CCO Pekiringan September
CCO Pekiringan September
LOKASI
: Kab. Purbalingga
SUMBER DANA
: DAU APBD
PELAKSANA
: CV. BAWONO
NO KONTRAK
NO
I
1
1.2
III
1
2
3
4
3.1.(1a)
3.1.(3)
3.1.(4)
3.2.(1a)
VI
1
1
1
2
6.1 (2)(a)
6.1 (2)(c)
SNI 6749-2008(S)
6.3 (3a)
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
URAIAN
ANALISA
7.1(5)a
7.1(6)
7.1(7)a
7.1(9)
7.1(10)
7.3(1)
7.3(3)
7.4.(1)b
7.4.(2)b
Taksir
7.9.(1)
7.10.(1)
7.11.(1)a
7.12.(3)
SATUAN
DIVISI 1. UMUM
Mobilisasi
LS
m3
m3
m3
m3
Liter
liter
m2
Ton
DIVISI 7. STRUKTUR
Beton mutu sedang fc' = 30 Mpa lantai jembatan
Beton mutu sedang fc' = 25 Mpa (Pilar, Abutmen dan pondasi jembatan)
Beton mutu sedang fc' = 20 Mpa
Beton Siklop fc' = 15 Mpa
Beton mutu rendah fc' = 10 Mpa (Lantai Kerja)
Baja Tulangan BJ 24 Polos
Baja Tulangan BJ 32 Ulir
Penyediaan baja struktur BJ 37 (titik leleh 240 MPA)
Pemasangan baja struktur BJ 37 (titik leleh 240 MPA)
Pasang Mur/Baut
Pasangan batu
Pasangan batu Kosong yang Diisi Adukan
Expansion Joint Tipe Asphaltic Plug Fixed
Perletakan Elastomerik Sintetis Ukuran 350 mm x 300 mm x 36 mm
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
buah
m3
m3
m3
buah
15
7.13.(1)
16
Taksir
17
7.15.(2)
18
7.15.(6)
19
PTT-38-2000-C
20 SNI BT 91-0014-2007
m1
buah
m3
m
m2
cm1
TO
RENCANA PELAKSANAAN (%)
KOMULATIF RENCANA PELAKSANAAN (%)
REALISASI PELAKSANAAN (%)
KOMULATIF REALISASI PELAKSANAAN (%)
Disetujui,
Pejabat Pelaksana Teknis Kegiatan
PENGGANTIAN JEMBATAN PEKIRINGAN GRANTUNG
GUNAWAN WIBISONO, ST
NIP. 19681214 200312 1 003
PENGGAN
TIME SHCEDULE
(Jadwal Pelaksanaan Kegiatan)
MEI
VOLUME
( Rp. )
JUNI
TOTAL
HARGA
NILAI
BOBOT
II
III
IV
VI
( Rp. )
25-28
29-04
05-11
12-18
19-25
26-02
11,782,000.00
1.000
11,782,000.00
0.867
21,477.12
25,930.11
28,489.08
-
158.650
104.000
44.398
-
3,407,345.09
2,696,731.44
1,264,858.17
-
0.251
0.199
0.093
0.000
66,866.88
-
317.940
-
21,259,655.83
-
0.000
0.000
1.565
0.000
1,420,244.19
1,368,730.82
1,074,154.10
638,677.61
597,297.25
14,880.25
15,430.25
14,982.56
2,818.08
5,000.00
641,491.57
604,495.84
1,920,000.00
212,851.11
19.440
205.847
3.403
17.604
5.200
3,589.611
23,824.662
6,750.071
6,750.071
184.000
440.960
59.250
12.000
16.000
27,609,547.05
281,749,133.10
3,655,319.55
11,243,280.65
3,105,945.70
53,414,302.63
367,620,493.52
101,133,339.10
19,022,239.21
920,000.00
282,872,122.71
35,816,378.52
23,040,000.00
3,405,617.76
2.032
20.740
0.269
0.828
0.229
3.932
27.061
7.444
1.400
0.068
20.822
2.636
1.696
0.251
0.079
0.079
0.079
0.079
0.079
0.079
Li
b
u
r
H
a
ri
HARGA
SATUAN
255,479.58
1,000,000.00
551,023.35
122,646.86
56,082.63
2,883.86
96.000
2.000
19.440
96.000
229.096
14,432.000
JUMLAH
PPN 10 %
TOTAL BIAYA
24,526,039.68
2,000,000.00
10,711,893.92
11,774,098.56
12,848,325.61
41,619,867.52
1.805
0.147
0.789
0.867
0.946
3.064
1,358,498,535.33
135,849,853.53
1,494,348,000.00
100.00
0.263
0.079
0.079
Diperiksa,
Staf Teknis DPUK PURBALINGGA
ENGGANTIAN JEMBATAN PEKIRINGAN GRANTUNG
SUMARI
#REF!
