2023
LEMBAR PERSETUJUAN
Ahli Struktur
COVER
LEMBAR PERSETUJUAN
DAFTAR ISI
B. Pekerjaan Struktur
Penulangan Plat
Plat Lantai Dak Atap Hal. Plat Lantai Dak_1
Plat Lantai Hal. Plat Lantai_1
Perhitungan Beban Portal Hal. Beban Portal_1
Rekap Mu, Vu dan Nu Hal. Rekap Vu, Mu dan Nu_1
Penulangan Balok
Sloof 15/30 Hal. Penul. Sloof SL1 15x30__1
Sloof 15/25 Hal. Penul. Sloof SL2 15X25__1
Balok 20/45 Hal. Penul. Balok 20X45__1
Balok 20/40 Hal. Penul. Balok 20X40__1
Balok 20/40 (B3) Hal. Penul. Balok 20/40 (B2A)__1
Balok 20/30 Hal. Penul. Balok 20X30__1
Balok 15/30 Hal. Penul. Balok 15X30__1
Balok Anak 15/30 Hal. Penul. Balok Anak 15x30__1
Balok Anak 15/20 Hal. Penul. Balok Anak 15x20__1
Balok Anak 15/25 Hal. Penul. Balok Anak 15x25__1
Penulangan Kolom
Kolom Lantai 1 uk. 20x55 Hal. Kolom lt 1 20x55 __1
Kolom Lantai 1 uk. 25x25 Hal. K2 25X25 =1
Kolom Lantai 1 uk. 20x45 Hal. Kolom K2- 20X45 __1
Kolom Lantai 1 uk. 15x30 Hal. K3 15X30 =1
Kolom Lantai 2 uk. 20x30 Hal. Kolom Lantai 2 20X45 =1
Kolom Lantai 2 uk. 20x55 Hal. Kolom Lantai 2 20x55 __1
Kolom Lantai 2 uk. 25x25 Hal. Kolom Lantai 2 25X25 =1
Penulangan Pondasi
Pondasi uk. 150x150 Hal. Pondasi Kolom 20x55_1
Pondasi uk. 100x100 Hal. Pondasi Kolom 20x45_1
Pondasi uk. 120x120 Hal. Pondasi Kolom 25x25_1
Pondasi uk. 80x80 Hal. Pondasi Kolom 15x30_1
Penulangan Tangga Hal. Tangga_1
C. Lampiran
INFORMASI PERENCANAAN STRUKTUR
PEMBEBANAN
1 Beban Mati
Berat volume beton = 2400 kg/m3 = 24 kN/m3
Berat dinding bata = 250 kg/m2 = 2.5 kN/m2
Berat volume baja = 7850 kg/m3 = 78.5 kN/m3
2 Beban Hidup
Lantai Rumah Tinggal = 150 kg/m2 = 2.5 kN/m2
Tangga = 400 kg/m2 = 4 kN/m2
Pekerja = 100 kg = 1 kN
Air hujan = 20 kg/m2 = 0.2 kN/m2
3 Beban angin = 40 kg/m2 = 0.4 kN/m2
DATA BAHAN
1 Mutu beton struktural = f'c = 20 Mpa
2 Mutu baja tulangan = fy = 400 Mpa (ulir, d ≥ 13 mm)
= 240 Mpa (polos, d < 13 mm)
3 Mutu baja profil = fy = 240 Mpa
Pengantar__1
PERHITUNGAN PEMBEBANAN DAN KOMBINASI PEMBEBANAN
Beban gravitasi terdiri dari beban mati dan beban hidup
1 Baja = 7,850 kg/m3 = 78.5 kN/m3
2 Beton bertulang = 2,400 kg/m3 = 24 kN/m3
3
3 Kayu = 800 kg/m = 8 kN/m3
4 Pasir = 1,600 kg/m3 = 16 kN/m3
5 Screeding per cm tebal = 21 kg/m2 = 0.21 kN/m2
6 Pasangan batu bata = 1,700 kg/m3 = 17 kN/m3
2
7 Plafon dan penggantung = 18 kg/m = 0.18 kN/m2
8 Finishing lantai per cm tebal = 21 kg/m2 = 0.21 kN/m2
9 Beban hidup lantai = 150 kg/m2 = 1.5 kN/m2
3
10 Air = 1,000 kg/m = 10 kN/m3
Beban Gempa
Beban gempa dihitung berdasarkan cara statik eqivalen untuk gedung beraturan yang
nilainya berbanding lurus dengan berat massa bangunan/segmen bangunan yang di
tinjau, dan ditulis dalam persamaan :
Ct . I
V = Wt
R
V = Beban gempa total yang bekerja pada segmen bangunan yang ditinjau
Ct = Nilai faktor respon gempa, tergantung lokasi dan jenis tanah
I = Faktor keutamaan gedung
Wt = Beban total gedung (beban mati dan beban hidup tereduksi)
R = Faktor reduksi gempa
Wi . hi
Fi = V
SWi . hi
Pengantar__2
KOMBINASI PEMBEBANAN
Kasus Beban yang ditinjau adalah :
Load Case - 0 : Termasuk berat sendiri struktur (self weight)
Load Case - 1 : Beban mati : berat sendiri pelat, plafon, finising, dinding
Load Case - 2 : Beban hidup
Load Case - 3 : Beban gempa arah -X
Load Case - 4 : Beban gempa arah -Y
Pengantar__3
PERENCANAAN PELAT 2 ARAH
PELAT ATAP
Berat sendiri plat = 0.12 x 24 = 2.880 KN/m²
Berat plapond + penggantung = 0.18 = 0.180 KN/m²
Total beban mati qD = 3.060 KN/m²
