KONSULTAN PERENCANA
KONSULTAN REVIEW
KSO
2020
DAFTAR HARGA SATUAN DASAR TENAGA KERJA, BAHAN DAN PERALATAN
INDEKS KEMAHALAN KONSTRUKSI PROPINSI (IKKP) 1
HARGA UPAH
1 Pembantu/pekerja OH Rp 157,643.00
2 Kepala Tukang OH Rp 182,676.00
3 Mandor OH Rp 194,724.00
4 Tukang Gali OH Rp 166,729.00
5 Tukang Batu OH Rp 166,729.00
6 Tukang Kayu OH Rp 166,729.00
7 Tukang Besi OH Rp 166,729.00
8 Tukang Cat OH Rp 166,729.00
9 Tukang Listrik OH Rp 166,729.00
10 Tukang Pipa OH Rp 166,729.00
11 Tukang Las OH Rp 166,729.00
12 Operator OH Rp 194,274.00
13 Pembantu Operator OH Rp 166,729.00
14 Juru Ukur OH Rp 166,729.00
15 Pembantu Juru Ukur OH Rp 157,643.00
BAHAN KAYU
1 Kayu Jati (Kayu Kelas I) M3 Rp 29,500,000.00
2 Kayu Meranti balok 6/15 (Kayu Kelas II) M3 #DIV/0!
3 Kayu Meranti papan 3/20 (Kayu Kelas II) M3 #DIV/0!
4 Kayu Meranti usuk 5/7 (Kayu Kelas II) M3 #DIV/0!
5 Kayu Papan Bekisting 2/20, 3/20 M3 #DIV/0!
6 Kayu Reng/ Kaso Bekisting 3/4, 4/6, 5/7 M3 #DIV/0!
7 Kayu Balok Bekisting 5/7, 5/10, 6/12, 8/12 M3 #DIV/0!
8 Kayu Klos Jati 12/15 Lengkap dengan Begel Ø 16mm Unit #DIV/0!
9 Bambu Bongkotan btg #DIV/0!
10 Dolken kayu galam φ 8–10, pjg 4 m btg #DIV/0!
11 Kayu Bakar M3 #DIV/0!
12 Plywood Tebal 3 mm (122x244) lbr #DIV/0!
13 Plywood Tebal 4 mm (90x220) mm lbr #DIV/0!
14 Plywood Tebal 4 mm (1.2x2.4) lbr #DIV/0!
15 Plywood Tebal 9 mm (1.2x2.4) lbr #DIV/0!
16 Triplek Tebal 3 mm (1.2x2.4) lbr #DIV/0!
17 Triplek Tebal 4 mm (1.2x2.4) lbr #DIV/0!
18 Multipleks 18 mm lbr #DIV/0!
BAHAN BATU
1 Batu Belah 15-20 M3 #DIV/0!
2 Batu Pecah 5-7 cm M3 #DIV/0!
3 Batu Pecah 3-5 cm M3 #DIV/0!
4 Batu Pecah 2-3 cm M3 #DIV/0!
5 Batu Pecah 1-2 cm M3 #DIV/0!
6 Batu Kerikil beton 2-3 M3 #DIV/0!
7 Batu Kerikil beton (BD Kerikil = 1.350 Kg/m3) Kg #DIV/0!
8 Paving stone / Blok 8 cm M2 #DIV/0!
9 Paving Stone / Blok 6 cm M2 #DIV/0!
10 Kansten 40x20x8 cm Bh #DIV/0!
11 Grass Block : 20x40 Tbl 8cm Abu M2 #DIV/0!
12 Grass Block : 20x40 Tbl 10cm Abu M2 #DIV/0!
13 Buis beton U 20 bh #DIV/0!
14 Buis beton D 30 cm M1 #DIV/0!
15 Gorong-gorong D 60 cm M1 #DIV/0!
16 Agregat kasar M3 #DIV/0!
17 Agregat halus M3 #DIV/0!
BAHAN DINDING
1 Bata ringan uk. 60 x 20 x 10 cm Bh #DIV/0!
2 Bata ringan uk. 60 x 20 x 7,5 cm Bh #DIV/0!
3 Batu bata 5x11x22 cm Bh #DIV/0!
4 Batako 20x40x9 cm (press) Bh #DIV/0!
5 Kerawang press (roster) 18x18 cm Bh #DIV/0!
6 Kerawang (roster) 20x20 cm, beton Bh #DIV/0!
7 Batako kuning (putih/tras) Bh #DIV/0!
NO JENIS SATUAN Harga
READY MIX
1 Beton K250 ready mix M3 #DIV/0!
2 Beton K300 ready mix M3 #DIV/0!
3 Beton K350 ready mix M3 #DIV/0!
4 Tiang Pancang Beton Uk. 25 x 25 cm L = 12 M K.450 M1 #DIV/0!
5 Tiang Pancang Beton Uk. 30 x 30 cm L = 12 M K.450 M1 #DIV/0!
6 Air M3 #DIV/0!
BAHAN SEMEN
1 Mortar siap pakai utk spesi pasangan bata Kg #DIV/0!
2 Semen mortar siap pakai utk acian (instan) Kg #DIV/0!
3 Semen 50 Kg Zak #DIV/0!
4 Semen 40 Kg Zak #DIV/0!
5 Semen Kg #DIV/0!
6 Semen warna Kg #DIV/0!
7 sika grout 125 (25 kg) Zak #DIV/0!
