 M.4.158 . . .
A.4.6.1.16. K-216 … m2 Pemasangan 1 m2 Rangka Atap Genteng Keramik. Kayu kelas II 124,931 0.22 . 28,840 - 96,092
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 89,250 M.4.059 . . .
0.00 m3 Reng bengkirai 2/3 17 M.4.048 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.17. K-217 … m2 Pemasangan 1 m2 Rangka Atap Genteng Beton Kayu Kelas II 124,966 0.22 . 28,840 - 96,126
0.10 OH Pekerja 10,300 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 89,250 M.4.059 . . .
0.01 m3 Reng bengkirai 3/4 51 M.4.049 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.18. K-218 … m2 Pemasangan 1 m2 Rangka Atap Sirap. Kayu Kelas II 669,542 0.26 . 34,607 - 634,935
0.12 OH Pekerja 12,360 L.4.001 . . .
0.12 OH Tukang Kayu 18,540 L.4.016 . . .
0.01 OH Kepala Tukang 2,317 L.4.036 . . .
0.01 OH Mandor 1,390 L.4.035 . . .
0.17 m3 Kaso 5/7 Kelas II 629,475 M.4.057 . . .
0.20 m3 Paku Biasa 2" - 5" 5,460 M.4.158 . . .
A.4.6.1.19. K-219 … m2 Pemasangan 1 m2 Rangka Langit-Langit 50x100cm. Kayu kelas II atau
188,606
III 0.56 . 84,971 - 103,635
0.15 OH Pekerja 15,450 L.4.001 . . .
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.03 OH Kepala Tukang 5,793 L.4.036 . . .
0.08 OH Mandor 17,378 L.4.035 . . .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 98,175 M.4.059 . . .
0.20 kg Paku Biasa 2" - 5" 5,460 M.4.158 . . .

www.mitra-arsitek.com 237/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
A.4.6.1.20. K-220 … m2 Pemasangan 1 m2 Rangka Langit-Langit 60x60cm. Kayu Kelas II atau
185,798
III 0.54 . 75,060 - 110,738
0.20 OH Pekerja 20,600 L.4.001 . . .
0.30 OH Tukang Kayu 46,350 L.4.016 . . .
0.03 OH Kepala Tukang 5,793 L.4.036 . . .
0.01 OH Mandor 2,317 L.4.035 . . .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 103,913 M.4.059 . . .
0.25 kg Paku Biasa 2" - 5" 6,825 M.4.158 . . .
A.4.6.1.21. K-221 … m1 Pemasangan 1 m’ Lisplank Ukuran 3x20cm. Kayu Kelas I atau Kelas 87,885
II 0.33 . 46,221 - 41,664
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu papan 3/20 38,934 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
A.4.6.1.22. K-222 … m1 Pemasangan 1 m’ Lisplank Ukuran 3x30cm. Kayu Kelas I atau Kelas 87,241
II 0.33 . 46,221 - 41,020
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
0.01 m3 Kayu papan 3/20 39,655 M.4.100 . . .
0.05 kg Paku Biasa 2" - 5" 1,365 M.4.158 . . .
A.4.6.1.23. K-223 … m2 Pemasangan 1 m2 Rangka Dinding Pemisah 60x120cm Kayu kelas II196,633
atau III 0.65 . 95,518 - 101,115
0.15 OH Pekerja 15,450 L.4.001 . . .
0.45 OH Tukang Kayu 69,525 L.4.016 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.03 m3 Balok kayu kelas II 97,020 M.4.078 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
A.4.6.1.25. K-224 … m2 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu300,515
Kelas II 0.65 . 95,518 - 204,997
0.15 OH Pekerja 15,450 L.4.001 . . .
0.45 OH Tukang Kayu 69,525 L.4.016 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
0.03 m3 Balok kayu, 6 x 12 126,000 M.4.081 . . .
0.15 kg Paku Biasa 2" - 5" 4,095 M.4.158 . . .
0.86 Lembar Plywood 120x240 tbl. 4 mm 67,510 M.4.365 . . .
0.56 kg Lem kayu 7,392 M.4.553 . . .
