Anda di halaman 1dari 169

NO.

URAIAN BELANJA KODE SATUAN

1 Mandor L.04 Hr
2 Pekerja L.01 Hr
3 Tukang Batu L.02 Hr
4 Tukang Kayu L.02 Hr
5 Tukang Besi L.02 Hr
6 Tukang Cat L.02 Hr
7 Tukang Gali L.02 Hr
8 Tukang Listrik L.02 Hr
9 Tukang Plitur L.02 Hr
10 Tukang Jalan L.02 Hr
11 Tukang masak aspal L.02 Hr
12 Tukang Ledeng L.02 Hr
13 Kep Tukang Batu L.03 Hr
14 Kep Tukang Kayu L.03 Hr
15 Kep Tukang Besi L.03 Hr
16 Kep Tukang Cat L.03 Hr
17 Penjaga Malam / Satpam L.01 Hr
18 Sopir L.03 Hr
19 Pembantu Sopir / Kenek L.01 Hr
20 Operator Alat Berat L.05 Hr
21 Pembantu Operator Alat Berat L.06 Hr
22 Mekanik / Teknisi Alat Berat L.03 Hr
23 Juru Ukur L.07 Hr
HARGA
(Rp)
Rp121,000.00
Rp88,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp99,000.00
Rp110,000.00
Rp110,000.00
Rp110,000.00
Rp110,000.00
Rp88,000.00
Rp110,000.00
Rp88,000.00
Rp132,000.00
Rp94,000.00
Rp110,000.00
Rp127,000.00
1. STANDAR HARGA MATERIAL KONSTRUKSI BIDANG BANGUNAN

NO. URAIN BELANJA


1 BAHAN DASAR
BATU KALI
Bulat Utuh
Batu Belah Hitam
Batu Belah Putih
Pecah Hitam 10/15
Pecah Hitam 5/7
Pecah Hitam 3/5
KERIKIL
Timbun
Sawur/Koral Untuk Beton
Batu Pecah 0,5/1 (Hitam)
Batu Pecah 1/1 (Hitam)
Batu Pecah 1/2 (Hitam)
Batu Pecah 2/3 (Hitam)
Batu Pecah 3/5 (Hitam)
Batu Pecah 5/7 (Hitam)
Batu Pecah 7/10 (Hitam)
Tras Giling
BATU BATA / DINDING
Batu bata merah (lokal)
Batu bata/ merah Exspose
Dinding Bata Ringan Heubel 60 x 20 x Tb 7.5 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 8 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 10 cm
PASIR
Pasir Urung (ada unsur lempung)
Pasir Pasang (sedang)
Pasir Pasang kali / gunung (ex. Bengawan Solo)
Pasang Cukup
Pasir Beton (ex. Muntilan)
Pasir Beton (Kasar- ex. Bengawan Solo)

NO. URAIN BELANJA


TANAH
Sirtu
Sirtu Royalyty
Tanah Biasa
Tanah Liat
Tanah Padas
Tanah Pilihan Grosok (Ex. Tahunan Prigi)
Tanah Urung di Borrrow Area,jarak angkut 1 Km
Tanah Urug di Lokasi
Tanah Urug Pilihan
Timbunan Tanah (Pasir Urug)
Bahan Tanah Timbunan
Bahan Pilihan Grosok (Grosok Tahunan)
Tanah (Merah)
KAPUR
Pasang (Padam)
Semen Merah
PORTALND CEMENT
Portalnd Pozzolan Cement / PPC (40 kg)
Portalnd Pozzolan Cement / PPC (50 kg)
Portalnd Pozzolan Cement / PPC - Warna
Portalnd Pozzolan Cement / PPC
IV. BAHAN BESI
BESI BETON
Baja Tulangan U 24 (Besi Beton biasa) Polos
Baja Tulangan U 32 (Besi Beton biasa) Polos
Besi Beton Polos
Besi Beton Ulir
BESI PLAT
Besi Strip
BESI PROFIL
Besi Profil L4 X 0,2 mm
Besi Profil L4 X 0,1 mm
Besi Profil L4 X 0,3 mm
JARING-JARING BAJA
Diameter 4 - 15
Diameter 6 - 15
Kawat Bronjong Diameter 2 - 4 mm
Kawat Pabrikan (2 x 1 x 0,5) Diameter Kawat 2,7 mm
Kawat Pabrikan (2 x 1 x 0,5) Diameter Kawat 3 mm

NO. URAIN BELANJA


Baja Profil "L" atau "C"
Baja Profil "IWF"
Baja Profil CNP
Baja Profil Siku

Kawat beton / Bendrat


* Harmonika 12 x 45 mm
* Harmonika 12 x 24 mm
* Harmonika 14 x 30 mm
* Harmonika 14 x 35 mm
* Kawat Nyamuk Nylon
* Kawat Kasa
* Saringan Pasir
* Kawat Loket
* Kawat Duri
* Kawat Loket

Rangka Metal (Hollow 40.20.0,3 mm)


Rangka Metal (Hollow 40.20.0,4 mm)
Rangka Metal (Hollow 40.40.0,3 mm)
Rangka Metal (Hollow 40.40.0,4 mm)

V. BAHAN PIPA
I Pipa PVC SII SCJ ,S - 12,5 (10 bar)
Pipa PVC Maspion tipe AW diameter 1/2"
Pipa PVC Maspion tipe AW diameter 3/4"
Pipa PVC Maspion tipe AW diameter 1"
Pipa PVC Maspion tipe AW diameter 1 1/4"
Pipa PVC Maspion tipe AW diameter 1 1/2"
Pipa PVC Maspion tipe AW diameter 2"
Pipa PVC Maspion tipe AW diameter 2 1/2"
Pipa PVC Maspion tipe AW diameter 3"
Pipa PVC Maspion tipe AW diameter 4"
Pipa PVC Maspion tipe AW diameter 5"
Pipa PVC Maspion tipe AW diameter 6"
Pipa PVC Wavin tipe AW diameter 1/2"
Pipa PVC Wavin tipe AW diameter 1"
Pipa PVC Wavin tipe AW diameter 3/4"
Pipa PVC Wavin tipe AW diameter 1 1/4"
Pipa PVC Wavin tipe AW diameter 1 1/2"
Pipa PVC Wavin tipe AW diameter 2"
Pipa PVC Wavin tipe AW diameter 2 1/2"
Pipa PVC Wavin tipe AW diameter 3"
NO. URAIN BELANJA
Pipa PVC Wavin tipe AW diameter 4"
Pipa PVC Wavin type S 12,5 uk.2"
Pipa PVC Wavin type S 12,5 uk.3"
Pipa PVC Wavin type S 12,5 uk.4"
Pipa PVC Wavin type S 12,5 uk.6"
Pipa PVC Wavin type S 12,5 uk.8"
Pipa PVC Maspion type S 10 +MOF 8"
Pipa PVC Maspion type S 10 +RR 2"
Pipa PVC Maspion type S 10 +RR 2 1/2"
Pipa PVC Maspion type S 10 +RR 3"
Pipa PVC Maspion type S 10 +RR 4"
Pipa PVC Maspion type S 10 +RR 5"
Pipa PVC Maspion type S 10 +RR 6"
Pipa PVC Maspion type S 10 +RR 8"
Pipa PVC Maspion type S 12,5 +MOF 8"
Pipa PVC Maspion type S 12,5 +RR 2"
Pipa PVC Maspion type S 12,5 +RR 3"
Pipa PVC Maspion type S 12,5 +RR 4"
Pipa PVC Maspion type S 12,5 +RR 5"
Pipa PVC Maspion type S 12,5 +RR 6"
Pipa PVC Maspion type S 12,5 +RR 8"
II. BAHAN KAYU
JATI
Kayu Jati Kelas I (Papan)
Kayu Jati Kelas I (Balok/Pesagen)

Kayu Jati Kelas II (Balok/Pesagen)


Kayu Jati Kelas II (Papan)

Kayu Jati Kampung (Balok/Pesagen)


Kayu Jati Kampung (Papan)

Kayu Jati Kampung 5/7


Reng Kayu Jati (2 x 3 x 300)
Usuk Kayu Jati (3 x 5 x 400)
Usuk Kayu Jati (4 x 6 x 400)
KAMPER
Kayu Kamper Kelas I (Balok/Pesagen)
Kayu Kamper Kelas I (Papan)
Kayu Kamper Kelas II (Balok/Pesagen)
Kayu Kamper Kelas II (Papan)
Kayu Kamper Kelas III (Balok/Pesagen)
Kayu Kamper Kelas III (Papan)

NO. URAIN BELANJA


KRUING
Kayu Kruing Kelas I (Balok/Pesagen)
Kayu Kruing Kelas I (Papan)
Kayu Kruing Kelas II (Balok/Pesagen)
Kayu Kruing Kelas II (Papan)
Kayu Kruing KelasII I (Balok/Pesagen)
Kayu Kruing Kelas III (Papan)
Kayu Kruing 2/3
Kayu Kruing 5/7
BENGKIRAI
Kayu Bengkirai Kelas I (Balok/Pesagen)
Kayu Bengkirai Kelas I (Papan)
Kayu Bengkirai Kelas II (Balok/Pesagen)
Kayu Bengkirai Kelas II (Papan)
Kayu Bengkirai KelasII I (Balok/Pesagen)
Kayu Bengkirai Kelas III (Papan)
DOLKEN
Sedang 8 x 10 x 400 cm
Kecil 6 x 7 x 400 cm
Beesar 10 x 12 x 400 cm
Kayu Cetakan
Kayu Bakar
Bambu
Pecancah

II. BAHAN PENUTUP ATAP


SIRAP (100 lbr)
GENTENG,BETON,GLAZOUR & KERAMIK
Genteng Beton Plat
Genteng Keramik (KIA,M-CLASS,KANMURI)
Genteng Glazour
Genteng Beton Warna Special
Genteng Beton Warna Khusus
Kerpus Beton Warna Standard
Kerpus Jatiwangi (Glazour)
Kerpus Kodok (Glazour)
Kerpus Genteng Keramik
NO. URAIN BELANJA
GENTENG TANAH LIAT
Plentong Press Kecil
Plentong Press Besar
Pres Kodok
Kerpus Plentong Press
Kerpus Lokal
Press Lokal
Nok Kerpus Plentong Super
GENTENG KACA
Vlaam tebal 2 mm
Vlaam tebal 3 mm
Kodok tebal 2 mm
Kodok tebal 3 mm
ASBES GELOMBANG BESAR
200 cm X 102 cm X 5 mm
225 cm X 102 cm X 5 mm
250 cm X 102 cm X 5 mm
200 cm X 102 cm X 6 mm
225 cm X 102 cm X 6 mm
250 cm X 102 cm X 6 mm
ASBES GELOMBANG KECIL
150 cm X 105 cm X 5 mm
180 cm X 105 cm X 5 mm
210 cm X 105 cm X 5 mm
240 cm X 105 cm X 5 mm
270 cm X 105 cm X 4 mm
300 cm X 105 cm X 5 mm
ASBES NOK
Kerpus Genteng
Stel Besar
Paten Besar
NOKSTEL GELOMBANG HARFLEX
Stel Besar
Patent Besar
Plat Besar
Nok Asbes
Nok Galfalum
Nok Seng Gelombang

NO. URAIN BELANJA


ASBES PLAT
100 cm X 100 cm X 3 mm
100 cm X 100 cm X 4 mm
50 cm X 200 cm X 3 mm
100 cm X 100 cm X 3 mm
100 cm X 100 cm X 5 mm
100 cm X 200 cm X 5 mm
100 cm X 240 cm X 5 mm
FIBRE GLASS (JABES)
180 X 92 cm
200 X 92 cm
250 X 92 cm
180 X 105 cm
210 X 105 cm
250 X 105 cm
SENG PLAT
BJLS 0,18 lebar 55 cm
BJLS 0,20 lebar 55 cm
BJLS 0,28 lebar 55 cm
BJLS 0,30 lebar 55 cm

Seng Tulang BJLS 26 lebar 0,60


Seng Tulang BJLS 26 lebar 0,90
Seng Tulang BJLS 26 lebar 1,20

Seng Pelat BJLS 26 lebar 0,6 m


Seng Pelat BJLS 26 lebar 0,9 m
Seng Pelat 26 lebar 0,9 m t=0,02
Seng Pelat 26 lebar 0,9 m t=0,025
Seng Pelat 26 lebar 0,9 m t=0,03
Seng Pelat 26 lebar 0,9 m t=0,04
Seng Pelat 26 lebar 0,9 m t=0,05
SENG GELOMBANG
BJLS 0,18 panjang 180 cm
BJLS 0,20 panjang 180 cm
BJLS 0,28 panjang 180 cm
BJLS 0,30 panjang 180 cm

NO. URAIN BELANJA


Seng Gelombang Uk. 0,7 x 1,8, t=0,02
Seng Gelombang Uk. 0,7 x 2,1, t=0,025
Seng Gelombang Uk. 0,7 x 2,4, t=0,03
Seng Gelombang Uk. 0,7 x 3,0, t=0,04

Tb. 3 mm panjang 180 cm


Tb. 3 mm panjang 210 cm
Tb. 3 mm panjang 240 cm
Tb. 3 mm panjang 300 cm
Tb. 3 mm panjang 400 cm
Tb. 3 mm panjang 500 cm
Tb. 3 mm panjang 600 cm

Tb. 3,5 mm panjang 180 cm


Tb. 3,5 mm panjang 210 cm
Tb. 3,5 mm panjang 240 cm
Tb. 3,5 mm panjang 300 cm
Tb. 3,5 mm panjang 400 cm
Tb. 3,5 mm panjang 500 cm
Tb. 3,5 mm panjang 600 cm

III. BAHAN PENUTUP DINDING/ LANTAI


Ubin ( Tegel Biasa )
PC Polos
40 X 40 cm
30 X 30 cm
20 X 20 cm
PC Warna
40 X 40 cm
30 X 30 cm
20 X 20 cm
Teraso
30 X 30 cm
Tegel Plint
PC Warna 10 X 20 cm
PC abu-abu 15 X 20
POLIS UBIN
Lantai/Badan
Plint
Trap

NO. URAIN BELANJA


UBIN PORSELIN
Lokal 11 X 11 putih
Lokal 11 X 11 warna
Lokal 15 X 15 putih
Lokal 15 X 15 putih
MOZAIK PORSELIN
10 X 20 cm
15 X 15 cm
20 X 20 cm
20 X 25 cm
KERAMIK
Keramik 60 X 60 Motif
Keramik 50 X 50 Motif
Keramik 40 X 40 Motif
Keramik 30 X 30 Motif
Keramik 20 X 20 Motif
Keramik 25 X 25 Motif
Keramik 20 X 25 Motif
Keramik 20 X 45 Motif
Step Nosing
GRANIT
Granit 60 X 60 Pholised
Granit 60 X 60 Unpholised (kasar)
Parquet Jati
Batu Paros
Batu Alam
Batu Alam (Candi)
Batu Muka
Batu Alam (Andesit)
Batu Alam (Candi) - Alur Lurus
Batu Alam (Candi) - Alur Patah
Batu Alam (Lempeng) - Acak
Batu Alam (Lempeng) - Berdimensi
Batu Alam (Marmo) - Bakar
Batu Alam (Marmo) - Krem
Batu Alam Palimanan RTM Polos

Marmer

NO. URAIN BELANJA


V. BAHAN CETAK
BUIS BETON
Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 70 cm - 100 cm
Ø 80 cm - 100 cm
Ø 100 cm - 100 cm
U 10 cm - 100 cm
U 20 cm - 100 cm
U 30 cm - 100 cm

LUBANG ANGIN (ROSTER) PC + AIR


BETON
10 X 20 cm
20 X 20 cm
25 X 25 cm
KAYU
25 X 25 cm
30 X 30 cm
15 X 25 cm
15 X 30 cm

VI. BAHAN LANGIT - LANGIT


AKUSTIK - uk :
30 X 30
60 X 60
60 X 120
LIS PLAFON
Lis Kayu 2/3
Lis Kayu Profil
Lis Gypsum

SOFT BOARD
Gypsum Tebal 9 mm (Elepant & Jaya Board)

HARD BOARD
Kalsiboard 1,20 X 2,40

PVC BOARD
Pvc Plafon Motif

NO. URAIN BELANJA


Paku Ukuran 1" s/d 4"
Paku Ukuran 2" s/d 5"
Paku Payung
Paku Sekrup
Paku Beton
Mur Baut (Kuda Kuda)
Angkur Baut
Lem Kayu
Tali Ijuk
Ramset/Dina blot

NO URAIAN BELANJA

1 Mandor
2 Pekerja
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Tukang Cat
7 Tukang Gali
8 Tukang Listrik
9 Tukang Plitur
10 Tukang Jalan
11 Tukang Masak Aspal
12 Tukang Ledeng
13 Kep Tukang Batu
14 Kep Tukang Kayu
15 Kep Tukang Besi
16 Kep Tukang Cat
17 Penjaga Malam / Satpam
18 Sopir
19 Pembantu Sopir / Kenek
20 Operator Alat Berat
21 Pembantu Operator Alat Berat
22 Mekanik / Teknisi Alat Berat
23 Juru Ukur

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

HARGA
SATUAN
PEKERJAA
I A. 2.2.1
N
PERSIAPA
N
Pagar Sementara
dari Seng
1 A.2.2.1.2 1 m'
Gelombang Tinggi
2m

A TENAGA
L.01 0.2 OH Pekerja
L.02 0.4 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.02 OH Mandor
B BAHAN

Kayu Dolken
1.25 Btg diameter 8 - 10 /
400 cm

2.5 Kg Lbr Portland Semen

Seng Gelombang
1.2 m3
3" - 5"

0.005 m3 Pasir Beton


0.009 m3 Koral Beton
Kayu 5/7X4m
0.072 m3
Kayu Kruing
kg
0.06 Paku Biasa 2" - 5"

0.45 kg Meni Besi


C PERALATAN
D Jumlah A + B + C
Overhead & Profit
E
10%

Harga Satuan
F
Pekerjaan (D+E)

Overhe
ad &
Profit
10%

Pengukuran dan
2 A.2.2.1.4 1 m' Pemasangan
Bouwplank
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
Kayu 5/7x 4m
0.012 m3
Kayu Kruing

0.02 Kg m3 Paku Biasa 2" - 5"


Kayu Papan 3/20
0.007
Kruing

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Membersihkan
5 A.2.2.1.9 1 m2 Lapangan dan
Perataan

A Tenaga
L.01 0.1 OH Pekerja
L.04 0.05 OH Mandor
B Bahan
C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Pembuatan
6 A.2.2.1.10 1 m2 Steger/Perancah
dari Bambu

A Tenaga
L.01 1 OH Pekerja
L.02 2 OH Tukang Kayu
L.03 0.2 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan

Bambu diameter 6
1.25 Btg
- 8 / 600 cm

0.186 Kg Tali Ijuk


C PERALATAN

D Jumlah A + B + C
Overhead & Profit
E
10%

Harga Satuan
F
Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

I A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m

A TENAGA

L.01 0 ,75 OH Pekerja

L.04 0.025 OH Mandor

B BAHAN

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit

F Harga Satuan Pekerjaan (D+E)

Overhead & Profit 10%

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

11 A.2.3.1.11 1 m3 Urugan Pasir

A TENAGA

L.01 0 ,30 OH Pekerja


L.04 0 ,01 OH Mandor

B BAHAN

1.2 m3 Pasir Urug

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Mengurug Tanah
14 A.2.3.1.14.B 1 m3 Pilihan (Tanah
Merah)

0 ,25 OH Pekerja

0.025 OH Mandor
B BAHAN

1.2 m3 Tanah (Merah)

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Pengurugan
9 A.2.3.1.9 1 m3
Kembali

Pengurugan
Kembali di hitung
dari 1/3 kali
koefisien

A TENAGA

L.01 0 ,50 OH Pekerja

L.04 0.05 OH Mandor

B BAHAN

C PERALATAN

D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)

Pemasangan Pondasi
3 A.3.2.1.3 1 m3 Batu Belah 1SP : 5
PP

A TENAGA

L.01 1 ,5 OH Pekerja

L.02 0.75 OH Tukang Batu

L.03 0.075 OH Kepala Tukang

L.04 0.075 OH Mandor

B BAHAN

1 ,2 m3 Batu Belah

136 Kg Portland Sement

0.544 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Pemasang Batu
9 A.3.2.1.9 1 m3
Kosong/Anstamping

A Tenaga
L.01 0 ,78 OH Pekerja

L.02 0 ,39 OH Tukang Batu

L.03 0.039 OH Kepala Tukang

L.04 0.039 OH Mandor

B Bahan

1 ,2 m3 Batu Belah

0.432 m3 Pasir Urug

C PERALATAN

D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)

Memasang Bekisting
19 A.4.1.1.21 1 m2
untuk Sloof

A Tenaga

L.01 0.52 OH Pekerja

L.02 0.26 OH Tukang Kayu

L.03 0.026 OH Kepala Tukang

L.04 0.026 OH Mandor

B Bahan

0.045 m3 Kayu Perancah

0.3 Kg Paku Biasa 2" - 5"

0.1 Ltr Minyak Bekisting

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Memasang Bekisting
21 A.4.1.1.22 1 m2
untuk Kolom

A Tenaga

L.01 0.66 OH Pekerja

L.02 0.33 OH Tukang Kayu

L.03 0.033 OH Kepala Tukang

L.04 0.033 OH Mandor

B Bahan

0.04 m3 Kayu Perancah

0.4 Kg Paku Biasa 2" - 5"

0.2 Ltr Minyak Bekisting

0.015 m3 Balok Kayu Klas II

0.35 Lbr Plywood tebal 9mm


Dolken Kayu Galam
2 Btg diameter 8 - 10 cm /
4m

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Memasang Bekisting
23 A.4.1.1.23 1 m2
untuk Balok
A Tenaga

L.01 0.66 OH Pekerja

L.02 0.33 OH Tukang Kayu

L.03 0.033 OH Kepala Tukang

L.04 0.033 OH Mandor

B Bahan

0.04 m3 Kayu Perancah

0.4 Kg Paku Biasa 2" - 5"

0.2 Ltr Minyak Bekisting

0.018 m3 Balok Kayu Klas II

0.35 Lbr Plywood tebal 9mm

Dolken Kayu Galam


2 Btg diameter 8 - 10 cm /
4m

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Membuat Beton
mutu f'c=21,7 MPa
8 A.4.1.1.8 1 m3
(K250), slum (1
2±2)cm, w/c = 0,56

A Tenaga

L.01 1.65 OH Pekerja

L.02 0.275 OH Tukang Batu

L.03 0.028 OH Kepala Tukang

L.04 0.083 OH Mandor

B Bahan

384 Kg Portland Semen


692 Kg Pasir Beton

Kerikil (maksimum
1,039 Kg
30 mm)

215 ltr Air

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

HARGA
SATUAN
3 A.4.4.1 PEKERJAAN
PASANGAN
DINDING

Pemasangan Dinding
Bata Merah Ukuran
3 A.4.4.1.3 1 m2 (5x11x22) cm Tebal 1
Bata Camp. 1SP :
4PP

A Tenaga

L.01 0.6 OH Pekerja

L.02 0.2 OH Tukang Batu

L.03 0.02 OH Kepala Tukang Batu

L.04 0.03 OH Mandor

B Bahan

140 Buah Bata Merah

26.55 kg Portland Semen (PC)

0.093 m3 Pasir Pasang (PP)

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Memasang Bekisting
21 A.4.1.1.22 1 m2
untuk Kolom

A Tenaga

L.01 0.66 OH Pekerja

L.02 0.33 OH Tukang Kayu


L.03 0.033 OH Kepala Tukang

L.04 0.033 OH Mandor

B Bahan

0.04 m3 Kayu Perancah

0.4 Kg Paku Biasa 2" - 5"

0.2 Ltr Minyak Bekisting

0.015 m3 Balok Kayu Klas II

0.35 Lbr Plywood tebal 9mm

Dolken Kayu Galam


2 Btg diameter 8 - 10 cm /
4m

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

HARGA SATUAN
5 A.4.4.2 PEKERJAAN
PLESTERAN

Pemasangan
4 A.4.4.2.4 1 m2 Plesteran 1 Pc : 4 Pp
Tebal 15 mm

A Tenaga

L.01 0 ,3 OH Pekerja

L.02 0 ,15 OH Tukang batu

L.03 0.015 OH Kepala Tukang

L.04 0.015 OH Mandor

B Bahan

6.24 Kg Portland Semen

0.024 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%
Harga Satuan
F
Pekerjaan (D+E)

25 A.4.4.2.27 1 m2 Pemasangan Acian

Tenaga

L.01 0 ,20 OH Pekerja

L.02 0 ,10 OH Tukang batu

L.03 0.01 OH Kepala Tukang

L.04 0.01 OH Mandor


Bahan

3 ,25 Kg Portland Semen

C PERALATAN

D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pembesian dg Besi
14 A.4.1.1.17.a 1 Kg
Polos atau Besi Ulir

A Tenaga

L.01 0.007 OH Pekerja

L.02 0.007 OH Tukang Besi

L.03 0.0007 OH Kepala Tukang

L.04 0.0004 OH Mandor

B Bahan

1.05 Kg Besi Beton polos

0.015 Kg Kawat Beton

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN

HARGA SATUAN
PEKERJAAN
9 A.4.4.3
PENUTUP LANTAI
DAN DINDING

Pemasangan 1 m2
lantai ubin PC abu-
1 A.4.4.3.1 1 m2
abu ukuran 40cm x
40 cm

A Tenaga

L.01 0 ,25 OH Pekerja

L.02 0.125 OH Tukang Batu

L.03 0.013 OH Kepala Tukang

L.04 0.013 OH Mandor


B Bahan

Ubin Abu-abu 30x30


6 ,63 Buah
cm

9 ,80 Kg Portland Semen

0.045 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Pemasangan lantai
6 A.4.4.3.6 1 m2 Ubin PC Warna Uk.
20 x 20 cm
A Tenaga

L.01 0 ,27 OH Pekerja

L.02 0.135 OH Tukang Batu

L.03 0.014 OH Kepala Tukang

L.04 0.014 OH Mandor

B Bahan

Ubin Warna 20x20


26 ,5 Buah
cm

10 ,4 Kg Portland Semen

1 Kg Semen warna

0.045 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%
Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN

HARGA
SATUAN
7 A.4.5.2 PEKERJAAN
PENUTUP
ATAP

Pemasangan 1 m2
2 A.4.5.2.2 1 m2 atap genteng kodok
glazuur

A Tenaga

L.01 0.15 OH Pekerja

L.02 0.075 OH Tukang Kayu

L.03 0.008 OH Kepala Tukang

L.04 0.008 OH Mandor

B Bahan
Genteng Kodok
25 Buah
Glazour

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Overhea
d&
Profit
10%

URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN

Pemasangan 1 m’
6 A.4.5.2.5 1 m' bubung genteng
kodok glazuur
A Tenaga

L.01 0.4 OH Pekerja

L.02 0.2 OH Tukang Kayu

L.03 0.02 OH Kepala Tukang

L.04 0.002 OH Mandor

B Bahan

Kerpus Kodok
5 Buah
(Glazour)

8 Kg Portland Semen

0.032 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

HARGA SATUAN
6 A.4.6.1 PEKERJAAN K A
Y U
Pembuatan &
Pemasangan Kosen
1 A.4.6.1.1 1 m3
Pintu & Jendela
A Kayu Jati Kelas II
Tenaga

L.01 7 OH Pekerja

L.02 21 OH Tukang Kayu

L.03 2 ,10 OH Kepala Tukang

L.04 0 ,35 OH Mandor

B Bahan
Kayu Jati Kelas II
1 ,10 m3
(Balok/Pesagen)

1 ,25 kg Paku Biasa 2" - 5 "

1 ,00 kg Lem Kayu

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pembuatan &
Pemasangan Daun
4 A.4.6.1.4 1 m2 Pintu Klamp
Sederhana Kayu
Klas III

Tenaga

L.01 0 ,35 OH Pekerja

L.02 1 ,05 OH Tukang Kayu

L.03 0.105 OH Kepala Tukang

L.04 0.018 OH Mandor

Bahan

Kayu Klas II
0.04 m3
(Kamfer), papan

0 ,05 Kg Paku Biasa 2" - 5 "

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pembuatan&Pemasa
ngan Konstruksi
17 A.4.6.1.14.(a) 1 m3
Kuda-kuda Kayu
A Jati Kelas II
Tenaga

L.01 6.7 OH Pekerja

L.02 20.1 OH Tukang Kayu

L.03 2.01 OH Kepala Tukang

L.04 0.335 OH Mandor

B Bahan
Kayu Jati Kelas II
1.2 m3
(Balok/Pesagen)

15 Kg Besi Strip

5.6 Kg Paku Biasa 2" - 5"

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pemasangan
konstruksi Nok,
18 A.4.6.1.15 1 m3 Gording, Muirplat &
Jurai kayu Kruing
A Tenaga Klas I

L.01 6.7 OH Pekerja

L.02 20.1 OH Tukang Kayu

L.03 2.01 OH Kepala Tukang

L.04 0.335 OH Mandor

B Bahan

Kayu Kruing Klas I


1.1 m3
(Balok/pesagen)

15 Kg Besi Strip

3 Kg Paku Biasa 2" - 5"

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pemasangan Rangka
23 A.4.6.1.18 1 m2 Atap Sirap, Kayu
Kruing

A Tenaga

L.01 0 ,12 OH Pekerja

L.02 0 ,12 OH Tukang Kayu

L.03 0.012 OH Kepala Tukang

L.04 0.006 OH Mandor

B Bahan

0.014 m3 Kayu Kruing 5/7


0.057 Kg Paku Biasa 2" - 5"

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

Pemasangan Rangka
Langit-langit (60x60)
25 A.4.6.1.20 1 m2
cm, kayu Klas II
atau Klas III

A Tenaga

L.01 0 ,2 OH Pekerja

L.02 0 ,3 OH Tukang Kayu

L.03 0 ,03 OH Kepala Tukang

L.04 0 ,01 OH Mandor

B Bahan

0.0163 m3 Kayu Kruing

0 ,25 Kg Paku Biasa 2" - 5"

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PAKERJAAN

Pemasangan
Listplank Uk.
26 A.4.6.1.21 1 m'
(3x20)cm Kayu Jati
Kelas II

A Tenaga

L.01 0 ,1 OH Pekerja

L.02 0 ,2 OH Tukang Kayu

L.03 0.02 OH Kepala Tukang

L.04 0.005 OH Mandor

B Bahan
Kayu Jati Kelas II
0.0108 m3
(Papan)
0 ,10 Kg Paku Biasa 2" - 5"

C PERALATAN

D Jumlah A + B + C
Overhead & Profit
E
10%
Harga Satuan
F
Pekerjaan (D+E)

A.4.5.1HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFON)


A.4.5.1.7.
Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm
No Uraian Kode Satuan

A TENAGA
KERJA
Pekerja L.01 OH
Tukang L.02 OH
kayu
Kepala L.03 OH
tukang
Mandor L.04 OH

B BAHAN
Gypsum Lembar
tebal 9
mm
(Elepant
& Jaya
Board)

PAKU - kg
sekrup

C PERALA
TAN

D Jumlah
(A+B+C)
E Biaya Umum dan Keuntungan
F Harga
Satuan
Pekerjaa
n (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
HARGA
SATUAN
10 A.4.6.2 PEKERJAA
N KUNCI
dan KACA

Pemasangan
1 A.4.6.2.2 1 Buah Kunci Tanam
Biasa

A Tenaga
L.01 0.01 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
Kunci Tanam
1 Buah
Biasa 2 Slag
C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%
Harga Satuan
F
Pekerjaan (D+E)
Overhea
d&
Profit
10%

Pemasangan
4 A.4.6.2.5 1 Buah
Engsel Pintu

A Tenaga
L.01 0.015 OH OH OH OH Pekerja
L.02 0.15 Tukang Kayu
L.03 0.015 Kepala Tukang
L.04 0.0008 Mandor
B Bahan

Engsel pintu
1 Buah
Nylon Kupu-Kupu

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)

URAIAN
No. SNI KODE KOEF SAT.
PEKERJAAN
Pemasangan
5 A.4.6.2.6 1 Buah Engsel Jendela
Kupu-kupu

A Tenaga
L.01 0.01 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.0005 OH Mandor
B Bahan

Engsel Jendela
1 Buah
Kupu-Kupu Biasa

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)
KODE URAIAN HARGA SATUAN
NO. SAT
ANALISA PEKERJAAN PEKERJAAN
(Rp)

1 2 3 4 Rp 5.00
HARGA SATUAN
I A. 2.2.1 PEKERJAAN
PERSIAPAN
Keselamatan Dan
1 1:19 Lump Sum Rp 704,000.00
Kesehatan Kerja
Pagar Sementara
dari Seng
2 A.2.2.1.2 m' Rp 923,268.50
Gelombang Tinggi
2,00 m
Pengukuran dan
3 A.2.2.1.4 Pemasangan m' Rp 222,513.50
Bouwplank

Membersihkan
4 A.2.2.1.9 Lapangan dan m2 Rp 16,335.00
Perataan

HARGA SATUAN
II A.2.3.1 PEKERJAAN
TANAH
Menggali Tanah
1 A.2.3.1.1 m3 Rp 75,927.50
Biasa Sedalam 1 m
Pengurugan
2 A.2.3.1.9 m3 Rp 55,055.00
Kembali

3 A.2.3.1.11 Urugan Pasir m3 Rp 331,331.00

Mengurug Tanah
4 A.2.3.1.14.B Pilihan (Tanah m3 Rp 199,127.50
Merah)

DAF
TAR HA
RGA SA AN
TUAN P
E K NO.
ERJA KODE URAIAN HARGA SATUAN
SAT
ANALISA PEKERJAAN PEKERJAAN

(Rp)

1 2 3 4 Rp 5.00

HARGA SATUAN
III A.3.2.1. PEKERJAAN
PONDASI

Pemasangan
1 A.3.2.1.3 Pondasi Batu m3 Rp 977,642.29
Belah 1SP : 5 PP

Pemasang Batu
2 A.3.2.1.9 Kosong/Anstampin m3 Rp 605,830.50
g

HARGA SATUAN
PEKERJAAN
IV A.4.4.1
PASANGAN
DINDING

Pemasangan
Dinding Bata
Merah Ukuran
1 A.4.4.1.3 m2 Rp 253,178.30
(5x11x22) cm
Tebal 1 Bata
Camp. 1SP : 4PP
HARGA SATUAN
V A.4.4.2 PEKERJAAN
PLESTERAN
Pemasangan
1 A.4.4.2.4 Plesteran 1 Pc : 4 m2 Rp 65,518.33
Pp Tebal 15 mm

2 A.4.4.2.27 Pemasangan Acian m2 Rp 37,617.25


DAF
TAR HA
RGA SA
TUAN P
EKERJA KODE URAIAN HARGA SATUAN
NO.
AN SAT
ANALISA PEKERJAAN PEKERJAAN

(Rp)

1 2 3 4 Rp 5.00

HARGA SATUAN
VI A.4.6.1 PEKERJAAN K
A Y U

Pembuatan &
Pemasangan Kosen
1 A.4.6.1.1 m3 Rp 17,839,910.00
Pintu & Jendela
Kayu Jati Kelas II

Pembuatan &
Pemasangan Daun
2 A.4.6.1.4 Pintu Klamp m2 Rp 692,370.80
Sederhana Kayu
Klas III
Pembuatan&Pema
A.4.6.1.14. sangan Konstruksi
3 m3 Rp 19,354,538.50
(a) Kuda-kuda Kayu
Jati Kelas II
Pemasangan
konstruksi Nok,
4 A.4.6.1.15 Gording, Muirplat m3 Rp 14,350,198.50
& Jurai kayu
Kruing klas I

Pemasangan
5 A.4.6.1.18 Rangka Atap m2 Rp 146,194.62
Sirap, Kayu Kruing
Pemasangan
Rangka Langit-
6 A.4.6.1.20 langit (60x60) cm, m2 Rp 199,681.72
kayu Klas II atau
III

Pemasangan
Listplank Uk.
7 A.4.6.1.21 m' Rp 191,075.50
(3x20)cm Kayu Jati
Kelas II

DAF
TAR HA
RGA SA
TUAN P
EKERJA KODE URAIAN HARGA SATUAN
NO.
AN SAT
ANALISA PEKERJAAN PEKERJAAN

(Rp)

1 2 3 4 Rp 5.00

HARGA SATUAN
VI A.4.1.1 PEKERJAAN B
ETON
Membuat Beton
mutu f'c=21,7 MPa
1 A.4.1.1.8 (K250), slum m3 Rp 1,197,754.61
(12±2)cm, w/c =
0,56

Memasang
2 A.4.1.1.21 Bekisting untuk m2 Rp 181,891.60
Sloof
Memasang
3 A.4.1.1.22 Bekisting untuk m2 Rp 461,667.80
Kolom
Memasang
4 A.4.1.1.23 Bekisting untuk m2 Rp 491,367.80
Balok

