Ahsp 2016&2022
Ahsp 2016&2022
-
Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?
1 2 3 4
HARGA SATUAN UPAH
1 Kepala Tukang OH -
2 Mandor OH -
3 Operator Crane OH -
4 Pekerja OH -
4 Pembantu Operator Crane OH -
4 Tukang Alluminium OH -
5 Tukang Batu OH -
5 Tukang Ereksi OH -
6 Tukang Kayu OH -
6 Tukang Besi OH -
6 Tukang Besi Konstruksi OH -
7 Tukang Vibrator OH -
7 Tukang Las OH -
8 Tukang Cat OH -
8 OH -
9 OH -
9 OH -
10 OH -
BAHAN MATERIAL
1 Air Ltr -
1 Alang-alang Ikat -
1 Aluminium Foil M² -
1 Aluminium Strip Lebar 8cm M -
1 Ampelas Lbr -
1 Atap Serat Semen gel. 92 x 180 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 200 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 225 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 250 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 150 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 210 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 240 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 270 x 0,4 cm Lbr -
1 Atap Serat Semen gel. 105 x 300 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 108 x 180 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 210 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 240 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 270 x 0,6 cm Lbr -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Atap Serat Semen gel. 108 x 300 x 0,6 cm Lbr -
1 Atap Sirap Kayu Bh -
1 Atap Spandek 95 x 180cm Lbr -
2 Baja Ringan Canai Dingin C75 Btg -
1 Bak Cuci Piring Stainlessteel Unit -
1 Bak Cuci Piring Teraso Unit -
1 Bak Mandi Fiberglass Vol. 0,30 m³ Unit -
1 Bak Mandi Fiberglass Vol. 1 m³ Unit -
1 Bak Mandi Teraso Vol. 0,30 m³ Unit -
1 Bambu ᴓ6-8 Btg -
1 Bata Merah Biasa Bh -
1 Bata Merah Jumbo Bh -
2 Bata Berongga 12x11x24cm Bh -
2 Bata Pelapis (ekposes) 3 x 7 x 24 cm Bh -
3 Bata Ringan Tebal 7,5 cm Bh -
4 Bata Ringan Tebal 10 cm Bh -
1 Bata Rooster 12x11x24cm Bh -
1 Bathtub Porselen Unit -
1 Batu Gunung M³ -
1 Batu Paras M² -
1 Batu Screening M³ -
1 Batu Tempel Hitam M² -
1 Besi Angker Kg -
1 Besi Baja IWF Kg -
1 Besi Baja Profil Kg -
1 Besi Beton Polos Kg -
1 Besi Beton Ulir Kg -
1 Besi Hollow 20X20X1,2 mm M -
1 Besi Hollow 40x20x0,3 mm M -
1 Besi Hollow 40x20x0,4 mm M -
1 Besi Hollow 40x20x1 mm M -
1 Besi Hollow 40x20x1,2 mm M -
1 Besi Hollow 40x40x0,25 mm M -
1 Besi Hollow 40x40x0,4 mm M -
1 Besi Hollow 40x40x1 mm M -
1 Besi Hollow 40x40x1,2 mm M -
1 Besi Hollow 40x40x1,7 mm M -
1 Besi Hollow 40x40x1,8 mm M -
1 Besi Hollow 50x50x1,2 mm M -
1 Besi Hollow 60x40x1,2 mm M -
1 Besi Hollow 60x40x1,7 mm M -
1 Besi Hollow 60x60x1,7 mm M -
1 Besi Hollow 80x40x1,2 mm M -
1 Besi Hollow 100x50x1,2 mm M -
1 Besi Hollow Galvanis 20x20x1,1 mm M -
1 Besi Hollow Galvanis 20x20x1,5 mm M -
1 Besi Hollow Galvanis 20x20x1,7 mm M -
1 Besi Hollow Galvanis 30x15x1,1 mm M -
1 Besi Hollow Galvanis 30x15x1,5 mm M -
1 Besi Hollow Galvanis 30x30x1,1 mm M -
1 Besi Hollow Galvanis 30x30x1,5 mm M -
1 Besi Hollow Galvanis 30x30x1,7 mm M -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Besi Hollow Galvanis 40x20x1,5 mm M -
1 Besi Hollow Galvanis 40x20x1,7 mm M -
1 Besi Hollow Galvanis 40x40x1,5 mm M -
1 Besi Hollow Galvanis 40x40x1,7 mm M -
1 Besi Hollow Galvanis 50x50x1,8 mm M -
1 Besi Hollow Galvanis 60x30x1,8 mm M -
1 Besi Hollow Galvanis 60x40x1,8 mm M -
1 Besi Hollow Galvanis 100x50x2,7 mm M -
1 Besi Lis Kaca 2mm M -
1 Besi Lis Kaca 3mm M -
1 Besi Lis Kaca 4mm M -
1 Besi Lis Kaca 5mm M -
1 Besi Plat Baja 2 mm Kg -
1 Besi Siku 30.30.3 mm Kg -
1 Besi Strip 20X3mm Kg -
1 Besi Strip 20X4mm Kg -
1 Besi Strip 20X5mm Kg -
1 Besi Strip 25X3mm Kg -
1 Besi Strip 25X4mm Kg -
1 Besi Strip 25X5mm Kg -
1 Besi Strip 30X3mm Kg -
1 Besi Strip 30X4mm Kg -
1 Besi Strip 30X5mm Kg -
1 Besi Wiremesh M6-M8 M -
1 Bilik Bambu M² -
1 Bubung Genteng Kodok Bh -
1 Bubung Genteng Palentong Besar Bh -
1 Bubung Genteng Palenting Kecil Bh -
1 Bubung Paten 92 cm Bh -
1 Bubung Paten 105 cm Bh -
1 Bubung Paten 108 cm Bh -
1 Bubung Stel Gelombang 92 cm Bh -
1 Bubung Stel Gelombang 105 cm Bh -
1 Bubung Stel Gelombang 108 cm Bh -
1 Bubung Stel Rata 92 cm Bh -
1 Bubung Stel Rata 105 cm Bh -
1 Cat Antara (Cat Kayu/Besi) Kg -
1 Cat Dasar (Kayu/Besi) Kg -
1 Cat Dasar (Tembok) Kg -
1 Cat Menie Besi Kg -
1 Cat Menie Kayu Kg -
1 Cat Penutup (kayu/Besi) Kg -
1 Cat Penutup (Tembok) Kg -
1 Cat Residu Ltr -
1 Closet Duduk Unit -
1 Closet Jongkok Porselen Unit -
1 Closet Jongkok Teraso Unit -
1 Conblock HB10 Bh -
1 Conblock HB15 Bh -
1 Conblock HB20 Bh -
1 Dempul Kg -
1 Dolken ᴓ8-10 Btg -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Door Closer Set -
1 Door Holder Bh -
1 Door Stop Bh -
1 Dynabolt M8 x 40 Bh -
1 Dynabolt M8 x 65 Bh -
1 Dynabolt M8 x 85 Bh -
1 Dynabolt M10 x 50 Bh -
1 Dynabolt M10 x 65 Bh -
1 Dynabolt M10 x 77 Bh -
1 Dynabolt M10 x 97 Bh -
1 Dynabolt M12 x 75 Bh -
1 Dynabolt M12 x 99 Bh -
1 Dynabolt M12 x 129 Bh -
1 Engsel Angin Bh -
1 Engsel Jendela Kupu-kupu Bh -
1 Engsel Pintu Bh -
1 Fitting Lampu Bh -
1 Floor Drain Bh -
1 Floor Harderner Kg -
1 Fording Door Plastik/PVC M² -
1 Formika/HPL Lbr -
1 Genteng Aspal 80 x 120cm Bh -
1 Genteng Beton Bh -
1 Genteng Kodok Bh -
1 Genteng Metal 80 x 100cm Bh -
1 Genteng Palentong Kecil Bh -
1 Genteng Palentong Besar Bh -
1 Gypsum Board 120 x 240 x 9 mm Lbr -
1 Ijuk Kg -
1 Jendela Nako 7 daun Bh -