qu = 1,2 x qD + 1,6 x qL
= 6.072 KN/m²
Lx
Ly
Untuk tujuan praktis desain tulangan berdasarkan momen tumpuan maksumum, dalam
hal ini tumpuan X
As = r perlu x b x d
2
= 300.00 mm
S tul. = As 1 tul. x b /As
= 261.80 mm
S pakai = 300 mm
2
As akt. = 261.799388 mm
a = As aktual . fy / 0.85 f'c . b
= 3.695991 mm
Mn = As aktual . fy ( d - a/2 )
= 5.539 kNm
Mr = f Mn
4.431 kNm > Mtx……………….Oke
qu = 1,2 x qD + 1,6 x qL
= 7.392 KN/m²
Lx
Ly
Untuk tujuan praktis desain tulangan berdasarkan momen tumpuan maksumum, dalam
hal ini tumpuan X
Pelat Lantai__1
0.04 x f'c
r min = =
fy
= 0.0033333
0.85 x f'c x b 600
rb = x
fy 600 + fy
= 0.0430060
r maks = 0,75 x rb
= 0.03225446
r perlu = w x 0,85 x f'c/fy
= 0.0025151
As = r perlu x b x d
2
= 300.00 mm
S tul. = As 1 tul. x b /As
= 261.80 mm
S pakai = 300 mm
2
As akt. = 261.799388 mm
a = As aktual . fy / 0.85 f'c . b
= 3.695991 mm
Mn = As aktual . fy ( d - a/2 )
= 5.539 kNm
Mr = f Mn
4.431 kNm > Mtx……………….Oke
Pelat Lantai__2
TABEL PENULANGAN PELAT LANTAI
PELAT PELAT PELAT PELAT
No Notasi Satuan
1 2 3 4
1 Ly 465.00 543.00 462.00 320.00 mm
2 Lx 253.00 253.00 320.00 240.00 mm
3 Ly/Lx 1.838 2.146 1.444 1.333
4 Ctx 81.2 82.3 73.2 68.9
5 Mu 3.84 3.89 5.54 2.93 kNm
6 b 1000.0 1000.0 1000.0 1000.0 mm
7 h 120.0 120.0 120.0 120.0 mm
8 dx 90.0 90.0 90.0 90.0 mm
9 s 25.0 25.0 25.0 25.0 mm
10 f'c 20.0 20.0 20.0 20.0 Mpa
11 fy 240.0 240.0 240.0 240.0 MPa
12 b 0.85 0.85 0.85 0.85
13 ø 0.80 0.80 0.80 0.80
14 dia 10.0 10.0 10.0 10.0 mm
15 As1 78.540 78.540 78.540 78.540 mm2
16 Rn 0.034877 0.035349 0.050298 0.026631 Mpa
17 r b 0.04301 0.04301 0.04301 0.04301
18 r mak 0.03225 0.03225 0.03225 0.03225
19 r min 0.00333 0.00333 0.00333 0.00333
20 w 0.03551 0.03600 0.05163 0.02699
21 r perlu 0.00252 0.00255 0.00366 0.00191
22 r pakai 0.00333 0.00333 0.00366 0.00333
23 As 300.00 300.00 329.15 300.00 mm2
24 n 4.0 4.0 5.0 4.0 buah
25 S 262 262 239 262 mm
26 Sterpakai 300 300 300 300 mm
27 Dipakai f10-300 f10-300 f10-300 f10-300
28 As ada 261.8 261.8 261.8 261.8 mm2
29 a 3.696 3.696 3.696 3.696 mm
30 Mn 5.539 5.539 5.539 5.539 kNm
31 Mr 4.431 4.431 4.431 4.431 kNm
> Mu..Oke > Mu..Oke < Mu..No. > Mu..Oke
Pelat Lantai__3
PERHITUNGAN BEBAN PORTAL
A PEMBEBANAN
L = 4.650 m
L/2 = 2.325 m
a = 1.265 m
b = 1.060 m
1. Diagram bidang pembebanan awal
w1 = luas segitiga = 0.500 x 1.265 x 1.265 = 0.800 m²
w2 = luas segiempat = 1.265 x 1.060 = 1.341 m²
RA = W1 + W2 = 2.14 m²
Mc1 = RA (L/2) - W1 (a/3 + b) - W2 (b/2) …………………1
3.082 m3
2. Diagram bidang setelah merata
Mc2 = 1/8 x heq x L2
= 2.703 heq . m2 …………………………………. 2
Pers. 1 = Pers. 2
heq = 1.140 m
Beban Portal__ 1
Pemerataan Beban Pelat Type 2
L = 2.530 m
L/2 = 1.265 m
a = 1.265 m
Dengan cara yang sama, maka perataan beban eqivalen Pelat disajikan dalam tabel dibawah ini
Beban Portal__ 2
B PERHITUNGAN PEMBEBANAN
BALOK LANTAI
qDL = 4.16 kN/m2
qLL = 1.50 kN/m2
BALOK ATAP
qDL = 3.06 kN/m2
qLL = 1.50 kN/m2
PEMBEBANAN PORTAL
POT. 4
L= 1.68 M
a. Beban Pelat lantai = 4.160 x 0.560 x 1= 2.3 KN/m
b. Beban dinding = 1.2 x 2.60 = 3.1 KN/m
Beban mati qD1 = 5.4 KN/m
L= 4.65 M
a. Beban Pelat lantai = 4.160 x 1.140 x 1= 4.7 KN/m
b. Beban dinding = 1.2 x 2.60 = 3.1 KN/m
Beban mati qD1 = 7.9 KN/m
L= 2.40 M
a. Beban Pelat lantai = 4.160 x 0.800 x 2= 6.7 KN/m
b. Beban dinding = 1.2 x 2.60 = 3.1 KN/m
Beban mati qD1 = 9.8 KN/m
Beban Portal__ 3
PERHITUNGAN BERAT BANGUNAN
Berat bangunan dihitung per pias portal (arah melintang), karena portal seragam.
