Anda di halaman 1dari 35

DAFTAR HARGA SATUAN BAHAN

KABUPATEN BANDUNG TAHUN ANGGARAN 2012


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

BAHAN
ALKALI (CAT DASAR ICI)
ALUMUNIUM T. 0,2 MM (UKURAN PINTU)
AMPELAS DUCO
ASBES GELOMBANG (105 x 180)
ASBES MOTIP GENTENG
BAHAN PLAFON GRC PLAT 4 MM
BAHAN PLAFOND ASBES SEMEN
BAHAN PLAFOND ETERNIT 4 MM
BAHAN PLAFOND GIFSUM SEK. JAYA BOARD
BAHAN PLITUR KRIPIK (SIRLAK INDIA)
BAJA RINGAN
BAJA RINGAN (PRIDA)
BAK KM 60 X 60 FIBRE
BAK PENAMPUNG/ROOF TANK KAP. 1 M3
BAMBU
BATA (KOSIM)
BATA MERAH KELAS 1
BATACO
BATU APUNG ( GOSOK )
BATU BELAH UNTUK PONDASI
BATU KALI
BATU KAPUR
BATU PECAH 1/2
BATU PECAH 5/7 CM
BATU PECAH 7/10 CM
BATU PECAH MESIN 2/3
BATU PECAH MESIN 3/5
BATU PECAH TERSARING BERGRADASI (A)
BATU PECAH TERSARING BERGRADASI (B)
BATU TEMPLEK HITAM
BAUD ANGKUR 19 MM
BAUD DAN MUR 12 MM
BAUD DAN MUR 19 MM
BAUD/SKUP
BESI AISAN
BESI BETON U 24 (RATA-RATA)
BESI BETON U 39/U 32 (RATA-RATA)
BESI IWF EX. DN SII
BESI PROFIL DN SII
BESI SIKU EX DN
BESI STRIP
BETON READY MIX K-175
BETON READY MIX K-225
BIAYA PENYAMBUNGAN
BONDEK
BOX MCB (12 GRUP) HAGER
BOX MCB (4 GRUP) HAGER
BOX MCB (8 GRUP) HAGER
BUBUNGAN ASBES
BUBUNGAN GENTENG PLENTONG PRES (LOKAL)
BUBUNGAN GENTENG PLENTONG PRES EX JATIWANGI
BUSA
CAT BESI (AVIAN)
CAT BESI (DECOLUX)
CAT BOR/CAT HITAM
CAT DUCO - A
CAT DUCO - B
CAT KAYU (AVIAN)
CAT KAYU (DECOLUX)
CAT TEMBOK (KATALUX)
CAT TEMBOK (KEMTONE EXTERIOR)
CAT TEMBOK (KEMTONE INTERIOR)
CAT TEMBOK (SANLEX)
CAT TEMBOK (VINILEX)
CAT TEMBOK KTREMTONE EKTERIOR
CAT TEMBOK KTREMTONE INTERIOR
CLOSET JONGKOK (TOHO)
DEMPUL HALUS.IMPRA (WOOD FILLER)
DEMPUL KAYU (GENTONG)
DEMPUL LILIN

HARGA
47,500
30,000
2,000
35,000
25,000
41,000
11,000
10,000
60,000
115,000
140,000
170,000
150,000
950,000
23,300
400
450
2,500
18,000
105,000
150,000
100,000
181,500
137,500
142,170
165,000
165,000
142,200
155,400
93,500
3,000
1,500
3,000
50
15,000
9,000
9,000
9,700
9,700
9,700
9,400
595,000
600,000
725
117,370
121,000
60,000
75,000
25,000
1,500
2,000
7,500
35,000
40,000
32,500
60,000
50,000
40,000
30,000
8,000
62,500
47,500
18,150
3,500
45,200
30,600
75,000
40,000
10,000
17,500

SATUAN
LTR
LBR
LBR
LBR
BH
lbr
M2
M2
LBR
KG
M2
M2
BH
BH
BTG
BH
BH
BH
KG
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
BH
BH
BH
BH
BH
KG
KG
KG
KG
KG
KG
M3
M3
WATT
M2
BH
BH
BH
BH
BH
BH
M2
KG
KG
BH
KG
KG
KG
KG
KG
LTR
LTR
KG
KG
KG
KG
BH
KG
KG
KG

KETERANGAN

Harga Satuan Bahan


1

DAFTAR HARGA SATUAN BAHAN


KABUPATEN BANDUNG TAHUN ANGGARAN 2012
No.
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

BAHAN
DEMPUL PLITUR
Dolken 5 s/d 7 cm
Dolken 8 s/d 10 cm
DOWN LIGHT + Frame Eksterior Silver Persegi - 2 lampu (ZETALUX)
DOWN LIGHT 4"
DOWN LIGHT 5"
DOWN LIGHT OUT BOW KOTAK WARNA HITAM (VACOLUX)
ENGSEL ANGIN
ENGSEL JENDELA Unilon Besar
ENGSEL LEMARI 3"
ENGSEL PINTU BESI
ENGSEL PINTU LEMARI/MEJA
ESPAGNOLET/SLOT TANAM
FLINGCOAT (GENTONG)
FORMICA (UKURAN PINTU)
GENTENG PLENTONG PRES BAKAR KW I
GLASS BLOCK
GRAVEL 1/2 20 CM
GRAVEL 1/2 30 CM
GRAVEL 20 CM
GRAVEL 30 CM
GRENDEL/SLOT LACI/LEMARI
HANDLE/PEGANGAN PINTU ALUMINIUM
INJUK
JENDELA NAKO
Kabel NYM 2x1,5 MM (ETERNA)
Kabel NYM 2x2,5 MM (ETERNA)
Kabel NYM 3x1,5 MM (ETERNA)
Kabel NYM 3x2,5 MM (ETERNA)
Kabel NYY 2x1,5 MM (ETERNA)
Kabel NYY 2x2,5 MM (ETERNA)
Kabel NYY 3x1,5 MM (ETERNA)
Kabel NYY 4x10 MM (ETERNA)
KACA ACRYLIK 5 MM
KACA ES 3 MM
KACA ES 5 MM
KACA POLOS 3 MM
KACA POLOS 5 MM
KACA RAYBAND 3 MM
KACA RAYBAND 5 MM
KAIN STRIMIN
KAIT ANGIN (KUNINGAN)
KAIT ANGIN (KUNINGAN)
KAPE KAYU
KAPE TEMBOK
KAPUR BAKAR (KAPUR PADAM)
KARET JOK HITAM
KAWAT BETON
KAWAT BRONJONG
KAWAT DURI
KAWAT LAS KARBIT
KAWAT LAS LISTRIK
KAYU BAKAR
KAYU BALOK BORNEO SUPER
KAYU BALOK KAMPER BANJAR
KAYU BALOK KAMPER SAMARINDA OVEN
KAYU BALOK MAHONI
KAYU BALOK MARANTI / BORNEO SUPER
KAYU KASO BORNEO, UK. 5/7 - 4 M'
KAYU LOKAL/RAWA (ALBASIAH)
KAYU PAPAN BORNEO SUPER
KAYU PAPAN KAMPER BANJAR
KAYU PAPAN KAMPER SAMARINDA OVEN
KAYU PAPAN MAHONI
KAYU PAPAN MARANTI
KAYU TERENTANG
KERAMIK 20/20 ANTI SLIP (KM/WC) SEK. MULIA
KERAMIK 20/20 DINDING SEK. MULIA
KERAMIK 30/30 SEK. MULIA
KERAMIK 30/30 WARNA/KASAR SEK. MULIA

HARGA
24,000
6,000
7,000
90,000
23,000
35,750
65,000
25,000
20,000
2,500
25,000
30,000
25,000
10,000
77,000
1,400
15,000
40,000
44,000
75,000
85,000
2,000
15,000
12,000
7,500
197,500
275,000
276,000
345,000
238,000
320,000
293,000
491,250
125,000
90,800
125,000
48,000
68,000
71,500
107,300
15,000
7,500
150,000
4,000
5,000
135,000
10,000
15,000
25,000
2,600
19,000
101,350
135,000
4,000,000
6,000,000
6,985,000
2,100,000
4,000,000
2,100,000
1,100,000
4,250,000
6,500,000
6,325,000
2,500,000
4,125,000
1,300,000
35,500
27,500
28,000
32,500

SATUAN
KG
Btng
Btng
BH
BH
BH
BH
BH
BH
PS
BH
PS
BH
LTR
LBR
BH
BH
BH
BH
BH
BH
BH
SET
KG
DAUN
ROL
ROL
ROL
ROL
ROL
ROL
ROL
ROL
M2
M2
M2
M2
M2
M2
M2
ROL
BH
BH
BH
BH
M3
M2
KG
KG
M'
KG
KG
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2

KETERANGAN

50 M'/ROL
50 M'/ROL
50 M'/ROL
50 M'/ROL
50 M'/ROL
50 M'/ROL
50 M'/ROL
50 M'/ROL

10 M'/ROL

1 ROL 25 M'

Harga Satuan Bahan


2

DAFTAR HARGA SATUAN BAHAN


KABUPATEN BANDUNG TAHUN ANGGARAN 2012
No.
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210

BAHAN
KERAMIK LIST 4/20 SEK. MULIA
KHICEN ZINK
KLEM JEPIT
KRAN AIR (TOHO)
KRAN AIR LEHER ANGSA
KUMPON
KUNCI KM BULAT (ALFA)
KUNCI LACI
KUNCI LEMARI ALFA
KUNCI TANAM BESAR (ROYAL)
KUNCI TANAM BIASA
KUNCI TANAM KECIL (ROYAL)
KWAS 2"
KWAS 3"
KWAS 4"
LAMLP TL 1 x 20 WATT + ARMATUR TANAM + REFLEKTOR
LAMLP TL 3 x 18 WATT + ARMATUR TANAM + REFLEKTOR
LAMPU BARET 25 WATT + ARMATUR KOTAK 20 X 20
LAMPU PIJAR 25 WATT (Philips)
LAMPU SL.14 WATT (Philips)
LAMPU SL.15 WATT (Philips)
LAMPU SL.23 WATT (Philips)
LAMPU SL.9 WATT (Philips)
LAMPU TL 1 x 18 WATT LENGKAP (Philips)
LAMPU TL 1 x 20 WATT LENGKAP (Philips)
LAMPU TL 2 x 18 WATT Armatur Aluminium + Reflektor (Philips)
LAMPU TL 2 x 20 WATT LENGKAP (Philips)
LAMPU TL 20 Watt (Philips)
LAMPU TL 4 x 18 WATT Armatur Aluminium + Reflektor (Philips)
LAMPU TL 40 Watt (Phillips lengkap)
LEM KUNING (AICA/AIBON)
LEM PARALON
LEM PLAMIR GIFSUM
LEM PUTIH (FOX)
LIST GIFSUM 10 CM
LIST GIFSUM 12 CM
LIST GIFSUM 5 CM
LIST GRC 10 CM
LIST GRC 30 CM
LIST PROFIL
LIST PROFIL 1 x 5
LIST PROFIL 1 x 8 (PLIN)
LIST PROFIL UNTUK KUSEN
MCB
MCB KWALITAS SNI
MEGATEAK 4 MM (UKURAN PINTU)
MELAMIK
MELAMIN 4 MM (120 x 240 CM)
MENI KAYU/BESI (GENTONG)
MINYAK BAKAR PREMIUM
MINYAK BAKAR SOLAR
MINYAK PELUMAS
MINYAK TANAH
MULTIPLEK 12 MM (120 x 240 CM)
MULTIPLEK 15 MM (120 x 240 CM)
MULTIPLEK 18 MM (120 x 240 CM)
MULTIPLEK 9 MM (120 x 240 CM)
OKER (MATAHARI)
OTEM (PEWARNA PLITUR)
OYAN
PAKU 1 - 3 Cm
PAKU 5 - 7 Cm
PAKU 8 - 12 Cm
PAKU SUMBAT
PASIR BETON
PASIR PASANG
PASIR URUG
PAVING BLOCK NATURAL 6 CM SEK. CISANGKAN
PAVING BLOCK WARNA 6 CM SEK. CISANGKAN
PEGANGAN PINTU

