DAFTAR HARGA SATUAN BAHAN & UPAH KERJA

-
Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?

No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
HARGA SATUAN UPAH
1 Kepala Tukang OH -
2 Mandor OH -
3 Operator Crane OH -
4 Pekerja OH -
4 Pembantu Operator Crane OH -
4 Tukang Alluminium OH -
5 Tukang Batu OH -
5 Tukang Ereksi OH -
6 Tukang Kayu OH -
6 Tukang Besi OH -
6 Tukang Besi Konstruksi OH -
7 Tukang Vibrator OH -
7 Tukang Las OH -
8 Tukang Cat OH -
8 OH -
9 OH -
9 OH -
10 OH -
BAHAN MATERIAL
1 Air Ltr -
1 Alang-alang Ikat -
1 Aluminium Foil M² -
1 Aluminium Strip Lebar 8cm M -
1 Ampelas Lbr -
1 Atap Serat Semen gel. 92 x 180 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 200 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 225 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 92 x 250 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 150 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 210 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 240 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 105 x 270 x 0,4 cm Lbr -
1 Atap Serat Semen gel. 105 x 300 x 0,5 cm Lbr -
1 Atap Serat Semen gel. 108 x 180 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 210 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 240 x 0,6 cm Lbr -
1 Atap Serat Semen gel. 108 x 270 x 0,6 cm Lbr -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Atap Serat Semen gel. 108 x 300 x 0,6 cm Lbr -
1 Atap Sirap Kayu Bh -
1 Atap Spandek 95 x 180cm Lbr -
2 Baja Ringan Canai Dingin C75 Btg -
1 Bak Cuci Piring Stainlessteel Unit -
1 Bak Cuci Piring Teraso Unit -
1 Bak Mandi Fiberglass Vol. 0,30 m³ Unit -
1 Bak Mandi Fiberglass Vol. 1 m³ Unit -
1 Bak Mandi Teraso Vol. 0,30 m³ Unit -
1 Bambu ᴓ6-8 Btg -
1 Bata Merah Biasa Bh -
1 Bata Merah Jumbo Bh -
2 Bata Berongga 12x11x24cm Bh -
2 Bata Pelapis (ekposes) 3 x 7 x 24 cm Bh -
3 Bata Ringan Tebal 7,5 cm Bh -
4 Bata Ringan Tebal 10 cm Bh -
1 Bata Rooster 12x11x24cm Bh -
1 Bathtub Porselen Unit -
1 Batu Gunung M³ -
1 Batu Paras M² -
1 Batu Screening M³ -
1 Batu Tempel Hitam M² -
1 Besi Angker Kg -
1 Besi Baja IWF Kg -
1 Besi Baja Profil Kg -
1 Besi Beton Polos Kg -
1 Besi Beton Ulir Kg -
1 Besi Hollow 20X20X1,2 mm M -
1 Besi Hollow 40x20x0,3 mm M -
1 Besi Hollow 40x20x0,4 mm M -
1 Besi Hollow 40x20x1 mm M -
1 Besi Hollow 40x20x1,2 mm M -
1 Besi Hollow 40x40x0,25 mm M -
1 Besi Hollow 40x40x0,4 mm M -
1 Besi Hollow 40x40x1 mm M -
1 Besi Hollow 40x40x1,2 mm M -
1 Besi Hollow 40x40x1,7 mm M -
1 Besi Hollow 40x40x1,8 mm M -
1 Besi Hollow 50x50x1,2 mm M -
1 Besi Hollow 60x40x1,2 mm M -
1 Besi Hollow 60x40x1,7 mm M -
1 Besi Hollow 60x60x1,7 mm M -
1 Besi Hollow 80x40x1,2 mm M -
1 Besi Hollow 100x50x1,2 mm M -
1 Besi Hollow Galvanis 20x20x1,1 mm M -
1 Besi Hollow Galvanis 20x20x1,5 mm M -
1 Besi Hollow Galvanis 20x20x1,7 mm M -
1 Besi Hollow Galvanis 30x15x1,1 mm M -
1 Besi Hollow Galvanis 30x15x1,5 mm M -
1 Besi Hollow Galvanis 30x30x1,1 mm M -
1 Besi Hollow Galvanis 30x30x1,5 mm M -
1 Besi Hollow Galvanis 30x30x1,7 mm M -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Besi Hollow Galvanis 40x20x1,5 mm M -
1 Besi Hollow Galvanis 40x20x1,7 mm M -
1 Besi Hollow Galvanis 40x40x1,5 mm M -
1 Besi Hollow Galvanis 40x40x1,7 mm M -
1 Besi Hollow Galvanis 50x50x1,8 mm M -
1 Besi Hollow Galvanis 60x30x1,8 mm M -
1 Besi Hollow Galvanis 60x40x1,8 mm M -
1 Besi Hollow Galvanis 100x50x2,7 mm M -
1 Besi Lis Kaca 2mm M -
1 Besi Lis Kaca 3mm M -
1 Besi Lis Kaca 4mm M -
1 Besi Lis Kaca 5mm M -
1 Besi Plat Baja 2 mm Kg -
1 Besi Siku 30.30.3 mm Kg -
1 Besi Strip 20X3mm Kg -
1 Besi Strip 20X4mm Kg -
1 Besi Strip 20X5mm Kg -
1 Besi Strip 25X3mm Kg -
1 Besi Strip 25X4mm Kg -
1 Besi Strip 25X5mm Kg -
1 Besi Strip 30X3mm Kg -
1 Besi Strip 30X4mm Kg -
1 Besi Strip 30X5mm Kg -
1 Besi Wiremesh M6-M8 M -
1 Bilik Bambu M² -
1 Bubung Genteng Kodok Bh -
1 Bubung Genteng Palentong Besar Bh -
1 Bubung Genteng Palenting Kecil Bh -
1 Bubung Paten 92 cm Bh -
1 Bubung Paten 105 cm Bh -
1 Bubung Paten 108 cm Bh -
1 Bubung Stel Gelombang 92 cm Bh -
1 Bubung Stel Gelombang 105 cm Bh -
1 Bubung Stel Gelombang 108 cm Bh -
1 Bubung Stel Rata 92 cm Bh -
1 Bubung Stel Rata 105 cm Bh -
1 Cat Antara (Cat Kayu/Besi) Kg -
1 Cat Dasar (Kayu/Besi) Kg -
1 Cat Dasar (Tembok) Kg -
1 Cat Menie Besi Kg -
1 Cat Menie Kayu Kg -
1 Cat Penutup (kayu/Besi) Kg -
1 Cat Penutup (Tembok) Kg -
1 Cat Residu Ltr -
1 Closet Duduk Unit -
1 Closet Jongkok Porselen Unit -
1 Closet Jongkok Teraso Unit -
1 Conblock HB10 Bh -
1 Conblock HB15 Bh -
1 Conblock HB20 Bh -
1 Dempul Kg -
1 Dolken ᴓ8-10 Btg -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Door Closer Set -
1 Door Holder Bh -
1 Door Stop Bh -
1 Dynabolt M8 x 40 Bh -
1 Dynabolt M8 x 65 Bh -
1 Dynabolt M8 x 85 Bh -
1 Dynabolt M10 x 50 Bh -
1 Dynabolt M10 x 65 Bh -
1 Dynabolt M10 x 77 Bh -
1 Dynabolt M10 x 97 Bh -
1 Dynabolt M12 x 75 Bh -
1 Dynabolt M12 x 99 Bh -
1 Dynabolt M12 x 129 Bh -
1 Engsel Angin Bh -
1 Engsel Jendela Kupu-kupu Bh -
1 Engsel Pintu Bh -
1 Fitting Lampu Bh -
1 Floor Drain Bh -
1 Floor Harderner Kg -
1 Fording Door Plastik/PVC M² -
1 Formika/HPL Lbr -
1 Genteng Aspal 80 x 120cm Bh -
1 Genteng Beton Bh -
1 Genteng Kodok Bh -
1 Genteng Metal 80 x 100cm Bh -
1 Genteng Palentong Kecil Bh -
1 Genteng Palentong Besar Bh -
1 Gypsum Board 120 x 240 x 9 mm Lbr -
1 Ijuk Kg -
1 Jendela Nako 7 daun Bh -
1 Jendela Nako (Rangka + Kaca 5mm, Lebar 15cm) M² -
1 Kabel m -
1 Kaca Buram 12mm M² -
1 Kaca Cermin 5mm M² -
1 Kaca Cermin 8mm M² -
1 Kaca Patri 5mm M² -
1 Kaca Polos 2mm M² -
1 Kaca Polos 3mm M² -
1 Kaca Polos 5mm M² -
1 Kaca Polos 8mm M² -
1 Kaca Wireglassed 5mm M² -
1 Kait Angin Bh -
1 Kalkarium Kg -
1 Kapur Padam M³ -
1 Kapur Sirih Kg -
1 Kayu Kelas I
Papan kayu Kelas I M³ -
Balok Kayu Kelas I M³ -
3 Kayu Kelas II
Papan kayu Kelas II M³ -
Balok Kayu Kelas II M³ -
3 Kayu Kelas III
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
Papan kayu Kelas III M³ -
Balok Kayu Kelas III M³ -
1 Kawat Ø4 mm Kg -
1 Kawat Beton Kg -
1 Kawat Duri M -
1 Kawat Las Kg -
2 Kawat Nyamuk M² -
2 Keramik Artistik 5 x 20 cm Bh -
2 Keramik Artistik 10 x 10 cm Bh -
2 Keramik Artistik 10 x 20 cm Bh -
2 Keramik Mozaik 30 x 30 cm Bh -
2 Keramik 10 x 20 cm Bh -
2 Keramik 10 x 33 cm Bh -
2 Keramik 33 x 33 cm Dos -
2 Keramik 20 x 20 cm Dos -
2 Keramik 30 x 30 cm Dos -
2 Keramik Porselen 11 x 11 cm Bh -
2 Keramik Porselen 11 x 11 cm Dos -
2 Keramik Porselen 10 x 20 cm Bh -
2 Keramik Porselen 20 x 20 cm Bh -
4 Kerikil/agregat M³ -
1 Klem Kabel Biasa Bh -
1 Kolom Beton Pracetak 220 Btg -
1 Kran Air 1/2" Bh -
1 Kran Air 3/4" Bh -
1 Kuas Bh -
1 Kunci Lemari Set -
1 Kunci Silinder Bh -
1 Kunci Slot (Grendel) Bh -
1 Kunci Tanam 2 Slag Bh -
1 Kunci Tanam Antik Bh -
1 Kunci Tanam Biasa Bh -
1 Kunci Tanam KM Bh -
2 L Bow Bh -
2 Lantai Karpet M² -
2 Las Dop Bh -
2 Lem Karet Kg -
2 Lem Kayu Kg -
2 List Kayu Profil M -
2 Marmer 100 x 100 cm Bh -
2 MCB Bh -
2 MCCB (Box MCB) Bh -
2 Melamic Kg -
1 Minyak Bekisting Ltr -
1 Minyak Pelumas Ltr -
2 Mongkok Bh -
2 Mortar Siap Pakai Kg -
1 Nok Spandek Bh -
1 Nok Genteng Aspal Bh -
1 Nok Genteng Beton Bh -
1 Nok Genteng Metal Panjang 100cm Bh -
1 Pagar BRC M² -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Papan Serat Semen M² -
4 Paku 12cm Bh -
4 Paku Campur 1/2 - 1cm Kg -
4 Paku Campur 1 - 5 cm Kg -
5 Paku Campur 5 - 10 cm Kg -
6 Paku Campur 8 - 12 cm Kg -
6 Paku Pancing 6 x 23 Kg -
7 Paku Sekrup Bh -
7 Paku Sekrup 10cm Kg -
7 Paku Tripleks Kg -
1 Panel Beton Pracetak 240x40x5 Lbr -
1 Panel Beton Pracetak 240x50x5 Lbr -
4 Parquet Gymfloor M² -
4 Parquet Kayu M² -
4 Pasir Beton M³ -
5 Pasir Pasang M³ -
1 Pasir Urug M³ -
1 Paving Block Natural Tebal 6 cm M² -
1 Paving Block Natural Tebal 8 cm M² -
1 Paving Block Berwarna Tebal 6 cm M² -
1 Paving Block Berwarna Tebal 8 cm M² -
1 Pengencer Cat Ltr -
1 Phenolic Film 12 mm Lbr -
1 Pipa Galvanis 1/2" M -
1 Pipa Galvanis 3/4" M -
1 Pipa Galvanis 1" M -
1 Pipa Galvanis 1 1/2" M -
1 Pipa Galvanis 3" M -
1 Pipa Galvanis 4" M -
1 Pipa Listrik 5/8" Btg -
1 Pipa PVC AW 1/2" M -
1 Pipa PVC AW 3/4" M -
1 Pipa PVC AW 1" M -
1 Pipa PVC AW 1 1/2" M -
1 Pipa PVC AW 2" M -
1 Pipa PVC AW 2 1/2" M -
1 Pipa PVC AW 3" M -
1 Pipa PVC AW 4" M -
1 Pipa PVC AW 6" M -
1 Pipa PVC AW 8" M -
1 Plafond Akustik 30 x 30 cm Lbr -
1 Plafond Akustik 30 x 60 cm Lbr -
1 Plafond Akustik 60 x 120 cm Lbr -
1 Plamur Kg -
1 Plastik Aerator Bh -
1 Plint Internal Cove 5 x 5 x 20 cm Bh -
1 Plint Keramik 10 x 10 cm Bh -
1 Plint Keramik 10 x 20 cm Bh -
1 Plint Ubin PC 15 x 20 cm Bh -
1 Plint Ubin PC 10 x 30 cm Bh -
1 Plint Ubin PC 10 x 40 cm Bh -
1 Plint Ubin Warna 10 x 20 cm Bh -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Plint Ubin Warna 10 x 30 cm Bh -
1 Plint Ubin Warna 10 x 40 cm Bh -
1 Plint Ubin Teraso 10 x 30 cm Bh -
1 Plint Ubin Teraso 10 x 40 cm Bh -
1 Plint Ubin Granit 10 x 30 cm Bh -
1 Plint Ubin Granit 10 x 40 cm Bh -
1 Plint Ubin Teralux Kerang 10 x 30 cm Bh -
1 Plint Ubin Teralux Kerang 10 x 40 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 30 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 40 cm Bh -
1 Plint Ubin Teralux Marmer 10 x 60 cm Bh -
1 Plywood 3mm Lbr -
2 Plywood 4mm Lbr -
2 Plywood 5mm Lbr -
3 Plywood 6mm Lbr -
3 Plywood 9mm Lbr -
4 Plywood 12mm Lbr -
5 Politur Ltr -
5 Politur Jadi Ltr -
5 Profil Aluminium M -
6 Profil Aluminium (lis Kaca) M -
4 Ramset Bh -
4 Rel Pintu Dorong Set -
4 Residu Ltr -
4 Rolling Door Aluminium M² -
4 Rolling Door Besi M² -
4 Rooflight fiberglass 90 x 180 cm Lbr -
4 Sabun Cuci Kg -
4 Saklar Tunggal Bh -
4 Saklar Ganda Bh -
4 Saklar Triple Bh -
4 Sanding Kg -
4 Sealant Tube -
4 Sealtape Bh -
5 Sekrup Fixer Bh -
4 Semen Grout Kg -
4 Semen Portland Kg -
5 Semen Warna Kg -
1 Seng Gelombang BJLS 0,2 mm Lbr -
1 Seng plat Lbr -
2 Seng plat BJLS 28 Lebar 90cm M -
3 Seng plat BJLS 30 Lebar 45cm M -
4 Serbuk Batu Granit Kg -
5 Serbuk Batu Traso Kg -
1 Sirtu M³ -
1 Soda Api Kg -
1 Solar Industri Ltr -
1 Spacer Bekisting Bh -
1 Spring Knip Bh -
1 Strorox 100 Kg -
2 Sunscreen Aluminium M² -
1 T Dus Bh -
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4
1 Taekwood 3mm Lbr -
2 Taekwood 4mm Lbr -
2 Taekwood 5mm Lbr -
3 Taekwood 6mm Lbr -
3 Taekwood 9mm Lbr -
4 Taekwood 12mm Lbr -
1 Tali Ijuk M -
1 Tanah Liat M³ -
1 Teak Oil Ltr -
1 Teraso Cor Instan M³ -
1 Thinner Ltr -
2 Tirai (Vebetions Blinds/Vertical Blinds) M² -
2 Ubin Abu-Abu 20 x 20 cm Bh -
2 Ubin Abu-Abu 30 x 30 cm Bh -
2 Ubin Abu-Abu 40 x 40 cm Bh -
2 Ubin Granit 40 x 40 cm Bh -
2 Ubin Granit 30 x 30 cm Bh -
2 Ubin Teralux 40 x 40 cm Bh -
2 Ubin Teralux 30 x 30 cm Bh -
2 Ubin Teralux Marmer 60 x 60 cm Bh -
2 Ubin Teralux Marmer 40 x 40 cm Bh -
2 Ubin Teralux Marmer 30 x 30 cm Bh -
2 Ubin Teraso 40 x 40 cm Bh -
2 Ubin Teraso 30 x 30 cm Bh -
3 Ubin Warna 20 x 20 cm Bh -
4 Ubin Warna 30 x 30 cm Bh -
5 Ubin Warna 40 x 40 cm Bh -
5 Underlayer Lantai M² -
5 Urinoir Unit -
2 Vernis Ltr -
2 Vynil 15 x 30 cm Bh -
2 Vynil 30 x 30 cm Bh -
1 Wallpaper Lebar 50 cm M -
1 Wastafel Unit -
1 Waterdrain Bh -
1 Waterstop Lebar 150 mm M -
2 Waterstop Lebar 200 mm M -
3 Waterstop Lebar 230-320 mm M -
3 Wood Filler Kg -
3 Woodstain Kg -
HARGA SEWA ALAT
1 Sewa Crane Hari -
2 Sewa Pipe Support Hari -
3 Sewa Scaffolding Hari -
4 Sewa Alat Las Jam -