1 Jendela Nako (Rangka + Kaca 5mm, Lebar 15cm) M² -
1 Kabel m -
1 Kaca Buram 12mm M² -
1 Kaca Cermin 5mm M² -
1 Kaca Cermin 8mm M² -
1 Kaca Patri 5mm M² -
1 Kaca Polos 2mm M² -
1 Kaca Polos 3mm M² -
1 Kaca Polos 5mm M² -
1 Kaca Polos 8mm M² -
1 Kaca Wireglassed 5mm M² -
1 Kait Angin Bh -
1 Kalkarium Kg -
1 Kapur Padam M³ -
1 Kapur Sirih Kg -
1 Kayu Kelas I
Papan kayu Kelas I M³ -
Balok Kayu Kelas I M³ -
3 Kayu Kelas II
Papan kayu Kelas II M³ -
Balok Kayu Kelas II M³ -
3 Kayu Kelas III
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
Papan kayu Kelas III M³ -
Balok Kayu Kelas III M³ -
1 Kawat Ø4 mm Kg -
1 Kawat Beton Kg -
1 Kawat Duri M -
1 Kawat Las Kg -
2 Kawat Nyamuk M² -
2 Keramik Artistik 5 x 20 cm Bh -
2 Keramik Artistik 10 x 10 cm Bh -
2 Keramik Artistik 10 x 20 cm Bh -
2 Keramik Mozaik 30 x 30 cm Bh -
2 Keramik 10 x 20 cm Bh -
2 Keramik 10 x 33 cm Bh -
2 Keramik 33 x 33 cm Dos -
2 Keramik 20 x 20 cm Dos -
2 Keramik 30 x 30 cm Dos -
2 Keramik Porselen 11 x 11 cm Bh -
2 Keramik Porselen 11 x 11 cm Dos -
2 Keramik Porselen 10 x 20 cm Bh -
2 Keramik Porselen 20 x 20 cm Bh -
4 Kerikil/agregat M³ -
1 Klem Kabel Biasa Bh -
1 Kolom Beton Pracetak 220 Btg -
1 Kran Air 1/2" Bh -
1 Kran Air 3/4" Bh -
1 Kuas Bh -
1 Kunci Lemari Set -
1 Kunci Silinder Bh -
1 Kunci Slot (Grendel) Bh -
1 Kunci Tanam 2 Slag Bh -
1 Kunci Tanam Antik Bh -
1 Kunci Tanam Biasa Bh -
1 Kunci Tanam KM Bh -
2 L Bow Bh -
2 Lantai Karpet M² -
2 Las Dop Bh -
2 Lem Karet Kg -
2 Lem Kayu Kg -
2 List Kayu Profil M -
2 Marmer 100 x 100 cm Bh -
2 MCB Bh -
2 MCCB (Box MCB) Bh -
2 Melamic Kg -
1 Minyak Bekisting Ltr -
1 Minyak Pelumas Ltr -
2 Mongkok Bh -
2 Mortar Siap Pakai Kg -
1 Nok Spandek Bh -
1 Nok Genteng Aspal Bh -
1 Nok Genteng Beton Bh -
1 Nok Genteng Metal Panjang 100cm Bh -
1 Pagar BRC M² -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Papan Serat Semen M² -
4 Paku 12cm Bh -
4 Paku Campur 1/2 - 1cm Kg -
4 Paku Campur 1 - 5 cm Kg -
5 Paku Campur 5 - 10 cm Kg -
6 Paku Campur 8 - 12 cm Kg -
6 Paku Pancing 6 x 23 Kg -
7 Paku Sekrup Bh -
7 Paku Sekrup 10cm Kg -
7 Paku Tripleks Kg -
1 Panel Beton Pracetak 240x40x5 Lbr -
1 Panel Beton Pracetak 240x50x5 Lbr -
4 Parquet Gymfloor M² -
4 Parquet Kayu M² -
4 Pasir Beton M³ -
5 Pasir Pasang M³ -
1 Pasir Urug M³ -
1 Paving Block Natural Tebal 6 cm M² -
1 Paving Block Natural Tebal 8 cm M² -
1 Paving Block Berwarna Tebal 6 cm M² -
1 Paving Block Berwarna Tebal 8 cm M² -
1 Pengencer Cat Ltr -
1 Phenolic Film 12 mm Lbr -
1 Pipa Galvanis 1/2" M -
1 Pipa Galvanis 3/4" M -
1 Pipa Galvanis 1" M -
1 Pipa Galvanis 1 1/2" M -
1 Pipa Galvanis 3" M -
1 Pipa Galvanis 4" M -
1 Pipa Listrik 5/8" Btg -
1 Pipa PVC AW 1/2" M -
1 Pipa PVC AW 3/4" M -
1 Pipa PVC AW 1" M -
1 Pipa PVC AW 1 1/2" M -
1 Pipa PVC AW 2" M -
1 Pipa PVC AW 2 1/2" M -
1 Pipa PVC AW 3" M -
1 Pipa PVC AW 4" M -
1 Pipa PVC AW 6" M -
1 Pipa PVC AW 8" M -
1 Plafond Akustik 30 x 30 cm Lbr -
1 Plafond Akustik 30 x 60 cm Lbr -
1 Plafond Akustik 60 x 120 cm Lbr -
1 Plamur Kg -
1 Plastik Aerator Bh -
1 Plint Internal Cove 5 x 5 x 20 cm Bh -
1 Plint Keramik 10 x 10 cm Bh -
1 Plint Keramik 10 x 20 cm Bh -
1 Plint Ubin PC 15 x 20 cm Bh -
1 Plint Ubin PC 10 x 30 cm Bh -
1 Plint Ubin PC 10 x 40 cm Bh -
1 Plint Ubin Warna 10 x 20 cm Bh -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Plint Ubin Warna 10 x 30 cm Bh -
1 Plint Ubin Warna 10 x 40 cm Bh -
1 Plint Ubin Teraso 10 x 30 cm Bh -
1 Plint Ubin Teraso 10 x 40 cm Bh -
1 Plint Ubin Granit 10 x 30 cm Bh -
1 Plint Ubin Granit 10 x 40 cm Bh -
1 Plint Ubin Teralux Kerang 10 x 30 cm Bh -
1 Plint Ubin Teralux Kerang 10 x 40 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 30 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 40 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 60 cm Bh -
1 Plywood 3mm Lbr -
2 Plywood 4mm Lbr -
2 Plywood 5mm Lbr -
3 Plywood 6mm Lbr -
3 Plywood 9mm Lbr -
4 Plywood 12mm Lbr -
5 Politur Ltr -
5 Politur Jadi Ltr -
5 Profil Aluminium M -
6 Profil Aluminium (lis Kaca) M -
4 Ramset Bh -
4 Rel Pintu Dorong Set -
4 Residu Ltr -
4 Rolling Door Aluminium M² -
4 Rolling Door Besi M² -
4 Rooflight fiberglass 90 x 180 cm Lbr -
4 Sabun Cuci Kg -
4 Saklar Tunggal Bh -
4 Saklar Ganda Bh -
4 Saklar Triple Bh -
4 Sanding Kg -
4 Sealant Tube -
4 Sealtape Bh -
5 Sekrup Fixer Bh -
4 Semen Grout Kg -
4 Semen Portland Kg -
5 Semen Warna Kg -
1 Seng Gelombang BJLS 0,2 mm Lbr -
1 Seng plat Lbr -
2 Seng plat BJLS 28 Lebar 90cm M -
3 Seng plat BJLS 30 Lebar 45cm M -
4 Serbuk Batu Granit Kg -
5 Serbuk Batu Traso Kg -
1 Sirtu M³ -
1 Soda Api Kg -
1 Solar Industri Ltr -
1 Spacer Bekisting Bh -
1 Spring Knip Bh -
1 Strorox 100 Kg -
2 Sunscreen Aluminium M² -
1 T Dus Bh -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
1 Taekwood 3mm Lbr -
2 Taekwood 4mm Lbr -
2 Taekwood 5mm Lbr -
3 Taekwood 6mm Lbr -
3 Taekwood 9mm Lbr -
4 Taekwood 12mm Lbr -
1 Tali Ijuk M -
1 Tanah Liat M³ -
1 Teak Oil Ltr -
1 Teraso Cor Instan M³ -
1 Thinner Ltr -
2 Tirai (Vebetions Blinds/Vertical Blinds) M² -
2 Ubin Abu-Abu 20 x 20 cm Bh -
2 Ubin Abu-Abu 30 x 30 cm Bh -
2 Ubin Abu-Abu 40 x 40 cm Bh -
2 Ubin Granit 40 x 40 cm Bh -
2 Ubin Granit 30 x 30 cm Bh -
2 Ubin Teralux 40 x 40 cm Bh -
2 Ubin Teralux 30 x 30 cm Bh -
2 Ubin Teralux Marmer 60 x 60 cm Bh -
2 Ubin Teralux Marmer 40 x 40 cm Bh -