8 sika grout 125 (1 kg) Kg #DIV/0!
BAHAN CAT
1 Cat besi/kayu setara Glotex Kg #DIV/0!
2 Cat meni (besi / kayu) cat pedang Kg #DIV/0!
3 Thinner A ltr #DIV/0!
4 Thinner B ltr #DIV/0!
5 Cat tembok Interior, warna Stand Kg #DIV/0!
6 Cat dasar interior Kg #DIV/0!
7 Cat tembok Exterior Kg #DIV/0!
8 Cat dasar exterior Kg #DIV/0!
9 Cat alkali (undercoat) Kg #DIV/0!
10 Minyak cat / Afdunner ltr #DIV/0!
11 Minyak pelumas ltr #DIV/0!
12 Teak Oil Cap 1 liter ltr #DIV/0!
13 Plamur Tembok Set. MATEX Kg #DIV/0!
14 Plamir Kayu / Besi Kg #DIV/0!
15 Lem kayu Kg #DIV/0!
16 Lem PVC bh #DIV/0!
17 Minyak cat / thinner ltr #DIV/0!
18 Dempul Kg #DIV/0!
19 Ampelas lbr #DIV/0!
20 Kuas 2inc bh #DIV/0!
21 Cat epoxy Kg #DIV/0!
KERAMIK
1 Keramik Dinding 20x25 polish Buah #DIV/0!
2 Keramik Lantai 20x20 un polish Buah #DIV/0!
3 Keramik Lantai 30x30 polos Buah #DIV/0!
4 HT Lantai 60x60 polish Buah #DIV/0!
5 HT Lantai 60x60 unpolish Buah #DIV/0!
6 HT Lantai 40x40 unpolish Buah #DIV/0!
7 HT step nosing 10x60 unpolish cutting Buah #DIV/0!
8 Plint HT 10x60 polish cutting Buah #DIV/0!
9 Keramik Lantai 30x30 Tactile (pemandu tunanetra) Buah #DIV/0!
10 Keramik Lantai 40x40 Tactile (pemandu tunanetra) Buah #DIV/0!
PENUTUP ATAP
1 Atap genteng metal Spandek berpasir T=0.4 MM M1 #DIV/0!
2 Nok Metal roof ( L = 120 cm ) Buah #DIV/0!
3 Genteng Buah #DIV/0!
4 Atap genteng metal berpasir 0,35mm Lembar #DIV/0!
5 Asbes gelombang besar uk. 80 x 180, 4 mm Lembar #DIV/0!
6 Asbes gelombang besar uk. 105 x 180, 5 mm Lembar #DIV/0!
7 Seng Gelombang BJLS 0,25 mm x 80 cm x 180 cm M2 #DIV/0!
8 Seng Plat BJLS 30 l=60 Cm Lembar #DIV/0!
9 Lisplank GRC 2,4 x 0,2 m, t = 9 mm M1 #DIV/0!
10 Roof Bottom/Reng R 33-0.45 M1 #DIV/0!
11 Baja ringan C 75.75 M1 #DIV/0!
12 Alumunium foil 2sisi M2 #DIV/0!
13 Profil Reng baja ringan M1 #DIV/0!
14 Dinabolt bh #DIV/0!
15 Atap Transparant UPVC M1 #DIV/0!
16 Nok UPVC M1 #DIV/0!
17 Self drilling screw dia 6 x 20 mm (truss Screw) Buah #DIV/0!
18 Pasang ijuk untk resapan Kg #DIV/0!
19 Insulasi Powder M2 #DIV/0!
PLAFOND
1 Gypsum Board uk. 1,2 x 2,4 t : 9 mm Lembar #DIV/0!
2 Kalsiboard 120 x 240, tebal 6 mm Lembar #DIV/0!
3 GRC board 120 x 240, tebal 4 mm Lembar #DIV/0!
4 List gypsum 5 cm M1 #DIV/0!
5 List Kayu Profil 5 cm M1 #DIV/0!
6 Joint tape Rol #DIV/0!
7 Kompon (Compound, 20 kg) Zak #DIV/0!
8 Kompon (1 kg) Kg #DIV/0!
9 Paku Sekrup (1box = 900 bh) Buah #DIV/0!
10 Rockwool (peredam suara dan panas) M2 #DIV/0!
BAHAN KACA
1 Kaca Bening 3 mm M2 #DIV/0!