Gaya geser gempa diperhitungkan bekerja sebagai gaya horizontal pada masing-
masing portal
Beban gempa dihitung berdasarkan pias portal yang ditinjau
BERAT ATAP
- Berat pelat lantai Atap = 7.00 x 2.64 x 3.1 = 56.5 KN
- Beban hidup lantai = 7.00 x 2.64 x 1.5 x 0.7 = 19 KN
- Berat Balok
Memanjang = 0.20 x 0.28 x 7.0 x 1 x 24 = 9.4 KN
= 0.15 x 0.08 x 3.5 x 1 x 24 = 1.0 KN
= 0.20 x 0.18 x 1.3 x 1 x 24 = 1.1 KN
Melintang = 0.20 x 0.28 x 1 x 3 x 24 = 5.1 KN
= 0.15 x 0.13 x 2 x 3 x 24 = 2.2 KN
- Berat tembok
Melintang = 0.15 x 9.11 x 0.3 x 1 x 8 = 2.7 KN
- Berat kolom Lt. Atap = 0.15 x 0.15 x 0.4 x 8 x 24 = 1.5 KN
99.1 KN
BERAT LANTAI 3
- Berat pelat lantai = 6.81 x 1.00 x 3.1 = 20.8 KN
- Beban hidup lantai = 6.81 x 1.00 x 1.5 x 0.7 = 7.2 KN
- Berat Balok
Memanjang = 0.20 x 0.28 x 7.0 x 1 x 24 = 9.4 KN
= 0.20 x 0.18 x 1.4 x 1 x 24 = 1.2 KN
= 0.15 x 0.08 x 7.0 x 1 x 24 = 2.0 KN
Melintang = 0.20 x 0.33 x 3 x 2 x 24 = 8.4 KN
= 0.20 x 0.18 x 1 x 3 x 24 = 3.5 KN
= 0.15 x 0.08 x 1 x 2 x 24 = 0.8 KN
- Berat tembok = 0.15 x 9.50 x 0.4 x 1 x 8 = 4.0 KN
- Berat kolom Lt. Atap = 0.15 x 0.15 x 0.4 x 4 x 24 = 0.8 KN
- Berat kolom Lt. 2 = 0.20 x 0.55 x 1.5 x 4 x 24 = 15.8 KN
73.9 KN
Beban Portal__ 4
BERAT LANTAI 2
- Berat pelat lantai = 7.00 x 4.00 x 4.2 = 116.5 KN
- Beban hidup lantai = 7.00 x 4.00 x 1.5 x 0.7 = 29.4 KN
- Berat Balok
Memanjang = 0.20 x 0.28 x 8.7 x 1 x 24 = 11.7 KN
= 0.15 x 0.08 x 3.5 x 1 x 24 = 1.0 KN
Melintang = 0.20 x 0.33 x 4 x 4 x 24 = 25.3 KN
= 0.15 x 0.18 x 4 x 2 x 24 = 5.2 KN
- Berat tembok = 0.15 x 9.50 x 2 x 1 x 8 = 17.1 KN
- Berat kolom Lt. Atap = 0.20 x 0.55 x 1.5 x 4 x 24 = 15.8 KN
- Berat kolom Lt. 2 = 0.20 x 0.55 x 1.5 x 4 x 24 = 15.8 KN
237.9 KN
R = 8.50
dimana :
C = 0.9 untuk jenis tanah lunak zona 3
I = 1 faktor fungsi gedung
R = 8.5 Sistem rangka pemikul momen khusus (spesial resisting moment frame)
beton bertulang
Beban Portal__ 5
hi wi hi x wi Fi
7.20 99.08 713.40 16.06
6.20 73.90 458.16 10.31
3.20 237.93 761.37 17.14
S wi x hi 1932.94
F8 F10 F9
F6 F7 F5
F1 F3 F4 F2
Beban horizontal di atas bekerja pada portal 100% arah X (pendek), 30% arah Y (arah panjang)
Untuk Portal tepi setengahnya
Beban Portal__ 6
RANGKUMAN HASIL PERHITUNGAN Mu, Vu, & Nu
BALOK
L = 5.4 m B1-2
-
Mu = 29.9 kNm
Mu+ = 18.0 kNm
Vu = 35.2 kN
qu = 23.3 kN/m
L = 4.7 m B2-8
-
Mu = 33.3 kNm
+
Mu = 33.7 kNm
Vu = 34.2 kN
qu = 23.6 kN/m
L = 2.6 m
B2a-1 Mu- = 23.9 kNm
+
Mu = 14.6 kNm
Vu = 79.3 kN
qu = 16.0 kN/m
L = 5.4 m
B3a-2 Mu- = 14.0 kNm
Mu+ = 7.8 kNm
Vu = 16.0 kN
qu = 9.5 kN/m
L = 5.4 m
BA2-5 Mu- = 8.4 kNm
Mu+ = 6.5 kNm
Vu = 9.3 kN
qu = 8.4 kN/m
L = 1.4 m
BA1-12 Mu- = 5.1 kNm
+
Mu = 2.5 kNm
Vu = 7.4 kN
qu = 1.6 kN/m
L = 2.0 m
BA3-3-2 Mu- = 11.2 kNm
+
Mu = 2.7 kNm
Vu = 11.5 kN
qu = 1.6 kN/m
KOLOM
PONDASI
PONDASI KOLOM TENGAH P1 PONDASI KOLOM TEPI P2
DATA - DATA :
Mu tumpuan = 19.10 KNm d = 261 mm d' = 25 mm
Mu lapangan = 12.73 KNm f'c = 18.5 Mpa
Vu = 28.30 KN fy = 240 Mpa ( ut. lentur )
qu = 10.48 KN/m fy = 240 Mpa ( ut. geser )
h = 300 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 150 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 300 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 19099800 Nmm
Mn = 23874750 Nmm
Rn = 2.336504162
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.010591496 >> rho perlu…Oke.
r terpakai = 0.010591496
As = 414.6570674 mm2
Mu = 12733200 Nmm
Mn = 15916500 Nmm
Rn = 1.557669441
Vs perlu = 38.40579387 kN
Vm = 17.46666667 kN/m
X = 2.198804992 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 1.864674987 m
Vs = 33.84699387 kN
S perlu = 186.05 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 58.36 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 131 mm (1/2 d)
= 600 mm
4ø12
4ø12
30
ø8-150 ø8-200
4ø12 4ø12
15 15
Tump. Lap.