2 Ubin Teralux Marmer 30 x 30 cm Bh -
2 Ubin Teraso 40 x 40 cm Bh -
2 Ubin Teraso 30 x 30 cm Bh -
3 Ubin Warna 20 x 20 cm Bh -
4 Ubin Warna 30 x 30 cm Bh -
5 Ubin Warna 40 x 40 cm Bh -
5 Underlayer Lantai M² -
5 Urinoir Unit -
2 Vernis Ltr -
2 Vynil 15 x 30 cm Bh -
2 Vynil 30 x 30 cm Bh -
1 Wallpaper Lebar 50 cm M -
1 Wastafel Unit -
1 Waterdrain Bh -
1 Waterstop Lebar 150 mm M -
2 Waterstop Lebar 200 mm M -
3 Waterstop Lebar 230-320 mm M -
3 Wood Filler Kg -
3 Woodstain Kg -
HARGA SEWA ALAT
1 Sewa Crane Hari -
2 Sewa Pipe Support Hari -
3 Sewa Scaffolding Hari -
4 Sewa Alat Las Jam -
0
Dibuat Oleh :
?
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)
1 2 3 4
?
?
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI
Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?
A.1.5.1.13. Pemasangan 1m² Lapisan Ijuk Tebal 10cm untuk Bidang Resapan Tangki Septik
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ijuk Kg 0.9860 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.2.2.1.1. (K3) Pembuatan 1m² pagar sementara dari kayu tinggi 2 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 0.1200 - -
Semen Portland Kg 5.0000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Balok Kayu Kelas III M³ 0.0720 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
Residu Ltr 0.4000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.2.2.1.2. (K3) Pembuatan 1m² pagar sementara dari seng gelombang tinggi 2 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.4000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.2500 - -
Semen Portland Kg 2.5000 - -
Seng Gelombang BJLS 0,2 mm Lbr 1.2000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Balok Kayu Kelas III M³ 0.0720 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
Err:509 ### 0.4500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.2.2.1.3. (K3) Pembuatan 1m² pagar sementara dari skawat duri tinggi 1,8 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.0000 - -
Semen Portland Kg 2.0000 - -
Kawat Duri M 25.0000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.6. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 1KP : 2PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1700 - -
Semen Portland Kg 0.1700 - -
Pasir Pasang M³ 0.3400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.7. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 3KP : 10PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1470 - -
Semen Portland Kg 61.0000 - -
Pasir Pasang M³ 0.4920 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.8. Pemasangan 1m³ pondasi batu Gunung campuran 1/4SP : 1KP : 4PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1310 - -
Semen Portland Kg 61.0000 - -
Pasir Pasang M³ 0.5230 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.10. Pemasangan 1m³ Pondasi Siklop, 60% Beton Campuran 1SP : 2 Pb ; 3 KR 40% Batu Belah
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.4000 - -
Tukang Batu L.02 OH 0.8500 - -
Kepala Tukang L.03 OH 0.0850 - -
Mandor L.04 OH 0.1700 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 0.4800 - -
Semen Portland Kg 194.0000 - -
Pasir Beton M³ 0.3120 - -
Kerikil/agregat M³ 0.4680 - -
Besi Beton Polos Kg 126.0000 - -
Kawat Beton Kg 1.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.4. Pembuatan 1m³ Lantai Kerja Beton Mutu f'c = 7,4 Mpa Slump (3-6) cm, w/e = 0,87
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 230.0000 - -
Pasir Beton M³ 0.6379 - -
Kerikil/agregat M³ 0.7607 - -
Air Ltr 200.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.12. Pembuatan 1m³ Beton Mutu f'c = 31,2 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 448.0000 - -
Pasir Beton M³ 0.4764 - -
Kerikil/agregat M³ 0.7407 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.13. Pembuatan 1m³ Beton Kedap Air dengan Aditif Kedap Air
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 400.0000 - -
Pasir Beton M³ 0.4800 - -
Kerikil/agregat M³ 0.8000 - -
Strorox 100 Kg 1.2000 - -
Air Ltr 210.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.20. Pemasangan 1m² Bekisting untuk Pondasi Telapak Beton Bangunan Gedung
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.3000 - -
Minyak Bekisting Ltr 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.24. Pemasangan 1m² Bekisting untuk Plat Lantai Beton Bangunan Gedung
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0150 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 6.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.1. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 8cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1320 - -
Tukang Batu L.02 OH 0.0220 - -
Kepala Tukang L.03 OH 0.0020 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 26.0800 - -
Pasir Beton M³ 0.0434 - -
Kerikil/agregat M³ 0.0610 - -
Air Ltr 17.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.2. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 10cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1650 - -
Tukang Batu L.02 OH 0.0280 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 32.6000 - -
Pasir Beton M³ 0.0543 - -
Kerikil/agregat M³ 0.0762 - -
Air Ltr 21.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.3. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 12cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1980 - -
