REKAPITULASI BILL OF QUALITY

(STRUKTUR,ARSITEKTUR DAN MEKANIKAL ELEKTRIKAL)


PEKERJAAN
LOKASI

No.
A.
B.
C.

: PEMBANGUNAN GEDUNG SENTRAL FAKULTAS PERTANIAN TAHAP II UNIVERSITAS BRAWIJAYA MALANG


: KAMPUS UNIVERSITAS BRAWIJAYA MALANG

URAIAN PEKERJAAN

TOTAL BIAYA
(Rp.)

PEKERJAAN STRUKTUR TAHAP II


PEKERJAAN ARSITEKTURAL
PEKERJAANMEKANIKAL ELEKTRIKAL

JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN

Malang,

2014

...................................
.....................................

.........................................
........................................

LL OF QUALITY
MEKANIKAL ELEKTRIKAL)

ERTANIAN TAHAP II UNIVERSITAS BRAWIJAYA MALANG

TOTAL BIAYA
(Rp.)

Malang,

2014

...................................
.....................................

.........................................
........................................

BILL OF QUALITY
STRUKTUR
PEKERJAAN
LOKASI

No.

: PEMBANGUNAN GEDUNG SENTRAL FAKULTAS PERTANIAN TAHAP II UNIVERSITAS BRAWIJAYA MALAN


: KAMPUS UNIVERSITAS BRAWIJAYA MALANG

URAIAN PEKERJAAN

TOTAL BIAYA
(Rp.)

PEKERJAAN STRUKTUR
A. PEKERJAAN STRUKTUR LANTAI 1
B. PEKERJAAN STRUKTUR LANTAI 2
JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN

Malang,

2014

..............................
...............................

...............................
..............................

UALITY
TUR

TANIAN TAHAP II UNIVERSITAS BRAWIJAYA MALANG

TOTAL BIAYA
(Rp.)

1,328,500,250.43
1,651,965,037.46
2,980,465,287.90
298,046,528.79
3,278,511,816.68

Malang,

2014

...............................
...............................

...............................
..............................

DAFTAR HARGA BAHAN BANGUNAN


KODE
M001
M002
M003
M004
M005
M006
M007
M008
M009

M009
M010
M011
M012
M013
M014
M015
M016
M017
M018
M019
M020
M021
M022
M022.a
M023
M024
M025
M026
M027
M028
M029
M030
M031
M032
M033
M034
M035
M036.a
M036.b
M036.c
M037
M037.a
M038

BAHAN BANGUNAN

SATUAN

Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

Tanah Liat
Batu Belah Gunung
Batu Belah Kali
Batu Kali
Stenslah/batu pecah tangan 1/2
Stenslah/batu pecah tangan 2/3
Stenslah/batu pecah tangan 3/5
Stenslah/batu pecah tangan 4/6 - 5/7
Batu pecah mesin 1/1
Batu pecah mesin 1/2
Batu pecah mesin 2/3
Batu pecah mesin 3/5
Batu pecah mesin 4/6 - 5/7
Bata Merah
Batu Bata Tahan Api
Bata Berongga
Batako
Rooster
Batu Granito
Batu Teraso
Batu Palimanan
Batu Tempel Hitam
Hollow Blok (HB.20)
Hollow Blok (HB.15)
Hollow Blok (HB.10)
Paving Block Segi Empat t=8 cm, sekualitas Fass
Paving Block Segi Empat t= 8 cm Sekualitas Cone Block
Paving Block Segi Enam Biasa
Paving Block Segi Enam Warna
Paving Block Tiga Berlian Biasa
Paving Block Tiga Berlian Warna
Portland Cement (PC)
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 kg

KODE
M039
M040
M041
M042
M043

BAHAN BANGUNAN
Portland Cement (PC) Warna
Portland Cement (PC) Grouting
Kapur
Gamping
Semen Merah

SATUAN

1 kg
1 kg
1 m
1 kg
1 m

KODE
M044
M045
M046
M047
M048
M049
M050
M051
M052
M053
M054
M055
M056
M057
M058
M059
M060
M061
M062
M063
M064
M065
M066
M067
M068
M069
M070
M071
M078
M079
M080
M081
M082
M083
M084
M085
M088
M089
M090
M091
M092
M093
M094
M095
M096

BAHAN BANGUNAN
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
Reng : 2/3, 3/5
Usuk : 5/7
Balok

SATUAN

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m
1 m
1 m
1 m

KODE
M097
M098
M099
M100
M101
M102
M103
M104
M105
M106
M107
M108
M109
M110
M111

BAHAN BANGUNAN
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm

SATUAN

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

KODE
M112
M113
M114
M115
M116
M116.a
M116.b
M117
M118
M119
M120
M121
M122
M123
M124
M124.a
M124.b
M125
M126
M127
M128
M129
M130
M131
M132
M133
M134
M135
M136
M137
M138
M139
M140
M141
M142
M143
M144
M145
M146
M147
M148
M148.a
M148.b
M148.c
M148.d

BAHAN BANGUNAN
Besi Beton Polos
Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil
Plat Baja
Roda Railling
Angker Bar / Dynabolt
Kabel prestressed
Pintu Besi Baja
Pintu Gulung Besi
Pintu Lipat
Rolling Door
Pagar Besi
Pintu Pagar besi
Pagar Model BRC tinggi 1 m
Pintu Pagar Model BRC tinggi 1 m
Profil Aluminium Putih
Profil Aluminium Coklat
Sunscream Aluminium
Pintu Fiber KM
Atap Aluminium
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran
Paku Seng Segala Ukuran
Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran
Sekrup segala ukuran
Baut Segala Ukuran
Paku Keling
Paku Beton
Wire Mesh
Sealant
Aluminium Strip
Profil Kaca

SATUAN

1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 bh
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg
1 Kg
1 bh
1 bh
1 bh
1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m

KODE
M148.e
M148.f
M148.g
M148.h
M149
M150
M151
M152
M153
M154
M155
M156
M157
M158
M159
M160

BAHAN BANGUNAN
Venetion blinds dan vertical blinds (tirai)
Atap Seng Galvalum
Bubung Atap Seng Galvalum
Plat Bondex
Genteng sekualitas Monier
Genteng Press ex. Trenggalek
Genteng Karang Pilang ex. Malang
Genteng Karang Pilang ex. Trenggalek
Genteng Karang Pilang ex. Surabaya
Genteng sekualitas kanmuri
Genteng Kaca
Bubung Genteng sekualitas Monier
Bubung Genteng Press ex. Trenggalek
Bubung Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya

SATUAN

1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

KODE
M161
M162
M163
M164
M165
M166
M167
M168
M169
M170
M171
M172
M173
M173.a
M174
M175
M176
M176.a
M177
M178
M179
M180
M181
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M194
M195
M196
M197
M198
M199
M200
M201
M202
M203

BAHAN BANGUNAN
Bubung Genteng sekualitas kanmuri
Genteng Palentong Kecil
Genteng Kodok Glazuur
Genteng Palentong Super/Besar
Bubung Genteng Palentong Kecil
Bubung Genteng Kodok Glazuur
Bubung Genteng Palentong Super/Besar
Genteng Aspal
Genteng Metal
Atap Sirap
Bubung Genteng Aspal
Bubung Genteng Metal
Bubung Atap Sirap
Plastik Aerator
Seng plat BJLS 30 L = 0.45 M
Seng plat BJLS 30 L = 0.60 M
Seng plat BJLS 30 L = 0.90 M
Plat Alumunium t=0.35 mm, L = 0.90 M
Seng plat BJLS 28 (90 x 180) cm
Atap Seng Gelombang bjls 20
Bubung Seng Gelombang
Roof Light Fibreglass
Atap Polycarbonat
Asbes Gelombang (3.00 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.70 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.40 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.10 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (1.50 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.50 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (2.25 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (2.00 x 0.92) m x 5 mm sekualitas Varia Uaha
Asbes Gelombang (1.80 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (3.00 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (2.70 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (2.10 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (1.80 x 1.08) m x 6 mm sekualitas Varia Usaha
Bubung Stel Gelombang 0.92 m sekualitas Varia Usaha
Bubung Stel Gelombang 1.05 m sekualitas Varia Usaha
Bubung Stel Gelombang 1.08 m sekualitas Varia Usaha
Bubung Paten 0.92 m
Bubung Paten 1.05 m
Bubung Paten 1.08 m
Bubung Stel Rata 0.92 m
Bubung Stel Rata 1.05 m
Asbes (1,00 x 1,00) m x 6 mm sekualitas cap Kerang

SATUAN

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m
1 m
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr

KODE
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
M214
M215
M216
M217
M218
M219
M220

BAHAN BANGUNAN
Asbes (1,00 x 1,00) m x 5 mm sekualitas cap Kerang
Asbes (1,00 x 1,00) m x 4 mm sekualitas cap Kerang
Asbes (1,00 x 1,00) m x 3,5 mm sekualitas cap Kerang
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Harplek 4 mm
List Gypsum
Soft Board
Gypsum Board
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm

SATUAN

1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr

KODE
M221
M222
M223
M224
M225
M226
M227
M228
M229
M230
M231
M232
M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265

BAHAN BANGUNAN
Plywood Lapis Aluminium
Plywood (30 x 60) cm x 4 mm
Plywood (30 x 60) cm x 6 mm
Plywood (60 x 120) cm x 4 mm
Plywood (60 x 120) cm x 6 mm
Plywood (120 x 240) cm x 4 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm
Kloset Jongkok Porselin Kw. A
Kloset Duduk Porselin Kw. A sekualitas Toto
Kloset Jongkok Lux sekualitas Toto
Kloset Duduk Lux sekualitas Toto
Kloset Jongkok Teraso
Kran Air 1/2 " sekualitas San Ei
Kran Air 3/4 " sekualitas San Ei
Bak Mandi Teraso
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Firing Teraso
Bak Cuci Firing Stainless
Badkip Porselen
Urinoir Porselin sekualitas Toto
Urinoir Keramik sekualitas Toto
Wastafel Komplit (Kran + Sipon) Lux sekualitas Toto
Wastafel Komplit (Kran + Sipon) Kw. A sekualitas Toto
Tempat Sabun Keramik
Afor Stainless
Afor Plastic
Kaca Wastafel
Kunci Tanam
Kunci Tanam sekualitas DEKSON
Kunci Pintu Kamar Mandi sekualitas SOLID
Kunci Silinder
Engsel Pintu
Engsel Jendela
Hak Angin sekualitas SOLID
Spring Knip
Kait Angin sekualitas SOLID
Grendel Pintu
Grendel Jendela sekualitas SOLID
Door Closer sekualitas SOLID
Slot/Kunci Pintu sekualitas SOLID

SATUAN

1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

KODE
M266
M267
M268
M269
M270
M271
M272
M273
M274
M275
M276
M277
M278
M279
M280

BAHAN BANGUNAN
Door Holder sekualitas SOLID
Door Stop sekualitas SOLID
Rel Pintu Dorong sekualitas Handerson
Kunci Lemari
Kaca Polos tebal 3 mm sekualitas Asahi Mas
Kaca Polos tebal 5 mm sekualitas Asahi Mas
Kaca Polos tebal 8 mm sekualitas Asahi Mas
Kaca Polos tebal 12 mm sekualitas Asahi Mas
Kaca Buram tebal 3 mm sekualitas Asahi Mas
Kaca Buram tebal 5 mm sekualitas Asahi Mas
Kaca Buram tebal 8 mm sekualitas Asahi Mas
Kaca Buram tebal 12 mm sekualitas Asahi Mas
Kaca Cermin tebal 5 mm sekualitas Asahi Mas
Kaca Cermin tebal 6 mm sekualitas Asahi Mas
Kaca Cermin tebal 8 mm sekualitas Asahi Mas

SATUAN

1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

KODE
M281
M282
M283
M284
M285
M286
M287
M288
M289
M290
M291
M292
M293
M294
M295
M296
M297
M298
M299
M299a
M299b
M299c
M299d
M300
M301
M302
M303
M304
M305
M306
M307
M308
M309
M310
M311
M312
M313
M314
M315
M316
M316.a
M317
M318
M319
M320

BAHAN BANGUNAN
Kaca Rayben tebal 3 mm sekualitas Asahi Mas
Kaca Rayben tebal 5 mm sekualitas Asahi Mas
Kaca Rayben tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 12 mm sekualitas Asahi Mas
Jendela Nako + accessories
Glass Block
Painting Glass
Kaca "Wireglass" 5 mm
Kaca Patri 5 mm
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin sekualitas Granit Tile ex. China 40 x 40 cm
Ubin sekualitas Granit Tile ex. China 60 x 60 cm
Ubin sekualitas Teralux Kerang 40 x 40 cm
Ubin sekualitas Teralux Kerang 30 x 30 cm
Ubin sekualitas Teralux Kerang 60 x 60 cm
Ubin sekualitas Teralux Marmer 40 x 40 cm
Plint ubin pc abu-abu 15 x 20 cm
Plint ubin pc abu-abu 10 x 30 cm
Plint ubin pc abu-abu 10 x 40 cm
Plint ubin pc warna 10 x 20 cm
Plint ubin pc warna 10 x 30 cm
Plint ubin pc warna 10 x 40 cm
Plint Ubin Terasso 10 x 30 cm
Plint Ubin Terasso 10 x 40 cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 40 cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 60 cm
Lantai keramik artistik 10 x 20
Lantai keramik artistik 10 x 10
Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Bahan Teraso Cor
Keramik Lantai 40 x 40 cm putih sekualitas Asia
Keramik Lantai 40 x 40 cm warna/motif sekualitas Asia
Keramik Lantai 30 x 30 cm putih sekualitas Asia
Keramik Lantai 30 x 30 cm warna/motif sekualitas Asia

SATUAN

1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 bh
1 bh
1 bh

KODE
M321
M322
M323
M324
M325
M326
M327
M328
M329
M330

BAHAN BANGUNAN
Keramik Lantai 20 x 20 cm putih sekualitas Asia
Keramik Lantai 20 x 20 cm warna/motif sekualitas Asia
Keramik Lantai KM 20 x 20 cm sekualitas Asia
Plint Keramik Lantai 10 x 20 cm sekualitas Asia
Plint Keramik Lantai 10 x 30 cm sekualitas Asia
Plint Keramik Lantai 10 x 40 cm sekualitas Asia
Keramik Dinding 20 x 25 cm sekualitas Asia
Keramik Dinding 20 x 20 cm sekualitas Asia
Porselin 15 x 15 cm putih
Porselin 15 x 15 cm warna

SATUAN

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

KODE
M331
M332
M333
M333.a
M333.b
M333.c
M333.d
M333.e
M333.f
M333.g
M334
M335
M336
M337
M338
M339
M340
M341
M342
M343
M344
M345
M346
M347
M348
M349
M350
M351
M352
M353
M354
M355
M356
M357
M358
M359
M360
M361
M362
M363
M364
M365
M366
M367
M368

BAHAN BANGUNAN
Porselin 10 x 20 cm warna
Porselin 20 x 20 cm warna
Gymflour
Parquet Jati Kualitas Hara uk. 15 x 90 x 300 mm
Karpet
Lantai marmer 100x100 cm sekualitas ex Tulungagung
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm warna
Wall Paper
Batu Ampyangan Granit
Pipa PVC tipe AW 1/2" sekualitas Maspion
Pipa PVC tipe AW 3/4" sekualitas Maspion
Pipa PVC tipe AW 1" sekualitas Maspion
Pipa PVC tipe AW 1.5" sekualaitas Maspion
Pipa PVC tipe AW 2" sekualitas Maspion
Pipa PVC tipe AW 2.5" sekualitas Maspion
Pipa PVC tipe AW 3 " sekualitas Maspion
Pipa PVC tipe AW 4 " sekualitas Maspion
Pipa PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 8 " sekualitas Maspion
Pipa PVC tipe D 1/2 " sekualitas Maspion
Pipa PVC tipe D 3/4 " sekualaitas Maspion
Pipa PVC tipe D 1" sekualitas Maspion
Pipa PVC tipe D 1.5 " sekualitas Maspion
Pipa PVC tipe D 2 " sekualitas Maspion
Pipa PVC tipe D 2.5 " sekualitas Maspion
Pipa PVC tipe D 3 " sekualitas Maspion
Pipa PVC tipe D 4 " sekualitas Maspion
Pipa PVC tipe C 1/2 " sekualitas Maspion
Pipa PVC tipe C 3/4 " sekualitas Maspion
Pipa PVC tipe C 1" sekualitas Maspion
Pipa PVC tipe C 1.5 " sekualitas Maspion
Pipa PVC tipe C 2 " sekualitas Maspion
Pipa PVC tipe C 2.5 " sekualitas Maspion
Pipa PVC tipe C 3 " sekualitas Maspion
Pipa PVC tipe C 4 " sekualitas Maspion
Shock PVC 1/2 " sekualitas Masion
Shock PVC 3/4 " sekualitas Maspion
Shock PVC 1 " sekualitas Maspion
Shock PVC 1.5 " sekualitas Maspion
Shock PVC 2 " sekualitas Maspion
Shock PVC 2.5 " sekualitas Maspion
Shock PVC 3 " sekualitas Maspion
Shock PVC 4 " sekualitas Maspion
Knee PVC 1/2 " sekualitas Maspion

SATUAN

1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

KODE
M369
M370
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380

BAHAN BANGUNAN
Knee PVC 3/4 " sekualitas Maspion
Knee PVC 1 " sekualitas Maspion
Knee PVC 1.5 " sekualitas Maspion
Knee PVC 2 " sekualitas Maspion
Knee PVC 2.5 " sekualitas Maspion
Knee PVC 3 " sekualitas Maspion
Knee PVC 4 " sekualitas Maspion
Pipa Galvanis 1/2" tebal 1.8 mm sekualitas Spindo
Pipa Galvanis 3/4" tebal 1.8 mm sekualitas Spindo
Pipa Galvanis 1 ", tebal 2 mm sekualitas Spindo
Pipa Galvanis 1.5 ", tebal 2 mm sekualitas Spindo
Pipa Galvanis 2 ", tebal 2.3 mm sekualitas Spindo

SATUAN

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m

KODE
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
M400.a
M400.b
M400.c
M400.d
M400.e
M400.f
M400.g
M400.h
M401
M402
M403
M404
M405
M406
M407
M408
M409
M410
M411
M412
M413
M414
M415
M415.a
M415.b

BAHAN BANGUNAN
Pipa Galvanis 2.5 ", tebal 2.5 mm sekualitas Spindo
Pipa Galvanis 3" tebal 2.5 mm sekualitas Spindo
Pipa Galvanis 4" tebal 2.8 mm sekualitas Spindo
Shock Galvanis 1/2 " sekualitas Spindo
Shock Galvanis 3/4 " sekualitas Spindo
Shock Galvanis 1 " sekualitas Spindo
Shock Galvanis 1.5 " sekualitas Spindo
Shock Galvanis 2 " sekualitas Spindo
Shock Galvanis 2.5 " sekuallitas Spindo
Shock Galvanis 3 " sekualitas Spindo
Shock Galvanis 4 " sekualitas Spindo
Knee Galvanis 1/2 " sekualitas Spindo
Knee Galvanis 3/4 " sekualitas Spindo
Knee Galvanis 1 " sekualitas Spindo
Knee Galvanis 1.5 " sekualitas Spindo
Knee Galvanis 2 " sekualitas Spindo
Knee Galvanis 2.5 " sekualitas Spindo
Knee Galvanis 3 " sekualaitas Spindo
Knee Galvanis 4 " sekualitas Spindo
Pipa Screen PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 5 " sekualitas Maspion
Pipa Screen PVC tipe AW 5 " sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 2" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 2,5" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 3" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 4" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 6" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 8" sekualitas Maspion
Kertas Gosok
Plamir Kayu sekualitas cap Pedang
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu sekualitas Emco
Cat meni besi sekualitas Emco
Cat Dasar Kayu sekualitas Emco
Cat Dasar Tembok eksterior sekualitas Mowilex
Cat Dasar Besi sekualitas Emco
Cat Kayu sekualitas Emco
Cat Tembok eksterior sekualitas Mowilex
Cat Tembok Interior sekualitas ICI Catylac
Cat Tembok Eksterior sekualitas ICI Weathar Shield

SATUAN

1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg

KODE
M416
M417
M418
M419
M420
M421
M422
M423
M424
M425
M426
M427
M428
M429
M430

BAHAN BANGUNAN
Cat Besi sekualitas Emco
Cat Genting sekualitas Nippon Paint
Waterproofing sekualitas Sika
Vernis
Politur Jadi
Kuas
Lem Kayu sekualitas Rajawali
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun

SATUAN

1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg

KODE
M430.a
M430.b
M430.c
M431
M432
M433
M434
M435
M436
M437
M438
M438a
M438b
M439
M440
M440.a
M441
M442
M443
M444
M445
M446
M447
M448
M449
M450
M451
M452
M453
M454
M455
M456
M457
M458
M459
M460
M460.a
M460.b
M460.c
M460.d

BAHAN BANGUNAN
Vinyl (30x30)cm
Batu Apung
Alang-Alang
Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap sekualitas Dragon
Pompa Air sekualitas Sanyo
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
Zekering Kast Lokal 2 Group
Zekering Kast Lokal 3 Group
Lampu TL Komplit 20 Watt sekualitas Phillip
Lampu TL Komplit 40 Watt sekualitas Phillip
Lampu XL (Lilin) 5 Watt sekualitas Phillip
Lampu XL (Lilin) 8 Watt sekualitas Phillip
Lampu XL (Lilin) 14 Watt sekualitas Phillip
Lampu XL (Lilin) 18 Watt sekualitas Phillip
Lampu XL (Lilin) 23 Watt sekualitas Phillip
Lampu Pijar 5 - 40 Watt sekualitas Phillip
Lampu Pijar 50 -100 Watt sekualitas Phillip
Tambah Daya 2200 Watt
Pasang Baru PLN
Pipa Arde
Splits Dia 1
Timah
Kawat BC
Klemp

SATUAN

1 bh
1 kg
1 ikat
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh

KODE
M461
M462
M463
M464
M464.a
M465
M466
M467
M468
M469
M470
M471
M471a
M472
M473
M474
M475
M476
M477
M478
M479
M480
M481
M482
M482.a
M483
M483.a
M484
M485
M486
M487
M488
M489
M490
M491
M492
M493
M494
M495
M496
M497
M498
M499
M500
M501

BAHAN BANGUNAN
Rumput Lamur
Rumput Manila
Semak Hias
Pohon Pelindung
Gebalan rumput
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri
Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih
Kuas 4"
Besi Ulir 10
Besi Ulir 13
Besi Ulir 16
Besi Ulir 19
Besi Ulir 22
Besi Ulir 25
Besi Polos 8
Besi Polos 10
Besi Polos 12
Besi Polos 16
Besi Polos 19
Besi Polos 20
Baja Siku
Baja Canal C

SATUAN

1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr
1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr
1 bh
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg

KODE
M502
M503
M504

BAHAN BANGUNAN
Pipa baja 4
Sewa alat mesin bor
Sewa alat mesin las

SATUAN

kg
1hr
1hr

AR HARGA BAHAN BANGUNAN


HARGA
92,500.00
115,500.00
85,000.00
115,000.00
8,000.00
75,000.00
70,000.00
60,000.00
42,923.75

KETERANG
AN
Tanah dan
Pasir

53,000.00
Batu,Bata &
140,000.00
Beton Block
#REF!
209,500.00
159,120.00
163,000.00
145,500.00
234,000.00
#REF!
159,120.00
183,000.00
169,000.00
450.00
13,200.00
950.00
5,250.00
9,750.00
3,300.00
2,600.00
80,250.00
76,000.00
5,100.00
4,500.00
3,750.00
1,350.00 Per Meter isi 45
1,800.00 Per Meter isi 45
2,100.00 Per Meter isi 28
2,200.00 Per Meter isi 28
1,400.00 Per Meter isi 33
1,600.00 Per Meter isi 33
1,600.00 Semen
4,300.00
2,700.00

M01d
M01b
M01a

M16

M06
M02

M91
M92

M12.