DATA - DATA :
Mu tumpuan = 6.71 KNm d = 211 mm d' = 25 mm
Mu lapangan = 4.47 KNm f'c = 20.0 Mpa
Vu = 16.77 KN fy = 300 Mpa ( ut. lentur )
qu = 10.48 KN/m fy = 240 Mpa ( ut. geser )
h = 250 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 150 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 250 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 6707200 Nmm
Mn = 8384000 Nmm
Rn = 1.255437509
r min = 0.004666667
rb = 0.032111111 1
r mak. = 0.024083333
m = 17.64705882
r perlu = 0.004351901 << rho min … pakai rho min.
r terpakai = 0.004666667
As = 147.7 mm2
Mu = 4471466.667 Nmm
Mn = 5589333.333 Nmm
Rn = 0.836958339
Vs perlu = 21.28318409 kN
Vm = 17.46666667 kN/m
X = 1.218502906 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 0.96417151 m
Vs = 17.81313965 kN
S perlu = 269.09 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 44.42 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 99 mm (1/2 d)
= 600 mm
TUMPUAN 113.09734
2
As = 339.29 mm n = 3 buah Tulangan tarik
2
As' = 67.86 mm n = 1 buah Tulangan tekan, diambil 20% As
LAPANGAN
2
As = 226.19 mm n = 2 buah Tulangan tarik
2
As' = 45.24 mm n = 1 buah Tulangan tekan, diambil 20% As
2ø12
2ø12
25
ø8-150 ø8-200
2ø12 2ø12
15 15
Tump. Lap.
L = 5.40 m
DATA - DATA :
Mu tumpuan = 29.92 KNm d = 411 mm d' = 25 mm
Mu lapangan = 18.02 KNm f'c = 18.5 Mpa
Vu = 35.18 KN fy = 240 Mpa ( ut. lentur )
qu = 23.32 KN/m fy = 240 Mpa ( ut. geser )
h = 450 mm = 0.80 untuk lentur
bw = 200 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
1
Dia. tul. Tkn. = 12 mm As 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 29919000 Nmm
Mn = 37398750 Nmm
Rn = 1.106989362
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.004787352 << rho min … pakai rho min.
r terpakai = 0.005833333
As = 479.5 mm2
Mu = 18020600 Nmm
Mn = 22525750 Nmm
Rn = 0.666753986
Vs perlu = 40.90973068 kN
Vm = 38.86666667 kN/m
X = 1.052565969 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
Av = 150.7964474 mm2 (3 x As sengkang )
L = 0.748644826 m
Vs = 25.51075735 kN
S perlu = 560.00 mm
S maks. = 542.87 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 118.12 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 198 mm (1/2 d)
= 600 mm
2ø12
5ø12
45
2ø8 2ø8
ø8-100 ø8-150
2ø12 5ø12
20 20
Tump. Lap.
L = 4.70 m
DATA - DATA :
Mu tumpuan = 33.32 KNm d = 361 mm d' = 25 mm
Mu lapangan = 33.71 KNm f'c = 18.5 Mpa
Vu = 34.20 KN fy = 240 Mpa ( ut. lentur )
qu = 23.56 KN/m fy = 240 Mpa ( ut. geser )
h = 400 mm = 0.80 untuk lentur
bw = 200 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 33315800 Nmm
Mn = 41644750 Nmm
Rn = 1.597775876
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.007035084 >> rho perlu…Oke.
r terpakai = 0.007035084
As = 507.9330639 mm2
Mu = 33706200 Nmm
Mn = 42132750 Nmm
Rn = 1.616498876
Vs perlu = 41.51913199 kN
Vm = 39.26666667 kN/m
X = 1.057363293 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 150.7964474 mm (3 x As sengkang )
L = 0.794501924 m
Vs = 27.92501199 kN
S perlu = 440.00 mm
S maks. = 542.87 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 103.22 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 173 mm (1/2 d)
= 600 mm
2ø12
5ø12
40
2ø8 2ø8
ø8-100 ø8-150
2ø12 5ø12
20 20
Tump. Lap.
L = 2.55 m
DATA - DATA :
Mu tumpuan = 23.93 KNm d = 361 mm d' = 25 mm
Mu lapangan = 14.57 KNm f'c = 18.5 Mpa
Vu = 79.29 KN fy = 240 Mpa ( ut. lentur )
qu = 16.00 KN/m fy = 240 Mpa ( ut. geser )
h = 400 mm = 0.80 untuk lentur
bw = 200 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 23929800 Nmm
Mn = 29912250 Nmm
Rn = 1.147637372
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.004970345 << rho min … pakai rho min.
r terpakai = 0.005833333
As = 421.1666667 mm2
Mu = 14574700 Nmm
Mn = 18218375 Nmm
Rn = 0.698980786
Vs perlu = 116.6674653 kN
Vm = 26.66666667 kN/m
X = 4.37502995 m
d Sengkang = 12 mm
As sengkang = 113.0973355 mm2
2
Av = 226.1946711 mm (2 x As sengkang )
L = 3.987966583 m
Vs = 107.4354653 kN
S perlu = 170.00 mm
S maks. = 814.30 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 103.22 kN < Vs perlu maka, S =1/4 d atau 300 mm
S pakai = 173 mm (1/2 d)
= 600 mm
5ø12 3ø12
40
1.5ø8-100 4ø10 1.5ø8-150
3ø12 3ø12
20 20
Tump. Lap.
L = 3.20 m
DATA - DATA :
Mu tumpuan = 23.84 KNm d = 261 mm d' = 25 mm
Mu lapangan = 5.12 KNm f'c = 18.5 Mpa
Vu = 23.26 KN fy = 240 Mpa ( ut. lentur )
qu = 15.60 KN/m fy = 240 Mpa ( ut. geser )
h = 300 mm = 0.80 untuk lentur
bw = 200 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 23837700 Nmm
Mn = 29797125 Nmm
Rn = 2.187073369
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.009853766 >> rho perlu…Oke.
r terpakai = 0.009853766
As = 514.3666005 mm2
Mu = 5118100 Nmm
Mn = 6397625 Nmm
Rn = 0.46957803
r min = 0.005833333
Vs perlu = 27.76293461 kN
Vm = 26 kN/m
X = 1.067805177 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
Av = 100.5309649 mm2 (2 x As sengkang )
L = 0.785487261 m
Vs = 21.36173461 kN
S perlu = 270.00 mm
S maks. = 361.91 mm
1/3 x f'c
0,5
x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 73.40 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 123 mm (1/2 d)
= 600 mm
TUMPUAN 113.09734
5ø12 2ø12
30
ø8-150 ø8-200
2ø12 3ø12
20 20
Tump. Lap.
