PEKERJAAN / MATERIAL
SAT. VOLUME
HARGA
SATUAN
PEKERJAAN DESAIN
ls
1.00
sub total
II
PEKERJAAN PONDASI
m3
15.00
3.00
Urugan sirtu
18.00
Anstampeng
3.00
3.00
163.00
III
PEKERJAAN BETON
Lantai 1
Kolom 15/25
m3
2.25
Kolom 15/20
0.36
Kolom 15/15
1.89
Sloof 20/25
4.18
Balok 15/25
2.44
Balok 15/20
2.13
Balok pintu
m3
0.12
Deck lantai 2
m3
6.00
5.55
10 Deck tangga
0.80
11 Meja dapur
0.11
12 Rabatan lantai
14.72
sub total
sub total
Lantai 2
1
Kolom 15/20
m3
0.72
Kolom 15/15
0.47
Balok 15/20
1.75
Gewel 15/15
1.35
Balok pintu
0.06
m3
2.00
sub total
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
301.63
265.50
Acian
676.92
Benangan
350.00
sub total
B. LANTAI 2
1
m2
119.27
Plesteran 1 pc ; 6 ps
238.54
Acian
238.54
JUMLAH
TOTAL
Benangan
m1
175.00
sub total
V
A.
1
2
3
4
4
unit
unit
unit
unit
unit
1.00
5.00
3.00
2.00
6.00
Kaca 6mm
m2
12.78
sub total
B.
1
2
3
LANTAI 2
Jendela
Pintu taekwood
Pintu KM
unit
unit
unit
5.00
2.00
1.00
Kaca 6mm
m2
18.33
sub total
VI
A.
1
3
4
5
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
sub total
bh
bh
bh
bh
2.00
5.00
5.00
2.00
sub total
Keramik 40x40
m2
103.00
9.28
40.00
sub total
B. LANTAI 2
1
Keramik 40x40
m2
56.35
3.10
16.75
sub total
Rangka atap
m2
155.00
Atap genteng
155.00
Atap bubungan
30.00
Listplank
51.00
sub total
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
m2
55.00
sub total
m2
181.00
sub total
X PEKERJAAN CAT
A. LANTAI 1
97.56
Cat interior
m2
515.00
Cat plafond
m2
55.00
sub total
LANTAI 2
Cat interior
3
4
55.00
218.00
110.00
Cat plafond
m2
181.00
sub total
XI
1
2
3
4
PEKERJAAN SANITASI
Closet duduk
Closet Jongkok
Shower
Floordrain plastik
unit
unit
unit
unit
2.00
1.00
2.00
5.00
sub total
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
m1
pcs
pcs
pcs
45.00
17.00
12.00
8.00
sub total
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00
18.00
14.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00
10.00
5.00
sub total
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
13.00
8.00
2.00
7.00
3.00
7.00
1.00
1.00
sub total
1
2
3
4
5
6
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
6.00
3.00
1.00
3.00
1.00
2.00
sub total
XIII
1
2
3
ttk
ttk
ttk
27.00
23.00
3.00
sub total
Railing tangga
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
Fasilitas listrik kerja
Pembersihan area
m1
bh
ls
bulan
bulan
ls
13.00
8.00
1.00
8.00
8.00
2.00
sub total
TOTAL NILAI KONTRAK
Jasa 10%
Total
Dibulatkan
m3
m2
Plesteran 1 pc ; 6 ps
m2
Acian
m2
Benangan
m2
Rabatan lantai
m3
Sirtu
m3
Batu kupang
m3
10 Tanah taman
m3
11 Vegetasi
m2
m2
13 Batu brobos
m2
14 Pagar depan
m1
1
2
3
4
5
6
7
8
9
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Direktur
PEKERJAAN / MATERIAL
SAT. VOLUME
HARGA
SATUAN
PEKERJAAN DESAIN
ls
1.00
sub total
II
PEKERJAAN PONDASI
m3
15.00
3.00
Urugan sirtu
18.00
Anstampeng
3.00
3.00
163.00
III
PEKERJAAN BETON
Lantai 1
Kolom 15/25
m3
2.25
Kolom 15/20
0.36
Kolom 15/15
1.89
Sloof 20/25
4.18
Balok 15/25
2.44
Balok 15/20
2.13
Balok pintu
m3
0.12
Deck lantai 2
m3
6.00
5.55
10 Deck tangga
0.80
11 Meja dapur
0.11
12 Rabatan lantai
14.72
sub total
sub total
Lantai 2
1
Kolom 15/20
m3
0.72
Kolom 15/15
0.47
Balok 15/20
1.75
Gewel 15/15
1.35
Balok pintu
0.06
m3
2.00
sub total
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
301.63
265.50
Acian
676.92
Benangan
350.00
sub total
B. LANTAI 2
1
m2
119.27
Plesteran 1 pc ; 6 ps
238.54
Acian
238.54
JUMLAH
TOTAL
Benangan
m1
175.00
sub total
V
A.
1
2
3
4
4
unit
unit
unit
unit
unit
1.00
5.00
3.00
2.00
6.00
Kaca 6mm
m2
12.78
sub total
B.
1
2
3
LANTAI 2
Jendela
Pintu taekwood
Pintu KM
unit
unit
unit
5.00
2.00
1.00
Kaca 6mm
m2
18.33
sub total
VI
A.
1
3
4
5
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
sub total
bh
bh
bh
bh
2.00
5.00
5.00
2.00
sub total
Keramik 40x40
m2
103.00
9.28
40.00
sub total
B. LANTAI 2
1
Keramik 40x40
m2
56.35
3.10
16.75
sub total
Rangka atap
m2
155.00
Atap genteng
155.00
Atap bubungan
30.00
Listplank
51.00
sub total
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
m2
55.00
sub total
m2
181.00
sub total
X PEKERJAAN CAT
A. LANTAI 1
97.56
Cat interior
m2
515.00
Cat plafond
m2
55.00
sub total
LANTAI 2
Cat interior
3
4
55.00
218.00
110.00
Cat plafond
m2
181.00
sub total
XI
1
2
3
4
PEKERJAAN SANITASI
Closet duduk
Closet Jongkok
Shower
Floordrain plastik
unit
unit
unit
unit
2.00
1.00
2.00
5.00
sub total
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
m1
pcs
pcs
pcs
45.00
17.00
12.00
8.00
sub total
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00
18.00
14.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00
10.00
5.00
sub total
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
13.00
8.00
2.00
7.00
3.00
7.00
1.00
1.00
sub total
1
2
3
4
5
6
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
6.00
3.00
1.00
3.00
1.00
2.00
sub total
XIII
1
2
3
ttk
ttk
ttk
27.00
23.00
3.00
sub total
Railing tangga
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
Fasilitas listrik kerja
Pembersihan area
m1
bh
ls
bulan
bulan
ls
13.00
8.00
1.00
8.00
8.00
2.00
sub total
TOTAL NILAI KONTRAK
Jasa 10%
Total
Dibulatkan
m3
m2
Plesteran 1 pc ; 6 ps
m2
Acian
m2
Benangan
m2
Rabatan lantai
m3
Sirtu
m3
Batu kupang
m3
10 Tanah taman
m3
11 Vegetasi
m2
m2
13 Batu brobos
m2
14 Pagar depan
m1
1
2
3
4
5
6
7
8
9
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Direktur
PEKERJAAN / MATERIAL
PEKERJAAN DESAIN
II
PEKERJAAN PONDASI
Urugan sirtu
Anstampeng
III
PEKERJAAN BETON
VOLUME
Bobot
MEI
APRIL
1
1.00
2.94
2.94
15.00
0.15
0.15
3.00
0.08
0.08
18.00
0.39
0.19
3.00
0.15
0.15
3.00
1.53
163.00
3.05
JUNI
4
AGUSTUS
JULI
3
SEPTEMBER
4
OKTOBER
4
NOVEMBER
4
DESEMBER
4
JUMLAH
4
TOTAL
Rp
Rp
Rp
0.19
750,000.00
Rp
388,500.00
Rp
1,980,000.00
Rp
0.76
15,000,000.00
15,000,000.00
787,500.00
0.76
Rp
7,800,000.00
3.05
Rp
15,566,500.00
Rp
27,272,500.00
7,537,500.00
Lantai 1
1
Kolom 15/25
2.25
1.48
0.37
0.37
0.37
0.37
Rp
Kolom 15/20
0.36
0.24
0.06
0.06
0.06
0.06
Rp
Kolom 15/15
1.89
1.24
0.41
0.41
0.41
Rp
6,331,500.00
Sloof 20/25
4.18
2.74
Rp
13,986,250.00
Balok 15/25
2.44
1.60
0.80
0.80
Rp
8,165,625.00
Balok 15/20
2.13
1.40
0.70
0.70
Rp
Balok pintu
0.12
0.07
0.03
0.03
Rp
336,600.00
Deck lantai 2
6.00
2.76
Rp
14,100,000.00
5.55
2.56
Rp
13,042,500.00
10
Deck tangga
0.80
0.37
11
Meja dapur
12
Rabatan lantai
0.11
0.05
14.72
2.45
1.37
1.37
2.76
1.28
1.28
0.37
0.82
0.82
Rp
0.82
1,206,000.00
7,135,500.00
1,880,000.00
Rp
258,500.00
Rp
Rp
12,507,750.00
86,487,725.00
Rp
2,412,000.00
Rp
1,582,875.00
Rp
5,854,125.00
Rp
4,522,500.00
Lantai 2
1
Kolom 15/20
0.72
0.47
0.16
0.16
0.16
Kolom 15/15
0.47
0.31
0.10
0.10
0.10
Balok 15/20
1.75
1.15
0.29
0.29
0.29
Gewel 15/15
1.35
0.89
0.30
0.30
0.30
Balok pintu
0.06
0.03
2.00
0.92
IV
A.
PEKERJAAN PASANGAN
LANTAI 1
301.63
8.57
265.50
2.52
Acian
676.92
4.58
Benangan
350.00
2.40
B.
LANTAI 2
119.27
3.39
Plesteran 1 pc ; 6 ps
238.54
2.27
Acian
238.54
1.61
Benangan
175.00
1.20
0.02
0.02
0.01
0.46
1.07
1.07
0.29
1.07
1.07
1.07
1.07
1.07
1.07
0.32
0.32
0.32
0.32
0.01
0.01
0.46
0.32
0.32
0.32
0.32
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.68
0.68
0.68
0.38
0.38
0.38
0.38
0.38
0.38
0.23
0.23
0.23
0.68
0.68
0.30
0.23
0.23
0.23
0.23
0.15
0.15
0.15
0.15
Rp
165,000.00
Rp
Rp
4,700,000.00
19,236,500.00
Rp
43,735,625.00
Rp
12,876,750.00
Rp
23,353,740.00
Rp
Rp
12,250,000.00
92,216,115.00
Rp
17,294,150.00
Rp
11,569,190.00
Rp
0.15
0.15
0.15
0.15
8,229,630.00
Rp
6,125,000.00
Rp
43,217,970.00
V
A.
1
2
1.00
5.00
0.54
1.15
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
Rp
Rp
2,750,000.00
5,875,000.00
3
4
Pintu taekwood
Pintu taekwood + Kaca
3.00
2.00
1.00
0.98
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
Rp
Rp
5,100,000.00
5,000,000.00
Pintu Kaca
6.00
1.82
0.30
0.30
0.30
0.30
0.30
0.30
Rp
Kaca 6mm
12.78
0.75
0.13
0.13
0.13
0.13
0.13
0.13
Rp
3,834,000.00
Rp
31,859,000.00
B.
1
2
3
LANTAI 2
Jendela
5.00
1.15
0.19
0.19
0.19
0.19
0.19
0.19
Rp
5,875,000.00
Pintu taekwood
Pintu KM
2.00
1.00
0.67
0.05
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
Rp
Rp
3,400,000.00
250,000.00
18.33
1.08
0.18
0.18
0.18
0.18
0.18
0.18
Rp
Rp
5,499,000.00
15,024,000.00
Rp
900,000.00
Kaca 6mm
VI
A.
1
LANTAI 1
Handle pintu + kunci
6.00
0.18
3
4
Selot jendela
Engsel jendela
5.00
10.00
0.04
0.09
Engsel pivot
12.00
0.29
B.
1
LANTAI 2
Handle pintu + kunci
2.00
0.06
2
3
Selot jendela
Engsel jendela
5.00
5.00
0.07
0.07
Engsel pivot
2.00
0.05
VII
A.
9,300,000.00
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
Rp
Rp
225,000.00
450,000.00
Rp
Rp
1,500,000.00
3,075,000.00
Rp
300,000.00
Rp
Rp
375,000.00
375,000.00
Rp
Rp
250,000.00
1,300,000.00
Rp
17,510,000.00
PEKERJAAN KERAMIK
LANTAI 1
Keramik 40x40
103.00
3.43
0.69
0.69
0.69
0.69
0.69
9.28
0.19
0.04
0.04
0.04
0.04
0.04
Rp
950,687.50
40.00
0.80
0.16
0.16
0.16
0.16
0.16
Rp
Rp
4,100,000.00
22,560,687.50
B.
LANTAI 2
Keramik 40x40
56.35
1.88
0.38
0.38
0.38
0.38
0.38
Rp
9,579,500.00
3.10
0.06
0.01
0.01
0.01
0.01
0.01
Rp
16.75
0.34
0.07
0.07
0.07
0.07
0.07
Rp
1,716,875.00
Rp
11,614,125.00
VIII
317,750.00
PEKERJAAN ATAP
Rangka atap
155.00
3.86
1.29
1.29
1.29
Rp
19,685,000.00
Atap genteng
155.00
4.48
1.49
1.49
1.49
Rp
22,862,500.00
Atap bubungan
30.00
0.36
0.12
0.12
0.12
Rp
Listplank
51.00
0.90
0.30
0.30
0.30
Rp
4,590,000.00
Rp
48,985,500.00
IX
PEKERJAAN PLAFOND
LANTAI 1
LANTAI 2
55.00
0.78
X
A.
PEKERJAAN CAT
LANTAI 1
Cat interior
Cat plafond
55.00
LANTAI 2
55.00
0.47
Cat interior
218.00
1.43
110.00
0.97
Cat plafond
181.00
1.19
0.20
0.64
0.20
0.64
0.20
0.64
0.20
0.64
1,848,000.00
Rp
3,987,500.00
Rp
3,987,500.00
Rp
Rp
13,122,500.00
13,122,500.00
181.00
2.57
97.56
0.83
0.14
0.14
0.14
0.14
0.14
Rp
4,243,860.00
515.00
3.38
0.68
0.68
0.68
0.68
0.68
Rp
17,252,500.00
0.36
0.07
0.07
0.07
0.07
0.07
Rp
1,842,500.00
Rp
23,338,860.00
Rp
2,392,500.00
Rp
7,303,000.00
XI
1
PEKERJAAN SANITASI
Closet duduk
2.00
0.71
2
3
Closet Jongkok
Shower
1.00
2.00
0.19
0.06
Floordrain plastik
5.00
0.01
XI
1
2
PVC 3/4"
Knee 3/4"
45.00
17.00
0.16
0.01
3
4
Shock 3/4"
Tee 3/4"
12.00
8.00
0.01
0.01
0.14
0.16
0.48
0.16
0.16
0.29
0.29
0.033
0.033
0.033
0.033
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.29
0.29
Rp
0.24
0.033
0.29
0.48
0.24
0.353
0.093
0.353
0.093
0.029
0.007
0.029
0.007
0.24
0.24
0.24
4,950,000.00
Rp
6,063,500.00
Rp
20,709,000.00
Rp
3,600,000.00
Rp
Rp
950,000.00
300,000.00
Rp
Rp
75,000.00
4,925,000.00
Rp
Rp
832,500.00
59,500.00
Rp
Rp
42,000.00
28,000.00
Rp
962,000.00
XI
PVC 3"
40.00
0.18
0.09
0.09
Rp
940,000.00
2
3
Knee 3"
Shock 3"
18.00
14.00
0.04
0.03
0.02
0.02
0.02
0.02
Rp
Rp
225,000.00
175,000.00
4
5
PVC 4"
Knee 4"
35.00
10.00
0.19
0.03
0.09
0.09
Shock 4"
5.00
0.01
0.01
0.01
945,000.00
135,000.00
0.01
0.01
Rp
Rp
Rp
Rp
75,000.00
2,495,000.00
XII
PEKERJAAN ELEKTRIKAL
1
2
Lantai 1
Lampu downlight (interior)
Lampu downlight (eksterior)
13.00
8.00
0.17
0.11
0.033
0.022
0.033
0.022
0.033
0.022
0.033
0.022
0.033
0.022
Rp
Rp
845,000.00
560,000.00
3
4
2.00
7.00
0.01
0.03
0.001
0.006
0.001
0.006
0.001
0.006
0.001
0.006
0.001
0.006
Rp
Rp
35,000.00
154,000.00
5
6
Saklar TV ex broco
Stop kontak ex broco
3.00
7.00
0.03
0.03
0.005
0.006
0.005
0.006
0.005
0.006
0.005
0.006
0.005
0.006
Rp
Rp
135,000.00
157,500.00
7
8
saklar telp
Saklar AC
1.00
1.00
0.00
0.01
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
Rp
Rp
25,000.00
35,000.00
Rp
1,946,500.00
Rp
Rp
390,000.00
52,500.00
Rp
Rp
22,000.00
67,500.00
Lantai 2
1
2
6.00
3.00
0.08
0.01
3
4
1.00
3.00
0.00
0.01
5
6
saklar telp
Saklar AC
1.00
2.00
0.00
0.01
XIII
1
2
3
0.56
0.47
0.06
23.00
3.00
0.11
0.09
0.11
0.09
0.11
0.09
0.11
0.09
0.11
0.09
0.01
0.01
0.01
0.01
0.01
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.003
0.003
0.003
0.003
Rp
Rp
25,000.00
70,000.00
Rp
627,000.00
Rp
2,835,000.00
Rp
Rp
2,415,000.00
315,000.00
Rp
5,565,000.00
Rp
4,940,000.00
Rp
Rp
600,000.00
2,350,000.00
Rp
Rp
2,000,000.00
2,000,000.00
Rp
Rp
3,000,000.00
14,890,000.00
Rp
510,417,482.50
Railing tangga
13.00
0.97
2
3
Bak kontrol
Instalasi tandon atas
8.00
1.00
0.12
0.46
4
5
8.00
8.00
0.39
0.39
Pembersihan area
2.00
0.59
0.24
0.24
0.24
0.24
0.01
0.01
0.01
0.01
0.01
0.01
0.59
0.12
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.46
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
100.00
3.53
3.53
DP
2.59
6.73
2.79
2.80
1.99
2.66
2.94
4.17
3.05
2.68
1.17
1.85
2.43
2.93
2.99
5.43
4.48
5.59
1.82
1.81
3.12
2.82
1.93
1.93
1.70
2.99
1.72
1.61
1.67
1.46
1.75
1.27
1.28
2.17
2.41
1.35
0.89
0.89
0.61
6.12 12.85 15.64 18.45 20.43 23.09 26.03 30.20 33.25 35.94 37.10 38.95 41.38 44.31 47.30 52.73 57.21 62.80 64.63 66.44 69.55 72.37 74.30 76.23 77.93 80.93 82.65 84.26 85.93 87.39 89.14 90.41 91.69 93.86 96.27 97.62 98.51 99.39 100.00
Termyn I
Termyn II
Termyn III
Termyn IV
Termyn V
PEKERJAAN / MATERIAL
HARGA
SATUAN
SAT. VOLUME
JUMLAH
TOTAL
PEKERJAAN DESAIN
ls
1.00
Rp
15,000,000.00
sub total
Rp
Rp
15,000,000.00
15,000,000.00
II
PEKERJAAN PONDASI
m3
15.00 Rp
50,000.00
Rp
750,000.00
3.00 Rp
129,500.00
Rp
388,500.00
Urugan sirtu
Rp
110,000.00
Rp
1,980,000.00
Anstampeng
3.00 Rp
262,500.00
Rp
787,500.00
3.00
Rp
2,600,000.00
Rp
7,800,000.00
163.00 Rp
102,500.00
sub total
Rp
Rp
16,707,500.00
28,413,500.00
III
PEKERJAAN BETON
Lantai 1
Kolom 15/25
m3
2.25
Rp
3,300,000.00
Rp
7,425,000.00
Kolom 15/20
0.36
Rp
3,300,000.00
Rp
1,188,000.00
Kolom 15/15
1.89
Rp
3,300,000.00
Rp
6,237,000.00
Sloof 20/25
4.18
Rp
3,300,000.00
Rp
13,777,500.00
Balok 15/25
2.44
Rp
3,300,000.00
Rp
8,043,750.00
Balok 15/20
2.13
Rp
3,300,000.00
Rp
7,029,000.00
Balok pintu
m3
0.12
Rp
2,750,000.00
Rp
336,600.00
Deck lantai 2
m3
6.00
Rp
2,200,000.00
Rp
13,200,000.00
5.55
Rp
2,200,000.00
Rp
12,210,000.00
10 Deck tangga
0.80
Rp
2,200,000.00
Rp
1,760,000.00
11 Meja dapur
0.11
Rp
2,200,000.00
Rp
242,000.00
12 Rabatan lantai
750,000.00 Rp
sub total
Rp
11,036,250.00
82,485,100.00
18.00
14.72 Rp
Lantai 2
1
Kolom 15/20
m3
0.72
Rp
3,300,000.00
Rp
2,376,000.00
Kolom 15/15
0.47
Rp
3,300,000.00
Rp
1,559,250.00
Balok 15/20
1.75
Rp
3,300,000.00
Rp
5,766,750.00
Gewel 15/15
1.35
Rp
3,300,000.00
Rp
4,455,000.00
Balok pintu
0.06
Rp
2,750,000.00
Rp
165,000.00
m3
2.00
Rp
2,200,000.00
sub total
Rp
Rp
4,400,000.00
18,722,000.00
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
301.63 Rp
140,000.00
Rp
42,227,500.00
265.50 Rp
45,000.00
Rp
11,947,500.00
Acian
676.92 Rp
32,500.00
Rp
21,999,900.00
Benangan
350.00 Rp
35,000.00
sub total
Rp
Rp
12,250,000.00
88,424,900.00
B. LANTAI 2
1
m2
119.27 Rp
140,000.00
Rp
16,697,800.00
Plesteran 1 pc ; 6 ps
238.54 Rp
45,000.00
Rp
10,734,300.00
Acian
238.54 Rp
32,500.00
Rp
7,752,550.00
Benangan
m1
175.00 Rp
35,000.00
sub total
Rp
Rp
6,125,000.00
41,309,650.00
V
A.
1
2
3
4
4
unit
unit
unit
unit
unit
Kaca 6mm
B.
1
2
3
Rp
Rp
Rp
Rp
Rp
2,750,000.00
1,150,000.00
1,650,000.00
2,500,000.00
1,450,000.00
Rp
Rp
Rp
Rp
Rp
2,750,000.00
5,750,000.00
4,950,000.00
5,000,000.00
8,700,000.00
m2
12.78 Rp
300,000.00
sub total
Rp
Rp
3,834,000.00
30,984,000.00
LANTAI 2
Jendela
Pintu taekwood
Pintu KM
unit
unit
unit
5.00 Rp
2.00 Rp
1.00 Rp
1,150,000.00
1,650,000.00
250,000.00
Rp
Rp
Rp
5,750,000.00
3,300,000.00
250,000.00
Kaca 6mm
m2
18.33 Rp
300,000.00
sub total
Rp
Rp
5,499,000.00
14,799,000.00
VI
A.
1
3
4
5
150,000.00
45,000.00
45,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
900,000.00
225,000.00
450,000.00
1,500,000.00
3,075,000.00
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
Rp
Rp
Rp
Rp
150,000.00
75,000.00
75,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
300,000.00
375,000.00
375,000.00
250,000.00
1,300,000.00
bh
bh
bh
bh
1.00
5.00
3.00
2.00
6.00
2.00
5.00
5.00
2.00
Keramik 40x40
m2
103.00 Rp
166,000.00
Rp
17,098,000.00
9.28 Rp
105,000.00
Rp
973,875.00
40.00 Rp
105,000.00
sub total
Rp
Rp
4,200,000.00
22,271,875.00
B. LANTAI 2
1
Keramik 40x40
m2
56.35 Rp
166,000.00
Rp
9,354,100.00
3.10 Rp
105,000.00
Rp
325,500.00
16.75 Rp
105,000.00
sub total
Rp
Rp
1,758,750.00
11,438,350.00
Rangka atap
m2
155.00 Rp
125,000.00
Rp
19,375,000.00
Atap genteng
155.00 Rp
145,000.00
Rp
22,475,000.00
Atap bubungan
30.00 Rp
56,000.00
Rp
1,680,000.00
Listplank
51.00 Rp
85,000.00
sub total
Rp
Rp
4,335,000.00
47,865,000.00
m2
55.00 Rp
70,000.00
sub total
Rp
Rp
3,850,000.00
3,850,000.00
m2
181.00 Rp
70,000.00
sub total
Rp
Rp
12,670,000.00
12,670,000.00
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
X PEKERJAAN CAT
A. LANTAI 1
97.56 Rp
40,000.00
Rp
3,902,400.00
Cat interior
m2
515.00 Rp
27,500.00
Rp
14,162,500.00
Cat plafond
m2
55.00 Rp
27,500.00
sub total
Rp
Rp
1,512,500.00
19,577,400.00
LANTAI 2
Cat interior
3
4
XI
1
2
3
4
55.00 Rp
40,000.00
Rp
2,200,000.00
218.00 Rp
27,500.00
Rp
5,995,000.00
110.00 Rp
45,000.00
Rp
4,950,000.00
Cat plafond
m2
181.00 Rp
27,500.00
sub total
Rp
Rp
4,977,500.00
18,122,500.00
PEKERJAAN SANITASI
Closet duduk
Closet Jongkok
Shower
Floordrain plastik
unit
unit
unit
unit
Rp
Rp
Rp
Rp
1,700,000.00
950,000.00
150,000.00
15,000.00
sub total
Rp
Rp
Rp
Rp
Rp
3,400,000.00
950,000.00
300,000.00
75,000.00
4,725,000.00
m1
pcs
pcs
pcs
45.00 Rp
17.00 Rp
12.00 Rp
8.00 Rp
17,500.00
3,500.00
3,500.00
3,500.00
sub total
Rp
Rp
Rp
Rp
Rp
787,500.00
59,500.00
42,000.00
28,000.00
917,000.00
2.00
1.00
2.00
5.00
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00 Rp
18.00 Rp
14.00 Rp
22,500.00
12,500.00
12,500.00
Rp
Rp
Rp
900,000.00
225,000.00
175,000.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00 Rp
10.00 Rp
5.00 Rp
26,000.00
13,500.00
15,000.00
sub total
Rp
Rp
Rp
Rp
910,000.00
135,000.00
75,000.00
2,420,000.00
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
13.00
8.00
2.00
7.00
3.00
7.00
1.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
55,000.00
65,000.00
15,000.00
20,000.00
40,000.00
15,000.00
15,000.00
15,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
715,000.00
520,000.00
30,000.00
140,000.00
120,000.00
105,000.00
15,000.00
15,000.00
1,660,000.00
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
6.00
3.00
1.00
3.00
1.00
2.00
Rp
Rp
Rp
Rp
Rp
Rp
55,000.00
45,000.00
55,000.00
45,000.00
15,000.00
45,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
330,000.00
135,000.00
55,000.00
135,000.00
15,000.00
90,000.00
760,000.00
ttk
ttk
ttk
27.00 Rp
23.00 Rp
3.00 Rp
80,000.00
80,000.00
80,000.00
sub total
Rp
Rp
Rp
Rp
2,160,000.00
1,840,000.00
240,000.00
4,240,000.00
1
2
3
4
5
6
XIII
1
2
3
Railing tangga
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
Fasilitas listrik kerja
Pembersihan area
m1
bh
ls
bulan
bulan
ls
13.00
8.00
1.00
8.00
8.00
2.00
Rp
Rp
Rp
Rp
Rp
Rp
375,000.00
75,000.00
2,250,000.00
250,000.00
250,000.00
1,500,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,875,000.00
600,000.00
2,250,000.00
2,000,000.00
2,000,000.00
3,000,000.00
14,725,000.00
Rp
Rp
Rp
Rp
489,755,275.00
48,975,527.50
538,730,802.50
538,730,802.00
m3
9.02 Rp
835,550.00
Rp
7,536,661.00
51.36 Rp
140,000.00
Rp
7,190,848.00
Plesteran 1 pc ; 6 ps
30.82 Rp
45,000.00
Rp
1,386,806.40
Acian
m2
30.82 Rp
32,500.00
Rp
1,001,582.40
Benangan
m2
52.00 Rp
35,000.00
Rp
1,820,000.00
73.96 Rp
40,000.00
Rp
2,958,520.32
Rabatan lantai
4.95 Rp
750,000.00
Rp
3,712,500.00
Sirtu
31.50 Rp
110,000.00
Rp
3,465,000.00
Batu kupang
0.53 Rp
575,000.00
Rp
304,750.00
10 Tanah taman
22.37 Rp
275,000.00
Rp
6,150,375.00
11 Vegetasi
26.00 Rp
150,000.00
Rp
3,900,000.00
m2
55.20 Rp
465,350.00
Rp
25,687,320.00
13 Batu brobos
m2
36.24 Rp
275,000.00
Rp
9,966,000.00
14 Pagar depan
10.85 Rp
450,000.00
Rp
4,882,500.00
Rp
Rp
Rp
Rp
79,962,863.12
7,996,286.31
87,959,149.43
87,959,149.00
Rp
Rp
Rp
Rp
1
2
3
4
5
6
7
8
9
Direktur
PEKERJAAN / MATERIAL
PEKERJAAN DESAIN
II
PEKERJAAN PONDASI
Urugan sirtu
Anstampeng
III
PEKERJAAN BETON
VOLUME
Bobot
MEI
APRIL
1
1.00
2.94
2.94
15.00
0.15
0.15
3.00
0.08
0.08
18.00
0.39
0.19
3.00
0.15
0.15
3.00
1.53
163.00
3.05
JUNI
4
AGUSTUS
JULI
3
SEPTEMBER
4
OKTOBER
4
NOVEMBER
4
DESEMBER
4
JUMLAH
4
TOTAL
Rp
Rp
Rp
0.19
750,000.00
Rp
388,500.00
Rp
1,980,000.00
Rp
0.76
15,000,000.00
15,000,000.00
787,500.00
0.76
Rp
7,800,000.00
3.05
Rp
15,566,500.00
Rp
27,272,500.00
7,537,500.00
Lantai 1
1
Kolom 15/25
2.25
1.48
0.37
0.37
0.37
0.37
Rp
Kolom 15/20
0.36
0.24
0.06
0.06
0.06
0.06
Rp
Kolom 15/15
1.89
1.24
0.41
0.41
0.41
Rp
6,331,500.00
Sloof 20/25
4.18
2.74
Rp
13,986,250.00
Balok 15/25
2.44
1.60
0.80
0.80
Rp
8,165,625.00
Balok 15/20
2.13
1.40
0.70
0.70
Rp
Balok pintu
0.12
0.07
0.03
0.03
Rp
336,600.00
Deck lantai 2
6.00
2.76
Rp
14,100,000.00
5.55
2.56
Rp
13,042,500.00
10
Deck tangga
0.80
0.37
11
Meja dapur
12
Rabatan lantai
0.11
0.05
14.72
2.45
1.37
1.37
2.76
1.28
1.28
0.37
0.82
0.82
Rp
0.82
1,206,000.00
7,135,500.00
1,880,000.00
Rp
258,500.00
Rp
Rp
12,507,750.00
86,487,725.00
Rp
2,412,000.00
Rp
1,582,875.00
Rp
5,854,125.00
Rp
4,522,500.00
Lantai 2
1
Kolom 15/20
0.72
0.47
0.16
0.16
0.16
Kolom 15/15
0.47
0.31
0.10
0.10
0.10
Balok 15/20
1.75
1.15
0.29
0.29
0.29
Gewel 15/15
1.35
0.89
0.30
0.30
0.30
Balok pintu
0.06
0.03
2.00
0.92
IV
A.
PEKERJAAN PASANGAN
LANTAI 1
301.63
8.57
265.50
2.52
Acian
676.92
4.58
Benangan
350.00
2.40
B.
LANTAI 2
119.27
3.39
Plesteran 1 pc ; 6 ps
238.54
2.27
Acian
238.54
1.61
Benangan
175.00
1.20
0.02
0.02
0.01
0.46
1.07
1.07
0.29
1.07
1.07
1.07
1.07
1.07
1.07
0.32
0.32
0.32
0.32
0.01
0.01
0.46
0.32
0.32
0.32
0.32
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.68
0.68
0.68
0.38
0.38
0.38
0.38
0.38
0.38
0.23
0.23
0.23
0.68
0.68
0.30
0.23
0.23
0.23
0.23
0.15
0.15
0.15
0.15
Rp
165,000.00
Rp
Rp
4,700,000.00
19,236,500.00
Rp
43,735,625.00
Rp
12,876,750.00
Rp
23,353,740.00
Rp
Rp
12,250,000.00
92,216,115.00
Rp
17,294,150.00
Rp
11,569,190.00
Rp
0.15
0.15
0.15
0.15
8,229,630.00
Rp
6,125,000.00
Rp
43,217,970.00
V
A.
1
2
1.00
5.00
0.54
1.15
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
0.09
0.19
Rp
Rp
2,750,000.00
5,875,000.00
3
4
Pintu taekwood
Pintu taekwood + Kaca
3.00
2.00
1.00
0.98
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
0.17
0.16
Rp
Rp
5,100,000.00
5,000,000.00
Pintu Kaca
6.00
1.82
0.30
0.30
0.30
0.30
0.30
0.30
Rp
Kaca 6mm
12.78
0.75
0.13
0.13
0.13
0.13
0.13
0.13
Rp
3,834,000.00
Rp
31,859,000.00
B.
1
2
3
LANTAI 2
Jendela
5.00
1.15
0.19
0.19
0.19
0.19
0.19
0.19
Rp
5,875,000.00
Pintu taekwood
Pintu KM
2.00
1.00
0.67
0.05
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
0.11
0.01
Rp
Rp
3,400,000.00
250,000.00
18.33
1.08
0.18
0.18
0.18
0.18
0.18
0.18
Rp
Rp
5,499,000.00
15,024,000.00
Rp
900,000.00
Kaca 6mm
VI
A.