HARGA
11,700.00
8,750.00
1,430,000.00
1,000.00
197,500.00

KETERANG
AN

KETERANG
AN
38,000.00 Buis Beton
48,000.00
66,000.00
82,500.00
106,000.00
201,000.00
219,250.00
280,500.00
29,200.00
42,250.00
8,830,000.00 Kayu Borneo
8,830,000.00 Kayu Borneo
8,830,000.00 Kayu Borneo
10,910,000.00 Kayu Borneo
11,170,000.00 Kayu Borneo
11,170,000.00 Kayu Borneo
4,830,000.00 Kayu Meranti
4,830,000.00 Kayu Meranti
5,175,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
6,178,000.00 Kayu Kruing
6,178,000.00 Kayu Kruing
6,490,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
9,350,000.00 Kayu Kamper
9,610,000.00 Kayu Kamper
9,870,000.00 Kayu Kamper
11,430,000.00 Kayu Kamper
11,690,000.00 Kayu Kamper
11,950,000.00 Kayu Kamper
Kayu Lain2,850,000.00
lain
4,250,000.00
M99
24,100.00
27,000.00
7,700.00
3,630,000.00
38,400.00
80,100.00
13,551,600.00 Kayu Jati Ex Malang
13,551,600.00 Kayu Jati Ex Malang
13,551,600.00 Kayu Jati Ex Malang
HARGA

HARGA

KETERANG
AN

15,059,600.00 Kayu Jati Ex Malang


15,059,600.00 Kayu Jati Ex Malang
15,059,600.00 Kayu Jati Ex Malang
16,006,000.00 Kayu Jati Ex Madiun/Nga
16,006,000.00 Kayu Jati Ex Madiun/Ngawi
16,006,000.00 Kayu Jati Ex Madiun/Ngawi
16,006,000.00 Kayu Jati Ex Madiun/Ngawi
16,006,000.00 Kayu Jati Ex Madiun/Ngawi
16,006,000.00 Kayu Jati Ex Madiun/Ngawi
19,968,400.00 Kayu Jati Ex Bojonegoro
19,968,400.00 Kayu Jati Ex Bojonegoro
19,968,400.00 Kayu Jati Ex Bojonegoro
19,968,400.00 Kayu Jati Ex Bojonegoro
19,968,400.00 Kayu Jati Ex Bojonegoro
19,968,400.00 Kayu Jati Ex Bojonegoro

KETERANG
AN
Besi dan
M13
8,300.00
Aluminium
M39b
8,500.00
13,900.00
.
M48
18,328.13
M46
11,500.00
17,200.00
13,100.00
30,400.00
753,000.00
2,070,500.00
1,694,100.00
1,254,900.00
627,500.00
721,600.00
329,400.00
421,600.00
91,000.00
109,200.00
313,700.00
349,800.00
102,800.00
100,400.00
31,300.00
41,000.00
44,500.00
66,300.00
M14
23,400.00
23,900.00
21,800.00
21,100.00
20,500.00
M18
13,500.00
25,700.00
600.00
900.00
700.00
450.00
11,800.00
3,300.00
39,300.00
17,500.00
27,500.00
17,500.00
11,400.00

HARGA

HARGA

KETERANG
AN

563,500.00
112,300.00
109,200.00
140,000.00
2,700.00 Atap Genteng
1,300.00
1,500.00
1,700.00
2,100.00
14,500.00
14,100.00
4,900.00
2,500.00
4,700.00
5,100.00
5,700.00

HARGA

KETERANG
AN

11,500.00
2,300.00
2,300.00
4,500.00
4,100.00
7,300.00
7,800.00
6,700.00
100,700.00
1,600.00
45,100.00
100,700.00
121,900.00
6,900.00
35,900.00 Atap Seng / Asbes
40,900.00
51,400.00
65,000.00
70,100.00
32,000.00
78,900.00
78,200.00
114,200.00
107,700.00
99,500.00
86,100.00
76,300.00
57,900.00
109,400.00
94,700.00
83,900.00
63,800.00
134,900.00
129,300.00
95,600.00
76,900.00
47,800.00
50,800.00
51,100.00
44,400.00
44,000.00
47,400.00
47,800.00
40,600.00
18,700.00

HARGA

KETERANG
AN

17,600.00
17,000.00
16,400.00
15,000.00
27,500.00
36,000.00
54,100.00
10,000.00
72,100.00
76,900.00
54,100.00 Kayu Olahan
75,000.00
86,500.00
125,000.00
150,300.00
146,000.00
M73
258,400.00

HARGA

KETERANG
AN

90,100.00
7,300.00
10,200.00
23,800.00
28,200.00
95,900.00
7,800.00
27,700.00
87,500.00
159,800.00 Perlengkapan Kamar Man
1,565,500.00
235,000.00
1,628,200.00
62,500.00
39,200.00
43,700.00
141,800.00
344,300.00
216,600.00
2,191,800.00
443,700.00
219,000.00
312,200.00
939,300.00
1,095,800.00
1,127,100.00
1,377,700.00
455,100.00
31,200.00
53,100.00
15,500.00
62,500.00
75,000.00 Alat-Alat Penggantung
385,000.00
75,000.00
151,600.00
12,500.00
10,000.00
28,750.00
12,300.00
9,500.00
7,500.00
46,000.00
176,900.00
375,000.00

HARGA

KETERANG
AN

126,300.00
37,300.00
450,000.00
11,900.00
83,800.00 Kaca
127,200.00
246,000.00
341,400.00
96,800.00
154,400.00
206,700.00
339,200.00
200,000.00
255,800.00
348,600.00

HARGA

KETERANG
AN

125,200.00
183,600.00
375,900.00
600,300.00
245,300.00
23,900.00
558,700.00
627,000.00
1,367,400.00
2,300.00 Perlengkapan Lantai
1,750.00
1,150.00
2,900.00
1,800.00
1,200.00
4,100.00
2,900.00
15,200.00
40,000.00
41,000.00
35,100.00
70,400.00
52,700.00
2,900.00
3,200.00
3,500.00
1,800.00
2,300.00
3,500.00
4,100.00
5,900.00
10,000.00
15,000.00
8,700.00
8,700.00
8,700.00
17,400.00
17,400.00
17,400.00
23,200.00
182,100.00
8,000.00
8,800.00
3,200.00
4,500.00

HARGA
1,500.00
1,900.00
2,200.00
4,700.00
8,700.00
10,000.00
4,200.00
3,000.00
950.00
950.00

KETERANG
AN

HARGA

KETERANG
AN

900.00
2,000.00
231,100.00
450,000.00
56,400.00
394,500.00
850.00
1,100.00
54,600.00
6,700.00
2,000.00 Perpipaan
2,000.00
2,500.00
3,500.00
18,000.00
20,000.00 4
24,000.00 532,900.00
165,000.00
133,225.00
203,550.00
4,000.00
6,075.00
7,950.00
10,650.00
M24c
#REF!
18,925.00
27,475.00
M24d
#REF!
3,000.00
4,575.00
5,975.00
8,000.00
10,775.00
13,675.00
16,175.00
20,575.00
1,600.00
2,400.00
2,700.00
5,800.00
8,100.00
11,600.00
13,100.00
15,900.00
2,100.00

HARGA
2,600.00
3,800.00
7,600.00
11,400.00
13,100.00
14,600.00
18,300.00
35,950.00
46,525.00
180,000.00
#REF!
133,150.00

KETERANG
AN

M24b

HARGA

KETERANG
AN

185,975.00
#REF!
310,625.00
4,100.00
4,900.00
7,700.00
13,600.00
21,600.00
38,200.00
57,300.00
76,400.00
4,700.00
6,400.00
9,000.00
17,900.00
28,000.00
53,500.00
82,700.00
101,800.00
162,825.00
105,050.00
134,150.00
30,600.00
42,625.00
63,500.00
93,175.00
201,300.00
326,025.00
4,600.00 Plitur & Cat
20,400.00
13,000.00
36,500.00
32,000.00
19,400.00
12,500.00
160,500.00
25,500.00
25,500.00
48,800.00
80,960.00
48,800.00
48,800.00
80,960.00
28,000.00
80,960.00

M24a

HARGA
48,800.00
132,500.00
154,600.00
34,600.00
77,500.00
13,300.00
30,200.00
34,600.00
60,300.00
27,400.00
2,300.00
8,700.00
4,700.00
23,900.00
35,200.00

KETERANG
AN

HARGA

KETERANG
AN

24,100.00
38,800.00
4,100.00
725,000.00 Peralatan Air Bersih
1,289,900.00
2,016,100.00
3,376,100.00
198,200.00
795,000.00
4,400.00 Instalasi Listrik
7,200.00
13,300.00
8,000.00
27,000.00
33,000.00
37,800.00
650.00
800.00
1,050.00
7,500.00
10,600.00
67,700.00
98,400.00
135,200.00
63,300.00
93,900.00
27,600.00
31,800.00
35,900.00
38,600.00
44,000.00
18,100.00
30,000.00
3,710,000.00
4,699,900.00
110,600.00
77,500.00
438,600.00
45,300.00
2,100.00

KETERANG
AN
22,400.00 Lain - Lain
19,100.00
12,700.00
193,300.00
16,800.00
19,100.00
154,600.00
32,000.00
57,800.00
67,500.00
13,500.00
2,710.00
90,250.00
2,500.00
55,250.00
4,100.00
64,200.00
83,600.00
6,900.00
6,200.00
32,000.00
64,200.00
3,000.00
M20
#REF!
M21
4,500.00
#REF!
4,500.00
M22
#REF!
17,500.00
30.00
13,300.00
9,500.00
9,500.00
9,500.00
9,900.00
9,900.00
9,900.00
9,250.00
9,250.00
9,250.00
9,250.00
9,250.00
9,250.00
11,000.00
18,328.13

HARGA

HARGA
11,000.00
350,000.00
350,000.00

KETERANG
AN

REKAPITULASI RENCANA ANGGARAN BIAYA


STRUKTUR
TOTAL/FINISH
PEKERJAAN
LOKASI

No.

A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.

: PEMBANGUNAN GEDUNG SENTRAL FAKULTAS PERTANIAN UNIVERSITAS BRAWIJAYA MALAN


: KAMPUS UNIVERSITAS BRAWIJAYA MALANG

URAIAN PEKERJAAN

TOTAL
(Rp

PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR LANTAI 1
PEKERJAAN STRUKTUR LANTAI 2
PEKERJAAN STRUKTUR LANTAI 3
PEKERJAAN STRUKTUR LANTAI 4
PEKERJAAN STRUKTUR LANTAI 5
PEKERJAAN STRUKTUR LANTAI 6
PEKERJAAN STRUKTUR AUDITORIUM
PEKERJAAN STRUKTUR ELV. 27.00
PEKERJAAN STRUKTUR ELV. 28.00
PEKERJAAN STRUKTUR ELV. 28.50 (Trap auditorium)
PEKERJAAN STRUKTUR TOP FLOOR
PEKERJAAN STRUKTUR ATAP

JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN

Terbilang : Dua Puluh Tujuh Milyard Tiga Ratus Delapan Puluh Delapan Juta Tujuh Ratus Tiga Puluh

Malang,

CV KOSA MAT

Ir. SAHIR
Direk

CANA ANGGARAN BIAYA


RUKTUR
AL/FINISH

PERTANIAN UNIVERSITAS BRAWIJAYA MALANG

TOTAL BIAYA
(Rp.)

2,834,517,832.19
1,967,189,706.08
1,277,267,394.99
1,042,706,720.99
490,634,502.07

7,612,316,156.32
761,231,615.63
8,373,547,771.95
8,373,547,000.00

uluh Delapan Juta Tujuh Ratus Tiga Puluh Lima Ribu Rupiah

Malang,

2013

CV KOSA MATRA GRAHA

Ir. SAHIRWAN
Direktur

Owner :

MC - 0

PEMBANGUNAN GEDUNG SENTRAL FAKULTAS


PERTANIAN UNIVERSITAS BRAWIJAYA ( TAHAP
I,PEK STRIKTUR)
Konsultan Pengawas :

Kontraktor Pelaksana :

No.

URAIAN PEKERJAAN
1

PEMBANGUNAN GEDUNG SENTRAL FAK


Lokasi

: Jl. Veteran - Malang

Tahun Anggaran

: 2012 - 2013

No Kontrak Pek

: 3745/UN10.4/PD/2013

Nilai Kontrak Pek.

: Rp. 8.425.445.000

Jangka Waktu Pek.

: 110 Hari Kalender

Periode Waktu Pek.

: 09 September 2013 s/d 31 Desember 201

HARGA SATUAN

SAT
2

Kontrak

(Rp.)
3

VOLUME
MC-0

Deviasi
7 =(6-5)

A. PEKERJAAN STRUKTUR LANTAI 1


I

PEKERJAAN PERSIAPAN

Pembersihan Lokasi

Ls

Rp

2,000,000.00

1.00

1.00

Pagar Sementara Keliling Proyek

Rp

281,700.00

264.00

264.00

Pengukuran dan Pemasangan Bowplank

Rp

53,560.00

236.80

236.80

Direksi Keet

Rp

974,900.00

60.48

60.48

Test PDA ( use pile)

ttk

Rp

20,000,000.00

3.00

3.00

Sewa lift barang(lengkap operator/BBM)

ls

Rp

60,000,000.00

1.00

1.00

Mobilisasi Alat

Ls

Rp

10,000,000.00

1.00

1.00

Demobilisasi Alat

Ls

Rp

10,000,000.00

1.00

1.00

10 Papan Nama proyek

Unit

Rp

500,000.00

1.00

1.00

11 Listrik Kerja

Ls

Rp

5,500,000.00

1.00

1.00

12 I M B

Ls

Rp

87,500,000.00

1.00

1.00

559.69

1
1

SUB TOTAL POIN A.1


II

PEKERJAAN TANAH

Galian tanah Pilecap

m3

Rp

51,845.00

344.64

Galian tanah pondasi plat

Rp

60,992.64

43.09

Galian tanah pit-depht lift

m3

Rp

43,625.00

195.53

Bor strauss 40 cm

m1

Rp

89,815.00

1,256.50

2,101.00

844.50

Urugan tanah kembali

m3

Rp

14,540.00

162.05

226.57

64.51

Urugan pasir bawah pondasi pilecap

Rp

137,285.00

13.01

19.33

6.32

Urugan pasir bawah pondasi plat tangga

m3

Rp

137,285.00

0.14

0.14

Urugan pasir bawah pondasi pondasi pit-depth lift

m3

Rp

137,285.00

0.69

215.05
(195.53)

(0.69)

SUB TOTAL POIN A.II


III

PEKERJAAN PONDASI DAN SLOOF

Rabat lantai kerja pondasi t= 10 cm

m3

Rp

700,805.00

26.02

Rabat lantai kerja pondasi pit-depth lift t= 7 cm

m3

Rp

700,805.00

0.96

(0.96)

Rabat lantai kerja sloof, t= 5 cm

m3

Rp

700,805.00

8.71

5.28

(3.43)

Rabat lantai kerja pondasi tangga, t= 7 cm

m3

Rp

700,805.00

0.20

0.20

Strouss 30 cm - 3.50 m Menjadi 40 cm - 5.50 m

m3

Rp

4,344,795.00

88.77

191.92

24.71

(1.31)

103.15

No.

URAIAN PEKERJAAN
1

HARGA SATUAN

SAT
2

(Rp.)
3

Kontrak

Pilecap P-1

Rp

Pilecap P-2

Rp

1,747,050.00

120.96

186.39

65.43

Pilecap P-3

Rp

1,814,970.00

16.90

5.63

(11.26)

Pondasi footplat tangga

Rp

4,458,305.00

0.58

0.58

10 Pondasi footplat (FP1)

m3

Rp

4,747,750.68

7.78

11 Pondasi footplat (FP2)

Rp

4,862,013.34

1.80

3
3

Deviasi

4
3,812,002.41

5
270.48

VOLUME
MC-0

7 =(6-5)

SUB TOTAL POIN A.III


IV PEKERJAAN PONDASI DAN SLOOF
12 Pedestal

m3

Rp

4,715,960.00

22.28

13 Pondasi dan dinding lift t =15 cm

Rp

4,998,830.00

5.15

14 Sloof 1 (35x70)

Rp

3,433,870.00

107.21

67.38

(39.84)

15 Sloof 2 (30x45)

Rp

4,035,475.00

9.45

4.75

(4.70)

16 Sloof 3 (25x45)

Rp

8,825,445.91

18.78

17 Sloof 4 (30x55)

Rp

3,672,710.00

0.63

0.63

18 Sloof 5 (25x35)

Rp

5,120,615.00

0.42

0.42

19 Stek Besi D16 untuk Sloof Tahap Selanjutnya

kg

Rp

10,905.00

1,463.95

1,463.95

3
3
3
3
3

37.17
-

14.89
(5.15)

SUB TOTAL POIN A.IV


V

PEKERJAAN KOLOM

Kolom (80x80) K1, Elv. 0.00 s/d + 4.50

m3

Rp

4,715,960.00

80.64

80.64

Kolom (60x60) K2, Elv. 0.00 s/d + 4.50

Rp

6,298,985.00

27.54

27.54

Kolom (40x40) K3, Elv. 0.00 s/d + 4.50

Rp

4,792,445.00

1.44

1.44

Kolom (25x25) K4, Elv. 0.00 s/d + 4.50

Rp

11,442,258.36

1.69

Plat Tangga utama dan bordes lt 1 ke lt 2

m3

Rp

3,622,030.00

3.37

3.37

Plat Tangga darurat dan bordes lt 1 ke lt 2 (2 unit)

Rp

3,622,030.00

3.75

3.75

3
3

SUB TOTAL POIN A.V


VI PEKERJAAN STEK BESI SLOOF
1

Stek besi sloof 35/70

kg

Rp

10,905.00

133.76

133.76

Stek besi sloof 30/45

kg

Rp

10,905.00

160.50

160.50

SUB TOTAL POIN A.VI


JUMLAH TOTAL POIN A

No.