L = 5.40 m
DATA - DATA :
Mu tumpuan = 14.00 KNm d = 261 mm d' = 25 mm
Mu lapangan = 7.84 KNm f'c = 18.5 Mpa
Vu = 16.04 KN fy = 240 Mpa ( ut. lentur )
qu = 9.48 KN/m fy = 240 Mpa ( ut. geser )
h = 300 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 300 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 13999700 Nmm
Mn = 17499625 Nmm
Rn = 1.712602086
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.007573556 >> rho perlu…Oke.
r terpakai = 0.007573556
As = 296.5047111 mm2
Mu = 7843400 Nmm
Mn = 9804250 Nmm
Rn = 0.959493646
Vs perlu = 18.60130273 kN
Vm = 15.8 kN/m
X = 1.177297641 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 0.834103664 m
Vs = 14.76980273 kN
S perlu = 390.00 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 54.22 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 121 mm (1/2 d)
= 600 mm
4ø12 2ø12
30
ø8-100 ø8-150
2ø12 4ø12
15 15
Tump. Lap.
L = 5.40 m
DATA - DATA :
Mu tumpuan = 8.38 KNm d = 261 mm d' = 25 mm
Mu lapangan = 6.49 KNm f'c = 18.5 Mpa
Vu = 9.29 KN fy = 240 Mpa ( ut. lentur )
qu = 8.36 KN/m fy = 240 Mpa ( ut. geser )
h = 300 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 12 mm As1 113.10 mm2
Dia. tul. Tkn. = 12 mm As1 113.10 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 8378400 Nmm
Mn = 10473000 Nmm
Rn = 1.024940914
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.004419649 << rho min … pakai rho min.
r terpakai = 0.005833333
As = 228.375 mm2
Mu = 6493900 Nmm
Mn = 8117375 Nmm
Rn = 0.7944075
Vs perlu = 7.342969399 kN
Vm = 13.93333333 kN/m
X = 0.527007373 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 0.137835255 m
Vs = 3.964136065 kN
S perlu = 1,470.00 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 54.22 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 121 mm (1/2 d)
= 600 mm
4ø12 2ø12
30
ø8-150 ø8-150
2ø12 4ø12
15 15
Tump. Lap.
L = 1.37 m
DATA - DATA :
Mu tumpuan = 5.07 KNm d = 162 mm d' = 25 mm
Mu lapangan = 2.46 KNm f'c = 18.5 Mpa
Vu = 7.36 KN fy = 240 Mpa ( ut. lentur )
qu = 1.64 KN/m fy = 240 Mpa ( ut. geser )
h = 200 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 10 mm As1 78.54 mm2
Dia. tul. Tkn. = 10 mm As1 78.54 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 5065600 Nmm
Mn = 6332000 Nmm
Rn = 1.60849464
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.007085139 >> rho perlu…Oke.
r terpakai = 0.007085139
As = 172.1688808 mm2
Mu = 2464500 Nmm
Mn = 3080625 Nmm
Rn = 0.782559823
Vs perlu = 7.421655992 kN
Vm = 2.726666667 kN/m
X = 2.721878726 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 1.536872041 m
Vs = 7.027652659 kN
S perlu = 490.00 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 32.31 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 72 mm (1/2 d)
= 600 mm
4ø12 2ø12
20
ø8-100 ø8-150
2ø12 2ø12
15 15
Tump. Lap.
L = 2.00 m
DATA - DATA :
Mu tumpuan = 11.21 KNm d = 212 mm d' = 25 mm
Mu lapangan = 2.73 KNm f'c = 18.5 Mpa
Vu = 11.50 KN fy = 240 Mpa ( ut. lentur )
qu = 1.64 KN/m fy = 240 Mpa ( ut. geser )
h = 250 mm = 0.80 untuk lentur
bw = 150 mm = 0.60 untuk geser
bE = 1000 mm b = 0.85 ( ut. f'c < 30 Mpa )
hf = 120 mm
Selimut beton = 25 mm
Dia. tul. trk = 10 mm As1 78.54 mm2
Dia. tul. Tkn. = 10 mm As1 78.54 mm2
Dia. tul. skg. = 8 mm As2 48.25 mm2
Mu = 11212300 Nmm
Mn = 14015375 Nmm
Rn = 2.078938976
r min = 0.005833333
rb = 0.039780506 1
r mak. = 0.029835379
m = 15.26232114
r perlu = 0.009325954 >> rho perlu…Oke.
r terpakai = 0.009325954
As = 296.5653317 mm2
Mu = 2728600 Nmm
Mn = 3410750 Nmm
Rn = 0.505925893
Vs perlu = 12.64293834 kN
Vm = 2.726666667 kN/m
X = 4.636774453 m
d Sengkang = 8 mm
As sengkang = 50.26548246 mm2
2
Av = 100.5309649 mm (2 x As sengkang )
L = 3.041730853 m
Vs = 12.11260168 kN
S perlu = 380.00 mm
S maks. = 482.55 mm
1/3 x f'c0,5 x bw x d >>> Vs perlu, maka spasi sengkang maksimum diambil nilai
= 43.49 kN > Vs perlu maka, S =1/2 d atau 600 mm
S pakai = 97 mm (1/2 d)
= 600 mm
4ø12 2ø12
25
ø8-100 ø8-150
2ø12 3ø12
15 15
Tump. Lap.
INPUT DATA
Mutu beton f'c = 20.00 Mpa
Mutu baja fy = 300.00 Mpa Faktor pemb. Momen
Gaya Aksial Pu = 351,885.00 N 1.2
Moment Mu = 20,511,360.00 Nmm
Eksentrisitas e = Mu/Pu
e= 58.29 mm
Lebar beton b= 200.00 mm
Tinggi beton h= 550.00 mm
Selimut beton d' = 30.00 mm
Tinggi effektif d = h - d'
d= 505.50 mm
Diameter tulangan Tul. D = 13.00 mm
Jumlah tulangan D= 12.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 6.00 tulangan
Luas tul. Sisi tarik As = 796.39 mm2
Luas tul. Sisi tekan As' = 796.39 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.00788
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 337.00 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 286.45 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 546.59 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 300.00 Mpa
Pn = 385,164.32 kN
Pu = 351,885.00 kN
STATUS AMAN !!
