Anda di halaman 1dari 12

No.

Uraian Satuan Harga Satuan Keterangan


Tenaga :
1 Pekerja oh 30,000
2 Tukang oh 40,000
3 Mandor oh 30,000
Bahan :
1 Semen / PC (50 kg) kg 1,250 62,500
2 Pasir Beton m3 145,000
3 Koral Beton m3 140,000
4 Pasir Pasang m3 110,000
5 Batu belah m3 85,000
6 Pasir urug m3 100,000
7 Paving abu-abu tbl 6 cm m2 47,000
8 Besi Beton Polos kg 8,200
10 Kawat Beton kg 17,000
12 balok 6/12 pjng 4 m btg 69,000
13 Papan Kayu Albasia 2/30 2m lbr 15,500
14 Paku kg 15,000
Alat :
1 Concrete mixer 125 l jam 50,000
4 Ember bh 8,000
5 Keranjang bh 15,000
6 Benang roll 5,000
Desa : Tambi
HARGA SATUAN
Desa/ Kel: Tambi Jenis Pras. : Rabat Beton
Kecamatan : Kejajar Lokasi :Rejosari
Kabupaten: Wonosobo Volume : 276 m
A. Pekerjaan Rabat Beton
a. Volume Rabat
STA Tinggi Lebar Pj Jml Volume
1 0.12 0.95 49.00 2.00 11.17
2 0.12 0.95 50.00 2.00 11.40
3 0.12 0.95 50.00 2.00 11.40
4 0.12 0.95 50.00 2.00 11.40
5 0.12 0.95 46.00 2.00 10.49
6 0.12 0.95 31.00 2.00 7.07
Total PJ Rabat = 276.00 Total Vol.Pasangan Rabat Beton = 62.93 m3
b. Bekesting
STA Tinggi Lebar Pj Jml
0+276 0.12 276 2.00 Dua kali Pakai 66.24
0.12 1.90 276 Satu Kali Pakai 62.93
Total Luas Bekesting = 129.17 m2
Asumsi : Papan 2/30 2 m Untuk luas Bekesting = 0.40 m2
Sehingga kebutuhan papan =
Asumsi : balok 6/12 4 m Untuk luasan Rabat = 4.00 m2
Sehingga kebutuhan Balok =
Asumsi : 1 kg Paku Untuk luasan rabat = 8.00 m2
Sehingga kebutuhan Paku
B. Pekerjaan Paving
STA Tinggi Lebar Pj Jml Luas
1 0.12 0.60 49.00 1.00 29.40
2 0.12 0.60 50.00 1.00 30.00
3 0.12 0.60 50.00 1.00 30.00
4 0.12 0.60 50.00 1.00 30.00
5 0.12 0.60 46.00 1.00 27.60
6 0.12 0.60 31.00 1.00 18.60
Total Luas Paving = 165.60 m2
B. Pekerjaan Talud
a. Pasangan Batu Kali
titik a b d H A1 A2 A total Jml L Volume
ka 1 0.30 0.60 0.50 1.50 0.68 0.30 0.98 1.00 30.00 29.25 m3
29.25 m3
C. Pekerjaan Plesteran
STA a a+ 0.05 L Luas
0+30 0.30 0.35 30.00 10.50 m2
TAKE OF SHEET
Kg
4.00
276.00
=
Lbr
Btg 69
= 323
129.17
0.40
Dibuat Oleh :
KPMD/TPK
129.17
8.00
= 16.15
+ - +
^- e^
`+ ^`+ .
e- ` e^
e+e

.
