REKAPITULASI

RENCANA ANGGARAN BIAYA


KEGIATAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN

: REHABILITASI SEDANG / BERAT GEDUNG KANTOR


: JL. MT. HARYONO NO. 53G SAMARINDA
: APBD PROPINSI KALIMANTAN TIMUR
: 2015

NO

URAIAN

PEKERJAAN PENDAHULUAN

II

PEKERJAAN BETON STRUKTUR

JUMLAH
HARGA SATAUAN
(Rp)
3
7.500.000,00
11.312.669,72

III PEKERJAAN LANTAI DINDING

55.266.204,06

IV PEKERJAAN PLAFOND

17.202.720,00

PEKERJAAN KUSEN, PINTU & JENDELA

27.277.675,75

VI PASANGAN KUNCI, ENGSEL, TERALIS & KACA

8.148.087,84

VII PEKERJAAN ELEKTRIKAL

5.105.375,00

VIII PEKERJAAN PENGECATAN

15.071.245,79

IX PEKERJAAN LAIN - LAIN


X

12.500.000,00

PEKERJAAN COR LANTAI WORK SHOP

117.734.554,46
JUMLAH

277.118.532,62

PPN 10%

27.711.853,26

TOTAL

304.830.385,88

DIBULATKAN

304.830.000,00

TERBILANG : " Tiga Ratus Empat Juta Delapan Ratus Tiga Puluh Ribu Rupiah "

SAMARINDA, 6 APRIL 2015


Penawar
CV. MALIBU

SULAIMAN
Direktur

DAFTAR KUANTITAS DAN HARGA


KEGIATAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN

:
:
:
:

REHABILITASI SEDANG / BERAT GEDUNG KANTOR


JL. MT. HARYONO NO. 53G SAMARINDA
APBD PROPINSI KALIMANTAN TIMUR
2015
JUMLAH
HARGA SATUAN
(Rp)
6

URAIAN

SAT

4,00

PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi dan Pembongkaran

Ls

1,00

7.500.000,00

7.500.000,00
7.500.000,00

PEKERJAAN BETON STRUKTUR


1 Beton Kolom Praktis 13cm/13cm
2 Beton Kolom K1
3 Beton Balok B1
4 Beton Ring Balk 13/15

M3
M3
M3
M3

0,09
0,66
0,91
0,35

7.124.620,00
8.729.620,00
5.369.247,00
68.257,00

641.215,80
5.761.549,20
4.886.014,77
23.889,95
11.312.669,72

PEKERJAAN LANTAI DINDING


1 Pasang dinding batako 1:4
2 Plesteran List Profil dan Kolom
3 Plesteran Dinding Batako 1:4
4 Pasang Keramik Lantai 40 x 40
5 Pasang Gelagar Ulin 5/10 (lantai 2)
6 Pasang Papan Ulin 2/20 (lantai 2)
7 Pasang Wiremesh 6 (lantai2)

M2
M
M2
M2
M3
M3
Kg

26,70
10,00
340,48
96,00
0,52
0,96
117,60

127.875,00
43.805,00
54.214,50
198.993,50
6.727.195,00
6.947.195,00
31.327,50

3.414.262,50
438.050,00
18.458.952,96
19.103.376,00
3.498.141,40
6.669.307,20
3.684.114,00
55.266.204,06

PEKERJAAN PLAFOND
1 Pasang Plafond Calsiboard 4,5 mm & Rangka Metal Furing
2 Pasang List profil Plafond Gypsum 10cm

M2
M

48,00
44,00

199.385,00
173.460,00

9.570.480,00
7.632.240,00
17.202.720,00

PEKERJAAN KUSEN, PINTU & JENDELA


1 Pasang Kusen Kayu Bengkirai
2 Pasang Daun Pintu Panel Bengkirai
3 Pasang Papan Jalusi jendela
4 Pasang Daun Jendela

M
Bh
M2
Bh

48,90
5,00
1,89
7,00

345.033,33
750.000,00
743.675,00
750.000,00

16.872.130,00
3.750.000,00
1.405.545,75
5.250.000,00
27.277.675,75

PASANGAN KUNCI, ENGSEL, TERALIS & KACA


1 Pasang Kunci Pintu dan Handel Steenlist
2 Pasang Engsel Pintu, Jendela Stenlist
3 Pasang Grendel Jendela Stenlist
4 Pasang Kait Angin Jendela Stenlist
5 Pasang Handel Jendela Stenlist
6 Pasang Expangnyolet Pintu / Kunci Tanam
7 Pasang Kaca Bening tebal 5mm

