1 Mandor L.04 Hr
2 Pekerja L.01 Hr
3 Tukang Batu L.02 Hr
4 Tukang Kayu L.02 Hr
5 Tukang Besi L.02 Hr
6 Tukang Cat L.02 Hr
7 Tukang Gali L.02 Hr
8 Tukang Listrik L.02 Hr
9 Tukang Plitur L.02 Hr
10 Tukang Jalan L.02 Hr
11 Tukang masak aspal L.02 Hr
12 Tukang Ledeng L.02 Hr
13 Kep Tukang Batu L.03 Hr
14 Kep Tukang Kayu L.03 Hr
15 Kep Tukang Besi L.03 Hr
16 Kep Tukang Cat L.03 Hr
17 Penjaga Malam / Satpam L.01 Hr
18 Sopir L.03 Hr
19 Pembantu Sopir / Kenek L.01 Hr
20 Operator Alat Berat L.05 Hr
21 Pembantu Operator Alat Berat L.06 Hr
22 Mekanik / Teknisi Alat Berat L.03 Hr
23 Juru Ukur L.07 Hr
HARGA
(Rp)
Rp121,000.00
Rp88,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp110,000.00
Rp110,000.00
Rp110,000.00
Rp110,000.00
Rp88,000.00
Rp110,000.00
Rp88,000.00
Rp132,000.00
Rp94,000.00
Rp110,000.00
Rp127,000.00
1. STANDAR HARGA MATERIAL KONSTRUKSI BIDANG BANGUNAN
V. BAHAN PIPA
I Pipa PVC SII SCJ ,S - 12,5 (10 bar)
Pipa PVC Maspion tipe AW diameter 1/2"
Pipa PVC Maspion tipe AW diameter 3/4"
Pipa PVC Maspion tipe AW diameter 1"
Pipa PVC Maspion tipe AW diameter 1 1/4"
Pipa PVC Maspion tipe AW diameter 1 1/2"
Pipa PVC Maspion tipe AW diameter 2"
Pipa PVC Maspion tipe AW diameter 2 1/2"
Pipa PVC Maspion tipe AW diameter 3"
Pipa PVC Maspion tipe AW diameter 4"
Pipa PVC Maspion tipe AW diameter 5"
Pipa PVC Maspion tipe AW diameter 6"
Pipa PVC Wavin tipe AW diameter 1/2"
Pipa PVC Wavin tipe AW diameter 1"
Pipa PVC Wavin tipe AW diameter 3/4"
Pipa PVC Wavin tipe AW diameter 1 1/4"
Pipa PVC Wavin tipe AW diameter 1 1/2"
Pipa PVC Wavin tipe AW diameter 2"
Pipa PVC Wavin tipe AW diameter 2 1/2"
Pipa PVC Wavin tipe AW diameter 3"
NO. URAIN BELANJA
Pipa PVC Wavin tipe AW diameter 4"
Pipa PVC Wavin type S 12,5 uk.2"
Pipa PVC Wavin type S 12,5 uk.3"
Pipa PVC Wavin type S 12,5 uk.4"
Pipa PVC Wavin type S 12,5 uk.6"
Pipa PVC Wavin type S 12,5 uk.8"
Pipa PVC Maspion type S 10 +MOF 8"
Pipa PVC Maspion type S 10 +RR 2"
Pipa PVC Maspion type S 10 +RR 2 1/2"
Pipa PVC Maspion type S 10 +RR 3"
Pipa PVC Maspion type S 10 +RR 4"
Pipa PVC Maspion type S 10 +RR 5"
Pipa PVC Maspion type S 10 +RR 6"
Pipa PVC Maspion type S 10 +RR 8"
Pipa PVC Maspion type S 12,5 +MOF 8"
Pipa PVC Maspion type S 12,5 +RR 2"
Pipa PVC Maspion type S 12,5 +RR 3"
Pipa PVC Maspion type S 12,5 +RR 4"
Pipa PVC Maspion type S 12,5 +RR 5"
Pipa PVC Maspion type S 12,5 +RR 6"
Pipa PVC Maspion type S 12,5 +RR 8"
II. BAHAN KAYU
JATI
Kayu Jati Kelas I (Papan)
Kayu Jati Kelas I (Balok/Pesagen)
Marmer
SOFT BOARD
Gypsum Tebal 9 mm (Elepant & Jaya Board)
HARD BOARD
Kalsiboard 1,20 X 2,40
PVC BOARD
Pvc Plafon Motif
NO URAIAN BELANJA
1 Mandor
2 Pekerja
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Tukang Cat
7 Tukang Gali
8 Tukang Listrik
9 Tukang Plitur
10 Tukang Jalan
11 Tukang Masak Aspal
12 Tukang Ledeng
13 Kep Tukang Batu
14 Kep Tukang Kayu
15 Kep Tukang Besi
16 Kep Tukang Cat
17 Penjaga Malam / Satpam
18 Sopir
19 Pembantu Sopir / Kenek
20 Operator Alat Berat
21 Pembantu Operator Alat Berat
22 Mekanik / Teknisi Alat Berat
23 Juru Ukur
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
HARGA
SATUAN
PEKERJAA
I A. 2.2.1
N
PERSIAPA
N
Pagar Sementara
dari Seng
1 A.2.2.1.2 1 m'
Gelombang Tinggi
2m
A TENAGA
L.01 0.2 OH Pekerja
L.02 0.4 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.02 OH Mandor
B BAHAN
Kayu Dolken
1.25 Btg diameter 8 - 10 /
400 cm
Seng Gelombang
1.2 m3
3" - 5"
Harga Satuan
F
Pekerjaan (D+E)
Overhe
ad &
Profit
10%
Pengukuran dan
2 A.2.2.1.4 1 m' Pemasangan
Bouwplank
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
Kayu 5/7x 4m
0.012 m3
Kayu Kruing
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Membersihkan
5 A.2.2.1.9 1 m2 Lapangan dan
Perataan
A Tenaga
L.01 0.1 OH Pekerja
L.04 0.05 OH Mandor
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Pembuatan
6 A.2.2.1.10 1 m2 Steger/Perancah
dari Bambu
A Tenaga
L.01 1 OH Pekerja
L.02 2 OH Tukang Kayu
L.03 0.2 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
Bambu diameter 6
1.25 Btg
- 8 / 600 cm
D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Mengurug Tanah
14 A.2.3.1.14.B 1 m3 Pilihan (Tanah
Merah)
0 ,25 OH Pekerja
0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Pengurugan
9 A.2.3.1.9 1 m3
Kembali
Pengurugan
Kembali di hitung
dari 1/3 kali
koefisien
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)
Pemasangan Pondasi
3 A.3.2.1.3 1 m3 Batu Belah 1SP : 5
PP
A TENAGA
L.01 1 ,5 OH Pekerja
B BAHAN
1 ,2 m3 Batu Belah
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Pemasang Batu
9 A.3.2.1.9 1 m3
Kosong/Anstamping
A Tenaga
L.01 0 ,78 OH Pekerja
B Bahan
1 ,2 m3 Batu Belah
C PERALATAN
D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)
Memasang Bekisting
19 A.4.1.1.21 1 m2
untuk Sloof
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Memasang Bekisting
21 A.4.1.1.22 1 m2
untuk Kolom
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Memasang Bekisting
23 A.4.1.1.23 1 m2
untuk Balok
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Membuat Beton
mutu f'c=21,7 MPa
8 A.4.1.1.8 1 m3
(K250), slum (1
2±2)cm, w/c = 0,56
A Tenaga
B Bahan
Kerikil (maksimum
1,039 Kg
30 mm)
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
HARGA
SATUAN
3 A.4.4.1 PEKERJAAN
PASANGAN
DINDING
Pemasangan Dinding
Bata Merah Ukuran
3 A.4.4.1.3 1 m2 (5x11x22) cm Tebal 1
Bata Camp. 1SP :
4PP
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Memasang Bekisting
21 A.4.1.1.22 1 m2
untuk Kolom
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
HARGA SATUAN
5 A.4.4.2 PEKERJAAN
PLESTERAN
Pemasangan
4 A.4.4.2.4 1 m2 Plesteran 1 Pc : 4 Pp
Tebal 15 mm
A Tenaga
L.01 0 ,3 OH Pekerja
B Bahan
C PERALATAN
D Jumlah A + B + C
Tenaga
C PERALATAN
D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pembesian dg Besi
14 A.4.1.1.17.a 1 Kg
Polos atau Besi Ulir
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
HARGA SATUAN
PEKERJAAN
9 A.4.4.3
PENUTUP LANTAI
DAN DINDING
Pemasangan 1 m2
lantai ubin PC abu-
1 A.4.4.3.1 1 m2
abu ukuran 40cm x
40 cm
A Tenaga
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Pemasangan lantai
6 A.4.4.3.6 1 m2 Ubin PC Warna Uk.
20 x 20 cm
A Tenaga
B Bahan
10 ,4 Kg Portland Semen
1 Kg Semen warna
C PERALATAN
D Jumlah A + B + C
URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
HARGA
SATUAN
7 A.4.5.2 PEKERJAAN
PENUTUP
ATAP
Pemasangan 1 m2
2 A.4.5.2.2 1 m2 atap genteng kodok
glazuur
A Tenaga
B Bahan
Genteng Kodok
25 Buah
Glazour
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Overhea
d&
Profit
10%
URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
Pemasangan 1 m’
6 A.4.5.2.5 1 m' bubung genteng
kodok glazuur
A Tenaga
B Bahan
Kerpus Kodok
5 Buah
(Glazour)
8 Kg Portland Semen
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
HARGA SATUAN
6 A.4.6.1 PEKERJAAN K A
Y U
Pembuatan &
Pemasangan Kosen
1 A.4.6.1.1 1 m3
Pintu & Jendela
A Kayu Jati Kelas II
Tenaga
L.01 7 OH Pekerja
B Bahan
Kayu Jati Kelas II
1 ,10 m3
(Balok/Pesagen)
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pembuatan &
Pemasangan Daun
4 A.4.6.1.4 1 m2 Pintu Klamp
Sederhana Kayu
Klas III
Tenaga
Bahan
Kayu Klas II
0.04 m3
(Kamfer), papan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pembuatan&Pemasa
ngan Konstruksi
17 A.4.6.1.14.(a) 1 m3
Kuda-kuda Kayu
A Jati Kelas II
Tenaga
B Bahan
Kayu Jati Kelas II
1.2 m3
(Balok/Pesagen)
15 Kg Besi Strip
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pemasangan
konstruksi Nok,
18 A.4.6.1.15 1 m3 Gording, Muirplat &
Jurai kayu Kruing
A Tenaga Klas I
B Bahan
15 Kg Besi Strip
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pemasangan Rangka
23 A.4.6.1.18 1 m2 Atap Sirap, Kayu
Kruing
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
Pemasangan Rangka
Langit-langit (60x60)
25 A.4.6.1.20 1 m2
cm, kayu Klas II
atau Klas III
A Tenaga
L.01 0 ,2 OH Pekerja
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN
Pemasangan
Listplank Uk.