0
Dibuat Oleh :
?
No JENIS BAHAN/UPAH SATUAN HARGA (Rp)

1 2 3 4

?
?
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI

ANALISA HARGA SATUAN PEKERJAN (AHS-P)


SNI 2016 DAN 2022

Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?

A.1.1.1.11. Pembuatan 1m² Streger/Perancah dari Bambu s.d. Tinggi 6 meter


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 2.0000 - -
Kepala Tukang L.03 OH 0.2000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bambu ᴓ6-8 Btg 1.2500 - -
Tali Ijuk M 2.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.1.1.1.15. Pemasangan 1m² Pagar BRC Galvanis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Besi L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pagar BRC M² 1.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.1.1.1.16. Pemasangan 1m² Panel Beton Pracetak 50x50x240cm untuk pagar


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3750 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0190 - -
JUMLAH TENAGA KERJA -
B BAHAN
Panel Beton Pracetak 240x40x5 Lbr 0.9860 - -
Kolom Beton Pracetak 220 Btg 0.5250 - -
Semen Portland Kg 45.0000 - -
Pasir Beton M³ 0.0740 - -
Kerikil/agregat M³ 0.1460 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.1.5.1.13. Pemasangan 1m² Lapisan Ijuk Tebal 10cm untuk Bidang Resapan Tangki Septik
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ijuk Kg 0.9860 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.1. (K3) Pembuatan 1m² pagar sementara dari kayu tinggi 2 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 0.1200 - -
Semen Portland Kg 5.0000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Balok Kayu Kelas III M³ 0.0720 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
Residu Ltr 0.4000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.2. (K3) Pembuatan 1m² pagar sementara dari seng gelombang tinggi 2 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.4000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.2500 - -
Semen Portland Kg 2.5000 - -
Seng Gelombang BJLS 0,2 mm Lbr 1.2000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Balok Kayu Kelas III M³ 0.0720 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
Err:509 ### 0.4500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.3. (K3) Pembuatan 1m² pagar sementara dari skawat duri tinggi 1,8 meter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.0000 - -
Semen Portland Kg 2.0000 - -
Kawat Duri M 25.0000 - -
Pasir Beton M³ 0.0050 - -
Kerikil/agregat M³ 0.0090 - -
Paku Campur 5 - 10 cm Kg 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.4. (K3) Pengukuran dan pemasangan 1m Bouwplank


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas III M³ 0.0120 - -
Papan kayu Kelas III M³ 0.0200 - -
Paku Campur 5 - 10 cm Kg 0.0070 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.5. (K3) Pembuatan 1m² kantor sementara lantai plasteran


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 - -
Tukang Kayu L.02 OH 2.0000 - -
Tukang Batu L.02 OH 1.0000 - -
Kepala Tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.2500 - -
Balok Kayu Kelas II M³ 0.1800 - -
Paku Campur 5 - 10 cm Kg 0.0800 - -
Besi Strip 20X3mm Kg 1.1000 - -
Semen Portland Kg 35.0000 - -
Pasir Pasang M³ 0.1500 - -
Pasir Beton M³ 0.1000 - -
Kerikil/agregat M³ 0.1500 - -
Bata Merah Jumbo Bh 30.0000 - -
Seng plat Lbr 0.2500 - -
Jendela Nako 7 daun Bh 0.2000 - -
Kaca Polos 3mm M² 0.0800 - -
Kunci Tanam 2 Slag Bh 0.1500 - -
Plywood 5mm Lbr 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.6. (K3) Pembuatan 1m² rumah jaga (konstruksi kayu)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 1.5000 - -
Kepala Tukang L.03 OH 0.1500 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 3.0000 - -
Balok Kayu Kelas II M³ 0.2760 - -
Paku Campur 5 - 10 cm Kg 0.7000 - -
Seng Gelombang BJLS 0,2 mm Lbr 1.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.7. (K3) Pembuatan 1m² gudang semen dan peralatan


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 2.0000 - -
Kepala Tukang L.03 OH 0.2000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.7000 - -
Balok Kayu Kelas II M³ 0.2100 - -
Paku Campur 5 - 10 cm Kg 0.3000 - -
Semen Portland Kg 10.5000 - -
Pasir Beton M³ 0.0300 - -
Kerikil/agregat M³ 0.0500 - -
Seng Gelombang BJLS 0,2 mm Lbr 1.5000 - -
Seng plat Lbr 0.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.8. (K3) Pembuatan 1m² bedeng pekerja


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 2.0000 - -
Kepala Tukang L.03 OH 0.2000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken ᴓ8-10 Btg 1.2500 - -
Balok Kayu Kelas II M³ 0.1860 - -
Paku Campur 5 - 10 cm Kg 0.3000 - -
Semen Portland Kg 18.0000 - -
Pasir Beton M³ 0.0300 - -
Kerikil/agregat M³ 0.0500 - -
Seng Gelombang BJLS 0,2 mm Lbr 1.5000 - -
Plywood 5mm Lbr 1.3500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.9. (K3) Pembersihan 1m² lapangan dan perataan


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x 40cm x 25cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0360 - -
Balok Kayu Kelas III M³ 0.0140 - -
Paku Campur 5 - 10 cm Kg 0.0800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.12. Pembuatan 1m² jaln sementara


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 0.1500 - -
Kerikil/agregat M³ 0.0900 - -
Pasir Pasang M³ 0.0100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.13. Pembongkaran 1m³ beton bertulang


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 13.3340 - -
Mandor L.04 OH 0.6660 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.14. Pembongkaran 1m³ dinding tembok bata


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 - -
Mandor L.04 OH 0.3330 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.15. Pemasangan 1m² paagr kawat jaring galvanis panjang 240 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0420 - -
Tukang Besi L.02 OH 0.0040 - -
Kepala Tukang L.03 OH 0.0020 - -
Mandor L.04 OH 0.0420 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.2.1.16. Pemasangan 1m² panel beton pracetak 5x50x240 cm untuk pagar


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3750 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0190 - -
JUMLAH TENAGA KERJA -
B BAHAN
Panel Beton Pracetak 240x50x5 Lbr 0.9860 - -
Kolom Beton Pracetak 220 Btg 0.5250 - -
Semen Portland Kg 45.0000 - -
Pasir Beton M³ 0.0740 - -
Kerikil/agregat M³ 0.1460 - -
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.1. Menggali 1m³ tanah biasa sedalam 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.2. Menggali 1m³ tanah biasa sedalam 2 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.3. Menggali 1m³ tanah biasa sedalam 3 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 - -
Mandor L.04 OH 0.0670 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.4. Menggali 1m³ tanah keras sedalam 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Mandor L.04 OH 0.0320 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.5. Menggali 1m³ tanah cadas sedalam 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.6. Menggali 1m³ tanah lumpur sedalam 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.7. Pengerjaan stripping 1m³ tanah tebing setinggi 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.8. (K3) Pembuangan 1m³ tanah sejauh 30 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3300 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.9. Pengurugan kembali 1m³ galian tanah


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.10. (K3) Pemadatan tanah 1m³ tanah (per 20 cm)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.11. Pengurugan 1m³ dengan pasir urug


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pasir Urug M³ 1.2000 - -

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.12. Pemasangan 1m³ lapisan pudel campuran 1KP : 3PP :7TL


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 0.4000 - -
Kepala Tukang L.03 OH 0.0400 - -
Mandor L.04 OH 0.0800 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kapur Padam M³ 0.1350 - -
Pasir Pasang M³ 0.4000 - -
Tanah Liat M³ 0.9480 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.14. Pengurugan 1m³ sirtu padat


