3 PEKERJAAN SLOOF & KOLOM BETON BERTULANG

P09 Pekerjaan Beton M3 9 Rp 967,747.00


9.275 Semen Portland 40 Kg MT08 Zak Rp 56,700.00 Rp 525,892.50
0.436 Pasir Beton MT09 M3 Rp 182,400.00 Rp 79,526.40
0.551 Batu Pecah Mesin 1/2 MT10 M3 Rp 271,200.00 Rp 149,431.20
215.000 Air (Biaya Air Tawar) MT11 Lt Rp 100.00 Rp 21,500.00
1.650 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 141,075.00
0.275 Tukang Batu TK04 Or/Hari Rp 109,300.00 Rp 30,057.50
0.028 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 3,830.40
0.083 Mandor TK02 Or/Hari Rp 198,000.00 Rp 16,434.00

P010 Pekerjaan Besi Beton M3 2 Rp 14,746.60


1.050 Besi Beton Ulir 39 MT12 Kg Rp 10,900.00 Rp 11,445.00
0.015 Kawat Beton (Bendrat) MT13 Kg Rp 17,600.00 Rp 264.00
0.007 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 598.50
0.007 Tukang Besi TK06 Or/Hari Rp 109,300.00 Rp 765.10
0.005 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 684.00
0.005 Mandor TK02 Or/Hari Rp 198,000.00 Rp 990.00

P11 Pekerjaan Bekisting M3 1.2 Rp 474,630.60


0.022 Kayu Meranti Papan (MC) 2/20 MT03 M3 Rp 1,890,000.00 Rp 41,580.00
0.002 Paku Biasa 2"-5" MT02 Kg Rp 15,900.00 Rp 31.80
0.300 Minyak Begesting MT14 Lt Rp 7,100.00 Rp 2,130.00
0.100 Kayu Meranti Balok MT01 M3 Rp 3,498,000.00 Rp 349,800.00
0.520 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 44,460.00
0.260 Tukang Kayu TK05 Or/Hari Rp 107,400.00 Rp 27,924.00
0.026 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 3,556.80
0.026 Mandor TK02 Or/Hari Rp 198,000.00 Rp 5,148.00

4 PEKERJAAN INSTALASI AIR


P12 1 Instalasi Air Bersih M 15 Rp 17,000.00 Rp 17,000.00
P13 1 Instalasi Air Kotor M 10 Rp 17,500.00 Rp 17,500.00

5 PEKERJAAN DINDING
P14 Pemasangan Dinding Batu Bata M2 3.3 Rp 109,380.90
70.000 Batu Bata Merah MT15 Buah Rp 700.00 Rp 49,000.00
0.194 Semen Portland 50 Kg MT16 Zak Rp 61,100.00 Rp 11,853.40
0.045 Pasir Pasang MT07 M3 Rp 169,100.00 Rp 7,609.50
0.300 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 25,650.00
0.100 Tukang Batu TK04 Or/Hari Rp 109,300.00 Rp 10,930.00
0.010 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 1,368.00
0.015 Mandor TK02 Or/Hari Rp 198,000.00 Rp 2,970.00

P15 Plesteran Dinding Batu Bata M2 55 Rp 57,818.00


0.104 Semen Portland 50 Kg MT16 Zak Rp 61,100.00 Rp 6,354.40
0.026 Pasir Pasang MT07 M3 Rp 169,100.00 Rp 4,396.60
0.300 Pekerja TK01 Or/Hari Rp 85,500.00 Rp 25,650.00
0.150 Tukang Batu TK04 Or/Hari Rp 109,300.00 Rp 16,395.00
0.015 Kepala Tukang TK03 Or/Hari Rp 136,800.00 Rp 2,052.00
0.015 Mandor TK02 Or/Hari Rp 198,000.00 Rp 2,970.00