Anda di halaman 1dari 1

AS PLAN DRAWING

BOR
ING
M
15 M ANUAL NOTES/LEGEND/SYMBOL :

KABEL FTTH NEW HANDHOLE HH

KABEL 12C HANDHOLE EXISTING HH


HH
KABEL 24C MANHOLE DBM MH

KABEL 48C NEW XCC XCC

HH EXT & CLOSURE EXT RISEPIPE 4 M KABEL 96C XCC EXISTING XCC
* = Warna Slack
Lat : -6.302994 KABEL EXISTING NEW SLACK sesuai jenis kabel

Long : 106.838451 NEW TIANG 7 SLACK EXISTING


NEW NEW TIANG 9 NEW OTB 12 CORE OTB

TIANG EXISTING NEW OTB 24 CORE OTB

TIANG BERSAMA NEW OTB 48 CORE OTB

NEW CLOSURE NEW OTB 96 CORE OTB

CLOSURE EXISTING OTB EXISTING OTB

NEW SPLITER (ODP) LOBANG PIT


SPLITER EXISTING
KETERANGAN :
TOTAL PANJANG KABEL 538 meter
PANJANG KABEL12C 538 meter
KOMPOSISI JALUR PELANGGAN 25 meter
INDOOR/DINDING/PLAFON 25 meter
KEBUTUHAN MATERIAL PELANGGAN
OTB 12C 1 unit
KOMPOSISI JALUR PU/DBM 483 meter
BORING MANUAL 15 meter
AERIAL/JALUR UDARA 468 meter
KEBUTUHAN MATERIAL DI AREA PU
RISED PIPE 4 meter
HHB, HH LA, HH DBM 1 titik
T EXT & T BERSAMA 13 titik
TOTAL TREK JALUR 508 meter
TOTAL SPARE KABEL 30 meter
SPARE KABEL 12C 30 meter
KETERANGAN
1 Lokasi Server berada di RUANG SERVER PEGADAIAN
2 Tarikan Kabel di arahkan ke : HH EKSISTING DI JL. RA KATINI

ng

KABEL UD
DEPAN CUTTING STIKER

Lenteng Agu
3 PERIZINAN PU, PUSAT PEGADAIAN, & PIC DI TEMPAT

468 M
ARA
Jl. Baung 2

: APD SA352166 - 2024413461 PEGADAIAN (PERSERO)


PEKERJAAN TANJUNG BARAT

LOKASI : TANJUNG BARAT.KEL. TANJUNG BARAT, KEC. JAGAKARSA

GAMBAR : PETA LOKASI


SURVEY SELESAI PEKERJAAN
Jl. Amd. 8

NAMA ERLAND TANGGAL 26 April 2024


TANGGAL - SKALA MAPS
DIGAMBAR UKURAN KERTAS A4
NAMA NADJIB
PARAF REVISI
DIPERIKSA
NAMA DEDEN I
PARAF
MENGETAHUI

Jl. Cendrawasih Mas 2


OO
R lintasarta KOPKARLA
IND25 M

LOKASI PELANGGAN
NAMA DEDEN ISWORO
Lat : -6.306124, ENGINEER KORDINATOR
.6
ER LT

Long : 106.838717
OTB

SERV

rawasi h Mas 7
NAMA DIDIK SUPRIYADI

Jl. Cend
PROJECT MANAGER SUPERVISOR

Jl. Baun
g

Anda mungkin juga menyukai