Bh
Bh
Bh
Bh
Bh
Bh
M2

4,00
29,00
14,00
7,00
7,00
14,00
2,59

128.576,00
48.576,00
38.576,00
28.576,00
88.576,00
304.285,00
233.576,00

514.304,00
1.408.704,00
540.064,00
200.032,00
620.032,00
4.259.990,00
604.961,84
8.148.087,84

II

III

IV

VI

VOL

HARGA SATUAN
(Rp)

NO

NO

URAIAN

SAT

VII

VIII

IX

VII

VOL

HARGA SATUAN
(Rp)
5

JUMLAH
HARGA SATUAN
(Rp)
6

4,00

PEKERJAAN ELEKTRIKAL
1 Pasangan Instalasi Lampu
2 Pasangan Stop Kontak
3 Pasangan Stop Kontak AC
4 Panel Skring Kash Listrik 2 Group
5 Pasangan Lampu SL 14 Watt

Ttk
Ttk
Ttk
Unit
Bh

12,00
4,00
3,00
1,00
5,00

213.000,00
169.500,00
169.500,00
1.000.000,00
72.575,00

2.556.000,00
678.000,00
508.500,00
1.000.000,00
362.875,00
5.105.375,00

PEKERJAAN PENGECATAN
1 Pengecatan Plafond dan List
2 Pengecetan Dinding Bata
3 Pengecatan Kusen, daun Pintu dan Jendela

M2
M2
M2

48,00
340,48
37,10

72.750,00
28.048,00
54.702,50

3.492.000,00
9.549.783,04
2.029.462,75
15.071.245,79

PEKERJAAN LAIN - LAIN


1 Pasang tangga Besi

Unit

1,00

12.500.000,00

12.500.000,00
12.500.000,00

PEKERJAAN COR LANTAI WORK SHOP


1 Cor Beton K-250
2 Pasang Besi Wiremesh 12
3 Galian Tanah
4 Cor Lantai Kerja K-100 Tebal 7cm
5 Pasir Urug tebal 5cm

M3
Kg
M3
M3
M3

43,78
1.991,61
3,84
0,18
0,13

1.255.356,67
31.327,50
39.130,00
1.121.553,44
236.450,00

54.959.514,87
62.392.162,28
150.259,20
201.879,62
30.738,50
117.734.554,46

ANALISA HARGA SATUAN PEKERJAAN


: REHABILITASI SEDANG / BERAT GEDUNG KANTOR
: JL. MT. HARYONO NO. 53G SAMARINDA

KEGIATAN
LOKASI

: APBD PROPINSI KALIMANTAN TIMUR


: 2015

SUMBER DANA
TAHUN ANGGARAN

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

M1

Beton Kolom Praktis 13cm/13cm

1
Bahan
0,4000
4,0000
175,0000
1,8000
323,0000
0,5200
0,7800
20,0000
Upah
7,3000
0,3500
3,3000
2,1000
0,5700
0,2500

M3
Kg
Kg
Kg
Kg
M3
M3
Btg

Kayu bekisting
Paku Biasa
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Dolken -8-10/4m

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor

M3

Beton Kolom K1

M3
Kg
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg

Kayu bekisting
Paku Biasa 2" - 5"
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
kayu 5/7
Multiplex 9mm
Dolken -8-10/4m

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor

M1

Beton Balok B1

M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg

Kayu bekisting
Paku Biasa
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
kayu 5/7
Multiplex 9mm
Dolken -8-10/4m