A.4.6.1.26. K-225 … m2 Pemasangan 1 m2 Dinding Lambrisering dari Papan Kayu Kelas I 411,659 2.61 . 381,609 - 30,050
0.60 OH Pekerja 61,800 L.4.001 . . .
1.80 OH Tukang Kayu 278,100 L.4.016 . . .
0.18 OH Kepala Tukang 34,758 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
0.01 m3 Kayu papan 3/20 25,235 M.4.100 . . .
0.10 kg Paku Biasa 2" - 5" 2,730 M.4.158 . . .
0.15 kg Paku skrup 10 cm 2,085 M.4.168 . . .
A.4.6.1.27. K-226 … m2 Pemasangan 1 m2 Dinding Lambrisering dari Plywood (Kayu Lapis) Ukuran
49,794 120x240cm
0.11 . 15,939 - 33,855
0.03 OH Pekerja 2,575 L.4.001 . . .
0.08 OH Tukang Kayu 11,588 L.4.016 . . .
0.01 OH Kepala Tukang 1,545 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .

www.mitra-arsitek.com 238/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.40 lembar Multiplek 32,640 M.4.358 . . .
0.05 kg Paku Biasa ½" - 1" 1,215 M.4.157 . . .
A.4.6.1.28. K-227 … m2 Pemasangan 1 m2 Dinding Bilik. Rangka Kayu Kelas III atau IV 243,497 0.16 . 20,149 - 223,348
0.10 OH Pekerja 10,300 L.4.001 . . .
0.05 OH Tukang Kayu 7,725 L.4.016 . . .
0.01 OH Kepala Tukang 966 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.50 m2 Bilik bambu 115,950 M.4.350 . . .
0.01 m3 Kaso-kaso (5 x 7) cm bengkirai 89,250 M.4.059 . . .
0.01 kg Paku Biasa 2" - 5" 328 M.4.158 . . .
0.00 m3 List kayu 2/4 17,820 M.4.043 . . .
A.4.6.2.1. K-228 … bh Pemasangan 1 Buah Kunci Tanam Antik 383,661 0.72 . 111,161 - 272,500
0.06 OH Pekerja 6,180 L.4.001 . . .
0.60 OH Tukang Kayu 92,700 L.4.016 . . .
0.06 OH Kepala Tukang 11,586 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 buah Kunci tanam antik 272,500 M.4.582 . . .
A.4.6.2.2. K-229 … bh Pemasangan 1 Buah Kunci Tanam Biasa 230,794 0.57 . 89,094 - 141,700
0.01 OH Pekerja 1,030 L.4.001 . . .
0.50 OH Tukang Kayu 77,250 L.4.016 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 buah Kunci tanam biasa 141,700 M.4.583 . . .
A.4.6.2.3. K-230 … bh Pemasangan 1 Buah Kunci Tanam Kamar Mandi 137,615 0.56 . 88,115 - 49,500
0.01 OH Pekerja 515 L.4.001 . . .
0.50 OH Tukang Kayu 77,250 L.4.016 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 buah Kunci tanam KM 49,500 M.4.584 . . .
A.4.6.2.4. K-231 … bh Pemasangan 1 Buah Kunci Tanam Silinder 167,615 0.56 . 88,115 - 79,500
0.01 OH Pekerja 515 L.4.001 . . .
0.50 OH Tukang Kayu 77,250 L.4.016 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 buah Kunci silinder 79,500 M.4.580 . . .
A.4.6.2.5. K-232 … bh Pemasangan 1 Buah Engsel Pintu 45,202 0.18 . 27,802 - 17,400
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.00 buah Engsel pintu 17,400 M.4.574 . . .
A.4.6.2.6. K-233 … bh Pemasangan 1 Buah Engsel Jendela Kupu-Kupu 27,227 0.12 . 18,527 - 8,700
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.00 OH Mandor 116 L.4.035 . . .
1.00 buah Engsel jendela 8,700 M.4.572 . . .
A.4.6.2.7. K-234 … bh Pemasangan 1 Buah Engsel Angin 53,078 0.32 . 45,178 - 7,900
0.10 OH Pekerja 10,300 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .

www.mitra-arsitek.com 239/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 116 L.4.035 . . .
1.00 buah Engsel angin 7,900 M.4.571 . . .
A.4.6.2.8. K-235 … bh Pemasangan 1 Buah Spring Knip untuk Jendela 37,670 0.19 . 29,470 - 8,200
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 buah Spring knip 8,200 M.4.600 . . .