HARGA
1,500
125,000
15,000
7,500
35,000
5,000
99,000
7,500
8,000
82,500
100,000
71,500
5,000
7,000
12,500
125,000
200,000
115,000
3,500
25,400
24,000
53,300
20,000
80,000
40,000
235,000
75,000
10,000
460,000
85,000
25,000
5,000
75,000
20,000
15,000
25,000
11,000
25,000
50,000
3,125
3,750
10,000
1,500
50,000
175,000
125,000
35,000
78,100
23,000
4,500
4,500
28,000
3,000
200,000
225,000
250,000
135,000
24,000
8,250
2,000
15,000
12,500
12,500
100
159,500
108,000
112,000
93,500
112,750
75,000

SATUAN
BH
BH
BH
BH
BH
KG
BH
BH
BH
BH
BH
BH
BH
BH
BH
SET
SET
SET
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
KG
TUBE
ZAK
KG
BTG
BTG
BTG
BTG/2,5
BTG/2,5
M'
M'
M'
M'
BH
BH
LBR
KG
LBR
KG
LITER
LITER
LITER
LITER
LBR
LBR
LBR
LBR
KG
BKS
BKS
KG
KG
KG
BH
M3
M3
M3
M2
M2
SET

KETERANGAN

30 KG/ZAK
2 M'/BTG
2 M'/BTG
2 M'/BTG
2,5 M'/BTG
2,5 M'/BTG

Harga Satuan Bahan


3

DAFTAR HARGA SATUAN BAHAN


KABUPATEN BANDUNG TAHUN ANGGARAN 2012
No.
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280

BAHAN
PENGGANTUNG BOR
PINTU KM/WC ALUMINIUM
PINTU KM/WC BAHAN PVC (HANYA DAUN PINTU)
PINTU KM/WC BAHAN PVC (POLOS)
PIPA PERFORATED 4"
PIPA PVC 1 1/2" AW (Wavin)
PIPA PVC 1 1/4" AW (Wavin)
PIPA PVC 1" AW (Wavin)
PIPA PVC 1/2" AW (Wavin)
PIPA PVC 2 1/2" AW (Wavin)
PIPA PVC 2" AW (Wavin)
PIPA PVC 3" AW (Wavin)
PIPA PVC 3" D (Wavin)
PIPA PVC 3/4" AW (Wavin)
PIPA PVC 4" AW (Wavin)
PIPA PVC 4" D (Wavin)
PLAMIR TEMBOK
PLAMIR TEMBOK (SANLEX)
Plint Kayu Kamper Samarinda finish Melamic ukuran 1,5/10 cm
PLITUR JADI (KEMUDI)
POMPA AIR (dorong) DAB TYPT AQUA 175 A
POMPA AIR 125 WATT SANYO
POMPA AIR JET PUMP GRUNDFOS JDB 5 (500 Watt)
POMPA TANGAN DRAGON
REL PINTU DORONG
RODA 3 " UNTUK PINTU DORONG
ROL CAT TEMBOK
ROSTER/KRAWANG
ROSTER/KRAWANG KHUSUS AL-JIHAD
SAKLAR DOUBLE
SAKLAR DOUBLE (PANASONIC)
SAKLAR DOUBLE x 3 PASANG / 6 SERI (PANASONIC)
SAKLAR SINGLE
SAKLAR SINGLE ENGKEL BESAR (PANASONIC)
SARINGAN LANTAI
SCRENING
SEMEN PC (TIGA RODA - 50 KG/ZAK)
SEMEN WARNA (DUA GUNUNG)
SEMEN WARNA (MITZUBISHI)
SENG GELOMBANG BJLS 28 (80 x 180)
SENG PLAT BJLS 30 LEBAR 55 CM (100 M')
SENG PLAT BJLS 30 LEBAR 90 CM (100 M')
SIRTU DISARING
SIRTU TIDAK DISARING
SLOT LEMARI
SLOT PINTU BESI
SLOT/GRENDEL JENDELA DAN PARTISI
SODA API
SOLIGNEUM
SPIRTUS
STOP KONTAK
STOP KONTAK AC
STOP KONTAK AC (CLIPSAL)
TALANG PVC
TANAH MERAH
TANAH URUG (pilihan)
TARIKAN LACI (STAINLESS STEEL)
TARIKAN LACI STAINLESS
TEAKWOOD 3 MM (UKURAN PINTU)
TEAKWOOD 4 MM (120 x 240 CM)
TERPENTIN
TINNER B
TITIK LAMPU
TRIPLEK 3 MM (120 x 240 CM)
TRIPLEK 3 MM (UKURAN PINTU)
TRIPLEK 4 MM (120 x 240 CM)
TRIPLEK 6 MM (120 x 240 CM)
TRIPLEK 9 MM (120 x 240 CM)
VERNIS (COPAL)
WALLPAPER

HARGA
1,000
225,000
125,000
175,000
58,058
8,125
5,682
4,374
2,875
15,417
13,023
21,965
16,541
3,500
38,791
23,353
12,500
7,000
35,000
17,500
650,000
450,000
2,550,000
175,000
203,500
25,000
20,000
5,200
7,000
15,000
21,500
63,500
12,500
16,000
15,000
155,000
58,000
4,400
4,400
40,000
20,000
25,000
164,560
145,100
7,500
25,000
3,500
2,500
1,785
8,000
15,000
25,000
70,000
10,000
82,000
40,000
3,000
7,500
75,000
95,000
6,000
17,000
75,000
45,000
30,000
55,000
90,200
155,000
15,000
73,000

SATUAN
BH
SET
SET
SET
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
KG
KG
m'
LTR
KG
BH
KG
BH
SET
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
M3
ZAK
KG
KG
LBR
M'
M'
M3
M3
BH
BH
BH
BKS
LTR
LTR
BH
BH
BH
M'
M3
M3
BH
BH
LBR
LBR
LTR
LTR
TTK
LBR
LBR
LBR
LBR
LBR
LTR
M2

KETERANGAN

31319.44444

Harga Satuan Bahan


4

DAFTAR HARGA SATUAN BAHAN


KABUPATEN BANDUNG TAHUN ANGGARAN 2012
No.
281
282
283
284
285

BAHAN
Water Profing Emulsion " Weldcrete"
WATER PROOFING (AQUA PROF)
WATER PROOFING (NO DROP)
WIREMESH M8
WOTER TORN KAP. 500 LTR (EXEL)

HARGA
72,000
40,000
37,500
35,090
550,000

SATUAN
Kg
KG
KG
M2
BH

KETERANGAN

Harga Satuan Bahan


5

LIST_BATU

Harga Satuan Bahan


6

LIST_BATU

Harga Satuan Bahan


7

LIST_BATU

Harga Satuan Bahan


8

LIST_BATU

Harga Satuan Bahan


9

LIST_BATU

Harga Satuan Bahan


10

DAFTAR HARGA SATUAN UPAH DAN BAHAN


KABUPATEN BANDUNG TAHUN ANGGARAN 2012
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

UPAH
PEKERJA
TUKANG GALI
KEPALA TUKANG GALI
TUKANG BATU
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT/PLITUR
KEPALA TUKANG CAT/PLITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
TUKANG PIPA / TUKANG LAS
KEPALA TUKANG PIPA / KEPALA TUKANG LAS
MANDOR

HARGA
30,000
50,000
55,000
50,000
55,000
50,000
55,000
50,000
55,000
50,000
55,000
50,000
55,000
50,000
55,000
60,000

SATUAN
1 Orang/HR
2 Orang/HR
3 Orang/HR
4 Orang/HR
5 Orang/HR
6 Orang/HR
7 Orang/HR
8 Orang/HR
9 Orang/HR
10 Orang/HR
11 Orang/HR
12 Orang/HR
13 Orang/HR
14 Orang/HR
15 Orang/HR
16 Orang/HR

KETERANGAN

DAFTAR :
ANALISA HARGA SATUAN
TAHUN 2012 KABUPATEN BANDUNG
No.

URAIAN

KOEFISIENSATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

A. ANALISA UMUM
1

1 M2 PEK. PENGUKURAN KEMBALI (SITE)


Tukang Batu
Pekerja
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M' PEK. PASANGAN BOUWPLANK & PENGUKURAN
Kayu Lokal Kelas II 5/7
Paku Biasa 2" - 5"
Kayu Papan lokal kelas II
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 LOS KERJA / GUDANG
Dolken Kayu dia 8 - 10/400 cm
Kayu Borneo 5/7
Paku Biasa 2" - 5"
PC (50 Kg)
Pasir Beton
Koral beton
Seng Gelombang BJLS 25
Tripleks 4 mm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

Analisis Harga Satuan

0.0100
0.0200
0.5000

OH
OH
Lot

10.0000 %

0.0070
0.0200
0.0070
0.1000
0.1000
0.0100
0.0500

M3
Kg
M3
OH
OH
OH
OH

10.0000 %

1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.0000
1.2000
1.0000
1.2000
0.1200
0.0500
10.0000 %

50,000.00
30,000.00
1,100.00
1,650.00

1,100,000.00
15,000.00
1,100,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Btg
M3
Kg
Kg
M3
M3
Lbr
Lbr
OH
OH
OH
OH

27,250.00

7,000.00
2,100,000.00
15,000.00
1,200.00
159,500.00
165,000.00
40,000.00
55,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

644,085.00

500.00
600.00
550.00
1,650.00
165.00
1,815.00
1,815.00
7,700.00
300.00
7,700.00
3,000.00
5,000.00
550.00
3,000.00
27,250.00
2,725.00
29,975.00
29,975.00
8,750.00
390,600.00
4,500.00
21,600.00
4,785.00
8,250.00
40,000.00
66,000.00
30,000.00
60,000.00
6,600.00
3,000.00
644,085.00
64,408.50
708,493.50
708,493.00

