No.
A.
B.
C.
URAIAN PEKERJAAN
TOTAL BIAYA
(Rp.)
JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN
Malang,
2014
...................................
.....................................
.........................................
........................................
LL OF QUALITY
MEKANIKAL ELEKTRIKAL)
TOTAL BIAYA
(Rp.)
Malang,
2014
...................................
.....................................
.........................................
........................................
BILL OF QUALITY
STRUKTUR
PEKERJAAN
LOKASI
No.
URAIAN PEKERJAAN
TOTAL BIAYA
(Rp.)
PEKERJAAN STRUKTUR
A. PEKERJAAN STRUKTUR LANTAI 1
B. PEKERJAAN STRUKTUR LANTAI 2
JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN
Malang,
2014
..............................
...............................
...............................
..............................
UALITY
TUR
TOTAL BIAYA
(Rp.)
1,328,500,250.43
1,651,965,037.46
2,980,465,287.90
298,046,528.79
3,278,511,816.68
Malang,
2014
...............................
...............................
...............................
..............................
M009
M010
M011
M012
M013
M014
M015
M016
M017
M018
M019
M020
M021
M022
M022.a
M023
M024
M025
M026
M027
M028
M029
M030
M031
M032
M033
M034
M035
M036.a
M036.b
M036.c
M037
M037.a
M038
BAHAN BANGUNAN
SATUAN
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
Tanah Liat
Batu Belah Gunung
Batu Belah Kali
Batu Kali
Stenslah/batu pecah tangan 1/2
Stenslah/batu pecah tangan 2/3
Stenslah/batu pecah tangan 3/5
Stenslah/batu pecah tangan 4/6 - 5/7
Batu pecah mesin 1/1
Batu pecah mesin 1/2
Batu pecah mesin 2/3
Batu pecah mesin 3/5
Batu pecah mesin 4/6 - 5/7
Bata Merah
Batu Bata Tahan Api
Bata Berongga
Batako
Rooster
Batu Granito
Batu Teraso
Batu Palimanan
Batu Tempel Hitam
Hollow Blok (HB.20)
Hollow Blok (HB.15)
Hollow Blok (HB.10)
Paving Block Segi Empat t=8 cm, sekualitas Fass
Paving Block Segi Empat t= 8 cm Sekualitas Cone Block
Paving Block Segi Enam Biasa
Paving Block Segi Enam Warna
Paving Block Tiga Berlian Biasa
Paving Block Tiga Berlian Warna
Portland Cement (PC)
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 kg
KODE
M039
M040
M041
M042
M043
BAHAN BANGUNAN
Portland Cement (PC) Warna
Portland Cement (PC) Grouting
Kapur
Gamping
Semen Merah
SATUAN
1 kg
1 kg
1 m
1 kg
1 m
KODE
M044
M045
M046
M047
M048
M049
M050
M051
M052
M053
M054
M055
M056
M057
M058
M059
M060
M061
M062
M063
M064
M065
M066
M067
M068
M069
M070
M071
M078
M079
M080
M081
M082
M083
M084
M085
M088
M089
M090
M091
M092
M093
M094
M095
M096
BAHAN BANGUNAN
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
Reng : 2/3, 3/5
Usuk : 5/7
Balok
SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m
1 m
1 m
1 m
KODE
M097
M098
M099
M100
M101
M102
M103
M104
M105
M106
M107
M108
M109
M110
M111
BAHAN BANGUNAN
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
KODE
M112
M113
M114
M115
M116
M116.a
M116.b
M117
M118
M119
M120
M121
M122
M123
M124
M124.a
M124.b
M125
M126
M127
M128
M129
M130
M131
M132
M133
M134
M135
M136
M137
M138
M139
M140
M141
M142
M143
M144
M145
M146
M147
M148
M148.a
M148.b
M148.c
M148.d
BAHAN BANGUNAN
Besi Beton Polos
Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil
Plat Baja
Roda Railling
Angker Bar / Dynabolt
Kabel prestressed
Pintu Besi Baja
Pintu Gulung Besi
Pintu Lipat
Rolling Door
Pagar Besi
Pintu Pagar besi
Pagar Model BRC tinggi 1 m
Pintu Pagar Model BRC tinggi 1 m
Profil Aluminium Putih
Profil Aluminium Coklat
Sunscream Aluminium
Pintu Fiber KM
Atap Aluminium
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran
Paku Seng Segala Ukuran
Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran
Sekrup segala ukuran
Baut Segala Ukuran
Paku Keling
Paku Beton
Wire Mesh
Sealant
Aluminium Strip
Profil Kaca
SATUAN
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 bh
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg
1 Kg
1 bh
1 bh
1 bh
1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m
KODE
M148.e
M148.f
M148.g
M148.h
M149
M150
M151
M152
M153
M154
M155
M156
M157
M158
M159
M160
BAHAN BANGUNAN
Venetion blinds dan vertical blinds (tirai)
Atap Seng Galvalum
Bubung Atap Seng Galvalum
Plat Bondex
Genteng sekualitas Monier
Genteng Press ex. Trenggalek
Genteng Karang Pilang ex. Malang
Genteng Karang Pilang ex. Trenggalek
Genteng Karang Pilang ex. Surabaya
Genteng sekualitas kanmuri
Genteng Kaca
Bubung Genteng sekualitas Monier
Bubung Genteng Press ex. Trenggalek
Bubung Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya
SATUAN
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
KODE
M161
M162
M163
M164
M165
M166
M167
M168
M169
M170
M171
M172
M173
M173.a
M174
M175
M176
M176.a
M177
M178
M179
M180
M181
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M194
M195
M196
M197
M198
M199
M200
M201
M202
M203
BAHAN BANGUNAN
Bubung Genteng sekualitas kanmuri
Genteng Palentong Kecil
Genteng Kodok Glazuur
Genteng Palentong Super/Besar
Bubung Genteng Palentong Kecil
Bubung Genteng Kodok Glazuur
Bubung Genteng Palentong Super/Besar
Genteng Aspal
Genteng Metal
Atap Sirap
Bubung Genteng Aspal
Bubung Genteng Metal
Bubung Atap Sirap
Plastik Aerator
Seng plat BJLS 30 L = 0.45 M
Seng plat BJLS 30 L = 0.60 M
Seng plat BJLS 30 L = 0.90 M
Plat Alumunium t=0.35 mm, L = 0.90 M
Seng plat BJLS 28 (90 x 180) cm
Atap Seng Gelombang bjls 20
Bubung Seng Gelombang
Roof Light Fibreglass
Atap Polycarbonat
Asbes Gelombang (3.00 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.70 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.40 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.10 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (1.50 x 1.05) m x 4 mm sekualitas Varia Usaha
Asbes Gelombang (2.50 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (2.25 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (2.00 x 0.92) m x 5 mm sekualitas Varia Uaha
Asbes Gelombang (1.80 x 0.92) m x 5 mm sekualitas Varia Usaha
Asbes Gelombang (3.00 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (2.70 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (2.10 x 1.08) m x 6 mm sekualitas Varia Usaha
Asbes Gelombang (1.80 x 1.08) m x 6 mm sekualitas Varia Usaha
Bubung Stel Gelombang 0.92 m sekualitas Varia Usaha
Bubung Stel Gelombang 1.05 m sekualitas Varia Usaha
Bubung Stel Gelombang 1.08 m sekualitas Varia Usaha
Bubung Paten 0.92 m
Bubung Paten 1.05 m
Bubung Paten 1.08 m
Bubung Stel Rata 0.92 m
Bubung Stel Rata 1.05 m
Asbes (1,00 x 1,00) m x 6 mm sekualitas cap Kerang
SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m
1 m
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
KODE
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
M214
M215
M216
M217
M218
M219
M220
BAHAN BANGUNAN
Asbes (1,00 x 1,00) m x 5 mm sekualitas cap Kerang
Asbes (1,00 x 1,00) m x 4 mm sekualitas cap Kerang
Asbes (1,00 x 1,00) m x 3,5 mm sekualitas cap Kerang
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Harplek 4 mm
List Gypsum
Soft Board
Gypsum Board
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
SATUAN
1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
KODE
M221
M222
M223
M224
M225
M226
M227
M228
M229
M230
M231
M232
M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
BAHAN BANGUNAN
Plywood Lapis Aluminium
Plywood (30 x 60) cm x 4 mm
Plywood (30 x 60) cm x 6 mm
Plywood (60 x 120) cm x 4 mm
Plywood (60 x 120) cm x 6 mm
Plywood (120 x 240) cm x 4 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm
Kloset Jongkok Porselin Kw. A
Kloset Duduk Porselin Kw. A sekualitas Toto
Kloset Jongkok Lux sekualitas Toto
Kloset Duduk Lux sekualitas Toto
Kloset Jongkok Teraso
Kran Air 1/2 " sekualitas San Ei
Kran Air 3/4 " sekualitas San Ei
Bak Mandi Teraso
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Firing Teraso
Bak Cuci Firing Stainless
Badkip Porselen
Urinoir Porselin sekualitas Toto
Urinoir Keramik sekualitas Toto
Wastafel Komplit (Kran + Sipon) Lux sekualitas Toto
Wastafel Komplit (Kran + Sipon) Kw. A sekualitas Toto
Tempat Sabun Keramik
Afor Stainless
Afor Plastic
Kaca Wastafel
Kunci Tanam
Kunci Tanam sekualitas DEKSON
Kunci Pintu Kamar Mandi sekualitas SOLID
Kunci Silinder
Engsel Pintu
Engsel Jendela
Hak Angin sekualitas SOLID
Spring Knip
Kait Angin sekualitas SOLID
Grendel Pintu
Grendel Jendela sekualitas SOLID
Door Closer sekualitas SOLID
Slot/Kunci Pintu sekualitas SOLID
SATUAN
1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
KODE
M266
M267
M268
M269
M270
M271
M272
M273
M274
M275
M276
M277
M278
M279
M280
BAHAN BANGUNAN
Door Holder sekualitas SOLID
Door Stop sekualitas SOLID
Rel Pintu Dorong sekualitas Handerson
Kunci Lemari
Kaca Polos tebal 3 mm sekualitas Asahi Mas
Kaca Polos tebal 5 mm sekualitas Asahi Mas
Kaca Polos tebal 8 mm sekualitas Asahi Mas
Kaca Polos tebal 12 mm sekualitas Asahi Mas
Kaca Buram tebal 3 mm sekualitas Asahi Mas
Kaca Buram tebal 5 mm sekualitas Asahi Mas
Kaca Buram tebal 8 mm sekualitas Asahi Mas
Kaca Buram tebal 12 mm sekualitas Asahi Mas
Kaca Cermin tebal 5 mm sekualitas Asahi Mas
Kaca Cermin tebal 6 mm sekualitas Asahi Mas
Kaca Cermin tebal 8 mm sekualitas Asahi Mas
SATUAN
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
KODE
M281
M282
M283
M284
M285
M286
M287
M288
M289
M290
M291
M292
M293
M294
M295
M296
M297
M298
M299
M299a
M299b
M299c
M299d
M300
M301
M302
M303
M304
M305
M306
M307
M308
M309
M310
M311
M312
M313
M314
M315
M316
M316.a
M317
M318
M319
M320
BAHAN BANGUNAN
Kaca Rayben tebal 3 mm sekualitas Asahi Mas
Kaca Rayben tebal 5 mm sekualitas Asahi Mas
Kaca Rayben tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 12 mm sekualitas Asahi Mas
Jendela Nako + accessories
Glass Block
Painting Glass
Kaca "Wireglass" 5 mm
Kaca Patri 5 mm
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin sekualitas Granit Tile ex. China 40 x 40 cm
Ubin sekualitas Granit Tile ex. China 60 x 60 cm
Ubin sekualitas Teralux Kerang 40 x 40 cm
Ubin sekualitas Teralux Kerang 30 x 30 cm
Ubin sekualitas Teralux Kerang 60 x 60 cm
Ubin sekualitas Teralux Marmer 40 x 40 cm
Plint ubin pc abu-abu 15 x 20 cm
Plint ubin pc abu-abu 10 x 30 cm
Plint ubin pc abu-abu 10 x 40 cm
Plint ubin pc warna 10 x 20 cm
Plint ubin pc warna 10 x 30 cm
Plint ubin pc warna 10 x 40 cm
Plint Ubin Terasso 10 x 30 cm
Plint Ubin Terasso 10 x 40 cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 40 cm
Plint Ubin sekualitas Granit Tile ex. China 10 x 60 cm
Lantai keramik artistik 10 x 20
Lantai keramik artistik 10 x 10
Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Bahan Teraso Cor
Keramik Lantai 40 x 40 cm putih sekualitas Asia
Keramik Lantai 40 x 40 cm warna/motif sekualitas Asia
Keramik Lantai 30 x 30 cm putih sekualitas Asia
Keramik Lantai 30 x 30 cm warna/motif sekualitas Asia
SATUAN
1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 bh
1 bh
1 bh
KODE
M321
M322
M323
M324
M325
M326
M327
M328
M329
M330
BAHAN BANGUNAN
Keramik Lantai 20 x 20 cm putih sekualitas Asia
Keramik Lantai 20 x 20 cm warna/motif sekualitas Asia
Keramik Lantai KM 20 x 20 cm sekualitas Asia
Plint Keramik Lantai 10 x 20 cm sekualitas Asia
Plint Keramik Lantai 10 x 30 cm sekualitas Asia
Plint Keramik Lantai 10 x 40 cm sekualitas Asia
Keramik Dinding 20 x 25 cm sekualitas Asia
Keramik Dinding 20 x 20 cm sekualitas Asia
Porselin 15 x 15 cm putih
Porselin 15 x 15 cm warna
SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
KODE
M331
M332
M333
M333.a
M333.b
M333.c
M333.d
M333.e
M333.f
M333.g
M334
M335
M336
M337
M338
M339
M340
M341
M342
M343
M344
M345
M346
M347
M348
M349
M350
M351
M352
M353
M354
M355
M356
M357
M358
M359
M360
M361
M362
M363
M364
M365
M366
M367
M368
BAHAN BANGUNAN
Porselin 10 x 20 cm warna
Porselin 20 x 20 cm warna
Gymflour
Parquet Jati Kualitas Hara uk. 15 x 90 x 300 mm
Karpet
Lantai marmer 100x100 cm sekualitas ex Tulungagung
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm warna
Wall Paper
Batu Ampyangan Granit
Pipa PVC tipe AW 1/2" sekualitas Maspion
Pipa PVC tipe AW 3/4" sekualitas Maspion
Pipa PVC tipe AW 1" sekualitas Maspion
Pipa PVC tipe AW 1.5" sekualaitas Maspion
Pipa PVC tipe AW 2" sekualitas Maspion
Pipa PVC tipe AW 2.5" sekualitas Maspion
Pipa PVC tipe AW 3 " sekualitas Maspion
Pipa PVC tipe AW 4 " sekualitas Maspion