2 Kaca Bening 5 mm M2 #DIV/0!
3 Kaca Bening 6 mm M2 #DIV/0!
4 Kaca Bening 8 mm M2 #DIV/0!
5 Kaca Tempered 8 mm M2 #DIV/0!
6 Glass Block 20 x 20 Bh #DIV/0!
7 Jendela Nako Bh #DIV/0!
BAHAN LAIN-LAIN
1 Waterstop lebar 230mm - 320mm M1 #DIV/0!
2 Waterproofing liquid Kg #DIV/0!
3 Water proofing Membrane M1 #DIV/0!
4 Material Primer Bitumen Kg #DIV/0!
5 Pipa PVC 3/4" M1 #DIV/0!
6 Minyak Bekisting Liter #DIV/0!
7 Solar INDUSTRI Liter #DIV/0!
8 Bahan Bakar Mesin (BBM) non-Subsidi Liter #DIV/0!
9 Railing hollow 4/4 & 2/4 tebal 1,2mm, termasuk finishing by specialist M1 #DIV/0!
10 Kanstein uk. 8.40.20 sekeliling bangunan M1 #DIV/0!
11 Buis beton setengah lingkaran 30 cm M1 #DIV/0!
12 Gorong-gorong dia. 60 cm menuju ke riol kota M1 #DIV/0!
13 Grill penutup saluran, besi siku 50.50.5 + plat strip M1 #DIV/0!
14 Tangga Lipat Unit #DIV/0!
15 Tangga Dalam 'M' GWT + cat ( model gantung lengkap terpasang ) Unit #DIV/0!
16 Tangga Luar 'M' GWT + cat ( model gantung lengkap terpasang ) Unit #DIV/0!
17 Penutup mainhole baja (terpasang) Unit #DIV/0!
18 List plafond gypsum 5/5 M1 #DIV/0!
19 Shower Unit #DIV/0!
20 Talang Zincalum t= 0,35mm, L=90 cm M1 #DIV/0!
21 Minyak Tanah Liter #DIV/0!
22 Air M3 #DIV/0!
23 Pengeboran tanah D 60 cm M1 #DIV/0!
24 Pengeboran tanah D 80 cm M1 #DIV/0!
25 Menie Cat Besi Kg #DIV/0!
Handrail Stainless Kloset, Bahan pipa 11/4 in tbl 1mm+Ukuran Lebar 80cm x
26 Unit #DIV/0!
tinggi 75cm Berat 3kg
27 Pipa Galvanis 4" 3,5 mm Kg #DIV/0!
28 CAT DUCO NIPPE 2000 - SUPER BLACK 480 1 LITER Kg #DIV/0!
29 Mur Baut A325 HTB Dia 12 mm Bh #DIV/0!
30 Pipa Galvanis 2,5" 3,5 mm Kg #DIV/0!
31 Pipa Galvanis 3" 3,5 mm Kg #DIV/0!
32 Cermin Toilet bh #DIV/0!
33 Jaring Nyamauk M2 #DIV/0!
34 Coring Beton Untuk Pipa Titik #DIV/0!
35 ACRYLIC 3 MM – 4 x 8 BENING M2 #DIV/0!
36 Cat ACRYLIC Ls #DIV/0!
37 Lakban Kertas Ls #DIV/0!
38 Pen acrylic Bh #DIV/0!
39 Pasang Pipa PVC dia 100 + Acsessories M1 #DIV/0!
40 Pasang Pipa PVC dia 50 + Acsessories M1 #DIV/0!
41 Pasang Pipa Vent Unit #DIV/0!
NO JENIS SATUAN Harga
SEWA ALAT
1 Sewa Mobil Pickup (Kendaraan Pengangkut) Sewa-Hari #DIV/0!
2 Sewa alat ukur theodolit Sewa-Hari #DIV/0!
3 Sewa tripot/Tackel & handle crane 2T Sewa-Hari #DIV/0!
4 Sewa alat bantu ls #DIV/0!
5 Sewa alat bantu Jam #DIV/0!
6 Sewa alat test Jam #DIV/0!
7 Sewa dump truck 5 m3 Jam #DIV/0!
8 Sewa dump truck 8 - 10 m3 Jam #DIV/0!
9 Molen (concrete mixer 0.125 m3) Sewa-Hari #DIV/0!
10 Molen (concrete mixer 0.35 m3) Sewa-Hari #DIV/0!