HARGA SATUAN
VII A.4.5.2 PEKERJAAN
PENUTUP ATAP

Pemasangan 1 m2
1 A.4.5.2.2 atap genteng m2 Rp 162,220.30
kodok glazuur

Pemasangan 1 m’
2 A.4.5.2.5 bubung genteng m' Rp 150,486.78
kodok glazuur

HARGA SATUAN
VIII A.4.5.1 PEKERJAAN
LANGIT-LANGIT

1 0 0 m2 Rp -

HARGA SATUAN
PEKERJAAN
XI A.4.6.2
KUNCI dan
KACA

Pemasangan Kunci
1 A.4.6.2.2 Buah Rp227,133.50
Tanam Biasa

Pemasangan
3 A.4.6.2.5 Buah Rp36,208.48
Engsel Pintu

Pemasangan
4 A.4.6.2.6 Engsel Jendela Buah Rp32,384.55
Kupu-kupu

Pemasangan Kaca
5 A.4.6.2.17 m2 Rp170,958.48
tebal 5 mm

HARGA SATUAN
PEKERJAAN
XII A.4.4.3
PENUTUP LANTAI
DAN DINDING

1 0 0 m2 Rp -

2 0 0 m2 Rp -

HARGA SATUAN
XIII A.4.7.1 PEKERJAAN
PENGECATAN
Pengecatan 1 M2
Bidang Kayu Baru
5 A.4.7.1.5 (1 lp Plamuur, 1 lp m2 Rp73,395.30
Cat dasar, 3 Lp
Cat Penutup)

Pengecatan 1m2
Tembok Baru
3 A.4.7.1.10 (1lap.Plamur, 1lap m2 Rp52,198.30
Cat Dasar 2 lap.
Cat Penutup)

1M' Pengukuran dan


3 A.2.2.1.4 1 m' Pemasangan
Bouwplank

A Tenaga

L.01 0.1 OH Pekerja

L.02 0.1 OH Tukang Kayu

L.03 0.01 OH Kepala Tukang

L.04 0.005 OH Mandor

B Bahan

Kayu 5/7 x 4m kayu


0.012 m3
kruing

0.02 kg Paku biasa 2"-5"

Kayu papan 3/20


0.007 m3
kruing

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E
10%

Harga Satuan
F
Pekerjaan (D+E)
N BELANJA SATUAN

m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3

N BELANJA SATUAN

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3

zak
zak
Kg
Kg

Kg
Kg
Kg
Kg

Kg

Kg
Kg
Kg

Kg
Kg
Kg
bh
bh

N BELANJA SATUAN
Kg
Kg
Kg
Kg

Kg
m2
m2
m2
m2
m2
m2
m2
m2
m
Kg

m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
N BELANJA SATUAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m3
m3

m3
m3

m3
m3

m3
btg
btg
btg

m3
m3
m3
m3
m3
m3

N BELANJA SATUAN

m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3

bt
bt
bt
m3
m3
bt
m3

pak

bh
bh
bh
bh
bh
bh
bh
bh
bh
N BELANJA SATUAN

bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh

bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh

bh
bh
bh

bh
bh
bh
bh
m
m

N BELANJA SATUAN

bh
bh
bh
bh
lbr
lbr
lbr

bh
bh
bh
bh
bh
bh

bh
bh
bh
bh

bh
bh
bh

m
m
m
m
m
m
m

lbr
lbr
lbr
lbr

N BELANJA SATUAN
lbr
lbr
lbr
lbr

lbr
lbr
lbr
lbr
lbr
lbr
lbr

lbr
lbr
lbr
lbr
lbr
lbr
lbr

m2
m2
m2

m2
m2
m2

m2

bh
bh

m
m
m

N BELANJA SATUAN

dos
dos
dos
dos

m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
bh

m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2

N BELANJA SATUAN

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
bh
bh

bh
bh
bh
bh

lbr
lbr
lbr

m
m
m

lbr

lbr

m2

N BELANJA SATUAN
kg
kg
kg
kg
kg
bh
bh
kg
kg
kg

LANJA KODE SATUAN

L.04 Hr
L.01 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.02 Hr
L.03 Hr
L.03 Hr
L.03 Hr
L.03 Hr
L.01 Hr
L.03 Hr
L.01 Hr
L.05 Hr
L.06 Hr
L.03 Hr
L.07 Hr

HARGA JUMLAH

BAHAN/UPAH Rp
Rp
Rp 923,268.50

Rp 88,000.00 Rp 17,600.00
Rp 99,000.00 Rp 39,600.00
Rp 110,000.00 Rp 2,200.00
Rp 121,000.00 Rp 2,420.00
Rp 61,820.00

Rp 32,000.00 Rp 40,000.00

Rp 1,350.00 Rp 3,375.00

Rp 53,000.00 Rp 63,600.00

Rp 374,000.00 Rp 1,870.00
Rp 295,000.00 Rp 2,655.00

Rp 9,000,000.00 Rp 648,000.00

Rp 19,000.00 Rp 1,140.00

Rp 37,500.00 Rp 16,875.00

Rp 839,335.00

10% Rp 83,933.50

Rp 923,268.50

Rp 222,513.50
Rp 20,405.00
Rp 88,000.00 Rp 8,800.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 605.00
Rp 181,880.00

Rp 9,000,000.00 Rp 108,000.00

Rp 19,000.00 Rp 380.00
Rp 10,500,000.00 Rp 73,500.00

Rp 202,285.00

10% Rp 20,228.50

Rp 222,513.50

HARGA JUMLAH

BAHAN/UPAH Rp
Rp

Rp 16,335.00

Rp 14,850.00
Rp 88,000.00 Rp 8,800.00
Rp 121,000.00 Rp 6,050.00

Rp 14,850.00

10% Rp 1,485.00

Rp 16,335.00

Rp 374,182.60

Rp 314,050.00
Rp 88,000.00 Rp 88,000.00
Rp 99,000.00 Rp 198,000.00
Rp 110,000.00 Rp 22,000.00
Rp 121,000.00 Rp 6,050.00
Rp 26,116.00

Rp 20,000.00 Rp 25,000.00

Rp 6,000.00 Rp 1,116.00

Rp 340,166.00
10% Rp 34,016.60

Rp 374,182.60

N PAKERJAAN HARGA JUMLAH


BAHAN/UPAH Rp

Rp

gali Tanah Biasa Sedalam 1 m Rp 75,927.50

Rp 69,025.00

Rp 88,000.00 Rp 66,000.00

Rp 121,000.00 Rp 3,025.00

Rp 69,025.00

10% Rp 6,902.50

Satuan Pekerjaan (D+E) Rp 75,927.50

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 331,331.00

Rp 27,610.00

Rp 88,000.00 Rp 26,400.00
Rp 121,000.00 Rp 1,210.00

Rp 273,600.00

Rp 228,000.00 Rp 273,600.00

Rp 301,210.00

Rp 30,121.00

Rp 331,331.00

Rp 199,127.50

Rp 88,000.00 Rp 22,000.00

Rp 121,000.00 Rp 3,025.00
Rp 156,000.00

Rp 130,000.00 Rp 156,000.00

Rp 181,025.00

Rp 18,102.50

Rp 199,127.50

Rp 55,055.00

Rp 50,050.00

Rp 88,000.00 Rp 44,000.00

Rp 121,000.00 Rp 6,050.00

Rp 50,050.00

10% Rp 5,005.00

Rp 55,055.00

Rp 977,642.29

Rp 223,575.00

Rp 88,000.00 Rp 132,000.00

Rp 99,000.00 Rp 74,250.00

Rp 110,000.00 Rp 8,250.00

Rp 121,000.00 Rp 9,075.00

Rp 665,190.72

Rp 280,000.00 Rp 336,000.00

Rp 1,350.00 Rp 183,600.00

Rp 267,630.00 Rp 145,590.72

Rp 888,765.72

Rp 88,876.57

Rp 977,642.29

Rp 605,830.50

Rp 116,259.00
Rp 88,000.00 Rp 68,640.00

Rp 99,000.00 Rp 38,610.00

Rp 110,000.00 Rp 4,290.00

Rp 121,000.00 Rp 4,719.00

Rp 434,496.00

Rp 280,000.00 Rp 336,000.00

Rp 228,000.00 Rp 98,496.00

Rp 550,755.00

10% Rp 55,075.50

Rp 605,830.50

Rp 181,891.60

Rp 77,506.00

Rp 88,000.00 Rp 45,760.00

Rp 99,000.00 Rp 25,740.00

Rp 110,000.00 Rp 2,860.00

Rp 121,000.00 Rp 3,146.00

Rp 87,850.00

Rp 1,800,000.00 Rp 81,000.00

Rp 19,000.00 Rp 5,700.00

Rp 11,500.00 Rp 1,150.00

Rp 165,356.00

10% Rp 16,535.60

Rp 181,891.60

Rp 461,667.80

Rp 98,373.00

Rp 88,000.00 Rp 58,080.00

Rp 99,000.00 Rp 32,670.00

Rp 110,000.00 Rp 3,630.00

Rp 121,000.00 Rp 3,993.00

Rp 321,325.00

Rp 1,800,000.00 Rp 72,000.00

Rp 19,000.00 Rp 7,600.00

Rp 11,500.00 Rp 2,300.00

Rp 9,000,000.00 Rp 135,000.00

Rp 115,500.00 Rp 40,425.00
Rp 32,000.00 Rp 64,000.00

Rp 419,698.00

10% Rp 41,969.80

Rp 461,667.80

HARGA BAHAN/UPAH JUMLAH

Rp Rp

Rp 491,367.80

Rp 98,373.00

Rp 88,000.00 Rp 58,080.00

Rp 99,000.00 Rp 32,670.00

Rp 110,000.00 Rp 3,630.00

Rp 121,000.00 Rp 3,993.00

Rp 348,325.00

Rp 1,800,000.00 Rp 72,000.00

Rp 19,000.00 Rp 7,600.00

Rp 11,500.00 Rp 2,300.00

Rp 9,000,000.00 Rp 162,000.00

Rp 115,500.00 Rp 40,425.00

Rp 32,000.00 Rp 64,000.00

Rp 446,698.00

10% Rp 44,669.80

Rp 491,367.80

Rp 1,197,754.61

Rp 185,548.00

Rp 88,000.00 Rp 145,200.00

Rp 99,000.00 Rp 27,225.00

Rp 110,000.00 Rp 3,080.00

Rp 121,000.00 Rp 10,043.00

Rp 903,319.83

Rp 1,350.00 Rp 518,400.00
Rp 212.61 Rp 147,129.09

Rp 218.52 Rp 227,040.74

Rp 50.00 Rp 10,750.00

Rp 1,088,867.83

10% Rp 108,886.78

Rp 1,197,754.61

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 253,178.30

Rp 78,430.00

Rp 88,000.00 Rp 52,800.00

Rp 99,000.00 Rp 19,800.00

Rp 110,000.00 Rp 2,200.00

Rp 121,000.00 Rp 3,630.00

Rp 151,732.09

Rp 650.00 Rp 91,000.00

Rp 1,350.00 Rp 35,842.50

Rp 267,630.00 Rp 24,889.59

Rp 230,162.09

Rp 23,016.21

Rp 253,178.30

Rp 461,667.80

Rp 98,373.00

Rp 88,000.00 Rp 58,080.00

Rp 99,000.00 Rp 32,670.00
Rp 110,000.00 Rp 3,630.00

Rp 121,000.00 Rp 3,993.00

Rp 321,325.00

Rp 1,800,000.00 Rp 72,000.00

Rp 19,000.00 Rp 7,600.00

Rp 11,500.00 Rp 2,300.00

Rp 9,000,000.00 Rp 135,000.00

Rp 115,500.00 Rp 40,425.00

Rp 32,000.00 Rp 64,000.00

Rp 419,698.00

10% Rp 41,969.80

Rp 461,667.80

HARGA BAHAN/UPAH JUMLAH

Rp Rp

Rp 65,518.33

Rp 44,715.00

Rp 88,000.00 Rp 26,400.00

Rp 99,000.00 Rp 14,850.00

Rp 110,000.00 Rp 1,650.00

Rp 121,000.00 Rp 1,815.00

Rp 14,847.12

Rp 1,350.00 Rp 8,424.00

Rp 267,630.00 Rp 6,423.12

Rp 59,562.12

10% Rp 5,956.21

Rp 65,518.33

Rp 37,617.25

Rp 29,810.00

Rp 88,000.00 Rp 17,600.00

Rp 99,000.00 Rp 9,900.00

Rp 110,000.00 Rp 1,100.00

Rp 121,000.00 Rp 1,210.00
Rp 4,387.50

Rp 1,350.00 Rp 4,387.50

Rp 34,197.50

10% Rp 3,419.75

Rp 37,617.25

HARGA BAHAN/UPAH JUMLAH

Rp Rp

Rp 15,805.79

Rp 1,434.40

Rp 88,000.00 Rp 616.00

Rp 99,000.00 Rp 693.00

Rp
Rp 110,000.00
77 ,00

Rp
Rp 121,000.00
48 ,40

Rp 12,934.50

Rp 12,000.00 Rp 12,600.00

Rp 22,300.00 Rp 334.50

Rp 14,368.90

Rp 1,436.89

Rp 15,805.79

HARGA
JUMLAH
BAHAN/UPAH

Rp Rp

###

###

Rp 88,000.00 ###

Rp 99,000.00 ###

Rp 110,000.00 Rp1,430.00

Rp 121,000.00 Rp1,573.00
###

11.11 Rp 4,666.67 ###

0.3 Rp 1,350.00 ###

0.09 Rp 267,630.00 ###

###

10% Rp9,359.14

###

Rp 105,382.59

Rp 40,359.00

Rp 88,000.00 Rp 23,760.00

Rp 99,000.00 Rp 13,365.00

Rp 110,000.00 Rp 1,540.00

Rp 121,000.00 Rp 1,694.00

Rp 55,443.35

Rp 1,040.00 Rp 27,560.00

Rp 1,350.00 Rp 14,040.00

Rp 1,800.00 Rp 1,800.00

Rp 267,630.00 Rp 12,043.35

Rp 95,802.35

10% Rp 9,580.24

Rp 105,382.59

HARGA BAHAN/UPAH JUMLAH

Rp Rp

Rp 162,220.30

Rp 22,473.00

Rp
Rp 88,000.00 13.200,00 Rp
7.425,00

Rp 99,000.00 Rp 880.00

Rp 110,000.00 Rp 968.00

Rp 121,000.00

Rp 125,000.00
Rp 5,000.00 Rp 125,000.00

Rp 147,473.00

10% Rp 14,747.30

Rp 162,220.30

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 150,486.78

Rp 57,442.00

Rp 88,000.00 Rp 35,200.00

Rp 99,000.00 Rp 19,800.00

Rp 110,000.00 Rp 2,200.00

Rp 121,000.00 Rp 242.00

Rp 79,364.16

Rp 12,000.00 Rp 60,000.00

Rp 1,350.00 Rp 10,800.00

Rp 267,630.00 Rp 8,564.16

Rp 136,806.16

10% Rp 13,680.62

Rp 150,486.78

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 17,839,910.00

Rp 2,968,350.00

Rp 88,000.00 Rp 616,000.00

Rp 99,000.00 Rp 2,079,000.00

Rp 110,000.00 Rp 231,000.00

Rp 121,000.00 Rp 42,350.00

Rp 13,249,750.00
Rp 12,000,000.00 Rp 13,200,000.00

Rp 19,000.00 Rp 23,750.00

Rp 26,000.00 Rp 26,000.00

Rp 16,218,100.00

10% Rp 1,621,810.00

Rp 17,839,910.00

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 692,370.80

Rp 148,478.00

Rp 88,000.00 Rp 30,800.00

Rp 99,000.00 Rp 103,950.00

Rp 110,000.00 Rp 11,550.00

Rp 121,000.00 Rp 2,178.00

Rp 480,950.00

Rp 12,000,000.00 Rp 480,000.00

Rp 19,000.00 Rp 950.00

Rp 629,428.00

10% Rp 62,942.80

Rp 692,370.80

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 19,354,538.50

Rp 2,841,135.00

Rp 88,000.00 Rp 589,600.00

Rp 99,000.00 Rp 1,989,900.00

Rp 110,000.00 Rp 221,100.00

Rp 121,000.00 Rp 40,535.00

Rp 14,753,900.00
Rp 12,000,000.00 Rp 14,400,000.00

Rp 16,500.00 Rp 247,500.00

Rp 19,000.00 Rp 106,400.00

Rp 17,595,035.00

10% Rp 1,759,503.50

Rp 19,354,538.50

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 14,350,198.50

Rp 2,841,135.00

Rp 88,000.00 Rp 589,600.00

Rp 99,000.00 Rp 1,989,900.00

Rp 110,000.00 Rp 221,100.00

Rp 121,000.00 Rp 40,535.00

Rp 10,204,500.00

Rp 9,000,000.00 Rp 9,900,000.00

Rp 16,500.00 Rp 247,500.00

Rp 19,000.00 Rp 57,000.00

Rp 13,045,635.00

10% Rp 1,304,563.50

Rp 14,350,198.50

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 146,194.62

Rp 24,486.00

Rp 88,000.00 Rp 10,560.00

Rp 99,000.00 Rp 11,880.00

Rp 110,000.00 Rp 1,320.00

Rp 121,000.00 Rp 726.00

Rp 108,418.20

Rp 7,666,800.00 Rp 107,335.20
Rp 19,000.00 Rp 1,083.00

Rp 132,904.20

10% Rp 13,290.42

Rp 146,194.62

Rp 199,681.72

Rp 51,810.00

Rp 88,000.00 Rp 17,600.00

Rp 99,000.00 Rp 29,700.00

Rp 110,000.00 Rp 3,300.00

Rp 121,000.00 Rp 1,210.00

Rp 129,718.84

Rp 7,666,800.00 Rp 124,968.84

Rp 19,000.00 Rp 4,750.00

Rp 181,528.84

10% Rp 18,152.88

Rp 199,681.72

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 191,075.50

Rp 31,405.00

Rp 88,000.00 Rp 8,800.00

Rp 99,000.00 Rp 19,800.00

Rp 110,000.00 Rp 2,200.00

Rp 121,000.00 Rp 605.00

Rp 142,300.00

Rp 13,000,000.00 Rp 140,400.00

Rp 19,000.00 Rp 1,900.00

Rp 173,705.00

10% Rp 17,370.50
Rp 191,075.50

Jumlah Harga
Koefisien Harga Satuan (Rp)
(Rp)

0.1 - Rp -
0.05 - Rp -
0.005 -
Rp -

0.005 - Rp -
JUMLAH HARGA -
TENAGA KERJA

0.364 -

Rp -

0.11 30,000.00 3,300.00

JUMLAH HARGA 3,300.00


BAHAN

JUMLAH HARGA
ALAT
3,300.00

10.0% xD 330.00
3,630.00

HARGA JUMLAH

BAHAN/UPAH Rp
Rp
Rp 227,133.50

Rp 56,485.00
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 49,500.00
Rp 110,000.00 Rp 5,500.00
Rp 121,000.00 Rp 605.00
Rp 150,000.00
Rp 150,000.00 Rp 150,000.00