URAIAN PEKERJAAN
1

HARGA SATUAN

SAT
2

VOLUME
MC-0

Kontrak

(Rp.)
3

Deviasi
7 =(6-5)

B. PEKERJAAN STRUKTUR LANTAI 2


I

PEKERJAAN BETON

Plat lantai t 12 cm (S1) Elv. + 4.50

m3

Rp

3,232,590.00

107.35

107.35

Plat lantai t 12 cm (S2) Elv. + 4.50

Rp

3,309,545.00

77.35

77.35

Kolom (80x80) K1, Elv. + 4.50 s/d + 9.00

Rp

4,715,960.00

80.64

80.64

Kolom (60x60) K2, Elv. + 4.50 s/d + 9.00

Rp

6,298,985.00

27.54

27.54

Kolom (40x40) K3, Elv. + 4.50 s/d + 9.00

Rp

4,792,445.00

1.44

1.44

Kolom (25x25) K4, Elv. + 4.50 s/d + 9.00

Rp

Balok 35/70 (B1) Elv. + 4.50

m3

Rp

4,167,555.00

131.12

131.12

Balok 30/45 (B2) Elv. + 4.50

Rp

4,941,620.00

12.10

12.10

Balok 25/45 (B3) Elv. + 4.50

Rp

5,165,400.00

1.80

1.80

10

Balok 30/55 (B4) Elv. + 4.50

Rp

11

Balok 25/40 (B anak) Elv. + 4.50

m3

Rp

6,335,225.00

25.60

25.60

12

Balok sabuk lift 15/30, Elv. + 2.25

Rp

5,838,580.00

0.69

13

Plat Tangga utama dan bordes lt 2 ke lt 3

Rp

3,622,030.00

3.37

3.37

14

Plat Tangga darurat dan bordes lt 2 ke lt 3 (2 unit)

Rp

3,622,030.00

3.75

3.75

3
3
3
3

3
3

3
3
3

1.69

3.43

(0.69)

JUMLAH TOTAL POIN B.1


C. PEKERJAAN STRUKTUR LANTAI 3
I

PEKERJAAN BETON

Plat lantai t 12 cm (S1), Elv. + 9.00

m3

3,232,590.00

102.08

102.08

Kolom (80x80) K1, Elv. + 9.00 s/d + 13.50

4,715,960.00

80.64

80.64

Kolom (60x60) K2, Elv. + 9.00 s/d + 13.50

6,298,985.00

12.96

12.96

Kolom (40x40) K3, Elv. + 9.00 s/d + 13.50

4,792,445.00

1.44

1.44

Kolom (25x25) K4, Elv. + 9.00 s/d + 13.50

Balok 35/70 (B1), Elv. + 9.00

m3

4,167,555.00

74.28

74.28

Balok 30/45 (B2), Elv. + 9.00

4,941,620.00

9.56

9.56

Balok 25/45 (B3), Elv. + 9.00

5,165,400.00

1.26

1.26

Balok 25/35 (B anak), Elv. + 9.00

6,335,225.00

14.07

14.07

10

Balok sabuk lift 15/30, Elv. + 6.75

5,838,580.00

0.69

(0.69)

11

Plat Tangga dan bordes lt 3 ke lt 4

3,622,030.00

3.37

3.37

12

Plat Tangga darurat dan bordes lt 3 ke lt 4 (2 unit)

3,622,030.00

3.81

3.81

3
3
3

3
3
3
3
3
3

1.69

JUMLAH TOTAL POIN C.1


d.

PEKERJAAN STRUKTUR LANTAI 4

PEKERJAAN BETON

Plat lantai t 12 cm (S1), Elv. + 13.50

m3

Rp

3,232,590.00

102.08

102.08

Kolom (80x80) K1, Elv. +13.5.00 s/d + 18.00

Rp

4,715,960.00

80.64

46.08

(34.56)

Kolom (60x60) K2, Elv. + 13.5 s/d + 18.00

Rp

6,298,985.00

12.96

3.24

(9.72)

Kolom (40x40) K3, Elv. + 13.50 s/d + 18.00

Rp

4,792,445.00

1.44

0.72

(0.72)

Kolom (25x25) K4, Elv. + 13.50 s/d + 18.00

Rp

Balok 35/70 (B1), Elv. + 13.50

Rp

4,167,555.00

74.28

74.28

Balok 30/45 (B2), Elv. + 13.50

Rp

4,941,620.00

9.56

9.56

3
3
3
3
3
3

1.69

No.

URAIAN PEKERJAAN

HARGA SATUAN

SAT

(Rp.)
3

Kontrak

Balok 25/45 (B3), Elv. + 13.50

Rp

Balok 25/35 (B anak), Elv. + 13.50

Rp

6,335,225.00

14.07

10

Balok sabuk lift 15/30, Elv. + 11.25

Rp

5,838,580.00

0.69

(0.69)

11

Plat Tangga dan bordes lt 4 ke lt 5

Rp

3,622,030.00

3.37

3.37

12

Plat Tangga darurat dan bordes lt 4 ke lt 5 (2 unit)

Rp

3,622,030.00

3.81

1.91

(1.91)

(41.91)

3
3
3
3

Deviasi

4
5,165,400.00

5
1.26

VOLUME
MC-0

7 =(6-5)

1.26

14.07

JUMLAH TOTAL POIN D.1


E. PEKERJAAN STRUKTUR LANTAI 5
I

PEKERJAAN BETON

Plat lantai t 12 cm (S1),Elv +18.00

m3

Rp

3,232,590.00

102.08

60.17

Stek besi kolom (80x80) K1, Elv. + 18.00 s/d +19.00

kg

Rp

10,905.00

2,621.70

2,621.70

Stek besi kolom (60x60) K2, Elv. + 18.00s/d +19.00

kg

Rp

10,905.00

642.05

642.05

Stek besi kolom (40x40) K3, Elv. + 18.00 s/d +19.00

kg

Rp

10,905.00

41.18

41.18

Balok 35/70 (B1),Elv +18.00

m3

Rp

4,167,555.00

74.28

40.47

(33.81)

Balok 30/45 (B2),Elv +18.00

Rp

4,941,620.00

9.56

4.73

(4.83)

Balok 25/45 (B3),Elv +18.00

m3

Rp

5,165,400.00

1.26

0.63

(0.63)

Balok 25/35 (B anak),Elv +18.00

Rp

6,335,225.00

14.07

8.93

(5.15)

Stek Besi Balok 35/70

kg

Rp

10,905.00

379.38

379.38

10 Stek Besi Balok 30/45

kg

Rp

10,905.00

209.97

209.97

11 Stek Besi Balok 25/35

kg

Rp

10,905.00

169.29

169.29

JUMLAH TOTAL POIN E.1


JUMLAH TOTAL
PPN 10%
JUMLAH TOTAL + PPN 10%
JUMLAH TOTAL PEMBULATAN
DEVIASI KONTRAK DAN MC 0 SESUDAH PPN 10 %
Mengetahui / Menyetujui,

Mengetahui / Menyetujui,

Diperik

Pejabat Pembuat Komitmen (PPK)

Ketua Tim Teknis

Konsu

Fakultas Pertanian
Universitas Brawijaya

Prof. Ir. Sumeru Ashari, M.Agr.Sc.Phd


Nip. 19530328 19810310 1 001

Fakultas Pertanian
Universitas Brawijaya

Ir. MA. Helmy Sjoekoer


Nip. 19540824 198403 1 002

CV. KOSA

Yosimson

Te

MC - 0 (MUTHUAL CHECK)

UNG SENTRAL FAKULTAS PERTANIAN UNIVERSITAS BRAWIJAYA ( TAHAP I,PEK STRIKTUR)

13 s/d 31 Desember 2013

JUMLAH TOTAL (Rp)


MC-0 (Rp)

KONTRAK (Rp)
8=(4*5)

KETERANGAN

Deviasi (Rp)

9=(4*6)

10=(9-8)

Rp

2,000,000.00 Rp

2,000,000.00 Rp

Rp

74,368,800.00 Rp

74,368,800.00 Rp

Rp

12,683,008.00 Rp

12,683,008.00 Rp

Rp

58,961,952.00 Rp

58,961,952.00 Rp

Rp

60,000,000.00 Rp

60,000,000.00 Rp

Rp

60,000,000.00 Rp

60,000,000.00 Rp

Rp

10,000,000.00 Rp

10,000,000.00 Rp

Rp

10,000,000.00 Rp

10,000,000.00 Rp

Rp

500,000.00 Rp

500,000.00 Rp

Rp

5,500,000.00 Rp

5,500,000.00 Rp

Rp

87,500,000.00 Rp

87,500,000.00 Rp

Rp

381,513,760.00 Rp

381,513,760.00 Rp

Rp

17,867,860.80 Rp

29,016,967.33 Rp

Rp
Rp

11,149,106.53 Volume Bertambah

2,628,294.84
-

11

Tidak Dikerjakan
Rp

Rp

Tidak Masuk dalam Tahap I

Rp

112,852,547.50 Rp

188,701,315.00 Rp

75,848,767.50 Volume Bertambah

Rp

2,356,238.99 Rp

3,294,273.57 Rp

938,034.58 Volume Bertambah

Rp

1,785,940.57 Rp

2,653,982.64 Rp

868,042.07 Volume Bertambah

Rp

19,769.04 Rp

19,769.04 Rp

Rp

Rp

Rp

Rp

137,510,651.74 Rp

223,686,307.57 Rp

Rp

18,233,544.49 Rp

17,314,677.01 Rp

Rp

Rp

Rp

Rp

6,102,609.94 Rp

3,701,301.61 Rp

Rp

141,282.29 Rp

141,282.29 Rp

Rp

385,694,946.92 Rp

833,839,153.06 Rp

Tidak Masuk dalam Tahap I

88,803,950.68
(918,867.48) Volume Bertambah
-

Tidak Masuk dalam Tahap I

(2,401,308.33) Volume Berkurang


448,144,206.13 Volume Bertambah

JUMLAH TOTAL (Rp)


MC-0 (Rp)

KONTRAK (Rp)
8=(4*5)

KETERANGAN

Deviasi (Rp)

9=(4*6)

10=(9-8)

1,031,070,410.85

11
Tidak Dikerjakan

Rp

211,323,168.00 Rp

325,633,907.38 Rp

114,310,739.38 Volume Bertambah

Rp

30,665,733.12 Rp

10,221,911.04 Rp

(20,443,822.08) Volume Berkurang

Rp

2,567,983.68 Rp

2,567,983.68 Rp

Rp

36,918,509.32

Tidak Dikerjakan

Rp

8,751,624.02

Tidak Dikerjakan

Rp

1,731,469,812.63 Rp

1,193,420,216.05 Rp

Rp

105,052,724.96 Rp

175,292,233.20 Rp

Rp

Rp

Rp

538,690,947.61
70,239,508.24 Volume Bertambah
-

Tidak Masuk dalam Tahap I

Rp

368,152,070.44 Rp

231,356,991.25 Rp

(136,795,079.19) Volume Berkurang

Rp

38,135,238.75 Rp

19,176,577.20 Rp

(18,958,661.55) Volume Berkurang

Rp

165,728,636.10

Tidak Dikerjakan

Rp

Rp

2,302,789.17 Rp

2,302,789.17 Pek Tambah - Belum ada di BQ

Rp

Rp

2,150,658.30 Rp

2,150,658.30 Pek Tambah - Belum ada di BQ

Rp

Rp

15,964,411.91 Rp

15,964,411.91 Pek Tambah - Belum ada di BQ

Rp

677,068,670.25 Rp

446,243,661.03 Rp

Rp

380,295,014.40 Rp

380,295,014.40

Rp

173,474,046.90 Rp

173,474,046.90

Rp

6,901,120.80 Rp

6,901,120.80

Rp

19,308,810.99

Rp

12,203,488.36 Rp

12,203,488.36

Rp

13,571,311.77 Rp

13,571,311.77

Rp

605,753,793.21 Rp

Rp

1,458,652.80 Rp

1,458,652.80

Rp

1,750,252.50 Rp

1,750,252.50

Rp

3,208,905.30 Rp

3,208,905.30 Rp

Rp

3,536,525,593.13 Rp

2,834,517,832.19 Rp

(65,096,373.12)

Tidak Dikerjakan

586,444,982.22 Rp

562,398,525.18

JUMLAH TOTAL (Rp)


MC-0 (Rp)

KONTRAK (Rp)
8=(4*5)

9=(4*6)

Rp

347,025,001.68 Rp

347,025,001.68

Rp

255,999,924.84 Rp

255,999,924.84

Rp

380,295,014.40 Rp

380,295,014.40

Rp

173,474,046.90 Rp

173,474,046.90

Rp

6,901,120.80 Rp

6,901,120.80

Rp

11

Tidak Dikerjakan

546,466,481.82 Rp

546,466,481.82

Rp

59,773,835.52 Rp

59,773,835.52

Rp

9,297,720.00 Rp

9,297,720.00

Tidak Dikerjakan

Rp

162,181,760.00 Rp

Rp

4,046,135.94 Rp

Rp

12,203,488.36 Rp

12,203,488.36

Rp

13,571,311.77 Rp

13,571,311.77

Rp

1,971,235,842.02 Rp

Rp

329,972,442.91 Rp

329,972,442.91

Rp

380,295,014.40 Rp

380,295,014.40

Rp

81,634,845.60 Rp

81,634,845.60

Rp

6,901,120.80 Rp

6,901,120.80

Rp

10=(9-8)

Rp

Rp

KETERANGAN

Deviasi (Rp)

162,181,760.00
Tidak Masuk dalam Tahap I

1,967,189,706.08 Rp

Tidak Dikerjakan

Rp

309,582,655.62 Rp

309,582,655.62

Rp

47,232,003.96 Rp

47,232,003.96

Rp

6,508,404.00 Rp

6,508,404.00

Rp

89,136,615.75 Rp

89,136,615.75

Rp

4,046,135.94 Rp

Rp

12,203,488.36 Rp

12,203,488.36

Rp

13,800,803.59 Rp

13,800,803.59

Rp

1,281,313,530.93 Rp

Rp

329,972,442.91 Rp

329,972,442.91

Rp

380,295,014.40 Rp

217,311,436.80 Rp

(162,983,577.60) Pekerjaan Kurang

Rp

81,634,845.60 Rp

20,408,711.40 Rp

(61,226,134.20) Pekerjaan Kurang

Rp

6,901,120.80 Rp

3,450,560.40 Rp

(3,450,560.40) Pekerjaan Kurang

Rp

Tidak Masuk dalam Tahap I

1,277,267,394.99 Rp

Tidak Dikerjakan

Rp

309,582,655.62 Rp

309,582,655.62

Rp

47,232,003.96 Rp

47,232,003.96

JUMLAH TOTAL (Rp)


MC-0 (Rp)

KONTRAK (Rp)
8=(4*5)

KETERANGAN

Deviasi (Rp)

9=(4*6)

10=(9-8)

11

Rp

6,508,404.00 Rp

6,508,404.00

Rp

89,136,615.75 Rp

89,136,615.75

Rp

4,046,135.94 Rp

Rp

12,203,488.36 Rp

Rp

13,800,803.59 Rp

6,900,401.79 Rp

Rp

1,281,313,530.93 Rp

1,042,706,720.99 Rp

Rp

329,972,442.91 Rp

194,498,475.12 Rp

Rp

28,589,594.88 Rp

28,589,594.88 Rp

Rp

7,001,533.44 Rp

7,001,533.44 Rp

Rp

449,111.52 Rp

449,111.52 Rp

Rp

309,582,655.62 Rp

168,677,621.07 Rp

(140,905,034.55) Pekerjaan Kurang

Rp

47,232,003.96 Rp

23,349,154.50 Rp

(23,882,849.46) Pekerjaan Kurang

Rp

6,508,404.00 Rp

3,254,202.00 Rp

(3,254,202.00) Pekerjaan Kurang

Rp

89,136,615.75 Rp

56,541,883.13 Rp

(32,594,732.63) Pekerjaan Kurang

Tidak Masuk dalam Tahap I

12,203,488.36

(6,900,401.79) Pekerjaan Kurang


(234,560,673.99)

(135,473,967.79) Pekerjaan Kurang

Rp

Rp

4,137,113.70 Rp

4,137,113.70 Pek Tambah - Belum ada di BQ

Rp

Rp

2,289,723.30 Rp

2,289,723.30 Pek Tambah - Belum ada di BQ

Rp

Rp

1,846,089.41 Rp

1,846,089.41 Pek Tambah - Belum ada di BQ

Rp

818,472,362.08 Rp

490,634,502.07 Rp

(327,837,860.01)

Rp

8,888,860,859.09 Rp

7,612,316,156.32 Rp

(8.83)

Rp

888,886,085.91 Rp

761,231,615.63

Rp

9,777,746,945.00 Rp

8,373,547,771.95

Rp

9,777,746,000.00 Rp

8,373,547,000.00

Rp

(1,404,199,000.00)
Malang, 21 Oktober 2013

Diperiksa / Menyetujui,

Dibuat Oleh,

Konsultan Pengawas

Kontraktor Pelaksana

CV. KOSA MATRA GRAHA

PT.CITRA MANDIRI CIPTA

Yosimson P. Manaha, ST, MT

ADJINOTO

Team Leader

Project Manager

BACK UP VOLUME
PEKERJAAN
LOKASI
LEMBAR PERHITUNGAN
NO

144.00
118.40
3.60

120.00
118.40
16.80

2.80

2.80

P3

1.60

0.80

FP1
FP2

1.80
1.50
2.70

1.80
1.50
5.10

PEKERJAAN STRUKTUR LANTAI 1


PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pagar Sementara Keliling Proyek
Pengukuran dan Pemasangan Bowplank
Direksi Keet
Mobilisasi Alat
Papan Nama proyek
Listrik Kerja
PEKERJAAN TANAH
Galian tanah Pilecap
P1
P2
1.18

1.04

3.60

1.18
.8 0

Elev. LANTAI 1

1 .5 0
.8 0

MTA ( Muka Tanah Asli )

.10

.20
.05

4 .0 0

2.60
1.42

A.

JENIS PEKERJAAN / SKET GAMBAR

.80
.20

1.TRAPESIUM
2.PERSEGI 2

((2,6+1,42)/2)*1,18*2

.40

.40
3.20

.40

.40

.40
.20

4.744
2.704
7.448

1,04*2,6
luas

Galian tanah pondasi plat

Galian tanah pit-depht lift


Bor strauss 40 cm
P1
P2

P3
Urugan tanah kembali
Urugan pasir bawah pondasi pilecap
P1
P2
P3
FP1
FP2

1.60
1.80
1.50
1.20
2.70

0.80
1.80
1.50
1.20
5.10

1.60
1.80
1.50
2.70

0.80
1.80
1.50
5.10

617.90
139.10
48.00
20.80
74.59

0.35
0.30
0.25
0.30
0.25

1.20
1.20

1.20
1.20

1.60
1.20

0.80
1.20

FP1
FP2

1.80
1.50

1.80
1.50

P1
P2
P3
FP1
FP2

0.80
0.60
0.80
0.60
0.40

0.80
0.60
0.80
0.60
0.40

Urugan pasir bawah pondasi plat tangga


Urugan pasir bawah pondasi pondasi pit-depth lift
PEKERJAAN PONDASI DAN SLOOF
Rabat lantai kerja pondasi t= 10 cm
P1
P2
P3
FP1
FP2
Rabat lantai kerja pondasi pit-depth lift t= 7 cm
Rabat lantai kerja sloof, t= 5 cm
SL1
SL2
SL3
SL4
SL5
Rabat lantai kerja pondasi tangga, t= 7 cm
utama
darurat
Strouss 40 cm - 5.50 m
P1
P2
P3
Pilecap P-1
Pilecap P-2
Pilecap P-3
Pondasi footplat tangga
Pondasi footplat

Pedestal

Tangga utama
Tangga darurat

1.80
1.20

0.20
0.20

5.10
5.15
2.55
617.90
139.10
48.00
20.80
74.59

2.70
0.15
0.15
0.35
0.30
0.25
0.30
0.25

Pondasi dan dinding lift t =15 cm

Sloof 1 (35x70)
Sloof 2 (30x45)
Sloof 3 (25x45)
Sloof 4 (30x55)
Sloof 5 (25x35)

PEKERJAAN KOLOM
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Plat Tangga utama dan bordes lt 1 ke lt 2
Plat Tangga darurat dan bordes lt 1 ke lt 2 (2 unit)
B.

C.

PEKERJAAN STRUKTUR LANTAI 2


Plat lantai t 12 cm (S1)
Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 30/55 (B4)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga utama dan bordes lt 2 ke lt 3
Plat Tangga darurat dan bordes lt 2 ke lt 3 (2 unit)
PEKERJAAN STRUKTUR LANTAI 3
Plat lantai t 12 cm (S1)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga dan bordes lt 3 ke lt 4

D.

Plat Tangga darurat dan bordes lt 3 ke lt 4 (2 unit)


PEKERJAAN STRUKTUR LANTAI 4
Plat lantai t 12 cm (S1)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)

0.80
0.25
0.40
0.25
13.37
13.01

0.80
0.25
0.40
0.25
2.10
1.20

0.80
0.60
0.40
0.25
710.00
157.70
44.54
20.80
518.16
15.40

0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.30
0.25
0.15
2.10
1.20

13.37
13.01

0.80
0.60
0.40
0.25
710.00
157.70
11.34
514.46
15.40
13.37
13.23

0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.25
0.15
2.10
1.20

0.80
0.60
0.40
0.25
710.00

0.80
0.60
0.40
0.25
0.35

Balok 30/45 (B2)


Balok 25/45 (B3)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga dan bordes lt 4 ke lt 5

E.

Plat Tangga darurat dan bordes lt 4 ke lt 5 (2 unit)


PEKERJAAN STRUKTUR LANTAI 5
Plat lantai t 12 cm (S1)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga dan bordes lt 5 ke lt 6

F.

Plat Tangga darurat dan bordes lt 5 ke lt 6 (2 unit)


PEKERJAAN STRUKTUR LANTAI 6
Plat lantai t 12 cm (S1)
Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 40/80 (B1a)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga dan bordes lt 6 ke lt 7

G.