26 A.4.6.1.21 1 m'
(3x20)cm Kayu Jati
Kelas II
A Tenaga
L.01 0 ,1 OH Pekerja
B Bahan
Kayu Jati Kelas II
0.0108 m3
(Papan)
0 ,10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)
A TENAGA
KERJA
Pekerja L.01 OH
Tukang L.02 OH
kayu
Kepala L.03 OH
tukang
Mandor L.04 OH
B BAHAN
Gypsum Lembar
tebal 9
mm
(Elepant
& Jaya
Board)
PAKU - kg
sekrup
C PERALA
TAN
D Jumlah
(A+B+C)
E Biaya Umum dan Keuntungan
F Harga
Satuan
Pekerjaa
n (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
HARGA
SATUAN
10 A.4.6.2 PEKERJAA
N KUNCI
dan KACA
Pemasangan
1 A.4.6.2.2 1 Buah Kunci Tanam
Biasa
A Tenaga
L.01 0.01 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
Kunci Tanam
1 Buah
Biasa 2 Slag
C PERALATAN
D Jumlah A + B + C
Pemasangan
4 A.4.6.2.5 1 Buah
Engsel Pintu
A Tenaga
L.01 0.015 OH OH OH OH Pekerja
L.02 0.15 Tukang Kayu
L.03 0.015 Kepala Tukang
L.04 0.0008 Mandor
B Bahan
Engsel pintu
1 Buah
Nylon Kupu-Kupu
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
Pemasangan
5 A.4.6.2.6 1 Buah Engsel Jendela
Kupu-kupu
A Tenaga
L.01 0.01 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.0005 OH Mandor
B Bahan
Engsel Jendela
1 Buah
Kupu-Kupu Biasa
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
KODE URAIAN HARGA SATUAN
NO. SAT
ANALISA PEKERJAAN PEKERJAAN
(Rp)
1 2 3 4 Rp 5.00
HARGA SATUAN
I A. 2.2.1 PEKERJAAN
PERSIAPAN
Keselamatan Dan
1 1:19 Lump Sum Rp 704,000.00
Kesehatan Kerja
Pagar Sementara
dari Seng
2 A.2.2.1.2 m' Rp 923,268.50
Gelombang Tinggi
2,00 m
Pengukuran dan
3 A.2.2.1.4 Pemasangan m' Rp 222,513.50
Bouwplank
Membersihkan
4 A.2.2.1.9 Lapangan dan m2 Rp 16,335.00
Perataan
HARGA SATUAN
II A.2.3.1 PEKERJAAN
TANAH
Menggali Tanah
1 A.2.3.1.1 m3 Rp 75,927.50
Biasa Sedalam 1 m
Pengurugan
2 A.2.3.1.9 m3 Rp 55,055.00
Kembali
Mengurug Tanah
4 A.2.3.1.14.B Pilihan (Tanah m3 Rp 199,127.50
Merah)
DAF
TAR HA
RGA SA AN
TUAN P
E K NO.
ERJA KODE URAIAN HARGA SATUAN
SAT
ANALISA PEKERJAAN PEKERJAAN
(Rp)
1 2 3 4 Rp 5.00
HARGA SATUAN
III A.3.2.1. PEKERJAAN
PONDASI
Pemasangan
1 A.3.2.1.3 Pondasi Batu m3 Rp 977,642.29
Belah 1SP : 5 PP
Pemasang Batu
2 A.3.2.1.9 Kosong/Anstampin m3 Rp 605,830.50
g
HARGA SATUAN
PEKERJAAN
IV A.4.4.1
PASANGAN
DINDING
Pemasangan
Dinding Bata
Merah Ukuran
1 A.4.4.1.3 m2 Rp 253,178.30
(5x11x22) cm
Tebal 1 Bata
Camp. 1SP : 4PP
HARGA SATUAN
V A.4.4.2 PEKERJAAN
PLESTERAN
Pemasangan
1 A.4.4.2.4 Plesteran 1 Pc : 4 m2 Rp 65,518.33
Pp Tebal 15 mm
(Rp)
1 2 3 4 Rp 5.00
HARGA SATUAN
VI A.4.6.1 PEKERJAAN K
A Y U
Pembuatan &
Pemasangan Kosen
1 A.4.6.1.1 m3 Rp 17,839,910.00
Pintu & Jendela
Kayu Jati Kelas II
Pembuatan &
Pemasangan Daun
2 A.4.6.1.4 Pintu Klamp m2 Rp 692,370.80
Sederhana Kayu
Klas III
Pembuatan&Pema
A.4.6.1.14. sangan Konstruksi
3 m3 Rp 19,354,538.50
(a) Kuda-kuda Kayu
Jati Kelas II
Pemasangan
konstruksi Nok,
4 A.4.6.1.15 Gording, Muirplat m3 Rp 14,350,198.50
& Jurai kayu
Kruing klas I
Pemasangan
5 A.4.6.1.18 Rangka Atap m2 Rp 146,194.62
Sirap, Kayu Kruing
Pemasangan
Rangka Langit-
6 A.4.6.1.20 langit (60x60) cm, m2 Rp 199,681.72
kayu Klas II atau
III
Pemasangan
Listplank Uk.
7 A.4.6.1.21 m' Rp 191,075.50
(3x20)cm Kayu Jati
Kelas II
DAF
TAR HA
RGA SA
TUAN P
EKERJA KODE URAIAN HARGA SATUAN
NO.
AN SAT
ANALISA PEKERJAAN PEKERJAAN
(Rp)
1 2 3 4 Rp 5.00
HARGA SATUAN
VI A.4.1.1 PEKERJAAN B
ETON
Membuat Beton
mutu f'c=21,7 MPa
1 A.4.1.1.8 (K250), slum m3 Rp 1,197,754.61
(12±2)cm, w/c =
0,56
Memasang
2 A.4.1.1.21 Bekisting untuk m2 Rp 181,891.60
Sloof
Memasang
3 A.4.1.1.22 Bekisting untuk m2 Rp 461,667.80
Kolom
Memasang
4 A.4.1.1.23 Bekisting untuk m2 Rp 491,367.80
Balok
HARGA SATUAN
VII A.4.5.2 PEKERJAAN
PENUTUP ATAP
Pemasangan 1 m2
1 A.4.5.2.2 atap genteng m2 Rp 162,220.30
kodok glazuur
Pemasangan 1 m’
2 A.4.5.2.5 bubung genteng m' Rp 150,486.78
kodok glazuur
HARGA SATUAN
VIII A.4.5.1 PEKERJAAN
LANGIT-LANGIT
1 0 0 m2 Rp -
HARGA SATUAN
PEKERJAAN
XI A.4.6.2
KUNCI dan
KACA
Pemasangan Kunci
1 A.4.6.2.2 Buah Rp227,133.50
Tanam Biasa
Pemasangan
3 A.4.6.2.5 Buah Rp36,208.48
Engsel Pintu
Pemasangan
4 A.4.6.2.6 Engsel Jendela Buah Rp32,384.55
Kupu-kupu
Pemasangan Kaca
5 A.4.6.2.17 m2 Rp170,958.48
tebal 5 mm
HARGA SATUAN
PEKERJAAN
XII A.4.4.3
PENUTUP LANTAI
DAN DINDING
1 0 0 m2 Rp -
2 0 0 m2 Rp -
HARGA SATUAN
XIII A.4.7.1 PEKERJAAN
PENGECATAN
Pengecatan 1 M2
Bidang Kayu Baru
5 A.4.7.1.5 (1 lp Plamuur, 1 lp m2 Rp73,395.30
Cat dasar, 3 Lp
Cat Penutup)
Pengecatan 1m2
Tembok Baru
3 A.4.7.1.10 (1lap.Plamur, 1lap m2 Rp52,198.30
Cat Dasar 2 lap.