H
d
b
a
lebar
rabat beton
tinggi
lebar
paving
lebar
rabat beton
Rabat Beton 1:3:5
Telasah Lama
Paving Abu-abu 6 cm
Pasir Urug
KODE
K.720
PROPINSI KODE KODE
JAWA TENGAH 33 07
JUMLAH JUMLAH UPAH BIAYA SUB TOTAL
ORANG ( Hr-Org ) ( Rp./Hr/Org ) ( Rp. ) ( Rp. )
P
E Mandor 10.488 1.00 L.061 10.49 30,000.00 314,640.00
K Tukang 10.488 1.00 L.079 10.49 40,000.00 419,520.00
E Pekerja 125.856 1.00 L.101 125.86 30,000.00 3,775,680.00
R
J
A
4,509,840.00
VOLUME SATUAN KODE HARGA BIAYA SUB JUMLAH
M SAT.( Rp. ) ( Rp. ) ( Rp. )
A
T Pasir beton 31.464 m3 M.041 145,000.00 4,562,280.00
E Semen PC 335.616 zak (50kg) M.080 62,500.00 20,976,000.00
R Batu pecah tersaring 52.440 m3 K.017 140,000.00 7,341,600.00
I
A
L
32,879,880.00
JUMLAH HARI KODE JAM BIAYA BIAYA SUB JUMLAH
P ALAT KERJA KERJA ( Rp./JAM ) ( Rp. / JAM ) ( Rp. )
E
R Concrete mixer 125 l 1.00 1.00 E.252 62.928 50,000.00 3,146,400.00
A
L
A
T
A
N
3,146,400.00
JUMLAH (Rp) 40,536,120.00
VOLUME 62.93 SATUAN : M3 644,166.67 per M3
QUANTITY
PERALATAN
HARGA SATUAN ( Rp ) :
P E K E R J A HARI KODE
MATERIAL
KABUPATEN DISUSUN OLEH :
WONOSOBO TPK DESA/KEL : TAMBI
DINAS PEKERJAAN UMUM
KABUPETEN WONOSOBO BETON NON STRUKTUR / RABAT KLAS K 125
( MENGGUNAKAN BURUH )
DAFTAR ANALISA
ANALISA BIAYA PEKERJAAN
NAMA DESA : Tambi
KEGIATAN : Rabat Beton
LOKASI :Rejosari
KECAMATAN : Kejajar
ANALISA H. SATUAN UPAH BAHAN JUMLAH
K.720 6 m BETON NON STRUKTUR / RABAT KLAS K 125
3.000 m3 Pasir beton 145,000 435,000 435,000
32.000 zak Semen PC 62,500 2,000,000 2,000,000
5.000 m3 Batu pecah tersaring 140,000 700,000 700,000
5.000 jam Concret Mixer 50,000 250,000 250,000
1.000 oh Mandor 30,000 30,000 30,000
1.000 oh Tukang 40,000 40,000 40,000
12.000 oh Pekerja 30,000 360,000 360,000
430,000 3,385,000 3,815,000
10.49 m BETON NON STRUKTUR / RABAT KLAS K 125
31.464 m3 Pasir beton 145,000 4,562,280 4,562,280
335.616 zak Semen PC 62,500 20,976,000 20,976,000
52.440 m3 Batu pecah tersaring 140,000 7,341,600 7,341,600
52.440 set Concret Mixer 50,000 2,622,000 2,622,000
10.488 oh Mandor 30,000 314,640 314,640
10.488 oh Tukang 40,000 419,520 419,520
125.856 oh Pekerja 30,000 3,775,680 3,775,680
4,509,840 35,501,880 40,011,720
VII.30a 1 m2 Pasang bekisting Material tersedia
0.3000 oh pekerja 30,000 9,000 9,000
0.2600 oh tukang kayu 40,000 10,400 10,400
0.0050 oh mandor 30,000 150 150
19,550 - 19,550
129.17 m2 Pasang bekisting Material tersedia
38.7504 oh pekerja 30,000 1,162,512 1,162,512
33.5837 oh tukang kayu 40,000 1,343,347 1,343,347
0.6458 oh mandor 30,000 19,375 19,375
2,525,234 - 2,525,234
URAIAN
DAFTAR ANALISA
DAFTAR KEBUTUHAN UPAH DAN BAHAN