1
LANTAI 1
Handle pintu + kunci
6.00
0.18
3
4
Selot jendela
Engsel jendela
5.00
10.00
0.04
0.09
Engsel pivot
12.00
0.29
B.
1
LANTAI 2
Handle pintu + kunci
2.00
0.06
2
3
Selot jendela
Engsel jendela
5.00
5.00
0.07
0.07
Engsel pivot
2.00
0.05
VII
A.
9,300,000.00
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.03
0.01
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.05
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
Rp
Rp
225,000.00
450,000.00
Rp
Rp
1,500,000.00
3,075,000.00
Rp
300,000.00
Rp
Rp
375,000.00
375,000.00
Rp
Rp
250,000.00
1,300,000.00
Rp
17,510,000.00
PEKERJAAN KERAMIK
LANTAI 1
Keramik 40x40
103.00
3.43
0.69
0.69
0.69
0.69
0.69
9.28
0.19
0.04
0.04
0.04
0.04
0.04
Rp
950,687.50
40.00
0.80
0.16
0.16
0.16
0.16
0.16
Rp
Rp
4,100,000.00
22,560,687.50
B.
LANTAI 2
Keramik 40x40
56.35
1.88
0.38
0.38
0.38
0.38
0.38
Rp
9,579,500.00
3.10
0.06
0.01
0.01
0.01
0.01
0.01
Rp
16.75
0.34
0.07
0.07
0.07
0.07
0.07
Rp
1,716,875.00
Rp
11,614,125.00
VIII
317,750.00
PEKERJAAN ATAP
Rangka atap
155.00
3.86
1.29
1.29
1.29
Rp
19,685,000.00
Atap genteng
155.00
4.48
1.49
1.49
1.49
Rp
22,862,500.00
Atap bubungan
30.00
0.36
0.12
0.12
0.12
Rp
Listplank
51.00
0.90
0.30
0.30
0.30
Rp
4,590,000.00
Rp
48,985,500.00
IX
PEKERJAAN PLAFOND
LANTAI 1
LANTAI 2
55.00
0.78
X
A.
PEKERJAAN CAT
LANTAI 1
Cat interior
Cat plafond
55.00
LANTAI 2
55.00
0.47
Cat interior
218.00
1.43
110.00
0.97
Cat plafond
181.00
1.19
0.20
0.64
0.20
0.64
0.20
0.64
0.20
0.64
1,848,000.00
Rp
3,987,500.00
Rp
3,987,500.00
Rp
Rp
13,122,500.00
13,122,500.00
181.00
2.57
97.56
0.83
0.14
0.14
0.14
0.14
0.14
Rp
4,243,860.00
515.00
3.38
0.68
0.68
0.68
0.68
0.68
Rp
17,252,500.00
0.36
0.07
0.07
0.07
0.07
0.07
Rp
1,842,500.00
Rp
23,338,860.00
Rp
2,392,500.00
Rp
7,303,000.00
XI
1
PEKERJAAN SANITASI
Closet duduk
2.00
0.71
2
3
Closet Jongkok
Shower
1.00
2.00
0.19
0.06
Floordrain plastik
5.00
0.01
XI
1
2
PVC 3/4"
Knee 3/4"
45.00
17.00
0.16
0.01
3
4
Shock 3/4"
Tee 3/4"
12.00
8.00
0.01
0.01
0.14
0.16
0.48
0.16
0.16
0.29
0.29
0.033
0.033
0.033
0.033
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.29
0.29
Rp
0.24
0.033
0.29
0.48
0.24
0.353
0.093
0.353
0.093
0.029
0.007
0.029
0.007
0.24
0.24
0.24
4,950,000.00
Rp
6,063,500.00
Rp
20,709,000.00
Rp
3,600,000.00
Rp
Rp
950,000.00
300,000.00
Rp
Rp
75,000.00
4,925,000.00
Rp
Rp
832,500.00
59,500.00
Rp
Rp
42,000.00
28,000.00
Rp
962,000.00
XI
PVC 3"
40.00
0.18
0.09
0.09
Rp
940,000.00
2
3
Knee 3"
Shock 3"
18.00
14.00
0.04
0.03
0.02
0.02
0.02
0.02
Rp
Rp
225,000.00
175,000.00
4
5
PVC 4"
Knee 4"
35.00
10.00
0.19
0.03
0.09
0.09
Shock 4"
5.00
0.01
0.01
0.01
945,000.00
135,000.00
0.01
0.01
Rp
Rp
Rp
Rp
75,000.00
2,495,000.00
XII
PEKERJAAN ELEKTRIKAL
1
2
Lantai 1
Lampu downlight (interior)
Lampu downlight (eksterior)
13.00
8.00
0.17
0.11
0.033
0.022
0.033
0.022
0.033
0.022
0.033
0.022
0.033
0.022
Rp
Rp
845,000.00
560,000.00
3
4
2.00
7.00
0.01
0.03
0.001
0.006
0.001
0.006
0.001
0.006
0.001
0.006
0.001
0.006
Rp
Rp
35,000.00
154,000.00
5
6
Saklar TV ex broco
Stop kontak ex broco
3.00
7.00
0.03
0.03
0.005
0.006
0.005
0.006
0.005
0.006
0.005
0.006
0.005
0.006
Rp
Rp
135,000.00
157,500.00
7
8
saklar telp
Saklar AC
1.00
1.00
0.00
0.01
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
Rp
Rp
25,000.00
35,000.00
Rp
1,946,500.00
Rp
Rp
390,000.00
52,500.00
Rp
Rp
22,000.00
67,500.00
Lantai 2
1
2
6.00
3.00
0.08
0.01
3
4
1.00
3.00
0.00
0.01
5
6
saklar telp
Saklar AC
1.00
2.00
0.00
0.01
XIII
1
2
3
0.56
0.47
0.06
23.00
3.00
0.11
0.09
0.11
0.09
0.11
0.09
0.11
0.09
0.11
0.09
0.01
0.01
0.01
0.01
0.01
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.015
0.002
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.001
0.003
0.003
0.003
0.003
0.003
Rp
Rp
25,000.00
70,000.00
Rp
627,000.00
Rp
2,835,000.00
Rp
Rp
2,415,000.00
315,000.00
Rp
5,565,000.00
Rp
4,940,000.00
Rp
Rp
600,000.00
2,350,000.00
Rp
Rp
2,000,000.00
2,000,000.00
Rp
Rp
3,000,000.00
14,890,000.00
Rp
510,417,482.50
Railing tangga
13.00
0.97
2
3
Bak kontrol
Instalasi tandon atas
8.00
1.00
0.12
0.46
4
5
8.00
8.00
0.39
0.39
Pembersihan area
2.00
0.59
0.24
0.24
0.24
0.24
0.01
0.01
0.01
0.01
0.01
0.01
0.59
0.12
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.46
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
100.00
3.53
3.53
DP
2.59
6.73
2.79
2.80
1.99
2.66
2.94
4.17
3.05
2.68
1.17
1.85
2.43
2.93
2.99
5.43
4.48
5.59
1.82
1.81
3.12
2.82
1.93
1.93
1.70
2.99
1.72
1.61
1.67
1.46
1.75
1.27
1.28
2.17
2.41
1.35
0.89
0.89
0.61
6.12 12.85 15.64 18.45 20.43 23.09 26.03 30.20 33.25 35.94 37.10 38.95 41.38 44.31 47.30 52.73 57.21 62.80 64.63 66.44 69.55 72.37 74.30 76.23 77.93 80.93 82.65 84.26 85.93 87.39 89.14 90.41 91.69 93.86 96.27 97.62 98.51 99.39 100.00
Termyn I
Termyn II
Termyn III
Termyn IV
Termyn V
OH
OH
0.7500
0.0250
55000
110000
41250
2750
###
m3
OH
OH
1.2000
0.3000
0.0100
132000
55000
110000
158400
16500
1100
###
OH
OH
0.5250
0.0175
55000
110000
28875
1925
###
PEKERJAAN BETON
1m3 Lantai kerja
Bahan : Semen / PC (50 kg)
Pasir beton
Koral beton
Air
Tenaga : Pekerja
Tukang batu
Kepala tukang
Mandor
zak
m3
m3
ltr
OH
OH
OH
OH
4.9400
0.5430
0.5260
215.0000
1.0000
0.2500
0.1000
0.0500
72050
198000
302500
27.5
55000
77000
82500
110000
355927
107514
159115
5912.5
55000
19250
8250
5500
###
+ bekisting
Zak
6.720
m3
0.540
m3
0.810
Kg
207.093
Kg
3.000
m3
0.270
Kg
2.000
ltr
0.600
OH
0.283
OH
0.323
OH
1.400
OH
0.275
OH
1.560
OH
5.650
6.720
0.540
0.810
132.000
2.250
0.320
3.200
1.600
0.318
0.333
1.400
0.275
1.650
6.350
SNI DT 91-0008-2007
72050
484176
198000
106920
302500
245025
9762.5 2021748.667
15400
46200
1595000
430650
16500
33000
5280
3168
110000
31130
82500
26647.5
77000
107800
77000
21175
82500
128700
55000
310750
###
72050
198000
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
484176
106920
245025
1288650
34650
510400
52800
8448
34980
27472.5
107800
21175
136125
349250
###
0.080
0.006
72050
198000
5764
1188
m3
Kg
Kg
m3
Kg
ltr
OH
OH
OH
OH
OH
OH
0.009
4.009
0.450
0.002
0.010
0.000
0.009
0.006
0.002
0.002
0.002
0.180
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
2722.5
39135.58
6930
3190
165
0
990
495
154
154
165
9900
###
6.720
0.540
0.810
207.093
2.250
0.320
3.200
1.600
2.800
16.000
0.318
0.333
1.400
0.275
1.650
6.350
72050
484176
198000
106920
302500
245025
9762.5 2021748.667
15400
34650
1595000
510400
16500
52800
5280
8448
104500
292600
7150
114400
110000
34980
82500
27472.5
77000
107800
77000
21175
82500
136125
55000
349250
###
Zak
m3
m3
Kg
Kg
m3
Kg
ltr
OH
OH
OH
OH
OH
OH
0.110
0.009
0.015
4.155
0.050
0.003
0.020
0.000
0.015
0.010
0.033
0.033
0.033
0.297
72050
198000
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
7925.5
1782
4537.5
40563.84
770
4785
330
0
1650
825
2541
2541
2722.5
16335
###
1kg pembesian
Bahan : Besi Beton (polos/ulir)
Kawat Beton
Tenaga : Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Kg
Kg
OH
OH
OH
OH
1.0500
0.0150
0.0070
0.0070
0.0007
0.0004
9762.5
15400
55000
77000
82500
110000
10250.63
231
385
539
57.75
44
###
m3
kg
ltr
m3
lbr
btg
0.020
0.200
0.100
0.075
0.175
3.000
1595000
16500
5280
2200000
104500
7150
31900
3300
528
165000
18287.5
21450
###
Tenaga : Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
OH
OH
OH
OH
0.660
0.330
0.033
0.033
55000
77000
82500
110000
36300
25410
2722.5
3630
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
OH
0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033
1595000
16500
5280
2200000
104500
7150
55000
77000
82500
110000
47850
6600
792
33000
36575
14300
36300
25410
2722.5
3630
Zak
m3
m3
ltr
OH
OH
OH
OH
7.420
0.499
0.582
215
1.650
0.275
0.028
0.083
72050
198000
302500
27.5
55000
77000
82500
110000
534611
98717.1
175954.2
5912.5
90750
21175
2310
9130
###
###
###
###
###
###
1m3 pekerjaan plat lantai 12cm
bahan : Pembesian
Bekisting
Beton K225
kg
m2
m3
67.833
8.333
1
### 780583.6042
### 2571066.667
### 938559.8095
###
kg
m2
m3
58.658
8.333
1
### 674993.8491
### 2571066.667
### 938559.8095
###
PEKERJAAN PASANGAN
1m3 Pondasi Batu Kali
Bahan : batu kali
semen
pasir pasang
Tenaga : pekerja
tukang batu
kepala tukang batu
mandor
m3
zak
m3
OH
OH
OH
OH
1.2
3.52
0.38
2.25
0.6
0.06
0.017
236500
72050
148500
55000
77000
82500
110000
283800
253616
56430
123750
46200
4950
1870
###
bh
zak
m3
OH
OH
OH
OH
475
2.4
0.416
1.5
0.15
3
0.15
577.5
72050
148500
77000
82500
55000
110000
274312.5
172920
61776
115500
12375
165000
16500
###
bh
zak
75
0.58
577.5
72050
43312.5
41789
pasir pasang
Tenaga : tk.batu
kepala tukang batu
pekerja
mandor
m3
OH
OH
OH
OH
0.047
0.2
0.02
0.5
0.025
148500
77000
82500
55000
110000
6979.5
15400
1650
27500
2750
###
bh
zak
m3
OH
OH
OH
OH
30.00
0.22
0.04
0.30
0.10
0.01
0.02
1980
72050
148500
55000
77000
82500
110000
59400
15851
5197.5
16500
7700
825
1650
###
zak
m3
OH
OH
OH
OH
0.24
0.02
0.214
0.021
0.35
0.018
72050
148500
77000
82500
55000
110000
17292
2970
16478
1732.5
19250
1980
###
zak
m3
OH
OH
OH
OH
0.125
0.024
0.150
0.015
0.300
0.015
72050
148500
77000
82500
55000
110000
8991.84
3564
11550
1237.5
16500
1650
###
zak
m3
OH
OH
OH
OH
0.088
0.027
0.150
0.015
0.300
0.015
72050
148500
77000
82500
55000
110000
6363.456
4009.5
11550
1237.5
16500
1650
###
1m2 Acian PC
Bahan : semen
Tenaga : tukang batu
kepala tukang batu
pekerja
mandor
zak
OH
OH
OH
OH
0.065
0.100
0.010
0.200
0.010
72050
77000
82500
55000
110000
4683.25
7700
825
11000
1100
###
zak
m3
OH
OH
OH
OH
0.010
0.013
0.004
0.040
0.400
0.080
72050
148500
110000
82500
77000
55000
720.5
1930.5
440
3300
30800
4400
###
PEKERJAAN LANTAI
1m2 pas. Keramik 20x20
Bahan : lantai keramik 20/20
pasir pasang
semen
m2
m3
zak
1.05
0.03
0.2
95700
148500
72050
100485
4455
14410
semen warna
Tenaga : tk batu
kepala tukang batu
pekerja
mandor
kg
OH
OH
OH
OH
0.1
0.4
0.1125
0.2
0.03
1650
77000
82500
55000
110000
165
30800
9281.25
11000
3300
###
m2
m3
zak
kg
OH
OH
OH
OH
1.05
0.03
0.2
0.07
0.4
0.075
0.2
0.02
100100
148500
72050
1650
77000
82500
55000
110000
105105
4455
14410
115.5
30800
6187.5
11000
2200
###
m2
m3
zak
m2
OH
OH
OH
OH
1.05
0.03
0.25
1
0.6
0.075
0.25
0.025
106700
148500
72050
2500
77000
82500
55000
110000
112035
4455
18012.5
2500
46200
6187.5
13750
2750
###
m2
m3
zak
m2
OH
OH
OH
OH
1.05
0.03
0.25
1
1.5
0.075
0.5
0.025
170500
148500
72050
2500
77000
82500
55000
110000
179025
4455
18012.5
2500
115500
6187.5
27500
2750
###
m2
m3
zak
m2
OH
OH
OH
1.05
0.03
0.2
0.09
0.5
0.075
0.25
49.5
148500
72050
2500
77000
82500
55000
95700
4455
14410
225
38500
6187.5
13750
OH
0.025
110000
2750
###
JENIS PEKERJAAN
SAT.
INDEKS
HARGA SAT.
(Rp.)
JUMLAH
(Rp.)
PEKERJAAN PERSIAPAN
1m2 Pembersihan area
Tenaga : Pekerja
Mandor
OH
OH
0.1000
0.0500
55000
110000
5500
5500
m3
kg
m3
OH
OH
OH
OH
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
2200000
71500
3300000
55000
77000
82500
110000
26400
1430
23100
5500
7700
825
550
OH
OH
0.7500
0.0250
55000
110000
41250
2750
m3
OH
OH
1.2000
0.3000
0.0100
132000
55000
110000
158400
16500
1100
OH
OH
0.5250
0.0175
55000
110000
28875
1925
PEKERJAAN BETON
1m3 Lantai kerja
Bahan : Semen / PC (50 kg)
Pasir beton
zak
m3
4.9400
0.5430
72050
198000
355927
107514
Koral beton
Air
Tenaga : Pekerja
Tukang batu
Kepala tukang
Mandor
m3
ltr
OH
OH
OH
OH
0.5260
215.0000
1.0000
0.2500
0.1000
0.0500
+ bekisting
Zak
6.720
m3
0.540
m3
0.810
Kg
207.093
Kg
3.000
m3
0.270
Kg
2.000
ltr
0.600
OH
0.283
OH
0.323
OH
1.400
OH
0.275
OH
1.560
OH
5.650
302500
27.5
55000
77000
82500
110000
72050
198000
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
159115
5912.5
55000
19250
8250
5500
SNI DT 91-0008-2
484176
106920
245025
2021748.667
46200
430650
33000
3168
31130
26647.5
107800
21175
128700
310750
6.720
0.540
0.810
132.000
2.250
0.320
3.200
1.600
0.318
0.333
1.400
0.275
1.650
6.350
72050
198000
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
484176
106920
245025
1288650
34650
510400
52800
8448
34980
27472.5
107800
21175
136125
349250
0.080
0.006
0.009
4.009
72050
198000
302500
9762.5
5764
1188
2722.5
39135.58
Kawat Beton
Bekistingkayu glugu bekisting
Paku Usuk
Minyak Bekisting
Tenaga : Mandor
Kepala Tukang Besi
Tukang Besi
Tukang Batu
Tukang Kayu
Pekerja
Kg
m3
Kg
ltr
OH
OH
OH
OH
OH
OH
0.450
0.002
0.010
0.000
0.009
0.006
0.002
0.002
0.002
0.180
6.720
0.540
0.810
207.093
2.250
0.320
3.200
1.600
2.800
16.000
0.318
0.333
1.400
0.275
1.650
6.350
Zak
m3
m3
Kg
Kg
m3
Kg
ltr
OH
OH
OH
OH
OH
OH
0.110
0.009
0.015
4.155
0.050
0.003
0.020
0.000
0.015
0.010
0.033
0.033
0.033
0.297
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
6930
3190
165
0
990
495
154
154
165
9900
72050
484176
198000
106920
302500
245025
9762.5 2021748.667
15400
34650
1595000
510400
16500
52800
5280
8448
104500
292600
7150
114400
110000
34980
82500
27472.5
77000
107800
77000
21175
82500
136125
55000
349250
72050
198000
302500
9762.5
15400
1595000
16500
5280
110000
82500
77000
77000
82500
55000
7925.5
1782
4537.5
40563.84
770
4785
330
0
1650
825
2541
2541
2722.5
16335
1kg pembesian
Bahan : Besi Beton (polos/ulir)
Kawat Beton
Tenaga : Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Kg
Kg
OH
OH
OH
OH
1.0500
0.0150
0.0070
0.0070
0.0007
0.0004
9762.5
15400
55000
77000
82500
110000
10250.63
231
385
539
57.75
44
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
OH
0.020
0.200
0.100
0.075
0.175
3.000
0.660
0.330
0.033
0.033
1595000
16500
5280
2200000
104500
7150
55000
77000
82500
110000
31900
3300
528
165000
18287.5
21450
36300
25410
2722.5
3630
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
OH
0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033
1595000
16500
5280
2200000
104500
7150
55000
77000
82500
110000
47850
6600
792
33000
36575
14300
36300
25410
2722.5
3630
Zak
m3
m3
ltr
OH
OH
OH
OH
7.420
0.499
0.582
215
1.650
0.275
0.028
0.083
72050
198000
302500
27.5
55000
77000
82500
110000
534611
98717.1
175954.2
5912.5
90750
21175
2310
9130
kg
m2
m3
67.833
8.333
1
### 780583.6042
### 2571066.667
### 938559.8095
kg
m2
m3
58.658
8.333
1
### 674993.8491
### 2571066.667
### 938559.8095
PEKERJAAN PASANGAN
1m3 Pondasi Batu Kali
Bahan : batu kali
semen
pasir pasang
Tenaga : pekerja
tukang batu
kepala tukang batu
mandor
m3
zak
m3
OH
OH
OH
OH
1.2
3.52
0.38
2.25
0.6
0.06
0.017
bh
zak
m3
OH
OH
OH
OH
236500
72050
148500
55000
77000
82500
110000
283800
253616
56430
123750
46200
4950
1870
475
2.4
0.416
1.5
0.15
3
0.15
577.5
72050
148500
77000
82500
55000
110000
274312.5
172920
61776
115500
12375
165000
16500
bh
zak
m3
OH
OH
OH
OH
75
0.58
0.047
0.2
0.02
0.5
0.025
577.5
72050
148500
77000
82500
55000
110000
43312.5
41789
6979.5
15400
1650
27500
2750
bh
zak
m3
OH
30.00
0.22
0.04
0.30
1980
72050
148500
55000
59400
15851
5197.5
16500
Tukang batu
kepala tukang batu
Mandor
OH
OH
OH
0.10
0.01
0.02
77000
82500
110000
7700
825
1650
zak
m3
OH
OH
OH
OH
0.24
0.02
0.214
0.021
0.35
0.018
72050
148500
77000
82500
55000
110000
17292
2970
16478
1732.5
19250
1980
zak
m3
OH
OH
OH
OH
0.125
0.024
0.150
0.015
0.300
0.015
72050
148500
77000
82500
55000
110000
8991.84
3564
11550
1237.5
16500
1650
zak
m3
OH
OH
OH
OH
0.088
0.027
0.150
0.015
0.300
0.015
72050
148500
77000
82500
55000
110000
6363.456
4009.5
11550
1237.5
16500
1650
1m2 Acian PC
Bahan : semen
Tenaga : tukang batu
kepala tukang batu
pekerja
mandor
zak
OH
OH
OH
OH
0.065
0.100
0.010
0.200
0.010
72050
77000
82500
55000
110000
4683.25
7700
825
11000
1100
zak
m3
OH
OH
OH
OH
0.010
0.013
0.004
0.040
0.400
0.080
72050
148500
110000
82500
77000
55000
720.5
1930.5
440
3300
30800
4400
PEKERJAAN LANTAI
1m2 pas. Keramik 20x20
Bahan : lantai keramik 20/20
pasir pasang
semen
semen warna
Tenaga : tk batu
kepala tukang batu
pekerja
mandor
m2
m3
zak
kg
OH
OH
OH
OH
1.05
0.03
0.2
0.1
0.4
0.1125
0.2
0.03
95700
148500
72050
1650
77000
82500
55000
110000
100485
4455
14410
165
30800
9281.25
11000
3300
m2
m3
zak
kg
OH
OH
OH
OH
1.05
0.03
0.2
0.07
0.4
0.075
0.2
0.02
100100
148500
72050
1650
77000
82500
55000
110000
105105
4455
14410
115.5
30800
6187.5
11000
2200
m2
m3
zak
m2
OH
OH
OH
OH
1.05
0.03
0.25
1
0.6
0.075
0.25
0.025
106700
148500
72050
2500
77000
82500
55000
110000
112035
4455
18012.5
2500
46200
6187.5
13750
2750
m2
m3
zak
m2
OH
OH
OH
OH
1.05
0.03
0.25
1
1.5
0.075
0.5
0.025
170500
148500
72050
2500
77000
82500
55000
110000
179025
4455
18012.5
2500
115500
6187.5
27500
2750
m2
m3
zak
m2
OH
OH
OH
1.05
0.03
0.2
0.09
0.5
0.075
0.25
49.5
148500
72050
2500
77000
82500
55000
95700
4455
14410
225
38500
6187.5
13750
OH
0.025
110000
2750
m'
1.01
50050
50550.5
semen
zak
0.02
72050
1441
pasir pasang
m3
0.002
148500
297
tk batu
kepala tukang batu
pekerja
mandor
OH
OH
OH
OH
0.1
0.01
0.2
0.01
77000
82500
55000
110000
7700
825
11000
1100
m2
kg
OH
OH
OH
OH
1.05
0.6
0.65
0.35
0.035
0.0325
412500
48400
55000
77000
82500
110000
433125
29040
35750
26950
2887.5
3575
PEKERJAAN ATAP
1 m2 Pasang rangka atap galvalume (reng+usuk)
Bahan : Reng+Usuk Galvalume t=0.75
1.05
m2
Tenaga : Mandor
OH
0.002
Kepala Tukang besi
OH
0.020
Tukang besi
OH
0.200
Pekerja
OH
0.400
71500
110000
82500.00
77000.00
55000.00
75075
220
1650
15400
22000
275000
577500
mandor
m1
2.1
Tenaga : Mandor
Kepala Tukang besi
Tukang besi
Pekerja
OH
OH
OH
OH
0.002
0.020
0.200
0.400
110000
82500.00
77000.00
55000.00
220
1650
15400
22000
m3
m3
kg
OH
OH
OH
OH
0.014
0.057
0.250
0.100
0.100
0.010
0.005
2750000
2750000
16500
55000
77000
82500
110000
38500
156750
4125
5500
7700
825
550
bh
OH
OH
OH
OH
15.00
0.008
0.008
0.075
0.150
8580
110000
82500
77000
55000
128700
880
660
5775
8250
0.160
0.032
5.000
0.002
0.020
0.200
0.400
72050
148500
15400
110000
82500
77000
55000
11528
4796.55
77000
220
1650
15400
22000
0.382
0.188
0.500
4.000
0.075
0.025
0.150
0.250
61050
58300
44000
49.5
110000
82500
77000
55000
23315.00
10931.25
22000.00
198.00
8250.00
2062.50
11550.00
13750.00
Lembar
lonjor
lonjor
bh
O.H
O.H
O.H
O.H
PEKERJAAN PLAFOND
1 m2 Pasang plafond gypsum rangka hollow
Lembar
lonjor
bh
OH
OH
OH
OH
0.382
1.007
20.000
0.075
0.025
0.250
0.150
61050
44000
49.5
110000
82500
77000
55000
23315.00
44308
990
8250
2062.5
19250
8250
PEKERJAAN PENGECATAN
1m2 Pengecatan Tembok interior (1 lapis cat dasar,2 lapis cat penutup)
Bahan : Cat dasar
0.100
66880
ltr
Kertas gosok
0.100
4950
lbr
cat tembok
0.300
33000
kg
Tenaga : Mandor
0.003
110000
OH
Kepala Tukang Cat
0.008
82500
OH
Tukang Cat
0.075
77000
OH
Pekerja
0.050
55000
OH
6688.00
495.00
9900.00
275.00
618.75
5775.00
2750.00
kg
lbr
OH
OH
OH
OH
0.3000
0.1000
0.008
0.023
0.225
0.150
56100
4950
110000
82500
77000
55000
16830.00
495.00
825.00
1856.25
17325.00
8250.00
Kg
m2
OH
OH
OH
OH
0.350
1.000
0.003
0.008
0.075
0.050
40700
9900
110000
82500
77000
55000
14245.00
9900.00
275.00
618.75
5775.00
2750.00
Buah
rol
Buah
1.000
1.000
0.060
1650000
9350
1650000
1650000.00
9350.00
99000.00
PEKERJAAN SANITASI
Pasang Kloset Duduk Porselen
Bahan : Closet Duduk Porselen Warna P
rol TBA
Perlengkapan 6% harga closet
Tenaga : Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja/Buruh Tak Terampil
OH
OH
OH
OH
0.003
0.008
0.075
0.050
110000
82500
77000
55000
275.00
618.75
5775.00
2750.00
Buah
rol
OH
OH
1.000
1.000
0.030
0.150
207900
9350
82500
77000
207900.00
9350.00
2475.00
11550.00
Buah
OH
OH
1
0.030
0.150
495000
82500
77000
495000.00
2475.00
11550.00
Buah
rol
OH
OH
1
1
0.03
0.15
71500
9350
82500
77000
71500.00
9350.00
2475.00
11550.00
Pasang floordrain
Bahan : Avour steanliss
Tenaga : Kepala Tukang Pipa
Tukang Pipa
Buah
OH
OH
1
0.030
0.150
66000
82500
77000
66000.00
2475.00
11550.00
Buah
Buah
Zak
m3
1.000
0.120
0.120
0.010
0.100
0.150
1.450
1.200
495000
495000.00
495000
59400.00
72050
8646.00
148500
1485.00
110000
11000.00
82500
12375.00
77000
111650.00
55000
66000.00
132000
132000.00
Pasang wastafel
Bahan : Wastafel Besar Warna
Perlengkapan 12 % harga
Semen (50kg)
Pasir Pasang
Tenaga : Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja
OH
OH
OH
OH
Buah
Rol TBA
Tenaga : Kepala Tukang Pipa
Tukang Pipa
rol
9350
9350.00
OH
0.03
82500
2475.00
OH
0.15
77000
11550.00
1
1
0.03
0.3
275000
66000
275000.00
82500
2475.00
77000
23100.00
waterdrain + asesoris
Tenaga : kepala tukang
tukang batu
bh
set
OH
OH
66000.00
Buah
rol
OH
OH
1
1
0.03
0.15
82500
9350
82500
77000
82500.00
9350.00
2475.00
11550.00
Buah
rol
OH
OH
1
1
0.03
0.15
52800
9350
82500
77000
52800.00
9350.00
2475.00
11550.00
0.300
0.350
16500
16500
4950.00
5775.00
OH
0.002
110000
198.00
OH
0.006
82500
495.00
Tukang Pipa
OH
0.060
77000
4620.00
Pekerja
OH
0.036
55000
1980.00
0.300
0.350
0.002
0.006
0.060
0.036
22000
22000
110000
82500
77000
55000
6600.00
7700.00
198.00
495.00
4620.00
1980.00
Tenaga : Mandor
ljr
Buah
OH
OH
OH
OH
1m'
ljr
Buah
OH
OH
OH
OH
0.300
0.350
0.004
0.135
0.135
0.081
126500
126500
110000
82500
77000
55000
37950.00
44275.00
451.00
11137.50
10395.00
4455.00
1m'
ljr
Buah
OH
OH
OH
OH
0.300
0.350
0.004
0.135
0.135
0.081
210100
210100
110000
82500
77000
55000
63030.00
73535.00
451.00
11137.50
10395.00
4455.00
1m'
m3
sak
m3
m3
kg
m3
OH
OH
OH
OH
144.676
1.54
0.13
0.02
2.6
0.09
1.42
0.473
0.047
0.071
577.5
72050
148500
302500
9762.5
198000
55000
77000
82500
110000
83550.35
110957.00
19305.00
6050.00
25382.50
17820.00
78100.00
36421.00
3877.50
7810.00
2.000
326700.00
653400.00
kg
m3
Buah
m3
14.130
13200
186516.00
0.236
148500
34971.75
1.000
181500.00
181500.00
0.589
0.004
0.004
850584.44
110000
55000
500781.59
440.00
209.00
Pembuatan septictank
Pembuatan Resapan
Ijuk
Batu Kosong
Tutup Plat Beton
Bantalan dari Beton K350 30m
Tenaga : Mandor
Pekerja Terampil
PEKERJAAN ELEKTRIKAL
OH
OH
bh
bh
OH
OH
OH
1.000
1.000
0.480
0.048
0.048
38500
9900
55000
77000
82500
38500.00
9900.00
26400.00
3696.00
3960.00
bh
bh
OH
OH
OH
1.000
2.000
0.480
0.048
0.048
38500
27500
55000
77000
82500
38500.00
55000.00
26400.00
3696.00
3960.00
bh
bh
OH
OH
OH
1.000
2.000
0.480
0.048
0.048
38500
66000
55000
77000
82500
38500.00
132000.00
26400.00
3696.00
3960.00
bh
OH
OH
OH
1.000
0.480
0.048
0.048
605000
55000
77000
82500
605000.00
26400.00
3696.00
3960.00
bh
OH
OH
OH
1.000
0.400
0.040
0.040
14300
55000
77000
82500
14300.00
22000.00
3080.00
3300.00
bh
OH
OH
OH
1.000
0.400
0.040
0.040
18700
55000
77000
82500
18700.00
22000.00
3080.00
3300.00
bh
14300
14300.00
Tenaga : pekerja
tukang listruk
kepala tukang listrik
OH
OH
OH
0.48
0.048
0.048
55000
77000
82500
26400.00
3696.00
3960.00
pasang TV outlet
Bahan : TV outlet
Tenaga : Pekerja
Tukang listrik
Kepala tukang listrik
bh
OH
OH
OH
1.000
0.400
0.040
0.040
38500
55000
77000
82500
38500.00
22000.00
3080.00
3300.00
bh
OH
OH
OH
1.000
0.400
0.040
0.040
38500
55000
77000
82500
38500.00
22000.00
3080.00
3300.00
1ttk
m'
ttk
OH
OH
OH
11.000
1.000
0.48
0.048
0.048
7700
45000
55000
77000
82500
84700.00
45000.00
26400.00
3696.00
3960.00
PEKERJAAN KUSEN
Pintu P1
Bahan : Kusen kayu nyatoh
daun pintu
kaca clear 8 mm
cat kusen
cat daun pintu
Handle
Engsel
jasa pasang
m3
m2
m2
m'
unit
unit
unit
unit
0.083
9.900
7.000
9.200
4.000
4.000
4.000
4.000
7150000
280500
176000
33000
495000
236500
220000
55000
592020.00
2776950.00
1232000.00
303600.00
1980000.00
946000.00
880000.00
220000.00
Pintu P2
Bahan : Kusen kayu nyatoh
daun pintu
kaca clear 5 mm
cat kusen
cat daun pintu
m3
m2
m2
m'
unit
0.055
2.500
1.840
6.100
1.000
7150000
280500
104500
33000
495000
392535.00
701250.00
192280.00
201300.00
495000.00
Handle
Engsel
jasa pasang
unit
unit
unit
1.000
1.000
1.000
165000
55000
55000
165000.00
55000.00
55000.00
Pintu P3
Bahan : Kusen kayu nyatoh
daun pintu
kaca clear 5 mm
cat kusen
cat daun pintu
Handle
Engsel
jasa pasang
m3
m2
m2
m'
unit
unit
unit
unit
0.047
1.680
0.000
5.200
1.000
1.000
1.000
1.000
7150000
379500
104500
33000
495000
165000
55000
55000
334620.00
637560.00
0.00
171600.00
495000.00
165000.00
55000.00
55000.00
Pintu P4
Bahan : Kusen kayu nyatoh
daun pintu pvc
kaca clear 5 mm
cat kusen
cat daun pintu
Handle
Engsel
jasa pasang
m3
unit
m2
m'
unit
unit
unit
unit
0.047
1.000
0.000
5.200
0.000
0.000
1.000
1.000
7150000
275000
104500
33000
495000
165000
55000
55000
334620.00
275000.00
0.00
171600.00
0.00
0.00
55000.00
55000.00
Pintu P5
Bahan : Kusen kayu nyatoh
daun pintu
kaca clear 8 mm
cat kusen
cat daun pintu
Handle
Engsel
jasa pasang
m3
m2
m2
m'
unit
unit
unit
unit
0.067
4.950
3.500
7.400
2.000
2.000
2.000
2.000
7150000
280500
176000
33000
495000
236500
55000
55000
476190.00
1388475.00
616000.00
244200.00
990000.00
473000.00
110000.00
110000.00
jendela J1
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 8 mm
cat kusen
cat daun jendela
Handle
Engsel
m3
m2
m2
m'
unit
unit
unit
0.165
0.000
1.904
18.300
0.000
0.000
0.000
7150000
280500
176000
33000
495000
236500
55000
1177605.00
0.00
335104.00
603900.00
0.00
0.00
0.00
jasa pasang
unit
4.000
55000
220000.00
jendela J2
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 5 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.061
2.250
1.920
6.800
6.800
1.000
1.000
1.000
7150000
280500
104500
33000
49500
38500
55000
55000
437580.00
631125.00
200640.00
224400.00
336600.00
38500.00
55000.00
55000.00
jendela J3
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 5 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.091
2.880
1.760
7.600
12.000
2.000
2.000
2.000
7150000
280500
104500
33000
49500
38500
55000
55000
649935.00
807840.00
183920.00
250800.00
594000.00
77000.00
110000.00
110000.00
jendela J4
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 5 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.000
0.000
1.348
0.000
0.000
0.000
0.000
1.000
7150000
280500
104500
33000
49500
38500
55000
55000
0.00
0.00
140813.75
0.00
0.00
0.00
0.00
55000.00
jendela J5
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 5 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.078
0.000
4.625
8.700
0.000
0.000
0.000
1.000
7150000
280500
104500
33000
49500
38500
55000
55000
559845.00
0.00
483312.50
287100.00
0.00
0.00
0.00
55000.00
jendela J6
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 8 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.209
3.550
7.750
23.250
7.840
1.000
1.000
3.000
7150000
280500
176000
33000
49500
38500
55000
55000
1496137.50
995775.00
1364000.00
767250.00
388080.00
38500.00
55000.00
165000.00
bouvenlight
Bahan : Kusen kayu nyatoh
daun jendela
kaca clear 8 mm
cat kusen
cat daun jendela
kunci jendela
Engsel
jasa pasang
m3
m2
m2
m'
m'
unit
unit
unit
0.038
0.360
0.900
4.200
2.400
1.000
1.000
1.000
7150000
280500
0
33000
49500
38500
55000
55000
270270.00
100980.00
0.00
138600.00
118800.00
38500.00
55000.00
55000.00
PEKERJAAN BONGKARAN
Bongkar dinding 1/2 batu
pekerja
mandor
m2
OH
OH
0.2
0.01
55000
110000
11000.00
1100.00
Bongkar plesteran
pekerja
mandor
m2
OH
OH
0.05
0.0025
55000
110000
2750.00
275.00
m3
OH
OH
1.5
0.075
55000
110000
82500.00
8250.00
m3
OH
OH
3
0.15
55000
110000
165000.00
16500.00
Bongkar beton
tukang
kepala tukang
pekerja
mandor
m3
OH
OH
OH
OH
1.2
0.12
6
0.3
77000
82500
55000
110000
92400.00
9900.00
330000.00
33000.00
m3
OH
OH
OH
OH
1.6
0.16
8
0.4
77000
82500
55000
110000
123200.00
13200.00
440000.00
44000.00
Bongkar lantai
pekerja
mandor
m2
OH
OH
0.1
0.01
55000
110000
5500.00
1100.00
m2
OH
OH
0.02
0.01
55000
110000
1100.00
1100.00
m'
OH
OH
0.03
0.015
55000
110000
1650.00
1650.00
m2
OH
OH
0.05
0.01
77000
110000
3850.00
1100.00
m2
OH
OH
OH
OH
0.025
0.0025
0.1
0.005
77000
82500
55000
110000
1925.00
206.25
5500.00
550.00
m3
OH
OH
1
0.2
55000
110000
55000.00
22000.00
Bongkar listplank
m'
pekerja
mandor
OH
OH
0.03
0.015
55000
110000
1650.00
1650.00
m2
OH
OH
0.05
0.025
55000
110000
2750.00
2750.00
m3
OH
OH
1
0.1
77000
110000
77000.00
11000.00
m2
OH
OH
0.02
0.001
55000
110000
1100.00
110.00
Bongkar kaca
pekerja
mandor
m2
OH
OH
0.03
0.003
55000
110000
1650.00
330.00
m2
OH
OH
0.05
0.0025
55000
110000
2750.00
275.00
bh
OH
OH
0.3
0.015
55000
110000
16500.00
1650.00
AN
HSPK
koef
1.1
###
###
###
###
###
###
SNI DT 91-0008-2007
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Rp 3,025.00
###
###
###
###
Rp 6,600.00
Rp 2,200.00
Rp 3,300.00
Rp 4,950.00
Rp 8,181.25
###
Rp 3,300.00
Rp 5,500.00
###
Rp 1,210.00
Rp 1,980.00
Rp 3,025.00
###
PEKERJAAN / MATERIAL
HARGA
SATUAN
SAT. VOLUME
JUMLAH
TOTAL
PEKERJAAN PERSIAPAN
Pekrjaan persiapan
data sondir
survey peijinan setempat dan pemkab malang
uitzet dan bouplank area lokasi
pembersihan lokasi
bikin gudang material
bikin direksikeet buat tenaga kerja
bikin pagar pengaman proyek
ls
ls
m2
m2
m2
m2
m2
Rp 5,500,000.00 Rp
Rp
500,000.00 Rp
Rp
45,000.00 Rp
Rp
25,000.00 Rp
Rp
550,000.00 Rp
Rp
750,000.00 Rp
Rp
450,000.00 Rp
sub total
Rp
II
PEKERJAAN PONDASI
m3
Rp
69,500.00
Rp
m3
Rp
178,000.00
Rp
Rp
164,000.00
Rp
Anstampeng
Rp
262,500.00
Rp
5
6
m
ttk
Rp 2,600,000.00
Rp
850,000.00
Rp
Rp
m3
Rp
69,500.00 Rp
sub total
Rp
III
PEKERJAAN BETON
Lantai 1
Kolom 15/45
m3
Rp 3,850,000.00
Rp
Kolom 15/25
Rp 3,850,000.00
Rp
Kolom 15/15
Rp 3,850,000.00
Rp
Sloof 20/25
m3
Rp 3,850,000.00
Rp
Balok 15/25
Rp 3,850,000.00
Rp
Balok 15/20
Rp 3,850,000.00
Rp
Balok tangga
Rp 3,100,000.00
Rp
Deck lantai 2
Rp 3,500,000.00
Rp
Deck tangga
m3
Rp 3,100,000.00
Rp
Rabatan lantai
Rp
Rp
Rp 3,100,000.00 Rp
sub total
Rp
10 Balok pintu
850,000.00
Lantai 2
1
Kolom 15/45
m3
Rp 3,850,000.00
Rp
Kolom 15/25
Rp 3,850,000.00
Rp
Kolom 15/15
Rp 3,850,000.00
Rp
Balok 15/25
m3
Rp 3,850,000.00
Rp
Balok 15/20
Rp 3,100,000.00
Rp
Balok tangga
Rp 3,500,000.00
Rp
Deck lantai 3
Rp 3,500,000.00
Rp
Deck tangga
m3
Rp 3,500,000.00
Rp
Balok pintu
Rp 3,100,000.00
Rp
sub total
Rp
Lantai 3
1
Kolom 15/45
m3
Rp 3,850,000.00
Rp
Kolom 15/25
Rp 3,850,000.00
Rp
Balok 15/20
Rp 3,850,000.00
Rp
Kolom 15/15
m3
Rp 3,850,000.00
Rp
Balok pintu
Rp 3,100,000.00
Rp
Deck atap 12 cm
Rp 3,500,000.00
Rp
sub total
Rp
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
Rp
145,000.00
Rp
Rp
359,000.00
Rp
Rp
48,500.00
Rp
Acian
Rp
34,500.00
Rp
Benangan
Rp
35,000.00
sub total
Rp
Rp
B. LANTAI 2
1
m2
Rp
174,000.00
Rp
Rp
359,000.00
Rp
Plesteran 1 pc ; 6 ps
m2
Rp
58,200.00
Rp
16,514,250.00
Acian
m2
Rp
41,400.00
Rp
11,747,250.00
Benangan
Rp
42,000.00
sub total
Rp
Rp
28,261,500.00
LANTAI 3
1
2
m2
Rp
Rp
208,800.00
359,000.00
Rp
Rp
Plesteran 1 pc ; 6 ps
m2
Rp
208,800.00
Rp
Acian
Rp
49,680.00
Rp
Benangan
Rp
50,400.00
sub total
Rp
Rp
V
A.