Cat Penutup)
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
N BELANJA SATUAN
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
N BELANJA SATUAN
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
zak
zak
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
bh
bh
N BELANJA SATUAN
Kg
Kg
Kg
Kg
Kg
m2
m2
m2
m2
m2
m2
m2
m2
m
Kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
N BELANJA SATUAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
m3
m3
m3
m3
m3
m3
btg
btg
btg
m3
m3
m3
m3
m3
m3
N BELANJA SATUAN
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
bt
m3
m3
bt
m3
pak
bh
bh
bh
bh
bh
bh
bh
bh
bh
N BELANJA SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
N BELANJA SATUAN
bh
bh
bh
bh
lbr
lbr
lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
m
m
lbr
lbr
lbr
lbr
N BELANJA SATUAN
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
m2
m2
m2
bh
bh
m
m
m
N BELANJA SATUAN
dos
dos
dos
dos
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
N BELANJA SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
lbr
m
m
m
lbr
lbr
m2
N BELANJA SATUAN
kg
kg
kg
kg
kg
bh
bh
kg
kg
kg
L.04 Hr
L.01 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.03 Hr
L.03 Hr
L.03 Hr
L.03 Hr
L.01 Hr
L.03 Hr
L.01 Hr
L.05 Hr
L.06 Hr
L.03 Hr
L.07 Hr
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 923,268.50
Rp 88,000.00 Rp 17,600.00
Rp 99,000.00 Rp 39,600.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 2,420.00
Rp 61,820.00
Rp 32,000.00 Rp 40,000.00
Rp 1,350.00 Rp 3,375.00
Rp 53,000.00 Rp 63,600.00
Rp 374,000.00 Rp 1,870.00
Rp 295,000.00 Rp 2,655.00
Rp 9,000,000.00 Rp 648,000.00
Rp 19,000.00 Rp 1,140.00
Rp 37,500.00 Rp 16,875.00
Rp 839,335.00
10% Rp 83,933.50
Rp 923,268.50
Rp 222,513.50
Rp 20,405.00
Rp 88,000.00 Rp 8,800.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 605.00
Rp 181,880.00
Rp 9,000,000.00 Rp 108,000.00
Rp 19,000.00 Rp 380.00
Rp 10,500,000.00 Rp 73,500.00
Rp 202,285.00
10% Rp 20,228.50
Rp 222,513.50
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 16,335.00
Rp 14,850.00
Rp 88,000.00 Rp 8,800.00
Rp 121,000.00 Rp 6,050.00
Rp 14,850.00
10% Rp 1,485.00
Rp 16,335.00
Rp 374,182.60
Rp 314,050.00
Rp 88,000.00 Rp 88,000.00
Rp 99,000.00 Rp 198,000.00
Rp 110,000.00 Rp 22,000.00
Rp 121,000.00 Rp 6,050.00
Rp 26,116.00
Rp 20,000.00 Rp 25,000.00
Rp 6,000.00 Rp 1,116.00
Rp 340,166.00
10% Rp 34,016.60
Rp 374,182.60
Rp
Rp 69,025.00
Rp 88,000.00 Rp 66,000.00
Rp 121,000.00 Rp 3,025.00
Rp 69,025.00
10% Rp 6,902.50
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 331,331.00
Rp 27,610.00
Rp 88,000.00 Rp 26,400.00
Rp 121,000.00 Rp 1,210.00
Rp 273,600.00
Rp 228,000.00 Rp 273,600.00
Rp 301,210.00
Rp 30,121.00
Rp 331,331.00
Rp 199,127.50
Rp 88,000.00 Rp 22,000.00
Rp 121,000.00 Rp 3,025.00
Rp 156,000.00
Rp 130,000.00 Rp 156,000.00
Rp 181,025.00
Rp 18,102.50
Rp 199,127.50
Rp 55,055.00
Rp 50,050.00
Rp 88,000.00 Rp 44,000.00
Rp 121,000.00 Rp 6,050.00
Rp 50,050.00
10% Rp 5,005.00
Rp 55,055.00
Rp 977,642.29
Rp 223,575.00
Rp 88,000.00 Rp 132,000.00
Rp 99,000.00 Rp 74,250.00
Rp 110,000.00 Rp 8,250.00
Rp 121,000.00 Rp 9,075.00
Rp 665,190.72
Rp 280,000.00 Rp 336,000.00
Rp 1,350.00 Rp 183,600.00
Rp 267,630.00 Rp 145,590.72
Rp 888,765.72
Rp 88,876.57
Rp 977,642.29
Rp 605,830.50
Rp 116,259.00
Rp 88,000.00 Rp 68,640.00
Rp 99,000.00 Rp 38,610.00
Rp 110,000.00 Rp 4,290.00
Rp 121,000.00 Rp 4,719.00
Rp 434,496.00
Rp 280,000.00 Rp 336,000.00
Rp 228,000.00 Rp 98,496.00
Rp 550,755.00
10% Rp 55,075.50
Rp 605,830.50
Rp 181,891.60
Rp 77,506.00
Rp 88,000.00 Rp 45,760.00
Rp 99,000.00 Rp 25,740.00
Rp 110,000.00 Rp 2,860.00
Rp 121,000.00 Rp 3,146.00
Rp 87,850.00
Rp 1,800,000.00 Rp 81,000.00
Rp 19,000.00 Rp 5,700.00
Rp 11,500.00 Rp 1,150.00
Rp 165,356.00
10% Rp 16,535.60
Rp 181,891.60
Rp 461,667.80
Rp 98,373.00
Rp 88,000.00 Rp 58,080.00
Rp 99,000.00 Rp 32,670.00
Rp 110,000.00 Rp 3,630.00
Rp 121,000.00 Rp 3,993.00
Rp 321,325.00
Rp 1,800,000.00 Rp 72,000.00
Rp 19,000.00 Rp 7,600.00
Rp 11,500.00 Rp 2,300.00
Rp 9,000,000.00 Rp 135,000.00
Rp 115,500.00 Rp 40,425.00
Rp 32,000.00 Rp 64,000.00
Rp 419,698.00
10% Rp 41,969.80
Rp 461,667.80
Rp Rp
Rp 491,367.80
Rp 98,373.00
Rp 88,000.00 Rp 58,080.00
Rp 99,000.00 Rp 32,670.00
Rp 110,000.00 Rp 3,630.00
Rp 121,000.00 Rp 3,993.00
Rp 348,325.00
Rp 1,800,000.00 Rp 72,000.00
Rp 19,000.00 Rp 7,600.00
Rp 11,500.00 Rp 2,300.00
Rp 9,000,000.00 Rp 162,000.00
Rp 115,500.00 Rp 40,425.00
Rp 32,000.00 Rp 64,000.00
Rp 446,698.00
10% Rp 44,669.80
Rp 491,367.80
Rp 1,197,754.61
Rp 185,548.00
Rp 88,000.00 Rp 145,200.00
Rp 99,000.00 Rp 27,225.00
Rp 110,000.00 Rp 3,080.00
Rp 121,000.00 Rp 10,043.00
Rp 903,319.83
Rp 1,350.00 Rp 518,400.00
Rp 212.61 Rp 147,129.09
Rp 218.52 Rp 227,040.74
Rp 50.00 Rp 10,750.00
Rp 1,088,867.83
10% Rp 108,886.78
Rp 1,197,754.61
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 253,178.30
Rp 78,430.00
Rp 88,000.00 Rp 52,800.00
Rp 99,000.00 Rp 19,800.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 3,630.00
Rp 151,732.09
Rp 650.00 Rp 91,000.00
Rp 1,350.00 Rp 35,842.50
Rp 267,630.00 Rp 24,889.59
Rp 230,162.09
Rp 23,016.21
Rp 253,178.30
Rp 461,667.80
Rp 98,373.00
Rp 88,000.00 Rp 58,080.00
Rp 99,000.00 Rp 32,670.00
Rp 110,000.00 Rp 3,630.00
Rp 121,000.00 Rp 3,993.00
Rp 321,325.00
Rp 1,800,000.00 Rp 72,000.00
Rp 19,000.00 Rp 7,600.00
Rp 11,500.00 Rp 2,300.00
Rp 9,000,000.00 Rp 135,000.00
Rp 115,500.00 Rp 40,425.00
Rp 32,000.00 Rp 64,000.00
Rp 419,698.00
10% Rp 41,969.80
Rp 461,667.80
Rp Rp
Rp 65,518.33
Rp 44,715.00
Rp 88,000.00 Rp 26,400.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 1,815.00
Rp 14,847.12
Rp 1,350.00 Rp 8,424.00
Rp 267,630.00 Rp 6,423.12
Rp 59,562.12
10% Rp 5,956.21
Rp 65,518.33
Rp 37,617.25
Rp 29,810.00
Rp 88,000.00 Rp 17,600.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 1,210.00
Rp 4,387.50
Rp 1,350.00 Rp 4,387.50
Rp 34,197.50
10% Rp 3,419.75
Rp 37,617.25
Rp Rp
Rp 15,805.79
Rp 1,434.40
Rp 88,000.00 Rp 616.00
Rp 99,000.00 Rp 693.00
Rp
Rp 110,000.00
77 ,00
Rp
Rp 121,000.00
48 ,40
Rp 12,934.50
Rp 12,000.00 Rp 12,600.00
Rp 22,300.00 Rp 334.50
Rp 14,368.90
Rp 1,436.89
Rp 15,805.79
HARGA
JUMLAH
BAHAN/UPAH
Rp Rp
###
###
Rp 88,000.00 ###
Rp 99,000.00 ###
Rp 110,000.00 Rp1,430.00
Rp 121,000.00 Rp1,573.00
###
###
10% Rp9,359.14
###
Rp 105,382.59
Rp 40,359.00
Rp 88,000.00 Rp 23,760.00
Rp 99,000.00 Rp 13,365.00
Rp 110,000.00 Rp 1,540.00
Rp 121,000.00 Rp 1,694.00
Rp 55,443.35
Rp 1,040.00 Rp 27,560.00
Rp 1,350.00 Rp 14,040.00
Rp 1,800.00 Rp 1,800.00
Rp 267,630.00 Rp 12,043.35
Rp 95,802.35
10% Rp 9,580.24