A.4.6.2.9. K-236 … bh Pemasangan 1 Buah Kait Angin 35,170 0.19 . 29,470 - 5,700
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.00 buah Kait angin 5,700 M.4.142 . . .
A.4.6.2.10. K-237 … bh Pemasangan 1 Buah Doorcloser 347,750 0.60 . 92,750 - 255,000
0.05 OH Pekerja 5,150 L.4.001 . . .
0.50 OH Tukang Kayu 77,250 L.4.016 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 set Door closer 255,000 M.4.568 . . .
A.4.6.2.11. K-238 … bh Pemasangan 1 Buah Kunci Slot (Grendel) untuk Jendela 86,054 0.24 . 37,054 - 49,000
0.02 OH Pekerja 2,060 L.4.001 . . .
0.20 OH Tukang Kayu 30,900 L.4.016 . . .
0.02 OH Kepala Tukang 3,862 L.4.036 . . .
0.00 OH Mandor 232 L.4.035 . . .
1.00 buah Kunci slot 49,000 M.4.581 . . .
A.4.6.2.12. K-239 … bh Pemasangan 1 Buah Doorholder 194,650 0.60 . 92,750 - 101,900
0.05 OH Pekerja 5,150 L.4.001 . . .
0.50 OH Tukang Kayu 77,250 L.4.016 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 buah Door holder 101,900 M.4.569 . . .
A.4.6.2.13. K-240 … bh Pemasangan 1 Buah Doorstop 113,670 0.13 . 19,570 - 94,100
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang Kayu 15,450 L.4.016 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 buah Door stop 94,100 M.4.570 . . .
A.4.6.2.14. K-241 … bh Pemasangan 1 Buah Rel Pintu Dorong 311,161 0.72 . 111,161 - 200,000
0.06 OH Pekerja 6,180 L.4.001 . . .
0.60 OH Tukang Kayu 92,700 L.4.016 . . .
0.06 OH Kepala Tukang 11,586 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Set Rel pintu dorong 200,000 M.4.179 . . .
A.4.6.2.15. K-242 … bh Pemasangan 1 Buah Kunci Lemari 58,929 0.30 . 46,329 - 12,600
0.03 OH Pekerja 2,575 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .

www.mitra-arsitek.com 240/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Set Kunci lemari 12,600 M.4.579 . . .
A.4.6.2.16. K-243 … m2 Pemasangan 1 m2 Kaca Polos Tebal 3 mm 140,122 0.18 . 27,802 - 112,320
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.10 m2 Kaca Tebal 3mm 100,980 M.4.525 . . .
0.05 Tube Sealant 11,340 M.4.598 . . .
A.4.6.2.17. K-244 … m2 Pemasangan 1 m2 Kaca Polos Tebal 5 mm 167,182 0.18 . 27,802 - 139,380
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.00 OH Mandor 185 L.4.035 . . .
1.10 m2 Kaca tebal 5 mm 128,040 M.4.526 . . .
0.05 Tube Sealant 11,340 M.4.598 . . .
A.4.6.2.18. K-245 … m2 Pemasangan 1 m2 Kaca Polos Tebal 8mm 253,303 0.20 . 31,507 - 221,796
0.02 OH Pekerja 1,751 L.4.001 . . .
0.17 OH Tukang Kayu 26,265 L.4.016 . . .
0.02 OH Kepala Tukang 3,283 L.4.036 . . .
0.00 OH Mandor 209 L.4.035 . . .
1.10 m2 Kaca tebal 8 mm 205,920 M.4.527 . . .
0.07 Tube Sealant 15,876 M.4.598 . . .
A.4.6.2.19. K-246 … m2 Pemasangan 1 m2 Kaca Buram Tebal 12mm 240,405 0.30 . 46,329 - 194,076
0.03 OH Pekerja 2,575 L.4.001 . . .
0.25 OH Tukang Kayu 38,625 L.4.016 . . .
0.03 OH Kepala Tukang 4,828 L.4.036 . . .
0.00 OH Mandor 301 L.4.035 . . .
1.10 m2 Kaca buram 12 mm 178,200 M.4.520 . . .
0.07 Tube Sealant 15,876 M.4.598 . . .
A.4.6.2.20. K-247 … m2 Pemasangan 1 m2 Kaca Cermin Tebal 5mm 208,330 0.19 . 29,470 - 178,860
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.10 m2 Kaca cermin 5 mm 178,860 M.4.521 . . .