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor

1.500.000,00
15.600,00
8.000,00
10.400,00
1.850,00
300.000,00
400.000,00
150.000,00

600.000,00
62.400,00
1.400.000,00
18.720,00
597.550,00
156.000,00
312.000,00
3.000.000,00
65.000,00
75.000,00
75.000,00
75.000,00
85.000,00
95.000,00
6.146.670,00

Bahan
0,4000
4,0000
210,0000
1,8000
323,0000
0,5200
0,7800
0,1500
3,5000
20,0000
Upah
7,3000
0,3500
3,3000
2,1000
0,5700
0,2500

1.500.000,00
15.600,00
8.000,00
10.400,00
1.850,00
300.000,00
400.000,00
3.000.000,00
250.000,00
150.000,00

Bahan
0,3200
3,2000
1,6000
120,0000
1,8000
0,5200
0,7800
0,1500
0,1400
2,8000
16,0000
Upah
0,297
0,033
0,033
0,033
0,010
0,015

7.124.620,00

474.500,00
26.250,00
247.500,00
157.500,00
48.450,00
23.750,00
977.950,00

8.729.620,00

19.305,00
2.475,00
2.475,00
2.475,00
850,00
1.425,00
29.005,00

5.369.247,00

600.000,00
62.400,00
1.680.000,00
18.720,00
597.550,00
156.000,00
312.000,00
450.000,00
875.000,00
3.000.000,00
65.000,00
75.000,00
75.000,00
75.000,00
85.000,00
95.000,00
7.751.670,00

474.500,00
26.250,00
247.500,00
157.500,00
48.450,00
23.750,00
977.950,00

1.500.000,00
15.600,00
10.400,00
8.000,00
10.400,00
1.850,00
300.000,00
400.000,00
3.000.000,00
250.000,00
150.000,00

480.000,00
49.920,00
16.640,00
960.000,00
18.720,00
962,00
234.000,00
60.000,00
420.000,00
700.000,00
2.400.000,00
65.000,00
75.000,00
75.000,00
75.000,00
85.000,00
95.000,00
5.340.242,00

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

M1

Beton Ring Balk 13/15

1
Bahan
0,0030
0,0200
3,6000
0,0500
5,5000
0,0090
0,0150
Upah
0,1000
0,0330
0,0330
0,0330
0,0100
0,0050

M3
Kg
Kg
Kg
Kg
M3
M3

Kayu bekisting
Paku Biasa
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor

M2

Pasang dinding batako 1:4

bh
kg
M3

Batako
PC
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Plesteran List Profil dan Kolom

kg
M3

PC
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M2

Plesteran Dinding Batako 1:4

kg
M3

PC
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M2

Pasang Keramik Lantai 40 x 40

m2
Kg
M3
Kg

Keramik 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.500.000,00
15.600,00
8.000,00
10.400,00
1.850,00
300.000,00
400.000,00

4.500,00
312,00
28.800,00
520,00
10.175,00
2.700,00
6.000,00
65.000,00
75.000,00
75.000,00
75.000,00
85.000,00
95.000,00
53.007,00

Bahan
13,0000
12,0000
0,0380
Upah
0,3000
0,1000
0,0100
0,0150

5.000,00
1.850,00
300.000,00

Bahan
0,5000
0,0130
Upah
0,0800
0,4000
0,0400
0,0040

65.000,00
75.000,00
85.000,00
95.000,00

1.850,00
300.000,00

Bahan
7,0700
0,0210
Upah
0,2600
0,2000
0,0200
0,0130

65.000,00
75.000,00
85.000,00
95.000,00

1.850,00
300.000,00

Bahan
1,0000
8,0000
0,0215
0,0130
Upah
0,2500
0,1200
0,0120
0,0125

127.875,00

5.200,00
30.000,00
3.400,00
380,00
38.980,00

43.805,00

16.900,00
15.000,00
1.700,00
1.235,00
34.835,00

54.214,50

16.250,00
9.000,00
1.020,00
1.187,50
27.457,50

198.993,50

13.079,50
6.300,00
65.000,00
75.000,00
85.000,00
95.000,00
19.379,50

19.500,00
7.500,00
850,00
1.425,00
29.275,00

925,00
3.900,00

4.825,00
1

68.257,00

65.000,00
22.200,00
11.400,00

98.600,00
1

6.500,00
2.475,00
2.475,00
2.475,00
850,00
475,00
15.250,00

150.000,00
1.850,00
300.000,00
22.000,00

150.000,00
14.800,00
6.450,00
286,00
65.000,00
75.000,00
85.000,00
95.000,00
171.536,00