Rp 105,382.59
Rp Rp
Rp 162,220.30
Rp 22,473.00
Rp
Rp 88,000.00 13.200,00 Rp
7.425,00
Rp 99,000.00 Rp 880.00
Rp 110,000.00 Rp 968.00
Rp 121,000.00
Rp 125,000.00
Rp 5,000.00 Rp 125,000.00
Rp 147,473.00
10% Rp 14,747.30
Rp 162,220.30
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 150,486.78
Rp 57,442.00
Rp 88,000.00 Rp 35,200.00
Rp 99,000.00 Rp 19,800.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 242.00
Rp 79,364.16
Rp 12,000.00 Rp 60,000.00
Rp 1,350.00 Rp 10,800.00
Rp 267,630.00 Rp 8,564.16
Rp 136,806.16
10% Rp 13,680.62
Rp 150,486.78
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 17,839,910.00
Rp 2,968,350.00
Rp 88,000.00 Rp 616,000.00
Rp 99,000.00 Rp 2,079,000.00
Rp 110,000.00 Rp 231,000.00
Rp 121,000.00 Rp 42,350.00
Rp 13,249,750.00
Rp 12,000,000.00 Rp 13,200,000.00
Rp 19,000.00 Rp 23,750.00
Rp 26,000.00 Rp 26,000.00
Rp 16,218,100.00
10% Rp 1,621,810.00
Rp 17,839,910.00
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 692,370.80
Rp 148,478.00
Rp 88,000.00 Rp 30,800.00
Rp 99,000.00 Rp 103,950.00
Rp 110,000.00 Rp 11,550.00
Rp 121,000.00 Rp 2,178.00
Rp 480,950.00
Rp 12,000,000.00 Rp 480,000.00
Rp 19,000.00 Rp 950.00
Rp 629,428.00
10% Rp 62,942.80
Rp 692,370.80
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 19,354,538.50
Rp 2,841,135.00
Rp 88,000.00 Rp 589,600.00
Rp 99,000.00 Rp 1,989,900.00
Rp 110,000.00 Rp 221,100.00
Rp 121,000.00 Rp 40,535.00
Rp 14,753,900.00
Rp 12,000,000.00 Rp 14,400,000.00
Rp 16,500.00 Rp 247,500.00
Rp 19,000.00 Rp 106,400.00
Rp 17,595,035.00
10% Rp 1,759,503.50
Rp 19,354,538.50
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 14,350,198.50
Rp 2,841,135.00
Rp 88,000.00 Rp 589,600.00
Rp 99,000.00 Rp 1,989,900.00
Rp 110,000.00 Rp 221,100.00
Rp 121,000.00 Rp 40,535.00
Rp 10,204,500.00
Rp 9,000,000.00 Rp 9,900,000.00
Rp 16,500.00 Rp 247,500.00
Rp 19,000.00 Rp 57,000.00
Rp 13,045,635.00
10% Rp 1,304,563.50
Rp 14,350,198.50
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 146,194.62
Rp 24,486.00
Rp 88,000.00 Rp 10,560.00
Rp 99,000.00 Rp 11,880.00
Rp 110,000.00 Rp 1,320.00
Rp 121,000.00 Rp 726.00
Rp 108,418.20
Rp 7,666,800.00 Rp 107,335.20
Rp 19,000.00 Rp 1,083.00
Rp 132,904.20
10% Rp 13,290.42
Rp 146,194.62
Rp 199,681.72
Rp 51,810.00
Rp 88,000.00 Rp 17,600.00
Rp 99,000.00 Rp 29,700.00
Rp 110,000.00 Rp 3,300.00
Rp 121,000.00 Rp 1,210.00
Rp 129,718.84
Rp 7,666,800.00 Rp 124,968.84
Rp 19,000.00 Rp 4,750.00
Rp 181,528.84
10% Rp 18,152.88
Rp 199,681.72
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 191,075.50
Rp 31,405.00
Rp 88,000.00 Rp 8,800.00
Rp 99,000.00 Rp 19,800.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 605.00
Rp 142,300.00
Rp 13,000,000.00 Rp 140,400.00
Rp 19,000.00 Rp 1,900.00
Rp 173,705.00
10% Rp 17,370.50
Rp 191,075.50
Jumlah Harga
Koefisien Harga Satuan (Rp)
(Rp)
0.1 - Rp -
0.05 - Rp -
0.005 -
Rp -
0.005 - Rp -
JUMLAH HARGA -
TENAGA KERJA
0.364 -
Rp -
JUMLAH HARGA
ALAT
3,300.00
10.0% xD 330.00
3,630.00
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 227,133.50
Rp 56,485.00
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 49,500.00
Rp 110,000.00 Rp 5,500.00
Rp 121,000.00 Rp 605.00
Rp 150,000.00
Rp 150,000.00 Rp 150,000.00
Rp 206,485.00
10% Rp 20,648.50
Rp 227,133.50
Rp 36,208.48
Rp 17,916.80
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 15,000.00
Rp 15,000.00 Rp 15,000.00
Rp 32,916.80
10% Rp 3,291.68
Rp 36,208.48
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 32,384.55
Rp 11,940.50
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 60.50
Rp 17,500.00
Rp 17,500.00 Rp 17,500.00
Rp 29,440.50
10% Rp 2,944.05
Rp 32,384.55
Rp 222,513.50
Rp 20,405.00
Rp 88,000.00 Rp 8,800.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 605.00
Rp 181,880.00
Rp 9,000,000.00 Rp 108,000.00
Rp 19,000.00 Rp 380.00
Rp 10,500,000.00 Rp 73,500.00
Rp 202,285.00
10% Rp 20,228.50
Rp 222,513.50
BESARAN
Rp 150,000.00
Rp 325,000.00
Rp 280,000.00
Rp 280,000.00
Rp 280,000.00
Rp 289,500.00
Rp 140,000.00
Rp 289,200.00
Rp 289,200.00
Rp 295,000.00
Rp 295,000.00
Rp 322,500.00
Rp 300,000.00
Rp 290,000.00
Rp 290,000.00
Rp 220,000.00
Rp 650.00
Rp 1,750.00
Rp 663,000.00
Rp 675,000.00
Rp 690,000.00
Rp 228,000.00
Rp 267,630.00
Rp 267,630.00
Rp 210,000.00
Rp 374,000.00
Rp 297,660.00
BESARAN
Rp 281,000.00
Rp 65,000.00
Rp 73,500.00
Rp 105,000.00
Rp 84,000.00
Rp 175,000.00
Rp 75,000.00
Rp 136,500.00
Rp 130,000.00
Rp 84,000.00
Rp 134,400.00
Rp 175,120.00
Rp 130,000.00
Rp 300,000.00
Rp 150,000.00
Rp 54,000.00
Rp 67,500.00
Rp 1,800.00
Rp 1,350.00
Rp 12,700.00
Rp 13,750.00
Rp 12,000.00
Rp 13,500.00
Rp 16,500.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 15,000.00
Rp 25,000.00
Rp 340,000.00
Rp 375,100.00
BESARAN
Rp 16,000.00
Rp 16,000.00
Rp 15,000.00
Rp 15,000.00
Rp 22,300.00
Rp 19,000.00
Rp 21,000.00
Rp 20,000.00
Rp 18,000.00
Rp 22,800.00
Rp 22,000.00
Rp 17,700.00
Rp 16,875.00
Rp 60,000.00
Rp 25,000.00
Rp 7,500.00
Rp 8,750.00
Rp 10,000.00
Rp 9,500.00
Rp 5,000.00
Rp 6,000.00
Rp 9,000.00
Rp 12,500.00
Rp 16,000.00
Rp 22,500.00
Rp 29,000.00
Rp 42,000.00
Rp 69,700.00
Rp 96,250.00
Rp 126,000.00
Rp 4,250.00
Rp 4,500.00
Rp 6,250.00
Rp 9,000.00
Rp 10,000.00
Rp 12,500.00
Rp 18,500.00
Rp 22,500.00
BESARAN
Rp 42,500.00
Rp 30,600.00
Rp 63,000.00
Rp 94,500.00
Rp 197,500.00
Rp 308,000.00
Rp 293,268.00
Rp 30,013.00
Rp 42,308.00
Rp 59,928.00
Rp 89,714.00
Rp 142,022.00
Rp 187,686.00
Rp 300,344.00
Rp 237,367.00
Rp 25,186.00
Rp 35,478.00
Rp 51,505.00
Rp 72,763.00
Rp 153,504.00
Rp 244,058.00
Rp 15,200,000.00
Rp 14,000,000.00
Rp 12,000,000.00
Rp 13,000,000.00
Rp 9,000,000.00
Rp 10,500,000.00
Rp 7,500,000.00
Rp 6,000.00
Rp 8,000.00
Rp 600,000.00
Rp 11,000,000.00
Rp 12,000,000.00
Rp 9,000,000.00
Rp 10,500,000.00
Rp 8,000,000.00
Rp 9,500,000.00
BESARAN
Rp 9,000,000.00
Rp 10,500,000.00
Rp 8,500,000.00
Rp 9,700,000.00
Rp 7,000,000.00
Rp 7,200,000.00
Rp 9,163,500.00
Rp 7,666,800.00
Rp 12,500,000.00
Rp 14,000,000.00
Rp 10,500,000.00
Rp 12,000,000.00
Rp 900,000.00
Rp 11,000,000.00
Rp 32,000.00
Rp 26,000.00
Rp 34,000.00
Rp 1,750,000.00
Rp 139,100.00
Rp 20,000.00
Rp 1,800,000.00
Rp 175,000.00
Rp 9,750.00
Rp 11,000.00
Rp 5,000.00
Rp 10,500.00
Rp 11,000.00
Rp 25,000.00
Rp 15,000.00
Rp 12,000.00
Rp 25,000.00
BESARAN
Rp 2,500.00
Rp 5,000.00
Rp 2,500.00
Rp 5,000.00
Rp 5,000.00
Rp 3,500.00
Rp 10,000.00
Rp 8,000.00
Rp 10,000.00
Rp 12,000.00
Rp 15,000.00
Rp 87,000.00
Rp 105,000.00
Rp 115,000.00
Rp 102,000.00
Rp 118,000.00
Rp 125,000.00
Rp 65,000.00
Rp 56,000.00
Rp 65,000.00
Rp 73,500.00
Rp 74,300.00
Rp 90,000.00
Rp 33,000.00
Rp 45,000.00