Pipa PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 8 " sekualitas Maspion
Pipa PVC tipe D 1/2 " sekualitas Maspion
Pipa PVC tipe D 3/4 " sekualaitas Maspion
Pipa PVC tipe D 1" sekualitas Maspion
Pipa PVC tipe D 1.5 " sekualitas Maspion
Pipa PVC tipe D 2 " sekualitas Maspion
Pipa PVC tipe D 2.5 " sekualitas Maspion
Pipa PVC tipe D 3 " sekualitas Maspion
Pipa PVC tipe D 4 " sekualitas Maspion
Pipa PVC tipe C 1/2 " sekualitas Maspion
Pipa PVC tipe C 3/4 " sekualitas Maspion
Pipa PVC tipe C 1" sekualitas Maspion
Pipa PVC tipe C 1.5 " sekualitas Maspion
Pipa PVC tipe C 2 " sekualitas Maspion
Pipa PVC tipe C 2.5 " sekualitas Maspion
Pipa PVC tipe C 3 " sekualitas Maspion
Pipa PVC tipe C 4 " sekualitas Maspion
Shock PVC 1/2 " sekualitas Masion
Shock PVC 3/4 " sekualitas Maspion
Shock PVC 1 " sekualitas Maspion
Shock PVC 1.5 " sekualitas Maspion
Shock PVC 2 " sekualitas Maspion
Shock PVC 2.5 " sekualitas Maspion
Shock PVC 3 " sekualitas Maspion
Shock PVC 4 " sekualitas Maspion
Knee PVC 1/2 " sekualitas Maspion
SATUAN
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
KODE
M369
M370
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
BAHAN BANGUNAN
Knee PVC 3/4 " sekualitas Maspion
Knee PVC 1 " sekualitas Maspion
Knee PVC 1.5 " sekualitas Maspion
Knee PVC 2 " sekualitas Maspion
Knee PVC 2.5 " sekualitas Maspion
Knee PVC 3 " sekualitas Maspion
Knee PVC 4 " sekualitas Maspion
Pipa Galvanis 1/2" tebal 1.8 mm sekualitas Spindo
Pipa Galvanis 3/4" tebal 1.8 mm sekualitas Spindo
Pipa Galvanis 1 ", tebal 2 mm sekualitas Spindo
Pipa Galvanis 1.5 ", tebal 2 mm sekualitas Spindo
Pipa Galvanis 2 ", tebal 2.3 mm sekualitas Spindo
SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
KODE
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
M400.a
M400.b
M400.c
M400.d
M400.e
M400.f
M400.g
M400.h
M401
M402
M403
M404
M405
M406
M407
M408
M409
M410
M411
M412
M413
M414
M415
M415.a
M415.b
BAHAN BANGUNAN
Pipa Galvanis 2.5 ", tebal 2.5 mm sekualitas Spindo
Pipa Galvanis 3" tebal 2.5 mm sekualitas Spindo
Pipa Galvanis 4" tebal 2.8 mm sekualitas Spindo
Shock Galvanis 1/2 " sekualitas Spindo
Shock Galvanis 3/4 " sekualitas Spindo
Shock Galvanis 1 " sekualitas Spindo
Shock Galvanis 1.5 " sekualitas Spindo
Shock Galvanis 2 " sekualitas Spindo
Shock Galvanis 2.5 " sekuallitas Spindo
Shock Galvanis 3 " sekualitas Spindo
Shock Galvanis 4 " sekualitas Spindo
Knee Galvanis 1/2 " sekualitas Spindo
Knee Galvanis 3/4 " sekualitas Spindo
Knee Galvanis 1 " sekualitas Spindo
Knee Galvanis 1.5 " sekualitas Spindo
Knee Galvanis 2 " sekualitas Spindo
Knee Galvanis 2.5 " sekualitas Spindo
Knee Galvanis 3 " sekualaitas Spindo
Knee Galvanis 4 " sekualitas Spindo
Pipa Screen PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 5 " sekualitas Maspion
Pipa Screen PVC tipe AW 5 " sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 2" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 2,5" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 3" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 4" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 6" sekualitas Maspion
Pipa PVC moof 6 m S - 12,5 8" sekualitas Maspion
Kertas Gosok
Plamir Kayu sekualitas cap Pedang
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu sekualitas Emco
Cat meni besi sekualitas Emco
Cat Dasar Kayu sekualitas Emco
Cat Dasar Tembok eksterior sekualitas Mowilex
Cat Dasar Besi sekualitas Emco
Cat Kayu sekualitas Emco
Cat Tembok eksterior sekualitas Mowilex
Cat Tembok Interior sekualitas ICI Catylac
Cat Tembok Eksterior sekualitas ICI Weathar Shield
SATUAN
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
KODE
M416
M417
M418
M419
M420
M421
M422
M423
M424
M425
M426
M427
M428
M429
M430
BAHAN BANGUNAN
Cat Besi sekualitas Emco
Cat Genting sekualitas Nippon Paint
Waterproofing sekualitas Sika
Vernis
Politur Jadi
Kuas
Lem Kayu sekualitas Rajawali
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun
SATUAN
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
KODE
M430.a
M430.b
M430.c
M431
M432
M433
M434
M435
M436
M437
M438
M438a
M438b
M439
M440
M440.a
M441
M442
M443
M444
M445
M446
M447
M448
M449
M450
M451
M452
M453
M454
M455
M456
M457
M458
M459
M460
M460.a
M460.b
M460.c
M460.d
BAHAN BANGUNAN
Vinyl (30x30)cm
Batu Apung
Alang-Alang
Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap sekualitas Dragon
Pompa Air sekualitas Sanyo
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
Zekering Kast Lokal 2 Group
Zekering Kast Lokal 3 Group
Lampu TL Komplit 20 Watt sekualitas Phillip
Lampu TL Komplit 40 Watt sekualitas Phillip
Lampu XL (Lilin) 5 Watt sekualitas Phillip
Lampu XL (Lilin) 8 Watt sekualitas Phillip
Lampu XL (Lilin) 14 Watt sekualitas Phillip
Lampu XL (Lilin) 18 Watt sekualitas Phillip
Lampu XL (Lilin) 23 Watt sekualitas Phillip
Lampu Pijar 5 - 40 Watt sekualitas Phillip
Lampu Pijar 50 -100 Watt sekualitas Phillip
Tambah Daya 2200 Watt
Pasang Baru PLN
Pipa Arde
Splits Dia 1
Timah
Kawat BC
Klemp
SATUAN
1 bh
1 kg
1 ikat
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh
KODE
M461
M462
M463
M464
M464.a
M465
M466
M467
M468
M469
M470
M471
M471a
M472
M473
M474
M475
M476
M477
M478
M479
M480
M481
M482
M482.a
M483
M483.a
M484
M485
M486
M487
M488
M489
M490
M491
M492
M493
M494
M495
M496
M497
M498
M499
M500
M501
BAHAN BANGUNAN
Rumput Lamur
Rumput Manila
Semak Hias
Pohon Pelindung
Gebalan rumput
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri
Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih
Kuas 4"
Besi Ulir 10
Besi Ulir 13
Besi Ulir 16
Besi Ulir 19
Besi Ulir 22
Besi Ulir 25
Besi Polos 8
Besi Polos 10
Besi Polos 12
Besi Polos 16
Besi Polos 19
Besi Polos 20
Baja Siku
Baja Canal C
SATUAN
1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr
1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr
1 bh
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
KODE
M502
M503
M504
BAHAN BANGUNAN
Pipa baja 4
Sewa alat mesin bor
Sewa alat mesin las
SATUAN
kg
1hr
1hr
KETERANG
AN
Tanah dan
Pasir
53,000.00
Batu,Bata &
140,000.00
Beton Block
#REF!
209,500.00
159,120.00
163,000.00
145,500.00
234,000.00
#REF!
159,120.00
183,000.00
169,000.00
450.00
13,200.00
950.00
5,250.00
9,750.00
3,300.00
2,600.00
80,250.00
76,000.00
5,100.00
4,500.00
3,750.00
1,350.00 Per Meter isi 45
1,800.00 Per Meter isi 45
2,100.00 Per Meter isi 28
2,200.00 Per Meter isi 28
1,400.00 Per Meter isi 33
1,600.00 Per Meter isi 33
1,600.00 Semen
4,300.00
2,700.00
M01d
M01b
M01a
M16
M06
M02
M91
M92
M12.
HARGA
11,700.00
8,750.00
1,430,000.00
1,000.00
197,500.00
KETERANG
AN
KETERANG
AN
38,000.00 Buis Beton
48,000.00
66,000.00
82,500.00
106,000.00
201,000.00
219,250.00
280,500.00
29,200.00
42,250.00
8,830,000.00 Kayu Borneo
8,830,000.00 Kayu Borneo
8,830,000.00 Kayu Borneo
10,910,000.00 Kayu Borneo
11,170,000.00 Kayu Borneo
11,170,000.00 Kayu Borneo
4,830,000.00 Kayu Meranti
4,830,000.00 Kayu Meranti
5,175,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
4,945,000.00 Kayu Meranti
6,178,000.00 Kayu Kruing
6,178,000.00 Kayu Kruing
6,490,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
7,010,000.00 Kayu Kruing
9,350,000.00 Kayu Kamper
9,610,000.00 Kayu Kamper
9,870,000.00 Kayu Kamper
11,430,000.00 Kayu Kamper
11,690,000.00 Kayu Kamper
11,950,000.00 Kayu Kamper
Kayu Lain2,850,000.00
lain
4,250,000.00
M99
24,100.00
27,000.00
7,700.00
3,630,000.00
38,400.00
80,100.00
13,551,600.00 Kayu Jati Ex Malang
13,551,600.00 Kayu Jati Ex Malang
13,551,600.00 Kayu Jati Ex Malang
HARGA
HARGA
KETERANG
AN
KETERANG
AN
Besi dan
M13
8,300.00
Aluminium
M39b
8,500.00
13,900.00
.
M48
18,328.13
M46
11,500.00
17,200.00
13,100.00
30,400.00
753,000.00
2,070,500.00
1,694,100.00
1,254,900.00
627,500.00
721,600.00
329,400.00
421,600.00
91,000.00
109,200.00
313,700.00
349,800.00
102,800.00
100,400.00
31,300.00
41,000.00
44,500.00
66,300.00
M14
23,400.00
23,900.00
21,800.00
21,100.00
20,500.00
M18
13,500.00
25,700.00
600.00
900.00
700.00
450.00
11,800.00
3,300.00
39,300.00
17,500.00
27,500.00
17,500.00
11,400.00
HARGA
HARGA
KETERANG
AN
563,500.00
112,300.00
109,200.00
140,000.00
2,700.00 Atap Genteng
1,300.00
1,500.00
1,700.00
2,100.00
14,500.00
14,100.00
4,900.00
2,500.00
4,700.00
5,100.00
5,700.00
HARGA
KETERANG
AN
11,500.00
2,300.00
2,300.00
4,500.00
4,100.00
7,300.00
7,800.00
6,700.00
100,700.00
1,600.00
45,100.00
100,700.00
121,900.00
6,900.00
35,900.00 Atap Seng / Asbes
40,900.00
51,400.00
65,000.00
70,100.00
32,000.00
78,900.00
78,200.00
114,200.00
107,700.00
99,500.00
86,100.00
76,300.00
57,900.00
109,400.00
94,700.00
83,900.00
63,800.00
134,900.00
129,300.00
95,600.00
76,900.00
47,800.00
50,800.00
51,100.00
44,400.00
44,000.00
47,400.00
47,800.00
40,600.00
18,700.00
HARGA
KETERANG
AN
17,600.00
17,000.00
16,400.00
15,000.00
27,500.00
36,000.00
54,100.00
10,000.00
72,100.00
76,900.00
54,100.00 Kayu Olahan
75,000.00
86,500.00
125,000.00
150,300.00
146,000.00
M73
258,400.00
HARGA
KETERANG
AN
90,100.00
7,300.00
10,200.00
23,800.00
28,200.00
95,900.00
7,800.00
27,700.00
87,500.00
159,800.00 Perlengkapan Kamar Man
1,565,500.00
235,000.00
1,628,200.00
62,500.00
39,200.00
43,700.00
141,800.00
344,300.00
216,600.00
2,191,800.00
443,700.00
219,000.00
312,200.00
939,300.00
1,095,800.00
1,127,100.00
1,377,700.00
455,100.00
31,200.00
53,100.00
15,500.00
62,500.00
75,000.00 Alat-Alat Penggantung
385,000.00
75,000.00
151,600.00
12,500.00
10,000.00
28,750.00
12,300.00
9,500.00
7,500.00
46,000.00
176,900.00
375,000.00
HARGA
KETERANG
AN
126,300.00
37,300.00
450,000.00
11,900.00
83,800.00 Kaca
127,200.00
246,000.00
341,400.00
96,800.00
154,400.00
206,700.00
339,200.00
200,000.00
255,800.00
348,600.00
HARGA
KETERANG
AN
125,200.00
183,600.00
375,900.00
600,300.00
245,300.00
23,900.00
558,700.00
627,000.00
1,367,400.00
2,300.00 Perlengkapan Lantai
1,750.00
1,150.00
2,900.00
1,800.00
1,200.00
4,100.00
2,900.00
15,200.00
40,000.00
41,000.00
35,100.00
70,400.00
52,700.00
2,900.00
3,200.00
3,500.00
1,800.00
2,300.00
3,500.00
4,100.00
5,900.00
10,000.00
15,000.00
8,700.00
8,700.00
8,700.00
17,400.00
17,400.00
17,400.00
23,200.00
182,100.00
8,000.00
8,800.00
3,200.00
4,500.00
HARGA
1,500.00
1,900.00
2,200.00
4,700.00
8,700.00
10,000.00
4,200.00
3,000.00
950.00
950.00
KETERANG
AN
HARGA
KETERANG
AN
900.00
2,000.00
231,100.00
450,000.00
56,400.00
394,500.00
850.00
1,100.00
54,600.00
6,700.00
2,000.00 Perpipaan
2,000.00
2,500.00
3,500.00
18,000.00
20,000.00 4
24,000.00 532,900.00
165,000.00
133,225.00
203,550.00
4,000.00
6,075.00
7,950.00
10,650.00
M24c
#REF!
18,925.00
27,475.00
M24d
#REF!
3,000.00
4,575.00
5,975.00
8,000.00
10,775.00
13,675.00
16,175.00
20,575.00
1,600.00
2,400.00
2,700.00
5,800.00
8,100.00
11,600.00
13,100.00
15,900.00
2,100.00
HARGA
2,600.00
3,800.00
7,600.00
11,400.00
13,100.00
14,600.00
18,300.00
35,950.00
46,525.00
180,000.00
#REF!
133,150.00
KETERANG
AN
M24b
HARGA
KETERANG
AN
185,975.00
#REF!
310,625.00
4,100.00
4,900.00
7,700.00
13,600.00
21,600.00
38,200.00
57,300.00
76,400.00
4,700.00
6,400.00
9,000.00
17,900.00
28,000.00
53,500.00
82,700.00
101,800.00
162,825.00
105,050.00
134,150.00
30,600.00
42,625.00
63,500.00
93,175.00
201,300.00
326,025.00
4,600.00 Plitur & Cat
20,400.00
13,000.00
36,500.00
32,000.00
19,400.00
12,500.00
160,500.00
25,500.00
25,500.00
48,800.00
80,960.00
48,800.00
48,800.00
80,960.00
28,000.00
80,960.00
M24a
HARGA
48,800.00
132,500.00
154,600.00
34,600.00
77,500.00
13,300.00
30,200.00
34,600.00
60,300.00
27,400.00
2,300.00
8,700.00
4,700.00
23,900.00
35,200.00
KETERANG
AN
HARGA
KETERANG
AN
24,100.00
38,800.00
4,100.00
725,000.00 Peralatan Air Bersih
1,289,900.00
2,016,100.00
3,376,100.00
198,200.00
795,000.00
4,400.00 Instalasi Listrik
7,200.00
13,300.00
8,000.00
27,000.00
33,000.00
37,800.00
650.00
800.00
1,050.00
7,500.00
10,600.00
67,700.00
98,400.00
135,200.00
63,300.00
93,900.00
27,600.00
31,800.00
35,900.00
38,600.00
44,000.00
18,100.00
30,000.00
3,710,000.00
4,699,900.00
110,600.00
77,500.00
438,600.00
45,300.00
2,100.00
KETERANG
AN
22,400.00 Lain - Lain
19,100.00
12,700.00
193,300.00
16,800.00
19,100.00
154,600.00
32,000.00
57,800.00
67,500.00
13,500.00
2,710.00
90,250.00
2,500.00
55,250.00
4,100.00
64,200.00
83,600.00
6,900.00
6,200.00
32,000.00
64,200.00
3,000.00
M20
#REF!