PEKERJAAN STRUKTUR AUDITORIUM


Plat lantai t 12 cm (plat trap t.duduk)
Kolom (80x80) K1

Balok 40/80 (B1a)


Balok 40/80 (Tb1)
Balok 30/50 (Tb2)
Balok 25/40 (Tb3)
Balok 40/80 (KS1)

157.70
11.34
514.46
15.40
13.37
13.23

0.30
0.25
0.25
0.15
2.10
1.20

0.80
0.60
0.40
0.25
710.00
157.70
11.34
514.46
15.40
13.37
13.23

0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.25
0.15
2.10
1.20

0.80
0.60
0.40
0.25
523.60
126.20
11.40
226.80
507.64
15.40
13.23

0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.50
0.25
0.15
0.86

44.30

26.30

0.80
0.80
0.80
24.98
95.56
70.10
20.60
2.90

0.80
0.80
0.80
0.40
0.40
0.30
0.25
0.40

H.

PEKERJAAN STRUKTUR ELV. 27.00


Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
Plat Tangga dan bordes elv.27.00 ke elv. 28.00

I.

PEKERJAAN STRUKTUR ELV. 28.00

0.80
0.60
0.40
363.30
62.00
11.40
151.10
15.40
7.06

0.80
0.60
0.40
0.35
0.30
0.25
0.25
0.15
1.25

J.

K.

Plat lantai t 12 cm (S2)


Kolom (80x80) K1
Kolom (60x60) K2
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/35 (B anak)
Balok sabuk lift 15/30
PEKERJAAN STRUKTUR ELV. 28.50
Balok 40/80 (Tb1)
Balok 30/50 (Tb2)
PEKERJAAN STRUKTUR TOP FLOOR
Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (30x35) K5
Balok 35/70 (B1)
Balok 30/45 (B2)
Ring Balk 35/60 (BR1)
Balok konsol 40/80 (Bks1)
Balok 25/35 (Banak)
PEKERJAAN RING BALK
Ring Balk 30/50 (BR2)
PEKERJAAN ATAP
Kuda - Kuda baja WF 350.250.9.14
Gording kanal kait C 200.75.20.3,2
Tabung Plat t= 20mm
Plat Plendes t = 15 mm
Ikatan angin / Trekstang 19 mm
Baut ASTM-490 5/8"
Baut angker baja A90-3/4" t= 35cm
Baut 12 mm gording
Usuk + Reng Galvalum EX IGGI
Genteng sekualitas kanmuri
Bubungan sekualitas kanmuri

0.80
0.60
75.20
6.40
22.45
15.40

0.80
0.60
0.35
0.30
0.25
0.15

5.60
25.70

0.40
0.30

0.80
0.60
0.30
86.40
36.60
109.00
32.60
22.20

0.80
0.60
0.35
0.35
0.30
0.50
0.40
0.25

97.20

0.30

264.80
561.10
0.30
22.00

0.35

24.00
71.20

24.65

VOLUME

DETAIL PERHITUNGAN

L ( Luas )

1.50
1.50

1.50

7.45

Volume/Jmlh ( bh )

23.00
50.00

11.00

1.80
1.80
14.20

6.00
2.00

5.50
5.50

207.00
500.00

koef

JUMLAH

SAT.

1.00
264.00
236.80
60.48
1.00
1.00
1.00

ls
m'
m'
m2
ls
unit
ls

850.17
270.48
558.57

m3
m3
m3

21.12
43.09
34.99
8.10
195.53
4,130.50
1,138.50
2,750.00

m3

m3
m1

5.50

0.05
0.05
0.05
0.05
0.05
0.05
0.05

0.10
0.10
0.10
0.10
0.10
0.07

44.00

7.45
7.45

7.45
7.45

23.00
50.00
11.00
6.00
2.00
2.00

23.00
50.00
11.00
6.00
2.00

0.05
0.05
0.05
0.05
0.05
0.07
0.07

0.80
0.80
0.40
0.40
0.40
0.40
1.10
1.10
1.10
1.50
1.70

0.69
0.69
0.69
7.45
7.45

207.00
500.00
44.00
23.00
50.00
11.00
2.00
6.00
2.00
23.00
50.00
11.00
6.00
2.00

242.00
326.64
29.08
8.56
18.62
0.70
0.97
0.23
0.14
0.69
58.17
17.13
37.24
1.41
1.94
0.45
0.96
14.74
10.81
2.09
0.60
0.31
0.93
0.20
0.10
0.10
518.79
143.00
345.40
30.40
171.29
297.90
5.63
1.15
7.78
1.80
48.19
16.19
19.80
7.74
3.24
0.54

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3

m3
m3
m3

m3

0.80
0.80
0.15
1.60
1.60
0.70
0.45
0.45
0.55
0.35

1.00
2.00
1.00
2.00
3.00

0.29
0.38
5.15
2.07
2.47
0.61
151.39
18.78
5.40
3.43
6.53

m3

m3
m3
m3
m3
m3

4.50
4.50
4.50
4.50
0.12
0.12

64.00
24.00
4.00
6.00
2.00

0.12
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.55
0.35
0.30
0.12
0.12

1,910.50
364.00

0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12
0.12

1,910.50

0.12
4.50
4.50
4.50
4.50
0.70

1,925.20

64.00
24.00
4.00
6.00

2.00

64.00
16.00
4.00
6.00

2.00

64.00
16.00
4.00
6.00

184.32
6.75
2.88
1.69
3.37
3.75

229.26
43.68
184.32
38.88
2.88
1.69
173.95
21.29
5.01
3.43
45.34
0.69
3.37
3.75

229.26
184.32
25.92
2.88
1.69
173.95
21.29
1.28
45.02
0.69
3.37
3.81
231.02
184.32
25.92
2.88
1.69
173.95

0.45
0.45
0.35
0.30
0.12
0.12

2.00

0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12
0.12

1,925.20

0.12
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
1.00
0.35
0.30
0.12

1,611.20
186.60

64.00
16.00
4.00
6.00

2.00

64.00
16.00
4.00
6.00

1.00

0.20
4.50
4.20
3.00
0.80
0.80
0.50
0.40
0.80

11.00
4.00
4.00

21.29
1.28
45.02
0.69
3.37
3.81
231.02
184.32
25.92
2.88
1.69
173.95
21.29
1.28
45.02
0.69
3.37
3.81
193.34
22.39
184.32
25.92
2.88
1.69
128.28
17.04
1.28
113.40
44.42
0.69
1.37
233.02
50.11
31.68
10.75
7.68
7.99
30.58
10.52
2.06
0.93

0.12
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12

965.98
12.00
3.00
2.00

2.00

115.92
34.56
4.86
1.44
89.01
8.37
1.28
13.22
0.69
2.12

0.12
3.50
3.50
0.70
0.45
0.35
0.30

121.80

14.62
67.20
2.52
18.42
0.86
1.96
0.69

30.00
2.00

0.80
0.50
0.12
2.30
2.30
2.30
0.70
0.45
0.60
0.80
0.35

1.79
3.86
234.80

28.18
38.27
1.66
3.86
21.17
4.94
32.70
10.43
1.94

26.00
2.00
16.00

0.50

0.02

14.58

0.30
4.00
864.00
128.00
1,560.42
0.71

79.70
9.27
7850
350.00
2.23

21,104.56
5,201.40
47.10
36.75
196.24
864.00
128.00
1,560.42
836.65
836.65
71.20

kg

bh
m2
m2
m1

No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

F. PEKERJAAN STRUKTUR ATAP


I

PEKERJAAN BETON

Ring Balk 30/50 (BR2)

#REF!

m3

SUB TOTAL

II

PEKERJAAN ATAP

1
2
3
4
5
6
7
8
9
10
11

Kuda - Kuda baja WF 350.250.9.14


Gording kanal kait C 200.75.20.3,2
Tabung Plat t= 20mm
Plat Plendes t = 15 mm
Ikatan angin / Trekstang 19 mm
Baut ASTM-490 5/8"
Baut angker baja A90-3/4" t= 35cm
Baut 12 mm gording
Usuk + Reng Galvalum EX IGGI
Genteng sekualitas kanmuri
Bubungan sekualitas kanmuri

#REF!

kg
kg
kg
kg
kg
kg
kg
bh
bh
m2
m2

38,171.29
16,654.79
23,529.79
26,626.74
25,490.94
46,231.77
47,609.92
32,741.37
160,000.00
174,416.92
133,866.14
SUB TOTAL
JUMLAH TOTAL

JUMLAH HARGA
(Rp.)

#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!

No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

E. PEKERJAAN STRUKTUR TOP FLOOR


I
1
2
3
4
5
6
7
8
9

PEKERJAAN BETON
Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (30x35) K5
Balok 35/70 (B1)
Balok 30/45 (B2)
Ring Balk 35/60 (BR1)
Balok konsol 40/80 (Bks1)
Balok 25/35 (Banak)

#REF!

m3
m3
m3
m3
m3
m3
m3
m3
m3

SUB TOTAL

JUMLAH HARGA
(Rp.)

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!

No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

E. PEKERJAAN STRUKTUR ELV. 28.50 (trap auditorium)


I
1
2

PEKERJAAN BETON
Balok 40/80 (Tb1)
Balok 30/50 (Tb2)

#REF!

m3
m3

SUB TOTAL

JUMLAH HARGA
(Rp.)

#REF!
#VALUE!
#REF!

No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

E. PEKERJAAN STRUKTUR AUDITORIUM


I
1
2
3
4
5
6
7

PEKERJAAN BETON
Plat lantai t 12 cm (plat trap t.duduk)
Kolom (80x80) K1
Balok 40/80 (B1a)
Balok 40/80 (Tb1)
Balok 30/50 (Tb2)
Balok 25/40 (Tb3)
Balok 40/80 (KS1)

#REF!

m3
m3
m3
m3
m3
m3
m3

SUB TOTAL

JUMLAH HARGA
(Rp.)

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!

BILL OF QUALITY
STRUKTUR
PEKERJAAN STRUKTUR LANTAI 2
No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

A. PEKERJAAN STRUKTUR LANTAI 1


I
1
2
3
4
5
6

PEKERJAAN TANAH
Galian tanah Pilecap
Galian tanah pondasi plat
Galian tanah pit-depht lift
Bor strauss 40 cm
Urugan tanah kembali
Urugan pasir bawah pondasi pilecap

7
8

Urugan pasir bawah pondasi plat tangga


Urugan pasir bawah pondasi pondasi pit-depth lift

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

PEKERJAAN PONDASI DAN SLOOF


Rabat lantai kerja pondasi t= 10 cm
Rabat lantai kerja pondasi pit-depth lift t= 7 cm
Rabat lantai kerja sloof, t= 5 cm
Rabat lantai kerja pondasi tangga, t= 7 cm
Strouss 40 cm - 5.50 m
Pilecap P-1
Pilecap P-2
Pilecap P-3
Pondasi footplat tangga
Pondasi footplat (FP1)
Pondasi footplat (FP2)
Pedestal
Pondasi dan dinding lift t =15 cm
Sloof 1 (35x70)
Sloof 2 (30x45)
Sloof 3 (25x45)
Sloof 4 (30x55)
Sloof 5 (25x35)
Stek Besi Balok 35/70
Stek Besi Balok 30/45
Stek Besi Balok 25/35

III
1
2
3
4
5
6

PEKERJAAN KOLOM
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Plat Tangga utama dan bordes lt 1 ke lt 2
Plat Tangga darurat dan bordes lt 1 ke lt 2 (2 unit)

76.80
31.43
27.83
640.00
40.82
7.02

m3
m3
m3
m1
m3
m3

72,386.40
60,992.64
60,992.64
90,631.39
20,330.88
172,052.92

0.07
0.70

m3
m3

172,052.92
172,052.92
SUB TOTAL

14.03
0.97
2.75
0.10
5.02
88.06
0.72
5.18
1.80
2.99
5.15
28.22
3.40
0.42
1.98
0.88
379.38
209.97
169.29

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg

806,000.26
806,000.26
806,000.26
806,000.26
5,977,143.20
3,812,002.41
3,301,825.98
4,277,241.07
6,048,882.53
4,747,750.68
4,862,013.34
14,470,348.20
10,611,869.05
6,407,061.74
7,836,690.24
8,825,445.91
7,045,198.25
10,317,973.65
14,463.00
14,463.00
14,463.00
SUB TOTAL

46.08
6.48
1.44
1.69
3.37
-

m3
m3
m3
m3
m3
m3

8,023,706.93
11,521,254.65
11,573,976.79
16,362,231.76
16,172,750.39

SUB TOTAL
JUMLAH TOTAL

JUMLAH HARGA
(Rp.)

5,559,275.83
1,916,876.69
1,697,120.21
58,004,089.60
829,823.16
1,207,295.34
12,387.81
119,684.31
69,346,552.95
11,311,407.65
784,943.50
2,212,974.46
81,244.83
30,029,167.41
290,772,003.10
4,355,195.42
24,612,339.55
8,751,624.02
43,295,281.82
54,645,819.68
180,832,910.58
26,660,420.18
3,673,591.86
13,949,492.54
9,055,311.62
5,486,939.51
3,036,796.71
2,448,417.35
715,995,881.81
369,732,415.36
74,657,730.14
16,666,526.57
27,611,266.09
54,489,877.51
-

543,157,815.67
1,328,500,250.43

No.

URAIAN PEKERJAAN

HARGA SATUAN

VOLUME

(Rp.)

B. PEKERJAAN STRUKTUR LANTAI 2


I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

PEKERJAAN BETON
Plat lantai t 12 cm (S1)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 30/55 (B4)
Balok 25/40 (B anak) Elv. + 4.50
Balok sabuk lift 15/30
Plat Tangga utama dan bordes lt 2 ke lt 3
Plat Tangga darurat dan bordes lt 2 ke lt 3 (2 unit)
Stek Besi Balok 35/70
Stek Besi Balok 30/45
Stek Besi Balok 25/35

68.60
46.08
6.48
1.44
1.69
33.12
4.75
2.59
8.52
0.69
3.37
379.38
209.97
169.29

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg

7,628,225.44
8,023,706.93
11,521,254.65
11,573,976.79
16,362,231.76
10,853,753.10
11,486,573.00
10,530,510.74
14,601,279.42
12,634,408.63
16,172,750.39
16,172,750.39
14,463.00
14,463.00
14,463.00
SUB TOTAL

JUMLAH HARGA
(Rp.)

523,278,720.43
369,732,415.36
74,657,730.14
16,666,526.57
27,611,266.09
359,519,717.68
54,584,194.89
27,279,288.06
124,417,501.98
8,755,645.18
54,489,877.51
5,486,939.51
3,036,796.71
2,448,417.35
1,651,965,037.46

ANALISA HARGA SATUAN


NO.

KOMPONEN

JENIS PEKERJAAN
A. TENAGA
1
2
3
4

PERKIRAAN
SATUANKUANTITAS

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

: 1 m' Pagar Sementara dari seng gelo

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0200

btg
kg
Ibr
m
m
m
kg
kg

1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8

BAHAN
Dolken Kayu 8 cm
Portland Cement (PC)
Atap Seng Gelombang bjls 20
Pasir Cor
Stenslah/batu pecah tangan 2/3
Balok Kayu Kelas II
Paku Kayu Segala Ukuran
Cat meni besi sekualitas Emco

M089
M037
M178
M004
M014
M084
M140
M410

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m1 Pengukuran dan pemasangan b
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1000
0.1000
0.0100
0.0050

0.0120

JUMLAH HARGA TENAGA


B
1

BAHAN
Balok Kayu Kelas III

M084

81

2
3

Paku Kayu Segala Ukuran


Papan (3x20) cm

M140
M064

kg
m

0.0200
0.0070

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

82

JENIS PEKERJAAN

: 1 m2 Pembuatan kantor sementara,

A. TENAGA
1
2
3
4
5

Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor

L17
L08
L07
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

2.0000
1.0000
1.0000
0.3000
0.0500

m
kg
kg
m
m
m
bh
Ibr
m
m
lbr
bh
bh

0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.0750
0.1500
1.5000
2.0000
2.0000

JUMLAH HARGA TENAGA


B
1
2
2
3
4
5
6
7
8
9
11
12
13

BAHAN
Balok Kayu Kelas III
M084
Paku Kayu Segala Ukuran
M140
Portland Cement (PC)
M037
Pasir Pasang
M002
Pasir Cor
M004
Stenslah/batu pecah tangan 2/3 M014
Bata Merah
M022
Atap Seng Gelombang bjls 20
M178
Jendela Nako + accessories
M285
Kaca Polos tebal 3 mm sekualitas M270
Multiplek 6 mm
M216
Grendel Pintu
M262
Engsel Pintu
M257
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
: 1 m3 Galian tanah biasa sedalam 2 m
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.9000
0.0450

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN

83

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

84

JENIS PEKERJAAN

: 1 m3 Galian tanah biasa sedalam 3 m

A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.0500
0.0670

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m1 Bor Strouss
A. TENAGA

JENIS PEKERJAAN

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.7250
0.0200

0.1225

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C
1

PERALATAN
Sewa alat mesin bor

M503

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Urugan tanah kembali
JENIS PEKERJAAN
A. TENAGA
1
2
3

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu

L17
L07
L02

Org/hr
Org/hr
Org/hr

0.3000
85

Mandor

L01

Org/hr

0.0150

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

86

JENIS PEKERJAAN

: 1 m3 Urugan pasir

A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.0100

1.2000

JUMLAH HARGA TENAGA


B
1

BAHAN
Pasir Urug

M001

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Lantai Kerja
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.2000
0.2000
0.0200
0.0600

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

230.0000
0.6379
0.7563
200.000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

87

JENIS PEKERJAAN

: 1 m3 Pondasi Strouss 40 cm

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

157.7191
59.0476
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 16
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M490
M495
M135
M037
M004
M019

JUMLAH HARGA BAHAN


PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi beton poer (P1)
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

32.0384
66.8934
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M490
M492
M135
M037
M004
M019

88

JUMLAH HARGA BAHAN


PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

89

JENIS PEKERJAAN

: 1 m3 Pondasi beton poer (P2)

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

24.0288
52.0282
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M490
M492
M135
M037
M004
M019

JUMLAH HARGA BAHAN


PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi beton poer (P3)
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

40.6250
79.1667
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M490
M492
M135
M037
M004
M019

90

JUMLAH HARGA BAHAN


PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

91

JENIS PEKERJAAN

: 1 m3 Pondasi Footplat (FP1)

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

40.5370
100.3509
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 13
Besi Ulir 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

JUMLAH HARGA BAHAN


PERALATAN

M489
M490
M135
M037
M004
M019

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi Footplat (FP2)
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
kg
m
m

42.0111
104.0000
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6

BAHAN
Besi Ulir 13
Besi Ulir 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M489
M490
M135
M037
M004
M019

JUMLAH HARGA BAHAN


92

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

93

JENIS PEKERJAAN

: 1 m3 Pondasi Footplat tangga

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

kg
kg
kg
m
m

307.2222
2.2500
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5

BAHAN
Besi Polos 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

JUMLAH HARGA BAHAN


PERALATAN

M497
M135
M037
M004
M019

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Beton plat lantai & dinding lift
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
m
m

0.2500
3.0000
1.2000
277.3333
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M474
M490
M135
M037
M004
M019

94

9
10
11

Balok Kayu Kelas III


Multiplek 9 mm
Dolken Kayu 8 cm

M084
M217
M089

m
lbr
btg

0.1050
2.5000
14.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

95

JENIS PEKERJAAN

: 1 m3 Sloof beton bertulang 35x70 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
kg
m
m

0.2700
2.0000
0.6000
136.4898
33.4980
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M474
M492
M495
M135
M037
M004
M019

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Sloof beton bertulang 30x45 +
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg

0.2700
2.0000

JUMLAH HARGA TENAGA


B
1
2

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran

M085
M140

96

3
4
5
6
7
8
9

Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M474
M491
M495
M135
M037
M004
M019

Itr
kg
kg
kg
kg
m
m

0.6000
198.1630
37.2407
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

97

JENIS PEKERJAAN

: 1 m3 Sloof beton bertulang 25x45 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
kg
m
m

0.2700
2.0000
0.6000
237.7956
44.4889
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M474
M491
M495
M135
M037
M004
M019

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Sloof beton bertulang 30x55 +
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg

0.2700
2.0000

JUMLAH HARGA TENAGA


B
1
2

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran

M085
M140

98

3
4
5
6
7
8
9

Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M474
M491
M495
M135
M037
M004
M019

Itr
kg
kg
kg
kg
m
m

0.6000
162.1333
38.0758
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

99

JENIS PEKERJAAN

: 1 m3 Sloof beton bertulang 25x35 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
kg
m
m

0.2700
2.0000
0.6000
305.7371
42.9143
3.0000
413.0000
0.4864
0.7563

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M474
M491
M495
M135
M037
M004
M019

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Kolom beton bertulang 80x80 +
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

m
kg

0.4000
4.0000

JUMLAH HARGA TENAGA


B
1
2

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran

M085
M140

100

3
4
5
6
7
8
9
10
11
12

Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

Itr
kg
kg
kg
kg
m
m
m
lbr
btg

2.0000
146.3000
61.6563
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000

JUMLAH HARGA BAHAN

101

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Kolom beton bertulang 60x60 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.4000
4.0000
2.0000
222.9333
172.6111
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien Lt.2 x
102

Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

Lt.3
Lt.4
Lt.5
Lt.5
Lt.5

x
x
x
x
x

103

JENIS PEKERJAAN

: 1 m3 Kolom beton bertulang 40x40 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.4000
4.0000
2.0000
128.7000
189.7000
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 16
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

104

JENIS PEKERJAAN

: 1 m3 Kolom beton bertulang 25x25 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.4000
4.0000
2.0000
219.6480
40.0800
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 16
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.5
Lt.5

x
x
x
x
x
x

: 1 m3 Beton plat tangga

A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja

L17
L07
L08
L09

Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
105

5
6

Kepala Tukang Batu


Mandor

L02
L01

Org/hr
Org/hr

0.3230
0.2830

JUMLAH HARGA TENAGA

106

B
1
2
3
4
5
6
7
8
9
10
11

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 13
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M489
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

0.2500
3.0000
1.2000
526.6667
3.0000
413.0000
0.4864
0.7563
0.1050
2.5000
14.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien Lt.2 x
Kooefisien Lt.3 x
Kooefisien Lt.4 x
Kooefisien Lt.5 x
Kooefisien Lt.6x
Kooefisien Lt.7 x

JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 35x70 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg

0.3200
3.2000
1.6000
163.7878
37.1533

JUMLAH HARGA TENAGA


B
1
2
3
4
5

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10

M085
M140
M474
M492
M495

107

6
7
8
9
10
11
12

Kawat Beton/Bendrat RRT


Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M135
M037
M004
M019
M084
M217
M089

kg
kg
m
m
m
lbr
btg

3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN

108

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 30x45 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.6000
222.9333
46.4259
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


109

Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

110

JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 25x45 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.6000
267.5200
31.8921
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 30x55 +

A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja

L17
L07
L08
L09

Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
111

5
6

Kepala Tukang Batu


Mandor

L02
L01

Org/hr
Org/hr

0.3330
0.3180

JUMLAH HARGA TENAGA

112

B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.6000
202.6667
27.3398
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien Lt.2 x
Kooefisien Lt.3 x
Kooefisien Lt.4 x
Kooefisien Lt.5 x
Kooefisien Lt.6x
Kooefisien Lt.7 x

JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 25x40 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg

0.3200
3.2000
1.6000
334.4000

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22

M085
M140
M474
M492

113

5
6
7
8
9
10
11
12

Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M495
M135
M037
M004
M019
M084
M217
M089

kg
kg
kg
m
m
m
lbr
btg

31.4000
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien

Lt.2
Lt.3
Lt.4
Lt.5

x
x
x
x

114

Kooefisien Lt.6 x
Kooefisien Lt.7 x
JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 15x30 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.6000
305.0667
46.1259
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 16
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Beton Plat lantai (S1)

A. TENAGA
1
2

Pekerja Biasa
Tukang Batu

L17
L07

Org/hr
Org/hr

5.6500
0.2750
115

3
4
5
6

Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.2000
75.7778
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Beton Plat lantai (S2)

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

JUMLAH HARGA TENAGA


B

BAHAN DAN BEKISTING (2 KALI PAKAI)

116

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M495
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

0.3200
3.2000
1.2000
103.3333
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 50x100

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m3

0.3200
3.2000
1.6000
120.3840
37.1462
3.0000
413.0000
0.4864

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor

M085
M140
M474
M492
M495
M135
M037
M004

117

9
10
11
12

Batu pecah mesin 2/3


Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M019
M084
M217
M089

m
m
lbr
btg

0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 40x80 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
167.2000
49.1375
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN

118

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 30x50 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

JUMLAH HARGA TENAGA

119

B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
267.5200
37.7000
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 30x50 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg

0.3200
3.2000
1.6000
267.5200
37.7000

JUMLAH HARGA TENAGA


B
1
2
3
4
5

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10

M085
M140
M474
M492
M495

120

6
7
8
9
10
11
12

Kawat Beton/Bendrat RRT


Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M135
M037
M004
M019
M084
M217
M089

kg
kg
m3
m
m
lbr
btg

3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien Lt.2 x
Kooefisien Lt.3 x
Kooefisien Lt.4x
Kooefisien Lt.5 x
Kooefisien Lt.6 x
Kooefisien Lt.7 x

JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 25x45 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
0.6200
0.6667
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

121

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 40x80 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
4.0000
66.6667
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


122

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Balok beton bertulang 35x60 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
267.5200
37.7000
13.0533
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 16
Besi Polos 10
Besi Polos 12
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M490
M495
M496
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien

Lt.2
Lt.3
Lt.4
Lt.5

x
x
x
x
123

Kooefisien Lt.6 x
Kooefisien Lt.7 x
JENIS PEKERJAAN

: 1 m3 Balok beton bertulang 30x50 +

A. TENAGA
1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m
kg
Itr
kg
kg
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.6000
267.5200
6.6667
0.6200
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000

JUMLAH HARGA TENAGA


B BAHAN DAN BEKISTING (2 KALI PAKAI)
1
Papan Kayu kelas III
M085
2
Paku Kayu Segala Ukuran
M140
3
Minyak bekisting
M474
4
Besi Ulir 16
M490
5
Besi Polos 10
M495
6
Besi Polos 12
M496
7
Kawat Beton/Bendrat RRT
M135
8
Portland Cement (PC)
M037
9
Pasir Cor
M004
10 Batu pecah mesin 2/3
M019
11 Balok Kayu Kelas III
M084
12 Multiplek 9 mm
M217
13 Dolken Kayu 8 cm
M089
JUMLAH HARGA BAHAN
C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien

JENIS PEKERJAAN

Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7

x
x
x
x
x
x

: 1 m3 Beton Plat lantai (trap t. duduk

A. TENAGA
1
2

Pekerja Biasa
Tukang Batu

L17
L07

Org/hr
Org/hr

5.6500
0.2750
124

3
4
5
6

Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.5600
1.4000
0.3230
0.2830

m
kg
Itr
kg
kg
kg
m3
m
m
lbr
btg

0.3200
3.2000
1.2000
171.1111
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000

JUMLAH HARGA TENAGA


B
1
2
3
4
5
6
7
8
9
10
11

BAHAN DAN BEKISTING (2 KALI PAKAI)


Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
Besi Ulir 13
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M489
M135
M037
M004
M019
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


Kooefisien Lt.5 x

JENIS PEKERJAAN

: 1 kg Pasang Baja WF

A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Baja Profil (WF/ C)
Solar Industri
Minyak Pelumas
Elektroda

M116
M483
M484
M473

JUMLAH HARGA BAHAN


125

PERALATAN

1
JUMLAH HARGA PERALATAN
D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Pasang Baja Canal C
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Baja Canal 200
Solar Industri
Minyak Pelumas
Elektroda

M501
M483
M484
M473

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 kg Ikatan Angin/Trekstang
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr

1.0500
0.0100
0.0010

JUMLAH HARGA TENAGA


B
1
2
3

BAHAN
Besi Beton Polos
Solar Industri
Minyak Pelumas

M112
M483
M484

126

Elektroda

M473

kg

0.0200

JUMLAH HARGA BAHAN


C

PERALATAN

Err:512

E05

Err:512

0.0160

JUMLAH HARGA PERALATAN


D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 bh Pasang baut angker baja
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg

1.0500

JUMLAH HARGA TENAGA


B
1

BAHAN
Angker Bar f 19 mm

M117

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
JENIS PEKERJAAN
: 1 bh Pasang baut gording
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg

1.0000

JUMLAH HARGA TENAGA


B
1

BAHAN
Baut Segala Ukuran

M146

JUMLAH HARGA BAHAN


C

PERALATAN
127

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


JENIS PEKERJAAN
: 1 m2 Pasang atap genteng sekualita
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.0750
0.0080
0.0080

bh
kg

12.0000
0.0300

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Genteng sekualitas kanmuri


Paku Kayu Segala Ukuran
JUMLAH HARGA BAHAN

PERALATAN

M154
M140

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


JENIS PEKERJAAN
: 1 m2 Pasang bubung genteng sekua
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0020

bh
kg
m3

5.0000
8.0000
0.0320

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Bubung Genteng sekualitas kanmuM161


M037
Portland Cement (PC)
M002
Pasir Pasang
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN

128

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Pasang Plat Plendes
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

hari

0.0160

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Besi Strip / Plat Plendes
Solar Industri
Minyak Pelumas
Elektroda

M114
M483
M484
M473

JUMLAH HARGA BAHAN


C
1

PERALATAN
Sewa Mesin Las (150A)

E05

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Pasang Tabung Plat
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

hari

0.0160

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Plat Baja
Solar Industri
Minyak Pelumas
Elektroda

M116.a
M483
M484
M473

JUMLAH HARGA BAHAN


C
1

PERALATAN
Sewa Mesin Las (150A)

E05

129

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Ikatan Angin/Trekstang
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

kg
Itr
Itr
kg

1.0500
0.0100
0.0010
0.0200

hari

0.0160

JUMLAH HARGA TENAGA


B
1
2
3
4

BAHAN
Besi Beton Polos
Solar Industri
Minyak Pelumas
Elektroda

M112
M483
M484
M473

JUMLAH HARGA BAHAN


C
1

PERALATAN
Sewa Mesin Las (150A)

E05

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut angker baja
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0300

kg

1.0500

JUMLAH HARGA TENAGA


B
1

BAHAN
Angker Bar f 19 mm

M117

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN

130

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut gording
JENIS PEKERJAAN
A. TENAGA
1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0300

kg

1.0000

JUMLAH HARGA TENAGA


B
1

BAHAN
Baut Segala Ukuran

M146

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

131

ANALISA HARGA SATUAN


HARGA
SATUAN
(Rp.)

BIAYA

: 1 m' Pagar Sementara dari seng gelombang tinggi 2 m

63,534.00
75,000.00
105,890.00
84,712.00

25,413.60
15,000.00
2,117.80
1,694.24
44,225.64

24,000.00
1,560.00
116,650.00
206,267.00
287,503.00
5,100,000.00
13,500.00
50,688.00

30,000.00
3,900.00
139,980.00
1,031.34
2,587.53
367,200.00
810.00
22,809.60
568,318.46

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m1 Pengukuran dan pemasangan bouwplank

63,534.00
75,000.00
105,890.00
84,712.00

612,544.10

6,353.40
7,500.00
1,058.90
423.56
15,335.86

7,951,956.00

95,423.47
132

GA, BAHAN DAN PERALATAN (A + B + C)

13,500.00
9,528,019.00

270.00
66,696.13
162,389.61

177,725.47

133

: 1 m2 Pembuatan kantor sementara, dengan lantai plesteran

63,534.00
75,000.00
79,418.00
105,890.00
84,712.00

127,068.00
75,000.00
79,418.00
31,767.00
4,235.60
317,488.60

7,951,956.00
13,500.00
1,560.00
193,291.00
206,267.00
287,503.00
1,352.00
116,650.00
245,300.00
113,591.00
117,335.00
30,818.00
48,525.00

1,431,352.08
4,050.00
54,600.00
28,993.65
20,626.70
43,125.45
40,560.00
58,325.00
18,397.50
17,038.65
176,002.50
61,636.00
97,050.00
2,051,757.53

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Galian tanah biasa sedalam 2 m

63,534.00
79,418.00
105,890.00
84,712.00

2,369,246.13

57,180.60
3,812.04
60,992.64

134

GA, BAHAN DAN PERALATAN (A + B + C)

60,992.64

135

: 1 m3 Galian tanah biasa sedalam 3 m

63,534.00
79,418.00
105,890.00
84,712.00

66,710.70
5,675.70
72,386.40

GA, BAHAN DAN PERALATAN (A + B + C)

72,386.40

63,534.00
79,418.00
105,890.00
84,712.00

46,062.15
1,694.24
47,756.39

350,000.00

42,875.00
42,875.00

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Urugan tanah kembali

90,631.39

63,534.00
79,418.00
105,890.00

19,060.20
136

GA, BAHAN DAN PERALATAN (A + B + C)

84,712.00

1,270.68
20,330.88

20,330.88

137

63,534.00
79,418.00
105,890.00
84,712.00

19,907.32

126,788.00

152,145.60
152,145.60

GA, BAHAN DAN PERALATAN (A + B + C)

GA, BAHAN DAN PERALATAN (A + B + C)

19,060.20
847.12

172,052.92

63,534.00
79,418.00
105,890.00
84,712.00

76,240.80
15,883.60
2,117.80
5,082.72
99,324.92

1,560.00
206,267.00
285,082.00
3.50

358,800.00
131,568.88
215,606.46
700.00
706,675.34

806,000.26

138

: 1 m3 Pondasi Strouss 40 cm

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

3,517,609.95
854,005.71
55,656.00
644,280.00
100,334.16
215,606.46
5,387,492.29

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi beton poer (P1)

5,977,143.20

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

714,552.36
1,491,922.51
55,656.00
644,280.00
100,334.16
215,606.46
139

GA, BAHAN DAN PERALATAN (A + B + C)

3,222,351.50

3,812,002.41

140

: 1 m3 Pondasi beton poer (P2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

535,914.27
1,160,384.18
55,656.00
644,280.00
100,334.16
215,606.46
2,712,175.07

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi beton poer (P3)

3,301,825.98

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

906,059.38
1,765,654.17
55,656.00
644,280.00
100,334.16
215,606.46
141

GA, BAHAN DAN PERALATAN (A + B + C)

3,687,590.16

4,277,241.07

142

: 1 m3 Pondasi Footplat (FP1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

904,097.54
2,238,125.61
55,656.00
644,280.00
100,334.16
215,606.46
4,158,099.77

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Pondasi Footplat (FP2)

4,747,750.68

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

936,973.81
2,319,512.00
55,656.00
644,280.00
100,334.16
215,606.46
4,272,362.43
143

GA, BAHAN DAN PERALATAN (A + B + C)

4,862,013.34

144

: 1 m3 Pondasi Footplat tangga

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91

14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

4,443,355.00
55,656.00
644,280.00
100,334.16
215,606.46
5,459,231.62

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m3 Beton plat lantai & dinding lift

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

6,048,882.53

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00

1,062,500.00
40,500.00
4,704.00
6,185,365.33
74,208.00
644,280.00
100,334.16
215,606.46
145

GA, BAHAN DAN PERALATAN (A + B + C)

7,951,956.00
178,499.00
24,000.00

834,955.38
446,247.50
336,000.00
9,944,700.84

10,611,869.05

146

: 1 m3 Sloof beton bertulang 35x70 + bekisting (SL1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

1,147,500.00
27,000.00
2,352.00
3,044,131.92
484,480.98
74,208.00
644,280.00
100,334.16
215,606.46
5,739,893.52

GA, BAHAN DAN PERALATAN (A + B + C)


6,407,061.74
: 1 m3 Sloof beton bertulang 30x45 + bekisting (SL2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00

1,147,500.00
27,000.00
147

GA, BAHAN DAN PERALATAN (A + B + C)

3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

2,352.00
4,419,628.56
538,612.83
74,208.00
644,280.00
100,334.16
215,606.46
7,169,522.02

7,836,690.24

148

: 1 m3 Sloof beton bertulang 25x45 + bekisting (SL3)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

1,147,500.00
27,000.00
2,352.00
5,303,554.28
643,442.80
74,208.00
644,280.00
100,334.16
215,606.46
8,158,277.70

GA, BAHAN DAN PERALATAN (A + B + C)


8,825,445.91
: 1 m3 Sloof beton bertulang 30x55 + bekisting (SL4)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00

1,147,500.00
27,000.00
149

GA, BAHAN DAN PERALATAN (A + B + C)

3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

2,352.00
3,616,059.73
550,689.68
74,208.00
644,280.00
100,334.16
215,606.46
6,378,030.04

7,045,198.25

150

: 1 m3 Sloof beton bertulang 25x35 + bekisting (SL5)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00

1,147,500.00
27,000.00
2,352.00
6,818,855.50
620,669.31
74,208.00
644,280.00
100,334.16
215,606.46
9,650,805.43

GA, BAHAN DAN PERALATAN (A + B + C)


10,317,973.65
: 1 m3 Kolom beton bertulang 80x80 + bekisting

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46

4,250,000.00
13,500.00

1,700,000.00
54,000.00
151

3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

7,840.00
3,262,928.90
891,734.34
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
9,285,575.77

152

GA, BAHAN DAN PERALATAN (A + B + C)

10,118,435.22
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Kolom beton bertulang 60x60 + bekisting

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,700,000.00
54,000.00
7,840.00
4,972,082.13
2,496,474.50
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
12,599,469.16

GA, BAHAN DAN PERALATAN (A + B + C)

13,432,328.61
1.090
153

1.120
1.135
1.162
1.189
1.216

154

: 1 m3 Kolom beton bertulang 40x40 + bekisting

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,700,000.00
54,000.00
7,840.00
2,870,396.10
2,743,631.10
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
10,744,939.72

GA, BAHAN DAN PERALATAN (A + B + C)

11,577,799.18
1.090
1.120
1.135
1.162
1.189
1.216

155

: 1 m3 Kolom beton bertulang 25x25 + bekisting

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,700,000.00
54,000.00
7,840.00
4,898,809.34
579,677.04
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
10,609,398.91

GA, BAHAN DAN PERALATAN (A + B + C)

11,442,258.36
1.090
1.120
1.135
1.162
1.189
1.216

63,534.00
79,418.00
75,000.00
79,418.00

358,967.10
21,839.95
117,000.00
111,185.20
156

105,890.00
84,712.00

34,202.47
23,973.50
667,168.22

157

4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,062,500.00
40,500.00
4,704.00
11,746,246.67
74,208.00
644,280.00
100,334.16
215,606.46
834,955.38
446,247.50
336,000.00
15,505,582.17

GA, BAHAN DAN PERALATAN (A + B + C)

16,172,750.39
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 35x70 + bekisting (B1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00

1,360,000.00
43,200.00
6,272.00
3,652,958.30
537,348.00
158

24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
8,631,277.97

159

GA, BAHAN DAN PERALATAN (A + B + C)

9,353,693.81
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 30x45 + bekisting (B2)

GA, BAHAN DAN PERALATAN (A + B + C)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
4,972,082.13
671,458.17
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,084,511.96

10,806,927.80
160

1.090
1.120
1.135
1.162
1.189
1.216

161

: 1 m3 Balok beton bertulang 25x45 + bekisting (B3)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
5,966,498.56
461,254.91
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,868,725.14

GA, BAHAN DAN PERALATAN (A + B + C)

11,591,140.97
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 30x55 + bekisting (B4)

63,534.00
79,418.00
75,000.00
79,418.00

403,440.90
21,839.95
123,750.00
111,185.20
162

105,890.00
84,712.00

35,261.37
26,938.42
722,415.84

163

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
4,520,074.67
395,415.92
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
9,356,462.25

GA, BAHAN DAN PERALATAN (A + B + C)

10,078,878.08
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 25x40 + bekisting (B anak)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00

1,360,000.00
43,200.00
6,272.00
7,458,123.20
164

14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

454,138.20
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
12,353,233.06

GA, BAHAN DAN PERALATAN (A + B + C)

13,075,648.90
1.090
1.120
1.135
1.162

165

1.189
1.216

: 1 m3 Balok beton bertulang 15x30 + bekisting (Balok Lift)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
6,803,901.87
667,119.27
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
11,911,992.80

GA, BAHAN DAN PERALATAN (A + B + C)

12,634,408.63
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Beton Plat lantai (S1)

63,534.00
79,418.00

358,967.10
21,839.95
166

75,000.00
79,418.00
105,890.00
84,712.00

117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
4,704.00
1,095,974.00
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
5,276,825.66

GA, BAHAN DAN PERALATAN (A + B + C)

5,943,993.88
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Beton Plat lantai (S2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

167

4,250,000.00
13,500.00
3,920.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

GA, BAHAN DAN PERALATAN (A + B + C)

1,360,000.00
43,200.00
4,704.00
1,494,510.00
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
5,675,361.66

6,342,529.88
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 50x100 + bekisting (B1a)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00

1,360,000.00
43,200.00
6,272.00
2,684,924.35
537,244.82
74,208.00
644,280.00
100,334.16
168

285,082.00
7,951,956.00
178,499.00
24,000.00

215,606.46
1,113,273.84
499,797.20
384,000.00
7,663,140.84

GA, BAHAN DAN PERALATAN (A + B + C)

8,385,556.67
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 40x80 + bekisting (B tb1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
3,729,061.60
710,675.66
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
8,880,708.93

169

GA, BAHAN DAN PERALATAN (A + B + C)

9,603,124.76
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 30x50 + bekisting (B tb2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

170

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,952,725.32

GA, BAHAN DAN PERALATAN (A + B + C)

11,675,141.16
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 30x50 + bekisting (B tb2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00

1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
171

24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,952,725.32

GA, BAHAN DAN PERALATAN (A + B + C)

11,675,141.16
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 25x45 + bekisting (B tb3)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
13,827.86
9,642.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
172

4,464,441.52

GA, BAHAN DAN PERALATAN (A + B + C)

5,186,857.36
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 40x80 + bekisting (B KS1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
89,212.00
964,200.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
5,494,383.66

173

GA, BAHAN DAN PERALATAN (A + B + C)

6,216,799.50
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Balok beton bertulang 35x60 + bekisting (BR1)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
188,790.36
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
11,141,515.68

GA, BAHAN DAN PERALATAN (A + B + C)