Rp 42,000.00
Rp 41,500.00
Rp 22,000.00
Rp 49,000.00
Rp 35,000.00
Rp 40,000.00
Rp 21,000.00
BESARAN
Rp 16,000.00
Rp 18,000.00
Rp 13,000.00
Rp 12,500.00
Rp 16,500.00
Rp 40,000.00
Rp 57,520.00
Rp 48,000.00
Rp 62,000.00
Rp 75,000.00
Rp 64,000.00
Rp 67,500.00
Rp 81,000.00
Rp 20,000.00
Rp 25,000.00
Rp 35,000.00
Rp 40,000.00
Rp 21,000.00
Rp 27,000.00
Rp 45,000.00
Rp 21,000.00
Rp 27,000.00
Rp 22,000.00
Rp 26,250.00
Rp 29,000.00
Rp 29,000.00
Rp 35,000.00
Rp 45,000.00
Rp 53,000.00
Rp 61,000.00
Rp 72,000.00
BESARAN
Rp 40,000.00
Rp 45,000.00
Rp 52,000.00
Rp 64,000.00
Rp 67,500.00
Rp 79,000.00
Rp 90,000.00
Rp 112,500.00
Rp 150,000.00
Rp 187,500.00
Rp 225,000.00
Rp 76,500.00
Rp 89,500.00
Rp 102,000.00
Rp 127,500.00
Rp 170,000.00
Rp 212,500.00
Rp 255,000.00
Rp 28,000.00
Rp 25,000.00
Rp 23,000.00
Rp 30,000.00
Rp 27,500.00
Rp 26,000.00
Rp 50,000.00
Rp 5,500.00
Rp 5,200.00
BESARAN
Rp 42,000.00
Rp 45,000.00
Rp 44,000.00
Rp 47,000.00
Rp 52,000.00
Rp 52,000.00
Rp 53,000.00
Rp 52,100.00
Rp 90,000.00
Rp 85,000.00
Rp 78,000.00
Rp 72,000.00
Rp 68,000.00
Rp 63,000.00
Rp 65,000.00
Rp 67,000.00
Rp 29,000.00
Rp 130,000.00
Rp 145,000.00
Rp 250,000.00
Rp 115,000.00
Rp 122,500.00
Rp 110,000.00
Rp 145,000.00
Rp 122,500.00
Rp 130,000.00
Rp 80,000.00
Rp 122,500.00
Rp 140,000.00
Rp 110,000.00
Rp 122,500.00
Rp 480,000.00
BESARAN
Rp 35,000.00
Rp 55,000.00
Rp 70,000.00
Rp 90,000.00
Rp 136,000.00
Rp 220,000.00
Rp 310,000.00
Rp 370,000.00
Rp 22,000.00
Rp 30,000.00
Rp 38,000.00
Rp 12,500.00
Rp 4,000.00
Rp 6,000.00
Rp 28,000.00
Rp 25,000.00
Rp 32,000.00
Rp 15,000.00
Rp 30,000.00
Rp 5,100.00
Rp 12,500.00
Rp 38,000.00
Rp 5,000.00
Rp 6,000.00
Rp 12,000.00
Rp 80,000.00
Rp 68,000.00
Rp 120,000.00
BESARAN
Rp 19,000.00
Rp 19,000.00
Rp 21,000.00
Rp 30,000.00
Rp 17,000.00
Rp 14,000.00
Rp 12,800.00
Rp 18,000.00
Rp 6,000.00
Rp 8,000.00
HARGA
(Rp)
Rp 121,000.00
Rp 88,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 88,000.00
Rp 110,000.00
Rp 88,000.00
Rp 132,000.00
Rp 94,000.00
Rp 110,000.00
Rp 127,000.00
overhead
12.5%
BACKUP DATA
B
a 1.25 c 4.00
b 1.25
TOTAL 2.50 4.00 6.50
Ø 8-150
NO.A.B.c
A
X: 0.15
Y: 0.15
Tinggi : 3.000
Jumlah : 6
DESCRIPTION
15
KOLOM
2Ø10
BETON Panjang Lebar Tinggi Jumlah Volume
UKURAN
A 0.15 0.15 3.000 6.000 0.405
15
Ø 8-150
15cmx15cm Total 0.405 m3
2Ø10
K
2
X: 0.15
Y: 0.15
Tinggi : 2.3
Jumlah: 3
Ø 8-150
Panjang : 0.717
RB
2Ø10
2
UKURAN
15cmx20cm
20
Ø 8-150
RB X: 0.150
2Ø10
2
Y: 0.200
URAIAN
Ø 8-150
Panjang : 0.717
BL X: 0.150
2Ø10
2
Y: 0.200
A m2
Panjang : 7.40
X: 0.15
Y: 0.15
219.643
kg
URAIAN
USUK KAYU
X: 0.050 m3
Y: 0.070
RENG KAYU
X: 0.020
Y: 0.030 m3
LISTPLANG m3
X: 0.020
Y: 0.200
BALOK BUBUNGAN
X: 0.080 m3
Y: 0.120
GENTENG
m3
1 m2 = 25 Buah
..
TOTAL BESI Ø10 50.717 kg
TOTAL BESI Ø8 34.531 kg
TOTAL BESI Ø10 66.216 kg
TOTAL BESI Ø8 25.880 kg
NO. URAIAN BELANJA
I BAHAN DASAR
BATU KALI
Bulat Utuh
Batu Belah hitam
Batu Belah putih
Pecah Hitam Oct-15
Pecah Hitam 5-Jul
Pecah Hitam 3-May
KERIKIL
Timbun
Sawur / Koral untuk Beton
Batu Pecah 0,5/1 (hitam)
Batu Pecah 1/1 (hitam)
Batu Pecah 1/2 (hitam)
Batu Pecah 2/3 (hitam)
Batu Pecah 3/5 (hitam)
Batu Pecah 5/7 (hitam)
Batu Pecah 7/10 (hitam)
Tras Giling
BATU BATA / DINDING
Batu bata merah (lokal)
Batu bata / merah Ekspose
Dinding Bata Ringan Heubel 60 x 20 x Tb 7.5 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 8 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 10 cm
PASIR
Pasir urug (ada unsur lempung)
Pasir Pasang (Sedang)
Pasir pasang kali/gunung (ex. Bengawan Solo)
Pasang Cukup
Pasir Beton (ex Muntilan)
Pasir beton (Kasar- ex. Bengawan Solo)
DOLKEN
Sedang 8 x 10 x 400 cm bt
Kecil 6 x 7 x 400 cm bt
Besar 10 x 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt
Perancah m3
VI . B A H A N L A N G I T - L A N G I T
AKUSTIK-uk :
30 X 30
30 X 60
60 X 120
LIS PLAFON
Lis Kayu 2/3
Lis Kayu Profil
Lis Gypsum
SOFT BOARD
Gypsum tebal 9 mm (Elepant & Jaya Board)
HARD BOARD
Kalsiboard 1,20 x 2,40
PVC BOARD
PVC Plafon Motif
NO. URAIN BELANJA
Paku Ukuran 1" s/d 4"
Paku Ukuran 2" s/d 5"
Paku Payung
Paku Sekrup
Paku Beton
Mur Baut (Kuda Kuda)
Angkur Baut
Lem Kayu
Tali Ijuk
Ramset/Dina blot
SATUAN BESARAN
m3 Rp150,000
m3 Rp325,000
m3 Rp280,000
m3 Rp280,000
m3 Rp280,000
m3 Rp289,500
m3 Rp140,000
m3 Rp289,200
m3 Rp289,200
m3 Rp295,000
m3 Rp295,000
m3 Rp322,500
m3 Rp300,000
m3 Rp290,000
m3 Rp290,000
m3 Rp220,000
bh Rp650
bh Rp1,750
m3 Rp663,000
m3 Rp675,000
m3 Rp690,000
m3 Rp228,000
m3 Rp267,630
m3 Rp267,630
m3 Rp210,000
m3 Rp374,000
m3 Rp297,660
BESARAN
Rp281,000
Rp65,000
Rp73,500
Rp105,000
Rp84,000
Rp175,000
Rp75,000
Rp136,500
Rp130,000
Rp84,000
Rp134,400
Rp175,120
Rp130,000
Rp300,000
Rp150,000
Rp54,000
Rp67,500
Rp1,800
Rp1,350
Rp12,700
Rp13,750
Rp12,000
Rp13,500
Rp16,500
Rp15,000
Rp15,000
Rp15,000
Rp15,000
Rp15,000
Rp25,000
Rp340,000
Rp375,100
BESARAN
Rp42,500
Rp30,600
Rp63,000
Rp94,500
Rp197,500
Rp308,000
Rp293,268
Rp30,013
Rp42,308
Rp59,928
Rp89,714
Rp142,022
Rp187,686
Rp300,344
Rp237,367
Rp25,186
Rp35,478
Rp51,505
Rp72,763
Rp153,504
Rp244,058
Rp15,200,000
Rp14,000,000
Rp12,000,000
Rp13,000,000
Rp9,000,000
Rp10,500,000
Rp7,500,000
Rp6,000
Rp8,000
Rp600,000
Rp11,000,000
Rp12,000,000
Rp9,000,000
Rp10,500,000
Rp8,000,000
Rp9,500,000
BESARAN
Rp9,000,000
Rp10,500,000
Rp8,500,000
Rp9,700,000
Rp7,000,000
Rp7,200,000
Rp9,163,500
Rp7,666,800
Rp12,500,000
Rp14,000,000
Rp10,500,000
Rp12,000,000
Rp900,000
Rp11,000,000
Rp32,000
Rp26,000
Rp34,000
Rp1,750,000
Rp139,100
Rp20,000
Rp1,800,000
Rp175,000
Rp9,750
Rp11,000
Rp5,000
Rp10,500
Rp11,000
Rp25,000
Rp15,000
Rp12,000
Rp25,000
SATUAN BESARAN
lbr Rp40,000
lbr Rp45,000
lbr Rp52,000
lbr Rp64,000
lbr Rp67,500
lbr Rp79,000
lbr Rp90,000
lbr Rp112,500
lbr Rp150,000
lbr Rp187,500
lbr Rp225,000
lbr Rp76,500
lbr Rp89,500
lbr Rp102,000
lbr Rp127,500
lbr Rp170,000
lbr Rp212,500
lbr Rp255,000
m2 Rp28,000
m2 Rp25,000
m2 Rp23,000
m2 Rp30,000
m2 Rp27,500
m2 Rp26,000
m2 Rp50,000
bh Rp5,500
bh Rp5,200
m'
m'
m'
SATUAN BESARAN
bh Rp35,000
bh Rp55,000
bh Rp70,000
bh Rp90,000
bh Rp136,000
bh Rp220,000
bh Rp310,000
bh Rp370,000
bh Rp22,000
bh Rp30,000
bh Rp38,000
Rp12,500
bh Rp4,000
bh Rp6,000
bh Rp28,000
bh Rp25,000
bh Rp32,000
bh Rp15,000
bh Rp30,000
lbr Rp5,100
lbr Rp12,500
lbr Rp38,000
m' Rp5,000
m' Rp6,000
m' Rp12,000
lbr Rp80,000
lbr Rp68,000
M2 Rp120,000
URAIN BELANJA
an 1" s/d 4"
an 2" s/d 5"
ng
up
n
(Kuda Kuda)
ut
ina blot
SATUAN BESARAN
kg Rp 19,000.00
kg Rp 19,000.00
kg Rp 21,000.00
kg Rp 30,000.00
kg Rp 17,000.00
bh Rp 14,000.00
bh Rp 12,800.00
kg Rp 18,000.00
kg Rp 6,000.00
kg Rp 8,000.00
No. SNI KODE KOEF SAT.