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

M3

Pasang Gelagar Ulin 5/10 (lantai 2)

1
Bahan
1,1000
5,6000
15,0000
Upah
0,2600
0,2000
0,0200
0,0130

M3
Kg
Kg

Balok ulin 5/10


Paku Biasa
Besi Strip

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

M3

Pasang Papan Ulin 2/20 (lantai 2)

M3
Kg
Kg

Papan ulin 2/20


Paku Biasa
Besi Strip

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kg

Pasang Wiremesh 6 (lantai2)

M3
Kg

Wiremesh M6
Kawat Beton

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

M2

Pasang Plafond Calsiboard 4,5 mm & Rangka


Metal Furing

Btg
Btg
Lbr
kg
Bh
Bh
Zak

Hollow 4/4 Zincromate


Hollow 2/4 Zincromate
Gypsum board ( 120 x 240 x 9 ) mm
Paku gypsum
Ramset / dina bolt
Cotton plaster
Compoun

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang List profil Plafond Gypsum 10cm

M
Kg

List gypsum
Tepung gypsum

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

5.800.000,00
15.600,00
15.000,00

6.380.000,00
87.360,00
225.000,00
65.000,00
75.000,00
85.000,00
95.000,00
6.692.360,00

Bahan
1,1000
5,6000
15,0000
10
Upah
0,2600
0,2000
0,0200
0,0130

6.000.000,00
15.600,00
15.000,00

Bahan
1,2000
0,0500
11 Upah
0,0250
0,0250
0,0025
0,0010

65.000,00
75.000,00
85.000,00
95.000,00

22.500,00
10.400,00
65.000,00
75.000,00
85.000,00
95.000,00

55.000,00
40.000,00
250.000,00
75.000,00
12.000,00
30.000,00
80.000,00

Bahan
1,0500
0,1500
13 Upah
0,0500
0,0500
0,0050
0,0030

6.947.195,00

1.625,00
1.875,00
212,50
95,00
3.807,50

31.327,50

6.500,00
3.750,00
425,00
475,00
11.150,00

199.385,00

3.250,00
3.750,00
425,00
285,00
7.710,00

173.460,00

22.825,00
6.000,00
91.000,00
8.250,00
48.000,00
2.160,00
10.000,00
65.000,00
75.000,00
85.000,00
95.000,00
188.235,00

16.900,00
15.000,00
1.700,00
1.235,00
34.835,00

27.000,00
520,00

27.520,00
1
Bahan
0,4150
0,1500
0,3640
0,1100
12
4,0000
0,0720
0,1250
Upah
0,1000
0,0500
0,0050
0,0050

6.727.195,00

6.600.000,00
87.360,00
225.000,00

6.912.360,00
1

16.900,00
15.000,00
1.700,00
1.235,00
34.835,00

150.000,00
55.000,00

157.500,00
8.250,00
65.000,00
75.000,00
85.000,00
95.000,00
165.750,00

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

M2

Pasang Kusen Kayu Bengkirai

0,400
0,167
0,417

M3
Kg
Kg

Kayu Bengkirai
Lem Kayu
Paku biasa 2" - 5"

2,000
6,000
0,600
0,100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bahan

14

7.000.000,00
20.000,00
15.600,00

2.800.000,00
3.333,33
6.500,00

Upah
65.000,00
75.000,00
85.000,00
95.000,00
2.809.833,33
1

M2

Pasang Papan Jalusi jendela

0,060
0,150

M3
Kg

Kayu bangkirei, papan


Paku biasa 2" - 5"