10-150
55
12 13
20
K1
INPUT DATA
Mutu beton f'c = 18.50 Mpa
Mutu baja fy = 360.00 Mpa
Gaya Aksial Pu = 138,727.00 N
Moment Mu = 12,174,900.00 Nmm
Eksentrisitas e = Mu/Pu
e= 87.76 mm
Lebar beton b= 250.00 mm
Tinggi beton h= 250.00 mm
Selimut beton d' = 40.00 mm
Tinggi effektif d = h - d'
d= 195.50 mm
Diameter tulangan Tul. D = 13.00 mm
Jumlah tulangan D= 12.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 6.00 tulangan
Luas tul. Sisi tarik As = 796.39 mm2
Luas tul. Sisi tekan As' = 796.39 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.01629
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 122.19 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 103.86 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 403.58 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 360.00 Mpa
K2 25X25 =1
RUNTUH TEKAN
CHECK KAPASITAS TEKAN NOMINAL
As '. fy b.h. f ' c
Pn = +
e 3.h.e
+ 0.50 + 1.18
d − d' d2
A's .fy = 286,701.75 N
d - d' = 155.50 mm
b.h.f'c = 1,156,250.00 N
3h.e = 65,821.18 mm2
2
d = 38,220.25 mm2
Pn = 269,757.95 kN
Pu = 138,727.00 kN
STATUS AMAN !!
8-100 25
12 13
25
K2a
K2 25X25 =2
PERHITUNGAN TULANGAN KOLOM
KOLOM LANTAI 1
K2 20X45
INPUT DATA
Mutu beton f'c = 18.50 Mpa
Mutu baja fy = 240.00 Mpa
Gaya Aksial Pu = 135,262.00 N
Moment Mu = 12,626,200.00 Nmm
Eksentrisitas e = Mu/Pu
e= 93.35 mm
Lebar beton b= 200.00 mm
Tinggi beton h= 450.00 mm
Selimut beton d' = 40.00 mm
Tinggi effektif d = h - d'
d= 396.00 mm
Diameter tulangan Tul. D = 12.00 mm
Jumlah tulangan D= 8.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 4.00 tulangan
Luas tul. Sisi tarik As = 452.39 mm2
Luas tul. Sisi tekan As' = 452.39 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.00571
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 282.86 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 240.43 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 515.15 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 240.00 Mpa
Pn = 143,285.23 kN
Pu = 135,262.00 kN
STATUS AMAN !!
8-100
45
8 12
20
K2
INPUT DATA
Mutu beton f'c = 18.50 Mpa
Mutu baja fy = 240.00 Mpa
Gaya Aksial Pu = 23,984.00 N
Moment Mu = 3,814,400.00 Nmm
Eksentrisitas e = Mu/Pu
e= 159.04 mm
Lebar beton b= 150.00 mm
Tinggi beton h= 300.00 mm
Selimut beton d' = 25.00 mm
Tinggi effektif d = h - d'
d= 262.00 mm
Diameter tulangan Tul. D = 10.00 mm
Jumlah tulangan D= 8.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 4.00 tulangan
Luas tul. Sisi tarik As = 314.16 mm2
Luas tul. Sisi tekan As' = 314.16 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.00799
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 187.14 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 159.07 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 519.85 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 240.00 Mpa
K3 15X30 =1
RUNTUH TARIK
f's ≥ fy YA
LANJUTKAN
ρ = ρ' = As / b.d
ρ = ρ' = 0.00799
m = fy / ( 0.85 f'c )
m= 15.26
h − 2e h − 2e
2
Pn = 0 . 85 . f ' c .b .d d'
2d + + 2 .m . 1 −
2 d d
Kap. Tekan nominal
Pn = 269,802.79 N
a = Pn / ( 0.85f'c.b )
a= 114.38 mm
c = a / β1
c= 134.57 mm
f's = 600 (( c - d' ) / c )
f's = 488.53 Mpa
f's ≥ fy YA
φ= 0.65
φ.Pn = 175,371.82 N 7.31
Pu = 23,984.00 N
Mr = 27,891,021.15 Nmm
STATUS AMAN..!!
8-150
30
8 10
15
K2- SELASAR
K3 15X30 =2
PERHITUNGAN TULANGAN KOLOM
KOLOM TEPI LANTAI 2
K2A 20X45
INPUT DATA
Mutu beton f'c = 18.50 Mpa
Mutu baja fy = 240.00 Mpa
Gaya Aksial Pu = 49,751.00 N
Moment Mu = 12,043,600.00 Nmm
Eksentrisitas e = Mu/Pu
e= 242.08 mm
Lebar beton b= 200.00 mm
Tinggi beton h= 450.00 mm
Selimut beton d' = 40.00 mm
Tinggi effektif d = h - d'
d= 396.00 mm
Diameter tulangan Tul. D = 12.00 mm
Jumlah tulangan D= 8.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 4.00 tulangan
Luas tul. Sisi tarik As = 452.39 mm2
Luas tul. Sisi tekan As' = 452.39 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.00571
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 282.86 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 240.43 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 515.15 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 240.00 Mpa
f's ≥ fy YA
LANJUTKAN
ρ = ρ' = As / b.d
ρ = ρ' = 0.00571
m = fy / ( 0.85 f'c )
m= 15.26
h − 2e h − 2e
2
Pn = 0 . 85 . f ' c .b .d d'
2d + + 2 .m . 1 −
2 d d
Kap. Tekan nominal
Pn = 442,281.68 N
a = Pn / ( 0.85f'c.b )
a= 140.63 mm
c = a / β1
c= 165.45 mm
f's = 600 (( c - d' ) / c )
f's = 454.94 Mpa
f's ≥ fy YA
φ= 0.65
φ.Pn = 287,483.09 N 5.78
Pu = 49,751.00 N
Mr = 69,593,201.52 Nmm
STATUS AMAN..!!