11 Pompa dan conveyor beton Jam #DIV/0!
12 Crane < 10 ton Jam #DIV/0!
13 Crane > 10 ton Jam #DIV/0!
14 Crane > 30 ton Jam #DIV/0!
15 Lift sampai dengan tinggi maksimum 12 m Jam #DIV/0!
16 Alat Pancang + Hammer 2 ton Jam #DIV/0!
17 Alat Penyambung Tiang Pancang Jam #DIV/0!
18 Tripod Jam #DIV/0!
19 Pemadat Timbunan (stamper) Sewa-Hari #DIV/0!
20 Sewa stamper Jam #DIV/0!
21 Jack Hammer Sewa-Hari #DIV/0!
22 Concrete Vibrator Jam #DIV/0!
23 Cronrete pump Jam #DIV/0!
24 Sewa Molen hr #DIV/0!
25 Excavator Jam #DIV/0!
26 Sewa Mesin las Jam #DIV/0!
27 Sewa Alat Bor Tanah 60 cm Jam #DIV/0!
28 Sewa Alat Bor Tanah D 80 Jam #DIV/0!
29 Sewa Alat Bor Tanah D 100 Jam #DIV/0!
30 Crawler Crane 35 ton Jam #DIV/0!
31 Sewa Mobil Buang Lumpur Bore Pile Rit #DIV/0!
PEKERJAAN LUMPSUM
1 Foto Proyek 3 Fase (warna) ls #DIV/0!
2 Air Kerja ls #DIV/0!
3 Listrik Kerja ls #DIV/0!
4 Pekerjaan mobilisasi dan demobilisasi ls #DIV/0!
5 Pasang Kerangkeng Pompa Lengkap atap pelindung ls #DIV/0!
6 PDA TEST PAKET #DIV/0!
NO JENIS SATUAN Harga
c Pelatihan K3;
- Bekerja di Ketinggian Org #DIV/0!
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS) Org #DIV/0!
- Analysis Keselamatan Pekerjaan Org #DIV/0!
- Perilaku Berbasis Keselamatan (Budaya K3) Org #DIV/0!
- P3K Org #DIV/0!
d Simulasi K3; Org #DIV/0!
e Spanduk (banner) ; Lb #DIV/0!
f Poster; Lb #DIV/0!
g Papan Informasi K3. Bh #DIV/0!
F BAHAN PIPA AC
1 Pipa Drain AC M1 #DIV/0!
2 Isolasi Pipa AC Bh #DIV/0!
G BAHAN VALVE
1 Gate valve 10K 3/4" (20 mm) Bh #DIV/0!
2 Gate valve 10K 1" (25 mm) Bh #DIV/0!
3 Gate valve 10K 1,25" (32 mm) Bh #DIV/0!
4 Gate valve 10K 1,5" (40 mm) Bh #DIV/0!
5 Gate valve 10K 2" (50 mm) Bh #DIV/0!
6 Gate valve 10K 2,5" (65 mm) Bh #DIV/0!
7 Gate valve 10K 3" (80 mm) Bh #DIV/0!
8 Gate valve 10K 4" (100 mm) Bh #DIV/0!
9 Gate valve 10K 6" (150 mm) Bh #DIV/0!
10 Gate valve 16K 2" (50 mm) Bh #DIV/0!
11 Gate valve 16K 4" (100 mm) Bh #DIV/0!
12 Gate valve 16K 6" (150 mm) Bh #DIV/0!
13 Butterfly valve 10K 6" (150 mm) Bh #DIV/0!
14 Check valve 10K 2" (50 mm) Bh #DIV/0!
15 Check valve 16K 4" (100 mm) Bh #DIV/0!
16 Check valve 16K 6" (150 mm) Bh #DIV/0!
17 strainer 10K 2" (50 mm) Bh #DIV/0!
18 strainer 16K 2" (50 mm) Bh #DIV/0!
19 strainer 16K 4" (100 mm) Bh #DIV/0!
20 flexible joint 10K 2" (50 mm) Bh #DIV/0!
21 flexible joint 10K 4" (100 mm) Bh #DIV/0!
22 foot valve 10K 2" (50 mm) Bh #DIV/0!
23 foot valve 10K 4" (100 mm) Bh #DIV/0!
24 safety valve 10K 4" (100 mm) Bh #DIV/0!
25 flow meter 10K 4" (100 mm) Bh #DIV/0!