M21
4,500.00
#REF!
4,500.00
M22
#REF!
17,500.00
30.00
13,300.00
9,500.00
9,500.00
9,500.00
9,900.00
9,900.00
9,900.00
9,250.00
9,250.00
9,250.00
9,250.00
9,250.00
9,250.00
11,000.00
18,328.13
HARGA
HARGA
11,000.00
350,000.00
350,000.00
KETERANG
AN
No.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
URAIAN PEKERJAAN
TOTAL
(Rp
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR LANTAI 1
PEKERJAAN STRUKTUR LANTAI 2
PEKERJAAN STRUKTUR LANTAI 3
PEKERJAAN STRUKTUR LANTAI 4
PEKERJAAN STRUKTUR LANTAI 5
PEKERJAAN STRUKTUR LANTAI 6
PEKERJAAN STRUKTUR AUDITORIUM
PEKERJAAN STRUKTUR ELV. 27.00
PEKERJAAN STRUKTUR ELV. 28.00
PEKERJAAN STRUKTUR ELV. 28.50 (Trap auditorium)
PEKERJAAN STRUKTUR TOP FLOOR
PEKERJAAN STRUKTUR ATAP
JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN
Terbilang : Dua Puluh Tujuh Milyard Tiga Ratus Delapan Puluh Delapan Juta Tujuh Ratus Tiga Puluh
Malang,
CV KOSA MAT
Ir. SAHIR
Direk
TOTAL BIAYA
(Rp.)
2,834,517,832.19
1,967,189,706.08
1,277,267,394.99
1,042,706,720.99
490,634,502.07
7,612,316,156.32
761,231,615.63
8,373,547,771.95
8,373,547,000.00
uluh Delapan Juta Tujuh Ratus Tiga Puluh Lima Ribu Rupiah
Malang,
2013
Ir. SAHIRWAN
Direktur
Owner :
MC - 0
Kontraktor Pelaksana :
No.
URAIAN PEKERJAAN
1
Tahun Anggaran
: 2012 - 2013
No Kontrak Pek
: 3745/UN10.4/PD/2013
: Rp. 8.425.445.000
HARGA SATUAN
SAT
2
Kontrak
(Rp.)
3
VOLUME
MC-0
Deviasi
7 =(6-5)
PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Ls
Rp
2,000,000.00
1.00
1.00
Rp
281,700.00
264.00
264.00
Rp
53,560.00
236.80
236.80
Direksi Keet
Rp
974,900.00
60.48
60.48
ttk
Rp
20,000,000.00
3.00
3.00
ls
Rp
60,000,000.00
1.00
1.00
Mobilisasi Alat
Ls
Rp
10,000,000.00
1.00
1.00
Demobilisasi Alat
Ls
Rp
10,000,000.00
1.00
1.00
Unit
Rp
500,000.00
1.00
1.00
11 Listrik Kerja
Ls
Rp
5,500,000.00
1.00
1.00
12 I M B
Ls
Rp
87,500,000.00
1.00
1.00
559.69
1
1
PEKERJAAN TANAH
m3
Rp
51,845.00
344.64
Rp
60,992.64
43.09
m3
Rp
43,625.00
195.53
Bor strauss 40 cm
m1
Rp
89,815.00
1,256.50
2,101.00
844.50
m3
Rp
14,540.00
162.05
226.57
64.51
Rp
137,285.00
13.01
19.33
6.32
m3
Rp
137,285.00
0.14
0.14
m3
Rp
137,285.00
0.69
215.05
(195.53)
(0.69)
m3
Rp
700,805.00
26.02
m3
Rp
700,805.00
0.96
(0.96)
m3
Rp
700,805.00
8.71
5.28
(3.43)
m3
Rp
700,805.00
0.20
0.20
m3
Rp
4,344,795.00
88.77
191.92
24.71
(1.31)
103.15
No.
URAIAN PEKERJAAN
1
HARGA SATUAN
SAT
2
(Rp.)
3
Kontrak
Pilecap P-1
Rp
Pilecap P-2
Rp
1,747,050.00
120.96
186.39
65.43
Pilecap P-3
Rp
1,814,970.00
16.90
5.63
(11.26)
Rp
4,458,305.00
0.58
0.58
m3
Rp
4,747,750.68
7.78
Rp
4,862,013.34
1.80
3
3
Deviasi
4
3,812,002.41
5
270.48
VOLUME
MC-0
7 =(6-5)
m3
Rp
4,715,960.00
22.28
Rp
4,998,830.00
5.15
14 Sloof 1 (35x70)
Rp
3,433,870.00
107.21
67.38
(39.84)
15 Sloof 2 (30x45)
Rp
4,035,475.00
9.45
4.75
(4.70)
16 Sloof 3 (25x45)
Rp
8,825,445.91
18.78
17 Sloof 4 (30x55)
Rp
3,672,710.00
0.63
0.63
18 Sloof 5 (25x35)
Rp
5,120,615.00
0.42
0.42
kg
Rp
10,905.00
1,463.95
1,463.95
3
3
3
3
3
37.17
-
14.89
(5.15)
PEKERJAAN KOLOM
m3
Rp
4,715,960.00
80.64
80.64
Rp
6,298,985.00
27.54
27.54
Rp
4,792,445.00
1.44
1.44
Rp
11,442,258.36
1.69
m3
Rp
3,622,030.00
3.37
3.37
Rp
3,622,030.00
3.75
3.75
3
3
kg
Rp
10,905.00
133.76
133.76
kg
Rp
10,905.00
160.50
160.50
No.
URAIAN PEKERJAAN
1
HARGA SATUAN
SAT
2
VOLUME
MC-0
Kontrak
(Rp.)
3
Deviasi
7 =(6-5)
PEKERJAAN BETON
m3
Rp
3,232,590.00
107.35
107.35
Rp
3,309,545.00
77.35
77.35
Rp
4,715,960.00
80.64
80.64
Rp
6,298,985.00
27.54
27.54
Rp
4,792,445.00
1.44
1.44
Rp
m3
Rp
4,167,555.00
131.12
131.12
Rp
4,941,620.00
12.10
12.10
Rp
5,165,400.00
1.80
1.80
10
Rp
11
m3
Rp
6,335,225.00
25.60
25.60
12
Rp
5,838,580.00
0.69
13
Rp
3,622,030.00
3.37
3.37
14
Rp
3,622,030.00
3.75
3.75
3
3
3
3
3
3
3
3
3
1.69
3.43
(0.69)
PEKERJAAN BETON
m3
3,232,590.00
102.08
102.08
4,715,960.00
80.64
80.64
6,298,985.00
12.96
12.96
4,792,445.00
1.44
1.44
m3
4,167,555.00
74.28
74.28
4,941,620.00
9.56
9.56
5,165,400.00
1.26
1.26
6,335,225.00
14.07
14.07
10
5,838,580.00
0.69
(0.69)
11
3,622,030.00
3.37
3.37
12
3,622,030.00
3.81
3.81
3
3
3
3
3
3
3
3
3
1.69
PEKERJAAN BETON
m3
Rp
3,232,590.00
102.08
102.08
Rp
4,715,960.00
80.64
46.08
(34.56)
Rp
6,298,985.00
12.96
3.24
(9.72)
Rp
4,792,445.00
1.44
0.72
(0.72)
Rp
Rp
4,167,555.00
74.28
74.28
Rp
4,941,620.00
9.56
9.56
3
3
3
3
3
3
1.69
No.
URAIAN PEKERJAAN
HARGA SATUAN
SAT
(Rp.)
3
Kontrak
Rp
Rp
6,335,225.00
14.07
10
Rp
5,838,580.00
0.69
(0.69)
11
Rp
3,622,030.00
3.37
3.37
12
Rp
3,622,030.00
3.81
1.91
(1.91)
(41.91)
3
3
3
3
Deviasi
4
5,165,400.00
5
1.26
VOLUME
MC-0
7 =(6-5)
1.26
14.07
PEKERJAAN BETON
m3
Rp
3,232,590.00
102.08
60.17
kg
Rp
10,905.00
2,621.70
2,621.70
kg
Rp
10,905.00
642.05
642.05
kg
Rp
10,905.00
41.18
41.18
m3
Rp
4,167,555.00
74.28
40.47
(33.81)
Rp
4,941,620.00
9.56
4.73
(4.83)
m3
Rp
5,165,400.00
1.26
0.63
(0.63)
Rp
6,335,225.00
14.07
8.93
(5.15)
kg
Rp
10,905.00
379.38
379.38
kg
Rp
10,905.00
209.97
209.97
kg
Rp
10,905.00
169.29
169.29
Mengetahui / Menyetujui,
Diperik
Konsu
Fakultas Pertanian
Universitas Brawijaya
Fakultas Pertanian
Universitas Brawijaya
CV. KOSA
Yosimson
Te
MC - 0 (MUTHUAL CHECK)
KONTRAK (Rp)
8=(4*5)
KETERANGAN
Deviasi (Rp)
9=(4*6)
10=(9-8)
Rp
2,000,000.00 Rp
2,000,000.00 Rp
Rp
74,368,800.00 Rp
74,368,800.00 Rp
Rp
12,683,008.00 Rp
12,683,008.00 Rp
Rp
58,961,952.00 Rp
58,961,952.00 Rp
Rp
60,000,000.00 Rp
60,000,000.00 Rp
Rp
60,000,000.00 Rp
60,000,000.00 Rp
Rp
10,000,000.00 Rp
10,000,000.00 Rp
Rp
10,000,000.00 Rp
10,000,000.00 Rp
Rp
500,000.00 Rp
500,000.00 Rp
Rp
5,500,000.00 Rp
5,500,000.00 Rp
Rp
87,500,000.00 Rp
87,500,000.00 Rp
Rp
381,513,760.00 Rp
381,513,760.00 Rp
Rp
17,867,860.80 Rp
29,016,967.33 Rp
Rp
Rp
2,628,294.84
-
11
Tidak Dikerjakan
Rp
Rp
Rp
112,852,547.50 Rp
188,701,315.00 Rp
Rp
2,356,238.99 Rp
3,294,273.57 Rp
Rp
1,785,940.57 Rp
2,653,982.64 Rp
Rp
19,769.04 Rp
19,769.04 Rp
Rp
Rp
Rp
Rp
137,510,651.74 Rp
223,686,307.57 Rp
Rp
18,233,544.49 Rp
17,314,677.01 Rp
Rp
Rp
Rp
Rp
6,102,609.94 Rp
3,701,301.61 Rp
Rp
141,282.29 Rp
141,282.29 Rp
Rp
385,694,946.92 Rp
833,839,153.06 Rp
88,803,950.68
(918,867.48) Volume Bertambah
-
KONTRAK (Rp)
8=(4*5)
KETERANGAN
Deviasi (Rp)
9=(4*6)
10=(9-8)
1,031,070,410.85
11
Tidak Dikerjakan
Rp
211,323,168.00 Rp
325,633,907.38 Rp
Rp
30,665,733.12 Rp
10,221,911.04 Rp
Rp
2,567,983.68 Rp
2,567,983.68 Rp
Rp
36,918,509.32
Tidak Dikerjakan
Rp
8,751,624.02
Tidak Dikerjakan
Rp
1,731,469,812.63 Rp
1,193,420,216.05 Rp
Rp
105,052,724.96 Rp
175,292,233.20 Rp
Rp
Rp
Rp
538,690,947.61
70,239,508.24 Volume Bertambah
-
Rp
368,152,070.44 Rp
231,356,991.25 Rp
Rp
38,135,238.75 Rp
19,176,577.20 Rp
Rp
165,728,636.10
Tidak Dikerjakan
Rp
Rp
2,302,789.17 Rp
Rp
Rp
2,150,658.30 Rp
Rp
Rp
15,964,411.91 Rp
Rp
677,068,670.25 Rp
446,243,661.03 Rp
Rp
380,295,014.40 Rp
380,295,014.40
Rp
173,474,046.90 Rp
173,474,046.90
Rp
6,901,120.80 Rp
6,901,120.80
Rp
19,308,810.99
Rp
12,203,488.36 Rp
12,203,488.36
Rp
13,571,311.77 Rp
13,571,311.77
Rp
605,753,793.21 Rp
Rp
1,458,652.80 Rp
1,458,652.80
Rp
1,750,252.50 Rp
1,750,252.50
Rp
3,208,905.30 Rp
3,208,905.30 Rp
Rp
3,536,525,593.13 Rp
2,834,517,832.19 Rp
(65,096,373.12)
Tidak Dikerjakan
586,444,982.22 Rp
562,398,525.18
KONTRAK (Rp)
8=(4*5)
9=(4*6)
Rp
347,025,001.68 Rp
347,025,001.68
Rp
255,999,924.84 Rp
255,999,924.84
Rp
380,295,014.40 Rp
380,295,014.40
Rp
173,474,046.90 Rp
173,474,046.90
Rp
6,901,120.80 Rp
6,901,120.80
Rp
11
Tidak Dikerjakan
546,466,481.82 Rp
546,466,481.82
Rp
59,773,835.52 Rp
59,773,835.52
Rp
9,297,720.00 Rp
9,297,720.00
Tidak Dikerjakan
Rp
162,181,760.00 Rp
Rp
4,046,135.94 Rp
Rp
12,203,488.36 Rp
12,203,488.36
Rp
13,571,311.77 Rp
13,571,311.77
Rp
1,971,235,842.02 Rp
Rp
329,972,442.91 Rp
329,972,442.91
Rp
380,295,014.40 Rp
380,295,014.40
Rp
81,634,845.60 Rp
81,634,845.60
Rp
6,901,120.80 Rp
6,901,120.80
Rp
10=(9-8)
Rp
Rp
KETERANGAN
Deviasi (Rp)
162,181,760.00
Tidak Masuk dalam Tahap I
1,967,189,706.08 Rp
Tidak Dikerjakan
Rp
309,582,655.62 Rp
309,582,655.62
Rp
47,232,003.96 Rp
47,232,003.96
Rp
6,508,404.00 Rp
6,508,404.00
Rp
89,136,615.75 Rp
89,136,615.75
Rp
4,046,135.94 Rp
Rp
12,203,488.36 Rp
12,203,488.36
Rp
13,800,803.59 Rp
13,800,803.59
Rp
1,281,313,530.93 Rp
Rp
329,972,442.91 Rp
329,972,442.91
Rp
380,295,014.40 Rp
217,311,436.80 Rp
Rp
81,634,845.60 Rp
20,408,711.40 Rp
Rp
6,901,120.80 Rp
3,450,560.40 Rp
Rp
1,277,267,394.99 Rp
Tidak Dikerjakan
Rp
309,582,655.62 Rp
309,582,655.62
Rp
47,232,003.96 Rp
47,232,003.96
KONTRAK (Rp)
8=(4*5)
KETERANGAN
Deviasi (Rp)
9=(4*6)
10=(9-8)
11
Rp
6,508,404.00 Rp
6,508,404.00
Rp
89,136,615.75 Rp
89,136,615.75
Rp
4,046,135.94 Rp
Rp
12,203,488.36 Rp
Rp
13,800,803.59 Rp
6,900,401.79 Rp
Rp
1,281,313,530.93 Rp
1,042,706,720.99 Rp
Rp
329,972,442.91 Rp
194,498,475.12 Rp
Rp
28,589,594.88 Rp
28,589,594.88 Rp
Rp
7,001,533.44 Rp
7,001,533.44 Rp
Rp
449,111.52 Rp
449,111.52 Rp
Rp
309,582,655.62 Rp
168,677,621.07 Rp
Rp
47,232,003.96 Rp
23,349,154.50 Rp
Rp
6,508,404.00 Rp
3,254,202.00 Rp
Rp
89,136,615.75 Rp
56,541,883.13 Rp
12,203,488.36
Rp
Rp
4,137,113.70 Rp
Rp
Rp
2,289,723.30 Rp
Rp
Rp
1,846,089.41 Rp
Rp
818,472,362.08 Rp
490,634,502.07 Rp
(327,837,860.01)
Rp
8,888,860,859.09 Rp
7,612,316,156.32 Rp
(8.83)
Rp
888,886,085.91 Rp
761,231,615.63
Rp
9,777,746,945.00 Rp
8,373,547,771.95
Rp
9,777,746,000.00 Rp
8,373,547,000.00
Rp
(1,404,199,000.00)
Malang, 21 Oktober 2013
Diperiksa / Menyetujui,
Dibuat Oleh,
Konsultan Pengawas
Kontraktor Pelaksana
ADJINOTO
Team Leader
Project Manager
BACK UP VOLUME
PEKERJAAN
LOKASI
LEMBAR PERHITUNGAN
NO
144.00
118.40
3.60
120.00
118.40
16.80
2.80
2.80
P3
1.60
0.80
FP1
FP2
1.80
1.50
2.70
1.80
1.50
5.10
1.04
3.60
1.18
.8 0
Elev. LANTAI 1
1 .5 0
.8 0
.10
.20
.05
4 .0 0
2.60
1.42
A.