1
2
3
4
5
unit
unit
unit
unit
unit
Rp
Rp
Rp
Rp
Rp
1,175,000.00
2,500,000.00
1,500,000.00
5,500,000.00
5,500,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
B.
1
2
3
4
LANTAI 2
Jendela kaca 0,1 X 1,2 (KM)
Pintu taekwood
Pintu KM (kayu pallet)
Jendela kaca 4 x 0,3 (dinding kamar)
unit
unit
unit
unit
Rp
Rp
Rp
Rp
1,500,000.00
2,500,000.00
1,500,000.00
1,500,000.00
Rp
Rp
Rp
Rp
m2
Rp 5,200,000.00
sub total
Rp
Rp
C
1
2
3
LANTAI 3
Jendela kaca 0,1 X 1,2 (KM)
Pintu taekwood
Pintu KM (kayu pallet)
unit
unit
unit
Rp 1,500,000.00
Rp 2,500,000.00
Rp 1,500,000.00
Rp
Rp
Rp
unit
Rp 1,500,000.00
Rp
Rp 5,200,000.00
sub total
Rp
Rp
VI
A.
1
2
3
4
Rp
Rp
Rp
Rp
225,000.00
45,000.00
65,000.00
250,000.00
sub total
Rp
Rp
Rp
Rp
Rp
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
bh
bh
bh
bh
Rp
Rp
Rp
Rp
225,000.00
45,000.00
65,000.00
250,000.00
sub total
Rp
Rp
Rp
Rp
Rp
C
1
2
3
4
LANTAI 3
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
bh
bh
bh
bh
Rp
Rp
Rp
Rp
45,000.00
65,000.00
250,000.00
250,000.00
sub total
Rp
Rp
Rp
Rp
Rp
m2
Rp
280,000.00
Rp
Rp
250,000.00
Rp
Rp
150,000.00
Rp
Rp
150,000.00
Rp
m2
Rp
100,000.00
sub total
Rp
Rp
B. LANTAI 2
1
m2
Rp
280,000.00
Rp
m2
Rp
280,000.00
Rp
batu alam 30 x 60
Rp
250,000.00
Rp
Rp
150,000.00
Rp
Rp
150,000.00
Rp
m2
Rp
100,000.00
Rp
m2
Rp
45,000.00
sub total
Rp
Rp
LANTAI 3
m2
Rp
280,000.00
Rp
Rp
280,000.00
Rp
batu alam 30 x 60
Rp
250,000.00
Rp
Rp
150,000.00
Rp
Rp
150,000.00
sub total
Rp
Rp
sub total
Rp
Rangka atap
m2
Atap genteng
m2
Atap bubungan
m1
Listplank
m1
IX
PEKERJAAN PLAFOND
LANTAI 1
m2
Rp
105,000.00
sub total
Rp
Rp
LANTAI 2
LANTAI 3
m2
Rp
105,000.00
sub total
Rp
Rp
m2
Rp
105,000.00
sub total
Rp
Rp
m2
Rp
45,000.00
Rp
m2
Rp
38,500.00
Rp
Cat plafond
m2
Rp
33,500.00
sub total
Rp
Rp
LANTAI 2
m2
Rp
45,000.00
Rp
Rp
38,500.00
Rp
Cat plafond
Rp
33,500.00
sub total
Rp
Rp
LANTAI 3
m2
Rp
45,000.00
Rp
Rp
38,500.00
Rp
Rp
150,000.00
Rp
Cat plafond
Rp
33,500.00
sub total
Rp
Rp
XI
1
2
3
4
PEKERJAAN SANITASI
Lantai 1
Closet duduk
Kran air biasa
Shower air panas dingin
Handrail
unit
unit
unit
unit
Rp 1,800,000.00
Rp
150,000.00
Rp
750,000.00
Rp
Rp
Rp
12,600,000.00
1,050,000.00
5,250,000.00
sub total
Rp
18,900,000.00
1
2
3
4
5
6
Lantai 2
Closet duduk
Closet Kamar VIP
Closet Kamar VVIP
Kran air biasa
Shower air panas dingin
Handrail
Rp 1,800,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp
150,000.00
Rp
750,000.00
Rp
Rp
Rp
Rp
Rp
9,000,000.00
-
sub total
Rp
9,000,000.00
XI
1
2
3
4
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
m1
pcs
pcs
pcs
Rp
Rp
Rp
Rp
21,000.00
3,500.00
3,500.00
3,500.00
Rp
Rp
Rp
Rp
5
6
m1
pcs
Rp
Rp
75,000.00
25,000.00
sub total
Rp
Rp
Rp
XI
1
2
3
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
Rp
Rp
Rp
60,000.00
15,500.00
14,000.00
Rp
Rp
Rp
PVC 4"
m1
Rp
35,000.00
Rp
X PEKERJAAN CAT
A. LANTAI 1
1
unit
unit
unit
unit
unit
unit
7.00
7.00
7.00
5.00
5.00
5.00
5
6
Knee 4"
Shock 4"
pcs
pcs
Rp
Rp
21,700.00
19,600.00
sub total
Rp
Rp
Rp
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ls
ls
ttk
Rp
65,000.00 Rp
Rp
65,000.00 Rp
Rp
17,500.00 Rp
Rp
22,000.00 Rp
Rp
45,000.00 Rp
Rp
22,500.00 Rp
Rp
65,000.00 Rp
Rp
270,000.00 Rp
Rp 3,000,000.00 Rp
Rp
Rp
sub total
Rp
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
ttk
ttk
ttk
ttk
Rp
65,000.00
Rp
65,000.00
Rp
17,500.00
Rp
22,000.00
Rp
45,000.00
Rp
22,500.00
Rp 1,500,000.00
Rp
65,000.00
Rp
-
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
sub total
Rp
180,000.00 Rp
180,000.00 Rp
Rp
sub total
Rp
1
2
3
4
5
6
7
8
Lantai 2
Lampu downlight (interior)
Lampu downlight (exterior)
Saklar tunggal ex broco
Saklar ganda ex broco
Saklar TV ex broco
Stop kontak ex broco
saklar telp
Saklar AC
1
2
3
4
5
6
7
8
9
7
8
9
10
11
12
Lantai 3
Lampu downlight (interior)
Lampu downlight (exterior)
Saklar tunggal ex broco
Saklar ganda ex broco
Saklar TV ex broco
Stop kontak ex broco
kipas angin Up.dormitori
saklar telp
Saklar AC
Pasang lampu downlight inbow
Pasang lampu downligt outbow
Pasang kipas angin
Pasang lampu dinding
Pasang lampu halogen
Pasang lampu up light
1
2
3
lantai 2
Instalansi lampu
Instalansi Stop Kontak
Instalasi AC
ttk
ttk
ttk
Rp
Rp
Rp
1
2
3
4
lantai 3
Instalansi lampu
Instalansi Stop Kontak
Instalasi AC
instalasi kipas angin
ttk
ttk
ttk
ttk
Rp
Rp
Rp
Rp
ttk
ttk
ttk
ttk
bj
bj
bj
bj
bj
bj
65,000.00 Rp
65,000.00 Rp
17,500.00 Rp
22,000.00 Rp
45,000.00 Rp
22,500.00 Rp
65,000.00 Rp
Rp
sub total
Rp
216,000.00
216,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Railing tangga
Bak kontrol
Instalasi tandon atas 1m3
Bikin tandon bawah 5m3
4 Fasilitas air kerja
5 Fasilitas listrik kerja
6 Grass stone
7 tanaman ketapang kencana
8 rumput gajah mini
9 tanaman perdu
10 tanah taman
m1
bh
pcs
pcs
bulan
bulan
m2
pcs
m2
pcs
m3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
750,000.00
125,000.00
3,500,000.00
7,800,000.00
1,500,000.00
1,500,000.00
250,000.00
2,500,000.00
30,000.00
250,000.00
180,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
56,161,500.00
1,732,400,000.00
Direktur
PEKERJAAN / MATERIAL
SAT. VOLUME
HARGA
SATUAN
JUMLAH
TOTAL
PEKERJAAN PERSIAPAN
Pekrjaan persiapan
data sondir test
survey peijinan setempat dan pemkab malang
uitzet dan bouplank area lokasi
pembersihan lokasi
bikin gudang material
bikin direksikeet buat tenaga kerja
bikin pagar pengaman proyek
ls
ls
m2
m2
m2
m2
m2
1.00
1.00
280.00
280.00
20.00
20.00
16.00
Rp 5,500,000.00
Rp
500,000.00
Rp
45,000.00
Rp
25,000.00
Rp
550,000.00
Rp
750,000.00
Rp
450,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Direktur
5,500,000.00
500,000.00
12,600,000.00
7,000,000.00
11,000,000.00
15,000,000.00
7,200,000.00
58,800,000.00
PEKERJAAN / MATERIAL
HARGA
SATUAN
SAT. VOLUME
JUMLAH
TOTAL
PEKERJAAN DESAIN
m2
74.00
Rp
150,000.00
sub total
Rp
Rp
11,100,000.00
11,100,000.00
II
PEKERJAAN PONDASI
m3
35.00
Rp
69,500.00
Rp
2,432,500.00
7.00
Rp
178,000.00
Rp
1,246,000.00
Urugan sirtu
38.50
Rp
164,000.00
Rp
6,314,000.00
Anstampeng
1.80
Rp
262,500.00
Rp
472,500.00
5
6
m
m2
1.80
8.00
Rp
Rp
2,600,000.00
35,000.00
Rp
Rp
4,680,000.00
280,000.00
m3
7.00
Rp
178,000.00
sub total
Rp
Rp
1,246,000.00
16,671,000.00
III
PEKERJAAN BETON
Lantai 1
Kolom 15/25
m3
3.00
Rp
3,850,000.00
Rp
11,550,000.00
Kolom 15/15
0.14
Rp
3,850,000.00
Rp
519,750.00
Sloof 20/25
1.75
Rp
3,850,000.00
Rp
6,737,500.00
Balok 15/25
1.31
Rp
3,850,000.00
Rp
5,053,125.00
Balok 15/20
0.26
Rp
3,850,000.00
Rp
1,010,625.00
Balok tangga
0.26
Rp
3,100,000.00
Rp
813,750.00
Deck lantai 2
m3
7.00
Rp
3,500,000.00 Rp
24,500,000.00
Deck tangga
m3
1.40
Rp
3,100,000.00
Rp
4,340,000.00
Rabatan lantai
7.00
Rp
850,000.00
sub total
Rp
Rp
5,950,000.00
60,474,750.00
23,581,250.00
Lantai 2
1
Kolom 15/20
m3
6.13
Rp
3,850,000.00 Rp
Balok 15/20
m3
1.31
Rp
3,850,000.00
Rp
5,053,125.00
Gewel 15/15
0.79
Rp
3,850,000.00
Rp
3,031,875.00
Balok pintu
0.18
Rp
3,100,000.00
Rp
558,000.00
1.40
Rp
3,500,000.00
sub total
Rp
Rp
4,900,000.00
37,124,250.00
m2
60.00
Rp
145,000.00
Rp
8,700,000.00
m2
120.00
Rp
48,500.00
Rp
5,820,000.00
Acian
m2
120.00
Rp
34,500.00
Rp
4,140,000.00
Benangan
68.00
Rp
35,000.00
sub total
Rp
Rp
2,380,000.00
21,040,000.00
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
B. LANTAI 2
1
m2
210.00
Rp
145,000.00
Rp
30,450,000.00
Plesteran 1 pc ; 6 ps
m2
420.00
Rp
48,500.00
Rp
20,370,000.00
Acian
420.00
Rp
34,500.00
Rp
14,490,000.00
Benangan
140.00
Rp
35,000.00
sub total
Rp
Rp
4,900,000.00
70,210,000.00
LANTAI 2
Jendela 0,8 X 1.5
Pintu taekwood
Pintu KM PVC
2.00
2.00
1.00
Rp
Rp
Rp
1,175,000.00
2,500,000.00
250,000.00
sub total
Rp
Rp
Rp
Rp
2,350,000.00
5,000,000.00
250,000.00
7,600,000.00
VI
A.
1
2
3
4
Rp
Rp
Rp
Rp
225,000.00
45,000.00
65,000.00
135,000.00
sub total
Rp
Rp
Rp
Rp
Rp
450,000.00
225,000.00
650,000.00
1,620,000.00
2,945,000.00
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
unit
unit
unit
bh
bh
bh
bh
2.00
2.00
2.00
2.00
Rp
Rp
Rp
Rp
225,000.00
45,000.00
65,000.00
135,000.00
sub total
Rp
Rp
Rp
Rp
Rp
450,000.00
90,000.00
130,000.00
270,000.00
940,000.00
Keramik 60x60
m2
35.00
Rp
280,000.00
Rp
9,800,000.00
12.00
Rp
175,000.00
Rp
2,100,000.00
15.00
Rp
150,000.00
sub total
Rp
Rp
2,250,000.00
14,150,000.00
B. LANTAI 2
1
Keramik 60x60
m2
35.00
Rp
280,000.00
Rp
9,800,000.00
batu alam 30 x 60
3.10
Rp
175,000.00
Rp
542,500.00
16.75
Rp
150,000.00
sub total
Rp
Rp
2,512,500.00
12,855,000.00
Rangka atap
m2
35.00
Rp
127,000.00
Rp
4,445,000.00
Atap genteng
m2
35.00
Rp
147,500.00
Rp
5,162,500.00
Atap bubungan
18.00
Rp
61,600.00
Rp
1,108,800.00
Listplank
51.00
Rp
90,000.00
sub total
Rp
Rp
4,590,000.00
15,306,300.00
m2
35.00
Rp
105,000.00
sub total
Rp
Rp
3,675,000.00
3,675,000.00
m2
35.00
Rp
105,000.00
sub total
Rp
Rp
3,675,000.00
3,675,000.00
Rp
45,000.00
Rp
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
X PEKERJAAN CAT
A. LANTAI 1
1
m2
Cat interior
Cat plafond
51.00
Rp
38,500.00
Rp
1,963,500.00
35.00
Rp
33,500.00
sub total
Rp
Rp
1,172,500.00
3,136,000.00
LANTAI 2
m2
102.00
Rp
45,000.00
Rp
4,590,000.00
Cat interior
153.00
Rp
38,500.00
Rp
5,890,500.00
20.00
Rp
45,000.00
Rp
900,000.00
Cat plafond
m2
30.00
Rp
33,500.00
sub total
Rp
Rp
1,005,000.00
12,385,500.00
XI
1
2
3
PEKERJAAN SANITASI
Closet duduk
Closet Kamar Utama
Shower air panas dingin
unit
unit
unit
1.00
1.00
2.00
Rp
Rp
Rp
1,800,000.00
3,000,000.00
750,000.00
sub total
Rp
Rp
Rp
Rp
1,800,000.00
3,000,000.00
1,500,000.00
6,300,000.00
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
m1
pcs
pcs
pcs
45.00
17.00
12.00
8.00
Rp
Rp
Rp
Rp
21,000.00
3,500.00
3,500.00
3,500.00
Rp
Rp
Rp
Rp
945,000.00
59,500.00
42,000.00
28,000.00
5
6
m1
pcs
25.00
6.00
Rp
Rp
18,500.00
27,500.00
sub total
Rp
Rp
Rp
462,500.00
165,000.00
1,702,000.00
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00
18.00
14.00
Rp
Rp
Rp
60,000.00
15,500.00
14,000.00
Rp
Rp
Rp
2,400,000.00
279,000.00
196,000.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00
10.00
5.00
Rp
Rp
Rp
35,000.00
21,700.00
19,600.00
sub total
Rp
Rp
Rp
Rp
1,225,000.00
217,000.00
98,000.00
4,415,000.00
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ls
ls
ttk
10.00
4.00
2.00
2.00
1.00
10.00
1.00
1.00
1.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
70,000.00
17,500.00
22,000.00
45,000.00
22,500.00
25,000.00
750,000.00
4,000,000.00
35,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650,000.00
280,000.00
35,000.00
44,000.00
45,000.00
225,000.00
25,000.00
750,000.00
4,000,000.00
35,000.00
6,089,000.00
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
10.00
3.00
1.00
10.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
17,500.00
22,000.00
22,500.00
25,000.00
35,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650,000.00
52,500.00
22,000.00
225,000.00
35,000.00
984,500.00
ttk
ttk
ttk
ttk
ttk
ttk
bj
bj
bj
bj
bj
bj
24.00
20.00
2.00
Rp
Rp
Rp
200,000.00
200,000.00
155,000.00
Rp
Rp
Rp
4,800,000.00
4,000,000.00
310,000.00
Rp
9,110,000.00
1
2
3
4
5
6
XIII
1
2
3
4
5
6
7
8
9
10
11
12
sub total
XIV PEKERJAAN LAIN LAIN
1
2
3
4
5
6
7
Railing tangga
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
Fasilitas listrik kerja
Pembersihan area
Kolam + filter area
m1
bh
ls
bulan
bulan
ls
m2
21.00
4.00
1.00
2.00
2.00
1.00
8.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
380,000.00
75,000.00
3,500,000.00
250,000.00
250,000.00
1,500,000.00
1,750,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,980,000.00
300,000.00
3,500,000.00
500,000.00
500,000.00
1,500,000.00
14,000,000.00
28,280,000.00
Rp
Rp
Rp
Rp
350,168,300.00
35,016,830.00
385,185,130.00
385,735,000.00
m3
9.02 Rp
835,550.00
Rp
7,536,661.00
51.36 Rp
145,000.00
Rp
7,447,664.00
Plesteran 1 pc ; 6 ps
m2
30.82 Rp
48,500.00
Rp
1,494,669.12
Acian
30.82 Rp
34,500.00
Rp
1,063,218.24
Benangan
52.00 Rp
35,000.00
Rp
1,820,000.00
Rabatan lantai
4.95 Rp
750,000.00
Rp
3,712,500.00
Sirtu
31.50 Rp
110,000.00
Rp
3,465,000.00
55.20 Rp
465,350.00 Rp
25,687,320.00
Batu brobos
36.24 Rp
275,000.00
Rp
9,966,000.00
m3
2.00 Rp
2,750,000.00
Rp
5,500,000.00
11
12
13
14
m
bh
bh
bh
1.00
2.00
2.00
2.00
2,000,000.00
1,700,000.00
1,500,000.00
1,500,000.00
Rp
Rp
Rp
Rp
2,000,000.00
3,400,000.00
3,000,000.00
3,000,000.00
Pembelian+Pasang Septitank
Pintu utama
Pintu kamar
Pintu kamar mandi
Rp
Rp
Rp
Rp
Direktur
PEKERJAAN / MATERIAL
HARGA
SATUAN
SAT. VOLUME
JUMLAH
TOTAL
PEKERJAAN DESAIN
m2
74.00
Rp
150,000.00
sub total
Rp
Rp
11,100,000.00
11,100,000.00
II
PEKERJAAN PONDASI
m3
35.00
Rp
50,000.00
Rp
1,750,000.00
7.00
Rp
129,500.00
Rp
906,500.00
Urugan sirtu
38.50
Rp
110,000.00
Rp
4,235,000.00
Anstampeng
1.80
Rp
262,500.00
Rp
472,500.00
5
6
m
m2
1.80
8.00
Rp
Rp
2,600,000.00
25,000.00
Rp
Rp
4,680,000.00
200,000.00
m3
7.00
Rp
95,500.00
sub total
Rp
Rp
668,500.00
12,912,500.00
III
PEKERJAAN BETON
Lantai 1
Kolom 15/25
m3
3.00
Rp
3,350,000.00 Rp
10,050,000.00
Kolom 15/15
m3
0.14
Rp
3,350,000.00
Rp
452,250.00
Sloof 20/25
1.75
Rp
3,350,000.00
Rp
5,862,500.00
Balok 15/25
1.31
Rp
3,350,000.00
Rp
4,396,875.00
Balok 15/20
0.26
Rp
3,350,000.00
Rp
879,375.00
Balok tangga
0.26
Rp
2,750,000.00
Rp
721,875.00
Deck lantai 2
7.00
Rp
2,350,000.00 Rp
16,450,000.00
Deck tangga
1.40
Rp
2,350,000.00
Rp
3,290,000.00
Rabatan lantai
m3
7.00
Rp
850,000.00
sub total
Rp
Rp
5,950,000.00
48,052,875.00
20,518,750.00
Lantai 2
1
Kolom 15/20
m3
6.13
Rp
3,350,000.00 Rp
Balok 15/20
1.31
Rp
3,350,000.00
Rp
4,396,875.00
Gewel 15/15
0.79
Rp
3,350,000.00
Rp
2,638,125.00
Balok pintu
m3
0.18
Rp
2,750,000.00
Rp
495,000.00
1.40
Rp
2,350,000.00
sub total
Rp
Rp
3,290,000.00
31,338,750.00
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
60.00
Rp
145,000.00
Rp
8,700,000.00
120.00
Rp
48,500.00
Rp
5,820,000.00
Acian
120.00
Rp
34,500.00
Rp
4,140,000.00
Benangan
m1
68.00
Rp
35,000.00
sub total
Rp
Rp
2,380,000.00
21,040,000.00
B. LANTAI 2
1
m2
210.00
Rp
145,000.00
Rp
30,450,000.00
Plesteran 1 pc ; 6 ps
420.00
Rp
48,500.00
Rp
20,370,000.00
Acian
420.00
Rp
34,500.00
Rp
14,490,000.00
Benangan
m1
140.00
Rp
35,000.00
sub total
Rp
Rp
4,900,000.00
70,210,000.00
V
A.
1
2
3
4
5
Pintu taekwood
Pintu taekwood + Kaca
Pintu Kaca
unit
unit
unit
unit
unit
Rp
Rp
Rp
Rp
Rp
2,750,000.00
1,175,000.00
1,700,000.00
2,500,000.00
1,550,000.00
Rp
Rp
Rp
Rp
Rp
Kaca 6mm
m2
Rp
300,000.00
sub total
Rp
Rp
B.
1
2
3
LANTAI 2
Jendela 0,8 X 1.5
Pintu taekwood
Pintu KM
unit
unit
unit
2.00
2.00
1.00
Rp
Rp
Rp
1,175,000.00
2,500,000.00
250,000.00
sub total
Rp
Rp
Rp
Rp
2,350,000.00
5,000,000.00
250,000.00
7,600,000.00
VI
A.