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sirtu M³ 1.2000 - -

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.1. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 3PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Semen Portland Kg 202.0000 - -
Pasir Pasang M³ 0.4850 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.2. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 4PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Semen Portland Kg 163.0000 - -
Pasir Pasang M³ 0.5200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.3. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 5PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Semen Portland Kg 136.0000 - -
Pasir Pasang M³ 0.5440 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.4. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 6PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Semen Portland Kg 117.0000 - -
Pasir Pasang M³ 0.5610 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.5. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 8PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Semen Portland Kg 91.0000 - -
Pasir Pasang M³ 0.5840 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.6. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 1KP : 2PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1700 - -
Semen Portland Kg 0.1700 - -
Pasir Pasang M³ 0.3400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.7. Pemasangan 1m³ pondasi batu Gunung campuran 1SP : 3KP : 10PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1470 - -
Semen Portland Kg 61.0000 - -
Pasir Pasang M³ 0.4920 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.8. Pemasangan 1m³ pondasi batu Gunung campuran 1/4SP : 1KP : 4PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Kapur Padam M³ 0.1310 - -
Semen Portland Kg 61.0000 - -
Pasir Pasang M³ 0.5230 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.9. Pemasangan 1m³ batu kosong (Aanstamping) untuk Pondasi Gedung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 - -
Tukang Batu L.02 OH 0.3900 - -
Kepala Tukang L.03 OH 0.0390 - -
Mandor L.04 OH 0.0390 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 1.2000 - -
Pasir Urug M³ 0.4320 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.10. Pemasangan 1m³ Pondasi Siklop, 60% Beton Campuran 1SP : 2 Pb ; 3 KR 40% Batu Belah
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.4000 - -
Tukang Batu L.02 OH 0.8500 - -
Kepala Tukang L.03 OH 0.0850 - -
Mandor L.04 OH 0.1700 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 0.4800 - -
Semen Portland Kg 194.0000 - -
Pasir Beton M³ 0.3120 - -
Kerikil/agregat M³ 0.4680 - -
Besi Beton Polos Kg 126.0000 - -
Kawat Beton Kg 1.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.11. Pemasangan 1m³ Pondasi Sumuran, Diameter 100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.4000 - -
Tukang Batu L.02 OH 0.8000 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.1190 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Gunung M³ 0.4500 - -
Semen Portland Kg 194.0000 - -
Pasir Beton M³ 0.3120 - -
Kerikil/agregat M³ 0.4680 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.1. Pembuatan 1m³ Beton Mutu f'c = 7,4 Mpa (K100)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 194.0000 - -
Pasir Beton M³ 0.6207 - -
Kerikil/agregat M³ 0.7400 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.2. Pembuatan 1m³ Beton Mutu f'c = 9,8 Mpa (K125)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 276.0000 - -
Pasir Beton M³ 0.5914 - -
Kerikil/agregat M³ 0.7496 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.3. Pembuatan 1m³ Beton Mutu f'c = 12,2 Mpa (K150)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 299.0000 - -
Pasir Beton M³ 0.5707 - -
Kerikil/agregat M³ 0.7533 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.4. Pembuatan 1m³ Lantai Kerja Beton Mutu f'c = 7,4 Mpa Slump (3-6) cm, w/e = 0,87
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 230.0000 - -
Pasir Beton M³ 0.6379 - -
Kerikil/agregat M³ 0.7607 - -
Air Ltr 200.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.5. Pembuatan 1m³ Beton Mutu f'c = 14,5 Mpa (K175)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 326.0000 - -
Pasir Beton M³ 0.5429 - -
Kerikil/agregat M³ 0.7622 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.6. Pembuatan 1m³ Beton Mutu f'c = 16,9 Mpa (K200)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 352.0000 - -
Pasir Beton M³ 0.5221 - -
Kerikil/agregat M³ 0.7637 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.7. Pembuatan 1m³ Beton Mutu f'c = 19,3 Mpa (K225)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 371.0000 - -
Pasir Beton M³ 0.4986 - -
Kerikil/agregat M³ 0.7756 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.8. Pembuatan 1m³ Beton Mutu f'c = 21,7 Mpa (K250)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 384.0000 - -
Pasir Beton M³ 0.4943 - -
Kerikil/agregat M³ 0.7696 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.9. Pembuatan 1m³ Beton Mutu f'c = 24,0 Mpa (K275)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 406.0000 - -
Pasir Beton M³ 0.4886 - -
Kerikil/agregat M³ 0.7600 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.10. Pembuatan 1m³ Beton Mutu f'c = 26,4 Mpa (K300)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 413.0000 - -
Pasir Beton M³ 0.4864 - -
Kerikil/agregat M³ 0.7563 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.11. Pembuatan 1m³ Beton Mutu f'c = 28,8 Mpa


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 439.0000 - -
Pasir Beton M³ 0.4786 - -
Kerikil/agregat M³ 0.7452 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.12. Pembuatan 1m³ Beton Mutu f'c = 31,2 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 448.0000 - -
Pasir Beton M³ 0.4764 - -
Kerikil/agregat M³ 0.7407 - -
Air Ltr 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.13. Pembuatan 1m³ Beton Kedap Air dengan Aditif Kedap Air
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 400.0000 - -
Pasir Beton M³ 0.4800 - -
Kerikil/agregat M³ 0.8000 - -
Strorox 100 Kg 1.2000 - -
Air Ltr 210.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.14. Pemasangan 1 m' PVC Waterstop Lebar 150 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Batu L.02 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Waterstop Lebar 150 mm M 1.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.15. Pemasangan 1 m' PVC Waterstop Lebar 200 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Batu L.02 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Waterstop Lebar 200 mm M 1.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.16. Pemasangan 1 m' PVC Waterstop Lebar 230-320 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Batu L.02 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Waterstop Lebar 230-320 mm M 1.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.17. Pembesian 10 Kg dengan Besi Polos


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Polos Kg 10.5000 - -
Kawat Beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.17. Pembesian 10 Kg dengan Besi Ulir


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Ulir Kg 10.5000 - -
Kawat Beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.18. Pembesian 10 Kg Kabel Prategang (Prestressed) Polos


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Besi L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Polos Kg 10.5000 - -
Kawat Beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.18. Pembesian 10 Kg Kabel Prategang (Prestressed) Ulir


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Besi L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Ulir Kg 10.5000 - -
Kawat Beton Kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.19. Pembesian 10 Kg Jaring Kawat Baja (Wiremesh)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Besi L.02 OH 0.0250 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Wiremesh M6-M8 M 10.2000 - -
Kawat Beton Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.20. Pemasangan 1m² Bekisting untuk Pondasi Telapak Beton Bangunan Gedung
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.3000 - -
Minyak Bekisting Ltr 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.21. Pemasangan 1m² Bekisting untuk Sloof Beton Bangunan Gedung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0450 - -
Paku Campur 5 - 10 cm Kg 0.3000 - -
Minyak Bekisting Ltr 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.22. Pemasangan 1m² Bekisting untuk Kolom Beton Bangunan Gedung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0150 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 2.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.23. Pemasangan 1m² Bekisting untuk Balok Beton Bangunan Gedung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0180 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 2.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.24. Pemasangan 1m² Bekisting untuk Plat Lantai Beton Bangunan Gedung
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0150 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 6.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.25. Pemasangan 1m² Bekisting untuk Dinding (Sheerwall)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0300 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0200 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 3.0000 - -
Spacer Bekisting Bh 4.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.26. Pemasangan 1m² Bekisting untuk Tangga Beton Bangunan Gedung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0300 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0150 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 2.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.28. Pemasangan Bekisting 1m² Jembatan untuk Pengecoran Beton


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0660 - -
Tukang Kayu L.02 OH 0.3300 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0300 - -
Paku Campur 8 - 12 cm Kg 0.4000 - -
Minyak Bekisting Ltr 0.2000 - -
Balok Kayu Kelas II M³ 0.0150 - -
Plywood 9mm Lbr 0.3500 - -
Dolken ᴓ8-10 Btg 2.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.35. Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 - -
Tukang Batu L.02 OH 0.0200 - -
Tukang Kayu L.02 OH 0.2000 - -
Tukang Besi L.02 OH 0.0200 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0090 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0020 - -
Paku Campur 8 - 12 cm Kg 0.0100 - -
Minyak Bekisting Ltr - -
Besi Beton Polos Kg 3.0000 - -
Kawat Beton Kg 0.4500 - -
Semen Portland Kg 4.0000 - -
Pasir Beton M³ 0.0060 - -
Kerikil/agregat M³ 0.0090 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.36. Membuat 1m' Ring balok Beton Bertulang (10 x 15) cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 - -
Tukang Batu L.02 OH 0.0330 - -
Tukang Kayu L.02 OH 0.0330 - -
Tukang Besi L.02 OH 0.0330 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0030 - -
Paku Campur 8 - 12 cm Kg 0.0200 - -
Minyak Bekisting Ltr - -
Besi Beton Polos Kg 3.6000 - -
Kawat Beton Kg 0.0500 - -
Semen Portland Kg 5.5000 - -
Pasir Beton M³ 0.0090 - -
Kerikil/agregat M³ 0.0150 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.1. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 8cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1320 - -
Tukang Batu L.02 OH 0.0220 - -
Kepala Tukang L.03 OH 0.0020 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 26.0800 - -
Pasir Beton M³ 0.0434 - -
Kerikil/agregat M³ 0.0610 - -
Air Ltr 17.2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.2. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 10cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1650 - -
Tukang Batu L.02 OH 0.0280 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 32.6000 - -
Pasir Beton M³ 0.0543 - -
Kerikil/agregat M³ 0.0762 - -
Air Ltr 21.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.3. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 12cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1980 - -
Tukang Batu L.02 OH 0.0330 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 39.1200 - -
Pasir Beton M³ 0.0651 - -
Kerikil/agregat M³ 0.0915 - -
Air Ltr 25.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.4. (K3) Pembuatan 1m² Beton Pracetak (Cast In Place) tebal 15cm Beton f'c 14,5 Mpa, Slump (120±20) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2480 - -
Tukang Batu L.02 OH 0.0410 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 48.9000 - -
Pasir Beton M³ 0.0814 - -
Kerikil/agregat M³ 0.1143 - -
Air Ltr 32.2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.5. Pembuatan 1m² Bekisting untuk Plat Beton Pracetak Komponen Modular Bangunan Gedung (5 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 - -
Tukang Kayu L.02 OH 0.0760 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Lantai Kerja t=10cm M3 0.0080 - -
Besi Hollow 50x50x1,2 mm M 2.1000 - -
Balok Kayu Kelas II M³ 0.0050 - -
Phenolic Film 12 mm Lbr 0.0800 - -
Minyak Bekisting Ltr 0.2000 - -
Dynabolt M12 x 129 Bh 3.8820 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.6. Pembuatan 1m² Bekisting untuk Balok Beton Pracetak (10-12 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 - -
Tukang Kayu L.02 OH 0.0380 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0050 - -
Phenolic Film 12 mm Lbr 0.0430 - -
Minyak Bekisting Ltr 0.2000 - -
Paku Campur 5 - 10 cm Kg 0.0460 - -
Dynabolt M12 x 129 Bh 0.6930 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.7. Pembuatan 1m² Bekisting untuk Kolom Beton Pracetak (10-12 Kali Pakai)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 - -
Tukang Kayu L.02 OH 0.0380 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0040 - -
Phenolic Film 12 mm Lbr 0.0480 - -
Minyak Bekisting Ltr 0.2000 - -
Paku Campur 5 - 10 cm Kg 0.0460 - -
Dynabolt M12 x 129 Bh 0.6930 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.8. Pemasangan dan Membuka Cetakan 1 Buah Komponen Plat Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0530 - -
Tukang Kayu L.02 OH 0.0180 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.9. Pemasangan dan Membuka Cetakan 1 Buah Komponen Balok Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0890 - -
Tukang Kayu L.02 OH 0.0300 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.10. Pemasangan dan Membuka Cetakan 1 Buah Komponen Kolom Beton Pracetak
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0710 - -
Tukang Kayu L.02 OH 0.0240 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.11. Penuangan/Menebar Beton 1m³ untuk Plat Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0640 - -
Tukang Batu L.02 OH 0.2440 - -
Tukang Vibrator L.02 OH 0.1280 - -
Kepala Tukang L.03 OH 0.0340 - -
Mandor L.04 OH 0.0730 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.12. Penuangan/Menebar Beton 1m³ untuk Balok Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0690 - -
Tukang Batu L.02 OH 0.2420 - -
Tukang Vibrator L.02 OH 0.1380 - -
Kepala Tukang L.03 OH 0.0370 - -
Mandor L.04 OH 0.0730 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.13. Penuangan/Menebar Beton 1m³ untuk Kolom Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0610 - -
Tukang Batu L.02 OH 0.2130 - -
Tukang Vibrator L.02 OH 0.1220 - -
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0730 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.14. Pemasangan Ereksi 1 Buah Komponen untuk Plat Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0670 - -
Pembantu Operator Crane L.09 OH 0.0670 - -
Pekerja L.01 OH 0.0670 - -
Tukang Batu L.02 OH 0.0670 - -
Tukang Ereksi L.02 OH 0.1340 - -
Kepala Tukang L.03 OH 0.0670 - -
Mandor L.04 OH 0.0670 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 6.6760 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0670 - -
Sewa Pipe Support Hari 1.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.15. Pemasangan Ereksi 1 Buah Komponen untuk Balok Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0610 - -
Pembantu Operator Crane L.09 OH 0.0610 - -
Pekerja L.01 OH 0.0610 - -
Tukang Batu L.02 OH 0.0610 - -
Tukang Ereksi L.02 OH 0.1220 - -
Kepala Tukang L.03 OH 0.0610 - -
Mandor L.04 OH 0.0610 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 6.1100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0610 - -
Sewa Scaffolding Hari 1.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.16. Pemasangan Ereksi 1 Buah Komponen untuk Kolom Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0830 - -
Pembantu Operator Crane L.09 OH 0.0830 - -
Pekerja L.01 OH 0.0830 - -
Tukang Batu L.02 OH 0.0830 - -
Tukang Ereksi L.02 OH 0.1660 - -
Kepala Tukang L.03 OH 0.0830 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 8.2770 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0830 - -
Sewa Pipe Support Hari 2.2000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.17. Pemindahan 1 Buah Komponen untuk Plat Pracetak (±20cm)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0190 - -
Pembantu Operator Crane L.09 OH 0.0190 - -
Pekerja L.01 OH 0.0190 - -
Tukang Batu L.02 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 1.8970 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0190 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.18. Pemindahan 1 Buah Komponen untuk Balok Pracetak (±20cm)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0190 - -
Pembantu Operator Crane L.09 OH 0.0190 - -
Pekerja L.01 OH 0.0190 - -
Tukang Batu L.02 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 1.8970 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0190 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.19. Pemindahan 1 Buah Komponen untuk Kolom Pracetak (±20cm)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Operator Crane L.08 OH 0.0190 - -
Pembantu Operator Crane L.09 OH 0.0190 - -
Pekerja L.01 OH 0.0190 - -
Tukang Batu L.02 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 1.8970 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Crane Hari 0.0190 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.20. Bahan 1 M³ Grout Campuran