0,670
2,400
0,200
0,335

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bh

Pasang Kunci Pintu dan Handel Steenlist

1,000

Bh

Handel dan Kunci Pintu Stainless

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bh

Pasang Engsel Pintu, Jendela Stenlist

1,000

Bh

Engsel Pintu/ Jendela

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bh

Pasang Grendel Jendela Stenlist

1,000

Bh

Grendel

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

130.000,00
450.000,00
51.000,00
9.500,00
640.500,00
M1

3.450.333,33
345.033,33

43.550,00
180.000,00
17.000,00
31.825,00
272.375,00

743.675,00

975,00
11.250,00
1.275,00
76,00
13.576,00

128.576,00

975,00
11.250,00
1.275,00
76,00
13.576,00

48.576,00

975,00
11.250,00
1.275,00
76,00
13.576,00

38.576,00

Bahan
7.800.000,00
22.000,00

468.000,00
3.300,00

15 Upah
65.000,00
75.000,00
85.000,00
95.000,00
471.300,00
Bahan
16

115.000,00

115.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
115.000,00

Bahan
17

35.000,00

35.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
35.000,00

Bahan
18

25.000,00

25.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
25.000,00

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

Bh

Pasang Kait Angin Jendela Stenlist

1,000

Bh

Kait Angin

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bh

Pasang Handel Jendela Stenlist

1,000

Bh

Handel Jendela Stainless

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bh

Pasang Expangnyolet Pintu / Kunci Tanam

1,000

Bh

Kunci Tanam

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

M2

Pasang Kaca Bening tebal 5mm

1,100

Bh

Handel Jendela Stainless

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Ttk

Pasangan Stop Kontak

15,000
1,200
1,000

M
Btg
Bh

Kabel NYA 1 x 2,5 mm


Pipa pralon 5/8"
Stop kontak + indoos

OH
OH
OH

Pekerja
Tukang Listrik
Kepala Tukang

Bahan
19

15.000,00

15.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
15.000,00

975,00
11.250,00
1.275,00
76,00
13.576,00

28.576,00

975,00
11.250,00
1.275,00
76,00
13.576,00

88.576,00

3.900,00
45.000,00
5.100,00
285,00
54.285,00

304.285,00

975,00
11.250,00
1.275,00
76,00
13.576,00

233.576,00

3.250,00
37.500,00
4.250,00
45.000,00

169.500,00

Bahan
20

75.000,00

75.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
75.000,00

Bahan
21

250.000,00

250.000,00

Upah
0,0600
0,6000
0,0600
0,0030

65.000,00
75.000,00
85.000,00
95.000,00
250.000,00

Bahan
22

200.000,00

220.000,00

Upah
0,0150
0,1500
0,0150
0,0008

65.000,00
75.000,00
85.000,00
95.000,00
220.000,00

Bahan

23

3.500,00
35.000,00
30.000,00

52.500,00
42.000,00
30.000,00

Upah
0,0500
0,5000
0,0500

65.000,00
75.000,00
85.000,00
124.500,00

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

Ttk

Pasangan Instalasi Lampu

18,000
3,000

M
Btg

Kabel NYA 1 x 2,5 mm


Pipa pralon 5/8"