1
2
3
4
Rp
Rp
Rp
Rp
175,000.00
45,000.00
45,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
350,000.00
225,000.00
450,000.00
1,500,000.00
2,525,000.00
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
bh
bh
bh
bh
2.00
2.00
2.00
2.00
Rp
Rp
Rp
Rp
150,000.00
75,000.00
75,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
300,000.00
150,000.00
150,000.00
250,000.00
850,000.00
Keramik 60x60
m2
35.00
Rp
250,000.00
Rp
8,750,000.00
12.00
Rp
102,500.00
Rp
1,230,000.00
15.00
Rp
102,500.00
sub total
Rp
Rp
1,537,500.00
11,517,500.00
B. LANTAI 2
1
Keramik 60x60
m2
35.00
Rp
150,000.00
Rp
5,250,000.00
batu alam 30 x 60
3.10
Rp
150,000.00
Rp
465,000.00
16.75
Rp
150,000.00
sub total
Rp
Rp
2,512,500.00
8,227,500.00
Rangka atap
m2
35.00
Rp
127,000.00
Rp
4,445,000.00
Atap genteng
35.00
Rp
147,500.00
Rp
5,162,500.00
Atap bubungan
18.00
Rp
61,600.00
Rp
1,108,800.00
Listplank
51.00
Rp
90,000.00
sub total
Rp
Rp
4,590,000.00
15,306,300.00
m2
35.00
Rp
105,000.00
sub total
Rp
Rp
3,675,000.00
3,675,000.00
m2
35.00
Rp
105,000.00
sub total
Rp
Rp
3,675,000.00
3,675,000.00
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
X PEKERJAAN CAT
A. LANTAI 1
1
m2
60.00
Rp
43,500.00
Rp
2,610,000.00
Cat interior
60.00
Rp
33,500.00
Rp
2,010,000.00
Cat plafond
m2
35.00
Rp
33,500.00
sub total
Rp
Rp
1,172,500.00
5,792,500.00
LANTAI 2
m2
210.00
Rp
43,500.00
Rp
9,135,000.00
Cat interior
210.00
Rp
33,500.00
Rp
7,035,000.00
110.00
Rp
45,000.00
Rp
4,950,000.00
Cat plafond
m2
30.00
Rp
33,500.00
sub total
Rp
Rp
1,005,000.00
22,125,000.00
unit
unit
1.00
1.00
Rp
Rp
1,800,000.00
3,000,000.00
sub total
Rp
Rp
Rp
1,800,000.00
3,000,000.00
4,800,000.00
m1
pcs
pcs
pcs
45.00
17.00
12.00
8.00
Rp
Rp
Rp
Rp
18,500.00
3,500.00
3,500.00
3,500.00
sub total
Rp
Rp
Rp
Rp
Rp
832,500.00
59,500.00
42,000.00
28,000.00
962,000.00
XI PEKERJAAN SANITASI
1 Closet duduk
2 Closet Kamar Utama
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00
18.00
14.00
Rp
Rp
Rp
23,500.00
12,500.00
12,500.00
Rp
Rp
Rp
940,000.00
225,000.00
175,000.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00
10.00
5.00
Rp
Rp
Rp
27,000.00
13,500.00
15,000.00
sub total
Rp
Rp
Rp
Rp
945,000.00
135,000.00
75,000.00
2,495,000.00
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
10.00
4.00
2.00
2.00
1.00
10.00
1.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
70,000.00
17,500.00
22,000.00
45,000.00
22,500.00
25,000.00
35,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650,000.00
280,000.00
35,000.00
44,000.00
45,000.00
225,000.00
25,000.00
35,000.00
1,339,000.00
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
10.00
3.00
1.00
10.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
17,500.00
22,000.00
22,500.00
25,000.00
35,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650,000.00
52,500.00
22,000.00
225,000.00
35,000.00
984,500.00
ttk
ttk
ttk
ttk
ttk
ttk
bj
bj
bj
bj
bj
bj
24.00
20.00
2.00
Rp
Rp
Rp
105,000.00
105,000.00
145,000.00
Rp
Rp
Rp
2,520,000.00
2,100,000.00
290,000.00
Rp
4,910,000.00
Rp
7,980,000.00
1
2
3
4
5
6
XIII
1
2
3
4
5
6
7
8
9
10
11
12
sub total
XIV PEKERJAAN LAIN LAIN
1
Railing tangga
m1
21.00 Rp
380,000.00
2
3
4
5
6
7
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
Fasilitas listrik kerja
Pembersihan area
Kolam + filter area
bh
ls
bulan
bulan
ls
m2
4.00
1.00
3.00
3.00
1.00
8.00
Rp
Rp
Rp
Rp
Rp
Rp
75,000.00
2,350,000.00
250,000.00
250,000.00
1,500,000.00
1,750,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
300,000.00
2,350,000.00
750,000.00
750,000.00
1,500,000.00
14,000,000.00
13,630,000.00
Rp
Rp
Rp
Rp
312,068,425.00
31,206,842.50
343,275,267.50
343,275,267.00
m3
9.02 Rp
835,550.00
Rp
7,536,661.00
51.36 Rp
145,000.00
Rp
7,447,664.00
Plesteran 1 pc ; 6 ps
30.82 Rp
48,500.00
Rp
1,494,669.12
Acian
m2
30.82 Rp
34,500.00
Rp
1,063,218.24
Benangan
52.00 Rp
35,000.00
Rp
1,820,000.00
Rabatan lantai
4.95 Rp
750,000.00
Rp
3,712,500.00
Sirtu
31.50 Rp
110,000.00
Rp
3,465,000.00
55.20 Rp
465,350.00 Rp
25,687,320.00
Batu brobos
36.24 Rp
275,000.00
Rp
9,966,000.00
2.00 Rp
2,750,000.00
Rp
5,500,000.00
11
12
13
14
m3
bh
bh
bh
1.00
2.00
2.00
2.00
2,000,000.00
1,700,000.00
1,500,000.00
1,500,000.00
Rp
Rp
Rp
Rp
2,000,000.00
3,400,000.00
3,000,000.00
3,000,000.00
Pembelian+Pasang Septitank
Pintu utama
Pintu kamar
Pintu kamar mandi
Rp
Rp
Rp
Rp
Direktur
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
JENIS BAHAN
Batu pecah/ split 3-4 cm
Pasir pasang
Batu bata merah
Kusen pintu P1
Kusen jendela J1
Kusen ventilasi V1
Daun pintu panel 210 x 82
Daun jendela kaca 75x120
Balok kayu kamper medan/ singkil 6/12
Balok kayu kamper samarinda 5/7
Balok kayu borneo 5/7
Reng kayu samarinda 3/4
Papan kayu kamper singkil 3/30
Papan kayu kamper singkil 2/30
Papan mal/ cor
Semen @ 40 kg
Gypsum 9 mm
List gypsum
Triplek 9 mm
Besi beton 19 mm
Besi beton 16 mm
Besi beton 12 mm
Besi beton 10 mm
Besi beton 8 mm
Kawat beton @ 23 kg
Keramik 40x40 Roman
Keramik 20x20 Roman
Eternit 1x1 m
Residu
Tangga besi putar
Railling tangga besi
Cat meni dasar
Paku 10 cm
Paku 7 cm
Paku 5 cm + 4 cm
Paku triplek
Cat tembok Catylac @ 5 kg
Plamur tembok @ 5 kg
Plamur kayu
Cat kayu Glotex @ 1 kg
Minyak cat @ 1 ltr
Kuas 4 "
Kuas 3 "
Kuas Roll
Dempul kayu
Kunci SES 2 x putar
Kait angin jendela
Slot jendela
Engsel pintu
Engsel jendela
VOLUME
9.00
11.00
1,800.00
1.00
2.00
1.00
1.00
4.00
17.00
22.00
100.00
35.00
3.00
18.00
50.00
125.00
10.00
60.00
11.00
12.00
28.00
38.00
40.00
57.00
1.00
36.00
6.00
8.00
15.00
1.00
1.00
5.00
1.00
10.00
10.00
1.00
6.00
6.00
2.00
15.00
10.00
1.00
2.00
2.00
1.00
1.00
4.00
4.00
3.00
8.00
SAT.
m3
m3
bh
bh
bh
bh
bh
bh
btg
btg
btg
btg
lbr
lbr
lbr
zak
lbr
m'
lbr
btg
btg
btg
btg
btg
roll
dos
dos
lbr
ltr
set
m'
klg
kg
kg
kg
kg
klg
klg
klg
klg
klg
bh
bh
bh
klg
bh
bh
bh
bh
bh
HRG SAT
165,000.00
200,000.00
850.00
300,000.00
275,000.00
175,000.00
900,000.00
275,000.00
70,000.00
72,000.00
28,000.00
25,000.00
140,000.00
140,000.00
23,800.00
38,500.00
52,000.00
7,500.00
92,500.00
70,000.00
62,000.00
52,000.00
38,000.00
25,000.00
9,000.00
45,000.00
44,500.00
8,000.00
7,000.00
600,000.00
150,000.00
40,000.00
9,000.00
9,000.00
9,000.00
9,000.00
60,000.00
42,000.00
17,500.00
29,000.00
13,000.00
15,000.00
12,500.00
20,000.00
18,500.00
350,000.00
13,500.00
7,000.00
18,000.00
16,000.00
JUMLAH
1,485,000.00
2,200,000.00
1,530,000.00
300,000.00
550,000.00
175,000.00
900,000.00
1,100,000.00
1,190,000.00
1,584,000.00
2,800,000.00
875,000.00
420,000.00
2,520,000.00
1,190,000.00
4,812,500.00
520,000.00
450,000.00
1,017,500.00
840,000.00
1,736,000.00
1,976,000.00
1,520,000.00
1,425,000.00
9,000.00
1,620,000.00
267,000.00
64,000.00
105,000.00
600,000.00
150,000.00
200,000.00
9,000.00
90,000.00
90,000.00
9,000.00
360,000.00
252,000.00
35,000.00
435,000.00
130,000.00
15,000.00
25,000.00
40,000.00
18,500.00
350,000.00
54,000.00
28,000.00
54,000.00
128,000.00
NO.
51
52
53
54
55
56
57
58
1
2
3
4
5
JENIS BAHAN
Genteng glazzur
Nok genteng glazzur
Nok genteng pinggir
Saklar double
Kaca polos 5 mm 72x 62
Stop kontak
Lampu SL 9 W
lampu TL bulat 20 W
Skop
Linggis besar
Kape
cangkul
Tangkai kuas roll
VOLUME
SAT.
HRG SAT
448.00
26.00
2.00
3.00
1.00
2.00
4.00
2.00
bh
bh
bh
bh
bh
bh
bh
bh
2,200.00
12,400.00
12,500.00
49,500.00
55,000.00
49,200.00
35,000.00
30,000.00
3.00
1.00
10.00
1.00
1
bh
bh
bh
bh
bh
35,000.00
25,000.00
3,500.00
25,000.00
15,000.00
JUMLAH
985,600.00
322,400.00
25,000.00
148,500.00
55,000.00
98,400.00
140,000.00
60,000.00
105,000.00
25,000.00
35,000.00
25,000.00
15,000.00
40,293,400.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
m3
kg
kg
ton
m2
m3
krg
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Bh
Bh
Bh
110,000.00
200,000.00
195,000.00
180,000.00
155,000.00
165,000.00
165,000.00
160,000.00
160,000.00
850.00
850.00
160,000.00
110,000.00
3,595.00
4,265.00
460,000.00
7,915.00
28,900.00
114,800.00
2,800.00
2,650.00
4,000.00
2,000.00
65,000.00
100,000.00
136,000.00
105,000.00
120,000.00
90,000.00
118,500.00
77,000.00
29,300.00
50,000.00
72,000.00
37
38
39
40
41
zak
zak
zak
kg
kg
55,000.00
55,000.00
3,500.00
8,400.00
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
16,000,000.00
4,900,000.00
4,220,000.00
5,200,000.00
3,810,000.00
2,500,000.00
1,910,000.00
1,700,000.00
16,000,000.00
4,900,000.00
4,000,000.00
4,800,000.00
-
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
lbr
lbr
3,700,000.00
2,300,000.00
1,800,000.00
2,100,000.00
1,700,000.00
4,000,000.00
4,800,000.00
3,700,000.00
2,300,000.00
1,800,000.00
2,100,000.00
1,700,000.00
4,000,000.00
4,800,000.00
3,700,000.00
2,300,000.00
2,100,000.00
1,700,000.00
75,000.00
13,000.00
16,500.00
9,500.00
61,000.00
55,000.00
83
84
85
86
87
88
89
90
91
92
93
94
95
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
175,000.00
127,500.00
100,000.00
79,500.00
67,700.00
49,200.00
39,500.00
59,000.00
57,000.00
44,500.00
31,000.00
29,700.00
23,500.00
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
29,000.00
32,000.00
42,000.00
36,000.00
27,000.00
12,500.00
32,000.00
35,200.00
39,000.00
54,000.00
62,000.00
12,500.00
30,000.00
36,000.00
11,450.00
46,000.00
18,000.00
8,500.00
17,500.00
19,500.00
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
kg
9,180.00
117
meni besi setara Nipon
118
meni besi setara Jotun
119
residu
120
teak oil
121
bronz
122
politur
123
politur kayu merk Ultran interior (P 01)
124
politur kayu merk Ultran exterior (P 03)
125
politur kayu merk Impra semprot warna muda
126
politur kayu merk Impra semprot warna tua
127
sending sealer Impra
128
melamic Impra (dove) finishing
129
cat warna Ultran/ Impra
130
lem kayu putih rachol
131
cat dasar
132
cat duco Nippe 2000
133
cat duco danagloses
134
cat duco metalic danagloses
135
cat scolight (Nippon paint)
136
Dempul duco sanpolac
Pasang la bj
Pasang la bj
Pasang lambj
###
kuas kecil
###
kuas besar
###
Kuas roll
###
amplas kayu/ besi
###
grouting
###
thinner Impala
###
thinner ND
###
solar
###
pelumas
###
silicosal (1 drum = 205 ltr = Rp 4.500.000)
###
kalbon
###
sapu lidi
###
ijuk
###
kg
kg
ltr
ltr
kg
kg
ltr
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
Ltr
kg
Ltr
9,180.00
7,000.00
13,000.00
27,700.00
30,000.00
27,000.00
30,000.00
32,000.00
37,000.00
28,000.00
30,000.00
32,000.00
23,000.00
14,000.00
40,000.00
70,720.00
70,300.00
117,700.00
27,500.00
25,800.00
kg
bh
bh
bh
lbr
kg
ltr
ltr
ltr
ltr
ltr
ltr
ikat
ikat
25,000.00
8,000.00
14,000.00
20,000.00
4,500.00
12,750.00
12,500.00
7,000.00
4,300.00
30,000.00
25,000.00
15,000.00
5,000.00
8,000.00
ltr
22,000.00
2
3
2
- First Layer
###
###
###
###
###
###
###
###
###
###
###
###
kg
kg
kg
kg
kg
kg
kg
ltr
kg
kg
38,000.00
76,000.00
50,000.00
60,000.00
65,000.00
75,000.00
52,000.00
19,500.00
5,000.00
2,500.00
m2
m2
m'
m'
m'
m2
m2
m2
m2
m2
bh
bh
21,000.00
23,500.00
3,000.00
5,000.00
4,000.00
23,500.00
23,500.00
5,400.00
7,200.00
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
40,000.00
43,000.00
44,500.00
41,000.00
45,500.00
48,000.00
52,500.00
48,000.00
54,000.00
122,000.00
131,000.00
184,000.00
280,000.00
225,000.00
195,000.00
188,000.00
168,500.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
kg
kg
155,000.00
105,000.00
355,000.00
295,000.00
195,000.00
188,000.00
117,500.00
99,000.00
94,500.00
950,000.00
130,000.00
95,000.00
15,000.00
15,000.00
35,000.00
250,000.00
300,000.00
35,000.00
23,000.00
10,000.00
75,000.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
66,000.00
99,000.00
175,500.00
220,000.00
185,000.00
235,000.00
32,000.00
42,500.00
57,500.00
92,500.00
125,000.00
152,000.00
168,000.00
55,500.00
60,900.00
73,900.00
84,000.00
51,700.00
49,500.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
m'
m'
m'
12,500.00
7,500.00
4,000.00
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
doos
zak
6,500.00
8,500.00
9,500.00
10,200.00
10,400.00
14,200.00
27,500.00
15,000.00
33,500.00
44,000.00
56,500.00
79,100.00
118,650.00
5,000.00
65,000.00
lbr
lbr
lbr
105,000.00
43,350.00
###
lbr
54,400.00
bh
bh
bh
bh
bh
32,800.00
11,000.00
5,500.00
24,400.00
37,880.00
Accessories :
Stiffner (masing-masing berikut 3 clip)
Adjustable clip + rod (hanger max 1.5 m
bh
bh
1,500.00
2,900.00
lbr
lbr
zak
zak
zak
zak
zak
roll
bks/50gram
btg/4m'
btg/4m'
btg/3m'
btg/3m'
52,000.00
60,000.00
11,000.00
81,000.00
65,000.00
94,000.00
32,000.00
13,500.00
21,000.00
16,000.00
30,000.00
26,500.00
rangka standar :
###
###
###
###
###
###
###
paku rata-rata
paku asbes
paku seng
paku gypsum
paku genteng metal
kg
bh
kg
bh
kg
9,000.00
950.00
12,000.00
100.00
20,000.00
###
###
###
###
###
###
###
###
kg
kg
kg
kg
btg
kg
kg
kg
6,100.00
6,200.00
6,250.00
10,000.00
20,000.00
9,000.00
18,000.00
7,800.00
kg
kg
kg
lbr
lbr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m'
m2
kg
m2
m2
m2
m'
bh
bh
ttk
6,500.00
7,700.00
8,200.00
7,700.00
7,700.00
7,700.00
7,700.00
7,850.00
7,850.00
7,850.00
7,800.00
8,000.00
8,000.00
8,000.00
7,600.00
54,700.00
100,000.00
7,000.00
24,000.00
30,250.00
41,500.00
26,000.00
30,000.00
63,000.00
277,400.00
###
Pentanahan Panel
ttk
119,875.00
###
###
###
###
###
###
###
###
###
###
###
###
###
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
1,850.00
2,200.00
1,350.00
1,700.00
1,400.00
2,250.00
4,750.00
2,850.00
3,800.00
5,800.00
9,500.00
156,800.00
156,000.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
5,800.00
12,400.00
55,000.00
7,000.00
4,500.00
9,000.00
6,000.00
9,000.00
15,000.00
17,500.00
102,000.00
95,600.00
62,000.00
56,000.00
53,000.00
47,000.00
35,700.00
77,500.00
69,000.00
63,000.00
55,000.00
lbr
lbr
lbr
lbr
psg
psg
psg
m'
m'
m'
m'
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
kg
m2
m'
lbr
lbr
lbr
bh
bh
bh
bh
52,300.00
67,000.00
70,400.00
73,000.00
40,000.00
22,500.00
40,000.00
49,000.00
24,000.00
22,000.00
16,000.00
47,000.00
36,000.00
35,000.00
29,000.00
55,750.00
71,700.00
13,000.00
6,500.00
9,000.00
13,500.00
95,750.00
46,000.00
74,500.00
94,000.00
71,500.00
161,000.00
238,500.00
167,000.00
245,000.00
###
###
###
###
###
###
###
bh
btg
bh
bh
bh
bh
bh
1,000.00
42,000.00
7,500.00
3,000.00
3,000.00
5,500.00
2,250.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
bh
bh
bh
bh
bh
305,000.00
433,000.00
1,630,000.00
1,432,000.00
1,296,000.00
706,000.00
998,000.00
1,447,000.00
1,147,000.00
890,000.00
164,000.00
204,000.00
322,000.00
422,000.00
232,000.00
642,000.00
803,000.00
123,000.00
189,000.00
256,000.00
-
bh
bh
bh
bh
bh
bh
bh
bh
89,200.00
136,000.00
368,000.00
56,000.00
58,000.00
63,000.00
70,000.00
80,000.00
###
###
###
###
###
###
###
bh
bh
bh
bh
bh
unit
unit
600,000.00
825,000.00
548,000.00
870,000.00
140,000.00
350,000.00
3,500,000.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
dn
dn
dn
dn
78,000.00
94,400.00
132,000.00
172,500.00
88,000.00
87,000.00
139,000.00
215,000.00
293,000.00
365,000.00
14,000.00
25,500.00
27,000.00
-
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
bh
bh
bh
bh
bh
bh
bh
bh
ps
ps
ps
ps
ps
ps
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
350,000.00
138,500.00
185,700.00
225,000.00
60,000.00
45,000.00
35,000.00
45,000.00
16,000.00
18,500.00
8,500.00
9,500.00
8,500.00
11,000.00
14,200.00
5,000.00
8,500.00
13,000.00
28,000.00
13,000.00
20,000.00
316,000.00
80,000.00
25,000.00
###
###
###
###
###
###
###
###
###
###
###
###
###
m3
m3
m3
m3
m3
m3
495,000.00
511,500.00
533,500.00
-
m3
m3
m3
unit/hr
unit/hr
unit/hr
unit
unit/bln
unit
20,000.00
24,000.00
150,000.00
600,000.00
250,000.00
60,000.00
400,000.00
750,000.00
kg
m2
kg
set/hr
10,000.00
48,000.00
3,800.00
60,000.00
Pekerja
Tukang gali
org/hr
org/hr
40,000.00
50,000.00
Tukang batu
Kepala tukang batu
Tukang kayu
Kepala tukang kayu
Tukang besi
Kepala tukang besi
Tukang las
Tukang cat
Kepala tukang cat
Tukang cat melamic
Tukang gypsum
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
50,000.00
60,000.00
50,000.00
55,000.00
50,000.00
55,000.00
50,000.00
50,000.00
60,000.00
70,000.00
50,000.00
14
15
16
17
18
19
20
21
22
23
24
Tukang allumunium
Tukang aspal
Tukang pasang pipa
Kepala tukang pas. pipa
Tukang kaca
Tukang talang
Tukang poles lantai
Instalator
Operator mesin genset
Operator alat berat
Mandor
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
org/hr
Jakarta,
55,000.00
50,000.00
50,000.00
55,000.00
50,000.00
50,000.00
55,000.00
60,000.00
60,000.00
75,000.00
75,000.00
2006
KASUBDIT RENKON
>>>>>>>>>
>>>>>>>>
PEKERJAAN PERSIAPAN :
Pek.pembersihan lapangan/
pemerataan tanah
M2
M'
M'
semen
pasir pasang
koral beton
besi siku 50.50.5
kawat duri
paku rata-rata
tk.batu
pekerja
M2
M2
pekerja
mandor
0.10
0.005
0.00
75,000.00
375.00
Dibulatkan
org/hr
0.03
1.2
0.2
0.17
0.02
0.04
1.80
0.25
0.5
m3
lbr
kg
zak
m3
m3
m2
org/hr
org/hr
2,100,000.00
29,000.00
9,000.00
55,000.00
200,000.00
155,000.00
15,596.00
50,000.00
40,000.00
63,000.00
34,800.00
1,800.00
9,350.00
4,000.00
6,200.00
28,072.80
12,500.00
20,000.00
Dibulatkan
0.2
0.026
0.044
0.33
2
0.2
0.25
0.5
zak
m3
m3
btg
kg
kg
org/hr
org/hr
55,000.00
200,000.00
155,000.00
62,700.00
7,800.00
9,000.00
50,000.00
40,000.00
11,000.00
5,200.00
6,820.00
20,691.00
15,600.00
1,800.00
12,500.00
20,000.00
Dibulatkan
0.07
0.8
0.24
0.52
0.1
1
0.5
0.6
6
0.7
0.06
1
2
0.4
0.04
1.2
0.06
m3
lbr
m3
zak
m3
lbr
kg
lbr
bh
m2
m2
dn
m2
org/hr
org/hr
org/hr
org/hr
1,800,000.00
57,500.00
160,000.00
55,000.00
200,000.00
6,500.00
9,000.00
47,000.00
950.00
68,865.00
223,225.00
25,500.00
24,600.00
50,000.00
60,000.00
40,000.00
75,000.00
126,000.00
46,000.00
38,400.00
28,600.00
20,000.00
6,500.00
4,500.00
28,200.00
5,700.00
48,205.50
13,393.50
25,500.00
49,200.00
20,000.00
2,400.00
48,000.00
4,500.00
Dibulatkan
0.07
0.8
0.15
0.01
0.019
1
0.5
0.6
6
0.7
0.06
1
2
0.4
m3
lbr
zak
m3
m3
lbr
kg
lbr
bh
m2
m2
dn
m2
org/hr
1,700,000.00
57,500.00
55,000.00
200,000.00
165,000.00
6,500.00
9,000.00
47,000.00
950.00
68,865.00
223,225.00
25,500.00
24,600.00
50,000.00
119,000.00
46,000.00
8,250.00
2,400.00
3,135.00
6,500.00
4,500.00
28,200.00
5,700.00
48,205.50
13,393.50
25,500.00
49,200.00
20,000.00
kepala tukang
pekerja
mandor
0.04
1.0
0.05
org/hr
org/hr
org/hr
60,000.00
40,000.00
75,000.00
2,400.00
40,000.00
3,750.00
Dibulatkan
0.003
0.006
0.05
0.04
0.08
m3
m3
kg
org/hr
org/hr
2,100,000.00
1,700,000.00
9,000.00
50,000.00
40,000.00
6,300.00
10,200.00
450.00
2,000.00
3,200.00
Pasang bouwplank
M'
Air Kerja
Listrik Kerja
dengan penyambungan daya
sementara untuk +/- 5 bulan
Bln
10
Foto Dokumentasi
Set
11
BH
0.025
0.09
0.6
0.75
1
2
0.5
3
0.5
0.06
0.1
1
0.1
1.2
1
0.1
II.
PEKERJAAN TANAH :
M2
pekerja
mandor
M3
1
1
10
2
1
1
20
2
unit
unit
m'
m'
bh
bh
m'
bh
750,000.00
350,000.00
14,000.00
48,970.00
4,500.00
4,000.00
5,000.00
50,000.00
750,000.00
350,000.00
140,000.00
97,940.00
4,500.00
4,000.00
100,000.00
100,000.00
1
3
2
1
1
1
1
5
unit
unit
unit
unit
bh
bh
set
bln
750,000.00
166,400.00
165,350.00
470,900.00
223,000.0
74,000.00
100,000.00
250,000.00
750,000.00
499,200.00
330,700.00
470,900.00
223,000.00
74,000.00
100,000.00
1,250,000.00
1
40
2
10
2
unit/bln
ltr/bln
ltr/bln
org/hr
ttk
400,000.00
4,300.00
30,000.00
60,000.00
50,000.00
400,000.00
172,000.00
60,000.00
600,000.00
100,000.00
1
1
108
3
roll
roll
lbr
bh
32,000.00
16,000.00
2,000.00
75,000.00
32,000.00
16,000.00
216,000.00
225,000.00
m3
m3
kg
kg
kg
lbr
bh
kg
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
2,500,000.00
1,800,000.00
9,000.00
9,180.00
17,500.00
4,500.00
14,000.00
29,000.00
55,000.00
195,000.00
155,000.00
50,000.00
55,000.00
50,000.00
40,000.00
75,000.00
62,500.00
162,000.00
5,400.00
6,885.00
17,500.00
9,000.00
7,000.00
87,000.00
27,500.00
11,700.00
15,500.00
50,000.00
5,500.00
60,000.00
40,000.00
7,500.00
Dibulatkan
0.05
0.005
org/hr
org/hr
40,000.00
75,000.00
2,000.00
375.00
pekerja
mandor
0.6
0.02
org/hr
org/hr
40,000.00
75,000.00
24,000.00
1,500.00
M3
pekerja
mandor
0.75
0.025
org/hr
org/hr
40,000.00
75,000.00
30,000.00
1,875.00
M3
pekerja
mandor
1.05
0.04
org/hr
org/hr
40,000.00
75,000.00
42,000.00
3,000.00
M3
pekerja
mandor
1.35
0.06
org/hr
org/hr
40,000.00
75,000.00
54,000.00
4,500.00
Dibulatkan
6
M3
pekerja
mandor
0.9
0.033
org/hr
org/hr
40,000.00
75,000.00
36,000.00
2,475.00
Dibulatkan
M3
pekerja
mandor
1.5
0.05
org/hr
org/hr
40,000.00
75,000.00
60,000.00
3,750.00
Dibulatkan
M3
pekerja
mandor
0.90
0.03
org/hr
org/hr
40,000.00
75,000.00
36,000.00
2,250.00
Dibulatkan
M3
pekerja
mandor
1.5
0.05
org/hr
org/hr
40,000.00
75,000.00
60,000.00
3,750.00
Dibulatkan
10
M3
pekerja
mandor
1.75
0.075
org/hr
org/hr
40,000.00
75,000.00
70,000.00
5,625.00
Dibulatkan
2
3
2
105000
105,000.00
105,000.00
105,000.00
bj M3
bj
bj
pekerja
0.75
mandor
0.375
139,375.00
### Urugan tanah kembali
M3
pekerja
mandor
0.2
0.01
org/hr
org/hr
40,000.00
75,000.00
8,000.00
750.00
Dibulatkan
M3
pekerja
mandor
sewa stamper
0.6
0.05
1
org/hr
org/hr
unit
40,000.00
75,000.00
3,900.00
24,000.00
3,750.00
3,900.00
M3
tanah merah
sewa stamper
pekerja
mandor
ongkos angkut truk s/d 20 km
1.2
1
0.4
0.04
1.2
m3
unit
org/hr
org/hr
m3
28,900.00
3,900.00
40,000.00
75,000.00
45,000.00
34,680.00
3,900.00
16,000.00
3,000.00
54,000.00
M3
sewa stamper
pekerja
mandor
1
0.5
0.05
unit
org/hr
org/hr
3,900.00
40,000.00
75,000.00
3,900.00
20,000.00
3,750.00
M3
pasir urug
pekerja
mandor
1.2
0.25
0.01
m3
org/hr
org/hr
110,000.00
40,000.00
75,000.00
132,000.00
10,000.00
750.00
Dibulatkan
M3
sirtu
pekerja
mandor
pemadatan
1.2
0.3
0.02
1
m3
org/hr
org/hr
m3
110,000.00
40,000.00
75,000.00
27,650.00
132,000.00
12,000.00
1,500.00
27,650.00
Dibulatkan
M2
sirtu
pekerja
mandor
pemadatan
0.24
0.06
0.004
0.2
m3
org/hr
org/hr
m3
110,000.00
40,000.00
75,000.00
27,650.00
26,400.00
2,400.00
300.00
5,530.00
Dibulatkan
M2
sirtu
pekerja
mandor
pemadatan
0.3
0.075
0.005
0.25
m3
org/hr
org/hr
m3
110,000.00
40,000.00
75,000.00
27,650.00
33,000.00
3,000.00
375.00
6,912.50
Dibulatkan
M2
sirtu
pekerja
mandor
pemadatan
0.36
0.09
0.006
0.3
m3
org/hr
org/hr
m3
110,000.00
40,000.00
75,000.00
27,650.00
39,600.00
3,600.00
450.00
8,295.00
Dibulatkan
M3
pekerja
mandor
0.33
0.01
org/hr
org/hr
40,000.00
75,000.00
13,200.00
750.00
Dibulatkan
M3
pekerja
mandor
0.5
0.015
org/hr
org/hr
40,000.00
75,000.00
20,000.00
1,125.00
Dibulatkan
M3
pekerja
mandor
0.6
0.015
org/hr
org/hr
40,000.00
75,000.00
24,000.00
1,125.00
Dibulatkan
M3
upah
m3
56,000.00
56,000.00
Rit
upah
m3
56,000.00
224,000.00
M3
upah
m3
60,000.00
60,000.00
Rit
upah
m3
60,000.00
360,000.00
M3
upah
m3
65,000.00
65,000.00
M3
upah
m3
45,000.00
45,000.00
M3
Stripping
Galian tanah s/d 1m
Angkut tanah s/d 500 m
Urugan tanah kembali (padat)
1
1
1
1
m2
m3
m3
m3
2,375.00
25,500.00
25,125.00
31,650.00
2,375.00
25,500.00
25,125.00
31,650.00
Dibulatkan
III.
PEKERJAAN BETON :
Beton 1:3:5
M3
semen
pasir beton
split
tk.batu
kepala tukang batu
pekerja
mandor
4.54
0.54
0.91
1
0.1
3
0.1
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
165,000.00
50,000.00
60,000.00
40,000.00
75,000.00
249,700.00
105,300.00
150,150.00
50,000.00
6,000.00
120,000.00
7,500.00
Dibulatkan
Beton 1:2:3
M3
semen
pasir beton
split
tk.batu
kepala tukang batu
pekerja
mandor
6.8
0.54
0.82
1
0.1
3
0.1
zak
m3
m3
hr
hr
hr
hr
55,000.00
195,000.00
165,000.00
50,000.00
60,000.00
40,000.00
75,000.00
374,000.00
105,300.00
135,300.00
50,000.00
6,000.00
120,000.00
7,500.00
Dibulatkan
Beton K.225
M3
semen
pasir beton
split
tk.batu
kepala tukang batu
pekerja
mandor
6.8
0.54
0.82
1
0.1
3
0.1
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
165,000.00
50,000.00
60,000.00
40,000.00
75,000.00
374,000.00
105,300.00
135,300.00
50,000.00
6,000.00
120,000.00
7,500.00
Dibulatkan
M3
1.05
1
0.25
0.1
2.0
0.01
m3
m3
org/hr
org/hr
org/hr
org/hr
495,000.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
519,750.00
20,000.00
12,500.00
6,000.00
80,000.00
750.00
Dibulatkan
M3
1.05
1
0.25
0.1
2.0
0.01
m3
m3
org/hr
org/hr
org/hr
org/hr
511,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
537,075.00
20,000.00
12,500.00
6,000.00
80,000.00
750.00
Dibulatkan
M3
1.05
1
0.25
0.1
2.0
0.01
m3
m3
org/hr
org/hr
org/hr
org/hr
533,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
560,175.00
20,000.00
12,500.00
6,000.00
80,000.00
750.00
Dibulatkan
7
Kg
besi beton
kawat beton
tk.besi
kepala tukang besi
pekerja
1.05
0.01
0.02
0.01
0.04
kg
kg
org/hr
org/hr
org/hr
6,100.00
9,000.00
50,000.00
55,000.00
40,000.00
6,405.00
90.00
1,000.00
550.00
1,600.00
Dibulatkan
Kg
besi beton
kawat beton
tk.besi
kepala tukang besi
pekerja
1.05
0.01
0.03
0.015
0.04
kg
kg
org/hr
org/hr
org/hr
6,200.00
9,000.00
50,000.00
55,000.00
40,000.00
6,510.00
90.00
1,500.00
825.00
1,600.00
Dibulatkan
Pekerjaan Wiremesh M6
M2
Wiremesh M6
kawat las
pekerja
tukang besi
mandor
1.01
0.1
0.1
0.075
0.01
m2
kg
org/hr
org/hr
org/hr
24,000.00
18,000.00
40,000.00
50,000.00
75,000.00
24,240.00
1,800.00
4,000.00
3,750.00
750.00
Dibulatkan
10
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.012
0.028
0.3
0.03
0.2
0.01
0.3
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
25,200.00
58,800.00
15,000.00
1,650.00
8,000.00
750.00
12,000.00
Dibulatkan
11
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk. bongkar
0.35
0.4
0.012
0.042
0.4
0.04
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
25,200.00
88,200.00
20,000.00
2,200.00
8,000.00
750.00
16,000.00
Dibulatkan
12
M2
0.012
0.042
0.25
0.4
0.04
0.2
0.01
0.3
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
org/hr
2,100,000.00
2,100,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
25,200.00
88,200.00
2,250.00
20,000.00
2,200.00
8,000.00
750.00
12,000.00
Dibulatkan
13
Pekerjaan Bondex
M2
bondex
kawat las
pekerja
tukang las
mandor
shear connector
1.01
0.1
0.05
0.03
0.01
1
m2
kg
org/hr
org/hr
org/hr
ls
100,000.00
18,000.00
40,000.00
50,000.00
75,000.00
7,500.00
101,000.00
1,800.00
2,000.00
1,500.00
750.00
7,500.00
Dibulatkan
14
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.012
0.014
0.3
0.03
0.2
0.01
0.3
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
25,200.00
29,400.00
15,000.00
1,650.00
8,000.00
750.00
12,000.00
Dibulatkan
15
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.018
0.03
0.5
0.05
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
37,800.00
63,000.00
25,000.00
2,750.00
8,000.00
750.00
16,000.00
Dibulatkan
16
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.012
0.028
0.5
0.05
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
25,200.00
58,800.00
25,000.00
2,750.00
8,000.00
750.00
16,000.00
Dibulatkan
17
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.018
0.032
0.5
0.05
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
37,800.00
67,200.00
25,000.00
2,750.00
8,000.00
750.00
16,000.00
Dibulatkan
18
M2
main frame
cross brace
cross brace
ladder frame
joint plate
jack base
head jack
pipe support
0.6
0.84
0.71
0.53
1.13
1.13
1.13
0.27
bh
bh
bh
bh
bh
bh
bh
bh
5,700.00
3,500.00
3,500.00
5,500.00
2,800.00
3,600.00
2,700.00
5,500.00
3,420.00
2,940.00
2,485.00
2,915.00
3,164.00
4,068.00
3,051.00
1,485.00
Dibulatkan
m2
3,000.00
3,000.00
19
M2
semen
pasir beton
split
tukang batu
kepala tukang batu
pekerja
mandor
0.454
0.054
0.091
0.1
0.01
0.3
0.01
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
165,000.00
50,000.00
60,000.00
40,000.00
75,000.00
24,970.00
10,530.00
15,015.00
5,000.00
600.00
12,000.00
750.00
Dibulatkan
20
M3
semen
pasir beton
split
tukang batu
kepala tukang batu
pekerja
mandor
4.54
0.54
0.91
1
0.1
3
0.1
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
165,000.00
50,000.00
60,000.00
40,000.00
75,000.00
249,700.00
105,300.00
150,150.00
50,000.00
6,000.00
120,000.00
7,500.00
Dibulatkan
PEKERJAAN BAJA :
1
kg
baja siku
kawat las
solar
oli/ pelumas
sewa alat
tukang las
kepala tukang besi
pekerja
mandor
1.025
0.03
0.03
0.003
0.0015
0.025
0.006
0.075
0.0015
kg
kg
ltr
ltr
unit
org/hr
org/hr
org/hr
org/hr
7,700.00
18,000.00
4,300.00
30,000.00
250,000.00
50,000.00
55,000.00
40,000.00
75,000.00
7,892.50
540.00
129.00
90.00
375.00
1,250.00
330.00
3,000.00
112.50
Dibulatkan
Pekerjaan baja WF
kg
baja WF
kawat las
solar
oli/ pelumas
sewa alat
tukang las
kepala tukang besi
pekerja
mandor
1.025
0.025
0.02
0.0025
0.0025
0.02
0.005
0.075
0.0015
kg
kg
ltr
ltr
unit
org/hr
org/hr
org/hr
org/hr
8,000.00
18,000.00
4,300.00
30,000.00
250,000.00
50,000.00
55,000.00
40,000.00
75,000.00
8,200.00
450.00
86.00
75.00
625.00
1,000.00
275.00
3,000.00
112.50
Dibulatkan
IV.
