AHSP
AHSP
PEKERJAAN
KODE KP SATUAN PK VOLUME HARGA SATUAN SD HSP
KODE KOEFISIEN NAMA SD KODE SD SATUAN SD
1 PEKERJAAN AWAL
P01 Pembersihan Lokasi M2 Rp 18,450.00
0.100 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 8,550.00
0.050 Mandor TK02 Or/Hari Rp 198,000.00 Rp 9,900.00
2 PEKERJAAN PONDASI
P02 Pengukuran Bowplank M 112 Rp 77,172.00
0.012 Kayu Meranti Balok MT01 M3 Rp 3,498,000.00 Rp 41,976.00
0.020 Paku Biasa 2"-5" MT02 Kg Rp 15,900.00 Rp 318.00
0.007 Kayu Meranti Papan (MC) 2/20 MT03 M3 Rp 1,890,000.00 Rp 13,230.00
0.100 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 8,550.00
0.100 Tukang Kayu TK05 Or/Hari Rp 107,400.00 Rp 10,740.00
0.010 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 1,368.00
0.005 Mandor TK02 Or/Hari Rp 198,000.00 Rp 990.00