OH
OH
OH

Pekerja
Tukang Listrik
Kepala Tukang

BH

Pasangan Lampu SL 14 Watt

1,000
1,000

Bh
Bh

Lampu SL 14 Watt
Fitting Keramik

0,010
0,020
0,005

OH
OH
OH

Pekerja
Tukang Listrik
Kepala Tukang

M2

Pengecatan Plafond dan List

Kg
Kg
Bh
Ls
Lbr

Cat tembok
Plamir tembok
Rol cat
Steger werk
Ampelas

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

M2

Pengecetan Dinding Bata

Kg
Kg
Kg
Bh

Plamir tembok
Cat dasar
Cat penutup 2x
Rol cat

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

Bahan
24

3.500,00
35.000,00

63.000,00
105.000,00

Upah
0,0500
0,5000
0,0500

65.000,00
75.000,00
85.000,00
168.000,00

3.250,00
37.500,00
4.250,00
45.000,00

213.000,00

650,00
1.500,00
425,00
2.575,00

72.575,00

13.000,00
22.500,00
2.550,00
950,00
39.000,00

72.750,00

1.300,00
4.725,00
535,50
237,50
6.798,00

28.048,00

4.550,00
7.875,00
340,00
237,50
13.002,50

54.702,50

107.250,00
20.625,00
2.380,00
7.885,00
138.140,00

1.255.356,67

Bahan
25

45.000,00
25.000,00

45.000,00
25.000,00

Upah
65.000,00
75.000,00
85.000,00
70.000,00

Bahan
0,2000
0,1600
0,0100
1,0000
26
0,5000
Upah
0,2000
0,3000
0,0300
0,0100

55.000,00
30.000,00
45.000,00
15.000,00
5.000,00

11.000,00
4.800,00
450,00
15.000,00
2.500,00
65.000,00
75.000,00
85.000,00
95.000,00
33.750,00

1
Bahan
0,1000
0,1000
0,2600
27
0,0100
Upah
0,0200
0,0630
0,0063
0,0025

30.000,00
35.000,00
55.000,00
45.000,00

3.000,00
3.500,00
14.300,00
450,00
65.000,00
75.000,00
85.000,00
95.000,00
21.250,00

1
Bahan
0,2000
0,1500
0,1700
0,3500
28
0,1000
Upah
0,0700
0,1050
0,0040
0,0025
1

M2

Pengecatan Kusen, daun Pintu dan Jendela

Kg
Kg
Kg
Kg
Bh

Cat Meni
Plamir
Cat dasar
Cat penutup 2x
Kuas

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

M3

Cor Beton K-250

Kg
M3
M3

Semen Portland
Pasir Beton
Koral Beton 2/3

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

55.000,00
30.000,00
35.000,00
55.000,00
10.000,00

11.000,00
4.500,00
5.950,00
19.250,00
1.000,00
65.000,00
75.000,00
85.000,00
95.000,00
41.700,00

Bahan
384,0000
0,4325
0,6927
29
Upah
1,6500
0,2750
0,0280
0,0830

1.850,00
300.000,00
400.000,00

710.400,00
129.750,00
277.066,67
65.000,00
75.000,00
85.000,00
95.000,00
1.117.216,67

HARGA SATUAN

JUMLAH HARGA SATUAN

TOTAL

NO

KODE

SAT

URAIAN

BAHAN
(Rp)

UPAH
(Rp)

BAHAN
(Rp)

UPAH
(Rp)

HARGA SATUAN
(Rp)

Kg

Pasang Besi Wiremesh 12

M3
Kg

Wiremesh M12
Kawat Beton

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

M3

Galian Tanah

OH
OH

Pekerja
Mandor

M3

Cor Lantai Kerja K-100 Tebal 7cm

Kg
M3
M3
Liter

Semen Portland
Pasir beton
Kerikil beton
Air Kerja

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M3

Pasir Urug tebal 5cm

1,200

M3

Pasir Urug

0,300
0,010

OH
OH

Pekerja
Mandor

M2

0,400
0,167
0,417

M3
Kg
Kg

Kayu Bengkirai
Lem Kayu
Paku biasa 2" - 5"

2,000
6,000
0,600
0,100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1
Bahan
1,2000
0,0500
30 Upah
0,0250
0,0250
0,0025
0,0010
1
Bahan
31 Upah
0,5260
0,0520
1
Bahan
230,000
0,638
0,761
32
200,000
Upah
1,200
0,200
0,020
0,060

22.500,00
10.400,00

27.000,00
520,00
65.000,00
75.000,00
85.000,00
95.000,00
27.520,00

1.625,00
1.875,00
212,50
95,00
3.807,50

31.327,50

0,00

34.190,00
4.940,00
39.130,00

39.130,00

78.000,00
15.000,00
1.700,00
5.700,00
100.400,00

1.121.553,44

19.500,00
950,00
20.450,00

236.450,00

0,00
0,00
39.000,00
9.500,00
48.500,00
M1

48.500,00
4.850,00

65.000,00
95.000,00

1.850,00
300.000,00
400.000,00
500,00

425.500,00
191.357,14
304.296,30
100.000,00
65.000,00
75.000,00
85.000,00
95.000,00
1.021.153,44