PEKERJAAN PASANGAN :
M3
batu kali
pasir pasang
pekerja
mandor
1.2
0.44
1.5
0.075
m3
m3
org/hr
org/hr
160,000.00
200,000.00
40,000.00
75,000.00
192,000.00
88,000.00
60,000.00
5,625.00
M3
batu kali
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
1.2
3.52
0.38
0.6
0.06
2.25
0.017
m3
zak
m3
org/hr
org/hr
org/hr
org/hr
160,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
192,000.00
193,600.00
76,000.00
30,000.00
3,600.00
90,000.00
1,275.00
Dibulatkan
M3
batu kali
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
1.2
1.76
0.76
0.6
0.06
2.25
0.017
m3
zak
m3
org/hr
org/hr
org/hr
org/hr
160,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
192,000.00
96,800.00
152,000.00
30,000.00
3,600.00
90,000.00
1,275.00
Dibulatkan
M3
batu kali
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
1.5
1.76
0.76
1.2
0.12
2.25
0.017
m3
zak
m3
org/hr
org/hr
org/hr
org/hr
160,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
240,000.00
96,800.00
152,000.00
60,000.00
7,200.00
90,000.00
1,275.00
Dibulatkan
M3
batu tempel
semen
1.1
0.12
m2
zak
65,000.00
55,000.00
71,500.00
6,600.00
pasir pasang
tukang batu
kepala tukang batu
pekerja
mandor
0.032
0.3
0.05
0.375
0.034
m3
org/hr
org/hr
org/hr
org/hr
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
6,400.00
15,000.00
3,000.00
15,000.00
2,550.00
Dibulatkan
475
2.4
0.416
1.5
0.15
3
0.15
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
403,750.00
132,000.00
83,200.00
75,000.00
9,000.00
120,000.00
11,250.00
0.07
834,200.00
58,394.00
Dibulatkan
M3
M'
M2
75
0.58
0.047
0.2
0.02
0.50
0.025
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
63,750.00
31,900.00
9,400.00
10,000.00
1,200.00
20,000.00
1,875.00
Dibulatkan
M2
75
0.354
0.057
0.2
0.02
0.50
0.025
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
63,750.00
19,470.00
11,400.00
10,000.00
1,200.00
20,000.00
1,875.00
Dibulatkan
10
M3
500
4.12
0.333
1.5
0.15
4.5
0.225
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
425,000.00
226,600.00
66,600.00
75,000.00
9,000.00
180,000.00
16,875.00
Dibulatkan
11
M3
500
2.53
0.406
1.5
0.15
4.5
0.225
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
425,000.00
139,150.00
81,200.00
75,000.00
9,000.00
180,000.00
16,875.00
Dibulatkan
12
M2
25
0.172
0.017
0.18
0.018
0.50
0.025
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
2,650.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
66,250.00
9,460.00
3,400.00
9,000.00
1,080.00
20,000.00
1,875.00
Dibulatkan
13
M2
33
0.2
0.016
0.18
0.018
0.50
0.025
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
4,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
132,000.00
11,000.00
3,200.00
9,000.00
1,080.00
20,000.00
1,875.00
Dibulatkan
14
M2
bataco press
semen
pasir pasang
tk.batu
kepala tukang batu
13
0.103
0.02
0.18
0.018
bh
zak
m3
org/hr
org/hr
2,800.00
55,000.00
200,000.00
50,000.00
60,000.00
36,400.00
5,665.00
4,000.00
9,000.00
1,080.00
pekerja
mandor
0.50
0.025
org/hr
org/hr
40,000.00
75,000.00
20,000.00
1,875.00
Dibulatkan
V.
PEKERJAAN PLESTERAN :
M2
semen
pasir pasang
tk batu
kepala tukang batu
pekerja
mandor
0.24
0.02
0.214
0.021
0.35
0.018
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
13,200.00
4,000.00
10,700.00
1,260.00
14,000.00
1,350.00
Dibulatkan
M2
semen
pasir pasang
tk batu
kepala tukang batu
pekerja
mandor
0.1632
0.0194
0.214
0.021
0.35
0.018
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
8,976.00
3,880.00
10,700.00
1,260.00
14,000.00
1,350.00
Dibulatkan
M2
semen
pasir pasang
tk batu
kepala tukang batu
pekerja
mandor
0.13022
0.021
0.214
0.021
0.35
0.018
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
7,162.10
4,200.00
10,700.00
1,260.00
14,000.00
1,350.00
Dibulatkan
Acian PC
M2
semen
tk batu
kepala tukang batu
pekerja
mandor
0.08
0.11
0.011
0.14
0.01
zak
org/hr
org/hr
org/hr
org/hr
55,000.00
50,000.00
60,000.00
40,000.00
75,000.00
4,400.00
5,500.00
660.00
5,600.00
750.00
M2
semen
pasir pasang
tk batu
kepala tukang batu
pekerja
mandor
0.085
0.017
0.09
0.009
0.18
0.009
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
4,675.00
3,400.00
4,500.00
540.00
7,200.00
675.00
Dibulatkan
M2
1.05
0.03
0.2
0.14
0.45
0.075
0.2
0.02
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
200,000.00
55,000.00
3,500.00
50,000.00
60,000.00
40,000.00
75,000.00
#VALUE!
6,000.00
11,000.00
490.00
22,500.00
4,500.00
8,000.00
1,500.00
Dibulatkan
M2
1.05
0.03
0.2
0.1
0.4
0.075
0.2
0.02
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
40,000.00
200,000.00
55,000.00
3,500.00
50,000.00
60,000.00
40,000.00
75,000.00
42,000.00
6,000.00
11,000.00
350.00
20,000.00
4,500.00
8,000.00
1,500.00
Dibulatkan
M2
1.05
0.03
0.24
0.1
0.4
0.1125
0.2
0.03
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
27,500.00
200,000.00
55,000.00
3,500.00
50,000.00
60,000.00
40,000.00
75,000.00
28,875.00
6,000.00
13,200.00
350.00
20,000.00
6,750.00
8,000.00
2,250.00
Dibulatkan
M2
1.05
0.03
0.2
0.07
0.4
0.075
0.2
0.02
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
43,000.00
200,000.00
55,000.00
3,500.00
50,000.00
60,000.00
40,000.00
75,000.00
45,150.00
6,000.00
11,000.00
245.00
20,000.00
4,500.00
8,000.00
1,500.00
Dibulatkan
M2
1.05
0.03
0.25
1
0.60
0.075
0.25
0.025
m2
m3
zak
m2
org/hr
org/hr
org/hr
org/hr
122,000.00
200,000.00
55,000.00
15,000.00
50,000.00
60,000.00
40,000.00
75,000.00
128,100.00
6,000.00
13,750.00
15,000.00
30,000.00
4,500.00
10,000.00
1,875.00
M2
1.05
0.04
0.4
1
1.5
0.075
0.5
0.025
m2
m3
zak
m2
org/hr
org/hr
org/hr
org/hr
195,000.00
200,000.00
55,000.00
15,000.00
50,000.00
60,000.00
40,000.00
75,000.00
204,750.00
8,000.00
22,000.00
15,000.00
75,000.00
4,500.00
20,000.00
1,875.00
M2
granit tebal 2 cm
pasir pasang
semen
grouting lantai
tk batu
kepala tukang batu
pekerja
mandor
1.05
0.04
0.40
1
1.5
0.075
0.5
0.025
m2
m3
zak
m2
org/hr
org/hr
org/hr
org/hr
950,000.00
200,000.00
55,000.00
15,000.00
50,000.00
60,000.00
40,000.00
75,000.00
997,500.00
8,000.00
22,000.00
15,000.00
75,000.00
4,500.00
20,000.00
1,875.00
M2
1.05
0.03
0.2
0.2
0.6
0.1
0.3
0.025
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
23,500.00
200,000.00
55,000.00
1,375.00
50,000.00
60,000.00
40,000.00
75,000.00
24,675.00
6,000.00
11,000.00
275.00
30,000.00
6,000.00
12,000.00
1,875.00
Dibulatkan
M2
1.05
0.03
0.2
0.09
0.5
0.075
0.25
0.025
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
48,000.00
200,000.00
55,000.00
1,375.00
50,000.00
60,000.00
40,000.00
75,000.00
50,400.00
6,000.00
11,000.00
123.75
25,000.00
4,500.00
10,000.00
1,875.00
Dibulatkan
10
M2
1.05
0.03
0.2
0.09
0.5
0.075
0.25
0.025
m2
m3
zak
kg
org/hr
org/hr
org/hr
org/hr
48,000.00
200,000.00
55,000.00
1,375.00
50,000.00
60,000.00
40,000.00
75,000.00
50,400.00
6,000.00
11,000.00
123.75
25,000.00
4,500.00
10,000.00
1,875.00
Dibulatkan
11
M2
granit DN
pasir pasang
semen
campuran kedap air
tk batu
kepala tukang batu
pekerja
mandor
1.05
0.03
0.3
1
1.5
0.1
0.5
0.05
m2
m3
zak
m2
org/hr
org/hr
org/hr
org/hr
950,000.00
200,000.00
55,000.00
15,000.00
50,000.00
60,000.00
40,000.00
75,000.00
997,500.00
6,000.00
16,500.00
15,000.00
75,000.00
6,000.00
20,000.00
3,750.00
12
M'
1.01
0.02
0.002
0.1
0.01
0.2
0.01
m'
zak
m3
org/hr
org/hr
org/hr
org/hr
4,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
4,040.00
1,100.00
400.00
5,000.00
600.00
8,000.00
750.00
Dibulatkan
13
M'
1.01
0.02
0.002
0.1
0.01
0.2
0.01
m'
zak
m3
org/hr
org/hr
org/hr
org/hr
5,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
5,050.00
1,100.00
400.00
5,000.00
600.00
8,000.00
750.00
Dibulatkan
14
M'
5
0.02
0.002
0.1
0.01
0.2
0.01
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
5,400.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
27,000.00
1,100.00
400.00
5,000.00
600.00
8,000.00
750.00
Dibulatkan
15
M2
kg
10,000.00
1,000.00
0.1
semen putih
semir kilap lantai
mesin poles
tukang poles
kepala tukang batu
pekerja
mandor
1
0.035
0.075
0.5
0.125
0.25
0.01
kg
kg
unit
org/hr
org/hr
org/hr
org/hr
1,375.00
75,000.00
60,000.00
55,000.00
60,000.00
40,000.00
75,000.00
1,375.00
2,625.00
4,500.00
27,500.00
7,500.00
10,000.00
750.00
Dibulatkan
16
Pasang karpet
VII.
PEK. WATERPROOFING
M2
Karpet executive
foam (underlayer)
alat bantu (lem, paku, list dll)
ongkos pasang
1
1
1
1
m2
m2
m2
m2
250,000.00
35,000.00
10,000.00
5,000.00
250,000.00
35,000.00
10,000.00
5,000.00
1.
Screeding tebal 3 cm
M2
semen
pasir beton
tukang batu
kepala tukang batu
pekerja
mandor
0.288
0.039
0.1
0.01
0.2
0.01
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
50,000.00
60,000.00
40,000.00
75,000.00
15,840.00
7,605.00
5,000.00
600.00
8,000.00
750.00
Dibulatkan
2.
Screeding tebal 2 cm
M2
semen
pasir beton
tukang batu
kepala tukang batu
pekerja
mandor
0.2
0.026
0.1
0.01
0.2
0.01
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
195,000.00
50,000.00
60,000.00
40,000.00
75,000.00
11,000.00
5,070.00
5,000.00
600.00
8,000.00
750.00
3.
M2
1
0.4
2.5
0.02
0.2
0.2
0.02
0.1
0.01
m2
m'
kg
unit
bh
org/hr
org/hr
org/hr
org/hr
1,500.00
13,383.33
10,000.00
60,000.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,500.00
5,353.33
25,000.00
1,200.00
2,800.00
10,000.00
1,200.00
4,000.00
750.00
Dibulatkan
4.
M2
Material primer
water proofing membrane
tk batu
kepala tukang batu
pekerja
mandor
pengetesan
0.3
1.05
0.5
0.05
0.25
0.0125
1
kg
m2
org/hr
org/hr
org/hr
org/hr
m2
25,000.00
48,000.00
50,000.00
60,000.00
40,000.00
75,000.00
2,500.00
7,500.00
50,400.00
25,000.00
3,000.00
10,000.00
937.50
2,500.00
5.
M2
6
0.125
0.15
0.015
0.075
0.0075
kg
ltr
org/hr
org/hr
org/hr
org/hr
3,800.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
22,800.00
2,500.00
7,500.00
900.00
3,000.00
562.50
Dibulatkan
M2
24
0.1
0.01
0.15
0.01
bh
org/hr
org/hr
org/hr
org/hr
1,850.00
50,000.00
60,000.00
40,000.00
75,000.00
44,400.00
5,000.00
600.00
6,000.00
750.00
Dibulatkan
M2
24
0.1
0.01
0.15
0.01
bh
org/hr
org/hr
org/hr
org/hr
1,350.00
50,000.00
60,000.00
40,000.00
75,000.00
32,400.00
5,000.00
600.00
6,000.00
750.00
Dibulatkan
M2
11.1
0.1
0.01
0.15
0.01
bh
org/hr
org/hr
org/hr
org/hr
4,750.00
50,000.00
60,000.00
40,000.00
75,000.00
52,725.00
5,000.00
600.00
6,000.00
750.00
Dibulatkan
M2
14.5
0.1
bh
org/hr
3,800.00
50,000.00
55,100.00
5,000.00
0.01
0.15
0.01
org/hr
org/hr
org/hr
60,000.00
40,000.00
75,000.00
600.00
6,000.00
750.00
Dibulatkan
1.05
0.05
0.05
0.01
0.1
0.01
1
m2
kg
org/hr
org/hr
org/hr
org/hr
m2
156,800.00
20,000.00
50,000.00
55,000.00
40,000.00
75,000.00
750.00
164,640.00
1,000.00
2,500.00
550.00
4,000.00
750.00
750.00
Dibulatkan
M2
M2
asbes gelombang
paku asbes
tk.kayu
kepala tukang kayu
pekerja
mandor
0.6
6
0.08
0.008
0.10
0.005
lbr
bh
org/hr
org/hr
org/hr
org/hr
55,000.00
950.00
50,000.00
55,000.00
40,000.00
75,000.00
33,000.00
5,700.00
4,000.00
440.00
4,000.00
375.00
Dibulatkan
M2
asbes gelombang
paku asbes
tk.kayu
kepala tukang kayu
pekerja
mandor
0.52
6
0.08
0.008
0.10
0.005
lbr
bh
org/hr
org/hr
org/hr
org/hr
63,000.00
950.00
50,000.00
55,000.00
40,000.00
75,000.00
32,760.00
5,700.00
4,000.00
440.00
4,000.00
375.00
Dibulatkan
M2
0.74
0.1
0.10
0.01
0.10
0.005
lbr
kg
org/hr
org/hr
org/hr
org/hr
36,000.00
12,000.00
50,000.00
55,000.00
40,000.00
75,000.00
26,640.00
1,200.00
5,000.00
550.00
4,000.00
375.00
Dibulatkan
M2
0.74
0.1
0.10
0.01
0.10
0.005
lbr
kg
org/hr
org/hr
org/hr
org/hr
55,750.00
12,000.00
50,000.00
55,000.00
40,000.00
75,000.00
41,255.00
1,200.00
5,000.00
550.00
4,000.00
375.00
Dibulatkan
10
M'
5.05
0.16
0.025
0.003
0.2
0.02
0.2
0.02
bh
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
5,800.00
55,000.00
195,000.00
2,500,000.00
50,000.00
60,000.00
40,000.00
75,000.00
29,290.00
8,800.00
4,875.00
7,500.00
10,000.00
1,200.00
8,000.00
1,500.00
11
M'
3.55
0.16
0.025
0.003
0.2
0.02
0.2
0.02
bh
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
9,000.00
55,000.00
195,000.00
2,500,000.00
50,000.00
60,000.00
40,000.00
75,000.00
31,950.00
8,800.00
4,875.00
7,500.00
10,000.00
1,200.00
8,000.00
1,500.00
12
M'
4
0.24
0.038
0.003
0.2
0.02
0.2
0.02
bh
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
9,000.00
55,000.00
195,000.00
2,500,000.00
50,000.00
60,000.00
40,000.00
75,000.00
36,000.00
13,200.00
7,410.00
7,500.00
10,000.00
1,200.00
8,000.00
1,500.00
Dibulatkan
13
M'
1.01
m'
102,000.00
103,020.00
Rainbow Roof
0.03
0.04
0.004
0.05
1
kg
org/hr
org/hr
org/hr
m'
20,000.00
50,000.00
55,000.00
40,000.00
375.00
600.00
2,000.00
220.00
2,000.00
375.00
Dibulatkan
14
M'
asbes gelombang
paku asbes
papan ruiter kamper medan
tk.kayu
kepala tukang kayu
pekerja
mandor
1.15
6
0.003
0.09
0.009
0.10
0.005
lbr
bh
m3
org/hr
org/hr
org/hr
org/hr
22,500.00
950.00
2,500,000.00
50,000.00
55,000.00
40,000.00
75,000.00
25,875.00
5,700.00
7,500.00
4,500.00
495.00
4,000.00
375.00
Dibulatkan
15
M'
asbes gelombang
paku asbes
papan ruiter kamper medan
tk.kayu
kepala tukang kayu
pekerja
mandor
1.25
6
0.003
0.09
0.009
0.10
0.005
lbr
bh
m3
org/hr
org/hr
org/hr
org/hr
40,000.00
950.00
2,500,000.00
50,000.00
55,000.00
40,000.00
75,000.00
50,000.00
5,700.00
7,500.00
4,500.00
495.00
4,000.00
375.00
Dibulatkan
16
Pas.nok seng
M'
0.505
0.1
0.003
0.1
0.01
0.1
m'
kg
m3
org/hr
org/hr
org/hr
49,000.00
12,000.00
2,500,000.00
50,000.00
55,000.00
40,000.00
24,745.00
1,200.00
7,500.00
5,000.00
550.00
4,000.00
17
M2
1.32
4
0.08
0.008
0.08
m2
bh
org/hr
org/hr
org/hr
95,750.00
1,000.00
50,000.00
55,000.00
40,000.00
126,390.00
4,000.00
4,000.00
440.00
3,200.00
Dibulatkan
18
M2
1.1
4
0.08
0.008
0.08
m2
bh
org/hr
org/hr
org/hr
0.00
1,000.00
50,000.00
55,000.00
40,000.00
0.00
4,000.00
4,000.00
440.00
3,200.00
Dibulatkan
19
M'
1.05
4
0.1
0.01
0.1
m'
bh
org/hr
org/hr
org/hr
46,000.00
1,000.00
50,000.00
55,000.00
40,000.00
48,300.00
4,000.00
5,000.00
550.00
4,000.00
Dibulatkan
20
M2
zink alumunium
angkur pengikat atap
tk.besi
kepala tukang besi
pekerja
4.4
8
0.08
0.008
0.08
bh
bh
org/hr
org/hr
org/hr
74,500.00
1,000.00
50,000.00
55,000.00
40,000.00
327,800.00
8,000.00
4,000.00
440.00
3,200.00
Dibulatkan
21
M2
4.4
8
0.08
0.008
0.08
bh
bh
org/hr
org/hr
org/hr
94,000.00
1,000.00
50,000.00
55,000.00
40,000.00
413,600.00
8,000.00
4,000.00
440.00
3,200.00
Dibulatkan
22
M'
1.05
4
0.1
0.01
0.1
m'
bh
org/hr
org/hr
org/hr
161,000.00
1,000.00
50,000.00
55,000.00
40,000.00
169,050.00
4,000.00
5,000.00
550.00
4,000.00
Dibulatkan
23
M'
1.05
m'
238,500.00
250,425.00
24
4
0.1
0.01
0.1
bh
org/hr
org/hr
org/hr
1,000.00
50,000.00
55,000.00
40,000.00
4,000.00
5,000.00
550.00
4,000.00
Dibulatkan
M'
0.008
1.01
0.15
0.1
0.1
0.2
0.15
0.02
0.15
0.015
m3
m'
kg
kg
kg
org/hr
org/hr
org/hr
org/hr
org/hr
2,500,000.00
24,000.00
9,000.00
12,000.00
13,500.00
50,000.00
50,000.00
55,000.00
40,000.00
75,000.00
20,000.00
24,240.00
1,350.00
1,200.00
1,350.00
10,000.00
7,500.00
1,100.00
6,000.00
1,125.00
Dibulatkan
M2
plamur kayu
amplas
cat dasar
cat kayu Glotex
thinner
kuas
tukang cat
kepala tukang cat
pekerja
mandor
0.15
0.5
0.15
0.25
0.15
0.05
0.25
0.025
0.2
0.01
kg
lbr
kg
kg
ltr
bh
org/hr
org/hr
org/hr
org/hr
17,500.00
4,500.00
14,000.00
29,000.00
12,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
2,625.00
2,250.00
2,100.00
7,250.00
1,875.00
700.00
12,500.00
1,500.00
8,000.00
750.00
Dibulatkan
M2
plamur tembok
amplas
cat dasar
cat tembok ICI
kuas roll
tk cat
kepala tukang cat
pekerja
mandor
0.2
0.5
0.1
0.2
0.025
0.25
0.03
0.16
0.01
kg
lbr
kg
kg
bh
org/hr
org/hr
org/hr
org/hr
8,500.00
4,500.00
22,500.00
35,200.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,700.00
2,250.00
2,250.00
7,040.00
500.00
12,500.00
1,800.00
6,400.00
750.00
Dibulatkan
M2
0.125
0.2
0.5
0.025
0.28
0.03
0.16
0.01
ltr
kg
lbr
bh
org/hr
org/hr
org/hr
org/hr
25,700.00
54,000.00
4,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
3,212.50
10,800.00
2,250.00
500.00
14,000.00
1,800.00
6,400.00
750.00
Dibulatkan
M2
plamur tembok
amplas
cat tembok Vinilex
kuas roll
tk cat
kepala tukang cat
pekerja
mandor
0.2
0.5
0.25
0.025
0.22
0.022
0.1
0.01
kg
lbr
kg
bh
org/hr
org/hr
org/hr
org/hr
8,500.00
4,500.00
12,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,700.00
2,250.00
3,125.00
500.00
11,000.00
1,320.00
4,000.00
750.00
Dibulatkan
M2
plamur tembok
amplas
cat tembok Vinilex
kuas roll
tk cat
kepala tukang cat
pekerja
mandor
0.2
0.5
0.275
0.025
0.22
0.022
0.125
0.01
kg
lbr
kg
bh
org/hr
org/hr
org/hr
org/hr
8,500.00
4,500.00
12,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,700.00
2,250.00
3,437.50
500.00
11,000.00
1,320.00
5,000.00
750.00
Dibulatkan
M2
plamur tembok
amplas
cat tembok Vinilex
kuas roll
0.1
0.3
0.17
0.015
kg
lbr
kg
bh
8,500.00
4,500.00
12,500.00
20,000.00
850.00
1,350.00
2,125.00
300.00
tk cat
kepala tukang cat
pekerja
mandor
0.125
0.0125
0.05
0.005
org/hr
org/hr
org/hr
org/hr
50,000.00
60,000.00
40,000.00
75,000.00
6,250.00
750.00
2,000.00
375.00
Dibulatkan
4,500.00
2,250.00
560.00
12,500.00
1,500.00
5,000.00
937.50
1,500.00
Dibulatkan
1,500.00
3,600.00
2,250.00
560.00
7,500.00
900.00
5,000.00
937.50
1,500.00
Dibulatkan
M2
0.250
0.500
0.040
0.25
0.025
0.125
0.0125
1.0
kg
lbr
bh
org/hr
org/hr
org/hr
org/hr
ls
18,000.00
4,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,500.00
M2
1.000
0.200
0.500
0.040
0.150
0.015
0.125
0.0125
1.000
m2
kg
lbr
bh
org/hr
org/hr
org/hr
org/hr
ls
1,500.00
18,000.00
4,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
1,500.00
M2
cat besi
amplas
meni besi
thinner
kuas
tk cat
kepala tukang cat
pekerja
mandor
0.2
0.4
0.167
0.15
0.05
0.22
0.022
0.125
0.01
kg
lbr
kg
ltr
bh
org/hr
org/hr
org/hr
org/hr
29,000.00
4,500.00
9,180.00
12,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
5,800.00
1,800.00
1,533.06
1,875.00
700.00
11,000.00
1,320.00
5,000.00
750.00
Dibulatkan
10
Cat zinchromate
M2
0.2
0.1
0.4
0.03
0.08
0.004
kg
ltr
lbr
bh
org/hr
org/hr
27,000.00
12,500.00
4,500.00
14,000.00
50,000.00
75,000.00
5,400.00
1,250.00
1,800.00
420.00
4,000.00
300.00
Dibulatkan
11
Politur (2 lapis)
termasuk pek.: plamur/dempul
amplas/gosok
M2
politur
plamur kayu
thinner
amplas
kuas
tk cat
mandor
0.3
0.2
0.1
0.5
0.05
0.32
0.016
kg
kg
ltr
lbr
bh
org/hr
org/hr
30,000.00
17,500.00
12,500.00
4,500.00
14,000.00
50,000.00
75,000.00
9,000.00
3,500.00
1,250.00
2,250.00
700.00
16,000.00
1,200.00
Dibulatkan
12
M2
politur
thinner
amplas
kuas
tk cat
mandor
0.2
0.075
0.25
0.04
0.2
0.01
kg
ltr
lbr
bh
org/hr
org/hr
30,000.00
12,500.00
4,500.00
14,000.00
50,000.00
75,000.00
6,000.00
937.50
1,125.00
560.00
10,000.00
750.00
Dibulatkan
13
M2
politur ultran
wood filler ultran
thinner
amplas
kuas
tk cat
kepala tukang cat
pekerja
mandor
0.3
0.2
0.1
0.5
0.05
0.28
0.04
0.25
0.02
kg
kg
ltr
lbr
bh
org/hr
org/hr
org/hr
org/hr
27,000.00
19,500.00
12,500.00
4,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
8,100.00
3,900.00
1,250.00
2,250.00
700.00
14,000.00
2,400.00
10,000.00
1,500.00
14
Melamic Impra
termasuk pek.: plamur/dempul
amplas/gosok
M2
0.25
0.35
0.25
0.3
kg
kg
kg
kg
19,500.00
28,000.00
32,000.00
30,000.00
4,875.00
9,800.00
8,000.00
9,000.00
thinner
amplas
sprayer
tk cat melamic
mandor
0.5
0.6
1
0.6
0.06
ltr
lbr
m2
org/hr
org/hr
12,500.00
4,500.00
3,000.00
70,000.00
75,000.00
6,250.00
2,700.00
3,000.00
42,000.00
4,500.00
Dibulatkan
15
M1
0.12
0.18
0.125
0.2
0.25
0.4
1
0.3
0.03
kg
kg
kg
kg
ltr
lbr
m'
org/hr
org/hr
19,500.00
28,000.00
32,000.00
30,000.00
12,500.00
4,500.00
2,000.00
70,000.00
75,000.00
2,340.00
5,040.00
4,000.00
4,500.00
3,125.00
1,800.00
2,000.00
21,000.00
2,250.00
Dibulatkan
16
Residu
M2
residu
kuas
pekerja
mandor
0.35
0.05
0.12
0.006
ltr
bh
org/hr
org/hr
7,000.00
14,000.00
40,000.00
75,000.00
2,450.00
700.00
4,800.00
450.00
Dibulatkan
17
Meni kayu
M2
meni kayu
kuas
tk cat
mandor
0.25
0.025
0.08
0.006
ltr
bh
org/hr
org/hr
9,180.00
14,000.00
50,000.00
75,000.00
2,295.00
350.00
4,000.00
450.00
Dibulatkan
18
M2
silicosal
semen
kalbon
kuas
tukang cat
kepala tukang cat
pekerja
mandor
0.4
0.01
0.05
0.25
0.2
0.02
0.2
0.01
ltr
zak
ltr
bh
org/hr
org/hr
org/hr
org/hr
25,000.00
55,000.00
15,000.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
10,000.00
550.00
750.00
3,500.00
10,000.00
1,200.00
8,000.00
750.00
Dibulatkan
EPOXY
17
M2
0.2
0.2
0.1
0.35
0.28
0.25
1
ltr
kg
kg
kg
kg
ltr
m2
22,000.00
38,000.00
65,000.00
5,000.00
52,000.00
19,500.00
15,000.00
4,400.00
7,600.00
6,500.00
1,750.00
14,560.00
4,875.00
15,000.00
Dibulatkan
18
M2
0.2
0.28
0.15
0.5
0.35
0.5
1
ltr
kg
kg
kg
kg
ltr
m2
22,000.00
38,000.00
65,000.00
5,000.00
52,000.00
19,500.00
17,500.00
4,400.00
10,640.00
9,750.00
2,500.00
18,200.00
9,750.00
17,500.00
Dibulatkan
19
M2
0.2
0.33
0.2
0.5
0.6
0.5
1
ltr
kg
kg
kg
kg
ltr
m2
22,000.00
38,000.00
65,000.00
5,000.00
52,000.00
19,500.00
20,000.00
4,400.00
12,540.00
13,000.00
2,500.00
31,200.00
9,750.00
20,000.00
Dibulatkan
20
0.2
0.3
2.25
1
0.25
1
ltr
kg
kg
kg
ltr
m2
22,000.00
38,000.00
50,000.00
75,000.00
19,500.00
27,000.00
4,400.00
11,400.00
112,500.00
75,000.00
4,875.00
27,000.00
Dibulatkan
21
0.2
0.3
3.5
1
0.25
1
ltr
kg
kg
kg
ltr
m2
22,000.00
38,000.00
50,000.00
75,000.00
19,500.00
30,000.00
4,400.00
11,400.00
175,000.00
75,000.00
4,875.00
30,000.00
22
M2
0.2
0.3
3.5
1
2
0.25
1
ltr
kg
kg
kg
kg
ltr
m2
22,000.00
38,000.00
60,000.00
75,000.00
2,500.00
19,500.00
30,000.00
4,400.00
11,400.00
210,000.00
75,000.00
5,000.00
4,875.00
30,000.00
23
M'
0.025
0.12
0.25
2
0.2
1
ltr
kg
kg
kg
ltr
m'
22,000.00
76,000.00
76,000.00
2,500.00
19,500.00
10,000.00
550.00
9,120.00
19,000.00
5,000.00
3,900.00
10,000.00
X.
