PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
: WINRIP
:
: Manggopoh - Padang Sawah
:
: SS. 7(10)4
: Shotcrete
: M2
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
B.
1
2
3
4
BAHAN
Beton Shotcrete
Additive
Wiremesh
Geotekstile
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
3,7037
0,7407
0,3704
HARGA
SATUAN
(Rp.)
10.825,18
14.289,24
18.186,30
C.
PERALATAN
1
2
3
4
5
6
M3
Ltr
M2
M'
(E06)
(E23)
(E20)
jam
jam
jam
jam
jam
Ls
0,1000
0,2700
1,1000
0,0000
907.000,00
65.000,00
95.000,00
35.000,00
3
4
40.093,25
10.584,62
6.735,67
57.413,54
90.700,00
17.550,00
104.500,00
0,00
212.750,00
0,0741
1,3600
0,0741
0,0741
0,1852
1,0000
4.686,57
326.682,44
27.454,19
12.466,31
27.777,78
1.000,00
63.268,71
240.207,68
370.631,62
168.295,18
150.000,00
1.000,00
JUMLAH
HARGA
(Rp.)
400.067,30