Tukang Batu L.02 OH 0.0330 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 39.1200 - -
Pasir Beton M³ 0.0651 - -
Kerikil/agregat M³ 0.0915 - -
Air Ltr 25.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.4. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 15cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2480 - -
Tukang Batu L.02 OH 0.0410 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 48.9000 - -
Pasir Beton M³ 0.0814 - -
Kerikil/agregat M³ 0.1143 - -
Air Ltr 32.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.5. Pembuatan 1m² Bekisting untuk Plat Beton Pracetak Komponen Modular Bangunan Gedung (5 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 - -
Tukang Kayu L.02 OH 0.0760 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Lantai Kerja t=10cm M3 0.0080 - -
Besi Hollow 50x50x1,2 mm M 2.1000 - -
Balok Kayu Kelas II M³ 0.0050 - -
Phenolic Film 12 mm Lbr 0.0800 - -
Minyak Bekisting Ltr 0.2000 - -
Dynabolt M12 x 129 Bh 3.8820 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.6. Pembuatan 1m² Bekisting untuk Balok Beton Pracetak (10-12 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 - -
Tukang Kayu L.02 OH 0.0380 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0050 - -
Phenolic Film 12 mm Lbr 0.0430 - -
Minyak Bekisting Ltr 0.2000 - -
Paku Campur 5 - 10 cm Kg 0.0460 - -
Dynabolt M12 x 129 Bh 0.6930 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.7. Pembuatan 1m² Bekisting untuk Kolom Beton Pracetak (10-12 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 - -
Tukang Kayu L.02 OH 0.0380 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0040 - -
Phenolic Film 12 mm Lbr 0.0480 - -
Minyak Bekisting Ltr 0.2000 - -
Paku Campur 5 - 10 cm Kg 0.0460 - -
Dynabolt M12 x 129 Bh 0.6930 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.8. Pemasangan dan Membuka Cetakan 1 Buah Komponen Plat Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0530 - -
Tukang Kayu L.02 OH 0.0180 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.9. Pemasangan dan Membuka Cetakan 1 Buah Komponen Balok Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0890 - -
Tukang Kayu L.02 OH 0.0300 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.10. Pemasangan dan Membuka Cetakan 1 Buah Komponen Kolom Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0710 - -
Tukang Kayu L.02 OH 0.0240 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.4. Pembuatan 1m² Pintu Besi Plat Baja Tebal 2mm Rangkap, Rangka Baja Siku
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 - -
Tukang Las L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0520 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Siku 30.30.3 mm Kg 15.0000 - -
Besi Plat Baja 2 mm Kg 32.8000 - -
Kawat Las Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.19. Pemasangan 1m Talang 1/2 Lingkaran D-15cm, Seng Plat BJLS 30 Lebar 45cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng plat BJLS 30 Lebar 45cm M 1.0500 - -
Paku Campur 1 - 5 cm Kg 0.1000 - -
Besi Strip 20X3mm Kg 0.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.20. Pemasangan 1m² Rangka Besi Hollow Galvanis 40.40mm, Modul 60 x 120 cm, untuk Partisi
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Besi L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Hollow Galvanis 40x20x1,7 mm M 3.5000 - -
Assesoris Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.21. Pemasangan 1m² Rangka Besi Hollow Galvanis 40.40mm, Modul 60 x 60 cm, untuk Plafond
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Besi L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Hollow Galvanis 40x20x1,7 mm M 4.0000 - -
Assesoris Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.22. Pemasangan 1m² Atap Plana Rangka Baja Ringan (Canai Dingin) Profil C75
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 - -
Tukang Besi L.02 OH 0.7340 - -
Kepala Tukang L.03 OH 0.0730 - -
Mandor L.04 OH 0.0370 - -
JUMLAH TENAGA KERJA -
B BAHAN
Baja Ringan Canai Dingin C75 Btg 0.8730 - -
Assesoris Ls 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.2.1.23. Pemasangan 1m² Atap Jurai/Limasan Rangka Baja Ringan (Canai Dingin) Profil C75
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7604 - -
Tukang Besi L.02 OH 0.7604 - -
Kepala Tukang L.03 OH 0.0760 - -
Mandor L.04 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Baja Ringan Canai Dingin C75 Btg 0.8730 - -
Assesoris Ls 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.1. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 2PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 43.5000 - -
Pasir Pasang M³ 0.0800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.2. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 3PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 32.9500 - -
Pasir Pasang M³ 0.0910 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.3. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 4PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 26.5500 - -
Pasir Pasang M³ 0.9300 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.4. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 5PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 22.2000 - -
Pasir Pasang M³ 0.1020 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.5. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 6PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 18.5000 - -