0.342
0.421
0.263
0.342
0.762
0.263
0.289
0.289
0.289
0.631
1.393
0.368
1.761
0.368
2.128
Diperiksa,
Konsultan Pengawas
CV. PRASIDHA CONSULTANT
WIBOWO JANUDARDONO, ST
Site Engineer
iatan)
JULI
VII
VIII
IX
XI
03-09
10-16
17-23
24-30
31-06
0.079
0.079
0.099
0.099
0.047
0.079
0.079
BULAN
AGUSTUS
MINGGU
XII
XIII
XIV
TANGGAL
07-13 14-20 21-27
SEPTEMBER
XV
XVI
XVII
XVIII
XIX
28-03
04-10
11-17
18-24
25-01
0.079
0.050
0.047
2.592
0.135
2.592
2.592
0.000
0.000
0.000
0.000
2.592
2.592
2.592
2.592
0.135
0.229
1.311
1.311
3.383
3.383
3.383
3.383
ri
R
a
y
a
Id
ul
Fi
tr
i
3.383
0.879
0.879
3.383
3.383
3.383
2.481
0.467
0.023
5.206
0.879
0.251
0.903
0.000
2.128
1.057
3.185
1.332
4.517
2.315
6.832
3.596
10.428
3.596
14.024
5.975
19.999
5.975
25.974
6.226
32.200
1.021
1.021
1.021
6.996
39.196
6.996
46.193
7.899
54.092
0.903
13.032
67.124
Purbalingga,
Diperiksa,
Konsultan Pengawas
CV. PRASIDHA CONSULTANT
Mei 20
Dibuat,
Kontraktor Pelaksan
CV. BAWONO
FARKHAN WIDODO, ST
Direktur
NOVEMBER
XX
XXI
XXII
XXIII
XXIV
XXV
XXVI
02-08
09-15
16-22
23-29
30-05
06-12
13-20
Keterangan
OKTOBER
100
0.050
0.050
0.050
0.050
1.565
1.016
1.016
0.276
0.276
2.592
0.276
50
1.311
2.481
0.467
0.023
5.206
2.481
0.467
0.023
5.206
5.206
0.848
0.848
0.147
0.473
0.473
0
12.130
79.254
Purbalingga,
9.519
88.772
Mei 2016
Kontraktor Pelaksana
CV. BAWONO
6.548
95.320
0.326
95.646
1.321
96.967
1.468
98.435
1.565
100.00
Dibuat,
Kontraktor Pelaksana
CV. BAWONO
#REF!