.80
.20
1.TRAPESIUM
2.PERSEGI 2
((2,6+1,42)/2)*1,18*2
.40
.40
3.20
.40
.40
.40
.20
4.744
2.704
7.448
1,04*2,6
luas
P3
Urugan tanah kembali
Urugan pasir bawah pondasi pilecap
P1
P2
P3
FP1
FP2
1.60
1.80
1.50
1.20
2.70
0.80
1.80
1.50
1.20
5.10
1.60
1.80
1.50
2.70
0.80
1.80
1.50
5.10
617.90
139.10
48.00
20.80
74.59
0.35
0.30
0.25
0.30
0.25
1.20
1.20
1.20
1.20
1.60
1.20
0.80
1.20
FP1
FP2
1.80
1.50
1.80
1.50
P1
P2
P3
FP1
FP2
0.80
0.60
0.80
0.60
0.40
0.80
0.60
0.80
0.60
0.40
Pedestal
Tangga utama
Tangga darurat
1.80
1.20
0.20
0.20
5.10
5.15
2.55
617.90
139.10
48.00
20.80
74.59
2.70
0.15
0.15
0.35
0.30
0.25
0.30
0.25
Sloof 1 (35x70)
Sloof 2 (30x45)
Sloof 3 (25x45)
Sloof 4 (30x55)
Sloof 5 (25x35)
PEKERJAAN KOLOM
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Plat Tangga utama dan bordes lt 1 ke lt 2
Plat Tangga darurat dan bordes lt 1 ke lt 2 (2 unit)
B.
C.
D.
0.80
0.25
0.40
0.25
13.37
13.01
0.80
0.25
0.40
0.25
2.10
1.20
0.80
0.60
0.40
0.25
710.00
157.70
44.54
20.80
518.16
15.40
0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.30
0.25
0.15
2.10
1.20
13.37
13.01
0.80
0.60
0.40
0.25
710.00
157.70
11.34
514.46
15.40
13.37
13.23
0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.25
0.15
2.10
1.20
0.80
0.60
0.40
0.25
710.00
0.80
0.60
0.40
0.25
0.35
E.
F.
G.
157.70
11.34
514.46
15.40
13.37
13.23
0.30
0.25
0.25
0.15
2.10
1.20
0.80
0.60
0.40
0.25
710.00
157.70
11.34
514.46
15.40
13.37
13.23
0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.25
0.15
2.10
1.20
0.80
0.60
0.40
0.25
523.60
126.20
11.40
226.80
507.64
15.40
13.23
0.80
0.60
0.40
0.25
0.35
0.30
0.25
0.50
0.25
0.15
0.86
44.30
26.30
0.80
0.80
0.80
24.98
95.56
70.10
20.60
2.90
0.80
0.80
0.80
0.40
0.40
0.30
0.25
0.40
H.
I.
0.80
0.60
0.40
363.30
62.00
11.40
151.10
15.40
7.06
0.80
0.60
0.40
0.35
0.30
0.25
0.25
0.15
1.25
J.
K.
0.80
0.60
75.20
6.40
22.45
15.40
0.80
0.60
0.35
0.30
0.25
0.15
5.60
25.70
0.40
0.30
0.80
0.60
0.30
86.40
36.60
109.00
32.60
22.20
0.80
0.60
0.35
0.35
0.30
0.50
0.40
0.25
97.20
0.30
264.80
561.10
0.30
22.00
0.35
24.00
71.20
24.65
VOLUME
DETAIL PERHITUNGAN
L ( Luas )
1.50
1.50
1.50
7.45
Volume/Jmlh ( bh )
23.00
50.00
11.00
1.80
1.80
14.20
6.00
2.00
5.50
5.50
207.00
500.00
koef
JUMLAH
SAT.
1.00
264.00
236.80
60.48
1.00
1.00
1.00
ls
m'
m'
m2
ls
unit
ls
850.17
270.48
558.57
m3
m3
m3
21.12
43.09
34.99
8.10
195.53
4,130.50
1,138.50
2,750.00
m3
m3
m1
5.50
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.10
0.10
0.10
0.10
0.10
0.07
44.00
7.45
7.45
7.45
7.45
23.00
50.00
11.00
6.00
2.00
2.00
23.00
50.00
11.00
6.00
2.00
0.05
0.05
0.05
0.05
0.05
0.07
0.07
0.80
0.80
0.40
0.40
0.40
0.40
1.10
1.10
1.10
1.50
1.70
0.69
0.69
0.69
7.45
7.45
207.00
500.00
44.00
23.00
50.00
11.00
2.00
6.00
2.00
23.00
50.00
11.00
6.00
2.00
242.00
326.64
29.08
8.56
18.62
0.70
0.97
0.23
0.14
0.69
58.17
17.13
37.24
1.41
1.94
0.45
0.96
14.74
10.81
2.09
0.60
0.31
0.93
0.20
0.10
0.10
518.79
143.00
345.40
30.40
171.29
297.90
5.63
1.15
7.78
1.80
48.19
16.19
19.80
7.74
3.24
0.54
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
0.80
0.80
0.15
1.60
1.60
0.70
0.45
0.45
0.55
0.35
1.00
2.00
1.00
2.00
3.00
0.29
0.38
5.15
2.07
2.47
0.61
151.39
18.78
5.40
3.43
6.53
m3
m3
m3
m3
m3
m3
4.50
4.50
4.50
4.50
0.12
0.12
64.00
24.00
4.00
6.00
2.00
0.12
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.55
0.35
0.30
0.12
0.12
1,910.50
364.00
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12
0.12
1,910.50
0.12
4.50
4.50
4.50
4.50
0.70
1,925.20
64.00
24.00
4.00
6.00
2.00
64.00
16.00
4.00
6.00
2.00
64.00
16.00
4.00
6.00
184.32
6.75
2.88
1.69
3.37
3.75
229.26
43.68
184.32
38.88
2.88
1.69
173.95
21.29
5.01
3.43
45.34
0.69
3.37
3.75
229.26
184.32
25.92
2.88
1.69
173.95
21.29
1.28
45.02
0.69
3.37
3.81
231.02
184.32
25.92
2.88
1.69
173.95
0.45
0.45
0.35
0.30
0.12
0.12
2.00
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12
0.12
1,925.20
0.12
0.12
4.50
4.50
4.50
4.50
0.70
0.45
0.45
1.00
0.35
0.30
0.12
1,611.20
186.60
64.00
16.00
4.00
6.00
2.00
64.00
16.00
4.00
6.00
1.00
0.20
4.50
4.20
3.00
0.80
0.80
0.50
0.40
0.80
11.00
4.00
4.00
21.29
1.28
45.02
0.69
3.37
3.81
231.02
184.32
25.92
2.88
1.69
173.95
21.29
1.28
45.02
0.69
3.37
3.81
193.34
22.39
184.32
25.92
2.88
1.69
128.28
17.04
1.28
113.40
44.42
0.69
1.37
233.02
50.11
31.68
10.75
7.68
7.99
30.58
10.52
2.06
0.93
0.12
4.50
4.50
4.50
0.70
0.45
0.45
0.35
0.30
0.12
965.98
12.00
3.00
2.00
2.00
115.92
34.56
4.86
1.44
89.01
8.37
1.28
13.22
0.69
2.12
0.12
3.50
3.50
0.70
0.45
0.35
0.30
121.80
14.62
67.20
2.52
18.42
0.86
1.96
0.69
30.00
2.00
0.80
0.50
0.12
2.30
2.30
2.30
0.70
0.45
0.60
0.80
0.35
1.79
3.86
234.80
28.18
38.27
1.66
3.86
21.17
4.94
32.70
10.43
1.94
26.00
2.00
16.00
0.50
0.02
14.58
0.30
4.00
864.00
128.00
1,560.42
0.71
79.70
9.27
7850
350.00
2.23
21,104.56
5,201.40
47.10
36.75
196.24
864.00
128.00
1,560.42
836.65
836.65
71.20
kg
bh
m2
m2
m1
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN BETON
#REF!
m3
SUB TOTAL
II
PEKERJAAN ATAP
1
2
3
4
5
6
7
8
9
10
11
#REF!
kg
kg
kg
kg
kg
kg
kg
bh
bh
m2
m2
38,171.29
16,654.79
23,529.79
26,626.74
25,490.94
46,231.77
47,609.92
32,741.37
160,000.00
174,416.92
133,866.14
SUB TOTAL
JUMLAH TOTAL
JUMLAH HARGA
(Rp.)
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN BETON
Plat lantai t 12 cm (S2)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (30x35) K5
Balok 35/70 (B1)
Balok 30/45 (B2)
Ring Balk 35/60 (BR1)
Balok konsol 40/80 (Bks1)
Balok 25/35 (Banak)
#REF!
m3
m3
m3
m3
m3
m3
m3
m3
m3
SUB TOTAL
JUMLAH HARGA
(Rp.)
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN BETON
Balok 40/80 (Tb1)
Balok 30/50 (Tb2)
#REF!
m3
m3
SUB TOTAL
JUMLAH HARGA
(Rp.)
#REF!
#VALUE!
#REF!
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN BETON
Plat lantai t 12 cm (plat trap t.duduk)
Kolom (80x80) K1
Balok 40/80 (B1a)
Balok 40/80 (Tb1)
Balok 30/50 (Tb2)
Balok 25/40 (Tb3)
Balok 40/80 (KS1)
#REF!
m3
m3
m3
m3
m3
m3
m3
SUB TOTAL
JUMLAH HARGA
(Rp.)
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
BILL OF QUALITY
STRUKTUR
PEKERJAAN STRUKTUR LANTAI 2
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN TANAH
Galian tanah Pilecap
Galian tanah pondasi plat
Galian tanah pit-depht lift
Bor strauss 40 cm
Urugan tanah kembali
Urugan pasir bawah pondasi pilecap
7
8
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
III
1
2
3
4
5
6
PEKERJAAN KOLOM
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Plat Tangga utama dan bordes lt 1 ke lt 2
Plat Tangga darurat dan bordes lt 1 ke lt 2 (2 unit)
76.80
31.43
27.83
640.00
40.82
7.02
m3
m3
m3
m1
m3
m3
72,386.40
60,992.64
60,992.64
90,631.39
20,330.88
172,052.92
0.07
0.70
m3
m3
172,052.92
172,052.92
SUB TOTAL
14.03
0.97
2.75
0.10
5.02
88.06
0.72
5.18
1.80
2.99
5.15
28.22
3.40
0.42
1.98
0.88
379.38
209.97
169.29
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg
806,000.26
806,000.26
806,000.26
806,000.26
5,977,143.20
3,812,002.41
3,301,825.98
4,277,241.07
6,048,882.53
4,747,750.68
4,862,013.34
14,470,348.20
10,611,869.05
6,407,061.74
7,836,690.24
8,825,445.91
7,045,198.25
10,317,973.65
14,463.00
14,463.00
14,463.00
SUB TOTAL
46.08
6.48
1.44
1.69
3.37
-
m3
m3
m3
m3
m3
m3
8,023,706.93
11,521,254.65
11,573,976.79
16,362,231.76
16,172,750.39
SUB TOTAL
JUMLAH TOTAL
JUMLAH HARGA
(Rp.)
5,559,275.83
1,916,876.69
1,697,120.21
58,004,089.60
829,823.16
1,207,295.34
12,387.81
119,684.31
69,346,552.95
11,311,407.65
784,943.50
2,212,974.46
81,244.83
30,029,167.41
290,772,003.10
4,355,195.42
24,612,339.55
8,751,624.02
43,295,281.82
54,645,819.68
180,832,910.58
26,660,420.18
3,673,591.86
13,949,492.54
9,055,311.62
5,486,939.51
3,036,796.71
2,448,417.35
715,995,881.81
369,732,415.36
74,657,730.14
16,666,526.57
27,611,266.09
54,489,877.51
-
543,157,815.67
1,328,500,250.43
No.
URAIAN PEKERJAAN
HARGA SATUAN
VOLUME
(Rp.)
PEKERJAAN BETON
Plat lantai t 12 cm (S1)
Kolom (80x80) K1
Kolom (60x60) K2
Kolom (40x40) K3
Kolom (25x25) K4
Balok 35/70 (B1)
Balok 30/45 (B2)
Balok 25/45 (B3)
Balok 30/55 (B4)
Balok 25/40 (B anak) Elv. + 4.50
Balok sabuk lift 15/30
Plat Tangga utama dan bordes lt 2 ke lt 3
Plat Tangga darurat dan bordes lt 2 ke lt 3 (2 unit)
Stek Besi Balok 35/70
Stek Besi Balok 30/45
Stek Besi Balok 25/35
68.60
46.08
6.48
1.44
1.69
33.12
4.75
2.59
8.52
0.69
3.37
379.38
209.97
169.29
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg
7,628,225.44
8,023,706.93
11,521,254.65
11,573,976.79
16,362,231.76
10,853,753.10
11,486,573.00
10,530,510.74
14,601,279.42
12,634,408.63
16,172,750.39
16,172,750.39
14,463.00
14,463.00
14,463.00
SUB TOTAL
JUMLAH HARGA
(Rp.)