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
-
JUMLAH TENAGA KERJA -
B BAHAN
Semen Grout Kg 1,200.0000 - -
Batu Screening M³ 0.4483 - -
Air Ltr 350.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.21. Bahan 1 M³ Grout (Tidak Campuran)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
-
JUMLAH TENAGA KERJA -
B BAHAN
Semen Grout Kg 1,850.0000 - -
Air Ltr 400.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.22. Upah 1 Titik Pekjerjaan Grout Pada Joint Beton Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Tukang Batu L.02 OH 0.3670 - -
Kepala Tukang L.03 OH 0.0470 - -
Mandor L.04 OH 0.0370 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.23. Pemasangan 1 Titik Bekisting Joint Pracetak


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1470 - -
Tukang Kayu L.02 OH 0.1470 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0120 - -
Papan kayu Kelas III M³ 0.0040 - -
Paku Campur 5 - 10 cm Kg 0.2640 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.2.24. Upah 1 Titk Joint dengan Sling


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2200 - -
Tukang Kayu L.02 OH 0.0220 - -
Tukang Besi L.02 OH 0.2200 - -
Mandor L.04 OH 0.0110 - -
JUMLAH TENAGA KERJA -
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.1. Pembuatan 1 Kg Baja Profil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Las L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Baja Profil Kg 1.1500 - -
Kawat Las Kg - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.2. Pembuatan 1 Kg Tangka Kuda-Kuda Baja IWF


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Las L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Baja IWF Kg 1.1500 - -
Kawat Las Kg - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.3. Pengerjaan 100 Kg Pekerjaan Perakitan


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Besi Konstruksi L.03 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0010 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Solar Industri Ltr 1.0000 - -
Minyak Pelumas Ltr 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Alat Jam 0.8000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.4. Pembuatan 1m² Pintu Besi Plat Baja Tebal 2mm Rangkap, Rangka Baja Siku
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 - -
Tukang Las L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0520 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Siku 30.30.3 mm Kg 15.0000 - -
Besi Plat Baja 2 mm Kg 32.8000 - -
Kawat Las Kg 0.0500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.5. Pengerjaan 10cm Pengelasan dengan Las Listrik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 - -
Tukang Besi Konstruksi L.03 OH 0.0200 - -
Kepala Tukang L.03 OH 0.0020 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kawat Las Kg 0.4000 - -
Solar Industri Ltr 0.3000 - -
Minyak Pelumas Ltr 0.0400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Alat Las Jam 0.1700 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.6. Pembuatan 1m² Rangka Jendela Besi Hollow


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6500 - -
Tukang Las L.02 OH 0.6500 - -
Kepala Tukang L.03 OH 0.0650 - -
Mandor L.04 OH 0.0320 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Hollow 40x40x1,2 mm M 4.7600 - -
Besi Lis Kaca 3mm M 4.5220 - -
Pengelasan Cm 20.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.7. Pemasangan 1m² Pintu Rolling Door Besi


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Las L.02 OH 1.2000 - -
Kepala Tukang L.03 OH 0.1200 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rolling Door Besi M² 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.8. Pemasangan 1m² Pintu Lipat (Folding Door) Bahan Plastik/PVC


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4400 - -
Tukang Kayu L.02 OH 0.4400 - -
Kepala Tukang L.03 OH 0.0440 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Fording Door Plastik/PVC M² 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.9. Pemasangan 1m² Sunscreen Aluminium


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 - -
Tukang Alluminium L.02 OH 0.8000 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sunscreen Aluminium M² 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.10. Pemasangan 1m² Rolling Door Aluminium


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Alluminium L.02 OH 1.0000 - -
Kepala Tukang L.03 OH 0.1000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rolling Door Aluminium M² 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.15. Pemasangan 1m² Teralis Besi Strip 20x3mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.6700 - -
Tukang Las L.02 OH 1.6700 - -
Kepala Tukang L.03 OH 0.1670 - -
Mandor L.04 OH 0.8300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Strip 20X3mm Kg 6.1770 - -
Pengelasan cm 27.0800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.16. Pemasangan 1m² Kawat Nyamuk


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Las L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kawat Nyamuk M² 1.1000 - -
Besi Strip 20X3mm Kg 1.7160 - -
Pengelasan cm 11.1100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.17. Pemasangan 1m² Jendela Nako dan Tralis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Las L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Jendela Nako (Rangka + Kaca 5mm, Lebar
M² 1.1000 - -
15cm)
Paku Sekrup Bh 10.0000 - -
Besi Strip 20X3mm Kg 16.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.18. Pemasangan 1m Talang Datar/Jurai Seng BJLS 28 Lebar 90cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng plat BJLS 28 Lebar 90cm M 1.0500 - -
Paku Campur 1 - 5 cm Kg 0.0150 - -
Papan kayu Kelas II M³ 0.0190 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.19. Pemasangan 1m Talang 1/2 Lingkaran D-15cm, Seng Plat BJLS 30 Lebar 45cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng plat BJLS 30 Lebar 45cm M 1.0500 - -
Paku Campur 1 - 5 cm Kg 0.1000 - -
Besi Strip 20X3mm Kg 0.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.20. Pemasangan 1m² Rangka Besi Hollow Galvanis 40.40mm, Modul 60 x 120 cm, untuk Partisi
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Besi L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Hollow Galvanis 40x20x1,7 mm M 3.5000 - -
Assesoris Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.21. Pemasangan 1m² Rangka Besi Hollow Galvanis 40.40mm, Modul 60 x 60 cm, untuk Plafond
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Besi L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Hollow Galvanis 40x20x1,7 mm M 4.0000 - -
Assesoris Ls 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.22. Pemasangan 1m² Atap Plana Rangka Baja Ringan (Canai Dingin) Profil C75
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 - -
Tukang Besi L.02 OH 0.7340 - -
Kepala Tukang L.03 OH 0.0730 - -
Mandor L.04 OH 0.0370 - -
JUMLAH TENAGA KERJA -
B BAHAN
Baja Ringan Canai Dingin C75 Btg 0.8730 - -
Assesoris Ls 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.23. Pemasangan 1m² Atap Jurai/Limasan Rangka Baja Ringan (Canai Dingin) Profil C75
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7604 - -
Tukang Besi L.02 OH 0.7604 - -
Kepala Tukang L.03 OH 0.0760 - -
Mandor L.04 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Baja Ringan Canai Dingin C75 Btg 0.8730 - -
Assesoris Ls 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.24. Pemasangan 1m Kusen Pintu Aluminium


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 - -
Tukang Alluminium L.02 OH 0.0430 - -
Kepala Tukang L.03 OH 0.0043 - -
Mandor L.04 OH 0.0021 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Aluminium M 1.1000 - -
Sekrup Fixer Bh 2.0000 - -
Sealant Tube 0.0600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.25. Pemasangan 1m² Pintu Aluminium Strip Lebar 8cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 - -
Tukang Alluminium L.02 OH 0.0430 - -
Kepala Tukang L.03 OH 0.0043 - -
Mandor L.04 OH 0.0021 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Aluminium M 4.4000 - -
Aluminium Strip Lebar 8cm M 14.6000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.26. Pemasangan 1m² Pintu Kaca Rangka Aluminium


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 - -
Tukang Alluminium L.02 OH 0.0850 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Aluminium M 4.4000 - -
Profil Aluminium (lis Kaca) M 4.5000 - -
Sealant Tube 0.2700 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.2.1.27. Pemasangan 1m² Venetions Blinds dan Vertical Blinds


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Kayu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Tirai (Vebetions Blinds/Vertical Blinds) M² 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.1. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 2PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 43.5000 - -
Pasir Pasang M³ 0.0800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.2. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 3PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 32.9500 - -
Pasir Pasang M³ 0.0910 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.3. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 4PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 26.5500 - -
Pasir Pasang M³ 0.9300 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.4. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 5PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 22.2000 - -
Pasir Pasang M³ 0.1020 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.5. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1 Bata (Camp. 1SP : 6PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 140.0000 - -
Semen Portland Kg 18.5000 - -
Pasir Pasang M³ 0.1220 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.7. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 2PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 18.9500 - -
Pasir Pasang M³ 0.0380 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.8. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 3PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 14.3700 - -
Pasir Pasang M³ 0.0400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.9. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 4PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 11.5000 - -
Pasir Pasang M³ 0.0430 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.10. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 5PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 9.6800 - -
Pasir Pasang M³ 0.0450 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.11. Pemasangan 1m² Dinding Bata Merah (5x11x22) cm Tebal 1/2 Bata (Camp. 1SP : 6PP)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 8.3200 - -
Pasir Pasang M³ 0.0490 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.16. Pemasangan 1m² Dinding Conblock HB20 Campuran 1SP : 3PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB20 Bh 12.5000 - -
Semen Portland Kg 30.3200 - -
Pasir Pasang M³ 0.7280 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.17. Pemasangan 1m² Dinding Conblock HB20 Campuran 1SP : 4PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB20 Bh 12.5000 - -
Semen Portland Kg 24.2600 - -
Pasir Pasang M³ 0.7720 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.18. Pemasangan 1m² Dinding Conblock HB15 Campuran 1SP : 3PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB15 Bh 12.5000 - -
Semen Portland Kg 22.7400 - -
Pasir Pasang M³ 0.5500 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.19. Pemasangan 1m² Dinding Conblock HB15 Campuran 1SP : 4PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB15 Bh 12.5000 - -
Semen Portland Kg 18.2000 - -
Pasir Pasang M³ 0.5820 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.20. Pemasangan 1m² Dinding Conblock HB10 Campuran 1SP : 3PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB10 Bh 12.5000 - -
Semen Portland Kg 15.1600 - -
Pasir Pasang M³ 0.3640 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.21. Pemasangan 1m² Dinding Conblock HB10 Campuran 1SP : 4PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Conblock HB10 Bh 12.5000 - -
Semen Portland Kg 12.1300 - -
Pasir Pasang M³ 0.3880 - -
Besi Angker Kg 0.2800 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.22. Pemasangan 1m² Dinding Terawang (Rooster) 12x11x24cm Campuran 1PS : 3PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Rooster 12x11x24cm Bh 30.0000 - -
Semen Portland Kg 11.0000 - -
Pasir Pasang M³ 0.0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.23. Pemasangan 1m² Dinding Terawang (Rooster) 12x11x24cm Campuran 1PS : 4PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Rooster 12x11x24cm Bh 30.0000 - -
Semen Portland Kg 11.0000 - -
Pasir Pasang M³ 0.0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.24. Pemasangan 1m² Dinding Bata Berongga Ekspose 12x11x24 campuran 1PS : 3PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Berongga 12x11x24cm Bh 70.0000 - -
Semen Portland Kg 14.0000 - -
Pasir Pasang M³ 0.0320 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.25. Pemasangan 1m² Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.4700 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.26. Pemasangan 1m² Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 - -
Tukang Batu L.02 OH 1.3000 - -
Kepala Tukang L.03 OH 0.1300 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.4700 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.1.26. Pemasangan 1m² Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6710 - -
Tukang Batu L.02 OH 1.3000 - -
Kepala Tukang L.03 OH 0.1300 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.4000 - -
Mortar Siap Pakai Kg 0.6300 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.1. Pemasangan 1m² Plesteran Campuran 1SP : 1PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 15.5040 - -
Pasir Pasang M³ 0.0160 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.2. Pemasangan 1m² Plesteran Campuran 1SP : 2PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 10.2240 - -
Pasir Pasang M³ 0.0200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.3. Pemasangan 1m² Plesteran Campuran 1SP : 3PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 7.7760 - -
Pasir Pasang M³ 0.0230 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.4. Pemasangan 1m² Plesteran Campuran 1SP : 4PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 6.2400 - -
Pasir Pasang M³ 0.0240 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.5. Pemasangan 1m² Plesteran Campuran 1SP : 5PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 5.1840 - -
Pasir Pasang M³ 0.0260 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.6. Pemasangan 1m² Plesteran Campuran 1SP : 6PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 4.4160 - -
Pasir Pasang M³ 0.0270 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.7. Pemasangan 1m² Plesteran Campuran 1SP : 7PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.9360 - -
Pasir Pasang M³ 0.0280 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.8. Pemasangan 1m² Plesteran Campuran 1SP : 8PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.4560 - -
Pasir Pasang M³ 0.0290 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.9. Pemasangan 1m² Plesteran Campuran 1SP : 1/2KP : 3PP Tebal 15mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 5.7600 - -
Kerikil/agregat M³ 0.0030 - -
Pasir Pasang M³ 0.0130 - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.10. Pemasangan 1m² Plesteran Campuran 1SP : 2KP : 3PP Tebal 15mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.0000 - -
Kerikil/agregat M³ 0.0050 - -
Pasir Pasang M³ 0.0200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.13. Pemasangan 1m² Plesteran Campuran 1SP : 1PP Tebal 20mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 13.6320 - -
Pasir Pasang M³ 0.0270 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.14. Pemasangan 1m² Plesteran Campuran 1SP : 3PP Tebal 20mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 10.3680 - -
Pasir Pasang M³ 0.0310 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.15. Pemasangan 1m² Plesteran Campuran 1SP : 4PP Tebal 20mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 8.3200 - -
Pasir Pasang M³ 0.0320 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.16. Pemasangan 1m² Plesteran Campuran 1SP : 5PP Tebal 20mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 6.9120 - -
Pasir Pasang M³ 0.0350 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.17. Pemasangan 1m² Plesteran Campuran 1SP : 6PP Tebal 20mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0220 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 5.8880 - -
Pasir Pasang M³ 0.0360 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.19. Pemasangan 1m² Berapen 1SP : 5PP Tebal 15mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Batu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 5.1840 - -
Pasir Pasang M³ 0.0260 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.20. Pemasangan 1m Plesteran Skoning 1SP : 3PP Lebar 10cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 - -
Tukang Batu L.02 OH 0.4000 - -
Kepala Tukang L.03 OH 0.0400 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 0.5000 - -
Pasir Pasang M³ 0.0130 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.21. Pemasangan 1m² Plesteran Granit 1SP : 2 Granit Tebal 10mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 - -
Tukang Batu L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0230 - -
Mandor L.04 OH 0.0230 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 10.0000 - -
Serbuk Batu Granit Kg 15.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.22. Pemasangan 1m² Plesteran Traso 1SP : 2 Traso Tebal 10mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 - -
Tukang Batu L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0230 - -
Mandor L.04 OH 0.0230 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 10.0000 - -
Serbuk Batu Traso Kg 15.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.23. Pemasangan 1m² Plesteran Ciprat (kamprotan) Campuran 1SP : 2PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.1500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 4.3200 - -
Pasir Pasang M³ 0.0060 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.24. Pemasangan Finishing 1m² Dinding Siar Pasangan Bata Merah