A.4.6.2.22. K-248 … m2 Pemasangan 1 m2 Kaca Cermin Tebal 8mm 294,524 0.21 . 33,384 - 261,140
0.02 OH Pekerja 1,751 L.4.001 . . .
0.17 OH Tukang Kayu 26,265 L.4.016 . . .
0.02 OH Kepala Tukang 3,283 L.4.036 . . .
0.01 OH Mandor 2,085 L.4.035 . . .
1.10 m2 Kaca cermin 8 mm 261,140 M.4.522 . . .
A.4.6.2.23. K-249 … m2 Pemasangan 1 m2 Kaca Wireglassed Tebal 5mm 306,120 0.19 . 29,470 - 276,650
0.02 OH Pekerja 1,545 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.01 OH Mandor 1,854 L.4.035 . . .
1.10 m2 Kaca wire glass 276,650 M.4.528 . . .
A.4.6.2.24. K-250 … m2 Pemasangan 1 m2 Kaca Patri Tebal 5mm 146,163 0.24 . 34,723 - 111,440
0.08 OH Pekerja 7,725 L.4.001 . . .
0.15 OH Tukang Kayu 23,175 L.4.016 . . .

www.mitra-arsitek.com 241/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 2,897 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.10 m2 Kaca patri 5mm 100,100 M.4.523 . . .
0.05 Tube Sealant 11,340 M.4.598 . . .
A.4.7.1.22. K-251 … m2 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3167,089
Lapis Cat Terakhir
1.19 . 158,471 - 8,618
0.40 OH Pekerja 41,200 L.4.001 . . .
0.70 OH Tukang Cat 99,120 L.4.010 . . .
0.07 OH Kepala Tukang 13,517 L.4.036 . . .
0.02 OH Mandor 4,634 L.4.035 . . .
0.30 Kg Cat dasar 8,250 M.4.378 . . .
0.01 L Pengencer 368 M.4.398 . . .
A.5.1.1.1. K-252 … m2 Pemasangan 1 Buah Closet Duduk/MoNoblock 2,976,977 1.77 . 260,453 16,524 2,700,000
0.50 OH Pekerja 51,500 L.4.001 . . .
1.10 OH Tukang Batu 169,950 L.4.007 . . .
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.16 OH Mandor 37,072 L.4.035 . . .
1.00 Unit Kloset duduk / monoblock 2,700,000 M.4.191 . . .
0.06 Ls Alat Bantu/Perlengkapan Umum 16,524 T.4.001 . . .
A.5.1.1.2. K-253 … bh Pemasangan 1 Buah Closet Jongkok Porselen 661,287 2.81 . 400,787 - 260,500
1.00 OH Pekerja 103,000 L.4.001 . . .
1.50 OH Tukang Batu 231,750 L.4.007 . . .
0.15 OH Kepala Tukang 28,965 L.4.036 . . .
0.16 OH Mandor 37,072 L.4.035 . . .
1.00 Unit Kloset jongkok porselen 160,500 M.4.192 . . .
100.00 bh Bata merah 100,000 M.4.007 . . .
A.5.1.1.3. K-254 … bh Pemasangan 1 Buah Closet Jongkok Teraso 635,800 2.70 . 375,300 - 260,500
1.00 OH Pekerja 103,000 L.4.001 . . .
1.50 OH Tukang Batu 231,750 L.4.007 . . .
0.15 OH Kepala Tukang 28,965 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 Unit Kloset jongkok porselen 160,500 M.4.192 . . .
100.00 bh Bata merah 100,000 M.4.007 . . .
A.5.1.1.4. K-255 … bh Pemasangan 1 Buah UriNoir 1,828,021 2.15 . 288,395 - 1,539,626
1.00 OH Pekerja 103,000 L.4.001 . . .
1.00 OH Tukang Batu 154,500 L.4.007 . . .
0.10 OH Kepala Tukang 19,310 L.4.036 . . .
0.05 OH Mandor 11,585 L.4.035 . . .
1.00 Unit Urinoir 1,526,000 M.4.200 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
A.5.1.1.5. K-256 … bh Pemasangan 1 Buah Wastafel 2,161,518 2.86 . 390,492 - 1,771,026
1.20 OH Pekerja 123,600 L.4.001 . . .
1.45 OH Tukang Batu 224,025 L.4.007 . . .
0.15 OH Kepala Tukang 28,965 L.4.036 . . .
0.06 OH Mandor 13,902 L.4.035 . . .
1.20 Unit Wastafel 1,757,400 M.4.201 . . .
6.00 Kg Semen 11,400 M.4.033 . . .
0.01 m3 Pasir pasang 2,226 M.4.030 . . .