12

1
4

1 M2 PEMB. DIREKSI KEET DENGAN LANTAI DIPLESTER


Dolken Kayu dia 8 - 10/400 cm
1.2500
Kayu Borneo 5/7
0.1800
Paku Biasa 2" - 5"
0.8500
Besi Strip
1.1000
PC 50 Kg
35.0000
Pasir Pasang
0.1500
Pasir Beton
0.1000
Koral Beton
0.1500
Bata Merah
30.0000
Seng Plat, BJLS 25
0.2500
Jendela Nako
2.0000
Kaca Polos
0.0800
Kunci Tanam
0.1500
Playwood 4 mm
0.0600
Pekerja
1.0000
Tukang Kayu
1.5000
Tukang Batu
1.0000
Kepala Tukang Kayu
0.3000
Mandor
0.0500
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 BH PAPAN NAMA PROYEK
Kayu Kuat Kelas II (Maranti)
0.0060
Triplek 3 mm
0.3472
Paku 5 - 7 Cm
0.2500
Cat Minyak
1.0000
Penulisan
0.1250
Ongkos Pasang
0.1250
Upah Angkut
0.0000
Jumlah
Papan Nama Uk. 1,2 m x 0,8 m
0.9600
Kaso 4/6 Kuat Kelas II (Maranti) (Tiang Penyangga)
0.0140
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAGAR PENGAMAN PROYEK
Seng Gelombang BJLS 28 (80 x 180 cm)
1.4300
Kayu Kuat Kelas II (Maranti)
0.0360
Paku 5 - 7 Cm
0.2000
Pengecatan Cat Minyak 2x Bag. Luar
1.8000
Ongkos Pasang
0.2000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'
Pekerja
0.4000
Mandor
0.0400
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

Btng
M3
Kg
Kg
Kg
M3
M3
M3
Bh
Lbr
Bh
M2
Bh
Lbr
OH
OH
OH
OH
OH
%

7,000.00
2,100,000.00
15,000.00
13,420.00
1,200.00
108,000.00
159,500.00
165,000.00
450.00
40,000.00
7,500.00
48,000.00
82,500.00
75,000.00
30,000.00
50,000.00
50,000.00
55,000.00
60,000.00
x

8,750.00
378,000.00
12,750.00
14,762.00
42,000.00
16,200.00
15,950.00
24,750.00
13,500.00
10,000.00
15,000.00
3,840.00
12,375.00
4,500.00
30,000.00
75,000.00
50,000.00
16,500.00
3,000.00
746,877.00
74,687.70
821,564.70
821,564.00

746,877.00

M3
Lbr
Kg
M2
Ls
Ls
Lot

2,100,000.00
165,000.00
108,000.00
25,345.00
122,233.00
137,512.13
137,512.13

M2
M3

4,000,000.00

12,600.00
57,288.00
27,000.00
25,345.00
15,279.13
17,189.02
`

Lbr
M3
Kg
M2
Ls
Lot
%

159,500.00
2,100,000.00
108,000.00
24,158.33
368,770.00
368,770.00
x

OH
OH
%

56,000.00

442,524.00

30,000.00
60,000.00
x

14,400.00

56,000.00
56,000.00
5,600.00
61,600.00
61,600.00
228,085.00
75,600.00
21,600.00
43,485.00
73,754.00
442,524.00
44,252.40
486,776.40
486,776.00
12,000.00
2,400.00
14,400.00
1,440.00
15,840.00
15,840.00

13

1
8

10

11

12

13

14

1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2 M'


Pekerja
0.5260
Mandor
0.0520
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 M'
Pekerja
0.5160
Mandor
0.0500
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN TANAH KEMBALI
Pekerja
0.1920
Mandor
0.0190
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEMADATAN TANAH, TANAH DILOKASI
Pekerja
0.5000
Mandor
0.0500
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN SIRTU
Sirtu ( Membeli Sirtu)
1.2000
Tukang Gali
0.2500
Mandor
0.0250
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH SUMURAN MAX. KEDALAMAN 1 M'
Tukang Gali
0.4000
Mandor
0.0400
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN PASIR URUG
Pasir Urug
1.2000
Pekerja
0.3000
Mandor
0.0100
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

OH
OH
%

30,000.00
60,000.00
x

OH
OH
%

30,000.00
60,000.00
x

OH
OH
%

Org
Org

M3
Org
Org

OH
OH

188,120.00

50,000.00
60,000.00
x

M3
OH
OH
%

18,000.00

145,100.00
50,000.00
60,000.00
x

6,900.00

30,000.00
60,000.00
x

18,480.00

30,000.00
60,000.00
x

18,900.00

22,400.00

112,000.00
30,000.00
60,000.00
x

144,000.00

6
15,780.00
3,120.00
18,900.00
1,890.00
20,790.00
20,790.00
15,480.00
3,000.00
18,480.00
1,848.00
20,328.00
20,328.00
5,760.00
1,140.00
6,900.00
690.00
7,590.00
7,590.00
15,000.00
3,000.00
18,000.00
1,800.00
19,800.00
19,800.00
174,120.00
12,500.00
1,500.00
188,120.00
18,812.00
206,932.00
206,932.00
20,000.00
2,400.00
22,400.00
2,240.00
24,640.00
24,640.00
134,400.00
9,000.00
600.00
144,000.00
14,400.00
158,400.00
158,400.00

14

1
15

16

17

18

19

1 M3 ADUKKAN BETON TUMBUK CAMP 1PC : 3PS : 5KRL


Semen PC (@ 50 Kg/Zak)
218.0000
Split Pecah Mesin 2/3
0.5200
Pasir Beton
0.8700
Pekerja
1.6500
Tukang Batu
0.2500
Kepala Tukang Batu
0.0250
Mandor
0.0800
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON SITE MIX K - 175
Semen PC (@ 50 Kg/Zak)
340.0000
Split Pecah Mesin 2/3
0.8300
Pasir Beton
0.5400
Pekerja
1.6500
Tukang Batu
0.2500
Kepala Tukang Batu
0.0250
Mandor
0.0800
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 KG BESI BETON TERPASANG POLOS
Besi Beton Polos
1.0500
Kawat Beton
0.0150
Pekerja
0.0070
Tukang Besi
0.0070
Kepala Tukang Besi
0.0007
Mandor
0.0003
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 KG BESI BETON TERPASANG U-39 (ULIR)
Besi Beton rata-rata (U-39/Uril)
1.0500
Kawat Beton
0.0150
Pekerja
0.0070
Tukang Besi
0.0070
Kepala Tukang Besi
0.0007
Mandor
0.0003
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 Kayu Kuat Kelas II (Maranti) Sp (2x pakai) 50%
0.0170
Papan Kayu Lokal/Rawa (Albasiah) (2 X Pakai) 75 %
0.0240
Paku
0.4000
Pekerja
0.1200
Tukang Kayu
0.2700
Kepala Tukang Kayu
0.1500
Mandor
0.0500
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

Kg
M3
M3
Org
Org
Org
Org
%

1,200.00
165,000.00
159,500.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
M3
M3
Org
Org
Org
Org
%

1,200.00
165,000.00
159,500.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
Kg
OH
OH
OH
OH
%

699,255.00

408,000.00
136,950.00
86,130.00
49,500.00
12,500.00
1,375.00
4,800.00
699,255.00
69,925.50
769,180.50
769,180.00
9,450.00
225.00
210.00
350.00
38.50
18.00
10,291.50
1,029.15
11,320.65
11,320.00

9,000.00
15,000.00
30,000.00
50,000.00
55,000.00
60,000.00

9,450.00
225.00
210.00
350.00
38.50
18.00
10,291.50
1,029.15
11,320.65
11,320.00

2,100,000.00
1,100,000.00
12,500.00
30,000.00
50,000.00
55,000.00
60,000.00
42,650.00

17,850.00
19,800.00
5,000.00
3,600.00
13,500.00
8,250.00
3,000.00
71,000.00
7,100.00
78,100.00
78,100.00

M3
M3
Kg
OH
OH
OH
OH
Lot

261,600.00
85,800.00
138,765.00
49,500.00
12,500.00
1,375.00
4,800.00
554,340.00
55,434.00
609,774.00
609,774.00

9,000.00
15,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
Kg
OH
OH
OH
OH

554,340.00

71,000.00

15

1
20

21

22

23

24

1 M2 BEKISTING DENGAN MULTIPLEX 9 MM


Kaso 5/7 Kayu Kuat Kelas II (Maranti) Sp (2x pakai) 50%
0.0170
MultIplek 9 mm (2 X Pakai) 75 %
0.3470
Paku
0.4000
Pekerja
0.1200
Tukang Kayu
0.2700
Kepala Tukang Kayu
0.1500
Mandor
0.0500
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PASANGAN SSTEGER WERK DARI BAMBU
Bambu
1.0000
Tali Injuk
0.2500
Pekerja
0.2500
Tukang Kayu
0.0170
Kepala Tukang Kayu
0.0020
Mandor
1.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU KOSONG (AANSTAMPING)
Batu Belah 15 Cm/ 20 Cm
1.2000
Pasir Urug
0.3000
Pekerja
0.7800
Tukang Batu
0.3900
Kepala Tukang Batu
0.0390
Mandor
0.0390
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP
Batu Belah 15 Cm/ 20 Cm
1.1000
Semen PC (@ 50 Kg/Zak)
136.0000
Pasir Pasang
0.5440
Pekerja
1.5000
Tukang Batu
0.7500
Kepala Tukang Batu
0.0750
Mandor
0.0750
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DINDING KERAMIK UKURAN 20 x 20 CM SEK. MULIA
Keramik Dinding 20 x 20 cm Sek. Mulia
1.0100
Semen PC (@ 50 Kg/Zak)
9.3000
Pasir Pasang
0.0180
Semen Warna
1.5000
Pekerja
0.6000
Tukang Batu
0.4500
Kepala Tukang Batu
0.0450
Mandor
0.0300
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

M3
Lbr
Kg
OH
OH
OH
OH
Lot
%

2,100,000.00
135,000.00
12,500.00
30,000.00
50,000.00
55,000.00
60,000.00
57,983.75
x

Btg
Kg
OH
OH
OH
OH
%

23,300.00
12,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M3
M3
OH
OH
OH
OH
%

M3
Kg
M3
OH
OH
OH
OH

206,985.00

105,000.00
1,200.00
108,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M2
Kg
M3
Kg
OH
OH
OH
OH
%

81,610.00

105,000.00
112,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

86,333.75

428,577.00

27,500.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
x

92,254.00

6
17,850.00
35,133.75
5,000.00
3,600.00
13,500.00
8,250.00
3,000.00
86,333.75
8,633.38
94,967.13
94,967.00
11,650.00
1,500.00
7,500.00
850.00
110.00
60,000.00
81,610.00
8,161.00
89,771.00
89,771.00
126,000.00
33,600.00
23,400.00
19,500.00
2,145.00
2,340.00
206,985.00
20,698.50
227,683.50
227,683.00
115,500.00
163,200.00
58,752.00
45,000.00
37,500.00
4,125.00
4,500.00
428,577.00
42,857.70
471,434.70
471,434.00
27,775.00
11,160.00
1,944.00
6,600.00
18,000.00
22,500.00
2,475.00
1,800.00
92,254.00
9,225.40
101,479.40
101,479.00