Pasir Pasang M³ 0.1220 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.7. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 2PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 18.9500 - -
Pasir Pasang M³ 0.0380 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.8. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 3PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 14.3700 - -
Pasir Pasang M³ 0.0400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.9. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 4PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 11.5000 - -
Pasir Pasang M³ 0.0430 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.10. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 5PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 9.6800 - -
Pasir Pasang M³ 0.0450 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.11. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 6PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 8.3200 - -
Pasir Pasang M³ 0.0490 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.22. Pemasangan 1m² Dinding Terawang (Rooster) 12x11x24cm Campuran 1PS : 3PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Rooster 12x11x24cm Bh 30.0000 - -
Semen Portland Kg 11.0000 - -
Pasir Pasang M³ 0.0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.23. Pemasangan 1m² Dinding Terawang (Rooster) 12x11x24cm Campuran 1PS : 4PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Rooster 12x11x24cm Bh 30.0000 - -
Semen Portland Kg 11.0000 - -
Pasir Pasang M³ 0.0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.24. Pemasangan 1m² Dinding Bata Berongga Ekspose 12x11x24 campuran 1PS : 3PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Berongga 12x11x24cm Bh 70.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang M³ 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.25. Pemasangan 1m² Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.4700 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.26. Pemasangan 1m² Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 - -
Tukang Batu L.02 OH 1.3000 - -
Kepala Tukang L.03 OH 0.1300 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.4700 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.1.26. Pemasangan 1m² Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6710 - -
Tukang Batu L.02 OH 1.3000 - -
Kepala Tukang L.03 OH 0.1300 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.6300 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.2.9. Pemasangan 1m² Plesteran Campuran 1SP : 1/2KP : 3PP Tebal 15mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 5.7600 - -
Kerikil/agregat M³ 0.0030 - -
Pasir Pasang M³ 0.0130 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.2.10. Pemasangan 1m² Plesteran Campuran 1SP : 2KP : 3PP Tebal 15mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.0000 - -
Kerikil/agregat M³ 0.0050 - -
Pasir Pasang M³ 0.0200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.2.26. Pemasangan 1m² Finishing Siar Pasangan Batu Kali, Campuran 1SP : 2PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 6.3400 - -
Pasir Pasang M³ 0.0120 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.3.31. Pemasangan 1m² Lantai Lantai Teraso Cor di Tempat, Tebal 3cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1800 - -
Kepala Tukang L.03 OH 0.0180 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Teraso Cor Instan M³ 0.0360 - -
Semen Warna Kg 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.1.1. Pemasangan 1m² Langit-Langit Serat Semen, Tebal 4mm, 5mm, dan 6mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan Serat Semen M² 1.1000 - -
Paku Tripleks Kg 0.0100 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.1.5. Pemasangan 1m² Langit-Langit Plywood, Tebal 3mm, 4mm, dan 6mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plywood 3mm Lbr 1.1000 - -
Paku Tripleks Kg 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.1.7. Pemasangan 1m² Langit-Langit Gypsum Board Ukuran (120 x 240 x 9)mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Gypsum Board 120 x 240 x 9 mm Lbr 0.3640 - -
Paku Sekrup Bh 0.1100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.1.12. Pemasangan 1m² Langit-Langit Akustik Ukuran 60 x 120 cm Berikut Rangka Aluminium
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Besi L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Aluminium M 3.6000 - -
Kawat Ø4 mm Kg 0.1500 - -
Ramset Bh 1.0500 - -
Plafond Akustik 60 x 120 cm Lbr 1.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.12. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 300 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 300 x 0,5 cm Lbr 0.3500 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.15. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 240 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 240 x 0,5 cm Lbr 0.4400 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.17. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 210 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 210 x 0,5 cm Lbr 0.5100 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.18. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 150 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 150 x 0,5 cm Lbr 0.8000 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.19. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 300 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 300 x 0,6 cm Lbr 0.3500 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.20. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 270 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 270 x 0,6 cm Lbr 0.3800 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.21. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 240 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 240 x 0,6 cm Lbr 0.4600 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.22. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 210 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 210 x 0,6 cm Lbr 0.4900 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.23. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 180 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 180 x 0,6 cm Lbr 0.5700 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.45. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 270 x 0,4cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 270 x 0,4 cm Lbr 0.4200 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.1. Pembuatan dan Pemasangan 1m³ Kusen Pintu dan Kusen jendela, Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 - -
Tukang Kayu L.02 OH 21.0000 - -
Kepala Tukang L.03 OH 2.1000 - -
Mandor L.04 OH 0.3500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas I M³ 1.1000 - -
Paku Campur 8 - 12 cm Kg 1.2500 - -
Lem Kayu Kg 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.2. Pembuatan dan Pemasangan 1m³ Kusen Pintu dan Kusen jendela, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 - -
Tukang Kayu L.02 OH 18.0000 - -
Kepala Tukang L.03 OH 1.8000 - -
Mandor L.04 OH 0.3000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 1.2000 - -
Paku Campur 8 - 12 cm Kg 1.2500 - -
Lem Kayu Kg 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.3. Pembuatan dan Pemasangan 1m² Pintu Klamp Standar, Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Kayu L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas II M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.4. Pembuatan dan Pemasangan 1m² Pintu Klamp Standar, Kayu Kelas III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Kayu L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.6. Pembuatan 1m² Pintu dan Jendela Kaca, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0240 - -
Lem Kayu Kg 0.3000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.7. Pembuatan 1m² Pintu dan Jendela Jalusi, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 3.0000 - -
Kepala Tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0640 - -
Lem Kayu Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.8. Pembuatan 1m² Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup (Lebar sampai 90cm)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Kayu L.02 OH 2.1000 - -
Kepala Tukang L.03 OH 0.2100 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas II M³ 0.0250 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.5000 - -
Plywood 4mm Lbr 0.6700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.9. Pembuatan 1m² Daun Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0256 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.5000 - -
Plywood 4mm Lbr 0.6700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.10. Pembuatan dan Pemasangan 1m² Jalusi Kusen, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 - -
Tukang Kayu L.02 OH 2.0000 - -
Kepala Tukang L.03 OH 0.2000 - -
Mandor L.04 OH 0.3350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0600 - -
Paku Campur 1 - 5 cm Kg 0.1500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.12. Pembuatan 1m² Pintu Taekwood Rangkap Lapis Formika/HPL,Rangka Expose Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8500 - -
Tukang Kayu L.02 OH 2.5500 - -
Kepala Tukang L.03 OH 0.2550 - -
Mandor L.04 OH 0.0430 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0250 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.8000 - -
Taekwood 4mm Lbr 0.6700 - -
Formika/HPL Lbr 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.13. Pemasngan 1m³ Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III Bentang Sampai dengan 6m
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 - -
Tukang Kayu L.02 OH 12.0000 - -
Kepala Tukang L.03 OH 1.2000 - -
Mandor L.04 OH 0.2000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas I M³ 1.1000 - -
Besi Strip 20X5mm Kg 15.0000 - -
Paku Campur 8 - 12 cm Kg 5.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.19. Pemasangan 1m² Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0154 - -
Paku Campur 5 - 10 cm Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.20. Pemasangan 1m² Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0163 - -
Paku Campur 5 - 10 cm Kg 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.23. Pemasangan 1m² Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0280 - -
Paku Campur 5 - 10 cm Kg 0.1500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.27. Pemasangan 1m² Dinding Lambrisering dari Plywood Ukuran (120 x 240) cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Kayu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plywood 4mm Lbr 0.4000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.6.1.28. Pemasangan 1m² Dinding Bilik, Rangka Kayu Kelas III atau IV