KEGIATAN
LOKASI
SUMBER DANA
PELAKSANA
NO KONTRAK
NO
1.2
III
1
2
3
3.1.(1a)
3.1.(3)
3.1.(4)
VI
1
VII
URAIAN
ANALISA
I
1
:
:
:
:
:
SNI 6749-2008(S)
DIVISI 1. UMUM
Mobilisasi
DIVISI 3. PEKERJAAN TANAH
Galian Biasa
Galian Struktur dengan kedalaman 0-2 meter
Galian struktur dengan kedalaman 2-4 meter
DIVISI 6. PERKERASAN ASPAL
LATASIR KELAS B ( 1,5 cm )
DIVISI 7. STRUKTUR
1
7.1(5)a
Beton mutu sedang fc' = 30 Mpa lantai jembatan
2
7.1(6)
Beton mutu sedang fc' = 25 Mpa (Pilar, Abutmen dan pondasi jembatan)
3
7.1(7)a
Beton mutu sedang fc' = 20 Mpa
4
7.1(9)
Beton Siklop fc' = 15 Mpa
5
7.1(10)
Beton mutu rendah fc' = 10 Mpa (Lantai Kerja)
6
7.3(1)
Baja Tulangan BJ 24 Polos
7
7.3(3)
Baja Tulangan BJ 32 Ulir
8
7.4.(1)b
Penyediaan baja struktur BJ 37 (titik leleh 240 MPA)
9
7.4.(2)b
Pemasangan baja struktur BJ 37 (titik leleh 240 MPA)
10
Taksir
Pasang Mur/Baut
11
7.9.(1)
Pasangan batu
12
7.10.(1)
Pasangan batu Kosong yang Diisi Adukan
13
7.11.(1)a
Expansion Joint Tipe Asphaltic Plug Fixed
14
7.12.(3)
Perletakan Elastomerik Sintetis Ukuran 350 mm x 300 mm x 36 mm
15
7.13.(1)
Sandaran / Railling (Pipa Galvanis Dia 3" t = 2 mm)
16
Taksir
Papan Nama Jembatan (Granit Hitam Ukuran 40 x 60 cm Tulisan Grafir)
17
7.15.(2)
Pembongkaran Beton
18
7.15.(6)
Pembongkaran Balok Baja (Steel Stringers)
19
PTT-38-2000-C
Pengecatan
20 SNI BT 91-0014-2007 Pengelasan dengan Las Listrik
Disetujui,
Pejabat Pelaksana Teknis Kegiatan
PENGGANTIAN JEMBATAN PEKIRINGAN GRANTUNG
GUNAWAN WIBISONO, ST
NIP. 19681214 200312 1 003
TIME SHCED
(Jadwal Pelaksanaan
MEI
SATUAN
HARGA
SATUAN
VOLUME
( Rp. )
NILAI
BOBOT
II
III
( Rp. )
25-28
29-04
05-11
LS
11,782,000.00
1.000
11,782,000.00
0.867
m3
m3
m3
21,477.12
25,930.11
28,489.08
202.966
117.446
35.100
4,359,125.14
3,045,387.70
999,966.71
0.321
0.224
0.074
m2
66,866.88
261.650
17,495,719.15
1.288
1,420,244.19
1,368,730.82
1,074,154.10
638,677.61
597,297.25
14,880.25
15,430.25
14,982.56
2,818.08
5,000.00
641,491.57
604,495.84
1,920,000.00
212,851.11
255,479.58
1,000,000.00
551,023.35
122,646.86
56,082.63
2,883.86
19.440
194.016
3.403
29.802
5.200
2,041.754
23,562.389
6,453.285
6,453.285
184.000
520.540
46.750
12.000
16.000
96.000
2.000
19.440
96.000
229.096
14,432.000
27,609,547.05
265,555,678.77
3,655,319.55
19,033,870.13
3,105,945.70
30,381,809.96
363,573,552.87
96,686,729.71
18,185,873.39
920,000.00
333,922,021.85
28,260,180.52
23,040,000.00
3,405,617.76
24,526,039.68
2,000,000.00
10,711,893.92
11,774,098.56
12,848,325.61
41,619,867.52
2.032
19.548
0.269
1.401
0.229
2.236
26.763
7.117
1.339
0.068
24.580
2.080
1.696
0.251
1.805
0.147
0.789
0.867
0.946
3.064
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
buah
m3
m3
m3
buah
m1
buah
m3
m
m2
cm1
JUNI
TOTAL
HARGA
0.079
0.079
0.079
0.263
0.263
JUMLAH
PPN 10 %
TOTAL BIAYA
1,358,498,571.26
135,849,857.13
1,494,348,000.00
100.00
0.079
0.079
0.342
0.421
0.342
0.762
Diperiksa,
Staf Teknis DPUK PURBALINGGA
PENGGANTIAN JEMBATAN PEKIRINGAN GRANTUNG
Diperiksa,
Konsultan Pengawas
CV. PRASIDHA CONSULTANT
SUMARI
#REF!