1 A.2.2.1.2 1 m'
L.01 0.2 OH
L.02 0.4 OH
L.03 0.02 OH
L.04 0.02 OH
1.25 Btg
2.5 Kg Lbr
1.2 m3
0.005 m3
0.009 m3
0.072 m3
0.06 kg
0.45 kg
F
Overhead
& Profit
10%
2 A.2.2.1.4 1 m'
A
L.01 0.1 OH
L.02 0.1 OH
L.03 0.01 OH
L.04 0.005 OH
B
0.012 m3
0.02 Kg m3
0.007
C
D
E
F
5 A.2.2.1.9 1 m2
A
L.01 0.1 OH
L.04 0.05 OH
B
C
D
E
F
6 A.2.2.1.10 1 m2
A
L.01 1 OH
L.02 2 OH
L.03 0.2 OH
L.04 0.05 OH
B
1.25 Btg
0.186 Kg
C
D
E
F
HARGA
Rp
TENAGA
Pekerja Rp88,000.00
Mandor Rp121,000.00
BAHAN
PERALATAN
Jumlah A + B + C
Tenaga
Pekerja Rp88,000.00
Tukang Kayu Rp99,000.00
Kepala Tukang Rp110,000.00
Mandor Rp121,000.00
Bahan
Kayu 5/7x 4m Kayu Kruing Rp9,000,000
Paku Biasa 2" - 5" Rp 19,000.00
Kayu Papan 3/20 Kruing Rp10,500,000
PERALATAN
Jumlah A + B + C
Overhead & Profit 10% 10%
Harga Satuan Pekerjaan (D+E)
HARGA
URAIAN PAKERJAAN BAHAN/UPAH
Rp
Rp 855,209.08
Rp 17,600.00
Rp 39,600.00
Rp 2,200.00
Rp 2,420.00
Rp 61,820.00
Rp 40,000.00
Rp 3,375.00
Rp 63,600.00
Rp 1,870.00
Rp 2,602.80
Rp 648,000.00
Rp 1,140.00
Rp 16,875.00
Rp 777,462.80
Rp 77,746.28
Rp 855,209.08
Rp 222,513.50
Rp 20,405.00
Rp 8,800.00
Rp 9,900.00
Rp 1,100.00
Rp 605.00
Rp 181,880.00
Rp 108,000.00
Rp 380.00
Rp 73,500.00
Rp 202,285.00
Rp 20,228.50
Rp 222,513.50
JUMLAH
Rp
Rp 16,335.00
Rp 14,850.00
Rp 8,800.00
Rp 6,050.00
Rp 14,850.00
Rp 1,485.00
Rp 16,335.00
Rp 374,182.60
Rp 314,050.00
Rp 88,000.00
Rp 198,000.00
Rp 22,000.00
Rp 6,050.00
Rp 26,116.00
Rp 25,000.00
Rp 1,116.00
Rp 340,166.00
Rp 34,016.60
Rp 374,182.60
HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH
Rp
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH
Rp
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
B BAHAN
C PERALATAN
D Jumlah A + B + C
A TENAGA
B BAHAN
C PERALATAN
D Jumlah A + B + C
Harga Satuan
F
Pekerjaan (D+E)
overhead
JUMLAH 12.5%
Rp
Rp 75,927.50
Rp 69,025.00
Rp 66,000.00
Rp 3,025.00
Rp 69,025.00
Rp 6,902.50
Rp 75,927.50
JUMLAH
Rp
Rp 331,331.00
Rp 27,610.00
Rp 26,400.00
Rp 1,210.00
Rp 273,600.00
Rp 273,600.00
Rp 301,210.00
Rp 30,121.00
Rp 331,331.00
Rp 199,127.50
Rp 25,025.00
Rp 22,000.00
Rp 3,025.00
Rp 156,000.00
Rp 156,000.00
Rp 181,025.00
Rp 18,102.50
Rp 199,127.50
Rp 55,055.00
Rp 50,050.00
Rp 44,000.00
Rp 6,050.00
Rp 50,050.00
Rp 5,005.00
Rp 55,055.00
3 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP
A TENAGA
1
L.01 OH Pekerja Rp88,000.00
,5
L.02 0.75 OH Tukang Batu Rp99,000.00
B BAHAN
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
1
m3 Batu Belah Rp325,000
,2
C PERALATAN
D Jumlah A + B + C
Rp 1,037,042.29
Rp 223,575.00
Rp 132,000.00
Rp 74,250.00
Rp 8,250.00
Rp 9,075.00
Rp 719,190.72
Rp 390,000.00
Rp 183,600.00
Rp 145,590.72
Rp 942,765.72
Rp 94,276.57
Rp 1,037,042.29
Rp 665,230.50
Rp 116,259.00
Rp 68,640.00
Rp 38,610.00
Rp 4,290.00
Rp 4,719.00
Rp 488,496.00
Rp 390,000.00
Rp 98,496.00
Rp 604,755.00
Rp 60,475.50
Rp 665,230.50
19 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
HARGA BAHAN/UPAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp
23 A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp 77,506.00
Rp 45,760.00
Rp 25,740.00
Rp 2,860.00
Rp 3,146.00
Rp 87,850.00
Rp 81,000.00
Rp 5,700.00
Rp 1,150.00
Rp 165,356.00
Rp 16,535.60
Rp 181,891.60
Rp 461,667.80
Rp 98,373.00
Rp 58,080.00
Rp 32,670.00
Rp 3,630.00
Rp 3,993.00
Rp 321,325.00
Rp 72,000.00
Rp 7,600.00
Rp 2,300.00
Rp 135,000.00
Rp 40,425.00
Rp 64,000.00
Rp 419,698.00
Rp 41,969.80
Rp 461,667.80
JUMLAH
Rp
Rp 491,367.80
Rp 98,373.00
Rp 58,080.00
Rp 32,670.00
Rp 3,630.00
Rp 3,993.00
Rp 348,325.00
Rp 72,000.00
Rp 7,600.00
Rp 2,300.00
Rp 162,000.00
Rp 40,425.00
Rp 64,000.00
Rp 446,698.00
Rp 44,669.80
Rp 491,367.80
8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (1 2±2)cm, w/c = 0,56
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
215 Air
C PERALATAN
D Jumlah A + B + C
Rp 185,548.00
Rp 88,000.00 Rp 145,200.00
Rp 99,000.00 Rp 27,225.00
Rp 110,000.00 Rp 3,080.00
Rp 121,000.00 Rp 10,043.00
Rp 903,319.83
Rp 1,350.00 Rp 518,400.00
Rp 212.61 Rp 147,129.09
Rp 218.52 Rp 227,040.74
Rp 50.00 Rp 10,750.00
Rp 1,088,867.83
Rp 108,886.78
Rp 1,197,754.61
Rp 185,548.00
Rp 88,000.00 Rp 145,200.00
Rp 99.000,00 Rp Rp 27.225,00 Rp
110.000,00 3.080,00
Rp 121,000.00 Rp 10,043.00
Rp 928,478.17
Rp 1,350.00 Rp 548,100.00
Rp 212.61 Rp 145,428.17
Rp 218.52 Rp 224,200.00
Rp 50.00 Rp 10,750.00
Rp 1,114,026.17
Rp 111,402.62
Rp 1,225,428.79
SNI KODE KOEF SAT. URAIAN PAKERJAAN
No.
