Anda di halaman 1dari 1

Canal Dimension

LOCATION b h w1 w2 m Keterangan

(m)
BCk.1 - BCk.2 1.00 0.36 0.20 0.40 1.00 Saluran Pas. Batu Patok Ce.29 s.d BCk.2

BCk.2 - BCk.3 0.80 0.34 0.20 0.40 1.00 Saluran Pas. Batu

2 POTONGAN MELINTANG A-A 3 POTONGAN B-B


### -
### -

A A 1 DETAIL A
### -

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Provinsi : SULAWESI


DREKTORAT JENDERAL SUMBER DAYA AIR SELATAN
0 2.0 4.0 6.0 8.0 10.0 m
BA LA I B E SA R WI LA Y A H S U NGA I PO MP EN GA N - J E NE BE R A N G Proyek :
S.A = 1 : 100
JALANMONUMEN EMMY SAELAN NO.109 Telp. / Fax. (0411) 86871 MAKASSAR REHABILITASI DAN MODERNISASI
0 100 200 300 400 500 Cm STRA T EGIC IRRIGATION M O DERNIZATION AND URGEND REHABILIT A TION PROJECT (SIMURP) D.I SADDANG SUB UNIT LANGNGA
S.B = 1 : 50 ( SIMURP )
Title : SALURAN SEKUNDER CENGKONG
B 0 50 100 150 200 250 Cm
Kabupaten :

S.C = 1 : 25 PINRANG
(BCk.1 - BCk.2)
TYPICAL SALURAN
(BCk.2 - BCk.3)
No. Gambar : ... - ... - ... - ...
1 DENAH SALURAN
### - Satuan Kegiatan Irigasi dan Rawa II SIMURP Konsultan Supervisi Kontraktor :
No.Rev Tgl Yang Di Revisi Oleh Direnc Diset SNTV. PJPA POMPENGAN JENEBERANG Korea Rural Community PT.NINDYA KARYA(Persero) No. Lembar : 02 / 02
PROV SUL - SEL Corporation
NINDYA

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN Tanggal : No. Kontrak :

09 MEI 2022 HK.02.01/Au.8.2/76


ARI KUSNADI S.T., M.T. Ir. A. MUSTAKIM M, MT. HUSEIN SYARIF, ST.
NIP. 19861224 201402 1 004 SUB-PROJECT LEADER PROJECT MANAGER