WIBOWO JANUDARDONO, ST
Site Engineer
TIME SHCEDULE
JUNI
JULI
IV
VI
VII
VIII
IX
XI
12-18
19-25
26-02
03-09
10-16
17-23
24-30
31-06
0.079
0.079
0.079
0.079
0.079
0.079
0.112
0.112
0.037
0.037
BULAN
AGUSTUS
MINGGU
XII
XIII
XIV
TANGGAL
07-13 14-20 21-27
0.079
0.079
0.135
0.135
3.345
3.345
2.443
2.443
3.345
3.345
0.229
0.745
0.693
0.263
0.289
0.289
0.289
0.693
0.693
0.631
1.393
0.368
1.761
0.368
2.128
0.000
2.128
0.884
3.013
1.150
4.162
1.555
5.717
3.559
9.276
Diperiksa,
ultan Pengawas
SIDHA CONSULTANT
Diperiksa,
Konsultan Pengawas
CV. PRASIDHA CONSULTANT
JANUDARDONO, ST
Site Engineer
3.559
12.834
5.789
18.623
5.789
24.412
LAN
US
GGU
SEPTEMBER
OKTOBER
NOVEMBER
XV
XVI
XVII
XVIII
XIX
XX
XXI
XXII
XXIII
XXIV
XXV
28-03
04-10
11-17
18-24
25-01
02-08
09-15
16-22
23-29
30-05
06-12
GGAL
0.064
2.443
3.345
2.443
3.345
2.443
3.345
2.443
2.443
0.064
0.064
0.064
1.016
1.016
0.467
0.467
2.372
0.446
0.023
6.145
6.145
0.064
2.443
0.745
0.745
2.372
0.446
0.023
6.145
2.372
0.446
0.023
6.145
0.467
3.345
0.848
0.848
0.251
0.903
0.903
0.147
0.473
1.021
1.021
1.021
0.473
6.040
30.452
6.810
37.262
6.810
44.072
7.713
51.784
Purbalingga,
13.142
64.926
12.239
77.166
10.534
87.699
September 2016
7.692
95.392
0.531
95.923
1.321
97.244
1.468
98.712
Dibuat,
Kontraktor Pelaksana
CV. BAWONO
Dibuat,
Kontraktor Pelaksana
CV. BAWONO
#REF!
XXVI
Keterangan
NOVEMBER
13-20
100
1.288
50
1
2
3
4
5
6
17
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
3.06
1.288
100.00
ptember 2016
32
16
DAFTA
KEGIATAN
LOKASI
SUMBER DANA
PELAKSANA
NO KONTRAK
No
:
:
:
:
:
No Mata Pembayaran
I
1
1.2
1
2
3
3.1.(1a)
3.1.(3)
3.1.(4)
SNI 6749-2008(S)
III
VI
VII
1
7.1(5)a
2
7.1(6)
3
7.1(7)a
4
7.1(9)
5
7.1(10)
6
7.3(1)
7
7.3(3)
8
7.4.(1)b
9
7.4.(2)b
10
Taksir
11
7.9.(1)
12
7.10.(1)
13
7.11.(1)a
14
7.12.(3)
15
7.13.(1)
16
Taksir
17
7.15.(2)
18
7.15.(6)
19
PTT-38-2000-C
20 SNI BT 91-0014-2007
U r a i an
DIVISI 1 UMUM
Mobilisasi
Satuan
Ls
m3
m3
m3
m2
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
buah
m3
m3
m3
buah
m1
buah
m3
m
m2
cm1
T
D
Konsultan Perencana
Panitia Penelit
1. Cahyo Rudiy
2. Yoga Utama,
Wisnu Raharjo, ST
Site Engineer
3. Nur Nuzulian
KONTRAK AWAL
Harga
Satuan
Volume
Pekerjaan
( Rp. )
Total
Harga
( Rp. )
ADENDUM 01
Nilai
Bobot
%
Volume
Pekerjaan
Total
Harga
( Rp. )
Nilai
Bobot
%
11,782,000.00
1.000
11,782,000.00
0.867
1.000
11,782,000.00
0.867
21,477.12
25,930.11
28,489.08
158.650
104.000
44.398
3,407,345.09
2,696,731.44
1,264,858.17
0.251
0.199
0.093
202.966
117.446
35.100
4,359,125.14
3,045,387.70
999,966.71
0.321
0.224
0.074
66,866.88
317.940
21,259,655.83
1.565