A.5.1.1.6. K-257 … bh Pemasangan 1 Buah Bak Mandi Teraso Volume 0.30 m3 1,439,683 8.45 . 1,222,435 33,048 184,200
3.00 OH Pekerja 309,000 L.4.001 . . .

www.mitra-arsitek.com 242/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
4.50 OH Tukang Batu 695,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.90 OH Mandor 208,530 L.4.035 . . .
1.00 Unit Bak mandi teraso 184,200 M.4.187 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,048 T.4.001 . . .
A.5.1.1.7. K-258 … bh Pemasangan 1 Buah Bak Fibreglass Volume 0.3 m3 1,594,683 8.45 . 1,222,435 33,048 339,200
3.00 OH Pekerja 309,000 L.4.001 . . .
4.50 OH Tukang Batu 695,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.90 OH Mandor 208,530 L.4.035 . . .
1.00 Unit Bak fiberglass 339,200 M.4.186 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,048 T.4.001 . . .
A.5.1.1.8. K-259 … bh Pemasangan 1buah Bak Mandi Pasangan Bata Volume 0.30 m3 4,003,161 9.33 . 1,146,381 - 2,856,780
6.00 OH Pekerja 618,000 L.4.001 . . .
3.00 OH Tukang Batu 463,500 L.4.007 . . .
0.30 OH Kepala Tukang 57,930 L.4.036 . . .
0.03 OH Mandor 6,951 L.4.035 . . .
150.00 buah Bata merah 150,000 M.4.007 . . .
120.00 Kg Semen 228,000 M.4.033 . . .
0.30 m3 Pasir pasang 66,780 M.4.030 . . .
360.00 bh Porselen (11 x 11) cm 2,412,000 M.4.449 . . .
A.5.1.1.9. K-260 … bh Pemasangan 1 Buah Bathtub Porselen 2,861,278 0.90 . 138,778 - 2,722,500
0.08 OH Pekerja 7,725 L.4.001 . . .
0.75 OH Tukang Batu 115,875 L.4.007 . . .
0.08 OH Kepala Tukang 14,483 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.00 Unit Bathcuip 2,722,500 M.4.188 . . .
A.5.1.1.10. K-261 … bh Pemasangan 1 buah Bak Beton volume 1 m3 8,993,976 8.07 . 1,069,576 - 7,924,400
3.50 OH Pekerja 360,500 L.4.001 . . .
4.50 OH Tukang Batu 695,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.02 OH Mandor 4,171 L.4.035 . . .
0.90 m3 Beton 1:2:3 1,123,200 M.4.531 . . .
180.00 Kg Besi beton 2,538,000 M.4.132 . . .
0.40 m3 Papan kayu 3/20 Kelas III 763,200 M.4.106 . . .
500.00 buah Porselen Dinding 20x20 3,500,000 M.4.451 . . .
A.5.1.1.11. K-262 … bh Pemasangan 1 Buah Bak Air Fibreglass Volume 1 m3 484,838 0.81 . 112,590 33,048 339,200
0.30 OH Pekerja 30,900 L.4.001 . . .
0.45 OH Tukang Batu 69,525 L.4.007 . . .
0.05 OH Kepala Tukang 8,690 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
1.00 Unit Bak fiberglass 339,200 M.4.186 . . .
0.12 Ls Alat Bantu/Perlengkapan Umum 33,048 T.4.001 . . .
A.5.1.1.16. K-263 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 30x30cm Tinggi 35cm
546,549
dengan Tutup
2.96 Beton
. 350,172 - 196,377
2.16 OH Pekerja 222,480 L.4.001 . . .
0.72 OH Tukang Batu 111,240 L.4.007 . . .
0.07 OH Kepala Tukang 13,903 L.4.036 . . .
0.01 OH Mandor 2,549 L.4.035 . . .
40.00 buah Bata merah 40,000 M.4.007 . . .