Bahan
33

180.000,00

216.000,00

Upah
65.000,00
95.000,00
216.000,00
Bahan

14

0,00
0,00
0,00

0,00
0,00
0,00

Upah
0,00
0,00
65.000,00
95.000,00
0,00

DAFTAR HARGA UPAH DAN BAHAN


KEGIATAN
: REHABILITASI SEDANG / BERAT GEDUNG KANTOR
LOKASI
: JL. MT. HARYONO NO. 53G SAMARINDA
SUMBER DANA
: APBD PROPINSI KALIMANTAN TIMUR
TAHUN ANGGARAN: 2015
NO

URAIAN

SAT

HARGA
(Rp)
4

1
2
3
4
5
6
7

UPAH TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Listrik
Kepala Tukang
Mandor

OH
OH
OH
OH
OH
OH
OH

65.000,00
75.000,00
75.000,00
75.000,00
75.000,00
85.000,00
95.000,00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

HARGA BAHAN
Tanah Urug
Aggregat B
Pasir Beton
Pasir Urug
Batu Gunung
Kerikil Beton
Kayu Bekisting
Besi Beton
Kawat baja dilas / Wiremash
Kawat Bendrat
Paku 2 - 5"
Semen Portland
Minyak Begesting
Kawat Beton
Batako
Kayu Dolken
Kayu 5/7
Multiplex 9mm
Keramik 40 x 40
Semen Warna
Balok Ulin 5/10
Papan ulin 2/20
Kayu Bengkirai, papan
kayu bengkirai, Balok
Besi Strip
Besi Hollow 4/4

M3
M3
M3
M3
M3
M3
M3
KG
KG
KG
KG
KG
LTR
KG
Bh
Btg
M3
Lbr
M2
Kg
M3
M3
M3
M3
KG
Btg

100.000,00
310.000,00
300.000,00
180.000,00
350.000,00
400.000,00
1.500.000,00
8.000,00
22.000,00
12.000,00
15.600,00
1.850,00
10.400,00
10.400,00
5.000,00
150.000,00
3.000.000,00
250.000,00
150.000,00
22.000,00
5.800.000,00
6.000.000,00
7.800.000,00
7.000.000,00
15.000,00
55.000,00

NO

URAIAN

SAT

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Besi Hollow 2/4


Gypsum Board (120 x 240 x 9) mm
Paku Gypsum
Dina Bolt
Cotton Plaster
Compound
List Gypsum
Tepung Gypsum
Wiremesh M6
Wiremesh M12
Lem Kayu
Handel Pintu + Kunci Stainless
Engsel
Grendel
Kait Angin
Handel Jendela Stainless
Kunci Tanam Stainless
Kaca Bening 5mm
Kabel NYA 1 x 2,5 mm
Pipa Paralon 5/8"
Stop Kontak Biasa
Lampu SL 14 Watt
Fitting Keramik
Cat tembok
Plamir tembok
Cat Dasar
Rol cat
Steger werk
Ampelas
Cat Meni
Kuas
Air Kerja

Btg
Lbr
kg
Bh
Bh
Zak
M
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M
Btg
Bh
Bh
Bh
Kg
Kg
Kg
Bh
Ls
Lbr
Kg
Bh
LTR

HARGA
(Rp)
4
40.000,00
250.000,00
75.000,00
12.000,00
30.000,00
80.000,00
150.000,00
55.000,00
22.500,00
22.500,00
20.000,00
115.000,00
35.000,00
25.000,00
15.000,00
75.000,00
250.000,00
200.000,00
3.500,00
35.000,00
30.000,00
45.000,00
25.000,00
55.000,00
30.000,00
35.000,00
45.000,00
15.000,00
5.000,00
55.000,00
10.000,00
500,00