261.650
17,495,719.15
1.288
1,420,244.19
1,368,730.82
1,074,154.10
638,677.61
597,297.25
14,880.25
15,430.25
14,982.56
2,818.08
5,000.00
641,491.57
604,495.84
1,920,000.00
212,851.11
255,479.58
1,000,000.00
551,023.35
122,646.86
56,082.63
2,883.86
19.440
205.847
3.403
17.604
5.200
3,589.611
23,824.662
6,750.071
6,750.071
184.000
440.960
59.250
12.000
16.000
96.000
2.000
19.440
96.000
229.096
14,432.000
27,609,547.05
281,749,133.10
3,655,319.55
11,243,280.65
3,105,945.70
53,414,302.63
367,620,493.52
101,133,339.10
19,022,239.21
920,000.00
282,872,122.71
35,816,378.52
23,040,000.00
3,405,617.76
24,526,039.68
2,000,000.00
10,711,893.92
11,774,098.56
12,848,325.61
41,619,867.52
2.032
20.740
0.269
0.828
0.229
3.932
27.061
7.444
1.400
0.068
20.822
2.636
1.696
0.251
1.805
0.147
0.789
0.867
0.946
3.064
19.440
194.016
3.403
29.802
5.200
2,041.754
23,562.389
6,453.285
6,453.285
184.000
520.540
46.750
12.000
16.000
96.000
2.000
19.440
96.000
229.096
14,432.000
27,609,547.05
265,555,678.77
3,655,319.55
19,033,870.13
3,105,945.70
30,381,809.96
363,573,552.87
96,686,729.71
18,185,873.39
920,000.00
333,922,021.85
28,260,180.52
23,040,000.00
3,405,617.76
24,526,039.68
2,000,000.00
10,711,893.92
11,774,098.56
12,848,325.61
41,619,867.52
2.032
19.548
0.269
1.401
0.229
2.236
26.763
7.117
1.339
0.068
24.580
2.080
1.696
0.251
1.805
0.147
0.789
0.867
0.946
3.064
1,358,498,535.33
135,849,853.53
1,494,348,388.86
1,494,348,000.00
100.00
1,358,498,571.26
135,849,857.13
1,494,348,428.38
1,494,348,000.00
100.000
JUMLAH
PPN 10 %
TOTAL BIAYA
DIBULATKAN
Direksi Kegiatan
1. Cahyo Rudiyanto, ST
: ........................................
1. Gunawan Wibisono, ST
: ....................
2. Yoga Utama, ST
: ......................................
2. Sumari
: ...................
3. Wibowo Janudardono, ST
: ...................
44.32
13.45
951,780.05
348,656.26
-
PEKERJAAN KURANG
Volume
Total
Pekerjaan
Harga
( Rp. )
###
Nilai
Bobot
%
KET.
Tetap
0.070
0.026
-
9.30
264,891.47
Tambah
Tambah
0.019 Kurang
56.29
3,763,936.68
0.277 Tambah
11.83
1,547.86
262.27
296.79
296.79
12.50
-
16,193,454.33
23,032,492.68
4,046,940.65
4,446,609.39
836,365.81
7,556,198.00
-
Tambah
1.192 Kurang
Tetap
Tetap
Tetap
1.695 Kurang
0.298
Tetap
0.327 Kurang
0.062 Kurang
Kurang
Tambah
0.556 Kurang
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Kurang
.
12.20
79.58
-
7,790,589.49
51,049,899.14
-
0.573
3.758
-
60,140,924.936
6,014,092.49
66,155,017.43
66,155,000.00
35.93
4.427
Purbalingga,
60,140,889.005
6,014,088.90
66,154,977.91
66,154,000.00
September 2016
Kontraktor Pelaksana
4.427