8-150
45
8 12
20
K2- SELASAR
INPUT DATA
Mutu beton f'c = 20.00 Mpa
Mutu baja fy = 300.00 Mpa
Gaya Aksial Pu = 102,517.00 N
Moment Mu = 24,136,800.00 Nmm
Eksentrisitas e = Mu/Pu
e= 235.44 mm
Lebar beton b= 200.00 mm
Tinggi beton h= 550.00 mm
Selimut beton d' = 40.00 mm
Tinggi effektif d = h - d'
d= 495.50 mm
Diameter tulangan Tul. D = 13.00 mm
Jumlah tulangan D= 8.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 4.00 tulangan
Luas tul. Sisi tarik As = 530.93 mm2
Luas tul. Sisi tekan As' = 530.93 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.00536
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 330.33 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 280.78 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 527.35 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 300.00 Mpa
f's ≥ fy YA
LANJUTKAN
ρ = ρ' = As / b.d
ρ = ρ' = 0.00536
m = fy / ( 0.85 f'c )
m= 17.65
h − 2e h − 2e
2
Pn = 0 . 85 . f ' c .b .d d'
2d + + 2 .m . 1 −
2 d d
Kap. Tekan nominal
Pn = 849,647.47 N
a = Pn / ( 0.85f'c.b )
a= 249.90 mm
c = a / β1
c= 294.00 mm
f's = 600 (( c - d' ) / c )
f's = 518.37 Mpa
f's ≥ fy YA
φ= 0.65
φ.Pn = 552,270.86 N 5.39
Pu = 102,517.00 N
Mr = 130,027,714.73 Nmm
STATUS AMAN..!!
8-100
55
8 13
20
K2
INPUT DATA
Mutu beton f'c = 18.50 Mpa
Mutu baja fy = 360.00 Mpa
Gaya Aksial Pu = 48,684.00 N
Moment Mu = 8,911,300.00 Nmm
Eksentrisitas e = Mu/Pu
e= 183.04 mm
Lebar beton b= 250.00 mm
Tinggi beton h= 250.00 mm
Selimut beton d' = 40.00 mm
Tinggi effektif d = h - d'
d= 195.50 mm
Diameter tulangan Tul. D = 13.00 mm
Jumlah tulangan D= 10.00 tulangan merata
Diameter sengkang D= 8.00 mm
Jumlah sisi tekan D 1 sisi = 5.00 tulangan
Luas tul. Sisi tarik As = 663.66 mm2
Luas tul. Sisi tekan As' = 663.66 mm2
Besaran Rho ρ = ρ' = As / ( b x d' )
ρ = ρ' = 0.01358
Betha f'c < 30 Mpa b1 = 0.85
KONDISI BALANCE
Tinggi tekan beton Cb = ( 600 x d ) / ( 600 + fy )
Cb = 122.19 mm
Tinggi blok tegangan ab = b1 x Cb
ab = 103.86 mm
Chek tulangan tekan f's = 600 x [ ( Cb - d' ) / Cb ]
Tegangan tekan baja f's = 403.58 Mpa Tulangan leleh…!!
Tegangan terpakai f's = 360.00 Mpa
f's ≥ fy YA
LANJUTKAN
ρ = ρ' = As / b.d
ρ = ρ' = 0.01358
m = fy / ( 0.85 f'c )
m= 22.89
h − 2e h − 2e
2
Pn = 0 . 85 . f ' c .b .d d'
+ + 2 .m . 1 −
2d 2d d
Kap. Tekan nominal
Pn = 358,479.00 N
a = Pn / ( 0.85f'c.b )
a= 91.19 mm
c = a / β1
c= 107.28 mm
f's = 600 (( c - d' ) / c )
f's = 376.28 Mpa
f's ≥ fy YA
φ= 0.65
φ.Pn = 233,011.35 N 4.79
Pu = 48,684.00 N
Mr = 42,651,261.64 Nmm
STATUS AMAN..!!
8-100
25
10 13
25
K2a
PONDASI TELAPAK P1
PONDASI TENGAH
Data-data :
- Mu = 16.32 KNm - Tebal pangkal plat
- Pu = 363.29 KN pondasi, t2 = 300 mm
- fc' = 18.50 Mpa - Tebal ujung plat
- fy = 240.00 MPa pondasi, t1 = 300 mm
- s ijin = 2.37 kg/cm² - Kedalaman pondasi,
= 237.40 KN/m² h = 2000 mm
- g tnh. = 17.50 KN/m3 - Lt. Kerja = 50 mm
- g b.t. = 24.00 KN/m3 - tul. utama = 12 mm
- g b. = 22.00 KN/m3 - tul. bagi = 10 mm
- Selimut Beton = 40.00 mm
- Tinggi efektif = 254.00 mm 0
Dms Kolom b = 200 mm 0
h = 550 mm 1
Y = 32.877 KN/m²
a = 0.65 m b = 0.85 m B = 1.500 m
q1 = 202.28 KN/m²
q2 = 227.42 - 202.3 = 25.141 KN/m²
Mu = 1/2 x q1 x a + 2/3 x q2 x a2
2
= 49.813 kNm
Vu = q1 x a + 1/2 x q2 x a = 139.653 kN
150
ø10 - 100
ø12 - 100
150
Jadi digunakan
- Tulangan utama ( arah memanjang ) = 12 - 100 mm
- Tulangan utama ( arah melintang ) = 12 - 100 mm
- Tulangan atas = 10 - 100 mm
PONDASI TELAPAK P2
PONDASI TEPI
Data-data :
- Mu = 12.53 KNm - Tebal pangkal plat
- Pu = 129.80 KN pondasi, t2 = 300 mm
- fc' = 18.50 Mpa - Tebal ujung plat
- fy = 240.00 MPa pondasi, t1 = 300 mm
- s ijin = 2.37 kg/cm² - Kedalaman pondasi,
= 237.40 KN/m² h = 2000 mm
- g tnh. = 17.50 KN/m3 - Lt. Kerja = 50 mm
- g b.t. = 24.00 KN/m3 - tul. utama = 12 mm
- g b. = 22.00 KN/m3 - tul. bagi = 10 mm
- Selimut Beton = 40.00 mm
- Tinggi efektif = 254.00 mm 0
Dms Kolom b = 250 mm 0
h = 450 mm 0
Y = 91.004 KN/m²
a = 0.38 m b = 0.63 m B = 1.010 m
q1 = 182.25 KN/m²
q2 = 237.14 - 182.2 = 54.892 KN/m²
Mu = 1/2 x q1 x a + 2/3 x q2 x a2
2
= 18.443 kNm
Vu = q1 x a + 1/2 x q2 x a = 79.684 kN
100
ø10 - 200
ø12 - 200
100
Jadi digunakan
- Tulangan utama ( arah memanjang ) = 12 - 200 mm
- Tulangan utama ( arah melintang ) = 12 - 200 mm
- Tulangan atas = 10 - 200 mm
PONDASI TEPI
Data-data :
- Mu = 19.84 KNm - Tebal pangkal plat
- Pu = 154.90 KN pondasi, t2 = 300 mm
- fc' = 18.50 Mpa - Tebal ujung plat
- fy = 240.00 MPa pondasi, t1 = 300 mm
- s ijin = 2.37 kg/cm² - Kedalaman pondasi,
= 237.40 KN/m² h = 2000 mm
- g tnh. = 17.50 KN/m3 - Lt. Kerja = 50 mm
- g b.t. = 24.00 KN/m3 - tul. utama = 12 mm
- g b. = 22.00 KN/m3 - tul. bagi = 10 mm
- Selimut Beton = 40.00 mm
- Tinggi efektif = 254.00 mm 0
Dms Kolom b = 250 mm 0
h = 250 mm 0
Y = 83.250 KN/m²
a = 0.48 m b = 0.73 m B = 1.200 m
q1 = 158.87 KN/m²
q2 = 213.41 - 158.9 = 54.543 KN/m²
Mu = 1/2 x q1 x a2 + 2/3 x q2 x a2 = 26.127 kNm
Vu = q1 x a + 1/2 x q2 x a = 88.418 kN
120
ø10 - 150
ø12 - 150
120
Jadi digunakan
- Tulangan utama ( arah memanjang ) = 12 - 150 mm
- Tulangan utama ( arah melintang ) = 12 - 150 mm
- Tulangan atas = 10 - 150 mm
PONDASI TELAPAK P3
PONDASI TEPI
Data-data :
- Mu = 3.67 KNm - Tebal pangkal plat
- Pu = 23.98 KN pondasi, t2 = 300 mm
- fc' = 18.50 Mpa - Tebal ujung plat
- fy = 240.00 MPa pondasi, t1 = 300 mm
- s ijin = 2.37 kg/cm² - Kedalaman pondasi,
= 237.40 KN/m² h = 2000 mm
- g tnh. = 17.50 KN/m3 - Lt. Kerja = 50 mm
- g b.t. = 24.00 KN/m3 - tul. utama = 12 mm
- g b. = 22.00 KN/m3 - tul. bagi = 10 mm
- Selimut Beton = 40.00 mm
- Tinggi efektif = 254.00 mm 0
Dms Kolom b = 150 mm 0
h = 300 mm 0
Y = 51.125 KN/m²
a = 0.33 m b = 0.48 m B = 0.800 m
q1 = 82.50 KN/m²
q2 = 117.48 - 82.5 = 34.98 KN/m²
Mu = 1/2 x q1 x a2 + 2/3 x q2 x a2 = 6.820 kNm
Vu = q1 x a + 1/2 x q2 x a = 32.496 kN
80
ø10 - 200
ø12 - 200
80
Jadi digunakan
- Tulangan utama ( arah memanjang ) = 12 - 200 mm
- Tulangan utama ( arah melintang ) = 12 - 200 mm
- Tulangan atas = 10 - 200 mm
0,00
3,20
4.50 1.50
A PEMBEBANAN
TANGGA
a. Berat sendiri plat = 0.15 x 24 = 3.600 KN/m²
b. Berat spesi + kramik = 0.05 x 22 = 1.100 KN/m²
Total beban mati qD = 4.700 KN/m²
BORDES
a. Berat sendiri plat = 0.15 x 0= 0.000 KN/m²
b. Berat spesi + kramik = 0.05 x 0= 0.000 KN/m²
Total beban mati qD = 0.000 KN/m²
TANGGA
a. Beban plat tangga = 4.700 x 1.000 4.700 KN/m
Beban mati qD2 = 4.700 KN/m
b. Beban hidup plat tangga = 3.00 x 1.000 = 3.000 KN/m
Beban hidup qL2 = 3.000 KN/m
Dari hasil mekanika dengan bantuan program SAP 2000 didapat sebagai berikut :
Tangga 1
Momen maksimum terfaktor
TANGGA
M tumpuan = 10.29 kNm Negatif
M lapangan = 4.71 kNm Positif
BORDES
M tumpuan = 0 kNm Negatif
M lapangan = 0 kNm Negatif
TANGGA BORDES
No Tul. Tump. Tul. Lap. Tul. Tump. Tul. Lap. Satuan
Arah Sb. X Arah Sb. X Arah Sb. X Arah Sb. X
1 Mu 10.29 4.71 kNm
2 b 1000.0 1000.0 mm
3 h 150.0 150.0 mm
4 dx 125.0 125.0 mm
6 s 20.0 20.0 mm
7 f'c 20.0 20.0 Mpa
8 fy 240.0 240.0 MPa
9 b 0.85 0.85
10 ø 0.80 0.80
11 dia 10.0 10.0 mm
2
12 As1 78.540 78.540 mm
13 Kdx 0.82320 0.37680 Mpa
15 r b 0.0430 0.0430
16 r mak 0.0323 0.0323
17 r min 0.00333 0.00333
18 m 14.118 14.118
19 r perlu 0.00352 0.00159
2
20 As 439.67 416.67 mm
21 n 6.0 6.0 buah
22 S 167 167 mm
23 Sterpakai 150 150 mm
24 As ada 523.6 523.6 mm2
25 a 7.392 7.392 mm
26 Mn 15.244 15.244 kNm
27 Mr 12.195 12.195 kNm
> Mu….Oke > Mu….Oke
Kesimpulan :
Tulangan tumpuan = ø 10 - 150
Tulangan lapangan = ø 10 - 150
Tangga 2