JADWAL PELAKSANAAN
KEGIATAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN

:
:
:
:

REHABILITASI SEDANG / BERAT GEDUNG KANTOR


JL. MT. HARYONO NO. 53G SAMARINDA
APBD PROPINSI KALIMANTAN TIMUR
2015

JANGKA WAKTU PELAKSANAAN


NO

URAIAN PEKERJAAN
2

1
I

BOBOT (%)
4

PEKERJAAN PENDAHULUAN

2,71

1
5

BULAN KE-1
2
3
6
7

4
8

5
9

BULAN KE-2
6
7
10
11

2,71

II

PEKERJAAN BETON STRUKTUR

4,08

4,08

PEKERJAAN LANTAI DINDING

19,94

4,99

IV

PEKERJAAN PLAFOND

6,21

PEKERJAAN KUSEN, PINTU & JENDELA

9,84

4,92

VI

PASANGAN KUNCI, ENGSEL, TERALIS & KACA

2,94

2,94

VII

PEKERJAAN ELEKTRIKAL

1,84

1,84

VIII

PEKERJAAN PENGECATAN

5,44

2,72

2,72

PEKERJAAN LAIN - LAIN

4,51

PEKERJAAN COR LANTAI WORK SHOP

42,49

JUMLAH
RENCANA
REALISASI

4,99

4,99

4,99

3,10

3,10
4,92
50%

4,51
8,50

8,50

8,50

8,50

8,50

16,59
33,35

24,45
57,80

17,98
75,78

15,73
91,50

8,50
100,00

100,00
Mingguan
Kumulatif
Mingguan
Kumulatif

17
100%

III

IX

KET.
8
12

2,71
2,71

9,07
11,77

4,99
16,76

SAMARINDA, 6 APRIL 2015


Penawar
CV. MALIBU

SULAIMAN
Direktur

0%

FORMULIR REKAPITULASI PERHITUNGAN TKDN


Nama Penyedia Jasa
Alamat
Paket Pekerjaan
Lokasi Pekerjaan

Uraian Pekerjaan

: CV. MALIBU
: Jl. Wijaya Kusuma V No. 22B Samarinda Kaltim
: REHABILITASI SEDANG / BERAT GEDUNG KANTOR
: JL. MT. HARYONO NO. 53G SAMARINDA
Nilai Kontrak (Rp)
DN
TOTAL
Rp

LN

Barang
I. Material Langsung (Bahan Baku)
II. Peralatan ( Barang Jadi )
A. Sub Total Barang
Jasa
III. Manajemen Proyek dan Perekayasaan
IV. Alat Kerja/ Fasilitas Kerja
V. Konstruksi dan Fabrikasi
VI. Jasa Umum
B. Sub Total Jasa
C. Total Biaya (A+ B)
Capaian nilai TKDN di atas dinyatakan sendiri oleh :
CV. MALIBU

TKDN Gabungan
% TKDN

Rp 166.271.120
Rp 69.279.633

Rp
Rp
Rp

166.271.120
69.279.633
235.550.753

60
25
85

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

13.855.927
6.927.963
13.855.927
6.927.963
41.567.780
277.118.533

5
2,5
5
2,5
15
100

13.855.927
6.927.963
13.855.927
6.927.963

Rp

Rp
Rp
Rp

166.271.120
69.279.633
235.550.753

60
25
85

Rp
Rp
Rp
Rp
Rp
Rp

13.855.927
6.927.963
13.855.927
6.927.963
41.567.780
277.118.533

5
2,5
5
2,5
15
100

% KDN
Barang
60
25
85
Jasa
5
2,5
5
2,5
15
100

SAMARINDA, 6 APRIL 2015


CV. MALIBU

Keterangan :
1. Tingkat Komponen Dalam Negeri
2. Nilai Gabungan Barang dan Jasa dapat diambil dari nilai kontrak
3. Komponen Dalam Negeri

SULAIMAN
Direktur

Anda mungkin juga menyukai