BOQ Gg. Buntu
BOQ Gg. Buntu
REKAPITULASI
BILL OF QUANTITY (BOQ)
I PEKERJAAN PENDAHULUAN
II PEKERJAAN JALAN
TOTAL
PPN [ 11 % ]
JUMLAH
DIBULATKAN
Terbilang :
Penajam, ….................2024
PT/CV ….................
(…............................)
Direktur
RENCANA AGGARAN BIAYA
( RAB )
I. PEKERJAAN PENDAHULUAN
2. Perlengkapan K3 1,000 Ls -
TOTAL I -
4. Bekisting 21,800 M2 - -
B Harga Bahan
1 Semen PC 40 kg Setara Tonasa Kg 40 Kg
2 Pasir Urug M3
3 Pasir Beton (Pasir Sungai) Kg 1400 Kg/M3
4 Batu Split ( ukuran 2-3 cm/1-2 ) M3
- Batu Split ( ukuran 2-3 cm/1-2 ) Kg 1350 Kg/M3
5 Tanah Timbunan M3
Wire Mesh M6 Kg 5,448 Kg/M2
6 Besi Beton Polos Kg
7 Kawat Bendrat / Beton Kg
8 Kayu Galam Dia. 10 - 12 Cm Btg
- Kayu Galam Permeter M' 4 Meter
9 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan M3
10 Minyak bekisting Ltr
11 Paku biasa (rata-rata) Kg
12 Kayu Kelas 2 M3
13 Papan Kayu Klas 2 M3
14 Papan Nama Proyek Buah
15 Plywood 9 mm Lbr
16 Plastik Cor M2
17 Air Liter
18 Beton Ready mix K175 M3
C Peralatan
1 Sewa Molen (Concrete Mixer) Sewa/Hari
ANALISA HARGA SATUAN PEKERJAAN
D Jumlah (A+B+C) -
E Overhead & Profit 12% x D -
Harga Satuan Pekerjaan
F -
(D+E)
1.7.2.e (c) Pengurugan dan Pemadatan 1 m3 Sirtu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0,250 - -
Mandor L.04 OH 0,025 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Sirtu M3 1,20 350.000,00 420.000,00
JUMLAH HARGA BAHAN 420.000,00
C PERALATAN
D Jumlah (A+B+C) -
E Overhead & Profit 12% x D -
F Harga Satuan Pekerjaan (D+E) -
2.2.3.a 1 M3 Pengecoran beton menggunakan ready Mixed mutu f’c=14,5 MPa (K175)
D Jumlah (A+B+C) -
E Overhead & Profit 12% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.28 Pemasangan Bekisting 1 m2
D Jumlah (A+B+C) -
E Overhead & Profit 12% x D -
F Harga Satuan Pekerjaan (D+E) -
D Jumlah (A+B+C) -
E Overhead & Profit 12% x D -
F Harga Satuan Pekerjaan (D+E) -