PEKERJAAN BONGKARAN :
M2
pekerja
mandor
0.2
0.01
org/hr
org/hr
40,000.00
75,000.00
8,000.00
750.00
M3
pekerja
mandor
2
0.1
org/hr
org/hr
40,000.00
75,000.00
80,000.00
7,500.00
M3
pekerja
mandor
1.5
0.075
org/hr
org/hr
40,000.00
75,000.00
60,000.00
5,625.00
Dibulatkan
M3
pekerja
mandor
3
0.15
org/hr
org/hr
40,000.00
75,000.00
120,000.00
11,250.00
M3
tukang
kepala tukang
pekerja
mandor
1.2
0.12
6
0.3
org/hr
org/hr
org/hr
org/hr
50,000.00
60,000.00
40,000.00
75,000.00
60,000.00
7,200.00
240,000.00
22,500.00
M3
tukang
kepala tukang
pekerja
mandor
1.6
0.16
8
0.4
org/hr
org/hr
org/hr
org/hr
50,000.00
60,000.00
40,000.00
75,000.00
80,000.00
9,600.00
320,000.00
30,000.00
M2
pekerja
mandor
0.1
0.01
org/hr
org/hr
40,000.00
75,000.00
4,000.00
750.00
M2
pekerja
mandor
0.05
0.0025
org/hr
org/hr
40,000.00
75,000.00
2,000.00
187.50
Dibulatkan
M2
pekerja
mandor
0.02
0.01
org/hr
org/hr
40,000.00
75,000.00
800.00
750.00
M'
pekerja
mandor
0.03
0.015
org/hr
org/hr
40,000.00
75,000.00
1,200.00
1,125.00
M2
tk.besi
pekerja
0.05
0.01
org/hr
org/hr
50,000.00
40,000.00
2,500.00
400.00
M2
tk.kayu
kep.tk.kayu
pekerja
mandor
0.025
0.0025
0.1
0.005
org/hr
org/hr
org/hr
org/hr
50,000.00
55,000.00
40,000.00
75,000.00
1,250.00
137.50
4,000.00
375.00
Dibulatkan
M3
tukang kayu
kepala tukang
1
0.2
org/hr
org/hr
50,000.00
60,000.00
50,000.00
12,000.00
M2
pekerja
mandor
0.04
0.02
org/hr
org/hr
40,000.00
75,000.00
1,600.00
1,500.00
M'
pekerja
mandor
0.03
0.015
org/hr
org/hr
40,000.00
75,000.00
1,200.00
1,125.00
M3
tukang
kepala tukang
1
0.1
org/hr
org/hr
50,000.00
60,000.00
50,000.00
6,000.00
M2
pekerja
mandor
0.02
0.001
org/hr
org/hr
40,000.00
75,000.00
800.00
75.00
Dibulatkan
M2
pekerja
mandor
0.03
0.003
org/hr
org/hr
40,000.00
75,000.00
1,200.00
225.00
Dibulatkan
M2
pekerja
mandor
0.05
0.0025
org/hr
org/hr
40,000.00
75,000.00
2,000.00
187.50
Dibulatkan
BH
pekerja
mandor
0.3
0.015
org/hr
org/hr
40,000.00
75,000.00
12,000.00
1,125.00
Dibulatkan
M'
pek.galian tanah
pek.urugan pasir
pek.pasangan batu bata 1:4
pek.plesteran 1:4
buis beton 1/2 dia 30 cm
urugan tanah kembali
0.25
0.025
0.7
0.9
1
0.05
m3
m3
m2
m2
bh
m3
25,500.00
142,750.00
127,695.00
38,600.00
31,000.00
8,750.00
6,375.00
3,568.75
89,386.50
34,740.00
31,000.00
437.50
Dibulatkan
M'
pek.galian tanah
pek.urugan pasir
pek.pasangan batu bata 1:4
pek.plesteran 1:4
buis beton 1/2 dia 30 cm
urugan tanah kembali
0.15
0.025
0.4
0.6
1
0.05
m3
m3
m2
m2
bh
m3
25,500.00
142,750.00
127,695.00
38,600.00
31,000.00
8,750.00
3,825.00
3,568.75
51,078.00
23,160.00
31,000.00
437.50
Dibulatkan
M'
pek.galian tanah
pek.urugan pasir
pek.pasangan batu kali 1:3
pek.plesteran 1:2
buang tanah s/d 30 m
1.2
0.16
0.53
2.16
1.2
m3
m3
m3
m2
m3
25,500.00
142,750.00
696,060.00
44,510.00
13,950.00
30,600.00
22,840.00
368,911.80
96,141.60
16,740.00
Dibulatkan
M'
pek.galian tanah
pek.urugan pasir
pek.pasangan batu kali 1:3
pek.plesteran 1:2
buang tanah s/d 30 m
beton duiker tebal 15 cm
2.24
0.24
0.65
2.7
2.24
0.18
m3
m3
m3
m2
m3
m3
25,500.00
142,750.00
696,060.00
44,510.00
13,950.00
3,066,367.75
57,120.00
34,260.00
452,439.00
120,177.00
31,248.00
551,946.20
Dibulatkan
BH
Pek.galian tanah
Pek.urugan pasir
Pas. bata 1:4
Pek. plesteran 1:4
Besi plat 3,2 mm
Urugan tanah kembali
Buangan tanah
0.4
0.064
1.20
2.30
5.85
0.14
0.26
m3
m3
m2
m2
kg
m3
m3
25,500.00
142,750.00
127,600.00
38,600.00
7,700.00
8,750.00
13,950.00
10,200.00
9,136.00
153,120.00
88,780.00
45,045.00
1,225.00
3,627.00
Dibulatkan
BH
Pek.galian tanah
Pek.urugan pasir
Pas. bata 1:4
Pek. plesteran 1:4
Beton duiker tebal 10 cm :
- pembesian
- bekesting
- beton 1:2:3
Urugan tanah kembali
Buangan tanah
0.4
0.064
1.20
2.30
m3
m3
m2
m2
25,500.00
142,750.00
127,600.00
38,600.00
10,200.00
9,136.00
153,120.00
88,780.00
2.00
0.16
0.025
0.14
0.26
kg
m2
m3
m3
m3
9,645.00
139,000.00
798,100.00
8,750.00
13,950.00
19,290.00
22,240.00
20,152.03
1,225.00
3,627.00
Dibulatkan
7
M'
pek.galian tanah
pek.urugan pasir
pondasi batu kali 1:3
dinding turap batu kali 1:3
brapen 1:4
plesteran 1:2
alat bantu
0.8
0.12
0.5
1.05
3.5
0.5
1
m3
m3
m3
m3
m2
m2
ls
25,500.00
142,750.00
696,060.00
696,060.00
20,990.00
44,510.00
1,500.00
20,400.00
17,130.00
348,030.00
730,863.00
73,465.00
22,255.00
1,500.00
Dibulatkan
M'
pek.galian tanah
pek.urugan pasir
pondasi batu kali 1:3
dinding turap batu kali 1:3
brapen 1:4
plesteran 1:2
alat bantu
0.64
0.12
0.4
0.74
2.4
0.45
1
m3
m3
m3
m3
m2
m2
ls
25,500.00
142,750.00
696,060.00
696,060.00
20,990.00
44,510.00
1,500.00
16,320.00
17,130.00
278,424.00
515,084.40
50,376.00
20,029.50
1,500.00
Dibulatkan
M2
0.4
0.06
1
0.2
1
0.027
0.24
0.024
0.16
0.008
m3
m3
m2
m3
m2
m3
org/hr
org/hr
org/hr
org/hr
25,500.00
142,750.00
34,630.00
27,650.00
105,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
10,200.00
8,565.00
34,630.00
5,530.00
105,000.00
5,400.00
12,000.00
1,440.00
6,400.00
600.00
Dibulatkan
10
M2
0.25
0.06
0.5
0.2
1
0.027
0.24
0.024
0.16
0.008
m3
m3
m2
m3
m2
m3
org/hr
org/hr
org/hr
org/hr
25,500.00
142,750.00
34,630.00
27,650.00
105,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
6,375.00
8,565.00
17,315.00
5,530.00
105,000.00
5,400.00
12,000.00
1,440.00
6,400.00
600.00
Dibulatkan
11
Pekerjaan kansteen
M'
pek.galian tanah
pek.bouwplank
pek.urugan pasir 5 cm padat
beton kansteen
adukan 1:4 untuk penahan
semen untuk pengikat
urugan tanah kembali
pekerja
mandor
0.07
0.1
0.018
2.5
0.015
0.1
0.05
0.1
0.005
m3
m'
m3
bh
m3
zak
m3
org/hr
org/hr
25,500.00
22,150.00
142,750.00
29,300.00
308,800.00
55,000.00
8,750.00
40,000.00
75,000.00
1,785.00
2,215.00
2,569.50
73,250.00
4,632.00
5,500.00
437.50
4,000.00
375.00
Dibulatkan
12
galian tanah
urugan pasir
aanstamping
pondasi batu kali 1:4
sloof beton (75 kg)
urugan tanah
pagar BRC
tiang pipa dia.2"
plesteran 1:4
pengecatan dinding (ICI)
1.188
0.132
0.198
0.343
0.072
0.515
1
1.25
0.96
0.96
m3
m3
m3
m3
m3
m3
bh
bh
m2
m2
25,500.00
142,750.00
345,625.00
565,650.00
1,545,801.00
8,000.00
184,000.00
99,500.00
38,600.00
35,190.00
30,294.00
18,843.00
68,433.75
194,017.95
111,297.67
4,120.00
184,000.00
124,375.00
37,056.00
33,782.40
M'
806,219.77
2.40
=
Dibulatkan
13
galian tanah
urugan pasir
aanstamping
pondasi batu kali 1:4
sloof beton (75 kg)
urugan tanah
pagar BRC
tiang pipa dia.2"
plesteran 1:4
pengecatan dinding (ICI)
M'
720,469.77
1.188
0.132
0.198
0.343
0.072
0.515
1
1.25
0.96
0.96
m3
m3
m3
m3
m3
m3
bh
bh
m2
m2
25,500.00
142,750.00
345,625.00
565,650.00
1,545,801.00
8,000.00
132,000.00
72,500.00
38,600.00
35,190.00
2.40
30,294.00
18,843.00
68,433.75
194,017.95
111,297.67
4,120.00
132,000.00
90,625.00
37,056.00
33,782.40
=
Dibulatkan
14
M'
talang PVC
kait talang PVC
corong talang PVC
papan penahan talang samping
pekerja
kepala tukang kayu
0.25
1.5
0.35
0.004
0.2
0.02
btg
bh
bh
m3
org/hr
org/hr
42,000.00
2,250.00
7,500.00
1,910,000.00
40,000.00
55,000.00
10,500.00
3,375.00
2,625.00
7,640.00
8,000.00
1,100.00
JALAN :
15
M2
batu belah
pasir pasang
biaya menggilas
pekerja
mandor
0.24
0.15
1
0.3
0.01
m3
m3
m2
org/hr
org/hr
160,000.00
200,000.00
860.00
40,000.00
75,000.00
38,400.00
30,000.00
860.00
12,000.00
750.00
16
M2
batu belah
pasir pasang
biaya menggilas
pekerja
mandor
0.3
0.2
1
0.3
0.01
m3
m3
m2
org/hr
org/hr
160,000.00
200,000.00
860.00
40,000.00
75,000.00
48,000.00
40,000.00
860.00
12,000.00
750.00
17
Biaya menggilas/mesin
Hr
hr
ls
hr
600,000.00
232,000.00
75,000.00
600,000.00
232,000.00
75,000.00
1
1
1
1,050
m2
Untuk kepadatan maks. lap. bt. pecah per hari = 42.000 m2 : (4 kali gilas x 5 lin
2,100
m2
>>>>>>>>>>>>>
Rp. 907000
1.050
Rp.
Dibulatkan
>>>>>>>>>>>>>
Rp. 907000
2,100
Rp.
Dibulatkan
18
M2
0.11
0.25
0.01
m3
org/hr
org/hr
160,000.00
40,000.00
75,000.00
17,600.00
10,000.00
750.00
19
M2
0.055
1
0.2
0.01
m3
m2
org/hr
org/hr
165,000.00
430.00
40,000.00
75,000.00
9,075.00
430.00
8,000.00
750.00
20
M2
0.01
0.01
0.16
0.008
m3
m3
org/hr
org/hr
165,000.00
195,000.00
40,000.00
75,000.00
1,650.00
1,950.00
6,400.00
600.00
Dibulatkan
21
Pengaspalan manual
(aspal pengikat)
M2
abu batu
aspal
kayu bakar
tk. aspal
mandor
alat bantu
0.004
4
0.03
0.08
0.004
1
m3
kg
m3
org/hr
org/hr
ls
160,000.00
3,595.00
75,000.00
50,000.00
75,000.00
2,500.00
640.00
14,380.00
2,250.00
4,000.00
300.00
2,500.00
Dibulatkan
22
Lapisan penetrasi
M2
( hanya dgn lap. pengisi bt.pecah 1/2 )
23
M2
24
M2
abu batu
aspal panas
kayu bakar
tukang aspal
pekerja
mandor
peralatan
25
M2
26
M2
0.01
0.01
0.004
4
0.03
0.08
0.16
0.012
1
1
m3
m3
m3
kg
m3
org/hr
org/hr
org/hr
m2
ls
165,000.00
195,000.00
160,000.00
4,265.00
75,000.00
50,000.00
40,000.00
75,000.00
430.00
2,500.00
1,650.00
1,950.00
640.00
17,060.00
2,250.00
4,000.00
6,400.00
900.00
430.00
2,500.00
Dibulatkan
m2
m2
m2
m2
28,350.00
18,255.00
10,600.00
24,070.00
28,350.00
18,255.00
10,600.00
24,070.00
Dibulatkan
0.036
5
0.01
0.06
0.08
0.015
0.005
m3
kg
m3
org/hr
org/hr
org/hr
unit/hr
160,000.00
4,265.00
75,000.00
50,000.00
40,000.00
75,000.00
500,000.00
5,760.00
21,325.00
750.00
3,000.00
3,200.00
1,125.00
2,500.00
Dibulatkan
1
1
0.066
1
0.06
0.015
m2
m2
ton
m2
org/hr
org/hr
0.00
7,915.00
460,000.00
430.00
50,000.00
75,000.00
0.00
7,915.00
30,360.00
430.00
3,000.00
1,125.00
Dibulatkan
1
1
0.11
1
0.08
0.020
m2
m2
ton
m2
org/hr
org/hr
0.00
7,915.00
460,000.00
430.00
50,000.00
75,000.00
0.00
7,915.00
50,600.00
430.00
4,000.00
1,500.00
Dibulatkan
1
1
1
1
XII.
PEKERJAAN KAYU . . . . .
M'
BLOKTEAK I MUKA
0.500
LBR
BLOKTEAK 2 MUKA
1.700
LBR
KASO KAYU SAMARINDA
0.035
M3
LIST KAYU KAMPER 1X2 CM
9.600
M'
LIST KAMPER PROFIL 1X1 CM
9.000
M'
PAKU RATA-2
0.500
KG
CAT MELAMIC
11.232
M2
ALAT PENGGANTUNG (ENGSEL 1.000
LS
KUNCI, DLL)
TUKANG MEUBEL
4.000 ORG/HR
PEKERJA
2.000 ORG/HR
MANDOR
2.000 ORG/HR
185,000.00
235,000.00
4,800,000.00
7,500.00
10,000.00
9,000.00
90,125.00
500,000.00
92,500.00
399,500.00
168,000.00
72,000.00
90,000.00
4,500.00
1,012,284.00
500,000.00
100,000.00
25,000.00
50,000.00
400,000.00
50,000.00
100,000.00
DIBULATKAN
S E L E S A I
M2
galian tanah
lapisan sirtu 20 cm padat
onderlaag; bt.kali 20 cm
biaya menggilas macadam
amparan bt.pecah 5/7, t=10 cm
amparan bt.pecah 2/3, t=5 cm
biaya menggilas bt. pecah
lapisan pengisi/penutup
pengaspalan manual
1
1
1
1
1
1
1
1
1
m2
m2
m2
m2
m2
m2
m2
m2
m2
25,500.00
#VALUE!
82,010.00
860.00
28,350.00
18,255.00
430.00
10,600.00
24,070.00
25,500.00
#VALUE!
82,010.00
860.00
28,350.00
18,255.00
430.00
10,600.00
24,070.00
0.60
0.19
0.022
0.14
1
1
1
1
1
1
1
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
31,875.00
142,750.00
798,100.00
31,650.00
#VALUE!
82,010.00
28,350.00
18,255.00
10,600.00
24,070.00
62,795.00
19,125.00
27,122.50
17,558.20
4,431.00
#VALUE!
49,206.00
17,010.00
10,953.00
6,360.00
14,442.00
37,677.00
Dibulatkan
Peralatan Utama
(armature, panel, kabel) / Titik
trafo
panel tenaga
panel penerangan
armature/ lampu
kabel
1
1
1
1
10
unit
unit
unit
set
m'
45,000.00
40,000.00
25,000.00
65,000.00
7,500.00
45,000.00
40,000.00
25,000.00
65,000.00
75,000.00
-------------------250,000.00
1
3
3
2
2
16
unit
unit
unit
unit
unit
m'
125,000.00
35,000.00
60,000.00
55,000.00
15,000.00
7,500.00
125,000.00
105,000.00
180,000.00
110,000.00
30,000.00
120,000.00
-------------------670,000.00
Junction Box
Ceilling Speaker
Coloum Speaker
Volume control
Inst. kabel ke speaker
1
3
2
1
25
unit
unit
unit
unit
m'
400,000.00
175,000.00
150,000.00
275,000.00
3,000.00
400,000.00
525,000.00
300,000.00
275,000.00
75,000.00
-------------------1,575,000.00
Compressor
Instalasi pemasangan
pengisian freon
1
1
12
unit
unit
kg
21,000,000.00
1,210,000.00
65,000.00
21,000,000.00
1,210,000.00
780,000.00
-------------------22,990,000.00
pek. bor 60 cm
Load test
beton ready mix K-250
besi beton dia. 10 mm
pemotongan kepala tiang
1
1
0.139
5.20
0
m'
m'
m3
kg
Ttk
35,000.00
10,000.00
#VALUE!
9,645.00
50,000.00
35,000.00
10,000.00
#VALUE!
50,154.00
5,000.00
m3
25,000.00
Dibulatkan
a. Pek. Saluran Induk Type I / M'
2.4
0.32
1.06
4.26
2.40
m3
m3
m3
m2
m3
12,000.00
64,800.00
263,340.00
17,110.00
5,250.00
Dibulatkan
0.7
0.33
0.2
2
5
m3
m3
m3
m'
bh
12,000.00
66,600.00
2,000,000.00
15,000.00
5,827.00
Dibulatkan
a. Hanggar
Pintu hanggar
Atap hanggar
Instalasi listrik
Armature
Lantai beton
M3 pekerja
mandor
3,475.00
-------------------#VALUE!
#VALUE!
28,800.00
20,736.00
279,140.40
72,888.60
12,600.00
-------------------414,165.00
414,100.00
8,400.00
21,978.00
400,000.00
30,000.00
29,135.00
-------------------489,513.00
489,510.00
1
25
25
1
ls
m'
m'
set
226,000.00
97,600.00
44,000.00
250,000.00
226,000.00
2,440,000.00
1,100,000.00
250,000.00
bh
50,000.00
50,000.00
-------------------4,066,000.00
1
1
1
4
1
unit
m2
unit
unit
m2
210,000.00
98,000.00
95,000.00
124,400.00
32,800.00
210,000.00
117,600.00
95,000.00
497,600.00
32,800.00
-------------------953,000.00
40,000.00
75,000.00
36,000.00
2,475.00
0.9 org/hr
0.033 org/hr
Dibulatkan
Jasa 10 %
Jumlah
Lapangan
M3
Rp.
Selisih
M3
Rp.
=
1.05
1
0.4
0.04
1.5
0.075
m3
m3
org/hr
org/hr
org/hr
org/hr
510,000.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
535,500.00
20,000.00
20,000.00
2,400.00
60,000.00
5,625.00
Dibulatkan
Jasa 10 %
Jumlah
Lapangan
M3
Rp.
Selisih
M3
Rp.
=
Kg
besi beton
kawat beton
tk.besi
kepala tukang besi
pekerja
1.05
kg
0.01
kg
0.02 org/hr
0.01 org/hr
0.04 org/hr
8,500.00
9,500.00
50,000.00
55,000.00
40,000.00
8,925.00
95.00
1,000.00
550.00
1,600.00
Dibulatkan
Jasa 10 %
Jumlah
Lapangan
Kg
Rp.
Selisih
Kg
Rp.
=
M2 triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk. bongkar
0.35
0.4
0.012
0.042
0.5
0.05
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
125,000.00
9,000.00
2,100,000.00
2,100,000.00
50,000.00
55,000.00
40,000.00
75,000.00
40,000.00
43,750.00
3,600.00
25,200.00
88,200.00
25,000.00
2,750.00
8,000.00
750.00
16,000.00
Jasa 10 %
Jumlah
Lapangan
M3
Rp.
Selisih
M3
Rp.
=
Pas. Travertine
m3
batu tempel
semen
pasir pasang
tukang batu
kepala tukang batu
pekerja
mandor
1.1
0.12
0.032
0.1
0.02
0.375
0.350
m2
zak
m3
org/hr
org/hr
org/hr
org/hr
500,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
550,000.00
6,600.00
6,400.00
5,000.00
1,000.00
15,000.00
26,250.00
Dibulatkan
-----------------------T O TAL
------------------------
375.00
0.00
0.0294
4.24
0.54
0.91
0.23
0.03
0.05
0.0270
0.1717
0.0219
0.0369
0.12555 perhitungan zak semen
0.01477
179,722.80
179,000.00
panjang 1 btg besi siku = 6 m
1 tiang memakai = 1/3 btg ( 2 m)
jarak tiap tiang = 1.5 m
---> untuk 3 m = 3 x 1/3 btg = 1 btg
---> untuk 1 m = 1 btg : 3 m = 0.33 btg
13.00
93,611.00
93,600.00
0.0530500
0.027778
0.0416667
6.2500000
515,099.00
515,000.00
22.62
m' kawat
426,134.00
426,000.00
22,150.00
0.002
0.006
0.08
0.058
0.116
1,546,440.00
3,697,800.00
1,332,000.00
489,000.00
0.025
0.09
574,985.00
574,900.00
0.20
0.015
0.02
1.20
0.12
1.00
3.60
0.18
1.26
2.40
3.66
30,744.00
0.12
8.33
2,375.00
25,500.00
31,875.00
45,000.00
1.08
0.036
58,500.00
1.45
0.048
1.45
0.04833
58,000.00
38,475.00
38,000.00
63,750.00
63,000.00
38,250.00
38,000.00
63,750.00
63,000.00
75,625.00
75,000.00
analisa A 10
0.00
0.00
8,750.00
8,000.00
2.5 menit
belum beli
31,650.00
111,580.00
480
192
38
150,000.00
3,906.25
3,900.00
menit/hari
/m2
/m3
( Rp.)
( Rp.) / m3
( Rp.) / m3
27,650.00
142,750.00
142,000.00
173,150.00
173,000.00
34,630.00
34,000.00
43,287.50
43,000.00
51,945.00
51,000.00
13,950.00
13,000.00
21,125.00
21,000.00
25,125.00
25,000.00
56,000.00
0.6
0.02
0.42
0.14
224,000.00
60,000.00
360,000.00
65,000.00
45,000.00
84,650.00
84,000.00
688,650.00
688,000.00
798,100.00
798,000.00
798,100.00
798,000.00
639,000.00
639,000.00
656,325.00
656,000.00
679,425.00
18700
679,000.00
9,645.00
9,645.00
0.339
10,525.00
10,500.00
34,540.00
34,500.00
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.012
0.028
0.3
0.03
0.2
0.01
0.3
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
160,000.00
15,000.00
2,200,000.00
2,200,000.00
70,000.00
70,000.00
50,000.00
75,000.00
50,000.00
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk. bongkar
0.35
0.4
0.012
0.042
0.4
0.04
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
160,000.00
15,000.00
2,200,000.00
2,200,000.00
70,000.00
70,000.00
50,000.00
75,000.00
50,000.00
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.012
0.014
0.3
0.03
0.2
0.01
0.3
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
160,000.00
15,000.00
2,200,000.00
2,200,000.00
70,000.00
70,000.00
50,000.00
75,000.00
50,000.00
168,750.00
168,000.00
207,700.00
207,000.00
158,600.00
158,000.00
114,550.00
114,000.00
139,350.00
139,000.00
200,650.00
200,000.00
183,850.00
183,000.00
1
204,850.00
204,000.00
23,528.00
23,525.00
3,000.00
3,500.00
1,500.00
1,500.00
2,700.00
600.00
2,500.00
2,500.00
4,500.00
M2
triplek 12 mm
paku rata-rata
kaso meranti utk.rangka
kaso meranti utk.stut
tk.kayu
kepala tukang kayu
pekerja
mandor
Pekerja utk.bongkar
0.35
0.4
0.018
0.032
0.5
0.05
0.2
0.01
0.4
lbr
kg
m3
m3
org/hr
org/hr
org/hr
org/hr
org/hr
160,000.00
15,000.00
2,200,000.00
2,200,000.00
70,000.00
70,000.00
50,000.00
75,000.00
50,000.00
19
M2
semen
pasir beton
split
tukang batu
kepala tukang batu
pekerja
mandor
0.454
0.054
0.091
0.1
0.01
0.3
0.01
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
230,000.00
240,000.00
65,000.00
70,000.00
50,000.00
75,000.00
20
M3
semen
pasir beton
split
tukang batu
kepala tukang batu
pekerja
mandor
4.54
0.54
0.91
1
0.1
3
0.1
zak
m3
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
230,000.00
240,000.00
65,000.00
70,000.00
50,000.00
75,000.00
68,865.00
68,800.00
688,650.00
688,000.00
1.1
0.08
0.1
0.01
0.0005
0.03
0.0100
0.0300
1.025
0.020
0.015
0.002
0.001
0.040
0.020
0.080
0.002
1.025
0.040
0.030
0.004
0.0015
0.030
0.010
0.080
0.002
0.01
0.001
1.10
0.06
0.06
0.005
0.0050
0.0012
0.06
0.0003
0.02
0.005
0.075
0.0015
1.025
0.040
0.030
0.004
0.0015
0.016
0.0045
0.080
0.0017
1.025
0.025
0.020
0.0025
0.001
0.020
0.010
0.060
0.002
0.002
0.0002
0.016
0.004
0.079
0.0017
13,719.00
13,715.00
13,823.50
13,800.00
345,625.00
G 31 l
M3
batu kali
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
1.2
3.312
0.486
1.2
0.12
3.6
0.18
m3
zak
m3
org/hr
org/hr
org/hr
org/hr
160,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
M3
batu kali
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
1
2
1
1
0
4
0
m3
zak
m3
org/hr
org/hr
org/hr
org/hr
160,000.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
M2
75
bh
4.2352
586,475.00
586,400.00
2.6056
565,675.00
565,650.00
2.90
0.43
647,275.00
647,250.00
850.00
120,050.00
120,050.00
0.225
0.0375
0.1875
0.0338
M2
834,200.00
semen
pasir pasang
tk.batu
kepala tukang batu
pekerja
mandor
0.44
0.053
0.2
0.02
0.50
0.025
zak
m3
org/hr
org/hr
org/hr
org/hr
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
75
0
0
0
0
1
0
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
58,394.00
58,350.00
56.25
0.51
0.04
138,125.00
138,100.00
7.14
0.3542
0.0568
70.00
127,695.00
127,600.00
11
Pas. dindiM3
12
Pas. dindiM3
999,075.00
999,000.00
2.53
926,225.00
926,000.00
0.158400
0.037200
111,065.00
111,000.00
27,337.20
33.33
0.18480
0.04340
0.19800
0.04650
178,155.00
178,150.00
(koefisien)
12.50
0.15840
0.03720
0.17160
0.04030
78,020.00
78,000.00
1.335
0.172
44,510.00
44,500.00
0.1632 = kep 05
1 tong semen = 3,4 zak
analisa G 50 = 0.048x3.4=0.1632 zak
40,166.00
40,150.00
4
Plesteran M2
tebal 15 mm
38,672.10
38,600.00
semen
pasir pasang
tk batu
kepala tukang ba
pekerja
mandor
16,910.00
G 1441
G 1442
20,990.00
20,990.00
0.00
0.00
93,350.00
93,000.00
85,425.00
85,000.00
M2
1.05
0.03
0.2
0.25
0.05
0.25
0.025
m2
m3
zak
org/hr
org/hr
org/hr
org/hr
#REF!
200,000.00
55,000.00
50,000.00
60,000.00
40,000.00
75,000.00
0.99
1.01
96,395.00
96,000.00
209,225.00
351,125.00
1,143,875.00
1.01
91,825.00
91,000.00
0.177
0.03
0.75
0.05
0.5
0.050
108,898.75
108,850.00
108,898.75
108,850.00
1,139,750.00
0.10
0.20
19,890.00
19,000.00
20,900.00
20,000.00
42,850.00
42,000.00
0.1680
55,250.00
55,200.00
300,000.00
37,795.00
37,750.00
30,420.00
bahan coating
Sika Top 107 seal
0.5
0.15
0.015
0.3
0.015
51,803.33
51,800.00
bahan membran
bitumat polyflame tebal 3 mm
99,337.50
37,262.50
37,250.00
56,750.00
56,750.00
44,750.00
44,750.00
65,075.00
65,000.00
M2
25
0
0
0
0
bh
org/hr
org/hr
org/hr
org/hr
1,850.00
50,000.00
60,000.00
40,000.00
75,000.00
67,450.00
67,450.00
174,190.00
174,150.00
0.600
47,515.00
47,000.00
0.510
47,275.00
47,200.00
8
M2
37,765.00
37,750.00
52,380.00
52,350.00
0.16
71,165.00
0.240
0.038
73,825.00
84,810.00
84,800.00
asbes gelombang
paku asbes
tk.kayu
kepala tukang kayu
pekerja
mandor
0.525
6
0.08
0.008
0.10
0.005
lbr
bh
org/hr
org/hr
org/hr
org/hr
950.00
50,000.00
55,000.00
40,000.00
75,000.00
108,215.00
108,200.00
1.11
6687.500
48,445.00
48,000.00
1.2500
72,570.00
72,500.00
42,995.00
138,030.00
138,000.00
0.00
61,850.00
61,800.00
343,440.00
343,000.00
429,240.00
429,200.00
182,600.00
182,600.00
263,975.00
263,000.00
73,865.00
73,000.00
M2
39,550.00
39,550.00
plamur kayu
amplas
cat dasar
cat kayu Glotex
thinner
kuas
tukang cat
kepala tukang ca
pekerja
mandor
35,190.00
35,100.00
39,712.50
39,700.00
24,645.00
24,600.00
25,957.50
25,950.00
0.4
0.25
0.4
0.05
0.09
0.009
0.06
0.006
1.
M2
plamur tembok
amplas
cat tembok Vinilex
kuas roll
tk cat
kepala tukang cat
pekerja
mandor
0.2
0.5
0.2
0.05
0.09
0.009
0.06
0.006
kg
lbr
kg
bh
org/hr
org/hr
org/hr
org/hr
8,500.00
4,500.00
12,500.00
20,000.00
50,000.00
60,000.00
40,000.00
75,000.00
14,000.00
14,000.00
28,747.50
28,700.00
23,747.50
23,700.00
29,778.06
29,700.00
20,911.67
15,596.00
harga satu gallon = 400.000
13,170.00
13,000.00
33,900.00
33,900.00
19,372.50
19,300.00
44,100.00
90,125.00
90,000.00
Teak oil
M2
teak oil
amplas
kuas
tk cat
mandor
0.3
kg
0.20
lbr
0.03
bh
0.12 org/hr
0.006 org/hr
46,055.00
46,000.00
8,400.00
8,400.00
0.14
0.007
7,095.00
7,000.00
34,750.00
34,700.00
54,685.00
54,600.00
72,740.00
72,700.00
93,390.00
93,000.00
6,500.00 pembersihan lantai /ls
65,350.00 First layer Polyfloor PFP 261 /m2
90,500.00 Epoxy Filler Polyfloor PFP 211 /m2
235,175.00
235,000.00
13,000.00
4,500.00
14,000.00
50,000.00
75,000.00
280,825.00
300,675.00
340,675.00
EPOXY
Pekerjaan Epoxy dinding / plafond
(tebal 200 micron)
M2
0
0
0
1
0
1
1
ltr
kg
kg
kg
kg
ltr
m2
22,000.00
38,000.00
65,000.00
5,000.00
52,000.00
19,500.00
16,000.00
M2
0
0
2
1
0
ltr
kg
kg
kg
ltr
22,000.00
38,000.00
50,000.00
75,000.00
19,500.00
Upah pasang
m2
27,000.00
0
0
0
2
0
1
ltr
kg
kg
kg
ltr
m2
22,000.00
76,000.00
76,000.00
2,500.00
19,500.00
8,500.00
47,570.00
8,750.00
87,500.00
65,625.00
65,600.00
131,250.00
M2
329,700.00
439,600.00
4,750.00
0.20
0.02
2,187.50
2,100.00
1,550.00
0.1
0.005
2,325.00
0.04
0.02
2,900.00
0.05
0.1
5,762.50
5,700.00
62,000.00
3,100.00
2,325.00
56,000.00
875.00
800.00
1,425.00
1,425.00
2,187.50
2,100.00
13,125.00
13,000.00
165,507.75
165,505.00
113,069.25
113,050.00
535,233.40
535,200.00
1,247,190.20
1,247,000.00
311,133.00
311,000.00
327,770.03
5.88
33,046.88
469,640.00
327,750.00
1,687,875.00
798,100.00
580,392.75
3,066,367.75
1,213,643.00
1,213,600.00
898,863.90
898,800.00
pemadatan stamper : 10
0
159,125.00
20,440.00
189,765.00
189,700.00
168,625.00
168,600.00
94,764.00
94,700.00
0.96
1,545,801.00
806,219.77
335,924.91
335,000.00
1.632
0.192
0.216
0.51
0.072
0.675
1.25
3
3
720,469.77
300,195.74
300,000.00
33,240.00
82,010.00
101,610.00
907,000.00
863.81
860.00
431.90
430.00
28,350.00
18,255.00
10,600.00
10,600.00
24,070.00
24,000.00
37,780.00
37,700.00
81,275.00
81,200.00
37,660.00
37,600.00
42,830.00
42,800.00
64,445.00
64,400.00
0.45833
1.69167
2,888,784.00
2,541,000.00
#VALUE!
68,236.70
#VALUE!
#VALUE!
#VALUE!