523,278,720.43
369,732,415.36
74,657,730.14
16,666,526.57
27,611,266.09
359,519,717.68
54,584,194.89
27,279,288.06
124,417,501.98
8,755,645.18
54,489,877.51
5,486,939.51
3,036,796.71
2,448,417.35
1,651,965,037.46
KOMPONEN
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
PERKIRAAN
SATUANKUANTITAS
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0200
btg
kg
Ibr
m
m
m
kg
kg
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
BAHAN
Dolken Kayu 8 cm
Portland Cement (PC)
Atap Seng Gelombang bjls 20
Pasir Cor
Stenslah/batu pecah tangan 2/3
Balok Kayu Kelas II
Paku Kayu Segala Ukuran
Cat meni besi sekualitas Emco
M089
M037
M178
M004
M014
M084
M140
M410
PERALATAN
JUMLAH HARGA PERALATAN
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
0.0120
BAHAN
Balok Kayu Kelas III
M084
81
2
3
M140
M064
kg
m
0.0200
0.0070
PERALATAN
82
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
L17
L08
L07
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
m
kg
kg
m
m
m
bh
Ibr
m
m
lbr
bh
bh
0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.0750
0.1500
1.5000
2.0000
2.0000
BAHAN
Balok Kayu Kelas III
M084
Paku Kayu Segala Ukuran
M140
Portland Cement (PC)
M037
Pasir Pasang
M002
Pasir Cor
M004
Stenslah/batu pecah tangan 2/3 M014
Bata Merah
M022
Atap Seng Gelombang bjls 20
M178
Jendela Nako + accessories
M285
Kaca Polos tebal 3 mm sekualitas M270
Multiplek 6 mm
M216
Grendel Pintu
M262
Engsel Pintu
M257
JUMLAH HARGA BAHAN
PERALATAN
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.0450
BAHAN
83
PERALATAN
84
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0500
0.0670
BAHAN
PERALATAN
JENIS PEKERJAAN
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.7250
0.0200
0.1225
BAHAN
PERALATAN
Sewa alat mesin bor
M503
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
L17
L07
L02
Org/hr
Org/hr
Org/hr
0.3000
85
Mandor
L01
Org/hr
0.0150
BAHAN
PERALATAN
86
JENIS PEKERJAAN
: 1 m3 Urugan pasir
A. TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0100
1.2000
BAHAN
Pasir Urug
M001
PERALATAN
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
0.2000
0.0200
0.0600
BAHAN
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Air Bersih
M037
M004
M019
M486
kg
m
m
Itr
230.0000
0.6379
0.7563
200.000
PERALATAN
87
JENIS PEKERJAAN
: 1 m3 Pondasi Strouss 40 cm
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
157.7191
59.0476
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 16
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M490
M495
M135
M037
M004
M019
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
32.0384
66.8934
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M490
M492
M135
M037
M004
M019
88
89
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
24.0288
52.0282
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M490
M492
M135
M037
M004
M019
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
40.6250
79.1667
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 16
Besi Ulir 22
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M490
M492
M135
M037
M004
M019
90
91
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
40.5370
100.3509
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 13
Besi Ulir 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M489
M490
M135
M037
M004
M019
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
kg
m
m
42.0111
104.0000
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Ulir 13
Besi Ulir 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M489
M490
M135
M037
M004
M019
PERALATAN
93
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
kg
kg
kg
m
m
307.2222
2.2500
413.0000
0.4864
0.7563
BAHAN
Besi Polos 16
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M497
M135
M037
M004
M019
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
m
m
0.2500
3.0000
1.2000
277.3333
3.0000
413.0000
0.4864
0.7563
M085
M140
M474
M490
M135
M037
M004
M019
94
9
10
11
M084
M217
M089
m
lbr
btg
0.1050
2.5000
14.0000
PERALATAN
95
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
kg
m
m
0.2700
2.0000
0.6000
136.4898
33.4980
3.0000
413.0000
0.4864
0.7563
M085
M140
M474
M492
M495
M135
M037
M004
M019
PERALATAN
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
0.2700
2.0000
M085
M140
96
3
4
5
6
7
8
9
Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M474
M491
M495
M135
M037
M004
M019
Itr
kg
kg
kg
kg
m
m
0.6000
198.1630
37.2407
3.0000
413.0000
0.4864
0.7563
PERALATAN
97
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
kg
m
m
0.2700
2.0000
0.6000
237.7956
44.4889
3.0000
413.0000
0.4864
0.7563
M085
M140
M474
M491
M495
M135
M037
M004
M019
PERALATAN
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
0.2700
2.0000
M085
M140
98
3
4
5
6
7
8
9
Minyak bekisting
Besi Ulir 19
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M474
M491
M495
M135
M037
M004
M019
Itr
kg
kg
kg
kg
m
m
0.6000
162.1333
38.0758
3.0000
413.0000
0.4864
0.7563
PERALATAN
99
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
kg
m
m
0.2700
2.0000
0.6000
305.7371
42.9143
3.0000
413.0000
0.4864
0.7563
M085
M140
M474
M491
M495
M135
M037
M004
M019
PERALATAN
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
m
kg
0.4000
4.0000
M085
M140
100
3
4
5
6
7
8
9
10
11
12
Minyak bekisting
Besi Ulir 22
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
2.0000
146.3000
61.6563
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000
101
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.4000
4.0000
2.0000
222.9333
172.6111
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Lt.3
Lt.4
Lt.5
Lt.5
Lt.5
x
x
x
x
x
103
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.4000
4.0000
2.0000
128.7000
189.7000
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000
M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
104
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.4000
4.0000
2.0000
219.6480
40.0800
4.5000
413.0000
0.4864
0.7563
0.1500
3.5000
20.0000
M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.5
Lt.5
x
x
x
x
x
x
A. TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
L17
L07
L08
L09
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
105
5
6
L02
L01
Org/hr
Org/hr
0.3230
0.2830
106
B
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M489
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
0.2500
3.0000
1.2000
526.6667
3.0000
413.0000
0.4864
0.7563
0.1050
2.5000
14.0000
PERALATAN
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
0.3200
3.2000
1.6000
163.7878
37.1533
M085
M140
M474
M492
M495
107
6
7
8
9
10
11
12
M135
M037
M004
M019
M084
M217
M089
kg
kg
m
m
m
lbr
btg
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
108
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.6000
222.9333
46.4259
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Kooefisien
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
110
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.6000
267.5200
31.8921
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
L17
L07
L08
L09
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
111
5
6
L02
L01
Org/hr
Org/hr
0.3330
0.3180
112
B
1
2
3
4
5
6
7
8
9
10
11
12
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.6000
202.6667
27.3398
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
PERALATAN
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
0.3200
3.2000
1.6000
334.4000
M085
M140
M474
M492
113
5
6
7
8
9
10
11
12
Besi Polos 10
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M495
M135
M037
M004
M019
M084
M217
M089
kg
kg
kg
m
m
m
lbr
btg
31.4000
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
PERALATAN
Lt.2
Lt.3
Lt.4
Lt.5
x
x
x
x
114
Kooefisien Lt.6 x
Kooefisien Lt.7 x
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.6000
305.0667
46.1259
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M490
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
Pekerja Biasa
Tukang Batu
L17
L07
Org/hr
Org/hr
5.6500
0.2750
115
3
4
5
6
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.2000
75.7778
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000
M085
M140
M474
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JUMLAH HARGA PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
116
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M495
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
0.3200
3.2000
1.2000
103.3333
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m3
0.3200
3.2000
1.6000
120.3840
37.1462
3.0000
413.0000
0.4864
M085
M140
M474
M492
M495
M135
M037
M004
117
9
10
11
12
M019
M084
M217
M089
m
m
lbr
btg
0.7563
0.1400
2.8000
16.0000
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
167.2000
49.1375
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
118
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
119
B
1
2
3
4
5
6
7
8
9
10
11
12
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
267.5200
37.7000
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
0.3200
3.2000
1.6000
267.5200
37.7000
M085
M140
M474
M492
M495
120
6
7
8
9
10
11
12
M135
M037
M004
M019
M084
M217
M089
kg
kg
m3
m
m
lbr
btg
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
PERALATAN
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
0.6200
0.6667
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
121
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
4.0000
66.6667
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M492
M495
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
267.5200
37.7000
13.0533
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
M085
M140
M474
M490
M495
M496
M135
M037
M004
M019
M084
M217
M089
PERALATAN
Lt.2
Lt.3
Lt.4
Lt.5
x
x
x
x
123
Kooefisien Lt.6 x
Kooefisien Lt.7 x
JENIS PEKERJAAN
A. TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
m
kg
Itr
kg
kg
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.6000
267.5200
6.6667
0.6200
3.0000
413.0000
0.4864
0.7563
0.1400
2.8000
16.0000
PERALATAN
JENIS PEKERJAAN
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Lt.7
x
x
x
x
x
x
A. TENAGA
1
2
Pekerja Biasa
Tukang Batu
L17
L07
Org/hr
Org/hr
5.6500
0.2750
124
3
4
5
6
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.5600
1.4000
0.3230
0.2830
m
kg
Itr
kg
kg
kg
m3
m
m
lbr
btg
0.3200
3.2000
1.2000
171.1111
2.2500
413.0000
0.4864
0.7563
0.1400
2.8000
6.0000
M085
M140
M474
M489
M135
M037
M004
M019
M084
M217
M089
PERALATAN
JENIS PEKERJAAN
: 1 kg Pasang Baja WF
A. TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
BAHAN
Baja Profil (WF/ C)
Solar Industri
Minyak Pelumas
Elektroda
M116
M483
M484
M473
PERALATAN
1
JUMLAH HARGA PERALATAN
D
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
BAHAN
Baja Canal 200
Solar Industri
Minyak Pelumas
Elektroda
M501
M483
M484
M473
PERALATAN
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
1.0500
0.0100
0.0010
BAHAN
Besi Beton Polos
Solar Industri
Minyak Pelumas
M112
M483
M484
126
Elektroda
M473
kg
0.0200
PERALATAN
Err:512
E05
Err:512
0.0160
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
1.0500
BAHAN
Angker Bar f 19 mm
M117
PERALATAN
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
1.0000
BAHAN
Baut Segala Ukuran
M146
PERALATAN
127
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
bh
kg
12.0000
0.0300
BAHAN
1
2
PERALATAN
M154
M140
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
bh
kg
m3
5.0000
8.0000
0.0320
BAHAN
1
2
3
PERALATAN
128
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
hari
0.0160
BAHAN
Besi Strip / Plat Plendes
Solar Industri
Minyak Pelumas
Elektroda
M114
M483
M484
M473
PERALATAN
Sewa Mesin Las (150A)
E05
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
hari
0.0160
BAHAN
Plat Baja
Solar Industri
Minyak Pelumas
Elektroda
M116.a
M483
M484
M473
PERALATAN
Sewa Mesin Las (150A)
E05
129
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
kg
Itr
Itr
kg
1.0500
0.0100
0.0010
0.0200
hari
0.0160
BAHAN
Besi Beton Polos
Solar Industri
Minyak Pelumas
Elektroda
M112
M483
M484
M473
PERALATAN
Sewa Mesin Las (150A)
E05
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
kg
1.0500
BAHAN
Angker Bar f 19 mm
M117
PERALATAN
130
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
kg
1.0000
BAHAN
Baut Segala Ukuran
M146
PERALATAN
131
BIAYA
63,534.00
75,000.00
105,890.00
84,712.00
25,413.60
15,000.00
2,117.80
1,694.24
44,225.64
24,000.00
1,560.00
116,650.00
206,267.00
287,503.00
5,100,000.00
13,500.00
50,688.00
30,000.00
3,900.00
139,980.00
1,031.34
2,587.53
367,200.00
810.00
22,809.60
568,318.46
63,534.00
75,000.00
105,890.00
84,712.00
612,544.10
6,353.40
7,500.00
1,058.90
423.56
15,335.86
7,951,956.00
95,423.47
132
13,500.00
9,528,019.00
270.00
66,696.13
162,389.61
177,725.47
133
63,534.00
75,000.00
79,418.00
105,890.00
84,712.00
127,068.00
75,000.00
79,418.00
31,767.00
4,235.60
317,488.60
7,951,956.00
13,500.00
1,560.00
193,291.00
206,267.00
287,503.00
1,352.00
116,650.00
245,300.00
113,591.00
117,335.00
30,818.00
48,525.00
1,431,352.08
4,050.00
54,600.00
28,993.65
20,626.70
43,125.45
40,560.00
58,325.00
18,397.50
17,038.65
176,002.50
61,636.00
97,050.00
2,051,757.53
63,534.00
79,418.00
105,890.00
84,712.00
2,369,246.13
57,180.60
3,812.04
60,992.64
134
60,992.64
135
63,534.00
79,418.00
105,890.00
84,712.00
66,710.70
5,675.70
72,386.40
72,386.40
63,534.00
79,418.00
105,890.00
84,712.00
46,062.15
1,694.24
47,756.39
350,000.00
42,875.00
42,875.00
90,631.39
63,534.00
79,418.00
105,890.00
19,060.20
136
84,712.00
1,270.68
20,330.88
20,330.88
137
63,534.00
79,418.00
105,890.00
84,712.00
19,907.32
126,788.00
152,145.60
152,145.60
19,060.20
847.12
172,052.92
63,534.00
79,418.00
105,890.00
84,712.00
76,240.80
15,883.60
2,117.80
5,082.72
99,324.92
1,560.00
206,267.00
285,082.00
3.50
358,800.00
131,568.88
215,606.46
700.00
706,675.34
806,000.26
138
: 1 m3 Pondasi Strouss 40 cm
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
3,517,609.95
854,005.71
55,656.00
644,280.00
100,334.16
215,606.46
5,387,492.29
5,977,143.20
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
714,552.36
1,491,922.51
55,656.00
644,280.00
100,334.16
215,606.46
139
3,222,351.50
3,812,002.41
140
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
535,914.27
1,160,384.18
55,656.00
644,280.00
100,334.16
215,606.46
2,712,175.07
3,301,825.98
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
906,059.38
1,765,654.17
55,656.00
644,280.00
100,334.16
215,606.46
141
3,687,590.16
4,277,241.07
142
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
904,097.54
2,238,125.61
55,656.00
644,280.00
100,334.16
215,606.46
4,158,099.77
4,747,750.68
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
22,303.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
936,973.81
2,319,512.00
55,656.00
644,280.00
100,334.16
215,606.46
4,272,362.43
143
4,862,013.34
144
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
336,730.20
21,839.95
97,500.00
83,388.90
27,743.18
22,448.68
589,650.91
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
4,443,355.00
55,656.00
644,280.00
100,334.16
215,606.46
5,459,231.62
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
6,048,882.53
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
1,062,500.00
40,500.00
4,704.00
6,185,365.33
74,208.00
644,280.00
100,334.16
215,606.46
145
7,951,956.00
178,499.00
24,000.00
834,955.38
446,247.50
336,000.00
9,944,700.84
10,611,869.05
146
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
1,147,500.00
27,000.00
2,352.00
3,044,131.92
484,480.98
74,208.00
644,280.00
100,334.16