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bilik Bambu M² 1.5000 - -
Balok Kayu Kelas III M³ 0.0140 - -
Paku Campur 1 - 5 cm Kg 0.0120 - -
Papan kayu Kelas III M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.4. 1m² Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.0090 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Kayu Kg 0.2000 - -
Plamur Kg 0.1500 - -
Cat Dasar (Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.2600 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0300 - -
Ampelas Lbr 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.5. 1m² Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.1050 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Kayu Kg 0.2000 - -
Plamur Kg 0.1500 - -
Cat Dasar (Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.3500 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0300 - -
Ampelas Lbr 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.8. Pelaburan 1m² Bidang Kayu dengan Cat Resitu atau Ter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Residu Ltr 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.10. Pengecatan 1m² Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamur Kg 0.1000 - -
Cat Dasar (Tembok) Kg 0.1000 - -
Cat Penutup (Tembok) Kg 0.2600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.11. Pengecatan 1m² Tembok Baru (, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 - -
Tukang Cat L.02 OH 0.0420 - -
Kepala Tukang L.03 OH 0.0042 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Dasar (Tembok) Kg 0.1200 - -
Cat Penutup (Tembok) Kg 0.1800 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.17. Pengecatan 1m² Permukaan Baja dengan Menie Besi Dengan Perancah
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Cat L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0225 - -
Mandor L.04 OH 0.0075 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Besi Kg 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
Kuas Bh 0.0100 - -
Balok Kayu Kelas III M³ 0.0020 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.19. Pengecatan 1m² Permukaan Baja Galvanis Secara Manual Sistem 1 Lapis Cat Mutakhir
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Cat L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Penutup (kayu/Besi) Kg 0.3000 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.20. Pengecatan 1m² Permukaan Baja Galvanis Secara Manual Sistem 3 Lapis
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Cat L.02 OH 0.8000 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Dasar (Kayu/Besi) Kg 0.1100 - -
Cat Antara (Cat Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.0800 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.7.1.22. Pengecatan 1m² Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Mutakhir
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Cat L.02 OH 0.7000 - -
Kepala Tukang L.03 OH 0.0700 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Penutup (kayu/Besi) Kg 0.3000 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.16. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30 x 30 cm tinggi 35cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1600 - -
Tukang Batu L.02 OH 0.7200 - -
Kepala Tukang L.03 OH 0.0720 - -
Mandor L.04 OH 0.0110 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 40.0000 - -
Semen Portland Kg 44.0000 - -
Pasir Pasang M³ 0.0700 - -
Pasir Beton M³ 0.0600 - -
Kerikil/agregat M³ 0.0700 - -
Besi Beton Polos Kg 1.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.17. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 45 x 45 cm tinggi 50cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 - -
Tukang Batu L.02 OH 1.1500 - -
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 77.0000 - -
Pasir Pasang M³ 0.1300 - -
Pasir Beton M³ 0.0900 - -
Kerikil/agregat M³ 0.0200 - -
Besi Beton Polos Kg 2.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.18. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60 x 60 cm tinggi 65cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 - -
Tukang Batu L.02 OH 1.1500 - -
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 123.0000 - -
Semen Portland Kg 114.0000 - -
Pasir Pasang M³ 0.1840 - -
Pasir Beton M³ 0.1200 - -
Kerikil/agregat M³ 0.0330 - -
Besi Beton Polos Kg 4.8500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.37. Pemasangan 1m Pipa Air Limbah Jenis Pipa Tanah Diameter 20cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 - -
Tukang Batu L.02 OH 0.0400 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 8" M 1.6000 - -
Semen Portland Kg 35.0000 - -
Pasir Pasang M³ 0.0140 - -
Pasir Urug M³ 0.0140 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.38. Pemasangan 1m Pipa Air Limbah Jenis Pipa Tanah Diameter 15cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Batu L.02 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 6" M 1.6000 - -
Semen Portland Kg 0.9300 - -
Pasir Pasang M³ 0.0130 - -
Pasir Urug M³ 0.0110 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
0
Dibuat Oleh :
?
?
?
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI
Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?
HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME JUMLAH (Rp.)
(Rp.)