ANALIS VOL Pekerja Tukang
Mando
r
PC
Pasir
beton
koral
beton
Alat
Bantu
Paku Usuk
1 3 4 5 9 18 19 19 19 20
K.720 BETON NON STRUKTUR / RABAT KLAS K 125/ 6 m3 10
3.000 m3 Pasir beton 31.46
32.000 zak Semen PC 335.62
5.000 m3 Batu pecah tersaring 52.44
0.600 set Alat Bantu 6.29
1.000 oh Mandor 10.49
1.000 oh Tukang 10.49
12.000 oh Pekerja 125.86
VII.30a Pasang bekisting kolom / m2 129.17
0.040 m3 kayu terentang
0.250 kg paku 32.29
0.010 m3 balok kayu albasia/usuk 1.29
0.300 oh pekerja 38.75
0.260 oh tukang kayu 33.58
0.005 oh mandor
0.65
JUMLAH 164.61 44.07 6.13 335.62 31.46 52.44 6.29 32.29 1.29
KEBUTUHAN BAHAN DAN UPAH
I UPAH
1 Pekerja 164.61 164.60
2 Tukang Batu 44.07 44.00
4 Mandor 6.13 6.00
II BAHAN
1 Pasir Beton 31.46 31.40
2 PC 335.62 336.00
3 Split 52.44 52.40
4 Alat Bantu
5 Kaso 5/5 69.00 69.00
6 Papan 2/20 Kayu Albasia 322.92 323.00
7 Paku 16.15 16.10
III ALAT
1 Ember 50.00 50.00
2 Benang 10.00 10.00
3 Keranjang 4.00 4.00
5 Papan Nama Kegiatan 1.00 1.00
2
URAIAN
Kayu
Terentang
21
5.17
5.17
DAFTAR KEBUTUHAN UPAH DAN BAHAN
ANALIS VOL Pekerja tukang Mandor Pasir urug
Paving t=6
cm
1 3 4 5 6 7 8
VII. 1 Pasang paving abu-abu tebal 6 cm 165.600
1.0000 m2 paving abu-abu 165.600
0.1000 m3 pasir urug 16.560
0.2000 Oh tukang 33.120
0.0200 Oh kepala tukang 3.312
0.4000 Oh pekerja 66.240
0.0200 Oh mandor
3.312
JUMLAH 66.24 36.43 3.31 16.56 165.60
KEBUTUHAN BAHAN DAN UPAH
I UPAH
1 Pekerja 66.24 66.00
2 Tukang Batu 36.43 36.00
4 Mandor 3.31 3.00
II BAHAN
1 Pasir Urug 16.56 16.50
2 Paving t=6 cm 165.60 165.60
URAIAN
2
DAFTAR KEBUTUHAN UPAH DAN BAHAN
ANALIS VOL Pekerja Tukang Mandor Batu belah PC Pasir Pasang
1 3 4 5 6 7 8 9
II.1 Galian tanah biasa sedalam 1 m / m3 9.00
0.4000 oh pekerja 3.60
0.0400 oh mandor 0.36
III.6 Pondasi batu kali 1:6 / m3 29.25
1.1000 m3 batu belah 32.18
117.0000 kg PC 3422.25
0.5610 m3 pasir pasang 16.41
1.5000 oh pekerja 43.88
0.6000 oh tukang batu 17.55
0.0750 oh Mandor 2.19
V. 6 Plesteran 1 : 6, tebal 1,5 cm 10.50
3.6800 kg PC 38.64
0.0230 m Pasir pasang 0.24
0.2000 oh Pekerja 2.10
0.1500 oh Tk. Batu 1.58
0.0100 oh Mandor 0.11
JUMLAH 49.58 19.49 2.30 32.18 3,460.89 16.65
KEBUTUHAN BAHAN DAN UPAH
I UPAH
1 Pekerja 49.58 49.50
2 Tukang Batu 19.49 19.00
4 Mandor 2.30 2.00
II BAHAN
2 Batu belah 32.18 32.10
4 PC 69.22 69.00
5 Pasir Pasang 16.65 16.60
III ALAT
1 Ember 2 2.00
2 Benang 1 1.00
3 Keranjang 2 2.00
5 Papan Nama Kegiatan
2
URAIAN
Propinsi : Jawa Tengah No. RAB. : 01
Kabupaten : Wonosobo Program : PNPM - MPd 2013
Kecamatan : Kejajar Jenis Kegiatan : Jalan Rabat Beton
Desa : Tambi Volume : 276 m
Dari Dari
Swadaya PNPM - MD Rp. Rp. Rp. Rp.
