NAMA BANGUNAN
Jenis Pekerjaan
PEKERJAAN PENDAHULUAN
DAN PERSIAPAN
A Direksi Keet, Gudang, Papan Nama
Proyek, Pagar Sementara
JUMLAH
BGN
1 Unit
B Pengurugan(Timbunan) Tahap 1
I
GEDUNG UTAMA
1 Pek. Arsitektur
2 Pek. Struktur
3 Pek. M&E
HARGA
SAT
m3
1 Bgn.
1 Bgn.
1 Bgn.
Subtotal
II
1
2
3
4
5
5
1
4
Bgn.
Bgn.
Bgn.
Bgn.
Subtotal
III
1 Bgn
1 Bgn
1 Bgn
Subtotal
GEDUNG KULIAH
1 Pek. Arsitektur
2 Pek. Struktur
3 Pek. M&E
1 Bgn
1 Bgn.
1 Bgn.
1 Bgn.
Subtotal
423 m2
TOTAL I
V
1 Bgn
1 Bgn
1 Bgn
Subtotal
VI
RUANG LUAR
1 Peralatan Utama Listrik /Telepon
2 Peralatan Utama Mekanikal
3 Pek. Hidrant Area Luar
1 Unit
1 Unit
Subtotal
TOTAL II
VII
1
1
1
Sub total
TOTAL III
PPN 10%
TOTAL
PEMBULATAN
JUMLAH
HARGA
JENIS PEKERJAAN
SATUAN
HARGA
SATUAN
PEKERJAAN PENDAHULUAN
DAN PERSIAPAN
1
2
3
3
VOLUME
54.00
16.00
1.00
1,175.00
m2
m2
bh
m1
16.00 m2
70,739.00 m2
PEKERJAAN PENGURUGAN
TAHAP 1
1 Pengurugan Peil 10.30
3 Pengurugan Peil 11.00
4 Pengurugan Peil 11.50
10,219.17 m3
20,115.00 m3
1,657.00 m3
TOTAL TAHAP 1
HARGA
REKAPITULASI
Pekerjaan
Lokasi
PEKERJAAN STRUKTUR
NO
URAIAN PEKERJAAN
BANGUNAN UTAMA
II
ASRAMA ( 5 Bangunan )
III
ASRAMA VIP
IV
BANGUNAN KELAS
HARGA (Rp)
Rp.
Uraian Pekerjaan
Volume
Sat
1,032.00
1,032.00
1.00
86.00
1.00
m
m1
ls
bh
set
21.60
6.60
450.12
572.88
73.44
m2
m3
kg
kg
m2
PEKERJAAN BETON
LANTAI DASAR
1
2
3
4
5
1
2
3
4
5
1.86
0.70
32.22
41.01
4.3
m2
m3
kg
kg
m2
1
2
3
4
5
Beton pilecap P2
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Bekisting
5.76
2.16
99.79
127.01
14.4
m2
m3
kg
kg
m2
1
2
3
4
5
6
Beton pilecap P3
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Besi dia. 16
Bekisting
2.65
1.02
11.71
35.14
70.28
4.62
m2
m3
kg
kg
kg
m2
Harga Satuan
Jumlah Harga
No
Uraian Pekerjaan
Volume
Sat
1
2
3
4
5
6
7
8
0.08
189.45
84.20
84.20
33.68
4,361.56
1,869.24
505.20
143.14
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
5
6
7
8
4.75
6.60
6.60
1.76
128.83
85.89
23.10
2.00
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
5
6
7
8
1.40
1.60
1.60
0.36
21.55
12.65
6.72
0.80
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
5
6
7
1.34
1.44
1.44
0.50
17.64
3.84
0.62
m3
m2
m2
m3
kg
m2
m3
1
2
3
4
14.58
1,942.79
1,046.12
238.14
m3
kg
kg
m2
1
2
3
4
0.91
141.15
54.89
12.85
m3
kg
kg
m2
Harga Satuan
Jumlah Harga
No
Uraian Pekerjaan
Volume
Sat
1
2
3
4
1.99
403.40
172.89
41.47
m3
kg
kg
m2
1
2
3
4
0.69
100.97
47.51
15.12
m3
kg
kg
m2
1
2
3
4
0.51
67.09
42.89
17.28
m3
kg
kg
m2
1
2
3
4
0.92
145.03
62.15
28.51
m3
kg
kg
m2
1
2
3
4
0.86
103.90
55.94
20.59
m3
kg
kg
m2
1
2
3
4
1.06
135.65
76.30
16.96
m3
kg
kg
m2
1
2
3
4
1.25
170.99
66.50
25.20
m3
kg
kg
m2
3.90
279.42
23.72
m3
kg
m2
Tangga
1 Beton K250
2 besi
3 bekisting
Harga Satuan
Jumlah Harga
No
Uraian Pekerjaan
Volume
Sat
61.20
8,262.00
496.80
m3
kg
m2
33.81
3,550.05
281.75
m3
kg
m2
17.48
1,713.04
174.80
m3
kg
m2
LANTAI ATAS
1
2
3
4
39.44
5,282.07
2,054.14
566.98
m3
kg
kg
m2
1
2
3
4
0.39
43.46
16.90
7.70
m3
kg
kg
m2
1
2
3
4
1.82
255.53
99.37
29.90
m3
kg
kg
m2
1
2
3
4
1.82
255.53
99.37
29.90
m3
kg
kg
m2
1
2
3
4
7.87
963.53
374.71
106.27
m3
kg
kg
m2
Harga Satuan
Jumlah Harga
No
Uraian Pekerjaan
Volume
Sat
1
2
3
4
14.18
2,404.08
1,352.30
214.20
m3
kg
kg
m2
1
2
3
4
1.12
175.62
98.78
32.64
m3
kg
kg
m2
1
2
3
4
0.94
117.15
99.80
11.97
m3
kg
kg
m2
1
2
3
4
0.84
135.48
76.20
10.40
m3
kg
kg
m2
1
2
3
4
0.84
135.48
76.20
10.40
m3
kg
kg
m2
1
2
3
4
6.57
919.63
394.13
215.42
m3
kg
kg
m2
1
2
3
4
2.63
395.44
169.48
71.81
m3
kg
kg
m2
1
2
3
4
0.35
49.12
41.84
20.88
m3
kg
kg
m2
Harga Satuan
Jumlah Harga
No
Uraian Pekerjaan
Tangga
1 Beton K250
2 besi
3 bekisting
Volume
Sat
2.59
185.33
15.73
m3
kg
m2
11.59
1,333.08
96.60
m3
kg
m2
3.58
509.07
250.74
97.15
m3
kg
kg
m2
368.22
29.46
3,944.96
1,534.15
423.45
m3
kg
kg
m2
LANTAI ATAP
Pelat Lantai type S2 (115 kg/m3)
1 Beton K250
2 Besi dia.8
3 Bekisting
1
2
3
4
1
2
3
4
1
2
3
4
0.28
39.31
15.29
4.60
m3
kg
kg
m2
20.81
1,768.85
208.10
m3
kg
m2
275
22.00
2,280.96
887.04
316.25
m3
kg
kg
m2
LANTAI ATAP 1
Pelat Lantai dak t = 10cm (85 kg/m3)
1 Beton K250
2 Besi dia.8
3 Bekisting
1
2
3
4
Harga Satuan
Jumlah Harga
Uraian Pekerjaan
Volume
Sat
540.00
540.00
1.00
45.00
1.00
m
m1
ls
bh
set
2.16
0.66
45.01
57.29
7.34
m2
m3
kg
kg
m2
9.36
3.51
162.16
206.39
23.40
m2
m3
kg
kg
m2
PEKERJAAN BETON
LANTAI DASAR
1
2
3
4
5
1
2
3
4
5
Beton pilecap P2
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Bekisting
1
2
3
4
5
6
Beton pilecap P3
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Besi dia. 16
Bekisting
3.98
1.53
17.57
52.71
105.41
6.93
m
3
m
kg
kg
kg
2
m
1
2
3
4
5
6
Beton pilecap P4
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Besi dia. 16
Bekisting
1.44
0.83
9.56
28.69
57.38
3.46
m
3
m
kg
kg
kg
2
m
Harga Satuan
Jumlah Harga
1
2
3
4
5
6
7
8
9.46
4.20
4.20
1.68
217.77
93.33
25.22
7.15
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
5
6
7
8
5.38
4.17
4.17
1.38
157.26
70.65
14.04
3.37
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
5
6
7
8
143.00
65.78
41.47
41.47
21.45
1,925.35
906.05
185.90
38.11
m3
m2
m2
m3
kg
kg
m2
m3
589.00
589.00
70.68
589.00
m2
m2
m3
m2
Tangga
1 Beton K250
2 besi
3 bekisting
1.99
142.56
12.10
m3
kg
m2
1
2
3
4
0.34
45.90
30.60
7.60
m3
kg
kg
m2
1
2
3
4
7.70
953.80
469.78
91.20
m3
kg
kg
m2
1
2
3
4
1.09
122.14
47.50
9.12
m3
kg
kg
m2
1
2
3
4
3.15
384.18
197.91
21.28
m3
kg
kg
m2
1
2
3
4
3.15
134.98
176.51
21.28
m3
kg
kg
m2
1
2
3
4
37.08
3,670.92
2,447.28
319.30
m3
kg
kg
m2
1
2
3
4
2.40
212.28
135.72
28.75
m3
kg
kg
m2
1
2
3
4
5.76
1,553.47
232.13
43.40
m3
kg
kg
m2
1
2
3
4
2.40
668.16
99.84
28.52
m3
kg
kg
m2
1
2
3
4
4.80
829.44
322.56
66.96
m3
kg
kg
m2
1
2
3
4
0.54
161.35
62.75
13.02
m3
kg
kg
m2
37.75
3,963.75
277.84
m3
kg
m2
1
2
3
4
29.25
2,193.75
1,462.50
234.00
m3
kg
kg
m2
2.10
19.95
21.00
m3
kg
m2
1
2
3
4
6.84