16

1
25

26

27

28

1 M2 DINDING KERAMIK UKURAN 30 x 30 CM SEK. MULIA


Keramik Dinding 30 x 30 cm Sek. Mulia
1.0100
M2
Semen PC (@ 50 Kg/Zak)
9.3000
Kg
Pasir Pasang
0.0180
M3
Semen Warna
1.5000
Kg
Pekerja
0.6000
OH
Tukang Batu
0.4500
OH
Kepala Tukang Batu
0.0450
OH
Mandor
0.0300
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M' PLINT KERAMIK 10 x 30 CM DN SEK. MULIA
Plint Keramik 10 x 40 Sek. Mulia
2.6500
BH
Semen PC (@ 50 Kg/Zak)
1.2000
Kg
Pasir Pasang
0.0300
M3
Semen Warna
0.1000
Kg
Pekerja
0.0800
OH
Tukang Batu
0.0400
OH
Kepala Tukang Batu
0.0040
OH
Mandor
0.0040
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M' LIST KERAMIK 4 x 20 CM DN BERCORAK/WARNA KM/WC SEK. MULIA
List Keramik 4 x 20 Bercorak/Warna Sek. Mulia
5.0000
BH
Semen PC (@ 50 Kg/Zak)
1.2000
Kg
Pasir Pasang
0.0300
M3
Semen Warna
0.1000
Kg
Pekerja
0.0800
OH
Tukang Batu
0.0400
OH
Kepala Tukang Batu
0.0040
OH
Mandor
0.0040
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM CORAK/ANTI SLIP SEK. MULIA
Keramik 20 x 20 Corak/ Anti Slip Sek. Mulia
1.0100
M2
Semen PC (@ 50 Kg/Zak)
11.3800
Kg
Pasir Pasang
0.0420
M3
Semen Warna
1.5000
Kg
Pekerja
0.6200
OH
Tukang Batu
0.3500
OH
Kepala Tukang Batu
0.0350
OH
Mandor
0.0300
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan

Analisis Harga Satuan

5
28,000.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
92,759.00

1,037.04
1,200.00
1,200.00
108,000.00
30,000.00
50,000.00
55,000.00
60,000.00
19,884.15

1,500.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
17,480.00

35,500.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
100,472.00

6
28,280.00
11,160.00
1,944.00
6,600.00
18,000.00
22,500.00
2,475.00
1,800.00
92,759.00
9,275.90
102,034.90
102,034.00
2,748.15
1,440.00
36.00
10,800.00
2,400.00
2,000.00
220.00
240.00
19,884.15
1,988.41
21,872.56
21,872.00
7,500.00
1,440.00
3,240.00
440.00
2,400.00
2,000.00
220.00
240.00
17,480.00
1,748.00
19,228.00
19,228.00
35,855.00
13,656.00
4,536.00
6,600.00
18,600.00
17,500.00
1,925.00
1,800.00
100,472.00
10,047.20
110,519.20
110,519.00

17

1
29

30

31

32

33

1 M2 LANTAI KERAMIK 30/30CM SEK. MULIA


Keramik 30 x 30 cm Sek. Mulia
1.0100
M2
Semen PC (@ 50 Kg/Zak)
11.3800
Kg
Pasir Pasang
0.0420
M3
Semen Warna
1.5000
Kg
Pekerja
0.6200
OH
Tukang Batu
0.3500
OH
Kepala Tukang Batu
0.0350
OH
Mandor
0.0300
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 LANTAI KERAMIK 30/30 CM SEK. MULIA CORAK/WARNA/KASAR
Keramik 40 x 40 cm Sek. Mulia
1.0100
M2
Semen PC (@ 50 Kg/Zak)
11.3800
Kg
Pasir Pasang
0.0420
M3
Semen Warna
1.5000
Kg
Pekerja
0.6200
OH
Tukang Batu
0.3500
OH
Kepala Tukang Batu
0.0350
OH
Mandor
0.0300
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 3 PP, TEBAL 1/2 BATA
Bata Merah Kelas 1 (5x11x22 Cm)
70.0000
Bh
Semen PC (@ 50 Kg/Zak)
14.3700
Kg
Pasir Pasang
0.0400
M3
Pekerja
0.3200
OH
Tukang Batu
0.1000
OH
Kepala Tukang Batu
0.0100
OH
Mandor
0.0150
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 5 PP, TEBAL 1/2 BATA
Bata Merah (5x11x22 Cm)
70.0000
Bh
Semen PC (@ 50 Kg/Zak)
9.6800
Kg
Pasir Pasang
0.0450
M3
Pekerja
0.3200
OH
Tukang Batu
0.1000
OH
Kepala Tukang Batu
0.0100
OH
Mandor
0.0150
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH, TEBAL 1 BATA 1 PC : 5 PS
Bata Merah (5x11x22 Cm)
140.0000
Bh
Semen PC (@ 50 Kg/Zak)
2.2200
Kg
Pasir Pasang
0.1020
M3
Pekerja
0.6500
OH
Tukang Batu
0.2000
OH
Kepala Tukang Batu
0.0300
OH
Mandor
0.0300
OH
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
Analisis Harga Satuan

5
28,000.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
92,897.00

32,500.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
60,000.00
97,442.00

450.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
58,797.00

450.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
53,709.00

450.00
1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
88,690.00

6
28,280.00
13,656.00
4,536.00
6,600.00
18,600.00
17,500.00
1,925.00
1,800.00
92,897.00
9,289.70
102,186.70
102,186.00
32,825.00
13,656.00
4,536.00
6,600.00
18,600.00
17,500.00
1,925.00
1,800.00
97,442.00
9,744.20
107,186.20
107,186.00
31,500.00
17,244.00
4,320.00
1,408.00
3,000.00
500.00
825.00
58,797.00
5,879.70
64,676.70
64,676.00
31,500.00
11,616.00
4,860.00
1,408.00
3,000.00
500.00
825.00
53,709.00
5,370.90
59,079.90
59,079.00
63,000.00
2,664.00
11,016.00
2,860.00
6,000.00
1,500.00
1,650.00
88,690.00
8,869.00
97,559.00
97,559.00

18

1
34

35

36

37

38

1 M2 PLESTERAN 1 PC ; 3 PP, TEBAL 1,5 CM


Semen PC (@ 50 Kg/Zak)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PLESTERAN 1 PC ; 4 PP, TEBAL 1,5 CM
Semen PC (@ 50 Kg/Zak)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PLESTERAN 1 PC ; 5 PP, TEBAL 1,5 CM
Semen PC (@ 50 Kg/Zak)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 ACIAN DENGAN PC
Semen PC (@ 50 Kg/Zak)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 UNIT SEPTICTANK 2 x 1,5 x 1,5 m + REMBESANNYA
Galian Tanah
Pasir Urug
Lantai Kerja t = 10 Cm
Pas. Bata ad. 1:3 + Plesteran
Plat Beton Penutup dan Balok
Pipa PVC 4" Jenis AW + Sambungan
Pipa GIP 11/2 "
Galian Tanah untuk Rembesan
Pas. Injuk
Urugan Kerikil 3,5 cm
Pipa PVC 4" Berlubang Jenis AW
Urugan Kembali Perataan Tanah
Tambahan Upah
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

6.4800
0.0190
0.2000
0.1500
0.0150
0.0150

4
Kg
M3
OH
OH
OH
OH

10.0000 %

5.2000
0.0200
0.2000
0.1500
0.0150
0.0150

Kg
M3
OH
OH
OH
OH

10.0000 %

16,783.00

1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
x

Kg
M3
OH
OH
OH
OH

10.0000 %

0.0650
0.1500
0.1000
0.0100
0.0080

1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
x

10.0000 %

4.3200
0.0220
0.2000
0.1500
0.0150
0.0150

15,355.00

1,200.00
108,000.00
4,400.00
30,000.00
50,000.00
55,000.00
x

Zak
OH
OH
OH
OH

14,515.00

1,200.00
4,400.00
30,000.00
50,000.00
55,000.00
x

4,678.00

(UNTUK KANTOR TYPE KECIL)


4.5000
M3
18,900.00
0.2142
M3
144,000.00
2.2500
55,434.00
M2
15.0000
75,580.00
M2
0.3000
M3
1,985,692.50
5.4000
M'
68,523.68
1.2000
btg
11,297.65
3.3750
M3
18,900.00
5.4000
Kg
12,000.00
1.0500
M3
165,000.00
9.0000
M'
68,523.68
1.1250
M3
6,900.00
0.0920
Ls
3,279,927.25
0.0000
Lot
3,279,927.25

Analisis Harga Satuan

10.0000 %

3,581,680.55

6
7,776.00
2,052.00
880.00
4,500.00
750.00
825.00
16,783.00
1,678.30
18,461.30
18,461.00
6,240.00
2,160.00
880.00
4,500.00
750.00
825.00
15,355.00
1,535.50
16,890.50
16,890.00
5,184.00
2,376.00
880.00
4,500.00
750.00
825.00
14,515.00
1,451.50
15,966.50
15,966.00
78.00
660.00
3,000.00
500.00
440.00
4,678.00
467.80
5,145.80
5,145.00
85,050.00
30,844.80
124,726.50
1,133,700.00
595,707.75
370,027.88
13,557.18
63,787.50
64,800.00
173,250.00
616,713.14
7,762.50
301,753.31
3,581,680.55
358,168.06
3,939,848.61
3,939,848.00

19

1
39

40

41

42

1 M2 PENGECATAN DINDING KEMTONE ESKTERIOR 3 x


Cat Tembok Kemtone
0.2500
Alkali ICI sebelum pengecatan
0.1250
Rol Cat
0.0100
Ampelas
0.5000
Pekerja
0.0280
Tukang Cat
0.0630
Kepala Tukang Cat
0.0063
Mandor
0.0025
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PENGECATAN DINDING KEMTONE INTERIOR 3 x
Cat Tembok Kemtone
0.2500
Cat Dasar sebelum pengecatan
0.1250
Rol Cat
0.0100
Ampelas
0.5000
Pekerja
0.0280
Tukang Cat
0.0630
Kepala Tukang Cat
0.0063
Mandor
0.0025
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PENGECATAN DINDING VINILEX (3x)
Cat Tembok Vinilex
0.2600
Plamir Tembok
0.1000
Rol Cat
0.0100
Ampelas
0.1500
Pekerja
0.0280
Tukang Cat
0.0630
Kepala Tukang Cat
0.0063
Mandor
0.0025
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND VINILEX (3x)
Cat Tembok Vinilex
0.2800
Plamir Tembok
0.1000
Rol Cat
0.0100
Ampelas
0.1500
Pekerja
0.0300
Tukang Cat
0.0750
Kepala Tukang Cat
0.0075
Mandor
0.0030
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

LTR
LTR
Bh
Lbr
OH
OH
OH
OH
%

62,500.00
52,500.00
38,000.00
2,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

LTR
LTR
Bh
Lbr
OH
OH
OH
OH
%

47,500.00
47,500.00
38,000.00
2,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
%

23,679.00

24,750.00
14,850.00
38,000.00
2,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
%

28,054.00

13,086.50

24,750.00
14,850.00
38,000.00
2,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

14,337.50

6
15,625.00
6,562.50
380.00
1,000.00
840.00
3,150.00
346.50
150.00
28,054.00
2,805.40
30,859.40
30,859.00
11,875.00
5,937.50
380.00
1,000.00
840.00
3,150.00
346.50
150.00
23,679.00
2,367.90
26,046.90
26,046.00
6,435.00
1,485.00
380.00
300.00
840.00
3,150.00
346.50
150.00
13,086.50
1,308.65
14,395.15
14,395.00
6,930.00
1,485.00
380.00
300.00
900.00
3,750.00
412.50
180.00
14,337.50
1,433.75
15,771.25
15,771.00

20

1
43

44

45

46

1 M2 PENGECATAN KAYU (3x)


Meni Kayu
Plamir Kayu
Cat Kayu Setara Merk Avian
Ampelas Kayu
Minyak Cat Terpentin
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN BESI (3x)
Meni Besi
Cat Besi Setara Merk Avian
Ampelas Besi
Minyak Cat (Tinner B)
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PLITURAN BANGUNAN (BIASA)
Dempul Plitur (Dempul Dasar)
Wood Filler (INFRA)
Oker Putih
Oker Warna
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas Kayu
Pekerja
Tukang Cat/ Plitur
Kepala Tukang Cat/ Plitur
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. RANGKA PLAFOND KAYU LOKAL
Kayu Lokal, Balok 5/7
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

0.2000
0.1500
0.3500
0.1500
0.1500
0.1000
0.0700
0.1050
0.0040
0.0025
=

Analisis Harga Satuan

Kg
Kg
Lbr
Ltr
Bh
OH
OH
OH
OH

10.0000 %

25,345.00

12,500.00
35,000.00
2,000.00
15,000.00
17,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Kg
Kg
Kg
Kg
Kg
Kg
Bh
Ltr
Lbr
OH
OH
OH
OH

10.0000 %

0.0175
0.1000
0.1500
0.2500
0.0250
0.0750

12,500.00
12,500.00
30,000.00
2,000.00
5,000.00
17,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

10.0000 %

0.0300
0.2000
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200

Kg
Kg
Kg
Lbr
Ltr
Bh
OH
OH
OH
OH

10.0000 %

0.1670
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100
=

36,237.50

24,000.00
40,000.00
24,000.00
24,000.00
18,000.00
115,000.00
17,000.00
8,000.00
2,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M3
Kg
Org
Org
Org
Org

61,360.00

1,100,000.00
10,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

43,125.00

6
2,500.00
1,875.00
10,500.00
300.00
750.00
1,700.00
2,100.00
5,250.00
220.00
150.00
25,345.00
2,534.50
27,879.50
27,879.00
2,087.50
7,000.00
800.00
2,250.00
850.00
6,000.00
15,000.00
1,650.00
600.00
36,237.50
3,623.75
39,861.25
39,861.00
720.00
8,000.00
480.00
240.00
1,800.00
23,000.00
170.00
1,600.00
200.00
7,500.00
14,250.00
2,200.00
1,200.00
61,360.00
6,136.00
67,496.00
67,496.00
19,250.00
1,000.00
4,500.00
12,500.00
1,375.00
4,500.00
43,125.00
4,312.50
47,437.50
47,437.00

21

1
47

48

49

50

51

1 M2 PAS. PLAFOND GRC 4 MM + RANGKA KAYU LOKAL KELAS II


GRC Plat 4 mm
0.3640
Lbr
41,000.00
RangKa Kayu Kelas II
1.0000
M2
43,125.00
Ongkos Pasang + Alat Bantu
0.1000
Lot
58,049.00
Jumlah
Keuntungan Max.
=
10.0000 %
x
63,853.90
Jumlah
Dibulatkan
1 M' PEK. LISTPLANK KAYU KUAT KELAS II (MAHONI) 3/30
Kayu Papan 3 x 30 Cm Kayu Kuat Kelas II
0.0100
M3
2,500,000.00
Paku 5 - 7 Cm
0.0100
Kg
10,000.00
Pekerja
0.0700
OH
30,000.00
Tukang Kayu
0.2000
OH
50,000.00
Kepala Tukang Kayu
0.0200
OH
55,000.00
Mandor
0.0040
OH
60,000.00
Upah Angkut
0.0000
Lot
25,100.00
Jumlah
Keuntungan Max.
=
10.0000 %
x
38,540.00
Jumlah
Dibulatkan
1 M3 KUSEN KAYU LOKAL KELAS II ( MAHONI )
Kayu Balok Lokal Kelas II
1.1000
M3
2,100,000.00
Paku 10 Cm
1.2500
Kg
10,000.00
Lem Putih (FOX)
1.0000
Kg
20,000.00
Pekerja
4.0000
OH
30,000.00
Tukang Kayu
15.5000
OH
50,000.00
Kepala Tukang Kayu
2.7000
OH
55,000.00
Mandor
0.5000
OH
60,000.00
Upah Angkut
0.0000
Lot
2,342,500.00
Jumlah
Keuntungan Max.
=
10.0000 %
x
3,416,000.00
Jumlah
Dibulatkan
1 M2 JENDELA TANPA KACA, KAYU LOKAL KELAS II
Kayu Lokal Kelas II, Papan
0.0400
M3
2,500,000.00
Pekerja
1.0000
OH
30,000.00
Tukang Kayu
3.0000
OH
50,000.00
Kepala Tukang Kayu
0.3000
OH
55,000.00
Mandor
0.0500
OH
60,000.00
Jumlah
Keuntungan Max.
=
10.0000 %
x
299,500.00
Jumlah
Dibulatkan
1 M2 DAUN PINTU PANIL MULTIPLEK 9 MM (RANGKA KAYU KUAT KELAS II
Papan Kayu Kuat Kelas II
0.0150
M3
2,500,000.00
Multiplek 18 mm
0.5000
Lbr
250,000.00
Lem Putih (FOX)
0.0500
Kg
20,000.00
List Kayu Profil
4.0000
M'
1,500.00
Pekerja
0.3000
OH
30,000.00
Tukang Kayu
1.5000
OH
50,000.00
Kepala Tukang Kayu
0.2000
OH
55,000.00
Mandor
0.0200
OH
60,000.00
Upah Angkut
0.0000
Lot
169,500.00
Jumlah
Keuntungan Max.
=
10.0000 %
x
265,700.00
Jumlah
Dibulatkan

Analisis Harga Satuan

6
14,924.00
43,125.00
5,804.90
63,853.90
6,385.39
70,239.29
70,239.00
25,000.00
100.00
2,100.00
10,000.00
1,100.00
240.00
38,540.00
3,854.00
42,394.00
42,394.00
2,310,000.00
12,500.00
20,000.00
120,000.00
775,000.00
148,500.00
30,000.00
3,416,000.00
341,600.00
3,757,600.00
3,757,600.00
100,000.00
30,000.00
150,000.00
16,500.00
3,000.00
299,500.00
29,950.00
329,450.00
329,450.00
37,500.00
125,000.00
1,000.00
6,000.00
9,000.00
75,000.00
11,000.00
1,200.00
265,700.00
26,570.00
292,270.00
292,270.00

22

1
52

53

54

55

56

1 M2 DAUN PINTU TEAKWOOD RANGKAP, KAYU LOKAL KELAS II


Kayu Lokal Kelas II, Papan
0.0196
M3
Paku biasa 1" - 2"
0.5000
Kg
Lem Kayu
0.0500
Kg
Teakwood 3 mm
1.0000
Lbr
Pekerja
0.3000
OH
Tukang Kayu
1.5000
OH
Kepala Tukang Kayu
0.2000
OH
Mandor
0.0200
OH
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS FORMIKA (KM/WC)
Rangka Papan Kayu Kuat Kelas II
0.0150
M3
Teakwood 3 mm (ukuran pintu)
1.0000
Lbr
Formika
1.0000
Lbr
Paku Triplek (1-2.5 Cm)
0.2000
Kg
Lem Putih (FOX)
0.5000
Kg
Pekerja
0.3000
OH
Tukang Kayu
1.3000
OH
Kepala Tukang Kayu
0.1300
OH
Mandor
0.0130
OH
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M' SALURAN GRAVEL BETON 1/2 20 CM + PASANGAN
Gravel Beton 20 Cm
1.0000
Bh
Pas. Bata + Plesteran 1 : 3
0.8000
M2
Galian Tanah
0.1500
M3
Upah Kerja
0.1500
Ls
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
10.0000 %
Jumlah
Dibulatkan
1 M3 URUGAN TANAH SETEMPAT DIRATAKAN
Tanah Setempat
1.2000
M3
Pekerja
0.5600
Org
Mandor
0.0150
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M3 URUGAN TANAH MERAH DIRATAKAN
Tanah Merah
1.2000
M3
Pekerja
0.5600
Org
Mandor
0.0150
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan

Analisis Harga Satuan

5
2,500,000.00
15,000.00
20,000.00
45,000.00
30,000.00
50,000.00
55,000.00
60,000.00
102,500.00
x

198,700.00

2,500,000.00
75,000.00
77,000.00
15,000.00
20,000.00
30,000.00
50,000.00
55,000.00
60,000.00
202,500.00
x

284,430.00

35,000.00
79,963.00
20,790.00
35,000.00
35,000.00
x

107,338.90

44,000.00
30,000.00
60,000.00
52,800.00
x

70,500.00

82,000.00
30,000.00
60,000.00
98,400.00
x

116,100.00

6
49,000.00
7,500.00
1,000.00
45,000.00
9,000.00
75,000.00
11,000.00
1,200.00
198,700.00
19,870.00
218,570.00
218,570.00
37,500.00
75,000.00
77,000.00
3,000.00
10,000.00
9,000.00
65,000.00
7,150.00
780.00
284,430.00
28,443.00
312,873.00
312,873.00
35,000.00
63,970.40
3,118.50
5,250.00
107,338.90
10,733.89
118,072.79
118,072.00
52,800.00
16,800.00
900.00
70,500.00
7,050.00
77,550.00
77,550.00
98,400.00
16,800.00
900.00
116,100.00
11,610.00
127,710.00
127,710.00

23

1
57

58

59

60

61

1 M' PAS. PIPA PVC TYPE AW 1/2"


Pipa PVC 1/2"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 3/4"
Pipa PVC 3/4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1"
Pipa PVC 1"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1 1/4"
Pipa PVC 1 1/4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1 1/2"
Pipa PVC 1 1/2"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
=

Analisis Harga Satuan

10.0000 %

8,974.25

3,500.00
1,225.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M'
Set
Org
Org
Org
Org

9,943.00

4,373.97
1,530.89
30,000.00
50,000.00
55,000.00
60,000.00
x

M'
Set
Org
Org
Org
Org

10.0000 %

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
=

M'
Set
Org
Org
Org
Org

10.0000 %

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018

2,875.00
1,006.25
30,000.00
50,000.00
55,000.00
60,000.00
x

10.0000 %

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018

M'
Set
Org
Org
Org
Org

10.0000 %

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
=

11,297.65

5,681.82
1,988.64
30,000.00
50,000.00
55,000.00
60,000.00
x

M'
Set
Org
Org
Org
Org

13,324.82

8,125.00
2,843.75
30,000.00
50,000.00
55,000.00
60,000.00
x

17,111.75

6
3,450.00
1,006.25
1,080.00
3,000.00
330.00
108.00
8,974.25
897.43
9,871.68
9,871.00
4,200.00
1,225.00
1,080.00
3,000.00
330.00
108.00
9,943.00
994.30
10,937.30
10,937.00
5,248.76
1,530.89
1,080.00
3,000.00
330.00
108.00
11,297.65
1,129.76
12,427.41
12,427.00
6,818.18
1,988.64
1,080.00
3,000.00
330.00
108.00
13,324.82
1,332.48
14,657.30
14,657.00
9,750.00
2,843.75
1,080.00
3,000.00
330.00
108.00
17,111.75
1,711.18
18,822.93
18,822.00

24

1
62

63

64

65

66

1 M' PAS. PIPA PVC TYPE AW 2"


Pipa PVC 2"
1.2000
M'
Perlengkapan (35 %)
1.0000
Set
Pekerja
0.0360
Org
Tukang Batu
0.0600
Org
Kepala Tukang Batu
0.0060
Org
Mandor
0.0018
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 2 1/2"
Pipa PVC 2 1/2"
1.2000
M'
Perlengkapan (35 %)
1.0000
Set
Pekerja
0.0360
Org
Tukang Batu
0.0600
Org
Kepala Tukang Batu
0.0060
Org
Mandor
0.0018
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE D 3" UNTUK PEMBUANGAN KM/WC
Pipa PVC D 3"
1.2000
M'
Perlengkapan (45 %)
1.0000
Set
Pekerja
0.0360
Org
Tukang Batu
0.0600
Org
Kepala Tukang Batu
0.0060
Org
Mandor
0.0018
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 3"
Pipa PVC AW 3"
1.2000
M'
Perlengkapan (35 %)
1.0000
Set
Pekerja
0.0360
Org
Tukang Batu
0.0600
Org
Kepala Tukang Batu
0.0060
Org
Mandor
0.0018
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE D 4" UNTUK PEMBUANGAN KM/WC
Pipa PVC D 4"
1.2000
M'
Perlengkapan (45 %)
1.0000
Set
Pekerja
0.0360
Org
Tukang Batu
0.0600
Org
Kepala Tukang Batu
0.0060
Org
Mandor
0.0018
Org
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
Jumlah
Dibulatkan

Analisis Harga Satuan

5
13,229.34
4,630.27
30,000.00
50,000.00
55,000.00
60,000.00
20,505.48
x

25,023.48

15,623.97
5,468.39
30,000.00
50,000.00
55,000.00
60,000.00
24,217.15
x

28,735.15

24,030.99
10,813.95
30,000.00
50,000.00
55,000.00
60,000.00
39,651.14
x

44,169.14

24,030.99
8,410.85
30,000.00
50,000.00
55,000.00
60,000.00
37,248.04
x

41,766.04

38,791.32
17,456.10
30,000.00
50,000.00
55,000.00
60,000.00
64,005.68
x

68,523.68

6
15,875.21
4,630.27
1,080.00
3,000.00
330.00
108.00
25,023.48
2,502.35
27,525.82
27,525.00
18,748.76
5,468.39
1,080.00
3,000.00
330.00
108.00
28,735.15
2,873.51
31,608.66
31,608.00
28,837.19
10,813.95
1,080.00
3,000.00
330.00
108.00
44,169.14
4,416.91
48,586.05
48,586.00
28,837.19
8,410.85
1,080.00
3,000.00
330.00
108.00
41,766.04
4,176.60
45,942.64
45,942.00
46,549.59
17,456.10
1,080.00
3,000.00
330.00
108.00
68,523.68
6,852.37
75,376.05
75,376.00

25

1
67

68

69

70

71

72

1 M' PAS. PIPA PVC TYPE AW 4"


Pipa PVC AW 4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI TANAM
Kunci
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI SLOT/ESPAGNOLET
Kunci Slot/Espagnolet
Pekerja
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI BULAT KM/WC
Kunci Bulat KM/WC
Pekerja
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 PS PAS. ENGSEL PINTU
Engsel Pintu
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 PS PAS. ENGSEL JENDELA
Engsel Jendela
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

1.0000
0.0600
0.6000
0.0600
0.0030
=

Analisis Harga Satuan

Bh
Org
Lot

10.0000 %

135,280.00

25,000.00
30,000.00
25,000.00
x

Bh
Org
Lot

40,000.00

99,000.00
30,000.00
99,000.00
x

Ps
Org
Org
Org
Org

10.0000 %

64,644.55

100,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

10.0000 %

1.0000
0.0600
0.6000
0.0600
0.0030
=

Bh
Org
Org
Org
Org

10.0000 %

1.0000
0.5000
0.0000

38,791.32
13,576.96
30,000.00
50,000.00
55,000.00
60,000.00
60,126.55
x

10.0000 %

1.0000
0.5000
0.0000

M'
Set
Org
Org
Org
Org
Lot

10.0000 %

1.0000
0.0600
0.6000
0.0600
0.0030
=

114,000.00

30,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Bh
Org
Org
Org
Org

65,280.00

20,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

55,280.00

6
46,549.59
13,576.96
1,080.00
3,000.00
330.00
108.00
64,644.55
6,464.45
71,109.00
71,109.00
100,000.00
1,800.00
30,000.00
3,300.00
180.00
135,280.00
13,528.00
148,808.00
148,808.00
25,000.00
15,000.00
40,000.00
4,000.00
44,000.00
44,000.00
99,000.00
15,000.00
114,000.00
11,400.00
125,400.00
125,400.00
30,000.00
1,800.00
30,000.00
3,300.00
180.00
65,280.00
6,528.00
71,808.00
71,808.00
20,000.00
1,800.00
30,000.00
3,300.00
180.00
55,280.00
5,528.00
60,808.00
60,808.00

26

1
73

74

75

76

77

1 BH PAS. ENGSEL ANGIN


Engsel Angin
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KAIT ANGIN
Kait Angin
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA POLOS TEBAL 3 MM
Kaca Polos 3 mm
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA POLOS TEBAL 5 MM
Kaca Polos 5 mm
Pekerja
Tukang Kayu
Kepala Tukang kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 MELABUR DENGAN PLITUR JADI
Plitur Jadi
Vernis
Dempul Lilin
Ampelas Kayu
Kwas 3"
Tukang Cat
Kepala Tukang Cat
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1.0000
0.0600
0.6000
0.0600
0.0030
=

Analisis Harga Satuan

10.0000 %

60,280.00

7,500.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M2
Org
Org
Org
Org

42,780.00

48,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

M2
Org
Org
Org
Org

10.0000 %

0.3720
0.1500
0.0500
0.1000
0.0100
0.1600
0.0160
0.0000
=

Bh
Org
Org
Org
Org

10.0000 %

1.1000
0.0600
0.6000
0.0600
0.0030

25,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

10.0000 %

1.1000
0.0600
0.6000
0.0600
0.0030

Bh
Org
Org
Org
Org

10.0000 %

1.0000
0.0600
0.6000
0.0600
0.0030
=

88,080.00

68,000.00
30,000.00
50,000.00
55,000.00
60,000.00
x

Ltr
Ltr
Kg
Lbr
Bh
Org
Org
Lot

110,080.00

17,500.00
15,000.00
17,500.00
2,000.00
7,000.00
50,000.00
55,000.00
9,905.00
x

18,785.00

6
25,000.00
1,800.00
30,000.00
3,300.00
180.00
60,280.00
6,028.00
66,308.00
66,308.00
7,500.00
1,800.00
30,000.00
3,300.00
180.00
42,780.00
4,278.00
47,058.00
47,058.00
52,800.00
1,800.00
30,000.00
3,300.00
180.00
88,080.00
8,808.00
96,888.00
96,888.00
74,800.00
1,800.00
30,000.00
3,300.00
180.00
110,080.00
11,008.00
121,088.00
121,088.00
6,510.00
2,250.00
875.00
200.00
70.00
8,000.00
880.00
18,785.00
1,878.50
20,663.50
20,663.00

27

1
78

79

80

81

82

83

84

1 M2 WATERPROOFING 3 LAPIS + SCREEDING SEK. FOSROC


Waterproofing 3 Lapis
0.5000
Screeding 1 : 3
1.0000
Tukang Batu
0.2000
Kepala Tukang Batu
0.3000
Mandor
0.0300
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' SALURAN GRAVEL BETON 1/2 30 CM + PASANGAN
Galian Tanah
0.2000
Gravel Beton 30 Cm
1.0000
Pas. Bata + Plesteran 1 : 3
1.0000
Upah Kerja
0.1500
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KOLOM PRAKTIS 12/12 TERPASANG
Adukan beton K.175
1.0000
Bekisting papan & Stootwerk 2x Pakai (62.5%)
16.6667
Besi beton U-24
218.8889
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KOLOM K1 20/20 TERPASANG
Adukan beton K.175
1.0000
Bekisting papan & Stootwerk 2x Pakai (62.5%)
12.3333
Besi beton U-24
212.5500
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KOLOM K2 12/25 TERPASANG
Adukan beton K.175
1.0000
Bekisting papan & Stootwerk 2x Pakai (62.5%)
12.3333
Besi beton U-24
326.1333
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 RING BALOK 15/20 TERPASANG
Adukan beton K.175
1.0000
Bekisting papan & Stootwerk 2x Pakai (62.5%)
8.3333
Besi beton U-24
268.4583
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 BALOK 12/25 TERPASANG ( B1 )
Adukan beton K.175
1.0000
Bekisting papan & Stootwerk 2x Pakai (62.5%)
16.6667
Besi beton U-24
200.5667
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

Analisis Harga Satuan

Kg
M2
OH
OH
OH
%

72,000.00
16,783.00
50,000.00
55,000.00
58,000.00
x

M3
Bh

44,000.00
40,000.00
75,580.00
48,800.00
124,380.00

M1
Ls
Lot
%

M3
M2
Kg
%

M3
M2
Kg

M3
M2
Kg

M3
M2
Kg

4,702,939.40

699,255.00
83,971.88
10,291.50
x

M3
M2
Kg
%

3,533,996.53

699,255.00
83,971.88
10,291.50
x

3,826,657.03

699,255.00
83,971.88
10,291.50
x

131,700.00

699,255.00
83,971.88
10,291.50
x

81,023.00

3,899,447.45

699,255.00
83,971.88
10,291.50
x

3,638,093.88

6
36,000.00
16,783.00
10,000.00
16,500.00
1,740.00
81,023.00
8,102.30
89,125.30
89,125.00
8,800.00
40,000.00
75,580.00
7,320.00
131,700.00
13,170.00
144,870.00
144,870.00
699,255.00
874,707.03
2,252,695.00
3,826,657.03
382,665.70
4,209,322.73
4,209,322.00
699,255.00
647,283.20
2,187,458.33
3,533,996.53
353,399.65
3,887,396.18
3,887,396.00
699,255.00
647,283.20
3,356,401.20
4,702,939.40
470,293.94
5,173,233.34
5,173,233.00
699,255.00
437,353.52
2,762,838.94
3,899,447.45
389,944.75
4,289,392.20
4,289,392.00
699,255.00
874,707.03
2,064,131.85
3,638,093.88
363,809.39
4,001,903.27
4,001,903.00

28

1
85

86

87

88

89

1 M3 SLOOF 15/20 TERPASANG


Adukan beton K.175
1.0000
M3
Bekisting papan 2x Pakai (62.5%)
5.0000
M2
Besi beton U-24
170.6667
Kg
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M' PEKERJAAN FLASHING TEBAL 0.4 MM
1.0000
M'
Flashing Sek. CBM T. 0.4 mm
Upah Pasang & Alat Angkkut
1.0000
Kg
Upah Angkut
0.0000
Lot
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M2 PASANG ATAP GENTENG PRESS PALENTONG EX. JATIWANGI
Genteng Press Palentong Ex. Jatiwangi
25.0000
Bh
Pekerja
0.1500
Oh
Tukang Kayu
0.0750
Oh
Kepala Tukang Kayu
0.0080
Oh
Mandor
0.0080
Oh
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M' PASANG BUBUNG GENTENG PRESS PALENTONG EX. JATIWANGI
Genteng Bubung Palentong
5.0000
Bh
Semen Portland
8.0000
Kg
Pasir Pasang
0.0320
M3
Pekerja
0.4000
Oh
Tukang Batu
0.2000
Oh
Kepala Tukang Batu
0.0200
Oh
Mandor
0.0020
Oh
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan
1 M3 PLAT LANTAI TEBAL 10 CM
Adukan beton K. 175
1.0000
M3
Bekisting Multiplek 9 mm & Stootwerk ( untuk 2x pakai dimbil15.0000
62,5% ) M3
Besi beton U-24
88.7445
Kg
Jumlah
Keuntungan Max.
=
10.0000 %
x
Jumlah
Dibulatkan

Analisis Harga Satuan

5
699,255.00
83,971.88
10,291.50
2,718,083.11

40,800.00
10,000.00
140,000.00
50,800.00

1,400.00
30,000.00
50,000.00
55,000.00
60,000.00
44,170.00

2,000.00
1,200.00
108,000.00
30,000.00
50,000.00
55,000.00
60,000.00
46,276.00

699,255.00
76,305.00
10,291.50
2,327,928.40

6
699,255.00
262,412.11
1,756,416.00
2,718,083.11
271,808.31
2,989,891.42
2,989,891.00
40,800.00
10,000.00
50,800.00
5,080.00
55,880.00
55,880.00
35,000.00
4,500.00
3,750.00
440.00
480.00
44,170.00
4,417.00
48,587.00
48,587.00
10,000.00
9,600.00
3,456.00
12,000.00
10,000.00
1,100.00
120.00
46,276.00
4,627.60
50,903.60
50,903.00
699,255.00
715,359.38
913,314.02
2,327,928.40
232,792.84
2,560,721.24
2,560,721.00

29

REKAPITULASI :
ANALISA HARGA SATUAN
TAHUN 2012 KABUPATEN BANDUNG

No.

URAIAN

HARGA SATUAN

A. ANALISA UMUM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

1 M2 PEK. PENGUKURAN KEMBALI (SITE)


Rp.
1 M' PEK. PASANGAN BOUWPLANK & PENGUKURAN
Rp.
1 M2 LOS KERJA / GUDANG
Rp.
1 M2 PEMB. DIREKSI KEET DENGAN LANTAI DIPLESTER
Rp.
1 M2 PAPAN NAMA PROYEK
Rp.
1 M2 PAGAR PENGAMAN PROYEK
Rp.
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'
Rp.
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2 M'
Rp.
1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 M'
Rp.
1 M3 URUGAN TANAH KEMBALI
Rp.
1 M3 PEMADATAN TANAH, TANAH DILOKASI
Rp.
1 M3 URUGAN SIRTU
Rp.
1 M3 PEK. GALIAN TANAH SUMURAN MAX. KEDALAMAN 1 M'
Rp.
1 M3 URUGAN PASIR URUG
Rp.
1 M3 ADUKKAN BETON TUMBUK CAMP 1PC : 3PS : 5KRL
Rp.
1 M3 COR BETON SITE MIX K - 175
Rp.
1 KG BESI BETON TERPASANG POLOS
Rp.
1 KG BESI BETON TERPASANG U-39 (ULIR)
Rp.
1 M2 BEKISTING DENGAN PAPAN
Rp.
1 M2 BEKISTING DENGAN MULTIPLEX 9 MM
Rp.
1 M2 PASANGAN SSTEGER WERK DARI BAMBU
Rp.
1 M3 PASANGAN BATU KOSONG (AANSTAMPING)
Rp.
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP
Rp.
1 M2 DINDING KERAMIK UKURAN 20 x 20 CM SEK. MULIA
Rp.
1 M2 DINDING KERAMIK UKURAN 30 x 30 CM SEK. MULIA
Rp.
1 M' PLINT KERAMIK 10 x 30 CM DN SEK. MULIA
Rp.
1 M' LIST KERAMIK 4 x 20 CM DN BERCORAK/WARNA KM/WC SEK. MULIA
Rp.
1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM CORAK/ANTI SLIP SEK. MULIA
Rp.
1 M2 LANTAI KERAMIK 30/30CM SEK. MULIA
Rp.
1 M2 LANTAI KERAMIK 30/30 CM SEK. MULIA CORAK/WARNA/KASAR
Rp.
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 3 PP, TEBAL 1/2 BATA
Rp.
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 5 PP, TEBAL 1/2 BATA
Rp.
1 M2 PASANGAN DINDING BATA MERAH, TEBAL 1 BATA 1 PC : 5 PS
Rp.
1 M2 PLESTERAN 1 PC ; 3 PP, TEBAL 1,5 CM
Rp.
1 M2 PLESTERAN 1 PC ; 4 PP, TEBAL 1,5 CM
Rp.
1 M2 PLESTERAN 1 PC ; 5 PP, TEBAL 1,5 CM
Rp.
1 M2 ACIAN DENGAN PC
Rp.
1 UNIT SEPTICTANK 2 x 1,5 x 1,5 m + REMBESANNYA (UNTUK KANTOR TYPE KECIL)
Rp.
1 M2 PENGECATAN DINDING KEMTONE ESKTERIOR 3 x
Rp.
1 M2 PENGECATAN DINDING KEMTONE INTERIOR 3 x
Rp.
1 M2 PENGECATAN DINDING VINILEX (3x)
Rp.
1 M2 PENGECATAN PLAFOND VINILEX (3x)
Rp.
1 M2 PENGECATAN KAYU (3x)
Rp.
1 M2 PENGECATAN BESI (3x)
Rp.
1 M2 PLITURAN BANGUNAN (BIASA)
Rp.
1 M2 PAS. RANGKA PLAFOND KAYU BORNEO
Rp.
1 M2 PAS. PLAFOND GRC 4 MM + RANGKA KAYU LOKAL KELAS II
Rp.
1 M' PEK. LISTPLANK KAYU KUAT KELAS II (MAHONI) 3/30
Rp.
1 M3 KUSEN KAYU LOKAL KELAS II ( MAHONI )
Rp.
1 M2 JENDELA TANPA KACA, KAYU LOKAL KELAS II
Rp.

1,815.00
29,975.00
708,493.00
821,564.00
61,600.00
486,776.00
15,840.00
20,790.00
20,328.00
7,590.00
19,800.00
206,932.00
24,640.00
158,400.00
609,774.00
769,180.00
11,320.00
11,320.00
78,100.00
94,967.00
89,771.00
227,683.00
471,434.00
101,479.00
102,034.00
21,872.00
19,228.00
110,519.00
102,186.00
107,186.00
64,676.00
59,079.00
97,559.00
18,461.00
16,890.00
15,966.00
5,145.00
3,939,848.00
30,859.00
26,046.00
14,395.00
15,771.00
27,879.00
39,861.00
67,496.00
47,437.00
70,239.00
42,394.00
3,757,600.00
329,450.00

Rekapitulasi Analisis Harga Satuan


30

1
3
51 1 M2 DAUN PINTU PANIL MULTIPLEK 9 MM (RANGKA KAYU KUAT KELAS II
52 1 M2 DAUN PINTU TEAKWOOD RANGKAP, KAYU LOKAL KELAS II
53 1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS FORMIKA (KM/WC)
54 1 M' SALURAN GRAVEL BETON 1/2 20 CM + PASANGAN
55 1 M3 URUGAN TANAH SETEMPAT DIRATAKAN
56 1 M3 URUGAN TANAH MERAH DIRATAKAN
57 1 M' PAS. PIPA PVC TYPE AW 1/2"
58 1 M' PAS. PIPA PVC TYPE AW 3/4"
59 1 M' PAS. PIPA PVC TYPE AW 1"
60 1 M' PAS. PIPA PVC TYPE AW 1 1/4"
61 1 M' PAS. PIPA PVC TYPE AW 1 1/2"
62 1 M' PAS. PIPA PVC TYPE AW 2"
63 1 M' PAS. PIPA PVC TYPE AW 2 1/2"
64 1 M' PAS. PIPA PVC TYPE D 3" UNTUK PEMBUANGAN KM/WC
65 1 M' PAS. PIPA PVC TYPE AW 3"
66 1 M' PAS. PIPA PVC TYPE D 4" UNTUK PEMBUANGAN KM/WC
67 1 M' PAS. PIPA PVC TYPE AW 4"
68 1 BH PAS. KUNCI TANAM
69 1 BH PAS. KUNCI SLOT/ESPAGNOLET
70 1 BH PAS. KUNCI TANAM KM/WC
71 1 BH PAS. ENGSEL PINTU
72 1 BH PAS. ENGSEL JENDELA
73 1 BH PAS. ENGSEL ANGIN
74 1 BH PAS. KAIT ANGIN
75 1 M2 PAS. KACA POLOS TEBAL 3 MM
76 1 M2 PAS. KACA POLOS TEBAL 5 MM
77 1 M2 MELABUR DENGAN PLITUR JADI
78 1 M2 WATERPROOFING 3 LAPIS + SCREEDING SEK. FOSROC
79 1 M' SALURAN GRAVEL BETON 1/2 30 CM + PASANGAN
80 1 M3 KOLOM PRAKTIS 12/12 TERPASANG
81 1 M3 KOLOM K1 20/20 TERPASANG
82 1 M3 KOLOM K2 12/25 TERPASANG
83 1 M3 RING BALK 15/20 TERPASANG
84 1 M3 BALOK 12/25 TERPASANG ( B1 )
85 1 M3 SLOOF 15/20 TERPASANG
86 1 M' PEKERJAAN FLASHING TEBAL 0.4 MM
87 1 M2 PASANG ATAP GENTENG PRESS PALENTONG EX. JATIWANGI
88 1 M' PASANG BUBUNG GENTENG PRESS PALENTONG EX. JATIWANGI
89 1 M3 PLAT LANTAI TEBAL 10 CM

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4
292,270.00
218,570.00
312,873.00
118,072.00
127,710.00
77,550.00
9,871.00
10,937.00
12,427.00
14,657.00
18,822.00
27,525.00
31,608.00
48,586.00
45,942.00
75,376.00
71,109.00
148,808.00
44,000.00
125,400.00
71,808.00
60,808.00
66,308.00
47,058.00
96,888.00
121,088.00
20,663.00
89,125.00
144,870.00
4,209,322.00
3,887,396.00
5,173,233.00
4,289,392.00
4,001,903.00
2,989,891.00
55,880.00
48,587.00
50,903.00
2,560,721.00

Rekapitulasi Analisis Harga Satuan


31

RENCANA ANGGARAN BIAYA ( RAB )


PEKERJAAN PEMBANGUNAN PUSKESMAS HEWAN ( PUSKESWAN )
PANGALENGAN KABUPATEN BANDUNG
TAHUN ANGGARAN 2012
A. BANGUNAN PUSKESWAN
VOL. KERJA
NO

I
1
2
3
4
5
6
7

URAIAN PEKERJAAN

JML

PEKERJAAN PERSIAPAN
Pembersihan Lahan & Pembongkaran
Pemasangan Listrik Baru 1300 Watt
Direksikeet/Los Kerja, Gudang & Alat
Administrasi dan Dokumentasi / IMB
Pasangan Bouwplank / Pengukuran
Pengadaan Air Kerja & Listrik Kerja
Papan Nama Proyek

SAT

1.000 ls
1.000 Ls
6.000 m
1.000 ls
95.050 m'
1.000 ls
1.000 Bh

HARGA
SATUAN

500,000.00
5,005,000.00
708,493.00
3,093,250.00
29,975.00
500,000.00
61,600.00

SUB TOTAL
(Rp)

500,000.00
5,005,000.00
4,250,958.00
3,093,250.00
2,849,123.75
500,000.00
61,600.00

SUB TOTAL I
II
1
2
3
4

PEKERJAAN TANAH
Galian Tanah Pondasi
Urugan Tanah Kembali Pondasi
Urugan Tanah Peninggian Lantai 25 cm & 65 cm
Urugan Pasir di bawah lantai ( t = 7 cm )

16,259,931.75

57.030
19.010
35.640
6.615

m
m
m
m

15,840.00
7,590.00
127,710.00
158,400.00

903,355.20
144,285.90
4,551,584.40
1,047,816.00

SUB TOTAL II
III PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Kali 1 : 5
2 Pasir Urug t = 5 cm

6,647,041.50

32.021 m
3.802 m

471,434.00
158,400.00

15,095,670.26
602,236.80

SUB TOTAL III


IV
1
2
3
4
5
6
7
8

PEKERJAAN BETON
Sloof 15/20 SL1 ( 4 12 + 10 - 15 )
Kolom Praktis12/12 KP ( 4 10 + 8 - 20 )
Kolom K1 20/20 ( 4 13 + 8 - 15 )
Kolom K2 12/25 ( 4 10 + 8 - 15 )
RB 1 12/20 ( 4 D 13 + 8 - 15 )
Balok B1 12/25 ( 4 Dia. 13 + 8 - 20 )
Meja Beton Tebal 10 cm
Dak Beton Tebal 10 cm

15,697,907.06

2.852
1.477
0.304
0.456
1.963
0.428
0.342
0.600

m
m
m
m
m
m
m
m

2,989,891.00
4,209,322.00
3,887,396.00
5,173,233.00
4,289,392.00
4,001,903.00
1,573,643.00
2,560,721.00

8,525,674.19
6,219,020.70
1,181,768.38
2,358,994.25
8,420,934.37
1,710,813.53
538,185.91
1,536,432.60

SUB TOTAL IV
V
1
2
3
4

VI
1
2
3
4
5
6
7
8

HARGA
TOTAL
(Rp)

30,491,823.93

PEKERJAAN DINDING, PLESTERAN & WATERPROFING


Pasangan Bata Merah 1 PC : 5 Ps
Plesteran Dinding 1 PC : 5 Ps
Water Proofing + Screeding 1.5 cm Dak Beton Sek. Fosroc
Acian Beton + Dak
SUB TOTAL V

257.615
464.640
7.000
7.000

PEKERJAAN LANTAI & KERAMIK


Lantai Kerja 1 Pc : 3 Psr : 5 Krl Tebal 5 cm
Keramik Lantai 30/30 Polos Sek. Mulia
Keramik Lantai 20/20 Anti Slip Sek. Mulia
Keramik Dinding 30/30 Polos Sek. Mulia ( R. Periksa )
Keramik Dinding KM/WC 20/20 Sek. Mulia
Keramik Meja Beton + Dinding 20/20 Sek. Mulia ( R. Lab )
Keramik Plint 10/30 Polos Sek. Mulia
List Keramik KM/WC 5 x 20 Sek. Mulia
SUB TOTAL VI

1.950
89.250
5.250
19.523
23.130
5.850
87.450
11.350

m
m
m
m

59,079.00
15,966.00
97,806.00
5,145.00

15,219,636.59
7,418,442.24
684,642.00
36,015.00
23,358,735.83

m
m
m
m
m
m
m'
m'

609,774.00
107,186.00
110,519.00
102,034.00
101,479.00
101,479.00
21,872.00
19,228.00

1,189,059.30
9,566,350.50
580,224.75
1,991,958.77
2,347,209.27
593,652.15
1,912,706.40
218,237.80
18,399,398.94

32

VOL. KERJA
NO

VII
1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

PEKERJAAN KUSEN, PINTU & JENDELA


Kusen Pintu dan Jendela Kayu Lokal Kelas II
Daun Pintu Panel
Daun Pintu Double Teakwood
Daun Pintu Melaminto KM/WC
Daun Jendela (tanpa Kaca) Kayu Lokal Kelas II
Kunci Pintu
Kunci Bulat KM/WC
Engsel Cabut Pintu ( 3 bh/Pintu )
Engsel Jendela Kupu - Kupu ( 2 bh/jendela )
Espagnolet Pintu Double
Sloot jendela
Hak angin
Kaca Polos 5 mm Sek. ASAHI

JML

SAT

1.249
7.560
9.240
2.940
14.850
9.000
2.000
33.000
46.000
2.000
23.000
23.000
20.537

m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
m

HARGA
SATUAN

3,757,600.00
292,270.00
218,570.00
312,873.00
329,450.00
148,808.00
140,394.00
20,103.00
16,427.00
26,150.00
23,779.00
32,203.00
121,088.00

SUB TOTAL
(Rp)

4,692,115.12
2,209,561.20
2,019,586.80
919,846.62
4,892,332.50
1,339,272.00
280,788.00
663,399.00
755,642.00
52,300.00
546,917.00
740,669.00
2,486,747.93
21,599,177.17

SUB TOTAL VII


VIII
1
2
3
4
5

PEKERJAAN ATAP
Atap Baja Ringan + Reng + Talang Bahan Galvanis G550, Sek. Pryda
Alumunium Foil Single Side
Pasangan Genteng Palentong
Pasangan Bubung Genteng Palentong
Listplank Kayu 3/30 Sek. Borneo Super
SUB TOTAL VIII

IX PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Lokal Klas II + GRC 4 mm
2 List Gypsum 7 cm

143.206 m
143.206 m
143.206 m
39.500 m'
51.450 m'

170,000.00
12,500.00
48,587.00
50,903.00
42,394.00

24,344,945.63
1,790,069.53
6,957,928.67
2,010,668.50
2,181,171.30
37,284,783.62

145.950 m
148.350 m'

70,239.00
11,000.00

10,251,382.05
1,631,850.00
11,883,232.05

SUB TOTAL IX
X
1
2
3
4
5
6

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

HARGA
TOTAL
(Rp)

PEKERJAAN PENGECATAN & LABURAN


Pengecatan Dinding Eksterior dengan Sek. Kemtone 3 x
Pengecatan Dinding Interior dengan Sek. Vinilex 3 x
Pengecatan Plafond dengan Sek. Vinilex 3 x
Plituran Daun Pintu
Pengecatan Kusen
Pengecatan Listplank
SUB TOTAL X

137.375
157.553
145.950
39.480
13.250
30.870

PEKERJAAN SANITAIR
Closet Jongkok Type CE 6 Sek. Toto
Closet Duduk C421 ( Lengkap Sek. Toto )
Jet Washer Sek. Wasser
Stop Kran Ex. Taiwan
Tempat Sabun Type S 156 N Sek. "TOTO"
Floor Drain 3" Sek. ISANO
Kran T 23 B13 ( KM/WC ) Sek. Toto
Kichensink + Kran Leher Angsa
Pompa 250 Sek. DAB
Pipa PVC dia 4" Sek. Maspion AW abu + Acces KM/WC & Hujan
Pipa PVC dia 3" Sek. Maspion AW abu + Acces KM/WC
Pipa PVC dia 2" Sek. Maspion AW abu + Acces
Pipa PVC dia 1" Sek. Maspion AW abu + Acces (air bersih)
Pipa PVC dia 3/4" Sek. Maspion AW abu + Acces (air bersih)
Pipa PVC dia 1/2" Sek. Maspion AW abu + Acces (air bersih)
Septictank 1,5 x 1 x 1,5 Type Kecil + Rembesan
SUB TOTAL XI

1.000
1.000
1.000
1.000
2.000
2.000
2.000
3.000
2.000
16.000
22.000
20.000
70.250
8.000
8.000
2.000

m
m
m
m
m
m

30,859.00
14,395.00
15,771.00
20,663.00
27,879.00
27,879.00

4,239,255.13
2,267,968.24
2,301,777.45
815,775.24
369,396.75
860,624.73
10,854,797.53

bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
bh

441,000.00
1,657,000.00
99,000.00
40,000.00
48,720.00
72,000.00
261,600.00
475,000.00
450,000.00
75,376.00
48,586.00
27,525.00
12,427.00
10,937.00
9,871.00
2,305,483.00

441,000.00
1,657,000.00
99,000.00
40,000.00
97,440.00
144,000.00
523,200.00
1,425,000.00
900,000.00
1,206,016.00
1,068,892.00
550,500.00
872,996.75
87,496.00
78,968.00
4,610,966.00
13,802,474.75

33

VOL. KERJA
NO

XII
1
2
3
4
5
6
7

URAIAN PEKERJAAN

PEKERJAAN INSTALASI LISTRIK


Lampu DOWN LIGTH 4" & SL 23 Watt (Spiral, white) Sek. Philips
Lampu SL 9 Watt Sek. Philips
Saklar Ganda Sek. Brocco
Saklar Tunggal Sek. Brocco
Stop Kontak Dinding Sek. Brocco
Instalasi Titik Penerangan/Lampu
Instalasi Titik Stopkontak & Saklar
SUB TOTAL XII

JML

SAT

28.000 ttk
8.000 bh
7.000 bh
6.000 bh
12.000 bh
36.000 ttk
25.000 ttk

HARGA
SATUAN

76,300.00
20,000.00
20,250.00
16,875.00
20,250.00
75,000.00
75,000.00

SUB TOTAL
(Rp)

HARGA
TOTAL
(Rp)

2,136,400.00
160,000.00
141,750.00
101,250.00
243,000.00
2,700,000.00
1,875,000.00
7,357,400.00

34

REKAPITULASI RENCANA ANGGARAN BIAYA


PEKERJAAN PEMBANGUNAN PUSKESMAS HEWAN ( PUSKESWAN )
PANGALENGAN KABUPATEN BANDUNG
TAHUN ANGGARAN 2012
A. BANGUNAN PUSKESWAN
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETON
PEKERJAAN DINDING, PLESTERAN & WATERPROFING
PEKERJAAN LANTAI & KERAMIK
PEKERJAAN KUSEN, PINTU & JENDELA
PEKERJAAN ATAP
PEKERJAAN PLAFOND
PEKERJAAN PENGECATAN & LABURAN
PEKERJAAN SANITAIR
PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JUMLAH Rp.

16,259,931.75
6,647,041.50
15,697,907.06
30,491,823.93
23,358,735.83
18,399,398.94
21,599,177.17
37,284,783.62
11,883,232.05
10,854,797.53
13,802,474.75
7,357,400.00
213,636,704.12

PPN 10% Rp.

21,363,670.41

JUMLAH + PPN 10% Rp.

235,000,374.53

JUMLAH

Rp.

TERBILANG :

Bandung,
2012
CV. CRESTA DESIGN

Ir. Jenny Natan.IAI.


Direktur

235,000,000.00

Anda mungkin juga menyukai