26 Roof drain 2" (50 mm) Bh #DIV/0!
27 Roof drain 3" (80 mm) Bh #DIV/0!
28 Roof drain 4" (100 mm) Bh #DIV/0!
29 Roof drain 5" (125 mm) Bh #DIV/0!
30 Floor drain 2" (50 mm) Bh #DIV/0!
31 Clean out (FCO) 3" (80 mm) Bh #DIV/0!
32 Clean out (FCO) 6" (150 mm) Bh #DIV/0!
33 Clean out (FCO) 2" (50 mm) Bh #DIV/0!
34 Clean out (FCO) 4" (100 mm) Bh #DIV/0!
35 Meter air dia. 20 mm Bh #DIV/0!
36 Meter air dia. 50 mm Bh #DIV/0!
37 Pressure Switch Bh #DIV/0!
38 Pressure Gauge Bh #DIV/0!
H PERALATAN HYDRANT
1 Indoor Hydran Box (IHB) Type B Bh #DIV/0!
2 Outdoor Hydran Box (OHB) Type C Bh #DIV/0!
3 Hydran pillar 2 ways (Ex. lokal) Bh #DIV/0!
4 Siamesse connection (ex. Local) Bh #DIV/0!
5 Automatic Air Vent Bh #DIV/0!
6 Fire Extinguisher Type CO2 Class B,C Kap. 4,6 kg Bh #DIV/0!
7 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg Bh #DIV/0!
I FAN
1 Exhaust Ceiling Mounted Kap. 200 Cfm Bh #DIV/0!
2 Exhaust Ceiling Mounted Kap. 100 Cfm Bh #DIV/0!
3 Grille 200x200 mm Bh #DIV/0!
4 Grille 100x100 mm Bh #DIV/0!
5 Kipas angin baling Bh #DIV/0!
J TEST
Test Commisioning lot #DIV/0!
NO JENIS SATUAN Harga
A BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring Ttk #DIV/0!