Rp 206,485.00

10% Rp 20,648.50

Rp 227,133.50

Rp 36,208.48

Rp 17,916.80
Rp 88,000.00 Rp 1,320.00

Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 15,000.00

Rp 15,000.00 Rp 15,000.00

Rp 32,916.80

10% Rp 3,291.68

Rp 36,208.48

HARGA JUMLAH
BAHAN/UPAH Rp
Rp

Rp 32,384.55

Rp 11,940.50
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 60.50
Rp 17,500.00

Rp 17,500.00 Rp 17,500.00

Rp 29,440.50

10% Rp 2,944.05

Rp 32,384.55
Rp 222,513.50

Rp 20,405.00

Rp 88,000.00 Rp 8,800.00

Rp 99,000.00 Rp 9,900.00

Rp 110,000.00 Rp 1,100.00

Rp 121,000.00 Rp 605.00

Rp 181,880.00

Rp 9,000,000.00 Rp 108,000.00

Rp 19,000.00 Rp 380.00

Rp 10,500,000.00 Rp 73,500.00

Rp 202,285.00

10% Rp 20,228.50

Rp 222,513.50
BESARAN

Rp 150,000.00
Rp 325,000.00
Rp 280,000.00
Rp 280,000.00
Rp 280,000.00
Rp 289,500.00

Rp 140,000.00
Rp 289,200.00
Rp 289,200.00
Rp 295,000.00
Rp 295,000.00
Rp 322,500.00
Rp 300,000.00
Rp 290,000.00
Rp 290,000.00
Rp 220,000.00

Rp 650.00
Rp 1,750.00
Rp 663,000.00
Rp 675,000.00
Rp 690,000.00

Rp 228,000.00
Rp 267,630.00
Rp 267,630.00
Rp 210,000.00
Rp 374,000.00
Rp 297,660.00

BESARAN

Rp 281,000.00
Rp 65,000.00
Rp 73,500.00
Rp 105,000.00
Rp 84,000.00
Rp 175,000.00
Rp 75,000.00
Rp 136,500.00
Rp 130,000.00
Rp 84,000.00
Rp 134,400.00
Rp 175,120.00
Rp 130,000.00

Rp 300,000.00
Rp 150,000.00

Rp 54,000.00
Rp 67,500.00
Rp 1,800.00
Rp 1,350.00

Rp 12,700.00
Rp 13,750.00
Rp 12,000.00
Rp 13,500.00

Rp 16,500.00

Rp 15,000.00
Rp 15,000.00
Rp 15,000.00

Rp 15,000.00
Rp 15,000.00
Rp 25,000.00
Rp 340,000.00
Rp 375,100.00

BESARAN
Rp 16,000.00
Rp 16,000.00
Rp 15,000.00
Rp 15,000.00

Rp 22,300.00
Rp 19,000.00
Rp 21,000.00
Rp 20,000.00
Rp 18,000.00
Rp 22,800.00
Rp 22,000.00
Rp 17,700.00
Rp 16,875.00
Rp 60,000.00
Rp 25,000.00

Rp 7,500.00
Rp 8,750.00
Rp 10,000.00
Rp 9,500.00

Rp 5,000.00
Rp 6,000.00
Rp 9,000.00
Rp 12,500.00
Rp 16,000.00
Rp 22,500.00
Rp 29,000.00
Rp 42,000.00
Rp 69,700.00
Rp 96,250.00
Rp 126,000.00
Rp 4,250.00
Rp 4,500.00
Rp 6,250.00
Rp 9,000.00
Rp 10,000.00
Rp 12,500.00
Rp 18,500.00
Rp 22,500.00
BESARAN
Rp 42,500.00
Rp 30,600.00
Rp 63,000.00
Rp 94,500.00
Rp 197,500.00
Rp 308,000.00
Rp 293,268.00
Rp 30,013.00
Rp 42,308.00
Rp 59,928.00
Rp 89,714.00
Rp 142,022.00
Rp 187,686.00
Rp 300,344.00
Rp 237,367.00
Rp 25,186.00
Rp 35,478.00
Rp 51,505.00
Rp 72,763.00
Rp 153,504.00
Rp 244,058.00

Rp 15,200,000.00
Rp 14,000,000.00

Rp 12,000,000.00
Rp 13,000,000.00

Rp 9,000,000.00
Rp 10,500,000.00

Rp 7,500,000.00
Rp 6,000.00
Rp 8,000.00
Rp 600,000.00

Rp 11,000,000.00
Rp 12,000,000.00
Rp 9,000,000.00
Rp 10,500,000.00
Rp 8,000,000.00
Rp 9,500,000.00

BESARAN

Rp 9,000,000.00
Rp 10,500,000.00
Rp 8,500,000.00
Rp 9,700,000.00
Rp 7,000,000.00
Rp 7,200,000.00
Rp 9,163,500.00
Rp 7,666,800.00

Rp 12,500,000.00
Rp 14,000,000.00
Rp 10,500,000.00
Rp 12,000,000.00
Rp 900,000.00
Rp 11,000,000.00

Rp 32,000.00
Rp 26,000.00
Rp 34,000.00
Rp 1,750,000.00
Rp 139,100.00
Rp 20,000.00
Rp 1,800,000.00

Rp 175,000.00

Rp 9,750.00
Rp 11,000.00
Rp 5,000.00
Rp 10,500.00
Rp 11,000.00
Rp 25,000.00
Rp 15,000.00
Rp 12,000.00
Rp 25,000.00
BESARAN

Rp 2,500.00
Rp 5,000.00
Rp 2,500.00
Rp 5,000.00
Rp 5,000.00
Rp 3,500.00
Rp 10,000.00

Rp 8,000.00
Rp 10,000.00
Rp 12,000.00
Rp 15,000.00

Rp 87,000.00
Rp 105,000.00
Rp 115,000.00
Rp 102,000.00
Rp 118,000.00
Rp 125,000.00

Rp 65,000.00
Rp 56,000.00
Rp 65,000.00
Rp 73,500.00
Rp 74,300.00
Rp 90,000.00

Rp 33,000.00
Rp 45,000.00
Rp 42,000.00

Rp 41,500.00
Rp 22,000.00
Rp 49,000.00
Rp 35,000.00
Rp 40,000.00
Rp 21,000.00

BESARAN

Rp 16,000.00
Rp 18,000.00
Rp 13,000.00
Rp 12,500.00
Rp 16,500.00
Rp 40,000.00
Rp 57,520.00

Rp 48,000.00
Rp 62,000.00
Rp 75,000.00
Rp 64,000.00
Rp 67,500.00
Rp 81,000.00

Rp 20,000.00
Rp 25,000.00
Rp 35,000.00
Rp 40,000.00

Rp 21,000.00
Rp 27,000.00
Rp 45,000.00

Rp 21,000.00
Rp 27,000.00
Rp 22,000.00
Rp 26,250.00
Rp 29,000.00
Rp 29,000.00
Rp 35,000.00

Rp 45,000.00
Rp 53,000.00
Rp 61,000.00
Rp 72,000.00

BESARAN
Rp 40,000.00
Rp 45,000.00
Rp 52,000.00
Rp 64,000.00

Rp 67,500.00
Rp 79,000.00
Rp 90,000.00
Rp 112,500.00
Rp 150,000.00
Rp 187,500.00
Rp 225,000.00

Rp 76,500.00
Rp 89,500.00
Rp 102,000.00
Rp 127,500.00
Rp 170,000.00
Rp 212,500.00
Rp 255,000.00

Rp 28,000.00
Rp 25,000.00
Rp 23,000.00

Rp 30,000.00
Rp 27,500.00
Rp 26,000.00

Rp 50,000.00

Rp 5,500.00
Rp 5,200.00

BESARAN

Rp 42,000.00
Rp 45,000.00
Rp 44,000.00
Rp 47,000.00

Rp 52,000.00
Rp 52,000.00
Rp 53,000.00
Rp 52,100.00

Rp 90,000.00
Rp 85,000.00
Rp 78,000.00
Rp 72,000.00
Rp 68,000.00
Rp 63,000.00
Rp 65,000.00
Rp 67,000.00
Rp 29,000.00

Rp 130,000.00
Rp 145,000.00
Rp 250,000.00
Rp 115,000.00

Rp 122,500.00
Rp 110,000.00
Rp 145,000.00
Rp 122,500.00
Rp 130,000.00
Rp 80,000.00
Rp 122,500.00
Rp 140,000.00
Rp 110,000.00
Rp 122,500.00

Rp 480,000.00

BESARAN

Rp 35,000.00
Rp 55,000.00
Rp 70,000.00
Rp 90,000.00
Rp 136,000.00
Rp 220,000.00
Rp 310,000.00
Rp 370,000.00
Rp 22,000.00
Rp 30,000.00
Rp 38,000.00

Rp 12,500.00

Rp 4,000.00
Rp 6,000.00
Rp 28,000.00

Rp 25,000.00
Rp 32,000.00
Rp 15,000.00
Rp 30,000.00

Rp 5,100.00
Rp 12,500.00
Rp 38,000.00

Rp 5,000.00
Rp 6,000.00
Rp 12,000.00

Rp 80,000.00

Rp 68,000.00

Rp 120,000.00

BESARAN
Rp 19,000.00
Rp 19,000.00
Rp 21,000.00
Rp 30,000.00
Rp 17,000.00
Rp 14,000.00
Rp 12,800.00
Rp 18,000.00
Rp 6,000.00
Rp 8,000.00

HARGA
(Rp)
Rp 121,000.00
Rp 88,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 99,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 110,000.00
Rp 88,000.00
Rp 110,000.00
Rp 88,000.00
Rp 132,000.00
Rp 94,000.00
Rp 110,000.00
Rp 127,000.00
overhead

12.5%
BACKUP DATA

GAMBAR SKET URAIAN

PONDASI BATU BELAH


A
NO. AS vertikal NO. AS horizontal total
1 1.75 A 4.00
2 1.75 B 4.00
3 1.75
TOTAL 5.250 8.000 13.250

B
a 1.25 c 4.00
b 1.25
TOTAL 2.50 4.00 6.50

V.PONDASI Panjang L.Atas L.Bawah Tinggi Volume


ket. : A 13.250 0.300 0.800 0.800 5.830 m3
1. pasir urug B 6.500 0.300 0.500 0.400 1.040 m3
2. anstamping
3. pondasi batu belah GALIAN panjang lb. Atas lb. Bawah tinggi Volume
4.urugan tanah kembali A 13.250 1.000 0.950 12.587
5. ururgan tanah merah B 6.500 0.500 0.350 1.138
Total 13.725 m3

URUGAN TANAH panjang lb. Atas lb. Bawah tinggi Volume


KEMBALI
A 13.250 0.350 0.100 0.600 3.577
B 6.500 0.050 0.200 0.065
Total 3.642 m3

ANSTAMPING panjang lb. Atas lb. Bawah tinggi Volume


13.250 1.000 0.200 2.650
Total 11.400 m3

URUGAN PASIR pj lb. Atas lb. Bawah tinggi Volume


A 13.250 1.000 0.050 0.663
B 6.500 0.500 0.050 0.163
Total 0.825 m3

URUGAN TANAH panjang lebar tinggi jumlah Volume


MERAH
K.M.1 1.850 1.600 0.200 1.000 0.592
K.M.2 1.850 1.600 0.200 1.000 0.592
T 4.000 1.250 0.230 1.000 1.150
Total 2.334 m3

PEKERJAAN SLOOF 15/20


X: 0.150
PEMBESIAN Y: 0.200

DESCRIPTION NO.1.2.3 P.Tulangan Isi Bj Jumlah Volume


SLOOF 15
2Ø10
4Ø10 1.750 4.000 0.617 3.000 12.957
UKURAN Ø8-150 0.620 13.000 0.395 3.000 9.551
15cmx20cm over stek 0.100 4.000 0.617 3.000 0.740
20

Ø 8-150

NO.A.B.c

SL 4Ø10 4.000 4.000 0.617 3.000 29.616


2Ø10
2

Ø8-150 0.620 28.000 0.395 3.000 20.572


POSISI TUMPUAN LAPANGAN over stek 0.100 4.000 0.617 3.000 0.740
TULANGAN NO.a.b
2Ø10
ATAS
4Ø10 1.250 4.000 0.617 2.000 6.170
Ø8-150 0.620 9.000 0.395 2.000 4.408
TULANGAN over stek 0.100 4.000 0.617 2.000 0.494
2Ø10
BAWAH Total 85.248 kg
Ø8-150
SENGKANG
BETON Panjang Lebar Tinggi Jumlah Volume
19.750 0.150 0.200 1.000 0.593 m3

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


19.750 0.200 2.000 1.000 7.900
Total 7.900 m2
BACKUP DATA

GAMBAR SKET URAIAN


KOLOM 15/15

A
X: 0.15
Y: 0.15
Tinggi : 3.000
Jumlah : 6
DESCRIPTION
15
KOLOM
2Ø10
BETON Panjang Lebar Tinggi Jumlah Volume
UKURAN
A 0.15 0.15 3.000 6.000 0.405
15

Ø 8-150
15cmx15cm Total 0.405 m3
2Ø10

K
2

PEMBESIAN A P.Tulangan Isi Bj Jumlah Volume


4Ø10 3.000 4.000 0.890 6.000 64.080
Ø8-150 0.520 21.000 0.395 6.000 25.880
POSISI TUMPUAN LAPANGAN
over stek 0.100 4.000 0.890 6.000 2.136
TULANGAN
2Ø10 Total 92.096 kg
ATAS

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


TULANGAN 2Ø10 A 3.000 0.150 2.000 6.000 5.400
BAWAH
B 3.000 0.180 2.000 6.000 6.480
Ø8-150 Total 11.880 m2
SENGKANG

KOLOM 15/15 TERAS

X: 0.15
Y: 0.15
Tinggi : 2.3
Jumlah: 3

BETON Panjang Lebar Tinggi Jumlah Volume


0.150 0.150 2.300 3.000 0.155
Total 0.155 m3

PEMBESIAN P.Tulangan Isi Bj Jumlah Volume


4Ø10 2.300 4.000 0.890 3.000 24.564
Ø8-150 0.520 16.000 0.395 3.000 9.859
over stek 0.400 4.000 0.890 3.000 4.272
Total 38.695 kg

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


2.300 0.150 2.000 3.000 2.070
2.300 0.180 2.000 3.000 2.484
Total 4.554 m2

RING BALK 15/20

No.As Vertikal no.As Horizontal Total


1 - - -
2 Isi Bj Jumlah
3 4.00 0.62 3.00
4 13.00 0.40 3.00
5 4.00 0.62 3.00
DESCRIPTION 6 -
RING BALK 15
2Ø10
7 4.00
UKURAN 8 0.62
15cmx20cm TOTAL 0.10 0.62 0.717
20

Ø 8-150

Panjang : 0.717

RB
2Ø10
2

POSISI TUMPUAN LAPANGAN


TULANGAN
2Ø10
ATAS
DESCRIPTION
RING BALK 15
2Ø10

UKURAN

15cmx20cm

20
Ø 8-150

RB X: 0.150
2Ø10
2

Y: 0.200

POSISI TUMPUAN LAPANGAN


TULANGAN BETON Panjang Lebar Tinggi Jumlah Volume
2Ø10
ATAS 0.717 0.150 0.200 1.000 0.022 m3

PEMBESIAN P.Tulangan Isi Bj Jumlah Volume


TULANGAN 2Ø10
BAWAH 4Ø10 0.717 4.000 0.890 1.000 2.553
Ø8-150 Ø8-150 0.620 6.000 0.395 1.000 1.469
SENGKANG
over stek 0.400 4.000 0.890 - -
Total 4.022 kg

URAIAN

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


BACKUP DATA 0.717 0.200 2.000 1.000 0.287
Total 0.287 m2
GAMBAR SKET

BALOK LATEI 15/20

No.As Vertikal no.As Horizontal Total


1 - - -
2 Isi Bj Jumlah
3 4.00 0.62 3.00
4 13.00 0.40 3.00
5 4.00 0.62 3.00
6 -
DESCRIPTION
7 4.00
BALOK LATEI 15
2Ø10
8 0.62
UKURAN
TOTAL 0.10 . 0.62 0.717
15cmx20cm
20

Ø 8-150

Panjang : 0.717

BL X: 0.150
2Ø10
2

Y: 0.200

POSISI TUMPUAN LAPANGAN


BETON Panjang Lebar Tinggi Jumlah Volume
TULANGAN
ATAS
2Ø10 0.717 0.150 0.200 1.000 0.022

PEMBESIAN P.Tulangan Isi Bj Jumlah Volume


TULANGAN 4Ø10 0.717 4.000 0.890 1.000 2.553
2Ø10
BAWAH Ø8-150 0.620 6.000 0.395 1.000 1.469
over stek 0.400 4.000 0.890 - - m3
Ø8-150
SENGKANG Total 4.022

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


0.717 0.200 2.000 1.000 0.287
Total 0.287
kg

RINGBALK SOFI SOFI

A m2
Panjang : 7.40
X: 0.15
Y: 0.15

BETON Panjang Lebar Tinggi Jumlah Volume


A 7.398 0.150 0.150 6.000 0.999
- - - - -
Total 0.999

PEMBESIAN A P.Tulangan Isi Bj Jumlah Volume


4Ø10 7.398 4.000 0.890 6.000 158.023
Ø8-150 0.520 50.000 0.395 6.000 61.620
m3

219.643

kg
URAIAN

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


BACKUP DATA A 7.398 0.150 2.000 4.000 8.878
B - - - 0.000 -
GAMBAR SKET Total 8.878

KUDA KUDA KAYU

Bentang Kuda - kuda : 5.15 m2


P. Kaki kuda - kuda : 3.144
T. Kuda - kuda : 1.930
Penyangga Kuda - kuda : 1.572
X : 0.080
Y : 0.120

Panjang X Y Jumlah Volume


Kaki 3.144 0.080 0.120 2.000 0.060
Tinggi 1.930 0.080 0.120 1.000 0.019
Penyangga 1.572 0.080 0.120 2.000 0.030
Bentang 5.15 0.080 0.120 1.000 0.049
Total 0.159

USUK KAYU

X: 0.050 m3
Y: 0.070

Panjang X Y Jumlah Volume


A 2.400 0.050 0.070 20.000 0.168
B 2.200 0.050 0.070 4.000 0.031
C 1.750 0.050 0.070 4.000 0.025
D 1.470 0.050 0.070 4.000 0.021
E 1.190 0.050 0.070 4.000 0.017
F 0.620 0.050 0.070 4.000 0.009
G 0.220 0.050 0.070 4.000 0.003
1 4.370 0.050 0.070 2.000 0.031
2 4.090 0.050 0.070 4.000 0.057
3 3.810 0.050 0.070 4.000 0.053
4 3.530 0.050 0.070 4.000 0.049
5 3.250 0.050 0.070 4.000 0.046
6 2.970 0.050 0.070 4.000 0.042
Total 0.550