215,606.46
5,739,893.52
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
1,147,500.00
27,000.00
147
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
2,352.00
4,419,628.56
538,612.83
74,208.00
644,280.00
100,334.16
215,606.46
7,169,522.02
7,836,690.24
148
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
1,147,500.00
27,000.00
2,352.00
5,303,554.28
643,442.80
74,208.00
644,280.00
100,334.16
215,606.46
8,158,277.70
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
1,147,500.00
27,000.00
149
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
2,352.00
3,616,059.73
550,689.68
74,208.00
644,280.00
100,334.16
215,606.46
6,378,030.04
7,045,198.25
150
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
1,147,500.00
27,000.00
2,352.00
6,818,855.50
620,669.31
74,208.00
644,280.00
100,334.16
215,606.46
9,650,805.43
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46
4,250,000.00
13,500.00
1,700,000.00
54,000.00
151
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
7,840.00
3,262,928.90
891,734.34
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
9,285,575.77
152
10,118,435.22
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,700,000.00
54,000.00
7,840.00
4,972,082.13
2,496,474.50
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
12,599,469.16
13,432,328.61
1.090
153
1.120
1.135
1.162
1.189
1.216
154
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,700,000.00
54,000.00
7,840.00
2,870,396.10
2,743,631.10
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
10,744,939.72
11,577,799.18
1.090
1.120
1.135
1.162
1.189
1.216
155
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
447,914.70
21,839.95
123,750.00
166,777.80
42,673.67
29,903.34
832,859.46
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,700,000.00
54,000.00
7,840.00
4,898,809.34
579,677.04
111,312.00
644,280.00
100,334.16
215,606.46
1,192,793.40
624,746.50
480,000.00
10,609,398.91
11,442,258.36
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
358,967.10
21,839.95
117,000.00
111,185.20
156
105,890.00
84,712.00
34,202.47
23,973.50
667,168.22
157
4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,062,500.00
40,500.00
4,704.00
11,746,246.67
74,208.00
644,280.00
100,334.16
215,606.46
834,955.38
446,247.50
336,000.00
15,505,582.17
16,172,750.39
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
1,360,000.00
43,200.00
6,272.00
3,652,958.30
537,348.00
158
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
8,631,277.97
159
9,353,693.81
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
4,972,082.13
671,458.17
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,084,511.96
10,806,927.80
160
1.090
1.120
1.135
1.162
1.189
1.216
161
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
5,966,498.56
461,254.91
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,868,725.14
11,591,140.97
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
403,440.90
21,839.95
123,750.00
111,185.20
162
105,890.00
84,712.00
35,261.37
26,938.42
722,415.84
163
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
4,520,074.67
395,415.92
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
9,356,462.25
10,078,878.08
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
1,360,000.00
43,200.00
6,272.00
7,458,123.20
164
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
454,138.20
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
12,353,233.06
13,075,648.90
1.090
1.120
1.135
1.162
165
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
6,803,901.87
667,119.27
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
11,911,992.80
12,634,408.63
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
358,967.10
21,839.95
166
75,000.00
79,418.00
105,890.00
84,712.00
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
4,704.00
1,095,974.00
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
5,276,825.66
5,943,993.88
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
358,967.10
21,839.95
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
167
4,250,000.00
13,500.00
3,920.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
4,704.00
1,494,510.00
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
5,675,361.66
6,342,529.88
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
1,360,000.00
43,200.00
6,272.00
2,684,924.35
537,244.82
74,208.00
644,280.00
100,334.16
168
285,082.00
7,951,956.00
178,499.00
24,000.00
215,606.46
1,113,273.84
499,797.20
384,000.00
7,663,140.84
8,385,556.67
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
3,729,061.60
710,675.66
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
8,880,708.93
169
9,603,124.76
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
170
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,952,725.32
11,675,141.16
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
171
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,952,725.32
11,675,141.16
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
13,827.86
9,642.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
172
4,464,441.52
5,186,857.36
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
89,212.00
964,200.00
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
5,494,383.66
173
6,216,799.50
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
5,966,498.56
545,255.10
188,790.36
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
11,141,515.68
11,863,931.52
1.090
1.120
1.135
1.162
174
1.189
1.216
63,534.00
79,418.00
75,000.00
79,418.00
105,890.00
84,712.00
403,440.90
21,839.95
123,750.00
111,185.20
35,261.37
26,938.42
722,415.84
4,250,000.00
13,500.00
3,920.00
22,303.00
14,463.00
14,463.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
6,272.00
5,966,498.56
96,420.00
8,967.06
74,208.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
384,000.00
10,512,857.28
11,235,273.12
1.090
1.120
1.135
1.162
1.189
1.216
63,534.00
79,418.00
358,967.10
21,839.95
175
75,000.00
79,418.00
105,890.00
84,712.00
117,000.00
111,185.20
34,202.47
23,973.50
667,168.22
4,250,000.00
13,500.00
3,920.00
22,303.00
24,736.00
1,560.00
206,267.00
285,082.00
7,951,956.00
178,499.00
24,000.00
1,360,000.00
43,200.00
4,704.00
3,816,291.11
55,656.00
644,280.00
100,334.16
215,606.46
1,113,273.84
499,797.20
144,000.00
7,997,142.77
8,664,310.99
1.162
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
27,710.00
10,138.00
67,044.00
55,250.00
31,866.50
101.38
67.04
1,105.00
33,139.92
176
38,171.29
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
9,000.00
10,138.00
67,044.00
55,250.00
10,350.00
101.38
67.04
1,105.00
11,623.42
16,654.79
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
14,463.00
10,138.00
67,044.00
15,186.15
101.38
67.04
177
55,250.00
1,105.00
16,459.57
21,490.94
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
40,551.00
42,578.55
42,578.55
47,609.92
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
27,710.00
27,710.00
27,710.00
178
63,534.00
75,000.00
105,890.00
84,712.00
32,741.37
9,530.10
5,625.00
847.12
677.70
16,679.92
13,111.00
13,500.00
63,534.00
75,000.00
105,890.00
84,712.00
157,332.00
405.00
157,737.00
174,416.92
25,413.60
15,000.00
2,117.80
169.42
42,700.82
14,500.00
1,560.00
193,291.00
72,500.00
12,480.00
6,185.31
91,165.31
179
133,866.14
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
14,193.00
10,138.00
67,044.00
55,250.00
16,321.95
101.38
67.04
1,105.00
17,595.37
250,000.00
4,000.00
4,000.00
26,626.74
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
11,500.00
10,138.00
67,044.00
55,250.00
13,225.00
101.38
67.04
1,105.00
14,498.42
250,000.00
4,000.00
180
4,000.00
23,529.79
63,534.00
79,418.00
105,890.00
84,712.00
3,875.57
484.45
645.93
25.41
5,031.37
14,463.00
10,138.00
67,044.00
55,250.00
15,186.15
101.38
67.04
1,105.00
16,459.57
250,000.00
4,000.00
4,000.00
25,490.94
63,534.00
79,418.00
105,890.00
84,712.00
1,270.68
2,382.54
3,653.22
40,551.00
42,578.55
42,578.55
181
46,231.77
63,534.00
79,418.00
105,890.00
84,712.00
1,270.68
2,382.54
3,653.22
27,710.00
27,710.00
27,710.00
31,363.22
182
M001
M002
M003
M004
M005
M006
M007
M008
M009
M010
M011
M012
M013
M014
M015
M016
M017
M018
M019
M020
M021
M022
M027
M028
M029
M036
M037
M038
M039
M040
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 bh
1 kg
1 m2
1 m2
1 bh
1 kg
1 kg
1 kg
1 kg
BUIS BETON
M044
M045
M046
M051
M052
M053
v
1
2
3
4
5
6
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
SEMEN
IV.
1
2
3
4
5
6
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
III.
1
2
3
4
SATUAN
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN BANGUNAN
KODE
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
KAYU
M060
M061
M062
M063
M064
M065
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
M089
VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Dolken Kayu 8 cm
1 btg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 m2
1 m2
1 m1
1 m1
1 m2
1 m2
1 kg
1 kg
1 kg
1 bh
1 bh
1 bh
21
22
23
24
VII
1
2
3
M145
M146
M147
M148
M154
M155
M161
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
1 bh
1 bh
1 bh
1 m'
1 m'
1 m'
lbr
1 lbr
lbr
1 m2
1 m2
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 m2
1 m'
1 lbr
1 lbr
KAYU OLAHAN
M214
M215
M216
M217
M218
M219
M220
M227
M228
M229
X.
1
2
3
1 bh
1 kg
1 bh
1 kg
ATAP SENG/ASBES
M174
M175
M176
M177
M178
M179
M180
M181
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M199
M200
M201
M202
M203
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
IX.
1
2
3
4
5
6
7
8
9
10
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm
1 m2
1 m2
1 m2
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Unit
1 Unit
1 Unit
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
besi polos 12
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
M266
M267
M268
M269
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1 bh
1 bh
1 bh
1 bh
1 bh
1 unit
1 bh
1 bh
1 bh
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
PERLENGKAPAN LANTAI
M311
M312
M313
M314
M315
M316
M317
M318
M319
M320
M321
M322
M323
M324
M325
M326
M327
M328
XII
1
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
XI.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 m2
1 m2
1 m2
PERPIPAAN
M338
1 Ljr
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
M339
M340
M341
M342
M343
M350
M351
M360
M361
M362
M363
M364
M365
M366
M367
M368
M369
M370
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 Ljr
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 ljr
Kertas Gosok
Plamir Kayu
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu
Cat meni besi sekualitas Emco
Cat Dasar Kayu
Cat Dasar Tembok
Cat Dasar Besi
Cat Kayu
Cat Tembok catylac
Cat Besi
Cat Genting
Waterproofing
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl
1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg
XIV
1
2
3
4
5
6
XV
1
2
3
4
5
6
7
8
9
10
11
12
M431
M432
M433
M434
M435
M436
M437
M438
M439
M440
M441
M442
M443
M444
M445
M446
M447
M448
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m1
1 m1
1 bh
1 bh
1 bh
1 m1
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit
13
14
15
16
17
18
19
20
21
22
XVI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
25
27
28
29
30
31
32
33
34
35
36
37
39
40
41
42
43
44
45
M449
M450
M451
M452
M453
M454
M455
M456
M457
M460
M466
M473
M474
M481
M482
M483
M484
M485
M486
M487
M488
M489
M490
M502
M503
M512
M513
M514
M515
M516
M517
M518
M519
M520
M521
M522
M523
M524
M525
M526
M527
M528
M529
M530
M531
M532
M533
M534
M535
M536
M537
M538
M539
M540
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m'
1 m3
1 kg
1 ltr
1 bh
1 ltr
1 ltr
1 ltr
1 kg
1m
1 hr
1 hr
1 hr
1 hr
1 m1
1 m1
1 bh
1 kg
1 m1
1 bh
1 lbr
1 m2
1 m2
1 m2
1 unit
1 bh
1 m2
1 unit
1 unit
1 unit
1 unit
1 Unit
1 unit
1 unit
1 unit
1 ljr
1 ljr
1 unit
1 ljr
1 lbr
1 ljr
1 ljr
1 kg
1 kg
1 cm
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
M541
M542
M543
M544
M545
M546
M547
M548
M549
M550
M551
M552
M553
M554
M555
M556
M557
M558
Besi ulir 10
Besi Ulir 13
Besi Ulir 16
Besi Ulir 19
Besi Ulir 22
Besi Polos 10
Besi Polos 16
Besi Polos 19
Keramik 50 x 50 sekualitas Roman
Cat Tembok Catilax
Keramik 40 x 40 Toilet Sekualitas Roman
Rel Jendela
Keramik 30 x 30 sekualitas Roman
Besi polos 8
Besi Ulir 25
Sealent
Reiling tangga
Reiling void
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 kg
1 m2
1 bh
1 m2
1 kg
1 kg
1 bh
1 m2
1 m2
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
M559
M560
M561
M562
M563
M564
M565
M566
M567
M568
M569
M570
M571
M572
M573
M574
M575
M576
M577
M578
M579
M580
M581
M582
M583
M584
M585
M586
M587
M588
M589
M590
M591
M592
M593
M594
M595
M596
M597
M598
M599
M600
M601
M602
M603
M604
M605
M606
M607
M608
M609
M610
M611
M612
M613
List keramik
Seng Gelombang 240 x 80 x 0.20 cm sekualitas elephant
Keramik 33 x 25 sekualitas Roman
Keramik 30 x 30 KM sekualitas Roman
Keramik 60 x 60 sekualitas Esenza
Granite Tile 60 x 60 cm
Gerbil beton
Batu Adhesit
Vernis batu alam
Batu beton sisir
Kabel NYM 3 x 2.5
Pipa PVC tipe AW Dia 5 "
Pipa GI 4 "
Saklar Tunggal MK
Saklar Ganda MK
Stepnosing sekualitas roman 10 x 33
Keramik 40 x 40 Sekualitas Roman
Shower komplit sekualitas TOTO seri TX433SJ
Akrilik bening t = 4 mm
Gate valves 2 " sekualitas TOYO
Gate vaves 1 1/4 " sekualitas TOYO
Pompa Groundfos CH8-50
Isolator pipa air panas
Bata klinker
Stop Kran sekualitas TOTO
Bedet Shower sekualitas TOTO
Box Lemari Panel
Lampu indikator 3 warna + Fuse Hitam
Volt meter + volt selector
Ampere meter 400A + CT 400/5
Bus bar
Arester 3 fasa STH 3 + N 65kA
MCCB 4 x 125 A
MCCB 3 x 6 A
MCCB 3 x 10 A
MCCB 3 x 25 A
MCCB 3 x 40 A
MCCB 3 x 50 A
Grounding panel dengan BC 50 mm2
Grounding arester dengan BC 50 mm2
Asesories dan wiring panel
Panel Box 30x40x15
Lampu indikator 3 warna + fuse hitam
Volt meter + volt selector
Ampere meter + CT
Bus bar Sisir
Arester 3 fasa STD 3+N
MCB 1 x 4 A
MCB 1 x 6 A
MCB 3 x 6 A
Grounding panel dengan BC 10 mm2
Grounding arester dengan BC 10 mm2
Asesories dan wiring panel
Kabel Power NYY 4 x 2,5 mm2
Panel Box
1 m'
1 lbr
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 ltr
1 m2
1 m1
1 ljr
1 ljr
1 bh
1 bh
1 bh
1 m2
1 Unit
1 m2
1 bh
1 bh
1 unit
1 m'
1 m2
1 bh
1 bh
1 unit
1 set
1 set
1 unit
1 lot
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 set
1 set
1 lot
1 unit
1 unit
1 set
1 unit
1 lot
1 unit
1 unit
2 unit
1 unit
1 mtr
1 mtr
1 set
1 mtr
1 unit
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
M614
M615
M616
M617
M618
M619
M620
M621
M622
M623
M624
M625
M626
M627
M628
M638
M639
M640
M641
M642
M646
M653
M654
M655
M656
M657
M658
M659
M660
M661
M662
M663
M664
M665
M666
M667
M668
M669
M670
M671
M672
M673
M674
M675
M676
M677
M678
M679
Plat Baja
1 set
1 set
1 unit
1 lot
1 unit
1 unit
1 unit
1 unit
1 unit
1 lot
1 mtr
1 mtr
1 set
1 mtr
1 unit
1 unit
1 unit
1 unit
1m
1 m2
1 bh
1 bh
1 m1
1 m1
1 m2
1m
1 m2
1 m2
1 m2
1 m2
1 bh
1 m2
1 m2
1 m2
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m2
1 m2
1 hari
1 ltr
1 kg
126,788.00
193,291.00
199,103.00
206,267.00
13,922.00
106,783.00
175,989.00
72,900.00
81,777.00
35,000.00
157,877.00
189,101.00
193,020.00
295,208.00
287,503.00
236,545.00
205,050.00
329,811.00
283,178.00
285,082.00
257,901.00
238,167.00
1,352.00
13,517.00
113,136.00
111,514.00
1,622.00
8,000.00
1,560.00
4,055.00
20,275.00
20,275.00
45,000.00
52,851.00
70,693.00
89,617.00
379,688.00
47,174.00
59,509.00
4,250,000.00
7,092,285.00
7,092,285.00
7,951,956.00
9,456,380.00
9,528,019.00
10,686,277.00
KET.