1 2 3 4 5 6 7 =(5 x 6)
I PEKERJAAN PERSIAPAN
1 Pekerjaan Bongkaran Ls 1.00 1,500,000.00 1,500,000.00
2 Persiapan / Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
3 Pengukuran dan Pemasangan Bowplank Ls 1.00 500,000.00 500,000.00
4 Papan Nama Proyek Ls 1.00 200,000.00 200,000.00
5 Administrasi, Dokumentasi dan P3K Ls 1.00 700,000.00 700,000.00
Sub Total ( I ) 2,400,000.00
II PEKERJAAN TANAH DAN PASIR
1 #NAME? Pek. Galian Tanah Pondasi Pagar M3 8.39 #NAME? #NAME?
2 #NAME? Urugan Tanah Kembali Galian Pondasi Pagar M3 2.80 #NAME? #NAME?
3 #NAME? Pek. Galian Tanah Pondasi Taman M3 1.68 #NAME? #NAME?
4 #NAME? Urugan Tanah Kembali Galian Pondasi Taman M3 0.56 #NAME? #NAME?
5 #NAME? Pek. Galian Tanah Papan Nama M3 1.05 #NAME? #NAME?
6 #NAME? Urugan Tanah Kembali Papan Nama M3 0.35 #NAME? #NAME?
7 #NAME? Urugan Pasir Bawah Pondasi Pagar M3 0.63 #NAME? #NAME?
8 #NAME? Urugan Pasir Bawah Jalur Pejalan Kaki M3 1.07 #NAME? #NAME?
8 #NAME? Urugan Pasir Bawah Pondasi Papan Nama M3 0.21 #NAME? #NAME?
10 #NAME? Urugan Tanah Urugan Tanah Biasa M3 16.84 #NAME? #NAME?
Sub Total ( II ) #NAME?
III PEKERJAAN PONDASI
1 #NAME? Pas. Batu Kosong M3 1.87 #NAME? #NAME?
1 #NAME? Pas. Pondasi Batu Gunung Pagar M3 3.38 #NAME? #NAME?
1 #NAME? Pas. Batu Gunung Taman M3 7.09 #NAME? #NAME?
1 #NAME? Pas. Batu Gunung Papan Nama M3 2.97 #NAME? #NAME?
Sub Total ( III ) #NAME?
IV PEKERJAAN PAGAR DAN PAPAN NAMA KANTOR
1 #NAME? Pek. Rabat Beton M3 1.11 #NAME? #NAME?
2 Pek. Kolom 40/40, camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #NAME?
#NAME? Besi Tulangan Kg #REF! #NAME? #NAME?
#NAME? Bekisting M2 #REF! #NAME? #NAME?
2 #NAME? Pek. Kolom praktis Papan Nama M 2.25 #NAME? #NAME?
1 Pek. Sloof Pagar dan Papan Nama 15/15 Camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #NAME?
#NAME? Pembesian Kg #REF! #NAME? #NAME?
#NAME? Bekisting M2 #REF! #NAME? #NAME?
3 Pek. Balok Pagar dan Papan Nama10/15, Camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #REF!
#NAME? Besi Tulangan Kg #REF! #NAME? #REF!
#NAME? Bekisting M2 #REF! #NAME? #REF!
6 #NAME? Pas. Dinding Bata Pagar M2 15.73 #NAME? #NAME?
6 #NAME? Pas. Dinding Bata Papan Nama M2 3.69 #NAME? #NAME?
7 #NAME? Pek. Plasteran Pondasi, Pagar, dan Papan Nama M2 77.65 #NAME? #NAME?
7 #NAME? Pek. Plasteran Penebalan Kolom Pagar M2 17.60 #NAME? #NAME?
1 #NAME? Pembuatan Topi Kolom Beton M3 0.20 #NAME? #NAME?
8 #NAME? Pek. Acian M2 73.08 #NAME? #NAME?
9 #NAME? Pengecatan Tembok Baru M2 73.08 #NAME? #NAME?
HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME JUMLAH (Rp.)
(Rp.)
1 2 3 4 5 6 7 =(5 x 6)
#NAME? Pas. Dinding Batu Alam 15x30cm M2 11.80 #NAME? #NAME?
#NAME? Pek. Railing Pagar M2 17.15 #NAME? #NAME?
#NAME? Pengecatan Railing Pagar M2 28.48 #NAME? #NAME?
18 Tambahan Pas. Huruf Akrilik "PEMERINTAH KOTA BAUBAU" t=15cm CM 300.00 20,000.00 6,000,000.00
19 Tambahan Pas. Huruf Akrilik "DINAS PERIKANAN" t=27cm CM 378.00 20,000.00 7,560,000.00
19 Tambahan Pas. Huruf Akrilik "JALAN WAODE WAU NOMOR 65 93721 04022 CM 360.00 20,000.00 7,200,000.00
19 Tambahan Pas. Akrilik LOGO KITA BAUBAU t=75cm CM 75.00 20,000.00 1,500,000.00
, Sub Total ( IV ) #REF!
Dibuat Oleh :
?
?
Kepala Dinas Perhubungan ?
Kota Baubau
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI
REKAPITULASI
Pekerjaan :?
Lokasi :?
Volume :? 187
T. Anggaran :? 6
193
1 2 3
### #NAME?
I PEKERJAAN PERSIAPAN Rp 2,400,000.00
TERBILANG : #NAME?
? ?
? ?
Mengetahui/Menyetujui :
PELAKSANA TUGAS KADIS LINGKUNGAN HIDUP
KOTA BAUBAU
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK)
PEKERJAAN :
Pembangunan Pusat Informasi TIC di Wisata Permadian Kaburaburana
LOKASI
Desa Lawela Kec. Batauga
KONSULTAN PERENCANA
TAHUN ANGGARAN
2019