RENG KAYU

X: 0.020
Y: 0.030 m3

Panjang X Y Jumlah Volume


1 10.170 0.020 0.030 2.000 0.012
2 10.070 0.020 0.030 2.000 0.012
3 10.054 0.020 0.030 2.000 0.012
4 10.038 0.020 0.030 2.000 0.012
5 10.022 0.020 0.030 2.000 0.012
6 10.006 0.020 0.030 2.000 0.012
7 9.990 0.020 0.030 2.000 0.012
8 9.974 0.020 0.030 2.000 0.012
9 9.958 0.020 0.030 2.000 0.012
10 9.942 0.020 0.030 2.000 0.012
11 9.926 0.020 0.030 2.000 0.012
12 9.910 0.020 0.030 2.000 0.012
13 9.894 0.020 0.030 2.000 0.012
14 9.878 0.020 0.030 2.000 0.012
15 9.862 0.020 0.030 2.000 0.012
16 9.846 0.020 0.030 2.000 0.012
17 9.830 0.020 0.030 2.000 0.012
18 9.814 0.020 0.030 2.000 0.012
19 9.798 0.020 0.030 2.000 0.012
A 7.210 0.020 0.030 2.000 0.009
B 7.200 0.020 0.030 2.000 0.009
C 7.184 0.020 0.030 2.000 0.009
D 7.168 0.020 0.030 2.000 0.009
E 7.152 0.020 0.030 2.000 0.009
F 7.136 0.020 0.030 2.000 0.009
G 7.120 0.020 0.030 2.000 0.009
H 7.104 0.020 0.030 2.000 0.009
I 7.088 0.020 0.030 2.000 0.009
J 7.072 0.020 0.030 2.000 0.008
K 7.056 0.020 0.030 2.000 0.008
L 7.040 0.020 0.030 2.000 0.008
M 7.024 0.020 0.030 2.000 0.008
N 7.008 0.020 0.030 2.000 0.008
O 6.992 0.020 0.030 2.000 0.008
P 6.976 0.020 0.030 2.000 0.008
Q 6.960 0.020 0.030 2.000 0.008
R 6.944 0.020 0.030 2.000 0.008
S 6.928 0.020 0.030 2.000 0.008
Total 0.388

LISTPLANG m3

X: 0.020
Y: 0.200

Panjang X Y Jumlah Volume


A 10.210 0.020 0.200 2.000 0.082
B 7.210 0.020 0.200 2.000 0.058
Total 0.139

BALOK BUBUNGAN

X: 0.080 m3
Y: 0.120

Panjang X Y Jumlah Volume


A 4,580 0.080 0.120 1.000 43.968
Total 43.968

GENTENG

m3
1 m2 = 25 Buah

Panjang Lebar Jumlah Volume


A 10.210 2.400 2 1225
B 7.210 2.200 2 793
Total 2018 buah
GENTENG KERPUS
1 m= 4 buah
Panjang j.genteng Jumlah Volume
A 3.050 4.000 1 12
B 4.450 4.000 4 71
Total 83 buah

..
TOTAL BESI Ø10 50.717 kg
TOTAL BESI Ø8 34.531 kg
TOTAL BESI Ø10 66.216 kg
TOTAL BESI Ø8 25.880 kg
NO. URAIAN BELANJA
I BAHAN DASAR
BATU KALI
Bulat Utuh
Batu Belah hitam
Batu Belah putih
Pecah Hitam Oct-15
Pecah Hitam 5-Jul
Pecah Hitam 3-May
KERIKIL
Timbun
Sawur / Koral untuk Beton
Batu Pecah 0,5/1 (hitam)
Batu Pecah 1/1 (hitam)
Batu Pecah 1/2 (hitam)
Batu Pecah 2/3 (hitam)
Batu Pecah 3/5 (hitam)
Batu Pecah 5/7 (hitam)
Batu Pecah 7/10 (hitam)
Tras Giling
BATU BATA / DINDING
Batu bata merah (lokal)
Batu bata / merah Ekspose
Dinding Bata Ringan Heubel 60 x 20 x Tb 7.5 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 8 cm
Dinding Bata Ringan Heubel 60 x 20 x Tb 10 cm
PASIR
Pasir urug (ada unsur lempung)
Pasir Pasang (Sedang)
Pasir pasang kali/gunung (ex. Bengawan Solo)
Pasang Cukup
Pasir Beton (ex Muntilan)
Pasir beton (Kasar- ex. Bengawan Solo)

NO. URAIAN BELANJA SATUAN


TANAH
Sirtu m3
Sirtu Royalty m3
Tanah Biasa m3
Tanah liat m3
Tanah Padas m3
Tanah Pilihan Grosok (Ex. Tahunan/Prigi) m3
Tanah urug di Borrrow Area, jarak angkut 1 km m3
Tanah urug di lokasi m3
Tanah Urug Pilihan m3
Timbunan Tanah (pasir urug) m3
Bahan Tanah Timbunan m3
Bahan Pilihan Grosok (Grosok Tahunan) m3
Tanah (Merah) m3
KAPUR
Pasang (Padam) m3
Semen Merah m3
PORTLAND CEMENT
Portland Pozzolan Cement / PPC (40 kg) zak
Portland Pozzolan Cement / PPC (50 kg) zak
Portland Pozzolan Cement / PPC - Warna kg
Portland Pozzolan Cement / PPC kg
IV . B A H A N B E S I
BESI BETON
Baja Tulangan U 24 (Besi Beton biasa) polos kg
Baja Tulangan U 32 (Besi Beton biasa) polos kg
Besi Beton Polos kg
Besi Beton Ulir kg
BESI PLAT
Besi Strip kg
BESI PROFIL
Besi Profil L 4 x 0,2 mm kg
L 4 x 0,1 mm kg
L 4 x 0,3 mm kg

JARING - JARING BAJA


Diameter 4 - 15 kg
Diameter 6 - 15 kg
Kawat Bronjong dia 2 - 4 mm kg
Kawat Pabrikan ( 2 x 1 x 0,5) dia kawat 2,7 mm bh
Kawat Pabrikan ( 2 x 1 x 0,5) dia kawat 3 mm bh

NO. URAIAN BELANJA SATUAN


Pipa PVC Wavin tipe AW ø 4" m'
Pipa PVC Wavin type S 12,5 uk. 2" m'
Pipa PVC Wavin type S 12,5 uk. 3" m'
Pipa PVC Wavin type S 12,5 uk. 4" m'
Pipa PVC Wavin type S 12,5 uk. 6" m'
Pipa PVC Wavin type S 12,5 uk. 8" m'
Pipa PVC Maspion type S 10 +MOF 8" m'
Pipa PVC Maspion type S 10 +RR uk. 2" m'
Pipa PVC Maspion type S 10 +RR uk. 2 1/2" m'
Pipa PVC Maspion type S 10 +RR uk. 3" m'
Pipa PVC Maspion type S 10 +RR uk. 4" m'
Pipa PVC Maspion type S 10 +RR uk. 5" m'
Pipa PVC Maspion type S 10 +RR 6" m'
Pipa PVC Maspion type S 10 +RR 8" m'
Pipa PVC Maspion type S 12,5 +MOF 8" m'
Pipa PVC Maspion type S 12,5 +RR uk. 2" m'
Pipa PVC Maspion type S 12,5 +RR uk. 2 1/2" m'
Pipa PVC Maspion type S 12,5 +RR uk. 3" m'
Pipa PVC Maspion type S 12,5 +RR uk. 4" m'
Pipa PVC Maspion type S 12,5 +RR 6" m'
Pipa PVC Maspion type S 12,5 +RR 8" m'
II . B A H A N K A Y U
JATI
Kayu Jati Kelas I (Papan) m3
Kayu Jati Kelas I (Balok/Pesagen) m3

Kayu Jati Kelas II (Balok/Pesagen) m3


Kayu Jati Kelas II (Papan) m3

Kayu Jati kampung (Balok/pesagen) m3


Kayu Jati kampung (Papan) m3

Kayu Jati Kampung 5/7 m3


Reng Kayu Jati (2x3x300) btg
Usuk Kayu Jati (3x5x400) btg
Usuk Kayu Jati (4x6x400) btg
KAMPER
Kayu Kamper Klas I (Balok/pesagen) m3
Kayu Kamper Klas I (Papan) m3
Kayu Kamper Klas II (Balok/pesagen) m3
Kayu Kamper Klas II (Papan) m3
Kayu Kamper Klas III (Balok/pesagen) m3
Kayu Kamper Klas III (Papan) m3
NO. URAIAN BELANJA SATUAN
KRUING
Kayu Kruing Klas I (Balok/pesagen) m3
Kayu Kruing Klas I (Papan) m3
Kayu Kruing Klas II (Balok/pesagen) m3
Kayu Kruing Klas II (Papan) m3
Kayu Kruing Klas III (Balok/pesagen) m3
Kayu Kruing Klas III (Papan) m3
Kayu Kruing 2/3 m3
Kayu Kruing 5/7 m3
BENGKIRAI
Kayu Bengkirai Klas I (Balok/Pesagen) m3
Kayu Bengkirai Klas I (Papan) m3
Kayu Bengkirai Klas II (Balok/Pesagen) m3
Kayu Bengkirai Klas II (Papan) m3
Kayu Bengkirai Klas III (Balok/Pesagen) m3
Kayu Bengkirai Klas III (Papan) m3

DOLKEN
Sedang 8 x 10 x 400 cm bt
Kecil 6 x 7 x 400 cm bt
Besar 10 x 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt
Perancah m3

II BAHAN PENUTUP ATAP


SIRAP (100 lbr) pak
GENTENG BETON, GLAZOUR & KERAMIK
Genteng Beton Plat bh
Genteng Keramik (KIA, M-CLASS, KANMURI) bh
Genteng Glazour bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh
Kerpus Jatiwangi (Glazour) bh
Kerpus Kodok (Glazour) bh
Kerpus Genteng Keramik bh

NO. URAIAN BELANJA


Seng Gelombang Uk. 0,7 x 1,8, t= 0,02
Seng Gelombang Uk. 0,7 x 2,1, t= 0,025
Seng Gelombang Uk. 0,7 x 2,4, t= 0,03
Seng Gelombang Uk. 0,7 x 3,0, t= 0,05

Tb. 3 mm panjang 180 cm


Tb. 3 mm panjang 210 cm
Tb. 3 mm panjang 240 cm
Tb. 3 mm panjang 300 cm
Tb. 3 mm panjang 400 cm
Tb. 3 mm panjang 500 cm
Tb. 3 mm panjang 600 cm

Tb. 3,5 mm panjang 180 cm


Tb. 3,5 mm panjang 210 cm
Tb. 3,5 mm panjang 240 cm
Tb. 3,5 mm panjang 300 cm
Tb. 3,5 mm panjang 400 cm
Tb. 3,5 mm panjang 500 cm
Tb. 3,5 mm panjang 600 cm

III . BAHAN PENUTUP DINDING / LANTAI


UBIN (TEGEL BIASA)
PC polos
40 X 40 cm
30 X 30 cm
20 X 20 cm
PC warna
40 X 40 cm
30 X 30 cm
20 X 20 cm
Teraso
30 X 30 cm
TEGEL PLINT
PC warna 10 X 20 cm
PC abu-abu 15 x 20
POLIS UBIN
Lantai/badan
Plint
Trap
URAIAN
NO.
BELANJA
V.BAHAN CETAK
BUIS BETON
Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 70 cm - 100 cm
Ø 80 cm - 100 cm
Ø 100 cm - 100 cm
U 10 cm - 100 cm
U 20 cm - 100 cm
U 30 cm - 100 cm

LUBANG ANGIN (ROSTER) PC + PASIR


Beton
10 X 20 cm
20 X 20 cm
25 X 25 cm
Kayu
25 X 25 cm
30 X 30 cm
15 X 25 cm
15 X 30 cm

VI . B A H A N L A N G I T - L A N G I T
AKUSTIK-uk :
30 X 30
30 X 60
60 X 120
LIS PLAFON
Lis Kayu 2/3
Lis Kayu Profil
Lis Gypsum

SOFT BOARD
Gypsum tebal 9 mm (Elepant & Jaya Board)

HARD BOARD
Kalsiboard 1,20 x 2,40

PVC BOARD
PVC Plafon Motif
NO. URAIN BELANJA
Paku Ukuran 1" s/d 4"
Paku Ukuran 2" s/d 5"
Paku Payung
Paku Sekrup
Paku Beton
Mur Baut (Kuda Kuda)
Angkur Baut
Lem Kayu
Tali Ijuk
Ramset/Dina blot
SATUAN BESARAN

m3 Rp150,000
m3 Rp325,000
m3 Rp280,000
m3 Rp280,000
m3 Rp280,000
m3 Rp289,500

m3 Rp140,000
m3 Rp289,200
m3 Rp289,200
m3 Rp295,000
m3 Rp295,000
m3 Rp322,500
m3 Rp300,000
m3 Rp290,000
m3 Rp290,000
m3 Rp220,000

bh Rp650
bh Rp1,750
m3 Rp663,000
m3 Rp675,000
m3 Rp690,000

m3 Rp228,000
m3 Rp267,630
m3 Rp267,630
m3 Rp210,000
m3 Rp374,000
m3 Rp297,660

BESARAN

Rp281,000
Rp65,000
Rp73,500
Rp105,000
Rp84,000
Rp175,000
Rp75,000
Rp136,500
Rp130,000
Rp84,000
Rp134,400
Rp175,120
Rp130,000

Rp300,000
Rp150,000

Rp54,000
Rp67,500
Rp1,800
Rp1,350

Rp12,700
Rp13,750
Rp12,000
Rp13,500

Rp16,500

Rp15,000
Rp15,000
Rp15,000

Rp15,000
Rp15,000
Rp25,000
Rp340,000
Rp375,100

BESARAN
Rp42,500
Rp30,600
Rp63,000
Rp94,500
Rp197,500
Rp308,000
Rp293,268
Rp30,013
Rp42,308
Rp59,928
Rp89,714
Rp142,022
Rp187,686
Rp300,344
Rp237,367
Rp25,186
Rp35,478
Rp51,505
Rp72,763
Rp153,504
Rp244,058

Rp15,200,000
Rp14,000,000

Rp12,000,000
Rp13,000,000

Rp9,000,000
Rp10,500,000

Rp7,500,000
Rp6,000
Rp8,000
Rp600,000

Rp11,000,000
Rp12,000,000
Rp9,000,000
Rp10,500,000
Rp8,000,000
Rp9,500,000
BESARAN

Rp9,000,000
Rp10,500,000
Rp8,500,000
Rp9,700,000
Rp7,000,000
Rp7,200,000
Rp9,163,500
Rp7,666,800

Rp12,500,000
Rp14,000,000
Rp10,500,000
Rp12,000,000
Rp900,000
Rp11,000,000

Rp32,000
Rp26,000
Rp34,000
Rp1,750,000
Rp139,100
Rp20,000
Rp1,800,000

Rp175,000

Rp9,750
Rp11,000
Rp5,000
Rp10,500
Rp11,000
Rp25,000
Rp15,000
Rp12,000
Rp25,000

SATUAN BESARAN
lbr Rp40,000
lbr Rp45,000
lbr Rp52,000
lbr Rp64,000

lbr Rp67,500
lbr Rp79,000
lbr Rp90,000
lbr Rp112,500
lbr Rp150,000
lbr Rp187,500
lbr Rp225,000

lbr Rp76,500
lbr Rp89,500
lbr Rp102,000
lbr Rp127,500
lbr Rp170,000
lbr Rp212,500
lbr Rp255,000

m2 Rp28,000
m2 Rp25,000
m2 Rp23,000

m2 Rp30,000
m2 Rp27,500
m2 Rp26,000

m2 Rp50,000

bh Rp5,500
bh Rp5,200

m'
m'
m'

SATUAN BESARAN
bh Rp35,000
bh Rp55,000
bh Rp70,000
bh Rp90,000
bh Rp136,000
bh Rp220,000
bh Rp310,000
bh Rp370,000
bh Rp22,000
bh Rp30,000
bh Rp38,000

Rp12,500

bh Rp4,000
bh Rp6,000
bh Rp28,000

bh Rp25,000
bh Rp32,000
bh Rp15,000
bh Rp30,000

lbr Rp5,100
lbr Rp12,500
lbr Rp38,000

m' Rp5,000
m' Rp6,000
m' Rp12,000

lbr Rp80,000

lbr Rp68,000

M2 Rp120,000
URAIN BELANJA
an 1" s/d 4"
an 2" s/d 5"
ng
up
n
(Kuda Kuda)
ut

ina blot
SATUAN BESARAN
kg Rp 19,000.00
kg Rp 19,000.00
kg Rp 21,000.00
kg Rp 30,000.00
kg Rp 17,000.00
bh Rp 14,000.00
bh Rp 12,800.00
kg Rp 18,000.00
kg Rp 6,000.00
kg Rp 8,000.00
No. SNI KODE KOEF SAT.

I A. 2.2.1 HARGA SATUAN PEKERJAAN

1 A.2.2.1.2 1 m'

L.01 0.2 OH

L.02 0.4 OH

L.03 0.02 OH

L.04 0.02 OH

1.25 Btg

2.5 Kg Lbr

1.2 m3

0.005 m3

0.009 m3

0.072 m3

0.06 kg

0.45 kg

F
Overhead
& Profit
10%
2 A.2.2.1.4 1 m'

A
L.01 0.1 OH
L.02 0.1 OH
L.03 0.01 OH
L.04 0.005 OH
B
0.012 m3
0.02 Kg m3
0.007
C
D
E
F

No. SNI KODE KOEF SAT.

5 A.2.2.1.9 1 m2
A
L.01 0.1 OH
L.04 0.05 OH
B
C
D
E
F

6 A.2.2.1.10 1 m2
A
L.01 1 OH
L.02 2 OH
L.03 0.2 OH
L.04 0.05 OH
B
1.25 Btg
0.186 Kg
C
D
E
F
HARGA

URAIAN PAKERJAAN BAHAN/UPAH

Rp

HARGA SATUAN PEKERJAAN PERSIAPAN

Pagar Sementara dari Seng Gelombang Tinggi 2m

TENAGA

Pekerja Rp88,000.00

Tukang Kayu Rp99,000.00

Kepala Tukang Rp110,000.00

Mandor Rp121,000.00

BAHAN

Kayu Dolken diameter 8 - 10 / 400 cm Rp32,000

Portland Semen Rp1,350

Seng Gelombang 3" - 5" Rp 53,000.00

Pasir Beton Rp374,000

Koral Beton Rp289,200

Kayu 5/7X4m Kayu Kruing Rp9,000,000

Paku Biasa 2" - 5" Rp 19,000.00

Meni Besi Rp 37,500.00

PERALATAN

Jumlah A + B + C

Overhead & Profit 10% 10%

Harga Satuan Pekerjaan (D+E)

Pengukuran dan Pemasangan Bouwplank

Tenaga
Pekerja Rp88,000.00
Tukang Kayu Rp99,000.00
Kepala Tukang Rp110,000.00
Mandor Rp121,000.00
Bahan
Kayu 5/7x 4m Kayu Kruing Rp9,000,000
Paku Biasa 2" - 5" Rp 19,000.00
Kayu Papan 3/20 Kruing Rp10,500,000
PERALATAN
Jumlah A + B + C
Overhead & Profit 10% 10%
Harga Satuan Pekerjaan (D+E)

HARGA
URAIAN PAKERJAAN BAHAN/UPAH
Rp

Membersihkan Lapangan dan Perataan


Tenaga
Pekerja Rp88,000.00
Mandor Rp121,000.00
Bahan
PERALATAN
Jumlah A + B + C
Overhead & Profit 10% 10%
Harga Satuan Pekerjaan (D+E)

Pembuatan Steger/Perancah dari Bambu


Tenaga
Pekerja Rp88,000.00
Tukang Kayu Rp99,000.00
Kepala Tukang Rp110,000.00
Mandor Rp121,000.00
Bahan
Bambu diameter 6 - 8 / 600 cm Rp20,000
Tali Ijuk Rp 6,000.00
PERALATAN
Jumlah A + B + C
Overhead & Profit 10% 10%
Harga Satuan Pekerjaan (D+E)
overhead
12.5%
JUMLAH
Rp

Rp 855,209.08

Rp 17,600.00

Rp 39,600.00

Rp 2,200.00

Rp 2,420.00

Rp 61,820.00

Rp 40,000.00

Rp 3,375.00

Rp 63,600.00

Rp 1,870.00

Rp 2,602.80

Rp 648,000.00

Rp 1,140.00

Rp 16,875.00

Rp 777,462.80

Rp 77,746.28

Rp 855,209.08

Rp 222,513.50

Rp 20,405.00
Rp 8,800.00
Rp 9,900.00
Rp 1,100.00
Rp 605.00
Rp 181,880.00
Rp 108,000.00
Rp 380.00
Rp 73,500.00

Rp 202,285.00
Rp 20,228.50
Rp 222,513.50

JUMLAH
Rp

Rp 16,335.00
Rp 14,850.00
Rp 8,800.00
Rp 6,050.00

Rp 14,850.00
Rp 1,485.00
Rp 16,335.00

Rp 374,182.60
Rp 314,050.00
Rp 88,000.00
Rp 198,000.00
Rp 22,000.00
Rp 6,050.00
Rp 26,116.00
Rp 25,000.00
Rp 1,116.00

Rp 340,166.00
Rp 34,016.60
Rp 374,182.60
HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH
Rp

I A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m

A TENAGA

L.01 0.75 OH Pekerja Rp88,000.00

L.04 0.025 OH Mandor Rp121,000.00

B BAHAN

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)

Overhead & Profit 10%

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH
Rp

11 A.2.3.1.11 1 m3 Urugan Pasir

A TENAGA

L.01 0 ,30 OH Pekerja Rp88,000.00

L.04 0 ,01 OH Mandor Rp121,000.00

B BAHAN

1.2 m3 Pasir Urug Rp228,000

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)

Mengurug Tanah Pilihan (Tanah


14 A.2.3.1.14.B 1 m3
Merah)

0 ,25 OH Pekerja Rp88,000.00

0.025 OH Mandor Rp121,000.00

B BAHAN

1.2 m3 Tanah (Merah) Rp130,000

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)


9 A.2.3.1.9 1 m3 Pengurugan Kembali

Pengurugan Kembali di hitung dari 1/3 kali koefisien

A TENAGA

L.01 0 ,50 OH Pekerja Rp88,000.00

L.04 0.05 OH Mandor Rp121,000.00

B BAHAN

C PERALATAN

D Jumlah A + B + C

Overhead & Profit


E 10%
10%

Harga Satuan
F
Pekerjaan (D+E)
overhead
JUMLAH 12.5%
Rp

Rp 75,927.50

Rp 69,025.00

Rp 66,000.00

Rp 3,025.00

Rp 69,025.00

Rp 6,902.50

Rp 75,927.50

JUMLAH
Rp

Rp 331,331.00

Rp 27,610.00

Rp 26,400.00

Rp 1,210.00

Rp 273,600.00

Rp 273,600.00

Rp 301,210.00

Rp 30,121.00

Rp 331,331.00

Rp 199,127.50

Rp 25,025.00

Rp 22,000.00

Rp 3,025.00

Rp 156,000.00

Rp 156,000.00

Rp 181,025.00

Rp 18,102.50

Rp 199,127.50
Rp 55,055.00

Rp 50,050.00

Rp 44,000.00

Rp 6,050.00

Rp 50,050.00

Rp 5,005.00

Rp 55,055.00
3 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP

A TENAGA
1
L.01 OH Pekerja Rp88,000.00
,5
L.02 0.75 OH Tukang Batu Rp99,000.00

L.03 0.075 OH Kepala Tukang Rp110,000.00


L.04 0.075 OH Mandor Rp121,000.00

B BAHAN

1 ,2 m3 Batu Belah Rp325,000

136 Kg Portland Sement Rp1,350

0.544 m3 Pasir Pasang Rp267,630

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)

9 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping

A Tenaga

L.01 0 ,78 OH Pekerja Rp88,000.00

L.02 0 ,39 OH Tukang Batu Rp99,000.00

L.03 0.039 OH Kepala Tukang Rp110,000.00

L.04 0.039 OH Mandor Rp121,000.00

B Bahan

1
m3 Batu Belah Rp325,000
,2

0.432 m3 Pasir Urug Rp228,000

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


overhead
12.5%

Rp 1,037,042.29

Rp 223,575.00

Rp 132,000.00

Rp 74,250.00

Rp 8,250.00

Rp 9,075.00

Rp 719,190.72

Rp 390,000.00

Rp 183,600.00

Rp 145,590.72

Rp 942,765.72

Rp 94,276.57

Rp 1,037,042.29

Rp 665,230.50

Rp 116,259.00

Rp 68,640.00

Rp 38,610.00

Rp 4,290.00

Rp 4,719.00

Rp 488,496.00

Rp 390,000.00

Rp 98,496.00

Rp 604,755.00

Rp 60,475.50

Rp 665,230.50
19 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof

A Tenaga

L.01 0.52 OH Pekerja Rp88,000.00

L.02 0.26 OH Tukang Kayu Rp99,000.00

L.03 0.026 OH Kepala Tukang Rp110,000.00

L.04 0.026 OH Mandor Rp121,000.00

B Bahan

0.045 m3 Kayu Perancah Rp1,800,000

0.3 Kg Paku Biasa 2" - 5" Rp 19,000.00

0.1 Ltr Minyak Bekisting Rp 11,500.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

21 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom

A Tenaga

L.01 0.66 OH Pekerja Rp88,000.00

L.02 0.33 OH Tukang Kayu Rp99,000.00

L.03 0.033 OH Kepala Tukang Rp110,000.00

L.04 0.033 OH Mandor Rp121,000.00

B Bahan

0.04 m3 Kayu Perancah Rp 1,800,000.00

0.4 Kg Paku Biasa 2" - 5" Rp 19,000.00

0.2 Ltr Minyak Bekisting Rp 11,500.00

0.015 m3 Balok Kayu Klas II Rp9,000,000

0.35 Lbr Plywood tebal 9mm Rp 115,500.00

Dolken Kayu Galam diameter 8 - 10


2 Btg Rp32,000
cm / 4 m

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

HARGA BAHAN/UPAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp

A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok

23 A Tenaga

L.01 0.66 OH Pekerja Rp88,000.00


L.02 0.33 OH Tukang Kayu Rp99,000.00

L.03 0.033 OH Kepala Tukang Rp110,000.00

L.04 0.033 OH Mandor Rp121,000.00

B Bahan

0.04 m3 Kayu Perancah Rp1,800,000

0.4 Kg Paku Biasa 2" - 5" Rp 19,000.00

0.2 Ltr Minyak Bekisting Rp 11,500.00

0.018 m3 Balok Kayu Klas II Rp9,000,000

0.35 Lbr Plywood tebal 9mm Rp 115,500.00

2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m Rp32,000

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


Rp 181,891.60

Rp 77,506.00

Rp 45,760.00

Rp 25,740.00

Rp 2,860.00

Rp 3,146.00

Rp 87,850.00

Rp 81,000.00

Rp 5,700.00

Rp 1,150.00

Rp 165,356.00

Rp 16,535.60

Rp 181,891.60

Rp 461,667.80

Rp 98,373.00

Rp 58,080.00

Rp 32,670.00

Rp 3,630.00

Rp 3,993.00

Rp 321,325.00

Rp 72,000.00

Rp 7,600.00

Rp 2,300.00

Rp 135,000.00

Rp 40,425.00

Rp 64,000.00

Rp 419,698.00

Rp 41,969.80

Rp 461,667.80

JUMLAH

Rp

Rp 491,367.80

Rp 98,373.00

Rp 58,080.00
Rp 32,670.00

Rp 3,630.00

Rp 3,993.00

Rp 348,325.00

Rp 72,000.00

Rp 7,600.00

Rp 2,300.00

Rp 162,000.00

Rp 40,425.00

Rp 64,000.00

Rp 446,698.00

Rp 44,669.80

Rp 491,367.80
8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (1 2±2)cm, w/c = 0,56

A Tenaga

L.01 1.65 OH Pekerja

L.02 0.275 OH Tukang Batu

L.03 0.028 OH Kepala Tukang

L.04 0.083 OH Mandor

B Bahan

384 Kg Portland Semen

692 Kg Pasir Beton

1,039 Kg Kerikil (maksimum 30 mm)

215 ltr Air

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

Membuat Lantai Kerja Beton mutu


9 A.4.1.1.9 1 m3
f'c=24,0 MPa (K w/c = 0,53

A Tenaga

L.01 1.65 OH Pekerja

L.02 0.275 OH Tukang Batu

L.03 0.028 OH Kepala Tukang

L.04 0.083 OH Mandor

B Bahan

406 Kg kg kg Portland Semen

684 ltr Pasir Beton

1,026 Kerikil (maksimum 30 mm)

215 Air

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


7 MPa (K250), slum (1 2±2)cm, w/c = 0,56 Rp 1,197,754.61

Rp 185,548.00

Rp 88,000.00 Rp 145,200.00

Rp 99,000.00 Rp 27,225.00

Rp 110,000.00 Rp 3,080.00

Rp 121,000.00 Rp 10,043.00

Rp 903,319.83

Rp 1,350.00 Rp 518,400.00

Rp 212.61 Rp 147,129.09

Rp 218.52 Rp 227,040.74

Rp 50.00 Rp 10,750.00

Rp 1,088,867.83

Rp 108,886.78

Rp 1,197,754.61

275), slum (12±2)cm, Rp 1,225,428.79

Rp 185,548.00

Rp 88,000.00 Rp 145,200.00
Rp 99.000,00 Rp Rp 27.225,00 Rp
110.000,00 3.080,00
Rp 121,000.00 Rp 10,043.00

Rp 928,478.17

Rp 1,350.00 Rp 548,100.00

Rp 212.61 Rp 145,428.17

Rp 218.52 Rp 224,200.00

Rp 50.00 Rp 10,750.00

Rp 1,114,026.17

Rp 111,402.62

Rp 1,225,428.79
SNI KODE KOEF SAT. URAIAN PAKERJAAN

No.

3 A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

3 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

A Tenaga

L.01 0.6 OH Pekerja

L.02 0.2 OH Tukang Batu

L.03 0.02 OH Kepala Tukang Batu

L.04 0.03 OH Mandor

B Bahan

140 Buah Bata Merah

26.55 kg Portland Semen (PC)

0.093 m3 Pasir Pasang (PP)

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)

21 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom

A Tenaga

L.01 0.66 OH Pekerja

L.02 0.33 OH Tukang Kayu

L.03 0.033 OH Kepala Tukang

L.04 0.033 OH Mandor

B Bahan

0.04 m3 Kayu Perancah

0.4 Kg Paku Biasa 2" - 5"

0.2 Ltr Minyak Bekisting

0.015 m3 Balok Kayu Klas II

0.35 Lbr Plywood tebal 9mm

Dolken Kayu Galam diameter 8 - 10


2 Btg
cm / 4 m

C PERALATAN
D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

5 A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

4 A.4.4.2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm

A Tenaga

L.01 0 ,3 OH Pekerja

L.02 0 ,15 OH Tukang batu

L.03 0.015 OH Kepala Tukang

L.04 0.015 OH Mandor

B Bahan

6.24 Kg Portland Semen

0.024 m3 Pasir Pasang

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

A.4.4.2.27 1 m2 Pemasangan Acian

25 Tenaga

L.01 0 ,20 OH Pekerja

L.02 0 ,10 OH Tukang batu

L.03 0.01 OH Kepala Tukang

L.04 0.01 OH Mandor

Bahan

3 ,25 Kg Portland Semen

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


HARGA JUMLAH

BAHAN/UPAH Rp

Rp

NDING

n (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP Rp 253,178.30

Rp 78,430.00

Rp 88,000.00 Rp 52,800.00

Rp 99,000.00 Rp 19,800.00

Rp 110,000.00 Rp 2,200.00

Rp 121,000.00 Rp 3,630.00

Rp 151,732.09

Rp 650.00 Rp 91,000.00

Rp 1,350.00 Rp 35,842.50

Rp 267,630.00 Rp 24,889.59

Rp 230,162.09

Rp 23,016.21

Rp 253,178.30

Rp 461,667.80

Rp 98,373.00

Rp 88,000.00 Rp 58,080.00

Rp 99,000.00 Rp 32,670.00

Rp 110,000.00 Rp 3,630.00

Rp 121,000.00 Rp 3,993.00

Rp 321,325.00

Rp 1,800,000.00 Rp 72,000.00

Rp 19,000.00 Rp 7,600.00

Rp 11,500.00 Rp 2,300.00

Rp 9,000,000.00 Rp 135,000.00

Rp 115,500.00 Rp 40,425.00

Rp 32,000.00 Rp 64,000.00
Rp 419,698.00

Rp 41,969.80

Rp 461,667.80

HARGA BAHAN/UPAH JUMLAH

Rp Rp

EKERJAAN PLESTERAN

Rp 65,518.33

Rp 44,715.00

Rp 88,000.00 Rp 26,400.00

Rp 99,000.00 Rp 14,850.00

Rp 110,000.00 Rp 1,650.00

Rp 121,000.00 Rp 1,815.00

Rp 14,847.12

Rp 1,350.00 Rp 8,424.00

Rp 267,630.00 Rp 6,423.12

Rp 59,562.12

Rp 5,956.21

Rp 65,518.33

Rp 37,617.25

Rp 29,810.00

Rp 88,000.00 Rp 17,600.00

Rp 99,000.00 Rp 9,900.00

Rp 110,000.00 Rp 1,100.00

Rp 121,000.00 Rp 1,210.00

Rp 4,387.50

Rp 1,350.00 Rp 4,387.50

Rp 34,197.50

Rp 3,419.75

Rp 37,617.25
HARGA BAHAN/UPAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp

14 A.4.1.1.17.a 1 Kg Pembesian dg Besi Polos atau Besi Ulir

A Tenaga

L.01 0.007 OH Pekerja Rp 88,000.00

L.02 0.007 OH Tukang Besi Rp 99,000.00

L.03 0.0007 OH Kepala Tukang Rp 110,000.00

L.04 0.0004 OH Mandor Rp 121,000.00

B Bahan

1.05 Kg Besi Beton polos Rp 12,000.00

0.015 Kg Kawat Beton Rp 22,300.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10%

F Harga Satuan Pekerjaan (D+E)

Kabel Presstresed
15 A.4.1.1.18 10 Kg
Polos/strand

A Tenaga

L.01 0.05 OH Pekerja Rp 88,000.00

L.02 0.05 OH Tukang Besi Rp 99,000.00

L.03 0.005 OH Kepala Tukang Rp 110,000.00

L.04 0.003 OH Mandor Rp 121,000.00

B Bahan

10.5 Kg Besi presstred polos Rp 12,000.00

0 ,1 Kg Kawat Beton Rp 22,300.00

C PERALATAN

D Jumlah A + B + C
E Overhead & Profit 10% 10%

Harga Satuan Pekerjaan


F
(D+E)

16 A.4.1.1.19 10 Kg Jaring Kawat baja/Wire Mesh

A Tenaga

L.01 0.025 OH Pekerja Rp 88,000.00

L.02 0.025 OH Tukang Besi Rp 99,000.00

L.03 0.025 OH Kepala Tukang Rp 110,000.00

L.04 0.001 OH Mandor Rp 121,000.00

B Bahan

10.2 Kg Jaring Kawat Baja dilas Rp 25,000.00

0.05 Kg Kawat Beton Rp 22,300.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

Harga Satuan Pekerjaan


F
(D+E)
JUMLAH

Rp

Rp 15,805.79

Rp 1,434.40

Rp 616.00

Rp 693.00

Rp 77 ,00

Rp 48 ,40

Rp 12,934.50

Rp 12,600.00

Rp 334.50

Rp 14,368.90

Rp 1,436.89

Rp 15,805.79

Rp 152,342.30

Rp 10,263.00

Rp 4,400.00

Rp 4,950.00

Rp 550.00

Rp 363.00

Rp 128,230.00

Rp 126,000.00

Rp 2,230.00

Rp 138,493.00
Rp 13,849.30

Rp 152,342.30

Rp 290,027.10

Rp 7,546.00

Rp 2,200.00

Rp 2,475.00

Rp 2,750.00

Rp 121.00

Rp 256,115.00

Rp 255,000.00

Rp 1,115.00

Rp 263,661.00

Rp 26,366.10

Rp 290,027.10
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

9 A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 A.4.4.3.1 1 m2 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm

A Tenaga

L.01 0 ,25 OH Pekerja

L.02 0.125 OH Tukang Batu

L.03 0.013 OH Kepala Tukang

L.04 0.013 OH Mandor

B Bahan

6 ,63 Buah Ubin Abu-abu 30x30 cm 11.11

9 ,80 Kg Portland Semen 0.3

0.045 m3 Pasir Pasang 0.09

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

A.4.4.3.6 1 m2 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm

6 A Tenaga

L.01 0 ,27 OH Pekerja Rp 88,000.00

L.02 0.135 OH Tukang Batu Rp 99,000.00

L.03 0.014 OH Kepala Tukang Rp 110,000.00

L.04 0.014 OH Mandor Rp 121,000.00

B Bahan

26 ,5 Buah Ubin Warna 20x20 cm Rp 1,040.00

10 ,4 Kg Portland Semen Rp 1,350.00

1 Kg Semen warna Rp 1,800.00

0.045 m3 Pasir Pasang Rp 267,630.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


HARGA
JUMLAH
BAHAN/UPAH

Rp Rp

AN DINDING

bu ukuran 40cm x 40 cm Rp 102,950.49

Rp 37,378.00

Rp 88,000.00 Rp 22,000.00

Rp 99,000.00 Rp 12,375.00

Rp 110,000.00 Rp 1,430.00

Rp 121,000.00 Rp 1,573.00

Rp 56,213.35

Rp 4,666.67 Rp 30,940.00

Rp 1,350.00 Rp 13,230.00

Rp 267,630.00 Rp 12,043.35

Rp 93,591.35

Rp 9,359.14

Rp 102,950.49

Rp 105,382.59

Rp 40,359.00

Rp 23,760.00

Rp 13,365.00

Rp 1,540.00

Rp 1,694.00

Rp 55,443.35

Rp 27,560.00

Rp 14,040.00

Rp 1,800.00

Rp 12,043.35

Rp 95,802.35

Rp 9,580.24

Rp 105,382.59
HARGA BAHAN/UPAH

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN Rp

7 A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

2 A.4.5.2.2 1 m2 Pemasangan 1 m2 atap genteng kodok glazuur

A Tenaga

L.01 0.15 OH Pekerja Rp 88,000.00

L.02 0.075 OH Tukang Kayu Rp 99,000.00

L.03 0.008 OH Kepala Tukang Rp 110,000.00

L.04 0.008 OH Mandor Rp 121,000.00

B Bahan

25 Buah Genteng Kodok Glazour Rp 5,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


Overhe
ad &
Profit
10%
HARGA

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH

Rp

6 A.4.5.2.5 1 m' Pemasangan 1 m’ bubung genteng kodok glazuur

A Tenaga

L.01 0.4 OH Pekerja Rp 88,000.00

L.02 0.2 OH Tukang Kayu Rp 99,000.00

L.03 0.02 OH Kepala Tukang Rp 110,000.00

L.04 0.002 OH Mandor Rp 121,000.00

B Bahan

5 Buah Kerpus Kodok (Glazour) Rp 12,000.00

8 Kg Portland Semen Rp 1,350.00

0.032 m3 Pasir Pasang Rp 267,630.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


JUMLAH

Rp

Rp 162,220.30

Rp 22,473.00

Rp 13.200,00 Rp
7.425,00

Rp 880.00

Rp 968.00

Rp 125,000.00

Rp 125,000.00

Rp 147,473.00

Rp 14,747.30

Rp 162,220.30

JUMLAH

Rp

Rp 150,486.78

Rp 57,442.00

Rp 35,200.00

Rp 19,800.00

Rp 2,200.00

Rp 242.00

Rp 79,364.16

Rp 60,000.00

Rp 10,800.00

Rp 8,564.16

Rp 136,806.16

Rp 13,680.62

Rp 150,486.78
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN HARGA

BAHAN/UPAH

Rp

6 A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II

A Tenaga

L.01 7 OH Pekerja Rp 88,000.00

L.02 21 OH Tukang Kayu Rp 99,000.00

L.03 2 ,10 OH Kepala Tukang Rp 110,000.00

L.04 0 ,35 OH Mandor Rp 121,000.00

B Bahan

1 ,10 m3 Kayu Jati Kelas II (Balok/Pesagen) Rp 12,000,000.00

1 ,25 kg Paku Biasa 2" - 5 " Rp 19,000.00

1 ,00 kg Lem Kayu Rp 26,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN HARGA

BAHAN/UPAH

Rp

4 A.4.6.1.4 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III

Tenaga

L.01 0 ,35 OH Pekerja Rp 88,000.00

L.02 1 ,05 OH Tukang Kayu Rp 99,000.00

L.03 0.105 OH Kepala Tukang Rp 110,000.00

L.04 0.018 OH Mandor Rp 121,000.00

Bahan

0.04 m3 Kayu Klas II (Kamfer), papan Rp 12,000,000.00

0 ,05 Kg Paku Biasa 2" - 5 " Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

HARGA

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN

Rp

17 A.4.6.1.14.(a) 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu Jati Kelas II

A Tenaga

L.01 6.7 OH Pekerja Rp 88,000.00

L.02 20.1 OH Tukang Kayu Rp 99,000.00

L.03 2.01 OH Kepala Tukang Rp 110,000.00

L.04 0.335 OH Mandor Rp 121,000.00

B Bahan

1.2 m3 Kayu Jati Kelas II (Balok/Pesagen) Rp 12,000,000.00

15 Kg Besi Strip Rp 16,500.00

5.6 Kg Paku Biasa 2" - 5" Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

HARGA

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH

Rp

18 A.4.6.1.15 1 m3 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai kayu Kruing Klas I

A Tenaga

L.01 6.7 OH Pekerja Rp 88,000.00

L.02 20.1 OH Tukang Kayu Rp 99,000.00

L.03 2.01 OH Kepala Tukang Rp 110,000.00

L.04 0.335 OH Mandor Rp 121,000.00

B Bahan

1.1 m3 Kayu Kruing Klas I (Balok/pesagen) Rp 9,000,000.00

15 Kg Besi Strip Rp 16,500.00

3 Kg Paku Biasa 2" - 5" Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

HARGA

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH

Rp

23 A.4.6.1.18 1 m2 Pemasangan Rangka Atap Sirap, Kayu Kruing

A Tenaga

L.01 0 ,12 OH Pekerja Rp 88,000.00


L.02 0 ,12 OH Tukang Kayu Rp 99,000.00

L.03 0.012 OH Kepala Tukang Rp 110,000.00

L.04 0.006 OH Mandor Rp 121,000.00

B Bahan

0.014 m3 Kayu Kruing 5/7 Rp 7,666,800.00

0.057 Kg Paku Biasa 2" - 5" Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

Pemasangan Rangka Langit-langit


25 A.4.6.1.20 1 m2
(60x60) cm, kayu Klas II atau Klas III

A Tenaga

L.01 0 ,2 OH Pekerja Rp 88,000.00

L.02 0 ,3 OH Tukang Kayu Rp 99,000.00

L.03 0 ,03 OH Kepala Tukang Rp 110,000.00

L.04 0 ,01 OH Mandor Rp 121,000.00

B Bahan

0.0163 m3 Kayu Kruing Rp 7,666,800.00

0 ,25 Kg Paku Biasa 2" - 5" Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PAKERJAAN HARGA

BAHAN/UPAH

Rp

26 A.4.6.1.21 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II

A Tenaga

L.01 0 ,1 OH Pekerja Rp 88,000.00

L.02 0 ,2 OH Tukang Kayu Rp 99,000.00

L.03 0.02 OH Kepala Tukang Rp 110,000.00

L.04 0.005 OH Mandor Rp 121,000.00

B Bahan

0.0108 m3 Kayu Jati Kelas II (Papan) Rp 13,000,000.00

0 ,10 Kg Paku Biasa 2" - 5" Rp 19,000.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%


F Harga Satuan Pekerjaan (D+E)
JUMLAH

Rp

Rp 17,839,910.00

Rp 2,968,350.00

Rp 616,000.00

Rp 2,079,000.00

Rp 231,000.00

Rp 42,350.00

Rp 13,249,750.00

Rp 13,200,000.00

Rp 23,750.00

Rp 26,000.00

Rp 16,218,100.00

Rp 1,621,810.00

Rp 17,839,910.00

JUMLAH

Rp

Rp 692,370.80

Rp 148,478.00

Rp 30,800.00

Rp 103,950.00

Rp 11,550.00

Rp 2,178.00

Rp 480,950.00

Rp 480,000.00

Rp 950.00

Rp 629,428.00

Rp 62,942.80

Rp 692,370.80

JUMLAH

Rp
Rp 19,354,538.50

Rp 2,841,135.00

Rp 589,600.00

Rp 1,989,900.00

Rp 221,100.00

Rp 40,535.00

Rp 14,753,900.00

Rp 14,400,000.00

Rp 247,500.00

Rp 106,400.00

Rp 17,595,035.00

Rp 1,759,503.50

Rp 19,354,538.50

JUMLAH

Rp

Rp 14,350,198.50

Rp 2,841,135.00

Rp 589,600.00

Rp 1,989,900.00

Rp 221,100.00

Rp 40,535.00

Rp 10,204,500.00

Rp 9,900,000.00

Rp 247,500.00

Rp 57,000.00

Rp 13,045,635.00

Rp 1,304,563.50

Rp 14,350,198.50

JUMLAH

Rp

Rp 146,194.62

Rp 24,486.00

Rp 10,560.00
Rp 11,880.00

Rp 1,320.00

Rp 726.00

Rp 108,418.20

Rp 107,335.20

Rp 1,083.00

Rp 132,904.20

Rp 13,290.42

Rp 146,194.62

Rp 199,681.72

Rp 51,810.00

Rp 17,600.00

Rp 29,700.00

Rp 3,300.00

Rp 1,210.00

Rp 129,718.84

Rp 124,968.84

Rp 4,750.00

Rp 181,528.84

Rp 18,152.88

Rp 199,681.72

JUMLAH

Rp

Rp 191,075.50

Rp 31,405.00

Rp 8,800.00

Rp 19,800.00

Rp 2,200.00

Rp 605.00

Rp 142,300.00

Rp 140,400.00

Rp 1,900.00

Rp 173,705.00

Rp 17,370.50
Rp 191,075.50
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFON)
A.4.5.1.7. Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm

No Uraian Kode Satuan Koefisien

A TENAGA KERJA
Pekerja L.01 OH 0.1
Tukang kayu L.02 OH 0.05

Kepala tukang L.03 OH 0.005


Mandor L.04 OH 0.005
JUMLAH HARGA TENAGA
B BAHAN KERJA
Gypsum tebal 9 mm (Elepant & Lembar 0.364
Jaya Board)

PAKU - sekrup kg 0.11


JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Biaya Umum dan Keuntungan 10.0%
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

88,000.00 Rp 8,800.00
99,000.00 Rp 4,950.00

110,000.00 Rp 550.00

121,000.00 Rp 605.00
MLAH HARGA TENAGA 14,905.00
RJA
80,000.00
Rp 29,120.00

30,000.00 3,300.00
MLAH HARGA BAHAN 32,420.00

MLAH HARGA ALAT


47,325.00
xD 4,732.50
52,057.50
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

10 A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA

1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa

A Tenaga

L.01 0.01 OH Pekerja

L.02 0.5 OH Tukang Kayu

L.03 0.05 OH Kepala Tukang


L.04 0.005 OH Mandor
B Bahan
1 Buah Kunci Tanam Biasa 2 Slag
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


Overhead &
Profit 10%
4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu
A Tenaga
OH OH OH
L.01 0.015 Pekerja
OH
L.02 0.15 Tukang Kayu
L.03 0.015 Kepala Tukang
L.04 0.0008 Mandor

B Bahan

1 Buah Engsel pintu Nylon Kupu-Kupu

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu


5 A Tenaga
L.01 0.01 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.0005 OH Mandor
B Bahan

1 Buah Engsel Jendela Kupu-Kupu Biasa

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm


14 A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.0008 OH Mandor
B Bahan
1.1 m2 Kaca tebal 5 mm
0.05 Kg Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


A.4.6.2.18 1 m2 Pemasangan Kaca tebal 8 mm
15 A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.0008 OH Mandor
B Bahan
1.1 m2 Kaca tebal 8 mm
0.05 Kg Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

Pemasangan Kaca Cermin tebal 5


A.4.6.2.20 1 m2
mm
16
A Tenaga
L.01 0.015 OH Pekerja
L.02 0.15 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1.1 m2 Kaca Cermin
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


HARGA JUMLAH

BAHAN/UPAH Rp
Rp

dan KACA

Kunci Tanam Biasa Rp 227,133.50

Rp 56,485.00

Rp 88,000.00 Rp 880.00

Rp 99,000.00 Rp 49,500.00
Rp 110,000.00 Rp 5,500.00
Rp 121,000.00 Rp 605.00
Rp 150,000.00
Rp 150,000.00 Rp 150,000.00

Rp 206,485.00
Rp 20,648.50
Rp 227,133.50

an Engsel Pintu Rp 36,208.48


Rp 17,916.80

Rp 88,000.00 Rp 1,320.00

Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80

Rp 15,000.00

Rp 15,000.00 Rp 15,000.00

Rp 32,916.80

Rp 3,291.68
Rp 36,208.48

HARGA JUMLAH

BAHAN/UPAH Rp
Rp

sel Jendela Kupu-kupu Rp 32,384.55

Rp 11,940.50
Rp 88,000.00 Rp 880.00
Rp 99,000.00 Rp 9,900.00
Rp 110,000.00 Rp 1,100.00
Rp 121,000.00 Rp 60.50
Rp 17,500.00

Rp 17,500.00 Rp 17,500.00

Rp 29,440.50

Rp 2,944.05

Rp 32,384.55

HARGA JUMLAH

BAHAN/UPAH Rp

Rp

Rp 170,958.48
Rp 17,916.80
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 137,500.00
Rp 125,000.00 Rp 137,500.00
Rp 5,000.00 Rp 250.00

Rp 155,416.80
Rp 15,541.68
Rp 170,958.48
Rp 201,208.48
Rp 17,916.80
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 96.80
Rp 165,000.00
Rp 150,000.00 Rp 165,000.00
Rp 5,000.00 Rp 250.00

Rp 182,916.80
Rp 18,291.68
Rp 201,208.48

Rp 202,166.80

Rp 18,788.00
Rp 88,000.00 Rp 1,320.00
Rp 99,000.00 Rp 14,850.00
Rp 110,000.00 Rp 1,650.00
Rp 121,000.00 Rp 968.00
Rp 165,000.00
Rp 150,000.00 Rp 165,000.00

Rp 183,788.00
Rp 18,378.80
Rp 202,166.80
3
A.4.7.1.5 1 m2 Pengecatan 1 M2 Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat penutu

A Tenaga

L.01 0.07 OH Pekerja

L.02 0.105 OH Tukang Cat

L.03 0.004 OH Kepala Tukang

L.04 0.003 OH Mandor

B Bahan

0.2 kg Cat Menie

0.15 kg Plamuur

0.17 kg Cat Dasar

0.35 kg Cat Kayu (baik)

0.01 bh Kuas

0.03 kg Pengencer (Minyak Cat)

0.2 lbr Amplas

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)

A.4.7.1.10 1 m2 Pengecatan 1m2 Tembok Baru (1lap.Plamur, 1lap Cat Dasar 2

A Tenaga

L.01 0 ,02 OH Pekerja

L.02 0.063 OH Tukang Cat

L.03 0.0063 OH Kepala Tukang

L.04 0.003 OH Mandor

B Bahan
3
0 ,10 Kg Plamur

0 ,10 Kg Cat Dasar

0 ,26 Kg Cat Penutup 2 kali

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 10% 10%

F Harga Satuan Pekerjaan (D+E)


1 lp Cat dasar, 3 Lp Cat penutup) Rp73,395.30

Rp17,358.00

Rp88,000.00 Rp6,160.00

Rp 10.395,00 Rp
Rp99,000.00
440,00

Rp110,000.00 Rp363.00

Rp121,000.00

Rp49,365.00

Rp37,500.00 Rp7,500.00

Rp27,000.00 Rp4,050.00

Rp58,000.00 Rp9,860.00

Rp75,000.00 Rp26,250.00

Rp52,500.00 Rp525.00

Rp16,000.00 Rp480.00

Rp3,500.00 Rp700.00

Rp66,723.00

Rp6,672.30

Rp73,395.30

lap. Cat Penutup) Rp52,198.30

Rp9,053.00

Rp88,000.00 Rp1,760.00

Rp 99.000,00 Rp
Rp6,237.00
110.000,00

Rp121,000.00 Rp693.00

Rp363.00

Rp38,400.00

Rp14,000.00 Rp1,400.00

Rp58,000.00 Rp5,800.00

Rp120,000.00 Rp31,200.00

Rp47,453.00

Rp4,745.30

Rp52,198.30
FORMULIR STANDAR UNT
PEREKAMAN ANALISA MASING MASING

ITEM PEMBAYARAN NO ; 1.19


JENIS PEKERJAAN ; Keselamatan dan Kesehatan Kerja
SATUAN PEMBAYARAN ; Lump sum

No. URAIAN PAKERJAAN

Keselamatan dan Kesehatan Kerja ( K3)


1 Sosialisasi dan Promosi dan Pelatihan :
a. Banner Informasi K3
2 Alat Pelindung Diri ( APD )
Alat Pelindung Diri ( APD ) terdiri atas :
a. Topi Pelindung ( Safety Helmet )
b. Rompi Keselamatan ( Safety Vest )
c. Pelindung Pernafasan dan mulut ( masker )
d. Sarung Tangan ( Safety gloves )
e. Sepatu Keselamatan ( Sepatu boot )

3 Fasilitas Sarana Kesehatan


a. Peralatan P3K ( Kotak P3k, Obat luka, Perban, Dll )

Jumlah
Overhead & Profit (contoh 10%)
TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA

CATATAN:
1. Perkiraan Kuantitas harus Disesuaikan dengan kebutuhan di lapangan
2. Harga perludisesuaikan dengan hargaterbaru,termasuk biaya personil
3.Yang dimaksud dengan konsultansi dengan ahli terkait keselamatankonstruksitermas
FORMULIR STANDAR UNTUK
MAN ANALISA MASING MASING HARGA SATUAN

Kesehatan Kerja

PERKIRAAN HARGA
JAAN SAT KUANTITAS SATUAN
( Rp )

Buah 1.000 65,000.00

Pekerja, Staf, dan Tamu Buah 4.000 50,000.00


Sesuai Kebutuhan Buah 4.000 50,000.00
Sesuai Kebutuhan Buah 4.000 9,000.00
Sesuai Kebutuhan psg 4.000 10,000.00
Pekerja, Staf, dan Tamu psg 4.000 100,000.00

ls 1.000 100,000.00

12.5%

kebutuhan di lapangan
ermasuk biaya personil
terkait keselamatankonstruksitermasuk pakar praktisi
Analisa EL 119

JUMLAH
HARGA
( Rp )

65,000.00

200,000.00
200,000.00
36,000.00
40,000.00
400,000.00

100,000.00

1,041,000.00
130,125.00
1,171,125.00
BACKUP DATA

GAMBAR SKET URAIAN

PEMBESIAN P.Tulangan Isi Bj Jumlah Volume


4Ø10 2.580 4.000 0.617 2.000 12.735
Ø8-150 0.520 18.000 0.395 2.000 7.394
over stek 0.100 4.000 0.617 2.000 0.494
Total 20.623 kg

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


2.580 0.150 4.000 2.000 3.096
Total 3.096 m2

BALOK LATEI 15/20

X: 0.150
PEMBESIAN Y: 0.200

NO.2 P.Tulangan Isi Bj Jumlah Volume


DESCRIPTION
4Ø10 1.750 4.000 0.617 1.000 4.319
BALOK LATEI 15
2Ø10
Ø8-150 0.620 13.000 0.395 1.000 3.184
UKURAN over stek 1.210 4.000 0.617 1.000 2.986
NO.5
15cmx20cm
20

Ø 8-150

4Ø10 - 4.000 0.617 1.000 -


Ø8-150 0.620 1.000 0.395 1.000 0.245

BL over stek 1.210 4.000 0.617 1.000 2.986


2Ø10
2

NO.D
4Ø10 - 4.000 0.617 1.000 -
POSISI TUMPUAN LAPANGAN Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
TULANGAN
2Ø10 NO.A,B
ATAS
4Ø10 4.000 4.000 0.617 2.000 19.744
Ø8-150 0.620 28.000 0.395 2.000 13.714
over stek 1.210 4.000 0.617 2.000 5.973
TULANGAN 2Ø10 NO.1,E
BAWAH 4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
Ø8-150
SENGKANG over stek 1.210 4.000 0.617 2.000 5.973
NO.3,4
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.C
4Ø10 0 4.000 0.617 1.000 -
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.98628
NO.F,a,b
4Ø10 0 4.000 0.617 3.000 -
Ø8-150 0.620 1.000 0.395 3.000 0.735
over stek 1.210 4.000 0.617 3.000 8.959
Total 111.263 kg
BETON Panjang Lebar Tinggi Jumlah Volume
17.250 0.150 0.200 1.000 0.518 m3

BEGISTING Panjang Lebar J.Sisi Jumlah Luas


17.250 0.200 2.000 1.000 6.900
Total 6.900 m2

RINGBALK 15/20

X: 0.150
DESCRIPTION PEMBESIAN Y: 0.200
RING BALK 15
2Ø10

UKURAN NO.2 P.Tulangan Isi Bj Jumlah Volume


4Ø10 1.750 4.000 0.617 1.000 4.319
15cmx20cm
20

Ø 8-150

Ø8-150 0.620 13.000 0.395 1.000 3.184


over stek 1.210 4.000 0.617 1.000 2.986

RB NO.5
2Ø10
2

4Ø10 - 4.000 0.617 1.000 -


Ø8-150 0.620 1.000 0.395 1.000 0.245
POSISI TUMPUAN LAPANGAN over stek 1.210 4.000 0.617 1.000 2.986

TULANGAN NO.D
2Ø10 4Ø10 - 4.000 0.617 1.000 -
ATAS
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
NO.A,B
TULANGAN 2Ø10 4Ø10 4.000 4.000 0.617 2.000 19.744
BAWAH
Ø8-150 0.620 28.000 0.395 2.000 13.714
Ø8-150 over stek 1.210 4.000 0.617 2.000 5.973
SENGKANG
NO.1,E
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.3,4
4Ø10 1.750 4.000 0.617 2.000 8.638
Ø8-150 0.620 13.000 0.395 2.000 6.367
over stek 1.210 4.000 0.617 2.000 5.973
NO.C
4Ø10 0 4.000 0.617 1.000 -
Ø8-150 0.620 1.000 0.395 1.000 0.245
over stek 1.210 4.000 0.617 1.000 2.986
NO.F,a,b
4Ø10 0 4.000 0.617 3.000 -
Ø8-150 0.620 1.000 0.395 3.000 0.735
over stek 1.210 4.000 0.617 3.000 8.959
Total 111.263 kg
RENCANA ANGGARAN BIAYA ( RAB )
NO URAIAN PEKERJAAN VOLUME SAT KODE HARGA PAJAK
ANALISA ( Rp ) 11%

1 2 3 4 5 6 7 = 3x6x11%

A PEKERJAAN PERSIAPAN
1 Keselamatan Dan Kesehatan Kerja 1.000 Lump Sum 1:19 Rp 704,000.00 Rp 77,440.00
2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 1.000 m' A.2.2.1.2 Rp 923,268.50 Rp 101,559.54
3 Pengukuran dan Pemasangan Bouwplank 17.250 m' A.2.2.1.4 #REF! #REF!
4 Membersihkan Lapangan dan Perataan 100.000 m2 A.2.2.1.9 Rp 16,335.00 Rp 179,685.00
TOTAL PEKERJAAN PERSIAPAN
B PEKERJAAN RUMAH
I Pekerjaan tanah
1 Menggali Tanah Biasa Sedalam 1 m 13.287 m3 A.2.3.1.1 Rp 75,927.50 Rp 110,977.53
2 Pengurugan Kembali 3.617 m3 A.2.3.1.9 Rp 55,055.00 Rp 21,907.76
3 Urugan Pasir 8.979 m3 A.2.3.1.11 Rp 331,331.00 Rp 327,250.49
4 Mengurug Tanah Pilihan (Tanah Merah) 0.763 m3 A.2.3.1.14.B Rp 199,127.50 Rp 16,701.82
TOTAL PEKERJAAN TANAH
II Pekerjaan pondasi
1 Pemasangan Pondasi Batu Belah 1SP : 5 PP 6.470 m3 A.3.2.1.3 Rp 977,642.29 Rp 695,788.02
2 Pemasang Batu Kosong/Anstamping 2.650 m3 A.3.2.1.9 Rp 605,830.50 Rp 176,599.59
TOTAL PEKERJAAN PONDASI
III Pekerjaan beton
1 Sloof 15/20 0.518 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 68,182.18
2 Balok Latei 15/20 0.518 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 68,182.18
3 Ring Balk 15/20 0.440 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 57,905.45
4 Kolom 15/15 1.339 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 176,384.34
5 Kolom 15/15 Teras 0.116 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 15,296.52
6 Dak Atap 0.400 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 52,701.20
7 Sofi-Sofi 0.202 m3 A.4.1.1.8 Rp 1,197,754.61 Rp 26,561.41
TOTAL PEKERJAAN BETON
IV Pekerjaan pembesian
1 Sloof 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
2 Balok Latei 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
3 Ring Balk 15/20 111.263 kg A.4.1.1.17.a Rp 15,805.79 Rp 193,445.85
4 Kolom 15/15 234.845 kg A.4.1.1.17.a Rp 15,805.79 Rp 408,309.84
5 Kolom 15/15 Teras 20.623 kg A.4.1.1.17.a Rp 15,805.79 Rp 35,855.70
6 Dak Atap 34.552 kg A.4.1.1.17.a Rp 15,805.79 Rp 60,073.38
7 Sofi-Sofi 40.148 kg A.4.1.1.17.a Rp 15,805.79 Rp 69,803.12
TOTAL PEKERJAAN PEMBESIAN
V Pekerjaan begisting
1 Sloof 15/20 6.900 m2 A.4.1.1.21 Rp 181,891.60 Rp 138,055.72
2 Balok Latei 15/20 6.900 m2 A.4.1.1.23 Rp 491,367.80 Rp 372,948.16
3 Ring Balk 15/20 5.860 m2 A.4.1.1.23 Rp 491,367.80 Rp 316,735.68
4 Kolom 15/15 35.700 m2 A.4.1.1.22 Rp 461,667.80 Rp 1,812,969.45
5 Kolom 15/15 Teras 3.096 m2 A.4.1.1.22 Rp 461,667.80 Rp 157,225.59
6 Dak Atap 3.830 m2 A.4.1.1.23 Rp 491,367.80 Rp 207,013.25
7 Sofi-Sofi 0.403 m2 A.4.1.1.23 Rp 491,367.80 Rp 21,793.14
TOTAL PEKERJAAN BEGISTING
VI Pekerjaan dinding
Pemasangan Dinding Bata Merah Ukuran
1 139.832 m2 A.4.4.1.3 Rp 253,178.30 Rp 3,894,266.42
(5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm 262.256 m2 A.4.4.2.4 Rp 65,518.33 Rp 1,890,079.92
3 Pemasangan Acian 262.256 m2 A.4.4.2.27 Rp 37,617.25 Rp 1,085,186.53
Pengecatan 1m2 Tembok Baru (1lap.Plamur, 1lap
4 262.256 m2 A.4.7.1.10 Rp 52,198.30 Rp 1,505,822.25
Cat Dasar 2 lap. Cat Penutup)
TOTAL PEKERJAAN DINDING
VII Pekerjaan lantai
Pemasangan 1 m2 lantai ubin PC abu-abu ukuran
1 20.216 m2 A.4.4.3.1 Rp 102,950.49 Rp 228,937.18
40cm x 40 cm
2 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm 15.038 m2 A.4.4.3.6 Rp 105,382.59 Rp 174,315.98
TOTAL PEKERJAAN DINDING

VIII Pekerjaan genteng


1 Pemasangan 1 m2 atap genteng kodok glazuur 49.008 m2 A.4.5.2.2 Rp 162,220.30 Rp 874,510.17
2 Pemasangan 1 m’ bubung genteng kodok glazuur 31.724 m2 A.4.5.2.5 Rp 150,486.78 Rp 525,144.69

TOTAL PEKERJAAN GENTENG


IX Pekerjaan kayu
Pembuatan & Pemasangan Kosen Pintu & Jendela
1 0.542 m3 A.4.6.1.1 Rp 17,839,910.00 Rp 1,064,070.71
Kayu Jati Kelas II
Pembuatan & Pemasangan Daun Pintu Klamp
2 6.676 m2 A.4.6.1.4 Rp 692,370.80 Rp 508,418.96
Sederhana Kayu Klas III
Pembuatan&Pemasangan Konstruksi Kuda-kuda
3 0.159 m3 A.4.6.1.14.(a) Rp 19,354,538.50 Rp 337,483.53
Kayu Jati Kelas II
Pemasangan konstruksi Nok, Gording, Muirplat &
4 0.447 m3 A.4.6.1.15 Rp 14,350,198.50 Rp 704,955.22
Jurai kayu Kruing klas I
5 Pemasangan Rangka Atap Sirap, Kayu Kruing 80.732 m2 A.4.6.1.18 Rp 146,194.62 Rp 1,298,284.25
Pemasangan Rangka Langit-langit (60x60) cm, kayu
6 35.254 m2 A.4.6.1.20 Rp 199,681.72 Rp 774,342.75
Klas II atau III
Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas
7 69.680 m' A.4.6.1.21 Rp 191,075.50 Rp 1,464,555.49
II
TOTAL PEKERJAAN KAYU
X Pekerjaan kunci dan kaca
1 Pemasangan Kunci Tanam Biasa 3.000 Buah A.4.6.2.2 Rp 227,133.50 Rp 74,954.06
2 Pemasangan Engsel Pintu 3.000 Buah A.4.6.2.5 Rp 36,208.48 Rp 11,948.80
3 Pemasangan Engsel Jendela Kupu-kupu 6.000 Buah A.4.6.2.6 Rp 32,384.55 Rp 21,373.80
4 Pemasangan Kaca tebal 5 mm 20.202 m2 A.4.6.2.17 Rp 170,958.48 Rp 379,914.88
TOTAL PEKERJAAN KUNCI DAN KACA
XI Pekerjaan plafon
1 Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm 35.254 m2 A.4.5.1.7. Rp 52,057.50 Rp 201,873.00
TOTAL PEKERJAAN KUNCI DAN KACA
0.518
JUMLAH HARGA TOTAL
+ PAJAK 11 % ( Rp )
( Rp )
8= ( 3 x 6 ) + 7 Rp 8.00

Rp 781,440.00
Rp 923,268.50
#REF!
Rp 1,813,185.00
#REF!

Rp 1,119,864.19
Rp 221,069.22
Rp 3,302,254.98
Rp 168,536.54
Rp 4,811,724.93

Rp 7,021,133.63
Rp 1,782,050.42
Rp 8,803,184.05

Rp 688,020.19
Rp 688,020.19
Rp 584,318.60
Rp 1,779,878.32
Rp 154,355.83
Rp 531,803.05
Rp 268,028.74
Rp 4,694,424.92

Rp 1,952,044.52
Rp 1,952,044.52
Rp 1,952,044.52
Rp 4,120,217.43
Rp 361,816.61
Rp 606,195.04
Rp 704,376.98
#REF!

Rp 1,393,107.76
Rp 3,763,385.98
Rp 3,196,150.99
Rp 18,294,509.91
Rp 1,586,549.09
Rp 2,088,951.93
Rp 219,912.64
Rp 30,542,568.31

Rp 39,296,688.39

Rp 68,287,490.69
Rp 18,267,731.28

Rp 11,371,154.31

Rp 137,223,064.67

Rp 2,310,184.29

Rp 1,759,006.67
Rp 4,069,190.96

Rp 8,824,602.63
Rp 5,299,187.30

Rp 14,123,789.93

Rp 10,737,440.79

Rp 5,130,409.47

Rp 3,405,515.63

Rp 7,113,639.07

Rp 13,100,868.31

Rp 7,813,822.26

Rp 14,778,696.33

Rp 62,080,391.86

Rp 756,354.56
Rp 120,574.24
Rp 215,681.10
Rp 3,833,686.47
Rp 4,926,296.37

Rp 2,037,082.07
Rp 2,037,082.07
#REF!
#REF!
NO URAIAN PEKERJAAN TOTAL HARGA

1 PEKERJAAN PERSIAPAN #REF!


2 Pekerjaan tanah Rp 4,811,724.93
3 Pekerjaan pondasi Rp 8,803,184.05
4 Pekerjaan beton Rp 4,694,424.92
5 Pekerjaan pembesian #REF!
6 Pekerjaan begisting Rp 30,542,568.31
7 Pekerjaan dinding Rp 137,223,064.67
8 Pekerjaan lantai Rp 4,069,190.96
9 Pekerjaan genteng Rp 14,123,789.93
10 Pekerjaan kayu Rp 62,080,391.86
11 Pekerjaan kunci dan kaca Rp 4,926,296.37
12 Pekerjaan plafon Rp 2,037,082.07
TOTAL #REF!
DAFTAR HARGA SATUAN PEKERJAAN

NO. KODE ANALISA URAIAN PEKERJAAN

1 2 3

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

1 1:19 Keselamatan Dan Kesehatan Kerja

2 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

3 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank

4 A.2.2.1.9 Membersihkan Lapangan dan Perataan

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m

2 A.2.3.1.9 Pengurugan Kembali

3 A.2.3.1.11 Urugan Pasir

4 A.2.3.1.14.B Mengurug Tanah Pilihan (Tanah Merah)

DAFTAR HARGA SATUAN PEKERJA

NO. KODE ANALISA URAIAN PEKERJAAN

1 2 3

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

1 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP

2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

1 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm

2 A.4.4.2.27 Pemasangan Acian

DAFTAR HARGA SATUAN PEKERJAAN

NO. KODE ANALISA URAIAN PEKERJAAN

1 2 3

VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U

1 A.4.6.1.1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II

2 A.4.6.1.4 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III

3 A.4.6.1.14.(a) Pembuatan&Pemasangan Konstruksi Kuda-kuda Kayu Jati Kelas II

4 A.4.6.1.15 Pemasangan konstruksi Nok, Gording, Muirplat & Jurai kayu Kruing klas I

5 A.4.6.1.18 Pemasangan Rangka Atap Sirap, Kayu Kruing


6 A.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III

7 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu Jati Kelas II

DAFTAR HARGA SATUAN PEKERJAAN

NO. KODE ANALISA URAIAN PEKERJAAN

1 2 3

VI A.4.1.1 HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56

2 A.4.1.1.21 Memasang Bekisting untuk Sloof

3 A.4.1.1.22 Memasang Bekisting untuk Kolom

4 A.4.1.1.23 Memasang Bekisting untuk Balok

VII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

1 A.4.5.2.2 Pemasangan 1 m2 atap genteng kodok glazuur

2 A.4.5.2.5 Pemasangan 1 m’ bubung genteng kodok glazuur

VIII A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT

1 A.4.5.1.7. Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm

XI A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA

1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa

3 A.4.6.2.5 Pemasangan Engsel Pintu

4 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu

5 A.4.6.2.17 Pemasangan Kaca tebal 5 mm

XII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 A.4.4.3.1 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm

2 A.4.4.3.6 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

5 A.4.7.1.5 Pengecatan 1 M2 Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)

3 A.4.7.1.10 Pengecatan 1m2 Tembok Baru (1lap.Plamur, 1lap Cat Dasar 2 lap. Cat Penutup)
HARGA SATUAN
SAT PEKERJAAN
(Rp)

4 Rp 5.00

RSIAPAN

Lump Sum Rp 704,000.00

m' Rp 923,268.50

m' #REF!

m2 Rp 16,335.00

TANAH

m3 Rp 75,927.50

m3 Rp 55,055.00

m3 Rp 331,331.00

m3 Rp 199,127.50

AN

HARGA SATUAN
SAT PEKERJAAN

(Rp)

4 Rp 5.00

PONDASI

m3 Rp 977,642.29

m3 Rp 605,830.50

GAN DINDING

m2 Rp 253,178.30

ESTERAN

m2 Rp 65,518.33

m2 Rp 37,617.25

AAN

HARGA SATUAN
SAT
PEKERJAAN

(Rp)

4 Rp 5.00

K A Y U

m3 Rp 17,839,910.00

m2 Rp 692,370.80

m3 Rp 19,354,538.50

m3 Rp 14,350,198.50

m2 Rp 146,194.62
m2 Rp 199,681.72

m' Rp 191,075.50

AAN

HARGA SATUAN
SAT PEKERJAAN

(Rp)

4 Rp 5.00

BETON

m3 Rp 1,197,754.61

m2 Rp 181,891.60

m2 Rp 461,667.80

m2 Rp 491,367.80

NUTUP ATAP

m2 Rp 162,220.30

m' Rp 150,486.78

GIT-LANGIT

m2 Rp 52,057.50

CI dan KACA

Buah Rp227,133.50

Buah Rp36,208.48

Buah Rp32,384.55

m2 Rp170,958.48

ANTAI DAN DINDING

m2 Rp 102,950.49

m2 Rp 105,382.59

NGECATAN

m2 Rp73,395.30

m2 Rp52,198.30
NO JENIS PEKERJAAN BOBOT (%)
WAKTU PELAKSANAAN
MINGGU KE
1 2 3

I PEKERJAAN PERSIAPAN #REF! #REF!


II Pekerjaan tanah #REF! #REF! #REF!
III Pekerjaan pondasi #REF! #REF! #REF!
IV Pekerjaan beton #REF! #REF!
V Pekerjaan pembesian #REF! #REF! #REF!
VI Pekerjaan begisting #REF! #REF!
VII Pekerjaan dinding #REF!
VIII Pekerjaan lantai #REF!
IX Pekerjaan genteng #REF!
X Pekerjaan kayu #REF!
XI Pekerjaan kunci dan kaca #REF!
XII Pekerjaan plafon #REF!
Total (%) #REF!
JUMLAH PER MINGGU #REF! #REF! #REF!
JUMLAH KOMULATIF #REF! #REF! #REF!
4 5 6 7 8
100%

75%
#REF! #REF!
#REF!
#REF! #REF! 50%
#REF! #REF! #REF!
#REF!
#REF! #REF!
#REF! #REF! #REF! 25%
#REF!
#REF!
0%
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

Anda mungkin juga menyukai