748.57
291.11
95.42
m3
kg
kg
m2
1
2
3
4
16.63
1,700.46
661.29
226.55
m3
kg
kg
m2
1
2
3
4
2.02
195.96
76.20
26.04
m3
kg
kg
m2
1
2
3
4
0.48
44.24
17.20
7.13
m3
kg
kg
m2
Uraian Pekerjaan
Volume
Sat
240.00
240.00
1.00
20.00
1.00
m
m
ls
bh
set
4.32
1.32
90.02
114.58
14.69
m2
m3
kg
kg
m2
PEKERJAAN BETON
LANTAI DASAR
1
2
3
4
5
1
2
3
4
5
Beton pilecap P2
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Bekisting
1
2
3
4
5
6
7
8
LANTAI DASAR
Tie Beam TB1 20x40 ( 165kg/m3)
Galian tanah
Urugan pasir padat 10 cm
Lantai kerja 5 cm
Beton K-250
Besi D16
Besi dia. 10
Bekisting
Urugan tanah kembali
1
2
3
4
1
2
3
4
2.88
1.08
49.90
63.50
7.2
m2
3
m
kg
kg
2
m
54.00
24.00
24.00
9.60
1,243.20
532.80
144.00
40.80
m3
m2
m2
m3
kg
kg
m2
m3
0.75
122.92
60.54
18.72
m3
kg
kg
m2
2.53
375.29
193.33
60.48
m3
kg
kg
m2
Harga Satuan
Jumlah Harga
1.36
180.41
77.32
27.13
m3
kg
kg
m2
190.20
190.20
19.02
190.20
11.20
m2
m2
m3
m2
m2
1.91
136.86
11.50
m3
kg
m2
1
2
3
4
LANTAI ATAS
Balok Beton 200x400 (196 kg/m3)
Beton K-250
Besi D 16
Besi dia.10
Bekisting
6.96
873.06
491.10
101.79
m3
kg
kg
m2
1
2
3
4
1.29
127.51
85.01
18.48
m3
kg
kg
m2
1
2
3
4
0.69
60.03
40.02
11.55
m3
kg
kg
m2
1
2
3
4
0.41
40.22
19.81
5.28
m3
kg
kg
m2
1.91
291.62
124.98
55.44
m3
kg
kg
m2
17.25
2,328.48
123.20
m3
kg
m2
4.03
504.00
33.60
m3
kg
m2
1
2
3
4
1
2
3
4
5
Tangga
1 Beton K250
2 besi
3 bekisting
1
2
3
4
4.84
653.18
40.32
m3
kg
m2
1.10
115.92
9.20
m3
kg
m2
3.17
333.04
27.14
m3
kg
m2
4.67
443.69
46.70
m3
kg
m2
1
2
3
4
ATAP
elv. (+7.00 s/d 8.00)
Ring Balok Beton 130x300 (164 kg/m3)
Beton K-250
Besi D 13
Besi dia.8
Bekisting
1.75
191.98
94.56
48.40
m3
kg
kg
m2
1
2
3
4
4.80
480.96
258.98
104.16
m3
kg
kg
m2
6.91
725.76
34.50
m3
kg
m2
Jumlah
Uraian Pekerjaan
Volume
Sat
300.00
300.00
1.00
25.00
1.00
m
m1
ls
bh
sat
7.56
2.31
157.54
200.51
25.70
m2
m3
kg
kg
m2
PEKERJAAN BETON
LANTAI DASAR
1
2
3
4
5
1
2
3
4
5
Beton pilecap P2
Lantai kerja 5cm
Beton K-250
Besi dia. 10
Besi dia. 13
Bekisting
1
2
3
4
5
6
7
8
1.44
0.54
24.95
31.75
3.6
15.93
16.25
16.25
5.20
643.50
214.50
67.60
8.29
m2
m3
kg
kg
m2
m3
m2
m2
m3
kg
kg
m2
m3
Harga Satuan
Jumlah Harga
1
2
3
4
5
6
7
8
23.11
32.10
32.10
8.56
626.59
417.73
112.35
9.74
m3
m2
m2
m3
kg
kg
m2
m3
1
2
3
4
4.64
730.30
312.98
107.64
m3
kg
kg
m2
1
2
3
4
5
258.00
258.00
25.80
258.00
14.80
m2
m2
m3
m2
m2
1
2
3
Tangga
Beton K250
besi
bekisting
1.99
142.56
12.10
m3
kg
m2
1
2
3
4
LANTAI ATAS
Balok Beton 200x450 (130 kg/m3)
Beton K250
Besi D 13
Besi dia.8
Bekisting
9.90
900.90
386.10
148.50
m3
kg
kg
m2
1
2
3
4
1.04
105.30
54.24
22.20
m3
kg
kg
m2
1
2
3
4
4.43
161.23
162.11
59.80
m3
kg
kg
m2
1
2
3
4
23.50
1,046.93
2,125.58
189.88
m3
kg
kg
m2
1
2
3
7.08
672.60
62.14
m3
kg
m2
1
2
3
4
4.12
648.27
277.83
95.55
m3
kg
kg
m2
1
2
3
4
1.27
208.68
89.43
40.95
m3
kg
kg
m2
1
2
3
4
6.43
359.86
154.22
122.40
m3
kg
kg
m2
1
2
3
4
5
3.08
150.80
70.96
60.50
m3
kg
kg
m2
1
2
3
4
5
0.37
13.31
8.87
8.16
m3
kg
kg
m2
1
2
3
3.95
335.75
39.90
m3
kg
m2
Jumlah 1 bangunan
Jumlah 5 bangunan
NO
URAIAN
SATUAN
HARGA SATUAN
A.
1
2
3
4
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
HARGA BAHAN
Pasir Urug
Pasir pasang
Pasir beton
Pasir beton palu
batu kali belah
batu belah 15/20
batu pecah 2/3 & 5/7 cm
Koral beton Palu
batu bata
PC Semen
Besi beton polos
besi beton ulir
besi wire mesh m6
Kawat beton
Baja WF
Baja profil
Angkur diam 19 mm
Paku biasa
Papan bekisting kayu meranti
Kaso 5/7 kayu meranti
Balok kayu bekisting
Multiflex 9 mm 120 x 240
Dolken kayu gelam
m3
m3
m3
m3
m3
m3
m3
m3
bh
kg
kg
kg
LBR
kg
kg
kg
bh
kg
m3
m3
m3
lbr
btg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
Tukang
Kepala Tukang
Mandor
Pekerja
oh
oh
oh
oh
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
Rp
Rp
Rp
Rp.
Rp.
=
=
=
=
=
Rp
Rp
Rp
Rp.
Rp.
=
=
=
=
=
Rp
Rp
Rp
Rp.
Rp.
@ Rp
@ Rp
= Rp.
= Rp.
@ Rp.
@ Rp
=
=
=
=
=
Rp
Rp
Rp
Rp.
Rp.
=
=
=
=
=
Rp
Rp
Rp
Rp.
Rp.
@ Rp.
= Rp
@ Rp
@ Rp~
=
=
=
=
=
=
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp,
Rp,
Rp,
Rp,
Rp,
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
Rp
Rp
Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp~
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp,
Rp,
Rp.
Rp.
Rp.
Rp.
Rp.
2 kali pakai
= Rp.
= Rp.
= Rp.
Rp,
Rp.
Rp
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
- Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
=
=
=
=
=
=
=
2 kali pakai
1
= Rp.
= Rp.
= Rp.
2 kali pakai
1
2 kali pakai
1
2 kali pakai
2
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp,
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13
@ Rp.
@ Rp.
= Rp.
= Rp.
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp,
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp,
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@
@
@
@
@
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp,
Rp,
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
= Rp.
@
@
@
@
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
= Rp.
@
@
@
@
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Pekerjaan pemancangan
0.08333 bh sambungan
1 m' Ongkos pancang
@ Rp.
@ Rp.
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
NO.
URAIAN
BANGUNAN UTAMA
BANGUNAN KULIAH
JUMLAH
PEK. ARSITEKTUR
1/1
PEKERJAAN
LOKASI
PEKERJAAN ARSITEKTUR
NO.
A.
A.1
A.2
A.3
B.
B.1
B.2
B.3
C.
JENIS PEKERJAAN
C.1
C.2
C.3
LANTAI DASAR
LANTAI DUA
LANTAI TIGA
D.
E.
PEKERJAAN SANITAIR
E.1
E.2
F.
LANTAI DASAR
LANTAI DUA
PEKERJAAN PLAFOND
F.1
F.2
F.3
LANTAI DASAR
LANTAI DUA
LANTAI TIGA
G.
PEKERJAAN PENGECATAN
G.1
G.2
G.3
H.
JUMLAH HARGA
(Rp.)
LANTAI DASAR
LANTAI DUA
LANTAI TIGA
PEKERJAAN EXTERIOR
TOTAL
PEK. ARSITEKTUR
1/1
PEKERJAAN ARSITEKTUR
NO.
A.
A.1
1
2
3
4
5
6
7
8
9
10
A.2
1
2
3
4
5
6
7
8
9
10
A.3
1
2
3
4
B.
B.1
1
2
3
4
5
6
7
8
9
10
11
B.2
1
2
3
4
5
6
7
B.3
1
2
JENIS PEKERJAAN
VOL.
SAT.