24,000.00
14,463.00
22,303.00
14,193.00
27,034.00
27,710.00
40,551.00
42,848.00
1,696,228.00
1,013,763.00
1,016,872.00
123,003.00
147,604.00
1,456,169.00
472,189.00
24,736.00
13,500.00
40,145.00
946.00
1,352.00
2,028.00
450.00
27,710.00
4,731.00
27034
13,111.00
33,792.00
14,500.00
48,931.00
55,825.00
70,017.00
95,159.00
116,650.00
116,650.00
110,297.00
285,611.00
145,576.00
134,493.00
116,380.00
103,133.00
81,642.00
147,874.00
128,004.00
113,406.00
90,022.00
182,342.00
174,773.00
129,221.00
59,474.00
64,070.00
72,045.00
57,311.00
33,792.00
27,034.00
24,060.00
23,114.00
38,117.00
42,037.00
50,688.00
76,235.00
28,791.00
101,647.00
108,405.00
73,126.00
91,644.00
117,335.00
178,499.00
203,464.00
252,146.00
349,509.00
60826
87,859.00
114,893.00
215,999.00
2,157,828.00
675,842.00
2,294,213.00
101,376.00
60,826.00
67,584.00
202,753.00
474,847.00
296,992.00
3,021,148.00
612,042.00
397,260.00
430,646.00
2,166,614.00
1,510,642.00
1,553,760.00
1,898,981.00
627,452.00
47,309.00
87,859.00
35,955.00
337,921.00
14,463.00
133,546.00
158,527.00
127,321.00
209,706.00
48,525.00
34,951.00
38,523.00
33,792.00
20,275.00
30,818.00
17,437.00
244,249.00
191,939.00
174,367.00
51,769.00
188,290.00
16,896.00
250,000.00
113,591.00
172,258.00
332,034.00
481,064.00
167,265.00
252,146.00
283,854.00
458,491.00
360,494.00
360,494.00
491,202.00
169,762.00
248,401.00
508,037.00
81,136.00
12,300.00
12,300.00
24,601.00
24,601.00
24,601.00
31,359.00
18,113.00
21,527.00
6,488.00
8,380.00
2,703.00
2,974.00
2,839.00
12,300.00
12,300.00
22,979.00
5,812.00
4,190.00
13,247.00
56,095.00
79,209.00
123,814.00
215,594.00
286,827.00
44,470.00
54,338.00
5,677.00
5,407.00
7,299.00
10,139.00
11,234.00
16,227.00
17,475.00
4,055.00
6,218.00
7,029.00
10,813.00
14,979.00
17,475.00
19,722.00
24,715.00
58,258.00
75,289.00
102,593.00
151,524.00
215,458.00
300,885.00
321,295.00
437,810.00
6,758.00
10,138.00
16,896.00
20,275.00
33,792.00
51,634.00
77,451.00
219,649.00
7,569.00
11,219.00
16,896.00
31,629.00
39,469.00
72,315.00
111,784.00
147,334.00
229,516.00
6,758.00
30,413.00
28,250.00
75,289.00
45,146.00
27,439.00
20,275.00
231,814.00
48,796.00
50,688.00
66,368.00
42,578.00
75,289.00
101,241.00
121,787.00
102,458.00
179,098.00
208,970.00
81,101.00
104,755.00
27,034.00
56,095.00
51,094.00
81,507.00
985,377.00
1,743,537.00
2,725,130.00
4,563,420.00
267,904.00
1,074,589.00
7,164.00
11,354.00
3,745.00
5,243.00
10,810.00
12,170.00
2,028.00
9,986.00
15,004.00
91,112.00
133,563.00
182,244.00
87,377.00
175,719.00
42,308.00
42,984.00
48,525.00
52,175.00
50,826.00
25,141.00
41,757.00
473,089.00
154,600.00
55,250.00
3,920.00
3,000.00
6,894.00
10,138.00
67,044.00
47,309.00
2,400,000.00
1,000,000.00
4,000,000.00
250,000.00
108,135.00
117,867.00
104,215.00
589,604.00
137,196.00
4,731.00
98,808.00
66,220.00
2,157,828.00
67,584.00
22,303.00
22,303.00
22,303.00
22,303.00
22,303.00
14,463.00
14,463.00
14,463.00
162,202.00
215,594.00
4,619.00
5,243.00
35000
229,000.00
12,500.00
110,162.00
110,162.00
17,000.00
27,034.00
110,162.00
110,162.00
149,496.00
289,260.00
175719
104,216.00
9,000.00
140,000.00
245,300.00
350,000.00
130,000.00
11,500.00
KODE
I.
1 M001
2 M002
3 M003
4 M004
5 M005
6 M006
7 M007
8 M008
9 M009
II.
BAHAN BANGUNAN
Tanah dan Pasir
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
SATUAN
HARGA
1 m
1 m
1 m
1 m
1 Kg
1 m
1 m
1 m
1 m
115,500.00
85,000.00
115,000.00
8,000.00
75,000.00
70,000.00
60,000.00
42,923.75
53,000.00
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh
140,000.00
25 M033
1 bh
1,350.00
1 bh
1 bh
1 bh
1 bh
1 bh
1,800.00
2,100.00
2,200.00
1,400.00
1,600.00
1 kg
1,600.00
Semen
Portland Cement (PC)
209,500.00
159,120.00
163,000.00
145,500.00
234,000.00
159,120.00
183,000.00
169,000.00
450.00
13,200.00
950.00
5,250.00
9,750.00
3,300.00
2,600.00
80,250.00
76,000.00
5,100.00
4,500.00
3,750.00
No
KODE
2 M037.a
3 M038
4 M039
5 M040
6 M041
7 M042
8 M043
BAHAN BANGUNAN
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih
Portland Cement (PC) Warna
Portland Cement (PC) Grouting
Kapur
Gamping
Semen Merah
SATUAN
1 kg
1 kg
1 kg
1 kg
1 m
1 kg
1 m
HARGA
4,300.00
2,700.00
11,700.00
8,750.00
1,430,000.00
1,000.00
197,500.00
No
KODE
IV.
1 M044
2 M045
3 M046
4 M047
5 M048
6 M049
7 M050
8 M051
9 M052
10 M053
V.
1 M054
2 M055
3 M056
4 M057
5 M058
6 M059
7 M060
8 M061
9 M062
10 M063
11 M064
12 M065
13 M066
14 M067
15 M068
16 M069
17 M070
18 M071
19 M078
20 M079
21 M080
22 M081
23 M082
24 M083
25 M084
26 M085
27 M088
28 M089
29 M090
30 M091
31 M092
32 M093
BAHAN BANGUNAN
Buis Beton
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Kayu
Kayu Borneo
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Meranti
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kruing
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Kamper
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Kayu Lain-lain
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
SATUAN
HARGA
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
38,000.00
48,000.00
66,000.00
82,500.00
106,000.00
201,000.00
219,250.00
280,500.00
29,200.00
42,250.00
1 m
1 m
1 m
1 m
1 m
1 m
8,830,000.00
8,830,000.00
8,830,000.00
10,910,000.00
11,170,000.00
11,170,000.00
1 m
1 m
1 m
1 m
1 m
1 m
4,830,000.00
4,830,000.00
5,175,000.00
4,945,000.00
4,945,000.00
4,945,000.00
1 m
1 m
1 m
1 m
1 m
1 m
6,178,000.00
6,178,000.00
6,490,000.00
7,010,000.00
7,010,000.00
7,010,000.00
1 m
1 m
1 m
1 m
1 m
1 m
9,350,000.00
9,610,000.00
9,870,000.00
11,430,000.00
11,690,000.00
11,950,000.00
1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m
2,850,000.00
4,250,000.00
24,100.00
27,000.00
7,700.00
3,630,000.00
38,400.00
80,100.00
No
KODE
BAHAN BANGUNAN
45 M106
46 M107
47 M108
48 M109
49 M110
50 M111
51 M111a
33 M094
34 M095
35 M096
36 M097
37 M098
38 M099
39 M100
40 M101
41 M102
42 M103
43 M104
44 M105
VI.
1 M112
2 M113
3 M114
4 M115
5 M116
6 M116.a
7 M116.b
8 M117
9 M118
10 M119
11 M120
12 M121
13 M122
14 M123
15 M124
16 M124.a
17 M124.b
18 M125
19 M126
20 M127
21 M128
22 M129
SATUAN
HARGA
1 m
1 m
1 m
1 m
1 m
1 m
13,551,600.00
13,551,600.00
13,551,600.00
15,059,600.00
15,059,600.00
15,059,600.00
1 m
1 m
1 m
1 m
1 m
1 m
16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00
16,006,000.00
1 m
1 m
1 m
1 m
1 m
1 m
19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00
19,968,400.00
1 m
53,130,000.00
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 kg
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m
8,300.00
8,500.00
13,900.00
.
18,328.13
11,500.00
17,200.00
13,100.00
30,400.00
753,000.00
2,070,500.00
1,694,100.00
1,254,900.00
627,500.00
721,600.00
329,400.00
421,600.00
91,000.00
109,200.00
313,700.00
349,800.00
102,800.00
No
KODE
23 M130
24 M131
25 M132
26 M133
27 M134
28 M135
29 M136
30 M137
31 M138
32 M139
33 M140
34 M141
35 M142
36 M143
37 M144
BAHAN BANGUNAN
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran
Paku Seng Segala Ukuran
Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran
SATUAN
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg
1 Kg
1 bh
1 bh
1 bh
HARGA
100,400.00
31,300.00
41,000.00
44,500.00
66,300.00
23,400.00
23,900.00
21,800.00
21,100.00
20,500.00
13,500.00
25,700.00
600.00
900.00
700.00
No
KODE
38 M145
39 M146
40 M147
41 M148
42 M148.a
43 M148.b
44 M148.c
45 M148.d
46 M148.e
47 M148.f
48 M148.g
49 M148.h
VII.
1 M149
2 M150
3 M151
4 M152
5 M153
6 M154
7 M155
8 M156
9 M157
10 M158
11 M159
12 M160
13 M161
14 M162
15 M163
16 M164
17 M165
18 M166
19 M167
20 M168
21 M169
22 M170
23 M171
24 M172
25 M173
26 M173.a
VIII.
1 M174
2 M175
3 M176
4 M176.a
4 M177
5 M178
6 M179
7 M180
BAHAN BANGUNAN
SATUAN
HARGA
1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m
1 m
1 m
1 m
1 m
450.00
11,800.00
3,300.00
39,300.00
17,500.00
27,500.00
17,500.00
11,400.00
563,500.00
112,300.00
109,200.00
140,000.00
Atap Genteng
Genteng Biasa ex. Malang
Genteng Press ex. Trenggalek
Genteng Karang Pilang ex. Malang
Genteng Karang Pilang ex. Trenggalek
Genteng Karang Pilang ex. Surabaya
Genteng Beton sekualitas Varia Usaha
Genteng Kaca
Bubung Genteng Biasa ex. Malang
Bubung Genteng Press ex. Trenggalek
Bubung Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya
Bubung Genteng Beton sekualitas Varia Usaha
Genteng Palentong Kecil
Genteng Kodok Glazuur
Genteng Palentong Super/Besar
Bubung Genteng Palentong Kecil
Bubung Genteng Kodok Glazuur
Bubung Genteng Palentong Super/Besar
Genteng Aspal
Genteng Metal
Atap Sirap
Bubung Genteng Aspal
Bubung Genteng Metal
Bubung Atap Sirap
Plastik Aerator
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh
2,700.00
1,300.00
1,500.00
1,700.00
2,100.00
14,500.00
14,100.00
4,900.00
2,500.00
4,700.00
5,100.00
5,700.00
11,500.00
2,300.00
2,300.00
4,500.00
4,100.00
7,300.00
7,800.00
6,700.00
100,700.00
1,600.00
45,100.00
100,700.00
121,900.00
6,900.00
1 m
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m
35,900.00
40,900.00
51,400.00
65,000.00
70,100.00
32,000.00
78,900.00
78,200.00
No
KODE
8 M181
9 M182
10 M183
11 M184
12 M185
13 M186
14 M187
15 M188
16 M189
17 M190
18 M191
19 M192
BAHAN BANGUNAN
Atap Polycarbonat
Asbes Gelombang (3.00 x 1.05) m x 4 mm
Asbes Gelombang (2.70 x 1.05) m x 4 mm
Asbes Gelombang (2.40 x 1.05) m x 4 mm
Asbes Gelombang (2.10 x 1.05) m x 4 mm
Asbes Gelombang (1.50 x 1.05) m x 4 mm
Asbes Gelombang (2.50 x 0.92) m x 5 mm
Asbes Gelombang (2.25 x 0.92) m x 5 mm
Asbes Gelombang (2.00 x 0.92) m x 5 mm
Asbes Gelombang (1.80 x 0.92) m x 5 mm
Asbes Gelombang (3.00 x 1.08) m x 6 mm
Asbes Gelombang (2.70 x 1.08) m x 6 mm
SATUAN
1 m
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
HARGA
114,200.00
107,700.00
99,500.00
86,100.00
76,300.00
57,900.00
109,400.00
94,700.00
83,900.00
63,800.00
134,900.00
129,300.00
No
KODE
20 M193
21 M194
22 M195
23 M196
24 M197
25 M198
26 M199
27 M200
28 M201
29 M202
30 M203
31 M204
32 M205
33 M206
34 M207
35 M208
36 M209
37 M210
38 M211
39 M212
40 M213
IX.
1 M214
2 M215
3 M216
4 M217
5 M218
6 M219
7 M220
8 M221
9 M222
10 M223
11 M224
12 M225
13 M226
14 M227
15 M228
16 M229
X.
1 M230
2 M231
3 M232
4 M233
5 M234
6 M235
7 M236
8 M237
9 M238
BAHAN BANGUNAN
SATUAN
HARGA
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr
95,600.00
76,900.00
47,800.00
50,800.00
51,100.00
44,400.00
44,000.00
47,400.00
47,800.00
40,600.00
18,700.00
17,600.00
17,000.00
16,400.00
15,000.00
27,500.00
36,000.00
54,100.00
10,000.00
72,100.00
76,900.00
Kayu Olahan
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
Plywood Lapis Aluminium
Plywood (30 x 60) cm x 4 mm
Plywood (30 x 60) cm x 6 mm
Plywood (60 x 120) cm x 4 mm
Plywood (60 x 120) cm x 6 mm
Plywood (120 x 240) cm x 4 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm
Teakwood (120 x 240) cm x 4 mm
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
54,100.00
75,000.00
86,500.00
125,000.00
150,300.00
146,000.00
258,400.00
90,100.00
7,300.00
10,200.00
23,800.00
28,200.00
95,900.00
7,800.00
27,700.00
87,500.00
1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
159,800.00
1,565,500.00
235,000.00
1,628,200.00
62,500.00
39,200.00
43,700.00
141,800.00
344,300.00
No
KODE
10 M239
11 M240
12 M241
13 M242
14 M243
15 M244
16 M245
17 M246
18 M247
19 M248
BAHAN BANGUNAN
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Firing Teraso
Bak Cuci Firing Stainless
Badkip Porselen
Urinoir Porselin sekualitas Toto
Urinoir Keramik sekualitas Toto
Wastafel Komplit (Kran + Sipon) Lux sekualitas
Toto
Wastafel Komplit (Kran + Sipon) Kw. A sekualitas
Toto
SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
HARGA
216,600.00
2,191,800.00
443,700.00
219,000.00
312,200.00
939,300.00
1,095,800.00
1,127,100.00
1,377,700.00
455,100.00
No
KODE
20 M249
21 M250
22 M251
23 M252
XI.