38,475.00
38,400.00
3,840.00
42,240.00
25,000.00
17,240.00
40.81 %
643,525.00
643,000.00
64,300.00
707,300.00
514,000.00
193,300.00
27.33 %
12,170.00
12,170.00
1,217.00
13,387.00
7,650.00
5,737.00
42.86 %
213,250.00
21,325.00
234,575.00
145,000.00
89,575.00
38.19 %
610,250.00
610,250.00
56,000.00
6,000.00
26,400.00
61,600.00
21,000.00
2,100.00
10,000.00
750.00
15,000.00
Dibulatkan
198,850.00
198,000.00
56,000.00
6,000.00
26,400.00
92,400.00
28,000.00
2,800.00
10,000.00
750.00
20,000.00
Dibulatkan
242,350.00
242,000.00
56,000.00
6,000.00
26,400.00
30,800.00
21,000.00
2,100.00
10,000.00
750.00
15,000.00
Dibulatkan
168,050.00
168,000.00
56,000.00
6,000.00
39,600.00
70,400.00
35,000.00
3,500.00
10,000.00
750.00
20,000.00
Dibulatkan
241,250.00
241,000.00
24,970.00
12,420.00
21,840.00
6,500.00
700.00
15,000.00
750.00
Dibulatkan
700000
1700000
82,180.00
82,100.00
249,700.00
124,200.00
218,400.00
65,000.00
7,000.00
150,000.00
7,500.00
Dibulatkan
821,800.00
821,000.00
192,000.00
182,160.00
97,200.00
60,000.00
7,200.00
144,000.00
13,500.00
Dibulatkan
696,060.00
696,060.00
192,000.00
119,680.00
112,000.00
60,000.00
7,200.00
144,000.00
13,500.00
Dibulatkan
648,380.00
648,380.00
63,750.00
6
9
3.232
127273
200000
24,200.00
10,600.00
10,000.00
1,200.00
20,000.00
1,875.00
Dibulatkan
63,750.00
14,300.00
12,200.00
10,000.00
1,200.00
20,000.00
1,875.00
0.4407
0.0529
0.432
131,625.00
131,620.00
7.14
0.2150
0.0608
0.2640
123,325.00
500
3
0
2
0
5
0
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00 425,000.00
55,000.00 173,250.00
200,000.00
75,600.00
50,000.00
75,000.00
60,000.00
9,000.00
40,000.00 180,000.00
75,000.00
16,875.00
954,725.00
500
1.536
0
2
0
5
0
bh
zak
m3
org/hr
org/hr
org/hr
org/hr
850.00 425,000.00
55,000.00
84,480.00
200,000.00
86,800.00
50,000.00
75,000.00
60,000.00
9,000.00
40,000.00 180,000.00
75,000.00
16,875.00
877,155.00
Dibulatkan
877,150.00
0.108
0
0
0
0
0
#REF!
6,000.00
11,000.00
12,500.00
3,000.00
10,000.00
1,875.00
Dibulatkan
zak
m3
org/hr
org/hr
org/hr
org/hr
#REF!
#REF!
55,000.00
200,000.00
50,000.00
60,000.00
40,000.00
75,000.00
5,940.00
4,600.00
10,000.00
1,200.00
14,000.00
1,500.00
Dibulatkan
37,240.00
37,200.00
46,250.00
5,000.00
600.00
12,000.00
1,125.00
Dibulatkan
64,975.00
64,900.00
#VALUE!
5,700.00
4,000.00
440.00
4,000.00
375.00
0
1
0
0
0
0
0
0
0
0
1,700.00
2,250.00
2,500.00
1,000.00
4,500.00
540.00
2,400.00
450.00
kg
lbr
kg
kg
ltr
bh
org/hr
org/hr
org/hr
org/hr
15,340.00
17,500.00
4,500.00
14,000.00
29,000.00
12,500.00
14,000.00
50,000.00
60,000.00
40,000.00
75,000.00
3,500.00
2,250.00
0.00
11,600.00
2,500.00
700.00
12,500.00
1,500.00
8,000.00
750.00
43,300.00
3,900.00
900.00
420.00
6,000.00
450.00
11,670.00
2,200.00
10,640.00
9,750.00
2,500.00
18,200.00
9,750.00
16,000.00
Dibulatkan
69,040.00
69,000.00
4,400.00
11,400.00
112,500.00
75,000.00
4,875.00
27,000.00
Dibulatkan
235,175.00
235,000.00
550.00
7,600.00
15,200.00
3,750.00
3,900.00
8,500.00
39,500.00
XII.
1
10
11
12
PEKERJAAN KAYU :
Kuzen pintu kayu jati klas II
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
1.1
2.5
1
24
2.4
8
0.4
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
16,000,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
17,600,000.00
22,500.00
23,000.00
1,200,000.00
132,000.00
320,000.00
30,000.00
19,327,500.00
balok sungkai
paku
lem putih
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
2.5
1
18
1.8
6
0.3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
4,900,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
5,390,000.00
22,500.00
23,000.00
900,000.00
99,000.00
240,000.00
22,500.00
6,697,000.00
1.1
2.5
1
18
1.8
6
0.3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
4,400,000.00
22,500.00
23,000.00
900,000.00
99,000.00
240,000.00
22,500.00
5,707,000.00
1.1
2.5
1
18
1.8
6
0.3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
4,800,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
5,280,000.00
22,500.00
23,000.00
900,000.00
99,000.00
240,000.00
22,500.00
6,587,000.00
1.1
2.5
1
18
1.8
6
0.3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
2,530,000.00
22,500.00
23,000.00
900,000.00
99,000.00
240,000.00
22,500.00
3,837,000.00
1.1
5.8
12
1.2
4
0.2
m3
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
4,400,000.00
52,200.00
600,000.00
66,000.00
160,000.00
15,000.00
5,293,200.00
1
5.8
12
1.2
4
0.2
m3
kg
org/hr
org/hr
org/hr
org/hr
3,700,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
4,070,000.00
52,200.00
600,000.00
66,000.00
160,000.00
15,000.00
4,963,200.00
1.1
5.8
12
1.2
4
0.2
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
2,530,000.00
52,200.00
600,000.00
66,000.00
160,000.00
15,000.00
3,423,200.00
1.1
5.8
18
1.8
6
0.3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
4,400,000.00
52,200.00
900,000.00
99,000.00
240,000.00
22,500.00
5,713,700.00
1.1
5.8
18
1.8
6
0.3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
2,530,000.00
52,200.00
900,000.00
99,000.00
240,000.00
22,500.00
3,843,700.00
1.2
5.8
9
3
3
0.5
m3
kg
org/hr
org/hr
org/hr
org/hr
4,800,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
5,760,000.00
52,200.00
450,000.00
165,000.00
120,000.00
37,500.00
6,584,700.00
1.1
m3
4,000,000.00
4,400,000.00
13
14
15
16
17
18
19
20
21
22
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
paku
tk kayu
kepala tukang kayu
pekerja
mandor
2.9
4.5
0.45
1.5
0.075
kg
org/hr
org/hr
org/hr
org/hr
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
26,100.00
225,000.00
24,750.00
60,000.00
5,625.00
4,741,475.00
1.1
2.9
4.5
0.45
1.5
0.075
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
2,530,000.00
26,100.00
225,000.00
24,750.00
60,000.00
5,625.00
2,871,475.00
0.0115
0.0032
0.25
0.1
0.01
0.1
0.005
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,800,000.00
4,800,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
55,200.00
15,360.00
2,250.00
5,000.00
550.00
4,000.00
375.00
82,735.00
0.0115
0.005
0.25
0.1
0.01
0.1
0.005
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,800,000.00
4,800,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
55,200.00
24,000.00
2,250.00
5,000.00
550.00
4,000.00
375.00
Dibulatkan
91,375.00
91,350.00
0.0115
0.0032
0.25
0.1
0.01
0.1
0.005
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
26,450.00
7,360.00
2,250.00
5,000.00
550.00
4,000.00
375.00
45,985.00
0.0115
0.005
0.25
0.1
0.01
0.1
0.005
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
26,450.00
11,500.00
2,250.00
5,000.00
550.00
4,000.00
375.00
Dibulatkan
50,125.00
50,100.00
0.044
0.1
0.75
5
0.5
1.7
0.085
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
#VALUE!
900.00
17,250.00
250,000.00
27,500.00
68,000.00
6,375.00
0.00
0.044
0.1
0.75
5
0.5
1.7
0.085
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
16,000,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
704,000.00
900.00
17,250.00
250,000.00
27,500.00
68,000.00
6,375.00
Dibulatkan
1,074,025.00
1,074,000.00
0.044
0.1
0.75
4
0.4
1.4
0.07
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
228,800.00
900.00
17,250.00
200,000.00
22,000.00
56,000.00
5,250.00
Dibulatkan
530,200.00
530,200.00
0.044
0.1
0.75
4
0.4
1.4
0.07
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
3,810,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
167,640.00
900.00
17,250.00
200,000.00
22,000.00
56,000.00
5,250.00
469,040.00
0.064
0.2
m3
kg
16,000,000.00
9,000.00
1,024,000.00
1,800.00
lem putih
list kayu
tk.kayu
kepala tukang kayu
pekerja
mandor
23
24
25
26
27
28
29
30
31
Daun pintu/jend.jalusi 2 cm
(kayu jati - klas II)
Daun pintu/jend.jalusi 2 cm
(kamper samarinda - oven)
Daun pintu/jend.jalusi 2 cm
(kamper medan)
Daun pintu/jend.kaca
(kayu jati - klas I)
M2
M2
M2
M2
M2
M2
M2
M2
M2
0.3
4
6
0.6
2
0.1
kg
m'
org/hr
org/hr
org/hr
org/hr
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
6,900.00
10,000.00
300,000.00
33,000.00
80,000.00
7,500.00
1,463,200.00
0.064
0.2
0.3
4
5.4
0.54
1.8
0.09
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
332,800.00
1,800.00
6,900.00
10,000.00
270,000.00
29,700.00
72,000.00
6,750.00
Dibulatkan
729,950.00
729,000.00
0.0512
0.2
0.3
4
5.4
0.54
1.8
0.09
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
16,000,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
819,200.00
1,800.00
6,900.00
10,000.00
270,000.00
29,700.00
72,000.00
6,750.00
Dibulatkan
1,216,350.00
1,216,000.00
0.0512
0.2
0.3
4
4.5
0.45
1.5
0.075
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
266,240.00
1,800.00
6,900.00
10,000.00
225,000.00
24,750.00
60,000.00
5,625.00
Dibulatkan
600,315.00
600,000.00
0.0415
0.2
0.3
4
4.5
0.45
1.5
0.075
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
2,500,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
103,750.00
1,800.00
6,900.00
10,000.00
225,000.00
24,750.00
60,000.00
5,625.00
437,825.00
0.052
0.1
0.2
1.8
0.18
0.6
0.03
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
16,000,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
832,000.00
900.00
4,600.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
963,650.00
963,000.00
0.052
0.1
0.2
1.5
0.15
0.5
0.025
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
270,400.00
900.00
4,600.00
75,000.00
8,250.00
20,000.00
1,875.00
381,025.00
0.052
0.1
0.2
1.5
0.15
0.5
0.025
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
3,810,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
198,120.00
900.00
4,600.00
75,000.00
8,250.00
20,000.00
1,875.00
Dibulatkan
308,745.00
308,000.00
0.052
0.1
0.2
1.5
0.15
0.5
0.025
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
2,500,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
130,000.00
900.00
4,600.00
75,000.00
8,250.00
20,000.00
1,875.00
240,625.00
0.025
0.2
0.4
4
m3
kg
kg
m'
9,000.00
23,000.00
2,500.00
#VALUE!
1,800.00
9,200.00
10,000.00
32
33
34
35
36
37
38
39
40
41
Daun pintu/jend.kaca
(kayu jati - klas II)
Daun pintu/jend.kaca
(kamper samarinda - oven)
Daun pintu/jend.kaca
(kamper singkil)
Daun pintu/jend.kaca
(kayu kamper medan)
Pekerjaan kaca es 5 mm
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
tk.kayu
kepala tukang kayu
pekerja
mandor
3
0.3
1
0.05
org/hr
org/hr
org/hr
org/hr
50,000.00
55,000.00
40,000.00
75,000.00
150,000.00
16,500.00
40,000.00
3,750.00
0.00
0.025
0.2
0.4
4
3
0.3
1
0.05
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
16,000,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
400,000.00
1,800.00
9,200.00
10,000.00
150,000.00
16,500.00
40,000.00
3,750.00
631,250.00
0.025
0.2
0.4
4
2.25
0.225
0.75
0.0375
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
130,000.00
1,800.00
9,200.00
10,000.00
112,500.00
12,375.00
30,000.00
2,812.50
Dibulatkan
308,687.50
308,000.00
0.025
0.2
0.4
4
2.25
0.225
0.75
0.0375
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
3,810,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
95,250.00
1,800.00
9,200.00
10,000.00
112,500.00
12,375.00
30,000.00
2,812.50
273,937.50
0.025
0.2
0.4
4
2.25
0.225
0.75
0.0375
m3
kg
kg
m'
org/hr
org/hr
org/hr
org/hr
2,500,000.00
9,000.00
23,000.00
2,500.00
50,000.00
55,000.00
40,000.00
75,000.00
62,500.00
1,800.00
9,200.00
10,000.00
112,500.00
12,375.00
30,000.00
2,812.50
241,187.50
kaca bening 5 mm
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
0.24
0.024
0.08
0.004
m2
org/hr
org/hr
org/hr
org/hr
78,000.00
50,000.00
55,000.00
40,000.00
75,000.00
85,800.00
12,000.00
1,320.00
3,200.00
300.00
Dibulatkan
102,620.00
102,600.00
kaca rayben 5 mm
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
0.24
0.024
0.08
0.004
m2
org/hr
org/hr
org/hr
org/hr
87,000.00
50,000.00
55,000.00
40,000.00
75,000.00
95,700.00
12,000.00
1,320.00
3,200.00
300.00
Dibulatkan
112,520.00
112,500.00
kaca bening 6 mm
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
0.27
0.027
0.09
0.0045
m2
org/hr
org/hr
org/hr
org/hr
94,400.00
50,000.00
55,000.00
40,000.00
75,000.00
103,840.00
13,500.00
1,485.00
3,600.00
337.50
Dibulatkan
122,762.50
122,750.00
kaca raybend 8 mm
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
0.27
0.027
0.09
0.0045
m2
org/hr
org/hr
org/hr
org/hr
215,000.00
50,000.00
55,000.00
40,000.00
75,000.00
236,500.00
13,500.00
1,485.00
3,600.00
337.50
Dibulatkan
255,422.50
255,000.00
kaca es 5 mm
tk.kayu
kepala tukang kayu
pekerja
mandor
1.1
0.24
0.024
0.08
0.004
m2
org/hr
org/hr
org/hr
org/hr
88,000.00
50,000.00
55,000.00
40,000.00
75,000.00
96,800.00
12,000.00
1,320.00
3,200.00
300.00
Dibulatkan
113,620.00
113,600.00
0.035
0.8
0.3
0.1
1.5
0.15
0.5
0.025
m3
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
4,220,000.00
66,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
147,700.00
52,800.00
2,700.00
2,300.00
75,000.00
8,250.00
20,000.00
1,875.00
310,625.00
42
43
44
45
46
47
48
49
50
M2
M2
M2
M2
M2
M2
M2
M2
M2
0.035
0.8
0.3
0.1
1.5
0.15
0.5
0.025
m3
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
3,810,000.00
66,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
133,350.00
52,800.00
2,700.00
2,300.00
75,000.00
8,250.00
20,000.00
1,875.00
296,275.00
0.035
0.8
0.3
0.1
1.5
0.15
0.5
0.025
m3
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
2,500,000.00
66,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
87,500.00
52,800.00
2,700.00
2,300.00
75,000.00
8,250.00
20,000.00
1,875.00
250,425.00
0.035
0.8
0.4
0.4
0.3
1.8
0.18
0.6
0.03
m3
lbr
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
4,220,000.00
66,000.00
105,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
147,700.00
52,800.00
42,000.00
3,600.00
6,900.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
379,150.00
379,000.00
0.035
0.8
0.4
0.4
0.3
1.8
0.18
0.6
0.03
m3
lbr
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
3,810,000.00
66,000.00
105,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
133,350.00
52,800.00
42,000.00
3,600.00
6,900.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
364,800.00
364,000.00
0.035
0.8
0.4
0.4
0.3
1.8
0.18
0.6
0.03
m3
lbr
lbr
kg
kg
org/hr
org/hr
org/hr
org/hr
2,500,000.00
66,000.00
105,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
87,500.00
52,800.00
42,000.00
3,600.00
6,900.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
318,950.00
318,950.00
0.004
0.014
0.25
0.3
0.05
0.25
0.014
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
4,000,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
16,000.00
56,000.00
2,250.00
15,000.00
2,750.00
10,000.00
1,050.00
Dibulatkan
103,050.00
103,000.00
0.004
0.014
0.25
0.3
0.05
0.25
0.014
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
9,200.00
32,200.00
2,250.00
15,000.00
2,750.00
10,000.00
1,050.00
Dibulatkan
72,450.00
72,000.00
0.004
0.015
0.30
0.36
0.06
0.30
0.017
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
4,000,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
16,000.00
60,000.00
2,700.00
18,000.00
3,300.00
12,000.00
1,275.00
Dibulatkan
113,275.00
113,000.00
0.004
0.015
0.30
0.36
0.06
0.30
0.017
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
9,200.00
34,500.00
2,700.00
18,000.00
3,300.00
12,000.00
1,275.00
Dibulatkan
80,975.00
80,000.00
51
52
53
54
55
56
57
58
59
M2
M2
M2
M2
M2
M2
M2
M2
0.004
0.02
0.35
0.40
0.07
0.32
0.02
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
4,000,000.00
4,000,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
16,000.00
80,000.00
3,150.00
20,000.00
3,850.00
12,800.00
1,500.00
Dibulatkan
137,300.00
137,000.00
0.004
0.02
0.30
0.40
0.07
0.32
0.02
m3
m3
kg
org/hr
org/hr
org/hr
org/hr
2,300,000.00
2,300,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
9,200.00
46,000.00
2,700.00
20,000.00
3,850.00
12,800.00
1,500.00
Dibulatkan
96,050.00
96,000.00
1
0.05
0.15
0.015
0.06
0.004
lbr
kg
org/hr
org/hr
org/hr
org/hr
8,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
8,500.00
450.00
7,500.00
825.00
2,400.00
300.00
Dibulatkan
19,975.00
19,950.00
1.4
0.1
0.16
0.016
0.06
0.004
lbr
kg
org/hr
org/hr
org/hr
org/hr
27,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
38,500.00
900.00
8,000.00
880.00
2,400.00
300.00
Dibulatkan
50,980.00
50,950.00
0.4
0.12
0.2
0.02
0.07
0.004
lbr
kg
org/hr
org/hr
org/hr
org/hr
42,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
17,000.00
1,080.00
10,000.00
1,100.00
2,800.00
300.00
Dibulatkan
32,280.00
32,250.00
0.40
0.12
0.2
0.02
0.07
0.004
lbr
kg
org/hr
org/hr
org/hr
org/hr
57,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
23,000.00
1,080.00
10,000.00
1,100.00
2,800.00
300.00
Dibulatkan
38,280.00
38,250.00
Gypsum 9 mm
skrup gypsum
compound UB 888
textile tape
amplas
tk gypsum
pekerja
mandor
0.4
9
0.06
0.12
0.3
0.25
0.10
0.005
lbr
bh
zak
roll
lbr
org/hr
org/hr
org/hr
52,000.00
100.00
65,000.00
32,000.00
4,500.00
50,000.00
40,000.00
75,000.00
20,800.00
900.00
3,900.00
3,840.00
1,350.00
12,500.00
4,000.00
375.00
Dibulatkan
47,665.00
47,000.00
Kalsiboard 3.5 mm
skrup Kalsiboard
compound Kalsiboard
textile tape
amplas
tukang kayu
pekerja
mandor
0.4
12
0.06
0.12
0.3
0.25
0.1
0.005
lbr
bh
zak
roll
lbr
org/hr
org/hr
org/hr
44,000.00
75.00
65,000.00
32,000.00
4,500.00
50,000.00
40,000.00
75,000.00
17,600.00
900.00
3,900.00
3,840.00
1,350.00
12,500.00
4,000.00
375.00
Dibulatkan
44,465.00
44,000.00
Hollow 4x4 cm
Hollow 2x4 cm
Gypsum 9 mm
skrup gypsum
penggantung + ramset
compound UB 888
textile tape
amplas
tk gypsum
pekerja
mandor
0.8
0.5
0.4
9
2
0.06
0.10
0.3
0.4
0.15
0.008
btg
btg
lbr
bh
ttk
zak
roll
lbr
org/hr
org/hr
org/hr
21,000.00
16,000.00
52,000.00
100.00
4,000.00
65,000.00
32,000.00
4,500.00
50,000.00
40,000.00
75,000.00
16,800.00
8,000.00
20,800.00
900.00
8,000.00
3,900.00
3,200.00
1,350.00
20,000.00
6,000.00
600.00
Dibulatkan
89,550.00
89,000.00
60
61
62
63
64
65
66
M2
M2
M2
M2
M2
Hollow 4x4 cm
Hollow 2x4 cm
KalsiBoard 4.5 mm
skrup kalsiboard
penggantung + ramset
compound
textile tape
amplas
tk.allumunium
tk. kayu
pekerja
mandor
0.8
0.5
0.4
12
2
0.06
0.10
0.3
0.2
0.2
0.15
0.008
btg
btg
lbr
bh
ttk
zak
roll
lbr
org/hr
org/hr
org/hr
org/hr
21,000.00
16,000.00
56,500.00
75.00
4,000.00
65,000.00
32,000.00
4,500.00
55,000.00
50,000.00
40,000.00
75,000.00
16,800.00
8,000.00
22,600.00
900.00
8,000.00
3,900.00
3,200.00
1,350.00
11,000.00
10,000.00
6,000.00
600.00
Dibulatkan
92,350.00
92,000.00
0.025
0.5
0.20
0.75
0.6
0.06
0.2
0.01
m3
kg
kg
lbr
org/hr
org/hr
org/hr
org/hr
4,000,000.00
9,000.00
23,000.00
66,000.00
50,000.00
55,000.00
40,000.00
75,000.00
100,000.00
4,500.00
4,600.00
49,500.00
30,000.00
3,300.00
8,000.00
750.00
Dibulatkan
200,650.00
200,000.00
0.025
0.5
0.20
0.75
0.6
0.06
0.2
0.01
m3
kg
kg
lbr
org/hr
org/hr
org/hr
org/hr
4,000,000.00
9,000.00
23,000.00
57,500.00
50,000.00
55,000.00
40,000.00
75,000.00
100,000.00
4,500.00
4,600.00
43,125.00
30,000.00
3,300.00
8,000.00
750.00
Dibulatkan
194,275.00
194,000.00
0.025
0.5
0.20
0.75
0.6
0.06
0.2
0.01
m3
kg
kg
lbr
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
23,000.00
57,500.00
50,000.00
55,000.00
40,000.00
75,000.00
57,500.00
4,500.00
4,600.00
43,125.00
30,000.00
3,300.00
8,000.00
750.00
Dibulatkan
151,775.00
151,000.00
0.025
0.75
0.30
0.24
0.12
24
0.5
0.25
0.3
0.2
0.015
m3
lbr
kg
roll
zak
bh
lbr
org/hr
org/hr
org/hr
org/hr
2,300,000.00
60,000.00
9,000.00
32,000.00
65,000.00
100.00
4,500.00
50,000.00
50,000.00
40,000.00
75,000.00
57,500.00
45,000.00
2,700.00
7,680.00
7,800.00
2,400.00
2,250.00
12,500.00
15,000.00
8,000.00
1,125.00
Dibulatkan
161,955.00
161,000.00
1.0
0.6
4
8
0.75
0.24
0.12
24
0.5
0.25
0.25
0.2
0.015
btg
btg
bh
bh
lbr
roll
zak
bh
lbr
org/hr
org/hr
org/hr
org/hr
30,000.00
26,500.00
100.00
100.00
60,000.00
32,000.00
65,000.00
100.00
4,500.00
50,000.00
55,000.00
40,000.00
75,000.00
30,000.00
15,900.00
400.00
800.00
45,000.00
7,680.00
7,800.00
2,400.00
2,250.00
12,500.00
13,750.00
8,000.00
1,125.00
Dibulatkan
147,605.00
147,000.00
Hollow 4x4 cm
Hollow 2x4 cm
Paku rivet
Skrup allumunium
Panel Gypsum 12 mm
textile tape
compound
skrup gypsum
amplas
tukang gypsum
tk. allumunium
pekerja
1.25
0.8
4
8
0.75
0.24
0.12
24
0.5
0.25
0.25
0.2
btg
btg
bh
bh
lbr
roll
zak
bh
lbr
org/hr
org/hr
org/hr
21,000.00
16,000.00
100.00
100.00
60,000.00
32,000.00
65,000.00
100.00
4,500.00
50,000.00
55,000.00
40,000.00
26,250.00
12,800.00
400.00
800.00
45,000.00
7,680.00
7,800.00
2,400.00
2,250.00
12,500.00
13,750.00
8,000.00
67
68
69
70
71
72
73
74
M2
M2
M2
M'
M'
M'
mandor
0.015
org/hr
75,000.00
1,125.00
Dibulatkan
140,755.00
140,000.00
0.025
0.3
0.75
0.24
0.12
32
0.5
0.5
0.05
0.2
0.01
m3
kg
lbr
roll
zak
bh
lbr
org/hr
org/hr
org/hr
org/hr
2,300,000.00
9,000.00
79,100.00
32,000.00
65,000.00
75.00
4,500.00
50,000.00
55,000.00
40,000.00
75,000.00
57,500.00
2,700.00
59,325.00
7,680.00
7,800.00
2,400.00
2,250.00
25,000.00
2,750.00
8,000.00
750.00
Dibulatkan
176,155.00
176,000.00
Hollow 4x4 cm
Hollow 2x4 cm
Paku rivet
Skrup allumunium
KalsiBoard 6 mm
textile tape
compound
skrup kalsiboard
amplas
tukang kayu
tk. allumunium
pekerja
mandor
1.25
0.8
4
8
0.75
0.24
0.12
32
0.5
0.25
0.25
0.2
0.015
btg
btg
bh
bh
lbr
roll
zak
bh
lbr
org/hr
org/hr
org/hr
org/hr
21,000.00
16,000.00
100.00
100.00
79,100.00
32,000.00
65,000.00
75.00
4,500.00
50,000.00
55,000.00
40,000.00
75,000.00
26,250.00
12,800.00
400.00
800.00
59,325.00
7,680.00
7,800.00
2,400.00
2,250.00
12,500.00
13,750.00
8,000.00
1,125.00
Dibulatkan
155,080.00
155,000.00
0.028
0.015
0.3
0.2
1.8
0.18
0.6
0.03
m3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
16,000,000.00
4,800,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
448,000.00
72,000.00
2,700.00
4,600.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
653,450.00
653,450.00
0.028
0.015
0.3
0.2
1.8
0.18
0.6
0.03
m3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
4,800,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
145,600.00
72,000.00
2,700.00
4,600.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
351,050.00
351,050.00
papan ramin
kaso kamper samarinda
paku rata-rata
lem kayu
tk kayu
kepala tukang kayu
pekerja
mandor
0.028
0.015
0.3
0.2
1.8
0.18
0.6
0.03
m3
m3
kg
kg
org/hr
org/hr
org/hr
org/hr
4,800,000.00
9,000.00
23,000.00
50,000.00
55,000.00
40,000.00
75,000.00
#VALUE!
72,000.00
2,700.00
4,600.00
90,000.00
9,900.00
24,000.00
2,250.00
Dibulatkan
#VALUE!
#VALUE!
0.01
0.025
0.25
0.025
0.125
0.006
m3
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
52,000.00
225.00
12,500.00
1,375.00
5,000.00
450.00
Dibulatkan
71,550.00
71,000.00
0.007
0.025
0.2
0.02
0.1
0.005
m3
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
36,400.00
225.00
10,000.00
1,100.00
4,000.00
375.00
Dibulatkan
52,100.00
52,100.00
0.014
0.05
0.3
0.03
0.2
0.01
m3
kg
org/hr
org/hr
org/hr
org/hr
5,200,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
72,800.00
450.00
15,000.00
1,650.00
8,000.00
750.00
98,650.00
75
76
77
78
List langit-langit
bahan kayu kamper profil 2.5/2.5
List langit-langit
bahan papan kamper 1x5 cm
List langit-langit
bahan papan ramin 1x5 cm
List langit-langit
bahan triplek 0.3x5 cm
M'
M'
M'
M'
Dibulatkan
98,650.00
1.1
0.05
0.06
0.006
0.02
0.001
m'
kg
org/hr
org/hr
org/hr
org/hr
7,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
8,250.00
450.00
3,000.00
330.00
800.00
75.00
Dibulatkan
12,905.00
12,900.00
papan kamper
paku rata-rata
tk kayu
kepala tukang kayu
pekerja
mandor
0.0008
0.05
0.1
0.01
0.03
0.0015
m3
kg
org/hr
org/hr
org/hr
org/hr
4,220,000.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
3,376.00
450.00
5,000.00
550.00
1,200.00
112.50
Dibulatkan
10,688.50
10,680.00
papan ramin
paku rata-rata
tk kayu
kepala tukang kayu
pekerja
mandor
0.0008
0.05
0.1
0.01
0.03
0.0015
m3
kg
org/hr
org/hr
org/hr
org/hr
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
#VALUE!
450.00
5,000.00
550.00
1,200.00
112.50
Dibulatkan
0.00
0.00
triplek 4x8 ft , 6 mm
paku rata-rata
tk kayu
kepala tukang kayu
pekerja
mandor
0.022
0.05
0.1
0.01
0.03
0.0015
lbr
kg
org/hr
org/hr
org/hr
org/hr
57,500.00
9,000.00
50,000.00
55,000.00
40,000.00
75,000.00
1,265.00
450.00
5,000.00
550.00
1,200.00
112.50
Dibulatkan
8,577.50
8,575.00
XIII.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
12
12
1
1
3
9
3
1
18
4
4
2
0.30
0.15
0.02
meter
meter
buah
buah
buah
buah
buah
meter
buah
buah
buah
buah
org/hr
org/hr
org/hr
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,200.00
2,500.00
3,000.00
3,000.00
750.00
500.00
750.00
4,000.00
100.00
100.00
400.00
1,000.00
60,000.00
40,000.00
60,000.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
86,400.00
30,000.00
3,000.00
3,000.00
2,250.00
4,500.00
2,250.00
4,000.00
1,800.00
400.00
1,600.00
2,000.00
18,000.00
6,000.00
1,200.00
= Rp 166,400.00
Kabel NYFGbY 3 x 4 mm
conduit
Galian Kabel
Urugan pasir
Urugan tanah kembali
Bata press Pelindung Kabel
Tukang listrik
Pekerja
Mandor ME
15
4
0.9
0.30
0.45
150
0.80
0.40
0.04
meter
meter
m3
m3
m3
buah
org/hr
org/hr
org/hr
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
28,920.00
2,500.00
25,500.00
142,750.00
31,650.00
850.00
60,000.00
40,000.00
60,000.00
=
=
=
=
=
=
=
=
=
Rp 433,800.00
Rp 10,000.00
Rp 22,950.00
Rp 42,825.00
Rp 14,242.50
Rp 127,500.00
Rp 48,000.00
Rp 16,000.00
Rp
2,400.00
= Rp 717,717.50
= Rp 717,700.00
25
1.5
0.5
0.75
250
0.95
0.50
0.05
meter
m3
m3
m3
buah
org/hr
org/hr
org/hr
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
40,080.00
25,500.00
142,750.00
31,650.00
850.00
60,000.00
40,000.00
60,000.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
24
24
1
1
6
18
3
24
4
4
2
12
0.80
0.40
0.04
meter
meter
buah
buah
buah
buah
buah
meter
buah
buah
buah
buah
buah
org/hr
org/hr
org/hr
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,200.00
2,500.00
3,000.00
3,000.00
750.00
500.00
750.00
4,000.00
100.00
100.00
400.00
1,000.00
1,500.00
60,000.00
40,000.00
60,000.00
=
=
=
=
=
=
=
=
Rp
###
Rp 38,250.00
Rp 71,375.00
Rp 23,737.50
Rp 212,500.00
Rp 57,000.00
Rp 20,000.00
Rp
3,000.00
= Rp
= Rp
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
###
###
Rp 172,800.00
Rp 60,000.00
Rp
3,000.00
Rp
3,000.00
Rp
4,500.00
Rp
9,000.00
Rp
2,250.00
Rp
0.00
Rp
2,400.00
Rp
400.00
Rp
1,600.00
Rp
2,000.00
Rp 18,000.00
Rp 48,000.00
Rp 16,000.00
Rp
2,400.00
= Rp 345,350.00
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
12
meter
12
meter
1
buah
1
buah
4
buah
9
buah
3
buah
18
buah
4
buah
4
buah
0.30 org/hr
0.15 org/hr
0.015 org/hr
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,200.00
2,500.00
7,500.00
3,000.00
750.00
500.00
750.00
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
F.