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
SUB TOTAL
LANTAI DASAR
Pasangan dinding batu bata 1/2 bata 1PC : 4 PS
Plester + aci dinding bata 1Pc : 4PS, t-1,5cm
Pas keramik KM/WC uk. 30x60
Pas. Dinding partisi gypsum tinggi-3m
Pas besi railing tangga + handrailing kayu
Pekerjaan skonengan sudut
Pas dinding batu alam tempel
Pas plin keramik uk. 10x40
Penebalan dinding closet dinding bata 1/2 bata 1PC : 4PS
Kolom praktis 11x11cm
953.17
1,737.61
168.74
67.23
14.08
770.40
60.25
367.86
12.15
457.20
m2
m2
m2
m2
m1
m1
m2
m1
m2
m1
1,016.04
1,856.73
175.35
69.48
121.85
56.44
691.20
457.81
12.15
334.80
m2
m2
m2
m2
m1
m1
m1
m1
m2
m1
459.26
918.52
82.43
14.40
m2
m2
m1
m1
LANTAI DUA
Pasangan dinding batu bata 1/2 bata 1PC : 4 PS
Plester + aci dinding bata 1Pc : 4PS, t-1,5cm
Pas keramik KM/WC uk. 30x60
Pas. Dinding partisi gypsum tinggi-3m
Pas besi railing tangga + handrailing kayu
Pas besi railing balkon + hand railing kayu
Pekerjaan skonengan sudut
Pas plin keramik uk. 10x40
Penebalan dinding closet dinding bata 1/2 bata 1PC : 4PS
Kolom praktis 11x11cm
LANTAI TIGA
Pasangan dinding batu bata 1/2 bata 1PC : 4 PS
Plester + aci dinding bata 1Pc : 4PS, t-1,5cm
Pas plin keramik uk. 10x40
Kolom praktis 11x11cm
PEKERJAAN LANTAI
SUB TOTAL
LANTAI DASAR
Urugan pasir t-10cm dibawah lantai
Lantai kerja t-7cm dibawah lantai
Pasangan keramik entrance uk. 60x60
Pasangan keramik border uk. 30x60
Pasangan keramik teras uk. 40x40
Pasangan keramik lantai lobby uk. 60x60
Pasangan keramik tangga uk. 60x60
Pasangan step nozing tangga uk. 10x60
Pasangan keramik KM/WC uk. 30x30
Pasangan keramik selasar uk. 60x60
Pasangan keramik ruangan uk. 40x40
91.93
64.35
73.73
32.37
80.30
142.54
36.84
42.00
39.01
276.60
283.68
m3
m3
m2
m2
m2
m2
m2
m1
m2
m2
m2
17.64
33.60
41.67
362.09
214.54
41.67
135.97
m2
m1
m2
m2
m2
m2
m2
86.49
268.64
m2
m2
LANTAI DUA
Pasangan keramik tangga uk. 60x60
Pasangan step nozing tangga uk. 10x60
Pasangan keramik KM/WC 30x30
Pasangan keramik ruangan uk. 40x40
Pasangan keramik selasar uk. 60x60
Water proofing area KM/WC
Screed + waterproofing membrane
LANTAI TIGA
Pasangan keramik selasar dan ruangan 40x40
Screed + waterproofing membrane
PEK. ARSITEKTUR
1/3
NO.
C.
C.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
C.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
C.3
1
2
3
4
5
6
JENIS PEKERJAAN
JUMLAH HARGA
(Rp.)
SUB TOTAL
7.00
2.00
4.00
4.00
4.00
5.00
2.00
3.00
2.00
1.00
1.00
7.00
2.00
1.00
2.00
3.00
1.00
4.00
3.00
5.00
6.00
3.00
2.00
1.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
7.00
1.00
5.00
2.00
4.00
3.00
7.00
2.00
2.00
3.00
8.00
8.00
1.00
2.00
2.00
4.00
3.00
6.00
5.00
6.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
2.00
2.00
4.00
1.00
8.00
5.00
Bh
Bh
Bh
Bh
Bh
Bh
LANTAI DUA
Bovent BV uk. 50x20
Bovent BV2 uk. 235x50
Jendela J5 uk. 205x180
Jendela J6 uk. 105x180
Jendela J7 uk. 155x180
Jendela J10 uk. 205x160
Jendela J11 uk. 50x35
Jendela J12 uk. 55x160
Jendela J14 uk. 200x240
Jendela J15 uk. 150x240
Jendela J16 uk. 240x250
Jendela J17 uk. 69x50
Jendela J18 uk. 200x90
Jendela J19 uk. 155x165
Jendela JT2 uk. 135x255
Pintu PM1 uk. 80x210
Pintu PM2 uk. 90x210
Pintu PP uk. 90x210
Pintu PR1 uk. 90x240
Pintu PR2 uk. 80x240
LANTAI TIGA
Jendela J7 uk. 155x180
Jendela J20 uk. 200x355
Jendela J21 uk. 66x80
Jendela J22 uk. 260x280
Jendela J23 uk. 85x40
Pintu PR1 uk. 90x240
1
2
3
4
5
1
2
3
4
5
6
7
8
HARGA SATUAN
(Rp.)
LANTAI DASAR
E.1
SAT.
D.
E.
VOL.
SUB TOTAL
1,041.39
175.14
254.38
21.69
2.00
m2
m1
m1
m2
bh
SUB TOTAL
PEKERJAAN SANITAIR
LANTAI DASAR
Pasang closet duduk std TOTO
Meja beton fin keramik dengan wastafel TOTO
Pasang tisu holder TOTO
Pasang kran TOTO
Pasang floor drain TOTO
Pasang kaca cermin 60x250
Pasang hand shower TOTO
Pasang bak mandi fiberglass
PEK. ARSITEKTUR
5.00
2.00
5.00
5.00
5.00
2.00
5.00
1.00
Buah
Unit
Buah
Buah
Buah
Buah
Buah
Buah
2/3
NO.
E.2
1
2
3
4
5
6
7
8
F.
F.1
1
2
3
4
5
F.2
1
2
3
F.3
1
2
G.
G.1
1
2
3
4
5
G.2
1
2
3
4
G.3
1
2
3
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
JENIS PEKERJAAN
VOL.
SAT.
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
LANTAI DUA
Pasang closet duduk std TOTO
Meja beton fin keramik dengan wastafel TOTO
Pasang tisu holder TOTO
Pasang kran TOTO
Pasang floor drain TOTO
Pasang kaca cermin 60x250
Pasang hand shower TOTO
Pasang bak mandi fiberglass
5.00
2.00
5.00
5.00
5.00
2.00
5.00
1.00
Buah
Unit
Buah
Buah
Buah
Buah
Buah
Buah
PEKERJAAN PLAFOND
SUB TOTAL
LANTAI DASAR
Plafond akustik gypsum entrance, teras
Plafond kisi-kisi kayu ramin
Plafond gypsum t-9mm
List plafond aluminium
Drop ceiling
358.85
67.97
618.30
367.86
24.00
m2
M2
m2
m1
m1
668.57
457.81
50.99
m2
m1
m1
195.52
82.43
m2
m1
LANTAI DUA
Plafond gypsum t-9mm
List plafond aluminium
Drop ceiling
LANTAI TIGA
Plafond gypsum t-9mm
List plafond aluminium
PEKERJAAN PENGECATAN
SUB TOTAL
LANTAI DASAR
Cat dinding luar weathershield
Cat dinding dalam
Cat area tangga
Cat plafond
Melamic plafond kayu ramin
478.78
1,393.29
36.84
618.30
67.97
m2
m2
m2
m2
m2
493.87
1,501.82
17.64
668.57
m2
m2
m2
m2
279.96
638.56
195.52
m2
m2
m2
LANTAI DUA
Cat
Cat
Cat
Cat
LANTAI TIGA
Cat dinding luar weathershield
Cat dinding dalam
Cat plafond
PEKERJAAN EXTERIOR
Pekerjaan pasangan batu kali talud ramp
Pekerjaan pasangan batu kali bawah kolom
Pekerjaan pasangan batu alam tempel talud ramp
Pekerjaan pasangan batu alam tempel bawah kolom
Pekerjaan batu kali tangga
Pekerjaan beton ramp
Ornamen Rooster GRS Type 1 (lubang angin)
Ornamen Rooster GRS Type 2 (lubang angin)
Ornamen Rooster GRS Type 3 (lubang angin)
Ornamen Rooster GRS Type 4 (lubang angin)
Ornament GRC (lukisan dinding depan)
Ornamen dinding depan (2bidang) batu granit uk. 230x730
Canopi beton t-10cm
Reiling dinding lt 3 (atap)
Tangga putar besi
Penebalan kolom
- Pasangan bata 1/2 bata, 1PC : 4PS
- Plester + aci dinding bata 1Pc : 4PS, t-1,5cm
- Kolom praktis 11x11cm
- Cat dinding luar weathershield
- Skonengan sudut
Kaca motif/Sandblas
PEK. ARSITEKTUR
SUB TOTAL
615.90
10.80
28.80
25.20
8.90
60.82
9.00
3.00
1.00
6.00
2.00
2.00
5.45
94.97
1.00
m3
m3
m2
m2
m3
m3
bh
bh
bh
bh
Bh
Bh
m3
m2
Bh
280.26
280.26
422.80
280.26
422.80
5.37
m2
m2
m1
m2
m1
m2
3/3
PEKERJAAN ARSITEKTUR
NO.
JENIS PEKERJAAN
A.
B.
PEKERJAAN LANTAI
C.
D.
E.
PEKERJAAN SANITAIR
F.
PEKERJAAN PLAFOND
G.
PEKERJAAN PENGECATAN
H.
PEKERJAAN EXTERIOR
JUMLAH HARGA
(Rp.)
TOTAL
PEK. ARSITEKTUR
1/1
PEKERJAAN ARSITEKTUR
NO.
A.
A.1
1
2
3
4
5
6
7
8
9
JENIS PEKERJAAN
1
2
3
4
5
6
7
8
B.
PEKERJAAN LANTAI
1
2
3
4
5
M2
2
M
2
M
1
M
1
M
M2
2
M
1
M
2
M
645.00
345.00
785.00
252.00
3.80
232.00
62.32
14.18
M
2
M
2
M
1
M
1
M
2
M
M1
M2
31.23
31.23
9.00
M
2
M
1
M
26.98
18.89
231.25
5.60
15.30
25.20
34.50
205.41
M3
M3
225.36
2.80
35.70
35.70
268.93
M
M2
2
M
2
M
1
M
LANTAI DASAR
Urugan pasir t-10cm dibawah lantai
Lantai kerja t-7cm dibawah lantai
Pasang Keramik 40x40 daerah Ruang tidur dan Selasar
Pasang 30x30 Pada Area Teras
Pasang Keramik 40x40 Area Tangga
Pasang step nozing 10x40 daerah tangga
Pasang Keramik 30x30 daerah km/wc
Pasang Plint keramik Tile 10x40 Area R. Tidur dan Selasar
B.2
662.99
283.48
1,058.48
255.00
7.70
179.50
14.39
54.12
12.15
LANTAI ATAP
Pasangan dinding Bata 1/2 bata adukan 1 : 4
Plester + aci dinding bata ringan exterior/dind. Terluar adukan 1 : 4
Kolom praktis & balok praktis 11/11
1
2
3
4
5
6
7
8
JUMLAH HARGA
(Rp.)
LANTAI DUA
1
2
3
B.1
HARGA SATUAN
(Rp)
LANTAI DASAR
A.3
SAT.
A.2
VOL.
M
M2
2
M
1
M
2
M
1
M
LANTAI DUA
Pasang Keramik 40x40 daerah Ruang tidur dan Selasar
Pasang 30x30 Pada Area Balkon
Pasang Keramik 30x30 daerah km/wc
Screed + water proofing daerah km/wc
Pasang Plint keramik Tile 10x40 Area R. Tidur dan Selasar
PEK. ARSITEKTUR
1/5
NO.
B.3
1
JENIS PEKERJAAN
C.1
SAT.
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp.)
LANTAI ATAP
Screed + water proofing membrane
C.
VOL.
76.00
1.00
Unit
1.00
Unit
8.00
Unit
8.00
Unit
Jendela (J1)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
2.00
Unit
Jendela (J2)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
2.00
Unit
Jendela (J3)
- Kaca Polos 5 mm
- Accessories aluminium
8.00
Unit
Jendela (J4)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
8.00
Unit
Jendela (J5)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
6.00
Unit
PEK. ARSITEKTUR
2/5
NO.
JENIS PEKERJAAN
VOL.
SAT.
10
Jendela (J6)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
2.00
Unit
11
Jendela (J7)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
4.00
Unit
12
Bovent (BV1)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
8.00
Unit
13
Bovent (BV2)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
3.00
Unit
C.2
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp.)
LANTAI DUA
1.00
Unit
8.00
Unit
7.00
Unit
Jendela (J3)
- Kaca Polos 5 mm
- Accessories aluminium
8.00
Unit
Jendela (J4)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
7.00
Unit
Jendela (J7)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
2.00
Unit
Jendela (J8)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
1.00
Unit
PEK. ARSITEKTUR
3/5
NO.
JENIS PEKERJAAN
VOL.
SAT.
Jendela (J9)
- aluminium 4"
- Frame Alumunium
- Kaca Polos 5 mm
- engsel
- hak angin
- Accessories aluminium
2.00
Unit
Jendela (J10)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
1.00
Unit
10
Jendela (J11)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
1.00
Unit
11
Bovent (BV1)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
8.00
Unit
12
Bovent (BV2)
- aluminium 4"
- Kaca Polos 5 mm
- Accessories aluminium
2.00
Unit
D.
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp.)
D.1
1
2
3
4
E.
LANTAI ATAP
Pasangan atap genteng metal
Kaca Tempered T 12 mm uk. 2 x 3 m
Lisplang Kayu 3/30
Nok genteng metal
PEKERJAAN SANITAIR
E.1
LANTAI DASAR
1
2
3
4
5
6
7
8
9
10
11
E.2
LANTAI DUA
1
2
3
4
5
6
7
8
9
10
11
PEK. ARSITEKTUR
416.89
6.00
46.50
24.65
M
M2
M'
M'
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
4/5
NO.
F.
JENIS PEKERJAAN
LANTAI DASAR
1
2
3
4
F.2
LANTAI DUA
1
2
3
4
G.
PEKERJAAN PENGECATAN
1
2
3
4
1
2
3
4
H.
2
3
4
5
6
7
270.00
225.95
15.90
0.00
M2
1
M
2
M
2
M
257.31
295.82
23.00
0.00
M
1
M
2
M
2
M
253.14
877.67
244.75
15.90
M
2
M
2
M
2
M
244.74
805.99
289.26
23.00
M
M2
2
M
2
M
62.46
30.65
3.00
6.80
Btg
20.00
18.00
bh
9.63
50.40
M2
5.85
LANTAI ATAP
JUMLAH HARGA
(Rp.)
LANTAI DUA
Cat
Cat
Cat
Cat
G.3
HARGA SATUAN
(Rp)
LANTAI DASAR
Cat
Cat
Cat
Cat
G.2
SAT.
PEKERJAAN PLAFOND
F.1
G.1
VOL.
PEK. ARSITEKTUR
M2
5/5
PEKERJAAN
LOKASI
PEKERJAAN ARSITEKTUR
NO.
A.
A.1
A.2
B.
B.1
B.2
C.
JENIS PEKERJAAN
C.1
C.2
LANTAI DASAR
LANTAI DUA
D.
E.
PEKERJAAN SANITAIR
E.1
E.2
F.
LANTAI DASAR
LANTAI DUA
PEKERJAAN PLAFOND
F.1
F.2
LANTAI DASAR
LANTAI DUA
G.
PEKERJAAN PENGECATAN
G.1
G.2
H.
JUMLAH HARGA
(Rp.)
LANTAI DASAR
LANTAI DUA
PEKERJAAN EXTERIOR
TOTAL
PEK. ARSITEKTUR
1/1
LOKASI
NO.
A.
URAIAN PEKERJAAN
VOLUME
SAT
813.20
1,626.40
154.60
25.40
7.55
m2
m2
m2
m2
m3
869.80
1,739.60
154.60
7.37
m2
m2
m2
m3
HARGA
DASARAN
SUB TOTAL
B. PEKERJAAN LANTAI
SUB TOTAL
575.20
32.50
23.48
326.80
31.35
607.70
m2
m2
m2
m1
m1
m2
522.60
32.50
212.30
m2
m2
m1
SUB TOTAL
2.00
1.00
4.00
3.00
4.00
8.00
22.00
1.00
3.00
4.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
JUMLAH HARGA
(Rp.)
5.00
3.00
4.00
18.00
8.00
8.00
3.00
4.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
SUB TOTAL
932.60
932.60
932.60
32.00
120.00
m2
m2
m2
m1
m1
E. PEKERJAAN SANITAIR
SUB TOTAL
4.00
4.00
3.00
3.00
4.00
4.00
2.00
4.00
4.00
7.00
bh
bh
bh
bh
bh
m2
bh
bh
bh
bh
4.00
4.00
3.00
3.00
4.00
4.00
2.00
4.00
4.00
7.00
bh
bh
bh
bh
bh
m2
bh
bh
bh
bh
SUB TOTAL
534.50
393.60
105.70
7.70
m2
m1
m2
m2
586.50
157.50
279.60
145.60
21.00
m2
m2
m1
m2
m2
G. PEKERJAAN PENGECATAN
SUB TOTAL
665.70
839.80
534.50
393.60
105.70
m2
m2
m2
m1
m2
806.90
821.80
586.50
157.50
279.60
48.60
m2
m2
m2
m2
m1
m2
1
2
3
4
5
6
H. PEKERJAAN EXTERIOR
1
2
3
4
5
6
SUB TOTAL
150.40
42.80
33.00
13.80
35.50
19.00
m2
m2
m1
m1
m2
bh
Pekerjaan
Lokasi
2.2
PEKERJAAN ARSITEKTUR
NO.
JENIS PEKERJAAN
A.
B.
PEKERJAAN LANTAI
C.
D.
E.
PEKERJAAN SANITAIR
F.
PEKERJAAN PLAFOND
G.
PEKERJAAN PENGECATAN
H.
PEKERJAAN EXTERIOR
JUMLAH HARGA
(Rp.)
TOTAL
PEK. ARSITEKTUR
1/1
Pekerjaan
Lokasi
PEKERJAAN ARSITEKTUR
NO.
A.
A.1
1
2
3
4
5
6
7
8
9
A.2
1
2
3
4
5
6
7
8
9
10
B.
B.1
1
2
3
4
5
6
7
B.2
1
2
3
4
B.3
1
C.
C.1
1
2
3
4
5
6
7
8
C.2
1
2
3
JENIS PEKERJAAN
VOL.
SAT.
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
SUB TOTAL
LANTAI DASAR
Pasangan dinding batu bata 1/2 bata 1Pc : 4Ps
Pasangan glass blok
Pasangan partisi ornamen
Plester + aci dinding bata 1Pc : 4Ps, t-1,5cm
Pas keramik KM/WC t-3m uk. 30x60cm
Pas besi railing tangga + hand railing kayu
Pasangan rooster beton 20x85cm
Kolom praktis 11x11cm
Penebalan dinding closet dinding bata 1/2 bata 1PC : 4PS
360.09
14.62
11.66
552.41
103.30
12.15
4.00
194.40
20.10
m2
m2
m2
m2
m2
m1
Bh
m1
m2
426.45
800.17
52.72
4.78
3.40
29.02
2.00
2.00
117.99
10.05
m2
m2
m2
m1
m1
m2
m2
Bh
m1
m2
LANTAI DUA
Pasangan dinding batu bata 1Pc : 4Ps
Plester + aci dinding bata 1Pc : 4Ps
Pas keramik KM/WC t-3m uk. 30x60cm
Pas besi railing tangga + hand railing kayu
Pas besi railing balkon + hand railing kayu
Pasangan partisi ornamen type 1
Pasangan partisi ornamen type 2
Pasangan rooster beton 20x85cm
Kolom praktis 11x11cm
Penebalan dinding closet dinding bata 1/2 bata 1PC : 4PS
PEKERJAAN LANTAI
SUB TOTAL
LANTAI DASAR
Urugan pasir t-10cm dibawah lantai
Lantai kerja t-7cm dibawah lantai
Pasangan keramik 40x40cm
Pasangan keramik KM/WC uk. 30x30cm
Pasangan keramik teras uk.30x30cm
Pasangan keramik tangga uk. 40x40cm
Pasangan step nosing tangga uk. 10x40
21.99
15.39
170.48
22.04
27.40
13.87
18.00
m3
m3
m2
m2
m2
m2
m1
162.76
12.40
3.60
12.40
m2
m2
m2
m2
69.26
m2
LANTAI DUA
Pasangan keramik 40x40cm
Pasangan keramik KM/WC uk. 30x30cm
Pasangan keramik teras balkon uk.30x30cm
Screed + water proofing membrane
LANTAI TIGA
Screed + waterproofing membrane
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
SUB TOTAL
LANTAI DASAR
Pintu PU uk. 190x250
Pintu P1 uk. 90x250
Pintu jendela PJ1 uk. 320x250
Jendela J1 uk. 100x170
Jendela J2 uk. 80x170
Jendela J3 uk. 85x35
Pintu PKM uk. 88x270
Pintu PR uk. 90x270
1.00
1.00
4.00
4.00
1.00
4.00
4.00
4.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
4.00
2.00
2.00
Bh
Bh
Bh
LANTAI DUA
Pintu P2 uk. 88x275
Pintu P3 uk. 95x256
Pintu J3 uk. 85x35
PEK. ARSITEKTUR
1/2
NO.
4
5
6
7
8
D.
JENIS PEKERJAAN
Jendela J4 uk. 77x215
Jendela J5 uk. 265x270
Jendela J6 uk. 170x175
Pntu PKM uk. 88x270
Pintu PR uk. 90x270
E.
PEKERJAAN SANITAIR
1
2
3
4
5
6
7
8
9
10
11
E.2
1
2
3
4
5
6
7
8
9
F.
F.1
1
2
3
F.2
1
2
3
G.
G.1
1
2
3
4
G.2
1
2
3
H.
1
2
3
4
4.00
2.00
2.00
2.00
2.00
SAT.
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
Bh
Bh
Bh
Bh
Bh
1
2
3
E.1
VOL.
SUB TOTAL
144.52
45.92
20.88
m2
m1
m2
SUB TOTAL
LANTAI DASAR
Pasang closet duduk std TOTO
Pasang hand shower TOTO
Pasang kran TOTO
Pasang floor drain TOTO
Pasang tisu holder TOTO
Pasang towel bar TOTO
Pasang shower spray TOTO
Pasang tempat sabun TOTO
Pasangan tanggulan kamar mandi
Meja beton wastafel TOTO
Pasang kaca cermin 500x1100
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Bh
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
LANTAI DUA
Pasang closet duduk std TOTO
Pasang hand shower TOTO
Pasang kran TOTO
Pasang floor drain TOTO
Pasang tisu holder TOTO
Pasang towel bar TOTO
Pasang shower spray TOTO
Pasang tempat sabun TOTO
Pasangan tanggulan kamar mandi
PEKERJAAN PLAFOND
SUB TOTAL
LANTAI DASAR
Plafond gypsum t-9mm
List plafond aluminium
Drop ceiling
185.49
150.37
0.00
m2
m1
m1
238.67
132.59
0.00
m2
m1
m1
LANTAI DUA
Plafond gypsum t-9mm
List plafond aluminium
Drop ceiling
PEKERJAAN PENGECATAN
SUB TOTAL
LANTAI DASAR
Cat
Cat
Cat
Cat
90.25
358.87
13.87
185.49
m2
m2
m2
m2
204.89
542.56
238.67
m2
m2
m2
LANTAI DUA
Cat dinding luar weathershield
Cat dinding dalam
Cat plafond
PEKERJAAN EXTERIOR
Pasangan batu tempel andesit bakar
Kamprotan dinding ornamen dan kanopi
Pasangan tangga batu kali
Pasangan batu alam tempel tangga
PEK. ARSITEKTUR
SUB TOTAL
64.48
83.04
5.45
23.18
m2
m2
m3
m2
2/2
ANALISA PEKERJAAN
Pekerjaan
Lokasi
ANALISA
Berdasarkan SNI
1
@ Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp,
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
10
11
12
13
14
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
15
16
17
18
19
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
19
20
21
22
23
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp,
= Rp,
= Rp
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
24
25
26
27
28
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
29
30
31
32
33
34
@ Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
35
36
37
38
39
40
1 Unit Meja
Bahan
0.1060
0.9400
1.0600
1.0000
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
beton t-10x90x1175x80cm
m3
m2
m2
Unit
41
42
43
44
45
46
47
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
48
49
50
51
52
53
54
1 Unit meja
Bahan
0.1920
0.9600
1.9200
4.0000
beton t-10x40x480x80cm
1 Unit meja
Bahan
0.2928
0.9600
2.9280
1.0000
beton t-10x60x488x80cm
m3
m2
m2
Unit
m3
m2
m2
Unit
1 Unit Meja
Bahan
0.0473
0.6880
0.4730
1.0000
beton t-10x43x110x80cm
1 Unit Meja
Bahan
0.1250
1.2000
1.2500
2.0000
beton t-10x50x250x80cm
m3
m2
m2
Unit
m3
m2
m2
Unit
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
55
56
57
58
1 Unit Meja
Bahan
0.0810
0.9600
0.8100
beton t-10x60x135x80cm
m3 Plat beton t-10cm
m2 Pasangan bata merah finish
m2 Pasangan keramik 20x20
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
NO
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
URAIAN
HARGA BAHAN
Pasir urug
Pasir pasang
Pasir beton
Batu kali
Batu pecah 2/3
Batu bata
PC Semen
Semen warna
Ubin keramik lantai 20x20
Ubin keramik lantai 30x30
Ubin keramik lantai 30x60
Ubin keramik lantai 40x40
Ubin keramik lantai 60x60
Ubin keramik border 30x30
Ubin keramik border 40x40
Ubin keramik border 60x60
Step nozing keramik 10x40 cm
Step nozing keramik 10x60 cm
Plint keramik 10x40 cm
Plint keramik 10x30 cm
Besi beton polos
Kawat beton
Paku biasa
Sekrup
Kayu Dolken
Papan kayu bengkirai
Papan bekisting kayu meranti
Kaso 5/7 kayu meranti
Papan kayu bengkirai
Multiplex t-9mmx120x240
Teak wood t-4mm
Formica t-3mm
Gypsum board t-9mm
List plafond aluminium
Cat tembok Vinilex / setara
Cat tembok weathershield
Plamur tembok
Cat dasar
Amplas
Roll kuas
Minyak bekisting
Hollow 3/5 rangka partisi
Atap metal spandek
Genteng metal
Bubungan genteng metal
Kran air STD
Kran air TOTO
Shower spray TOTO
Floor drain TOTO
SATUAN
m3
m3
m3
m3
m3
bh
kg
kg
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
kg
kg
kg
kg
btg
m3
m3
m3
m3
lbr
lbr
lbr
lbr
m1
ltr
ltr
kg
kg
lbr
bh
ltr
m1
m2
bh
bh
bh
bh
bh
bh
HARGA SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp
Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
kg
ltr
bh
bh
bh
m2
m2
m2
m1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp
Rp
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1
2
3
4
5
6
7
8
9
10
11
12
13
Kusen + access
Kusen aluminium 4"
Frame jendela/pintu
Kunci pintu termasuk handel
Kunci jendela
Engsel pintu 4"
Engsel jendela 3"
Kaca polos t-5mm + karet
Kaca motif/patri + karet
Kaca tempered 10 mm
Kaca tempered 12 mm
Kawat loket
Jalusi aluminium
Hak angin
m1
m1
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
bh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp.
Rp.
Rp.
Rp
Rp
Rp
B.
1
2
3
4
UPAH KERJA
Tukang
Kepala Tukang
Pekerja
Mandor
Oh
Oh
Oh
Oh
Rp
Rp.
Rp.
Rp.
REKAPITULASI POS/GERBANG
PEMBANGUNAN KANTOR BADAN DIKLAT
NO
PEKERJAAN ARSITEKTUR
JENIS PEKERJAAN
PEKERJAAN ARSITEKTUR
PEKERJAAN LANTAI
PEKERJAAN SANITAIR
PEKERJAAN PLAFOND
PEKERJAAN PENGECATAN
PEKERJAAN EXTERIOR
II
PEKERJAAN STRUKTUR
III
PEKERJAAN M&E
TOTAL
NO
PEKERJAAN ARSITEKTUR
JENIS PEKERJAAN
VOL.
SAT.
85.35
1.25
160
6.45
15
10.12
3.4
63
0.18
1.8
HARGA SATUAN
(RP.)
m2
m3
m2
m2
m1
m2
m2
m1
m3
m2
Sub Total
PEKERJAAN LANTAI
1
2
3
4
5
1.8
5.15
36
6.4
1.5
m3
m3
m2
m2
m2
Sub Total
2
1
1
2
1
bh
bh
bh
bh
bh
Sub Total
5.61 m3
46.75 m2
2 bh
Sub Total
PEKERJAAN SANITAIR
1 Pasang closed jongkok
2 Pasang kran
3 Pasang floor drain
1 unit
2 bh
1 bh
Sub Total
PEKERJAAN PLAFOND
1 Plafond Gypsum
1 Plafond expose beton
2 Plafond expose canopi beton
27 m2
46.75 m2
10 m2
Sub Total
PEKERJAAN PENGECATAN
1 Cat dinding luar weathershield
2 Cat dinding dalam
3 Cat plafond
126 m2
65 m2
52.15 m2
Sub Total
JUMLAH HARGA
(RP.)
PEKERJAAN EXTERIOR
1
2
3
4
5
6
55
6
24
0.04
17
4.8
m2
bh
m2
m3
m2
m2
Sub Total
Sub Total Arsitektur ( I )
1
2
3
4
5
6
7
8
9
10
11
12
PEKERJAAN STRUKTUR
Tiang beton canopi beton
Galian Pondasi
Urugan Pasir
Pondasi setempat
Pondasi batu kali
Urug tanah kembali
Sloof beton bertulang
Kolom Struktur 15 x 40 ( bgn. Pos )
Kolom struktur 15 x 50 ( bgn canopi beton )
Balok beton bertulang 15 x 30
Atap canopi beton (driveway)
Canopi beton selasar
1.26
17.5
8.6
1.2
7.56
7.95
0.76
0.85
1.7
0.75
3.76
1.44
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Sub Total
SubTotal Struktur ( II)
PEKERJAAN M&E
1
2
3
4
PEKERJAAN ELEKTRIKAL
Instalasi titik lampu
Instalasi saklar ganda
Saklar tunggal
Instalasi stop kontak
1
2
3
4
5
PEKERJAAN PLUMBING
Pasang pipa air bersih,wavin aw 1/2 inc
Pasang pipa air bersih,wavin aw3/4 inc
Pasang pipa air buangan (limbah) wavin 3 inc
Pasang pipa air kotor, wavin aw 4 inc
Pasang setictank bioseptic dia 1 m
15
2
1
4
titik
titik
titik
titk
Sub Total
4
10
14
2
1
m1
m1
m1
m1
bh
Sub Total
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Lampu sorot
Lmapu RMI 2x36 wt
Lmapu RMI 2x36 wt + batterey Nicad
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 16 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 4 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
15
2
4
4
8
2
6
11
25
8
2
4
1
19
19
151
12
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
1
12
1
1
1
12
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
7
4
1
11
1
1
1
1
1
1
1
TOTAL LISTRIK
FIRE ALARM
1
2
3
4
5
6
7
8
9
MCFA 10 Zone
ROR Temperature Heat Detektor
Manual Push Button
Alarm Bell
Indicator Lamp
Instalasi Detector
Instalasi Manual Push Button
Instalasi Alarm Bell
Instalasi Indicator Lamp
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
Mixer Amplifier - ZA 1121 (120W) TOA
Amplifier ZA 250S (240w) TOA
CD Polytron Type DAT 59
Selector Speaker
Radio Casset TEAC
Rak cabinet
Microphone ZM 520 TOA
TOTAL TATA SUARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
URAIAN PEKERJAAN
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 10x2x0,6)
SAT. VOL
bh
unit
ttk
bh
m
4
1
4
4
151
ttk
ttk
bh
bh
m
4
4
1
4
151
unit
m
m
m
bh
4
28
36
28
4
m
m
m
m
m
m
ls
33
22
42
18
151
2
1
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
unit
ls
42
54
39
49
1
ls
unit
bh
bh
1
15
2
4
4
8
2
6
2
25
8
2
2
1
36
36
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Lampu sorot
Lmapu RMI 2x36 wt
Lampu TL westafel 18 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
TOTAL LISTRIK
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
FIRE ALARM
1
2
3
4
5
6
7
8
bh
bh
bh
bh
ttk
ttk
ttk
ttk
7
1
1
1
7
1
1
1
bh
bh
bh
bh
6
2
1
8
bh
unit
ttk
bh
2
1
2
2
ttk
ttk
bh
bh
m
1
2
1
2
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
URAIAN PEKERJAAN
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
SAT. VOL
unit
m
m
m
bh
2
14
18
14
2
m
m
m
m
m
m
ls
19
22
13
17
22
2
1
m
m
m
m
ls
17
21
27
29
1
ls
1
2
3
4
5
6
7
1
2
3
4
5
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Lampu sorot
Lmapu RMI 2x36 wt
Lmapu RMI 2x36 wt + batterey Nicad
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 16 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 4 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
15
2
4
4
8
2
6
11
25
8
2
4
1
19
19
167
12
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
1
12
1
1
1
12
1
1
1
TOTAL LISTRIK
FIRE ALARM
1
2
3
4
5
6
7
8
9
MCFA 10 Zone
ROR Temperature Heat Detektor
Manual Push Button
Alarm Bell
Indicator Lamp
Instalasi Detector
Instalasi Manual Push Button
Instalasi Alarm Bell
Instalasi Indicator Lamp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
TATA SUARA
1
2
3
4
5
6
7
8
9
10
11
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
Mixer Amplifier - ZA 1121 (120W) TOA
Amplifier ZA 250S (240w) TOA
CD Polytron Type DAT 59
Selector Speaker
Radio Casset TEAC
Rak cabinet
Microphone ZM 520 TOA
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
7
4
1
11
1
1
1
1
1
1
1
bh
unit
ttk
bh
m
4
1
4
4
167
ttk
ttk
bh
bh
m
4
4
1
4
167
unit
m
m
m
bh
4
28
36
28
4
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 10x2x0,6)
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
m
m
ls
33
22
42
18
167
2
1
m
m
m
m
unit
ls
42
54
39
49
1
ls
unit
bh
bh
1
15
2
4
4
8
2
6
2
25
8
2
2
1
36
36
1
2
3
4
5
6
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Lampu sorot
Lmapu RMI 2x36 wt
Lampu TL westafel 18 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
TOTAL LISTRIK
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
FIRE ALARM
1
2
3
4
5
6
7
8
bh
bh
bh
bh
ttk
ttk
ttk
ttk
7
1
1
1
7
1
1
1
bh
bh
bh
bh
6
2
1
8
bh
unit
ttk
bh
2
1
2
2
ttk
ttk
bh
bh
m
1
2
1
2
unit
m
m
m
bh
2
14
18
14
2
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
m
m
ls
19
22
13
17
22
2
1
m
m
m
m
ls
17
21
27
29
1
ls
1
2
3
4
5
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
Uraian
Bangunan Utama
Asrama Putri Gedung - A
Asrama Putri Gedung - B
Asrama Putra Gedung - A
Asrama Putra Gedung - B
Asrama Putra Gedung - B
Bangunan Kuliah/Kelas
Bangunan Asrama VIP ( A )
Peralatan Utama Mekanikal
Peralatan Utama Elektrikal
TOTAL PEKERJAAN ME
Jumlah
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu Hidden lamp 1x 36
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 50 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 16 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
52
25
4
48
20
8
5
30
9
22
20
3
102
12
3
30
9
23
1
77
77
199
12
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
12
3
1
12
8
1
5
1
1
1
1
1
2
8
TOTAL LISTRIK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
TATA SUARA
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
Instalasi Horn speaker
Mixer Amplifier - ZA 1121 (120W) TOA
Amplifier ZA 250S (240w) TOA
CD Polytron Type DAT 59
Selector Speaker
Radio Casset TEAC
Rak cabinet
Microphone ZM 520 TOA
Microphone dilengkapi dengan stand untuk Upacara
Horn speaker lengkap dengan tiang dan dudukan
TOTAL TATA SUARA
HARGA SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
PEKERJAAN TELEPON
1
2
3
4
5
6
7
8
9
10
unit
unit
ttk
bh
unit
ttk
bh
bh
m
line
1
1
1
6
1
6
1
6
97
3
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
ttk
ttk
bh
bh
m
1
7
2
7
118
unit
unit
m
m
m
bh
6
3
63
81
63
23
m
m
m
m
m
m
ls
232
165
98
89
30
2
1
m
m
m
m
bh
bh
bh
unit
unit
ls
189
176
186
212
2
2
2
2
TOTAL MATV
1
1
2
3
4
5
TATA UDARA
AC Split wall 1 1/2Pk
AC Split wall 2 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
1
2
3
4
5
6
7
Biotec cap 4 m
Resapan 1,5 m3
Material Bantu
2
1
ls
HARGA SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan+AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lmapu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL 18 wt
Lampu Hidden lamp 1x 36
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
32
8
4
26
6
8
48
15
9
11
15
2
84
2
15
9
15
1
77
77
bh
bh
bh
bh
22
13
1
35
bh
unit
ttk
bh
m
7
1
7
7
12
ttk
ttk
bh
bh
1
10
2
10
TOTAL LISTRIK
1
2
3
4
TATA SUARA
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari TB-1 ke TB-2 ( 20x2x0,6)
TOTAL TELPHONE
1
2
3
4
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
TOTAL MATV
HARGA SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
TATA UDARA
1
1
2
3
4
5
AC Split wall 1 Pk
AC Split wall 1.5 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
unit
unit
m
m
m
bh
7
2
63
81
63
15
m
m
m
m
bh
ls
232
165
98
89
1
1
m
m
m
m
bh
bh
bh
ls
189
176
186
212
2
2
2
1
1
2
3
4
5
6
1
2
3
4
ls
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
m
8
2
25
2
4
1
10
1
2
1
6
LANTAI-3
1
2
3
4
5
6
7
8
9
10
11
LISTRIK
Lampu RMI 2x36 wt
Lampu TL 18 wt
Lampu Hidden lamp 1x 36
Stop Kontak
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Cabel tray 200x50 ( arus kuat )
TOTAL LISTRIK
HARGA SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
TATA SUARA
1
2
3
Ceilling speaker 6 w
Volume kontrol + Instalasi
Instalasi Speaker
bh
bh
bh
2
1
3
unit
m
m
m
1
6
6
10
unit
unit
unit
unit
m'
unit
unit
1
1
1
1
55
1
1
bh
m'
32
152
bh
ls
1
2
3
4
Rp
HARGA SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 50 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 16 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
44
7
2
17
5
6
30
8
11
15
2
81
7
2
30
8
6
1
39
39
169
12
bh
bh
bh
bh
m
12
6
1
18
112
bh
unit
ttk
bh
m
6
1
6
6
45
bh
TOTAL LISTRIK
TATA SUARA
1
2
3
4
5
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
kabel feeder sound system dr Bangunan utama
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 30x2x0,6)
TOTAL TELPHONE
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
6
42
54
42
6
m
m
m
m
m
m
m
ls
84
150
75
89
36
30
4
1
m
m
m
m
unit
ls
bh
bh
bh
69
76
86
88
1
ls
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
8
1
2
3
4
5
6
6
7
8
1
1
1
1
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
50
7
2
17
5
6
30
8
11
15
2
87
7
2
30
8
6
1
39
39
bh
bh
bh
bh
12
3
1
15
bh
unit
ttk
bh
m
6
1
6
6
12
ttk
ttk
bh
bh
1
7
2
7
unit
m
m
m
bh
6
42
54
42
6
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari TB-1 ke TB-2 ( 20x2x0,6)
TOTAL TELPHONE
1
2
3
4
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
m
m
m
m
m
m
ls
84
150
75
89
36
4
1
m
m
m
m
ls
bh
bh
bh
69
76
86
88
1
1
1
1
1
2
3
4
5
6
7
8
bh
m'
25
ls
Rp
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 50 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 16 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
1
44
7
2
17
5
6
30
8
11
15
2
81
7
2
30
8
6
1
39
39
169
12
TOTAL LISTRIK
TATA SUARA
1
2
3
4
5
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
kabel feeder sound system dr Bangunan utama
bh
bh
bh
bh
m
12
6
1
18
112
bh
unit
ttk
bh
m
6
1
6
6
45
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 30x2x0,6)
TOTAL TELPHONE
NO.
1
2
3
4
5
URAIAN PEKERJAAN
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
SAT. VOL
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
6
42
54
42
6
m
m
m
m
m
m
m
ls
84
150
75
89
36
30
4
1
m
m
m
m
unit
ls
bh
bh
bh
69
76
86
88
1
ls
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
8
1
2
3
4
5
6
6
7
8
1
1
1
1
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
50
7
2
17
5
6
30
8
11
15
2
87
7
2
30
8
6
1
39
39
bh
bh
bh
bh
12
3
1
15
bh
unit
ttk
bh
m
6
1
6
6
12
ttk
ttk
bh
bh
1
7
2
7
unit
m
m
m
bh
6
42
54
42
6
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari TB-1 ke TB-2 ( 20x2x0,6)
TOTAL TELPHONE
1
2
3
4
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
m
m
ls
84
150
75
89
36
4
1
m
m
m
m
ls
bh
bh
bh
69
76
86
88
1
1
1
1
1
2
3
4
5
6
7
8
bh
m'
25
ls
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 50 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 16 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
44
7
2
17
5
6
30
8
11
15
2
81
7
2
30
8
6
1
39
39
169
12
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
12
3
1
15
1
1
1
1
1
1
1
TOTAL LISTRIK
TATA SUARA
1
2
3
4
5
6
7
8
9
10
11
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
Mixer Amplifier - ZA 1121 (120W) TOA
Amplifier ZA 250S (240w) TOA
CD Polytron Type DAT 59
Selector Speaker
Radio Casset TEAC
Rak cabinet
Microphone ZM 520 TOA
TOTAL TATA SUARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
URAIAN PEKERJAAN
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 30x2x0,6)
SAT. VOL
bh
unit
ttk
bh
m
6
1
6
6
112
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
6
42
54
42
6
m
m
m
m
m
m
m
ls
84
150
75
89
36
172
2
1
m
m
m
m
unit
ls
bh
bh
bh
69
76
86
88
1
ls
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
1
1
1
1
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
URAIAN PEKERJAAN
SAT. VOL
LANTAI-2
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lmapu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
unit
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
50
7
2
17
5
6
30
8
11
15
2
87
7
2
30
8
6
1
39
39
bh
bh
bh
bh
12
3
1
15
bh
unit
ttk
bh
m
6
1
6
6
12
ttk
ttk
bh
bh
1
7
2
7
unit
m
m
m
bh
6
42
54
42
6
bh
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari TB-1 ke TB-2 ( 20x2x0,6)
TOTAL TELPHONE
1
2
3
4
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
m
m
ls
84
150
75
89
36
4
1
m
m
m
m
ls
bh
bh
bh
69
76
86
88
1
1
1
1
ls
1
2
3
4
5
6
7
8
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 50 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 16 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
44
7
2
17
5
6
30
8
11
15
2
81
7
2
30
8
6
1
39
39
169
12
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
12
0
1
12
1
1
1
1
1
1
1
TOTAL LISTRIK
TATA SUARA
1
2
3
4
5
6
7
8
9
10
11
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
Mixer Amplifier - ZA 1121 (120W) TOA
Amplifier ZA 250S (240w) TOA
CD Polytron Type DAT 59
Selector Speaker
Radio Casset TEAC
Rak cabinet
Microphone ZM 520 TOA
TOTAL TATA SUARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
URAIAN PEKERJAAN
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 30x2x0,6)
SAT. VOL
bh
unit
ttk
bh
m
6
1
6
6
112
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
6
42
54
42
6
m
m
m
m
m
m
m
ls
84
150
75
89
36
172
2
1
m
m
m
m
unit
ls
bh
bh
bh
69
76
86
88
1
ls
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
8
1
2
3
4
5
6
6
7
8
1
1
1
1
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
LISTRIK
Panel Penerangan&AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lmapu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
50
7
2
17
5
6
30
8
11
15
2
87
7
2
30
8
6
1
39
39
bh
bh
bh
bh
12
3
1
15
bh
unit
ttk
bh
m
6
1
6
6
12
ttk
ttk
bh
bh
1
7
2
7
unit
m
m
m
bh
6
42
54
42
6
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari TB-1 ke TB-2 ( 20x2x0,6)
TOTAL TELPHONE
1
2
3
4
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
TOTAL MATV
1
2
3
4
5
TATA UDARA
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
SAT. VOL
m
m
m
m
m
m
ls
84
150
75
89
36
4
1
m
m
m
m
ls
bh
bh
bh
69
76
86
88
1
1
1
1
ls
1
2
3
4
5
6
7
8
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Baret persegi PLC 20 wt + batteri Nicad
Lampu RMI 2x36 wt
Lampu RMI 2x36 wt + batterey nicad
Lampu TL westafel -T5 24 wt
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi Penerangaan emergency
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
Kabel Fedder dari P.1 ke MDP NNFGY 4x 16 mm
Kabel Fedder dari P.1 ke P.2 NNY 4x 4 mm
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
ttk
m
m
m
m
1
16
8
2
17
5
23
23
3
6
8
1
71
7
1
23
3
4
1
36
36
112
12
bh
bh
bh
bh
20
6
1
26
bh
unit
ttk
bh
m
3
1
3
3
112
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
5
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
Kabel Feeder dari MDF TP ke TB-telp ( 10x2x0,6)
TOTAL TELPHONE
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
1
2
3
4
5
URAIAN PEKERJAAN
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
SAT. VOL
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
3
21
27
21
4
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
TOTAL TATA UDARA
1
2
3
4
5
6
7
8
m
m
m
m
m
m
m
ls
45
150
33
53
23
134
2
1
1
2
3
4
5
6
7
8
9
m
m
m
m
unit
ls
bh
bh
bh
54
64
34
32
1
1
1
1
1
ls
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
LANTAI-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
LISTRIK
Panel Penerangan + AC
Down ligth SL 18 wt
Baret persegi PLC 20 wt
Lmapu RMI 2x36 wt
Lampu TL 2X36 WT
Stop Kontak
Stop Kontak AC
Saklar Tunggal
Saklar Ganda
Saklar hotel tunggal
Instalasi Penerangan
Instalasi saklar hotel
Instalasi Stop Kontak
Instalasi Stop Kontak AC
Instalasi Exhaus fan
Arde Panel
Cabel tray 200x50 ( arus kuat )
Cabel tray 200x50 ( arus lemah )
SAT. VOL
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
ttk
ttk
ttk
ttk
ttk
m
m
1
16
8
17
23
23
3
6
8
2
64
2
23
3
4
1
36
36
bh
bh
bh
bh
20
6
1
26
bh
unit
ttk
bh
3
1
3
3
TOTAL LISTRIK
TATA SUARA
1
2
3
4
Ceilling speaker 6 w
Volume kontrol + Instalasi
TB, TS, Bas 1
Instalasi Speaker
TOTAL TATA SUARA
1
2
3
4
INSTALASI TELEPON
Outlet Telepon
TB, Telp 10 pair
Instalasi Outlet Telepon
Pesawat telphone
TOTAL TELPHONE
1
2
3
4
5
MATV
Booster Amplifier
Instalasi MATV
Splitter 4 Way
Outle TV
Kabel Feeder dari antena ke boster Coaxial 7c
ttk
ttk
bh
bh
m
1
7
2
7
134
unit
m
m
m
bh
3
21
27
21
4
TOTAL MATV
TATA UDARA
1
2
3
4
5
AC Split wall 1 Pk
Pipa Reffrigerant + Isolasi dia. 5/8" + 1/4"
Instalasi Pipa Drain berikut isolasi dia. 25mm
NYM 3x2.5 mm2 ( Kabel kontrol OU-IU )
Exhaus Toilet
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO.
URAIAN PEKERJAAN
SAT. VOL
1
2
3
4
5
6
7
m
m
m
m
m
m
m
ls
45
60
33
53
23
134
2
1
m
m
m
m
ls
bh
bh
bh
54
64
34
32
1
1
1
1
bh
m'
5
25
1
2
3
4
5
6
7
8
ls
unit
unit
unit
unit
m'
unit
unit
1
1
1
1
55
1
1
Rp
HARGA
SATUAN
( Rp. )
TOTAL HARGA
( Rp. )
NO
JENIS PEKERJAAN
2
3
4
5
6
7
8
9
VOL
SAT
1 Unit
2 Unit
1 Unit
1 Unit
1 Unit
1 Unit
2 Set
1 unit
3
7
bh
bh
320
575 m
16 unit
C PERALATAN BANTU
1 Gate Valve:
- Diameter 80 mm
- Diameter 50 mm
- Diameter 40 mm
2 Flexible Connection:
- Diameter 65 mm
3 Check Valve
- Diameter 65 mm
4 Pressure Gauge 15mm
5 ARV dia 40mm
6 Material dan alat bantu
3
4
6
bh
bh
bh
bh
2
1
1
1
bh
bh
bh
ls
10
10
1
bh
bh
Ls
HARSAT
TOTAL HARGA
NO
JENIS PEKERJAAN
I
A
1
2
3
4
5
PEKERJAAN ELECTRIKAL
PERALATAN UTAMA LISTRIK
Kubikel TM Incoming
Kubikel TM Outgoing
Kubikel TM Incoming
Transformator, 500 Kva
Panel Utama LVMDP
VOL
1
1
1
1
1
SAT
Unit
Unit
Unit
Unit
Unit
PENGKABELAN :
- Dari G.PLN ke MVMDP, N2XSY 2(4x240 ) mm2
80
- Dari Trafo ke MVMDP, N2XSY 2(4x240 ) mm2
34
- Dari Trafo ke LVMD, NYY 2(4x1x300) mm2
14
- Dari Genset ke LVMD, NYY 2(4x1x300) mm2
14
- Cabble trench + cable support tutup plat beton L= 50cm
425
- Cabble trench + cable support tutup plat beton L= 30cm
110
- Gronding Sistem
1
m
m
m
m
m
m
ls
PEKERJAAN GENSET :
1 Unit Utama
- Genset kapasitas 400 KVA
1
- Panel Kontrol AMF
1
- Penempatan Genset ke Pondasi
1
2 Sistem Bahan Bakar
- Storage Tank Kapasitas 8000 lt
1
- Daily Tank Kapasitas 500 lt
1
- Electric Oil Transfer Pump 50 lt/menit (Gear Pump)
1
- Hand Pump 8 lt/menit
1
- Pemipaan Bahan Bakar
1
- BBM Pengetesan
4,000
2 Sistem Peredam Suara
- Residental Silencer/shuffer + Pemipaan
1
- Intake Sound Attenuator
1
- Discharge Sound Attenuator
1
- Soundproof Rock Wool 5 cm + Wire Mesh + Glasscoe 60
unit
unit
unit
unit
unit
unit
unit
unit
ltr
ls
ls
ls
m2
ls
HARSAT
TOTAL HARGA
URAIAN PEKERJAAN
PEKERJAAN JALAN
1
2
3
4
6,200.00
1,200.00
472.00
900.00
m2
m1
m2
m2
Sub Total
B
PEKERJAAN SALURAN
1 Pekerjaan (Saluran Terbuka ( Pas. Batu kali)
2 Pekerjaan Gorong-gorong
3 Pekerjaan Bak Kontrol
375.00
165.00
7.00
m1
m1
bh
Sub Total
C
PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Samping (BRC )
2 Pekerjaan Pagar Depan (Pas. Bt. Bata)
3 Pekerjaan Taman Parkir
265.00
124.00
433.00
m1
m1
m2
TOTAL A, B DAN C
JUMLAH HARGA
Pekerjaan
Lokasi
1
ANALISA PEKERJAAN
: SARANA/PRASARANA GEDUNG BALAI DIKLAT KAB KUTAI TIMUR
: BUKIT PELANGI SANGATA KUTAI TIMUR
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
10
1 M2 Pekerjaan Plesteran 1 PC : 3 Ps
Bahan
0.023 m
Pasir pasang
7.776 kg.
Portland cement
Tenaga
0.3 Oh
Pekerja
0.15 Oh
Tukang
0.015 Oh
Kepala Tukang
0.015 Oh
Mandor
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
1 M2 Pekerjaan Siaran 1 PC : 3 Ps
Bahan
0.016 m
Pasir pasang
5.28 kg.
Portland cement
Tenaga
0.346 Oh
Pekerja
0.115 Oh
Tukang
0.012 Oh
Kepala Tukang
0.017 Oh
Mandor
@ Rp.
@ Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
11
12
13
14
15
16
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
Top soil t = 20 cm
Rumput
Tanaman hias 1
Tanaman hias 2
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
1 M2 Pekerjaan Taman
Bahan
1 m2
1 m2
0.25 btg
0.25 btg
Tenaga
0.2 m3
0.2 m3
1 m2
1 m2
1 m2
A.
Satuan
Kuantitas
hari
hari
0.7500
0.0330
m
set
1.2000
0.1330
jam
jam
jam
0.0333
0.0667
0.0333
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
2 Jenis Pekerjaan
: ANALISA LPA (Lapis Pondasi Agregat Kelas A) diratakan dengan alat
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. mandor
B. B a h a n
1. agregat kelas A
2. alat bantu
C. Peralatan
1. motor grader
2. mesin gilas 2 roda 6 - 10 ton
3. truk tangki air
D. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
B.
Satuan
Kuantitas
hari
hari
0.7500
0.0330
m
set
1.2000
0.1330
jam
jam
jam
0.0333
0.0667
0.0333
Satuan
Kuantitas
hari
hari
0.0024
0.0002
kg.
liter
set
0.6420
0.4890
0.0004
jam
jam
0.0004
0.0004
2 Jenis Pekerjaan
: Analisa Lapis Perekat (Tack Coat)
Satuan Pekerjaan : liter
Uraian
A. Upah Tenaga
1. pekerja
3. tukang
B. B a h a n
1. aspal drum
2. minyak tanah industri
3. alat bantu
C. Peralatan
1. asphalt sprayer
2. compressor
D. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per liter :
Satuan
Kuantitas
hari
hari
0.0025
0.0001
kg.
liter
set
0.8880
0.2540
0.0003
jam
jam
0.0003
0.0003
analisa - 1
3 Jenis Pekerjaan
: ANALISA AC Base (Penghamparan dan Pemadatan tebal 5 cm)
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. tukang
3. mandor
B. B a h a n
1. AC Base (Produksi dan Suplai Terkirim ke Lokasi)
2. alat bantu
C. Peralatan
1. asphalt finisher
2. mesin gilas 2 roda 6 - 10 ton
3. mesin gilas roda karet 8 - 10 ton
4. truk tangki air
5. dump truck
D. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
Satuan
Kuantitas
hari
hari
hari
0.1791
0.0299
0.0149
ton
set
2.2388
0.0299
jam
jam
jam
jam
jam
0.0746
0.0746
0.0746
0.0746
0.4478
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
4 Jenis Pekerjaan
: ANALISA AC-WC (Penghamparan dan Pemadatan tebal 4 cm)
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. tukang
3. mandor
B. B a h a n
1. AC-WC (Produksi dan Suplai Terkirim ke Lokasi)
2. alat bantu
C. Peralatan
1. asphalt finisher
2. mesin gilas 2 roda 6 - 10 ton
3. mesin gilas roda karet 8 - 10 ton
4. truk tangki air
5. dump truck
D. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m 2 :
F.
Satuan
Kuantitas
hari
hari
hari
0.0006
0.0013
0.0076
ton
set
0.0921
0.0013
jam
jam
jam
jam
jam
0.0032
0.0032
0.0032
0.0032
0.0190
Satuan
Kuantitas
hari
hari
hari
0.4290
0.2000
0.0430
m
m
set
1.0000
0.0720
0.0300
5 Jenis Pekerjaan
: ANALISA Pasang Paving block abu K-350 t=8 cm,tebal pasir muntilan 6 cm
Satuan Pekerjaan : m
Harga Satuan
Uraian
Satuan Kuantitas
(Rp.)
A. Upah Tenaga
1. pekerja
hari
0.4290
2. tukang
hari
0.2000
3. mandor
hari
0.0430
B. B a h a n
1. paving block 8 cm. abu-abu K-350
m
1.0000
2. pasir
m
0.0720
3. alat bantu
set
0.0300
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
Jumlah
(Rp.)
analisa - 2
H.
Satuan
Kuantitas
hari
hari
hari
1.5000
0.5000
0.1250
kg.
m
m
set
176.0000
1.0924
0.3960
0.1000
jam
0.6000
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
Harga Satuan
(Rp.)
Jumlah
(Rp.)
13 Jenis Pekerjaan
: Analisa Suling-suling
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. mandor
B. B a h a n
1. Pipa PVC tipe AW dia 2"
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
Satuan
Kuantitas
hari
hari
0.0179
0.0018
batang
0.2500
Satuan
Kuantitas
3 Jenis Pekerjaan
: Analisa Plesteran 1 : 3
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. tukang
3. mandor
B. B a h a n
1. portland cement
2. pasir pasang
3. alat bantu
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
hari
hari
hari
0.3500
0.1700
0.0200
kg.
m
set
8.1600
0.0194
0.0135
4 Jenis Pekerjaan
: Analisa Siar 1 : 3
Satuan Pekerjaan : m
Uraian
A. Upah Tenaga
1. pekerja
2. tukang
3. mandor
B. B a h a n
1. portland cement
2. pasir pasang
3. alat bantu
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m :
Satuan
Kuantitas
hari
hari
hari
0.3570
0.1190
0.0170
kg.
m
set
4.0400
0.0097
0.0100
analisa - 3
URAIAN
SAT
A
1
2
3
4
UPAH
Pekerja
Tukang
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
B
1
2
3
4
5
6
7
8
9
10
11
BAHAN
Portland Cement
Pasir pasang
Paving block t = 8 cm natural
Paving block t = 6 cm natural
Kanstein 10x20x50 cm
Batu andesit t = 2 cm
Batu belah
Top Soil t = 20 cm
Rumput
Tanaman hias 1
Tanaman hias 2
kg
m3
m2
m2
bh
m2
m3
m2
m2
btg
btg
HARGA SATUAN
Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor
x
x
x
x
x
x
x
x
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (I)
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Kg
Kg
Kg
Kg
x
x
x
x
Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)
Jumlah per m
=
=
=
=
=
=
=
Rp
= Rp
M3
Kg
Kg
Kg
M3
3
M
M3
Bh
Lbr
Bh
M2
Bh
Lbr
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (I)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.000 Bh.
6.000 Kg
0.010 M3
x
x
x
Rp
Rp
Rp
Jumlah (II)
= Rp
0.200
0.400
0.020
0.020
Harga bahan
Tenaga
Tukang kayu
Tukang batu
Pekerja
Kepala tukang
Mandor
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060
2.000
1.000
2.000
0.300
0.050
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Jumlah (III)
Jumlah (I)+(II) +(III)
Jumlah per m
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1.000 bh
= Rp
Rp
Jumlah per m
Page 1 of 1
= Rp
Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor
x
x
x
x
x
x
x
x
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (I)
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Kg
Kg
Kg
Kg
x
x
x
x
Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)
Jumlah per m
=
=
=
=
=
=
=
Rp
= Rp
M3
Kg
Kg
Kg
M3
3
M
M3
Bh
Lbr
Bh
M2
Bh
Lbr
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (I)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.000 Bh.
6.000 Kg
0.010 M3
x
x
x
Rp
Rp
Rp
Jumlah (II)
= Rp
0.200
0.400
0.020
0.020
Harga bahan
Tenaga
Tukang kayu
Tukang batu
Pekerja
Kepala tukang
Mandor
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060
2.000
1.000
2.000
0.300
0.050
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Jumlah (III)
Jumlah (I)+(II) +(III)
Jumlah per m
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1.000 bh
= Rp
Rp
Jumlah per m
Page 1 of 1
= Rp