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Batu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.1080 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.25. Pemasangan Finishing 1m² Dinding Siar Pasangan Conblock Ekspose


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Batu L.02 OH 0.0350 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 1.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.26. Pemasangan 1m² Finishing Siar Pasangan Batu Kali, Campuran 1SP : 2PP
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 6.3400 - -
Pasir Pasang M³ 0.0120 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.2.27. Pemasangan 1m² Acian


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.1. Pemasangan 1m² Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 40 x 40 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.2. Pemasangan 1m² Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.3. Pemasangan 1m² Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 - -
Tukang Batu L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0140 - -
Mandor L.04 OH 0.0140 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 20 x 20 cm Bh 26.5000 - -
Semen Portland Kg 10.4000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.4.3.4. Pemasangan 1m² Lantai Ubin Warna Ukuran 40 x 40 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 20 x 20 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Semen Warna Kg 0.6000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.5. Pemasangan 1m² Lantai Ubin Warna Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang Batu L.02 OH 0.1300 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 20 x 20 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Semen Warna Kg 0.6000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.6. Pemasangan 1m² Lantai Ubin Warna Ukuran 20 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 - -
Tukang Batu L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0140 - -
Mandor L.04 OH 0.0140 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Abu-Abu 20 x 20 cm Bh 26.5000 - -
Semen Portland Kg 10.4000 - -
Semen Warna Kg 1.0000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.7. Pemasangan 1m² Lantai Ubin Teraso Ukuran 40 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teraso 40 x 40 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Semen Warna Kg 1.3000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.8. Pemasangan 1m² Lantai Ubin Teraso Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang Batu L.02 OH 0.1300 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teraso 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Semen Warna Kg 1.5000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.9. Pemasangan 1m² Lantai Ubin Granit Ukuran 40 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Granit 40 x 40 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Semen Warna Kg 1.3000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.10. Pemasangan 1m² Lantai Ubin Granit Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang Batu L.02 OH 0.1300 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Granit 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Semen Warna Kg 1.5000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.11. Pemasangan 1m² Lantai Ubin Teralux Ukuran 40 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teralux 40 x 40 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Semen Warna Kg 1.3000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.12. Pemasangan 1m² Lantai Ubin Teralux Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang Batu L.02 OH 0.1300 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teralux 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Semen Warna Kg 1.5000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.13. Pemasangan 1m² Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0120 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teralux Marmer 60 x 60 cm Bh 3.1000 - -
Semen Portland Kg 9.6000 - -
Semen Warna Kg 1.5000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.14. Pemasangan 1m² Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teralux Marmer 40 x 40 cm Bh 6.6300 - -
Semen Portland Kg 9.8000 - -
Semen Warna Kg 1.3000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.15. Pemasangan 1m² Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 - -
Tukang Batu L.02 OH 0.1300 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Ubin Teralux Marmer 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 10.0000 - -
Semen Warna Kg 1.5000 - -
Pasir Pasang M³ 0.0450 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.16. Pemasangan 1m Plint Ubin PC Abu-abu Ukuran 15 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin PC 15 x 20 cm Bh 5.3000 - -
Semen Portland Kg 1.6500 - -
Pasir Pasang M³ 0.0040 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.17. Pemasangan 1m Plint Ubin PC Abu-abu Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin PC 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.2400 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.18. Pemasangan 1m Plint Ubin PC Abu-abu Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin PC 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.2400 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.19. Pemasangan 1m Plint Ubin Warna Ukuran 10 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Warna 10 x 20 cm Bh 5.3000 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.20. Pemasangan 1m Plint Ubin Warna Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Warna 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.21. Pemasangan 1m Plint Ubin Warna Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Warna 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.22. Pemasangan 1m Plint Ubin Teraso Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teraso 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.23. Pemasangan 1m Plint Ubin Teraso Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teraso 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.24. Pemasangan 1m Plint Ubin Granit Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Granit 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.25. Pemasangan 1m Plint Ubin Granit Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Granit 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.26. Pemasangan 1m Plint Ubin Teralux Kerang Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teralux Kerang 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.27. Pemasangan 1m Plint Ubin Teralux Kerang Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teralux Kerang 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.28. Pemasangan 1m Plint Ubin Teralux Marmer Ukuran 10 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teralux Marmer 10 x 30 cm Bh 3.5300 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.29. Pemasangan 1m Plint Ubin Teralux Marmer Ukuran 10 x 40 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teralux Marmer 10 x 40 cm Bh 2.6500 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.30. Pemasangan 1m Plint Ubin Teralux Marmer Ukuran 10 x 60 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Ubin Teralux Marmer 10 x 60 cm Bh 1.7000 - -
Semen Portland Kg 1.1400 - -
Semen Warna Kg 1.1000 - -
Pasir Pasang M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.31. Pemasangan 1m² Lantai Lantai Teraso Cor di Tempat, Tebal 3cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 - -
Tukang Batu L.02 OH 0.1800 - -
Kepala Tukang L.03 OH 0.0180 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Teraso Cor Instan M³ 0.0360 - -
Semen Warna Kg 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.32. Pemasangan 1m² Lantai Keramik Artistik 10 x (10 s.d. <20) cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Artistik 10 x 10 cm Bh 106.0000 - -
Semen Portland Kg 8.1900 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 3.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.33. Pemasangan 1m² Lantai Keramik Artistik 10 x (20 s.d. <30) cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Artistik 10 x 20 cm Bh 53.0000 - -
Semen Portland Kg 8.1900 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 2.7500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.34. Pemasangan 1m² Lantai Keramik Ukuran 33 x 33 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 33 x 33 cm Dos 1.0500 - -
Semen Portland Kg 8.1900 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.35. Pemasangan 1m² Lantai Keramik Ukuran 20 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 20 x 20 cm Dos 1.0500 - -
Semen Portland Kg 10.4000 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.36. Pemasangan 1m² Lantai Keramik Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 30 x 30 cm Dos 1.0500 - -
Semen Portland Kg 10.0000 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.37. Pemasangan 1m² Lantai Keramik Ukuran 10 x 33 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 - -
Tukang Batu L.02 OH 0.5250 - -
Kepala Tukang L.03 OH 0.0530 - -
Mandor L.04 OH 0.0530 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 10 x 33 cm Bh 33.0000 - -
Semen Portland Kg 9.8000 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 4.3700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.38. Pemasangan 1m² Lantai Keramik Mozaik Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Mozaik 30 x 30 cm Bh 11.8700 - -
Semen Portland Kg 14.1500 - -
Pasir Pasang M³ 0.0390 - -
Semen Warna Kg 2.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.39. Pemasangan 1m Plint Keramik Ukuran 10 x 10 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Keramik 10 x 10 cm Bh 10.6000 - -
Semen Portland Kg 1.1400 - -
Pasir Pasang M³ 0.0030 - -
Semen Warna Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.40. Pemasangan 1m Plint Keramik Ukuran 10 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Keramik 10 x 20 cm Bh 5.3000 - -
Semen Portland Kg 1.1400 - -
Pasir Pasang M³ 0.0030 - -
Semen Warna Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.41. Pemasangan 1m Plint Internal Cove Ukuran 5 x 5 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0380 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plint Internal Cove 5 x 5 x 20 cm Bh 5.3000 - -
Semen Portland Kg 1.1400 - -
Pasir Pasang M³ 0.0030 - -
Semen Warna Kg 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.42. Pemasangan 1m² Lantai Marmer Ukuran 100 x 100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Marmer 100 x 100 cm Bh 1.0600 - -
Semen Portland Kg 8.9000 - -
Pasir Pasang M³ 0.0450 - -
Semen Warna Kg 0.1340 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.43. Pemasangan 1m² Lantai Karpet


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1700 - -
Tukang Kayu L.02 OH 0.1700 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0090 - -
JUMLAH TENAGA KERJA -
B BAHAN
Lantai Karpet M² 1.0500 - -
Lem Karet Kg 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.44. Pemasangan 1m² Underlayer Lantai (Pelapis Bawah Karet)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Underlayer Lantai M² 1.0500 - -
Lem Karet Kg 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.45. Pemasangan 1m² Lantai Parquet Kayu Solid


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Kayu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Parquet Kayu M² 1.0500 - -
Lem Kayu Kg 0.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.46. Pemasangan 1m² Lantai Kayu Gymfloor


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Kayu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Parquet Gymfloor M² 1.0500 - -
Lem Kayu Kg 0.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.47. Pemasangan 1m² Dinding Porselen Ukuran 11 x 11 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Porselen 11 x 11 cm Bh 1.0500 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.48. Pemasangan 1m² Dinding Porselen Ukuran 10 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Porselen 10 x 20 cm Bh 53.0000 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 2.7500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.49. Pemasangan 1m² Dinding Porselen Ukuran 20 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Porselen 20 x 20 cm Bh 26.0000 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 1.9400 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.50. Pemasangan 1m² Dinding Keramik Artistik Ukuran 10 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Artistik 10 x 20 cm Bh 52.0000 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 2.7500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.51. Pemasangan 1m² Dinding Keramik Artistik Ukuran 5 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik Artistik 5 x 20 cm Bh 104.0000 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 2.9000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.52. Pemasangan 1m² Dinding Keramik Ukuran 10 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 10 x 20 cm Bh 52.0000 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 2.7500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.53. Pemasangan 1m² Dinding Keramik Ukuran 20 x 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA -
B BAHAN
Keramik 20 x 20 cm Dos 1.0500 - -
Semen Portland Kg 9.3000 - -
Pasir Pasang M³ 0.0180 - -
Semen Warna Kg 1.9400 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.54. Pemasangan 1m² Dinding Marmer Ukuran 100 x 100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.3000 - -
Tukang Batu L.02 OH 0.6500 - -
Kepala Tukang L.03 OH 0.0650 - -
Mandor L.04 OH 0.0650 - -
JUMLAH TENAGA KERJA -
B BAHAN
Marmer 100 x 100 cm Bh 1.0600 - -
Semen Portland Kg 12.4400 - -
Pasir Pasang M³ 0.0250 - -
Semen Warna Kg 0.6500 - -
Paku 12cm Bh 3.0300 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.55. Pemasangan 1m² Dinding Bata Pelapis (Super) Ukuran 3 x 7 x 24 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Pelapis (ekposes) 3 x 7 x 24 cm Bh 53.0000 - -
Semen Portland Kg 12.4400 - -
Pasir Pasang M³ 0.0250 - -
Semen Warna Kg 2.7500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.56. Pemasangan 1m² Dinding Batu Paras


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Paras M² 1.1000 - -
Semen Portland Kg 11.7500 - -
Pasir Pasang M³ 0.0350 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.57. Pemasangan 1m² Dinding Batu Tempel Hitam


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Batu L.02 OH 0.3500 - -
Kepala Tukang L.03 OH 0.0350 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Tempel Hitam M² 1.1000 - -
Semen Portland Kg 11.7500 - -
Pasir Pasang M³ 0.0350 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.58. Pemasangan 1m² Lantai Vynil Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Batu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Vynil 30 x 30 cm Bh 11.8700 - -
Lem Karet Kg 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.59. Pemasangan 1m² Wallpaper Lebar 50 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Batu L.02 OH 0.1750 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Wallpaper Lebar 50 cm M 2.2000 - -
Lem Karet Kg 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.60. Pemasangan 1m² Floor Harderner