3 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
L.01 0 ,3 OH Pekerja
B Bahan
C PERALATAN
D Jumlah A + B + C
25 Tenaga
Bahan
C PERALATAN
D Jumlah A + B + C
BAHAN/UPAH Rp
Rp
NDING
Rp 78,430.00
Rp 88,000.00 Rp 52,800.00
Rp 99,000.00 Rp 19,800.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 3,630.00
Rp 151,732.09
Rp 650.00 Rp 91,000.00
Rp 1,350.00 Rp 35,842.50
Rp 267,630.00 Rp 24,889.59
Rp 230,162.09
Rp 23,016.21
Rp 253,178.30
Rp 461,667.80
Rp 98,373.00
Rp 88,000.00 Rp 58,080.00
Rp 99,000.00 Rp 32,670.00
Rp 110,000.00 Rp 3,630.00
Rp 121,000.00 Rp 3,993.00
Rp 321,325.00
Rp 1,800,000.00 Rp 72,000.00
Rp 19,000.00 Rp 7,600.00
Rp 11,500.00 Rp 2,300.00
Rp 9,000,000.00 Rp 135,000.00
Rp 115,500.00 Rp 40,425.00
Rp 32,000.00 Rp 64,000.00
Rp 419,698.00
Rp 41,969.80
Rp 461,667.80
Rp Rp
EKERJAAN PLESTERAN
Rp 65,518.33
Rp 44,715.00
Rp 88,000.00 Rp 26,400.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 1,815.00
Rp 14,847.12
Rp 1,350.00 Rp 8,424.00
Rp 267,630.00 Rp 6,423.12
Rp 59,562.12
Rp 5,956.21
Rp 65,518.33
Rp 37,617.25
Rp 29,810.00
Rp 88,000.00 Rp 17,600.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 1,210.00
Rp 4,387.50
Rp 1,350.00 Rp 4,387.50
Rp 34,197.50
Rp 3,419.75
Rp 37,617.25
HARGA BAHAN/UPAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Kabel Presstresed
15 A.4.1.1.18 10 Kg
Polos/strand
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10% 10%
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp
Rp 15,805.79
Rp 1,434.40
Rp 616.00
Rp 693.00
Rp 77 ,00
Rp 48 ,40
Rp 12,934.50
Rp 12,600.00
Rp 334.50
Rp 14,368.90
Rp 1,436.89
Rp 15,805.79
Rp 152,342.30
Rp 10,263.00
Rp 4,400.00
Rp 4,950.00
Rp 550.00
Rp 363.00
Rp 128,230.00
Rp 126,000.00
Rp 2,230.00
Rp 138,493.00
Rp 13,849.30
Rp 152,342.30
Rp 290,027.10
Rp 7,546.00
Rp 2,200.00
Rp 2,475.00
Rp 2,750.00
Rp 121.00
Rp 256,115.00
Rp 255,000.00
Rp 1,115.00
Rp 263,661.00
Rp 26,366.10
Rp 290,027.10
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
6 A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp Rp
AN DINDING
Rp 37,378.00
Rp 88,000.00 Rp 22,000.00
Rp 99,000.00 Rp 12,375.00
Rp 110,000.00 Rp 1,430.00
Rp 121,000.00 Rp 1,573.00
Rp 56,213.35
Rp 4,666.67 Rp 30,940.00
Rp 1,350.00 Rp 13,230.00
Rp 267,630.00 Rp 12,043.35
Rp 93,591.35
Rp 9,359.14
Rp 102,950.49
Rp 105,382.59
Rp 40,359.00
Rp 23,760.00
Rp 13,365.00
Rp 1,540.00
Rp 1,694.00
Rp 55,443.35
Rp 27,560.00
Rp 14,040.00
Rp 1,800.00
Rp 12,043.35
Rp 95,802.35
Rp 9,580.24
Rp 105,382.59
HARGA BAHAN/UPAH
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp
Rp 162,220.30
Rp 22,473.00
Rp 13.200,00 Rp
7.425,00
Rp 880.00
Rp 968.00
Rp 125,000.00
Rp 125,000.00
Rp 147,473.00
Rp 14,747.30
Rp 162,220.30
JUMLAH
Rp
Rp 150,486.78
Rp 57,442.00
Rp 35,200.00
Rp 19,800.00
Rp 2,200.00
Rp 242.00
Rp 79,364.16
Rp 60,000.00
Rp 10,800.00
Rp 8,564.16
Rp 136,806.16
Rp 13,680.62
Rp 150,486.78
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN HARGA
BAHAN/UPAH
Rp
1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
BAHAN/UPAH
Rp
4 A.4.6.1.4 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
Tenaga
Bahan
C PERALATAN
D Jumlah A + B + C
HARGA
Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
HARGA
Rp
18 A.4.6.1.15 1 m3 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai kayu Kruing Klas I
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
HARGA
Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
BAHAN/UPAH
Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
Rp
Rp 17,839,910.00
Rp 2,968,350.00
Rp 616,000.00
Rp 2,079,000.00
Rp 231,000.00
Rp 42,350.00
Rp 13,249,750.00
Rp 13,200,000.00
Rp 23,750.00
Rp 26,000.00
Rp 16,218,100.00
Rp 1,621,810.00
Rp 17,839,910.00
JUMLAH
Rp
Rp 692,370.80
Rp 148,478.00
Rp 30,800.00
Rp 103,950.00
Rp 11,550.00
Rp 2,178.00
Rp 480,950.00
Rp 480,000.00
Rp 950.00
Rp 629,428.00
Rp 62,942.80
Rp 692,370.80
JUMLAH
Rp
Rp 19,354,538.50
Rp 2,841,135.00
Rp 589,600.00
Rp 1,989,900.00
Rp 221,100.00
Rp 40,535.00
Rp 14,753,900.00
Rp 14,400,000.00
Rp 247,500.00
Rp 106,400.00
Rp 17,595,035.00
Rp 1,759,503.50
Rp 19,354,538.50
JUMLAH
Rp
Rp 14,350,198.50
Rp 2,841,135.00
Rp 589,600.00
Rp 1,989,900.00
Rp 221,100.00
Rp 40,535.00
Rp 10,204,500.00
Rp 9,900,000.00
Rp 247,500.00
Rp 57,000.00
Rp 13,045,635.00
Rp 1,304,563.50
Rp 14,350,198.50
JUMLAH
Rp
Rp 146,194.62
Rp 24,486.00
Rp 10,560.00
Rp 11,880.00
Rp 1,320.00
Rp 726.00
Rp 108,418.20
Rp 107,335.20
Rp 1,083.00
Rp 132,904.20
Rp 13,290.42
Rp 146,194.62
Rp 199,681.72
Rp 51,810.00
Rp 17,600.00
Rp 29,700.00
Rp 3,300.00
Rp 1,210.00
Rp 129,718.84
Rp 124,968.84
Rp 4,750.00
Rp 181,528.84
Rp 18,152.88
Rp 199,681.72
JUMLAH
Rp
Rp 191,075.50
Rp 31,405.00
Rp 8,800.00
Rp 19,800.00
Rp 2,200.00
Rp 605.00
Rp 142,300.00
Rp 140,400.00
Rp 1,900.00
Rp 173,705.00
Rp 17,370.50
Rp 191,075.50
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFON)
A.4.5.1.7. Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm
A TENAGA KERJA
Pekerja L.01 OH 0.1
Tukang kayu L.02 OH 0.05
88,000.00 Rp 8,800.00
99,000.00 Rp 4,950.00
110,000.00 Rp 550.00
121,000.00 Rp 605.00
MLAH HARGA TENAGA 14,905.00
RJA
80,000.00
Rp 29,120.00
30,000.00 3,300.00
MLAH HARGA BAHAN 32,420.00
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
C PERALATAN
D Jumlah A + B + C
BAHAN/UPAH Rp
Rp
dan KACA
Rp 56,485.00
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 49,500.00
Rp 110,000.00 Rp 5,500.00
Rp 121,000.00 Rp 605.00
Rp 150,000.00
Rp 150,000.00 Rp 150,000.00
Rp 206,485.00
Rp 20,648.50
Rp 227,133.50
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 15,000.00
Rp 15,000.00 Rp 15,000.00
Rp 32,916.80
Rp 3,291.68
Rp 36,208.48
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 11,940.50
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 60.50
Rp 17,500.00
Rp 17,500.00 Rp 17,500.00
Rp 29,440.50
Rp 2,944.05
Rp 32,384.55
HARGA JUMLAH
BAHAN/UPAH Rp
Rp
Rp 170,958.48
Rp 17,916.80
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 137,500.00
Rp 125,000.00 Rp 137,500.00
Rp 5,000.00 Rp 250.00
Rp 155,416.80
Rp 15,541.68
Rp 170,958.48
Rp 201,208.48
Rp 17,916.80
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 165,000.00
Rp 150,000.00 Rp 165,000.00
Rp 5,000.00 Rp 250.00
Rp 182,916.80
Rp 18,291.68
Rp 201,208.48
Rp 202,166.80
Rp 18,788.00
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 968.00
Rp 165,000.00
Rp 150,000.00 Rp 165,000.00
Rp 183,788.00
Rp 18,378.80
Rp 202,166.80
3
A.4.7.1.5 1 m2 Pengecatan 1 M2 Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat penutu
A Tenaga
B Bahan
0.15 kg Plamuur
0.01 bh Kuas
C PERALATAN
D Jumlah A + B + C
A Tenaga
B Bahan
3
0 ,10 Kg Plamur
C PERALATAN
D Jumlah A + B + C
Rp17,358.00
Rp88,000.00 Rp6,160.00
Rp 10.395,00 Rp
Rp99,000.00
440,00
Rp110,000.00 Rp363.00
Rp121,000.00
Rp49,365.00
Rp37,500.00 Rp7,500.00
Rp27,000.00 Rp4,050.00
Rp58,000.00 Rp9,860.00
Rp75,000.00 Rp26,250.00
Rp52,500.00 Rp525.00
Rp16,000.00 Rp480.00
Rp3,500.00 Rp700.00
Rp66,723.00
Rp6,672.30
Rp73,395.30
Rp9,053.00
Rp88,000.00 Rp1,760.00
Rp 99.000,00 Rp
Rp6,237.00
110.000,00
Rp121,000.00 Rp693.00
Rp363.00
Rp38,400.00
Rp14,000.00 Rp1,400.00
Rp58,000.00 Rp5,800.00
Rp120,000.00 Rp31,200.00
Rp47,453.00
Rp4,745.30
Rp52,198.30
FORMULIR STANDAR UNT
PEREKAMAN ANALISA MASING MASING
Jumlah
Overhead & Profit (contoh 10%)
TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA
CATATAN:
1. Perkiraan Kuantitas harus Disesuaikan dengan kebutuhan di lapangan
2. Harga perludisesuaikan dengan hargaterbaru,termasuk biaya personil
3.Yang dimaksud dengan konsultansi dengan ahli terkait keselamatankonstruksitermas
FORMULIR STANDAR UNTUK
MAN ANALISA MASING MASING HARGA SATUAN
Kesehatan Kerja
PERKIRAAN HARGA
JAAN SAT KUANTITAS SATUAN
( Rp )
ls 1.000 100,000.00
12.5%
kebutuhan di lapangan
ermasuk biaya personil
terkait keselamatankonstruksitermasuk pakar praktisi
Analisa EL 119
JUMLAH
HARGA
( Rp )
65,000.00
200,000.00
200,000.00
36,000.00
40,000.00
400,000.00
100,000.00
1,041,000.00
130,125.00
1,171,125.00
BACKUP DATA
X: 0.150
PEMBESIAN Y: 0.200
Ø 8-150
NO.D
4Ø10 - 4.000 0.617 1.000 -
POSISI TUMPUAN LAPANGAN Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
TULANGAN
2Ø10 NO.A,B
ATAS
4Ø10 4.000 4.000 0.617 2.000 19.744
Ø8-150 0.620 28.000 0.395 2.000 13.714
over stek 1.210 4.000 0.617 2.000 5.973
TULANGAN 2Ø10 NO.1,E
BAWAH 4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
Ø8-150
SENGKANG over stek 1.210 4.000 0.617 2.000 5.973
NO.3,4
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.C
4Ø10 0 4.000 0.617 1.000 -
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.98628
NO.F,a,b
4Ø10 0 4.000 0.617 3.000 -
Ø8-150 0.620 1.000 0.395 3.000 0.735
over stek 1.210 4.000 0.617 3.000 8.959
Total 111.263 kg
BETON Panjang Lebar Tinggi Jumlah Volume
17.250 0.150 0.200 1.000 0.518 m3
RINGBALK 15/20
X: 0.150
DESCRIPTION PEMBESIAN Y: 0.200
RING BALK 15
2Ø10
Ø 8-150
RB NO.5
2Ø10
2
TULANGAN NO.D
2Ø10 4Ø10 - 4.000 0.617 1.000 -
ATAS
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
NO.A,B
TULANGAN 2Ø10 4Ø10 4.000 4.000 0.617 2.000 19.744
BAWAH
Ø8-150 0.620 28.000 0.395 2.000 13.714
Ø8-150 over stek 1.210 4.000 0.617 2.000 5.973
SENGKANG
NO.1,E
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.3,4
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.C
4Ø10 0 4.000 0.617 1.000 -
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
NO.F,a,b
4Ø10 0 4.000 0.617 3.000 -
Ø8-150 0.620 1.000 0.395 3.000 0.735
over stek 1.210 4.000 0.617 3.000 8.959
Total 111.263 kg
RENCANA ANGGARAN BIAYA ( RAB )
NO URAIAN PEKERJAAN VOLUME SAT KODE HARGA PAJAK
ANALISA ( Rp ) 11%
1 2 3 4 5 6 7 = 3x6x11%
A PEKERJAAN PERSIAPAN
1 Keselamatan Dan Kesehatan Kerja 1.000 Lump Sum 1:19 Rp 704,000.00 Rp 77,440.00
2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 1.000 m' A.2.2.1.2 Rp 923,268.50 Rp 101,559.54