11,863,931.52
1.090
1.120
1.135
1.162
174

1.189
1.216

: 1 m3 Balok beton bertulang 30x50 + bekisting (BR2)

63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00

403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84

4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
6,272.00
5,966,498.56
96,420.00
8,967.06
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,512,857.28

GA, BAHAN DAN PERALATAN (A + B + C)

11,235,273.12
1.090
1.120
1.135
1.162
1.189
1.216

: 1 m3 Beton Plat lantai (trap t. duduk)

63,534.00
79,418.00

358,967.10
21,839.95
175

75,000.00
79,418.00
105,890.00
84,712.00

117,000.00
111,185.20
34,202.47
23,973.50
667,168.22

4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00

1,360,000.00
43,200.00
4,704.00
3,816,291.11
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
7,997,142.77

GA, BAHAN DAN PERALATAN (A + B + C)

8,664,310.99
1.162

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

27,710.00
10,138.00
67,044.00
55,250.00

31,866.50
101.38
67.04
1,105.00
33,139.92
176

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Pasang Baja Canal C

38,171.29

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

9,000.00
10,138.00
67,044.00
55,250.00

10,350.00
101.38
67.04
1,105.00
11,623.42

GA, BAHAN DAN PERALATAN (A + B + C)


GA, BAHAN DAN PERALATAN (A + B + C)
: 1 kg Ikatan Angin/Trekstang

16,654.79

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

14,463.00
10,138.00
67,044.00

15,186.15
101.38
67.04
177

55,250.00

1,105.00
16,459.57

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut angker baja

21,490.94

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

40,551.00

42,578.55
42,578.55

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut gording

47,609.92

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

27,710.00

27,710.00
27,710.00

178

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m2 Pasang atap genteng sekualitas Moneer

63,534.00
75,000.00
105,890.00
84,712.00

32,741.37

9,530.10
5,625.00
847.12
677.70
16,679.92

13,111.00
13,500.00

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 m2 Pasang bubung genteng sekualitas Moneer

63,534.00
75,000.00
105,890.00
84,712.00

157,332.00
405.00
157,737.00

174,416.92

25,413.60
15,000.00
2,117.80
169.42
42,700.82

14,500.00
1,560.00
193,291.00

72,500.00
12,480.00
6,185.31
91,165.31

179

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Pasang Plat Plendes

133,866.14

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

14,193.00
10,138.00
67,044.00
55,250.00

16,321.95
101.38
67.04
1,105.00
17,595.37

250,000.00

4,000.00
4,000.00

GA, BAHAN DAN PERALATAN (A + B + C)

26,626.74

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

11,500.00
10,138.00
67,044.00
55,250.00

13,225.00
101.38
67.04
1,105.00
14,498.42

250,000.00

4,000.00

180

4,000.00

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 kg Ikatan Angin/Trekstang

23,529.79

63,534.00
79,418.00
105,890.00
84,712.00

3,875.57
484.45
645.93
25.41
5,031.37

14,463.00
10,138.00
67,044.00
55,250.00

15,186.15
101.38
67.04
1,105.00
16,459.57

250,000.00

4,000.00
4,000.00

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut angker baja

25,490.94

63,534.00
79,418.00
105,890.00
84,712.00

1,270.68
2,382.54
3,653.22

40,551.00

42,578.55
42,578.55

181

GA, BAHAN DAN PERALATAN (A + B + C)


: 1 bh Pasang baut gording

GA, BAHAN DAN PERALATAN (A + B + C)

46,231.77

63,534.00
79,418.00
105,890.00
84,712.00

1,270.68
2,382.54
3,653.22

27,710.00

27,710.00
27,710.00

31,363.22

182

DAFTAR HARGA BAHAN BANGUNAN


TAHUN ANGGARAN 2013
NO.
I.
1
2
3
4
5
6
7
8
9

M001
M002
M003
M004
M005
M006
M007
M008
M009
M010
M011
M012
M013
M014
M015
M016
M017
M018
M019
M020
M021
M022
M027
M028
M029
M036
M037
M038
M039
M040

Batu Belah Gunung


batu belah kali
Batu Kali
Stenslah/batu pecah tangan 1/2
Stenslah/batu pecah tangan 2/3
Stenslah/batu pecah tangan 3/5
Stenslah/batu pecah tangan 4/6 - 5/7
Batu pecah mesin 1/1
Batu pecah mesin 1/2
Batu pecah mesin 2/3
Batu pecah mesin 3/5
Batu pecah mesin 4/6 - 5/7
Bata Merah
Batu Teraso
Batu Palimanan
Batu Tempel Hitam
Paving Block

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 bh
1 kg
1 m2
1 m2
1 bh

Portland Cement (PC)


Portland Cement (PC) Putih
Portland Cement (PC) Warna
Portland Cement (PC) Grouting

1 kg
1 kg
1 kg
1 kg

BUIS BETON
M044
M045
M046
M051
M052
M053

v
1
2
3
4
5
6

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

SEMEN

IV.
1
2
3
4
5
6

Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat

BATU, BATA DAN BETON BLOCK

III.
1
2
3
4

SATUAN

TANAH DAN PASIR

II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN BANGUNAN

KODE

Buis Beton Dia 0.20 m


Buis Beton Dia 0.30 m
Buis Beton Dia 0.40 m
Buis Beton Dia 1.00 m
Buis Beton U Dia 0.20 m
Buis Beton U Dia 0.30 m

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

KAYU
M060
M061
M062
M063
M064
M065

papan kayu kelas III


Reng : 2/3, 3/5 kayu meranti
Usuk : 5/7 kayu meranti
Balok Kayu Kelas III
Papan (2x20) cm kayu meranti
Papan (3x20) cm
Papan (3x30) cm kayu meranti

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

M089

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Dolken Kayu 8 cm

1 btg

BESI DAN ALUMINIUM


M112
M113
M114
M115
M116
M117
M118
M122
M123
M124
M125
M126
M127
M128
M135
M140
M141
M142
M143
M144

Besi Beton Polos


Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil (WF/ C)
Angker Bar 19 mm
Kabel prestressed
Rolling Door
Pagar Besi
Pintu Pagar besi
Kusen Alumunium Putih sekualitas YKK 4 "
Kusen Alumunium Coklat sekualitas YKK 4"
Pintu Aluminium
Pintu Fiber KM
Kawat Beton/Bendrat RRT
Paku Kayu Segala Ukuran
Paku Seng Segala Ukuran
Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran

1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 m2
1 m2
1 m1
1 m1
1 m2
1 m2
1 kg
1 kg
1 kg
1 bh
1 bh
1 bh

21
22
23
24
VII
1
2
3

M145
M146
M147
M148
M154
M155
M161

VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

1 bh
1 bh
1 bh

Seng plat BJLS 30 L = 0.45 M


Seng plat BJLS 30 L = 0.60 M
Seng plat BJLS 30 L = 0.90 M
Seng plat BJLS 28 (90 x 180) cm
Atap Seng Gelombang bjls 20
Bubung Seng Gelombang
Roof Light Fibreglass
Atap Polycarbonat
Asbes Gelombang (3.00 x 1.05) m x 4 mm
Asbes Gelombang (2.70 x 1.05) m x 4 mm
Asbes Gelombang (2.40 x 1.05) m x 4 mm
Asbes Gelombang (2.10 x 1.05) m x 4 mm
Asbes Gelombang (1.50 x 1.05) m x 4 mm
Asbes Gelombang (2.50 x 0.92) m x 5 mm
Asbes Gelombang (2.25 x 0.92) m x 5 mm
Asbes Gelombang (2.00 x 0.92) m x 5 mm
Asbes Gelombang (1.80 x 0.92) m x 5 mm
Asbes Gelombang (3.00 x 1.08) m x 6 mm
Asbes Gelombang (2.70 x 1.08) m x 6 mm
Asbes Gelombang (2.10 x 1.08) m x 6 mm
Bubung Paten 1.05 m
Bubung Paten 1.08 m
Bubung Stel Rata 0.92 m
Bubung Stel Rata 1.05 m
Asbes (1,00 x 1,00) m x 6 mm
Asbes (1,00 x 1,00) m x 5 mm
Asbes (1,00 x 1,00) m x 4 mm
Asbes (1,00 x 1,00) m x 3,5 mm
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Harplek 4 mm
List Gypsum
Soft Board
Gypsum Board sekualitas Jayaboard

1 m'
1 m'
1 m'
lbr
1 lbr
lbr
1 m2
1 m2
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 m2
1 m'
1 lbr
1 lbr

KAYU OLAHAN
M214
M215
M216
M217
M218
M219
M220
M227
M228
M229

X.
1
2
3

1 bh
1 kg
1 bh
1 kg

ATAP SENG/ASBES
M174
M175
M176
M177
M178
M179
M180
M181
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M199
M200
M201
M202
M203
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213

IX.
1
2
3
4
5
6
7
8
9
10

Sekrup Segala Ukuran


Baut Segala Ukuran
Paku Keling
Kawel
ATAP GENTENG
Genteng sekualitas kanmuri
Genteng Kaca
Bubung Genteng sekualitas kanmuri

Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm

1 m2
1 m2
1 m2
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr

PERLENGKAPAN KAMAR MANDI


M230
M231
M232

Kloset Jongkok Porselin Kw. A


Kloset Duduk Porselin Kw. A
Kloset Jongkok Lux

1 Unit
1 Unit
1 Unit

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252

Kloset Duduk Lux


Kloset Jongkok Teraso
Kran Air 1/2 "
Kran Air 3/4 "
Bak Mandi Teraso
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Piring Teraso
Bak Cuci Piring Stainless
Badkip Porselen
Urinoir sekualitas TOTO
Urinoir Keramik
Wastafel Komplit sekualitas TOTO
Wastafel Komplit (Kran + Sipon ) Kw. A
Tempat Sabun Keramik sekualitas TOTO
Afor Stainless
Afor Plastic
Kaca Wastafel

1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

besi polos 12
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
M266
M267
M268
M269

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

1 bh
1 bh
1 bh
1 bh
1 bh
1 unit
1 bh
1 bh
1 bh

Kaca Polos tebal 3 mm sekualitas Asahi Mas


Kaca Polos tebal 5 mm
Kaca Polos tebal 8 mm
Kaca Polos tebal 12 mm
Kaca Buram tebal 3 mm
Kaca Buram tebal 5 mm
Kaca Buram tebal 8 mm
Kaca Buram tebal 12 mm
Kaca Cermin tebal 5 mm
Kaca Cermin tebal 6 mm
Kaca Cermin tebal 8 mm
Kaca Rayben tebal 3 mm
Kaca Rayben tebal 6 mm
Kaca Rayben tebal 8 mm
Kaca Rayben tebal 12 mm

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

PERLENGKAPAN LANTAI
M311
M312
M313
M314
M315
M316
M317
M318
M319
M320
M321
M322
M323
M324
M325
M326
M327
M328

XII
1

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

Sewa Mesin Las (150A)


M270
M271
M272
M273
M274
M275
M276
M277
M278
M279
M280
M281
M282
M283
M284

XI.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Kunci Tanam sekualitas SOLID


Kunci Tanam sekualitas Dekson
Kunci Pintu Kamar Mandi sekualitas SES/SOLID
Kunci Silinder
Engsel Pintu
Engsel Jendela sekualitas AMCO
Hak Angin
Spring Knip
Kait Angin
Grendel Pintu
Grendel Jendela
Door Closer
Slot/Kunci Pintu
Handel Pintu Dekson
Door Stop
Rel Pintu Dorong
Kunci Lemari

Lantai keramik artistik 10 x 10


Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Keramik Lantai 40 x 40 cm putih
Keramik Lantai 50 x 50 cm warna/motif
Keramik Lantai 30 x 30 cm putih
Keramik Lantai 30 x 30 cm warna/motif
Keramik Lantai 20 x 20 cm putih
Keramik Lantai 20 x 20 cm warna/motif
Keramik Lantai KM 20 x 20 cm
Plint Keramik Lantai 10 x 20 cm
Plint Keramik Lantai 10 x 30 cm
Plint Keramik Lantai 10 x 40 cm
Keramik Dinding 20 x 25 cm
Keramik Dinding 20 x 20 cm

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 m2
1 m2
1 m2

PERPIPAAN
M338

Pipa PVC tipe AW Dia 1/2 "

1 Ljr

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

M339
M340
M341
M342
M343
M350
M351
M360
M361
M362
M363
M364
M365
M366
M367
M368
M369
M370

Pipa PVC tipe AW Dia 2.5 "


Pipa PVC tipe AW Dia 3 "
Pipa PVC tipe AW Dia 4 "
Pipa PVC tipe AW Dia 5 "
Pipa PVC tipe AW Dia 8 "
Pipa PVC tipe D Dia 3 "
Pipa PVC tipe D Dia 4 "
Shock PVC Dia 1/2 "
Shock PVC Dia 3/4 "
Shock PVC Dia 1 "
Shock PVC Dia 1 1/4 "
Shock PVC Dia 2 "
Shock PVC Dia 2.5 "
Shock PVC Dia 3 "
Tee PVC Dia 1 1/4 "
Knee PVC Dia 1/2 "
Knee PVC Dia 3/4 "
Knee PVC Dia 1 "

1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400

XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Knee PVC Dia 1 1.4 "


Knee PVC Dia 2 "
Knee PVC Dia 2.5 "
Knee PVC Dia 3 "
Knee PVC Dia 4 "
Pipa Galvanis Dia 1/2 "
Pipa Galvanis Dia 3/4 "
Pipa Galvanis Dia 1"
Pipa Galvanis Dia 1.5 "
Pipa Galvanis Dia 2 "
Pipa Galvanis Dia 2.5 "
Pipa Galvanis Dia 3 "
Pipa Galvanis Dia 4 "
Shock Galvanis Dia 1/2 "
Shock Galvanis Dia 3/4 "
Shock Galvanis Dia 1 "
Shock Galvanis Dia 1.5 "
Shock Galvanis Dia 2 "
Shock Galvanis Dia 2.5 "
Shock Galvanis Dia 3 "
Shock Galvanis Dia 4 "
Knee Galvanis Dia 1/2 "
Knee Galvanis Dia 3/4 "
Knee Galvanis Dia 1 "
Knee Galvanis Dia 1.5 "
Knee Galvanis Dia 2 "
Knee Galvanis Dia 2.5 "
Knee Galvanis Dia 3 "
Knee Galvanis Dia 4 "
Pipa Screen PVC tipe AW Dia 6 "

1 bh
1 bh
1 bh
1 bh
1 bh
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 ljr

PLITUR & CAT


M401
M402
M403
M404
M405
M406
M407
M408
M409
M410
M411
M412
M413
M414
M415
M416
M417
M418
M419
M420
M421
M422
M423
M424

Kertas Gosok
Plamir Kayu
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu
Cat meni besi sekualitas Emco
Cat Dasar Kayu
Cat Dasar Tembok
Cat Dasar Besi
Cat Kayu
Cat Tembok catylac
Cat Besi
Cat Genting
Waterproofing
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl

1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg

XIV
1
2
3
4
5
6
XV
1
2
3
4
5
6
7
8
9
10
11
12

M431
M432
M433
M434
M435
M436
M437
M438
M439
M440
M441
M442
M443
M444
M445
M446
M447
M448

PERALATAN AIR BERSIH


Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap
Pompa Air
INSTALASI LISTRIK
Kabel NYA 2 x 2.5 mm
Kabel NYA 4.0 mm
Stop Kontak ex Brocco
Saklar Broco
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
Zekering Kast Lokal 2 Group
Zekering Kast Lokal 3 Group

1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m1
1 m1
1 bh
1 bh
1 bh
1 m1
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit

13
14
15
16
17
18
19
20
21
22
XVI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
25
27
28
29
30
31
32
33
34
35
36
37
39
40
41
42
43
44
45

M449
M450
M451
M452
M453
M454
M455
M456
M457
M460
M466
M473
M474
M481
M482
M483
M484
M485
M486
M487
M488
M489
M490
M502
M503
M512
M513
M514
M515
M516
M517
M518
M519
M520
M521
M522
M523
M524
M525
M526
M527
M528
M529
M530
M531
M532
M533
M534
M535
M536
M537
M538
M539
M540

Lampu TL Komplit 20 Watt


Lampu TL Komplit 40 Watt
Lampu XL 5 Watt
Lampu XL 8 Watt
Lampu XL 14 Watt
Lampu XL 18 Watt
Lampu XL 23 Watt
Lampu Pijar 5 - 40 Watt
Lampu Pijar 50 - 100 Watt
Pipa Arde
LAIN - LAIN
Ijuk
Elektroda
Minyak bekisting
Seal Tape / TBA
Bensin
Solar Industri
Minyak Pelumas
Grease
Peralatan Hammer Injection
Sewa Kompresor
Sewa Genset
Sewa Pompa Tes
Sewa Mesin las
Jendela Alumunium Putih sekualitas YKK
Jendela Alumunium Coklat sekualitas YKK
Splits Dia 1 "
Timah
Kawat BC
Klemp
Seng plat BJLS 24 (90 x 180) cm
Metal furing channel RG3, C Channel RG1,Channel Clamp K26,U clamp K4-TB.C
Keramik 60 x 60 esenza
Keramik KM 30 x 30
Kloset duduk/monoblock sekualitas TOTO
Kran Air sekualitas TOTO
Keramik abu - abu 60 x 60
Lampu TL 2 x 25 Watt Inbow type RM sekualitas saka + saklar brc
Lampu TL 50 Watt Inbow type RM sekualitas saka + saklar brc
Lampu TL 50 Watt Outbow type RM sekualitas saka + saklar brc
Down light 25 VA Inbow 4"
Lampu Taman
Lampu Spot Light
SL 25 VA
Down light 25 VA inbow 6"
Pipa GI 21/2"
Pipa GI 1"
Down light 20 W
Pipa GI 11/2 "
Alumunium
Pipa GI 1 1/4 "
Pipa GI 1/2 "
Plat besi 1 cm
Kawat las
Pengelasan

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m'
1 m3
1 kg
1 ltr
1 bh
1 ltr
1 ltr
1 ltr
1 kg
1m
1 hr
1 hr
1 hr
1 hr
1 m1
1 m1
1 bh
1 kg
1 m1
1 bh
1 lbr
1 m2
1 m2
1 m2
1 unit
1 bh
1 m2
1 unit
1 unit
1 unit
1 unit
1 Unit
1 unit
1 unit
1 unit
1 ljr
1 ljr
1 unit
1 ljr
1 lbr
1 ljr
1 ljr
1 kg
1 kg
1 cm

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

M541
M542
M543
M544
M545
M546
M547
M548
M549
M550
M551
M552
M553
M554
M555
M556
M557
M558

Besi ulir 10
Besi Ulir 13
Besi Ulir 16
Besi Ulir 19
Besi Ulir 22
Besi Polos 10
Besi Polos 16
Besi Polos 19
Keramik 50 x 50 sekualitas Roman
Cat Tembok Catilax
Keramik 40 x 40 Toilet Sekualitas Roman
Rel Jendela
Keramik 30 x 30 sekualitas Roman
Besi polos 8
Besi Ulir 25
Sealent
Reiling tangga
Reiling void

1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 kg
1 m2
1 bh
1 m2
1 kg
1 kg
1 bh
1 m2
1 m2

64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118

M559
M560
M561
M562
M563
M564
M565
M566
M567
M568
M569
M570
M571
M572
M573
M574
M575
M576
M577
M578
M579
M580
M581
M582
M583
M584
M585
M586
M587
M588
M589
M590
M591
M592
M593
M594
M595
M596
M597
M598
M599
M600
M601
M602
M603
M604
M605
M606
M607
M608
M609
M610
M611
M612
M613

List keramik
Seng Gelombang 240 x 80 x 0.20 cm sekualitas elephant
Keramik 33 x 25 sekualitas Roman
Keramik 30 x 30 KM sekualitas Roman
Keramik 60 x 60 sekualitas Esenza
Granite Tile 60 x 60 cm
Gerbil beton
Batu Adhesit
Vernis batu alam
Batu beton sisir
Kabel NYM 3 x 2.5
Pipa PVC tipe AW Dia 5 "
Pipa GI 4 "
Saklar Tunggal MK
Saklar Ganda MK
Stepnosing sekualitas roman 10 x 33
Keramik 40 x 40 Sekualitas Roman
Shower komplit sekualitas TOTO seri TX433SJ
Akrilik bening t = 4 mm
Gate valves 2 " sekualitas TOYO
Gate vaves 1 1/4 " sekualitas TOYO
Pompa Groundfos CH8-50
Isolator pipa air panas
Bata klinker
Stop Kran sekualitas TOTO
Bedet Shower sekualitas TOTO
Box Lemari Panel
Lampu indikator 3 warna + Fuse Hitam
Volt meter + volt selector
Ampere meter 400A + CT 400/5
Bus bar
Arester 3 fasa STH 3 + N 65kA
MCCB 4 x 125 A
MCCB 3 x 6 A
MCCB 3 x 10 A
MCCB 3 x 25 A
MCCB 3 x 40 A
MCCB 3 x 50 A
Grounding panel dengan BC 50 mm2
Grounding arester dengan BC 50 mm2
Asesories dan wiring panel
Panel Box 30x40x15
Lampu indikator 3 warna + fuse hitam
Volt meter + volt selector
Ampere meter + CT
Bus bar Sisir
Arester 3 fasa STD 3+N
MCB 1 x 4 A
MCB 1 x 6 A
MCB 3 x 6 A
Grounding panel dengan BC 10 mm2
Grounding arester dengan BC 10 mm2
Asesories dan wiring panel
Kabel Power NYY 4 x 2,5 mm2
Panel Box

1 m'
1 lbr
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 ltr
1 m2
1 m1
1 ljr
1 ljr
1 bh
1 bh
1 bh
1 m2
1 Unit
1 m2
1 bh
1 bh
1 unit
1 m'
1 m2
1 bh
1 bh
1 unit
1 set
1 set
1 unit
1 lot
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 set
1 set
1 lot
1 unit
1 unit
1 set
1 unit
1 lot
1 unit
1 unit
2 unit
1 unit
1 mtr
1 mtr
1 set
1 mtr
1 unit

119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166

M614
M615
M616
M617
M618
M619
M620
M621
M622
M623
M624
M625
M626
M627
M628
M638
M639
M640
M641
M642
M646
M653
M654
M655
M656
M657
M658
M659
M660
M661
M662
M663
M664
M665
M666
M667
M668
M669
M670
M671
M672
M673
M674
M675
M676
M677
M678
M679

Lampu indikator 3 warna+fuse hitam


Volt meter + volt selector
Ampere meter + CT
Bus bar sisir
Arester 3 fasa STD 3+N
MCB 1 x 6 A
MCB 1 x 10 A
MCB 1 x 16 A
MCCB 3 x 50 A
busbar 3x20
Grounding panel dengan BC 16 mm2
Grounding arester dengan BC 16 mm2
Asesories dan wiring panel
Kabel Power NYY 4 x 10 mm2
Indoor Hydrant Box Type A2 c/w Glass
Terminal Box for 2 Module
Back Up Power / UPS ( 24 V DC, 10 AH)
MCB 3 x 10 A
NYFgBy 4 x 50 mm2
Meja Wastafel Granit black pearl
Kran air panas + air dingin diameter 1/2" sekualitas TOTO
Saklar Hotel
Kabel NYA 3 x 2.5
Tiang Pancang 25x25 cm
Gypsum board t = 9 mm sekualitas Jayaboard
Kabel NYY 4x4
Rangka Hollow
Partikel t = 9 mm
Megatex
Wallpaper
Engsel Pivot
Rangka Baja siku
Akustik board t = 9 mm sekualitas Jayaboard
GRC board t = 9 mm sekualitas Jayaboard
Baja Double L 80,80,8
Baja Double L 70,70,7
Baja Double L 60,60,6
Baja Canal 200
pipa d = 114.3 mm t = 3.5 mm
Baja WF 300.150.6,5.9
Baja WF 250.125.6.9
Plat besi 25 cm
Baja WF 150x100x6x9
Plat Bondex
Jendela Nako+aksesoris
Sewa alat Bor
kerikil cor

Plat Baja

1 set
1 set
1 unit
1 lot
1 unit
1 unit
1 unit
1 unit
1 unit
1 lot
1 mtr
1 mtr
1 set
1 mtr
1 unit
1 unit
1 unit
1 unit
1m
1 m2
1 bh
1 bh
1 m1
1 m1
1 m2
1m
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 m2
1 m2
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 m2
1 hari
1 ltr
1 kg

RGA BAHAN BANGUNAN


N ANGGARAN 2013
HARGA

126,788.00
193,291.00
199,103.00
206,267.00
13,922.00
106,783.00
175,989.00
72,900.00
81,777.00
35,000.00
157,877.00
189,101.00
193,020.00
295,208.00
287,503.00
236,545.00
205,050.00
329,811.00
283,178.00
285,082.00
257,901.00
238,167.00
1,352.00
13,517.00
113,136.00
111,514.00
1,622.00
8,000.00
1,560.00
4,055.00
20,275.00
20,275.00
45,000.00
52,851.00
70,693.00
89,617.00
379,688.00
47,174.00
59,509.00
4,250,000.00
7,092,285.00
7,092,285.00
7,951,956.00
9,456,380.00
9,528,019.00
10,686,277.00

KET.

24,000.00
14,463.00
22,303.00
14,193.00
27,034.00
27,710.00
40,551.00
42,848.00
1,696,228.00
1,013,763.00
1,016,872.00
123,003.00
147,604.00
1,456,169.00
472,189.00
24,736.00
13,500.00
40,145.00
946.00
1,352.00
2,028.00

450.00
27,710.00
4,731.00
27034
13,111.00
33,792.00
14,500.00
48,931.00
55,825.00
70,017.00
95,159.00
116,650.00
116,650.00
110,297.00
285,611.00
145,576.00
134,493.00
116,380.00
103,133.00
81,642.00
147,874.00
128,004.00
113,406.00
90,022.00
182,342.00
174,773.00
129,221.00
59,474.00
64,070.00
72,045.00
57,311.00
33,792.00
27,034.00
24,060.00
23,114.00
38,117.00
42,037.00
50,688.00
76,235.00
28,791.00
101,647.00
108,405.00
73,126.00
91,644.00
117,335.00
178,499.00
203,464.00
252,146.00
349,509.00
60826
87,859.00
114,893.00
215,999.00
2,157,828.00
675,842.00

2,294,213.00
101,376.00
60,826.00
67,584.00
202,753.00
474,847.00
296,992.00
3,021,148.00
612,042.00
397,260.00
430,646.00
2,166,614.00
1,510,642.00
1,553,760.00
1,898,981.00
627,452.00
47,309.00
87,859.00
35,955.00
337,921.00

14,463.00
133,546.00
158,527.00
127,321.00
209,706.00
48,525.00
34,951.00
38,523.00
33,792.00
20,275.00
30,818.00
17,437.00
244,249.00
191,939.00
174,367.00
51,769.00
188,290.00
16,896.00
250,000.00
113,591.00
172,258.00
332,034.00
481,064.00
167,265.00
252,146.00
283,854.00
458,491.00
360,494.00
360,494.00
491,202.00
169,762.00
248,401.00
508,037.00
81,136.00
12,300.00
12,300.00
24,601.00
24,601.00
24,601.00
31,359.00
18,113.00
21,527.00
6,488.00
8,380.00
2,703.00
2,974.00
2,839.00
12,300.00
12,300.00
22,979.00
5,812.00
4,190.00
13,247.00

56,095.00
79,209.00
123,814.00
215,594.00
286,827.00
44,470.00
54,338.00
5,677.00
5,407.00
7,299.00
10,139.00
11,234.00
16,227.00
17,475.00
4,055.00
6,218.00
7,029.00

10,813.00
14,979.00
17,475.00
19,722.00
24,715.00
58,258.00
75,289.00
102,593.00
151,524.00
215,458.00
300,885.00
321,295.00
437,810.00
6,758.00
10,138.00
16,896.00
20,275.00
33,792.00
51,634.00
77,451.00
219,649.00
7,569.00
11,219.00
16,896.00
31,629.00
39,469.00
72,315.00
111,784.00
147,334.00
229,516.00
6,758.00
30,413.00
28,250.00
75,289.00
45,146.00
27,439.00
20,275.00
231,814.00
48,796.00
50,688.00
66,368.00
42,578.00
75,289.00
101,241.00
121,787.00
102,458.00
179,098.00
208,970.00
81,101.00
104,755.00
27,034.00
56,095.00
51,094.00
81,507.00

985,377.00
1,743,537.00
2,725,130.00
4,563,420.00
267,904.00
1,074,589.00
7,164.00
11,354.00
3,745.00
5,243.00
10,810.00
12,170.00
2,028.00
9,986.00
15,004.00
91,112.00
133,563.00
182,244.00

87,377.00
175,719.00
42,308.00
42,984.00
48,525.00
52,175.00
50,826.00
25,141.00
41,757.00
473,089.00
154,600.00
55,250.00
3,920.00
3,000.00
6,894.00
10,138.00
67,044.00
47,309.00
2,400,000.00
1,000,000.00
4,000,000.00
250,000.00
108,135.00
117,867.00
104,215.00
589,604.00
137,196.00
4,731.00
98,808.00
66,220.00

2,157,828.00
67,584.00

22,303.00
22,303.00
22,303.00
22,303.00
22,303.00
14,463.00
14,463.00
14,463.00

162,202.00

215,594.00
4,619.00
5,243.00

35000

229,000.00

12,500.00

110,162.00
110,162.00
17,000.00

27,034.00

110,162.00
110,162.00
149,496.00

289,260.00

175719

104,216.00

9,000.00

140,000.00
245,300.00
350,000.00
130,000.00
11,500.00

DAFTAR HARGA BAHAN


UNIVERSITAS NEGERI MALANG (UM)
TAHUN ANGGARAN 2012
No

KODE

I.
1 M001
2 M002
3 M003
4 M004
5 M005
6 M006
7 M007
8 M008
9 M009
II.

BAHAN BANGUNAN
Tanah dan Pasir
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat

SATUAN

HARGA

1 m
1 m
1 m
1 m
1 Kg
1 m
1 m
1 m
1 m

115,500.00
85,000.00
115,000.00
8,000.00
75,000.00
70,000.00
60,000.00
42,923.75
53,000.00

Batu,Bata & Beton Block


Batu Belah Gunung
1 M010
Batu Belah Kali
2 M011
Batu Kali
3 M012
Stenslah/batu pecah tangan 1/2
4 M013
Stenslah/batu pecah tangan 2/3
5 M014
Stenslah/batu pecah tangan 3/5
6 M015
Stenslah/batu pecah tangan 4/6 - 5/7
7 M016
Batu pecah mesin 1/1
8 M017
Batu pecah mesin 1/2
9 M018
Batu pecah mesin 2/3
10 M019
Batu pecah mesin 3/5
11 M020
Batu pecah mesin 4/6 - 5/7
12 M021
Bata Merah
13 M022
14 M022.a Batu Bata Tahan Api
Bata Berongga
15 M023
Batako
16 M024
Rooster
17 M025
Batu Granito
18 M026
Batu Teraso
19 M027
Batu Palimanan
20 M028
Batu Tempel Hitam
21 M029
Hollow Blok (HB.20)
22 M030
Hollow Blok (HB.15)
23 M031
Hollow Blok (HB.10)
24 M032

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh

140,000.00

25 M033

1 bh

1,350.00

1 bh
1 bh
1 bh
1 bh
1 bh

1,800.00
2,100.00
2,200.00
1,400.00
1,600.00

1 kg

1,600.00

Paving Block Segi Empat t=8 cm, sekualitas Fass


Paving Block Segi Empat t= 8 cm Sekualitas Cone
26 M034
Block
Paving Block Segi Enam Biasa
27 M035
28 M036.a Paving Block Segi Enam Warna
29 M036.b Paving Block Tiga Berlian Biasa
30 M036.c Paving Block Tiga Berlian Warna
III.
1 M037

Semen
Portland Cement (PC)

209,500.00
159,120.00
163,000.00
145,500.00
234,000.00
159,120.00
183,000.00
169,000.00
450.00
13,200.00
950.00
5,250.00
9,750.00
3,300.00
2,600.00
80,250.00
76,000.00
5,100.00
4,500.00
3,750.00

No

KODE
2 M037.a
3 M038
4 M039
5 M040
6 M041
7 M042
8 M043

BAHAN BANGUNAN
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih
Portland Cement (PC) Warna
Portland Cement (PC) Grouting
Kapur
Gamping
Semen Merah

SATUAN
1 kg
1 kg
1 kg
1 kg
1 m
1 kg
1 m

HARGA
4,300.00
2,700.00
11,700.00
8,750.00
1,430,000.00
1,000.00
197,500.00

No

KODE

IV.
1 M044
2 M045
3 M046
4 M047
5 M048
6 M049
7 M050
8 M051
9 M052
10 M053
V.
1 M054
2 M055
3 M056
4 M057
5 M058
6 M059
7 M060
8 M061
9 M062
10 M063
11 M064
12 M065
13 M066
14 M067
15 M068
16 M069
17 M070
18 M071
19 M078
20 M079
21 M080
22 M081
23 M082
24 M083
25 M084
26 M085
27 M088
28 M089
29 M090
30 M091
31 M092
32 M093

BAHAN BANGUNAN
Buis Beton
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Kayu
Kayu Borneo
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Meranti
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kruing
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kamper
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Lain-lain
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu

SATUAN

HARGA

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

38,000.00
48,000.00
66,000.00
82,500.00
106,000.00
201,000.00
219,250.00
280,500.00
29,200.00
42,250.00

1 m
1 m
1 m
1 m
1 m
1 m

8,830,000.00
8,830,000.00
8,830,000.00
10,910,000.00
11,170,000.00
11,170,000.00

1 m
1 m
1 m
1 m
1 m
1 m

4,830,000.00
4,830,000.00
5,175,000.00
4,945,000.00
4,945,000.00
4,945,000.00

1 m
1 m
1 m
1 m
1 m
1 m

6,178,000.00
6,178,000.00
6,490,000.00
7,010,000.00
7,010,000.00
7,010,000.00

1 m
1 m
1 m
1 m
1 m
1 m

9,350,000.00
9,610,000.00
9,870,000.00
11,430,000.00
11,690,000.00
11,950,000.00

1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m

2,850,000.00
4,250,000.00
24,100.00
27,000.00
7,700.00
3,630,000.00
38,400.00
80,100.00

No

KODE

BAHAN BANGUNAN

45 M106
46 M107
47 M108
48 M109
49 M110
50 M111

Kayu Jati Ex Malang


Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Jati Ex Madiun/Ngawi
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Jati Ex Bojonegoro
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm

51 M111a

Kayu Jati Kualitas Hara

33 M094
34 M095
35 M096
36 M097
37 M098
38 M099
39 M100
40 M101
41 M102
42 M103
43 M104
44 M105

VI.
1 M112
2 M113
3 M114
4 M115
5 M116
6 M116.a
7 M116.b
8 M117
9 M118
10 M119
11 M120
12 M121
13 M122
14 M123
15 M124
16 M124.a
17 M124.b
18 M125
19 M126
20 M127
21 M128
22 M129

Besi dan Aluminium


Besi Beton Polos
Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil
Plat Baja
Roda Railling
Angker Bar / Dynabolt
Kabel prestressed
Pintu Besi Baja
Pintu Gulung Besi
Pintu Lipat
Rolling Door
Pagar Besi
Pintu Pagar besi
Pagar Model BRC tinggi 1 m
Pintu Pagar Model BRC tinggi 1 m
Profil Aluminium Putih
Profil Aluminium Coklat
Sunscream Aluminium
Pintu Fiber KM
Atap Aluminium

SATUAN

HARGA

1 m
1 m
1 m
1 m
1 m
1 m

13,551,600.00
13,551,600.00
13,551,600.00
15,059,600.00
15,059,600.00
15,059,600.00

1 m
1 m
1 m
1 m
1 m
1 m

16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00

1 m
1 m
1 m
1 m
1 m
1 m

19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00

1 m

53,130,000.00

1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 kg
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m

8,300.00
8,500.00
13,900.00
.
18,328.13
11,500.00
17,200.00
13,100.00
30,400.00
753,000.00
2,070,500.00
1,694,100.00
1,254,900.00
627,500.00
721,600.00
329,400.00
421,600.00
91,000.00
109,200.00
313,700.00
349,800.00
102,800.00

No

KODE

23 M130
24 M131
25 M132
26 M133
27 M134
28 M135
29 M136
30 M137
31 M138
32 M139
33 M140
34 M141
35 M142
36 M143
37 M144

BAHAN BANGUNAN
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran
Paku Seng Segala Ukuran
Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran

SATUAN
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg
1 Kg
1 bh
1 bh
1 bh

HARGA
100,400.00
31,300.00
41,000.00
44,500.00
66,300.00
23,400.00
23,900.00
21,800.00
21,100.00
20,500.00
13,500.00
25,700.00
600.00
900.00
700.00

No

KODE

38 M145
39 M146
40 M147
41 M148
42 M148.a
43 M148.b
44 M148.c
45 M148.d
46 M148.e
47 M148.f
48 M148.g
49 M148.h
VII.
1 M149
2 M150
3 M151
4 M152
5 M153
6 M154
7 M155
8 M156
9 M157
10 M158
11 M159
12 M160
13 M161
14 M162
15 M163
16 M164
17 M165
18 M166
19 M167
20 M168
21 M169
22 M170
23 M171
24 M172
25 M173
26 M173.a
VIII.
1 M174
2 M175
3 M176
4 M176.a
4 M177
5 M178
6 M179
7 M180

BAHAN BANGUNAN

SATUAN

HARGA

Sekrup segala ukuran


Baut Segala Ukuran
Paku Keling
Paku Beton
Wire Mesh
Sealant
Aluminium Strip
Profil Kaca
Venetion blinds dan vertical blinds (tirai)
Atap Seng Galvalum
Bubung Atap Seng Galvalum
Plat Bondex

1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m
1 m
1 m
1 m
1 m

450.00
11,800.00
3,300.00
39,300.00
17,500.00
27,500.00
17,500.00
11,400.00
563,500.00
112,300.00
109,200.00
140,000.00

Atap Genteng
Genteng Biasa ex. Malang
Genteng Press ex. Trenggalek
Genteng Karang Pilang ex. Malang
Genteng Karang Pilang ex. Trenggalek
Genteng Karang Pilang ex. Surabaya
Genteng Beton sekualitas Varia Usaha
Genteng Kaca
Bubung Genteng Biasa ex. Malang
Bubung Genteng Press ex. Trenggalek
Bubung Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya
Bubung Genteng Beton sekualitas Varia Usaha
Genteng Palentong Kecil
Genteng Kodok Glazuur
Genteng Palentong Super/Besar
Bubung Genteng Palentong Kecil
Bubung Genteng Kodok Glazuur
Bubung Genteng Palentong Super/Besar
Genteng Aspal
Genteng Metal
Atap Sirap
Bubung Genteng Aspal
Bubung Genteng Metal
Bubung Atap Sirap
Plastik Aerator

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh

2,700.00
1,300.00
1,500.00
1,700.00
2,100.00
14,500.00
14,100.00
4,900.00
2,500.00
4,700.00
5,100.00
5,700.00
11,500.00
2,300.00
2,300.00
4,500.00
4,100.00
7,300.00
7,800.00
6,700.00
100,700.00
1,600.00
45,100.00
100,700.00
121,900.00
6,900.00

Atap Seng / Asbes


Seng plat BJLS 30 L = 0.45 M
Seng plat BJLS 30 L = 0.60 M
Seng plat BJLS 30 L = 0.90 M
Plat Alumunium t=0.35 mm, L = 0.90 M
Seng plat BJLS 28 (90 x 180) cm
Atap Seng Gelombang
Bubung Seng Gelombang
Roof Light Fibreglass

1 m
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m

35,900.00
40,900.00
51,400.00
65,000.00
70,100.00
32,000.00
78,900.00
78,200.00

No

KODE

8 M181
9 M182
10 M183
11 M184
12 M185
13 M186
14 M187
15 M188
16 M189
17 M190
18 M191
19 M192

BAHAN BANGUNAN
Atap Polycarbonat
Asbes Gelombang (3.00 x 1.05) m x 4 mm
Asbes Gelombang (2.70 x 1.05) m x 4 mm
Asbes Gelombang (2.40 x 1.05) m x 4 mm
Asbes Gelombang (2.10 x 1.05) m x 4 mm
Asbes Gelombang (1.50 x 1.05) m x 4 mm
Asbes Gelombang (2.50 x 0.92) m x 5 mm
Asbes Gelombang (2.25 x 0.92) m x 5 mm
Asbes Gelombang (2.00 x 0.92) m x 5 mm
Asbes Gelombang (1.80 x 0.92) m x 5 mm
Asbes Gelombang (3.00 x 1.08) m x 6 mm
Asbes Gelombang (2.70 x 1.08) m x 6 mm

SATUAN
1 m
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr

HARGA
114,200.00
107,700.00
99,500.00
86,100.00
76,300.00
57,900.00
109,400.00
94,700.00
83,900.00
63,800.00
134,900.00
129,300.00

No

KODE

20 M193
21 M194
22 M195
23 M196
24 M197
25 M198
26 M199
27 M200
28 M201
29 M202
30 M203
31 M204
32 M205
33 M206
34 M207
35 M208
36 M209
37 M210
38 M211
39 M212
40 M213
IX.
1 M214
2 M215
3 M216
4 M217
5 M218
6 M219
7 M220
8 M221
9 M222
10 M223
11 M224
12 M225
13 M226
14 M227
15 M228
16 M229
X.
1 M230
2 M231
3 M232
4 M233
5 M234
6 M235
7 M236
8 M237
9 M238

BAHAN BANGUNAN

SATUAN

HARGA

Asbes Gelombang (2.10 x 1.08) m x 6 mm


Asbes Gelombang (1.80 x 1.08) m x 6 mm
Bubung Stel Gelombang 0.92 m
Bubung Stel Gelombang 1.05 m
Bubung Stel Gelombang 1.08 m
Bubung Paten 0.92 m
Bubung Paten 1.05 m
Bubung Paten 1.08 m
Bubung Stel Rata 0.92 m
Bubung Stel Rata 1.05 m
Asbes (1,00 x 1,00) m x 6 mm
Asbes (1,00 x 1,00) m x 5 mm
Asbes (1,00 x 1,00) m x 4 mm
Asbes (1,00 x 1,00) m x 3,5 mm
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Harplek 4 mm
List Gypsum
Soft Board
Gypsum Board

1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr

95,600.00
76,900.00
47,800.00
50,800.00
51,100.00
44,400.00
44,000.00
47,400.00
47,800.00
40,600.00
18,700.00
17,600.00
17,000.00
16,400.00
15,000.00
27,500.00
36,000.00
54,100.00
10,000.00
72,100.00
76,900.00

Kayu Olahan
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
Plywood Lapis Aluminium
Plywood (30 x 60) cm x 4 mm
Plywood (30 x 60) cm x 6 mm
Plywood (60 x 120) cm x 4 mm
Plywood (60 x 120) cm x 6 mm
Plywood (120 x 240) cm x 4 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm

1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr

54,100.00
75,000.00
86,500.00
125,000.00
150,300.00
146,000.00
258,400.00
90,100.00
7,300.00
10,200.00
23,800.00
28,200.00
95,900.00
7,800.00
27,700.00
87,500.00

Perlengkapan Kamar Mandi


Kloset Jongkok Porselin Kw. A
Kloset Duduk Porselin Kw. A sekualitas Toto
Kloset Jongkok Lux sekualitas Toto
Kloset Duduk Lux sekualitas Toto
Kloset Jongkok Teraso
Kran Air 1/2 " sekualitas San Ei
Kran Air 3/4 " sekualitas San Ei
Bak Mandi Teraso
Bak Mandi Fibre

1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh

159,800.00
1,565,500.00
235,000.00
1,628,200.00
62,500.00
39,200.00
43,700.00
141,800.00
344,300.00

No

KODE

10 M239
11 M240
12 M241
13 M242
14 M243
15 M244
16 M245
17 M246
18 M247
19 M248

BAHAN BANGUNAN
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Firing Teraso
Bak Cuci Firing Stainless
Badkip Porselen
Urinoir Porselin sekualitas Toto
Urinoir Keramik sekualitas Toto
Wastafel Komplit (Kran + Sipon) Lux sekualitas
Toto
Wastafel Komplit (Kran + Sipon) Kw. A sekualitas
Toto

SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit

HARGA
216,600.00
2,191,800.00
443,700.00
219,000.00
312,200.00
939,300.00
1,095,800.00
1,127,100.00
1,377,700.00
455,100.00

No

KODE

20 M249
21 M250
22 M251
23 M252
XI.
1 M253
2 M254
3 M255
4 M256
5 M257
6 M258
7 M259
8 M260
9 M261
10 M262
11 M263
12 M264
13 M265
14 M266
15 M267
16 M268
17 M269
XII.
1 M270
2 M271
3 M272
4 M273
5 M274
6 M275
7 M276
8 M277
9 M278
10 M279
11 M280
12 M281
13 M282
14 M283
15 M284
16 M285
17 M286
18 M287
19 M288
20 M289
XIII.
1 M290
2 M291
3 M292

BAHAN BANGUNAN

SATUAN

HARGA

Tempat Sabun Keramik


Afor Stainless
Afor Plastic
Kaca Wastafel

1 bh
1 bh
1 bh
1 bh

31,200.00
53,100.00
15,500.00
62,500.00

Alat-Alat Penggantung
Kunci Tanam
Kunci Tanam sekualitas DEKSON
Kunci Pintu Kamar Mandi sekualitas SOLID
Kunci Silinder
Engsel Pintu
Engsel Jendela
Hak Angin sekualitas SOLID
Spring Knip
Kait Angin sekualitas SOLID
Grendel Pintu
Grendel Jendela sekualitas SOLID
Door Closer sekualitas SOLID
Slot/Kunci Pintu sekualitas SOLID
Door Holder sekualitas SOLID
Door Stop sekualitas SOLID
Rel Pintu Dorong sekualitas Handerson
Kunci Lemari

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

75,000.00
385,000.00
75,000.00
151,600.00
12,500.00
10,000.00
28,750.00
12,300.00
9,500.00
7,500.00
46,000.00
176,900.00
375,000.00
126,300.00
37,300.00
450,000.00
11,900.00

Kaca
Kaca Polos tebal 3 mm sekualitas Asahi Mas
Kaca Polos tebal 5 mm sekualitas Asahi Mas
Kaca Polos tebal 8 mm sekualitas Asahi Mas
Kaca Polos tebal 12 mm sekualitas Asahi Mas
Kaca Buram tebal 3 mm sekualitas Asahi Mas
Kaca Buram tebal 5 mm sekualitas Asahi Mas
Kaca Buram tebal 8 mm sekualitas Asahi Mas
Kaca Buram tebal 12 mm sekualitas Asahi Mas
Kaca Cermin tebal 5 mm sekualitas Asahi Mas
Kaca Cermin tebal 6 mm sekualitas Asahi Mas
Kaca Cermin tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 3 mm sekualitas Asahi Mas
Kaca Rayben tebal 5 mm sekualitas Asahi Mas
Kaca Rayben tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 12 mm sekualitas Asahi Mas
Jendela Nako + accessories
Glass Block
Painting Glass
Kaca "Wireglass" 5 mm
Kaca Patri 5 mm

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m

83,800.00
127,200.00
246,000.00
341,400.00
96,800.00
154,400.00
206,700.00
339,200.00
200,000.00
255,800.00
348,600.00
125,200.00
183,600.00
375,900.00
600,300.00
245,300.00
23,900.00
558,700.00
627,000.00
1,367,400.00

Perlengkapan Lantai
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm

1 bh
1 bh
1 bh

2,300.00
1,750.00
1,150.00

No

KODE

4 M293
5 M294
6 M295
7 M296
8 M297
9 M298
10 M299
11 M299a
12 M299b
13 M299c

BAHAN BANGUNAN
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin sekualitas Granit Tile ex. China 40 x 40 cm
Ubin sekualitas Granit Tile ex. China 60 x 60 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Kerang 60 x 60 cm

SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

HARGA
2,900.00
1,800.00
1,200.00
4,100.00
2,900.00
15,200.00
40,000.00
41,000.00
35,100.00
70,400.00

No

KODE

BAHAN BANGUNAN

SATUAN

HARGA

14 M299d
15 M300
16 M301
17 M302
18 M303
19 M304
20 M305
21 M306
22 M307
23 M308
24 M309
25 M310
26 M311
27 M312
28 M313
29 M314
30 M315
31 M316
32 M316.a
33 M317

Ubin Teralux Marmer 40 x 40 cm


Plint ubin pc abu-abu 15 x 20 cm
Plint ubin pc abu-abu 10 x 30 cm
Plint ubin pc abu-abu 10 x 40 cm
Plint ubin pc warna 10 x 20 cm
Plint ubin pc warna 10 x 30 cm
Plint ubin pc warna 10 x 40 cm
Plint Ubin Terasso 10 x 30 cm
Plint Ubin Terasso 10 x 40 cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 40
cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 60
cm
Lantai keramik artistik 10 x 20
Lantai keramik artistik 10 x 10
Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Bahan Teraso Cor
Keramik Lantai 40 x 40 cm putih sekualitas Asia

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh

52,700.00
2,900.00
3,200.00
3,500.00
1,800.00
2,300.00
3,500.00
4,100.00
5,900.00
10,000.00
15,000.00
8,700.00
8,700.00
8,700.00
17,400.00
17,400.00
17,400.00
23,200.00
182,100.00
8,000.00

34 M318

Keramik Lantai 40 x 40 cm warna/motif sekualitas


Asia

1 bh

8,800.00

1 bh

3,200.00

1 bh

4,500.00

1 bh

1,500.00

35 M319
36 M320
37 M321

Keramik Lantai 30 x 30 cm putih sekualitas Asia


Keramik Lantai 30 x 30 cm warna/motif sekualitas
Asia
Keramik Lantai 20 x 20 cm putih sekualitas Asia

38 M322

Keramik Lantai 20 x 20 cm warna/motif sekualitas


Asia

1 bh

1,900.00

39 M323
40 M324
41 M325
42 M326
43 M327
44 M328
45 M329
46 M330
47 M331
48 M332
49 M333
50 M333.a
51 M333.b
52 M333.c
53 M333.d
54 M333.e
55 M333.f
56 M333.g

Keramik Lantai KM 20 x 20 cm sekualitas Asia


Plint Keramik Lantai 10 x 20 cm sekualitas Asia
Plint Keramik Lantai 10 x 30 cm sekualitas Asia
Plint Keramik Lantai 10 x 40 cm sekualitas Asia
Keramik Dinding 20 x 25 cm sekualitas Asia
Keramik Dinding 20 x 20 cm sekualitas Asia
Porselin 15 x 15 cm putih
Porselin 15 x 15 cm warna
Porselin 10 x 20 cm warna
Porselin 20 x 20 cm warna
Gymflour
Parquet
Karpet
Lantai marmer 100x100 cm sekualitas ex
Tulungagung
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm warna
Wall Paper
Batu Ampyangan Granit

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg

2,200.00
4,700.00
8,700.00
10,000.00
4,200.00
3,000.00
950.00
950.00
900.00
2,000.00
231,100.00
450,000.00
56,400.00
394,500.00
850.00
1,100.00
54,600.00
6,700.00

Perpipaan
Pipa PVC tipe AW 1/2" sekualitas Maspion
Pipa PVC tipe AW 3/4" sekualitas Maspion

1 m
1 m

2,000.00
2,000.00

XIV.
1 M334
2 M335

No

KODE

3 M336
4 M337
5 M338
6 M339
7 M340
8 M341
9 M342
10 M343
11 M344
12 M345
13 M346
14 M347
15 M348

BAHAN BANGUNAN
Pipa PVC tipe AW 1" sekualitas Maspion
Pipa PVC tipe AW 1.5" sekualaitas Maspion
Pipa PVC tipe AW 2" sekualitas Maspion
Pipa PVC tipe AW 2.5" sekualitas Maspion
Pipa PVC tipe AW 3 " sekualitas Maspion
Pipa PVC tipe AW 4 " sekualitas Maspion
Pipa PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 8 " sekualitas Maspion
Pipa PVC tipe D 1/2 " sekualitas Maspion
Pipa PVC tipe D 3/4 " sekualaitas Maspion
Pipa PVC tipe D 1" sekualitas Maspion
Pipa PVC tipe D 1.5 " sekualitas Maspion
Pipa PVC tipe D 2 " sekualitas Maspion

SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

HARGA
2,500.00
3,500.00
18,000.00
20,000.00
24,000.00
165,000.00
133,225.00
203,550.00
4,000.00
6,075.00
7,950.00
10,650.00

No

KODE

16 M349
17 M350
18 M351
19 M352
20 M353
21 M354
22 M355
23 M356
24 M357
25 M358
26 M359
27 M360
28 M361
29 M362
30 M363
31 M364
32 M365
33 M366
34 M367
35 M368
36 M369
37 M370
38 M371
39 M372
40 M373
41 M374
42 M375
43 M376
44 M377
45 M378
46 M379
47 M380
48 M381
49 M382
50 M383
51 M384
52 M385
53 M386
54 M387
55 M388
56 M389
57 M390
58 M391
59 M392
60 M393
61 M394
62 M395
63 M396
64 M397
65 M398

BAHAN BANGUNAN
Pipa PVC tipe D 2.5 " sekualitas Maspion
Pipa PVC tipe D 3 " sekualitas Maspion
Pipa PVC tipe D 4 " sekualitas Maspion
Pipa PVC tipe C 1/2 " sekualitas Maspion
Pipa PVC tipe C 3/4 " sekualitas Maspion
Pipa PVC tipe C 1" sekualitas Maspion
Pipa PVC tipe C 1.5 " sekualitas Maspion
Pipa PVC tipe C 2 " sekualitas Maspion
Pipa PVC tipe C 2.5 " sekualitas Maspion
Pipa PVC tipe C 3 " sekualitas Maspion
Pipa PVC tipe C 4 " sekualitas Maspion
Shock PVC 1/2 " sekualitas Masion
Shock PVC 3/4 " sekualitas Maspion
Shock PVC 1 " sekualitas Maspion
Shock PVC 1.5 " sekualitas Maspion
Shock PVC 2 " sekualitas Maspion
Shock PVC 2.5 " sekualitas Maspion
Shock PVC 3 " sekualitas Maspion
Shock PVC 4 " sekualitas Maspion
Knee PVC 1/2 " sekualitas Maspion
Knee PVC 3/4 " sekualitas Maspion
Knee PVC 1 " sekualitas Maspion
Knee PVC 1.5 " sekualitas Maspion
Knee PVC 2 " sekualitas Maspion
Knee PVC 2.5 " sekualitas Maspion
Knee PVC 3 " sekualitas Maspion
Knee PVC 4 " sekualitas Maspion
Pipa Galvanis 1/2" tebal 1.8 mm skw. Spindo
Pipa Galvanis 3/4" tebal 1.8 mm skw. Spindo
Pipa Galvanis 1 ", tebal 2 mm skw. Spindo
Pipa Galvanis 1.5 ", tebal 2 mm skw. Spindo
Pipa Galvanis 2 ", tebal 2.3 mm skw. Spindo
Pipa Galvanis 2.5 ", tebal 2.5 mm skw. Spindo
Pipa Galvanis 3" tebal 2.5 mm skw. Spindo
Pipa Galvanis 4" tebal 2.8 mm skw. Spindo
Shock Galvanis 1/2 " skw. Spindo
Shock Galvanis 3/4 " skw. Spindo
Shock Galvanis 1 " skw. Spindo
Shock Galvanis 1.5 " skw. Spindo
Shock Galvanis 2 " skw. Spindo
Shock Galvanis 2.5 " skw. Spindo
Shock Galvanis 3 " skw. Spindo
Shock Galvanis 4 " skw. Spindo
Knee Galvanis 1/2 " skw. Spindo
Knee Galvanis 3/4 " skw. Spindo
Knee Galvanis 1 " skw. Spindo
Knee Galvanis 1.5 " skw. Spindo
Knee Galvanis 2 " skw. Spindo
Knee Galvanis 2.5 " skw. Spindo
Knee Galvanis 3 " skw. Spindo

SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

HARGA
18,925.00
27,475.00
3,000.00
4,575.00
5,975.00
8,000.00
10,775.00
13,675.00
16,175.00
20,575.00
1,600.00
2,400.00
2,700.00
5,800.00
8,100.00
11,600.00
13,100.00
15,900.00
2,100.00
2,600.00
3,800.00
7,600.00
11,400.00
13,100.00
14,600.00
18,300.00
35,950.00
46,525.00
180,000.00
133,150.00
185,975.00
310,625.00
4,100.00
4,900.00
7,700.00
13,600.00
21,600.00
38,200.00
57,300.00
76,400.00
4,700.00
6,400.00
9,000.00
17,900.00
28,000.00
53,500.00
82,700.00

No

KODE

66 M399
67 M400
68 M400.a
69 M400.b
70 M400.c
71 M400.d
72 M400.e
73 M400.f
74 M400.g
75 M400.h

BAHAN BANGUNAN
Knee Galvanis 4 " skw. Spindo
Pipa Screen PVC tipe AW 6 " skw. Maspion
Pipa PVC tipe AW 5 " skw. Maspion
Pipa Screen PVC tipe AW 5 " skw. Maspion
Pipa PVC moof 6 m S - 12,5 2" skw. Maspion
Pipa PVC moof 6 m S - 12,5 2,5" skw. Maspion
Pipa PVC moof 6 m S - 12,5 3" skw. Maspion
Pipa PVC moof 6 m S - 12,5 4" skw. Maspion
Pipa PVC moof 6 m S - 12,5 6" skw. Maspion
Pipa PVC moof 6 m S - 12,5 8" skw. Maspion

SATUAN
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

HARGA
101,800.00
162,825.00
105,050.00
134,150.00
30,600.00
42,625.00
63,500.00
93,175.00
201,300.00
326,025.00

No

KODE

XV.
1 M401
2 M402
3 M403
4 M404
5 M405
6 M406
7 M407
8 M408
9 M409
10 M410
11 M411
12 M412
13 M413
14 M414
15 M415
16 M415.a
17 M415.b
18 M416
19 M417
20 M418
21 M419
22 M420
23 M421
24 M422
25 M423
26 M424
27 M425
28 M426
29 M427
30 M428
31 M429
32 M430
33 M430.a
34 M430.b
35 M430.c
XVI.
1 M431
2 M432
3 M433
4 M434
5 M435
6 M436
XVII.
1 M437
2 M438
3 M438a

BAHAN BANGUNAN

SATUAN

Plitur & Cat


Kertas Gosok
Plamir Kayu sekualitas cap Pedang
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu sekualitas Emco
Cat meni besi sekualitas Emco
Cat Dasar Kayu sekualitas Emco
Cat Dasar Tembok eksterior sekualitas Mowilex
Cat Dasar Besi sekualitas Emco
Cat Kayu sekualitas Emco
Cat Tembok eksterior sekualitas Mowilex
Cat Tembok Interior sekualitas ICI Catylac
Cat Tembok Eksterior sekualitas ICI Weathar Shield
Cat Besi sekualitas Emco
Cat Genting sekualitas Nippon Paint
Waterproofing sekualitas Sika
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun
Vinyl (30x30)cm
Batu Apung
Alang-Alang

1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 bh
1 kg
1 ikat

4,600.00
20,400.00
13,000.00
36,500.00
32,000.00
19,400.00
12,500.00
160,500.00
25,500.00
25,500.00
48,800.00
80,960.00
48,800.00
48,800.00
80,960.00
28,000.00
80,960.00
48,800.00
132,500.00
154,600.00
34,600.00
77,500.00
13,300.00
30,200.00
34,600.00
60,300.00
27,400.00
2,300.00
8,700.00
4,700.00
23,900.00
35,200.00
24,100.00
38,800.00
4,100.00

Peralatan Air Bersih


Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap sekualitas Dragon
Pompa Air sekualitas Sanyo

1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit

725,000.00
1,289,900.00
2,016,100.00
3,376,100.00
198,200.00
795,000.00

Instalasi Listrik
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm

1 m
1 m
1 m

HARGA

4,400.00
7,200.00
13,300.00

No

KODE

4 M438b
5 M439
6 M440
7 M440.a
8 M441
9 M442
10 M443
11 M444
12 M445
13 M446

BAHAN BANGUNAN
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group

SATUAN
1 m
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit

HARGA
8,000.00
27,000.00
33,000.00
37,800.00
650.00
800.00
1,050.00
7,500.00
10,600.00
67,700.00

No

KODE

14 M447
15 M448
16 M449
17 M450
18 M451
19 M452
20 M453
21 M454
22 M455
23 M456
24 M457
25 M458
26 M459
27 M460
28 M460.a
29 M460.b
30 M460.c
31 M460.d
XVIII.
1 M461
2 M462
3 M463
4 M464
5 M464.a
6 M465
7 M466
8 M467
9 M468
10 M469
11 M470
12 M471
13 M471a
14 M472
15 M473
16 M474
17 M475
18 M476
19 M477
20 M478
21 M479
22 M480
23 M481
24 M482
25 M482.a
26 M483
27 M483.a
28 M484
29 M485
30 M486

BAHAN BANGUNAN

SATUAN

HARGA

Zekering Kast Lokal 2 Group


Zekering Kast Lokal 3 Group
Lampu TL Komplit 20 Watt sekualitas Phillip
Lampu TL Komplit 40 Watt sekualitas Phillip
Lampu XL (Lilin) 5 Watt sekualitas Phillip
Lampu XL (Lilin) 8 Watt sekualitas Phillip
Lampu XL (Lilin) 14 Watt sekualitas Phillip
Lampu XL (Lilin) 18 Watt sekualitas Phillip
Lampu XL (Lilin) 23 Watt sekualitas Phillip
Lampu Pijar 5 - 40 Watt sekualitas Phillip
Lampu Pijar 50 -100 Watt sekualitas Phillip
Tambah Daya 2200 Watt
Pasang Baru PLN
Pipa Arde
Splits Dia 1
Timah
Kawat BC
Klemp

1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh

98,400.00
135,200.00
63,300.00
93,900.00
27,600.00
31,800.00
35,900.00
38,600.00
44,000.00
18,100.00
30,000.00
3,710,000.00
4,699,900.00
110,600.00
77,500.00
438,600.00
45,300.00
2,100.00

Lain - Lain
Rumput Lamur
Rumput Gajah Mutiara
Semak Hias
Pohon Pelindung
Gebalan rumput Gajah mutiara
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri
Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih

1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr
1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr

10,000.00
11,000.00
12,700.00
193,300.00
11,000.00
19,100.00
154,600.00
32,000.00
57,800.00
67,500.00
13,500.00
2,710.00
90,250.00
2,500.00
55,250.00
4,100.00
64,200.00
83,600.00
6,900.00
6,200.00
32,000.00
64,200.00
3,000.00
4,500.00
4,500.00
17,500.00
30.00

No

KODE

31 M487

BAHAN BANGUNAN
Kuas 4"

SATUAN
1 bh

HARGA
13,300.00

DAFTAR HARGA BAHAN


VERSITAS NEGERI MALANG (UM)
TAHUN ANGGARAN 2012
KETERANGAN

Per Meter isi 45


Per Meter isi 45
Per Meter isi 28
Per Meter isi 28
Per Meter isi 33
Per Meter isi 33

KETERANGAN

KETERANGAN

KETERANGAN

Kualitas Lokal (Kelas


II/A3)

Kualitas Ekspor (Hara),


kualifikasi lepas warna
putih, serat lurus/mahkota,
tidak doreng, lepas mata
mati.

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

Anda mungkin juga menyukai