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Batu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Floor Harderner Kg 5.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.61. Pemasangan 1m Plint Vynil Ukuran 15 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 - -
Tukang Batu L.02 OH 0.0800 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Vynil 15 x 30 cm Bh 3.1000 - -
Lem Karet Kg 0.0800 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.62. Pemasangan 1m Plint Kayu Tebal 2cm Lebar 10cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0030 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.63. Pemasangan 1m² Paving Block (Blok Beton) Natural Tebal 6 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paving Block Natural Tebal 6 cm M² 1.0100 - -
Pasir Beton M³ 0.0500 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.64. Pemasangan 1m² Paving Block (Blok Beton) Natural Tebal 8 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paving Block Natural Tebal 8 cm M² 1.0100 - -
Pasir Beton M³ 0.0800 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.65. Pemasangan 1m² Paving Block (Blok Beton) Berwarna Tebal 6 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paving Block Berwarna Tebal 6 cm M² 1.0100 - -
Pasir Beton M³ 0.0500 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.4.3.66. Pemasangan 1m² Paving Block (Blok Beton) Berwarna Tebal 8 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Paving Block Berwarna Tebal 8 cm M² 1.0100 - -
Pasir Beton M³ 0.0800 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.1. Pemasangan 1m² Langit-Langit Serat Semen, Tebal 4mm, 5mm, dan 6mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan Serat Semen M² 1.1000 - -
Paku Tripleks Kg 0.0100 - -
-
C PERALATAN
Peralatan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.2. Pemasangan 1m² Langit-Langit Akustik Ukuran 30 x 30 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plafond Akustik 30 x 30 cm Lbr 12.0000 - -
Paku Tripleks Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.3. Pemasangan 1m² Langit-Langit Akustik Ukuran 30 x 60 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plafond Akustik 30 x 60 cm Lbr 5.8000 - -
Paku Tripleks Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.4. Pemasangan 1m² Langit-Langit Akustik Ukuran 60 x 120 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plafond Akustik 60 x 120 cm Lbr 1.5000 - -
Paku Tripleks Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.5. Pemasangan 1m² Langit-Langit Plywood, Tebal 3mm, 4mm, dan 6mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plywood 3mm Lbr 1.1000 - -
Paku Tripleks Kg 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.6. Pemasangan 1m² Langit-Langit Lambrisering, Tebal 9mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 0.8000 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0150 - -
Paku Tripleks Kg 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.7. Pemasangan 1m² Langit-Langit Gypsum Board Ukuran (120 x 240 x 9)mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Gypsum Board 120 x 240 x 9 mm Lbr 0.3640 - -
Paku Sekrup Bh 0.1100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.10. Pemasangan 1m List Plafond Kayu Profil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
List Kayu Profil M 1.0500 - -
Paku Campur 5 - 10 cm Kg 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.12. Pemasangan 1m² Langit-Langit Akustik Ukuran 60 x 120 cm Berikut Rangka Aluminium
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Besi L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Profil Aluminium M 3.6000 - -
Kawat Ø4 mm Kg 0.1500 - -
Ramset Bh 1.0500 - -
Plafond Akustik 60 x 120 cm Lbr 1.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.1. Pemasangan 1m² Atap Genteng Palentong Kecil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0075 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Palentong Kecil Bh 25.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.2. Pemasangan 1m² Atap Genteng Kodok Glazuur


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Kodok Bh 25.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.3. Pemasangan 1m² Atap Genteng Palentong Besar/Morando


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Palentong Besar Bh 12.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.4. Pemasangan 1m Bubungan Genteng Palentong Kecil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Genteng Palenting Kecil Bh 5.0000 - -
Semen Portland Kg 8.0000 - -
Pasir Pasang M³ 0.0320 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.5. Pemasangan 1m Bubungan Genteng Kodok Glazuur
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Genteng Kodok Bh 5.0000 - -
Semen Portland Kg 8.0000 - -
Pasir Pasang M³ 0.0320 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.6. Pemasangan 1m Bubungan Genteng Palentong Besar


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Genteng Palentong Besar Bh 4.0000 - -
Semen Portland Kg 8.0000 - -
Pasir Pasang M³ 0.0320 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.7. Pemasangan 1m² Rooflight Fiberglass 90 x 180 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0670 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rooflight fiberglass 90 x 180 cm Lbr 0.6000 - -
Paku Campur 1/2 - 1cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.5.2.8. Pemasangan 1m² Atap Serat Semen Gelombang 92 x 250 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 92 x 250 x 0,5 cm Lbr 0.5000 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.9. Pemasangan 1m² Atap Serat Semen Gelombang 92 x 225 x 0,5 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 92 x 225 x 0,5 cm Lbr 0.6000 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.10. Pemasangan 1m² Atap Serat Semen Gelombang 92 x 200 x 0,5 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 92 x 200 x 0,5 cm Lbr 0.6000 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.11. Pemasangan 1m² Atap Serat Semen Gelombang 92 x 180 x 0,5 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 92 x 180 x 0,5 cm Lbr 0.7500 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.12. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 300 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 300 x 0,5 cm Lbr 0.3500 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.15. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 240 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 240 x 0,5 cm Lbr 0.4400 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.17. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 210 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 210 x 0,5 cm Lbr 0.5100 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.18. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 150 x 0,5 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 150 x 0,5 cm Lbr 0.8000 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.19. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 300 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 300 x 0,6 cm Lbr 0.3500 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.20. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 270 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 270 x 0,6 cm Lbr 0.3800 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.21. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 240 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 240 x 0,6 cm Lbr 0.4600 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.22. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 210 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 210 x 0,6 cm Lbr 0.4900 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.23. Pemasangan 1m² Atap Serat Semen Gelombang 108 x 180 x 0,6 cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 108 x 180 x 0,6 cm Lbr 0.5700 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.24. Pemasangan 1m Nok/Bubung Stel Gelombang 92 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Stel Gelombang 92 cm Bh 2.4000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.25. Pemasangan 1m Nok/Bubung Stel Gelombang 105 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Stel Gelombang 105 cm Bh 2.1000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.26. Pemasangan 1m Nok/Bubung Stel Gelombang 108 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Stel Gelombang 108 cm Bh 2.0000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.27. Pemasangan 1m Nok/Bubung Paten (Permanen) 92 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Paten 92 cm Bh 1.1000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.28. Pemasangan 1m Nok/Bubung Paten (Permanen) 105 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Paten 105 cm Bh 1.2000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.29. Pemasangan 1m Nok/Bubung Paten (Permanen) 108 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Paten 108 cm Bh 1.2000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.30. Pemasangan 1m Nok/Bubung Stel Rata 92 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Stel Rata 92 cm Bh 1.1000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.31. Pemasangan 1m Nok/Bubung Stel Rata 105 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 - -
Tukang Kayu L.02 OH 0.1250 - -
Kepala Tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bubung Stel Rata 105 cm Bh 1.1000 - -
Paku Sekrup Bh 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.32. Pemasangan 1m² Genteng Beton


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Beton Bh 11.0000 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.33. Pemasangan 1m² Genteng Aspal Ukuran 80 x 100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Aspal 80 x 120cm Bh 1.5000 - -
Plywood 6mm Lbr 0.3500 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Plastik Aerator Bh 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.34. Pemasangan 1m² Genteng Metal Ukuran 80 x 100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Genteng Metal 80 x 100cm Bh 2.0000 - -
Paku Campur 1 - 5 cm Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.35. Pemasangan 1m² Atap Sirap Kayu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1660 - -
Tukang Kayu L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Sirap Kayu Bh 30.0000 - -
Paku Campur 1 - 5 cm Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.36. Pemasangan 1m Nok/Bubung Genteng Beton


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Nok Genteng Beton Bh 3.5000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
Semen Portland Kg 10.8000 - -
Pasir Pasang M³ 0.0320 - -
Semen Warna Kg 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.37. Pemasangan 1m Nok/Bubung Genteng Aspal


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1250 - -
Tukang Kayu L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Nok Genteng Aspal Bh 2.0000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
Balok Kayu Kelas II M³ 0.0035 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.38. Pemasangan 1m Nok/Bubung Genteng Metal


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0130 - -
JUMLAH TENAGA KERJA -
B BAHAN
Nok Genteng Metal Panjang 100cm Bh 1.1000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.39. Pemasangan 1m Nok/Bubung Atap Sirap


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1250 - -
Tukang Kayu L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng plat BJLS 28 Lebar 90cm M 1.1000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.40. Pemasangan 1m² Atap Seng Gelombang 105 x 180cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng Gelombang BJLS 0,2 mm Lbr 0.7000 - -
Paku Campur 1 - 5 cm Kg 0.0200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.41. Pemasangan 1m Nok/Bubung Atap Seng


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Seng plat BJLS 28 Lebar 90cm M 1.1000 - -
Paku Campur 1 - 5 cm Kg 0.0400 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.42. Pemasangan 1m² Atap Aluminium Gelombang 195 x 180cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Spandek 95 x 180cm Lbr 0.7500 - -
Paku Pancing 6 x 23 Kg 0.0200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.43. Pemasangan 1m Nok/Bubung Atap Aluminium Gelombang


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 1.0000 - -
Kepala Tukang L.03 OH 0.1000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Nok Spandek Bh 1.2000 - -
Paku Campur 1 - 5 cm Kg 0.0200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.44. Pemasangan 1m² Lapisan Aluminium Foil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Aluminium Foil M² 1.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.2.45. Pemasangan 1m² Atap Serat Semen Gelombang 105 x 270 x 0,4cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Kayu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Atap Serat Semen gel. 105 x 270 x 0,4 cm Lbr 0.4200 - -
Paku Pancing 6 x 23 Kg 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.1. Pembuatan dan Pemasangan 1m³ Kusen Pintu dan Kusen jendela, Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 - -
Tukang Kayu L.02 OH 21.0000 - -
Kepala Tukang L.03 OH 2.1000 - -
Mandor L.04 OH 0.3500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas I M³ 1.1000 - -
Paku Campur 8 - 12 cm Kg 1.2500 - -
Lem Kayu Kg 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.2. Pembuatan dan Pemasangan 1m³ Kusen Pintu dan Kusen jendela, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 - -
Tukang Kayu L.02 OH 18.0000 - -
Kepala Tukang L.03 OH 1.8000 - -
Mandor L.04 OH 0.3000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 1.2000 - -
Paku Campur 8 - 12 cm Kg 1.2500 - -
Lem Kayu Kg 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.3. Pembuatan dan Pemasangan 1m² Pintu Klamp Standar, Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Kayu L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas II M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.4. Pembuatan dan Pemasangan 1m² Pintu Klamp Standar, Kayu Kelas III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 - -
Tukang Kayu L.02 OH 1.0500 - -
Kepala Tukang L.03 OH 0.1050 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas III M³ 0.0400 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.5. Pembuatan 1m² Pintu Panel, Kayu Kelas I atau II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 3.0000 - -
Kepala Tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas II M³ 0.0400 - -
Lem Kayu Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.6. Pembuatan 1m² Pintu dan Jendela Kaca, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0240 - -
Lem Kayu Kg 0.3000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.7. Pembuatan 1m² Pintu dan Jendela Jalusi, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 3.0000 - -
Kepala Tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0640 - -
Lem Kayu Kg 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.8. Pembuatan 1m² Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup (Lebar sampai 90cm)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 - -
Tukang Kayu L.02 OH 2.1000 - -
Kepala Tukang L.03 OH 0.2100 - -
Mandor L.04 OH 0.0350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas II M³ 0.0250 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.5000 - -
Plywood 4mm Lbr 0.6700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.9. Pembuatan 1m² Daun Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0256 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.5000 - -
Plywood 4mm Lbr 0.6700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.10. Pembuatan dan Pemasangan 1m² Jalusi Kusen, Kayu Kelas I atau II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 - -
Tukang Kayu L.02 OH 2.0000 - -
Kepala Tukang L.03 OH 0.2000 - -
Mandor L.04 OH 0.3350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0600 - -
Paku Campur 1 - 5 cm Kg 0.1500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.11. Pembuatan 1m² Pintu Taekwood Rangkap,Rangka Expose Kayu Kelas I


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 - -
Tukang Kayu L.02 OH 2.4000 - -
Kepala Tukang L.03 OH 0.2400 - -
Mandor L.04 OH 0.0400 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0250 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.3000 - -
Taekwood 4mm Lbr 0.6700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.12. Pembuatan 1m² Pintu Taekwood Rangkap Lapis Formika/HPL,Rangka Expose Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.8500 - -
Tukang Kayu L.02 OH 2.5500 - -
Kepala Tukang L.03 OH 0.2550 - -
Mandor L.04 OH 0.0430 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0250 - -
Paku Campur 1 - 5 cm Kg 0.0300 - -
Lem Kayu Kg 0.8000 - -
Taekwood 4mm Lbr 0.6700 - -
Formika/HPL Lbr 0.5000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.13. Pemasngan 1m³ Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III Bentang Sampai dengan 6m
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 - -
Tukang Kayu L.02 OH 12.0000 - -
Kepala Tukang L.03 OH 1.2000 - -
Mandor L.04 OH 0.2000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas I M³ 1.1000 - -
Besi Strip 20X5mm Kg 15.0000 - -
Paku Campur 8 - 12 cm Kg 5.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.14. Pemasangan 1m³ Konstruksi Kuda-kuda Expose, Kayu Kelas I


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 - -
Tukang Kayu L.02 OH 20.1000 - -
Kepala Tukang L.03 OH 2.0100 - -
Mandor L.04 OH 0.3350 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas I M³ 1.2000 - -
Besi Strip 20X5mm Kg 15.0000 - -
Paku Campur 8 - 12 cm Kg 5.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.15. Pemasangan 1m³ Konstruksi Gordeng, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.4000 - -
Tukang Kayu L.02 OH 7.2000 - -
Kepala Tukang L.03 OH 0.7200 - -
Mandor L.04 OH 0.1200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 1.1000 - -
Besi Strip 20X5mm Kg 15.0000 - -
Paku Campur 8 - 12 cm Kg 3.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.16. Pemasangan 1m² Rangka Atap Genteng Keramik, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0140 - -
Balok Kayu Kelas II M³ 0.0036 - -
Paku Campur 5 - 10 cm Kg 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.17. Pemasangan 1m² Rangka Atap Genteng Beton, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0140 - -
Balok Kayu Kelas II M³ 0.0057 - -
Paku Campur 5 - 10 cm Kg 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.18. Pemasangan 1m² Rangka Atap Sirap, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 - -
Tukang Kayu L.02 OH 0.1200 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.1650 - -
Paku Campur 5 - 10 cm Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.19. Pemasangan 1m² Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0154 - -
Paku Campur 5 - 10 cm Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.20. Pemasangan 1m² Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang Kayu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0300 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0163 - -
Paku Campur 5 - 10 cm Kg 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.21. Pemasangan 1m Lisplank Ukuran (3 x 20) cm, Kayu Kelas I atau II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0108 - -
Paku Campur 5 - 10 cm Kg 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.22. Pemasangan 1m Lisplank Ukuran (3 x 30) cm, Kayu Kelas I atau II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0110 - -
Paku Campur 5 - 10 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.23. Pemasangan 1m² Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II atau III
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0280 - -
Paku Campur 5 - 10 cm Kg 0.1500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.25. Pemasangan 1m² Dinding Pemisah Plywood Rangkap, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Balok Kayu Kelas II M³ 0.0280 - -
Paku Campur 5 - 10 cm Kg 0.1500 - -
Plywood 4mm Lbr 0.8600 - -
Lem Kayu Kg 0.5600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.26. Pemasangan 1m² Dinding Lambrisering dari Papan Kayu Kelas I