3 Pengukuran dan Pemasangan Bouwplank 17.250 m' A.2.2.1.4 #REF! #REF!
4 Membersihkan Lapangan dan Perataan 100.000 m2 A.2.2.1.9 Rp 16,335.00 Rp 179,685.00
TOTAL PEKERJAAN PERSIAPAN
B PEKERJAAN RUMAH
I Pekerjaan tanah
1 Menggali Tanah Biasa Sedalam 1 m 13.287 m3 A.2.3.1.1 Rp 75,927.50 Rp 110,977.53
2 Pengurugan Kembali 3.617 m3 A.2.3.1.9 Rp 55,055.00 Rp 21,907.76
3 Urugan Pasir 8.979 m3 A.2.3.1.11 Rp 331,331.00 Rp 327,250.49
4 Mengurug Tanah Pilihan (Tanah Merah) 0.763 m3 A.2.3.1.14.B Rp 199,127.50 Rp 16,701.82
TOTAL PEKERJAAN TANAH
II Pekerjaan pondasi
1 Pemasangan Pondasi Batu Belah 1SP : 5 PP 6.470 m3 A.3.2.1.3 Rp 977,642.29 Rp 695,788.02
2 Pemasang Batu Kosong/Anstamping 2.650 m3 A.3.2.1.9 Rp 605,830.50 Rp 176,599.59
TOTAL PEKERJAAN PONDASI
III Pekerjaan beton
1 Sloof 15/20 0.518 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 68,182.18
2 Balok Latei 15/20 0.518 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 68,182.18
3 Ring Balk 15/20 0.440 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 57,905.45
4 Kolom 15/15 1.339 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 176,384.34
5 Kolom 15/15 Teras 0.116 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 15,296.52
6 Dak Atap 0.400 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 52,701.20
7 Sofi-Sofi 0.202 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 26,561.41
TOTAL PEKERJAAN BETON
IV Pekerjaan pembesian
1 Sloof 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
2 Balok Latei 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
3 Ring Balk 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
4 Kolom 15/15 234.845 kg A.4.1.1.17.a Rp 15,805.79 Rp 408,309.84
5 Kolom 15/15 Teras 20.623 kg A.4.1.1.17.a Rp 15,805.79 Rp 35,855.70
6 Dak Atap 34.552 kg A.4.1.1.17.a Rp 15,805.79 Rp 60,073.38
7 Sofi-Sofi 40.148 kg A.4.1.1.17.a Rp 15,805.79 Rp 69,803.12
TOTAL PEKERJAAN PEMBESIAN
V Pekerjaan begisting
1 Sloof 15/20 6.900 m2 A.4.1.1.21 Rp 181,891.60 Rp 138,055.72
2 Balok Latei 15/20 6.900 m2 A.4.1.1.23 Rp 491,367.80 Rp 372,948.16
3 Ring Balk 15/20 5.860 m2 A.4.1.1.23 Rp 491,367.80 Rp 316,735.68
4 Kolom 15/15 35.700 m2 A.4.1.1.22 Rp 461,667.80 Rp 1,812,969.45
5 Kolom 15/15 Teras 3.096 m2 A.4.1.1.22 Rp 461,667.80 Rp 157,225.59
6 Dak Atap 3.830 m2 A.4.1.1.23 Rp 491,367.80 Rp 207,013.25
7 Sofi-Sofi 0.403 m2 A.4.1.1.23 Rp 491,367.80 Rp 21,793.14
TOTAL PEKERJAAN BEGISTING
VI Pekerjaan dinding
Pemasangan Dinding Bata Merah Ukuran
1 139.832 m2 A.4.4.1.3 Rp 253,178.30 Rp 3,894,266.42
(5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm 262.256 m2 A.4.4.2.4 Rp 65,518.33 Rp 1,890,079.92
3 Pemasangan Acian 262.256 m2 A.4.4.2.27 Rp 37,617.25 Rp 1,085,186.53
Pengecatan 1m2 Tembok Baru (1lap.Plamur, 1lap
4 262.256 m2 A.4.7.1.10 Rp 52,198.30 Rp 1,505,822.25
Cat Dasar 2 lap. Cat Penutup)
TOTAL PEKERJAAN DINDING
VII Pekerjaan lantai
Pemasangan 1 m2 lantai ubin PC abu-abu ukuran
1 20.216 m2 A.4.4.3.1 Rp 102,950.49 Rp 228,937.18
40cm x 40 cm
2 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm 15.038 m2 A.4.4.3.6 Rp 105,382.59 Rp 174,315.98
TOTAL PEKERJAAN DINDING
Rp 781,440.00
Rp 923,268.50
#REF!
Rp 1,813,185.00
#REF!
Rp 1,119,864.19
Rp 221,069.22
Rp 3,302,254.98
Rp 168,536.54
Rp 4,811,724.93
Rp 7,021,133.63
Rp 1,782,050.42
Rp 8,803,184.05
Rp 688,020.19
Rp 688,020.19
Rp 584,318.60
Rp 1,779,878.32
Rp 154,355.83
Rp 531,803.05
Rp 268,028.74
Rp 4,694,424.92
Rp 1,952,044.52
Rp 1,952,044.52
Rp 1,952,044.52
Rp 4,120,217.43
Rp 361,816.61
Rp 606,195.04
Rp 704,376.98
#REF!
Rp 1,393,107.76
Rp 3,763,385.98
Rp 3,196,150.99
Rp 18,294,509.91
Rp 1,586,549.09
Rp 2,088,951.93
Rp 219,912.64
Rp 30,542,568.31
Rp 39,296,688.39
Rp 68,287,490.69
Rp 18,267,731.28
Rp 11,371,154.31
Rp 137,223,064.67
Rp 2,310,184.29
Rp 1,759,006.67
Rp 4,069,190.96
Rp 8,824,602.63
Rp 5,299,187.30
Rp 14,123,789.93
Rp 10,737,440.79
Rp 5,130,409.47
Rp 3,405,515.63
Rp 7,113,639.07
Rp 13,100,868.31
Rp 7,813,822.26
Rp 14,778,696.33
Rp 62,080,391.86
Rp 756,354.56
Rp 120,574.24
Rp 215,681.10
Rp 3,833,686.47
Rp 4,926,296.37
Rp 2,037,082.07
Rp 2,037,082.07
#REF!
#REF!
NO URAIAN PEKERJAAN TOTAL HARGA
1 2 3
1 2 3
1 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
1 2 3
1 A.4.6.1.1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II
2 A.4.6.1.4 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
4 A.4.6.1.15 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai kayu Kruing klas I
1 2 3
1 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
5 A.4.7.1.5 Pengecatan 1 M2 Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
3 A.4.7.1.10 Pengecatan 1m2 Tembok Baru (1lap.Plamur, 1lap Cat Dasar 2 lap. Cat Penutup)
HARGA SATUAN
SAT PEKERJAAN
(Rp)
4 Rp 5.00
RSIAPAN
m' Rp 923,268.50
m' #REF!
m2 Rp 16,335.00
TANAH
m3 Rp 75,927.50
m3 Rp 55,055.00
m3 Rp 331,331.00
m3 Rp 199,127.50
AN
HARGA SATUAN
SAT PEKERJAAN
(Rp)
4 Rp 5.00
PONDASI
m3 Rp 977,642.29
m3 Rp 605,830.50
GAN DINDING
m2 Rp 253,178.30
ESTERAN
m2 Rp 65,518.33
m2 Rp 37,617.25
AAN
HARGA SATUAN
SAT
PEKERJAAN
(Rp)
4 Rp 5.00
K A Y U
m3 Rp 17,839,910.00
m2 Rp 692,370.80
m3 Rp 19,354,538.50
m3 Rp 14,350,198.50
m2 Rp 146,194.62
m2 Rp 199,681.72
m' Rp 191,075.50
AAN
HARGA SATUAN
SAT PEKERJAAN
(Rp)
4 Rp 5.00
BETON
m3 Rp 1,197,754.61
m2 Rp 181,891.60
m2 Rp 461,667.80
m2 Rp 491,367.80
NUTUP ATAP
m2 Rp 162,220.30
m' Rp 150,486.78
GIT-LANGIT
m2 Rp 52,057.50
CI dan KACA
Buah Rp227,133.50
Buah Rp36,208.48
Buah Rp32,384.55
m2 Rp170,958.48
m2 Rp 102,950.49
m2 Rp 105,382.59
NGECATAN
m2 Rp73,395.30
m2 Rp52,198.30
NO JENIS PEKERJAAN BOBOT (%)
WAKTU PELAKSANAAN
MINGGU KE
1 2 3
75%
#REF! #REF!
#REF!
#REF! #REF! 50%
#REF! #REF! #REF!
#REF!
#REF! #REF!
#REF! #REF! #REF! 25%
#REF!
#REF!
0%
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!