1 M253
2 M254
3 M255
4 M256
5 M257
6 M258
7 M259
8 M260
9 M261
10 M262
11 M263
12 M264
13 M265
14 M266
15 M267
16 M268
17 M269
XII.
1 M270
2 M271
3 M272
4 M273
5 M274
6 M275
7 M276
8 M277
9 M278
10 M279
11 M280
12 M281
13 M282
14 M283
15 M284
16 M285
17 M286
18 M287
19 M288
20 M289
XIII.
1 M290
2 M291
3 M292
BAHAN BANGUNAN
SATUAN
HARGA
1 bh
1 bh
1 bh
1 bh
31,200.00
53,100.00
15,500.00
62,500.00
Alat-Alat Penggantung
Kunci Tanam
Kunci Tanam sekualitas DEKSON
Kunci Pintu Kamar Mandi sekualitas SOLID
Kunci Silinder
Engsel Pintu
Engsel Jendela
Hak Angin sekualitas SOLID
Spring Knip
Kait Angin sekualitas SOLID
Grendel Pintu
Grendel Jendela sekualitas SOLID
Door Closer sekualitas SOLID
Slot/Kunci Pintu sekualitas SOLID
Door Holder sekualitas SOLID
Door Stop sekualitas SOLID
Rel Pintu Dorong sekualitas Handerson
Kunci Lemari
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
75,000.00
385,000.00
75,000.00
151,600.00
12,500.00
10,000.00
28,750.00
12,300.00
9,500.00
7,500.00
46,000.00
176,900.00
375,000.00
126,300.00
37,300.00
450,000.00
11,900.00
Kaca
Kaca Polos tebal 3 mm sekualitas Asahi Mas
Kaca Polos tebal 5 mm sekualitas Asahi Mas
Kaca Polos tebal 8 mm sekualitas Asahi Mas
Kaca Polos tebal 12 mm sekualitas Asahi Mas
Kaca Buram tebal 3 mm sekualitas Asahi Mas
Kaca Buram tebal 5 mm sekualitas Asahi Mas
Kaca Buram tebal 8 mm sekualitas Asahi Mas
Kaca Buram tebal 12 mm sekualitas Asahi Mas
Kaca Cermin tebal 5 mm sekualitas Asahi Mas
Kaca Cermin tebal 6 mm sekualitas Asahi Mas
Kaca Cermin tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 3 mm sekualitas Asahi Mas
Kaca Rayben tebal 5 mm sekualitas Asahi Mas
Kaca Rayben tebal 8 mm sekualitas Asahi Mas
Kaca Rayben tebal 12 mm sekualitas Asahi Mas
Jendela Nako + accessories
Glass Block
Painting Glass
Kaca "Wireglass" 5 mm
Kaca Patri 5 mm
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m
83,800.00
127,200.00
246,000.00
341,400.00
96,800.00
154,400.00
206,700.00
339,200.00
200,000.00
255,800.00
348,600.00
125,200.00
183,600.00
375,900.00
600,300.00
245,300.00
23,900.00
558,700.00
627,000.00
1,367,400.00
Perlengkapan Lantai
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm
1 bh
1 bh
1 bh
2,300.00
1,750.00
1,150.00
No
KODE
4 M293
5 M294
6 M295
7 M296
8 M297
9 M298
10 M299
11 M299a
12 M299b
13 M299c
BAHAN BANGUNAN
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin sekualitas Granit Tile ex. China 40 x 40 cm
Ubin sekualitas Granit Tile ex. China 60 x 60 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Kerang 60 x 60 cm
SATUAN
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
HARGA
2,900.00
1,800.00
1,200.00
4,100.00
2,900.00
15,200.00
40,000.00
41,000.00
35,100.00
70,400.00
No
KODE
BAHAN BANGUNAN
SATUAN
HARGA
14 M299d
15 M300
16 M301
17 M302
18 M303
19 M304
20 M305
21 M306
22 M307
23 M308
24 M309
25 M310
26 M311
27 M312
28 M313
29 M314
30 M315
31 M316
32 M316.a
33 M317
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
52,700.00
2,900.00
3,200.00
3,500.00
1,800.00
2,300.00
3,500.00
4,100.00
5,900.00
10,000.00
15,000.00
8,700.00
8,700.00
8,700.00
17,400.00
17,400.00
17,400.00
23,200.00
182,100.00
8,000.00
34 M318
1 bh
8,800.00
1 bh
3,200.00
1 bh
4,500.00
1 bh
1,500.00
35 M319
36 M320
37 M321
38 M322
1 bh
1,900.00
39 M323
40 M324
41 M325
42 M326
43 M327
44 M328
45 M329
46 M330
47 M331
48 M332
49 M333
50 M333.a
51 M333.b
52 M333.c
53 M333.d
54 M333.e
55 M333.f
56 M333.g
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
2,200.00
4,700.00
8,700.00
10,000.00
4,200.00
3,000.00
950.00
950.00
900.00
2,000.00
231,100.00
450,000.00
56,400.00
394,500.00
850.00
1,100.00
54,600.00
6,700.00
Perpipaan
Pipa PVC tipe AW 1/2" sekualitas Maspion
Pipa PVC tipe AW 3/4" sekualitas Maspion
1 m
1 m
2,000.00
2,000.00
XIV.
1 M334
2 M335
No
KODE
3 M336
4 M337
5 M338
6 M339
7 M340
8 M341
9 M342
10 M343
11 M344
12 M345
13 M346
14 M347
15 M348
BAHAN BANGUNAN
Pipa PVC tipe AW 1" sekualitas Maspion
Pipa PVC tipe AW 1.5" sekualaitas Maspion
Pipa PVC tipe AW 2" sekualitas Maspion
Pipa PVC tipe AW 2.5" sekualitas Maspion
Pipa PVC tipe AW 3 " sekualitas Maspion
Pipa PVC tipe AW 4 " sekualitas Maspion
Pipa PVC tipe AW 6 " sekualitas Maspion
Pipa PVC tipe AW 8 " sekualitas Maspion
Pipa PVC tipe D 1/2 " sekualitas Maspion
Pipa PVC tipe D 3/4 " sekualaitas Maspion
Pipa PVC tipe D 1" sekualitas Maspion
Pipa PVC tipe D 1.5 " sekualitas Maspion
Pipa PVC tipe D 2 " sekualitas Maspion
SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
HARGA
2,500.00
3,500.00
18,000.00
20,000.00
24,000.00
165,000.00
133,225.00
203,550.00
4,000.00
6,075.00
7,950.00
10,650.00
No
KODE
16 M349
17 M350
18 M351
19 M352
20 M353
21 M354
22 M355
23 M356
24 M357
25 M358
26 M359
27 M360
28 M361
29 M362
30 M363
31 M364
32 M365
33 M366
34 M367
35 M368
36 M369
37 M370
38 M371
39 M372
40 M373
41 M374
42 M375
43 M376
44 M377
45 M378
46 M379
47 M380
48 M381
49 M382
50 M383
51 M384
52 M385
53 M386
54 M387
55 M388
56 M389
57 M390
58 M391
59 M392
60 M393
61 M394
62 M395
63 M396
64 M397
65 M398
BAHAN BANGUNAN
Pipa PVC tipe D 2.5 " sekualitas Maspion
Pipa PVC tipe D 3 " sekualitas Maspion
Pipa PVC tipe D 4 " sekualitas Maspion
Pipa PVC tipe C 1/2 " sekualitas Maspion
Pipa PVC tipe C 3/4 " sekualitas Maspion
Pipa PVC tipe C 1" sekualitas Maspion
Pipa PVC tipe C 1.5 " sekualitas Maspion
Pipa PVC tipe C 2 " sekualitas Maspion
Pipa PVC tipe C 2.5 " sekualitas Maspion
Pipa PVC tipe C 3 " sekualitas Maspion
Pipa PVC tipe C 4 " sekualitas Maspion
Shock PVC 1/2 " sekualitas Masion
Shock PVC 3/4 " sekualitas Maspion
Shock PVC 1 " sekualitas Maspion
Shock PVC 1.5 " sekualitas Maspion
Shock PVC 2 " sekualitas Maspion
Shock PVC 2.5 " sekualitas Maspion
Shock PVC 3 " sekualitas Maspion
Shock PVC 4 " sekualitas Maspion
Knee PVC 1/2 " sekualitas Maspion
Knee PVC 3/4 " sekualitas Maspion
Knee PVC 1 " sekualitas Maspion
Knee PVC 1.5 " sekualitas Maspion
Knee PVC 2 " sekualitas Maspion
Knee PVC 2.5 " sekualitas Maspion
Knee PVC 3 " sekualitas Maspion
Knee PVC 4 " sekualitas Maspion
Pipa Galvanis 1/2" tebal 1.8 mm skw. Spindo
Pipa Galvanis 3/4" tebal 1.8 mm skw. Spindo
Pipa Galvanis 1 ", tebal 2 mm skw. Spindo
Pipa Galvanis 1.5 ", tebal 2 mm skw. Spindo
Pipa Galvanis 2 ", tebal 2.3 mm skw. Spindo
Pipa Galvanis 2.5 ", tebal 2.5 mm skw. Spindo
Pipa Galvanis 3" tebal 2.5 mm skw. Spindo
Pipa Galvanis 4" tebal 2.8 mm skw. Spindo
Shock Galvanis 1/2 " skw. Spindo
Shock Galvanis 3/4 " skw. Spindo
Shock Galvanis 1 " skw. Spindo
Shock Galvanis 1.5 " skw. Spindo
Shock Galvanis 2 " skw. Spindo
Shock Galvanis 2.5 " skw. Spindo
Shock Galvanis 3 " skw. Spindo
Shock Galvanis 4 " skw. Spindo
Knee Galvanis 1/2 " skw. Spindo
Knee Galvanis 3/4 " skw. Spindo
Knee Galvanis 1 " skw. Spindo
Knee Galvanis 1.5 " skw. Spindo
Knee Galvanis 2 " skw. Spindo
Knee Galvanis 2.5 " skw. Spindo
Knee Galvanis 3 " skw. Spindo
SATUAN
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
HARGA
18,925.00
27,475.00
3,000.00
4,575.00
5,975.00
8,000.00
10,775.00
13,675.00
16,175.00
20,575.00
1,600.00
2,400.00
2,700.00
5,800.00
8,100.00
11,600.00
13,100.00
15,900.00
2,100.00
2,600.00
3,800.00
7,600.00
11,400.00
13,100.00
14,600.00
18,300.00
35,950.00
46,525.00
180,000.00
133,150.00
185,975.00
310,625.00
4,100.00
4,900.00
7,700.00
13,600.00
21,600.00
38,200.00
57,300.00
76,400.00
4,700.00
6,400.00
9,000.00
17,900.00
28,000.00
53,500.00
82,700.00
No
KODE
66 M399
67 M400
68 M400.a
69 M400.b
70 M400.c
71 M400.d
72 M400.e
73 M400.f
74 M400.g
75 M400.h
BAHAN BANGUNAN
Knee Galvanis 4 " skw. Spindo
Pipa Screen PVC tipe AW 6 " skw. Maspion
Pipa PVC tipe AW 5 " skw. Maspion
Pipa Screen PVC tipe AW 5 " skw. Maspion
Pipa PVC moof 6 m S - 12,5 2" skw. Maspion
Pipa PVC moof 6 m S - 12,5 2,5" skw. Maspion
Pipa PVC moof 6 m S - 12,5 3" skw. Maspion
Pipa PVC moof 6 m S - 12,5 4" skw. Maspion
Pipa PVC moof 6 m S - 12,5 6" skw. Maspion
Pipa PVC moof 6 m S - 12,5 8" skw. Maspion
SATUAN
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
HARGA
101,800.00
162,825.00
105,050.00
134,150.00
30,600.00
42,625.00
63,500.00
93,175.00
201,300.00
326,025.00
No
KODE
XV.
1 M401
2 M402
3 M403
4 M404
5 M405
6 M406
7 M407
8 M408
9 M409
10 M410
11 M411
12 M412
13 M413
14 M414
15 M415
16 M415.a
17 M415.b
18 M416
19 M417
20 M418
21 M419
22 M420
23 M421
24 M422
25 M423
26 M424
27 M425
28 M426
29 M427
30 M428
31 M429
32 M430
33 M430.a
34 M430.b
35 M430.c
XVI.
1 M431
2 M432
3 M433
4 M434
5 M435
6 M436
XVII.
1 M437
2 M438
3 M438a
BAHAN BANGUNAN
SATUAN
1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 Ltr
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 bh
1 kg
1 ikat
4,600.00
20,400.00
13,000.00
36,500.00
32,000.00
19,400.00
12,500.00
160,500.00
25,500.00
25,500.00
48,800.00
80,960.00
48,800.00
48,800.00
80,960.00
28,000.00
80,960.00
48,800.00
132,500.00
154,600.00
34,600.00
77,500.00
13,300.00
30,200.00
34,600.00
60,300.00
27,400.00
2,300.00
8,700.00
4,700.00
23,900.00
35,200.00
24,100.00
38,800.00
4,100.00
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
725,000.00
1,289,900.00
2,016,100.00
3,376,100.00
198,200.00
795,000.00
Instalasi Listrik
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm
1 m
1 m
1 m
HARGA
4,400.00
7,200.00
13,300.00
No
KODE
4 M438b
5 M439
6 M440
7 M440.a
8 M441
9 M442
10 M443
11 M444
12 M445
13 M446
BAHAN BANGUNAN
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
SATUAN
1 m
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit
HARGA
8,000.00
27,000.00
33,000.00
37,800.00
650.00
800.00
1,050.00
7,500.00
10,600.00
67,700.00
No
KODE
14 M447
15 M448
16 M449
17 M450
18 M451
19 M452
20 M453
21 M454
22 M455
23 M456
24 M457
25 M458
26 M459
27 M460
28 M460.a
29 M460.b
30 M460.c
31 M460.d
XVIII.
1 M461
2 M462
3 M463
4 M464
5 M464.a
6 M465
7 M466
8 M467
9 M468
10 M469
11 M470
12 M471
13 M471a
14 M472
15 M473
16 M474
17 M475
18 M476
19 M477
20 M478
21 M479
22 M480
23 M481
24 M482
25 M482.a
26 M483
27 M483.a
28 M484
29 M485
30 M486
BAHAN BANGUNAN
SATUAN
HARGA
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh
98,400.00
135,200.00
63,300.00
93,900.00
27,600.00
31,800.00
35,900.00
38,600.00
44,000.00
18,100.00
30,000.00
3,710,000.00
4,699,900.00
110,600.00
77,500.00
438,600.00
45,300.00
2,100.00
Lain - Lain
Rumput Lamur
Rumput Gajah Mutiara
Semak Hias
Pohon Pelindung
Gebalan rumput Gajah mutiara
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri
Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih
1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr
1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr
10,000.00
11,000.00
12,700.00
193,300.00
11,000.00
19,100.00
154,600.00
32,000.00
57,800.00
67,500.00
13,500.00
2,710.00
90,250.00
2,500.00
55,250.00
4,100.00
64,200.00
83,600.00
6,900.00
6,200.00
32,000.00
64,200.00
3,000.00
4,500.00
4,500.00
17,500.00
30.00
No
KODE
31 M487
BAHAN BANGUNAN
Kuas 4"
SATUAN
1 bh
HARGA
13,300.00
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN