FINAL SCHEDULE

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM DRAINASE YANG TERHUBUNG LANGSUNG DENGAN SUNGAI DALAM DAERAH KABUPATEN /KOTA
SUB KEGIATAN : PEMBANGUNAN SISTEM DRAINASE LINGKUNGAN
PEKERJAAN : PEMBANGUNAN /PENINGKATAN SALURAN DRAINASE DAN PENANGGULANGAN BANJIR DI KELURAHAN BALER BALE AGUNG, KECAMATAN NEGARA
NO. KONTRAK : 10/PUPRPKP-SDA/Drainase B.B.A. Negara/VI/2023
TANGGAL : 05 Juni 2023
NO. SP : 07/PUPRPKP-SDA/Drainase B.B.A. Negara/VI/2023
TANGGAL : 05 Juni 2023
LOKASI : KELURAHAN B.B.AGUNG, KEC. NEGARA, KAB. JEMBRANA
TAHUN : 2023

PROGRESS s/d SISA PROGRESS s/d WAKTU PELAKSANAAN 90 (SEMBILAN PULUH LIMA) HARI KALENDER MASA
ADDENDUM P
TGL.18 JUNI 2023 TGL.18 JUNI 2023 JUNI JULI AGUSTUS PEMELIHARAAN
NO URAIAN PEKERJAAN VOLUME BOBOT H KETERANGAN
S I II III IV V VI VII VIII IX X XI XII XIII 180 HARI KALENDER F
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT O
P 5-11 12-18 19-25 26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-27 28-2 H
A O
T 100%
T D G
I ITEM PEKERJAAN G D T
L
1 Pekerjaan Galian Tanah 603,00 M3 0,434 144,775 M3 0,104 680,000 M3 0,489 535,225 M3 0,385 L 0,062 E 0,064 0,064 0,064 0,064 0,064 0,064 G
.
N L
2 Pekerjaan Timbunan Tanah 76,00 M3 0,583 - M3 - 30,000 M3 0,230 30,000 M3 0,230 0,230
5 D 2 .
3 Pekerjaan Beton Uditch 600x600x1200 300,00 Bh 38,962 - Bh - 200,000 Bh 25,974 200,000 Bh 25,974 1,974 6,000 7,000 5,000 5,000 1,000
U 0
4 Pekerjaan Pasangan Batu Kali 174,00 M3 19,910 - M3 - 285,000 M3 32,610 285,000 M3 32,610 3,982 6,982 8,982 6,595 6,069 2
J M 2 2
5 Pekerjaan Pasangan Plesteran 46,00 M2 0,401 - M2 - 105,000 M2 0,914 105,000 M2 0,914 U . J 0,300 0,300 0,314 3 8
S 50%
6 Pekerjaan Acian 374,00 M2 2,504 - M2 - 610,000 M2 4,084 610,000 M2 4,084 N U 1,300 1,300 1,484
E
7 Pekerjaan Beton Lantai 11,00 M3 1,987 - M3 - 10,000 M3 1,806 10,000 M3 1,806 I T N 1,000 0,806 P
P
8 Pekerjaan Beton Dinding 80,00 M3 13,707 - M3 - 90,000 M3 15,420 90,000 M3 15,420 G I 2,732 3,300 3,200 3,200 2,988 E
T
2 L B
9 Pekerjaan Pembesian Wiremesh M7 999,00 M2 14,978 - M2 - 786,000 M2 11,784 786,000 M2 11,784 2,441 1,650 1,377 1,650 4,666 E
0 . 2 R
10 Pekerjaan Pembesian dengan Besi Polos 1.191,00 Kg 2,436 - Kg - 1.266,000 Kg 2,590 1.266,000 Kg 2,590 1,241 1,349 M
2 0 U
11 Pemasangan Pintu Air Tipe 1 1,00 Unit 4,098 - Unit - 1,000 Unit 4,099 1,000 Unit 4,099 4,099 B
3 1 2 A
E 0%
2 3 R
R
I
TOTAL 100,000 0,104 100,000 99,896 Keterangan :
RENCANA JUMLAH 0,062 2,505 4,446 5,338 6,064 7,064 9,046 14,600 17,181 15,497 10,657 5,699 1,798 GARIS RENCANA
2
PELAKSANAAN KOMULATIF 0 0,062 0 2,609 7,055 12,394 18,458 25,522 34,568 49,168 66,349 81,846 92,503 98,202 100,000 0
REALISASI JUMLAH 0,104 4,076 5,937 5,692 6,793 7,806 7,392 12,795 15,178 15,732 9,320 8,593 0,582 GARIS BULANAN 2
PELAKSANAAN KOMULATIF 0 0,104 - 4,180 10,117 15,809 22,602 30,408 37,800 50,595 65,773 81,505 90,825 99,418 100,00 3
DEVIASI 0,042 1,571 3,062 3,416 4,144 4,886 3,232 1,427 (0,576) (0,341) (1,678) 1,216 - GARIS REALISASI
REALISASI PELAKSANAAN BULANAN 10,868 51,622 100,000

Negara, 12 Mei 2023


Disetujui Diperiksa Diperiksa Diperiksa Dibuat oleh,
Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan (PPTK) Pembantu PPTK Pengawas Pekerjaan CV. CIPTA DINATA KARYA
Dinas Pekerjaan Umum, Penataan Ruang, Sub Kegiatan Pembangunan Sistem Drainase Lingkungan Sub Kegiatan Pembangunan Sistem Drainase Lingkungan Pembangunan /Peningkatan
Perumahan dan Kawasan Permukiman Saluran Drainase dan Penanggulangan Banjir
Kabupaten Jembrana di Kelurahan Baler Bale Agung, Kecamatan Negara

I Wayan Sudiarta, SP. I Gede Sugianta, ST. I Made Wiwin Juni Aryantha, ST. I Wayan Neksen I Km. Adhi Septeana P, ST. I Ketut Suarjana, SE.
NIP. 19700604 200003 1 010 NIP. 19781122 200902 1 003 NIP. 19770625 200604 1 013 NIP. 19651231 200604 1 132 Direktur