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Kayu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Papan kayu Kelas I M³ 0.0070 - -
Paku Campur 5 - 10 cm Kg 0.1000 - -
Paku Sekrup 10cm Kg 0.1500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.27. Pemasangan 1m² Dinding Lambrisering dari Plywood Ukuran (120 x 240) cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Kayu L.02 OH 0.0750 - -
Kepala Tukang L.03 OH 0.0080 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plywood 4mm Lbr 0.4000 - -
Paku Campur 1 - 5 cm Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.1.28. Pemasangan 1m² Dinding Bilik, Rangka Kayu Kelas III atau IV
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.0500 - -
Kepala Tukang L.03 OH 0.0050 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bilik Bambu M² 1.5000 - -
Balok Kayu Kelas III M³ 0.0140 - -
Paku Campur 1 - 5 cm Kg 0.0120 - -
Papan kayu Kelas III M³ 0.0030 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.1. Pemasangan 1 Buah Kunci Tanam Antik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Kayu L.02 OH 0.6000 - -
Kepala Tukang L.03 OH 0.0600 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci Tanam Antik Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.3. Pemasangan 1 Buah Kunci Tanam Kamar Mandi


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 - -
Tukang Kayu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci Tanam KM Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.4. Pemasangan 1 Buah Kunci Tanam Silinder


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 - -
Tukang Kayu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci Silinder Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.5. Pemasangan 1 Buah Engsel Pintu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel Pintu Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.6. Pemasangan 1 Buah Engsel Jendela Kupu-kupu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0005 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel Jendela Kupu-kupu Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.7. Pemasangan 1 Buah Engsel Angin


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0005 - -
JUMLAH TENAGA KERJA -
B BAHAN
Engsel Angin Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.8. Pemasangan 1 Buah Spring Knip untuk Jendela


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Spring Knip Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.9. Pemasangan 1 Buah Spring Knip untuk Jendela


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Spring Knip Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.10. Pemasangan 1 Buah Door Closer


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Kayu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Door Closer Set 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.11. Pemasangan 1 Buah Kunci Slot (grendel) untuk Jendela


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Kayu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci Slot (Grendel) Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.12. Pemasangan 1 Buah Door Holder


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Kayu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Door Holder Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.13. Pemasangan 1 Buah Door Stop


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang Kayu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Door Stop Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.14. Pemasangan 1 Buah Rel Pintu Dorong


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Kayu L.02 OH 0.6000 - -
Kepala Tukang L.03 OH 0.0600 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rel Pintu Dorong Set 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.15. Pemasangan 1 Buah Kunci Lemari


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Kayu L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kunci Lemari Set 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.16. Pemasangan 1m² Kaca Polos Tebal 3mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Polos 3mm M² 1.1000 - -
Sealant Tube 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.17. Pemasangan 1m² Kaca Polos Tebal 5mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0008 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Polos 5mm M² 1.1000 - -
Sealant Tube 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.18. Pemasangan 1m² Kaca Polos Tebal 8mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0170 - -
Tukang Kayu L.02 OH 0.1700 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0009 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Polos 8mm M² 1.1000 - -
Sealant Tube 0.0700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.19. Pemasangan 1m² Kaca Buram Tebal 12mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 - -
Tukang Kayu L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Buram 12mm M² 1.1000 - -
Sealant Tube 0.0700 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.20. Pemasangan 1m² Kaca Cermin Tebal 5mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Cermin 5mm M² 1.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.22. Pemasangan 1m² Kaca Cermin Tebal 8mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0170 - -
Tukang Kayu L.02 OH 0.1700 - -
Kepala Tukang L.03 OH 0.0170 - -
Mandor L.04 OH 0.0090 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Cermin 8mm M² 1.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.23. Pemasangan 1m² Kaca Wireglassed Tebal 5mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Wireglassed 5mm M² 1.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.6.2.24. Pemasangan 1m² Kaca Patri Tebal 5mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0750 - -
Tukang Kayu L.02 OH 0.1500 - -
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kaca Patri 5mm M² 1.1000 - -
Sealant Tube 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.1. 1m² Pengikisan/Pengerokan Permukaan Cat Lama


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Soda Api Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.2. 1m² Pencucian Bidang Permukaan Tembok Yang Pernah dicat


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sabun Cuci Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.3. 1m² Pengerokan Karat pada Permukaan baja cara Manual


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 - -
Mandor L.04 OH 0.0080 - -
JUMLAH TENAGA KERJA -
B BAHAN
Sabun Cuci Kg 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.4. 1m² Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.0090 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Kayu Kg 0.2000 - -
Plamur Kg 0.1500 - -
Cat Dasar (Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.2600 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0300 - -
Ampelas Lbr 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.5. 1m² Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Cat L.02 OH 0.1050 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Kayu Kg 0.2000 - -
Plamur Kg 0.1500 - -
Cat Dasar (Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.3500 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0300 - -
Ampelas Lbr 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.6. Pelaburan 1m² Bidang Kayu dengan Teak Oil


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 - -
Tukang Cat L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0630 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Teak Oil Ltr 0.3600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.7. Pelaburan 1m² Bidang Kayu dengan Politur


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 - -
Tukang Cat L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0160 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Politur Ltr 0.1500 - -
Politur Jadi Ltr 0.3720 - -
Ampelas Lbr 2.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.8. Pelaburan 1m² Bidang Kayu dengan Cat Resitu atau Ter
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 - -
Mandor L.04 OH 0.0060 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Residu Ltr 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.9. Pelaburan 1m² Bidang Kayu dengan Vernis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1600 - -
Tukang Cat L.02 OH 0.1600 - -
Kepala Tukang L.03 OH 0.0160 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Vernis Ltr 0.1500 - -
Dempul Kg 0.0500 - -
Ampelas Lbr 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.10. Pengecatan 1m² Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.0630 - -
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamur Kg 0.1000 - -
Cat Dasar (Tembok) Kg 0.1000 - -
Cat Penutup (Tembok) Kg 0.2600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.11. Pengecatan 1m² Tembok Baru (, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 - -
Tukang Cat L.02 OH 0.0420 - -
Kepala Tukang L.03 OH 0.0042 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Dasar (Tembok) Kg 0.1200 - -
Cat Penutup (Tembok) Kg 0.1800 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.12. Pelaburan 1m² Tembok dengan Kalkarium (Kapur)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 - -
Tukang Cat L.02 OH 0.0420 - -
Kepala Tukang L.03 OH 0.0042 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kalkarium Kg 0.1000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.13. Pelaburan 1m² Tembok dengan Kapur Sirih


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 - -
Tukang Cat L.02 OH 0.0010 - -
Kepala Tukang L.03 OH 0.0001 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kapur Sirih Kg 0.1500 - -
Ampelas Lbr 0.1000 - -
Alang-alang Ikat 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.14. Pelaburan 1m² Tembok Lama dengan Kapur Sirih (Pemeliharaan)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 - -
Tukang Cat L.02 OH 0.0050 - -
Kepala Tukang L.03 OH 0.0005 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kapur Sirih Kg 0.3000 - -
Ampelas Lbr 0.2000 - -
Alang-alang Ikat 0.2500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.15. Pemasangan 1m² Wallpaper


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Wallpaper Lebar 50 cm M 2.2000 - -
Lem Kayu Kg 0.2000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.16. Pengecatan 1m² Permukaan Baja dengan Menie Besi


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Cat L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Besi Kg 0.1000 - -
Kuas Bh 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.17. Pengecatan 1m² Permukaan Baja dengan Menie Besi Dengan Perancah
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Cat L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0225 - -
Mandor L.04 OH 0.0075 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Besi Kg 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
Kuas Bh 0.0100 - -
Balok Kayu Kelas III M³ 0.0020 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.18. Pengecatan 1m² Permukaan Baja Secara Manual 4 Lapis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Cat L.02 OH 0.2500 - -
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0013 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Menie Besi Kg 0.2000 - -
Cat Penutup (kayu/Besi) Kg 0.0800 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.19. Pengecatan 1m² Permukaan Baja Galvanis Secara Manual Sistem 1 Lapis Cat Mutakhir
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Cat L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0120 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Penutup (kayu/Besi) Kg 0.3000 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.20. Pengecatan 1m² Permukaan Baja Galvanis Secara Manual Sistem 3 Lapis
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Cat L.02 OH 0.8000 - -
Kepala Tukang L.03 OH 0.0800 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Dasar (Kayu/Besi) Kg 0.1100 - -
Cat Antara (Cat Kayu/Besi) Kg 0.1700 - -
Cat Penutup (kayu/Besi) Kg 0.0800 - -
Kuas Bh 0.0100 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.21. Polituran 10m² dengan Politur MelamiC


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 - -
Tukang Cat L.02 OH 12.0000 - -
Kepala Tukang L.03 OH 1.2000 - -
Mandor L.04 OH 0.1000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Wood Filler Kg 1.5000 - -
Woodstain Kg 1.5000 - -
Sanding Kg 1.5000 - -
Melamic Kg 2.4000 - -
Thinner Ltr 2.0000 - -
Ampelas Lbr 6.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.7.1.22. Pengecatan 1m² Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Mutakhir
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Cat L.02 OH 0.7000 - -
Kepala Tukang L.03 OH 0.0700 - -
Mandor L.04 OH 0.0200 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat Penutup (kayu/Besi) Kg 0.3000 - -
Pengencer Cat Ltr 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.1. Pemasangan 1 Buah Closet Duduk/Monoblock


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Tukang Batu L.02 OH 1.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.1600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Closet Duduk Unit 1.0000 - -
Perlengkapan Ls 0.0600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.2. Pemasangan 1 Buah Closet Jongkok Porselen


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Batu L.02 OH 1.5000 - -
Kepala Tukang L.03 OH 0.1500 - -
Mandor L.04 OH 0.1600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Closet Jongkok Porselen Unit 1.0000 - -
Pasangan Bata Camp. 1PC : 3PP M² 0.0360 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.3. Pemasangan 1 Buah Closet Jongkok Teraso


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Batu L.02 OH 1.5000 - -
Kepala Tukang L.03 OH 0.1500 - -
Mandor L.04 OH 0.1600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Closet Jongkok Teraso Unit 1.0000 - -
Pasangan Bata Camp. 1PC : 3PP M² 0.0360 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.4. Pemasangan 1 Buah Urinoir


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 - -
Tukang Batu L.02 OH 1.0000 - -
Kepala Tukang L.03 OH 0.1000 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Urinoir Unit 1.0000 - -
Semen Portland Kg 6.0000 - -
Pasir Pasang M³ 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.5. Pemasangan 1 Buah Wastafel


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 1.4500 - -
Kepala Tukang L.03 OH 0.1500 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Wastafel Unit 1.2000 - -
Semen Portland Kg 6.0000 - -
Pasir Pasang M³ 0.0100 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.6. Pemasangan 1 Buah Bak Mandi Teraso Volume 0,30 m³


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 - -
Tukang Batu L.02 OH 4.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.9000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bak Mandi Teraso Vol. 0,30 m³ Unit 1.0000 - -
Perlengkapan Ls 0.0600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.7. Pemasangan 1 Buah Bak Mandi Fiberglass Volume 0,30 m³


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 - -
Tukang Batu L.02 OH 4.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.9000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bak Mandi Fiberglass Vol. 0,30 m³ Unit 1.0000 - -
Perlengkapan Ls 0.0600 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.8. Pemasangan 1 Buah Bak Mandi Pasangan Bata Volume 0,30 m³


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 - -
Tukang Batu L.02 OH 3.0000 - -
Kepala Tukang L.03 OH 0.3000 - -
Mandor L.04 OH 0.0300 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 150.0000 - -
Semen Portland Kg 120.0000 - -
Pasir Pasang M³ 0.3000 - -
Keramik Porselen 11 x 11 cm Bh 360.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.9. Pemasangan 1 Buah Bathtub Porselen


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0750 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bathtub Porselen Unit 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.10. Pemasangan 1 Buah Bak Beton Volume 1 m³


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.5000 - -
Tukang Batu L.02 OH 4.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0180 - -
JUMLAH TENAGA KERJA -
B BAHAN
Beton camp. 1PC : 2PP : 3KR M³ 0.9000 - -
Besi Beton Polos Kg 180.0000 - -
Papan kayu Kelas III M³ 8.0000 - -
Keramik Porselen 20 x 20 cm Bh 500.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.11. Pemasangan 1 Buah Bak Air Fiberglass Volume 1 m³