44.00 Kg Semen 83,600 M.4.033 . . .

www.mitra-arsitek.com 243/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 m3 Pasir pasang 15,582 M.4.030 . . .
0.06 m3 Pasir beton 17,688 M.4.028 . . .
0.07 m3 Kerikil 16,947 M.4.024 . . .
1.60 Kg Besi beton 22,560 M.4.132 . . .
A.5.1.1.17. K-264 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 45cm x 45cm tinggi826,378
50cm dengan4.38
Tutup
. Beton 513,106 - 313,272
3.20 OH Pekerja 329,600 L.4.001 . . .
1.15 OH Tukang Batu 177,675 L.4.007 . . .
0.01 OH Kepala Tukang 2,124 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
70.00 buah Bata merah 70,000 M.4.007 . . .
77.00 Kg Semen 146,300 M.4.033 . . .
0.13 m3 Pasir pasang 28,938 M.4.030 . . .
0.09 m3 Pasir beton 26,532 M.4.028 . . .
0.02 m3 Kerikil 4,842 M.4.024 . . .
2.60 Kg Besi beton 36,660 M.4.132 . . .
A.5.1.1.18. K-265 … bh Pemasangan 1 buah Bak Kontrol Pasangan Bata 60cm x 60cm Tinggi
1,005,415
65cm dengan
4.38
Tutup
. Beton 513,106 - 492,309
3.20 OH Pekerja 329,600 L.4.001 . . .
1.15 OH Tukang Batu 177,675 L.4.007 . . .
0.01 OH Kepala Tukang 2,124 L.4.036 . . .
0.02 OH Mandor 3,707 L.4.035 . . .
123.00 buah Bata merah 123,000 M.4.007 . . .
114.00 Kg Semen 216,600 M.4.033 . . .
0.18 m3 Pasir pasang 40,958 M.4.030 . . .
0.12 m3 Pasir beton 35,376 M.4.028 . . .
0.03 m3 Kerikil 7,989 M.4.024 . . .
4.85 Kg Besi beton 68,385 M.4.132 . . .
A.5.1.1.19. K-266 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter ½” 148,331 0.18 . 27,461 96,390 24,480
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 m Pipa galvanis ½” 24,480 M.4.212 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.20. K-267 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter ¾ ” 155,051 0.18 . 27,461 96,390 31,200
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 m Pipa galvanis 3/4” 31,200 M.4.213 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.21. K-268 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 1” 175,211 0.18 . 27,461 96,390 51,360
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.03 OH Mandor 6,256 L.4.035 . . .
1.20 m Pipa galvanis 1” 51,360 M.4.214 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.22. K-269 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 1 ½” 229,358 0.31 . 43,568 96,390 89,400
0.11 OH Pekerja 11,124 L.4.001 . . .
0.18 OH Tukang Batu 27,810 L.4.007 . . .

www.mitra-arsitek.com 244/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 OH Kepala Tukang 3,476 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.20 m Pipa galvanis 11/2” 89,400 M.4.215 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.23. K-270 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 3” 272,321 0.39 . 54,731 96,390 121,200
0.14 OH Pekerja 13,905 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m Pipa galvanis 3” 121,200 M.4.216 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.24. K-271 … m1 Pemasangan 1 m’ Pipa Galvanis Diameter 4” 323,201 0.39 . 54,731 96,390 172,080
0.14 OH Pekerja 13,905 L.4.001 . . .
0.23 OH Tukang Batu 34,763 L.4.007 . . .
0.02 OH Kepala Tukang 4,441 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.20 m Pipa galvanis 4” 172,080 M.4.217 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.25. K-272 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter ½” 116,270 0.10 . 14,600 96,390 5,280
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang Batu 9,270 L.4.007 . . .
0.01 OH Kepala Tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.20 m Pipa PVC 1/2" 5,280 M.4.203 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.26. K-273 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter ¾ ” 116,270 0.10 . 14,600 96,390 5,280
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang Batu 9,270 L.4.007 . . .
0.01 OH Kepala Tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.20 m Pipa PVC 1/2" 5,280 M.4.203 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.27. K-274 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1” 118,550 0.10 . 14,600 96,390 7,560
0.04 OH Pekerja 3,708 L.4.001 . . .
0.06 OH Tukang Batu 9,270 L.4.007 . . .
0.01 OH Kepala Tukang 1,159 L.4.036 . . .
0.00 OH Mandor 463 L.4.035 . . .
1.20 m Pipa PVC 1” 7,560 M.4.205 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.28. K-275 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1½” 126,570 0.16 . 21,900 96,390 8,280
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.20 m Pipa PVC 11/2” 8,280 M.4.206 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.29. K-276 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2” 127,050 0.16 . 21,900 96,390 8,760
0.05 OH Pekerja 5,562 L.4.001 . . .
0.09 OH Tukang Batu 13,905 L.4.007 . . .
0.01 OH Kepala Tukang 1,738 L.4.036 . . .

www.mitra-arsitek.com 245/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 OH Mandor 695 L.4.035 . . .
1.20 m Pipa PVC 2” 8,760 M.4.207 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.30. K-277 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2½” 138,124 0.23 . 32,734 96,390 9,000
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala Tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 m Pipa PVC 21/2” 9,000 M.4.208 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.31. K-278 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3” 139,324 0.23 . 32,734 96,390 10,200
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala Tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 m Pipa PVC 3” 10,200 M.4.210 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.32. K-279 … m1 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4” 139,324 0.23 . 32,734 96,390 10,200
0.08 OH Pekerja 8,343 L.4.001 . . .
0.14 OH Tukang Batu 20,858 L.4.007 . . .
0.01 OH Kepala Tukang 2,607 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.20 m Pipa PVC 3” 10,200 M.4.210 . . .
0.35 Ls Alat Bantu/Perlengkapan Umum 96,390 T.4.001 . . .
A.5.1.1.33. K-280 … bh Pemasangan 1 buah Bak Cuci Piring Stainlessteel 596,109 0.38 . 58,709 - 537,400
0.03 OH Pekerja 3,090 L.4.001 . . .
0.30 OH Tukang Batu 46,350 L.4.007 . . .
0.03 OH Kepala Tukang 5,793 L.4.036 . . .
0.02 OH Mandor 3,476 L.4.035 . . .
1.00 Unit Bak cuci piring 464,400 M.4.185 . . .
1.00 buah Waterdrain 73,000 M.4.202 . . .
A.5.1.1.34. K-281 … bh Pemasangan 1 buah Bak Cuci Piring Teraso 684,378 0.63 . 97,848 - 586,530
0.05 OH Pekerja 5,150 L.4.001 . . .
0.50 OH Tukang Batu 77,250 L.4.007 . . .
0.05 OH Kepala Tukang 9,655 L.4.036 . . .
0.03 OH Mandor 5,793 L.4.035 . . .
1.00 Unit Bak cuci piring 464,400 M.4.185 . . .
1.00 buah Waterdrain 73,000 M.4.202 . . .
20.00 Kg Semen 38,000 M.4.033 . . .
0.05 m3 Pasir pasang 11,130 M.4.030 . . .
A.5.1.1.35. K-282 … bh Pemasangan 1 buah Kran Diameter ½” atau ¾ ” 98,603 0.46 . 71,713 - 26,890
0.01 OH Pekerja 1,030 L.4.001 . . .
0.40 OH Tukang Batu 61,800 L.4.007 . . .
0.04 OH Kepala Tukang 7,724 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 Buah Kran air 26,800 M.4.194 . . .
0.03 Buah Sealtape 90 M.4.599 . . .
A.5.1.1.36 K-283 … bh Pemasangan 1 buah Floor Drain 81,370 0.13 . 19,570 - 61,800
0.01 OH Pekerja 1,030 L.4.001 . . .
0.10 OH Tukang Batu 15,450 L.4.007 . . .

www.mitra-arsitek.com 246/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 OH Kepala Tukang 1,931 L.4.036 . . .
0.01 OH Mandor 1,159 L.4.035 . . .
1.00 Unit Floor drain 61,800 M.4.189 . . .
A.5.1.1.37. K-284 … m1 Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah Ǿ 20 cm 165,894 0.13 . 16,119 - 149,775
0.08 OH Pekerja 8,240 L.4.001 . . .
0.04 OH Tukang Batu 6,180 L.4.007 . . .
0.00 OH Kepala Tukang 772 L.4.036 . . .
0.00 OH Mandor 927 L.4.035 . . .
1.60 m1 Pipa Tanah 76,640 M.4.198 . . .
35.00 Kg Semen 66,500 M.4.033 . . .
0.01 m3 Pasir pasang 3,116 M.4.030 . . .
0.01 m3 Pasir urug 3,518 M.4.032 . . .
A.5.1.1.38. K-285 … m1 Pemasangan 1 m’ Pipa Air Limbah Jenis Pipa Tanah diameter 15 cm96,155 0.10 . 12,089 - 84,065
0.06 OH Pekerja 6,180 L.4.001 . . .
0.03 OH Tukang Batu 4,635 L.4.007 . . .
0.00 OH Kepala Tukang 579 L.4.036 . . .
0.00 OH Mandor 695 L.4.035 . . .
1.60 m1 Pipa tanah 76,640 M.4.198 . . .
0.93 Kg Semen 1,767 M.4.033 . . .
0.01 m3 Pasir pasang 2,894 M.4.030 . . .
0.01 m3 Pasir urug 2,764 M.4.032 . . .
A.5.1.1.39. K-286 … m1 Pemasangan 1 m’ Pipa Beton Diameter 15 – 20 cm 101,189 0.22 . 28,209 - 72,981
0.14 OH Pekerja 14,420 L.4.001 . . .
0.07 OH Tukang Batu 10,815 L.4.007 . . .
0.01 OH Kepala Tukang 1,352 L.4.036 . . .
0.01 OH Mandor 1,622 L.4.035 . . .
1.10 m1 Pipa tanah 52,690 M.4.198 . . .
0.03 m3 Bata merah 27 M.4.007 . . .
0.93 Kg Semen 1,767 M.4.033 . . .
0.06 m3 Pasir pasang 12,466 M.4.030 . . .
0.02 m3 Pasir urug 6,031 M.4.032 . . .
A.5.1.1.40. K-287 … m1 Pemasangan 1 m’ Pipa Beton Diameter 30 – 100 cm 180,295 0.61 . 76,566 - 103,728
0.38 OH Pekerja 39,140 L.4.001 . . .
0.19 OH Tukang Batu 29,355 L.4.007 . . .
0.02 OH Kepala Tukang 3,669 L.4.036 . . .
0.02 OH Mandor 4,402 L.4.035 . . .
1.10 m1 Pipa tanah 52,690 M.4.198 . . .
0.55 m3 Bata merah 550 M.4.007 . . .
10.30 Kg Semen 19,570 M.4.033 . . .
0.06 m3 Pasir pasang 13,579 M.4.030 . . .
0.07 m3 Pasir urug 17,340 M.4.032 . . .
A.6.1.1.1. K-288 … bh Pemasangan 1 buah MCCB 791,100 - . 167,400 - 623,700
1.00 % Tukang Listrik 167,400 L.4.019 . . .
3.00 btg Pipa listrik 5/8” 40,200 M.4.519 . . .
15.00 m Kabel NYM 3x2,5 mm2-SNI 184,500 M.4.631 . . .
1.00 buah Tee Doos 1,600 M.4.518 . . .
2.00 buah L.Bow 21,200 M.4.195 . . .
24.00 buah Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 buah MCB + Box 357,000 M.4.629 . . .
A.6.2.1.1 K-289 … titik Pemasangan 1 Buah Titik Lampu 624,300 - . 167,400 - 456,900

www.mitra-arsitek.com 247/248
Aplikasi DataPro Premium v23.0 (Full).xlsx

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 % Tukang Listrik 167,400 L.4.019 . . .
3.00 btg Pipa listrik 5/8” 40,200 M.4.519 . . .
24.00 m Kabel NYM 3x2,5 mm2-SNI 295,200 M.4.631 . . .
3.00 buah Tee Doos 4,800 M.4.518 . . .
4.00 buah L.Bow 42,400 M.4.195 . . .
3.00 buah Las Dop 3,300 M.4.515 . . .
24.00 buah Klem Pipa Listrik 19,200 M.4.514 . . .
1.00 buah Mongkok (Listrik) 1,500 M.4.516 . . .
1.00 buah Saklar Listrik 24,800 M.4.633 . . .
1.00 buah Fitting Lampu 25,500 M.4.512 . . .

www.mitra-arsitek.com 248/248