a b c = a - b d e f g = b x f h = c x f i = g + h
1. BAHAN
1 PC 336.00 - 336.00 zak I. b 62,500 - 20,999,800 21,000,000
2 Pasir Beton 31.40 - 31.40 m I. a 145,000 - 4,553,000 4,553,000
3 Split / Koral 2/3 52.40 - 52.40 m I. a 140,000 - 7,336,000 7,336,000
4 Papan 2/30 2 m 322.92 - 322.92 lbr I. a 15,500 - 5,005,100 5,005,200
5 glogor 6/12 4 m 69.00 - 69.00 btg I. a 69,000 - 4,760,600 4,761,000
6 Paku 36.10 - 36.10 kg I. b 15,000 - 541,500 541,500
- 43,196,000 43,196,700
2. ALAT
1 Concrete mixer 125 l 62.92 - 62.92 Jam II. b 50,000 - 3,146,100 3,146,400
2 Ember 20.00 - 20.00 bh II. b 8,000 - 160,000 160,000
3 Benang 10.00 - 10.00 bh II. b 5,000 - 50,000 50,000
4 Arco 2.00 2.00 bh II. b 390,000 - 780,000 780,000
5 Keranjang 4.00 - 4.00 bh II. b 15,000 - 60,000 60,000
6 Papan Informasi 1.00 1.00 bh II. b 150,000 150,000 150,000
7 Papan Proyek 1.00 - 1.00 bh II. b 150,000 - 150,000 150,000
8 Prasasti 1.00 - 1.00 bh II. b 350,000 - 350,000 350,000
- 4,846,100 4,846,400
3. UPAH
1 Pekerja 164.60 - 164.60 oh III.a 30,000 - 4,938,000 4,938,000
2 Tukang 44.00 - 44.00 oh III.a 40,000 - 1,760,000 1,760,000
3 Ka Kelompok 6.00 - 6.00 oh III.a 30,000 - 180,000 180,000
- 6,878,000 6,878,000
- 54,920,100 54,921,100
- - -
- - -
- 54,920,100 -
Catatan :
- Sumbangan dalam bentuk bahan, upah, dan alat tulis dalam kolom Volume swadaya
- Nilai RAB didapat dari kolom Volume dari PNPM-PPK dikali kolom harga satuan yang kemudian ditotalkan.
- Sumbangan dalam bentuk uang dimasukan pada baris terbawah (Sumber dana dari swadaya)
- Swadaya dalam bentuk Lahan ditulis dalam format lain.
- Kategori biaya :
I.a Pembelian bahan hasil tenaga manusia
I.b.Pembelian bahan hasil Industri
I.c.Pembelian bahan administrasi
II.a.Pembelian alat tangan
II.b.Pembelian/penyewaan alat mesin
II.c.Pembelian alat administrasi
III.a.Pembayaran tenaga kerja untuk kontruksi
III.b.Pembayaran tenaga untuk pengumpulan bahan
III.c.Pembayaran honorarium Tim Pelaksana
RENCANA ANGGARAN BIAYA PRASARANA
NIP. 196504101989031009
PjOK KEC KEJAJAR FASILITATOR KECAMATAN
(Agus Sutanto,SE) ( Damar Danangjaya, ST) ( )
TIM PENGELOLA KEGIATAN
DIBUAT OLEH :
( Tartib Fachri )
MENGETAHUI : DIPERIKSA OLEH :
Sub Total 2)
Sub Total 3)
Total Biaya
Sumber dana
Swadaya Uang Tunai
Swadaya
Dari PNPM - MD
Sub Total 1)
Jumlah Total Swadaya PNPM - MD Kategori
Biaya
Harga Satuan
Total
No. Uraian
Volume
Satuan
Propinsi : Jawa Tengah No. RAB. : 02
Kabupaten : Wonosobo Program : PNPM - MPd 2013
Kecamatan : Kejajar Jenis Kegiatan : Pavingisasi
Desa : Tambi Volume : 276 m'
Dari Dari
Swadaya PNPM - MD Rp. Rp. Rp. Rp.
a b c = a - b d e f g = b x f h = c x f i = g + h
1. BAHAN
1 Paving 165.60 - 165.60 m2 I. b 47,000 - 7,783,200 7,783,200
2 Pasir urug 16.50 - 16.50 m I. a 100,000 - 1,650,000 1,650,000
- 9,433,200 9,433,200
2. ALAT
1 Benang 4.00 - 4.00 bh I. b 5,000 - 20,000 20,000
2 Keranjang 1.00 - 1.00 bh I. b 15,000 - 15,000 15,000
- 35,000 35,000
3. UPAH
1 Pekerja 66.00 - 66.00 oh III. a 30,000 - 1,980,000 1,980,000
2 Tukang 36.00 - 36.00 oh III. a 40,000 - 1,440,000 1,440,000
3 Ka Kelompok 3.00 - 3.00 oh III. a 30,000 90,000 90,000
- 3,510,000 3,510,000
- 12,978,200 12,978,200
- - -
- - -
- 12,978,200 -
Catatan :
- Sumbangan dalam bentuk bahan, upah, dan alat tulis dalam kolom Volume swadaya
- Nilai RAB didapat dari kolom Volume dari PNPM-PPK dikali kolom harga satuan yang kemudian ditotalkan.
- Sumbangan dalam bentuk uang dimasukan pada baris terbawah (Sumber dana dari swadaya)
- Swadaya dalam bentuk Lahan ditulis dalam format lain.
- Kategori biaya :
I.a Pembelian bahan hasil tenaga manusia
I.b.Pembelian bahan hasil Industri
I.c.Pembelian bahan administrasi
II.a.Pembelian alat tangan
II.b.Pembelian/penyewaan alat mesin
II.c.Pembelian alat administrasi
III.a.Pembayaran tenaga kerja untuk kontruksi
III.b.Pembayaran tenaga untuk pengumpulan bahan
III.c.Pembayaran honorarium Tim Pelaksana
RENCANA ANGGARAN BIAYA PRASARANA
No. Uraian
Volume
Satuan
Kategori
Biaya
Harga Satuan Jumlah Total PNPM - MD
DIPERIKSA OLEH :
Sub Total 1)
Sub Total 2)
Swadaya
Total
Sub Total 3)
Total Biaya
Swadaya Uang Tunai
Swadaya
Dari PNPM - MD
Sumber dana
(Agus Sutanto,SE) ( Damar Danangjaya, ST) ( )
NIP. 196504101989031009
( Tartib Fachri )
DIBUAT OLEH :
PjOK KEC KEJAJAR TIM PENGELOLA KEGIATAN FASILITATOR KECAMATAN
MENGETAHUI :
Propinsi : Jawa Tengah No. RAB. : 03
Kabupaten : Wonosobo Program : PNPM - MPd 2013
Kecamatan : Kejajar Jenis Kegiatan : Talud
Desa : Tambi Volume : 62 m
Dari Dari
Swadaya PNPM - MD Rp. Rp. Rp. Rp.
a b c = a - b d e f g = b x f h = c x f i = g + h
1. BAHAN
1 Batu Belah 32.10 - 32.10 m I. a 85,000 - 2,728,500 2,728,500
2 PC 69 - 69 sak I. b 62,500 - 4,312,500 4,312,500
3 Pasir Pasang 16.60 - 16.60 m I. a 110,000 - 1,826,000 1,826,000
- 8,867,000 8,867,000
2. ALAT
1 Ember 10.00 - 10.00 bh I. b 8,000 - 80,000 80,000
2 Benang 5.00 - 5.00 bh I. b 5,000 - 25,000 25,000
3 Keranjang 4.00 - 4.00 bh I. b 15,000 - 60,000 60,000
- 165,000 165,000
3. UPAH
1 Pekerja 49.50 - 49.50 oh III.a 30,000 - 1,485,000 1,485,000
2 Tukang 19.00 - 19.00 oh III.a 40,000 - 760,000 760,000
3 Ka Kelompok 2.00 - 2.00 oh III.a 30,000 - 60,000 60,000
- 2,305,000 2,305,000
- 11,337,000 11,337,000
- - -
- - -
- 11,337,000 -
Catatan :
- Sumbangan dalam bentuk bahan, upah, dan alat tulis dalam kolom Volume swadaya
- Nilai RAB didapat dari kolom Volume dari PNPM-PPK dikali kolom harga satuan yang kemudian ditotalkan.
- Sumbangan dalam bentuk uang dimasukan pada baris terbawah (Sumber dana dari swadaya)
- Swadaya dalam bentuk Lahan ditulis dalam format lain.
- Kategori biaya :
I.a Pembelian bahan hasil tenaga manusia
I.b.Pembelian bahan hasil Industri
I.c.Pembelian bahan administrasi
II.a.Pembelian alat tangan
II.b.Pembelian/penyewaan alat mesin
II.c.Pembelian alat administrasi
III.a.Pembayaran tenaga kerja untuk kontruksi
III.b.Pembayaran tenaga untuk pengumpulan bahan
III.c.Pembayaran honorarium Tim Pelaksana
Sub Total 2)
Sub Total 1)
( )
TIM PENGELOLA KEGIATAN
DIBUAT OLEH :
Sub Total 3)
Total Biaya
Sumber dana
RENCANA ANGGARAN BIAYA PRASARANA
Harga Satuan
No. Uraian
Volume
Total
Swadaya Uang Tunai
Swadaya
Dari PNPM - MD
PNPM - MD Swadaya Jumlah Total
Satuan
Kategori
Biaya
NIP. 196504101989031009
(Agus Sutanto,SE) ( Damar Danangjaya, ST)
PjOK KEC. KEJAJAR
MENGETAHUI :
FASILITATOR KECAMATAN
DIPERIKSA OLEH :
( Tartib Fachri )
Jenis Prasarana
Propinsi : Jawa Tengah Kecamatan : Kejajar
Kabupaten : Wonosobo Desa : Tambi
Kegiatan : Jalan Rabat Beton Kegiatan : Pavingisasi Kegiatan :Talud
Ukuran : 276 m Ukuran 276 m Ukuran :62 m
Jumlah : 1 Unit Jumlah : 1 Unit Jumlah :3 titik
No. RAB : 01 No. RAB : 02 No. RAB :03
PNPM-MD SWADAYA PNPM-MD SWADAYA PNPM-MD SWADAYA PNPM-MD SWADAYA
I BAHAN 43,196,000 - 51.79 9,433,200 - 11.31 8,867,000 - 10.63 61,496,200 - 73.73
(tidak perlu dirinci)
II PERALATAN 4,846,100 - 5.81 35,000.00 - 0.04 165,000 - 0.20 5,046,100 - 6.05
(tidak perlu dirinci)
III U P A H 6,878,000 0 8.25 3,510,000 - 4.21 2,305,000 - 2.76 12,693,000 - 15.22
54,920,100 0 65.85 12,978,200 - 15.56 11,337,000 - 13.59 79,235,300 0 95.00
IV Operasional UPK 2% 1,668,100
V Operasional TPK 3% 2,502,100
83,405,500 0
6,878,000 0 3,510,000 - 2,305,000 - 6,878,000 0
140.00 0.00 94.00 - 70.50 - 234.00 0.00
FASILITATOR KECAMATAN TPK
DIPERIKSA OLEH :
JUMLAH TOTAL
Jumlah Biaya Upah
Jumlah HOK Konstruksi
NIP. 196504101989031009
( Tartib Fachri )
PjOK KEC, KEJAJAR
MENGETAHUI :
Bobot
(%)
JUMLAH TOTAL
(Agus Sutanto,SE) (Damar Dj, ST)
JUMLAH
( )
DIBUAT OLEH:
: Rabat Beton
Bobot
(%)
Form.8.b
REKAPITULASI ANGGARAN BIAYA PRASARANA
No Uraian
Bobot
(%)
Bobot
(%)