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 - -
Tukang Batu L.02 OH 0.4500 - -
Kepala Tukang L.03 OH 0.0450 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bak Mandi Fiberglass Vol. 1 m³ Unit 1.0000 - -
Perlengkapan Ls 0.1200 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.16. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30 x 30 cm tinggi 35cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 2.1600 - -
Tukang Batu L.02 OH 0.7200 - -
Kepala Tukang L.03 OH 0.0720 - -
Mandor L.04 OH 0.0110 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 40.0000 - -
Semen Portland Kg 44.0000 - -
Pasir Pasang M³ 0.0700 - -
Pasir Beton M³ 0.0600 - -
Kerikil/agregat M³ 0.0700 - -
Besi Beton Polos Kg 1.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.17. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 45 x 45 cm tinggi 50cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 - -
Tukang Batu L.02 OH 1.1500 - -
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 70.0000 - -
Semen Portland Kg 77.0000 - -
Pasir Pasang M³ 0.1300 - -
Pasir Beton M³ 0.0900 - -
Kerikil/agregat M³ 0.0200 - -
Besi Beton Polos Kg 2.6000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.18. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60 x 60 cm tinggi 65cm dengan Tutup Beton
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 - -
Tukang Batu L.02 OH 1.1500 - -
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Biasa Bh 123.0000 - -
Semen Portland Kg 114.0000 - -
Pasir Pasang M³ 0.1840 - -
Pasir Beton M³ 0.1200 - -
Kerikil/agregat M³ 0.0330 - -
Besi Beton Polos Kg 4.8500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.19. Pemasangan 1m Pipa Galvanis Diameter 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0270 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 1/2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.20. Pemasangan 1m Pipa Galvanis Diameter 3/4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0270 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 3/4" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.21. Pemasangan 1m Pipa Galvanis Diameter 1"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0270 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 1" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.22. Pemasangan 1m Pipa Galvanis Diameter 1 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 - -
Tukang Batu L.02 OH 0.1800 - -
Kepala Tukang L.03 OH 0.0180 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 1 1/2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.23. Pemasangan 1m Pipa Galvanis Diameter 3"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 - -
Tukang Batu L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0230 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 3" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.5.1.1.24. Pemasangan 1m Pipa Galvanis Diameter 4"
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 - -
Tukang Batu L.02 OH 0.2250 - -
Kepala Tukang L.03 OH 0.0230 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 4" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.25. Pemasangan 1m Pipa PVC tipe AW Diameter 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 - -
Tukang Batu L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 1/2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.26. Pemasangan 1m Pipa PVC tipe AW Diameter 3/4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 - -
Tukang Batu L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Galvanis 3/4" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.27. Pemasangan 1m Pipa PVC tipe AW Diameter 1"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 - -
Tukang Batu L.02 OH 0.0600 - -
Kepala Tukang L.03 OH 0.0060 - -
Mandor L.04 OH 0.0020 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 1" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.28. Pemasangan 1m Pipa PVC tipe AW Diameter 1 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 1 1/2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.29. Pemasangan 1m Pipa PVC tipe AW Diameter 2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 - -
Tukang Batu L.02 OH 0.0900 - -
Kepala Tukang L.03 OH 0.0090 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.30. Pemasangan 1m Pipa PVC tipe AW Diameter 2 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 - -
Tukang Batu L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0135 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 2 1/2" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.31. Pemasangan 1m Pipa PVC tipe AW Diameter 3"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 - -
Tukang Batu L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0135 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 3" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.32. Pemasangan 1m Pipa PVC tipe AW Diameter 4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 - -
Tukang Batu L.02 OH 0.1350 - -
Kepala Tukang L.03 OH 0.0135 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 4" M 1.2000 - -
Perlengkapan Ls 0.3500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.33. Pemasangan 1 Buah Bak Cuci Piring Stainlessteel


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 - -
Tukang Batu L.02 OH 0.3000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bak Cuci Piring Stainlessteel Unit 1.0000 - -
Waterdrain Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.34. Pemasangan 1 Buah Bak Cuci Piring Teraso


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 - -
Tukang Batu L.02 OH 0.5000 - -
Kepala Tukang L.03 OH 0.0500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bak Cuci Piring Teraso Unit 1.0000 - -
Waterdrain Bh 1.0000 - -
Semen Portland Kg 20.0000 - -
Pasir Pasang M³ 0.0500 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.35. Pemasangan 1 Buah Kran Diameter 1/2" atau 3/4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang Batu L.02 OH 0.4000 - -
Kepala Tukang L.03 OH 0.0400 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kran Air 1/2" Bh 1.0000 - -
Sealtape Bh 0.0250 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.36 Pemasangan 1 Buah Floor Drain


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 - -
Tukang Batu L.02 OH 0.1000 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Floor Drain Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.37. Pemasangan 1m Pipa Air Limbah Jenis Pipa Tanah Diameter 20cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 - -
Tukang Batu L.02 OH 0.0400 - -
Kepala Tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 8" M 1.6000 - -
Semen Portland Kg 35.0000 - -
Pasir Pasang M³ 0.0140 - -
Pasir Urug M³ 0.0140 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.38. Pemasangan 1m Pipa Air Limbah Jenis Pipa Tanah Diameter 15cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 - -
Tukang Batu L.02 OH 0.0300 - -
Kepala Tukang L.03 OH 0.0030 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 6" M 1.6000 - -
Semen Portland Kg 0.9300 - -
Pasir Pasang M³ 0.0130 - -
Pasir Urug M³ 0.0110 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.39. Pemasangan 1m Pipa Beton Diameter 15 - 20 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 - -
Tukang Batu L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0070 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 6" M 1.1000 - -
Bata Merah Biasa Bh 20.4120 - -
Semen Portland Kg 0.9300 - -
Pasir Pasang M³ 0.0560 - -
Pasir Urug M³ 0.0240 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.5.1.1.40. Pemasangan 1m Pipa Beton Diameter 30-100 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 - -
Tukang Batu L.02 OH 0.1900 - -
Kepala Tukang L.03 OH 0.0190 - -
Mandor L.04 OH 0.0190 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa PVC AW 6" M 1.1000 - -
Bata Merah Biasa Bh 415.8000 - -
Semen Portland Kg 10.3000 - -
Pasir Pasang M³ 0.0610 - -
Pasir Urug M³ 0.0690 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.6.1.1.1. Pemasangan 1 Buah MCCB


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Upah Ls 1.0000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Listrik 5/8" Btg 3.0000 - -
Kabel m 15.0000 - -
T Dus Bh 1.0000 - -
L Bow Bh 2.0000 - -
Klem Kabel Biasa Bh 24.0000 - -
MCCB (Box MCB) Bh 1.0000 - -
MCB Bh 2.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.6.2.1.1. Pemasangan 1 Buah Titik Lampu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SAT KOEF
(Rp) SATUAN (Rp)
A TENAGA
Upah Ls 1.0000 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pipa Listrik 5/8" Btg 3.0000 - -
Kabel m 24.0000 - -
T Dus Bh 3.0000 - -
L Bow Bh 4.0000 - -
Las Dop Bh 3.0000 - -
Klem Kabel Biasa Bh 24.0000 - -
Mongkok Bh 1.0000 - -
Saklar Tunggal Bh 1.0000 - -
Fitting Lampu Bh 1.0000 - -
-
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

0
Dibuat Oleh :
?

?
?
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI

RENCANA ANGGARAN BIAYA ( RAB )

Pekerjaan :?
Lokasi :?
Volume :?
T. Anggaran :?

HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME JUMLAH (Rp.)
(Rp.)

1 2 3 4 5 6 7 =(5 x 6)
I PEKERJAAN PERSIAPAN
1 Pekerjaan Bongkaran Ls 1.00 1,500,000.00 1,500,000.00
2 Persiapan / Pembersihan Lokasi Ls 1.00 1,000,000.00 1,000,000.00
3 Pengukuran dan Pemasangan Bowplank Ls 1.00 500,000.00 500,000.00
4 Papan Nama Proyek Ls 1.00 200,000.00 200,000.00
5 Administrasi, Dokumentasi dan P3K Ls 1.00 700,000.00 700,000.00
Sub Total ( I ) 2,400,000.00
II PEKERJAAN TANAH DAN PASIR
1 #NAME? Pek. Galian Tanah Pondasi Pagar M3 8.39 #NAME? #NAME?
2 #NAME? Urugan Tanah Kembali Galian Pondasi Pagar M3 2.80 #NAME? #NAME?
3 #NAME? Pek. Galian Tanah Pondasi Taman M3 1.68 #NAME? #NAME?
4 #NAME? Urugan Tanah Kembali Galian Pondasi Taman M3 0.56 #NAME? #NAME?
5 #NAME? Pek. Galian Tanah Papan Nama M3 1.05 #NAME? #NAME?
6 #NAME? Urugan Tanah Kembali Papan Nama M3 0.35 #NAME? #NAME?
7 #NAME? Urugan Pasir Bawah Pondasi Pagar M3 0.63 #NAME? #NAME?
8 #NAME? Urugan Pasir Bawah Jalur Pejalan Kaki M3 1.07 #NAME? #NAME?
8 #NAME? Urugan Pasir Bawah Pondasi Papan Nama M3 0.21 #NAME? #NAME?
10 #NAME? Urugan Tanah Urugan Tanah Biasa M3 16.84 #NAME? #NAME?
Sub Total ( II ) #NAME?
III PEKERJAAN PONDASI
1 #NAME? Pas. Batu Kosong M3 1.87 #NAME? #NAME?
1 #NAME? Pas. Pondasi Batu Gunung Pagar M3 3.38 #NAME? #NAME?
1 #NAME? Pas. Batu Gunung Taman M3 7.09 #NAME? #NAME?
1 #NAME? Pas. Batu Gunung Papan Nama M3 2.97 #NAME? #NAME?
Sub Total ( III ) #NAME?
IV PEKERJAAN PAGAR DAN PAPAN NAMA KANTOR
1 #NAME? Pek. Rabat Beton M3 1.11 #NAME? #NAME?
2 Pek. Kolom 40/40, camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #NAME?
#NAME? Besi Tulangan Kg #REF! #NAME? #NAME?
#NAME? Bekisting M2 #REF! #NAME? #NAME?
2 #NAME? Pek. Kolom praktis Papan Nama M 2.25 #NAME? #NAME?
1 Pek. Sloof Pagar dan Papan Nama 15/15 Camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #NAME?
#NAME? Pembesian Kg #REF! #NAME? #NAME?
#NAME? Bekisting M2 #REF! #NAME? #NAME?
3 Pek. Balok Pagar dan Papan Nama10/15, Camp. 1Pc:2Kr:3Pp
#NAME? Beton M3 #REF! #NAME? #REF!
#NAME? Besi Tulangan Kg #REF! #NAME? #REF!
#NAME? Bekisting M2 #REF! #NAME? #REF!
6 #NAME? Pas. Dinding Bata Pagar M2 15.73 #NAME? #NAME?
6 #NAME? Pas. Dinding Bata Papan Nama M2 3.69 #NAME? #NAME?
7 #NAME? Pek. Plasteran Pondasi, Pagar, dan Papan Nama M2 77.65 #NAME? #NAME?
7 #NAME? Pek. Plasteran Penebalan Kolom Pagar M2 17.60 #NAME? #NAME?
1 #NAME? Pembuatan Topi Kolom Beton M3 0.20 #NAME? #NAME?
8 #NAME? Pek. Acian M2 73.08 #NAME? #NAME?
9 #NAME? Pengecatan Tembok Baru M2 73.08 #NAME? #NAME?
HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME JUMLAH (Rp.)
(Rp.)

1 2 3 4 5 6 7 =(5 x 6)
#NAME? Pas. Dinding Batu Alam 15x30cm M2 11.80 #NAME? #NAME?
#NAME? Pek. Railing Pagar M2 17.15 #NAME? #NAME?
#NAME? Pengecatan Railing Pagar M2 28.48 #NAME? #NAME?
18 Tambahan Pas. Huruf Akrilik "PEMERINTAH KOTA BAUBAU" t=15cm CM 300.00 20,000.00 6,000,000.00
19 Tambahan Pas. Huruf Akrilik "DINAS PERIKANAN" t=27cm CM 378.00 20,000.00 7,560,000.00
19 Tambahan Pas. Huruf Akrilik "JALAN WAODE WAU NOMOR 65 93721 04022 CM 360.00 20,000.00 7,200,000.00
19 Tambahan Pas. Akrilik LOGO KITA BAUBAU t=75cm CM 75.00 20,000.00 1,500,000.00
, Sub Total ( IV ) #REF!

JUMLAH TOTAL I+II+III+IV #REF!

Baubau, Juni 2022

Dibuat Oleh :
?

?
Kepala Dinas Perhubungan ?
Kota Baubau
LOGO DAN NAMA INSTANSI
LOGO DAN NAMA INSTANSI

REKAPITULASI

Pekerjaan :?
Lokasi :?
Volume :? 187
T. Anggaran :? 6
193

NO. URAIAN PEKERAJAAN JUMLAH (Rp.)

1 2 3
### #NAME?
I PEKERJAAN PERSIAPAN Rp 2,400,000.00

II PEKERJAAN TANAH DAN PASIR Rp #NAME?

III PEKERJAAN PONDASI Rp #NAME?

IV PEKERJAAN PAGAR DAN PAPAN NAMA KANTOR Rp #REF!

REAL COST (A) Rp #REF!


PPN (11 % x A) (B) Rp #REF!
Total Pekerjaan Fisik ( A + B ) (C) Rp #REF!
Dibulatkan (D) Rp #REF!

TERBILANG : #NAME?

Baubau, Juni 2022

Dibuat Oleh : Mengetahui/Menyetujui :


? ?
?
?

? ?
? ?

Mengetahui/Menyetujui :
PELAKSANA TUGAS KADIS LINGKUNGAN HIDUP
KOTA BAUBAU
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK)

Drs. RUSLAN RZ.,Msi


NIP. 196500105 199401 1 001
PEMERINTAH KAB. BUTON SELATAN
DINAS PARIWISATA
DAN EKONOMI KREATIF

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :
Pembangunan Pusat Informasi TIC di Wisata Permadian Kaburaburana

LOKASI
Desa Lawela Kec. Batauga

KONSULTAN PERENCANA
TAHUN ANGGARAN
2019