2 Lampu TL 1 x 10 w Bh #DIV/0!
3 Lampu TL 1 x 20 w Bh #DIV/0!
4 Lampu TL 1 x 40 w Bh #DIV/0!
5 Lampu pijar 25 w Bh #DIV/0!
6 Lampu pijar 40 - 100 w Bh #DIV/0!
7 Lampu TKI, TL 2x36 watt Bh #DIV/0!
8 Lampu V-SHAPE, TL 2x36 watt Bh #DIV/0!
9 Lampu TL Balk 1x18 watt Bh #DIV/0!
10 Lampu TL Balk 1x18 watt + Battery Bh #DIV/0!
11 Lampu TL Balk 1x36 watt Bh #DIV/0!
12 Lampu Baret 20 watt + Battery Bh #DIV/0!
13 Lampu Baret 20 watt Bh #DIV/0!
14 Lampu Baret 32 watt + Battery Bh #DIV/0!
15 Lampu Baret 32 watt Bh #DIV/0!
16 Lampu LED 7 watt Bh #DIV/0!
17 Lampu LED 7 watt c/w battery charger Bh #DIV/0!
18 Lampu LED 9 watt Bh #DIV/0!
19 Lampu LED 9 watt c/w battery charger Bh #DIV/0!
20 Lampu Downlight 13 watt Bh #DIV/0!
21 Lampu Downlight 18 watt Bh #DIV/0!
22 Lampu Taman SL-26 watt Bh #DIV/0!
23 Lampu Exit 18 watt + Battery Bh #DIV/0!
24 Isolator Bh #DIV/0!
25 Las Doof Bh #DIV/0!
26 Fiting Plafond Bh #DIV/0!
27 T dos PVC Bh #DIV/0!
28 Stop Kontak Wall Type Bh #DIV/0!
29 Stop Kontak Floor Type Bh #DIV/0!
30 Stop Kontak-AC Bh #DIV/0!
31 Stop Kontak-TV Bh #DIV/0!
32 Stop Kontak-TELEPON Bh #DIV/0!
33 Saklar tunggal Bh #DIV/0!
34 Sakla ganda Bh #DIV/0!
35 Saklar Hotel 1 gang Bh #DIV/0!
36 Saklar Hotel 2 gang Bh #DIV/0!
37 Kabel NYA 1000 Volt 1,5 mm M1 #DIV/0!
38 Kabel NYA 1000 Volt 2x1,5 mm M1 #DIV/0!
39 Kabel NYA 1000 Volt 3x1,5 mm M1 #DIV/0!
40 Kabel NYA 1000 Volt 2,5 mm M1 #DIV/0!
41 Kabel NYA 1000 Volt 2x2,5 mm M1 #DIV/0!
42 Kabel NYA 1000 Volt 4 mm M1 #DIV/0!
43 Kabel NYA 1000 Volt 6 mm M1 #DIV/0!
44 Kabel NYA 1000 Volt 10 mm M1 #DIV/0!
45 Kabel NYA 1000 Volt 16 mm M1 #DIV/0!
46 Kabel NYA 1000 Volt 25 mm M1 #DIV/0!
47 Kabel NYA 1000 Volt 35 mm M1 #DIV/0!
48 Kabel NYA 1000 Volt 50 mm M1 #DIV/0!
49 Kabel NYA 1000 Volt 70 mm M1 #DIV/0!
50 Kabel NYA 1000 Volt 95 mm M1 #DIV/0!
51 Kabel NYA 1000 Volt 120 mm M1 #DIV/0!
52 Kabel NYA 1000 Volt 150 mm M1 #DIV/0!
53 Kabel NYA 1000 Volt 185 mm M1 #DIV/0!
54 Kabel NYMHY 300/750 Volt 2x1,5 mm2 M1 #DIV/0!
55 Kabel NYM 300/750 Volt 3x1,5 mm2 M1 #DIV/0!
56 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 #DIV/0!
57 Kabel NYM 300/750 Volt 3x4 mm2 M2 #DIV/0!
58 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 #DIV/0!
59 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 #DIV/0!
60 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 #DIV/0!
61 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 #DIV/0!
62 Kabel NYY 0,6/1 Kv 4x10 mm2 M1 #DIV/0!
63 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 #DIV/0!
64 Kabel NYY 0,6/1 Kv 4x25 mm2 M1 #DIV/0!
65 Kabel NYY 0,6/1 Kv 4x35 mm2 M1 #DIV/0!
66 Kabel NYY 0,6/1 Kv 4x50 mm2 M1 #DIV/0!
67 Kabel NYY 0,6/1 Kv 4x70 mm2 M1 #DIV/0!
68 Kabel NYY 0,6/1 Kv 4x95 mm2 M1 #DIV/0!
69 Kabel NYY 0,6/1 Kv 4x120 mm2 M1 #DIV/0!
70 Kabel NYY 0,6/1 Kv 4x150 mm2 M1 #DIV/0!
71 Kabel NYY 0,6/1 Kv 4x185 mm2 M1 #DIV/0!
72 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 #DIV/0!
73 Kabel NYY 0,6/1 Kv 4x300 mm2 M1 #DIV/0!
74 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2 M1 #DIV/0!
75 Kabel NYFGBY 0,6/1 Kv 4x10 mm2 M1 #DIV/0!
76 Kabel NYFGBY 0,6/1 Kv 4x240 mm2 M1 #DIV/0!
77 Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 #DIV/0!
78 Kabel FRC 0,6/1 Kv 4Cx4 mm2 M1 #DIV/0!
79 Kabel FRC 0,6/1 Kv 4Cx6 mm2 M1 #DIV/0!
80 Kabel Coaxial 7C-2V M1 #DIV/0!
81 Kabel Coaxial 5C-2V M1 #DIV/0!
82 Kabel ITC 4x0,6 mm2 M1 #DIV/0!
83 Pipa Konduit HI dia.20 mm M1 #DIV/0!
84 Pipa Konduit HI dia.32 mm M1 #DIV/0!
85 Pipa Konduit HI 2 x dia.32 mm M1 #DIV/0!
86 Heat detector BH #DIV/0!
87 Smoke detector BH #DIV/0!
88 Manual push button BH #DIV/0!
89 Bell alarm BH #DIV/0!
90 Lampu indikator BH #DIV/0!
91 End of Line Resistor BH #DIV/0!
92 MCFA-10 Zone BH #DIV/0!
93 terminal Fire alarm BH #DIV/0!
94 Terminal Box TV BH #DIV/0!
95 Antena UHF,10 element BH #DIV/0!
96 Antena VHF,10 element BH #DIV/0!
97 Master Amplifier BH #DIV/0!
98 Arester Lightning Protection R=35 M BH #DIV/0!
99 Arester Lightning Protection R=50 M BH #DIV/0!
100 Sekrering Tunggal "LN" biasa Bh #DIV/0!
NO JENIS SATUAN Harga
B TEST
1 Testing & Commissioning Lot #DIV/0!
2 Biaya Perijinan Depnaker Lot #DIV/0!
3 Test Connection Link BH #DIV/0!
B PEKERJAAN LUMPSUM
1 Biaya pasang baru daya listrik PLN VA #DIV/0!
2 Pekerjaan Pasang Baru Daya Listrik PLN 66000 VA Lot #DIV/0!
3 #DIV/0!