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
86,400.00
30,000.00
7,500.00
3,000.00
3,000.00
4,500.00
2,250.00
1,800.00
400.00
1,600.00
18,000.00
6,000.00
900.00
= Rp 165,350.00
1
2
3
4
5
6
7
8
9
10
11
12
13
Kabel NYM 3 x 4 mm
Conduit
Outlet Box Metal
Tee Doos
Sock
Klem
Lasdop
Paku
Sekrup
Fisher
Tukang listrik
Pekerja
Mandor ME
30
meter
30
meter
1
buah
1
buah
9
buah
23
buah
3
buah
46
buah
4
buah
4
buah
0.50 org/hr
0.25 org/hr
0.025 org/hr
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,560.00
2,500.00
7,500.00
3,000.00
750.00
500.00
750.00
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
meter
15
meter
1
buah
1
buah
5
buah
14
buah
2
buah
1
meter
20
buah
5
buah
5
buah
0.30 org/hr
0.15 org/hr
0.015 org/hr
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,400.00
2,500.00
3,000.00
3,000.00
750.00
500.00
750.00
4,000.00
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp 316,800.00
Rp 75,000.00
Rp
7,500.00
Rp
3,000.00
Rp
6,750.00
Rp 11,500.00
Rp
2,250.00
Rp
4,600.00
Rp
400.00
Rp
1,600.00
Rp 30,000.00
Rp 10,000.00
Rp
1,500.00
= Rp 470,900.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
81,000.00
37,500.00
3,000.00
3,000.00
3,750.00
7,000.00
1,500.00
4,000.00
2,000.00
500.00
2,000.00
18,000.00
6,000.00
900.00
= Rp 170,150.00
10
10
1
1
3
8
2
meter
meter
buah
buah
buah
buah
buah
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,400.00
2,500.00
3,000.00
15,000.00
750.00
500.00
750.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
54,000.00
25,000.00
3,000.00
15,000.00
2,250.00
4,000.00
1,500.00
8
9
10
11
12
13
Paku
Sekrup
Fisher
Tukang listrik
Pekerja
Mandor ME
15
buah
4
buah
4
buah
0.30 org/hr
0.15 org/hr
0.015 org/hr
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
III
1
2
3
4
5
6
7
8
9
10
11
IV
1
2
3
4
5
6
7
8
9
10
11
12
40
meter
40
meter
1
buah
16
buah
40
buah
50
buah
14
buah
14
buah
0.75 org/hr
0.375 org/hr
### org/hr
x
x
x
x
x
x
x
x
x
x
x
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,500.00
400.00
1,600.00
18,000.00
6,000.00
900.00
= Rp 133,150.00
1,200.00
2,500.00
7,500.00
750.00
500.00
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
=
=
=
=
=
=
=
=
=
=
=
Rp 48,000.00
Rp 100,000.00
Rp
7,500.00
Rp 12,000.00
Rp 20,000.00
Rp
5,000.00
Rp
1,400.00
Rp
5,600.00
Rp 45,000.00
Rp 15,000.00
Rp
2,250.00
= Rp 261,750.00
= Rp 261,000.00
15
meter
15
meter
1
buah
5
buah
15
buah
1
meter
20
buah
5
buah
5
buah
0.30 org/hr
0.15 org/hr
0.015 org/hr
=
=
=
=
=
=
=
=
=
=
=
=
x
x
x
x
x
x
x
x
x
x
x
x
Instalasi Detector
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,400.00
2,500.00
3,000.00
750.00
500.00
4,000.00
100.00
100.00
400.00
60,000.00
40,000.00
60,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
81,000.00
37,500.00
3,000.00
3,750.00
7,500.00
4,000.00
2,000.00
500.00
2,000.00
18,000.00
6,000.00
900.00
= Rp 166,150.00
P Utama
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
6.80 m'
12.40 m'
m2
m'
m'
7.18
J kamar depan
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
5.82
5.42
7.49
5.82
5.42
4.85
Jendela Kantor
Kusen
3.76 m'
m'
m'
m2
m'
m'
Rp
75,000.00 Rp
Rp
50,000.00 Rp
Rp
135,000.00 Rp
Rp
35,000.00 Rp
Rp
15,000.00 Rp
Rp
45,000.00 Rp
total P1
Rp
323,100.00
3,617,100.00
Rp
Rp
Rp
Rp
Rp
Rp
total J1
Rp
Rp
Rp
Rp
Rp
Rp
Rp
436,500.00
271,000.00
1,011,285.00
203,700.00
81,300.00
218,115.00
2,221,900.00
75,000.00 Rp
282,000.00
Rp
75,000.00
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
3.36
0.77
3.76
3.36
3.10
m'
m2
m'
m'
Rp
Rp
Rp
Rp
Rp
total J3
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
Rp
Rp
Rp
Rp
Rp
Rp
168,000.00
103,680.00
131,600.00
50,400.00
139,320.00
875,000.00
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
7.80
6.40
2.70
7.80
6.40
6.28
m'
m'
m2
m'
m'
Rp
Rp
Rp
Rp
Rp
Rp
total J2
75,000.00
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
585,000.00
320,000.00
364,500.00
273,000.00
96,000.00
282,600.00
1,921,100.00
Pintu kantor lt 2
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
5.70
6.20
1.69
5.70
6.20
4.97
m'
m'
m2
m'
m'
Rp
Rp
Rp
Rp
Rp
Rp
total J2
75,000.00
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
427,500.00
310,000.00
227,812.50
199,500.00
93,000.00
223,650.00
1,481,462.50
J lantai 2 (1)
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
0.00
0.00
0.88
0.00
0.00
0.00
m'
m'
m2
m'
m'
Rp
Rp
Rp
Rp
Rp
Rp
total J4
75,000.00
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
118,125.00
118,125.00
J lantai 2 (2)
Kusen
Slimar
Kaca
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
Rp
3,000,000.00
Rp
50,000.00
Rp
135,000.00
Rp
135,000.00
Rp
35,000.00
Rp
45,000.00
total J4
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,080,000.00
729,000.00
48,600.00
643,950.00
2,501,550.00
BV
Kusen
Slimar
Kaca selip
Biaya pembuatan kusen
Biaya pembuatan slimar
Cat finishing
Rp
Rp
Rp
Rp
Rp
Rp
total J8
Rp
Rp
Rp
Rp
Rp
Rp
Rp
150,000.00
81,000.00
70,000.00
54,000.00
355,000.00
0.36 m3
m'
5.40 m2
0.36 m'
0.00 m'
14.31 m2
2.00
0.00
0.60
2.00
0.00
1.20
m'
m'
m2
m'
m'
75,000.00
50,000.00
135,000.00
35,000.00
15,000.00
45,000.00
bj
bj
bj
2
3
2
105000
105000
105000
105000
0
belum beli
PEKERJAAN / MATERIAL
HARGA
SATUAN
SAT. VOLUME
JUMLAH
TOTAL
PEKERJAAN DESAIN
ls
II
PEKERJAAN PONDASI
m3
2
3
Rp
15,000,000.00
sub total
Rp
Rp
15.00
Rp
50,000.00
Rp
750,000.00
3.00
Rp
129,500.00
Rp
388,500.00
Urugan sirtu
m3
18.00
Rp
110,000.00
Rp
1,980,000.00
Anstampeng
m3
787,500.00
5
6
III
PEKERJAAN BETON
Lantai 1
1
2
3.00
Rp
262,500.00
Rp
2.60
Rp
2,600,000.00
Rp
6,760,000.00
m3
163.00
Rp
95,000.00 Rp
sub total
Rp
15,485,000.00
26,151,000.00
Kolom 15/25
m3
2.25
Rp
3,300,000.00
Rp
7,425,000.00
Kolom 15/20
0.36
Rp
3,300,000.00
Rp
1,188,000.00
Kolom 15/15
m3
1.89
Rp
3,300,000.00
Rp
6,237,000.00
Sloof 20/25
m3
4.18
Rp
3,300,000.00
Rp
13,777,500.00
Balok 15/25
m3
2.44
Rp
3,300,000.00
Rp
8,043,750.00
Balok 15/20
m3
2.13
Rp
3,300,000.00
Rp
7,029,000.00
Balok pintu
m3
0.12
Rp
3,300,000.00
Rp
403,920.00
Deck lantai 2
6.00
Rp
2,200,000.00
Rp
13,200,000.00
m3
5.55
Rp
2,200,000.00
Rp
12,210,000.00
10 Deck tangga
0.80
Rp
2,200,000.00
Rp
1,760,000.00
11 Meja dapur
0.11
Rp
2,200,000.00
Rp
242,000.00
12 Rabatan lantai
m3
14.72
Rp
750,000.00 Rp
sub total
Rp
11,036,250.00
82,552,420.00
Lantai 2
1
Kolom 15/20
m3
0.72
Rp
3,300,000.00
Rp
2,376,000.00
Kolom 15/15
0.47
Rp
3,300,000.00
Rp
1,559,250.00
Balok 15/20
1.75
Rp
3,300,000.00
Rp
5,766,750.00
Gewel 15/15
m3
1.35
Rp
3,300,000.00
Rp
4,455,000.00
Balok pintu
0.06
Rp
3,300,000.00
Rp
198,000.00
2.00
Rp
2,200,000.00 Rp
sub total
Rp
4,400,000.00
18,755,000.00
IV PEKERJAAN PASANGAN
A. LANTAI 1
1
m2
301.63
Rp
135,000.00
Rp
40,719,375.00
m2
265.50
Rp
44,500.00
Rp
11,814,750.00
Acian
676.92
Rp
30,000.00
Rp
20,307,600.00
Benangan
350.00
Rp
35,000.00
sub total
Rp
Rp
12,250,000.00
85,091,725.00
B. LANTAI 2
1
m2
119.27
Rp
135,000.00
Rp
16,101,450.00
Plesteran 1 pc ; 6 ps
238.54
Rp
44,500.00
Rp
10,615,030.00
Acian
238.54
Rp
30,000.00
Rp
7,156,200.00
Benangan
m1
175.00
Rp
35,000.00
sub total
Rp
Rp
6,125,000.00
39,997,680.00
unit
unit
unit
unit
unit
1.00
5.00
3.00
2.00
6.00
Rp
Rp
Rp
Rp
Rp
2,750,000.00
1,000,000.00
1,500,000.00
2,500,000.00
1,500,000.00
Rp
Rp
Rp
Rp
Rp
2,750,000.00
5,000,000.00
4,500,000.00
5,000,000.00
9,000,000.00
Kaca 6mm
m2
12.78
Rp
300,000.00
sub total
Rp
Rp
3,834,000.00
30,084,000.00
B.
1
2
3
LANTAI 2
Jendela
Pintu taekwood
Pintu KM
unit
unit
unit
5.00
2.00
1.00
Rp
Rp
Rp
1,000,000.00
1,500,000.00
250,000.00
Rp
Rp
Rp
5,000,000.00
3,000,000.00
250,000.00
Kaca 6mm
m2
18.33
Rp
300,000.00
sub total
Rp
Rp
5,499,000.00
13,749,000.00
VI
A.
1
3
4
5
Rp
Rp
Rp
Rp
150,000.00
45,000.00
45,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
900,000.00
225,000.00
450,000.00
1,500,000.00
3,075,000.00
B.
1
2
3
4
LANTAI 2
Handle pintu + kunci
Selot jendela
Engsel jendela
Engsel pivot
bh
bh
bh
bh
2.00
5.00
5.00
2.00
Rp
Rp
Rp
Rp
150,000.00
75,000.00
75,000.00
125,000.00
sub total
Rp
Rp
Rp
Rp
Rp
300,000.00
375,000.00
375,000.00
250,000.00
1,300,000.00
17,098,000.00
Keramik 40x40
m2
103.00
Rp
166,000.00
Rp
2
3
9.28
Rp
90,000.00
Rp
834,750.00
m2
40.00
Rp
90,000.00
sub total
Rp
Rp
3,600,000.00
21,532,750.00
B. LANTAI 2
1
Keramik 40x40
m2
56.35
Rp
166,000.00
Rp
9,354,100.00
3.10
Rp
90,000.00
Rp
279,000.00
16.75
Rp
90,000.00
sub total
Rp
Rp
1,507,500.00
11,140,600.00
Rangka atap
m2
155.00
Rp
125,000.00
Rp
19,375,000.00
Atap genteng
m2
155.00
Rp
145,000.00
Rp
22,475,000.00
Atap bubungan
30.00
Rp
56,000.00
Rp
1,680,000.00
Listplank
51.00
Rp
85,000.00
sub total
Rp
Rp
4,335,000.00
47,865,000.00
m2
55.00
Rp
70,000.00
sub total
Rp
Rp
3,850,000.00
3,850,000.00
m2
181.00
Rp
70,000.00
sub total
Rp
Rp
12,670,000.00
12,670,000.00
IX PEKERJAAN PLAFOND
A LANTAI 1
1
LANTAI 2
X PEKERJAAN CAT
A. LANTAI 1
1
Cat interior
Cat plafond
LANTAI 2
1
2
97.56
Rp
40,000.00
Rp
3,902,400.00
515.00
Rp
27,500.00
Rp
14,162,500.00
55.00
Rp
27,500.00
sub total
Rp
Rp
1,512,500.00
19,577,400.00
55.00
Rp
40,000.00
Rp
2,200,000.00
Cat interior
m2
218.00
Rp
27,500.00
Rp
5,995,000.00
110.00
Rp
45,000.00
Rp
4,950,000.00
Cat plafond
181.00
Rp
27,500.00
sub total
Rp
Rp
4,977,500.00
18,122,500.00
XI
1
2
3
4
PEKERJAAN SANITASI
Closet duduk
Closet Jongkok
Shower
Floordrain plastik
unit
unit
unit
unit
2.00
1.00
2.00
5.00
Rp
Rp
Rp
Rp
1,700,000.00
950,000.00
200,000.00
15,000.00
sub total
Rp
Rp
Rp
Rp
Rp
3,400,000.00
950,000.00
400,000.00
75,000.00
4,825,000.00
m1
pcs
pcs
pcs
45.00
17.00
12.00
8.00
Rp
Rp
Rp
Rp
17,500.00
3,500.00
3,500.00
3,500.00
sub total
Rp
Rp
Rp
Rp
Rp
787,500.00
59,500.00
42,000.00
28,000.00
917,000.00
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
40.00
18.00
14.00
Rp
Rp
Rp
22,500.00
12,500.00
12,500.00
Rp
Rp
Rp
900,000.00
225,000.00
175,000.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
35.00
10.00
5.00
Rp
Rp
Rp
26,000.00
13,500.00
15,000.00
sub total
Rp
Rp
Rp
Rp
910,000.00
135,000.00
75,000.00
2,420,000.00
ttk
ttk
ttk
ttk
ttk
ttk
ttk
ttk
13.00
8.00
2.00
7.00
3.00
7.00
1.00
1.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
55,000.00 Rp
65,000.00 Rp
15,000.00 Rp
20,000.00 Rp
40,000.00 Rp
15,000.00 Rp
15,000.00 Rp
15,000.00 Rp
sub total
Rp
715,000.00
520,000.00
30,000.00
140,000.00
120,000.00
105,000.00
15,000.00
15,000.00
1,960,000.00
ttk
ttk
ttk
ttk
ttk
ttk
6.00
3.00
1.00
3.00
1.00
2.00
Rp
Rp
Rp
Rp
Rp
Rp
55,000.00 Rp
45,000.00 Rp
55,000.00 Rp
45,000.00 Rp
15,000.00 Rp
45,000.00 Rp
sub total
Rp
330,000.00
135,000.00
55,000.00
135,000.00
15,000.00
90,000.00
760,000.00
1
2
3
4
5
6
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
saklar telp
Saklar AC
XIII
1
2
3
ttk
ttk
ttk
27.00
23.00
3.00
Rp
Rp
Rp
m1
13.00 Rp
75,000.00 Rp
75,000.00 Rp
75,000.00 Rp
sub total
Rp
2,025,000.00
1,725,000.00
225,000.00
3,975,000.00
Railing tangga
2
3
4
5
6
7
m
bh
ls
bulan
bulan
ls
1
0.00
8.00
1.00
8.00
8.00
2.00
Rp
Rp
Rp
Rp
Rp
Rp
375,000.00
Rp
4,875,000.00
375,000.00
75,000.00
2,250,000.00
250,000.00
250,000.00
1,500,000.00
sub total
Rp
Rp
Rp
Rp
Rp
Rp
Rp
600,000.00
2,250,000.00
2,000,000.00
2,000,000.00
3,000,000.00
14,725,000.00
Rp
Rp
Rp
Rp
464,946,075.00
46,494,607.50
511,440,682.50
516,158,000.00
m3
9.02 Rp
818,400.00
Rp
7,381,968.00
50.45 Rp
135,000.00
Rp
6,810,210.00
Plesteran 1 pc ; 6 ps
m2
30.27 Rp
44,500.00
Rp
1,346,908.20
Acian
30.27 Rp
30,000.00
Rp
908,028.00
Benangan
52.00 Rp
35,000.00
Rp
1,820,000.00
66.59
Rp
40,000.00
Rp
2,663,548.80
Rabatan lantai
4.95 Rp
750,000.00
Rp
3,712,500.00
Sirtu
31.50 Rp
110,000.00
Rp
3,465,000.00
Batu kupang
m3
0.53 Rp
525,000.00
Rp
278,250.00
10 Tanah taman
22.37 Rp
250,000.00
Rp
5,591,250.00
11 Vegetasi
26.00 Rp
125,000.00
Rp
3,250,000.00
m2
50.60 Rp
418,400.00
Rp
21,171,040.00
13 Batu brobos
m2
33.22 Rp
250,000.00
Rp
8,305,000.00
14 Pagar depan
10.85 Rp
400,000.00
sub total
Jasa 10%
Total
Dibulatkan
Rp
Rp
Rp
Rp
Rp
4,340,000.00
71,043,703.00
7,104,370.30
78,148,073.30
78,148,073.00
Direktur
hitungan besi
pondasi
10
25.13 lonjor
kolom 15/25
(lantai 1)
10
8
6
14.08 lonjor
7.04 lonjor
14.08 lonjor
kolom 15/15
(lantai 1)
8
6
4.33 lonjor
3.25 lonjor
balok 15/25
(lantai 1)
10
6
34.19 lonjor
27.35 lonjor
balok pintu
8
6
1.98 lonjor
1.49 lonjor
deck lantai 2
56.87 lonjor
deck tangga
3.77 lonjor
1.28 lonjor
kolom 15/20
(lantai 2)
10
8
6
13.00 lonjor
6.50 lonjor
11.38 lonjor
kolom 15/15
(lantai 2)
8
6
3.00 lonjor
2.25 lonjor
balok 15/20
(lantai 2)
10
6
37.87 lonjor
26.51 lonjor
balok pintu
8
6
1.40 lonjor
1.05 lonjor
deck lantai 2
63.83 lonjor
total
10
8
6
124
150
87
lonjor
lonjor
lonjor
129
155
97
53,800.00
36,200.00
21,500.00
6,940,200.00
5,611,000.00
2,085,500.00
14,636,700.00
PEKERJAAN / MATERIAL
SAT.
HARGA
VOLUME
SATUAN
Bobot
MEI
1
0.14
0.14
0.12
0.12
0.08
0.05
JUNI
4
1.27
1.27
PEKERJAAN BONGKARAN
Bongkar dinding
m2
49.35
Rp
20,000
0.27
Bongkar atap
m2
168.56
Rp
55,000
2.54
3
4
5
Bongkar plafond
Bongkar pintu
Bongkar jendela
m2
unit
unit
86.70
11.00
9.00
Rp
Rp
Rp
10,000
50,000
40,000
0.24
0.15
0.10
m3
1.58
Rp
439,600
0.19
0.10
Bongkar pagar
m2
10.80
Rp
20,000
sub total
0.06
0.06
AGUSTUS
JULI
3
SEPTEMBER
4
OKTOBER
4
NOVEMBER
4
DESEMBER
4
JUMLAH
4
0.08
0.05
0.10
TOTAL
Rp
987,000.00
Rp
9,270,811.00
Rp
Rp
Rp
867,000.00
550,000.00
360,000.00
Rp
695,139.48
Rp
Rp
216,000.00
12,945,950.48
II
PEKERJAAN PONDASI
m3
13.00
Rp
50,000.00
0.18
0.18
m3
2.60
Rp
129,500.00
0.09
0.09
Urugan sirtu
m3
15.60
Rp
100,000.00
0.43
Anstampeng
m3
2.60
Rp
262,500.00
0.19
0.19
Rp
682,500.00
1.66
Rp
2,800,000.00
1.28
1.28
Rp
4,659,200.00
m3
35.60
Rp
129,500.00
sub total
1.26
Rp
Rp
4,610,200.00
12,498,600.00
III
PEKERJAAN BETON
Rp
4,436,250.00
Rp
0.43
1.26
650,000.00
Rp
336,700.00
Rp
1,560,000.00
Lantai 1
1
Kolom 15/25
m3
1.58
Rp
2,800,000.00
1.22
1.22
Kolom 15/15
m3
0.29
Rp
2,700,000.00
0.22
0.22
Balok 15/25
m3
3.08
Rp
2,800,000.00
2.36
Balok pintu
m3
0.13
Rp
2,700,000.00
0.10
Deck lantai 2
m3
8.19
Rp
2,000,000.00
4.49
Deck tangga
m3
0.54
Rp
2,000,000.00
0.30
Meja dapur
m3
0.26
Rp
2,000,000.00
0.14
1.18
1.18
0.10
4.49
0.30
0.14
sub total
Rp
789,750.00
Rp
8,615,250.00
Rp
361,462.50
Rp
16,377,600.00
Rp
1,086,720.00
Rp
510,000.00
Rp
32,177,032.50
Rp
3,276,000.00
Lantai 2
1
Kolom 15/20
m3
1.17
Rp
2,800,000.00
0.90
0.90
Kolom 15/15
m3
0.20
Rp
2,700,000.00
0.15
0.15
Balok 15/20
m3
2.73
Rp
2,800,000.00
2.09
Balok pintu
m3
0.09
Rp
2,700,000.00
0.07
Deck atap
m3
9.19
Rp
2,000,000.00
sub total
5.04
IV
A.
PEKERJAAN PASANGAN
LANTAI 1
m2
43.02
Rp
90,000.00
1.06
m2
333.39
Rp
44,500.00
4.07
Acian
m2
333.39
Rp
30,000.00
2.74
Benangan
m1
Rp
18,000.00
0.00
m2
16.50
Rp
250,000.00
sub total
1.13
B.
LANTAI 2
m2
120.14
Rp
90,000.00
2.96
1.48
1.48
Pasangan trasram
m2
28.35
Rp
90,000.00
0.70
0.35
0.35
Rp
2,551,500.00
Plesteran 1 pc ; 6 ps
m2
240.27
Rp
44,500.00
2.93
1.47
1.47
Rp
10,692,015.00
m2
56.70
Rp
79,000.00
1.23
0.61
0.61
Rp
4,479,300.00
Acian
296.97
Rp
30,000.00
2.44
1.22
Rp
8,909,100.00
Benangan
m1
Rp
18,000.00
0.00
0.00
Rp
m2
3.90
Rp
250,000.00
0.27
Pasangan travertine
9.46
Rp
610,250.00
1.58
V
A.
1
2
3
4
5
1.00
1.00
1.00
1.00
5.00
Rp
Rp
Rp
Rp
Rp
3,617,100.00
2,221,900.00
1,921,100.00
875,000.00
750,000.00
sub total
0.99
0.61
0.53
0.24
1.03
B.
1
2
3
4
LANTAI 2
Pintu kantor lt 2
Jendela hall 1
Jendela hall 2
Pintu taekwood
unit
unit
unit
unit
1.00 Rp
1.00 Rp
1.00 Rp
3.00 Rp
1,481,462.50
118,125.00
2,501,550.00
750,000.00
0.41
0.03
0.69
0.62
Kisi-kisi skylight
m2
5.84
Rp
295,000.00
sub total
0.47
VI
A.
1
3
4
5
Rp
Rp
Rp
Rp
175,000.00
75,000.00
75,000.00
100,000.00
sub total
0.34
0.08
0.08
0.14
B.
1
2
3
4
5
LANTAI 2
Handle pintu + kunci
Engsel pintu
Selot jendela
Engsel jendela
Engsel pivot
3.00
1.00
3.00
3.00
2.00
Rp
Rp
Rp
Rp
Rp
175,000.00
50,000.00
75,000.00
75,000.00
100,000.00
sub total
0.14
0.01
0.06
0.06
0.05
VII
A.
PEKERJAAN KERAMIK
LANTAI 1
2.09
0.07
5.04
0.53
0.53
2.03
2.03
1.37
1.37
0.00
546,750.00
7,634,760.00
Rp
255,150.00
Rp
Rp
18,384,000.00
30,096,660.00
Rp
3,871,800.00
Rp
14,835,855.00
Rp
10,001,700.00
Rp
1.13
1.22
0.27
Rp
Rp
4,125,000.00
32,834,355.00
Rp
10,812,150.00
Rp
975,000.00
Rp
5,769,913.75
Rp
44,188,978.75
Rp
Rp
Rp
Rp
Rp
Rp
3,617,100.00
2,221,900.00
1,921,100.00
875,000.00
3,750,000.00
12,385,100.00
0.41
0.03
0.69
0.62
Rp
Rp
Rp
Rp
1,481,462.50
118,125.00
2,501,550.00
2,250,000.00
0.47
Rp
Rp
1,722,800.00
8,073,937.50
0.34
0.08
0.08
0.14
Rp
Rp
Rp
Rp
Rp
1,225,000.00
300,000.00
300,000.00
500,000.00
2,325,000.00
0.14
0.01
0.06
0.06
0.05
Rp
Rp
Rp
Rp
Rp
Rp
525,000.00
50,000.00
225,000.00
225,000.00
200,000.00
1,225,000.00
1.58
sub total
bh
bh
bh
bh
bh
Rp
Rp
0.99
0.61
0.53
0.24
1.03
Keramik 20X20
m2
43.92
Rp
125,000.00
1.51
Rp
5,489,750.00
Keramik 33.3x33.3
m2
107.94
Rp
125,000.00
3.70
3.70
Rp
13,492,500.00
m2
29.23
Rp
150,000.00
1.20
1.20
Rp
4,384,500.00
Keramik kolplain
m1
144.00
Rp
25,000.00
0.99
0.99
Rp
3,600,000.00
Keramik 60x60
m2
12.75
Rp
175,000.00
sub total
0.61
0.61
Rp
Rp
2,231,250.00
29,198,000.00
B.
LANTAI 2
Keramik 33.3x33.3
m2
69.17
Rp
125,000.00
2.37
2.37
Rp
8,646,250.00
Keramik kolplain
m1
69.60
Rp
25,000.00
0.48
0.48
Rp
1,740,000.00
m2
3.50
Rp
125,000.00
0.12
0.12
Rp
437,500.00
m2
18.75
Rp
125,000.00
sub total
0.64
0.64
Rp
Rp
2,343,750.00
13,167,500.00
VIII
1.51
PEKERJAAN ATAP
m2
71.35
Rp
175,000.00
3.42
Rp
12,486,250.00
Atap genteng
m2
71.35
Rp
158,000.00
3.09
3.09
Rp
11,273,300.00
Atap bubungan
m1
7.50
Rp
67,200.00
0.14
3.42
0.14
Rp
504,000.00
Listplank
m1
23.50
Rp
150,000.00
0.97
Rp
3,525,000.00
Rangka polycarbonat
m2
1.79
Rp
131,000.00
0.06
0.06
Rp
234,490.00
Polycarbonat
m2
1.79
Rp
210,000.00
sub total
0.10
0.10
Rp
Rp
375,900.00
28,398,940.00
IX
A
PEKERJAAN PLAFOND
LANTAI 1
m2
79.61
Rp
95,000.00
2.07
List plafond
m1
83.30
Rp
16,000.00
sub total
0.37
LANTAI 2
m2
97.22
Rp
95,000.00
2.53
List plafond
m1
84.60
Rp
16,000.00
0.37
0.97
1.04
1.04
Rp
7,562,950.00
0.37
Rp
Rp
1,332,800.00
8,895,750.00
1.27
1.27
Rp
0.37
sub total
X
A.
PEKERJAAN CAT
LANTAI 1
m2
71.92
Rp
35,000.00
0.69
Cat interior
m2
601.35
Rp
25,000.00
4.12
Cat plafond
m2
79.61
Rp
25,000.00
sub total
0.55
LANTAI 2
85.37
Rp
35,000.00
0.82
Cat interior
m2
296.97
Rp
25,000.00
2.04
m2
84.26
Rp
45,000.00
1.04
Cat plafond
m2
97.22
Rp
25,000.00
0.67
m2
94.50
Rp
45,000.00
sub total
1.17
XI
1
2
3
PEKERJAAN SANITASI
Closet duduk
Shower
Floordrain plastik
unit
unit
unit
1.00
1.00
1.00
Rp
Rp
Rp
1,500,000.00
150,000.00
35,000.00
sub total
0.41
0.04
0.01
XI
1
2
3
4
PVC 3/4"
Knee 3/4"
Shock 3/4"
Tee 3/4"
11.50
2.00
2.00
3.00
Rp
Rp
Rp
Rp
17,500.00
3,500.00
3,500.00
3,500.00
sub total
0.055
0.002
0.002
0.003
0.0110
0.0004
0.0004
0.0006
0.022
0.001
0.001
0.001
XI
1
2
3
PVC 3"
Knee 3"
Shock 3"
m1
pcs
pcs
82.50
8.00
7.00
Rp
Rp
Rp
34,000.00
12,500.00
12,500.00
0.769
0.027
0.024
0.15
0.01
0.00
4
5
6
PVC 4"
Knee 4"
Shock 4"
m1
pcs
pcs
20.00
3.00
3.00
Rp
Rp
Rp
36,000.00
15,000.00
15,000.00
sub total
0.197
0.012
0.012
0.04
0.002
0.002
1
2
3
4
5
6
7
PEKERJAAN ELEKTRIKAL
Lantai 1
Lampu downlight (interior)
Lampu downlight (eksterior)
Saklar tunggal ex broco
Saklar ganda ex broco
Saklar TV ex broco
Stop kontak ex broco
Saklar AC
ttk
ttk
ttk
ttk
ttk
ttk
ttk
9.00
3.00
6.00
1.00
1.00
6.00
3.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
75,000.00
85,000.00
45,000.00
55,000.00
45,000.00
45,000.00
45,000.00
sub total
0.185
0.070
0.074
0.015
0.012
0.074
0.037
1
2
3
4
5
Lantai 2
Lampu downlight (interior)
Saklar tunggal ex broco
Saklar ganda ex broco
Stop kontak ex broco
Saklar AC
ttk
ttk
ttk
ttk
ttk
8.00
3.00
1.00
5.00
1.00
Rp
Rp
Rp
Rp
Rp
75,000.00
45,000.00
55,000.00
45,000.00
45,000.00
0.165
0.037
0.015
0.062
0.012
XII
m1
pcs
pcs
pcs
0.35
2.06
0.35
2.06
0.55
0.82
1.02
1.02
1.04
0.67
XIV
PEKERJAAN CARPORT
20.00
12.00
4.00
Rp
Rp
Rp
175,000.00
175,000.00
175,000.00
sub total
0.960
0.576
0.192
Rp
2,517,200.00
Rp
15,033,812.50
Rp
Rp
1,990,250.00
19,541,262.50
Rp
2,987,862.50
Rp
7,424,250.00
Rp
3,791,700.00
2,430,500.00
Rp
Rp
4,252,500.00
20,886,812.50
Rp
Rp
Rp
Rp
1,500,000.00
150,000.00
35,000.00
1,685,000.00
0.022
0.001
0.001
0.001
Rp
Rp
Rp
Rp
Rp
201,250.00
7,000.00
7,000.00
10,500.00
225,750.00
0.308
0.011
0.010
0.308
0.011
0.010
Rp
Rp
Rp
2,805,000.00
100,000.00
87,500.00
0.079
0.005
0.005
0.079
0.005
0.005
Rp
Rp
Rp
Rp
720,000.00
45,000.00
45,000.00
3,802,500.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
675,000.00
255,000.00
270,000.00
55,000.00
45,000.00
270,000.00
135,000.00
1,705,000.00
Rp
Rp
Rp
Rp
Rp
600,000.00
135,000.00
55,000.00
225,000.00
45,000.00
Rp
1,060,000.00
Rp
Rp
Rp
Rp
3,500,000.00
2,100,000.00
700,000.00
6,300,000.00
0.58
0.58
0.41
0.04
0.01
0.185
0.070
0.074
0.015
0.012
0.074
0.037
0.165
0.037
0.015
0.062
0.012
0.240
0.144
0.048
1,353,600.00
10,589,500.00
Rp
sub total
XIII
1
2
3
9,235,900.00
Rp
Rp
0.24
0.14
0.05
0.24
0.14
0.05
0.24
0.14
0.05
Pasangan bata
m3
2.40 Rp
90,000.00
0.059
0.06
Rp
216,000.00
Kolom carport
m3
0.27 Rp
2,700,000.00
0.200
0.20
Rp
729,000.00
Plester
m2
9.60 Rp
79,000.00
0.208
0.21
Rp
Acian
9.60 Rp
30,000.00
0.079
Rangka hollow
m2
31.50 Rp
131,000.00
1.132
Polycarbonat
m2
31.50 Rp
103,750.00
0.896
0.08
288,000.00
1.13
Rp
4,126,500.00
0.90
Rp
3,268,125.00
Rp
9,386,025.00
Rp
5,508,750.00
sub total
XV
Pagar hollow
m2
8.48 Rp
Cat besi
m2
XVI
758,400.00
Rp
650,000.00
1.511
1.51
16.95 Rp
35,000.00
0.163
0.16
Rp
593,250.00
4.02 Rp
250,000.00
0.276
0.28
Rp
1,005,000.00
m2
4.02 Rp
45,000.00
sub total
0.050
0.05
Rp
Rp
180,900.00
7,287,900.00
1.79
Rp
6,520,000.00
0.42
Rp
1,520,000.00
Rp
Rp
Rp
1,000,000.00
250,000.00
1,500,000.00
m1
16.30 Rp
400,000.00
1.788
400,000.00
0.417
Bak kontrol
Instalasi tandon atas
Fasilitas air kerja
m1
ls
ls
bulan
3.80 Rp
3
4
5
8.00 Rp
1.00 Rp
6.00 Rp
125,000.00
250,000.00
250,000.00
0.274
0.069
0.411
6
7
bulan
ls
6.00 Rp
1.00 Rp
250,000.00
1,500,000.00
0.411
0.411
0.27
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.03
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.08
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.03
0.01
0.01
0.01
0.01
0.01
0.16
0.01
0.16
sub total
TOTAL
Schedule
Schedule komulatif
100.00
0.28
0.28
0.83
1.11
0.15
1.26
1.45
2.71
2.16
4.87
1.57
6.44
1.72
8.15
1.99
2.69
4.61
2.58
4.95
3.35
4.30
5.56
6.29
3.45
3.25
7.49
3.04
3.33
4.82
3.50
3.08
1.39
0.75
2.55
2.51
2.40
2.24
4.97
4.14
1.68
0.77
10.14
12.83
17.44
20.01
24.96
28.31
32.61
38.17
44.45
47.90
51.15
58.65
61.68
65.01
69.84
73.34
76.42
77.80
78.55
81.10
83.61
86.00
88.25
93.22
97.36
99.04
99.81 100.00
0.19
Rp
Rp
1,500,000.00
1,500,000.00
Rp
13,790,000.00
Rp
364,670,554.23
DP
Termyn I
Termyn II
Termyn III
Termyn IV
Termyn V
PEKERJAAN / MATERIAL
PEKERJAAN PERSIAPAN
SAT.
VOLUME
HARGA
JUMLAH
SATUAN