REKAPITULASI
BILL OF QUANTITY (BOQ)
JUMLAH HARGA
No. JENIS PEKERJAAN
( Rp. )
PEKERJAAN PERSIAPAN Rp -
TOTAL I + II : Rp -
DIBULATKAN : Rp -
PPN 11 % : Rp -
TOTAL : Rp -
DI BULATKAN : Rp -
Terbilang :
……………………………………
DIREKTUR
I II III IV V VI VII
WAKTU
No. URAIAN PEKERJAAN BOBOT (M) KET
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28
A.1. PEKERJAAN LANTAI 1 Rp - Err:509 6 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A.2. PEKERJAAN LANTAI 2 Rp - Err:509 6 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
B.1. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) Rp 674,190,000.00 Err:509 4 Err:509 Err:509 Err:509 Err:509
B.2. PEKERJAAN STRUKTUR GWT DAN RUANG POMPA Rp 444,029,068.90 Err:509 3 Err:509 Err:509 Err:509
A.1. PEKERJAAN LANTAI SATU Rp - Err:509 8 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A.2. PEKERJAAN LANTAI DUA Rp - Err:509 8 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A.3. PEKERJAAN LANTAI DAK DAN ATAP Rp - Err:509 4 Err:509 Err:509 Err:509 Err:509
B.2. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN Rp - Err:509 3 Err:509 Err:509 Err:509
A.1. PEKERJAAN LANTAI 1 Rp - Err:509 9 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A.2. PEKERJAAN LANTAI 2 Rp - Err:509 9 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A.3. PEKERJAAN LANTAI ATAP Rp - Err:509 5 Err:509 Err:509 Err:509 Err:509 Err:509
A.5. PEKERJAAN SISTEM PENTANAHAN Rp - Err:509 5 Err:509 Err:509 Err:509 Err:509 Err:509
A.6. PEKERJAAN PENANGKAL PETIR (FARADAY) Rp - Err:509 5 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 6 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) Rp - Err:509 7 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 116 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - - - -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REKAPITULASI
BILL OF QUANTITY (BOQ)
- Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 5% 41.28 M3 0.00
2 Kusen Aluminium Powder Coating 3" + Daun Rk Alum + Kaca Clear 8mm +BV kaca clear 6mm+ Jaring Nyamuk (lengkap 2.00 Unit 0.00
terpasang) type P-1
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood + BV kaca clear 6mm+ Jaring Unit
3 Nyamuk (lengkap terpasang) type P-2 2.00 0.00
4 Kusen UPVC, Rangka Daun Pintu UPVC. + Louvre UPVC (lengkap terpasang) type PT 10.00 Unit 0.00
Unit
5 Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood (lengkap terpasang) type PS 2.00 0.00
Unit
6 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J1 4.00 0.00
Unit
7 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J2 4.00 0.00
8 Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 21.00 Unit 0.00
4 Pasang Homogenous Tile Step Nozing Tangga Entrance Uk. 10 x 60 cm 24.00 M1 0.00
5 Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela + Canopy Entrance 13.76 M2 0.00
I.7 PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING BANGUNAN 0.00
1 Pek. Pasang Hand Railling Ramp Pipa Besi Hitam (Black Steel) dia 3/4" + Fin. Cat 20.29 M1 0.00
2 Pek. Pasang Hand Railling Ramp Pipa Besi Hitam (Black Steel) dia 1" + Fin. Cat 9.50 M1 0.00
3 Pek. Pasang Hand Railling Ramp Pipa Besi Hitam (Black Steel) dia 2" + Fin. Cat 10.81 M1 0.00
4 Pasang Beton Ramp 0.53 M3 0.00
5 Pasang Homogenous Tile unpolish lantai Ramp Uk. 60x60 8.76 M2 0.00
6 Pasangan rollag bata tangga entrance depan & samping + Ramp 16.37 M2 0.00
4 Kusen UPVC, Rangka Daun Pintu UPVC. + Louvre UPVC (lengkap terpasang) type PT 10.00 Unit 0.00
Unit
5 Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood (lengkap terpasang) type PS 2.00 0.00
6 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J1 4.00 Unit 0.00
7 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J2 4.00 Unit 0.00
8 Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 21.00 Unit 0.00
9 Pasang Ornamen Type OW 6.73 M2 0.00
10 Pasang Ornamen, Type JOW 10.00 Unit 0.00
11 Railing Balkon type R1 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & asesoris & terpasang 2.00 Unit 0.00
12 Railing Balkon type R2 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & asesoris & terpasang 1.00 Unit 0.00
2 Pek. Pasang Keramik lantai Balkon, R Cuci dan Toilet Uk. 60x60 cm 40.53 M2 0.00
4 Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R Cuci 40.53 M2 0.00
5 Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela 13.76 M2 0.00
II BAK KONTROL
B.2. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN SUB TOTAL 0.00
Page 47 of 47
A.4. PEKERJAAN UTILITAS 0.00
1. INSTALASI PANEL Rp -
2. INSTALASI KABEL FEEDER Rp -
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp -
4. INSTALASI PENERANGAN & STOP KONTAK Rp -
PEKERJAAN
A.5. SISTEM PENTANAHAN 0.00
1. INSTALASI Rp -
Page 48 of 47
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
Page 49 of 47
3. PEMIPAAN AIR HUJAN 0.00
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
M1
- dia. 150 10.80 0.00
- dia. 100
M1 21.60 0.00
- dia. 80
M1 42.60 0.00
Page 50 of 47
6. INSTALASI KABEL FEEDER 0.00
a. Kabel Distribusi Daya dari MDP :
M1
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.1 5.00 0.00
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00 0.00
- Tee W200 x H100 bh 1.00 0.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) 3% lot 1.00 0.00
Page 51 of 47
Roof Drain, Cast Iron
- dia. 80 bh 2.00 0.00
Page 52 of 47
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 0.00
- Lampu LED 9 Watt bh 17.00 0.00
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 4.00 0.00
- Lampu LED 7 Watt bh 12.00 0.00
- Lampu LED 7 Watt, c/w battery charger (Selasar) bh 2.00 0.00
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh 1.00 0.00
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 18.00 0.00
- Saklar 2 gang bh 9.00 0.00
- Saklar Hotel 1 gang bh 1.00 0.00
- Saklar Hotel 2 gang bh 2.00 0.00
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 12.00 0.00
- dia. 32 bh 1.00 0.00
Page 53 of 47
2. PEMIPAAN AIR HUJAN 0.00
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
- dia. 150
M1 5.00 0.00
- dia. 100
M1 10.00 0.00
- dia. 80
M2 15.00 0.00
b. PEKERJAAN LV-MDP
Pengadaan dan pemasangan LV-MDP, dengan komponen panel, unit 1.00 0.00
sbb :
- MCCB 3P, 63 A
- MCCB 3P, 20 A
- MCCB 3P, 16 A
- MCB 3P, 16 A
- Contacto, (timer switch)
- Earth Fault Relay
- Over Current Relay
- Over / Under Voltage Relay
- Power Factor-meter
Page 54 of 47
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P
- CU Bar 5 x 80 A
- Accessories & Termination
- Box Panel
Page 55 of 47
c. P-POMPA AIR BERSIH
Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan kompo- unit 1.00 0.00
nen panel, sbb :
- MCB 3P, 20 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel
Page 56 of 47
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 0.00
a. Ruang Pompa
- TL 1 x 18 W, TL Balk Type bh 2.00 0.00
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1.00 0.00
- Saklar 1 gang bh 2.00 0.00
1. INSTALASI 0.00
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
Page 57 of 47
A.6. PEKERJAAN PENANGKAL PETIR (FARADAY) 0.00
1. INSTALASI 0.00
- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 5.00 0.00
- Grounding box/ Bak kontrol 40x40x30 cm unit 1.00 0.00
- Down Conduktor BC 50mm + accessories
M1 58.00 0.00
- Grounding System max. 2 ohm lot 1.00 0.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Testing & Comissioning included perijinan dari DEPNAKER lot 1.00 0.00
Page 58 of 47
BILL OF QUANTITY (BOQ)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a LANTAI 1
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3.00 0.00
b LANTAI 2
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3.00 0.00
2 LANTAI 2
- Exhaust kap 200 Cfm ( ceiling Mounted ) unit 2.00 0.00
- Kipas Angin Baling unit 4.00 0.00
Page 59 of 47
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) 0.00
Page 60 of 47
4 PEKERJAAN SHALLOW WELL unit 1.00 0.00
a Pembuatan / Pengeboran sumur shallow well
- Kedalaman + 50 Meter
Pipa Casing , Pipa GIP Medium dia 150mm
Pipa Rising dia 80mm
Pipa screen dia 80mm
b Pengadaan dan pemasangan pompa shallow well
- Kapasitas(deb air)150 s/d 200 Lpm,
pengadaan dan pemasangan pipa konstruksi : 1 unit
c Instalasi kabel Kontrol WLC : 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit
e Gate Valve dia 2" : 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 unit
g Panel kontrol shallow well type outdoor : 1 unit
h Pengujian kwalitas air ke laboratorium : 1 unit
i Testing Comissioning & Training : 1 unit
j Material & Alat Bantu : 1 unit
Page 61 of 47
- GIP med dia. 100 ( pipa header ) set 1.00 0.00
- Instalasi pemipaan area pompa 10% lot 1.00 0.00
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1.00 0.00
8 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 6.00 0.00
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 40 m 64.60 0.00
1 Pekerjaan Pasang Baru Daya Listrik PLN 13,2 KVA (13200 VA) Lot 1 0.00
- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )
Page 62 of 47
III PEKERJAAN INSTALASI KABEL FEEDER 0.00
Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1 m' 10.00 0.00
- NYY 4 x 4 mm2 ke LP-2 m' 10.00 0.00
- Proteksi Kabel dengan Pipa Gip Dia 100 m' 20.00 0.00
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya